WO2021197351A1 - Management method and system for tracking and verifying order, and storage medium - Google Patents

Management method and system for tracking and verifying order, and storage medium Download PDF

Info

Publication number
WO2021197351A1
WO2021197351A1 PCT/CN2021/084128 CN2021084128W WO2021197351A1 WO 2021197351 A1 WO2021197351 A1 WO 2021197351A1 CN 2021084128 W CN2021084128 W CN 2021084128W WO 2021197351 A1 WO2021197351 A1 WO 2021197351A1
Authority
WO
WIPO (PCT)
Prior art keywords
plan
production
order
production plan
blockchain
Prior art date
Application number
PCT/CN2021/084128
Other languages
French (fr)
Chinese (zh)
Inventor
肖光昱
贺小鹏
郑保明
Original Assignee
深圳点链科技有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 深圳点链科技有限公司 filed Critical 深圳点链科技有限公司
Publication of WO2021197351A1 publication Critical patent/WO2021197351A1/en

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/27Replication, distribution or synchronisation of data between databases or within a distributed database system; Distributed database system architectures therefor
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Definitions

  • This application relates to the field of data processing, and in particular to the invention of a method, system and storage medium for order tracking and verification management.
  • each production link involves the circulation of materials.
  • the circulation data of materials in each production planning link is Manually go to each link for accounting, and finally perform a unified verification.
  • it basically relies on the manual verification of material data. The accuracy and credibility of the calculation are very low, and the verification management efficiency is also low.
  • the main purpose of this application is to provide a method, system and storage medium for order tracking and verification management, which aims to solve the technical problem of low efficiency in the current production order tracking verification management in the production process.
  • this application provides a method for order tracking, verification and write-off management, and the method for order tracking, verification and write-off management includes:
  • the material verification module When it is detected that the production plan has been completed, based on the material verification module, the consumption of the same material in the production plan is verified, and the verification result is sent to the blockchain for storage.
  • the production line number matched by the production plan is associated with the sales order number to associate several production plans and/or blockchain blocks.
  • each production plan is executed in sequence, and the execution progress of the production plan is updated based on the blockchain block corresponding to each production plan.
  • a purchase order and a purchase plan are determined, and materials are purchased based on the purchase order;
  • Initiating the first blockchain transaction of the purchase order confirmation when detecting that the first blockchain transaction has been completed, update the status of the purchase plan to the purchase order confirmed based on the blockchain block corresponding to the purchase plan;
  • the outsourcing plan is determined, and the fourth blockchain transaction of the outsourcing plan is initiated, where the fourth blockchain transaction includes the material outsourcing sub-transaction, the material arrival sub-transaction, and the logistics warehousing Sub-affairs
  • the status of the outsourcing plan is updated as the material has been put into storage.
  • the customer supply plan is determined, and the production work order to be issued is determined according to the customer supply plan
  • the fifth blockchain transaction that initiates the issuance of the production work order, when detecting that the fifth blockchain transaction has been completed, based on the blockchain block corresponding to the guest-supplied material plan, the status of the guest-supplied material plan is updated as The production order has been issued.
  • the inventory requisition plan is determined, and the materials to be reclaimed are determined according to the inventory requisition plan;
  • the missing quantity of the same material in the production plan is acquired
  • the missing quantity of the same material is greater than the preset value, the consumption of the same material in the production plan will be written off based on the material write-off module.
  • this application also provides an order tracking verification management system, the order tracking verification management system including:
  • the production order generation module is used to obtain a sales order and convert the sales order into a production order
  • the production plan formulation module is used to formulate a production plan for the production order and establish a corresponding block chain block for the production plan to update the execution progress of the production plan based on the block chain block, wherein ,
  • the execution progress includes the progress information of the material
  • the material verification module is used to verify the usage of the same material in the production plan based on the material verification module when it is detected that the production plan has been completed, and send the verification result to the blockchain storage.
  • the present application also provides a storage medium, the storage medium stores an order tracking verification management program, the order tracking verification management program is executed by the processor to achieve any of the above The steps of the method of order tracking and write-off management.
  • the method of order tracking and verification management proposed in this application is to obtain sales orders and convert the sales orders into production orders, formulate a production plan for the production order, and establish a corresponding blockchain area for the production plan Block to update the execution progress of the production plan based on the blockchain block, where the execution progress of the production plan includes the progress information of the material, and when it is detected that the production plan has been completed, the execution of the production plan is acquired
  • the material verification module the use of the same material in the production plan is written off, the implementation of each plan is analyzed, management efficiency is improved, the risk of material loss is prevented, and a consensus mechanism is formed based on the blockchain to realize the impossible
  • the tampering can be traced to achieve the credibility of each user, to control the loss of materials, to improve the level of production management, and to provide higher value for production enterprises and customers.
  • FIG. 1 is a schematic diagram of a terminal structure of a hardware operating environment involved in a solution of an embodiment of the present application
  • Fig. 2 is a schematic flow chart of the first embodiment of the method for applying for order tracking and verification and write-off management.
  • FIG. 1 is a schematic diagram of a terminal structure of a hardware operating environment involved in a solution of an embodiment of the present application.
  • the terminal may include: a processor 1001, such as a CPU, a network interface 1004, a user interface 1003, a memory 1005, and a communication bus 1002.
  • the communication bus 1002 is used to implement connection and communication between these components.
  • the user interface 1003 may include a display screen (Display) and an input unit such as a keyboard (Keyboard), and the optional user interface 1003 may also include a standard wired interface and a wireless interface.
  • the network interface 1004 may optionally include a standard wired interface and a wireless interface (such as a WI-FI interface).
  • the memory 1005 may be a high-speed RAM memory, or a stable memory (non-volatile memory), such as a magnetic disk memory.
  • the memory 1005 may also be a storage device independent of the aforementioned processor 1001.
  • the terminal can also include a camera, RF (Radio Frequency (radio frequency) circuits, sensors, audio circuits, WiFi modules, etc.
  • sensors such as light sensors, motion sensors and other sensors.
  • the light sensor may include an ambient light sensor and a proximity sensor.
  • the ambient light sensor can adjust the brightness of the display screen according to the brightness of the ambient light
  • the proximity sensor can turn off the display screen and/or when the mobile terminal is moved to the ear.
  • Backlight As a kind of motion sensor, the gravity acceleration sensor can detect the magnitude of acceleration in various directions (usually three axes). It can detect the magnitude and direction of gravity when it is stationary.
  • the mobile terminal can also be equipped with other sensors such as gyroscope, barometer, hygrometer, thermometer, infrared sensor, etc. No longer.
  • terminal structure shown in FIG. 1 does not constitute a limitation on the terminal, and may include more or less components than shown in the figure, or combine some components, or arrange different components.
  • the memory 1005 as a storage medium may include an operating system, a network communication module, a user interface module, and an order tracking verification management program.
  • the network interface 1004 is mainly used to connect to the back-end server and communicate with the back-end server; the user interface 1003 is mainly used to connect to the client (user side) and communicate with the client; and the processor 1001 can be used to call the order tracking write-off management program stored in the memory 1005.
  • the blockchain-based data processing device includes: a memory 1005, a processor 1001, and an order tracking verification management program stored on the memory 1005 and running on the processor 1001, wherein, When the processor 1001 calls the order tracking write-off management program stored in the memory 1005, it performs the following operations:
  • the execution progress of the production plan is obtained, and the usage of the same material in the production plan is written off based on the material verification module.
  • processor 1001 may call the order tracking write-off management program stored in the memory 1005, and also perform the following operations:
  • the production line number matched by the production plan is associated with the sales order number to associate several production plans and/or blockchain blocks.
  • processor 1001 may call the order tracking write-off management program stored in the memory 1005, and also perform the following operations:
  • each production plan is executed in turn, and the execution progress of the production plan is updated based on the blockchain block corresponding to each production plan.
  • processor 1001 may call the order tracking write-off management program stored in the memory 1005, and also perform the following operations:
  • Initiating the first blockchain transaction for purchase order confirmation when detecting that the first blockchain transaction has been completed, update the status of the purchase plan to the purchase order confirmed based on the blockchain block corresponding to the purchase plan;
  • processor 1001 may call the order tracking write-off management program stored in the memory 1005, and also perform the following operations:
  • the fourth block chain transaction includes the sub-transaction of material outsourcing, the sub-transaction of material arrival, and the sub-transaction of logistics warehousing;
  • the status of the outsourcing plan is updated as the material has been put into storage.
  • processor 1001 may call the order tracking write-off management program stored in the memory 1005, and also perform the following operations:
  • the fifth block chain initiated the transaction issuance of production work order, upon detection of the fifth block chain transaction is completed, the block-based chain plans to block off for the corresponding materials, updating the status of the customer for materials planning The production order has been issued.
  • processor 1001 may call the order tracking write-off management program stored in the memory 1005, and also perform the following operations:
  • Initiating receive materials sixth block chain transactions upon detection of the sixth block chain transaction is complete, based on inventory requisitioned Plan corresponding block chain block, updating the inventory of state for material requisitioned Plan has receive.
  • processor 1001 may call the order tracking write-off management program stored in the memory 1005, and also perform the following operations:
  • the missing quantity of the same material is greater than the preset value, the consumption of the same material in the production plan will be written off based on the material write-off module.
  • FIG. 2 is a schematic flowchart of the first embodiment of the method for order tracking and verification management in this application.
  • Step S10 obtaining a sales order, and converting the sales order into a production order
  • the blockchain is decentralized, open, autonomous, anonymous, and information cannot be tampered with, it can be understood as a worldwide distributed ledger. If blockchain technology is applied to enterprises It will greatly reduce production costs and operating costs.
  • the company registers the company’s account information on the blockchain and obtains the sales order associated with the account information. Understandably, the customer can send the company’s account information to the company based on the company’s account on the blockchain platform.
  • the company receives the customer’s transaction request based on the blockchain platform and generates a corresponding sales order.
  • the sales order contains the order number and order information. After obtaining the sales order, the sales order is taken as the starting point. The sales order is converted into an internal production order.
  • Step S20 Formulate a production plan for the production order, and establish a corresponding blockchain block for the production plan, so as to update the execution progress of the production plan based on the blockchain block.
  • the execution progress includes the progress information of the material;
  • a production plan is developed, and the production plan is split into a production work order, an inventory requisition plan, a purchase plan, an outsourcing plan, a customer-supplied material plan, and a production plan is established
  • the corresponding blockchain block updates the execution progress of the production plan based on the blockchain block, where the execution progress of the production plan includes the progress information of the material, for example, the purchase material type information of the purchase plan and the quantity of the same purchased material Information, outsourcing type information of outsourced materials and quantity information of the same outgoing material, material type information and quantity information of the same material in the production work order of the customer-supplied material plan, and the received material type of the inventory requisition plan Information and quantity information of the same material, etc.
