WO2022004245A1 - 農業支援システム - Google Patents
農業支援システム Download PDFInfo
- Publication number
- WO2022004245A1 WO2022004245A1 PCT/JP2021/020834 JP2021020834W WO2022004245A1 WO 2022004245 A1 WO2022004245 A1 WO 2022004245A1 JP 2021020834 W JP2021020834 W JP 2021020834W WO 2022004245 A1 WO2022004245 A1 WO 2022004245A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- height
- field
- unit
- information
- work vehicle
- Prior art date
Links
- 239000002689 soil Substances 0.000 claims description 70
- 238000001514 detection method Methods 0.000 claims description 64
- 238000003860 storage Methods 0.000 description 37
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 34
- 238000004891 communication Methods 0.000 description 30
- 238000012545 processing Methods 0.000 description 17
- 238000004519 manufacturing process Methods 0.000 description 13
- 238000000034 method Methods 0.000 description 11
- 241000209094 Oryza Species 0.000 description 8
- 235000007164 Oryza sativa Nutrition 0.000 description 8
- 230000005540 biological transmission Effects 0.000 description 8
- 230000008859 change Effects 0.000 description 8
- 238000012937 correction Methods 0.000 description 8
- 235000009566 rice Nutrition 0.000 description 8
- 244000025254 Cannabis sativa Species 0.000 description 5
- 238000005520 cutting process Methods 0.000 description 4
- 238000005507 spraying Methods 0.000 description 4
- 238000003306 harvesting Methods 0.000 description 3
- 230000002093 peripheral effect Effects 0.000 description 3
- 230000001141 propulsive effect Effects 0.000 description 3
- 238000012935 Averaging Methods 0.000 description 2
- 230000001133 acceleration Effects 0.000 description 2
- 235000013339 cereals Nutrition 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000003337 fertilizer Substances 0.000 description 2
- 239000003621 irrigation water Substances 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 238000000465 moulding Methods 0.000 description 2
- 239000000575 pesticide Substances 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000007480 spreading Effects 0.000 description 2
- 238000003892 spreading Methods 0.000 description 2
- 239000010426 asphalt Substances 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 238000009313 farming Methods 0.000 description 1
- 239000007943 implant Substances 0.000 description 1
- 239000004973 liquid crystal related substance Substances 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Images
Classifications
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01B—SOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
- A01B69/00—Steering of agricultural machines or implements; Guiding agricultural machines or implements on a desired track
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/02—Agriculture; Fishing; Forestry; Mining
Definitions
- the present invention relates to an agricultural support system.
- the field water supply reservation system disclosed in Patent Document 1 is a field water supply reservation system that reserves water supply for irrigation water to a field group that is an aggregate of fields, and is a maximum allowable water supply for each field group within a predetermined period. Based on the permissible maximum water supply amount acquisition means to acquire the amount, and the water supply reservation information including the field identification information, water supply date and time information, and the required water supply amount, the total required water supply amount for each field group can be less than the permissible maximum water supply amount. It is provided with a water supply schedule management means for generating a water supply available schedule including the amount and the available water supply date and time.
- the water supply schedule management means of Patent Document 1 can supply a required amount of irrigation water to a field at a required time.
- a work vehicle such as a tractor or a combine can accurately run even when an appropriate amount of water is supplied to the field by using a water supply schedule management means as in Patent Document 1 or even if the field is uneven or inclined. In order to make it possible, it was necessary to accurately acquire the state of the field including the height of the field in advance.
- the present invention has been made to solve such problems of the prior art, and an object of the present invention is to provide an agricultural support system for easily acquiring the state of a field.
- the agricultural support system is based on an information acquisition unit that acquires the height of a work vehicle when traveling in a field, and a plurality of heights acquired by the information acquisition unit. It is equipped with a field information calculation unit that calculates the state of the field.
- the information acquisition unit acquires the first height, which is the height when the work vehicle is run in the first period, and the second height, which is the height when the work vehicle is run in the second period. Then, the field information calculation unit calculates the state of the field as a plurality of heights based on the first height and the second height acquired by the information acquisition unit.
- the field information calculation unit calculates the soil depth of the field as the state of the field based on the difference between the first height and the second height.
- the information acquisition unit has a first reference height, which is the height when the work vehicle is located at a predetermined reference position in the first period, and when the work vehicle is located at the reference position in the second period.
- the field information calculation unit acquires the height of the second reference height, which is the height of the first height, and the field information calculation unit corrects the first height with the first reference height and the second height corrected with the second reference height. Based on the difference between, and, the soil depth of the field is calculated as the state of the field.
- the agricultural support system includes a display device that displays height information regarding the height acquired by the information acquisition unit, and the display device displays the slope of the field as height information. Further, the display device displays the difference with respect to the reference plane obtained by the height as height information.
- the agricultural support system is provided in the work vehicle, and the height detection device that detects the height when the work vehicle travels in the field based on the signal of the positioning satellite, and the height detected by the height detection device. It is provided with a support device having an information acquisition unit for acquiring the information, a field information calculation unit for calculating the state of the field based on a plurality of heights acquired by the information acquisition unit, and a field information calculation unit.
- the height detection device is provided in the first detection device provided in the first work vehicle, which is a work vehicle that performs work in the first period, and in the second work vehicle, which is a work vehicle that performs work in the second period.
- the information acquisition unit acquires the first height, which is the height detected by the first detection device, and the second height, which is the height detected by the second detection device, including the second detection device.
- the field information calculation unit calculates the state of the field based on the first height and the second height acquired by the information acquisition unit as a plurality of heights.
- the field information calculation unit calculates the soil depth of the field as the state of the field based on the difference between the first height and the second height.
- the information acquisition unit has a first reference height, which is the height detected by the first detection device when the first work vehicle is located at a predetermined reference position, and the second work vehicle is located at the reference position.
- the second reference height which is the height detected by the second detection device, is acquired, and the field information calculation unit obtains the height obtained by correcting the first height with the first reference height, and the second height. Is calculated as the state of the field based on the difference between the height corrected by the second reference height and the soil depth of the field.
- the agricultural support system includes a display device that displays height information regarding the height acquired by the information acquisition unit, and the display device displays the slope of the field as height information. Further, the agricultural support system includes a display device for displaying height information regarding the height acquired by the information acquisition unit, and the display device displays the difference with respect to the reference plane obtained by the height as the height information.
- the state of the field can be easily acquired.
- FIG. 1 is a diagram illustrating a third screen displayed on a display device.
- FIG. 2 is a diagram illustrating a third screen displayed on the display device. It is a figure explaining the 4th screen displayed on the display device. It is a figure which shows the agricultural support system in 2nd Embodiment. It is a figure explaining the 5th screen displayed on the display device. It is a figure which shows the sectional view of the field.
- FIG. 1 shows an agricultural support system 1.
- the agricultural support system 1 is a system that calculates the state of the field based on, for example, the height when the work vehicle 2 travels in the field.
- the work vehicle 2 includes an agricultural machine such as a tractor 2A equipped with a work device 10 such as an implant, a rice transplanter 2B, and a combine 2C for harvesting.
- the tractor 2A includes a traveling vehicle 3 having a traveling device 7, a prime mover 4, and a transmission (not shown).
- the traveling device 7 is a tire-type traveling device or a crawler-type traveling device.
- the prime mover 4 is a diesel engine, an electric motor, or the like.
- the transmission can switch the propulsive force of the traveling device 7 by shifting, and can also switch between forward and reverse of the traveling device 7.
- the traveling vehicle 3 is provided with a driver's seat 6.
- a connecting portion 8 composed of a three-point link mechanism or the like is provided at the rear portion of the traveling vehicle 3.
- a working device 10 can be attached to and detached from the connecting portion 8. By connecting the working device 10 to the connecting portion 8, the working device 10 can be towed by the traveling vehicle 3.
- the working device 10 includes a tilling device for cultivating, a fertilizer spraying device for spraying fertilizer, a pesticide spraying device for spraying pesticides, a harvesting device for harvesting, a cutting device for cutting grass and the like, and a spreading device for spreading grass and the like. It is a grass collecting device for collecting grass and the like, a molding device for molding grass and the like, and the like.
- the working device 10 is a tilling device, and the tilling device is towed by the tractor 2A to cultivate the field.
- the rice transplanter 2B includes a traveling vehicle 13 having a traveling device 17, a prime mover 14, a transmission (not shown), and a seedling planting device 18.
- the traveling device 17 is a tire-type traveling device.
- the prime mover 14 is a diesel engine, an electric motor, or the like.
- the transmission can switch the propulsive force of the traveling device 17 by shifting, and can also switch between forward and reverse of the traveling device 17.
- the traveling vehicle 13 is provided with a driver's seat 16.
- the seedling planting device 18 is provided at the rear of the traveling vehicle 13.
- the seedling planting device 18 has a seedling stand 18a on which seedlings are mounted, and the seedlings are taken out from the seedling stand 18a and planted in a field or the like.
- the combine 2C includes a traveling vehicle 23 having a traveling device 27, a prime mover 24, a transmission (not shown), a cutting unit 28 for cutting crops (for example, grains), and threshing processing. It is equipped with an apparatus (not shown) and a grain tank 30 for storing threshed crops.
- the prime mover 24 is a diesel engine, an electric motor, or the like.
- the transmission can switch the propulsive force of the traveling device 27 by shifting, and can also switch between forward and reverse of the traveling device 27.
- the traveling vehicle 23 is provided with a driver's seat 26.
- the work vehicle 2 may be any vehicle traveling in the field, and the above-mentioned work vehicle 2 is not limited to the above-mentioned configuration, and the configurations of the tractor 2A, the rice transplanter 2B, and the combine 2C are not limited to the above-mentioned configuration. ..
- the work vehicle 2 includes a control device 40, a storage unit 41, a communication unit 42, and a position detection device 43.
- the control device 40 is a device that controls the work vehicle 2, such as a CPU.
- the control device 40 controls equipment such as a prime mover based on the operation of the operation device provided in the work vehicle 2.
- the storage unit 41 is a non-volatile memory or the like, and constitutes a storage area for storing information.
- the storage unit 41 stores the control program of the control device 40 and information acquired from the outside.
- the communication unit 42 is a communication module that performs either direct communication or indirect communication with an external device (for example, a support device 60 described later). Wireless communication can be performed by a registered trademark), BLE (Bluetooth (registered trademark) Low Energy), LPWA (Low Power, Wide Area), LPWAN (Low-Power Wide-Area Network), or the like. Further, the communication unit 42 can perform wireless communication by, for example, a mobile phone communication network or a data communication network.
- the position detection device 43 is mounted on the work vehicle 2.
- the mounting location of the position detection device 43 in the work vehicle 2 is not limited, and may be another location.
- the position detection device 43 is a device that detects its own position (positioning information including latitude, longitude, and altitude) by a satellite positioning system. That is, the position detection device 43 receives the signal transmitted from the positioning satellite Z (position of the positioning satellite Z, transmission time, correction information, etc.), and determines the position (latitude, longitude, and altitude) based on the received signal. To detect.
- the position detection device 43 detects the corrected position based on the correction signal from the base station (reference station) capable of receiving the signal from the positioning satellite Z as its own position (latitude, longitude, and altitude). You may.
- the position detection device 43 may have an inertial measurement unit such as a gyro sensor or an acceleration sensor, and may detect the position corrected by the inertial measurement unit as its own position.
- the agricultural support system 1 includes a display device 50.
- the display device 50 is a device capable of displaying various information, and is a device having any one of a liquid crystal panel, a touch panel, and other panels.
- the display device 50 is a terminal display device provided around the worker boarding the work vehicle 2.
- the terminal display device is connected to the control device 40, the communication unit 42, and the like via an in-vehicle network.
- the terminal display device can acquire various information from the support device 60 via the communication unit 42 or the like and display the information.
- the display device 50 is not limited to the terminal display device described above as long as it can display the information acquired from the support device 60, and is possessed by the driver who gets on the work vehicle 2 and operates the work vehicle 2.
- the mobile terminal and the management terminal are composed of a PC, a smartphone (multifunctional mobile phone) having a relatively high computing power, and the like.
- the mobile terminal and the management terminal have a device that performs either direct communication or indirect communication with the support device 60, and obtains various information from the support device 60 via the device to obtain the information. Can be displayed.
- the support device 60 is a server installed in, for example, a farmer, a farming company, a work machine (agricultural machine) maker, an agricultural service, or the like.
- the support device 60 stores, performs arithmetic processing, and manages information (data) received (acquired) from the outside.
- the support device 60 includes an arithmetic processing unit 61, a storage device 62, and a communication device 63.
- the arithmetic processing unit 61 is composed of a CPU, an electronic circuit, and the like, and performs arithmetic processing of various information acquired from the outside.
- the storage device 62 is a non-volatile memory or the like, and constitutes a storage area for storing information.
- the storage device 62 stores the processing program of the arithmetic treatment device and information acquired from the outside.
- the communication device 63 is a communication module that performs either direct communication or indirect communication with the work vehicle 2, and is, for example, Wi-Fi (Wireless Fidelity, registered trademark) and BLE (Bluetooth) of the IEEE 802.11 series, which are communication standards. (Registered trademark) Low Energy), LPWA (Low Power, Wide Area), LPWAN (Low-Power Wide-Area Network) and the like can be used for wireless communication.
- the communication device 63 can perform wireless communication by, for example, a mobile phone communication network or a data communication network, indirectly communicates via the communication unit 42 and the in-vehicle network, and performs various information processed by arithmetic processing. Output to the display device 50.
- the support device 60 can directly communicate with the display device 50 and output various information that has undergone arithmetic processing to the display device 50.
- the agricultural support system 1 includes a height detection device 43a, an information acquisition unit 61a, and a field information calculation unit 61b.
- the height detection device 43a is provided on the work vehicle 2 and detects the height when the work vehicle 2 travels in the field based on the signal of the positioning satellite Z. In the present embodiment, the height detection device 43a is also used by the position detection device 43.
- the height detection device 43a receives a signal transmitted from the positioning satellite Z (position of the positioning satellite Z, transmission time, correction information, etc.), and the position (latitude, longitude) based on the received signal. , And altitude), and the control device 40 stores the latitude, longitude, and altitude in the storage unit 41 as position information in association with the individual information of the work vehicle 2, the detected date, and the like.
- the position detection device 43 also serves as the height detection device 43a, but the height detection device 43a may be provided separately from the position detection device 43, and the satellite received by the position detection device 43 may be provided.
- the height detection device 43a is provided in the work vehicle 2 separately from the position detection device 43, and is high based on satellite signals, acceleration information, and the like. It may be detected.
- the position information stored in the storage unit 41 is output to the support device 60 by the communication unit 42.
- the information acquisition unit 61a and the field information calculation unit 61b are also used by the calculation processing device 61, and are composed of a CPU, an electronic circuit, and the like of the calculation processing device 61.
