WO2022059252A1 - バリューチェーン計画連携方法、バリューチェーン計画連携装置およびバリューチェーン計画連携システム - Google Patents

バリューチェーン計画連携方法、バリューチェーン計画連携装置およびバリューチェーン計画連携システム Download PDF

Info

Publication number
WO2022059252A1
WO2022059252A1 PCT/JP2021/017735 JP2021017735W WO2022059252A1 WO 2022059252 A1 WO2022059252 A1 WO 2022059252A1 JP 2021017735 W JP2021017735 W JP 2021017735W WO 2022059252 A1 WO2022059252 A1 WO 2022059252A1
Authority
WO
WIPO (PCT)
Prior art keywords
value chain
software
plan
information
application
Prior art date
Application number
PCT/JP2021/017735
Other languages
English (en)
French (fr)
Inventor
敦規 木内
多津 野本
Original Assignee
株式会社日立製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社日立製作所 filed Critical 株式会社日立製作所
Priority to US17/925,140 priority Critical patent/US20230186185A1/en
Publication of WO2022059252A1 publication Critical patent/WO2022059252A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management

Definitions

  • the present invention relates to a value chain plan linkage method, a value chain plan linkage device, and a value chain plan linkage system.
  • the present invention claims the priority of application number 2020-156429 of the Japanese patent filed on September 17, 2020, and for designated countries where incorporation by reference to the literature is permitted, the content described in the application is Incorporated into this application by reference.
  • Patent Document 1 discloses to provide a robust optimization device capable of efficiently obtaining a design value that gives a Pareto solution with small variation.
  • Patent Document 1 in a single application software, when a plurality of application software related to input / output are operated in cooperation with each other so that the output of one application software is used as an input value by the other application software. Although it is possible to calculate multiple solutions, it is difficult to find solutions that take into account the optimization of the output of the application software on the user side.
  • An object of the present invention is to provide a technique for calculating planning parameters that can obtain optimum results among a plurality of software that operate in cooperation with each other.
  • the present application includes a plurality of means for solving at least a part of the above problems, and examples thereof are as follows.
  • One aspect of the present invention is a value chain plan linkage method using a value chain plan linkage device that configures and executes a plurality of software in combination according to business, and at least one of the plurality of software is the plurality of software.
  • Output parameters obtained from any other software included in the software are used as input parameters, and the value chain planning linkage device is a separate solution request step for calculating a plurality of the output parameters in each of the plurality of software. It is characterized by carrying out a display step of displaying the output parameter as an overall plan, which can obtain the best important performance evaluation index value in the entire value chain according to the combination of the input / output parameters of the plurality of software. do.
  • the value chain refers to the chain of values given at each stage in the product supply process, from procurement of raw materials and parts to manufacturing, inventory control, sales, and delivery.
  • delivery and inventory management operations although it is not a process that directly adds value to goods, it is desirable to minimize those costs because they directly reduce the profits of the company. Therefore, in order to optimally operate the value chain, it is necessary to pursue both maximum profit and minimum cost.
  • KPIs Key Performance Indicators
  • application software application
  • application software for making small schedules
  • the best plan is to make a plan to reduce the number of equipment changes as much as possible. In other words, the optimal plan is to manufacture the same product at the same time.
  • the KPI of the delivery department that uses the software minimizes the arrangement cost, so it is best to load multiple products required by the demand area on the same truck. It becomes a plan.
  • the truck will wait until the time when the other products are manufactured. It will have to be done. This leads to inefficiency.
  • a plurality of application software related to input / output are linked so that the output of one application software is used as an input value by the other application software.
  • the value chain planning system it is possible to consistently formulate feasible and efficient plans for the entire value chain, so it can be expected to reduce shelving stock and improve production and sales efficiency.
  • FIG. 1 is a diagram showing a configuration example of a value chain plan cooperation system according to the first embodiment.
  • the value chain plan cooperation system 1 is a value chain plan cooperation device 100 that configures and executes a combination of a plurality of software according to business, and a user terminal device that is communicably connected to the value chain plan cooperation device 100 via a network 50. Includes 200 and.
  • the network 50 includes, for example, a LAN (Local Area Network), a WAN (Wide Area Network), a VPN (Virtual Private Network), a communication network using a part or all of general public lines such as the Internet, a mobile phone communication network, and the like. Any of these or a complex network of these.
  • the network 50 may be a wireless communication network such as Wi-Fi (registered trademark) or 5G (Generation).
  • the value chain planning cooperation device 100 includes a storage unit 110, a processing unit 120, an input / output unit 130, and a communication unit 140.
  • a storage unit 110 a storage unit 110
  • a processing unit 120 a processing unit 120
  • an input / output unit 130 a communication unit 140.
  • the software constituting the value chain executed by the value chain planning linkage device 100 at least one of the plurality of software uses an output parameter obtained from any other software included in the plurality of software as an input parameter. It is to be used.
  • the storage unit 110 includes the application master information 111, the operation variable information 112, the application chain information 113, the execution history information 114, the job chain information 115, the optimization result information 116, and the optimization result detailed information 117. , Scenario information 118, and.
  • FIG. 2 is a diagram showing an example of the data structure of the application master information.
  • the application ID 111a the application name 111b
  • the parameter ID 111c the KPI 111d
  • the number of solutions 111e are associated with each other.
  • the application ID 111a and the application name 111b are information that specifies an entry point for demonstrating a series of functions of software operation in the value chain plan cooperation system 1.
  • the application ID 111a is information for specifying a processing unit of a predetermined software operation, and is an identifier assigned without duplication.
  • the application name 111b is a name given to a processing unit specified by a certain application ID.
  • the parameter ID 111c is information that specifies a variable or a group of variables to be read by the software specified by the application ID 111a.
  • the KPI111d is information for specifying a variable to be emphasized (used for output evaluation) in the software specified by the application ID111a.
  • the solution generation number 111e is information that specifies an upper limit of the number of obtained robust solutions in the software specified by the application ID 111a. In the embodiment of the present invention, the robust solution can obtain a certain amount of KPI by manipulating the parameters of the software for one input so that deadlock or the like does not occur in the subsequent software. Multiple semi-optimal solutions.
  • FIG. 3 is a diagram showing an example of a data structure of instrumental variable information.
  • the operation variable is a variable that can be operated from outside the software among the input information used by the software, that is, an independent variable defined by a set value or the like, and a variable that can change the output information of the software. ..
  • the parameter ID 112a, the input file 112b, the column name 112c, the number of rows 112d, the upper limit 112e, and the lower limit 112f are associated with each other.
  • the parameter ID 112a is information for specifying a variable or a group of variables to be read by the software.
  • the input file 112b is information for specifying a file in which the variable group specified by the parameter ID 112a is stored.
  • the column name 112c is information for specifying the name of the variable specified by the parameter ID 112a in the file specified by the input file 112b.
  • the number of lines 112d is information for specifying the position (number of lines) in the file in which the variable specified by the column name 112c is stored.
  • the upper limit 112e and the lower limit 112f are information for determining the upper limit and the lower limit of possible values of the variable specified by the parameter ID 112a, respectively.
  • FIG. 4 is a diagram showing an example of the data structure of the application chain information.
  • the immediately preceding application ID 113a and the application ID 113b are associated with each other.
  • the immediately preceding application ID 113a is information that identifies the software that operates in advance from the two software that are in a relationship of operating continuously.
  • the application ID 113b is information that identifies the software that operates following the software that operates in advance, out of the two software that are in a relationship of operating continuously. That is, in the application chain information 113, the preceding software specified by the immediately preceding application ID 113a and the succeeding software specified by the application ID 113b are associated with each other according to their execution order.
  • FIG. 5 is a diagram showing an example of the data structure of the execution history information.
  • the application ID 114a the solution No. 114b
  • the parameter ID 114c the parameter value 114d
  • the KPI 114e the KPI 114e
  • the solution candidate flag 114f the solution candidate flag 114f
  • the application ID 114a is information that identifies the executed software.
  • the solution No. 114b is information for specifying the solution which is the result output by the software specified in the application ID 114a.
  • the parameter ID 114c is information for specifying a variable used for input by the software specified in the application ID 114a.
  • the parameter value 114d is information for specifying the value of the variable specified in the parameter ID 114c.
  • KPI114e is information for specifying the value of KPI as a result output by the software specified by the application ID 114a.
  • the solution candidate flag 114f indicates "No” if it is infeasible and “Yes” if it is executable, depending on whether or not the software specified in the application ID 114a becomes infeasible. Information.
  • FIG. 6 is a diagram showing an example of a data structure of job chain information.
  • the immediately preceding application ID 115a the input solution No. 115b, the application ID 115c, the solution No. 115d, and the solution result 115e are associated with each other.
  • the immediately preceding application ID 115a is information for specifying the software executed in advance among the two software executed consecutively.