  • step of establishing a corresponding blockchain block for the production plan it further includes:
  • Step 201 based on the sequence of several production plans, generate production line numbers matching each production plan, and obtain the sales order number of the sales order;
  • Step 202 Associate the production line number matched by the production plan with the sales order number to associate several production plans.
  • the production plan is divided into production work orders, inventory requisition plans, procurement plans, outsourcing plans, and customer-supplied material plans.
  • the production plan is divided into purchase plan, outsourcing plan, and customer.
  • Supply material plan and inventory requisition plan so in order to simplify the execution of each plan, based on the sequence of several production plans, generate production line numbers that match each production plan, such as purchase plan, outsourcing plan, customer-supplied material plan, and inventory requisition.
  • the planned production line numbers are 01, 02, 03, 04 in sequence.
  • the customer is on March 24, 2020.
  • the corresponding sales order is generated, and the corresponding sales order number A20200324 is generated.
  • the production line number matching the production plan is associated with the sales order number, that is These are A2020032401, A2020032402, A2020032403 and A2020032404 in order to associate several production plans on the blockchain platform.
  • a corresponding blockchain block is established for each of the above production plans on the blockchain platform, and based on the execution progress of the production plan described in the blockchain block, where each blockchain block passes "Sales order number + production line number" are related, specifically, the corresponding blockchain blocks are established for the purchase plan, outsourcing plan, customer-supplied material plan, and inventory requisition plan, and based on several related production plans , Associate several blockchain blocks, and then execute each production plan in sequence based on the sequence of several production plans, and update the execution progress of the production plan based on the blockchain block corresponding to each production plan.
  • the production plan is a procurement plan, in which, based on the sequence of several production plans, each production plan is executed in turn, and based on the blockchain block corresponding to each production plan, the steps to update the execution schedule of the production plan also include:
  • the first blockchain transaction that initiates the purchase order confirmation, when detecting that the first blockchain transaction has been completed, based on the blockchain block corresponding to the purchase plan, the status of the purchase plan is updated to the purchase order confirmed;
  • the purchaser contacts the supplier according to the purchase plan, confirms the purchase order and the purchase plan, and the supplier delivers the goods according to the purchase plan and inspects the warehouse.
  • the purchase order After the purchase order is confirmed, initiate a first block chain transaction of purchase order confirmation, and update the status of the purchase plan line to "purchase order confirmed"; after the supplier delivers, initiate a second purchase order
  • For blockchain transactions update the status of the purchase plan line to "arrived”; after checking the warehousing, initiate a third block chain transaction of purchases and warehousing, and update the status of the purchase plan line to "incoming"
  • the progress information of the material includes the type information of the purchased material in the purchase plan and the quantity information of the same purchased material, that is, the purchase order confirmation in the purchase plan, the arrival of the purchased material, and the purchase material type information in each link of the purchased material warehousing and The quantity information of the same purchased material.
  • the production plan is an outsourcing plan, in which, based on the sequence of several production plans, each production plan is executed in sequence, and based on the blockchain block corresponding to each production plan, the steps to update the execution schedule of the production plan also include:
  • the fourth blockchain transaction includes the sub-transaction of material outsourcing, the sub-transaction of material arrival, and the sub-transaction of logistics storage;
  • the status of the outsourcing plan is updated as the material has been sent out
  • the status of the outsourcing plan is updated as the material has arrived;
  • the status of the outsourcing plan is updated as the material has been put in storage.
  • the planner executes the outsourcing plan according to the material arrival situation, from the outsourcing to the outsourcing and warehousing, adding the fourth blockchain transaction of the "outsourcing plan” in turn, and based on the execution process of the plan, the outsourcing The status of the schedule line is updated to "Material has been sent out", “Incoming goods”, and “In stock”. Further, the material controller will follow up the complete set of outsourcing and materials according to the execution of each plan, and feed it back to the planner.
  • the progress information of the materials includes the outsourcing type information of the outsourcing plan and the same outgoing material
  • the quantity information of the outsourcing plan that is, the information of the type of outgoing materials and the quantity information of the same outgoing material in each link of the outsourcing plan, the arrival of the materials, and the logistics warehousing.
  • the production plan is a customer-supplied material plan, in which, based on the sequence of several production plans, each production plan is executed in turn, and based on the blockchain block corresponding to each production plan, the step of updating the execution schedule of the production plan also includes :
  • the fifth block chain initiated the transaction issuance of production work order, upon detection of the fifth block chain transaction is completed, the block-based chain plans to block off for the corresponding materials, updating the status of the customer for materials planning The production order has been issued.
  • the planner determines the customer supply plan, and determines the production work orders to be issued according to the material situation and the customer supply plan, issues production work orders according to the production plan, and registers a production work order issue transaction and uploads it to the blockchain to update production
  • the work order status is "Issued", where the progress information of the material includes the material type information and the quantity information of the same material in the production work order of the customer-supplied material plan.
  • the production plan is an inventory requisition plan, where, based on the sequence of several production plans, each production plan is executed in turn, and based on the blockchain block corresponding to each production plan, the step of updating the execution schedule of the production plan also includes :
  • Initiating receive materials sixth block chain transactions upon detection of the sixth block chain transaction is complete, based on inventory requisitioned Plan corresponding block chain block, updating the inventory of state for material requisitioned Plan has receive.
  • the picker performs production requisition according to the inventory requisition plan, and updates the requisitioned quantity of the corresponding plan line of the inventory requisition plan, external procurement plan, and customer supply plan, and registers the production requisition transaction on the blockchain.
  • the progress information of the material includes the received material type information and the quantity information of the same material in the inventory requisition plan.
  • step S30 when it is detected that the production plan has been completed, the execution progress of the production plan is obtained, and the consumption of the same material in the production plan is written off based on the material verification module.
  • the warehouse clerk When it is detected that the finished production plan has been completed, the warehouse clerk will put the finished product into the warehouse according to the finished warehouse receipt, and register a finished product into the warehouse transaction, and update the warehoused quantity of the production work order, and then confirm the production plan
  • the picker clears the situation of the multi-reclaimed materials
  • the planner closes the production work order, and then registers a production work order closing transaction on the blockchain, and changes the production work order status and/or production plan The row status is updated to "Completed".
  • the material requisition, purchase order, outsourcing warehousing, outsourcing processing, customer-supplied material requisition, and finished goods storage in the process of executing the plan are taken as the affairs of each block and added to the district.
  • the progress of each plan is updated to achieve the automatic update of the order progress, which also includes the consumption of qualified products, the consumption of defective products, and the stranded products during the production of products in the production plan.
  • the amount in the line, and these synchronized update storage values corresponding to the blockchain block so that the subsequent reverse traceability of the material verification.
  • Inventory amount of each material and component consumption of qualified product (including normal loss) + consumption of defective product (including normal loss) + medium volume of stranded production line + missing volume
  • the amount of outsourcing of each material the consumption of qualified products (including normal losses) + the consumption of defective products (including normal losses) + the amount stranded in the production line + the missing amount
  • the customer-supplied amount of each material the amount that should be consumed for the production of qualified products (including normal losses) + the amount consumed for the production of defective products (including normal losses) + the amount stranded in the production line + the amount missing
  • step S30 includes:
  • Step S301 obtaining the missing quantity of the same material in the production plan based on the progress information of the material in the production plan;
  • step S302 if the missing quantity of the same material is greater than the preset value, the consumption of the same material in the production plan is written off based on the material write-off module
  • This embodiment uses the above equation to write off, that is, based on the progress information of the materials in the production plan stored in the blockchain, obtain the missing amount of the same material in the production plan, and confirm whether the amount consumed for the production of defective products exceeds the preset amount If the missing amount is equal to 0, it is normal. If the missing amount is greater than 0, it means there is missing material for unknown reasons.
  • the materials can be traced, quality control is well done, and reconciliation and settlement with suppliers, especially the reconciliation and settlement of outsourced materials and customer-supplied materials, are timely and accurate.
  • the method of order tracking and verification management proposed in this application is to obtain sales orders and convert the sales orders into production orders, formulate a production plan for the production order, and establish a corresponding blockchain area for the production plan Block to update the execution progress of the production plan based on the blockchain block, where the execution progress of the production plan includes the progress information of the material, and when it is detected that the production plan has been completed, the execution of the production plan is acquired
  • the material verification module the consumption of the same material in the production plan is written off, and the multi-book bookkeeping of blockchain technology is used to automatically update the sales order progress every day, and automatically complete the verification according to the material verification identity
  • the write-off of various materials allows users and customers to quickly grasp the progress of orders, analyze the implementation of each plan, improve management efficiency, prevent material loss risks, and form a consensus mechanism based on the blockchain to achieve non-tamperable and traceable. All users are credible, control the loss of materials, improve the level of production management, and provide higher value to manufacturers and customers.
  • this application also provides an order tracking verification management system, the order tracking verification management system including:
  • the production order generation module is used to obtain a sales order and convert the sales order into a production order
  • the production plan formulation module is used to formulate a production plan for the production order and establish a corresponding block chain block for the production plan to update the execution progress of the production plan based on the block chain block, wherein ,
  • the execution progress includes the progress information of the material
  • the material verification module is used to verify the usage of the same material in the production plan based on the material verification module when it is detected that the production plan has been completed, and send the verification result to the blockchain storage.
  • an embodiment of the present application also proposes a storage medium, the storage medium stores an order tracking verification management program, the order tracking verification management program is executed by the processor to achieve the above-mentioned order tracking verification management Steps of various embodiments of the method.
  • the technical solution of this application essentially or the part that contributes to the existing technology can be embodied in the form of a software product, and the computer software product is stored in a storage medium (such as ROM/RAM) as described above. , Magnetic disks, optical disks), including several instructions to make a terminal device (which can be a mobile phone, a computer, a server, an air conditioner, or a network device, etc.) execute the method described in each embodiment of the present application.
  • a terminal device which can be a mobile phone, a computer, a server, an air conditioner, or a network device, etc.