- the information acquisition unit 61a acquires the height when the work vehicle 2 travels in the field. Specifically, the information acquisition unit 61a acquires position information from the work vehicle 2 via the communication device 63 and the communication unit 42.
- the information acquisition unit 61a corrects the height of the position information to the height of the ground plane of the work vehicle 2 based on the correction value stored in advance in the storage device 62.
- the correction value is the height of the position detection device 43 with respect to the ground plane. As a result, the information acquisition unit 61a acquires the height when the work vehicle 2 travels in the field.
- the height acquired by the information acquisition unit 61a is stored in the storage device 62 as height data in association with the latitude, longitude, individual information of the work vehicle 2, the detected date, etc. at the position where the height is detected. To. Therefore, a plurality of height data are stored in the storage device 62, and a plurality of height information associated with latitude and longitude is stored in the storage device 62.
- the information acquisition unit 61a may acquire the height when the work vehicle 2 travels in the field, and the acquisition method is not limited to the above method.
- the field information calculation unit 61b calculates the state of the field based on the height acquired by the information acquisition unit 61a and a plurality of heights.
- the field information calculation unit 61b performs a predetermined calculation process on the height data acquired by the information acquisition unit 61a.
- the field information calculation unit 61b has, for example, a map calculation unit 70 and a group setting unit 71.
- the map calculation unit 70 and the group setting unit 71 are composed of electric / electronic components, electric circuits, a program stored in the storage device 62, and the like included in the calculation processing device 61.
- the map calculation unit 70 performs a process of allocating information based on the height to the field based on the height acquired by the information acquisition unit 61a.
- the map calculation unit 70 sets the height acquired by the information acquisition unit 61a based on the height acquired by the information acquisition unit 61a, or the height from the standard based on the height and an arbitrary standard. Assign to the field as.
- the map calculation unit 70 acquires the minimum value as a reference among the heights acquired by the information acquisition unit 61a and a plurality of heights.
- the map calculation unit 70 calculates the difference between the plurality of heights and the minimum value, which is the height acquired by the information acquisition unit 61a.
- the difference is the height of the field based on the acquired minimum value.
- the first division data D1n is assigned to each.
- the divided data (first divided data D1n) corresponding to each of the areas Qn of the above is assigned.
- the map calculation unit 70 sets the width (vertical width, horizontal width) of one side of the area Qn to 10 m, and sets a plurality of workplaces every 10 m.
- the difference between the height and the minimum value is divided as the data entering the area Qn formed by dividing into the area Qn and dividing by the mesh size.
- the map calculation unit 70 averages the data values (differences) and allocates the average value as the first divided data D1n corresponding to the area Qn. Further, when there is only one data entering the area Qn, the map calculation unit 70 allocates the data as the first divided data D1n corresponding to the area Qn.
- the map information to which the map calculation unit 70 allocates the first division data D1n for each area Qn is stored in the storage device 62 as a field state map.
- the mesh size may be changed by operating a terminal communicably connected to the support device 60.
- the method of allocating the height of the field to the map based on the height acquired by the information acquisition unit 61a is not limited to the above-mentioned method, and the acquired height may be divided as data entering the area Qn.
- the height may be assigned as a plot arranged on the map, or the contour lines corresponding to the groups may be created on the map and the height may be assigned.
- the first divided data D1n is the height acquired by the information acquisition unit 61a and is the height based on the minimum value among the plurality of heights, but is arbitrary other than the minimum value.
- the height may be used as a reference.
- the group setting unit 71 sets a group for each area Qn in the divided data corresponding to each area Qn. For example, the group setting unit 71 sets a group for the first division data D1n for each area Qn assigned by the map calculation unit 70 in the state map.
- the support device 60 stores in advance group setting information indicating the relationship between the number of groups and the reference values (upper limit value, lower limit value) for each group, and the group setting unit 71 refers to the group setting information and divides data. And the reference value for each group are compared, and the group is set by assigning the group for each divided data.
- the divided data is divided into groups of multiple stages according to the numerical value of the height, and the group with the lowest height (the smallest value) is the "first group G1" and the group with the highest height (the largest value). )
- the group is assigned to the "nth group Gn".
- the group has five stages from the first group G1 to the fifth group G5.
- "second group G2" to "fourth group G4" are assigned in order from the group having the smallest numerical value.
- the group to which the divided data is divided is arbitrary and is not limited to the above-mentioned example.
- the numerical values shown in FIG. 3 are numerical values for explaining grouping and are not limited.
- the display device 50 can display the first screen M1 showing the map around the field on which the work vehicle 2 travels.
- the first screen M1 displays at least height information regarding the height acquired by the information acquisition unit 61a. Further, the first screen M1 can display the height of the field as height information.
- the first screen M1 displays a map display unit 80, a display switching unit 81, an operation unit 82, and a display change unit 83.
- the display device 50 acquires a state map stored in the storage device 62 from the support device 60, and displays the state map on the map display unit 80.
- the map display unit 80 has a plurality of groups (plurality) indicating the height of the field according to the size (value) of the first divided data D1n with respect to the first divided data D1n corresponding to the plurality of areas Qn. It is a map to which the rank of) is assigned.
- the group (rank) is indicated by a color, a numerical value, a character, or the like so that the group (rank) assigned in advance in the group setting unit 71 can be identified for each of the plurality of areas Qn.
- the numerical values shown in the plurality of areas Qn of the first screen M1 indicate the height of the field.
- the display switching unit 81 is an operable display image, and by being operated, the screen displayed on the display device 50 can be switched from the first screen M1 to a different screen. Further, the display switching unit 81 displays the name of the screen that can be changed, and the name of the screen being displayed is grayed out and displayed.
- the operation unit 82 is a display area on which various operations can be performed on the state map displayed on the map display unit 80. The operation unit 82 can perform an operation of enlarging or reducing the map or an operation of displaying the current location of the work vehicle 2 on the map, for example.
- the display change unit 83 is an operable display image, and the display form of the group to be displayed on the state map can be changed by being operated.
- the display changing unit 83 has, for example, a bar image 83a and a slider image 83b divided into groups.
- the bar image 83a is a long display image in the width direction, and different display forms are assigned in order from the left side. In the present embodiment, "1" to "10" are assigned to the bar image 83a in order from the left side.
- the slider image 83b is a display image displayed on the bar image 83a, and by moving left and right on the bar image 83a, the display form of the group to be displayed on the state map of the map display unit 80 can be selected.
- the slider image 83b is a frame-shaped display image whose length in the left-right direction is at least shorter than the length in the left-right direction of the bar image 83a.
- the left end of the slider image 83b corresponds to the first group G1
- the right end of the slider image 83b corresponds to the fifth group G5. Therefore, by moving the slider image 83b in the left-right direction, it is possible to select the display form of the first group G1 to the fifth group G5.
- the display change unit 83 When the display change unit 83 is operated and the display form of the group is selected, the display device 50 changes and displays the display form of the group to be displayed on the status map based on the operation information. For example, as shown in FIG. 4, the display changing unit 83 selects “1” as the display form of the first group G1 and “2” as the display form of the second group G2 in the initial state as shown in FIG. "3" is selected as the display form of the group G3, "4" is selected as the display form of the fourth group G4, and "5" is selected as the display form of the fifth group G5. Further, as shown in FIG.
- the display changing unit 83 selects “3” as the display form of the first group G1 and “7” as the display form of the fifth group G5.
- “4" is selected as the display form of the second group G2
- "5" is selected as the display form of the third group G3.
- the display changing unit 83 only needs to be able to change the display form of the group to be displayed on the state map by being operated, and the changing method and the display form are not limited to the above-described configuration.
- the display changing unit 83 may have a mode selection unit 83c.
- the mode selection unit 83c is an operable display image that is displayed adjacent to the bar image 83a, and by being operated, the bar image 83a is displayed as a display form of a group corresponding to the mode of the divided data.
- the slider image 83b is moved so that the display mode assigned to the center of the upper part is selected. That is, the central display form on the bar image 83a corresponding to the mode of the divided data is displayed as the horizontal reference plane F1. For example, in the example shown in FIG. 6, since the mode is the second group G2, the display form of the second group G2 is "5", which is the display form assigned to the center on the bar image 83a.
- the slider image 83b is moved to be selected.
- the first screen M1 may display the legend display unit 84 showing the relationship between the group and the first division data D1n instead of the display change unit 83.
- the legend display unit 84 is a long display image in the width direction, and different display forms are assigned in order from the left side.
- the groups are displayed in characters, and the legend display unit 84 is assigned "1" to "5" corresponding to the first group G1 to the fifth group G5 in order from the left side.
- a numerical value indicating the first divided data D1n is displayed in the vicinity of the numerical value.
- the display device 50 may display the gradient of the field based on the height acquired by the information acquisition unit 61a.
- the field information calculation unit 61b has a gradient calculation unit 72.
- the gradient calculation unit 72 is composed of electric / electronic components included in the calculation processing device 61, an electric circuit, a program stored in the storage device 62, and the like.
- the gradient calculation unit 72 calculates the gradient of the field based on the height acquired by the information acquisition unit 61a.
- the map calculation unit 70 calculates the slope of the field (direction of slope and angle of slope) based on the height assigned in the field.
- the gradient calculation unit 72 calculates the gradient of the field by performing the least squares plane calculation based on, for example, the height acquired by the information acquisition unit 61a and the least squares method. Specifically, the gradient calculation unit 72 calculates the gradient of the field by calculating the least squares plane using the first division data D1n based on the height acquired by the information acquisition unit 61a. As a result, as shown in FIG. 14, the inclined surface (reference surface) F1 which is the reference of the field is calculated by the gradient of the field calculated by the gradient calculation unit 72. The gradient calculated by the gradient calculation unit 72 is stored in the storage device 62.
- the method of calculating the gradient by the gradient calculation unit 72 is not limited to the above-mentioned method, and the gradient calculation unit 72 calculates the gradient of the field by calculating the least squares plane based on the height acquired by the information acquisition unit 61a. Alternatively, the gradient may be calculated without using the least squares method.
- the gradient calculation unit 72 can acquire the position information of the place where water is supplied to the field (water supply unit) and the place where drainage is performed (drainage unit) will be described.
- the position information of the water supply unit and the drainage unit is stored in the storage device 62 in advance, or the position information of the water supply unit and the drainage unit is input by a terminal communicably connected to the support device 60.
- the positions of the water supply part and the drainage part are selected and input in the map of the field displayed on the terminal.
- the gradient calculation unit 72 acquires the position information of the water supply unit and the drainage unit from the storage device 62 or the like, the distance between the water supply unit and the drainage unit and the direction from the water supply unit to the drainage unit (the direction from the water supply unit to the drainage unit) based on the position information. The direction of the slope) and. Further, the gradient calculation unit 72 determines the difference in height between the water supply unit and the drainage unit based on the divided data D1a of the area Qa corresponding to the water supply unit and the divided data D1b of the area Qb corresponding to the drainage unit. calculate. The gradient calculation unit 72 calculates the angle of the gradient based on the tangent of the calculated distance and the difference.
- the gradient calculation unit 72 calculates the gradient of the field based on, for example, the first division data D1n of the area in the peripheral portion of the field. First, the gradient calculation unit 72 averages the first division data D1n corresponding to one area Qn out of the area Qn in the peripheral portion of the field to the area Qn adjacent to the one area Qn, and calculates the division data. D2n is assigned as the divided data of the one area Qn.
- the gradient calculation unit 72 When the gradient calculation unit 72 allocates the divided data D2n, the gradient calculation unit 72 detects the area having the highest height among the divided data D2n of the area in the peripheral portion of the field as the area Qa corresponding to the water supply unit, and the height is the highest. The low area is detected as the area Qb corresponding to the drainage part. When the gradient calculation unit 72 detects the area Qa and the area Qb, the gradient calculation unit 72 determines the distance between the water supply unit and the drainage unit and the direction from the water supply unit to the drainage unit based on the position information of the area Qa and the area Qb. calculate.
- the gradient calculation unit 72 is based on the divided data D1a before averaging the area Qa corresponding to the water supply unit and the divided data D1b before averaging the area Qb corresponding to the drainage unit. Calculate the difference in height between the water supply section and the drainage section. The gradient calculation unit 72 calculates the gradient based on the tangent between the calculated distance and the difference.
- the display device 50 can display the second screen M2 showing the map around the field on which the work vehicle 2 travels, instead of the first screen M1.
- the second screen M2 can display the slope of the field as height information.
- the second screen M2 displays a map display unit 90, a display switching unit 91, an operation unit 92, a legend display unit 93, and a gradient display unit 94.
- the map display unit 90 displayed by the second screen M2 shows a state map in the same manner as the map display unit 80 and the like displayed by the first screen M1.
- the display switching unit 91 switches the screen displayed on the display device 50 from the second screen M2 to a different screen by being operated in the same manner as the display switching unit 81 displayed by the first screen M1.
- the operation unit 92 can perform various operations on the state map displayed on the map display unit 90, similarly to the operation unit 82 and the like displayed on the first screen M1. Further, the legend display unit 93 displays the relationship between the group and the first divided data D1n, similarly to the legend display unit 84 and the like displayed on the first screen M1.
- the gradient display unit 94 is a display area for displaying the gradient of the field calculated by the gradient calculation unit 72. As shown in FIG. 8, for example, the gradient display unit 94 displays the angle of the gradient of the field numerically, and displays the direction of the gradient with the arrow-shaped icon 94a. Specifically, the display device 50 acquires the angle of the gradient and the direction of the gradient stored in the storage device 62 from the support device 60, and displays the gradient display unit 94 based on the angle of the gradient and the direction of the gradient. .. In the present embodiment, the gradient display unit 94 numerically displays the angle of the gradient as "0.03 °". Further, the icon 94a of the gradient display unit 94 faces the left side, indicating that the direction of the gradient is from the right side to the left side of the field.
- the display device 50 may display the difference (unevenness) with respect to the reference surface F1 obtained by the height acquired by the information acquisition unit 61a.
- the field information calculation unit 61b has an unevenness calculation unit 73.
- the unevenness calculation unit 73 is composed of electric / electronic components included in the calculation processing device 61, an electric circuit, a program stored in the storage device 62, and the like.
- the field information calculation unit 61b has an unevenness calculation unit 73.
- the unevenness calculation unit 73 is composed of electric / electronic components included in the calculation processing device 61, an electric circuit, a program stored in the storage device 62, and the like.
- the unevenness calculation unit 73 calculates the difference with respect to the reference surface F1 obtained by the height as height information, and calculates the unevenness with respect to the reference surface F1.
- the reference surface F1 is an inclined surface based on the gradient calculated by the gradient calculation unit 72.
- the unevenness calculation unit 73 acquires the gradient calculated by the gradient calculation unit 72.
- the unevenness calculation unit 73 sets a correction coefficient (third division data D3n) so that the reference surface (inclined surface) F1 faces the horizontal direction, that is, the inclined surface F1 faces the vertical direction based on the gradient. calculate.
