- output
- supply
- output distribution
- stability
- monitoring device
- Prior art date
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/24—Arrangements for preventing or reducing oscillations of power in networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/46—Controlling of the sharing of output between the generators, converters, or transformers
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/12—Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
Definitions
- the present invention relates to a supply and demand monitoring device, a supply and demand adjusting device, and a method for an electric power system.
- the grid operator When a supply-demand imbalance occurs due to load fluctuations (including fluctuations in the output of renewable energy) in the power system, frequency fluctuations occur.
- ELD Economic Load Diskatch
- LFC Load Frequency Control
- the regulated power source can be selected from at least one of a generator, a storage battery, and a demand response.
- Economic load distribution ELD is a function that determines the output distribution of each regulated power supply so as to follow the load in consideration of fuel costs, etc., for load fluctuations of about ten minutes or more.
- Load frequency control LFC is a function that suppresses the system frequency within the permissible range by calculating the amount of fluctuation for a load of several minutes to a dozen minutes and instructing each regulated power source to generate power that follows this amount of fluctuation. be.
- Figure 1 shows an example of the output distribution for each adjusted power supply based on the output distribution according to the merit order.
- the adjustment costs MA to ME of each adjustment power supply G are MA ⁇ MB ⁇ MC ⁇ MD ⁇ ME.
- This example is an image in which the total value 80 of the adjusting force on the raising side is distributed to each adjusting power supply G (GA to GE) having an output distributable upper limit value of 30.
- the adjustment power source GA having the lowest adjustment cost is assigned the upper limit value of 30 for which the output can be distributed.
- the output allocation upper limit value of 30 is assigned to the adjustment power supply GB having the second lowest adjustment cost.
- 20 is assigned to the adjustment power supply GC, which has the second lowest adjustment cost.
- FIG. 2 shows an example in which 30 is distributed to the regulated power supply GA, 5 is distributed to the regulated power supply GB, 25 is distributed to the regulated power supply GC, and 20 is distributed to the regulated power supply GD as an example of distribution of the regulated power supply that is not in the order of merit order. ..
- FIG. 3 shows an example of an overloaded transmission line.
- the regulated power supply G (GA to GD) is connected as shown in the figure, and the above figure shows an example in which the tidal current in the direction from the regulated power supply GB to the load 1 is small.
- the figure below is an example in which the current in the direction to the load 1 becomes larger due to the increase in the output of the adjustment power supply GD. In addition, it is operated so that overload does not occur by changing the output of the adjustment power supply.
- Voltage deviation means that the voltage of each node deviates from the upper limit value or the lower limit value.
- FIG. 3 shows an example in which the node to which the load 3 is connected has a voltage deviation (deviation from the lower limit of the voltage). In addition, it is operated so that voltage deviation does not occur by properly adjusting the balance of reactive power.
- Voltage stability is the ability to maintain a stable voltage when the load increases or when the regulated power supply or substation equipment is stopped. Voltage stability becomes a problem due to long-distance large-power transmission due to remote power supply and uneven distribution, increase in reactive power loss, and changes in load characteristics (increase in constant power load).
- a synchronous condenser that controls voltage and reactive power and a static static power compensator are installed to maintain voltage stability.
- Synchronous stability will be explained as the fourth limitation of stability.
- Synchronous stability is the ability to maintain stable synchronization between regulated power supplies in the event of a disturbance such as a stop of the regulated power supply.
- a failure occurs in the power system due to a lightning strike or the like, the rotation of some rotary machine type adjustment power supplies accelerates with respect to other adjustment power supplies.
- the internal phase difference angle of the accelerated regulated power supply with respect to the reference regulated power supply becomes larger than that of other regulated power supplies, and synchronization between the regulated power supplies cannot be maintained.
- Synchronous stability is maintained by disconnecting the accelerated regulated power supply from the system and preventing the number of accelerated regulated power supplies from increasing.
- Adjusting power is the ability to change supply or demand in the up and down directions. It is necessary to secure this adjustment power so that it can cope with demand forecast errors, time fluctuations, power loss, and so on.
- Patent Document 1 There is a technique disclosed in Patent Document 1 as a method of adjusting the supply and demand of an electric power system. According to Patent Document 1, it is possible to adjust the supply and demand by merit order based on not only the economic load distribution LFC but also the load frequency control ELD, ensuring fairness and transparency at the time of procuring adjustment power, and excellent supply and demand control. It is stated to provide a powerful power supply and demand control system, program and method.
- Patent Document 2 As a method of adjusting the supply and demand of the electric power system, there is a technique disclosed in Patent Document 2. According to Patent Document 2, the calculation time is shortened by appropriately formulating the constraints of one or both of the transformer tap ratio and the phase adjustment equipment input of the parallel bank group and incorporating them into the optimum power flow calculation. It is stated that no matter what the objective function is, a reasonable solution according to the actual operation can be obtained as the optimum power flow calculation result.
- Patent Document 1 there is a possibility that various restrictions on the stability of the power system cannot be satisfied when only the output allocation by the merit order is carried out.
- Patent Document 2 does not mention the output distribution by the merit order method, it is calculated by the optimum power flow calculation so as not to violate the constraint on the stability of the power system. It is possible to satisfy power stability such as overload, but it may not be possible to explain whether it is the most economical output distribution after satisfying the stability constraints.
- the present invention it is possible to evaluate the validity of whether the output allocation is the most economical output allocation after satisfying the stability constraint, and the supply and demand of the electric power system to which the cheaper output allocation pattern can be applied. It is an object of the present invention to provide a monitoring device, a supply / demand adjusting device and a method.
- an output distribution pattern that determines a plurality of output distribution patterns that are cheaper than the output distribution command value and is a supply / demand monitoring device that determines the output distribution patterns of a plurality of regulated power supplies of the electric power system.
- the system analysis unit that performs system analysis of the power system based on each of the multiple output distribution patterns from the output distribution pattern determination unit, and the system analysis unit. It is equipped with a stability judgment unit that judges the stability of the power system, and the output distribution pattern of multiple regulated power supplies of the power system is the most economical output distribution after satisfying the stability constraint of the power system. It is a supply and demand monitoring device characterized by enabling validity evaluation.
- a supply and demand adjusting device provided with an output means in the supply and demand monitoring device so as to give an output command to a plurality of adjusting power sources of the electric power system via a communication means, and the output means is the electric power system.
- a supply and demand adjustment device characterized by selecting one output distribution pattern, which is the most economical output distribution, after satisfying stability constraints, and giving output commands to multiple adjustment power sources via communication means. " It was done.
- a supply and demand monitoring method for determining output distribution patterns of a plurality of regulated power sources of a power system, a plurality of output distribution patterns cheaper than an output distribution command value are determined, and a plurality of output distribution patterns are determined.
- the system analysis of the power system is carried out based on each of the above, and as a result of the system analysis, the stability of the power system at the time of multiple output distribution patterns is determined, and the output distribution pattern of the multiple adjustment power supplies of the power system is the power system. It is a supply and demand monitoring method characterized by enabling a validity evaluation of the power allocation of the most economy after satisfying the stability constraint of.
- a supply and demand adjustment method in which the output distribution pattern obtained by the supply and demand monitoring method is given as an output command to a plurality of adjustment power sources of the power system, satisfying the stability constraint of the power system.
- the above is a supply and demand adjustment method characterized by selecting one output distribution pattern, which is the most economical output distribution, and giving it as an output command to a plurality of adjustment power sources.
- the present invention it is possible to evaluate the validity of whether the output allocation is the most economical output allocation after satisfying the stability constraint, and it is possible to apply a cheaper output allocation pattern.
- the figure which shows an example of the output distribution according to a merit order The figure which shows an example which the output distribution does not become according to a merit order as a result of considering the constraint of stability of a power system.
- FIG. The flowchart which shows the processing of the supply and demand monitoring apparatus of FIG. The flowchart which shows the 1st example of the output distribution pattern automatic determination.
- the flowchart which shows the 2nd example of the output distribution pattern automatic determination The figure which shows the processing image of the 2nd example of the output distribution pattern automatic determination.
- the flowchart which shows the processing of the supply and demand monitoring apparatus of FIG. An example of an output image of the output distribution pattern of the regulated power supply and the results of the stability analysis is shown.
- FIG. The flowchart which shows the processing of the supply and demand adjustment apparatus of FIG. The figure which shows an example of the output image about the output distribution pattern of the adjustment power supply, and the result about the stability analysis.
- FIG. 4 is a block diagram showing a hardware configuration of the supply and demand monitoring device for the power system according to the first embodiment.