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Databases & Information Systems (AREA)
  • Game Theory and Decision Science (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Data Mining & Analysis (AREA)
  • Computing Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A management method and system for tracking and verifying an order, and a storage medium. The management method for tracking and verifying an order comprises: acquiring a sales order, and converting the sales order into a production order (S10); formulating a production plan for the production order, and establishing corresponding blocks of a block chain for the production plan, so as to update an execution progress of the production plan on the basis of the blocks of the block chain, the execution progress of the production plan comprising progress information of a material (S20); upon detection that the production plan has been completed, acquiring the execution progress of the production plan, and verifying, on the basis of a material verification module, the usage amount of the same material in the production plan (S30).

Description

订单跟踪核销管理的方法、系统及存储介质Method, system and storage medium for order tracking and verification management
本申请要求于2020年3月31日申请的、申请号为202010249081.4的中国专利申请的优先权,其全部内容通过引用结合在本申请中。This application claims the priority of the Chinese patent application filed on March 31, 2020 with the application number 202010249081.4, the entire content of which is incorporated into this application by reference.
技术领域Technical field
本申请涉及数据处理领域,尤其涉及发明一种订单跟踪核销管理的方法、系统及存储介质。This application relates to the field of data processing, and in particular to the invention of a method, system and storage medium for order tracking and verification management.
背景技术Background technique
目前在生产制造领域,在生产制造一个产品时,需要经过多个生产环节,其中,每一个生产环节都涉及物料的流转,现有技术中,在每一个生产计划环节中物料的流转数据均为人工去每一个环节进行核算,最后在统一进行核销,然而基本依赖于人工核对物料数据的方式,核算的准确度和可信度非常低下,且核销管理效率也低。At present, in the field of manufacturing, when a product is manufactured, it needs to go through multiple production links, among which, each production link involves the circulation of materials. In the prior art, the circulation data of materials in each production planning link is Manually go to each link for accounting, and finally perform a unified verification. However, it basically relies on the manual verification of material data. The accuracy and credibility of the calculation are very low, and the verification management efficiency is also low.
上述内容仅用于辅助理解本申请的技术方案,并不代表承认上述内容是现有技术。The above content is only used to assist the understanding of the technical solution of the application, and does not mean that the above content is recognized as prior art.
技术问题technical problem
本申请的主要目的在于提供一种订单跟踪核销管理的方法、系统及存储介质,旨在解决目前生产制程过程中生产订单的跟踪核销管理效率低的技术问题。The main purpose of this application is to provide a method, system and storage medium for order tracking and verification management, which aims to solve the technical problem of low efficiency in the current production order tracking verification management in the production process.
技术解决方案Technical solutions
为实现上述目的,本申请提供一种订单跟踪核销管理的方法,所述订单跟踪核销管理的方法包括:In order to achieve the above objective, this application provides a method for order tracking, verification and write-off management, and the method for order tracking, verification and write-off management includes:
获取销售订单,并将所述销售订单转换成生产订单;Obtain a sales order, and convert the sales order into a production order;
为所述生产订单制定生产计划,并为所述生产计划建立相应的区块链区块,以基于所述区块链区块更新所述生产计划的执行进度,其中,生产计划的执行进度包括物料的进度信息;Develop a production plan for the production order, and establish a corresponding blockchain block for the production plan to update the execution progress of the production plan based on the blockchain block, where the execution progress of the production plan includes Material progress information;
检测到所述生产计划已完成时,基于物料核销模块,对所述生产计划中同一物料的用量进行核销,并将核销结果发送至区块链存储。When it is detected that the production plan has been completed, based on the material verification module, the consumption of the same material in the production plan is verified, and the verification result is sent to the blockchain for storage.
在一实施例中,基于若干个生产计划的次序,生成各个生产计划匹配的生产行号,并获取所述销售订单的销售订单号;In an embodiment, based on the sequence of several production plans, generate the production line number matching each production plan, and obtain the sales order number of the sales order;
将所述生产计划匹配的生产行号与所述销售订单号关联,以将若干个生产计划和/或区块链区块关联。The production line number matched by the production plan is associated with the sales order number to associate several production plans and/or blockchain blocks.
在一实施例中,基于若干个生产计划的次序,依次执行各个生产计划,并基于各个生产计划对应的区块链区块,更新所述生产计划的执行进度。In one embodiment, based on the sequence of several production plans, each production plan is executed in sequence, and the execution progress of the production plan is updated based on the blockchain block corresponding to each production plan.
在一实施例中,确定采购订单及采购计划,并基于所述采购订单采购物料;In an embodiment, a purchase order and a purchase plan are determined, and materials are purchased based on the purchase order;
发起采购订单确认的第一区块链事务,在检测所述第一区块链事务已完成时,基于采购计划对应的区块链区块,更新所述采购计划的状态为采购订单已确认;Initiating the first blockchain transaction of the purchase order confirmation, when detecting that the first blockchain transaction has been completed, update the status of the purchase plan to the purchase order confirmed based on the blockchain block corresponding to the purchase plan;
发起采购物料到货的第二区块链事务,在检测所述第二区块链事务已完成时,基于采购计划对应的区块链区块,更新所述采购计划的状态为物料已到货;Initiate a second blockchain transaction for the arrival of purchased materials. When detecting that the second blockchain transaction has been completed, update the status of the purchase plan as the material arrived based on the blockchain block corresponding to the purchase plan ;
发起采购物料入库的第三区块链事务,在检测所述第三区块链事务已完成时,基于采购计划对应的区块链区块,更新所述采购计划的状态为物料已入库。Initiate the third blockchain transaction of purchasing materials into the warehouse. When detecting that the third blockchain transaction has been completed, update the status of the purchasing plan as the materials in the warehouse based on the blockchain block corresponding to the purchasing plan .
在一实施例中,确定外协计划,并发起外协计划的第四区块链事务,其中,所述第四区块链事务包括物料外发子事务、物料到货子事务及物流入库子事务;In one embodiment, the outsourcing plan is determined, and the fourth blockchain transaction of the outsourcing plan is initiated, where the fourth blockchain transaction includes the material outsourcing sub-transaction, the material arrival sub-transaction, and the logistics warehousing Sub-affairs
在检测到所述物料外发子事务已完成时,基于外协计划对应的区块链区块,更新所述外协计划的状态为物料已外发;When it is detected that the material outsourcing sub-transaction has been completed, based on the blockchain block corresponding to the outsourcing plan, update the status of the outsourcing plan to the outgoing material;
在检测到所述物料到货子事务已完成时,基于外协计划对应的区块链区块,更新所述外协计划的状态为物料已到货;When it is detected that the material arrival sub-transaction has been completed, based on the blockchain block corresponding to the outsourcing plan, update the status of the outsourcing plan as the material has arrived;
在检测到所述物流入库子事务已完成时,基于外协计划对应的区块链区块,更新所述外协计划的状态为物料已入库。When it is detected that the logistics warehousing sub-transaction has been completed, based on the blockchain block corresponding to the outsourcing plan, the status of the outsourcing plan is updated as the material has been put into storage.
在一实施例中,确定客供计划,并根据客供计划确定待发放的生产工单;In one embodiment, the customer supply plan is determined, and the production work order to be issued is determined according to the customer supply plan;
发起发放生产工单的第五区块链事务,在检测所述第五区块链事务已完成时,基于客供物料计划对应的区块链区块,更新所述客供物料计划的状态为生产工单已发放。The fifth blockchain transaction that initiates the issuance of the production work order, when detecting that the fifth blockchain transaction has been completed, based on the blockchain block corresponding to the guest-supplied material plan, the status of the guest-supplied material plan is updated as The production order has been issued.
在一实施例中,确定库存领用计划,并根据库存领用计划确定待领取的物料;In one embodiment, the inventory requisition plan is determined, and the materials to be reclaimed are determined according to the inventory requisition plan;
发起领取物料的第六区块链事务,在检测所述第六区块链事务已完成时,基于库存领用计划对应的区块链区块,更新所述库存领用计划的状态为物料已领取。Initiate the sixth blockchain transaction to receive materials. When detecting that the sixth blockchain transaction has been completed, update the status of the inventory requisition plan to the material completed based on the blockchain block corresponding to the inventory requisition plan receive.
在一实施例中,基于生产计划的物料的进度信息,获取生产计划中同一物料的缺失量;In an embodiment, based on the progress information of the material in the production plan, the missing quantity of the same material in the production plan is acquired;
若同一物料的缺失量大于预设值,则基于物料核销模块,对生产计划中同一物料的用量进行核销。If the missing quantity of the same material is greater than the preset value, the consumption of the same material in the production plan will be written off based on the material write-off module.
此外,为实现上述目的,本申请还提供一种订单跟踪核销管理系统,所述订单跟踪核销管理系统包括:In addition, in order to achieve the above purpose, this application also provides an order tracking verification management system, the order tracking verification management system including:
生产订单生成模块,用于获取销售订单,并将所述销售订单转换成生产订单;The production order generation module is used to obtain a sales order and convert the sales order into a production order;
生产计划制定模块,用于为所述生产订单制定生产计划,并为所述生产计划建立相应的区块链区块,以基于所述区块链区块更新所述生产计划的执行进度,其中,执行进度包括物料的进度信息;The production plan formulation module is used to formulate a production plan for the production order and establish a corresponding block chain block for the production plan to update the execution progress of the production plan based on the block chain block, wherein , The execution progress includes the progress information of the material;
物料核销模块,用于检测到所述生产计划已完成时,基于物料核销模块,对所述生产计划中同一物料的用量进行核销,并将核销结果发送至区块链存储。The material verification module is used to verify the usage of the same material in the production plan based on the material verification module when it is detected that the production plan has been completed, and send the verification result to the blockchain storage.
此外,为实现上述目的,本申请还提供一种存储介质,所述存储介质上存储有订单跟踪核销管理程序,所述订单跟踪核销管理程序被处理器执行时实现以上任一项所述的订单跟踪核销管理的方法的步骤。In addition, in order to achieve the above-mentioned object, the present application also provides a storage medium, the storage medium stores an order tracking verification management program, the order tracking verification management program is executed by the processor to achieve any of the above The steps of the method of order tracking and write-off management.
有益效果Beneficial effect
本申请提出的订单跟踪核销管理的方法,通过获取销售订单,并将所述销售订单转换成生产订单,为所述生产订单制定生产计划,并为所述生产计划建立相应的区块链区块,以基于所述区块链区块更新所述生产计划的执行进度,其中,生产计划的执行进度包括物料的进度信息,检测到所述生产计划已完成时,获取所述生产计划的执行进度,并基于物料核销模块,对所述生产计划中同一物料的用量进行核销,分析各计划的执行情况,提高管理效率,防范物料遗失风险,且基于区块链形成共识机制,实现不可篡改可追溯,达到各用户可信,对控制物料丢失,提高生产管理水平,为生产企业及客户提供了更高价值。The method of order tracking and verification management proposed in this application is to obtain sales orders and convert the sales orders into production orders, formulate a production plan for the production order, and establish a corresponding blockchain area for the production plan Block to update the execution progress of the production plan based on the blockchain block, where the execution progress of the production plan includes the progress information of the material, and when it is detected that the production plan has been completed, the execution of the production plan is acquired Based on the material verification module, the use of the same material in the production plan is written off, the implementation of each plan is analyzed, management efficiency is improved, the risk of material loss is prevented, and a consensus mechanism is formed based on the blockchain to realize the impossible The tampering can be traced to achieve the credibility of each user, to control the loss of materials, to improve the level of production management, and to provide higher value for production enterprises and customers.
附图说明Description of the drawings
图1是本申请实施例方案涉及的硬件运行环境的终端结构示意图;FIG. 1 is a schematic diagram of a terminal structure of a hardware operating environment involved in a solution of an embodiment of the present application;
图2为本申请订单跟踪核销管理的方法第一实施例的流程示意图。Fig. 2 is a schematic flow chart of the first embodiment of the method for applying for order tracking and verification and write-off management.
本申请目的的实现、功能特点及优点将结合实施例,参照附图做进一步说明。The realization, functional characteristics, and advantages of the purpose of this application will be further described in conjunction with the embodiments and with reference to the accompanying drawings.
本发明的实施方式Embodiments of the present invention
应当理解,此处所描述的具体实施例仅仅用以解释本申请,并不用于限定本申请。It should be understood that the specific embodiments described here are only used to explain the present application, and are not used to limit the present application.