- the third divided data D3n the third divided data D3b of the area Qb corresponding to the drainage portion becomes zero.
- the unevenness calculation unit 73 calculates the third division data D3n of the reference surface F1 for each area Qn, the first division data D1n corresponding to each area Qn and the calculated third division data D3n of the reference surface F1 are obtained. The difference is calculated as unevenness.
- the unevenness calculation unit 73 allocates the calculated difference to the field as the fourth division data D4n.
- the fourth division data D4n calculated by the unevenness calculation unit 73 for each area Qn is assigned to each area Qn and stored in the storage device 62 as an unevenness map of the field. Further, when the unevenness map is stored in the storage device 62, the group setting unit 71 sets a group for the fourth division data D4n for each area Qn assigned by the unevenness calculation unit 73 in the unevenness map.
- the display device 50 can display the third screen M3 showing the map around the field on which the work vehicle 2 travels, instead of the first screen M1 and the second screen M2.
- the third screen M3 can display the difference (unevenness) with respect to the reference plane F1 obtained by the height as height information.
- the third screen M3 displays the map display unit 100, the display switching unit 101, the operation unit 102, the legend display unit 103, and the gradient display unit 104.
- the map display unit 100 displayed by the third screen M3 shows an uneven map unlike the map display units 80 and 90 displayed by the first screen M1 and the second screen M2.
- the display device 50 acquires the unevenness map stored in the storage device 62 from the support device 60, and displays the unevenness map on the map display unit 100.
- the map display unit 100 has a plurality of groups (plurality) indicating the height of the field according to the size (value) of the fourth divided data D4n with respect to the fourth divided data D4n corresponding to each of the plurality of areas Qn. It is a map to which the rank of) is assigned.
- the group (rank) is colored, numerically, and characters so that the group (rank) assigned in advance in the group setting unit 71 can be identified for each of the plurality of areas Qn. Etc. are shown.
- the numerical values shown in the plurality of areas Qn of the third screen M3 indicate the height of the unevenness with respect to the reference surface F1 of the field.
- the display switching unit 101 switches the screen displayed on the display device 50 from the third screen M3 to a different screen by being operated in the same manner as the display switching unit 81 displayed by the first screen M1.
- the operation unit 102 can perform various operations on the state map displayed on the map display unit 100, similarly to the operation unit 82 and the like displayed on the first screen M1.
- the legend display unit 103 displays the relationship between the group and the fourth divided data D4n, similarly to the legend display unit 84 and the like displayed on the first screen M1.
- the gradient display unit 104 is a display area for displaying the gradient of the field calculated by the gradient calculation unit 72 in the same manner as the gradient display unit 94 displayed by the second screen M2, and displays the angle of the gradient of the field numerically and the gradient. The direction of is displayed by the arrow-shaped icon 104a.
- the gradient display unit 104 may have a gradient changing unit 105 capable of operating the gradient angle and the gradient direction correction.
- the gradient changing unit 105 has an angle changing unit 105a capable of changing the angle of the gradient and a direction changing unit 105b capable of changing the direction of the gradient.
- the angle changing portion 105a is, for example, an increasing portion 105a1 that increases the magnitude of the gradient by being displayed and operated as "+”, and a decreasing portion 105a that is displayed and operated as "-" to decrease the angle of the gradient.
- a part 105a2 and the like are included.
- the direction changing section 105b has a first arrow section 105b1 that turns clockwise and changes the direction of the gradient clockwise by an operation, and a predetermined angle changing the direction of the gradient counterclockwise by turning counterclockwise and operating.
- the second arrow portion 105b2 and the like are included.
- the display device 50 outputs the operation information of the gradient changing unit 105 to the support device 60 via the communication device 63, and when the support device 60 acquires the operation information, the unevenness calculation unit 73 determines the angle and gradient of the corrected gradient.
- the unevenness with respect to the reference plane F1 based on the direction is calculated.
- the map information to which the unevenness calculation unit 73 allocates the corrected fourth division data D4n is stored in the storage device 62 as the corrected unevenness map.
- the map display unit 100 can display the unevenness map based on the gradient angle and the gradient direction corrected based on the change operation of the gradient changing unit 105 so that the transition from FIG. 9 to FIG. 10 is made. can.
- the display device 50 may display the height of the ideal surface F2 when performing the leveling work for leveling the unevenness of the field. Further, the display device 50 may display the amount of soil that is larger than the ideal surface F2 and is moved by the leveling work (hereinafter referred to as the amount of moving soil).
- the agricultural support system 1 includes an ideal surface calculation unit 74 and a soil production amount calculation unit 75.
- the ideal surface calculation unit 74 and the soil production amount calculation unit 75 are also used by the calculation processing device 61, and are composed of a CPU, an electronic circuit, and the like of the calculation processing device 61.
- the ideal surface calculation unit 74 calculates the height of the ideal surface F2.
- the ideal surface F2 is a surface where the amount of soil cultivated on the unevenness of the field is the same, and is parallel to the reference surface F1.
- the ideal surface calculation unit 74 calculates the height of the ideal surface F2 based on, for example, an unevenness map. Specifically, the ideal surface calculation unit 74 is corrected by the gradient based on the fourth division data D4n calculated by the unevenness calculation unit 73 for each area Qn and assigned to each area Qn and the area of the field. Calculate the volume of soil in the field. When the ideal surface calculation unit 74 calculates the volume of the soil, the height of the ideal surface F2 is calculated based on the calculated volume of the soil. The height of the ideal surface F2 is stored in the storage device 62 by the ideal surface calculation unit 74.
- the soil production amount calculation unit 75 calculates the height of the ideal surface F2, the area Qc that is more convex than the ideal surface F2, that is, the area Qc to which the fourth division data D4n higher than the height of the ideal surface F2 is assigned. To detect. When the soil production amount calculation unit 75 detects the area Qc, it calculates the difference between the height of the ideal surface F2 and the fourth division data D4n for each detected area Qc, and determines the soil production amount by the fifth division data D5n. Calculated as.
- the fifth division data D5n calculated by the soil cropping amount calculation unit 75 for each area Qn is assigned to each area Qn and stored in the storage device 62 as a soil cropping amount map of the field. Further, when the soil production amount map is stored in the storage device 62, the group setting unit 71 receives the fifth divided data D5n for each area Qn assigned by the soil production amount calculation unit 75 in the soil production amount map. Set up a group.
- the display device 50 can display the fourth screen M4 that displays the ideal surface map and the amount of moved soil, instead of the first screen M1 and the like.
- the fourth screen M4 displays a map display unit 110, a display switching unit 111, an operation unit 112, a legend display unit 113, a gradient display unit 114, and an ideal surface display unit 115.
- the map display unit 110 displayed by the fourth screen M4 shows a soil production amount map unlike the map display unit 80 and the like displayed by the first screen M1.
- the display device 50 acquires the soil production amount map stored in the storage device 62 from the support device 60, and displays the soil production amount map on the map display unit 110.
- the map display unit 110 When the map display unit 110 displays the soil production amount map, the map display unit 110 sets the size (value) of the fifth division data D5n to the fifth division data D5n corresponding to each of the plurality of areas Qn. It is a map to which multiple groups (multiple ranks) showing the amount of soil cropped are assigned accordingly.
- the group (rank) is colored, numerically, and characters so that the group (rank) assigned in advance in the group setting unit 71 can be identified for each of the plurality of areas Qn. Etc. are shown.
- the numerical values shown in the plurality of areas Qn of the fourth screen M4 indicate the amount of soil to be moved.
- the map display unit 110 displayed by the fourth screen M4 may display the soil production amount map and the unevenness map in a switchable manner.
- the display switching unit 111 switches the screen displayed on the display device 50 from the fourth screen M4 to a different screen by being operated in the same manner as the display switching unit 81 displayed by the first screen M1.
- the operation unit 112 can perform various operations on the state map displayed on the map display unit 110, similarly to the operation unit 82 and the like displayed on the first screen M1.
- the legend display unit 113 has divided data (fourth divided data D4n or fifth divided data D5n) corresponding to the map displayed on the group and the map display unit 110, similarly to the legend display unit 84 and the like displayed on the first screen M1. Display the relationship with.
- the gradient display unit 114 is a display area for displaying the gradient of the field calculated by the gradient calculation unit 72 in the same manner as the gradient display unit 94 and the like displayed on the second screen M2, and displays the angle of the gradient of the field numerically.
- the direction of the gradient is indicated by the arrow-shaped icon 114a.
- the ideal surface display unit 115 is a display image that displays the height of the ideal surface F2 calculated by the ideal surface calculation unit 74.
- the ideal surface display unit 115 is an arrow-shaped icon, and is ideal by pointing to the height displayed by the legend display unit 113 when the map display unit 110 of the fourth screen M4 displays the uneven map.
- the height of the surface F2 is displayed.
- the above-mentioned agricultural support system 1 has an information acquisition unit 61a that acquires the height when the work vehicle 2 travels in the field, and a field that is the height acquired by the information acquisition unit 61a and is based on a plurality of heights.
- a field information calculation unit 61b for calculating the state of the above is provided. According to the above configuration, the state of the field can be calculated based on the height acquired when the work vehicle 2 is running, and the efficiency of grasping the state of the field can be improved.
- the agricultural support system 1 includes a display device 50 that displays height information regarding the height acquired by the information acquisition unit 61a, and the display device 50 displays the gradient of the field as height information.
- the gradient of the field can be easily recognized by the height (height information) acquired by the running of the work vehicle 2.
- the display device 50 displays the difference with respect to the reference plane F1 obtained by the height as height information. According to the above configuration, it is possible to prevent the information on the unevenness of the field from being buried due to the slope of the field or the like.
- the agricultural support system 1 is provided in the work vehicle 2 and has a height detection device 43a for detecting the height of the work vehicle 2 when traveling in the field based on the signal of the positioning satellite Z, and a height detection device.
- Support having an information acquisition unit 61a for acquiring the height detected by 43a, and a field information calculation unit 61b for calculating the state of the field based on a plurality of heights acquired by the information acquisition unit 61a.
- the device 60 is provided. According to the above configuration, the state of the field can be calculated based on the height acquired when the work vehicle 2 is running, and the efficiency of grasping the state of the field can be improved.
- the agricultural support system 1 includes a display device 50 that displays height information regarding the height acquired by the information acquisition unit 61a, and the display device 50 displays the gradient of the field as height information.
- the gradient of the field can be easily recognized by the height (height information) acquired by the running of the work vehicle 2.
- the agricultural support system 1 includes a display device 50 that displays height information regarding the height acquired by the information acquisition unit 61a, and the display device 50 is a difference with respect to the reference surface F1 obtained by the height as the height information. Is displayed. According to the above configuration, it is possible to prevent the information on the unevenness of the field from being buried due to the slope of the field or the like. [Second Embodiment] FIG.
- the field information calculation unit 61b calculates the slope and unevenness of the field as the state of the field, but instead of or in addition to the slope and unevenness of the field, the state of the field of the field is calculated. It may be configured to calculate the soil depth. In such a case, the display device 50 displays the soil depth of the field calculated by the field information calculation unit 61b.
- the agricultural support system 1 of the second embodiment will be mainly described with a configuration different from that of the above-described embodiment (first embodiment), and the configurations common to the first embodiment will be described in detail with the same reference numerals. Is omitted.
- the field information calculation unit 61b has a soil depth calculation unit 76.
- the soil depth calculation unit 76 is composed of electric / electronic parts, an electric circuit, a program stored in the storage device 62, and the like included in the calculation processing device 61.
- the soil depth calculation unit 76 calculates the state of the field based on the first height and the second height acquired by the information acquisition unit 61a as a plurality of heights.
- the first height is the height when the work vehicle 2 is run in a predetermined first period
- the second height is the height when the work vehicle 2 is driven. It is the height when running in the second period, which is different from the first period.
- the work vehicle 2 traveling in the first period may be described as the first work vehicle 2A
- the work vehicle 2 traveling in the second period may be described as the second work vehicle 2B.
- the first work vehicle 2A is a tractor 2A that pulls a tilling device to be cultivated
- the second work vehicle 2B is a rice transplanter 2B. Therefore, as shown in FIG. 14, the first work vehicle (tractor) 2A runs on the surface of the soil in the field, and the first height is the height of the surface of the soil.
- the second work vehicle (rice transplanter) 2B runs on the surface of the hard disk layer in the field, and the second height is the height of the surface of the hard disk layer.
- the first period is the time when the tractor 2A pulls the tilling device to cultivate the field
- the second period is the time when the rice transplanter 2B cultivates the field.
- the height detection device 43a (hereinafter referred to as the first detection device 43a1) provided in the first work vehicle 2A detects the first height
- the height detection device 43a provided in the second work vehicle 2B (Hereinafter referred to as the second detection device 43a2) detects the second height.
- the combination of the first work vehicle 2A and the second work vehicle 2B is not limited to the above-mentioned combination, and the first work vehicle 2A may be the tractor 2A and the second work vehicle 2B may be the combine 2C. It may be selected according to the state of the field to be calculated. Hereinafter, the calculation of the state of the field (soil depth) by the soil depth calculation unit 76 will be described in detail.
- the first work vehicle 2A travels in the field, and the first detection device 43a1 detects the first height. Further, the first work vehicle 2A preferably moves to an arbitrary reference position where the ground plane of the work vehicle 2 is horizontal and relatively hard, and the first detection device 43a1 moves to an arbitrary reference position at the reference position. Is detected.
- the reference position is, for example, a road adjacent to a field and made of concrete, asphalt, or the like.
- the second work vehicle 2B runs in the field, and the second detection device 43a2 detects the second height.
- the first detection device 43a1 moves to the reference position where the first reference height is detected, and the second detection device 43a2 detects the second reference height at the reference position.
- the soil depth calculation unit 76 acquires a field state map in which the map calculation unit 70 assigns division data to each of the plurality of areas Qn from the storage device 62, and calculates the soil depth in the field based on the state map. ..
- the first divided data D1n based on the first height is referred to as the first data D7n
- the first divided data D1n based on the second height is referred to as the second data D8n.
- the state map corresponding to the first height is referred to as a first state map
- the state map corresponding to the second height is referred to as a second state map
- the first state map and the second state map are used.
- the mesh sizes of the first state map are the same, and the area Qn of the first state map and the area Qn of the second state map are common.
- the map calculation unit 70 when the map calculation unit 70 allocates the first data D7n to a plurality of areas Qn based on the first height, the map calculation unit 70 has a first height unlike the first embodiment.
- the first reference height is used for correction, and the second height is corrected for the second reference height.
- the map calculation unit 70 calculates the difference between the plurality of first heights and the first reference height, which is the first height acquired by the information acquisition unit 61a, and sets the height as the first data D7n, respectively. Based on the latitude and longitude of the data, the divided data is assigned to each position where the height is detected.