- FIG. 4 describes a power system 20 and a supply and demand monitoring device 10 for a power system connected to various parts of the power system 20 via a communication network 300.
- the supply / demand monitoring device 10 is composed of, for example, a computer system.
- the supply and demand monitoring device 10 evaluates the validity of the output allocation of the optimum economy after satisfying the stability constraint for a certain output allocation.
- the supply / demand monitoring device 10 can access the measurement information of the power system 20 and the like via the communication network 300.
- the power system 20 here exemplifies the same configuration as in FIG. 3, in which a plurality of regulated power supplies G (GA to GD) and loads Ld (Ld1 to Ld6) are node N (N1 to N6) and a transformer Tr. It is a system interconnected with each other via (Tr1 to Tr4) and a transmission line L (L1 to L5).
- Various measuring instruments for protecting, controlling and monitoring the power system 20 are installed in the nodes N (N1 to N6).
- the supply / demand monitoring device 10 includes an output unit 21, an input unit 22, a communication unit 23, a processor 24, a memory 25, and a storage device 26, which are connected to each other via a bus 27.
- the display unit 21 displays the parameters handled by the supply and demand monitoring device 10, the processing result of the supply and demand monitoring device 10, and the like.
- the display unit 21 may be a display device, or may use a printer device, an audio output device, or the like together with the display device.
- the input unit 22 inputs various conditions for operating the supply and demand monitoring device 10.
- the input unit 22 may be provided with at least one of a touch panel, a voice instruction device, and the like, in addition to being able to use a keyboard, a mouse, and the like.
- the communication unit 23 includes a circuit and a communication protocol for connecting to the communication network 300.
- the communication network 300 may be a WAN (Wide Area Network) such as the Internet, a LAN (Local Area Network) such as WiFi or Ethernet (registered trademark), or a mixture of WAN and LAN. You may.
- the processor 24 executes a computer program, searches for data in various databases stored in the storage device 26, gives instructions for displaying processing results, and performs processing related to supply and demand monitoring of the power system 20.
- the processor 24 may be a CPU (Central Processing Unit) or a GPU (Graphics Processing Unit).
- the processor 24 may be a single-core processor or a multi-core processor.
- the processor 24 may include a hardware circuit (for example, FPGA (Field-Programmable Gate Array) or ASIC (Application Specific Integrated Circuit)) that performs a part or all of the processing.
- the processor 24 may include a neural network.
- the processor 24 may be configured as one or more semiconductor chips, or may be configured as a computer device such as a calculation server. Program execution may be shared by multiple processors and computers. Alternatively, the processor 24 may instruct a cloud computer or the like to execute all or a part of the supply / demand monitoring program via the communication network 300, and may receive the execution result.
- the memory 25 is configured as, for example, a RAM (Random Access Memory), stores a computer program and calculation result data, and provides a work area required for each process to the processor 24.
- a RAM Random Access Memory
- the storage device 26 is a storage device having a large storage capacity, and is, for example, a hard disk device or an SSD (Solid State Drive).
- the storage device 26 can hold an executable file of various programs and data used for executing the program.
- the storage device 26 can hold the output distribution command value model database DB1, the system information database DB2, and the stability result database DB3. Further, the storage device 26 can hold a supply and demand monitoring program.
- the supply and demand monitoring program may be software that can be installed in the supply and demand monitoring device 10, or may be incorporated as firmware in the supply and demand monitoring device 10.
- the output distribution command value database DB1 stores the output distribution command value D1 that has been output-distributed by the merit order method or the like.
- the system information database DB2 stores the system information D2 for analyzing the stability of the power system.
- the stability result database DB3 stores the stability result D3 regarding various constraints such as overload, voltage deviation, voltage stability, and synchronous stability.
- FIG. 4 shows an example in which the supply / demand monitoring device 10 holds the output allocation command value database DB1, the system information database DB2, and the stability result database DB3, but at least one of these databases is held in the cloud server. You may let it.
- FIG. 5 is a block diagram showing a functional configuration example of the supply / demand monitoring device according to the first embodiment.
- the processor 24 in FIG. 4 reads out the ⁇ part, which is a program, loads it into a DRAM (Dynamic Random Access Memory), and then ⁇ .
- the function of the department shall be realized.
- the supply / demand monitoring device 10 includes an output allocation command value database DB 1, a system information database DB 2, a stability result database DB 3, an output distribution pattern determination unit 11, a system analysis unit 12, and a stability determination unit 13.
- the output distribution pattern determination unit 11 inputs the output distribution command value D1 from the output distribution command value database DB 1, determines a plurality of cheaper output distribution patterns, and outputs the result to the system analysis unit 12.
- system analysis unit 12 an arbitrary time and an arbitrary output distribution command value D1 are input, and system information D2 is input from the system information database DB2, and power flow calculation, synchronous stability calculation, voltage stability calculation, and adjustment power are input. By performing the securing amount calculation and the like, the result is output to the stability determination unit 13.
- the stability determination unit 13 inputs the result calculated by the system analysis unit 12, determines the stability such as overload, voltage deviation, synchronization instability, voltage instability, and insufficient adjustment force, and determines the result. It is output to the stability result database DB3.
- FIG. 6 is a flowchart showing the processing of the supply and demand monitoring device of FIG.
- a plurality of inexpensive output distribution patterns are determined based on the output distribution command value D1.
- the output distribution pattern may be determined manually or automatically, and is not limited to a specific determination means. Two examples of automatically determining the output distribution pattern will be described below.
- the first example of the automatic determination of the output distribution pattern in the processing step S1 will be described with reference to the flow of FIG. 7 and the processing image of FIG. Further, a second example of automatic determination of the output distribution pattern in the processing step S1 will be described with reference to the flow of FIG. 9 and the processing image of FIG.
- FIG. 7 shows a flowchart showing an example of processing of the output distribution pattern determination unit 11. Further, each processing step in the flowchart will be described with reference to an image of an example of processing of the output distribution pattern determination unit 11 in FIG.
- the output distribution transfer target determination in the process step S11 of FIG. 7 an adjusted power supply deviating from the output distribution according to the ideal merit order is selected.
- the output distribution according to the ideal merit order is the output of 30, 30, and 20 by the three units (GA, GB, GC) in FIG. 1 from the viewpoint of cost. Therefore, this is shown in the upper part of FIG. Of the GA to GE of the regulated power supply, GB, GC, and GD are selected as the replacement target of the regulated power supply that deviates from the relationship.
- the increase adjustment width is calculated.
- the increase adjustment width is calculated.
- the adjustment power supply GB that the output deviates to the lower side, and the increase adjustment range is +25. Is.
- the reduction adjustment width is calculated.
- the output deviates from the output distribution according to the ideal merit order to the increase side in the adjustment power supply GC and the adjustment power supply GD, as compared with the relationship in FIG. Are -5 and -20, respectively.
- a cheaper output distribution pattern candidate is obtained by changing the output within the range of the up adjustment range and the down adjustment range.
- the output of the adjustment power supply GB is changed from 5 to 10 as a result of changing the output in increments of 5 for the increase adjustment width and the decrease adjustment width while considering the cost.
- the output of the adjustment power supply GD was changed from 20 to 15. Therefore, in the first output distribution pattern, the outputs of the adjustment power supplies GA to GE are 30, 10, 25, 15, and 0, respectively.
- the process of changing the output while considering the cost in increments of 5 for the increase adjustment width and the decrease adjustment width is continuously executed, and a new output distribution pattern is generated each time.
- step S15 it is determined whether the output transfer is completed for the entire adjustment range. When completed, this flow ends. If it is not completed, the process returns to the processing step S14, and the output distribution pattern in the next step is determined.
- the output distribution pattern after completion is described in the lower part of FIG. 8, and the output distribution is set according to the ideal merit order illustrated in FIG.
- the cheap adjustment power supply selection in the processing step S22 the cheapest adjustment power supply is selected from the transfer targets.
- the adjustment power supply GB is selected.
- the most expensive adjustment power supply GD is selected from the transfer targets.
- the output change in the processing step S24 is changed until the outputs of both adjustment power supplies GB and GD are the same, so that a cheaper output distribution pattern candidate is obtained.
- the output of the adjusted power supply GB is changed from 5 to 12.5 as a result of changing the output in consideration of the cost in both the adjusted power supply GB and GD. It means that the output of the adjustment power supply GD is changed from 20 to 12.5. At this time, the output may be changed while considering a certain step.
- step S25 it is determined whether or not the output change has been completed for all the adjusted power supplies. When completed, this flow ends. If it is not completed, the process returns to the processing step S22, and the output distribution pattern in the next step is determined.