如图1所示,图1是本申请实施例方案涉及的硬件运行环境的终端结构示意图。As shown in FIG. 1, FIG. 1 is a schematic diagram of a terminal structure of a hardware operating environment involved in a solution of an embodiment of the present application.
如图1所示,该终端可以包括:处理器1001,例如CPU,网络接口1004,用户接口1003,存储器1005,通信总线1002。其中,通信总线1002用于实现这些组件之间的连接通信。用户接口1003可以包括显示屏(Display)、输入单元比如键盘(Keyboard),可选用户接口1003还可以包括标准的有线接口、无线接口。网络接口1004可选的可以包括标准的有线接口、无线接口(如WI-FI接口)。存储器1005可以是高速RAM存储器,也可以是稳定的存储器(non-volatile memory),例如磁盘存储器。存储器1005可选的还可以是独立于前述处理器1001的存储装置。As shown in FIG. 1, the terminal may include: a processor 1001, such as a CPU, a network interface 1004, a user interface 1003, a memory 1005, and a communication bus 1002. Among them, the communication bus 1002 is used to implement connection and communication between these components. The user interface 1003 may include a display screen (Display) and an input unit such as a keyboard (Keyboard), and the optional user interface 1003 may also include a standard wired interface and a wireless interface. The network interface 1004 may optionally include a standard wired interface and a wireless interface (such as a WI-FI interface). The memory 1005 may be a high-speed RAM memory, or a stable memory (non-volatile memory), such as a magnetic disk memory. Optionally, the memory 1005 may also be a storage device independent of the aforementioned processor 1001.
终端还可以包括摄像头、RF(Radio Frequency,射频)电路,传感器、音频电路、WiFi模块等等。其中,传感器比如光传感器、运动传感器以及其他传感器。具体地,光传感器可包括环境光传感器及接近传感器,其中,环境光传感器可根据环境光线的明暗来调节显示屏的亮度,接近传感器可在移动终端移动到耳边时,关闭显示屏和/或背光。作为运动传感器的一种,重力加速度传感器可检测各个方向上(一般为三轴)加速度的大小,静止时可检测出重力的大小及方向,可用于识别移动终端姿态的应用(比如横竖屏切换、相关游戏、磁力计姿态校准)、振动识别相关功能(比如计步器、敲击)等;当然,移动终端还可配置陀螺仪、气压计、湿度计、温度计、红外线传感器等其他传感器,在此不再赘述。The terminal can also include a camera, RF (Radio Frequency (radio frequency) circuits, sensors, audio circuits, WiFi modules, etc. Among them, sensors such as light sensors, motion sensors and other sensors. Specifically, the light sensor may include an ambient light sensor and a proximity sensor. The ambient light sensor can adjust the brightness of the display screen according to the brightness of the ambient light, and the proximity sensor can turn off the display screen and/or when the mobile terminal is moved to the ear. Backlight. As a kind of motion sensor, the gravity acceleration sensor can detect the magnitude of acceleration in various directions (usually three axes). It can detect the magnitude and direction of gravity when it is stationary. Related games, magnetometer posture calibration), vibration recognition related functions (such as pedometer, percussion), etc.; of course, the mobile terminal can also be equipped with other sensors such as gyroscope, barometer, hygrometer, thermometer, infrared sensor, etc. No longer.
本领域技术人员可以理解,图1中示出的终端结构并不构成对终端的限定,可以包括比图示更多或更少的部件,或者组合某些部件,或者不同的部件布置。Those skilled in the art can understand that the terminal structure shown in FIG. 1 does not constitute a limitation on the terminal, and may include more or less components than shown in the figure, or combine some components, or arrange different components.
如图1所示,作为一种存储介质的存储器1005中可以包括操作系统、网络通信模块、用户接口模块以及订单跟踪核销管理程序。As shown in FIG. 1, the memory 1005 as a storage medium may include an operating system, a network communication module, a user interface module, and an order tracking verification management program.
在图1所示的终端中,网络接口1004主要用于连接后台服务器,与后台服务器进行数据通信;用户接口1003主要用于连接客户端(用户端),与客户端进行数据通信;而处理器1001可以用于调用存储器1005中存储的订单跟踪核销管理程序。In the terminal shown in FIG. 1, the network interface 1004 is mainly used to connect to the back-end server and communicate with the back-end server; the user interface 1003 is mainly used to connect to the client (user side) and communicate with the client; and the processor 1001 can be used to call the order tracking write-off management program stored in the memory 1005.
在本实施例中,基于区块链的数据处理装置包括:存储器1005、处理器1001及存储在所述存储器1005上并可在所述处理器1001上运行的订单跟踪核销管理程序,其中,处理器1001调用存储器1005中存储的订单跟踪核销管理程序时,并执行以下操作:In this embodiment, the blockchain-based data processing device includes: a memory 1005, a processor 1001, and an order tracking verification management program stored on the memory 1005 and running on the processor 1001, wherein, When the processor 1001 calls the order tracking write-off management program stored in the memory 1005, it performs the following operations:
获取销售订单,并将所述销售订单转换成生产订单;Obtain a sales order, and convert the sales order into a production order;
为所述生产订单制定生产计划,并为所述生产计划建立相应的区块链区块,以基于所述区块链区块更新所述生产计划的执行进度,其中,生产计划的执行进度包括物料的进度信息;Develop a production plan for the production order, and establish a corresponding blockchain block for the production plan to update the execution progress of the production plan based on the blockchain block, where the execution progress of the production plan includes Material progress information;
检测到所述生产计划已完成时,获取所述生产计划的执行进度,并基于物料核销模块,对所述生产计划中同一物料的用量进行核销。When it is detected that the production plan has been completed, the execution progress of the production plan is obtained, and the usage of the same material in the production plan is written off based on the material verification module.
进一步地,处理器1001可以调用存储器1005中存储的订单跟踪核销管理程序,还执行以下操作:Further, the processor 1001 may call the order tracking write-off management program stored in the memory 1005, and also perform the following operations:
基于若干个生产计划的次序,生成各个生产计划匹配的生产行号,并获取所述销售订单的销售订单号;Based on the sequence of several production plans, generate the production line number matching each production plan, and obtain the sales order number of the sales order;
将所述生产计划匹配的生产行号与所述销售订单号关联,以将若干个生产计划和/或区块链区块关联。The production line number matched by the production plan is associated with the sales order number to associate several production plans and/or blockchain blocks.
进一步地,处理器1001可以调用存储器1005中存储的订单跟踪核销管理程序,还执行以下操作:Further, the processor 1001 may call the order tracking write-off management program stored in the memory 1005, and also perform the following operations:
基于若干个生产计划的次序,依次执行各个生产计划,并基于各个生产计划对应的区块链区块,更新所述生产计划的执行进度。Based on the sequence of several production plans, each production plan is executed in turn, and the execution progress of the production plan is updated based on the blockchain block corresponding to each production plan.
进一步地,处理器1001可以调用存储器1005中存储的订单跟踪核销管理程序,还执行以下操作:Further, the processor 1001 may call the order tracking write-off management program stored in the memory 1005, and also perform the following operations:
确定采购订单及采购计划,并基于所述采购订单采购物料;Determine the purchase order and purchase plan, and purchase materials based on the purchase order;
发起采购订单确认的第一区块链事务,在检测所述第一区块链事务已完成时,基于采购计划对应的区块链区块,更新所述采购计划的状态为采购订单已确认;Initiating the first blockchain transaction for purchase order confirmation, when detecting that the first blockchain transaction has been completed, update the status of the purchase plan to the purchase order confirmed based on the blockchain block corresponding to the purchase plan;
发起采购物料到货的第二区块链事务,在检测所述第 区块链事务已完成时,基于采购计划对应的区块链区块,更新所述采购计划的状态为物料已到货; Initiate procurement of materials arrival of the second block chain transactions, upon detection of the second block chain transaction has been completed, based on the procurement plan corresponding block chain block, updating the status of the procurement plan for the material has arrived ;
发起采购物料入库的第三区块链事务,在检测所述第 区块链事务已完成时,基于采购计划对应的区块链区块,更新所述采购计划的状态为物料已入库。 Initiate purchase of a third material storage block chain transactions, upon detection of the third block chain transaction has been completed, based on the procurement plan corresponding block chain block, updating the status of the material procurement plan has been put in storage .
进一步地,处理器1001可以调用存储器1005中存储的订单跟踪核销管理程序,还执行以下操作:Further, the processor 1001 may call the order tracking write-off management program stored in the memory 1005, and also perform the following operations:
确定外协计划,并发起外协计划的第四区块链事务,其中,所述第四区块链事务包括物料外发子事务、物料到货子事务及物流入库子事务;Determine the outsourcing plan and initiate the fourth block chain transaction of the outsourcing plan, where the fourth block chain transaction includes the sub-transaction of material outsourcing, the sub-transaction of material arrival, and the sub-transaction of logistics warehousing;
在检测到所述物料外发子事务已完成时,基于外协计划对应的区块链区块,更新所述外协计划的状态为物料已外发;When it is detected that the material outsourcing sub-transaction has been completed, based on the blockchain block corresponding to the outsourcing plan, update the status of the outsourcing plan to the outgoing material;
在检测到所述物料到货子事务已完成时,基于外协计划对应的区块链区块,更新所述外协计划的状态为物料已到货;When it is detected that the material arrival sub-transaction has been completed, based on the blockchain block corresponding to the outsourcing plan, update the status of the outsourcing plan as the material has arrived;
在检测到所述物流入库子事务已完成时,基于外协计划对应的区块链区块,更新所述外协计划的状态为物料已入库。When it is detected that the logistics warehousing sub-transaction has been completed, based on the blockchain block corresponding to the outsourcing plan, the status of the outsourcing plan is updated as the material has been put into storage.
进一步地,处理器1001可以调用存储器1005中存储的订单跟踪核销管理程序,还执行以下操作:Further, the processor 1001 may call the order tracking write-off management program stored in the memory 1005, and also perform the following operations:
确定客供计划,并根据客供计划确定待发放的生产工单;Determine the customer supply plan, and determine the production work orders to be issued according to the customer supply plan;
发起发放生产工单的第五区块链事务,在检测所述第 区块链事务已完成时,基于客供物料计划对应的区块链区块,更新所述客供物料计划的状态为生产工单已发放。 The fifth block chain initiated the transaction issuance of production work order, upon detection of the fifth block chain transaction is completed, the block-based chain plans to block off for the corresponding materials, updating the status of the customer for materials planning The production order has been issued.
进一步地,处理器1001可以调用存储器1005中存储的订单跟踪核销管理程序,还执行以下操作:Further, the processor 1001 may call the order tracking write-off management program stored in the memory 1005, and also perform the following operations:
确定库存领用计划,并根据库存领用计划确定待领取的物料;Determine the inventory requisition plan, and determine the materials to be received according to the inventory requisition plan;
发起领取物料的第六区块链事务,在检测所述第 区块链事务已完成时,基于库存领用计划对应的区块链区块,更新所述库存领用计划的状态为物料已领取。 Initiating receive materials sixth block chain transactions, upon detection of the sixth block chain transaction is complete, based on inventory requisitioned Plan corresponding block chain block, updating the inventory of state for material requisitioned Plan has receive.
进一步地,处理器1001可以调用存储器1005中存储的订单跟踪核销管理程序,还执行以下操作:Further, the processor 1001 may call the order tracking write-off management program stored in the memory 1005, and also perform the following operations:
基于生产计划的物料的进度信息,获取生产计划中同一物料的缺失量;Based on the progress information of the material in the production plan, obtain the missing quantity of the same material in the production plan;
若同一物料的缺失量大于预设值,则基于物料核销模块,对生产计划中同一物料的用量进行核销。If the missing quantity of the same material is greater than the preset value, the consumption of the same material in the production plan will be written off based on the material write-off module.
本申请还提供一种订单跟踪核销管理的方法,参照图2,图2为本申请订单跟踪核销管理的方法第一实施例的流程示意图。This application also provides a method for order tracking and verification management. Referring to FIG. 2, FIG. 2 is a schematic flowchart of the first embodiment of the method for order tracking and verification management in this application.
步骤S10,获取销售订单,并将所述销售订单转换成生产订单;Step S10, obtaining a sales order, and converting the sales order into a production order;
在本申请实施例中,由于区块链具有去中心化、开放性、自治性、匿名性、信息不可篡改等,可以理解为一个世界范围的分布式账本,如果将区块链技术运用到企业中,将会大大降低生产成本和运营成本。In the embodiments of this application, because the blockchain is decentralized, open, autonomous, anonymous, and information cannot be tampered with, it can be understood as a worldwide distributed ledger. If blockchain technology is applied to enterprises It will greatly reduce production costs and operating costs.
在区块链平台的基础上,企业在区块链上注册企业的账户信息,并获取账户信息关联的销售订单,其中,可以理解地,客户可基于区块链平台上的企业账户,向企业发起订单交易请求,企业基于区块链平台接收客户的交易请求,并生成对应的销售订单,其中,销售订单中包含订单号及订单信息等,在获取销售订单之后,以销售订单为起点,将销售订单转换成为内部的生产订单。On the basis of the blockchain platform, the company registers the company’s account information on the blockchain and obtains the sales order associated with the account information. Understandably, the customer can send the company’s account information to the company based on the company’s account on the blockchain platform. Initiating an order transaction request, the company receives the customer’s transaction request based on the blockchain platform and generates a corresponding sales order. The sales order contains the order number and order information. After obtaining the sales order, the sales order is taken as the starting point. The sales order is converted into an internal production order.