  • the input solution No. 115b is information for specifying the solution which is the result output by the software specified by the immediately preceding application ID 115a. This solution can be said to be an input solution because it is used as an input for the software executed subsequently among the two software executed consecutively.
  • the application ID 115c is information that identifies software that has been continuously executed following the software specified in the immediately preceding application ID 115a.
  • the solution No. 115d is information for specifying the solution which is the result output by the software specified in the application ID 115c.
  • the solution result 115e is information indicating "Fairure” if it is infeasible and "Success” if it is executable, depending on whether or not the software specified in the application ID 115c becomes infeasible. Is.
  • FIG. 7 is a diagram showing an example of the data structure of the optimization result information.
  • the optimization result information 116 the scenario ID 116a and the optimum KPI116b are associated with each other.
  • Scenario ID 116a is information given to a planning unit in the value chain to distinguish one plan from another.
  • the optimum KPI116b is a planned optimal KPI value specified in the scenario ID 116a.
  • FIG. 8 is a diagram showing an example of a data structure of optimization result detailed information.
  • the optimization result detailed information 117 the scenario ID 117a, the application ID 117b, the solution No. 117c, the parameter ID 117d, and the parameter value 117e are associated with each other.
  • Scenario ID 117a is information given to a planning unit in the value chain to distinguish one plan from another.
  • the application ID 117b is information that identifies the planned and executed software specified in the scenario ID 117a.
  • the solution No. 117c is information for specifying the solution which is the result output in the application ID 117b.
  • the parameter ID 117d is information for specifying the parameter included in the solution specified in the solution No. 117c.
  • the parameter value 117e is information for specifying the value of the parameter specified in the parameter ID 117d.
  • FIG. 9 is a diagram showing an example of a data structure of scenario information.
  • the scenario information 118 the scenario ID 118a and the scenario name 118b are associated with each other.
  • Scenario ID 118a is information given to the planning unit of the value chain to distinguish one plan from another.
  • the scenario name 118b is information for specifying the name of the plan specified in the scenario ID 118a.
  • each piece of information in the storage unit 110 can be obtained from a system such as an ERP (Enterprise Resource Planning), a database accumulating data equivalent thereto, a NAS (Network Attached Storage) device, or the like, when necessary. It may be acquired via the communication unit 140.
  • each information of the storage unit 110 includes output parameters, by overwriting and saving the output parameters, it can be utilized as information used in another resource planning system different from the value chain planning cooperation device 100. ..
  • the storage unit 110 is stored in a NAS device or the like, by selecting and overwriting the input / output parameters for obtaining the best KPI value, another resource plan different from the value chain plan cooperation device can be planned. Can be sent to the system.
  • the processing unit 120 includes a setting information reading unit 121, an application execution unit 122, another solution request unit 123, a plan combination unit 124, a plan evaluation unit 125, and a display control unit 126.
  • the setting information reading unit 121 loads the data required for processing from the storage unit 110.
  • the application execution unit 122 executes a plurality of software in a predetermined order and stores important performance evaluation index values together with output parameters in the storage unit 110.
  • the plurality of types of software executed by the application execution unit 122 include various types of software, such as software that outputs an inventory plan that constitutes a value chain, software that outputs a production plan, and the like.
  • various software such as software for outputting a transportation plan is included.
  • the alternative solution request unit 123 sets an output parameter that is a robust optimum solution in the software immediately before outputting the information used as the input parameter of the software. calculate.
  • the planning combination unit 124 extracts the processing result obtained by obtaining the feasible solution from the processing results of the software executed by the application execution unit 122.
  • the plan evaluation unit 125 aggregates important performance evaluation index values according to the combination of input / output parameters of a plurality of software.
  • the display control unit 126 generates screen information to be displayed including the quality of the aggregated result, and displays it on a display unit such as a display device. Alternatively, the screen information is transmitted to the user terminal device 200 and displayed on the display device of the user terminal device 200.
  • the input / output unit 130 displays, for example, screen information including information to be output as a result of performing a predetermined process, and receives input information input by a keyboard, a mouse, a touch panel, or the like.
  • the communication unit 140 transmits / receives information to / from other devices including the user terminal device 200 via the network 50.
  • the user terminal device 200 is an information processing device that can be operated by a value chain planner.
  • the user terminal device 200 is an information processing device such as a general personal computer including a storage unit for holding data, an input / output unit for controlling input / output, and a processing unit for performing various processes.
  • FIG. 10 is a diagram showing an example of the hardware configuration of the value chain planning cooperation device.
  • the value chain planning linkage device 100 includes a central processing unit (CPU) 301, a memory 302, an external storage device 303 such as a hard disk device (Hard Disk Drive: HDD), and a CD (Computer Disk) or DVD (A reading device 305 that reads information from a portable storage medium 304 such as a Digital Versail Disk), an input device 306 such as a keyboard, mouse, or bar code reader, an output device 307 such as a display, and a network such as the Internet.
  • This can be realized by a general computer 300 including a communication device 308 that communicates with another computer via 50, or a network system including a plurality of the computers 300.
  • the reading device 305 may be capable of not only reading but also writing to the portable storage medium 304.
  • the setting information reading unit 121, the application execution unit 122, the alternative solution request unit 123, the plan combination unit 124, the plan evaluation unit 125, and the display control unit 126 included in the processing unit 120 are external storage devices. It can be realized by loading a predetermined program stored in 303 into the memory 302 and executing it in the CPU 301, and the input / output unit 130 can be realized by the CPU 301 using the input device 306 and the output device 307.
  • the communication unit 140 can be realized by the CPU 301 using the communication device 308, and the storage unit 110 can be realized by the CPU 301 using the memory 302 or the external storage device 303.
  • a predetermined program that realizes the processing unit 120 is downloaded from the portable storage medium 304 via the reading device 305 or from the network 50 via the communication device 308 to the external storage device 303, and then the memory 302. It may be loaded onto and executed by the CPU 301. Further, it may be directly loaded onto the memory 302 from the portable storage medium 304 via the reading device 305 or from the network via the communication device 308 and executed by the CPU 301.
  • the user terminal device 200 can also be realized by a general computer 300 as shown in FIG.
  • FIG. 11 is a diagram showing an example of the flow of the value chain plan linkage process.
  • the value chain plan linkage process is started when the value chain plan linkage device 100 receives a request after activation, or according to a predetermined cycle (for example, every day).
  • the setting information reading unit 121 reads the master data (step S001). Specifically, the setting information reading unit 121 reads the application master information 111, the operation variable information 112, the application chain information 113, and the scenario information 118. In each subsequent process, execution is controlled for each scenario ID in the scenario information 118.
  • the application execution unit 122 determines whether or not the last application has ended in the application chain on the scenario (step S002). Specifically, the application execution unit 122 refers to the application chain information 113, and determines whether or not the immediately preceding application ID 113a includes the application ID of the software for which processing has been completed. If it is not included, the application execution unit 122 determines that the last application has ended (“Yes” in step S002), and proceeds to control to step S011. If it is included, the application execution unit 122 determines that the last application has not ended (“No” in step S002) because the succeeding software still exists, and the application execution unit 122 determines that the application execution unit 122 has not ended. Advances control to step S003.
  • the application execution unit 122 executes the current application for each execution result of the immediately preceding application (step S003). Specifically, the application chain information 113 is referred to, the last executed software is searched from the immediately preceding application ID 113a, and the corresponding software is executed by referring to the associated application ID 113b (the software to be executed is referred to as the current application). do). Regarding the execution, the application execution unit 122 executes the software for each result when there are a plurality of sets of the results output from the immediately preceding application. At the time of initial execution, the application execution unit 122 executes the software from the beginning of the application chain by executing the software that does not exist in the application ID 113b and has the only entry in the immediately preceding application ID 113a.
  • the execution result of the software corresponding to the application ID 113b is stored as the solution No. used as the input value in the execution history information 114 by the application execution unit 122, the parameter ID and value, and the KPI obtained as a result of the execution.
  • the application execution unit 122 also creates and stores the job chain information 115.
  • the application execution unit 122 determines whether or not there is an infeasible solution (step S004). Specifically, the application execution unit 122 identifies the result determined to be unexecutable in the processing result of the executed current application. When there is no infeasible solution and all the solutions are executable (in the case of "Yes" in step S004), the application execution unit 122 advances the control to step S009.
  • step S004 If there is an infeasible solution (in the case of "No” in step S004), the application execution unit 122 sets "No” to the solution candidate flag 114f of the software if it is infeasible. Store (step S005). Further, the application execution unit 122 changes the solution result 115e of the job chain information 115 to "Fairure" when it cannot be executed.