- system analysis unit 12 in the processing step S2 performs system analysis such as power flow calculation, synchronous stability calculation, voltage stability calculation, and adjustment force securing amount calculation.
- system analysis such as power flow calculation, synchronous stability calculation, voltage stability calculation, and adjustment force securing amount calculation.
- a plurality of stability calculations may be performed or one stability calculation may be performed.
- the stability determination unit 13 in the processing step S3 outputs data related to the output distribution pattern and the stability result regarding the system analysis results such as the power flow calculation, the synchronous stability calculation, the voltage stability calculation, and the adjustment force securing amount calculation.
- Stability includes overload, voltage deviation, synchronous stability, voltage stability, lack of adjustment power, etc. described in the background technology.
- the processing of the processing step S2 and the processing step S3 is an intermediate stage (FIG. 8 middle stage, FIG. 10 lower stage) from the initial stage (FIG. 8 upper stage, FIG. 10 upper stage) to the final stage (FIG. 8 lower stage, FIG. 10 lower stage) in the processing step S1. It is carried out for each output distribution pattern in (10 middle stage), and various stability evaluations are performed for a plurality of output distribution patterns.
- FIG. 11 shows an example of an output image of the output distribution pattern of the regulated power supply and the result of the stability analysis.
- an output distribution pattern the output of each adjustment power supply from the initial stage 1 to the final stage X through the intermediate stage, the cost in the output distribution pattern of each stage, and the judgment results of various stability are organized in a list. Has been done. According to this list, at what timing and under what circumstances will the operation of the regulated power supply of the power system be changed in chronological order from the initial stage 1 through the intermediate stage to the final stage X? Turns out. From this, when the past output distribution at any time becomes stable in each stability and one or more arbitrary output distribution command values become unstable in each stability, the output distribution command value becomes the output distribution. It can be said that it is the most economical output allocation after satisfying the stability constraint.
- FIG. 12 is a block diagram showing a functional configuration of the supply / demand monitoring device according to the second embodiment.
- the supply / demand monitoring device 10 of FIG. 12 includes an output allocation command value database DB1, a system information database DB2, a stability result database DB3, an arbitrary output allocation command value database DB4, an output distribution pattern determination unit 11, a system analysis unit 12, and a stability determination.
- an arbitrary output allocation command value database DB 4 is further provided.
- Arbitrary output allocation command value database DB4 stores one pattern or a plurality of arbitrary output allocation command values.
- the output distribution pattern determination unit 11 inputs an output distribution command value and an arbitrary output distribution command value, determines a plurality of cheaper output distribution patterns, and outputs the result to the system analysis unit 12.
- the system analysis unit 12 inputs the output distribution pattern calculated by the output distribution pattern determination unit 11 and the system information stored in the system information DB 2, and performs power flow calculation, synchronous stability calculation, voltage stability calculation, and adjustment power securing amount. By performing calculations and the like, the results are output to the stability determination unit 13.
- the stability determination unit 13 inputs the result calculated by the system analysis unit 12, determines the stability such as overload, voltage deviation, synchronization instability, voltage instability, and insufficient adjustment force, and determines the result. It is output to the stability result database DB3.
- FIG. 13 is a flowchart showing the processing of the supply and demand monitoring device of FIG.
- the output distribution pattern is determined based on one or both of the output distribution command value distributed by the merit order method and the arbitrary output distribution command value. do. Two examples of output distribution patterns input to the system analysis unit 12 will be described below.
- the arbitrary output allocation command value is used as the arbitrary output allocation command value from the database DB4.
- the desired output can be obtained by using an arbitrary output distribution command value (such as an output distribution command value that is cheaper than the output distribution command value that is output distributed by the merit order method, etc.) desired by the grid operator or power generation company as an input value.
- the stability of the allocation command value can be determined.
- the output distribution command value that is output-distributed by the merit order method or the like and the arbitrary output distribution command value from the arbitrary output distribution command value database DB4 are used as the output distribution pattern.
- output distribution command value cheaper than the output distribution command value distributed by the merit order method, etc.
- output distribution command value By using the output distribution command value as an input value, it is possible to determine not only the stability of the desired output distribution command value but also the stability of the output distribution command value distributed by the merit order method or the like. This makes it possible to confirm the difference in the stability results between the two.
- the system analysis unit 12 in the processing step S2 performs system analysis such as power flow calculation, synchronous stability calculation, voltage stability calculation, and adjustment force securing amount calculation. For phylogenetic analysis, a plurality of stability calculations may be performed or one stability calculation may be performed.
- the stability determination unit 13 in the processing step S3 outputs data related to the output distribution pattern and the stability result regarding the system analysis results such as the power flow calculation, the synchronous stability calculation, the voltage stability calculation, and the adjustment force securing amount calculation.
- Stability includes overload, voltage deviation, synchronous stability, voltage stability, lack of adjustment power, etc. described in the background technology.
- FIG. 14 shows an example of an output image of the output distribution pattern of the adjusted power supply and the result of the stability analysis.
- FIG. 15 is a block diagram showing a functional configuration of the supply / demand monitoring device according to the third embodiment.
- the supply / demand adjustment device 10 includes an output allocation command value database DB1, a system information database DB2, a stability result database DB3, an output reallocation command value database DB5, an output distribution pattern determination unit 11, a system analysis unit 12, and stability.
- an output redistribution command value DB 4 an output distribution determination unit 14, and an output redistribution are further provided.
- the distribution determination unit 15 is provided.
- the output redistribution command value database DB5 stores the output redistribution command value that further satisfies the stability and reduces the cost based on the output distribution command value that is output distributed by the merit order method or the like.
- the output distribution determination unit 14 inputs the supply-demand imbalance, determines the output distribution to each adjustment power source, and outputs the result to the output distribution command value database DB1.
- the output distribution pattern determination unit 11 inputs the output distribution command value calculated by the output distribution determination unit 14, determines a plurality of cheaper output distribution patterns, and outputs the result to the system analysis unit 12.
- the system analysis unit 12 inputs the output distribution pattern calculated by the output distribution pattern determination unit 11 and the system information stored in the system information DB 2, and performs power flow calculation, synchronous stability calculation, voltage stability calculation, and adjustment power securing amount. By performing calculations and the like, the results are output to the stability determination unit 13.
- the stability determination unit 13 inputs the result calculated by the system analysis unit 12, determines the stability such as overload, voltage deviation, synchronization instability, voltage instability, and insufficient adjustment power, and determines the result. It is output to the stability result database DB 3 and the output reallocation determination unit 15.
- the output redistribution determination unit 15 inputs a plurality of output distribution patterns and their stability results, satisfies the stability constraint, selects the most economical output redistribution command value, and outputs the result again. Output to the distribution command value database DB5.
- FIG. 16 is a flowchart showing the processing of the supply and demand adjusting device of FIG.
- the output distribution to each regulated power source is determined based on the amount of supply-demand imbalance. For example, the output distribution is determined according to the merit order.
- the adjustment power should be allocated in order from the cheapest adjustment power supply within the range of the restrictions that can be assigned to each adjustment power supply. Can be done.
- the adjusting force can be allocated in order from each adjusting power source having the highest cost within the range of the constraint that can be assigned to each adjusting power source.
- the cost referred to here may include the procurement cost in addition to the fuel cost of the regulated power source.
- the output is distributed so as to satisfy not only the balance between supply and demand but also the stability of the power system such as overload, voltage deviation, voltage stability, and synchronous stability. Need to be decided. Therefore, it is common to set various constraints and then determine the output distribution by optimization calculation.
- a plurality of inexpensive output distribution patterns are determined based on the output distribution determined in the processing step S34. Two examples of determining the output distribution pattern will be described below.
- the system analysis unit 12 in the processing step S32 carries out system analysis such as power flow calculation, synchronous stability calculation, voltage stability calculation, and adjustment force securing amount calculation. For phylogenetic analysis, a plurality of stability calculations may be performed or one stability calculation may be performed.
- the stability determination unit 13 in the processing step S33 outputs data related to the output distribution pattern and the stability result regarding the system analysis results such as the power flow calculation, the synchronous stability calculation, the voltage stability calculation, and the adjustment force securing amount calculation.
- Stability includes overload, voltage deviation, synchronous stability, voltage stability, lack of adjustment power, etc. described in the background technology.
- FIG. 17 shows an example of an output image as a result of the output distribution pattern of the adjusted power supply and the stability analysis.
- the presence or absence of a constraint violation is determined by stability analysis in a plurality of output distribution patterns.