步骤S20,为所述生产订单制定生产计划,并为所述生产计划建立相应的区块链区块,以基于所述区块链区块更新所述生产计划的执行进度,其中,生产计划的执行进度包括物料的进度信息;Step S20: Formulate a production plan for the production order, and establish a corresponding blockchain block for the production plan, so as to update the execution progress of the production plan based on the blockchain block. The execution progress includes the progress information of the material;
在将销售订单转换成为内部的生产订单之后,并制定生产计划,以及将生产计划拆分为生产工单、库存领用计划、采购计划、外协计划、客供物料计划,并为生产计划建立相应的区块链区块,以基于区块链区块更新生产计划的执行进度,其中,生产计划的执行进度包括物料的进度信息,比如,采购计划的采购物料种类信息及同一采购物料的数量信息,外协计划的物料外发种类信息及同一外发物料的数量信息,客供物料计划的生产工单中的物料种类信息及同一物料的数量信息,库存领用计划的已领取的物料种类信息及同一物料的数量信息等。After the sales order is converted into an internal production order, a production plan is developed, and the production plan is split into a production work order, an inventory requisition plan, a purchase plan, an outsourcing plan, a customer-supplied material plan, and a production plan is established The corresponding blockchain block updates the execution progress of the production plan based on the blockchain block, where the execution progress of the production plan includes the progress information of the material, for example, the purchase material type information of the purchase plan and the quantity of the same purchased material Information, outsourcing type information of outsourced materials and quantity information of the same outgoing material, material type information and quantity information of the same material in the production work order of the customer-supplied material plan, and the received material type of the inventory requisition plan Information and quantity information of the same material, etc.
具体地,为所述生产计划建立相应的区块链区块的步骤之后,还包括:Specifically, after the step of establishing a corresponding blockchain block for the production plan, it further includes:
步骤201,基于若干个生产计划的次序,生成各个生产计划匹配的生产行号,并获取所述销售订单的销售订单号;Step 201, based on the sequence of several production plans, generate production line numbers matching each production plan, and obtain the sales order number of the sales order;
步骤202,将所述生产计划匹配的生产行号与所述销售订单号关联,以将若干个生产计划关联。Step 202: Associate the production line number matched by the production plan with the sales order number to associate several production plans.
其中,可以理解地,将生产计划拆分为生产工单、库存领用计划、采购计划、外协计划、客供物料计划,按照各个计划的执行次序,依次为采购计划、外协计划、客供物料计划及库存领用计划,因此为了简化各个计划的执行,基于若干个生产计划的次序,生成各个生产计划匹配的生产行号,比如采购计划、外协计划、客供物料计划及库存领用计划的生产行号依次为01,02,03,04。接着获取销售订单的销售订单号,并获取销售订单的销售订单号,且将生产计划匹配的生产行号与销售订单号关联,以将若干个生产计划关联,比如,客户在2020年3月24日接收客户A的交易请求,则生成对应的销售订单,并生成对应的销售订单号A20200324,在获取销售订单的销售订单号A20200324之后,将生产计划匹配的生产行号与销售订单号关联,即依次为A2020032401,A2020032402,A2020032403及A2020032404,以在区块链平台中将若干个生产计划关联。Among them, it is understandable that the production plan is divided into production work orders, inventory requisition plans, procurement plans, outsourcing plans, and customer-supplied material plans. According to the order of execution of each plan, the production plan is divided into purchase plan, outsourcing plan, and customer. Supply material plan and inventory requisition plan, so in order to simplify the execution of each plan, based on the sequence of several production plans, generate production line numbers that match each production plan, such as purchase plan, outsourcing plan, customer-supplied material plan, and inventory requisition. The planned production line numbers are 01, 02, 03, 04 in sequence. Then obtain the sales order number of the sales order, and obtain the sales order number of the sales order, and associate the production line number matched by the production plan with the sales order number to associate several production plans. For example, the customer is on March 24, 2020. When receiving the transaction request from customer A on the day, the corresponding sales order is generated, and the corresponding sales order number A20200324 is generated. After the sales order number A20200324 of the sales order is obtained, the production line number matching the production plan is associated with the sales order number, that is These are A2020032401, A2020032402, A2020032403 and A2020032404 in order to associate several production plans on the blockchain platform.
在将各个生产计划关联之后,在区块链平台为以上各个生产计划建立相应的区块链区块,并基于区块链区块所述生产计划的执行进度,其中,各区块链区块通过“销售订单号+生产行号”相关联,具体地,为采购计划、外协计划、客供物料计划及库存领用计划建立各自相应的区块链区块,并基于关联的若干个生产计划,将若干个区块链区块关联,接着基于若干个生产计划的次序,依次执行各个生产计划,并基于各个生产计划对应的区块链区块,更新所述生产计划的执行进度。After associating each production plan, a corresponding blockchain block is established for each of the above production plans on the blockchain platform, and based on the execution progress of the production plan described in the blockchain block, where each blockchain block passes "Sales order number + production line number" are related, specifically, the corresponding blockchain blocks are established for the purchase plan, outsourcing plan, customer-supplied material plan, and inventory requisition plan, and based on several related production plans , Associate several blockchain blocks, and then execute each production plan in sequence based on the sequence of several production plans, and update the execution progress of the production plan based on the blockchain block corresponding to each production plan.
具体地,生产计划为采购计划,其中,基于若干个生产计划的次序,依次执行各个生产计划,并基于各个生产计划对应的区块链区块,更新生产计划的执行进度的步骤还包括:Specifically, the production plan is a procurement plan, in which, based on the sequence of several production plans, each production plan is executed in turn, and based on the blockchain block corresponding to each production plan, the steps to update the execution schedule of the production plan also include:
确定采购订单及采购计划,并基于所述采购订单采购物料;Determine the purchase order and purchase plan, and purchase materials based on the purchase order;
发起采购订单确认的第一区块链事务,在检测第一区块链事务已完成时,基于采购计划对应的区块链区块,更新采购计划的状态为采购订单已确认;The first blockchain transaction that initiates the purchase order confirmation, when detecting that the first blockchain transaction has been completed, based on the blockchain block corresponding to the purchase plan, the status of the purchase plan is updated to the purchase order confirmed;
发起采购物料到货的第二区块链事务,在检测第 区块链事务已完成时,基于采购计划对应的区块链区块,更新采购计划的状态为物料已到货; Initiate procurement of materials arrival of the second block chain transactions, upon detection of the second block chain transaction has been completed, based on the procurement plan corresponding block chain block, update the status of procurement plan for the material has arrived;
发起采购物料入库的第三区块链事务,在检测第 区块链事务已完成时,基于采购计划对应的区块链区块,更新采购计划的状态为物料已入库。 Initiate purchase of a third material storage block chain transactions, upon detection of the third block chain transaction has been completed, based on the procurement plan corresponding block chain block, update status of materials procurement plan has been put in storage.
即采购员依据采购计划,联系供应商,确认采购订单及采购计划,供应商依据采购计划送货并检验入库。采购订单确认后,发起一笔采购订单确认的第一区块链事务,并将采购计划行的状态更新为“采购订单已确认”;供应商交货后,发起一笔采购到货的第二区块链的事务,将采购计划行的状态更新为“已到货”;检验入库后,发起一笔采购入库的第三区块链事务,将采购计划行的状态更新为“已入库”,其中,物料的进度信息包括采购计划的采购物料种类信息及同一采购物料的数量信息,即采购计划中采购订单确认、采购物料到货及采购物料入库各个环节中采购物料种类信息及同一采购物料的数量信息。That is, the purchaser contacts the supplier according to the purchase plan, confirms the purchase order and the purchase plan, and the supplier delivers the goods according to the purchase plan and inspects the warehouse. After the purchase order is confirmed, initiate a first block chain transaction of purchase order confirmation, and update the status of the purchase plan line to "purchase order confirmed"; after the supplier delivers, initiate a second purchase order For blockchain transactions, update the status of the purchase plan line to "arrived"; after checking the warehousing, initiate a third block chain transaction of purchases and warehousing, and update the status of the purchase plan line to "incoming" In which, the progress information of the material includes the type information of the purchased material in the purchase plan and the quantity information of the same purchased material, that is, the purchase order confirmation in the purchase plan, the arrival of the purchased material, and the purchase material type information in each link of the purchased material warehousing and The quantity information of the same purchased material.
具体地,生产计划为外协计划,其中,基于若干个生产计划的次序,依次执行各个生产计划,并基于各个生产计划对应的区块链区块,更新生产计划的执行进度的步骤还包括:Specifically, the production plan is an outsourcing plan, in which, based on the sequence of several production plans, each production plan is executed in sequence, and based on the blockchain block corresponding to each production plan, the steps to update the execution schedule of the production plan also include:
确定外协计划,并发起外协计划的第四区块链事务,其中,第四区块链事务包括物料外发子事务、物料到货子事务及物流入库子事务;Determine the outsourcing plan and initiate the fourth blockchain transaction of the outsourcing plan. The fourth blockchain transaction includes the sub-transaction of material outsourcing, the sub-transaction of material arrival, and the sub-transaction of logistics storage;
在检测到物料外发子事务已完成时,基于外协计划对应的区块链区块,更新外协计划的状态为物料已外发;When it is detected that the material outsourcing sub-transaction has been completed, based on the blockchain block corresponding to the outsourcing plan, the status of the outsourcing plan is updated as the material has been sent out;
在检测到物料到货子事务已完成时,基于外协计划对应的区块链区块,更新外协计划的状态为物料已到货;When it is detected that the material arrival sub-transaction has been completed, based on the blockchain block corresponding to the outsourcing plan, the status of the outsourcing plan is updated as the material has arrived;
在检测到物流入库子事务已完成时,基于外协计划对应的区块链区块,更新外协计划的状态为物料已入库。When it is detected that the logistics inbound sub-transaction has been completed, based on the blockchain block corresponding to the outsourcing plan, the status of the outsourcing plan is updated as the material has been put in storage.
即计划员根据物料到货情况,执行外协计划,从外协发料到外协入库,依次添加“外协计划”的第四区块链事务,基于计划的执行进程,依次将外协计划行状态更新为“物料已外发”,“已到货”,“已入库”。进一步地,物控员根据各计划的执行情况,跟进外协和物料的齐套情况,并反馈给计划员,其中,物料的进度信息包括外协计划的物料外发种类信息及同一外发物料的数量信息,即外协计划中物料外发、物料到货及物流入库各个环节中物料外发种类信息及同一外发物料的数量信息。That is to say, the planner executes the outsourcing plan according to the material arrival situation, from the outsourcing to the outsourcing and warehousing, adding the fourth blockchain transaction of the "outsourcing plan" in turn, and based on the execution process of the plan, the outsourcing The status of the schedule line is updated to "Material has been sent out", "Incoming goods", and "In stock". Further, the material controller will follow up the complete set of outsourcing and materials according to the execution of each plan, and feed it back to the planner. Among them, the progress information of the materials includes the outsourcing type information of the outsourcing plan and the same outgoing material The quantity information of the outsourcing plan, that is, the information of the type of outgoing materials and the quantity information of the same outgoing material in each link of the outsourcing plan, the arrival of the materials, and the logistics warehousing.
具体地,生产计划为客供物料计划,其中,基于若干个生产计划的次序,依次执行各个生产计划,并基于各个生产计划对应的区块链区块,更新生产计划的执行进度的步骤还包括:Specifically, the production plan is a customer-supplied material plan, in which, based on the sequence of several production plans, each production plan is executed in turn, and based on the blockchain block corresponding to each production plan, the step of updating the execution schedule of the production plan also includes :
确定客供计划,并根据客供计划确定待发放的生产工单;Determine the customer supply plan, and determine the production work orders to be issued according to the customer supply plan;
发起发放生产工单的第五区块链事务,在检测所述第 区块链事务已完成时,基于客供物料计划对应的区块链区块,更新所述客供物料计划的状态为生产工单已发放。 The fifth block chain initiated the transaction issuance of production work order, upon detection of the fifth block chain transaction is completed, the block-based chain plans to block off for the corresponding materials, updating the status of the customer for materials planning The production order has been issued.
即计划员确定客供计划,并根据物料情况及客供计划确定待发放的生产工单,依据生产计划发放生产工单,并登记一笔生产工单发放的事务上传到区块链,更新生产工单状态为“已发放”,其中,物料的进度信息包括客供物料计划的生产工单中的物料种类信息及同一物料的数量信息。That is, the planner determines the customer supply plan, and determines the production work orders to be issued according to the material situation and the customer supply plan, issues production work orders according to the production plan, and registers a production work order issue transaction and uploads it to the blockchain to update production The work order status is "Issued", where the progress information of the material includes the material type information and the quantity information of the same material in the production work order of the customer-supplied material plan.
具体地,生产计划为库存领用计划,其中,基于若干个生产计划的次序,依次执行各个生产计划,并基于各个生产计划对应的区块链区块,更新生产计划的执行进度的步骤还包括:Specifically, the production plan is an inventory requisition plan, where, based on the sequence of several production plans, each production plan is executed in turn, and based on the blockchain block corresponding to each production plan, the step of updating the execution schedule of the production plan also includes :
