WO2021200478A1 - 空気調和システム - Google Patents

空気調和システム Download PDF

Info

Publication number
WO2021200478A1
WO2021200478A1 PCT/JP2021/012264 JP2021012264W WO2021200478A1 WO 2021200478 A1 WO2021200478 A1 WO 2021200478A1 JP 2021012264 W JP2021012264 W JP 2021012264W WO 2021200478 A1 WO2021200478 A1 WO 2021200478A1
Authority
WO
WIPO (PCT)
Prior art keywords
air
fan
unit
air volume
units
Prior art date
Application number
PCT/JP2021/012264
Other languages
English (en)
French (fr)
Inventor
浩二 巽
Original Assignee
ダイキン工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ダイキン工業株式会社 filed Critical ダイキン工業株式会社
Priority to CN202180024949.3A priority Critical patent/CN115349069A/zh
Publication of WO2021200478A1 publication Critical patent/WO2021200478A1/ja
Priority to US17/955,704 priority patent/US20230019149A1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/72Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure
    • F24F11/74Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure for controlling air flow rate or air velocity
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/72Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F12/00Use of energy recovery systems in air conditioning, ventilation or screening
    • F24F12/001Use of energy recovery systems in air conditioning, ventilation or screening with heat-exchange between supplied and exhausted air
    • F24F12/006Use of energy recovery systems in air conditioning, ventilation or screening with heat-exchange between supplied and exhausted air using an air-to-air heat exchanger
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/10Temperature
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/40Pressure, e.g. wind pressure
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating

Definitions

  • Patent Document 1 Japanese Unexamined Patent Publication No. 10-253132
  • an air conditioning unit having a heat exchanger and an air conditioning fan a plurality of ventilation units having a blower fan
  • Air conditioning systems are known that include a duct that distributes conditioned air to the ventilation unit. In this air conditioning system, the rotation speed of the blower fan is controlled for air conditioning in the room.
  • the air conditioning system that takes in the outside air into the unit with a fan has a problem of preventing the backflow of the air taken into the unit by a route different from the route that takes in the outside air.
  • the air conditioning system of the first aspect includes a plurality of first units, a second unit, a duct, a second fan, and a controller.
  • Each of the plurality of first units has a first fan that blows first air into the target space.
  • the second unit has a heat exchanger and an air intake.
  • the duct distributes the first air sent from the second unit to the plurality of first units.
  • the second fan introduces the second air into the second unit.
  • the controller controls a plurality of first fans of the plurality of first units.
  • the second unit generates the first air by exchanging heat with the heat exchanger at least the second air introduced by the second fan and sends it to the duct.
  • the controller controls at least a plurality of first fans so that the first air or the second air does not flow out from the intake port by making the sum of the air volumes of the plurality of first units equal to or more than the air volume of the second fan. ..
  • the controller makes the total of the air volumes of the plurality of first units equal to or greater than the air volume of the second fan, the value obtained by subtracting the air volume of the second air from the air volume of the first air becomes negative. Instead, it is possible to control the inside of the second unit so that the pressure does not become positive (for example, above atmospheric pressure). As a result, the air conditioning system can prevent backflow of the first air and the second air.
  • the air conditioning system of the second aspect is a system of the first aspect, in which each of the plurality of first units has a first air volume detecting means for detecting the air volume of each first unit, and a plurality of controllers are used.
  • the plurality of first fans are controlled according to the result of comparison between the total of the air volumes detected by the plurality of first air volume detecting means of the first unit and the air volume of the second fan.
  • the air conditioning system of the third viewpoint is a system of the first viewpoint or the second viewpoint, and includes a second air volume detecting means for detecting the air volume of the second fan, and the controller is detected by the second air volume detecting means.
  • a plurality of first fans are controlled according to the result of comparison between the air volume and the sum of the air volumes of the plurality of first units.
  • the air conditioning system 1 shown in FIG. 1 includes a plurality of first units 10, a second unit 20, a duct 40, a controller 50, and an outside air introduction unit 110.
  • Each of the plurality of first units 10 has a first fan 11.
  • the second unit 20 has a heat exchanger 22 and intake ports 28 and 29.
  • Each first fan 11 blows out supply air SA (first air) from each first unit 10 to the target space 100.
  • the target space 100 is, for example, a room in a building.
  • a room is, for example, a space in which the movement of air is restricted by floors, ceilings and walls.
  • a plurality of first units 10 are arranged with respect to one or a plurality of target spaces 100.
  • the second unit 20 has intake ports 28 and 29.
  • the second unit 20 introduces the outside air OA from the outside air introduction unit 110 through the intake port 28.
  • the intake port 29 of the second unit 20 is connected to the target space 100 by a ventilation passage 82.
  • the indoor air RA returns from the target space 100 to the second unit 20 through the ventilation passage 82 and the intake port 29.
  • the outside air introduction unit 110 has an outside air supply fan 111.
  • the outside air introduction unit 110 takes in the outside air OA from the outside of the target space 100 by the outside air supply fan 111 and blows it to the intake port 28 of the second unit 20.
  • the rotation speed of the outside air supply fan 111 can be changed, and the larger the rotation speed, the larger the air volume of the outside air OA.
  • the outside air supply fan 111 is controlled by the main controller 51.
  • the second air introduced into the second unit 20 in this case is the outside air OA.
  • the outside air supply fan 111 that introduces the second air (outside air OA) into the second unit 20 is the second fan.
  • the duct 40 distributes the supply air SA (first air) sent from the second unit 20 by the first fan 11 to the plurality of first units 10.
  • the duct 40 includes a main pipe 41 and a branch pipe 42 branched from the main pipe 41.
  • FIG. 1 shows an example in which the inlet 41a of the main pipe 41 is connected to the second unit 20.
  • the outlet 41b of the main pipe 41 of the duct 40 is connected to the inlet 42a of the branch pipe 42.
  • the plurality of outlets 42b of the branch pipe 42 are connected to the plurality of first units 10.
  • the air supply fan 21 is arranged in the second unit 20.
  • the second unit 20 generates supply air SA (first air) by exchanging heat between the indoor air RA and the outside air OA (second air) introduced by the air supply fan 21 with the heat exchanger 22 to generate a duct. Send to 40.
  • all the air blown out from the air supply fan 21 is configured to flow into the duct 40.
  • Each first unit 10 and the target space 100 are connected by each ventilation passage 81.
  • the inlet 81a of each ventilation path 81 is connected to each first unit 10.
  • Each first fan 11 generates an air flow from the outlet 42b of the duct 40 toward the inlet 81a of each ventilation path 81 in each first unit 10. Looking at this from another point of view, each first fan 11 sucks the supply air SA from each outlet 42b of the branch pipe 42.
  • Each first fan 11 can change the static pressure in each first unit 10 (in front of the inlet 81a of each ventilation path 81) by changing the rotation speed.
  • each first fan 11 increases the static pressure in each first unit 10 (in front of the inlet 81a of each ventilation passage 81) by increasing the rotation speed. can do.
  • the static pressure in the first unit 10 becomes high, the air volume of the supply air SA flowing through the ventilation passage 81 increases.
  • the air supply air volume blown out from the outlet 81b of each ventilation path 81 to the target space 100 changes.
  • the controller 50 includes a main controller 51 and a plurality of sub-controllers 52.
  • the main controller 51 and the plurality of sub-controllers 52 are connected to each other to form the controller 50.
  • the main controller 51 controls the rotation speed of the air supply fan 21.
  • the main controller 51 controls the output of the air supply fan 21.
  • the state of the air supply fan 21 changes in the direction of increasing the air volume of the air supply fan 21.
  • One sub-controller 52 is provided for each first unit 10. Each sub-controller 52 issues an instruction regarding the air volume change to the corresponding first fan 11. Each sub-controller 52 stores the target air volume. If the supply air volume is insufficient with respect to the target air volume, each sub-controller 52 issues an instruction (instruction regarding changing the air volume) to increase the rotation speed of the corresponding first fan 11. On the contrary, if the supply air volume is excessive with respect to the target air volume, each sub-controller 52 issues an instruction (instruction regarding changing the air volume) to reduce the rotation speed of the corresponding first fan 11.
  • the controller 50 obtains information regarding the air volume of the supply air SA supplied to the target space 100 by the plurality of first fans 11 from the plurality of sub-controllers 52.
  • the information on the air volume includes, for example, information on the air volume to be supplied to the target space 100 per second.
  • the required output of the air supply fan 21 is determined based on the obtained information on the air volume.
  • the controller 50 controls the output of the air supply fan 21 so as to obtain the determined required output.
  • each sub-controller 52 obtains the value of the air volume of the first unit 10 from the corresponding first unit 10.
  • Each sub-controller 52 outputs the value of the air volume to the main controller 51.
  • the controller 50 sets the total air volume of the plurality of first units 10 to be equal to or greater than the air volume of the outside air supply fan 111 (second fan), so that the air supply air SA (first) is supplied from the intake port 29 to the outside of the second unit 20. At least a plurality of first fans 11 are controlled so that one air) or outside air OA (second air) does not flow out.
  • the second unit 20 includes a third air volume detecting means 23, a temperature sensor 24, and a water volume adjusting valve 25, in addition to the air supply fan 21, the heat exchanger 22, and the intake ports 28 and 29 described above.
  • a third air volume detecting means 23 for example, an air volume sensor, a wind speed sensor, or a differential pressure sensor can be used.