  • the separate solution request unit 123 refers to the immediately preceding application ID 115a of the record in which the solution result 115e of the job chain information 115 is "Fairure", and searches for the record corresponding to the application ID 114a in the execution history information 114. Then, the alternative solution request unit 123 refers to the KPI 114e for the searched result, and selects the solution No. 114b that obtains the best KPI. That is, the separate solution request unit 123 identifies the parameter that obtained the best KPI in the immediately preceding application of the software that led to the derivation of the infeasible solution.
  • the separate solution request unit 123 sets one robust optimum solution within the range of the upper limit 112e and the lower limit 112f shown in the operation variable information 112, with the parameter ID 114c and the parameter value 114d of the execution history information 114 as the initial operation variable values. Calculate multiple. (Step S006) That is, robust optimization is performed based on the output parameter when the KPI of the immediately preceding software is the best within the range of the parameters used for the processing of the immediately preceding software stored in advance in the operation variable information 112 of the storage unit 110. Calculate one or more output parameters to be the solution.
  • the method for calculating the robust optimal solution for example, Bayesian optimization, machine learning, or the like may be used, or sensitivity analysis in the mathematical programming method or the like may be used.
  • the separate solution request unit 123 calculates a plurality of values of the manipulated variables for which a good KPI can be obtained.
  • the number of solutions to be calculated is specified for each software unit in the solution generation number 111e of the application master information 111. It is necessary to execute the software when calculating the robust optimum solution, and the application execution unit 122 is used for the execution.
  • the application execution unit 122 determines whether or not all the solutions of the current application cannot be executed (step S007). Specifically, the application execution unit 122 determines from the execution history information 114 whether or not the robust optimum solution calculated in step S006 and all other solutions in the current application cannot be executed.
  • step S007 the application execution unit 122 adds the robust optimum solution in the immediately preceding application (step S008). Specifically, the application execution unit 122 refers to the application chain information 113 and identifies the immediately preceding application ID 113a of the current application. Then, the robust optimum solution is calculated by the specified immediately preceding application, and the control is returned to step S003.
  • the application execution unit 122 registers the execution history (step S009). Specifically, the application execution unit 122 stores "Yes" for the solution candidate flag 114f of the software if it is feasible, and saves the execution history information 114 and the job chain information 115 as planning cooperation information. ..
  • the application execution unit 122 proceeds to the next application (step S010). Specifically, the application execution unit 122 refers to the application chain information 113 to specify a record in which the current application has the immediately preceding application ID 113a, and specifies an application to be subsequently executed as the current application. Then, the application execution unit 122 returns the control to step S002.
  • the plan combination unit 124 and the plan evaluation unit 125 extract the overall solution that maximizes the KPI (step S011). Specifically, the plan combination unit 124 refers to the execution history information 114 and the job chain information 115 included in the plan linkage information, and records the solution candidate flag 114f and the solution result 115e as "Yes” and “Success”, respectively. To extract.
  • plan evaluation unit 125 creates the optimization result information 116 for the records extracted by the plan combination unit 124.
  • the plan evaluation unit 125 aggregates the KPI1114f of the execution history information 114 associated with the job chain information 115 constituting the scenario for each scenario, selects the best KPI, and stores it in the optimum KPI116b for each scenario ID 116a.
  • the plan evaluation unit 125 weights each KPI according to the nature of the KPI value, the index value to be emphasized, the combination of the input / output parameters of a plurality of software, and the like. You may do it. For example, if the KPI value with a smaller value is better and the KPI value with a larger value is simply summed, there is a high possibility that the evaluation of the overall KPI will not be appropriate, so some value processing is performed. You may try to calculate the whole KPI.
  • plan evaluation unit 125 creates the optimization result detailed information 117 for the records extracted by the plan combination unit 124.
  • the optimization result detailed information 117 stores data indicating the operation variables of each application that obtains a consistently executable value chain plan.
  • the display control unit 126 outputs the optimum solution to the user screen (step S012). Specifically, the display control unit 126 refers to the optimization result detailed information 117, generates a display screen including the breakdown of the KPI of each application when the overall KPI is optimized, and generates a display device or a user terminal. Output to the device 200.
  • the above is an example of the flow of value chain plan cooperation processing.
  • the value chain planning linkage process it is possible to calculate planning parameters that can obtain optimum results among a plurality of software that operate in linkage.
  • FIG. 12 is a diagram showing an example of an optimum solution display screen.
  • the display control unit 126 creates the optimum solution display screen 500 by using the optimization result information 116 and the optimization result detailed information 117.
  • a scenario list area 510 that accepts the selection of a scenario created by each user
  • a KPI graph display area 520 that graphs the entire KPI for each scenario
  • a breakdown that can obtain the optimum KPI for each scenario are applied.
  • An example of displaying the breakdown display area 530 to be displayed for each is shown.
  • the optimal KPI for shaded display and other feasible plan KPIs are displayed at the bottom of the combinations of plans that can be executed throughout the value chain, and the parameter values of each app and the current KPIs are displayed. KPIs can be displayed individually.
  • FIG. 13 is a diagram showing an execution example of the value chain plan linkage process.
  • the application execution unit 122 executes the A application 410, the B application 420, and the C application 430 in that order. It can be said that this is an example in which the information of "A application, B application” and "B application, C application” is included in the application chain information 113 as a combination of "immediately preceding application ID, application ID".
  • the subsequent B application 420 outputs the output information 421 using the output information 411.
  • the alternative solution request unit 123 specifies the output information 411, which is the best KPI among the A application 410, which is the immediately preceding application, and can obtain a similar KPI.
  • the optimum solution (for example, output information 411a and output information 411b) is generated.
  • the application execution unit 122 executes the B application 420 using the output information 411a, and obtains the output information 422.
  • the C application 430 following the B application 420 outputs the output information 431 using the output information 422. If the output information 431 is infeasible, the alternative solution request unit 123 specifies the output information 422, which is the best KPI among the immediately preceding application B application 420, and can obtain a similar KPI. Optimal solutions (eg, output information 422a and output information 422b) are generated.
  • the output information 432 and the output information 433 are obtained, respectively. Even when these output information 432 and output information 433 are infeasible solutions, the output information 424 by the B application 420 using the output information 411b which is the robust optimum solution of the output information 411 by the A application 410 can be obtained.
  • the C application 430 can be executed as the input information, and the output information 434 can be obtained.
  • the output of A application 410 is specified and displayed with the solution that can obtain the best overall KPI in the executed scenario as the optimum solution.
  • "X" is used when the result is not feasible
  • "triangle” is used when the result is feasible but standard
  • "X” is used when the KPI is good. Although it is shown as “Maru”, it may be displayed differently on the output screen.
  • the above is the plan cooperation system according to the first embodiment.
  • the value chain planning linkage system 1 it is possible to calculate planning parameters that can obtain optimum results among a plurality of software that operate in linkage, especially in the entire value chain.
  • the plan evaluation unit 125 performs weighting calculation when aggregating KPIs obtained in each application for each scenario, but the calculation is not limited to this, and the calculation is performed using, for example, a predetermined algorithm. You may.
  • the KPI obtained in each application has a fluctuation range, the total KPI may be calculated according to the probability distribution of the KPI.
  • plan evaluation unit 125 may not only aggregate the KPIs but also select the input / output parameters of the plan to obtain the best KPI and send them to another ERP system. By doing so, it is possible to automatically link with various systems.
  • each of the above configurations, functions, processing units, processing means, etc. may be realized by hardware by designing a part or all of them by, for example, an integrated circuit. Further, each of the above configurations, functions, and the like may be realized by software by the processor interpreting and executing a program that realizes each function. Information such as programs, tables, and files that realize each function can be placed in a memory, a recording device such as a hard disk or SSD, or a recording medium such as an IC card, SD card, or DVD.
  • control lines and information lines indicate what is considered necessary for explanation, and not all control lines and information lines are necessarily shown in the product. In reality, it may be considered that almost all configurations are connected to each other by a communication network, a bus, or the like.
  • the technique according to the present invention is not limited to the planning cooperation system, but can be provided in various forms such as a server device, a computer-readable program, and a value chain planning method.
  • 1 ... Planning cooperation system, 50 ... Network, 100 ... Value chain planning cooperation device, 110 ... Storage unit, 111 ... App master information, 112 ... Operation variable information, 113 ... -Appli chain information, 114 ... Execution history information, 115 ... Job chain information, 116 ... Optimization result information, 117 ... Optimization result detailed information, 118 ... Scenario information, 120 ... -Processing unit, 121 ... Setting information reading unit, 122 ... App execution unit, 123 ... Separate solution request unit, 124 ... Plan combination unit, 125 ... Plan evaluation unit, 126 ... Display control unit, 130 ... input / output unit, 140 ... communication unit, 200 ... user terminal device.