- the output distribution command value determined by the output distribution determination unit 14 is the most economical output after the output distribution satisfies the stability constraint. It can be said that it is an allocation.
- the output distribution pattern with the lowest cost among the corresponding output distribution patterns is selected as the output reallocation command value. In the example of FIG. 17, assuming that only pattern 1 and pattern 2 are stable in all patterns 1 to X, pattern 2 which is a cheaper pattern is selected.
- the supply and demand adjustment device is configured by further providing the function of allocating the output distribution pattern defined here to the adjustment power supply. Needless to say, you can do it.
- Example 3 As described above, according to the above-mentioned Example 3, a better output distribution can be searched for, and the output can be distributed based on the search, so that the cost can be reduced while satisfying the stability.
- the present invention is not limited to the above-described embodiment, and includes various modifications.
- the above-described embodiments have been described in detail in order to explain the present invention in an easy-to-understand manner, and are not necessarily limited to those having all the described configurations.
- it is possible to replace a part of the configuration of one embodiment with the configuration of another embodiment and it is also possible to add the configuration of another embodiment to the configuration of one embodiment.
- each of the above configurations, functions, processing units, and the like may be realized by hardware, for example, by designing a part or all of them by an integrated circuit.
- DB1 Output allocation command value database
- DB2 System information database
- DB3 Stability result database
- DB4 Arbitrary output allocation command value database
- DB5 Output redistribution command value database
- 24: Processor 25: Memory
- 26 Storage device
- 27 Bus, 300: Communication network
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
出力配分が安定性制約を満たした上で最経済の出力配分であるかについての妥当性を評価できるとともに、より安価な出力配分パターンを適用できる電力系統の需給監視装置、需給調整装置および方法を提供する。電力系統の複数の調整電源の出力配分パターンを定める需給監視装置であって、出力配分指令値に対してより安価な複数の出力配分パターンを決定する出力配分パターン決定部と、出力配分パターン決定部からの複数の出力配分パターンの夫々を基に電力系統の系統解析を実施する系統解析部と、系統解析部における系統解析の結果として複数の出力配分パターンの時の電力系統の安定性を判定する安定性判定部とを備え、電力系統の複数の調整電源の出力配分パターンが電力系統の安定性制約を満たした上で最経済の出力配分であることについての妥当性評価を可能とすることを特徴とする需給監視装置。
Description
本発明は、電力系統の需給監視装置、需給調整装置および方法に関する。
電力系統において負荷変動(再生可能エネルギーの出力変動を含む)などにより需給アンバランスが発生すると、周波数変動が発生する。現在、系統運用者は中央給電指令所で経済負荷配分(ELD:Economic Load Dispatch)と負荷周波数制御(LFC:Load Frequency Control)を組み合わせて、調整電源に出力配分することで、電力供給エリアの需給バランスを調整している。なお、本明細書では、需給調整における出力配分の配分先を調整電源と言う。調整電源は、発電機、蓄電池、デマンドレスポンスの少なくともいずれか1つから選択することができる。
経済負荷配分ELDは、十数分程度以上の負荷変動に対して、燃料費などを考慮して、負荷に追従するように各調整電源の出力配分を決める機能である。負荷周波数制御LFCは、数分~十数分程度の負荷に対する変動量を計算し、この変動量に追従する発電量を各調整電源に指令することで、系統周波数を許容範囲に抑制する機能である。
また、調整力の取引を行う需給調整市場が創設されると、系統運用者は、この需給調整市場において調整力を調達することになる。その運用においては、メリットオーダーに基づいて調整力を発動する仕組みが設けられる可能性がある。メリットオーダーによる出力配分では、コストに基づく優先順位を基に調整電源に出力を配分する。調整力の上げ方向についてはコストの安い順に出力を配分し、調整力の下げ方向についてはコストの高い順に出力を配分する。
図1に、メリットオーダーに応じた出力配分に基づく調整電源ごとの出力配分の一例を示す。但しこのとき、各調整電源G(GAからGE)の調整コストMA~MEは、MA<MB<MC<MD<MEであるものとする。この例は、出力配分可能上限値を30とする各調整電源G(GAからGE)に対して、上げ側の調整力の合計値80を配分するイメージである。この上げ側の調整力の配分例ではまず、調整コストが最も安い調整電源GAに出力配分可能上限値である30を割り当てる。次に、調整コストが2番目に安い調整電源GBに出力配分可能上限値である30を割り当てる。最後に、調整コストが2番目に安い調整電源GCに20を割り当てる。
この時、需給のバランスだけでなく、電力系統の安定性についても考慮して出力配分されることが想定される。電力系統を安定的に運用するためには、過負荷、電圧逸脱、電圧安定性、同期安定性、調整力確保などの各種制約を解消する必要がある。このような制約違反とならないように、メリットオーダーによる配分から出力を持替えることで、経済性は犠牲になるが、制約違反が起こらないように運用することが通常である。
つまり電力系統を安定性の制約を考慮した結果、図1のようなメリットオーダーに応じた出力配分にならない可能性がある。図2は、メリットオーダー順となっていない調整電源の配分例として、調整電源GAに30、調整電源GBに5、調整電源GCに25、調整電源GDに20が配分された例を示している。
安定性の一つ目の制約として、過負荷について説明する。過負荷とは、潮流が送電線の容量を超過することである。図3に過負荷となった送電線の例を示す。この送電系統は調整電源G(GAからGD)が図示のように接続されており、上図は調整電源GBから負荷1への方向の潮流が小さい例を示している。また下図は、調整電源GDの出力が増加することにより負荷1への方向の当該潮流が大きくなった例である。なお、調整電源の出力を変更するなどにより、過負荷が起こらないように運用している。
安定性の二つ目の制約として、電圧逸脱について説明する。電圧逸脱とは、各ノードの電圧が上限値または下限値を逸脱することである。図3では、負荷3が接続されたノードが電圧逸脱(電圧の下限値を逸脱)となった例を示している。なお、無効電力のバランスを適正に調整するなどにより、電圧逸脱が起こらないように運用している。
安定性の三つ目の制約として、電圧安定性について説明する。電圧安定性とは、負荷の増加、調整電源や変電設備の停止などの擾乱時に、電圧を安定に維持する能力である。電源の遠隔化や偏在化による長距離にわたる大電力送電と無効電力損失の増加および、負荷特性の変化(定電力負荷の増加)などにより、電圧安定性が問題となる。なお、電圧・無効電力を制御する同期調相機や静止型無効電力補償装置を設置し、電圧安定性を維持している。
