WO2021168963A1 - Novel boom installation method for luffing jib tower crane - Google Patents

Novel boom installation method for luffing jib tower crane Download PDF

Info

Publication number
WO2021168963A1
WO2021168963A1 PCT/CN2020/081521 CN2020081521W WO2021168963A1 WO 2021168963 A1 WO2021168963 A1 WO 2021168963A1 CN 2020081521 W CN2020081521 W CN 2020081521W WO 2021168963 A1 WO2021168963 A1 WO 2021168963A1
Authority
WO
WIPO (PCT)
Prior art keywords
boom
wire rope
pull rod
tower
luffing
Prior art date
Application number
PCT/CN2020/081521
Other languages
French (fr)
Chinese (zh)
Inventor
王建军
米成宏
衣磊
刘振
郑怀鹏
李海峰
Original Assignee
徐州建机工程机械有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 徐州建机工程机械有限公司 filed Critical 徐州建机工程机械有限公司
Publication of WO2021168963A1 publication Critical patent/WO2021168963A1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/64Jibs
    • B66C23/68Jibs foldable or otherwise adjustable in configuration
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/84Slewing gear

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

A boom installation method for a luffing jib tower crane. For a luffing jib tower crane, after the installation of a rotating platform (1), a counterweight (2), a tower top (3), and a luffing mechanism (4) is completed, a boom (5) is installed. The installation steps of the boom (5) comprise: reeving a luffing wire rope (6); installing the boom (5) and a hoist rope (7); and installing a boom pull rod pulley block (8).