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Educational Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Stored Programmes (AREA)

Abstract

連携動作する複数のソフトウェア間で最適な結果を得られる計画パラメータを算出する。 複数のソフトウェアを業務に応じて組み合わせて構成し実行するバリューチェーン計画連携装置を用いるバリューチェーン計画連携方法であって、複数のソフトウェアの少なくともいずれかは、複数のソフトウェアに含まれるいずれかの他のソフトウェアから得られる出力パラメータを入力パラメータとして用いるものであり、バリューチェーン計画連携装置は、複数のソフトウェアのそれぞれにおいて出力パラメータを複数算出する別解要求ステップと、複数のソフトウェアの入出力パラメータの組み合わせに応じてバリューチェーン全体で最良の重要業績評価指標値を得られる出力パラメータを全体計画として表示する表示ステップと、を実施する。

Description

バリューチェーン計画連携方法、バリューチェーン計画連携装置およびバリューチェーン計画連携システム
 本発明は、バリューチェーン計画連携方法、バリューチェーン計画連携装置およびバリューチェーン計画連携システムに関する。本発明は2020年9月17日に出願された日本国特許の出願番号2020-156429の優先権を主張し、文献の参照による織り込みが認められる指定国については、その出願に記載された内容は参照により本出願に織り込まれる。
 特許文献1には、ばらつきが小さいパレート解を与える設計値を効率的に求めることが可能なロバスト最適化装置を提供することが開示されている。
特開2013-12185号公報
 上述した特許文献1では、一方のアプリケーションソフトウェアの出力を他方のアプリケーションソフトウェアが入力値として利用するような入出力に利用関係のある複数のアプリケーションソフトウェアを連携動作させる際において、単一のアプリケーションソフトウェアにおいて複数の解を算出すること自体はできるが、利用側のアプリケーションソフトウェアの出力の最適化を考慮した求解を行うことは難しい。
 本発明の目的は、連携動作する複数のソフトウェア間で最適な結果を得られる計画パラメータを算出する技術を提供することにある。
 本願は、上記課題の少なくとも一部を解決する手段を複数含んでいるが、その例を挙げるならば、以下のとおりである。
 本発明の一態様は、複数のソフトウェアを業務に応じて組み合わせて構成し実行するバリューチェーン計画連携装置を用いるバリューチェーン計画連携方法であって、前記複数のソフトウェアの少なくともいずれかは、前記複数のソフトウェアに含まれるいずれかの他のソフトウェアから得られる出力パラメータを入力パラメータとして用いるものであり、前記バリューチェーン計画連携装置は、前記複数のソフトウェアのそれぞれにおいて前記出力パラメータを複数算出する別解要求ステップと、前記複数のソフトウェアの入出力パラメータの組み合わせに応じて前記バリューチェーン全体で最良の重要業績評価指標値を得られる前記出力パラメータを全体計画として表示する表示ステップと、を実施することを特徴とする。
 本発明によれば、連携動作する複数のソフトウェア間で最適な結果を得られる計画パラメータを算出することができる。
 上記した以外の課題、構成及び効果は、以下の実施形態の説明により明らかにされる。
第1実施形態に係るバリューチェーン計画連携システムの構成例を示す図である。 アプリマスター情報のデータ構造の例を示す図である。 操作変数情報のデータ構造の例を示す図である。 アプリチェーン情報のデータ構造の例を示す図である。 実行履歴情報のデータ構造の例を示す図である。 ジョブチェーン情報のデータ構造の例を示す図である。 最適化結果情報のデータ構造の例を示す図である。 最適化結果詳細情報のデータ構造の例を示す図である。 シナリオ情報のデータ構造の例を示す図である。 バリューチェーン計画連携装置のハードウェア構成の例を示す図である。 バリューチェーン計画連携処理の流れの例を示す図である。 最適解表示画面の例を示す図である。 バリューチェーン計画連携処理の実行例を示す図である。
 以下の実施形態においては便宜上その必要があるときは、複数のセクションまたは実施の形態に分割して説明するが、特に明示した場合を除き、それらはお互いに無関係なものではなく、一方は他方の一部または全部の変形例、詳細、補足説明等の関係にある。
 また、以下の実施形態において、要素の数等(個数、数値、量、範囲等を含む)に言及する場合、特に明示した場合および原理的に明らかに特定の数に限定される場合等を除き、その特定の数に限定されるものではなく、特定の数以上でも以下でもよい。
 さらに、以下の実施形態において、その構成要素(要素ステップ等も含む)は、特に明示した場合および原理的に明らかに必須であると考えられる場合等を除き、必ずしも必須のものではないことは言うまでもない。
 同様に、以下の実施形態において、構成要素等の形状、位置関係等に言及するときは特に明示した場合および原理的に明らかにそうではないと考えられる場合等を除き、実質的にその形状等に近似または類似するもの等を含むものとする。このことは、上記数値および範囲についても同様である。
 また、実施形態を説明するための全図において、同一の部材には原則として同一の符号を付し、その繰り返しの説明は省略する。以下、本発明の各実施形態について図面を用いて説明する。
 バリューチェーンとは、原材料・部品の調達から、製造、在庫管理、販売、配送までの製品の供給プロセスにおいて、各段階で付与される価値の連鎖を指す。配送や在庫管理業務においては、モノに直接的に価値を付与するプロセスではないものの、それらのコストは企業の利益を直接的に減少させるため最小化することが望ましい。したがって、バリューチェーンを最適運用するためには、利益最大かつコスト最小の両方を追求する必要がある。
 しかし、バリューチェーンを構成する各々の供給プロセスを個別にみたときには、それらのKPI(Key Performance Indicator:重要業績評価指標)が互いに異なる場合がある。製造部門を例にとると、小日程計画を立案するソフトウェア(以降、アプリケーションソフトウェア、アプリ、アプリケーションと称呼することがある)では、そのソフトウェアを用いる製造部門のKPIが製造コストの最小化であるため、設備の変更をできる限り少なくする計画を立案することが最適な計画となる。つまり、同一製品を同時刻にまとめて製造するのが最適な計画となる。
 一方で、製品の配送計画を立案するソフトウェアにおいては、そのソフトウェアを用いる配送部門のKPIが手配コストの最小化であるため、需要地が要求する複数の製品を同じトラックに積載するのが最適な計画となる。しかし、需要地に複数の製品を配送する場合を想定すると、上述したように同一製品が同時刻に完成する場合には、他の製品が製造される時刻までトラックの出発を後らせて待機させなければならないこととなる。これは非効率を招く。
 さらにいうと、工場においては、製品をトラックに積載するためのスペースに限りがあるため、同時刻に発着できるトラックの台数は制限される。そのため、小日程計画ソフトウェアが出力した製品の完成日時計画を配送計画ソフトウェアにインプットした場合、各トラックは製品の完成までの待機が必要となることから、発着可能台数を超過し、配送計画ソフトウェアにおいては実行不可能な解となる可能性すらある。
 本発明に係るバリューチェーン計画連携方法、装置、システムによれば、一方のアプリケーションソフトウェアの出力を他方のアプリケーションソフトウェアが入力値として利用するような入出力に利用関係のある複数のアプリケーションソフトウェアを連携動作させるバリューチェーンの計画システムにおいて、バリューチェーン全体で実行可能かつ効率的な計画を一貫性をもって立案できるため、棚資削減や生産、販売効率の向上が期待できる。
 図1は、第1実施形態に係るバリューチェーン計画連携システムの構成例を示す図である。バリューチェーン計画連携システム1は、複数のソフトウェアを業務に応じて組み合わせて構成し実行するバリューチェーン計画連携装置100と、ネットワーク50を介してバリューチェーン計画連携装置100に通信可能に接続するユーザー端末装置200と、を含む。
 ネットワーク50は、例えば、LAN(Local Area Network)、WAN(Wide Area Network)、VPN(Virtual Private Network)、インターネット等の一般公衆回線を一部または全部に用いた通信網、携帯電話通信網等、のいずれかまたはこれらの複合したネットワークである。なお、ネットワーク50は、Wi-Fi(登録商標)や5G(Generation)等の無線による通信網であってもよい。