安定性の四つ目の制約として、同期安定性について説明する。同期安定性とは、調整電源の停止などの擾乱時に、調整電源間の同期を安定に維持する能力である。落雷などが原因で電力系統に故障が発生すると、一部の回転機型調整電源において他の調整電源に対して回転が加速する。加速した調整電源の基準調整電源に対する内部相差角が他の調整電源と比較して大きくなり、調整電源間の同期が維持できなくなる。なお、加速した調整電源を系統から切り離し、加速する調整電源が増えないようすることで、同期安定性を維持している。
安定性の五つ目の制約として、調整力確保について説明する。調整力とは、上げ方向および下げ方向に供給または需要を変更できる能力である。この調整力を需要予測誤差、時間内変動、電源脱落などに対応できるように確保しておく必要がある。
電力系統の需給調整方法として、特許文献1に開示された技術がある。特許文献1によると、経済負荷配分LFCだけではなく負荷周波数制御ELDも踏まえた上でメリットオーダーによる需給調整を可能とし、調整力調達時の公平性および透明性を確保すると共に、優れた需給制御性能を発揮する電力需給制御システム、プログラムおよび方法を提供すると記載されている。
また、電力系統の需給調整方法として、特許文献2に開示された技術がある。特許文献2によると、並列バンク群の変圧器タップ比および調相設備投入量のいずれか一方または両方の制約について適切な定式化を図り最適潮流計算に組み入れることにより、計算時間を短縮化しつつ、目的関数がどのようなものであっても最適潮流計算結果として実際の運用に則した妥当な解を得ることができると記載されている。
しかしながら、特許文献1では、メリットオーダーによる出力配分のみを実施する場合に、電力系統の安定性の各種制約を満たせない可能性がある。
また、特許文献2では、メリットオーダー方式による出力配分に言及していないが、最適潮流計算によって、電力系統の安定性について制約違反とならないように計算される。
過負荷などの電力安定性を満たすことができるが、それが安定性の制約を満たした上で最経済な出力配分であるか、説明できない可能性がある。
過負荷などの電力安定性を満たすことができるが、それが安定性の制約を満たした上で最経済な出力配分であるか、説明できない可能性がある。
以上のことから本発明においては、出力配分が安定性制約を満たした上で最経済の出力配分であるかについての妥当性を評価できるとともに、より安価な出力配分パターンを適用できる電力系統の需給監視装置、需給調整装置および方法を提供することを目的とする。
以上のことから本発明においては「電力系統の複数の調整電源の出力配分パターンを定める需給監視装置であって、出力配分指令値に対してより安価な複数の出力配分パターンを決定する出力配分パターン決定部と、出力配分パターン決定部からの複数の出力配分パターンの夫々を基に電力系統の系統解析を実施する系統解析部と、系統解析部における系統解析の結果として複数の出力配分パターンの時の電力系統の安定性を判定する安定性判定部とを備え、電力系統の複数の調整電源の出力配分パターンが電力系統の安定性制約を満たした上で最経済の出力配分であることについての妥当性評価を可能とすることを特徴とする需給監視装置」としたものである。
また本発明においては「需給監視装置に出力手段を備え、電力系統の複数の調整電源に通信手段を介して出力指令を与えるようにされた需給調整装置であって、出力手段は、電力系統の安定性制約を満たした上で最経済の出力配分である1つの出力配分パターンを選択し、通信手段を介して複数の調整電源に対して出力指令を与えることを特徴とする需給調整装置」としたものである。
また本発明においては「電力系統の複数の調整電源の出力配分パターンを定める需給監視方法であって、出力配分指令値に対してより安価な複数の出力配分パターンを決定し、複数の出力配分パターンの夫々を基に電力系統の系統解析を実施し、系統解析の結果として複数の出力配分パターンの時の電力系統の安定性を判定し、電力系統の複数の調整電源の出力配分パターンが電力系統の安定性制約を満たした上で最経済の出力配分であることについての妥当性評価を可能とすることを特徴とする需給監視方法」としたものである。
また本発明においては「需給監視方法で得られた出力配分パターンを、電力系統の複数の調整電源に出力指令として与えるようにされた需給調整方法であって、電力系統の安定性制約を満たした上で最経済の出力配分である1つの出力配分パターンを選択し、複数の調整電源に対して出力指令として与えることを特徴とする需給調整方法。」としたものである。
本発明によれば、出力配分が安定性制約を満たした上で最経済の出力配分であるかについての妥当性を評価できるとともに、より安価な出力配分パターンを適用できることにある。
本発明の実施例について、図面を参照して説明する。なお、以下に説明する実施例では特許請求の範囲に係る発明を限定するものではなく、また、実施例の中で説明されている諸要素およびその組み合わせの全てが発明の解決手段に必須であるとは限らない。
図4は、実施例1に係る電力系統の需給監視装置のハードウェア構成を示すブロック図である。図4には電力系統20と、電力系統20の各所と通信ネットワーク300を介して接続された電力系統の需給監視装置10が記述されている。
図4において、需給監視装置10は、例えば、計算機システムで構成される。需給監視装置10は、ある出力配分に対して、安定性制約を満たした上で最適経済の出力配分であるかについての妥当性を評価する。
需給監視装置10は、通信ネットワーク300を介して、電力系統20の計測情報などにアクセスすることができる。ここでの電力系統20は、図3と同じ構成を例示しており、複数の調整電源G(GAからGD)および負荷Ld(Ld1からLd6)が、ノードN(N1からN6)、変圧器Tr(Tr1からTr4)および送電線L(L1からL5)などを介して相互に連系されたシステムである。ノードN(N1からN6)には、電力系統20の保護、制御および監視のための各種の計測器が設置されている。
需給監視装置10は、出力部21、入力部22、通信部23、プロセッサ24、メモリ25および記憶装置26を備え、これらは、バス27を介して相互に接続されている。
表示部21は、需給監視装置10で扱われるパラメータおよび需給監視装置10での処理結果などを表示する。表示部21は、ディスプレイ装置であってもよいし、ディスプレイ装置とともにプリンタ装置または音声出力装置などを用いてもよい。
入力部22は、需給監視装置10を動作させるための各種条件などを入力する。入力部22は、キーボードおよびマウスなどを使用できる他、タッチパネルまたは音声指示装置などの少なくともいずれか一つを備えるようにしてもよい。
通信部23は、通信ネットワーク300に接続するための回路および通信プロトコルを備える。通信ネットワーク300は、インターネットなどのWAN(Wide Area Network)であってもよいし、WiFiまたはイーサネット(登録商標)などのLAN(Local Area Network)であってもよいし、WANとLANが混在していてもよい。
プロセッサ24は、コンピュータプログラムを実行し、記憶装置26に記憶されている各種データベース内のデータの検索、処理結果の表示指示、電力系統20の需給監視に関する処理などを行う。プロセッサ24は、CPU(Central Processing Unit)であってもよいし、GPU(Graphics Processing Unit)であってもよい。プロセッサ24は、シングルコアロセッサであってもよいし、マルチコアロセッサであってもよい。プロセッサ24は、処理の一部または全部を行うハードウェア回路(例えばFPGA(Field-Programmable Gate Array)またはASIC(Application Specific Integrated Circuit))を備えていてもよい。プロセッサ24は、ニューラルネットワークを備えていてもよい。プロセッサ24は、1つまたは複数の半導体チップとして構成してもよいし、計算サーバのようなコンピュータ装置として構成してもよい。プログラムの実行は、複数のプロセッサやコンピュータに分担させてもよい。あるいは、プロセッサ24は、通信ネットワーク300を介してクラウドコンピュータなどに需給監視プログラムの全部または一部の実行を指示し、その実行結果を受け取るようにしてもよい。
メモリ25は、例えば、RAM(Random Access Memory)として構成され、コンピュータプログラムおよび計算結果データを記憶したり、各処理に必要なワークエリアをプロセッサ24に提供したりする。
記憶装置26は、大容量の記憶容量を有する記憶デバイスであり、例えば、ハードディスク装置やSSD(Solid State Drive)である。記憶装置26は、各種プログラムの実行ファイルやプログラムの実行に用いられるデータを保持することができる。記憶装置26は、出力配分指令値モデルデータベースDB1、系統情報データベースDB2、安定性結果データベースDB3を保持することができる。また、記憶装置26は、需給監視プログラムを保持することができる。需給監視プログラムは、需給監視装置10にインストール可能なソフトウェアであってもよいし、需給監視装置10にファームウェアとして組み込まれていてもよい。
出力配分指令値データベースDB1は、メリットオーダー方式などで出力配分された出力配分指令値D1を格納する。系統情報データベースDB2は、電力系統の安定性を解析するための系統情報D2を格納する。安定性結果データベースDB3は、過負荷、電圧逸脱、電圧安定性、同期安定性などの各種制約に関する安定性結果D3を格納する。
図4では、需給監視装置10が、出力配分指令値データベースDB1、系統情報データベースDB2、安定性結果データベースDB3を保持する例を示したが、これらデータベースの少なくともいずれか1つのデータベースをクラウドサーバに保持させるようにしてもよい。
図5は、実施例1に係る需給監視装置の機能的な構成例を示すブロック図である。なお、以下の説明では、“○○部は”と動作主体を記した場合、図4のプロセッサ24がプログラムである○○部を読み出し、DRAM(Dynamic Random Access Memory)にロードした上で○○部の機能を実現するものとする。
図5において、需給監視装置10は、出力配分指令値データベースDB1、系統情報データベースDB2、安定性結果データベースDB3、出力配分パターン決定部11、系統解析部12、安定性判定部13を備える。