  • the third air volume detecting means 23 detects the air volume blown by the air supply fan 21.
  • the third air volume detecting means 23 is connected to the main controller 51.
  • the value of the air volume detected by the third air volume detecting means 23 is transmitted from the third air volume detecting means 23 to the main controller 51.
  • the air volume detected by the third air volume detecting means 23 is the air volume flowing through the main pipe 41 of the duct 40. In other words, the air volume detected by the third air volume detecting means 23 is the total amount of the supplied air volume supplied from the plurality of first units 10 to the target space 100.
  • the temperature sensor 24 detects the temperature of the supply air SA sent from the air supply fan 21 to the duct 40.
  • the temperature sensor 24 is connected to the main controller 51.
  • the temperature value detected by the temperature sensor 24 is transmitted from the temperature sensor 24 to the main controller 51.
  • the second unit 20 is connected to the target space 100 via the ventilation passage 82.
  • the indoor air RA returned from the target space 100 through the ventilation passage 82 is drawn into the second unit 20 by the air supply fan 21.
  • the second unit 20 is connected to the outside air introduction unit 110.
  • the outside air OA is blown into the intake port 28 of the second unit 20 by the outside air supply fan 111.
  • the indoor air RA and the outside air OA drawn into the second unit 20 pass through the heat exchanger 22 to become the supply air SA, and the supply air SA is sent out to the duct 40.
  • the indoor air RA and the outside air OA exchange heat with the cold water or hot water flowing through the heat exchanger 22 to become conditioned air.
  • the amount of heat given to the conditioned air (supply air SA) by heat exchange in the heat exchanger 22 is adjusted by the water amount adjusting valve 25.
  • the opening degree of the water amount adjusting valve 25 is controlled by the main controller 51. As the opening degree of the water amount adjusting valve 25 increases, the amount of water flowing through the heat exchanger 22 increases, and the amount of heat exchanged between the heat exchanger 22 and the supply air SA per unit time increases. On the contrary, when the opening degree of the water amount adjusting valve 25 becomes small, the amount of water flowing through the heat exchanger 22 decreases, and the amount of heat exchanged between the heat exchanger 22 and the supply air SA per unit time decreases.
  • the first unit 10 has a first air volume detecting means 12 in addition to the first fan 11 already described.
  • the first air volume detecting means 12 detects the air volume blown by the first fan 11.
  • Each first air volume detecting means 12 is connected to one corresponding sub-controller 52.
  • the value of the air volume detected by the first air volume detecting means 12 is transmitted to the sub controller 52.
  • the air volume detected by the first air volume detecting means 12 is the air volume flowing through the ventilation passage 81.
  • the air volume detected by the first air volume detecting means 12 is the air supply air volume supplied from each first unit 10 to the target space 100.
  • an air volume sensor, a wind speed sensor, or a differential pressure sensor can be used for example.
  • the controller 50 is realized by, for example, a computer.
  • the controller 50 includes control arithmetic units 51a and 52a and storage devices 51b and 52b shown in FIG.
  • a processor such as a CPU or GPU can be used for the control arithmetic units 51a and 52a.
  • the control arithmetic units 51a and 52a read the programs stored in the storage devices 51b and 52b, and perform predetermined image processing and arithmetic processing according to the programs. Further, the control arithmetic units 51a and 52a can write the arithmetic results in the storage devices 51b and 52b and read the information stored in the storage devices 51b and 52b according to the program.
  • FIG. 2 shows various functional blocks realized by the control arithmetic units 51a and 52a.
  • the storage devices 51b and 52b can be used as a database.
  • the plurality of remote sensors 70 have the functions of a temperature sensor and a CO 2 concentration sensor. Each remote sensor 70 is configured to transmit data indicating the temperature and CO 2 concentration sensor of the target space 100 to the corresponding sub-controller 52. Each remote sensor 70 is configured to detect , for example, a temperature and CO 2 concentration sensor in the vicinity of the installation location in the target space 100.
  • the outside air introduction unit 110 includes outside air air volume detecting means 112 in addition to the outside air supply fan 111 already described.
  • the outside air air volume detecting means 112 functions as a second air volume detecting means for detecting the air volume of the outside air OA sent to the second unit 20.
  • the outside air air volume detecting means 112 transmits the detected value of the air volume of the outside air OA to the main controller 51.
  • an air volume sensor, a wind speed sensor, or a differential pressure sensor can be used for example.
  • Each of the plurality of sub-controllers 52 receives the detected temperature value of the target space 100 from the connected remote sensor 70.
  • Each sub-controller 52 holds data indicating the set temperature. For example, data indicating the set temperature is transmitted in advance to each sub-controller 52 from a remote controller (not shown) or the like.
  • Each sub-controller 52 stores data indicating a set temperature received from a remote controller or the like in a storage device 52b (see FIG. 2) such as a built-in memory.
  • Each sub-controller 52 transmits the set temperature value to the main controller 51.
  • the main controller 51 determines the temperature of the supply air SA and the target air volume of each first unit 10 according to the temperature detected by the corresponding remote sensor 70 based on the set temperature.
  • the main controller 51 transmits the value of the target air volume to each sub controller 52.
  • the main controller 51 determines the target discharge pressure of the air supply fan 21 according to the total amount of the target air volume to be supplied to the target space 100.
  • the main controller 51 controls the rotation speed of the air supply fan 21 so that the discharge pressure of the air supply fan 21 becomes the target discharge pressure. Therefore, the second unit 20 may have a sensor that detects the discharge pressure of the air supply fan 21.
  • the temperature of the supply air SA is adjusted by the water amount adjusting valve 25.
  • the main controller 51 adjusts the opening degree of the water amount adjusting valve 25 so that the temperature of the supply air SA becomes the determined temperature while detecting the temperature of the supply air SA by the temperature sensor 24.
  • the main controller 51 receives the detected value of the CO 2 concentration of the target space 100 from the connected remote sensor 70, respectively.
  • the main controller 51 holds data on the CO 2 concentration.
  • the main controller 51 on the basis of the data relating to the CO 2 concentration, in accordance with the detected CO 2 concentration of the corresponding remote sensor 70, determining the output of the outside air supply fan 111 (rpm).
  • the controller 50 may allow the supply air SA or the outside air OA to flow out of the second unit 20 from the intake ports 28 and 29 by making the total AV of the air volumes of the plurality of first units 10 equal to or greater than the air volume of the outside air supply fan 111.
  • a plurality of first fans 11 are controlled so as not to be present. Therefore, the controller 50 compares the total of the air volumes detected by the plurality of first air volume detecting means 12 of the plurality of first units 10 with the air volume of the outside air supply fan 111.
  • the controller 50 compares the determined target air volume TV of the outside air supply fan 111 with the total AV1 of the air volumes detected by the plurality of first air volume detecting means 12, and makes a plurality of orders such that AV1> TV.
  • the air volume of 1 fan 11 is controlled.
  • the controller 50 includes the air volume AV2 of the outside air supply fan 111 detected by the outside air volume detecting means 112 (second air volume detecting means) and the total AV1 of the air volumes detected by the plurality of first air volume detecting means 12. May be configured to compare. In this case, for example, the controller 50 controls a plurality of first fans 11 so that AV1 ⁇ AV2.
  • An indoor fan 120 for introducing the indoor air RA into the second unit 20 may be provided as in the air conditioning system 1 shown in FIGS. 3 and 4.
  • the same components as those of the air conditioning system 1 of the embodiments shown in FIGS. 1 and 2 will be described with the same reference numerals. Omit.
  • the air blown out from the indoor fan 120 flows through either a path guided to the second unit 20 through the ventilation path 82 or a path going out of the room through the ventilation path 83.
  • the air entering the second unit 20 from the intake port 29 is the indoor air RA
  • the air discharged to the outside is the exhaust EA.
  • a bypass damper 92 for adjusting the air flow rate of the ventilation passage 82 and an exhaust damper 93 for adjusting the air flow rate of the ventilation passage 83 may be provided.