- the map calculation unit 70 allocates the second data D8n to a plurality of areas Qn based on the second height
- the map calculation unit 70 is different from the first embodiment in that the second height acquired by the information acquisition unit 61a. Then, the difference between the plurality of second heights and the second reference height is calculated, and the divided data is divided for each position where the height is detected based on the latitude and longitude of the height data as the second data D8n, respectively. assign.
- the soil depth calculation unit 76 acquires the first state map and the second state map from the storage unit 41, and determines the soil depth for each area Qn based on the first state map and the second state map. calculate. That is, the soil depth calculation unit 76 creates soil based on the difference between the height obtained by correcting the first height by the first reference height and the height obtained by correcting the second height by the second reference height. Calculate the depth. Specifically, the soil depth calculation unit 76 calculates the soil depth for each area Qn by calculating the difference between the first data D7n and the second data D8n.
- the soil depth for each area Qn is the difference (second height) between the second height detected by the second detection device 43a2 of the rice transplanter 2B (second work vehicle 2B) and the second reference height.
- the soil depth calculated by the soil depth calculation unit 76 calculated by the difference between) and the soil depth (7th division data D9n) is assigned to each area Qn and stored as a soil depth map of the field. It is stored in the device 62. Further, when the soil depth map is stored in the storage device 62, the group setting unit 71 receives the 7th division data D9n for each area Qn assigned by the soil depth calculation unit 76 in the soil depth map. Set up a group.
- the display device 50 can display the fifth screen M5 showing the map around the field on which the work vehicle 2 travels.
- the fifth screen M5 can display the soil depth of the field calculated by the field information calculation unit 61b as height information.
- the fifth screen M5 displays the map display unit 120, the display switching unit 121, the operation unit 122, and the legend display unit 123.
- the map display unit 120 displayed by the fifth screen M5 shows a soil depth map unlike the map display unit 120 displayed by the first screen M1.
- the display device 50 acquires the soil depth map stored in the storage device 62 from the support device 60, and displays the soil depth map on the map display unit 120.
- the map display unit 120 has a plurality of groups (plurality) indicating the height of the field according to the size (value) of the 7th division data D9n with respect to the 7th division data D9n corresponding to each of the plurality of areas Qn. It is a map to which the rank of) is assigned.
- the group (rank) is colored, numerically, and characters so that the group (rank) assigned in advance in the group setting unit 71 can be identified for each of the plurality of areas Qn. Etc. are shown.
- the numerical values shown in the plurality of areas Qn of the fifth screen M5 indicate the soil depth.
- the display switching unit 121 switches the screen displayed on the display device 50 from the fifth screen M5 to a different screen by being operated in the same manner as the display switching unit 121 displayed by the first screen M1.
- the operation unit 122 can perform various operations on the state map displayed on the map display unit 120, similarly to the operation unit 122 and the like displayed on the first screen M1.
- the legend display unit 123 displays the relationship between the group and the seventh divided data D9n, similarly to the legend display unit 123 and the like displayed by the first screen M1.
- the above-mentioned information acquisition unit 61a has a first height, which is the height when the work vehicle 2 is run in the first period, and a second height, which is the height when the work vehicle 2 is run in the second period.
- the field information calculation unit 61b calculates the state of the field based on the first height and the second height acquired by the information acquisition unit 61a as a plurality of heights. According to the above configuration, it is possible to improve the calculation accuracy of the state of the field.
- the field information calculation unit 61b calculates the soil depth of the field as the state of the field based on the difference between the first height and the second height. According to the above configuration, the soil depth can be calculated relatively easily. Further, the information acquisition unit 61a has a first reference height, which is the height when the work vehicle 2 is located at a predetermined reference position in the first period, and the work vehicle 2 is located at the reference position in the second period. The second reference height, which is the height at the time of being used, is acquired, and the field information calculation unit 61b obtains the height obtained by correcting the first height with the first reference height and the second height as the second reference height. Based on the difference between the height corrected in and the height, the soil depth of the field is calculated as the state of the field. According to the above configuration, even when the reference heights of the first height and the second height change between the first period and the second period, calibration can be performed at a predetermined reference position. As a result, the soil depth of the field can be calculated accurately.
- the height detection device 43a is a first detection device 43a1 provided in the first work vehicle 2A, which is a work vehicle 2 that performs work in the first period, and a work vehicle 2 that performs work in the second period.
- the information acquisition unit 61a includes the second detection device 43a2 provided in the work vehicle 2B, the first height which is the height detected by the first detection device 43a1, and the height detected by the second detection device 43a2.
- the second height is acquired, and the field information calculation unit 61b calculates the state of the field as a plurality of heights based on the first height and the second height acquired by the information acquisition unit 61a. According to the above configuration, it is possible to improve the calculation accuracy of the state of the field.
- the field information calculation unit 61b calculates the soil depth of the field as the state of the field based on the difference between the first height and the second height. According to the above configuration, the soil depth can be calculated relatively easily. Further, the information acquisition unit 61a is based on the first reference height, which is the height detected by the first detection device 43a1 when the first work vehicle 2A is located at a predetermined reference position, and the second work vehicle 2B. The second reference height, which is the height detected by the second detection device 43a2 when the position is located, is acquired, and the field information calculation unit 61b corrects the first height with the first reference height.
- the soil depth of the field is calculated as the state of the field. According to the above configuration, even if the reference heights of the first detection device 43a1 and the second detection device 43a2 are different, calibration can be performed at a predetermined reference position. As a result, the soil depth of the field can be calculated accurately.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Business, Economics & Management (AREA)
- Primary Health Care (AREA)
- Tourism & Hospitality (AREA)
- Mining & Mineral Resources (AREA)
- Animal Husbandry (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Agronomy & Crop Science (AREA)
- Strategic Management (AREA)
- Marine Sciences & Fisheries (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Mechanical Engineering (AREA)