出力配分パターン決定部11では、出力配分指令値データベースDB1から出力配分指令値D1を入力し、より安価な複数の出力配分パターンを決定することで、その結果を系統解析部12に出力する。
系統解析部12では、任意の時間と、任意の出力配分指令値D1を入力し、また系統情報データベースDB2から系統情報D2を入力し、潮流計算、同期安定性計算、電圧安定性計算、調整力確保量計算などを実施することで、その結果を安定性判定部13に出力する。
安定性判定部13では、系統解析部12で計算された結果を入力し、過負荷、電圧逸脱、同期不安定、電圧不安定、調整力不足などの安定性を判定することで、その結果を安定性結果データベースDB3に出力する。
図6は、図5の需給監視装置の処理を示すフローチャートである。図6ではまず、処理ステップS1の出力配分パターン決定において、出力配分指令値D1を基により安価な複数の出力配分パターンを決定する。出力配分パターンは手動で決定しても良いし、自動で決定しても良く、特定の決定手段に限定されないものとする。出力配分パターンを自動で決定する例を以下で二つ説明する。
処理ステップS1の出力配分パターン自動決定の第1の例を、図7のフローと図8の処理イメージを用いて説明する。また、処理ステップS1の出力配分パターン自動決定の第2の例を、図9のフローと図10の処理イメージを用いて説明する。
出力配分パターン自動決定の第1の例として、図1における理想的なメリットオーダーに応じた出力配分から乖離した場合に、コストを考慮しながら出力配分パターンを決定する例を示す。図7に出力配分パターン決定部11の処理の例を示すフローチャートを示す。また、フローチャートの各処理ステップについて、図8の出力配分パターン決定部11の処理の例のイメージを用いて説明する。
図7の処理ステップS11の出力配分持替対象決定では、理想的なメリットオーダーに応じた出力配分から乖離した調整電源が選択される。この場合に、理想的なメリットオーダーに応じた出力配分は、コストの観点から図1の3台(GA、GB、GC)による30、30、20の出力であることから、図8上段においてこの関係から乖離した調整電源の持替対象として、調整電源のGA~GEのうち、GB、GC、GDが選択される。
処理ステップS12の上げ調整幅算出では、上げ調整幅を算出する。図8上段の例では、理想的なメリットオーダーに応じた出力配分である図1の関係と比較すると、下げ側に出力が乖離しているのは、調整電源GBであり、上げ調整幅は+25である。
同様に処理ステップS13の下げ調整幅算出では、下げ調整幅を算出する。図8上段の例では、理想的なメリットオーダーに応じた出力配分から上げ側に出力が乖離しているのは図1の関係と比較すると、調整電源GC、調整電源GDであり、上げ調整幅はそれぞれ-5、-20である。
処理ステップS14の出力持替では、上げ調整幅、下げ調整幅の範囲で出力を持替えることで、より安価な出力配分パターンの候補を求める。図8中段の例では、出力配分パターンの候補の1つ目として、上げ調整幅、下げ調整幅を5刻みでコストを考慮しながら出力を持替えた結果、調整電源GBの出力を5から10に、調整電源GDの出力を20から15に変更された。そのため、出力配分パターンの一つ目は、調整電源GA~GEの出力がそれぞれ30、10、25、15、0となる。処理ステップS14の出力持替処理は、上げ調整幅、下げ調整幅を5刻みでコストを考慮しながら出力を持替える処理が継続実行され、その都度新たな出力配分パターンが生成される。
処理ステップS15では、全調整幅について出力持替えが完了したか判定する。完了した場合、当フローを終了する。完了しない場合、処理ステップS14に戻り、次の刻みにおける出力配分パターンを決定する。完了後の出力配分パターンは図8下段に記述されており、図1に例示した理想的なメリットオーダーに応じた出力配分とされている。
出力配分パターン自動決定の第2の例として、安価な調整電源の出力が、高価な調整電源の出力より小さい場合に、コストを考慮しながら出力配分パターンを決定する例を、図9のフローと図10の処理イメージを用いて説明する。
図9の出力配分パターン決定部の処理の例を示すフローチャートでは、最初に処理ステップS21の出力配分持替対象決定処理において、安価な調整電源の出力が高価な調整電源の出力より小さい場合にそれぞれの調整電源が選択される。図10上段の事例では、安価な調整電源GBの出力が5であり、高価な調整電源GDの出力である20よりさらに小さい状態を図示しており、当初の出力配分持替対象としては調整電源GBと調整電源GDが選択されることになる。なお、以下の処理から明らかなように、図10の例では、持替対象として、最終的に調整電源のGA~GEのうち、GB、GC、GDが選択される。
処理ステップS22の安価な調整電源選択では、持替対象の中から最も安価な調整電源を選択する。図10上段の例では、調整電源GBが選択される。処理ステップS23の高価な調整電源選択では、図10上段の例では、持替対象の中から最も高価な調整電源GDを選択する。
処理ステップS24の出力持替では、両調整電源GB、GDの出力が同じになるまで出力を持替えることで、より安価な出力配分パターンの候補を求める。図10上段の例では、出力配分パターンの候補の1つ目として、両調整電源GB、GDにおいてコストを考慮しながら出力を持替えた結果、調整電源GBの出力を5から12.5に、調整電源GDの出力を20から12.5に変更されることを表している。この時、一定の刻みを考慮しながら出力を持替えてもよい。
処理ステップS25では、全調整電源について出力持替えが完了したか判定する。完了した場合、当フローを終了する。完了しない場合、処理ステップS22に戻り、次の刻みにおける出力配分パターンを決定する。
図10中段は、両調整電源GB、GDにおける第1回持替処理後に、再度安価な調整電源の出力が高価な調整電源の出力より小さい場合を検討した結果、第2回持替処理では調整電源GB、GCの間で6.25を調整幅として行うことを表している。この場合にも、持替処理の都度新たな出力配分パターンが生成される。
この結果、図10下段に示すように、両調整電源GB、GDの出力が等しくなり、次回実行条件である「安価な調整電源の出力が高価な調整電源の出力より小さい場合」が不存在となり、処理終了となったことを表している。
図6に戻り、処理ステップS2の系統解析部12では、潮流計算、同期安定性計算、電圧安定性計算、調整力確保量計算などの系統解析を実施する。系統解析については、複数の安定性計算を実施しても、一つの安定性計算を実施しても良い。
処理ステップS3の安定性判定部13では、潮流計算、同期安定性計算、電圧安定性計算、調整力確保量計算などの系統解析結果に関して、出力配分パターンと安定性結果に関するデータを出力する。安定性とは、背景技術で説明した過負荷、電圧逸脱、同期安定性、電圧安定性、調整力不足などが挙げられる。
処理ステップS2、処理ステップS3の処理は、処理ステップS1における初期段階(図8上段、図10上段)が最終段階(図8下段、図10下段)に至るまでの中間段階(図8中段、図10中段)における出力配分パターン毎に実施され、複数の出力配分パターンについての各種安定性評価が実行される。
図11に調整電源の出力配分パターンと安定性解析に関する結果についての出力イメージの一例を示す。ここでは、出力配分パターンとして初期段階1から中間段階を経て最終段階Xに至るまでの各調整電源の出力と、各段階の出力配分パターンでのコスト、ならびに各種安定性の判断結果が一覧に整理されている。この一覧によれば、初期段階1から中間段階を経て最終段階Xまで、時系列的に電力系統の調整電源の運用を変更していった場合に、どのタイミング、どの状況で不安定になるかが判明する。このことから、任意の時間における過去の出力配分が各安定性において全て安定となり、任意の出力配分指令値が各安定性において一つ以上不安定となる場合に、出力配分指令値は出力配分が安定性制約を満たした上で最経済の出力配分であると言える。
以上説明したように、上述した実施例1によれば、出力配分が安定性制約を満たした上で最経済の出力配分であるかについての妥当性を評価できる。
図12は、実施例2に係る需給監視装置の機能的な構成を示すブロック図である。
図12の需給監視装置10は、出力配分指令値データベースDB1、系統情報データベースDB2、安定性結果データベースDB3、任意出力配分指令値データベースDB4、出力配分パターン決定部11、系統解析部12、安定性判定部13、出力配分決定部14、出力再配分決定部15を備える実施例1、図5の需給監視装置10に加えて、さらに任意出力配分指令値データベースDB4を備えたものである。
任意出力配分指令値データベースDB4は、任意の出力配分指令値を1パターンまたは複数パターン格納している。
出力配分パターン決定部11では、出力配分指令値と任意出力配分指令値を入力し、より安価な複数の出力配分パターンを決定することで、その結果を系統解析部12に出力する。
系統解析部12では、出力配分パターン決定部11で計算された出力配分パターンと系統情報DB2に格納された系統情報を入力し、潮流計算、同期安定性計算、電圧安定性計算、調整力確保量計算などを実施することで、その結果を安定性判定部13に出力する。
安定性判定部13では、系統解析部12で計算された結果を入力し、過負荷、電圧逸脱、同期不安定、電圧不安定、調整力不足などの安定性を判定することで、その結果を安定性結果データベースDB3に出力する。
図13は、図12の需給監視装置の処理を示すフローチャートである。
処理ステップS1の出力配分パターン決定では、メリットオーダー方式などで出力配分された出力配分指令値と、任意出力配分指令値のうち、どちらか一つの値または両方の値を基に出力配分パターンを決定する。系統解析部12に入力する出力配分パターンの例を以下で二つ説明する。
一つ目の例では、任意出力配分指令値データベースDB4からの任意出力配分指令値とする。系統運用者や発電事業者が希望する任意の出力配分指令値(メリットオーダー方式などで出力配分された出力配分指令値より安価な出力配分指令値など)を入力値とすることで、所望の出力配分指令値の安定性を判別できる。
