Prior art keywords
anchor
anchor structure
building
sliding
elements
Prior art date
Application number
PCT/EP2020/065078
Other languages
German (de)
French (fr)
Inventor
Max BRÜNINGHOLD
Niculin Meng
Original Assignee
Mageba S.A.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mageba S.A. filed Critical Mageba S.A.
Priority to EP20733900.3A priority Critical patent/EP3980600B1/en
Publication of WO2020245065A1 publication Critical patent/WO2020245065A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/04Bearings; Hinges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/04Bearings; Hinges
    • E01D19/042Mechanical bearings

Definitions

  • the present invention relates to a building, comprising a first building part, a second building part movable relative to this, and at least two between the two
  • Structural bearings are suitable for transferring vertical loads and a second structural bearing is designed as a horizontal force bearing that is unsuitable for transferring vertical loads and is one-axis or two-axis fixed in the horizontal direction.
  • the first structural part can be used as an abutment (and thus as part of the substructure of the bridge), the second structural part can
  • horizontal force bearings are to be understood as guide bearings and retaining structures.
  • a guide bearing is therefore defined as "a bearing that offers resistance only in one horizontal direction, allows twisting and does not transmit any vertical forces". Only such guide bearings in the above sense are a horizontal one
  • a retaining structure which is defined as a bearing, which "prevents movements in the horizontal plane, allows twisting and does not transmit any vertical forces" corresponds to the above-mentioned horizontal force bearing that is unsuitable for the transmission of vertical loads and is biaxially fixed in the horizontal direction.
  • DIN EN 1337-8: 2008-01 (D) discloses several typical uniaxial horizontal force bearings (guide bearings), as they are in a structure of the initially described type can be used.
  • One of the guide bearings described in DIN EN 1337-8: 2008-01 (D) Figure 1 comprises two anchor structures, whereby these are typically firmly connected to one of the two structural parts by means of suitable fastening means. The two
  • Anchor structures interlock in a kind of tongue and groove configuration in such a way that movements along a horizontal axis are enabled, but are prevented in the second horizontal axis perpendicular to this.
  • the two anchor structures are not in direct contact with one another, but rather via sliding elements arranged between the anchor structures, the sliding elements mostly consisting of materials that are particularly suitable for forming low-friction sliding pairs.
  • the present invention is based on the object of providing a structure of the type described at the outset which, compared to the prior art, is more cost-effective to build, maintain and ideally also during the
  • Maintenance phase can be used without restrictions, and is also more durable. Particular attention is paid to the simplest and least possible
  • Horizontal force bearing comprises a first and a second anchor structure, the first anchor structure being fixedly connected to the first structural part via first anchor elements arranged on it, and the second anchor structure fixed to the second structural part via second anchor elements arranged on it
  • At least one first guide element with a first sliding surface is with the first anchor structure releasably connected, and at least one second guide element with a second sliding surface opposite the first sliding surface is releasably connected to the second anchor structure, wherein the first and the second
  • Sliding surface are in contact with each other and each other in the vertical direction forming at least one
  • the sliding contact zone overlaps the first anchor structure in a horizontal projection. Furthermore, the second includes
  • Anchor structure Support elements on which the associated at least one second guide element is supported in a form-fitting manner opposite its second sliding surface with horizontal force transmission.
  • the second anchor structure and / or the at least one second guide element overlaps the first structural part in the horizontal projection.
  • the geometry of the horizontal force bearing ensures that the lever arms of the horizontal forces to be transmitted turn out to be extremely small and thus only small moments between the respective anchor structure and the corresponding one
  • Anchor elements and structural parts of a structure according to the invention are less heavily loaded in this way.
  • Anchor elements are defined as components that can transmit tensile and shear forces. Said anchor elements can be designed as headed bolts, for example.
  • the structure is characterized in that the first
  • Another preferred development of the structure according to the invention is characterized in that at least one of the guide elements can be exchanged with an unchanged vertical distance between the two anchor structures.
  • This vertical distance between the two anchor structures is during normal operation of the structure a largely constant size. This distance is defined by the design of the first structural support, which is suitable for transferring vertical loads, and the two structural parts at a defined vertical distance
  • Guide elements is interchangeable with an unchanged vertical distance between the two anchor structures, it is thus expressed that at least one of the guide elements
  • the first structural store can also be used during the
  • Horizontal force bearing is intended to transfer loads in the vertical direction. In this way one becomes in the course of
  • the building according to the invention is, for example, a
  • the bridge can therefore possibly even be used by traffic while the guide elements are being replaced.
  • the costs of maintenance and the associated restriction on the use of the structure are therefore only very low.
  • the sliding surface is at least one of the guide elements by surface treatment, in particular by hardening
  • the low-friction sliding pairing reduces the friction-related wear of the guide elements, which has an advantageous effect on the longevity of the component and on maintenance costs.
  • At least one of the guide elements is one
  • PTFE polytetrafluoroethylene
  • UHMWPE ultra-high-molecular-weight polyethylene
  • the structure according to the invention is characterized in that at least one of the sliding elements can be exchanged with the vertical spacing of the two anchor structures from one another unchanged.
  • at least one of the sliding elements can be exchanged with the vertical spacing of the two anchor structures from one another unchanged.
  • Sliding elements can be replaced without this being a
  • no tie rods connecting the first anchor structure to the first structural part are provided.
  • tie rods are defined as anchor elements that have a length / diameter ratio greater than 35.
  • Tie rods can be designed in such a way that they are predominantly suitable for transmitting tensile forces and, despite the reference to their diameter, do not necessarily have to have a circular cross section. In the case of a non-circular cross-section, under diameter is a
  • Circular area is assigned.
  • Tie rods for connecting an anchor structure to a building part are made possible precisely by the extraordinarily flat design of the horizontal force bearing, as this minimizes the moment to be transferred between the anchor structure and building part and therefore, under certain circumstances, there is no need for the moment
  • tie rods to absorb generated tensile forces via tie rods.
  • the waiver of tie rods enables a greater degree of freedom in the Design of the structural parts and thus the entire structure (since no tie rods have to be provided), and on the other hand, it eliminates a common source of errors on construction sites, as z.
  • the second anchor structure is firmly connected to the second structural part by means of tie rods that engage outside the vertical projection of the first anchor structure is.
  • the support elements are designed as support ribs and the tie rods engage between two adjacent support ribs. This arrangement enables the realization of a very flat one
  • the first anchor structure forms an upper anchor structure and the second anchor structure forms a lower anchor structure. If the first, upper anchor structure is to be connected to the first structural part with the aid of concrete, the above arrangement of the first anchor structure can enable the particularly simple use of the upper anchor structure as part of a permanent formwork, which depends on the other circumstances below which the structure to be erected can be extremely beneficial.