 バリューチェーン計画連携装置100は、記憶部110と、処理部120と、入出力部130と、通信部140と、を備える。なお、バリューチェーン計画連携装置100が実行するバリューチェーンを構成するソフトウェアのうち、複数のソフトウェアの少なくともいずれかは、複数のソフトウェアに含まれるいずれかの他のソフトウェアから得られる出力パラメータを入力パラメータとして用いるものである。
 記憶部110には、アプリマスター情報111と、操作変数情報112と、アプリチェーン情報113と、実行履歴情報114と、ジョブチェーン情報115と、最適化結果情報116と、最適化結果詳細情報117と、シナリオ情報118と、が含まれる。
 図2は、アプリマスター情報のデータ構造の例を示す図である。アプリマスター情報111では、アプリID111aと、アプリ名称111bと、パラメータID111cと、KPI111dと解生成数111eと、が対応付けられている。
 アプリID111aと、アプリ名称111bとは、バリューチェーン計画連携システム1におけるソフトウェア動作の一連の機能を発揮するためのエントリーポイントを特定する情報である。例えば、アプリID111aは、所定のソフトウェア動作の処理単位を特定する情報で、重複なく割り振られた識別子である。アプリ名称111bは、あるアプリIDにより特定される処理単位に付けられた名称である。
 パラメータID111cは、アプリID111aにより特定されるソフトウェアにおいて読み込む変数または変数群を特定する情報である。KPI111dは、アプリID111aにより特定されるソフトウェアにおいて重視する(アウトプットの評価に用いる)変数を特定する情報である。解生成数111eは、アプリID111aにより特定されるソフトウェアにおいてロバスト解を得る数の上限を特定する情報である。なお、本発明に係る実施形態においては、ロバスト解は、後続するソフトウェアにおいてデッドロック等が発生しないように、一つの入力に対し、ソフトウェアが持つパラメータを操作することで、ある程度のKPIを得られる複数の準最適解とする。
 図3は、操作変数情報のデータ構造の例を示す図である。操作変数とは、ソフトウェアが利用する入力情報のうち、ソフトウェア外部から操作可能な変数、すなわち設定値等により規定される独立変数であって、かつソフトウェアの出力情報を変化させることができる変数である。操作変数情報112では、パラメータID112aと、入力ファイル112bと、カラム名称112cと、行数112dと、上限112eと、下限112fと、が対応付けられている。
 パラメータID112aは、ソフトウェアにおいて読み込む変数または変数群を特定する情報である。入力ファイル112bは、パラメータID112aによって特定される変数群が格納されているファイルを特定する情報である。カラム名称112cは、入力ファイル112bによって特定されるファイル内における、パラメータID112aによって特定される変数の名称を特定する情報である。
 行数112dは、カラム名称112cによって特定される変数が格納されているファイル内における位置(行数)を特定する情報である。上限112eと、下限112fとは、パラメータID112aによって特定される変数の取りうる値の上限と下限をそれぞれ決定する情報である。
 図4は、アプリチェーン情報のデータ構造の例を示す図である。アプリチェーン情報113では、直前アプリID113aと、アプリID113bと、が対応付けられている。
 直前アプリID113aは、連続して動作する関係性にある二つのソフトウェアのうち、先行して動作するソフトウェアを特定する情報である。そして、アプリID113bは、連続して動作する関係性にある二つのソフトウェアのうち、先行して動作するソフトウェアに続いて動作するソフトウェアを特定する情報である。すなわち、アプリチェーン情報113では、直前アプリID113aにより特定される先行ソフトウェアと、アプリID113bにより特定される後続ソフトウェアとがその実行順に応じて対応付けられている。
 図5は、実行履歴情報のデータ構造の例を示す図である。実行履歴情報114では、アプリID114aと、解No114bと、パラメータID114cと、パラメータ値114dと、KPI114eと、解候補フラグ114fと、が対応付けられている。
 アプリID114aは、実行したソフトウェアを特定する情報である。解No114bは、アプリID114aにおいて特定されるソフトウェアにより出力された結果である解を特定する情報である。パラメータID114cは、アプリID114aにおいて特定されるソフトウェアが入力に用いた変数を特定する情報である。パラメータ値114dは、パラメータID114cにおいて特定される変数の値を特定する情報である。
 KPI114eは、アプリID114aにおいて特定されるソフトウェアが出力した結果のKPIの値を特定する情報である。解候補フラグ114fは、アプリID114aにおいて特定されるソフトウェアが実行不可能となるか否かに応じて、実行不可能である場合には「No」、実行可能である場合には「Yes」を示す情報である。
 図6は、ジョブチェーン情報のデータ構造の例を示す図である。ジョブチェーン情報115では、直前アプリID115aと、入力解No115bと、アプリID115cと、解No115dと、解結果115eとが対応付けられている。
 直前アプリID115aは、連続して実行された二つのソフトウェアのうち、先行して実行したソフトウェアを特定する情報である。入力解No115bは、直前アプリID115aにおいて特定されるソフトウェアにより出力された結果である解を特定する情報である。この解は、連続して実行された二つのソフトウェアのうち、後続して実行したソフトウェアには入力として利用されるため、入力解ともいえる。
 アプリID115cは、直前アプリID115aにおいて特定されるソフトウェアに後続して連続して実行されたソフトウェアを特定する情報である。解No115dは、アプリID115cにおいて特定されるソフトウェアにより出力された結果である解を特定する情報である。
 解結果115eは、アプリID115cにおいて特定されるソフトウェアが実行不可能となるか否かに応じて、実行不可能である場合には「Failure」、実行可能である場合には「Success」を示す情報である。
 図7は、最適化結果情報のデータ構造の例を示す図である。最適化結果情報116では、シナリオID116aと、最適KPI116bとが対応付けられている。
 シナリオID116aは、バリューチェーンの計画立案単位に付与され、ある計画を他の計画から区別する情報である。最適KPI116bは、シナリオID116aにおいて特定される計画上最適となったKPIの値である。
 図8は、最適化結果詳細情報のデータ構造の例を示す図である。最適化結果詳細情報117では、シナリオID117aと、アプリID117bと、解No117cと、パラメータID117dと、パラメータ値117eとが対応付けられている。
 シナリオID117aは、バリューチェーンの計画立案単位に付与され、ある計画を他の計画から区別する情報である。アプリID117bは、シナリオID117aにおいて特定される計画上実行されたソフトウェアを特定する情報である。解No117cは、アプリID117bにおいて出力された結果である解を特定する情報である。パラメータID117dは、解No117cにおいて特定される解に含まれるパラメータを特定する情報である。パラメータ値117eは、パラメータID117dにおいて特定されるパラメータの値を特定する情報である。
 図9は、シナリオ情報のデータ構造の例を示す図である。シナリオ情報118では、シナリオID118aと、シナリオ名称118bとが対応付けられている。
 シナリオID118aは、バリューチェーンの計画立案単位に付与され、ある計画を他の計画から区別する情報である。シナリオ名称118bは、シナリオID118aにおいて特定される計画の名称を特定する情報である。
 このような記憶部110の各情報は、必要時に、ネットワーク50を介して、例えばERP(Enterprise Resource Planning)等のシステム、またはそれに準じるデータを蓄積したデータベース、もしくはNAS(Network Attached Storage)装置等から通信部140を介して取得するようにしてもよい。また、このような記憶部110の各情報は、出力パラメータを含むが、出力パラメータを上書き保存することで、バリューチェーン計画連携装置100とは異なる他のリソース計画システムにおいて用いられる情報として活用されうる。さらには、記憶部110がNAS装置等に保存されている場合、最良のKPI値を得る場合の入出力パラメータを選択して上書き保存することで、バリューチェーン計画連携装置とは異なる他のリソース計画システムに送信することができる。
 図1の説明に戻る。処理部120には、設定情報読み込み部121と、アプリ実行部122と、別解要求部123と、計画組合せ部124と、計画評価部125と、表示制御部126と、が含まれる。
 設定情報読み込み部121は、記憶部110から処理に必要なデータをロードする。