二つ目の例では、メリットオーダー方式などで出力配分された出力配分指令値と、任意出力配分指令値データベースDB4からの任意出力配分指令値を出力配分パターンとする。系統運用者や発電事業者が希望する任意の出力配分指令値(メリットオーダー方式などで出力配分された出力配分指令値より安価な出力配分指令値など)に加えて、メリットオーダー方式などで出力配分された出力配分指令値を入力値とすることで、所望の出力配分指令値の安定性だけでなく、メリットオーダー方式などで出力配分された出力配分指令値の安定性も判別できる。これにより、両者の安定性の結果の違いを確認できるようになる。
処理ステップS2の系統解析部12では、潮流計算、同期安定性計算、電圧安定性計算、調整力確保量計算などの系統解析を実施する。系統解析については、複数の安定性計算を実施しても、一つの安定性計算を実施しても良い。
処理ステップS3の安定性判定部13では、潮流計算、同期安定性計算、電圧安定性計算、調整力確保量計算などの系統解析結果に関して、出力配分パターンと安定性結果に関するデータを出力する。安定性とは、背景技術で説明した過負荷、電圧逸脱、同期安定性、電圧安定性、調整力不足などが挙げられる。
図14に調整電源の出力配分パターンと安定性解析に関する結果についての出力イメージの一例を示す。任意の時間における過去の出力配分が各安定性において全て安定となり、任意の出力配分指令値が各安定性において一つ以上不安定となる場合に、出力配分指令値が出力配分が安定性制約を満たした上で最経済の出力配分であると言える。
以上説明したように、実施例2によれば、出力配分が安定性制約を満たした上で最経済の出力配分であるかについての妥当性を評価できる。
図15は、実施例3に係る需給監視装置の機能的な構成を示すブロック図である。
図15において、需給調整装置10は、出力配分指令値データベースDB1、系統情報データベースDB2、安定性結果データベースDB3、出力再配分指令値データベースDB5、出力配分パターン決定部11、系統解析部12、安定性判定部13、出力配分決定部14、出力再配分決定部15を備える、実施例1、図5の需給監視装置10に加えて、さらに出力再配分指令値DB4、出力配分決定部14、出力再配分決定部15を備える。
出力再配分指令値データベースDB5は、メリットオーダー方式などで出力配分された出力配分指令値を基に、さらに安定性を満たした上でコストを低減する出力再配分指令値を格納する。
出力配分決定部14では、需給アンバランスを入力し、各調整電源への出力配分を決定することで、その結果を出力配分指令値データベースDB1に出力する。
出力配分パターン決定部11では、出力配分決定部14で計算された出力配分指令値を入力し、より安価な複数の出力配分パターンを決定することで、その結果を系統解析部12に出力する。
系統解析部12では、出力配分パターン決定部11で計算された出力配分パターンと系統情報DB2に格納された系統情報を入力し、潮流計算、同期安定性計算、電圧安定性計算、調整力確保量計算などを実施することで、その結果を安定性判定部13に出力する。
安定性判定部13では、系統解析部12で計算された結果を入力し、過負荷、電圧逸脱、同期不安定、電圧不安定、調整力不足などの安定性を判定することで、その結果を安定性結果データベースDB3、出力再配分決定部15に出力する。
出力再配分決定部15では、複数の出力配分パターンとその安定性結果を入力とし、安定性制約を満たした上で最経済である出力再配分指令値を選択することで、その結果を出力再配分指令値データベースDB5に出力する。
図16は、図15の需給調整装置の処理を示すフローチャートである。
最初の処理ステップS34の出力配分決定では、需給アンバランスの量を基に、各調整電源への出力配分を決定する。例えば、メリットオーダーに応じた出力配分を決定する。
メリットオーダーに応じて各調整電源の出力配分を決定する場合、調整力の上げ方向については、各調整電源に割り当て可能な制約の範囲内において、コストの安い各調整電源から順に調整力を割り当てることができる。調整力の下げ方向については、各調整電源に割り当て可能な制約の範囲内において、コストの高い各調整電源から順に調整力を割り当てることができる。ここで言うコストは、調整電源の燃料コストの他、調達コストを含んでも良い。
メリットオーダーに応じて各調整電源の出力配分を決定する場合、調整力の上げ方向については、各調整電源に割り当て可能な制約の範囲内において、コストの安い各調整電源から順に調整力を割り当てることができる。調整力の下げ方向については、各調整電源に割り当て可能な制約の範囲内において、コストの高い各調整電源から順に調整力を割り当てることができる。ここで言うコストは、調整電源の燃料コストの他、調達コストを含んでも良い。
この時、電力系統を安定的に運用するために、需給のバランスだけでなく、過負荷、電圧逸脱、電圧安定性、同期安定性などの電力系統の安定性についても満足させるように、出力配分を決定する必要がある。そのために、各種制約条件を設定した上で最適化計算によって出力配分を決定する方法が一般的である。
処理ステップS31の出力配分パターン決定では、処理ステップS34で決定した出力配分を基により安価な複数の出力配分パターンを決定する。出力配分パターンを決定する例を以下で二つ説明する。
処理ステップS32の系統解析部12では、潮流計算、同期安定性計算、電圧安定性計算、調整力確保量計算などの系統解析を実施する。系統解析については、複数の安定性計算を実施しても、一つの安定性計算を実施しても良い。
処理ステップS33の安定性判定部13では、潮流計算、同期安定性計算、電圧安定性計算、調整力確保量計算などの系統解析結果に関して、出力配分パターンと安定性結果に関するデータを出力する。安定性とは、背景技術で説明した過負荷、電圧逸脱、同期安定性、電圧安定性、調整力不足などが挙げられる。図17に調整電源の出力配分パターンと安定性解析に関する結果に出力イメージの一例を示す。
処理ステップS35の出力配分再決定では、複数の出力配分パターンでの安定性解析により制約違反の有無を判定する。全出力配分パターンに対して、各安定性において一つ以上不安定となる場合に、出力配分決定部14で決定した出力配分指令値が出力配分が安定性制約を満たした上で最経済の出力配分であると言える。また、各安定性において全て安定となる出力配分パターンが存在する場合に、該当の出力配分パターンの中で最もコストが安価な出力配分パターンを出力再配分指令値として選択する。図17の例では、パターン1~Xにおいて全ての安定性が安定なものがパターン1とパターン2のみと仮定すると、このうち、より安価なパターンであるパターン2が選択される。
なお上記の説明は、主として電力系統の需給監視装置を構成することについて説明を行ってきたが、ここで定めた出力配分パターンを調整電源に配分する機能をさらに備えることで、需給調整装置を構成できることは言うまでもない。
以上説明したように、上述した実施例3によれば、さらに良い出力配分も探索でき、それをもとに出力配分できることで、安定性を満たした上でコストを低減することができる。
なお、本発明は、上述した実施形態に限定されるものではなく、様々な変形例が含まれる。例えば、上述した実施形態は本発明を分かりやすく説明するために詳細に説明したものであり、必ずしも説明した全ての構成を備えるものに限定されるものではない。また、ある実施形態の構成の一部を他の実施形態の構成に置き換えることが可能であり、また、ある実施形態の構成に他の実施形態の構成を加えることも可能である。また、各実施形態の構成の一部について、他の構成の追加、削除または置換をすることが可能である。また、上記の各構成、機能および処理部などは、それらの一部又は全部を、例えば集積回路で設計するなどによりハードウェアで実現してもよい。
DB1:出力配分指令値データベース、DB2:系統情報データベース、DB3:安定性結果データベース、DB4:任意出力配分指令値データベース、DB5:出力再配分指令値データベース、20:電力系統、10:需給監視装置、11:出力配分パターン決定部、12:系統解析部、13:安定性判定部、14:出力配分決定部、15:出力再配分決定部、21:表示部、22:入力部、23:通信部、24:プロセッサ、25:メモリ、26:記憶装置、27:バス、300:通信ネットワーク
Claims (13)
- 電力系統の複数の調整電源の出力配分パターンを定める需給監視装置であって、
出力配分指令値に対してより安価な複数の出力配分パターンを決定する出力配分パターン決定部と、前記出力配分パターン決定部からの複数の出力配分パターンの夫々を基に電力系統の系統解析を実施する系統解析部と、前記系統解析部における系統解析の結果として複数の前記出力配分パターンの時の電力系統の安定性を判定する安定性判定部とを備え、電力系統の複数の調整電源の出力配分パターンが電力系統の安定性制約を満たした上で最経済の出力配分であることについての妥当性評価を可能とすることを特徴とする需給監視装置。 - 請求項1に記載の需給監視装置であって、
前記系統解析部における系統解析により、潮流計算、同期安定性計算、電圧安定性計算、調整力確保量計算の少なくとも1つ以上を計算することを特徴とする需給監視装置。 - 請求項1または請求項2に記載の需給監視装置であって、
前記安定性判定部では、安定性として過負荷、電圧逸脱、同期不安定、電圧不安定、調整力不足の少なくとも1つ以上について、安定性を判定することを特徴とする需給監視装置。 - 請求項1から請求項3のいずれか1項に記載の需給監視装置であって、
複数の前記出力配分パターンについて、電力系統の安定性制約を満たした上で最経済の出力配分であることについての妥当性評価を付して外部出力することを特徴とする需給監視装置。 - 請求項1から請求項4のいずれか1項に記載の需給監視装置であって、
前記出力配分パターン決定部は、理想的なメリットオーダーに応じた出力配分から乖離した場合に、コストを考慮しながら出力配分パターンを決定することを特徴とする需給監視装置。 - 請求項1から請求項5のいずれか1項に記載の需給監視装置であって、