  • first anchor structure forms a lower anchor structure and the second anchor structure forms an upper anchor structure. Because the installation position of the horizontal force bearing can thus be flexibly adapted, specific requirements of the respective structure can be taken into account individually.
  • the particularly advantageous overall design of the structure made possible by this can reduce the construction and maintenance costs and increase the
  • An extremely flat horizontal force bearing (with the associated advantages already mentioned above) can, according to another advantageous development of the Realize the structure according to the invention when the first and second guide elements are outside the vertical projection of the first anchor structure.
  • the first anchor structure is designed as an anchor plate and / or the second anchor structure is an anchor plate and is permanently connected to it
  • This embodiment also has the advantage that anchor plates and thus also the resulting anchor structure can be produced relatively inexpensively, which has an advantageous effect on production costs.
  • the use of anchor plates is also very advantageous from a static point of view, since due to the relatively simple geometry of the anchor plate, the force flows occurring during the intended use
  • Extension of the first anchor structure is at least 10 times greater than its vertical extension and / or if the
  • horizontal extension of the second anchor structure is at least 10 times greater than its vertical extension.
  • Opening and at least one second opening is arranged in the second anchor structure, a first in each case and a second breakthrough are aligned with one another, or at least overlap one another.
  • the first anchor structure has at least two first first anchor structure
  • transport securing element receptacles and the second anchor structure at least two second
  • transport securing element receptacles Includes transport securing element receptacles, a first transport securing element receptacle and a second transport securing element receptacle being aligned with one another.
  • a transport securing element can be detachable with a first and simultaneously with a second
  • Transport securing element receptacles are connected (with the first and second transport securing element receptacles being aligned with one another), whereby the two anchor structures are in a position defined by the transport element
  • the first anchor structure is in
  • Embodiment suitable in a particularly advantageous manner since the bearing properties within the plane in which the biaxially fixed horizontal force bearing prevents movements, are thus independent of the direction.
  • Support elements are arranged along a circular path, the distance between two adjacent support elements defining a circular arc along the circular path which is greater than the respective circular arc of the corresponding first and second guide elements. This enables the first and second guide elements to pass through the sufficiently
  • the space can be dismantled and reassembled through, which increases the maintenance friendliness of the structure and thus helps to minimize maintenance costs.
  • the first anchor structure is essentially rectangular and the at least one first and the at least one second guide element are in the Essentially run in the form of strips.
  • This embodiment is particularly suitable for single-axis fixed
  • the sliding contact zone protrude, preferably at least as far as the horizontal projection of the center of gravity of the sliding contact zone, particularly preferably completely covering the horizontal projection of the sliding contact zone.
  • an extremely flat horizontal force bearing can be achieved - albeit in different degrees - which has the advantages already described above.
  • Fig.l the schematic sectional view of a
  • Fig. 2 the horizontal force bearing of the structure according to Fig.l in a side view
  • Fig. 3a the lower and Fig.3b the upper part of the horizontal force bearing according to Fig. 2 each individually in plan view, in order to increase the clarity.
  • Structure 1 comprising a first structure part 2, a second structure part 3 movable relative to this and at least two structure bearings 4 acting between the two structure parts, 5, wherein a first structural bearing 4 is suitable for transferring vertical loads and a second structural bearing 5 is designed as a horizontal force bearing 5 which is uniaxially fixed in the horizontal direction and unsuitable for transferring vertical loads.
  • FIG.3a and Fig.3b show the same horizontal force bearing 5, but for the sake of clarity only the lower part (Fig.3a) and only the upper part (Fig.3b) - each in a top view.
  • the horizontal force bearing 5 comprises a first, lower anchor structure 6 and a second, upper anchor structure 7.
  • the first, lower anchor structure 6 is designed as a one-piece, essentially rectangular anchor plate 8 and via first anchor elements 9 arranged on it, which are the first
  • Head studs 10 are designed to be fixed to the first
  • the second, upper anchor structure 7 is also substantially rectangular and is fixed to the second via second anchor elements 11, which are arranged on it and are designed as second headed bolts 12
  • Structural part 3 connected.
  • the horizontal extent of the first anchor structure 6 and of the second anchor structure 7 is at least 10 times greater than their respective vertical extent.
  • Four first openings 13 are arranged in the first anchor structure 6 and four second openings 14 are arranged in the second anchor structure 7, a first opening 13 and a second opening 14 being aligned with one another.
  • Guide elements 17, each with a first sliding surface 18, are detachably connected to the first anchor structure 6, and two second, essentially strip-shaped ones
  • Guide elements 19 each with a second sliding surface 20 opposite the first sliding surface 18 are connected to the second anchor structure 7 releasably connected.
  • the first sliding surfaces 18 and the second sliding surfaces 20 are in contact with each other and overlap each other in the vertical direction to form two sliding contact zones 21.
  • the two sliding contact zones 21 overlap in the horizontal direction
  • Guide elements 17 and second guide elements 19 are located outside the vertical projection of the first anchor structure 6.
  • the second anchor structure 7 comprises a second anchor plate 22 and non-detachably connected to the anchor plate 22, as
  • Supporting ribs 23 designed support elements 24.
  • the second guide elements 19 are each supported
  • the support ribs 23 of the second anchor structure 7, the second guide elements 19 and the two sliding contact zones 21 overlap the first structural part 2 in the horizontal projection. Furthermore, the supporting elements 24 completely cover the horizontal projection of the two sliding contact zones 21.
  • the second anchor structure 7 is connected to the second by means of tie rods 25 which engage outside of the vertical projection of the first anchor structure 6 between two mutually adjacent support ribs 23
  • Structural part 3 firmly connected.
  • first anchor structure 6 no tie rods connecting it to the first structural part 2 are provided.
  • Guide elements 19 is through surface treatment
  • the two first guide elements 17 each include a
  • Sliding element 26 is made in particular of PTFE, UHMWPE or another equally suitable material.