确定库存领用计划,并根据库存领用计划确定待领取的物料;Determine the inventory requisition plan, and determine the materials to be received according to the inventory requisition plan;
发起领取物料的第六区块链事务,在检测所述第 区块链事务已完成时,基于库存领用计划对应的区块链区块,更新所述库存领用计划的状态为物料已领取。 Initiating receive materials sixth block chain transactions, upon detection of the sixth block chain transaction is complete, based on inventory requisitioned Plan corresponding block chain block, updating the inventory of state for material requisitioned Plan has receive.
即领料员依据库存领用计划做生产领料,并更新库存领用计划、外采计划、客供料计划对应计划行的已领用数量,并在区块链登记生产领料事务,其中,物料的进度信息包括库存领用计划的已领取的物料种类信息及同一物料的数量信息。That is, the picker performs production requisition according to the inventory requisition plan, and updates the requisitioned quantity of the corresponding plan line of the inventory requisition plan, external procurement plan, and customer supply plan, and registers the production requisition transaction on the blockchain. , The progress information of the material includes the received material type information and the quantity information of the same material in the inventory requisition plan.
步骤S30,检测到所述生产计划已完成时,获取所述生产计划的执行进度,并基于物料核销模块,对所述生产计划中同一物料的用量进行核销。In step S30, when it is detected that the production plan has been completed, the execution progress of the production plan is obtained, and the consumption of the same material in the production plan is written off based on the material verification module.
在检测到成产计划已完成时,仓管员依据完工入库单做产成品入库,并登记一笔产成品入库的事务,并更新生产工单的已入库数量,接着确认生产计划完成所有的生产任务后领料员清退多领的物料情况,计划员将生产工单关闭,接着在区块链登记一笔生产工单关闭事务,并将生产工单状态和/或生产计划行状态更新为“已完成”。When it is detected that the finished production plan has been completed, the warehouse clerk will put the finished product into the warehouse according to the finished warehouse receipt, and register a finished product into the warehouse transaction, and update the warehoused quantity of the production work order, and then confirm the production plan After completing all production tasks, the picker clears the situation of the multi-reclaimed materials, the planner closes the production work order, and then registers a production work order closing transaction on the blockchain, and changes the production work order status and/or production plan The row status is updated to "Completed".
本实施例中,通过将执行计划的过程发生的物料领用,采购订单、外购入库、外协加工、客供料领用、产成品完工入库做为各区块的事务,添加到区块链对应的区块中,并更新各计划的进度,达到订单进度的自动更新,其中,还包括生产计划中在生产产品时,合格品生产应消耗量、不良品生产应消耗量及滞留产线中的量,并将这些同步更新存储值对应的区块链区块中,以便后续进行物料核销时的逆向追溯。In this embodiment, the material requisition, purchase order, outsourcing warehousing, outsourcing processing, customer-supplied material requisition, and finished goods storage in the process of executing the plan are taken as the affairs of each block and added to the district. In the corresponding block of the block chain, the progress of each plan is updated to achieve the automatic update of the order progress, which also includes the consumption of qualified products, the consumption of defective products, and the stranded products during the production of products in the production plan. The amount in the line, and these synchronized update storage values corresponding to the blockchain block, so that the subsequent reverse traceability of the material verification.
进一步地,各订单生产完成后,需要根据物料核销恒模块对同一类物料零部件用量逐一明细核销,其中,物料核销恒模块的核销等式为:Further, after the production of each order is completed, the consumption of the same type of material and parts needs to be written off one by one according to the constant module of material verification. The write-off equation of the constant module of material verification is:
(1)各物料零部件使用量=库存领用量+外采用量+外协用量+客供用量=合格品生产应消耗量(含正常损耗)+不良品生产应消耗量(含正常损耗)+滞留产线中的量+缺失的量(1) The amount of each material and component used = the amount of inventory received + the amount of external use + the amount of outsourcing + the amount of customer supply = the consumption of qualified products (including normal losses) + the consumption of defective products (including normal losses) + The amount stranded in the production line + the amount missing
(2)各物料零部件库存领用量=合格品生产应消耗量(含正常损耗)+不良品生产所消耗量(含正常损耗)+滞留产线中量+缺失的量(2) Inventory amount of each material and component = consumption of qualified product (including normal loss) + consumption of defective product (including normal loss) + medium volume of stranded production line + missing volume
(3)各物料外采用量=合格品生产应消耗量(含正常损耗)+不良品生产所消耗量(含正常损耗)+滞留产线中的量+缺失的量(3) The amount of external use of each material = the consumption of qualified products (including normal losses) + the consumption of defective products (including normal losses) + the amount remaining in the production line + the missing amount
(4)各物料外协用量=合格品生产应消耗量(含正常损耗)+不良品生产所消耗量(含正常损耗)+滞留产线中的量+缺失的量(4) The amount of outsourcing of each material = the consumption of qualified products (including normal losses) + the consumption of defective products (including normal losses) + the amount stranded in the production line + the missing amount
(5)各物料客供用量=合格品生产应消耗量(含正常损耗)+不良品生产所消耗量(含正常损耗)+滞留产线中的量+缺失的量(5) The customer-supplied amount of each material = the amount that should be consumed for the production of qualified products (including normal losses) + the amount consumed for the production of defective products (including normal losses) + the amount stranded in the production line + the amount missing
具体地,步骤S30包括,Specifically, step S30 includes:
步骤S301,基于生产计划的物料的进度信息,获取生产计划中同一物料的缺失量;Step S301, obtaining the missing quantity of the same material in the production plan based on the progress information of the material in the production plan;
步骤S302,若同一物料的缺失量大于预设值,则基于物料核销模块,对生产计划中同一物料的用量进行核销In step S302, if the missing quantity of the same material is greater than the preset value, the consumption of the same material in the production plan is written off based on the material write-off module
本实施例通过以上等式进行核销,即基于区块链中存储的生产计划的物料的进度信息,获取生产计划中同一物料的缺失量,并确认不良品生产所消耗的用量是否超预设量,并分析原因进行管控,其中,缺失的量应大于等于0,缺失的量等于0时是正常的,缺失的量大于0时说明有物料不明原因的缺失。通过以上等式的核销可以追溯物料,做好品质管控,并于供应商进行对帐,结算,尤其是外协物料、客供物料的对帐结算,及时、准确。This embodiment uses the above equation to write off, that is, based on the progress information of the materials in the production plan stored in the blockchain, obtain the missing amount of the same material in the production plan, and confirm whether the amount consumed for the production of defective products exceeds the preset amount If the missing amount is equal to 0, it is normal. If the missing amount is greater than 0, it means there is missing material for unknown reasons. Through the verification and cancellation of the above equation, the materials can be traced, quality control is well done, and reconciliation and settlement with suppliers, especially the reconciliation and settlement of outsourced materials and customer-supplied materials, are timely and accurate.
本申请提出的订单跟踪核销管理的方法,通过获取销售订单,并将所述销售订单转换成生产订单,为所述生产订单制定生产计划,并为所述生产计划建立相应的区块链区块,以基于所述区块链区块更新所述生产计划的执行进度,其中,生产计划的执行进度包括物料的进度信息,检测到所述生产计划已完成时,获取所述生产计划的执行进度,并基于物料核销模块,对所述生产计划中同一物料的用量进行核销,利用区块链技术的多账本记账,实现每天自动更新销售订单进度,根据物料核销恒等式自动完成对各物料的核销,可以让用户和客户更快掌握订单的进度,分析各计划的执行情况,提高管理效率,防范物料遗失风险,且基于区块链形成共识机制,实现不可篡改可追溯,达到各用户可信,对控制物料丢失,提高生产管理水平,为生产企业及客户提供了更高价值。The method of order tracking and verification management proposed in this application is to obtain sales orders and convert the sales orders into production orders, formulate a production plan for the production order, and establish a corresponding blockchain area for the production plan Block to update the execution progress of the production plan based on the blockchain block, where the execution progress of the production plan includes the progress information of the material, and when it is detected that the production plan has been completed, the execution of the production plan is acquired Based on the material verification module, the consumption of the same material in the production plan is written off, and the multi-book bookkeeping of blockchain technology is used to automatically update the sales order progress every day, and automatically complete the verification according to the material verification identity The write-off of various materials allows users and customers to quickly grasp the progress of orders, analyze the implementation of each plan, improve management efficiency, prevent material loss risks, and form a consensus mechanism based on the blockchain to achieve non-tamperable and traceable. All users are credible, control the loss of materials, improve the level of production management, and provide higher value to manufacturers and customers.
此外,为实现上述目的,本申请还提供一种订单跟踪核销管理系统,所述订单跟踪核销管理系统包括:In addition, in order to achieve the above purpose, this application also provides an order tracking verification management system, the order tracking verification management system including:
生产订单生成模块,用于获取销售订单,并将所述销售订单转换成生产订单;The production order generation module is used to obtain a sales order and convert the sales order into a production order;
生产计划制定模块,用于为所述生产订单制定生产计划,并为所述生产计划建立相应的区块链区块,以基于所述区块链区块更新所述生产计划的执行进度,其中,执行进度包括物料的进度信息;The production plan formulation module is used to formulate a production plan for the production order and establish a corresponding block chain block for the production plan to update the execution progress of the production plan based on the block chain block, wherein , The execution progress includes the progress information of the material;
物料核销模块,用于检测到所述生产计划已完成时,基于物料核销模块,对所述生产计划中同一物料的用量进行核销,并将核销结果发送至区块链存储。The material verification module is used to verify the usage of the same material in the production plan based on the material verification module when it is detected that the production plan has been completed, and send the verification result to the blockchain storage.
此外,本申请实施例还提出一种存储介质,所述存储介质上存储有订单跟踪核销管理程序,所述订单跟踪核销管理程序被处理器执行时实现以上所述订单跟踪核销管理的方法的各个实施例的步骤。In addition, an embodiment of the present application also proposes a storage medium, the storage medium stores an order tracking verification management program, the order tracking verification management program is executed by the processor to achieve the above-mentioned order tracking verification management Steps of various embodiments of the method.
需要说明的是,在本文中,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者系统不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者系统所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括该要素的过程、方法、物品或者系统中还存在另外的相同要素。It should be noted that in this article, the terms "include", "include" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or system including a series of elements not only includes those elements, It also includes other elements that are not explicitly listed, or elements inherent to the process, method, article, or system. If there are no more restrictions, the element defined by the sentence "including a..." does not exclude the existence of other identical elements in the process, method, article, or system that includes the element.
上述本申请实施例序号仅仅为了描述,不代表实施例的优劣。The serial numbers of the foregoing embodiments of the present application are for description only, and do not represent the superiority or inferiority of the embodiments.
通过以上的实施方式的描述,本领域的技术人员可以清楚地了解到上述实施例方法可借助软件加必需的通用硬件平台的方式来实现,当然也可以通过硬件,但很多情况下前者是更佳的实施方式。基于这样的理解,本申请的技术方案本质上或者说对现有技术做出贡献的部分可以以软件产品的形式体现出来,该计算机软件产品存储在如上所述的一个存储介质(如ROM/RAM、磁碟、光盘)中,包括若干指令用以使得一台终端设备(可以是手机,计算机,服务器,空调器,或者网络设备等)执行本申请各个实施例所述的方法。Through the description of the above implementation manners, those skilled in the art can clearly understand that the above-mentioned embodiment method can be implemented by means of software plus the necessary general hardware platform, of course, it can also be implemented by hardware, but in many cases the former is better.的实施方式。 Based on this understanding, the technical solution of this application essentially or the part that contributes to the existing technology can be embodied in the form of a software product, and the computer software product is stored in a storage medium (such as ROM/RAM) as described above. , Magnetic disks, optical disks), including several instructions to make a terminal device (which can be a mobile phone, a computer, a server, an air conditioner, or a network device, etc.) execute the method described in each embodiment of the present application.
以上仅为本申请的优选实施例,并非因此限制本申请的专利范围,凡是利用本申请说明书及附图内容所作的等效结构或等效流程变换,或直接或间接运用在其他相关的技术领域,均同理包括在本申请的专利保护范围内。The above are only the preferred embodiments of the application, and do not limit the scope of the patent for this application. Any equivalent structure or equivalent process transformation made using the content of the description and drawings of the application, or directly or indirectly applied to other related technical fields , The same reason is included in the scope of patent protection of this application.