  • the outside air introduction unit 110 may be provided with an outside air damper 91 that switches between an open state and a closed state of the ventilation passage 84 that connects the outside air introduction unit 110 to the intake port 28 of the second unit 20.
  • the outside air damper 91, the bypass damper 92, and the exhaust damper 93 are configured to be opened and closed electrically, for example, and are controlled by the controller 50.
  • the outside air damper 91 is fully opened when the outside air supply fan 111 is operated, and is fully closed when the outside air supply fan 111 is stopped.
  • the rotation speed of the outside air supply fan 111 is controlled by the main controller 51 according to the CO 2 concentration detected by the remote sensor 70.
  • the main controller 51 increases the rotation speed of the outside air supply fan 111 to increase the amount of outside air OA supplied to the target space 100.
  • the main controller 51 changes the rotation speed of the indoor fan 120 according to the rotation speed of the air supply fan 21.
  • the main controller 51 increases the rotation speed of the indoor fan 120 when increasing the rotation speed of the air supply fan 21.
  • the main controller 51 makes the rotation speed of the indoor fan 120 proportional to the rotation speed of the air supply fan 21.
  • the main controller 51 changes the opening degree of the exhaust damper 93 according to the rotation speed of the outside air supply fan 111.
  • the main controller 51 increases the opening degree of the exhaust damper 93 to exhaust a large amount of indoor air RA.
  • the main controller 51 changes the opening degree of the exhaust damper 93 in proportion to the rotation speed of the outside air supply fan 111.
  • the main controller 51 causes the bypass damper 92 to perform an operation opposite to that of the exhaust damper 93.
  • the main controller 51 reduces the opening degree of the bypass damper 92 as the opening degree of the exhaust damper 93 increases.
  • the ventilation passage 82 is provided with indoor air air volume detecting means 121.
  • the indoor air air volume detecting means 121 functions as a second air volume detecting means for detecting the air volume of the indoor air RA sent to the second unit 20.
  • the indoor air air volume detecting means 121 transmits the detected air volume value of the indoor air RA to the main controller 51.
  • an air volume sensor, a wind speed sensor, or a differential pressure sensor can be used.
  • the outside air supply fan 111 and the indoor fan 120 are the second fans.
  • the second air introduced into the second unit 20 is the outside air OA and the indoor air RA introduced by the outside air supply fan 111 and the indoor fan 120.
  • the controller 50 sets the total AV of the air volumes of the plurality of first units 10 to be equal to or greater than the air volumes of the outside air supply fan 111 and the indoor fan 120, thereby supplying the air supply SA and the indoor air from the intake ports 28 and 29 to the outside of the second unit 20.
  • a plurality of first fans 11 are controlled so that RA or outside air OA does not flow out. Therefore, the controller 50 compares the total of the air volumes detected by the plurality of first air volume detecting means 12 of the plurality of first units 10 with the air volume of the outside air supply fan 111 and the air volume of the indoor fan 120.
  • the controller 50 includes an air volume AV2 of the outside air supply fan 111 detected by the outside air volume detecting means 112 (second air volume detecting means) and an indoor fan detected by the indoor air volume detecting means 121 (second air volume detecting means).
  • the total air volume AV4 of the 120 air volume AV3 is calculated.
  • the controller 50 compares the air volume AV4 with the total AV1 of the air volumes detected by the plurality of first air volume detecting means 12.
  • the controller 50 controls a plurality of first fans 11 so that, for example, AV1 ⁇ AV4.
  • the outside air supply fan 111 may be omitted from the configuration of the air conditioning system 1 shown in FIG.
  • the main controller 51 controls the opening degree of the outside air damper 91 according to the CO 2 concentration.
  • the main controller 51 increases the opening degree of the outside air damper 91 as the CO 2 concentration increases.
  • the indoor fan 120 is the second fan.
  • the second air introduced into the second unit 20 is the indoor air RA introduced by the indoor fan 120.
  • the controller 50 sets the total AV of the air volumes of the plurality of first units 10 to be equal to or greater than the air volume of the indoor fan 120, so that the supply air SA or the indoor air RA is generated from the intake ports 28 and 29 to the outside of the second unit 20.
  • a plurality of first fans 11 are controlled so as not to flow out. Therefore, the controller 50 compares the total of the air volumes detected by the plurality of first air volume detecting means 12 of the plurality of first units 10 with the air volume of the indoor fan 120.
  • the controller 50 compares the air volume AV3 of the indoor fan 120 detected by the indoor air volume detecting means 121 (second air volume detecting means) with the total AV1 of the air volumes detected by the plurality of first air volume detecting means 12. do.
  • the controller 50 controls a plurality of first fans 11 so that, for example, AV1 ⁇ AV3.
  • An exhaust fan 130 for exhausting the exhaust EA to the outside may be provided as in the air conditioning system 1 shown in FIGS. 5 and 6.
  • the same components as those of the air-conditioning system 1 of the embodiments shown in FIGS. 3 and 4 will be described with the same reference numerals. Omit.
  • the exhaust EA blown out from the exhaust fan 130 flows through the ventilation passage 83 to the outside of the room.
  • the remaining air excluding the exhaust EA is the indoor air RA that is guided to the second unit 20 through the ventilation passage 82.
  • a bypass damper 92 for adjusting the air flow rate of the ventilation passage 82 and an exhaust damper 93 for adjusting the air flow rate of the ventilation passage 83 may be provided.
  • the outside air introduction unit 110 may be provided with an outside air damper 91 that switches between an open state and a closed state of the ventilation passage 84 that connects the outside air introduction unit 110 to the intake port 28 of the second unit 20.
  • the outside air damper 91, the bypass damper 92, and the exhaust damper 93 are configured to be opened and closed electrically, for example, and are controlled by the controller 50.
  • the outside air damper 91 and the exhaust damper 93 are fully opened when the outside air supply fan 111 is operated, and are fully closed when the outside air supply fan 111 is stopped.
  • the rotation speed of the outside air supply fan 111 is controlled by the main controller 51 according to the CO 2 concentration detected by the remote sensor 70. When the CO 2 concentration in the target space 100 becomes high, the main controller 51 increases the rotation speed of the outside air supply fan 111 to increase the amount of outside air OA supplied to the target space 100.
  • the main controller 51 changes the rotation speed of the exhaust fan 130 according to the rotation speed of the outside air supply fan 111.
  • the main controller 51 increases the rotation speed of the exhaust fan 130 when increasing the rotation speed of the outside air supply fan 111.
  • the main controller 51 makes the rotation speed of the exhaust fan 130 proportional to the rotation speed of the outside air supply fan 111.
  • the main controller 51 causes the bypass damper 92 to perform the reverse operation of the exhaust fan 130.
  • the main controller 51 reduces the opening degree of the bypass damper 92 as the rotation speed of the exhaust fan 130 increases.
  • the outside air supply fan 111 is the second fan.
  • the second air introduced into the second unit 20 is the outside air OA introduced by the outside air supply fan 111. Therefore, the control of the plurality of first fans 11 for preventing the indoor air RA or the outside air OA from flowing out from the second unit 20 by the controller 50 is the same as in the embodiment.
  • the outside air supply fan 111 is configured to control the rotation speed.
  • the outside air supply fan 111 may be configured to switch between an on state and an off state at a constant rotation speed.
  • the main controller 51 turns on the outside air supply fan 111 when the CO 2 concentration detected by the remote sensor 70 exceeds the threshold value, and turns off the outside air supply fan 111 when the CO 2 concentration is equal to or less than the threshold value.
  • the controller 50 sets the total air volume of the plurality of first units 10 as the second fan, that is, the outside air supply fan 111, the indoor fan 120, or the outside air supply fan 111 and the room.
  • the air volume of both fans 120 is controlled to be equal to or higher than that of the fan 120. Therefore, the value obtained by subtracting the air volume of the outside air OA and / or the indoor air RA, which is the second air, from the air volume of the supply air SA, which is the first air, does not become negative.
  • Air conditioning system 10 1st unit 11 1st fan 12 1st air volume detecting means 20 2nd unit 22 Heat exchanger 28,29 Intake port 40 Duct 50 Controller 111 Outside air supply fan (Example of 2nd fan) 112 Outside air volume detecting means (example of second air volume detecting means) 120 Indoor fan (example of 2nd fan) 121 Indoor air air volume detecting means (example of second air volume detecting means)