  • the guide elements 17, 19 and / or the sliding elements 26 are interchangeable with the same vertical spacing of the two anchor structures 6, 7 from one another, the tie rods 25 being able to maintain their position and therefore not having to be removed.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention relates to a building structure comprising a first building structure part (2), a second building structure (3), which is movable relative thereto, and at least two structural bearings (5) acting between the two building structure parts, wherein the second structural bearing (5) is a horizontal force bearing (5), which is unsuitable for transmitting vertical loads and is fixed in one axis or two axes in the horizontal direction, and comprises a first anchor structure (6) and a second anchor structure (7). At least one first guide element (17) having a first sliding surface (18) is detachably connected to the first anchor structure (6), and at least one second guide element (19) is detachably connected to a second sliding surface (20) opposite the first sliding surface (18), wherein the second anchor structure (7) and/or the at least one second guide element (19) overlaps the first building structure part (2) in the horizontal projection.

Description

Bauwerk Building
Die vorliegende Erfindung betrifft ein Bauwerk, umfassend ein erstes Bauwerksteil , ein relativ zu diesem bewegliches zweites Bauwerksteil und mindestens zwei, zwischen den beiden The present invention relates to a building, comprising a first building part, a second building part movable relative to this, and at least two between the two
Bauwerksteilen wirkende Bauwerkslager, wobei ein erstes Structural bearings acting on structural parts, with a first
Bauwerkslager geeignet ist vertikale Lasten zu übertragen und ein zweites Bauwerkslager als ein zur Übertragung vertikaler Lasten ungeeignetes, in horizontaler Richtung einachsig oder zweiachsig festes Horizontalkraftlager ausgeführt ist. Structural bearings are suitable for transferring vertical loads and a second structural bearing is designed as a horizontal force bearing that is unsuitable for transferring vertical loads and is one-axis or two-axis fixed in the horizontal direction.
Als Bauwerke im Sinne der vorliegenden Erfindung kommen insbesondere Brücken in Betracht. Das erste Bauwerksteil kann dabei beispielsweise als Widerlager (und somit als Teil des Unterbaus der Brücke) , das zweite Bauwerksteil kann Bridges in particular come into consideration as structures in the context of the present invention. The first structural part can be used as an abutment (and thus as part of the substructure of the bridge), the second structural part can
beispielsweise als Überbau der Brücke ausgeführt sein. Unter Horizontalkraftlagern sind in Anlehnung an DIN EN 1337-8:2008- 01(D) Führungslager und Festhaltekonstruktionen zu verstehen. Ein Führungslager ist demnach als "Lager, das nur in einer horizontalen Richtung Widerstand bietet, Verdrehungen zulässt und keine Vertikalkräfte überträgt" definiert. Dabei sind nur solche Führungslager im obigen Sinne ein in horizontaler be designed, for example, as a superstructure of the bridge. On the basis of DIN EN 1337-8: 2008-01 (D), horizontal force bearings are to be understood as guide bearings and retaining structures. A guide bearing is therefore defined as "a bearing that offers resistance only in one horizontal direction, allows twisting and does not transmit any vertical forces". Only such guide bearings in the above sense are a horizontal one
Richtung einachsig festes Horizontalkraftlager, wenn das Lager Bewegungen entlang beider Halbrichtungen einer horizontalen Achse begrenzt. Eine Festhaltekonstruktion, die als Lager definiert ist, welches "Bewegungen in der horizontalen Ebene verhindert, Verdrehungen zulässt und keine Vertikalkräfte überträgt", entspricht dem oben erwähnten zur Übertragung vertikaler Lasten ungeeigneten, in horizontaler Richtung zweiachsig festen Horizontalkraftlager. Direction of uniaxial fixed horizontal force bearing, if the bearing limits movements along both half-directions of a horizontal axis. A retaining structure, which is defined as a bearing, which "prevents movements in the horizontal plane, allows twisting and does not transmit any vertical forces", corresponds to the above-mentioned horizontal force bearing that is unsuitable for the transmission of vertical loads and is biaxially fixed in the horizontal direction.
Horizontalkraftlager sind in vielfältigen Ausführungsformen aus dem Stand der Technik bekannt. DIN EN 1337-8 : 2008-01 (D) offenbart mehrere typische einachsige Horizontalkraftlager (Führungslager), wie sie in einem Bauwerk der eingangs beschriebenen Art zum Einsatz kommen können. Eines der in DIN EN 1337-8 : 2008-01 (D) , Bild 1 beschriebenen Führungslager umfasst zwei Ankerstrukturen, wobei diese typischerweise mittels geeigneter Befestigungsmittel jeweils fest mit einem der beiden Bauwerksteile verbunden sind. Die beiden Horizontal force bearings are known in various embodiments from the prior art. DIN EN 1337-8: 2008-01 (D) discloses several typical uniaxial horizontal force bearings (guide bearings), as they are in a structure of the initially described type can be used. One of the guide bearings described in DIN EN 1337-8: 2008-01 (D), Figure 1 comprises two anchor structures, whereby these are typically firmly connected to one of the two structural parts by means of suitable fastening means. The two
Ankerstrukturen greifen dabei in einer Art Feder-Nut- Konfiguration dergestalt ineinander, dass Bewegungen entlang einer horizontalen Achse ermöglicht, in der senkrecht zu dieser stehenden, zweiten horizontalen Achse aber unterbunden werden. Typischerweise stehen die beiden Ankerstrukturen dabei nicht direkt, sondern über zwischen den Ankerstrukturen angeordnete Gleitelemente miteinander in Kontakt, wobei die Gleitelemente meist aus Materialien bestehen, die sich in besonderer Weise dazu eignen reibungsarme Gleitpaarungen auszubilden . Anchor structures interlock in a kind of tongue and groove configuration in such a way that movements along a horizontal axis are enabled, but are prevented in the second horizontal axis perpendicular to this. Typically, the two anchor structures are not in direct contact with one another, but rather via sliding elements arranged between the anchor structures, the sliding elements mostly consisting of materials that are particularly suitable for forming low-friction sliding pairs.
Der vorliegenden Erfindung liegt die Aufgabe zugrunde, ein Bauwerk der eingangs beschriebenen Art bereitzustellen, welches im Vergleich zum Stand der Technik kostengünstiger gebaut, gewartet und idealerweise auch während der The present invention is based on the object of providing a structure of the type described at the outset which, compared to the prior art, is more cost-effective to build, maintain and ideally also during the
Wartungsphase uneingeschränkt genutzt werden kann, sowie darüber hinaus langlebiger ist. Besonderes Augenmerk liegt dabei auch auf der möglichst einfachen und wenig Maintenance phase can be used without restrictions, and is also more durable. Particular attention is paid to the simplest and least possible
fehleranfälligen Anbindung des Horizontalkraftlagers an die beiden Bauwerksteile. error-prone connection of the horizontal force bearing to the two structural parts.