Claims (10)

  1. 一种订单跟踪核销管理的方法,其中,所述订单跟踪核销管理的方法包括以下步骤:An order tracking verification management method, wherein the order tracking verification management method includes the following steps:
    获取销售订单,并将所述销售订单转换成生产订单;Obtain a sales order, and convert the sales order into a production order;
    为所述生产订单制定生产计划,并为所述生产计划建立相应的区块链区块,以基于所述区块链区块更新所述生产计划的执行进度,其中,生产计划的执行进度包括物料的进度信息;Develop a production plan for the production order, and establish a corresponding blockchain block for the production plan to update the execution progress of the production plan based on the blockchain block, where the execution progress of the production plan includes Material progress information;
    检测到所述生产计划已完成时,获取所述生产计划的执行进度,并基于物料核销模块,对所述生产计划中同一物料的用量进行核销。When it is detected that the production plan has been completed, the execution progress of the production plan is obtained, and the usage of the same material in the production plan is written off based on the material verification module.
  2. 如权利要求1所述的订单跟踪核销管理的方法,所述生产计划包含若干个,其中,所述为所述生产计划建立相应的区块链区块的步骤之后,还包括:The method for order tracking and verification management according to claim 1, wherein the production plan includes several, wherein after the step of establishing a corresponding blockchain block for the production plan, the method further comprises:
    基于若干个生产计划的次序,生成各个生产计划匹配的生产行号,并获取所述销售订单的销售订单号;Based on the sequence of several production plans, generate the production line number matching each production plan, and obtain the sales order number of the sales order;
    将所述生产计划匹配的生产行号与所述销售订单号关联,以将若干个生产计划和/或区块链区块关联。The production line number matched by the production plan is associated with the sales order number to associate several production plans and/or blockchain blocks.
  3. 如权利要求1所述的订单跟踪核销管理的方法,其中,所述基于所述区块链区块更新所述生产计划的执行进度的步骤还包括:The method for order tracking and verification management according to claim 1, wherein the step of updating the execution progress of the production plan based on the blockchain block further comprises:
    基于若干个生产计划的次序,依次执行各个生产计划,并基于各个生产计划对应的区块链区块,更新所述生产计划的执行进度。Based on the sequence of several production plans, each production plan is executed in turn, and the execution progress of the production plan is updated based on the blockchain block corresponding to each production plan.
  4. 如权利要求3所述的订单跟踪核销管理的方法,其中,所述生产计划为采购计划,所述物料的进度信息包括采购计划的采购物料种类信息及同一采购物料的数量信息,所述基于若干个生产计划的次序,依次执行各个生产计划,并基于各个生产计划对应的区块链区块,更新所述生产计划的执行进度的步骤包括:The method for order tracking verification and write-off management according to claim 3, wherein the production plan is a purchase plan, the progress information of the material includes the type information of the purchased material in the purchase plan and the quantity information of the same purchased material, and the production plan is based on In the sequence of several production plans, each production plan is executed in turn, and based on the blockchain block corresponding to each production plan, the steps to update the execution progress of the production plan include:
    确定采购订单及采购计划,并基于所述采购订单采购物料;Determine the purchase order and purchase plan, and purchase materials based on the purchase order;
    发起采购订单确认的第一区块链事务,在检测所述第一区块链事务已完成时,基于采购计划对应的区块链区块,更新所述采购计划的状态为采购订单已确认;Initiating the first blockchain transaction for purchase order confirmation, when detecting that the first blockchain transaction has been completed, update the status of the purchase plan to the purchase order confirmed based on the blockchain block corresponding to the purchase plan;
    发起采购物料到货的第二区块链事务,在检测所述第二区块链事务已完成时,基于采购计划对应的区块链区块,更新所述采购计划的状态为物料已到货;Initiate a second blockchain transaction for the arrival of purchased materials. When detecting that the second blockchain transaction has been completed, update the status of the purchase plan as the material arrived based on the blockchain block corresponding to the purchase plan ;
    发起采购物料入库的第三区块链事务,在检测所述第三区块链事务已完成时,基于采购计划对应的区块链区块,更新所述采购计划的状态为物料已入库。Initiate the third blockchain transaction of purchasing materials into the warehouse. When detecting that the third blockchain transaction has been completed, update the status of the purchasing plan as the materials in the warehouse based on the blockchain block corresponding to the purchasing plan .
  5. 如权利要求3所述的订单跟踪核销管理的方法,其中,所述生产计划为外协计划,所述物料的进度信息包括外协计划的物料外发种类信息及同一外发物料的数量信息,所述基于若干个生产计划的次序,依次执行各个生产计划,并基于各个生产计划对应的区块链区块,更新所述生产计划的执行进度的步骤包括:The method for order tracking verification and write-off management according to claim 3, wherein the production plan is an outsourcing plan, and the progress information of the material includes the outgoing type information of the outsourcing plan and the quantity information of the same outgoing material The steps of executing each production plan in sequence based on the sequence of several production plans, and updating the execution progress of the production plan based on the corresponding blockchain block of each production plan include:
    确定外协计划,并发起外协计划的第四区块链事务,其中,所述第四区块链事务包括物料外发子事务、物料到货子事务及物流入库子事务;Determine the outsourcing plan and initiate the fourth block chain transaction of the outsourcing plan, where the fourth block chain transaction includes the sub-transaction of material outsourcing, the sub-transaction of material arrival, and the sub-transaction of logistics warehousing;
    在检测到所述物料外发子事务已完成时,基于外协计划对应的区块链区块,更新所述外协计划的状态为物料已外发;When it is detected that the material outsourcing sub-transaction has been completed, based on the blockchain block corresponding to the outsourcing plan, update the status of the outsourcing plan to the outgoing material;
    在检测到所述物料到货子事务已完成时,基于外协计划对应的区块链区块,更新所述外协计划的状态为物料已到货;When it is detected that the material arrival sub-transaction has been completed, based on the blockchain block corresponding to the outsourcing plan, update the status of the outsourcing plan as the material has arrived;
    在检测到所述物流入库子事务已完成时,基于外协计划对应的区块链区块,更新所述外协计划的状态为物料已入库。When it is detected that the logistics warehousing sub-transaction has been completed, based on the blockchain block corresponding to the outsourcing plan, the status of the outsourcing plan is updated as the material has been put into storage.
  6. 如权利要求3所述的订单跟踪核销管理的方法,其中,所述生产计划为客供物料计划,所述物料的进度信息包括客供物料计划的生产工单中的物料种类信息及同一物料的数量信息,所述基于若干个生产计划的次序,依次执行各个生产计划,并基于各个生产计划对应的区块链区块,更新所述生产计划的执行进度的步骤包括:The method for order tracking and write-off management according to claim 3, wherein the production plan is a customer-supplied material plan, and the progress information of the material includes the material type information and the same material in the production work order of the customer-supplied material plan According to the sequence of several production plans, the steps of executing each production plan in turn, and updating the execution progress of the production plan based on the corresponding blockchain block of each production plan include:
    确定客供计划,并根据客供计划确定待发放的生产工单;Determine the customer supply plan, and determine the production work orders to be issued according to the customer supply plan;
    发起发放生产工单的第五区块链事务,在检测所述第五区块链事务已完成时,基于客供物料计划对应的区块链区块,更新所述客供物料计划的状态为生产工单已发放。The fifth blockchain transaction that initiates the issuance of the production work order, when detecting that the fifth blockchain transaction has been completed, based on the blockchain block corresponding to the guest-supplied material plan, the status of the guest-supplied material plan is updated as The production order has been issued.
  7. 如权利要求3所述的订单跟踪核销管理的方法,其中,所述生产计划为库存领用计划,所述物料的进度信息包括库存领用计划的已领取的物料种类信息及同一物料的数量信息,所述基于若干个生产计划的次序,依次执行各个生产计划,并基于各个生产计划对应的区块链区块,更新所述生产计划的执行进度的步骤包括:The method for order tracking verification and write-off management according to claim 3, wherein the production plan is an inventory requisition plan, and the progress information of the material includes the information of the received material type and the quantity of the same material in the inventory requisition plan. According to the information, the steps of executing each production plan in sequence based on the sequence of a number of production plans, and updating the execution progress of the production plan based on the block chain block corresponding to each production plan includes:
    确定库存领用计划,并根据库存领用计划确定待领取的物料;Determine the inventory requisition plan, and determine the materials to be received according to the inventory requisition plan;
    发起领取物料的第六区块链事务,在检测所述第六区块链事务已完成时,基于库存领用计划对应的区块链区块,更新所述库存领用计划的状态为物料已领取。Initiate the sixth blockchain transaction to receive materials. When detecting that the sixth blockchain transaction has been completed, update the status of the inventory requisition plan to the material completed based on the blockchain block corresponding to the inventory requisition plan receive.
  8. 如权利要求1至7任一项所述的订单跟踪核销管理的方法,其中,所述获取生产计划的执行进度,并基于物料核销模块,对所述生产计划中同一物料的用量进行核销的步骤包括:The method for order tracking verification and write-off management according to any one of claims 1 to 7, wherein said obtaining the execution progress of the production plan, and verifying the amount of the same material in the production plan based on the material verification module The steps to sell include:
    基于生产计划的物料的进度信息,获取生产计划中同一物料的缺失量;Based on the progress information of the material in the production plan, obtain the missing quantity of the same material in the production plan;
    若同一物料的缺失量大于预设值,则基于物料核销模块,对生产计划中同一物料的用量进行核销。If the missing quantity of the same material is greater than the preset value, the consumption of the same material in the production plan will be written off based on the material write-off module.
  9. 一种订单跟踪核销管理系统,其中,所述订单跟踪核销管理系统包括:An order tracking verification management system, wherein the order tracking verification management system includes:
    生产订单生成模块,用于获取销售订单,并将所述销售订单转换成生产订单;The production order generation module is used to obtain a sales order and convert the sales order into a production order;
    生产计划制定模块,用于为所述生产订单制定生产计划,并为所述生产计划建立相应的区块链区块,以基于所述区块链区块更新所述生产计划的执行进度,其中,执行进度包括物料的进度信息;The production plan formulation module is used to formulate a production plan for the production order and establish a corresponding block chain block for the production plan to update the execution progress of the production plan based on the block chain block, wherein , The execution progress includes the progress information of the material;
    物料核销模块,用于检测到所述生产计划已完成时,基于物料核销模块,对所述生产计划中同一物料的用量进行核销,并将核销结果发送至区块链存储。The material verification module is used to verify the usage of the same material in the production plan based on the material verification module when it is detected that the production plan has been completed, and send the verification result to the blockchain storage.
  10. 一种存储介质,其中,所述存储介质上存储有订单跟踪核销管理程序,所述订单跟踪核销管理程序被处理器执行时实现如权利要求1至8中任一项所述的订单跟踪核销管理的方法的步骤。A storage medium, wherein an order tracking verification management program is stored on the storage medium, and the order tracking verification management program is executed by a processor to realize the order tracking according to any one of claims 1 to 8. Steps of the method of write-off management.
PCT/CN2021/084128 2020-03-31 2021-03-30 Management method and system for tracking and verifying order, and storage medium WO2021197351A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202010249081.4A CN111461914A (en) 2020-03-31 2020-03-31 Order tracking verification and cancellation management method, system and storage medium
CN202010249081.4 2020-03-31