- Soil Sciences (AREA)
- Environmental Sciences (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Guiding Agricultural Machines (AREA)
- Lifting Devices For Agricultural Implements (AREA)
Abstract
圃場の状態を容易に取得する。 農業支援システム(1)は、作業車両(2)が圃場を走行したときの高さを取得する情報取得部(61a)と、情報取得部(61a)が取得した高さであって複数の高さに基づいて、圃場の状態を演算する圃場情報演算部(61b)と、を備えている。また、情報取得部(61a)は、作業車両(2)を第1時期に走行させたときの高さである第1高さと、作業車両(2)を第2時期に走行させたときの高さである第2高さとを取得し、圃場情報演算部(61b)は、複数の高さとして、情報取得部(61a)が取得した第1高さと第2高さとに基づいて、圃場の状態を演算する。
Description
本発明は、農業支援システムに関する。
特許文献1に開示された圃場給水予約システムは、圃場の集合体である圃場群に対して灌漑用水の給水を予約する圃場給水予約システムであって、所定期間内の圃場群ごとの許容最大給水量を取得する許容最大給水量取得手段と、圃場識別情報、給水日時情報及び必要給水量を含む給水予約情報に基づいて、圃場群ごとに必要給水量の合計が許容最大給水量を下回る給水可能量及び給水可能日時を含む給水可能スケジュールを生成する給水スケジュール管理手段と、を備えている。
特許文献1の給水スケジュール管理手段では必要な時期に必要な量の灌漑用水を圃場に給水できる。
しかしながら、特許文献1のような給水スケジュール管理手段を利用して圃場に適切な量の給水を行ったり、圃場の凹凸や傾斜がある場合であってもトラクタやコンバイン等の作業車両が正確に走行させたりするためには、予め圃場の高さを含む圃場の状態を正確に取得する必要があった。
しかしながら、特許文献1のような給水スケジュール管理手段を利用して圃場に適切な量の給水を行ったり、圃場の凹凸や傾斜がある場合であってもトラクタやコンバイン等の作業車両が正確に走行させたりするためには、予め圃場の高さを含む圃場の状態を正確に取得する必要があった。
本発明は、このような従来技術の問題点を解決すべくなされたものであって、圃場の状態を容易に取得する農業支援システムの提供を目的とする。
本発明の一態様に係る農業支援システムは、作業車両が圃場を走行したときの高さを取得する情報取得部と、情報取得部が取得した高さであって複数の高さに基づいて、圃場の状態を演算する圃場情報演算部と、を備えている。
また、情報取得部は、作業車両を第1時期に走行させたときの高さである第1高さと、作業車両を第2時期に走行させたときの高さである第2高さとを取得し、圃場情報演算部は、複数の高さとして、情報取得部が取得した第1高さと第2高さとに基づいて、圃場の状態を演算する。
また、情報取得部は、作業車両を第1時期に走行させたときの高さである第1高さと、作業車両を第2時期に走行させたときの高さである第2高さとを取得し、圃場情報演算部は、複数の高さとして、情報取得部が取得した第1高さと第2高さとに基づいて、圃場の状態を演算する。
また、圃場情報演算部は、第1高さと第2高さとの差に基づいて、圃場の状態として圃場の作土深を演算する。
また、情報取得部は、作業車両が第1時期に所定の基準位置に位置しているときの高さである第1基準高さと、作業車両が第2時期に基準位置に位置しているときの高さである第2基準高さとを取得し、圃場情報演算部は、第1高さを第1基準高さで補正した高さと、第2高さを第2基準高さで補正した高さと、の差に基づいて、圃場の状態として圃場の作土深を演算する。
また、情報取得部は、作業車両が第1時期に所定の基準位置に位置しているときの高さである第1基準高さと、作業車両が第2時期に基準位置に位置しているときの高さである第2基準高さとを取得し、圃場情報演算部は、第1高さを第1基準高さで補正した高さと、第2高さを第2基準高さで補正した高さと、の差に基づいて、圃場の状態として圃場の作土深を演算する。
また、農業支援システムは、情報取得部が取得した高さに関する高さ情報を表示する表示装置を備え、表示装置は、高さ情報として圃場の勾配を表示する。
また、表示装置は、高さ情報として高さによって得られた基準面に対する差分を表示する。
また、農業支援システムは、作業車両に設けられ且つ、測位衛星の信号に基づいて作業車両が圃場を走行したときの高さを検出する高さ検出装置と、高さ検出装置が検出した高さを取得する情報取得部と、情報取得部が取得した高さであって複数の高さに基づいて圃場の状態を演算する圃場情報演算部と、を有する支援装置と、を備えている。
また、表示装置は、高さ情報として高さによって得られた基準面に対する差分を表示する。
また、農業支援システムは、作業車両に設けられ且つ、測位衛星の信号に基づいて作業車両が圃場を走行したときの高さを検出する高さ検出装置と、高さ検出装置が検出した高さを取得する情報取得部と、情報取得部が取得した高さであって複数の高さに基づいて圃場の状態を演算する圃場情報演算部と、を有する支援装置と、を備えている。
また、高さ検出装置は、第1時期に作業を行う作業車両である第1作業車両に設けられた第1検出装置と、第2時期に作業を行う作業車両である第2作業車両に設けられた第2検出装置とを含み、情報取得部は、第1検出装置が検出した高さである第1高さと、第2検出装置が検出した高さである第2高さとを取得し、圃場情報演算部は、複数の高さとして、情報取得部が取得した第1高さと第2高さとに基づいて、圃場の状態を演算する。
また、圃場情報演算部は、第1高さと第2高さとの差に基づいて、圃場の状態として圃場の作土深を演算する。
また、情報取得部は、第1作業車両が所定の基準位置に位置しているときに第1検出装置が検出した高さである第1基準高さと、第2作業車両が基準位置に位置しているときに第2検出装置が検出した高さである第2基準高さとを取得し、圃場情報演算部は、第1高さを第1基準高さで補正した高さと、第2高さを第2基準高さで補正した高さと、の差に基づいて、圃場の状態として圃場の作土深を演算する。
また、情報取得部は、第1作業車両が所定の基準位置に位置しているときに第1検出装置が検出した高さである第1基準高さと、第2作業車両が基準位置に位置しているときに第2検出装置が検出した高さである第2基準高さとを取得し、圃場情報演算部は、第1高さを第1基準高さで補正した高さと、第2高さを第2基準高さで補正した高さと、の差に基づいて、圃場の状態として圃場の作土深を演算する。
また、農業支援システムは、情報取得部が取得した高さに関する高さ情報を表示する表示装置を備え、表示装置は、高さ情報として圃場の勾配を表示する。
また、農業支援システムは、情報取得部が取得した高さに関する高さ情報を表示する表示装置を備え、表示装置は、高さ情報として高さによって得られた基準面に対する差分を表示する。
また、農業支援システムは、情報取得部が取得した高さに関する高さ情報を表示する表示装置を備え、表示装置は、高さ情報として高さによって得られた基準面に対する差分を表示する。
上記農業支援システムによれば、圃場の状態を容易に取得できる。
以下、本発明の一実施形態について、図面を参照しながら説明する。
[第1実施形態]
図1は、農業支援システム1を示している。農業支援システム1は、例えば、作業車両2が圃場を走行したときの高さに基づいて、圃場の状態を演算するシステムである。作業車両2は、インプルメント等の作業装置10が装着されたトラクタ2A、田植機2B、及び収穫を行うコンバイン2C等の農業機械を含んでいる。
[第1実施形態]
図1は、農業支援システム1を示している。農業支援システム1は、例えば、作業車両2が圃場を走行したときの高さに基づいて、圃場の状態を演算するシステムである。作業車両2は、インプルメント等の作業装置10が装着されたトラクタ2A、田植機2B、及び収穫を行うコンバイン2C等の農業機械を含んでいる。
図1に示すように、トラクタ2Aは、走行装置7を有する走行車両3と、原動機4と、変速装置(図示略)とを備えている。走行装置7は、タイヤ型の走行装置又はクローラ型の走行装置である。原動機4は、ディーゼルエンジン、電動モータ等である。変速装置は、変速によって走行装置7の推進力を切換可能であると共に、走行装置7の前進、後進の切換が可能である。走行車両3には運転席6が設けられている。
また、走行車両3の後部には、3点リンク機構等で構成された連結部8が設けられている。連結部8には、作業装置10が着脱可能である。作業装置10を連結部8に連結することによって、走行車両3によって作業装置10を牽引することができる。作業装置10は、耕耘する耕耘装置、肥料を散布する肥料散布装置、農薬を散布する農薬散布装置、収穫を行う収穫装置、牧草等の刈取を行う刈取装置、牧草等の拡散を行う拡散装置、牧草等の集草を行う集草装置、牧草等の成形を行う成形装置等である。本実施形態において、作業装置10は耕耘装置であり、耕耘装置はトラクタ2Aに牽引されて圃場の耕耘を行う。
図1に示すように、田植機2Bは、走行装置17を有する走行車両13と、原動機14と、変速装置(図示略)と、苗植付装置18とを備えている。走行装置17は、タイヤ型の走行装置である。原動機14は、ディーゼルエンジン、電動モータ等である。変速装置は、変速によって走行装置17の推進力を切換可能であると共に、走行装置17の前進、後進の切換が可能である。走行車両13には運転席16が設けられている。苗植付装置18は走行車両13の後部に設けられている。苗植付装置18は、苗が搭載される苗載せ台18aを有し、当該苗載せ台18aから苗を取り出して、圃場等に植え付ける。
図1に示すように、コンバイン2Cは、走行装置27を有する走行車両23と、原動機24と、変速装置(図示略)と、作物(例えば、穀物)を刈り取る刈取部28と、脱穀処理する脱穀装置(図示略)と、脱穀された作物を貯留するグレンタンク30と、を備えている。原動機24は、ディーゼルエンジン、電動モータ等である。変速装置は、変速によって走行装置27の推進力を切換可能であると共に、走行装置27の前進、後進の切換が可能である。走行車両23には運転席26が設けられている。なお、作業車両2は圃場を走行する車両であればよく、前述した作業車両2は一例であり限定されず、また、トラクタ2A、田植機2B、及びコンバイン2Cの構成は上述した構成に限定されない。
図1に示すように、作業車両2は、制御装置40と、記憶部41と、通信部42と、位置検出装置43と、を備えている。制御装置40は、作業車両2を制御する装置であって、CPU等である。例えば、制御装置40は作業車両2に設けられた操作装置の操作に基づいて原動機等の機器の制御を行う。
記憶部41は、不揮発性のメモリ等であって、情報を記憶する記憶領域を構成する。記憶部41は、制御装置40の制御プログラムや外部から取得した情報を記憶する。
記憶部41は、不揮発性のメモリ等であって、情報を記憶する記憶領域を構成する。記憶部41は、制御装置40の制御プログラムや外部から取得した情報を記憶する。
通信部42は、外部(例えば、後述の支援装置60)と直接通信及び間接通信のいずれかを行う通信モジュールであって、例えば、通信規格であるIEEE802.11シリーズのWi-Fi(Wireless Fidelity、登録商標)、BLE(Bluetooth(登録商標) Low Energy)、LPWA(Low Power, Wide Area)、LPWAN(Low-Power Wide-Area Network)等により無線通信を行うことができる。また、通信部42は、例えば、携帯電話通信網又はデータ通信網などにより無線通信を行うことができる。
位置検出装置43は、作業車両2に装着されている。なお、位置検出装置43の作業車両2における装着場所は限定されず、別の場所であってもよい。位置検出装置43は、衛星測位システムによって自己の位置(緯度、経度、高度を含む測位情報)を検出する装置である。即ち、位置検出装置43は、測位衛星Zから送信された信号(測位衛星Zの位置、送信時刻、補正情報等)を受信し、受信した信号に基づいて位置(緯度、経度、及び高度)を検出する。なお、位置検出装置43は、測位衛星Zからの信号を受信可能な基地局(基準局)からの補正等の信号に基づいて補正した位置を、自己の位置(緯度、経度、及び高度)として検出してもよい。また、位置検出装置43がジャイロセンサや加速度センサ等の慣性計測装置を有し、慣性計測装置によって補正した位置を、自己の位置として検出してもよい。
図1に示すように、農業支援システム1は、表示装置50を備えている。表示装置50は、様々な情報を表示可能な装置であって、液晶パネル、タッチパネル、その他のパネルのいずれかを有する装置である。例えば、表示装置50は、作業車両2に搭乗する作業者の周囲に設けられたターミナル表示装置である。ターミナル表示装置は、車載ネットワークを介して、制御装置40、及び通信部42等に接続されている。ターミナル表示装置は、通信部42等を介して支援装置60から様々な情報を取得して、当該情報を表示することが可能である。なお、表示装置50は、支援装置60から取得した情報を表示することができればよく、上述したターミナル表示装置に限定されず、作業車両2に搭乗して当該作業車両2を操作する運転者が所持する携帯端末や、管理者が有する管理端末であってもよい。携帯端末及び管理端末は、PCや比較的演算能力の高いスマートフォン(多機能携帯電話)等で構成されている。斯かる場合において、携帯端末及び管理端末は、支援装置60と直接通信及び間接通信のいずれかを行う装置を有し、当該装置を介して支援装置60から様々な情報を取得して、当該情報を表示することが可能である。
図1に示すように、支援装置60は、例えば、農家、営農会社、作業機械(農業機械)メーカ、農業のサービス等に設置されたサーバである。支援装置60は、外部から受信(取得)した情報(データ)の記憶、演算処理や管理を行う。支援装置60は、演算処理装置61と、記憶装置62と、通信装置63と、を有している。演算処理装置61は、CPUや電子回路等から構成され、外部から取得した様々情報の演算処理を行う。
記憶装置62は、不揮発性のメモリ等であって、情報を記憶する記憶領域を構成する。記憶装置62は、演算処置装置の処理プログラムや外部から取得した情報を記憶する。
通信装置63は、作業車両2と直接通信及び間接通信のいずれかを行う通信モジュールであって、例えば、通信規格であるIEEE802.11シリーズのWi-Fi(Wireless Fidelity、登録商標)、BLE(Bluetooth(登録商標) Low Energy)、LPWA(Low Power, Wide Area)、LPWAN(Low-Power Wide-Area Network)等により無線通信を行うことができる。また、通信装置63は、例えば、携帯電話通信網又はデータ通信網などにより無線通信を行うことができ、通信部42及び車載ネットワークを介して間接通信を行い、演算処理を行った様々な情報を表示装置50に出力する。なお、表示装置50が携帯端末及び管理端末である場合、支援装置60は、表示装置50と直接通信を行い、演算処理を行った様々な情報を表示装置50に出力することが可能である。
通信装置63は、作業車両2と直接通信及び間接通信のいずれかを行う通信モジュールであって、例えば、通信規格であるIEEE802.11シリーズのWi-Fi(Wireless Fidelity、登録商標)、BLE(Bluetooth(登録商標) Low Energy)、LPWA(Low Power, Wide Area)、LPWAN(Low-Power Wide-Area Network)等により無線通信を行うことができる。また、通信装置63は、例えば、携帯電話通信網又はデータ通信網などにより無線通信を行うことができ、通信部42及び車載ネットワークを介して間接通信を行い、演算処理を行った様々な情報を表示装置50に出力する。なお、表示装置50が携帯端末及び管理端末である場合、支援装置60は、表示装置50と直接通信を行い、演算処理を行った様々な情報を表示装置50に出力することが可能である。
図1に示すように、農業支援システム1は、高さ検出装置43aと、情報取得部61aと、圃場情報演算部61bと、を備えている。高さ検出装置43aは、作業車両2に設けられ且つ、測位衛星Zの信号に基づいて作業車両2が圃場を走行したときの高さを検出する。本実施形態において、高さ検出装置43aは、位置検出装置43が兼用する。高さ検出装置43a(位置検出装置43)は、測位衛星Zから送信された信号(測位衛星Zの位置、送信時刻、補正情報等)を受信し、受信した信号に基づいて位置(緯度、経度、及び高度)を検出し、制御装置40は、当該緯度、経度、及び高度を作業車両2の個別情報や検出した日付等と対応付けて位置情報として記憶部41に記憶する。
なお、本実施形態において、位置検出装置43が高さ検出装置43aを兼用するが、高さ検出装置43aは、位置検出装置43と別に設けられていてもよく、位置検出装置43が受信した衛星信号に基づいて緯度及び経度を検出して、高さを検出しない場合、高さ検出装置43aは、位置検出装置43とは別に作業車両2に設けられ、衛星信号や加速度情報等に基づいて高さを検出してもよい。記憶部41に記憶された位置情報は、通信部42によって支援装置60に出力される。
情報取得部61a及び圃場情報演算部61bは、演算処理装置61が兼用しており、当該演算処理装置61のCPUや電子回路等から構成されている。情報取得部61aは、作業車両2が圃場を走行したときの高さを取得する。具体的には、情報取得部61aは、通信装置63及び通信部42を介して作業車両2から位置情報を取得する。情報取得部61aは、記憶装置62に予め記憶された補正値に基づいて、位置情報のうち高さを作業車両2の接地面の高さに補正する。補正値は、接地面を基準とした位置検出装置43の高さである。これにより、情報取得部61aは、作業車両2が圃場を走行したときの高さを取得する。情報取得部61aが取得した高さは、当該高さが検出された位置における緯度、経度、作業車両2の個別情報、及び検出した日付等と対応付けて高さデータとして記憶装置62に記憶される。このため、記憶装置62には複数の高さデータが蓄積され、記憶装置62には緯度及び経度と対応付けられた高さの情報が複数記憶される。なお、情報取得部61aは、作業車両2が圃場を走行したときの高さを取得すればよく、その取得方法は上記方法に限定されない。