Gelöst wird diese Aufgabenstellung durch ein Bauwerk der eingangs beschriebenen Art, bei welchem das This task is solved by a structure of the type described above, in which the
Horizontalkraftlager eine erste und eine zweite Ankerstruktur umfasst, wobei die erste Ankerstruktur über an ihr angeordnete erste Ankerelemente fest mit dem ersten Bauwerksteil verbunden ist, und die zweite Ankerstruktur über an ihr angeordnete zweite Ankerelemente fest mit dem zweiten Bauwerksteil Horizontal force bearing comprises a first and a second anchor structure, the first anchor structure being fixedly connected to the first structural part via first anchor elements arranged on it, and the second anchor structure fixed to the second structural part via second anchor elements arranged on it
verbunden ist. Mindestens ein erstes Führungselement mit einer ersten Gleitoberfläche ist dabei mit der ersten Ankerstruktur lösbar verbunden, und mindestens ein zweites Führungselement mit einer der ersten Gleitoberfläche gegenüberstehenden zweiten Gleitoberfläche ist mit der zweiten Ankerstruktur lösbar verbunden, wobei die erste und die zweite connected is. At least one first guide element with a first sliding surface is with the first anchor structure releasably connected, and at least one second guide element with a second sliding surface opposite the first sliding surface is releasably connected to the second anchor structure, wherein the first and the second
Gleitoberfläche miteinander in Kontakt stehen und einander in vertikaler Richtung unter Ausbildung mindestens einer Sliding surface are in contact with each other and each other in the vertical direction forming at least one
Gleitkontaktzone überlappen. Die mindestens eine Overlap sliding contact zone. The at least one
Gleitkontaktzone überlappt dabei in horizontaler Projektion die erste Ankerstruktur. Ferner umfasst die zweite The sliding contact zone overlaps the first anchor structure in a horizontal projection. Furthermore, the second includes
Ankerstruktur Stützelemente, an denen sich das zugeordnete mindestens eine zweite Führungselement gegenüberliegend seiner zweiten Gleitoberfläche mit horizontaler Kraftübertragung formschlüssig abstützt. Die zweite Ankerstruktur und/oder das mindestens eine zweite Führungselement überlappt dabei in der horizontalen Projektion das erste Bauwerksteil . Anchor structure Support elements on which the associated at least one second guide element is supported in a form-fitting manner opposite its second sliding surface with horizontal force transmission. The second anchor structure and / or the at least one second guide element overlaps the first structural part in the horizontal projection.
Durch die synergistische Kombination der vorstehend Through the synergistic combination of the above
angegebenen, für das erfindungsgemäße Bauwerk specified for the structure according to the invention
charakteristischen Merkmale kann ein Bauwerk mit einem im Vergleich zum Stand der Technik außergewöhnlich flachen Characteristic features can be a building with an unusually flat surface compared to the state of the art
Horizontalkraftlager realisiert werden. Durch die flache Horizontal force bearings can be realized. Due to the flat
Geometrie des Horizontalkraftlagers wird dabei erreicht, dass die Hebelarme der zu übertragenen Horizontalkräfte äußerst klein ausfallen und somit nur geringe Momente zwischen der jeweiligen Ankerstruktur und dem korrespondierenden The geometry of the horizontal force bearing ensures that the lever arms of the horizontal forces to be transmitted turn out to be extremely small and thus only small moments between the respective anchor structure and the corresponding one
Gebäudeteil wirken. Im Vergleich zum Stand der Technik, bei dem Horizontalkraftlager weniger flach ausgeführt sind und somit deutlich höhere Momente zwischen den Ankerstrukturen und den Bauwerksteilen wirken, werden Ankerstrukturen, Part of the building. Compared to the state of the art, in which horizontal force bearings are designed to be less flat and thus significantly higher moments act between the anchor structures and the building parts, anchor structures,
Ankerelemente sowie Bauwerksteile eines erfindungsgemäßen Bauwerks auf diese Weise weniger stark belastet. Diese Anchor elements and structural parts of a structure according to the invention are less heavily loaded in this way. These
geringere Belastung schlägt sich in einer höheren Lebensdauer des Bauwerks nieder und lässt sich darüber hinaus durch lower stress is reflected in a longer service life of the structure and can also be passed through
Materialreduktion in geringere Herstellungskosten übersetzen. Eine feste Verbindung zwischen Ankerstruktur und Bauwerksteil über Ankerelemente im obigen Sinne ist dabei eine Verbindung, die im Rahmen der bestimmungs- und ordnungsgemäßen Verwendung bezogen auf eine technisch sinnvolle Größenordnung weder translatorische noch rotatorische Bewegungen zulässt, wobei es unerheblich ist, ob die Verbindung lösbar oder unlösbar ist. Ankerelemente sind dabei als Bauteile definiert, die Zug- und Schubkräfte übertragen können. Besagte Ankerelemente können beispielsweise als Kopfbolzen ausgeführt sein. Translate material reduction into lower manufacturing costs. A fixed connection between the anchor structure and structural part via anchor elements in the above sense is a connection which, within the framework of the intended and proper use, does not allow translational or rotational movements in relation to a technically meaningful order of magnitude, regardless of whether the connection is detachable or undetachable is. Anchor elements are defined as components that can transmit tensile and shear forces. Said anchor elements can be designed as headed bolts, for example.
An dieser Stelle sei angemerkt, dass vorliegend aus Gründen der Lesbarkeit an einigen Stellen darauf verzichtet wurde, bei Komponenten, denen im Rahmen der erstmaligen Erwähnung eine Mindestanzahl zugeordnet wurde, diesen Hinweis auf besagte Mindestanzahl auch bei allen weiteren späteren Erwähnungen mitzuführen. Selbstverständlich gilt die bei der erstmaligen Erwähnung festgelegt Mindestanzahl einer Komponente im At this point it should be noted that, for reasons of readability, in some places it has been dispensed with in the case of components that were assigned a minimum number in the context of the initial mention, this reference to the said minimum number also in all subsequent mentions. Of course, the minimum number of components specified when it is first mentioned applies in the
gleichen Maße für alle späteren Erwähnungen derselben, auch wenn der explizite Hinweis unterbleibt. same dimensions for all subsequent mentions of the same, even if the explicit reference is omitted.