Publications (1)

Publication Number Publication Date
WO2021197351A1 true WO2021197351A1 (en) 2021-10-07

Family

ID=71679496

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2021/084128 WO2021197351A1 (en) 2020-03-31 2021-03-30 Management method and system for tracking and verifying order, and storage medium

Country Status (2)

Country Link
CN (1) CN111461914A (en)
WO (1) WO2021197351A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115081953A (en) * 2022-07-30 2022-09-20 南京维拓科技股份有限公司 Purchasing method according to production beat
US20230012566A1 (en) * 2021-07-13 2023-01-19 Dell Products L.P. Supply chain management using blockchain and machine learning functionalities
CN116151772A (en) * 2023-04-17 2023-05-23 山东恒远智能科技有限公司 Method and system for managing complete materials of equipment manufacturing enterprises

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111461914A (en) * 2020-03-31 2020-07-28 深圳点链科技有限公司 Order tracking verification and cancellation management method, system and storage medium
CN111931212B (en) * 2020-08-20 2021-09-10 合肥趣星文化传媒有限公司 E-commerce platform based on block chain technology
CN112418679A (en) * 2020-11-25 2021-02-26 上海艾康特医疗科技有限公司 Order production management system for contact lenses

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101706912A (en) * 2009-11-23 2010-05-12 浪潮集团山东通用软件有限公司 Sales order BOM-based method for tracking material and calculating material requirements
CN106529871A (en) * 2016-10-28 2017-03-22 上海福赛特机器人有限公司 Intelligent manufacturing method and system
CN109492880A (en) * 2018-10-18 2019-03-19 平安科技(深圳)有限公司 Roduction track method and terminal device based on block chain technology
CN110009180A (en) * 2019-01-23 2019-07-12 曲阜师范大学 A kind of block chain JIT production management method
CN110458484A (en) * 2018-10-11 2019-11-15 广州德亚机械制造有限公司 Systematic management system
CN110782139A (en) * 2019-10-10 2020-02-11 深圳点链科技有限公司 Daily yield daily clearing accounting method, device, equipment and storage medium based on block chain
CN111461914A (en) * 2020-03-31 2020-07-28 深圳点链科技有限公司 Order tracking verification and cancellation management method, system and storage medium

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108197718A (en) * 2018-01-18 2018-06-22 北京晒呗科技有限公司 A kind of Internet of Things equipment operation system and method based on block chain
CN110502920A (en) * 2019-07-16 2019-11-26 深圳拓谱信息技术有限公司 Production task based on block chain executes method, apparatus and equipment

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101706912A (en) * 2009-11-23 2010-05-12 浪潮集团山东通用软件有限公司 Sales order BOM-based method for tracking material and calculating material requirements
CN106529871A (en) * 2016-10-28 2017-03-22 上海福赛特机器人有限公司 Intelligent manufacturing method and system
CN110458484A (en) * 2018-10-11 2019-11-15 广州德亚机械制造有限公司 Systematic management system
CN109492880A (en) * 2018-10-18 2019-03-19 平安科技(深圳)有限公司 Roduction track method and terminal device based on block chain technology
CN110009180A (en) * 2019-01-23 2019-07-12 曲阜师范大学 A kind of block chain JIT production management method
CN110782139A (en) * 2019-10-10 2020-02-11 深圳点链科技有限公司 Daily yield daily clearing accounting method, device, equipment and storage medium based on block chain
CN111461914A (en) * 2020-03-31 2020-07-28 深圳点链科技有限公司 Order tracking verification and cancellation management method, system and storage medium

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20230012566A1 (en) * 2021-07-13 2023-01-19 Dell Products L.P. Supply chain management using blockchain and machine learning functionalities
CN115081953A (en) * 2022-07-30 2022-09-20 南京维拓科技股份有限公司 Purchasing method according to production beat
CN116151772A (en) * 2023-04-17 2023-05-23 山东恒远智能科技有限公司 Method and system for managing complete materials of equipment manufacturing enterprises

Also Published As

Publication number Publication date
CN111461914A (en) 2020-07-28

Similar Documents

Publication Publication Date Title
WO2021197351A1 (en) Management method and system for tracking and verifying order, and storage medium
JP2023038353A (en) System and method for managing and optimizing delivery networks
WO2019051822A1 (en) Resource transaction method, node, apparatus, and storage medium
US20150178739A1 (en) Systems and methods for passively determining a ratio of purchasers and prosepective purchasers in a merchant location
US20200134693A1 (en) Method, device and equipment for recommending product, and computer readable storage medium
US20200082298A1 (en) Server device configurations based on machine learning
WO2021155774A1 (en) Blockchain-based collaboration platform, method and device, and readable storage medium
US20200019932A1 (en) Touchless supplier information management
WO2021068591A1 (en) Blockchain-based daily production and daily clearing accounting method, apparatus and device, and storage medium
WO2013192443A1 (en) Intelligent consumer service terminal apparatuses, methods and systems
WO2021155772A1 (en) Production, supply and marketing linkage platform, method and system and computer storage medium
CN111028000B (en) Commodity sales promotion method, device, equipment and storage medium
WO2021208713A1 (en) Ex-warehouse control method, device and system
US11017464B1 (en) Detecting account takeover fraud from digital transactional data
JP2004178190A (en) Ordering/order receiving system, program and recording medium
WO2021208712A1 (en) Method and device for processing appliance demand information
KR102483828B1 (en) Method for auto-matically selling products and server performing the same
US10783533B2 (en) System for identification and resolution of opportunity triggers
US20210248550A1 (en) Mobile storefront control systems and methods
JP2014139760A (en) Electronic apparatus, server and purchased item management system
KR20220006330A (en) System for Delivering Mobile Phone for Performing Simultaneously Purchasing and Marketing Online
JP2021096866A (en) Electronic apparatus and operation method thereof
US11710170B2 (en) Method of providing sale-related information and electronic device using the same
KR102663672B1 (en) Method of providing sale-related information and electronic device using the same
US20180121862A1 (en) Vehicle service management system

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21781916

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21781916

Country of ref document: EP

Kind code of ref document: A1