圃場情報演算部61bは、情報取得部61aが取得した高さであって複数の高さに基づいて、圃場の状態を演算する。圃場情報演算部61bは、情報取得部61aが取得した高さデータに所定の演算処理を行う。具体的には、圃場情報演算部61bは、例えばマップ演算部70と、グループ設定部71と、を有している。マップ演算部70及びグループ設定部71は、演算処理装置61が有する電気・電子部品、電気回路、及び記憶装置62に格納されたプログラム等から構成されている。
マップ演算部70は、情報取得部61aが取得した高さに基づいて、当該高さに基づく情報を圃場内に割り当てる処理を行う。マップ演算部70は、情報取得部61aが取得した高さに基づいて、情報取得部61aが取得した高さ、又は当該高さと任意の基準に基づいて当該基準からの高さを圃場の高さとして圃場内に割り当てる。
具体的には、マップ演算部70は、情報取得部61aが取得した高さであって複数の高さのうち、基準として最小値を取得する。マップ演算部70は、最小値を取得すると、情報取得部61aが取得した高さであって複数の高さと最小値との差分を算出する。即ち、当該差分は、取得した最小値を基準とした圃場の高さである。マップ演算部70は、それぞれの差分を分割データ(第1分割データD1n,n=1,2,3・・・n)として、高さデータの緯度及び経度に基づいて、高さを検出した位置ごとに第1分割データD1nを割り当てる。
具体的には、マップ演算部70は、情報取得部61aが取得した高さであって複数の高さのうち、基準として最小値を取得する。マップ演算部70は、最小値を取得すると、情報取得部61aが取得した高さであって複数の高さと最小値との差分を算出する。即ち、当該差分は、取得した最小値を基準とした圃場の高さである。マップ演算部70は、それぞれの差分を分割データ(第1分割データD1n,n=1,2,3・・・n)として、高さデータの緯度及び経度に基づいて、高さを検出した位置ごとに第1分割データD1nを割り当てる。
例えば、図2に示すように、マップ演算部70は、1つの圃場内を複数のエリアQn(n=1,2,3・・・n)に区分したメッシュ型のマップを作成して、複数のエリアQnにそれぞれ対応する分割データ(第1分割データD1n)を割り当てる。例えば、図2に示すように、メッシュサイズが10mである場合、マップ演算部70は、エリアQnの1辺の幅(縦幅、横幅)を10mに設定して、10mごとに作業場を複数のエリアQnに区切り、当該メッシュサイズで区切ることで形成したエリアQnに入るデータとして高さと最小値との差分を分割する。ここで、マップ演算部70は、エリアQnに入る差分が複数ある場合には、例えば、データの値(差分)を平均し、平均値をエリアQnに対応する第1分割データD1nとして割り当てる。また、マップ演算部70は、エリアQnに入るデータが1つである場合には、当該データをエリアQnに対応する第1分割データD1nとして割り当てる。マップ演算部70がエリアQn毎に第1分割データD1nを割り当てたマップ情報は、圃場の状態マップとして記憶装置62に記憶される。
なお、メッシュサイズは、支援装置60に通信可能に接続された端末を操作して設定変更することができてもよい。また、情報取得部61aが取得した高さに基づいて圃場の高さをマップに割り当てる方法は、上述した方法に限定されず、取得した高さをエリアQnに入るデータとして分割してもよいし、マップ上に配置されるプロットとして高さを割り当ててもよいし、マップ上にグループに対応する等高線を作成して、高さを割り当てるような構成であってもよい。また、本実施形態において、第1分割データD1nは、情報取得部61aが取得した高さであって複数の高さのうち最小値を基準とした高さであるが、当該最小値以外の任意の高さを基準としてもよい。
図2に示すように、グループ設定部71は、エリアQn毎に、それぞれのエリアQnに対応する分割データにグループを設定する。例えば、グループ設定部71は、状態マップにおいてマップ演算部70で割り当てられたエリアQn毎の第1分割データD1nに対して、グループを設定する。支援装置60に、予めグループ数とグループ毎の基準値(上限値、下限値)との関係を示すグループ設定情報が記憶されており、グループ設定部71は、グループ設定情報を参照し、分割データとグループ毎の基準値とを比較して、分割データ毎にグループを割り当てることで、グループを設定する。
分割データは、高さの数値に応じて複数の段階のグループに分けられ、最も高さが低い(最も値が小さい)グループが「第1グループG1」、最も高さが高い(最も値が大きい)グループが「第nグループGn」に割り当てられる。本実施形態において、図3の一覧表T1に示すように、グループは、第1グループG1から第5グループG5の5段階である。「第1グループG1」から「第5グループG5」の間に、数値の大きさの低いグループから順に、「第2グループG2」~「第4グループG4」が割り当てられている。なお、分割データを、どのグループに分けるかは任意であって、上述した例に限定されない。図3に示した数値は、グループ分けを説明するための数値であり、限定されない。
図4に示すように、表示装置50は、作業車両2が走行する圃場の周辺地図を示す第1画面M1を表示可能である。第1画面M1は、少なくとも情報取得部61aが取得した高さに関する高さ情報を表示する。また、第1画面M1は、高さ情報として圃場の高さを表示可能である。第1画面M1は、マップ表示部80と、表示切換部81と、操作部82と、表示変更部83と、を表示する。
表示装置50は支援装置60から記憶装置62に記憶されている状態マップを取得し、マップ表示部80に状態マップを表示する。マップ表示部80は、複数のエリアQnにそれぞれ対応する第1分割データD1nに対して、当該第1分割データD1nの大きさ(値)に応じて、圃場の高さを示す複数のグループ(複数のランク)が割り当てられたマップである。マップ表示部80においては、複数のエリアQn毎に、グループ設定部71において予め割り当てられたグループ(ランク)が識別できるように、グループ(ランク)が色、数値、文字等で示されている。図4の例の場合、第1画面M1の複数のエリアQn内に示した数値が圃場の高さを示している。
表示切換部81は、操作可能な表示画像であり、操作されることで表示装置50に表示する画面を第1画面M1から異なる画面に切り換えることができる。また、表示切換部81には、遷移可能な画面の名称が表示されており、表示中の画面の名称は、グレーアウトして表示される。
操作部82は、マップ表示部80に表示される状態マップに様々な操作を行うことができる表示領域である。操作部82は、例えばマップを拡大及び縮小させる操作や、マップに作業車両2の現在地を表示させる操作を行うことができる。
操作部82は、マップ表示部80に表示される状態マップに様々な操作を行うことができる表示領域である。操作部82は、例えばマップを拡大及び縮小させる操作や、マップに作業車両2の現在地を表示させる操作を行うことができる。
表示変更部83は、操作可能な表示画像であり、操作されることで状態マップに表示するグループの表示形態を変更することができる。表示変更部83は、例えばグループ毎に区分されたバー画像83aとスライダ画像83bと、を有している。バー画像83aは、幅方向に長尺の表示画像であり、左側から順に異なる表示形態が割り当てられている。本実施形態において、バー画像83aは、左側から順に、「1」~「10」が割り当てられている。
スライダ画像83bは、バー画像83a上に表示される表示画像であり、バー画像83a上を左右に移動することで、マップ表示部80の状態マップに表示するグループの表示形態を選択可能である。本実施形態において、スライダ画像83bは、左右方向の長さが少なくともバー画像83aの左右方向の長さよりも短い枠状の表示画像である。スライダ画像83bの左端部は、第1グループG1と対応し、スライダ画像83bの右端部は、第5グループG5と対応している。このため、スライダ画像83bを左右方向に移動させることで、第1グループG1~第5グループG5の表示形態を選択可能である。
表示変更部83が操作され、グループの表示形態を選択すると、表示装置50は、当該操作情報に基づいて、状態マップに表示するグループの表示形態を変更して表示する。表示変更部83は、例えば、図4に示すように初期状態において、第1グループG1の表示形態として「1」を選択し、第2グループG2の表示形態として「2」を選択し、第3グループG3の表示形態として「3」を選択し、第4グループG4の表示形態として「4」を選択し、第5グループG5の表示形態として「5」を選択している。また、図5に示すように、スライダ画像83bを移動させて、表示変更部83が、第1グループG1の表示形態として「3」を選択し、第5グループG5の表示形態として「7」を選択した場合、第2グループG2の表示形態として「4」が選択され、第3グループG3の表示形態として「5」が選択される。
なお、表示変更部83は、操作されることで状態マップに表示するグループの表示形態を変更することができればよく、その変更方法や表示形態は上述した構成に限定されない。
また、表示変更部83は、最頻値選択部83cを有していても良い。最頻値選択部83cは、バー画像83aに隣接して表示される操作可能な表示画像であり、操作されることで、分割データの最頻値に対応するグループの表示形態として、バー画像83a上の中央に割り当てられた表示形態が選択されるようスライダ画像83bを移動させる。つまり、分割データの最頻値に相当するバー画像83a上の中央の表示形態が水平の基準面F1として表示される。例えば、図6に示す例においては、最頻値は第2グループG2であるため、当該第2グループG2の表示形態として、バー画像83a上の中央に割り当てられた表示形態である「5」が選択されるようスライダ画像83bを移動される。
また、表示変更部83は、最頻値選択部83cを有していても良い。最頻値選択部83cは、バー画像83aに隣接して表示される操作可能な表示画像であり、操作されることで、分割データの最頻値に対応するグループの表示形態として、バー画像83a上の中央に割り当てられた表示形態が選択されるようスライダ画像83bを移動させる。つまり、分割データの最頻値に相当するバー画像83a上の中央の表示形態が水平の基準面F1として表示される。例えば、図6に示す例においては、最頻値は第2グループG2であるため、当該第2グループG2の表示形態として、バー画像83a上の中央に割り当てられた表示形態である「5」が選択されるようスライダ画像83bを移動される。
また、図7に示すように、第1画面M1は、表示変更部83の代わりにグループと第1分割データD1nとの関係を示す凡例表示部84を表示してもよい。凡例表示部84は、幅方向に長尺の表示画像であり、左側から順に異なる表示形態が割り当てられている。本実施形態において、グループを文字で表示しており、凡例表示部84は、左側から順に、第1グループG1~第5グループG5に対応する「1」~「5」がそれぞれ割り当てられおり、当該数字の近傍に第1分割データD1nを示す数値を表示する。
また、表示装置50は、情報取得部61aが取得した高さに基づいて圃場の勾配を表示してもよい。図1に示すように、圃場情報演算部61bは、勾配演算部72を有している。勾配演算部72は、演算処理装置61が有する電気・電子部品、電気回路、及び記憶装置62に格納されたプログラム等から構成されている。
勾配演算部72は、情報取得部61aが取得した高さに基づいて圃場の勾配を算出する。マップ演算部70が圃場内に割り当てた高さに基づいて圃場の勾配(勾配の方角及び勾配の角度)を算出する。勾配演算部72は、例えば情報取得部61aが取得した高さと最小二乗法とに基づいて最小二乗平面計算を行って圃場の勾配を算出する。詳しくは、勾配演算部72は、情報取得部61aが取得した高さに基づく第1分割データD1nによって最小二乗平面計算することで圃場の勾配を算出する。これにより、勾配演算部72が算出した圃場の勾配によって、図14に示すように圃場の基準となる傾斜面(基準面)F1が算出される。勾配演算部72が算出した勾配は記憶装置62に記憶される。
勾配演算部72は、情報取得部61aが取得した高さに基づいて圃場の勾配を算出する。マップ演算部70が圃場内に割り当てた高さに基づいて圃場の勾配(勾配の方角及び勾配の角度)を算出する。勾配演算部72は、例えば情報取得部61aが取得した高さと最小二乗法とに基づいて最小二乗平面計算を行って圃場の勾配を算出する。詳しくは、勾配演算部72は、情報取得部61aが取得した高さに基づく第1分割データD1nによって最小二乗平面計算することで圃場の勾配を算出する。これにより、勾配演算部72が算出した圃場の勾配によって、図14に示すように圃場の基準となる傾斜面(基準面)F1が算出される。勾配演算部72が算出した勾配は記憶装置62に記憶される。
なお、勾配演算部72による勾配の算出方法は、上述した方法に限定されず、勾配演算部72は、情報取得部61aが取得した高さによって最小二乗平面計算することで圃場の勾配を算出してもよいし、最小二乗法によらないで勾配の算出を行ってもよい。
まず、圃場に給水を行う場所(給水部)と排水を行う場所(排水部)の位置情報を勾配演算部72が取得可能である場合について説明する。給水部及び排水部の位置情報は、例えば予め記憶装置62に記憶されたり、支援装置60と通信可能に接続されている端末によって給水部及び排水部の位置情報を入力される。端末によって給水部及び排水部の位置情報を入力する場合、例えば当該端末に表示される圃場のマップにおいて給水部及び排水部の位置をそれぞれ選択して入力を行う。
まず、圃場に給水を行う場所(給水部)と排水を行う場所(排水部)の位置情報を勾配演算部72が取得可能である場合について説明する。給水部及び排水部の位置情報は、例えば予め記憶装置62に記憶されたり、支援装置60と通信可能に接続されている端末によって給水部及び排水部の位置情報を入力される。端末によって給水部及び排水部の位置情報を入力する場合、例えば当該端末に表示される圃場のマップにおいて給水部及び排水部の位置をそれぞれ選択して入力を行う。
勾配演算部72は、記憶装置62等から給水部と排水部の位置情報を取得すると、当該位置情報に基づいて給水部と排水部との間の距離と、給水部から排水部に向かう方角(勾配の方角)と、を算出する。また、勾配演算部72は、給水部に対応するエリアQaの分割データD1aと、排水部に対応するエリアQbの分割データD1bと、に基づいて、給水部との排水部の高さの差分を算出する。勾配演算部72は、算出した距離と差分との正接に基づいて勾配の角度を算出する。
また、勾配演算部72が給水部及び排水部の位置情報を取得できない場合、勾配演算部72は、例えば圃場の周部におけるエリアの第1分割データD1nに基づいて圃場の勾配の算出を行う。まず、勾配演算部72は、圃場の周部におけるエリアQnのうち、一のエリアQnに対応する第1分割データD1nを、当該一のエリアQnに隣接するエリアQnと平均し、算出した分割データD2nを当該一のエリアQnの分割データとして割り当てる。勾配演算部72は、分割データD2nの割り当てを行うと、圃場の周部におけるエリアの分割データD2nのうち、最も高さが高いエリアを給水部に対応するエリアQaとして検出し、最も高さが低いエリアを排水部に対応するエリアQbとして検出する。勾配演算部72は、エリアQaとエリアQbとを検出すると、エリアQa及びエリアQbの位置情報に基づいて給水部と排水部との間の距離と、給水部から排水部に向かう方角と、を算出する。また、勾配演算部72は、給水部に対応するエリアQaの平均化を行う前の分割データD1aと、排水部に対応するエリアQbの平均化を行う前の分割データD1bと、に基づいて、給水部との排水部の高さの差分を算出する。勾配演算部72は、算出した距離と差分との正接に基づいて、勾配を算出する。
図8に示すように、表示装置50は、第1画面M1に代えて、作業車両2が走行する圃場の周辺地図を示す第2画面M2を表示可能である。第2画面M2は、高さ情報として圃場の勾配を表示可能である。第2画面M2は、マップ表示部90と、表示切換部91と、操作部92と、凡例表示部93と、勾配表示部94と、を表示する。第2画面M2が表示するマップ表示部90は、第1画面M1が表示するマップ表示部80等と同様に状態マップを示す。表示切換部91は、第1画面M1が表示する表示切換部81等と同様に、操作されることで表示装置50に表示する画面を第2画面M2から異なる画面に切り換える。操作部92は、第1画面M1が表示する操作部82等と同様に、マップ表示部90に表示される状態マップに様々な操作を行うことができる。また、凡例表示部93は、第1画面M1が表示する凡例表示部84等と同様に、グループと第1分割データD1nとの関係を表示する。
勾配表示部94は、勾配演算部72が演算した圃場の勾配を表示する表示領域である。図8に示すように、例えば勾配表示部94は、圃場の勾配の角度を数値で表示し、勾配の方角を矢印状のアイコン94aで表示する。具体的には、表示装置50は支援装置60から記憶装置62に記憶されている勾配の角度及び勾配の方角を取得し、当該勾配の角度及び勾配の方角に基づいて勾配表示部94を表示する。本実施形態において、勾配表示部94は、勾配の角度を数値で「0.03°」と表示している。また、勾配表示部94のアイコン94aは、左側を向いており、勾配の方角が圃場の右側から左側に向かっていることを示す。
また、表示装置50は、情報取得部61aが取得した高さによって得られた基準面F1に対する差分(凹凸)を表示してもよい。図1に示すように、圃場情報演算部61bは、凹凸演算部73を有している。凹凸演算部73は、演算処理装置61が有する電気・電子部品、電気回路、及び記憶装置62に格納されたプログラム等から構成されている。
圃場情報演算部61bは、凹凸演算部73を有している。凹凸演算部73は、演算処理装置61が有する電気・電子部品、電気回路、及び記憶装置62に格納されたプログラム等から構成されている。
圃場情報演算部61bは、凹凸演算部73を有している。凹凸演算部73は、演算処理装置61が有する電気・電子部品、電気回路、及び記憶装置62に格納されたプログラム等から構成されている。
凹凸演算部73は、高さ情報として高さによって得られた基準面F1に対する差分を算出して基準面F1に対する凹凸を算出する。本実施形態において、図14に示すように、基準面F1は、勾配演算部72が算出した勾配に基づく傾斜面である。まず、凹凸演算部73は勾配演算部72が算出した勾配を取得する。凹凸演算部73は、勾配を取得すると、当該勾配に基づいて基準面(傾斜面)F1が水平方向を向く、即ち傾斜面F1が鉛直方向を向くように補正係数(第3分割データD3n)を算出する。斯かる場合、第3分割データD3nのうち、排水部に対応するエリアQbの第3分割データD3bは零となる。