Gemäß einer ersten bevorzugten Weiterbildung der Erfindung ist das Bauwerk dadurch gekennzeichnet, dass sich der erste According to a first preferred development of the invention, the structure is characterized in that the first
Bauwerksteil in die horizontale Projektion der Part of the building in the horizontal projection of the
Gleitkontaktzone hineinerstreckt. Da auf diese Weise ein ganz besonders flaches Horizontalkraftlager realisiert werden kann, treffen die weiter oben erwähnten, damit einhergehenden Sliding contact zone extends into it. Since a particularly flat horizontal force bearing can be realized in this way, those mentioned above and accompanying it apply
Vorteile in ganz besonderem Maße zu. Benefits to a very special degree.
Eine andere bevorzugte Weiterbildung des erfindungsgemäßen Bauwerks zeichnet sich dadurch aus, dass mindestens eines der Führungselemente bei unverändertem vertikalen Abstand der zwei Ankerstrukturen zueinander austauschbar ist. Another preferred development of the structure according to the invention is characterized in that at least one of the guide elements can be exchanged with an unchanged vertical distance between the two anchor structures.
Dieser vertikale Abstand der zwei Ankerstrukturen zueinander ist dabei während des bestimmungsgemäßen Betriebs des Bauwerks eine weitestgehend konstante Größe. Definiert wird dieser Abstand durch die Auslegung des ersten Bauwerkslagers, welches zur Übertragung vertikaler Lasten geeignet ist und die beiden Bauwerksteile in einem definierten vertikalen Abstand This vertical distance between the two anchor structures is during normal operation of the structure a largely constant size. This distance is defined by the design of the first structural support, which is suitable for transferring vertical loads, and the two structural parts at a defined vertical distance
zueinander lagert. Dadurch, dass mindestens eines der to each other. By having at least one of the
Führungselemente bei unverändertem vertikalen Abstand der zwei Ankerstrukturen zueinander austauschbar ist, kommt somit zum Ausdruck, dass mindestens eines der Führungselemente Guide elements is interchangeable with an unchanged vertical distance between the two anchor structures, it is thus expressed that at least one of the guide elements
ausgetauscht werden kann, ohne dass hierfür ein Bauwerksteil angehoben werden muss (und somit der vertikale Abstand der zwei Ankerstrukturen zueinander verändert werden muss) . Somit kann das erste Bauwerkslager auch während des can be exchanged without having to lift a structural part (and thus having to change the vertical distance between the two anchor structures). Thus, the first structural store can also be used during the
Austauschvorgangs der Führungselemente des Exchange process of the guide elements of the
Horizontalkraftlagers in vertikaler Richtung bestimmungsgemäß Lasten übertragen. Auf diese Weise wird ein im Zuge von Horizontal force bearing is intended to transfer loads in the vertical direction. In this way one becomes in the course of
Wartungsarbeiten erfolgendes Auswechseln der Führungselemente mit minimalem Aufwand ermöglicht. Durch den Entfall der Maintenance work enables replacement of the guide elements with minimal effort. By eliminating the
Notwendigkeit des Anhebens eines Bauwerksteils kann im Zuge des Auswechselns der Führungselemente einerseits auf den Necessity of lifting a structural part can on the one hand in the course of replacing the guide elements
Einsatz von zum Anheben benötigten, schweren Gerät verzichtet und andererseits das Bauwerk während der Wartungsphase ggf. sogar nahezu uneingeschränkt genutzt werden. Handelt es sich bei dem erfindungsgemäßen Bauwerk beispielsweise um eine The use of heavy equipment required for lifting is dispensed with and, on the other hand, the structure can even be used almost without restriction during the maintenance phase. If the building according to the invention is, for example, a
Brücke, kann die Brücke somit ggf. sogar auch während des Auswechselns der Führungselemente vom Verkehr genutzt werden. Die Kosten der Wartung sowie die mit dieser einhergehenden Einschränkung der Nutzung des Bauwerks fallen somit nur sehr gering aus . Bridge, the bridge can therefore possibly even be used by traffic while the guide elements are being replaced. The costs of maintenance and the associated restriction on the use of the structure are therefore only very low.
Gemäß einer anderen bevorzugten Weiterbildung der Erfindung ist die Gleitoberfläche mindestens eines der Führungselemente durch Oberflächenbehandlung, insbesondere durch Härten According to another preferred development of the invention, the sliding surface is at least one of the guide elements by surface treatment, in particular by hardening
und/oder Polieren, in besonderer Weise dazu geeignet, eine reibungsarme Gleitpaarung mit der Gleitoberfläche des and / or polishing, particularly suitable for a low-friction pairing with the sliding surface of the
korrespondierenden, angrenzenden Führungselements auszubilden. Durch die reibungsarme Gleitpaarung wird der reibungsbedingte Abrieb der Führungselemente reduziert, was sich vorteilhaft auf die Langlebigkeit des Bauteils sowie die Wartungskosten auswirkt . to form corresponding, adjacent guide element. The low-friction sliding pairing reduces the friction-related wear of the guide elements, which has an advantageous effect on the longevity of the component and on maintenance costs.
Derselbe Effekt kann erzielt werden, wenn alternativ zu oder in Kombination mit der soeben beschriebenen Weiterbildung der Erfindung mindestens eines der Führungselemente ein The same effect can be achieved if, as an alternative to or in combination with the further development of the invention just described, at least one of the guide elements is one
Gleitelement und einen Gleitelementträger umfasst, wobei eine Oberfläche des Gleitelements die Gleitoberfläche des Sliding element and a sliding element carrier, wherein a surface of the sliding element is the sliding surface of the
mindestens einen Führungselements ausbildet, und wobei das Gleitelement insbesondere aus PTFE, UHMWPE oder einem anderen gleichermaßen geeigneten Material ausgeführt ist. Bei PTFE (Polytetrafluorethylen) und UHMWPE (Ultra-High-Molecular- Weight Polyethylene) handelt es sich dabei um im Stand der Technik genutzte, typische Gleitelementwerkstoffe. forms at least one guide element, and wherein the sliding element is made in particular of PTFE, UHMWPE or another equally suitable material. PTFE (polytetrafluoroethylene) and UHMWPE (ultra-high-molecular-weight polyethylene) are typical sliding element materials used in the prior art.