Abstract

ある経路で空気をユニット内にファンで取り込む空気調和システムにおいて、前記経路とは異なる経路でユニットの中に取り込む空気の逆流を防止する。複数の第1ユニット(10)は、供給空気(SA)を対象空間(100)に吹き出す第1ファン(11)をそれぞれ有する。ダクト(40)は、第2ユニット(20)から複数の第1ユニット(10)に送られる供給空気(SA)を分配する。第2ユニット(20)が、室内空気(RA)及び外気供給ファン(111)により導入された外気(OA)を熱交換器(22)で熱交換することによって供給空気(SA)を生成してダクト(40)に送出する。コントローラ(50)は、複数の第1ユニット(10)の風量の合計を外気供給ファン(111)の風量以上にすることによって吸気口(28,29)から供給空気(SA)または外気(OA)が流れ出すことがないように、少なくとも複数の第1ファン(11)を制御する。

Description

空気調和システム
 空気を分配するダクトを備える空気調和システムに関する。
 従来から、例えば特許文献1(特開平10-253132号公報)に記載されているような、熱交換器及び空調用ファンを有する空調ユニットと、送風ファンを有する複数の通気ユニットと、空調ユニットから通気ユニットに調和空気を分配するダクトとを備える空気調和システムが知られている。この空気調和システムでは、部屋の空気調和のために送風ファンの回転数が制御される。
 しかしながら、特許文献1に記載されている空気調和システムにおいて、さらに空調ユニットに外気を取り込むための外気取り込み用ファンを設けると、外気取り込み用ファンと通気ユニットの送風ファンの連携が不十分になって、例えば室内から空調ユニットに取り込む空気が逆流することがある。
 このように外気などをファンでユニット内に取り込む空気調和システムには、外気などを取り込む経路とは異なる経路でユニットの中に取り込む空気の逆流を防止するという課題がある。
 第1観点の空気調和システムは、複数の第1ユニットと、第2ユニットと、ダクトと、第2ファンと、コントローラとを備える。複数の第1ユニットは、第1空気を対象空間に吹き出す第1ファンをそれぞれ有する。第2ユニットは、熱交換器及び吸気口を有する。
ダクトは、第2ユニットから複数の第1ユニットに送られる第1空気を分配する。第2ファンは、第2空気を第2ユニットに導入する。コントローラは、複数の第1ユニットの複数の第1ファンを制御する。第2ユニットが、少なくとも第2ファンにより導入された第2空気を熱交換器で熱交換することによって第1空気を生成してダクトに送出する。コントローラが、複数の第1ユニットの風量の合計を第2ファンの風量以上にすることによって吸気口から第1空気または第2空気が流れ出すことがないように、少なくとも複数の第1ファンを制御する。
 第1観点のシステムは、コントローラが、複数の第1ユニットの風量の合計を第2ファンの風量以上にすることで、第1空気の風量から第2空気の風量を引いた値が負にならず、第2ユニットの中を正圧(例えば大気圧以上)にしないような制御を行える。その結果、空気調和システムは、第1空気及び第2空気の逆流を防止することができる。
 第2観点の空気調和システムは、第1観点のシステムであって、複数の第1ユニットの各々が、各第1ユニットの風量を検知する第1風量検知手段を有し、コントローラが、複数の第1ユニットの複数の第1風量検知手段で検知された風量の合計と第2ファンの風量との比較の結果に応じて、複数の第1ファンを制御する。
 第3観点の空気調和システムは、第1観点又は第2観点のシステムであって、第2ファンの風量を検知する第2風量検知手段を備え、コントローラは、第2風量検知手段で検知された風量と複数の第1ユニットの風量の合計との比較の結果に応じて、複数の第1ファンを制御する。
実施形態に係る空気調和システムの構成を示す概念図である。 図1の空気調和システムのコントローラの構成を説明するためのブロック図である。 変形例に係る空気調和システムの構成の一例を示す概念図である。 図3の空気調和システムのコントローラの構成を説明するためのブロック図である。 変形例に係る空気調和システムの構成の他の例を示す概念図である。 図5の空気調和システムのコントローラの構成を説明するためのブロック図である。
 (1)全体構成
 図1に示されている空気調和システム1は、複数の第1ユニット10と、第2ユニット20と、ダクト40と、コントローラ50と、外気導入ユニット110とを備えている。複数の第1ユニット10は、それぞれ、第1ファン11を有する。第2ユニット20は、熱交換器22及び吸気口28,29を有する。各第1ファン11は、各第1ユニット10から対象空間100に供給空気SA(第1空気)を吹出す。対象空間100は、例えば、建物内の部屋である。部屋は、例えば、床、天井及び壁によって空気の移動が制限された空間である。1つまたは複数の対象空間100に対して、複数の第1ユニット10が配設される。図1には、複数の第1ユニット10を備える空気調和システム1の代表例として、2つの第1ユニット10を備える空気調和システム1が1つの対象空間100に対して配設されている例が示されている。しかし、1つの対象空間100に対して配設される第1ユニット10の個数は、3以上であってもよく、適宜設定されるものである。第2ユニット20は、吸気口28,29を有する。第2ユニット20は、吸気口28を通して、外気導入ユニット110から外気OAを導入する。第2ユニット20の吸気口29は、通風路82により、対象空間100と繋がっている。室内空気RAは、通風路82及び吸気口29を通して対象空間100から第2ユニット20に戻る。
 外気導入ユニット110は、外気供給ファン111を有している。外気導入ユニット110は、外気供給ファン111により、対象空間100の外から外気OAを取り入れて第2ユニット20の吸気口28に送風する。外気供給ファン111は、回転数を変更でき、回転数が大きいほど外気OAの風量が多くなる。外気供給ファン111はメインコントローラ51により制御されている。この場合の第2ユニット20に導入される第2空気は、外気OAである。これら第2空気(外気OA)を第2ユニット20に導入する外気供給ファン111が第2ファンである。
 ダクト40は、第2ユニット20から第1ファン11により送出される供給空気SA(第1空気)を、複数の第1ユニット10に分配する。ダクト40は、主管41と、主管41から分岐した枝管42とを含んでいる。図1には、主管41の入口41aは、第2ユニット20に接続されている例が示されている。ダクト40の主管41の出口41bは、枝管42の入口42aに接続されている。枝管42の複数の出口42bは、複数の第1ユニット10に接続されている。
 給気ファン21は、第2ユニット20の中に配置されている。第2ユニット20は、給気ファン21により導入された室内空気RA及び外気OA(第2空気)を熱交換器22で熱交換することによって、供給空気SA(第1空気)を生成してダクト40に送出する。ここでは、給気ファン21から吹出される空気は、全てダクト40に流れ込むように構成されている。
 各第1ユニット10と、対象空間100とは、各通風路81により繋がっている。各通風路81の入口81aが各第1ユニット10に接続されている。各第1ファン11は、各第1ユニット10の中で、ダクト40の出口42bから各通風路81の入口81aに向う気流を発生させる。これを別の観点から見ると、各第1ファン11は、枝管42の各出口42bから供給空気SAを吸引しているということである。各第1ファン11は、回転数を変更することにより各第1ユニット10の中(各通風路81の入口81aの手前)の静圧を変更することができる。各第1ファン11は、ダクト40の静圧が一定であるとすると、回転数を大きくすることにより、各第1ユニット10の中(各通風路81の入口81aの手前)の静圧を高くすることができる。第1ユニット10の中の静圧が高くなると、通風路81を流れる供給空気SAの風量が多くなる。風量が変わることによって、各通風路81の出口81bから対象空間100に吹出される給気風量が変わる。
 コントローラ50は、メインコントローラ51と複数のサブコントローラ52とを含んでいる。メインコントローラ51と複数のサブコントローラ52とが互いに接続されて、コントローラ50が構成されている。メインコントローラ51は、給気ファン21の回転数を制御する。言い換えると、メインコントローラ51が給気ファン21の出力を制御する。給気ファン21の出力が高くなれば、給気ファン21の風量が多くなる方向に給気ファン21の状態が変わる。
 各第1ユニット10に対しては、1つのサブコントローラ52が設けられている。各サブコントローラ52は、対応する第1ファン11に風量変更に関する指示を出す。各サブコントローラ52は、目標風量を記憶している。各サブコントローラ52は、目標風量に対して給気風量が不足していれば、対応する第1ファン11の回転数を増加させる指示(風量変更に関する指示)を出す。逆に、各サブコントローラ52は、目標風量に対して給気風量が過剰であれば、対応する第1ファン11の回転数を減少させる指示(風量変更に関する指示)を出す。
 コントローラ50は、複数の第1ファン11により対象空間100に供給される供給空気SAの風量に関する情報を複数のサブコントローラ52から得る。風量に関する情報には、例えば、1秒間当たりに対象空間100に供給すべき風量の情報が含まれる。得られた風量に関する情報を基に給気ファン21の要求出力を決定する。コントローラ50は、決定した要求出力になるように、給気ファン21の出力を制御する。例えば、各サブコントローラ52が、対応する第1ユニット10から、当該第1ユニット10の風量の値を得ている。各サブコントローラ52は、風量の値をメインコントローラ51に出力する。