前記出力配分パターン決定部は、安価な調整電源の出力が、高価な調整電源の出力より小さい場合に、コストを考慮しながら出力配分パターンを決定することを特徴とする需給監視装置。 - 請求項1から請求項6のいずれか1項に記載の需給監視装置であって、
前記出力配分パターン決定部は、メリットオーダー方式などで出力配分された出力配分指令値と、任意出力配分指令値のうち、どちらか一つの値または両方の値を基に出力配分パターンを決定することを特徴とする需給監視装置。 - 請求項1から請求項7のいずれか1項に記載の需給監視装置であって、
複数の出力配分パターンとその安定性結果を基に出力再配分指令値を決定する出力再配分決定部とを更に備えることで、安定性制約を満たした上でより安価な出力配分パターンを適用できることを特徴とする需給監視装置。 - 請求項8に記載の需給監視装置であって、
需給アンバランスを入力し、各調整電源への出力配分を決定する出力配分決定部を備え、前記出力配分決定部の結果を前記出力配分パターン決定部に反映することを特徴とする需給監視装置。 - 請求項8に記載の需給監視装置であって、
出力再配分決定部は、複数の出力配分パターンとその安定性結果を入力とし、安定性制約を満たした上で最経済である出力再配分指令値を選択することで、その結果を出力再配分指令値データベースに出力することを特徴とする需給監視装置。 - 請求項1から請求項10のいずれか1項に記載の需給監視装置に出力手段を備え、電力系統の複数の調整電源に通信手段を介して出力指令を与えるようにされた需給調整装置であって、
前記出力手段は、電力系統の安定性制約を満たした上で最経済の出力配分である1つの出力配分パターンを選択し、通信手段を介して複数の調整電源に対して出力指令を与えることを特徴とする需給調整装置。 - 電力系統の複数の調整電源の出力配分パターンを定める需給監視方法であって、
出力配分指令値に対してより安価な複数の出力配分パターンを決定し、複数の前記出力配分パターンの夫々を基に電力系統の系統解析を実施し、前記系統解析の結果として複数の前記出力配分パターンの時の電力系統の安定性を判定し、電力系統の複数の調整電源の出力配分パターンが電力系統の安定性制約を満たした上で最経済の出力配分であることについての妥当性評価を可能とすることを特徴とする需給監視方法。 - 請求項12に記載の需給監視方法で得られた出力配分パターンを、電力系統の複数の調整電源に出力指令として与えるようにされた需給調整方法であって、
電力系統の安定性制約を満たした上で最経済の出力配分である1つの出力配分パターンを選択し、複数の調整電源に対して出力指令として与えることを特徴とする需給調整方法。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2020-112427 | 2020-06-30 | ||
JP2020112427A JP7551360B2 (ja) | 2020-06-30 | 2020-06-30 | 需給監視装置、需給調整装置および方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2022004029A1 true WO2022004029A1 (ja) | 2022-01-06 |
Family
ID=79315189
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2021/003481 WO2022004029A1 (ja) | 2020-06-30 | 2021-02-01 | 需給監視装置、需給調整装置および方法 |
Country Status (2)
Country | Link |
---|---|
JP (1) | JP7551360B2 (ja) |
WO (1) | WO2022004029A1 (ja) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019187359A1 (ja) * | 2018-03-30 | 2019-10-03 | 株式会社日立製作所 | 管理装置、管理方法及び管理システム |
JP2020039222A (ja) * | 2018-09-05 | 2020-03-12 | 株式会社日立製作所 | 電力需給制御装置、電力需給制御システムおよび電力需給制御方法 |
JP2020089175A (ja) * | 2018-11-29 | 2020-06-04 | 株式会社日立製作所 | 周波数制御装置および周波数制御方法 |
-
2020
- 2020-06-30 JP JP2020112427A patent/JP7551360B2/ja active Active
-
2021
- 2021-02-01 WO PCT/JP2021/003481 patent/WO2022004029A1/ja active Application Filing
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019187359A1 (ja) * | 2018-03-30 | 2019-10-03 | 株式会社日立製作所 | 管理装置、管理方法及び管理システム |
JP2020039222A (ja) * | 2018-09-05 | 2020-03-12 | 株式会社日立製作所 | 電力需給制御装置、電力需給制御システムおよび電力需給制御方法 |
JP2020089175A (ja) * | 2018-11-29 | 2020-06-04 | 株式会社日立製作所 | 周波数制御装置および周波数制御方法 |
Also Published As
Publication number | Publication date |
---|---|
JP7551360B2 (ja) | 2024-09-17 |
JP2022011353A (ja) | 2022-01-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6876406B2 (ja) | 電圧無効電力運用支援装置および支援方法、並びに電圧無効電力運用監視制御装置および監視制御方法 | |
Castro et al. | Optimal voltage control in distribution network in the presence of DGs | |
JP5393934B1 (ja) | 電圧監視制御装置、電圧制御装置および電圧監視制御方法 | |
Fernandes et al. | Load shedding strategies using optimal load flow with relaxation of restrictions | |
JP7240862B2 (ja) | 周波数制御装置および周波数制御方法 | |
CN105375506A (zh) | 特高压直流输电仿真系统 | |
JP7265928B2 (ja) | 系統管理装置および系統管理方法 | |
WO2022118495A1 (ja) | 電力系統運用計画作成支援装置および方法 | |
WO2020195078A1 (ja) | 負荷周波数制御装置および負荷周波数制御方法 | |
WO2022004029A1 (ja) | 需給監視装置、需給調整装置および方法 | |
CN107611993B (zh) | 一种适用于特高压半波长输电系统的无功优化方法 | |
JP7190983B2 (ja) | 分散型エネルギーリソース管理装置、電力制御システム、中央給電指令所計算機システム、および電力制御方法 | |
Abdelaziz et al. | Fuel-saving benefit analysis of islanded microgrid central controllers | |
JP2020107294A (ja) | 想定故障分析装置および想定故障分析方法 | |
WO2017046840A1 (ja) | 電圧信頼性評価管理システムおよび電圧信頼性評価管理方法 | |
JP7442417B2 (ja) | 需給調整支援装置、需給調整装置並びに方法 | |
JP7160747B2 (ja) | 発電機の制御状態決定装置及び方法 | |
Hemmatpour et al. | Optimal CVSR allocation to ensure network health in static load shedding–a Bi-level optimization approach | |
WO2021024554A1 (ja) | 調整力調達装置および調整力調達方法 | |
Pourbabak et al. | An efficient algorithm for dispatch of modular FACTS devices in transmission planning | |
Pawellek et al. | Utilization of HVDC-Systems in the International Grid Control Cooperation | |
CN115224697B (zh) | 一种多级综合能源微电网分层能量管理方法 | |
Zhang et al. | Distributed load-side frequency regulation for power systems | |
JP2021141700A (ja) | 電力系統の需給調整装置、電力系統の負荷周波数制御装置、電力系統のバランシンググループ装置および電力系統の需給調整方法 | |
Yesuratnam et al. | An expert system approach of congestion management for security and economy oriented power system operation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 21831552 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 21831552 Country of ref document: EP Kind code of ref document: A1 |