In abermals bevorzugter Weiterbildung zeichnet sich das erfindungsgemäße Bauwerk dadurch aus, dass mindestens eines der Gleitelemente bei unverändertem vertikalen Abstand der zwei Ankerstrukturen zueinander austauschbar ist. Mit anderen Worten kann somit (wie bereits weiter oben im Zusammenhang mit den Führungselementen ausgeführt) mindestens eines der In another preferred development, the structure according to the invention is characterized in that at least one of the sliding elements can be exchanged with the vertical spacing of the two anchor structures from one another unchanged. In other words (as already explained above in connection with the guide elements) at least one of the
Gleitelemente ausgetauscht werden, ohne dass hierfür ein Sliding elements can be replaced without this being a
Bauwerksteil angehoben werden muss. Die weiter oben Structural part must be lifted. The one above
dargelegten Vorteile, die sich dadurch erreichen lassen, dass Führungselemente ausgetauscht werden können, ohne hierfür einen Bauwerksteil anheben zu müssen, können auch dadurch erreicht werden, dass (gesonderte) Gleitelemente in gleicher Weise austauschbar sind. Durch den Austausch von solchen gesonderten Gleitelementen anstelle von Führungselementen können darüber hinaus die anfallenden Wartungskosten noch weiter verringert werden, da ein Gleitelement typischerweise günstiger herzustellen ist als ein Führungselement. Eine auch hinsichtlich des Kraftflusses sehr einfach und kompakt aufgebaute zweite Ankerstruktur lässt sich The advantages outlined here, which can be achieved in that guide elements can be exchanged without having to lift a structural part for this purpose, can also be achieved in that (separate) sliding elements can be exchanged in the same way. By replacing such separate sliding elements instead of guide elements, the resulting maintenance costs can also be reduced even further, since a sliding element is typically cheaper to manufacture than a guide element. A second anchor structure which is also very simple and compact with regard to the flow of force can be used
realisieren, wenn in einer anderen bevorzugten Weiterbildung des erfindungsgemäßen Bauwerks die Stützelemente (an denen sich das jeweils zugeordnete zweite Führungselement realize if, in another preferred development of the structure according to the invention, the support elements (on which the respectively assigned second guide element
formschlüssig abstützt) als Stützrippen ausgeführt sind. positively supported) are designed as support ribs.
In einer anderen bevorzugten Weiterbildung der Erfindung sind keine die erste Ankerstruktur mit dem ersten Bauwerksteil verbindenden Zuganker vorgesehen. Alternativ oder in In another preferred development of the invention, no tie rods connecting the first anchor structure to the first structural part are provided. Alternatively or in
Kombination damit kann das erfinderische Bauwerk in einer anderen vorteilhaften Weiterbildung dadurch gekennzeichnet sein, dass keine die zweite Ankerstruktur mit dem zweiten Bauwerksteil verbindenden Zuganker vorgesehen sind. Zuganker sind dabei in diesem Sinne als Ankerelemente definiert, die ein Längen-Durchmesser-Verhältnis von größer als 35 vorweisen. Zuganker können so ausgelegt sein, dass sie sich überwiegend zur Übertragung von Zugkräften eignen und müssen dabei trotz des Verweises auf deren Durchmesser keineswegs zwingend einen kreisförmigen Querschnitt aufweisen. Im Falle eines nicht kreisförmigen Querschnitts ist unter Durchmesser ein In combination with this, the inventive structure can be characterized in another advantageous development in that no tie rods connecting the second anchor structure to the second structural part are provided. In this context, tie rods are defined as anchor elements that have a length / diameter ratio greater than 35. Tie rods can be designed in such a way that they are predominantly suitable for transmitting tensile forces and, despite the reference to their diameter, do not necessarily have to have a circular cross section. In the case of a non-circular cross-section, under diameter is a
äquivalenter Durchmesser zu verstehen, der sich ermitteln lässt, indem der tatsächlichen Querschnittsfläche ein To understand equivalent diameter, which can be determined by adding the actual cross-sectional area
fiktiver, äquivalenter Durchmesser einer flächengleichen fictitious, equivalent diameter of an equal area
Kreisfläche zugeordnet wird. Circular area is assigned.
Der Verzicht auf im Stand der Technik allgemein übliche The waiver of those that are generally customary in the prior art
Zuganker zur Verbindung von einer Ankerstruktur mit einem Bauwerksteil wird dabei gerade durch die außergewöhnlich flache Bauweise des Horizontalkraftlagers erst ermöglicht, da hierdurch das zwischen Ankerstruktur und Bauwerksteil zu übertragende Moment minimiert wird und somit unter gewissen Umständen keine Notwendigkeit entsteht, die vom Moment Tie rods for connecting an anchor structure to a building part are made possible precisely by the extraordinarily flat design of the horizontal force bearing, as this minimizes the moment to be transferred between the anchor structure and building part and therefore, under certain circumstances, there is no need for the moment
erzeugten Zugkräfte über Zuganker abzufangen. Der Verzicht auf Zuganker ermöglicht zum einen größere Freiheitsgrade bei der Gestaltung der Bauwerksteile und somit des gesamten Bauwerks (da keine Zuganker vorgesehen werden müssen) , und zum anderen merzt er eine häufige Fehlerquelle auf Baustellen aus, da z.to absorb generated tensile forces via tie rods. The waiver of tie rods enables a greater degree of freedom in the Design of the structural parts and thus the entire structure (since no tie rods have to be provided), and on the other hand, it eliminates a common source of errors on construction sites, as z.
B. bei Betonierarbeiten zur Herstellung der Zugankeraufnahmen im Bauwerksteil (die in der Regel vor der Anlieferung des Horizontalkraftlagers auf der Baustelle anstehen) oftmals Vorgaben nicht exakt eingehalten werden, was zeit- und B. during concreting work to produce the tie rod receptacles in the structural part (which are usually pending before the delivery of the horizontal force bearing on the construction site), specifications are often not met exactly what time and
kostenintensive Nacharbeiten nach sich ziehen kann. can result in costly rework.
Der besonderen Einbau- oder Belastungssituation des The special installation or load situation of the
Horizontalkraftlagers geschuldet, kann zur Erzielung einer ausreichend festen Verbindung zwischen zweiter Ankerstruktur und zweitem Bauwerksteil allerdings gemäß einer anderen vorteilhaften Weiterbildung der Erfindung vorgesehen sein, dass die zweite Ankerstruktur mittels Zuganker, die außerhalb der vertikalen Projektion der ersten Ankerstruktur angreifen, mit dem zweiten Bauwerksteil fest verbunden ist. Owing to the horizontal force bearing, in order to achieve a sufficiently strong connection between the second anchor structure and the second structural part, however, according to another advantageous development of the invention, it can be provided that the second anchor structure is firmly connected to the second structural part by means of tie rods that engage outside the vertical projection of the first anchor structure is.