 アプリ実行部122は、複数のソフトウェアを所定の順に実行して出力パラメータとともに重要業績評価指標値を記憶部110に格納する。アプリ実行部122が実行する複数のソフトウェアには、様々な種類のソフトウェアが含まれるが、例えば、バリューチェーンを構成する在庫計画を出力するソフトウェアや、生産計画を出力するソフトウェア等が少なくとも含まれる。その他には、輸送計画を出力するソフトウェア等、各種のソフトウェアが含まれる。
 別解要求部123は、アプリ実行部122にて実行したソフトウェアが実行不可能解を算出すると、該ソフトウェアの入力パラメータとして用いた情報を出力した直前のソフトウェアにおいて、ロバスト最適解となる出力パラメータを算出する。
 計画組合せ部124は、アプリ実行部122が実行したソフトウェアの処理結果のうち、実施可能解を得られた処理結果を抽出する。
 計画評価部125は、複数のソフトウェアの入出力パラメータの組み合わせに応じて重要業績評価指標値を集計する。
 表示制御部126は、集計した結果の良否を含めて表示する画面情報を生成し、ディスプレイ装置等の表示部に表示させる。あるいは、画面情報をユーザー端末装置200に送信してユーザー端末装置200のディスプレイ装置上に表示させる。
 入出力部130は、例えば、所定の処理を行った結果出力する情報が含まれる画面情報を表示し、キーボード、マウスおよびタッチパネル等にて入力された入力情報を受け付ける。
 通信部140は、ネットワーク50を介して、ユーザー端末装置200を含む他の装置との間で情報の送受信を行う。
 ユーザー端末装置200は、バリューチェーン計画立案者が操作することのできる情報処理装置である。ユーザー端末装置200は、データを保持する記憶部と、入出力を制御する入出力部と、各種処理を行う処理部と、を備える一般的なパーソナルコンピューター等の情報処理装置である。
 図10は、バリューチェーン計画連携装置のハードウェア構成の例を示す図である。バリューチェーン計画連携装置100は、中央処理装置(Central Processing Unit:CPU)301と、メモリ302と、ハードディスク装置(Hard Disk Drive:HDD)などの外部記憶装置303と、CD(Compact Disk)やDVD(Digital Versatile Disk)などの可搬性を有する記憶媒体304に対して情報を読む読取装置305と、キーボードやマウス、バーコードリーダなどの入力装置306と、ディスプレイなどの出力装置307と、インターネットなどのネットワーク50を介して他のコンピュータと通信する通信装置308とを備えた一般的なコンピュータ300、あるいはこのコンピュータ300を複数備えたネットワークシステムにより実現できる。なお、読取装置305は、可搬性を有する記憶媒体304の読取だけでなく、書き込みも可能なものであっても良いことは言うまでもない。
 例えば、処理部120に含まれる設定情報読み込み部121と、アプリ実行部122と、別解要求部123と、計画組合せ部124と、計画評価部125と、表示制御部126とは、外部記憶装置303に記憶されている所定のプログラムをメモリ302にロードしてCPU301で実行することで実現可能であり、入出力部130は、CPU301が入力装置306および出力装置307を利用することで実現可能であり、通信部140は、CPU301が通信装置308を利用することで実現可能であり、記憶部110は、CPU301がメモリ302または外部記憶装置303を利用することにより実現可能である。
 処理部120を実現する所定のプログラムは、読取装置305を介して可搬性を有する記憶媒体304から、あるいは、通信装置308を介してネットワーク50から、外部記憶装置303にダウンロードされ、それから、メモリ302上にロードされてCPU301により実行されるようにしてもよい。また、読取装置305を介して可搬性を有する記憶媒体304から、あるいは、通信装置308を介してネットワークから、メモリ302上に直接ロードされ、CPU301により実行されるようにしてもよい。
 なお、ユーザー端末装置200についても、図10に示すような一般的なコンピュータ300で実現可能である。
 図11は、バリューチェーン計画連携処理の流れの例を示す図である。バリューチェーン計画連携処理は、バリューチェーン計画連携装置100が起動後に要求を受け付けた場合、あるいは所定の周期(例えば、毎日)に従って開始される。
 まず、設定情報読み込み部121は、マスタデータを読込む(ステップS001)。具体的には、設定情報読み込み部121は、アプリマスター情報111と、操作変数情報112と、アプリチェーン情報113と、シナリオ情報118と、を読込む。以降の各処理では、シナリオ情報118におけるシナリオIDごとに実行を制御する。
 アプリ実行部122は、シナリオ上のアプリチェーンにおいて、最後尾のアプリが終了したか否か判定する(ステップS002)。具体的には、アプリ実行部122は、アプリチェーン情報113を参照し、直前アプリID113aに、処理が完了したソフトウェアのアプリIDが含まれているか否か判定する。含まれていない場合には、アプリ実行部122は、最後尾のアプリが終了した(ステップS002にて「Yes」)と判断して、ステップS011へ制御を進める。含まれている場合には、アプリ実行部122は、まだ後続するソフトウェアが存在するために最後尾のアプリが終了していない(ステップS002にて「No」)と判断して、アプリ実行部122は、制御をステップS003へ進める。
 アプリ実行部122は、直前アプリの実行結果ごとにカレントアプリを実行する(ステップS003)。具体的には、アプリチェーン情報113を参照し、最後に実行したソフトウェアを直前アプリID113aから検索し、紐づけられたアプリID113bを参照して該当するソフトウェアを実行する(実行するソフトウェアをカレントアプリとする)。その実行については、アプリ実行部122は、直前アプリから出力された結果が複数セット存在する場合には、各結果ごとにソフトウェアを実行する。なお、初回実行時は、アプリ実行部122は、アプリID113bに存在しないアプリであって、かつ直前アプリID113aに唯一エントリのあるソフトウェアを実行することにより、アプリチェーンの先頭からソフトウェアを実行する。
 アプリID113bに該当するソフトウェアの実行結果は、アプリ実行部122が、実行履歴情報114に入力値として使用した解Noと、パラメータのIDと値と、実行の結果得たKPIとして格納する。また、アプリ実行部122は、ジョブチェーン情報115についても作成し格納する。
 そして、アプリ実行部122は、実行不可能解が無かったか否か判定する(ステップS004)。具体的には、アプリ実行部122は、実行したカレントアプリの処理結果において、実行不可能と判定された結果を特定する。実行不可能解が無く、すべての解が実行可能な場合(ステップS004にて「Yes」の場合)には、アプリ実行部122は、制御をステップS009へ進める。
 実行不可能解の存在がある場合(ステップS004にて「No」の場合)には、アプリ実行部122は、当該ソフトウェアの解候補フラグ114fについて、実行不可能である場合には「No」を格納する(ステップS005)。さらに、アプリ実行部122は、実行不可能である場合にはジョブチェーン情報115の解結果115eを「Failure」に変更する。
 そして、別解要求部123は、ジョブチェーン情報115の解結果115eが「Failure」であるレコードの直前アプリID115aを参照し、実行履歴情報114におけるアプリID114aに該当するレコードを検索する。そして、別解要求部123は、検索した結果について、KPI114eを参照し、最も良いKPIを得ている解No114bを選択する。すなわち、別解要求部123は、実行不能解を導出するに至ったソフトウェアの直前アプリにおいて最も良いKPIを得たパラメータを特定する。
 そして、別解要求部123は、実行履歴情報114のパラメータID114cとパラメータ値114dを初期操作変数値として、操作変数情報112に示した上限112e、下限112fの範囲内でロバスト最適解を一つまたは複数算出する。(ステップS006)すなわち、記憶部110の操作変数情報112に予め記憶された直前のソフトウェアの処理に用いるパラメータの範囲内で、直前のソフトウェアのKPIが最良となる場合の出力パラメータに基づいてロバスト最適解となる出力パラメータを一つまたは複数算出する。なお、ロバスト最適解の算出方法は例えばベイズ最適化や機械学習等を用いてもよいし、数理計画法における感度分析などを使用してもよい。
 ロバスト最適解を算出する処理においては、別解要求部123は、優良なKPIが求まる操作変数の値を複数算出する。算出する解の個数は、アプリマスター情報111の解生成数111eにおいて各ソフトウェア単位で特定される。ロバスト最適解を算出する際にソフトウェアの実行を要するが、その実行にはアプリ実行部122を使用する。
 そして、アプリ実行部122は、カレントアプリの全解が実行不可能か否か判定する(ステップS007)。具体的には、アプリ実行部122は、実行履歴情報114から、ステップS006において算出したロバスト最適解およびカレントアプリにおけるその他すべての解が実行不可能か否か判定する。