 コントローラ50は、複数の第1ユニット10の風量の合計を、外気供給ファン111(第2ファン)の風量以上にすることによって、吸気口29から第2ユニット20の外部に、供給空気SA(第1空気)または外気OA(第2空気)が流れ出すことがないように、少なくとも複数の第1ファン11を制御する。
 (2)詳細構成
 (2-1)第2ユニット20
 第2ユニット20は、既に説明した給気ファン21、熱交換器22及び吸気口28,29以外に、第3風量検知手段23、温度センサ24及び水量調整弁25を有している。熱交換器22には、熱源ユニット60から熱媒体として例えば冷水または温水が供給される。熱交換器22に供給される熱媒体は、冷水または温水以外のもの、例えばブラインであってもよい。第3風量検知手段23には、例えば、風量センサ、風速センサまたは差圧センサを用いることができる。
 第3風量検知手段23は、給気ファン21が送風する風量を検知する。第3風量検知手段23は、メインコントローラ51に接続されている。第3風量検知手段23が検知した風量の値は、第3風量検知手段23からメインコントローラ51に送信される。第3風量検知手段23が検知した風量は、ダクト40の主管41を流れる風量である。言い換えると、第3風量検知手段23が検知した風量は、複数の第1ユニット10から対象空間100に供給される給気風量の総量になる。
 温度センサ24は、給気ファン21からダクト40に送られる供給空気SAの温度を検知する。温度センサ24は、メインコントローラ51に接続されている。温度センサ24が検知した温度の値は、温度センサ24からメインコントローラ51に送信される。
 第2ユニット20は、通風路82を介して、対象空間100に繋がっている。通風路82を通って対象空間100から戻ってきた室内空気RAは、給気ファン21により第2ユニット20に引き込まれる。第2ユニット20は、外気導入ユニット110に接続されている。第2ユニット20の吸気口28には外気供給ファン111により外気OAが吹き込まれる。第2ユニット20に引き込まれた室内空気RA及び外気OAが熱交換器22を通ることによって供給空気SAとなり、供給空気SAがダクト40に送り出される。熱交換器22を通るときに、室内空気RA及び外気OAは、熱交換器22を流れる冷水または温水と熱交換して調和空気になる。熱交換器22での熱交換により調和空気(供給空気SA)に与えられる熱量は、水量調整弁25によって調整される。水量調整弁25の開度は、メインコントローラ51により制御される。水量調整弁25の開度が大きくなれば、熱交換器22に流れる水量が多くなり、熱交換器22と供給空気SAとの間で単位時間あたりに交換される熱量が多くなる。逆に、水量調整弁25の開度が小さくなれば、熱交換器22に流れる水量が少なくなり、熱交換器22と供給空気SAとの間の単位時間あたりの熱交換量が少なくなる。
 (2-2)第1ユニット10
 第1ユニット10は、既に説明した第1ファン11以外に、第1風量検知手段12を有している。第1風量検知手段12は、第1ファン11が送風する風量を検知する。各第1風量検知手段12は、対応する1つのサブコントローラ52に接続されている。第1風量検知手段12が検知した風量の値は、サブコントローラ52に送信される。第1風量検知手段12が検知した風量は、通風路81を流れる風量である。言い換えると、第1風量検知手段12が検知した風量は、各第1ユニット10から対象空間100に供給される給気風量になる。第1風量検知手段12には、例えば、風量センサ、風速センサまたは差圧センサを用いることができる。
 (2-3)コントローラ50
 コントローラ50は、例えばコンピュータにより実現されるものである。コントローラ50は、図2に示されている制御演算装置51a,52aと記憶装置51b,52bとを備える。制御演算装置51a,52aには、CPU又はGPUといったプロセッサを使用できる。制御演算装置51a,52aは、記憶装置51b,52bに記憶されているプログラムを読み出し、このプログラムに従って所定の画像処理や演算処理を行う。さらに、制御演算装置51a,52aは、プログラムに従って、演算結果を記憶装置51b,52bに書き込んだり、記憶装置51b,52bに記憶されている情報を読み出したりすることができる。図2は、制御演算装置51a,52aにより実現される各種の機能ブロックを示している。記憶装置51b,52bは、データベースとして用いることができる。
 (2-4)リモートセンサ70
 複数のリモートセンサ70は、温度センサ及びCO濃度センサの機能を有している。各リモートセンサ70は、対応するサブコントローラ52に、対象空間100の温度及びCO濃度センサを示すデータを送信できるように構成されている。各リモートセンサ70は、例えば、対象空間100の中の設置場所の近傍の温度及びCO濃度センサを検出するように構成される。
 (2-5)
 外気導入ユニット110は、既に説明した外気供給ファン111以外に、外気風量検知手段112を有している。外気風量検知手段112は、第2ユニット20に送られる外気OAの風量を検知する第2風量検知手段として機能する。外気風量検知手段112は、検知した外気OAの風量の値をメインコントローラ51に送信する。外気風量検知手段112には、例えば、風量センサ、風速センサまたは差圧センサを用いることができる。
 (3)空気調和システム1の動作
 複数のサブコントローラ52は、それぞれ、接続されているリモートセンサ70から、検知した対象空間100の温度の値を受信する。各サブコントローラ52は、設定温度を示すデータを保持している。例えば、リモートコントローラ(図示せず)などから、各サブコントローラ52に設定温度を示すデータが予め送信される。各サブコントローラ52は、リモートコントローラなどから受信した設定温度を示すデータを内蔵するメモリなどの記憶装置52b(図2参照)に記憶している。各サブコントローラ52が設定温度の値をメインコントローラ51に送信する。メインコントローラ51は、設定温度に基づき、対応するリモートセンサ70の検知した温度に応じて、供給空気SAの温度と、各第1ユニット10の目標風量とを決定する。メインコントローラ51は、目標風量の値を各サブコントローラ52に送信する。
 メインコントローラ51は、対象空間100に供給すべき目標風量の総量に応じて、給気ファン21の目標吐出圧力を決定する。メインコントローラ51は、給気ファン21の回転数を制御して、給気ファン21の吐出圧力が目標吐出圧力になるように制御する。そのために、第2ユニット20は、給気ファン21の吐出圧力を検知するセンサを有してもよい。また、供給空気SAの温度は、水量調整弁25によって調整される。メインコントローラ51は、温度センサ24によって供給空気SAの温度を検出しながら、供給空気SAの温度が決定した温度になるように水量調整弁25の開度を調整する。
 また、メインコントローラ51は、それぞれ、接続されているリモートセンサ70から、検知した対象空間100のCO濃度の値を受信する。メインコントローラ51は、CO濃度に関するデータを保持している。メインコントローラ51はCO濃度に関するデータに基づき、対応するリモートセンサ70の検知したCO濃度に応じて、外気供給ファン111の出力(回転数)を決定する。
 コントローラ50は、複数の第1ユニット10の風量の合計AVを外気供給ファン111の風量以上にすることによって吸気口28,29から第2ユニット20の外に供給空気SAまたは外気OAが流れ出すことがないように、複数の第1ファン11を制御する。そのために、コントローラ50は、複数の第1ユニット10の複数の第1風量検知手段12で検知された風量の合計と外気供給ファン111の風量とを比較する。
 例えば、コントローラ50は、決定した外気供給ファン111の目標風量TVと複数の第1風量検知手段12で検知された風量の合計AV1とを比較して、AV1>TVとなるように、複数の第1ファン11の風量を制御する。
 あるいは、例えば、コントローラ50は、外気風量検知手段112(第2風量検知手段)で検知された外気供給ファン111の風量AV2と、複数の第1風量検知手段12で検知された風量の合計AV1とを比較するように構成されてもよい。この場合、例えば、コントローラ50は、AV1≧AV2となるように、複数の第1ファン11を制御する。
 (4)変形例
 (4-1)変形例A
 図3及び図4に示されている空気調和システム1のように、室内空気RAを第2ユニット20に導入するための室内ファン120を設けてもよい。なお、図3及び図4に示されている空気調和システム1のうち、図1及び図2に示された実施形態の空気調和システム1と同様の構成部分については同じ符号を付して説明を省略する。室内ファン120から吹出される空気は、通風路82を通って第2ユニット20に導かれる経路と、通風路83を通って室外に出る経路のいずれかを流れる。この場合、室内ファン120から吹出される空気のうち、吸気口29から第2ユニット20に入る空気が室内空気RAであり、外部に出る空気が排気EAである。通風路82の空気の流量を調節するためのバイパスダンパ92と通風路83の空気の流量を調節するための排気ダンパ93とを設けてもよい。また、外気導入ユニット110に対しては、外気導入ユニット110から第2ユニット20の吸気口28に繋がる通風路84の開通状態と閉鎖状態を切り換える外気ダンパ91を設けてもよい。外気ダンパ91、バイパスダンパ92及び排気ダンパ93は、例えば電動で開閉するよう構成され、コントローラ50により制御される。
 外気ダンパ91は、外気供給ファン111の運転時に全開状態となり、外気供給ファン111の停止時に全閉状態となる。外気供給ファン111は、メインコントローラ51により、リモートセンサ70で検知されたCO濃度に応じて回転数を制御される。メインコントローラ51は、対象空間100のCO濃度が高くなれば、外気供給ファン111の回転数を増加させて対象空間100に供給する外気OAの量を増やす。