Im Einklang mit der Zielsetzung die Wartungskosten sowie die Nutzungseinschränkungen während der Wartung zu minimieren, ist dabei gemäß einer anderen bevorzugten Weiterbildung der In accordance with the objective of minimizing maintenance costs and usage restrictions during maintenance, according to another preferred development, the
Erfindung mindestens eines der Führungselemente unter Invention at least one of the guide elements below
Beibehaltung der Position der Zuganker austauschbar. Dadurch, dass die Position der Zuganker während des Austauschens mindestens eines der Führungselemente beibehalten werden kann, kommt zum Ausdruck, dass mindestens eines der Führungselemente austauschbar ist, ohne dass hierfür Zuganker entfernt werden müssen (und somit die Position der Zuganker verändert werden muss) . Retaining the position of the tie rods exchangeable. The fact that the position of the tie rods can be maintained during the exchange of at least one of the guide elements shows that at least one of the guide elements can be replaced without the tie rods having to be removed (and thus the position of the tie rods having to be changed).
In abermals bevorzugter Weiterbildung sind die Stützelemente als Stützrippen ausgeführt und die Zuganker greifen zwischen zwei einander benachbarten Stützrippen an. Diese Anordnung ermöglicht die Realisierung eines ausgesprochen flachen In yet another preferred development, the support elements are designed as support ribs and the tie rods engage between two adjacent support ribs. This arrangement enables the realization of a very flat one
Horizontalkraftlagers mit den oben bereits ausgeführten Vorteilen bezogen auf die Minimierung der übertragenen Momente zwischen Ankerstruktur und Bauwerksteil . Dabei kann dieses Konstruktionsprinzip ersichtlich auch mit jenem bereits erwähnten Merkmal kombiniert werden, welches die Horizontal force bearing with those already mentioned above Advantages related to the minimization of the transmitted moments between the anchor structure and part of the building. This construction principle can obviously also be combined with the feature already mentioned, which the
Austauschbarkeit der Führungselemente unter Beibehaltung der Position der Zuganker vorsieht (das heißt ohne dass hierfür Zuganker entfernt werden müssen) . Provides interchangeability of the guide elements while maintaining the position of the tie rods (that is, without having to remove tie rods).
Gemäß einer anderen vorteilhaften Weiterbildung der Erfindung bildet die erste Ankerstruktur eine obere Ankerstruktur und die zweite Ankerstruktur eine untere Ankerstruktur. Falls die erste, obere Ankerstruktur mithilfe von Beton mit dem ersten Bauwerksteil zu verbinden ist, kann die obige Anordnung der ersten Ankerstruktur die besonders einfache Nutzung der oberen Ankerstruktur als Teil einer verlorenen Schalung ermöglichen, was sich abhängig von den sonstigen Umständen, unten denen das Bauwerk zu errichten ist, als äußerst vorteilhaft darstellen kann . According to another advantageous development of the invention, the first anchor structure forms an upper anchor structure and the second anchor structure forms a lower anchor structure. If the first, upper anchor structure is to be connected to the first structural part with the aid of concrete, the above arrangement of the first anchor structure can enable the particularly simple use of the upper anchor structure as part of a permanent formwork, which depends on the other circumstances below which the structure to be erected can be extremely beneficial.
Abhängig von der spezifischen Situation, in der das jeweilige Bauwerk zu errichten ist, kann es sich allerdings alternativ auch als vorteilhaft darstellen, wenn die erste Ankerstruktur eine untere Ankerstruktur und die zweite Ankerstruktur eine obere Ankerstruktur bilden. Dadurch, dass die Einbaulage des Horizontalkraftlagers somit flexibel angepasst werden kann, kann spezifischen Anforderungen des jeweiligen Bauwerks individuell Rechnung getragen werden. Die dadurch ermöglichte besonders vorteilhafte Gesamtauslegung des Bauwerks kann zur Reduktion der Bau- und Wartungskosten, zur Erhöhung der Depending on the specific situation in which the respective structure is to be erected, it can, however, alternatively also be advantageous if the first anchor structure forms a lower anchor structure and the second anchor structure forms an upper anchor structure. Because the installation position of the horizontal force bearing can thus be flexibly adapted, specific requirements of the respective structure can be taken into account individually. The particularly advantageous overall design of the structure made possible by this can reduce the construction and maintenance costs and increase the
Langlebigkeit des Bauwerks sowie zur Ermöglichung ganz neuer baulicher Gestaltungen führen. Longevity of the building as well as enabling completely new structural designs.
Ein äußerst flaches Horizontalkraftlager (mit den damit verbundenen und oben bereits ausgeführten Vorteilen) lässt sich gemäß einer anderen vorteilhaften Weiterbildung des erfindungsgemäßen Bauwerks realisieren, wenn sich das erste und zweite Führungselement außerhalb der vertikalen Projektion der ersten Ankerstruktur befinden. An extremely flat horizontal force bearing (with the associated advantages already mentioned above) can, according to another advantageous development of the Realize the structure according to the invention when the first and second guide elements are outside the vertical projection of the first anchor structure.
Ebenfalls dem Zweck der Realisation eines besonders flachen Horizontalkraftlagers zuträglich ist es, wenn in einer It is also beneficial for the purpose of realizing a particularly flat horizontal force bearing if in one
weiteren Fortbildung der Erfindung die erste Ankerstruktur als Ankerplatte ausgeführt ist und/oder die zweite Ankerstruktur eine Ankerplatte sowie unlösbar mit dieser verbundene Further development of the invention, the first anchor structure is designed as an anchor plate and / or the second anchor structure is an anchor plate and is permanently connected to it
Stützelemente umfasst. Diese Ausführungsform hat darüber hinaus den Vorteil, dass Ankerplatten und somit auch die resultierende Ankerstruktur relativ günstig hergestellt werden können, was sich vorteilhaft auf die Herstellungskosten auswirkt. Darüber hinaus ist der Einsatz von Ankerplatten auch unter statischen Gesichtspunkten sehr vorteilhaft, da bedingt durch die relativ einfache Geometrie der Ankerplatte die auftretenden Kraftflüsse während des bestimmungsgemäßen Includes support elements. This embodiment also has the advantage that anchor plates and thus also the resulting anchor structure can be produced relatively inexpensively, which has an advantageous effect on production costs. In addition, the use of anchor plates is also very advantageous from a static point of view, since due to the relatively simple geometry of the anchor plate, the force flows occurring during the intended use
Einsatzes einfach und schnell bestimmbar sind, was sich vorteilhaft in geringen Konstruktionskosten niederschlägt. Ferner führt die einfache Geometrie der Ankerplatte zu klaren Lastpfaden, was zu einem robusten Tragverhalten beiträgt. Use can be determined quickly and easily, which is advantageously reflected in low construction costs. Furthermore, the simple geometry of the anchor plate leads to clear load paths, which contributes to a robust load-bearing behavior.