 すべての解が実行不可能の場合(ステップS007において「Yes」の場合)には、アプリ実行部122は、直前アプリにてロバスト最適解を追加する(ステップS008)。具体的には、アプリ実行部122は、アプリチェーン情報113を参照し、カレントアプリの直前アプリID113aを特定する。そして、特定した直前アプリでロバスト最適解を算出し、ステップS003に制御を戻す。
 いずれかの解を得られた場合(ステップS007において「No」の場合)には、アプリ実行部122は、実行履歴を登録する(ステップS009)。具体的には、アプリ実行部122は、当該ソフトウェアの解候補フラグ114fについて、実行可能である場合には「Yes」を格納し、実行履歴情報114とジョブチェーン情報115を計画連携情報として保存する。
 そして、アプリ実行部122は、次のアプリに処理を進める(ステップS010)。具体的には、アプリ実行部122は、アプリチェーン情報113を参照して、カレントアプリが直前アプリID113aであるレコードを特定し、後続して実行するアプリをカレントアプリとして特定する。そして、アプリ実行部122は、制御をステップS002に戻す。
 最後尾アプリが終了済みである場合(ステップS002にて「Yes」の場合)には、計画組合せ部124および計画評価部125は、KPIが最大となる全体解を抽出する(ステップS011)。具体的には、計画組合せ部124は、計画連携情報に含まれる実行履歴情報114およびジョブチェーン情報115を参照し、解候補フラグ114fと、解結果115eがそれぞれ「Yes」、「Success」のレコードを抽出する。
 そして、計画評価部125は、計画組合せ部124によって抽出されたレコードを対象として、最適化結果情報116を作成する。計画評価部125は、シナリオを構成するジョブチェーン情報115に紐づく実行履歴情報114のKPI1114fをシナリオ単位で集計し、最良KPIを選択してシナリオID116aごとに最適KPI116bに格納する。
 なお、このKPIの集計においては、計画評価部125は、KPIの値の性質、重視する指標値、複数のソフトウェアの入出力パラメータの組み合わせ等に応じて各KPIに重みづけを行って集計するようにしてもよい。例えば、小さい値の方が良いKPIの値と、大きい値の方が良いKPIの値とを単純に和算すると、全体KPIの評価が適切でなくなる可能性が大きいため、何らかの値の加工を行って全体KPIを算出するようにしてもよい。
 また、計画評価部125は、計画組合せ部124によって抽出されたレコードを対象に、最適化結果詳細情報117を作成する。最適化結果詳細情報117には、一貫して実行可能なバリューチェーン計画を得る各アプリの操作変数を示すデータが格納される。
 そして、表示制御部126は、ユーザー画面に最適解を出力する(ステップS012)。具体的には、表示制御部126は、最適化結果詳細情報117を参照して、全体KPIが最適となる場合の各アプリのKPIの内訳を含めて表示画面を生成し、ディスプレイ装置あるいはユーザー端末装置200に出力させる。
 以上が、バリューチェーン計画連携処理の流れの例である。バリューチェーン計画連携処理によれば、連携動作する複数のソフトウェア間で最適な結果を得られる計画パラメータを算出することができる。
 図12は、最適解表示画面の例を示す図である。表示制御部126は、最適化結果情報116および最適化結果詳細情報117を用いて、最適解表示画面500を作成する。最適解表示画面500では、各ユーザーが作成したシナリオの選択を受け付けるシナリオ一覧領域510と、シナリオごとの全体KPIをグラフ化したKPIグラフ表示領域520と、各シナリオの最適KPIを得られる内訳をアプリごとに表示する内訳表示領域530を表示している一例を示している。ユーザーはシナリオを選択すると、下部にバリューチェーン全体で実行可能な計画の組合せのうち、網掛け表示の最適KPIおよびその他の実行可能な計画のKPIを表示し、各アプリのパラメータ値とそのときのKPIを個別表示することができる。
 図13は、バリューチェーン計画連携処理の実行例を示す図である。アプリ実行部122は、Aアプリ410と、Bアプリ420と、Cアプリ430と、をその順に実行する。これは、アプリチェーン情報113に、「直前アプリID、アプリID」の組み合わせとして、「Aアプリ、Bアプリ」、「Bアプリ、Cアプリ」の情報が含まれる場合の例であるといえる。
 Aアプリ410が入力情報400を用いて、出力情報411を出力したとすると、後続するBアプリ420では出力情報411を用いて出力情報421を出力する。仮に出力情報421が実行不可能である場合には、別解要求部123は、直前アプリであるAアプリ410の中で最良のKPIとなる出力情報411を特定して類似のKPIを得られるロバスト最適解(例えば、出力情報411aと、出力情報411bと)を生成する。そして、アプリ実行部122は、出力情報411aを用いてBアプリ420を実行し、出力情報422を得る。
 Bアプリ420に後続するCアプリ430では出力情報422を用いて出力情報431を出力する。仮に出力情報431が実行不可能である場合には、別解要求部123は、直前アプリであるBアプリ420の中で最良のKPIとなる出力情報422を特定して類似のKPIを得られるロバスト最適解(例えば、出力情報422aと、出力情報422bと)を生成する。
 出力情報422aと、出力情報422bとを用いてCアプリ430が処理を行った場合に、それぞれ出力情報432と出力情報433とが得られる。これらの出力情報432と出力情報433とが実行不可能解である場合であっても、Aアプリ410による出力情報411のロバスト最適解である出力情報411bを用いたBアプリ420による出力情報424を入力情報としてCアプリ430を実行し、出力情報434を得ることができる。
 そして、この例では、実行したシナリオ内で最良の全体KPIを得られる解を最適解として、Aアプリ410の出力を特定し表示している。なお、図13においては、出力情報のうち、実施不可能結果の場合は「バツ」を、実行可能であるが標準的な結果の場合は「三角」を、KPIが良い結果の場合には「マル」として示しているが、出力画面上では別の表示を行うものとして構わない。
 以上が、第1実施形態に係る計画連携システムである。バリューチェーン計画連携システム1によると、連携動作する複数のソフトウェア間、とくにバリューチェーン全体で最適な結果を得られる計画パラメータを算出することができる。
 なお、本発明は上記の実施形態に限定されるものではなく、様々な変形例が含まれる。例えば、計画評価部125は、各アプリにおいて得られるKPIをシナリオ単位で集計する際に重みづけ計算を行っているが、これに限られるものではなく、例えば所定のアルゴリズムを用いて計算するようにしてもよい。あるいは、各アプリにおいて得られるKPIに変動幅がある場合には、KPIの確率分布に応じて全体KPIを算出するようにしてもよい。
 また、計画評価部125は、KPIを集計するのみならず、最良となるKPIを得る計画の入出力パラメータを選択して他のERPシステムに送信するようにしてもよい。このようにすることで、各種のシステムと自動的に連動することができる。
 また、ある実施形態の構成の一部を他の実施形態の構成に置き換えることが可能であり、ある実施形態の構成に他の実施形態の構成を加えることも可能である。また、実施形態の構成の一部について、他の構成の追加・削除・置換をすることが可能である。
 また、上記の各構成、機能、処理部、処理手段等は、それらの一部又は全部を、例えば集積回路で設計する等によりハードウェアで実現してもよい。また、上記の各構成、機能等は、プロセッサがそれぞれの機能を実現するプログラムを解釈し、実行することによりソフトウェアで実現してもよい。各機能を実現するプログラム、テーブル、ファイル等の情報は、メモリや、ハードディスク、SSD等の記録装置、または、ICカード、SDカード、DVD等の記録媒体に置くことができる。
 また、制御線や情報線は説明上必要と考えられるものを示しており、製品上必ずしも全ての制御線や情報線を示しているとは限らない。実際には殆ど全ての構成が通信ネットワーク、バス等により相互に接続されていると考えてもよい。
 本発明に係る技術は、計画連携システムに限られず、サーバー装置、コンピュータ読み取り可能なプログラム、バリューチェーン計画方法などの様々な態様で提供できる。
 1・・・計画連携システム、50・・・ネットワーク、100・・・バリューチェーン計画連携装置、110・・・記憶部、111・・・アプリマスター情報、112・・・操作変数情報、113・・・アプリチェーン情報、114・・・実行履歴情報、115・・・ジョブチェーン情報、116・・・最適化結果情報、117・・・最適化結果詳細情報、118・・・シナリオ情報、120・・・処理部、121・・・設定情報読み込み部、122・・・アプリ実行部、123・・・別解要求部、124・・・計画組合せ部、125・・・計画評価部、126・・・表示制御部、130・・・入出力部、140・・・通信部、200・・・ユーザー端末装置。