 対象空間100に供給する供給空気SAの量が増えれば、戻る室内空気RAの量も増える。そのため、メインコントローラ51は、室内ファン120の回転数を、給気ファン21の回転数に応じて変化させる。メインコントローラ51は、給気ファン21の回転数を増加させるときには、室内ファン120の回転数を増加させる。例えば、メインコントローラ51は、室内ファン120の回転数を、給気ファン21の回転数に比例させる。このとき、メインコントローラ51は、外気供給ファン111の回転数に応じて排気ダンパ93の開度を変化させる。メインコントローラ51は、外気供給ファン111の供給量が多くなれば、排気ダンパ93の開度を大きくして、多くの室内空気RAを排気させる。例えば、メインコントローラ51は、外気供給ファン111の回転数に比例して、排気ダンパ93の開度を変化させる。メインコントローラ51は、バイパスダンパ92に排気ダンパ93と逆の動作を行わせる。メインコントローラ51は、排気ダンパ93の開度が大きくなれば、バイパスダンパ92の開度を小さくする。
 通風路82には、室内空気風量検知手段121が設けられている。室内空気風量検知手段121は、第2ユニット20に送られる室内空気RAの風量を検知する第2風量検知手段として機能する。室内空気風量検知手段121は、検知した室内空気RAの風量の値をメインコントローラ51に送信する。室内空気風量検知手段121には、例えば、風量センサ、風速センサまたは差圧センサを用いることができる。
 この場合に、外気供給ファン111と室内ファン120が第2ファンである。第2ユニット20に導入される第2空気は、外気供給ファン111と室内ファン120により導入される外気OAと室内空気RAである。
 コントローラ50は、複数の第1ユニット10の風量の合計AVを外気供給ファン111及び室内ファン120の風量以上にすることによって吸気口28,29から第2ユニット20の外に供給空気SA、室内空気RAまたは外気OAが流れ出すことがないように、複数の第1ファン11を制御する。そのために、コントローラ50は、複数の第1ユニット10の複数の第1風量検知手段12で検知された風量の合計と外気供給ファン111の風量及び室内ファン120の風量とを比較する。
 例えば、コントローラ50は、外気風量検知手段112(第2風量検知手段)で検知された外気供給ファン111の風量AV2及び、室内空気風量検知手段121(第2風量検知手段)で検知された室内ファン120の風量AV3の合計の風量AV4を算出する。コントローラ50は、風量AV4と、複数の第1風量検知手段12で検知された風量の合計AV1とを比較する。コントローラ50は、例えば、AV1≧AV4となるように、複数の第1ファン11を制御する。
 なお、外気OAが通る通風路84が短いときには、図3に示されている空気調和システム1の構成から、外気供給ファン111を省いてもよい。この場合には、メインコントローラ51は、外気ダンパ91の開度をCO濃度に応じて制御する。メインコントローラ51は、CO濃度が高くなると、外気ダンパ91の開度を大きくする。外気供給ファン111を省いた場合には、室内ファン120が第2ファンである。第2ユニット20に導入される第2空気は、室内ファン120により導入される室内空気RAである。
 この場合、コントローラ50は、複数の第1ユニット10の風量の合計AVを室内ファン120の風量以上にすることによって吸気口28,29から第2ユニット20の外に供給空気SAまたは室内空気RAが流れ出すことがないように、複数の第1ファン11を制御する。そのために、コントローラ50は、複数の第1ユニット10の複数の第1風量検知手段12で検知された風量の合計と室内ファン120の風量とを比較する。
 例えば、コントローラ50は、室内空気風量検知手段121(第2風量検知手段)で検知された室内ファン120の風量AV3と、複数の第1風量検知手段12で検知された風量の合計AV1とを比較する。コントローラ50は、例えば、AV1≧AV3となるように、複数の第1ファン11を制御する。
 (4-2)変形例B
 図5及び図6に示されている空気調和システム1のように、排気EAを外部に排気するための排気ファン130を設けてもよい。なお、図5及び図6に示されている空気調和システム1のうち、図3及び図4に示された実施形態の空気調和システム1と同様の構成部分については同じ符号を付して説明を省略する。排気ファン130から吹出される排気EAは、通風路83を通って室外に出る経路を流れる。対象空間100から戻る空気のうち、排気EAを除いた残りの空気が、通風路82を通って第2ユニット20に導かれる室内空気RAである。通風路82の空気の流量を調節するためのバイパスダンパ92と通風路83の空気の流量を調節するための排気ダンパ93とを設けてもよい。また、外気導入ユニット110に対しては、外気導入ユニット110から第2ユニット20の吸気口28に繋がる通風路84の開通状態と閉鎖状態を切り換える外気ダンパ91を設けてもよい。外気ダンパ91、バイパスダンパ92及び排気ダンパ93は、例えば電動で開閉するよう構成され、コントローラ50により制御される。
 外気ダンパ91及び排気ダンパ93は、外気供給ファン111の運転時に全開状態となり、外気供給ファン111の停止時に全閉状態となる。外気供給ファン111は、メインコントローラ51により、リモートセンサ70で検知されたCO濃度に応じて回転数を制御される。メインコントローラ51は、対象空間100のCO濃度が高くなれば、外気供給ファン111の回転数を増加させて対象空間100に供給する外気OAの量を増やす。
 取り入れる外気OAの量が増えれば、排気EAの量も増える。そのため、メインコントローラ51は、排気ファン130の回転数を、外気供給ファン111の回転数に応じて変化させる。メインコントローラ51は、外気供給ファン111の回転数を増加させるときには、排気ファン130の回転数を増加させる。例えば、メインコントローラ51は、排気ファン130の回転数を、外気供給ファン111の回転数に比例させる。このとき、メインコントローラ51は、バイパスダンパ92に排気ファン130と逆の動作を行わせる。メインコントローラ51は、排気ファン130の回転数が大きくなれば、バイパスダンパ92の開度を小さくする。
 この場合に、外気供給ファン111が第2ファンである。第2ユニット20に導入される第2空気は、外気供給ファン111により導入される外気OAである。従って、コントローラ50による室内空気RAまたは外気OAが第2ユニット20から流れ出さないようにするための複数の第1ファン11の制御は、実施形態と同様になる。
 (4-3)変形例C
 上記実施形態では、外気供給ファン111は、回転数を制御するように構成されている場合について説明した。しかし、外気供給ファン111は、回転数一定で、オン状態とオフ状態を切り替える構成であってもよい。例えば、メインコントローラ51は、リモートセンサ70で検知されるCO濃度が閾値を超えたときに外気供給ファン111をオン状態にし、閾値以下のときに外気供給ファン111をオフ状態にする。
 (4-4)変形例D
 上記実施形態または変形例では、第2ユニット20の中に、給気ファン21を設ける場合について説明した。しかし、給気ファン21を第2ユニット20に設けない構成の空気調和システム1を構成することもできる。
 (4-5)変形例E
 上記実施形態では、複数の第1ユニット10の風量の合計を複数の第1風量検知手段12で検知された風量の合計から求めたが、複数の第1ユニット10の風量の合計を求める方法はこのような方法には限られない。例えば、複数の第1ユニット10の風量の合計は、第3風量検知手段23を用いて求めることもできる。
 (4-6)変形例F
 上記実施形態では、外気供給ファン111の風量がCO濃度に応じて変わる場合について説明したが、外気供給ファン111の風量を変化させるパラメータは、CO濃度のみに限られるものではない。外気供給ファン111の風量を変化させるパラメータに、CO濃度以外のパラメータを用いてもよく、あるいはCO濃度と他のパラメータを組み合わせたものを用いてもよい。
 (4-7)変形例G
 上記実施形態では、空気調和システム1が、対象空間100の気温とCO濃度を調節する場合について説明したが、空気調和システム1が行う空気調和は、気温とCO濃度に限られるものではない。例えば、空気調和システム1が、対象空間100の湿度を調節するように構成されてもよい。
 (5)特徴
 以上説明した空気調和システム1では、コントローラ50が、複数の第1ユニット10の風量の合計を第2ファンである外気供給ファン111、室内ファン120、または、外気供給ファン111と室内ファン120の両方の風量以上にするように制御している。そのため、第1空気である供給空気SAの風量から、第2空気である外気OA及び/または室内空気RAの風量を引いた値が負にならない。その結果、空気調和システム1は、第2ユニット20の中を正圧(例えば大気圧以上)にしないようにせずに、供給空気SA(第1空気の例)及び第2空気の逆流を防止することができる。実施形態では第2空気が外気OAであり、変形例Aでは第2空気が外気OAと室内空気RAまたは室内空気RAのみであり、変形例Bでは第2空気が外気OAである。
 以上、本開示の実施形態を説明したが、特許請求の範囲に記載された本開示の趣旨及び範囲から逸脱することなく、形態や詳細の多様な変更が可能なことが理解されるであろう。
 1 空気調和システム
 10 第1ユニット
 11 第1ファン
 12 第1風量検知手段
 20 第2ユニット
 22 熱交換器
 28,29 吸気口
 40 ダクト
 50 コントローラ
 111 外気供給ファン (第2ファンの例)
 112 外気風量検知手段 (第2風量検知手段の例)
 120 室内ファン (第2ファンの例)
 121 室内空気風量検知手段 (第2風量検知手段の例)
特開平10-253132号公報