Description

一种动臂塔机的新型起重臂安装方式A New Type of Boom Installation Method for Boom Tower Crane 技术领域Technical field
本发明涉及一种动臂塔机的新型起重臂安装方式,属于动臂塔机技术领域。The invention relates to a new type of boom installation method of a boom tower crane, and belongs to the technical field of boom tower cranes.
背景技术Background technique
超高层建筑用动臂塔机安装的安全性和快捷性一直是行业和客户关注的问题。动臂塔机按照要求完成转台、配重、塔顶及机构之后,方可进行起重臂安装、穿绕变幅钢丝绳等。对于超高层建筑用动臂塔机的安装,目前无论是国内还是国外大多采用传统的安装方法,传统的方法是先使用汽车起重机将起重臂安装在转台上;其次使用起升机构和辅助麻绳将变幅钢丝绳穿绕完成后,汽车起重机即可慢慢松放吊钩,直到起重臂变幅钢丝绳受力为止;再而将起升机构钢丝绳穿绕起重臂固定滑轮组后,一端垂到地面,在地面将起升钢丝绳缠绕过吊钩滑轮,然后将钢丝绳绳套和防扭机构连接好,最后用辅助吊车提起绳头至起重臂臂头处,将防扭机构和臂头连接处连接好,然后收起升钢丝绳。此方法需在高空穿绕起升钢丝绳,安全性低,安装效率低,耗时长。The safety and speed of the installation of boom tower cranes for super high-rise buildings have always been the concern of the industry and customers. After the boom tower crane completes the turntable, counterweight, tower top and mechanism according to the requirements, the boom installation and the winding of the luffing wire rope can be carried out. For the installation of boom tower cranes for super high-rise buildings, most of the traditional installation methods are currently used both at home and abroad. The traditional method is to first install the boom on the turntable using a truck crane; secondly, use the lifting mechanism and auxiliary hemp After the rope is wound around the luffing wire rope, the truck crane can slowly release the hook until the boom luffing wire rope is stressed; then the hoisting mechanism wire rope is threaded around the jib fixed pulley block, and one end hangs down. Go to the ground, wind the hoisting wire rope over the hook pulley on the ground, then connect the wire rope sleeve to the anti-torsion mechanism, and finally use the auxiliary crane to lift the rope to the head of the boom, and connect the anti-torsion mechanism to the arm head Connect the wires, and then put away the hoisting wire rope. This method requires winding and hoisting steel wire ropes at high altitude, which has low safety, low installation efficiency and long time-consuming.
发明内容Summary of the invention
为了克服上述现有技术的不足之处,本发明提供一种动臂塔机的新型起重臂安装方式,既能降低安全风险,减少高空操作,又能便捷的穿绕钢丝绳等,安装效率高,安全可靠,大大的节约了时间成本。In order to overcome the above-mentioned shortcomings of the prior art, the present invention provides a new type of installation method for the boom of a boom tower crane, which can reduce safety risks, reduce high-altitude operations, and can easily pass through the steel wire rope, etc., with high installation efficiency , Safe and reliable, greatly saving time and cost.
本发明是通过如下技术方案实现的:一种动臂塔机的新型起重臂安装方式,动臂塔机完成回转平台、配重、塔顶及变幅机构安装之后进行起重臂安装,其特征在于:起重臂的安装步骤为:The present invention is realized through the following technical solutions: a new type of boom installation method for the boom tower crane, the boom is installed after the boom tower crane completes the installation of the slewing platform, counterweight, tower top and luffing mechanism, and The feature is that the installation steps of the boom are:
步骤1:进行变幅钢丝绳的穿绕;Step 1: Thread the luffing wire rope;
步骤2:安装起重臂和起升钢丝绳;Step 2: Install the boom and hoisting wire rope;
步骤3:安装起重臂拉杆滑轮组。Step 3: Install the pulley block of the boom pull rod.
所述的步骤1:先使用起升机构和辅助麻绳将变幅钢丝绳与塔顶顶端滑轮组及起重臂拉杆滑轮组进行穿绕,再将起重臂拉杆滑轮组固定在塔顶上。Said step 1: first use the lifting mechanism and auxiliary hemp rope to thread the luffing wire rope with the pulley block on the top of the tower and the pulley block of the boom pull rod, and then fix the pulley block of the boom pull rod on the top of the tower.