Claims (9)

  1.  複数のソフトウェアを業務に応じて組み合わせて構成し実行するバリューチェーン計画連携装置を用いるバリューチェーン計画連携方法であって、
     前記複数のソフトウェアの少なくともいずれかは、前記複数のソフトウェアに含まれるいずれかの他のソフトウェアから得られる出力パラメータを入力パラメータとして用いるものであり、
     前記バリューチェーン計画連携装置は、
     前記複数のソフトウェアのそれぞれにおいて前記出力パラメータを複数算出する別解要求ステップと、
     前記複数のソフトウェアの入出力パラメータの組み合わせに応じて前記バリューチェーン全体で最良の重要業績評価指標値を得られる前記出力パラメータを全体計画として表示する表示ステップと、
     を実施することを特徴とするバリューチェーン計画連携方法。
  2.  請求項1に記載のバリューチェーン計画連携方法であって、
     前記別解要求ステップにおいて、前記バリューチェーン計画連携装置は、
     前記ソフトウェアの処理において、ロバスト最適解となる前記出力パラメータを一つまたは複数算出する、
     ことを特徴とするバリューチェーン計画連携方法。
  3.  請求項1に記載のバリューチェーン計画連携方法であって、
     前記別解要求ステップにおいて、前記バリューチェーン計画連携装置は、
     前記ソフトウェアの処理において、該ソフトウェアの前記出力パラメータより求まる重要業績評価指標値が最良となる場合の前記出力パラメータに基づいて前記ロバスト最適解となる前記出力パラメータを一つまたは複数算出する、
     ことを特徴とするバリューチェーン計画連携方法。
  4.  請求項1に記載のバリューチェーン計画連携方法であって、
     前記出力パラメータは、前記バリューチェーン計画連携装置とは異なる他のリソース計画システムにおいて用いられる情報である、
     ことを特徴とするバリューチェーン計画連携方法。
  5.  請求項1に記載のバリューチェーン計画連携方法であって、
     前記バリューチェーン計画連携装置は、
     前記出力パラメータより求まる重要業績評価指標値が最良となる場合の前記入出力パラメータを選択して、前記バリューチェーン計画連携装置とは異なる他のリソース計画システムに送信する計画評価ステップ、
     を実施することを特徴とするバリューチェーン計画連携方法。
  6.  請求項1に記載のバリューチェーン計画連携方法であって、
     前記バリューチェーン計画連携装置は、
     前記複数のソフトウェアの入出力パラメータの組み合わせに応じて前記出力パラメータより求まる重要業績評価指標値に所定の重みづけを行って集計する計画評価ステップ、
     を実施することを特徴とするバリューチェーン計画連携方法。
  7.  請求項1に記載のバリューチェーン計画連携方法であって、
     前記複数のソフトウェアには、少なくとも、在庫計画を出力する処理、または生産計画を出力する処理のいずれかを含む、
     ことを特徴とするバリューチェーン計画連携方法。
  8.  複数のソフトウェアを業務に応じて組み合わせて構成し実行するバリューチェーン計画連携装置であって、
     前記複数のソフトウェアの少なくともいずれかは、前記複数のソフトウェアに含まれるいずれかの他のソフトウェアから得られる出力パラメータを入力パラメータとして用いるものであり、
     前記複数のソフトウェアのそれぞれにおいて前記出力パラメータを複数算出する別解要求部と、
     前記複数のソフトウェアの入出力パラメータの組み合わせに応じて前記バリューチェーン全体で最良の重要業績評価指標値を得られる前記出力パラメータを全体計画として表示する表示制御部と、
     を備えることを特徴とするバリューチェーン計画連携装置。
  9.  複数のソフトウェアを業務に応じて組み合わせて構成し実行するバリューチェーン計画連携システムであって、
     前記複数のソフトウェアの少なくともいずれかは、前記複数のソフトウェアに含まれるいずれかの他のソフトウェアから得られる出力パラメータを入力パラメータとして用いるものであり、
     前記複数のソフトウェアのそれぞれにおいて前記出力パラメータを複数算出する別解要求部と、
     前記複数のソフトウェアの入出力パラメータの組み合わせに応じて前記バリューチェーン全体で最良の重要業績評価指標値を得られる前記出力パラメータを全体計画として表示する表示制御部と、
     を備えることを特徴とするバリューチェーン計画連携システム。
PCT/JP2021/017735 2020-09-17 2021-05-10 バリューチェーン計画連携方法、バリューチェーン計画連携装置およびバリューチェーン計画連携システム WO2022059252A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US17/925,140 US20230186185A1 (en) 2020-09-17 2021-05-10 Value chain plan linking method, value chain plan linking apparatus, and value chain plan linking system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2020156429A JP7489878B2 (ja) 2020-09-17 2020-09-17 バリューチェーン計画連携方法、バリューチェーン計画連携装置およびバリューチェーン計画連携システム
JP2020-156429 2020-09-17

Publications (1)

Publication Number Publication Date
WO2022059252A1 true WO2022059252A1 (ja) 2022-03-24

Family

ID=80777420

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2021/017735 WO2022059252A1 (ja) 2020-09-17 2021-05-10 バリューチェーン計画連携方法、バリューチェーン計画連携装置およびバリューチェーン計画連携システム

Country Status (3)

Country Link
US (1) US20230186185A1 (ja)
JP (1) JP7489878B2 (ja)
WO (1) WO2022059252A1 (ja)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018063598A (ja) * 2016-10-13 2018-04-19 株式会社日立製作所 業務支援システム、および、業務支援方法
JP2020030500A (ja) * 2018-08-21 2020-02-27 株式会社日立製作所 施策探索装置、方法およびプログラム
JP2020522800A (ja) * 2017-06-02 2020-07-30 アスペン テクノロジー インコーポレイテッド 予測推論モデルをオンラインで構築し配備するコンピュータシステム及び方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018063598A (ja) * 2016-10-13 2018-04-19 株式会社日立製作所 業務支援システム、および、業務支援方法
JP2020522800A (ja) * 2017-06-02 2020-07-30 アスペン テクノロジー インコーポレイテッド 予測推論モデルをオンラインで構築し配備するコンピュータシステム及び方法
JP2020030500A (ja) * 2018-08-21 2020-02-27 株式会社日立製作所 施策探索装置、方法およびプログラム

Also Published As

Publication number Publication date
JP2022050057A (ja) 2022-03-30
JP7489878B2 (ja) 2024-05-24
US20230186185A1 (en) 2023-06-15

Similar Documents

Publication Publication Date Title
Olhager Evolution of operations planning and control: from production to supply chains
Kumar et al. Minimisation of supply chain cost with embedded risk using computational intelligence approaches
Ding et al. Stochastic multi-objective production-distribution network design using simulation-based optimization
US7627493B1 (en) Production and distribution supply chain optimization software
JP7062561B2 (ja) 在庫配置設計装置および在庫配置設計方法
JP6997830B2 (ja) 原価管理装置、原価管理方法、及び、原価管理プログラム
JP2006503352A (ja) プランニング、スケジューリングおよびサプライ・チェーン・マネジメントを改善するためのシステムおよび方法
Wadhwa et al. Effects of information transparency and cooperation on supply chain performance: a simulation study
JP2004517378A (ja) 出荷および輸送を最適化するシステムおよび方法
JP4887846B2 (ja) 出荷計画システム
US20090083119A1 (en) Method for business plan optimization based on attributes
Vallejo et al. Enterprise integration engineering reference framework and toolbox
Mazzuto et al. Supply chain modelling and managing, using timed coloured Petri nets: a case study
JP7077059B2 (ja) 部品発注システムおよび部品発注装置
Öztayşi et al. Supply chain performance measurement using a SCOR based fuzzy VIKOR approach
JP2007323680A (ja) 経営意思決定支援システム
Ghalehkhondabi et al. Multiple customer order decoupling points within a hybrid MTS/MTO manufacturing supply chain with uncertain demands in two consecutive echelons
WO2009041962A1 (en) A method for business plan optimization based on attributes
WO2022059252A1 (ja) バリューチェーン計画連携方法、バリューチェーン計画連携装置およびバリューチェーン計画連携システム
US20160292625A1 (en) Product data analysis
Zobolas et al. Extending capacity planning by positive lead times and optional overtime, earliness and tardiness for effective master production scheduling
JP2005056024A (ja) 供給計画を作成するための支援システムおよび支援方法および支援のためのコンピュータプログラム
Dong et al. Integrated optimisation of consolidation and stowage planning of steel coil ships using differential evolution
US20150066565A1 (en) Systems and methods for managing an inventory of component parts
Chern et al. A heuristic master planning algorithm that includes fairness and flexibility

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21868939

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21868939

Country of ref document: EP

Kind code of ref document: A1