凹凸演算部73は、エリアQn毎の基準面F1の第3分割データD3nを算出すると、エリアQn毎にそれぞれ対応する第1分割データD1nと、算出した基準面F1の第3分割データD3nとの差分を凹凸として算出する。凹凸演算部73は算出した差分を第4分割データD4nとして圃場内への割り当てを行う。凹凸演算部73がエリアQn毎に算出した第4分割データD4nは、それぞれエリアQnごとに割り当てられ、圃場の凹凸マップとして記憶装置62に記憶される。また、記憶装置62に凹凸マップが記憶されると、グループ設定部71は、凹凸マップにおいて凹凸演算部73で割り当てられたエリアQn毎の第4分割データD4nに対して、グループを設定する。
図9に示すように、表示装置50は、第1画面M1及び第2画面M2に代えて、作業車両2が走行する圃場の周辺地図を示す第3画面M3を表示可能である。第3画面M3は、高さ情報として高さによって得られた基準面F1に対する差分(凹凸)を表示可能である。第3画面M3は、マップ表示部100と、表示切換部101と、操作部102と、凡例表示部103と、勾配表示部104と、を表示する。第3画面M3が表示するマップ表示部100は、第1画面M1及び第2画面M2が表示するマップ表示部80,90と異なり、凹凸マップを示す。表示装置50は支援装置60から記憶装置62に記憶されている凹凸マップを取得し、マップ表示部100に凹凸マップを表示する。マップ表示部100は、複数のエリアQnにそれぞれ対応する第4分割データD4nに対して、当該第4分割データD4nの大きさ(値)に応じて、圃場の高さを示す複数のグループ(複数のランク)が割り当てられたマップである。マップ表示部100においては、状態マップ等と同様に、複数のエリアQn毎に、グループ設定部71において予め割り当てられたグループ(ランク)が識別できるように、グループ(ランク)が色、数値、文字等で示されている。図9の例の場合、第3画面M3の複数のエリアQn内に示した数値が圃場の基準面F1に対する凹凸の高さを示している。
表示切換部101は、第1画面M1が表示する表示切換部81等と同様に、操作されることで表示装置50に表示する画面を第3画面M3から異なる画面に切り換える。操作部102は、第1画面M1が表示する操作部82等と同様に、マップ表示部100に表示される状態マップに様々な操作を行うことができる。また、凡例表示部103は、第1画面M1が表示する凡例表示部84等と同様に、グループと第4分割データD4nとの関係を表示する。勾配表示部104は、第2画面M2が表示する勾配表示部94と同様に勾配演算部72が演算した圃場の勾配を表示する表示領域であり、圃場の勾配の角度を数値で表示し、勾配の方角を矢印状のアイコン104aで表示する。
図9に示すように、勾配表示部104は、勾配の角度及び勾配の方角の補正の操作が可能な勾配変更部105を有していてもよい。勾配変更部105は、勾配の角度の変更操作が可能な角度変更部105aと、勾配の方角の変更操作が可能な方角変更部105bと、を有している。角度変更部105aは、例えば「+」と表示され且つ操作されることで勾配の大きさを増加させる増加部105a1と、「-」と表示され且つ操作されることで勾配の角度を減少させる減少部105a2と、を含んでいる。
方角変更部105bは、時計回りに向き且つ操作によって勾配の方角を時計回りに所定角度変更する第1矢印部105b1と、反時計回りに向き且つ操作によって勾配の方角を反時計回りに所定角度変更する第2矢印部105b2と、を含んでいる。
表示装置50は、通信装置63を介して勾配変更部105の操作情報を支援装置60に出力し、支援装置60が操作情報を取得すると、凹凸演算部73が補正後の勾配の角度及び勾配の方角に基づく基準面F1に対する凹凸を算出する。凹凸演算部73が補正後の第4分割データD4nを割り当てたマップ情報は、補正後の凹凸マップとして記憶装置62に記憶される。これによって、図9から図10に遷移にするように、マップ表示部100は、勾配変更部105の変更操作に基づいて補正された勾配の角度及び勾配の方角に基づく凹凸マップを表示することができる。
表示装置50は、通信装置63を介して勾配変更部105の操作情報を支援装置60に出力し、支援装置60が操作情報を取得すると、凹凸演算部73が補正後の勾配の角度及び勾配の方角に基づく基準面F1に対する凹凸を算出する。凹凸演算部73が補正後の第4分割データD4nを割り当てたマップ情報は、補正後の凹凸マップとして記憶装置62に記憶される。これによって、図9から図10に遷移にするように、マップ表示部100は、勾配変更部105の変更操作に基づいて補正された勾配の角度及び勾配の方角に基づく凹凸マップを表示することができる。
また、図11に示すように、表示装置50は、圃場の凹凸を均す均平化作業を行う際の理想面F2の高さを表示してもよい。さらに、表示装置50は、当該理想面F2よりも大きく且つ均平化作業で移動させる作土量(以下、移動作土量という)を表示してもよい。斯かる場合、農業支援システム1は、理想面演算部74と、作土量演算部75と、を備えている。理想面演算部74及び作土量演算部75は、演算処理装置61が兼用しており、当該演算処理装置61のCPUや電子回路等から構成されている。
理想面演算部74は、理想面F2の高さの演算を行う。図14に示すように、理想面F2とは圃場の凹凸の作土量が一致する面であり、基準面F1と平行である。理想面演算部74は、例えば凹凸マップに基づいて理想面F2の高さを算出する。具体的には、理想面演算部74は、凹凸演算部73がエリアQn毎に算出し且つそれぞれエリアQnごとに割り当てられた第4分割データD4nと圃場の面積とに基づいて、勾配によって補正された圃場の土壌の体積を算出する。理想面演算部74は、土壌の体積を算出すると、当該算出した土壌の体積に基づいて理想面F2の高さを算出する。理想面演算部74が理想面F2の高さは記憶装置62に記憶される。
作土量演算部75は、理想面F2の高さを算出すると、理想面F2よりも凸であるエリアQc、即ち理想面F2の高さよりも高い第4分割データD4nが割り当てられたエリアQcを検出する。作土量演算部75は、エリアQcを検出すると、当該検出されたエリアQc毎に理想面F2の高さと第4分割データD4nとの差分を算出して、作土量を第5分割データD5nとして算出する。作土量演算部75がエリアQn毎に算出した第5分割データD5nは、それぞれエリアQnごとに割り当てられ、圃場の作土量マップとして記憶装置62に記憶される。また、記憶装置62に作土量マップが記憶されると、グループ設定部71は、作土量マップにおいて作土量演算部75で割り当てられたエリアQn毎の第5分割データD5nに対して、グループを設定する。
図11に示すように、表示装置50は、第1画面M1等に代えて、理想面マップと移動作土量を表示する第4画面M4を表示可能である。第4画面M4は、マップ表示部110と、表示切換部111と、操作部112と、凡例表示部113と、勾配表示部114と、理想面表示部115と、を表示する。第4画面M4が表示するマップ表示部110は、第1画面M1が表示するマップ表示部80等と異なり、作土量マップを示す。表示装置50は支援装置60から記憶装置62に記憶されている作土量マップを取得し、マップ表示部110に作土量マップを表示する。マップ表示部110が作土量マップを表示する場合、マップ表示部110は、複数のエリアQnにそれぞれ対応する第5分割データD5nに対して、当該第5分割データD5nの大きさ(値)に応じて、作土量を示す複数のグループ(複数のランク)が割り当てられたマップである。マップ表示部110においては、状態マップ等と同様に、複数のエリアQn毎に、グループ設定部71において予め割り当てられたグループ(ランク)が識別できるように、グループ(ランク)が色、数値、文字等で示されている。図4の例の場合、第4画面M4の複数のエリアQn内に示した数値が移動させる作土量を示している。なお、第4画面M4が表示するマップ表示部110は、作土量マップと凹凸マップとを切換可能に表示してもよい。
表示切換部111は、第1画面M1が表示する表示切換部81等と同様に、操作されることで表示装置50に表示する画面を第4画面M4から異なる画面に切り換える。操作部112は、第1画面M1が表示する操作部82等と同様に、マップ表示部110に表示される状態マップに様々な操作を行うことができる。凡例表示部113は、第1画面M1が表示する凡例表示部84等と同様に、グループとマップ表示部110に表示するマップに対応する分割データ(第4分割データD4n又は第5分割データD5n)との関係を表示する。勾配表示部114は、第2画面M2が表示する勾配表示部94等と同様に勾配演算部72が演算した圃場の勾配を表示する表示領域であり、圃場の勾配の角度を数値で表示し、勾配の方角を矢印状のアイコン114aで表示する。
理想面表示部115は、理想面演算部74が算出した理想面F2の高さを表示する表示画像である。本実施形態において、理想面表示部115は、矢印状のアイコンであり、第4画面M4のマップ表示部110が凹凸マップを表示する場合において凡例表示部113が表示する高さを指し示すことで理想面F2の高さを表示する。
上述した農業支援システム1は、作業車両2が圃場を走行したときの高さを取得する情報取得部61aと、情報取得部61aが取得した高さであって複数の高さに基づいて、圃場の状態を演算する圃場情報演算部61bと、を備えている。上記構成によれば、作業車両2の走行時に取得した高さによって圃場の状態を演算することができ、圃場状態の把握の効率性を向上させることができる。
上述した農業支援システム1は、作業車両2が圃場を走行したときの高さを取得する情報取得部61aと、情報取得部61aが取得した高さであって複数の高さに基づいて、圃場の状態を演算する圃場情報演算部61bと、を備えている。上記構成によれば、作業車両2の走行時に取得した高さによって圃場の状態を演算することができ、圃場状態の把握の効率性を向上させることができる。
また、農業支援システム1は、情報取得部61aが取得した高さに関する高さ情報を表示する表示装置50を備え、表示装置50は、高さ情報として圃場の勾配を表示する。上記構成によれば、作業車両2の走行によって取得した高さ(高さ情報)によって圃場の勾配を容易に認識することができる。
また、表示装置50は、高さ情報として高さによって得られた基準面F1に対する差分を表示する。上記構成によれば、圃場の勾配等によって、圃場の凹凸の情報が埋もれてしまうことを抑制することができる。
また、表示装置50は、高さ情報として高さによって得られた基準面F1に対する差分を表示する。上記構成によれば、圃場の勾配等によって、圃場の凹凸の情報が埋もれてしまうことを抑制することができる。
また、農業支援システム1は、作業車両2に設けられ且つ、測位衛星Zの信号に基づいて作業車両2が圃場を走行したときの高さを検出する高さ検出装置43aと、高さ検出装置43aが検出した高さを取得する情報取得部61aと、情報取得部61aが取得した高さであって複数の高さに基づいて圃場の状態を演算する圃場情報演算部61bと、を有する支援装置60と、を備えている。上記構成によれば、作業車両2の走行時に取得した高さによって圃場の状態を演算することができ、圃場状態の把握の効率性を向上させることができる。
また、農業支援システム1は、情報取得部61aが取得した高さに関する高さ情報を表示する表示装置50を備え、表示装置50は、高さ情報として圃場の勾配を表示する。上記構成によれば、作業車両2の走行によって取得した高さ(高さ情報)によって圃場の勾配を容易に認識することができる。
また、農業支援システム1は、情報取得部61aが取得した高さに関する高さ情報を表示する表示装置50を備え、表示装置50は、高さ情報として高さによって得られた基準面F1に対する差分を表示する。上記構成によれば、圃場の勾配等によって、圃場の凹凸の情報が埋もれてしまうことを抑制することができる。
[第2実施形態]
図12は、農業支援システム1の別の実施形態(第2実施形態)を示す。第1実施形態における農業支援システム1において、圃場情報演算部61bは、圃場の状態として圃場の勾配や凹凸を演算するが、圃場の勾配や凹凸に代えて或いは加えて、圃場の状態として圃場の作土深を演算するような構成であってもよい。斯かる場合、表示装置50は、圃場情報演算部61bが演算した圃場の作土深を表示する。
また、農業支援システム1は、情報取得部61aが取得した高さに関する高さ情報を表示する表示装置50を備え、表示装置50は、高さ情報として高さによって得られた基準面F1に対する差分を表示する。上記構成によれば、圃場の勾配等によって、圃場の凹凸の情報が埋もれてしまうことを抑制することができる。
[第2実施形態]
図12は、農業支援システム1の別の実施形態(第2実施形態)を示す。第1実施形態における農業支援システム1において、圃場情報演算部61bは、圃場の状態として圃場の勾配や凹凸を演算するが、圃場の勾配や凹凸に代えて或いは加えて、圃場の状態として圃場の作土深を演算するような構成であってもよい。斯かる場合、表示装置50は、圃場情報演算部61bが演算した圃場の作土深を表示する。
以下、第2実施形態の農業支援システム1について、上述した実施形態(第1実施形態)と異なる構成を中心に説明し、第1実施形態と共通する構成については同じ符号を付して詳しい説明を省略する。
図12に示すように、圃場情報演算部61bは、作土深演算部76を有している。作土深演算部76は、演算処理装置61が有する電気・電子部品、電気回路、及び記憶装置62に格納されたプログラム等から構成されている。
図12に示すように、圃場情報演算部61bは、作土深演算部76を有している。作土深演算部76は、演算処理装置61が有する電気・電子部品、電気回路、及び記憶装置62に格納されたプログラム等から構成されている。
作土深演算部76は、複数の高さとして、情報取得部61aが取得した第1高さと第2高さとに基づいて、圃場の状態を演算する。第1高さ及び第2高さについて詳しく説明すると、第1高さは、作業車両2を所定の第1時期に走行させたときの高さであり、第2高さは、作業車両2を第1時期と異なる第2時期に走行させたときの高さである。以下の説明の都合上、第1時期に走行する作業車両2を第1作業車両2Aとして説明し、第2時期に走行する作業車両2を第2作業車両2Bとして説明する場合がある。例えば、第1作業車両2Aは、耕耘する耕耘装置を牽引するトラクタ2Aであり、第2作業車両2Bは、田植機2Bである。このため、図14に示すように、第1作業車両(トラクタ)2Aは、圃場における作土の表面を走行し、第1高さは、作土の表面の高さである。一方、第2作業車両(田植機)2Bは、圃場における硬盤層の表面を走行し、第2高さは、硬盤層の表面の高さである。
第1時期は、トラクタ2Aが耕耘装置を牽引して圃場の耕耘作業を行う時期であり、第2時期は、田植機2Bが圃場に田植を行う時期である。また、第1作業車両2Aに設けられた高さ検出装置43a(以下、第1検出装置43a1という)が第1高さの検出を行い、第2作業車両2Bに設けられた高さ検出装置43a(以下、第2検出装置43a2という)が第2高さの検出を行う。
なお、第1作業車両2A及び第2作業車両2Bの組み合わせは上述した組み合わせに限定されず、第1作業車両2Aがトラクタ2Aであって第2作業車両2Bがコンバイン2Cであってもよいし、演算する圃場の状態によって選択されていればよい。
以下、作土深演算部76による圃場の状態(作土深)の演算について詳しく説明する。まず、第1時期において、第1作業車両2Aが圃場で走行を行い、第1検出装置43a1が第1高さを検出する。また、第1作業車両2Aは、好ましくは作業車両2の接地面が水平であり且つ比較的硬質である任意の基準位置に移動し、第1検出装置43a1が当該基準位置において第1基準高さを検出する。基準位置は、例えば圃場に隣接し、且つコンクリートやアスファルト等で構成された道路である。つぎに、第2時期において、第2作業車両2Bが圃場で走行を行い、第2検出装置43a2が第2高さを検出する。また、第2作業車両2Bは、第1検出装置43a1が第1基準高さを検出した基準位置に移動し、第2検出装置43a2が当該基準位置において第2基準高さを検出する。
以下、作土深演算部76による圃場の状態(作土深)の演算について詳しく説明する。まず、第1時期において、第1作業車両2Aが圃場で走行を行い、第1検出装置43a1が第1高さを検出する。また、第1作業車両2Aは、好ましくは作業車両2の接地面が水平であり且つ比較的硬質である任意の基準位置に移動し、第1検出装置43a1が当該基準位置において第1基準高さを検出する。基準位置は、例えば圃場に隣接し、且つコンクリートやアスファルト等で構成された道路である。つぎに、第2時期において、第2作業車両2Bが圃場で走行を行い、第2検出装置43a2が第2高さを検出する。また、第2作業車両2Bは、第1検出装置43a1が第1基準高さを検出した基準位置に移動し、第2検出装置43a2が当該基準位置において第2基準高さを検出する。
作土深演算部76は、マップ演算部70が複数のエリアQnにそれぞれ分割データを割り当てた圃場の状態マップを記憶装置62から取得し、当該状態マップに基づいて圃場における作土深を演算する。なお、以下の説明において、第1高さに基づく第1分割データD1nを第1データD7nといい、第2高さに基づく第1分割データD1nを第2データD8nという。また、以下の説明において、第1高さに対応する状態マップを第1状態マップといい、第2高さに対応する状態マップを第2状態マップといい、第1状態マップと第2状態マップのメッシュサイズは一致しており、且つ第1状態マップのエリアQnと第2状態マップのエリアQnは、共通である。
第2実施形態において、マップ演算部70が第1高さに基づいて複数のエリアQnに第1データD7nを割り当てる場合、当該マップ演算部70は、第1実施形態と異なり、第1高さを第1基準高さで補正し、第2高さを第2基準高さで補正する。具体的には、マップ演算部70は、情報取得部61aが取得した第1高さであって複数の第1高さと第1基準高さとの差分を算出し、それぞれ第1データD7nとして、高さデータの緯度及び経度に基づいて、高さを検出した位置ごとに分割データを割り当てる。また、マップ演算部70が第2高さに基づいて複数のエリアQnに第2データD8nを割り当てる場合、当該マップ演算部70は、第1実施形態と異なり情報取得部61aが取得した第2高さであって複数の第2高さと第2基準高さとの差分を算出し、それぞれ第2データD8nとして、高さデータの緯度及び経度に基づいて、高さを検出した位置ごとに分割データを割り当てる。