所述的步骤2:在完成起重臂结构件拼装之后,再将起重臂拉杆组装起 来,将起重臂拉杆的销轴连接端与起重臂的顶节销轴连接好,并将起重臂拉杆放置于起重臂的拉杆支架中锁好;Said step 2: After the assembling of the boom structure is completed, the boom pull rod is assembled, the pin connecting end of the boom pull rod is connected with the top section pin of the boom, and the lift The pull rod of the boom is placed in the pull rod bracket of the boom and locked;
启动起升机构起升卷扬,将卷扬输出的起升钢丝绳至地面足够长度,关闭起升卷扬,然后将起升钢丝绳按照起升钢丝绳缠绕图沿起重臂穿过滑轮,按照要求穿绕吊钩,固定好绳端和各处绳挡;Start the hoisting mechanism to hoist the hoist, bring the hoisting wire rope output by the hoist to the ground enough length, turn off the hoisting hoist, and then pass the hoisting wire rope through the pulley along the crane arm according to the hoisting wire rope winding diagram, and wear it as required Around the hook, fix the rope end and various rope stops;
组装完毕后,用汽车起重机缓缓吊起起重臂,起重臂整体倾斜20o左右,将起重臂臂根部与塔机上回转平台用销轴连接,并用安全销锁定。After assembling, use a truck crane to slowly hoist the jib, tilt the jib as a whole about 20o, connect the root of the jib and the slewing platform on the tower crane with a pin, and lock it with a safety pin.
所述的步骤3:在汽车起重机将起重臂安装在回转平台后,使用辅助机构或辅助起重机将起重臂拉杆滑轮组从塔顶移动安装在起重臂拉杆上,慢慢的将汽车起重机松放,变幅机构协同工作,直至起重臂拉杆与变幅钢丝绳完全受力后,完成起重臂的安装。Said step 3: After the truck crane installs the boom on the slewing platform, use an auxiliary mechanism or auxiliary crane to move the boom pull rod pulley block from the top of the tower and install it on the boom pull rod, and slowly loosen the truck crane Release and luffing mechanism work together until the boom pull rod and luffing wire rope are fully stressed, then the installation of the boom is completed.
本发明的有益效果是:1)安全性高,起升钢丝绳穿绕及绳端固定臂头过程,完全在地面完成,避免了在高度利用辅助起重机拖拽、安装人员来回走动等高危工作;2)安装效率高,起升钢丝绳穿绕过程完全在地面完成,相比高空作业,大大节约时间,利用辅助机构安装起重臂拉杆滑轮组,安装快速,节约成本;3)人性化设计高,大大减少了高空作业工作及工作时间,人性化高。The beneficial effects of the present invention are: 1) high safety, the process of hoisting wire rope threading and rope end fixing the boom head is completely completed on the ground, avoiding high-risk work such as dragging by the auxiliary crane at a height and the installation personnel walking back and forth; 2 ) The installation efficiency is high. The winding process of the hoisting wire rope is completely completed on the ground. Compared with high-altitude operations, it saves time greatly. The auxiliary mechanism is used to install the boom pull rod pulley block, which is quick to install and saves costs; 3) High humanized design, greatly reducing The work and working hours at height are improved, and the humanity is high.
附图说明Description of the drawings
下面根据附图和实施例对本发明进一步说明。The present invention will be further described below based on the drawings and embodiments.
图1是本发明的步骤1变幅钢丝绳穿绕后的结构示意图;Figure 1 is a schematic diagram of the structure of the luffing steel wire rope in step 1 of the present invention after being wound;
图2是本发明的步骤2起重臂整体安装示意图;Figure 2 is a schematic diagram of the overall installation of the boom in step 2 of the present invention;
图3是本发明的步骤3辅助机构连接起重臂拉杆滑轮组示意图;Figure 3 is a schematic diagram of the step 3 of the present invention connecting the auxiliary mechanism to the pulley block of the boom pull rod;