Claims (3)

  1.  第1空気を対象空間に吹き出す第1ファン(11)をそれぞれ有する複数の第1ユニット(10)と、
     熱交換器(22)及び吸気口(28,29)を有する第2ユニット(20)と、
     前記第2ユニットから前記複数の第1ユニットに送られる前記第1空気を分配するダクト(40)と、
     第2空気を前記第2ユニットに導入する第2ファン(111,120)と、
     前記複数の第1ユニットの前記複数の第1ファンを制御するコントローラ(50)と、
    を備え、
     前記第2ユニットが、少なくとも前記第2ファンにより導入された前記第2空気を前記熱交換器で熱交換することによって前記第1空気を生成して前記ダクトに送出し、
     前記コントローラが、前記複数の第1ユニットの風量の合計を前記第2ファンの風量以上にすることによって前記吸気口から前記第1空気または前記第2空気が流れ出すことがないように、少なくとも前記複数の第1ファンを制御する、空気調和システム(1)。
  2.  前記複数の第1ユニットの各々が、各第1ユニットの風量を検知する第1風量検知手段(12)を有し、
     前記コントローラが、前記複数の第1ユニットの前記複数の第1風量検知手段で検知された風量の合計と前記第2ファンの風量との比較の結果に応じて、前記複数の第1ファンを制御する、
    請求項1に記載の空気調和システム(1)。
  3.  前記第2ファンの風量を検知する第2風量検知手段(112,121)を備え、
     前記コントローラは、前記第2風量検知手段で検知された風量と前記複数の第1ユニットの風量の合計との比較の結果に応じて、前記複数の第1ファンを制御する、
    請求項1または請求項2に記載の空気調和システム(1)。
     
PCT/JP2021/012264 2020-03-31 2021-03-24 空気調和システム WO2021200478A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202180024949.3A CN115349069A (zh) 2020-03-31 2021-03-24 空调系统
US17/955,704 US20230019149A1 (en) 2020-03-31 2022-09-29 Air conditioning system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2020-062863 2020-03-31
JP2020062863A JP6958657B2 (ja) 2020-03-31 2020-03-31 空気調和システム

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US17/955,704 Continuation US20230019149A1 (en) 2020-03-31 2022-09-29 Air conditioning system

Publications (1)

Publication Number Publication Date
WO2021200478A1 true WO2021200478A1 (ja) 2021-10-07

Family

ID=77928375

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2021/012264 WO2021200478A1 (ja) 2020-03-31 2021-03-24 空気調和システム

Country Status (4)

Country Link
US (1) US20230019149A1 (ja)
JP (1) JP6958657B2 (ja)
CN (1) CN115349069A (ja)
WO (1) WO2021200478A1 (ja)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0432634A (ja) * 1990-05-29 1992-02-04 Toshiba Corp 空気調和機
JP2002162067A (ja) * 2000-11-21 2002-06-07 Daikin Ind Ltd 空気調和装置
JP2008051466A (ja) * 2006-08-28 2008-03-06 Sanki Eng Co Ltd 可変風量装置及び空調システム
JP2020008211A (ja) * 2018-07-06 2020-01-16 三機工業株式会社 空調システム

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8348732B2 (en) * 2004-11-12 2013-01-08 Adaptive-Ac, Inc. Airflow control system
CN101158497A (zh) * 2007-11-15 2008-04-09 江苏苏净集团有限公司 洁净室门口处气流流向的控制系统
KR101429958B1 (ko) * 2013-05-10 2014-08-18 주식회사 환기연구소 통합 지하 환기장치
US9798336B2 (en) * 2015-04-23 2017-10-24 Johnson Controls Technology Company Building management system with linked thermodynamic models for HVAC equipment
US10274217B2 (en) * 2015-07-24 2019-04-30 Aeolus Building Efficiency Integrated airflow control for variable air volume and air handler HVAC systems to reduce building HVAC energy use
US20180363933A1 (en) * 2017-06-14 2018-12-20 Joseph A. Ross Zoning System for Air Conditioning (HVAC) Equipment
US11268714B2 (en) * 2017-08-24 2022-03-08 Siemens Industry, Inc. System and method for controlling building fluid distribution
JP6711802B2 (ja) * 2017-10-13 2020-06-17 株式会社日立産機システム 安全キャビネットおよびその排気ダクト接続の検査方法
CN107869928A (zh) * 2017-12-12 2018-04-03 陈祖卫 空气‑空气换热器及其制冷装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0432634A (ja) * 1990-05-29 1992-02-04 Toshiba Corp 空気調和機
JP2002162067A (ja) * 2000-11-21 2002-06-07 Daikin Ind Ltd 空気調和装置
JP2008051466A (ja) * 2006-08-28 2008-03-06 Sanki Eng Co Ltd 可変風量装置及び空調システム
JP2020008211A (ja) * 2018-07-06 2020-01-16 三機工業株式会社 空調システム

Also Published As

Publication number Publication date
JP2021162209A (ja) 2021-10-11
US20230019149A1 (en) 2023-01-19
CN115349069A (zh) 2022-11-15
JP6958657B2 (ja) 2021-11-02

Similar Documents

Publication Publication Date Title
WO2020218127A1 (ja) 給気システム
AU2020259881B2 (en) Fan unit, fan unit system, and air treatment system
US20030183380A1 (en) Air conditioning system using enthalpy of outside air
WO2021200478A1 (ja) 空気調和システム
JP7245730B2 (ja) 空気調和システム
EP3957919B1 (en) Air conditioning system
JP4477914B2 (ja) 空調システム
JP7167081B2 (ja) 給気システム
KR20170027164A (ko) 공기조화기 및 그 동작방법
US11976837B2 (en) Air conditioning system
AU2020258187B2 (en) Air conditioning system
US11614244B2 (en) Air conditioning system
JP2004226012A (ja) ダクト式空気調和機
JP4346295B2 (ja) 空調機の風量制御装置
JP6766402B2 (ja) 空調システム
JP2022102024A (ja) ファンユニットの選定方法
JP2021092377A (ja) 加湿機能付き熱交換形換気装置
KR20080065178A (ko) 하나의 실내기를 이용한 멀티형 공기조화기
JP2020159649A (ja) 空気調和システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21781617

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21781617

Country of ref document: EP

Kind code of ref document: A1