作土深演算部76は、第1状態マップと第2状態マップとを記憶部41から取得して、当該第1状態マップ及び第2状態マップに基づいてそれぞれのエリアQnごとに作土深を算出する。つまり、作土深演算部76は、第1高さを第1基準高さで補正した高さと、第2高さを第2基準高さで補正した高さと、の差に基づいて、作土深を算出する。詳しくは、作土深演算部76は、第1データD7nと第2データD8nとの差分を算出することで、エリアQnごとに作土深を算出する。即ち、本実施形態において、エリアQnごとの作土深は、田植機2B(第2作業車両2B)の第2検出装置43a2が検出した第2高さと第2基準高さとの差分(第2高さ-第2基準高さ)と、トラクタ2A(第1作業車両2A)の第1検出装置43a1が検出した第1高さと第1基準高さとの差分(第1高さ-第1基準高さ)と、の差分によって算出される作土深演算部76がエリアQn毎に算出した作土深(第7分割データD9n)は、それぞれエリアQnごとに割り当てられ、圃場の作土深マップとして記憶装置62に記憶される。また、記憶装置62に作土深マップが記憶されると、グループ設定部71は、作土深マップにおいて作土深演算部76で割り当てられたエリアQn毎の第7分割データD9nに対して、グループを設定する。
図13に示すように、表示装置50は、作業車両2が走行する圃場の周辺地図を示す第5画面M5を表示可能である。第5画面M5は、高さ情報として圃場情報演算部61bが演算した圃場の作土深を表示可能である。第5画面M5は、マップ表示部120と、表示切換部121と、操作部122と、凡例表示部123と、を表示する。第5画面M5が表示するマップ表示部120は、第1画面M1が表示するマップ表示部120と異なり、作土深マップを示す。表示装置50は支援装置60から記憶装置62に記憶されている作土深マップを取得し、マップ表示部120に作土深マップを表示する。マップ表示部120は、複数のエリアQnにそれぞれ対応する第7分割データD9nに対して、当該第7分割データD9nの大きさ(値)に応じて、圃場の高さを示す複数のグループ(複数のランク)が割り当てられたマップである。マップ表示部120においては、状態マップ等と同様に、複数のエリアQn毎に、グループ設定部71において予め割り当てられたグループ(ランク)が識別できるように、グループ(ランク)が色、数値、文字等で示されている。図13の例の場合、第5画面M5の複数のエリアQn内に示した数値が作土深を示している。表示切換部121は、第1画面M1が表示する表示切換部121等と同様に、操作されることで表示装置50に表示する画面を第5画面M5から異なる画面に切り換える。操作部122は、第1画面M1が表示する操作部122等と同様に、マップ表示部120に表示される状態マップに様々な操作を行うことができる。また、凡例表示部123は、第1画面M1が表示する凡例表示部123等と同様に、グループと第7分割データD9nとの関係を表示する。
上述した情報取得部61aは、作業車両2を第1時期に走行させたときの高さである第1高さと、作業車両2を第2時期に走行させたときの高さである第2高さとを取得し、圃場情報演算部61bは、複数の高さとして、情報取得部61aが取得した第1高さと第2高さとに基づいて、圃場の状態を演算する。上記構成によれば、圃場の状態の演算精度を向上させることができる。
また、圃場情報演算部61bは、第1高さと第2高さとの差に基づいて、圃場の状態として圃場の作土深を演算する。上記構成によれば、比較的簡単に作土深を演算することができる。
また、情報取得部61aは、作業車両2が第1時期に所定の基準位置に位置しているときの高さである第1基準高さと、作業車両2が第2時期に基準位置に位置しているときの高さである第2基準高さとを取得し、圃場情報演算部61bは、第1高さを第1基準高さで補正した高さと、第2高さを第2基準高さで補正した高さと、の差に基づいて、圃場の状態として圃場の作土深を演算する。上記構成によれば、第1時期と第2時期とで第1高さと第2高さとの基準の高さが変化した場合であっても、所定の基準位置でキャリブレーションを行うことができる。これにより、圃場の作土深を精度よく演算できる。
また、情報取得部61aは、作業車両2が第1時期に所定の基準位置に位置しているときの高さである第1基準高さと、作業車両2が第2時期に基準位置に位置しているときの高さである第2基準高さとを取得し、圃場情報演算部61bは、第1高さを第1基準高さで補正した高さと、第2高さを第2基準高さで補正した高さと、の差に基づいて、圃場の状態として圃場の作土深を演算する。上記構成によれば、第1時期と第2時期とで第1高さと第2高さとの基準の高さが変化した場合であっても、所定の基準位置でキャリブレーションを行うことができる。これにより、圃場の作土深を精度よく演算できる。
また、高さ検出装置43aは、第1時期に作業を行う作業車両2である第1作業車両2Aに設けられた第1検出装置43a1と、第2時期に作業を行う作業車両2である第2作業車両2Bに設けられた第2検出装置43a2とを含み、情報取得部61aは、第1検出装置43a1が検出した高さである第1高さと、第2検出装置43a2が検出した高さである第2高さとを取得し、圃場情報演算部61bは、複数の高さとして、情報取得部61aが取得した第1高さと第2高さとに基づいて、圃場の状態を演算する。上記構成によれば、圃場の状態の演算精度を向上させることができる。
また、圃場情報演算部61bは、第1高さと第2高さとの差に基づいて、圃場の状態として圃場の作土深を演算する。上記構成によれば、比較的簡単に作土深を演算することができる。
また、情報取得部61aは、第1作業車両2Aが所定の基準位置に位置しているときに第1検出装置43a1が検出した高さである第1基準高さと、第2作業車両2Bが基準位置に位置しているときに第2検出装置43a2が検出した高さである第2基準高さとを取得し、圃場情報演算部61bは、第1高さを第1基準高さで補正した高さと、第2高さを第2基準高さで補正した高さと、の差に基づいて、圃場の状態として圃場の作土深を演算する。上記構成によれば、第1検出装置43a1と第2検出装置43a2の基準の高さが異なる場合であっても、所定の基準位置でキャリブレーションを行うことができる。これにより、圃場の作土深を精度よく演算できる。
また、情報取得部61aは、第1作業車両2Aが所定の基準位置に位置しているときに第1検出装置43a1が検出した高さである第1基準高さと、第2作業車両2Bが基準位置に位置しているときに第2検出装置43a2が検出した高さである第2基準高さとを取得し、圃場情報演算部61bは、第1高さを第1基準高さで補正した高さと、第2高さを第2基準高さで補正した高さと、の差に基づいて、圃場の状態として圃場の作土深を演算する。上記構成によれば、第1検出装置43a1と第2検出装置43a2の基準の高さが異なる場合であっても、所定の基準位置でキャリブレーションを行うことができる。これにより、圃場の作土深を精度よく演算できる。
以上、本発明について説明したが、今回開示された実施の形態はすべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は上記した説明ではなくて請求の範囲によって示され、請求の範囲と均等の意味及び範囲内でのすべての変更が含まれることが意図される。
1 農業支援システム
2 作業車両
2A トラクタ(第1作業車両)
2B 田植機(第2作業車両)
43a 高さ検出装置
44a1 第1検出装置
44a2 第2検出装置
50 表示装置
60 支援装置(サーバ)
61 演算処理装置
61a 情報取得部
61b 圃場情報演算部
F1 傾斜面(基準面)
Z 測位衛星
2 作業車両
2A トラクタ(第1作業車両)
2B 田植機(第2作業車両)
43a 高さ検出装置
44a1 第1検出装置
44a2 第2検出装置
50 表示装置
60 支援装置(サーバ)
61 演算処理装置
61a 情報取得部
61b 圃場情報演算部
F1 傾斜面(基準面)
Z 測位衛星
Claims (12)
- 作業車両が圃場を走行したときの高さを取得する情報取得部と、
前記情報取得部が取得した前記高さであって複数の高さに基づいて、前記圃場の状態を演算する圃場情報演算部と、
を備えている農業支援システム。 - 前記情報取得部は、前記作業車両を第1時期に走行させたときの前記高さである第1高さと、前記作業車両を第2時期に走行させたときの前記高さである第2高さとを取得し、
前記圃場情報演算部は、前記複数の高さとして、前記情報取得部が取得した前記第1高さと前記第2高さとに基づいて、前記圃場の状態を演算する請求項1に記載の農業支援システム。 - 前記圃場情報演算部は、前記第1高さと前記第2高さとの差に基づいて、前記圃場の状態として前記圃場の作土深を演算する請求項2に記載の農業支援システム。
- 前記情報取得部は、前記作業車両が前記第1時期に所定の基準位置に位置しているときの前記高さである第1基準高さと、前記作業車両が前記第2時期に前記基準位置に位置しているときの前記高さである第2基準高さとを取得し、
前記圃場情報演算部は、前記第1高さを前記第1基準高さで補正した高さと、前記第2高さを前記第2基準高さで補正した高さと、の差に基づいて、前記圃場の状態として前記圃場の作土深を演算する請求項3に記載の農業支援システム。 - 前記情報取得部が取得した前記高さに関する高さ情報を表示する表示装置を備え、
前記表示装置は、前記高さ情報として前記圃場の勾配を表示する請求項1に記載の農業支援システム。 - 前記表示装置は、前記高さ情報として前記高さによって得られた基準面に対する差分を表示する請求項5に記載の農業支援システム。
- 作業車両に設けられ且つ、測位衛星の信号に基づいて前記作業車両が圃場を走行したときの高さを検出する高さ検出装置と、
前記高さ検出装置が検出した前記高さを取得する情報取得部と、前記情報取得部が取得した前記高さであって複数の高さに基づいて前記圃場の状態を演算する圃場情報演算部と、を有する支援装置と、
を備えている農業支援システム。 - 前記高さ検出装置は、第1時期に作業を行う作業車両である第1作業車両に設けられた第1検出装置と、第2時期に作業を行う作業車両である第2作業車両に設けられた第2検出装置とを含み、
前記情報取得部は、前記第1検出装置が検出した前記高さである第1高さと、前記第2検出装置が検出した前記高さである第2高さとを取得し、
前記圃場情報演算部は、前記複数の高さとして、前記情報取得部が取得した前記第1高さと前記第2高さとに基づいて、前記圃場の状態を演算する請求項7に記載の農業支援システム。 - 前記圃場情報演算部は、前記第1高さと前記第2高さとの差に基づいて、前記圃場の状態として前記圃場の作土深を演算する請求項8に記載の農業支援システム。
- 前記情報取得部は、前記第1作業車両が所定の基準位置に位置しているときに前記第1検出装置が検出した前記高さである第1基準高さと、前記第2作業車両が前記基準位置に位置しているときに前記第2検出装置が検出した前記高さである第2基準高さとを取得し、
前記圃場情報演算部は、前記第1高さを前記第1基準高さで補正した高さと、前記第2高さを前記第2基準高さで補正した高さと、の差に基づいて、前記圃場の状態として前記圃場の作土深を演算する請求項9に記載の農業支援システム。 - 前記情報取得部が取得した前記高さに関する高さ情報を表示する表示装置を備え、
前記表示装置は、前記高さ情報として前記圃場の勾配を表示する請求項7~10のいずれかに記載の農業支援システム。 - 前記情報取得部が取得した前記高さに関する高さ情報を表示する表示装置を備え、
前記表示装置は、前記高さ情報として前記高さによって得られた基準面に対する差分を表示する請求項7~10のいずれかに記載の農業支援システム。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202180022802.0A CN115315717A (zh) | 2020-07-02 | 2021-06-01 | 农业支援系统 |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2020-115082 | 2020-07-02 | ||
JP2020115082A JP7500307B2 (ja) | 2020-07-02 | 2020-07-02 | 農業支援システム |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2022004245A1 true WO2022004245A1 (ja) | 2022-01-06 |
Family
ID=79316000
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2021/020834 WO2022004245A1 (ja) | 2020-07-02 | 2021-06-01 | 農業支援システム |
Country Status (3)
Country | Link |
---|---|
JP (1) | JP7500307B2 (ja) |
CN (1) | CN115315717A (ja) |
WO (1) | WO2022004245A1 (ja) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004008187A (ja) * | 2002-06-11 | 2004-01-15 | Yanmar Agricult Equip Co Ltd | 散布作業車 |
JP2018041357A (ja) * | 2016-09-09 | 2018-03-15 | ヤンマー株式会社 | 経路生成システム |
-
2020
- 2020-07-02 JP JP2020115082A patent/JP7500307B2/ja active Active
-
2021
- 2021-06-01 WO PCT/JP2021/020834 patent/WO2022004245A1/ja active Application Filing
- 2021-06-01 CN CN202180022802.0A patent/CN115315717A/zh active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004008187A (ja) * | 2002-06-11 | 2004-01-15 | Yanmar Agricult Equip Co Ltd | 散布作業車 |
JP2018041357A (ja) * | 2016-09-09 | 2018-03-15 | ヤンマー株式会社 | 経路生成システム |
Also Published As
Publication number | Publication date |
---|---|
JP2022012910A (ja) | 2022-01-17 |
CN115315717A (zh) | 2022-11-08 |
JP7500307B2 (ja) | 2024-06-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6085135A (en) | Method for agricultural map image display | |
US20170127606A1 (en) | Agricultural Drone for Use in Controlling the Direction of Tillage and Applying Matter to a Field | |
US11567498B2 (en) | Agriculture support device and agriculture support system | |
KR20200096503A (ko) | 슬립 판정 시스템, 주행 경로 생성 시스템, 및 포장 작업차 | |
US6029106A (en) | Global position correction for the electronic display of field maps | |
US20190050947A1 (en) | Agricultural field management system | |
WO2017170984A1 (ja) | 施肥マップ作成方法と施肥マップ作成システムと施肥マップ作成装置と施肥マップ作成プログラム | |
JP5963700B2 (ja) | 対地作業機及びこの対地作業機と連携する携帯情報端末にインストールされる作業管理プログラム | |
JP6930824B2 (ja) | 経路生成システム | |
JP6847750B2 (ja) | 牧草管理システム | |
JP7009229B2 (ja) | 農業支援システム | |
JP6772105B2 (ja) | 作業管理システム | |
JP6862259B2 (ja) | 牧草管理システム | |
WO2022004245A1 (ja) | 農業支援システム | |
JP2024016273A (ja) | 作業関連情報管理装置および作業関連情報管理システム | |
JP2007209271A (ja) | 複数条植え移植機及び複数条植え移植機による植付け方法 | |
JP6855311B2 (ja) | 牧草管理システム | |
JP2020113123A (ja) | 営農システム | |
EP3841861A2 (en) | Work support system and work support device positioned in an area | |
JP7050874B2 (ja) | 作業管理システム | |
WO2021125124A1 (ja) | 作業機 | |
JP7506554B2 (ja) | 作業管理システム、作業管理方法及び作業管理プログラム | |
JP2021006058A (ja) | 表示システム | |
JP6815971B2 (ja) | 作業管理システム | |
JP2021009523A (ja) | 作業表示装置及び作業機 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 21832885 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 21832885 Country of ref document: EP Kind code of ref document: A1 |