图4是本发明的步骤3辅助机构牵引拉杆滑轮组与拉杆连接示意图;4 is a schematic diagram of the connection between the pull rod pulley block of the auxiliary mechanism traction rod and the rod in step 3 of the present invention;
图5是本发明的安装完成结构示意图。Figure 5 is a schematic diagram of the completed installation structure of the present invention.
图中:1、回转平台,2、配重,3、塔顶,4、变幅机构,5、起重臂,6、变幅钢丝绳,7、起升钢丝绳,8、起重臂拉杆滑轮组,9、起升机构,10、塔顶顶端滑轮组,11、起重臂拉杆,12、辅助机构。In the picture: 1. Slewing platform, 2. Counterweight, 3. Tower top, 4. Luffing mechanism, 5. Lifting boom, 6. Luffing wire rope, 7. Lifting wire rope, 8. Lifting arm pull rod pulley block, 9. Lifting mechanism, 10. Pulley group at the top of the tower, 11. Lifting arm rod, 12. Auxiliary mechanism.
具体实施方式Detailed ways
如图1到图5所示的一种动臂塔机的新型起重臂安装方式,动臂塔机完成回转平台1、配重2、塔顶3及变幅机构4安装之后进行起重臂5安装,其特征在于:起重臂5的安装步骤为:Figure 1 to Figure 5 shows a new type of boom installation method for the boom tower crane. After the boom tower crane has completed the installation of the slewing platform 1, the counterweight 2, the tower top 3 and the luffing mechanism 4, the boom is installed 5 installation, characterized in that: the installation steps of the boom 5 are:
步骤1:进行变幅钢丝绳6的穿绕;Step 1: Thread the luffing wire rope 6;
步骤2:安装起重臂5和起升钢丝绳7;Step 2: Install the boom 5 and the hoisting wire rope 7;
步骤3:安装起重臂拉杆滑轮组8。Step 3: Install the pulley block 8 of the boom pull rod.
所述的步骤1:先使用起升机构9和辅助麻绳将变幅钢丝绳6与塔顶顶端滑轮组10及起重臂拉杆滑轮组8进行穿绕,再将起重臂拉杆滑轮组8固定在塔顶3上。Said step 1: First use the lifting mechanism 9 and the auxiliary hemp rope to thread the luffing wire rope 6 with the top pulley block 10 and the boom pull rod pulley block 8 on the top of the tower, and then fix the boom pull rod pulley block 8 on the top of the tower 3 on.
所述的步骤2:在完成起重臂5结构件拼装之后,再将起重臂拉杆11组装起来,将起重臂拉杆11的销轴连接端与起重臂5的顶节销轴连接好,并将起重臂拉杆11放置于起重臂5的拉杆支架中锁好;Said step 2: After the assembling of the structural parts of the boom 5 is completed, the boom tie rod 11 is assembled, and the pin connecting end of the boom tie rod 11 is connected with the top section pin of the boom 5 , And place the boom tie rod 11 in the tie rod bracket of the boom 5 and lock it;
启动起升机构9起升卷扬,将卷扬输出的起升钢丝绳7至地面足够长度,关闭起升卷扬,然后将起升钢丝绳7按照起升钢丝绳缠绕图沿起重臂5穿过滑轮,按照要求穿绕吊钩,固定好绳端和各处绳挡;Start the hoisting mechanism 9 to hoist the hoist, bring the hoisting wire rope 7 output by the hoisting to the ground enough length, turn off the hoisting hoist, and then pass the hoisting wire rope 7 along the hoisting arm 5 through the pulley according to the hoisting wire rope winding diagram , Thread the hooks as required, and fix the rope ends and various rope stops;
组装完毕后,用汽车起重机缓缓吊起起重臂5,起重臂5整体倾斜20o左右,将起重臂5臂根部与塔机上回转平台1用销轴连接,并用安全销锁定。After assembling, use a truck crane to slowly hoist the boom 5, the boom 5 is tilted about 20o as a whole, and the boom root of the boom 5 is connected with the slewing platform 1 of the tower crane with a pin shaft and locked with a safety pin.
所述的步骤3:在汽车起重机将起重臂5安装在回转平台1后,使用辅助机构12或辅助起重机将起重臂拉杆滑轮组8从塔顶3移动安装在起重臂拉杆11上,慢慢的将汽车起重机松放,变幅机构4协同工作,直至起重臂拉杆11与变幅钢丝绳6完全受力后,完成起重臂5的安装。Said step 3: After the truck crane installs the boom 5 on the slewing platform 1, use the auxiliary mechanism 12 or auxiliary crane to move the boom pull rod pulley block 8 from the tower top 3 and install it on the boom pull rod 11. Slowly release the truck crane, and the luffing mechanism 4 works in cooperation until the boom pull rod 11 and the luffing wire rope 6 are fully stressed, and the installation of the boom 5 is completed.

Claims (4)

  1. 一种动臂塔机的新型起重臂安装方式,动臂塔机完成回转平台(1)、配重(2)、塔顶(3)及变幅机构(4)安装之后进行起重臂(5)安装,其特征在于:起重臂(5)的安装步骤为:A new type of boom installation method for the boom tower crane. The boom tower crane is installed after the slewing platform (1), counterweight (2), tower top (3) and luffing mechanism (4) are installed. 5) Installation, characterized in that: the installation steps of the boom (5) are:
    步骤1:进行变幅钢丝绳(6)的穿绕;Step 1: Thread the luffing wire rope (6);
    步骤2:安装起重臂(5)和起升钢丝绳(7);Step 2: Install the boom (5) and the hoisting wire rope (7);
    步骤3:安装起重臂拉杆滑轮组(8)。Step 3: Install the pulley block (8) of the boom pull rod.
  2. 根据权利要求1所述的一种动臂塔机的新型起重臂安装方式,其特征在于,所述的步骤1:先使用起升机构(9)和辅助麻绳将变幅钢丝绳(6)与塔顶顶端滑轮组(10)及起重臂拉杆滑轮组(8)进行穿绕,再将起重臂拉杆滑轮组(8)固定在塔顶(3)上。A new type of boom installation method for a boom tower crane according to claim 1, characterized in that, the step 1: first use a lifting mechanism (9) and an auxiliary hemp rope to connect the luffing wire rope (6) It is threaded with the pulley block (10) at the top of the tower and the pulley block (8) of the boom pull rod, and then the pulley block (8) of the boom pull rod is fixed on the top of the tower (3).
  3. 根据权利要求1所述的一种动臂塔机的新型起重臂安装方式,其特征在于,所述的步骤2:在完成起重臂(5)结构件拼装之后,再将起重臂拉杆(11)组装起来,将起重臂拉杆(11)的销轴连接端与起重臂(5)的顶节销轴连接好,并将起重臂拉杆(11)放置于起重臂(5)的拉杆支架中锁好;A new type of boom installation method for a boom tower crane according to claim 1, characterized in that, the step 2: after the completion of the assembling of the boom (5) structural parts, then the boom pull rod (11) Assemble, connect the pin connecting end of the boom tie rod (11) with the top section pin of the boom (5), and place the boom tie rod (11) on the boom (5) ) Is locked in the lever bracket;
    启动起升机构(9)起升卷扬,将卷扬输出的起升钢丝绳(7)至地面足够长度,关闭起升卷扬,然后将起升钢丝绳(7)按照起升钢丝绳缠绕图沿起重臂(5)穿过滑轮,按照要求穿绕吊钩,固定好绳端和各处绳挡;Start the hoisting mechanism (9) to hoist the hoist, bring the hoisting wire rope (7) output by the hoist to the ground enough length, turn off the hoisting hoist, and then lift the hoisting wire rope (7) according to the hoisting wire rope winding diagram The heavy arm (5) passes through the pulleys, passes through the hooks as required, and fixes the rope ends and various rope stops;
    组装完毕后,用汽车起重机缓缓吊起起重臂(5),起重臂(5)整体倾斜20°左右,将起重臂(5)臂根部与塔机上回转平台(1)用销轴连接,并用安全销锁定。After assembling, use a truck crane to slowly hoist the boom (5). The boom (5) is tilted about 20° as a whole, and the boom root (5) is connected to the slewing platform (1) of the tower crane with a pin. Connect and lock with safety pin.
  4. 根据权利要求1所述的一种动臂塔机的新型起重臂安装方式,其特征在于,所述的步骤3:在汽车起重机将起重臂(5)安装在回转平台(1)后,使用辅助机构(12)或辅助起重机将起重臂拉杆滑轮组(8)从塔顶(3)移动安装在起重臂拉杆(11)上,慢慢的将汽车起重机松放,变幅机构(4)协同工作,直至起重臂拉杆(11)与变幅钢丝绳(6)完全受力后,完成起重臂(5)的安装。A new type of boom installation method for a boom tower crane according to claim 1, wherein the step 3: after the truck crane installs the boom (5) on the slewing platform (1), Use the auxiliary mechanism (12) or auxiliary crane to move the boom pull rod pulley block (8) from the top of the tower (3) and install it on the boom pull rod (11), slowly loosen the truck crane, and the luffing mechanism (4) ) Work together until the boom pull rod (11) and the luffing wire rope (6) are fully stressed, and then the installation of the boom (5) is completed.
PCT/CN2020/081521 2020-02-27 2020-03-27 Novel boom installation method for luffing jib tower crane WO2021168963A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202010123155.X 2020-02-27
CN202010123155.XA CN111186779A (en) 2020-02-27 2020-02-27 Novel crane boom mounting mode of movable arm tower crane

Publications (1)

Publication Number Publication Date
WO2021168963A1 true WO2021168963A1 (en) 2021-09-02

Family

ID=70704819

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2020/081521 WO2021168963A1 (en) 2020-02-27 2020-03-27 Novel boom installation method for luffing jib tower crane

Country Status (2)

Country Link
CN (1) CN111186779A (en)
WO (1) WO2021168963A1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2858608Y (en) * 2006-01-06 2007-01-17 广东省建筑机械厂 Folding dual-horizontal-arm self-rising crane
US20100044332A1 (en) * 2008-08-22 2010-02-25 Cameron John F Monitoring crane component overstress
CN202643173U (en) * 2012-06-18 2013-01-02 山东永力重工科技发展有限公司 Movable arm type crane with detachable hoisting arm
CN109809310A (en) * 2018-12-24 2019-05-28 科曼萨建设机械(杭州)有限公司 A kind of movable arm tower crane pull rod and its installation method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102992206B (en) * 2012-12-20 2015-04-22 中联重科股份有限公司 Mounting method for variable-amplitude pull rod of tower crane
DE102013011489B4 (en) * 2013-07-09 2021-09-16 Liebherr-Werk Ehingen Gmbh Tower crane
CN103991800A (en) * 2014-05-05 2014-08-20 泰兴市第一建筑安装工程有限公司 Roof surface crane for building
CN106553968A (en) * 2016-11-10 2017-04-05 四川宇盛智创科技有限公司 It is a kind of can on-load luffing lifting arm elevator apparatus

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2858608Y (en) * 2006-01-06 2007-01-17 广东省建筑机械厂 Folding dual-horizontal-arm self-rising crane
US20100044332A1 (en) * 2008-08-22 2010-02-25 Cameron John F Monitoring crane component overstress
CN202643173U (en) * 2012-06-18 2013-01-02 山东永力重工科技发展有限公司 Movable arm type crane with detachable hoisting arm
CN109809310A (en) * 2018-12-24 2019-05-28 科曼萨建设机械(杭州)有限公司 A kind of movable arm tower crane pull rod and its installation method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
HOU YI-DONG, CHENG-HONG MI, LEI WANG: "New installation method of derrick tower crane boom module", CONSTRUCTION MECHANIZATION, 15 April 2014 (2014-04-15), pages 52 - 63, XP055840264, ISSN: 1001-1366, DOI: 10.13311/j.cnki.conmec.2014.04.015 *

Also Published As

Publication number Publication date
CN111186779A (en) 2020-05-22

Similar Documents

Publication Publication Date Title
CN100519396C (en) Gin pole integrated dismounting method for tower crane
CN101734560B (en) High-altitude dismantling method of inside-climbing tower crane for towering structure construction
CN2858608Y (en) Folding dual-horizontal-arm self-rising crane
CN111021749A (en) Simple hoisting mechanism for bare concrete exterior wall cladding and construction method thereof
WO2021168963A1 (en) Novel boom installation method for luffing jib tower crane
CN114180456A (en) Hoisting posture adjusting method for giant laterally inclined truss structure
CN107720569B (en) A kind of dismounting inner climbing crane tower is hung with masts type roofing
CN111422759B (en) Method for dismantling tower crane in narrow space
CN209194361U (en) A kind of fixed structure of suspension cable bridge section lifting hoisting platform
CN109279519B (en) Method for replacing steel wire rope of tower crane hoisting mechanism
CN218371219U (en) PCCP pipeline handling frock
CN217555687U (en) Hoisting accessory is changed to cladding material workshop electric block part
CN107337105A (en) Gantry crane with maintenance channel
CN207243306U (en) Tower crane two sides jacks stock
CN110294427A (en) A kind of method of large size derrick crane more change owner hoisting system wirerope
CN202529744U (en) Structure of auxiliary hoist of fixed mast and crawler crane equipped with structure
CN202744226U (en) Hoisting tri-magnification rope winding olecranon-shaped arm head of moving arm tower crane
CN205590168U (en) Overturning lifting device
CN212687327U (en) Lifting device for coal mine maintenance equipment
CN211691536U (en) Simple lifting mechanism for bare concrete exterior wall cladding
CN220283436U (en) Hoisting mechanism, wind power device thereof and full-automatic tower crane
CN212076223U (en) Pull rod hoist system convenient to dismantle
CN107445077A (en) Jib length combined technical method is converted in the air from liter arm tower crane
CN112811329B (en) Crane auxiliary arm mounting method and crane
CN204416914U (en) The hook assembly of high pedestal jib crane

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20921265

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20921265

Country of ref document: EP

Kind code of ref document: A1