Dem Ziel der Bereitstellung eines besonders flachen The aim of providing a particularly flat
Horizontalkraftlagers dient es ebenso, wenn gemäß einer weiteren erfindungsgemäßen Weiterbildung die horizontale Horizontal force bearing, it also serves if, according to a further development according to the invention, the horizontal
Ausdehnung der ersten Ankerstruktur mindestens 10-mal größer ist als deren vertikale Ausdehnung und/oder wenn die Extension of the first anchor structure is at least 10 times greater than its vertical extension and / or if the
horizontale Ausdehnung der zweiten Ankerstruktur mindestens 10-mal größer ist als deren vertikale Ausdehnung. horizontal extension of the second anchor structure is at least 10 times greater than its vertical extension.
Der Vereinfachung der Montage bzw. der Integration des The simplification of the assembly or the integration of the
Horizontalkraftlagers in das Bauwerk ist es ferner zuträglich, wenn in der ersten Ankerstruktur mindestens ein erster Horizontal force bearing in the structure, it is also beneficial if in the first anchor structure at least one first
Durchbruch und in der zweiten Ankerstruktur mindestens ein zweiter Durchbruch angeordnet ist, wobei jeweils ein erster und ein zweiter Durchbruch miteinander fluchten, zumindest aber einander überlappen. Durch die fluchtenden bzw. einander überlappenden Durchbrüche hindurch kann während der Opening and at least one second opening is arranged in the second anchor structure, a first in each case and a second breakthrough are aligned with one another, or at least overlap one another. Through the aligned or overlapping openings during the
Einbauphase des Horizontalkraftlagers beispielsweise Beton hindurchgeführt und verdichtet werden, um auf diese Weise die untere Ankerstruktur mit einem Bauwerksteil zu verbinden. Die einfache Realisation dieses Vorgangs mit Hilfe von fluchtenden Durchbrüchen hilft dabei Montagekosten zu reduzieren sowie die Montagearbeiten zu vereinfachen, was der Vermeidung von Installation phase of the horizontal force bearing, for example, concrete passed through and compacted in order to connect the lower anchor structure with a structural part in this way. The simple implementation of this process with the help of aligned breakthroughs helps to reduce assembly costs and simplify assembly work, which helps to avoid
Fehlern während dieser Tätigkeit zuträglich ist. Errors during this activity is beneficial.
Im Zusammenhang mit dem Transport des Horizontalkraftlagers (z. B. zur Baustelle) ist es überdies besonders vorteilhaft, wenn in einer anderen Fortbildung des erfinderischen Bauwerks die erste Ankerstruktur mindestens zwei erste In connection with the transport of the horizontal force bearing (e.g. to the construction site), it is also particularly advantageous if, in another development of the inventive structure, the first anchor structure has at least two first
Transportsicherungselementaufnahmen umfasst und die zweite Ankerstruktur mindestens zwei zweite Includes transport securing element receptacles and the second anchor structure at least two second
Transportsicherungselementaufnahmen umfasst, wobei je eine erste Transportsicherungselementaufnahme und je eine zweite Transportsicherungselementaufnahme miteinander fluchten. Ein Transportsicherungselement kann dabei lösbar mit einer ersten sowie gleichzeitig mit einer zweiten Includes transport securing element receptacles, a first transport securing element receptacle and a second transport securing element receptacle being aligned with one another. A transport securing element can be detachable with a first and simultaneously with a second
Transportsicherungselementaufnahme verbunden werden (wobei die erste und die zweite Transportsicherungselementaufnahmen dabei miteinander fluchten) , wodurch die beiden Ankerstrukturen in einer, durch das Transportelement definierten Position Transport securing element receptacles are connected (with the first and second transport securing element receptacles being aligned with one another), whereby the two anchor structures are in a position defined by the transport element
zueinander fixiert werden, was während der Transport- sowie der Einbauphase vorteilhaft sein kann. Nachdem der Einbau des Horizontalkraftlagers abgeschlossen ist, ist das be fixed to each other, which can be advantageous during the transport and the installation phase. After the installation of the horizontal force bearing is complete, that is
Transportsicherungselement zu entfernen, um den To remove the transport securing element to the
bestimmungsgemäßen Betrieb des Horizontalkraftlagers zu ermöglichen . to enable proper operation of the horizontal force bearing.
Es kann sich überdies vor dem Hintergrund der Reduktion der Herstellungskosten als besonders vorteilhaft erweisen, wenn mindestens eine der Ankerstrukturen einteilig ausgeführt ist. Darüber hinaus eliminiert die einteilige Ausführung und der damit verbundene Verzicht auf Verbindungsmittel mögliche In addition, in view of the reduction in manufacturing costs, it can prove to be particularly advantageous if at least one of the anchor structures is made in one piece. In addition, the one-piece design eliminates the need for fasteners
Schwachstellen und ermöglicht dadurch einen höheren Weak points and thereby enables a higher one
Ermüdungswiderstand. Hierbei wird "einteilig" als "nicht aus mehreren Teilen gefügt" verstanden. Fatigue resistance. Here, “in one piece” is understood to mean “not made up of several parts”.
Gemäß einer weiteren besonders vorteilhaften Fortbildung des erfinderischen Bauwerks ist die erste Ankerstruktur im According to a further particularly advantageous development of the inventive structure, the first anchor structure is in
Wesentlichen rotationssymmetrisch ausgeführt und sind das mindestens eine erste und das mindestens eine zweite Essentially rotationally symmetrical and are the at least one first and the at least one second
Führungselement im Wesentlichen kreisbogenförmig ausgeführt. Insbesondere für die Realisation eines zweiachsig festen Guide element designed essentially in the shape of a circular arc. Especially for the implementation of a biaxial fixed
Horizontalkraftlagers (Festhaltekonstruktion) ist diese Horizontal force bearing (retaining structure) is this
Ausführungsform in besonders vorteilhafter Art und Weise geeignet, da die Lagereigenschaften innerhalb jener Ebene, in der das zweiachsig feste Horizontalkraftlager Bewegungen verhindert, somit unabhängig von der Richtung sind. Embodiment suitable in a particularly advantageous manner, since the bearing properties within the plane in which the biaxially fixed horizontal force bearing prevents movements, are thus independent of the direction.
Gemäß einer besonders bevorzugten Weiterbildung sind die According to a particularly preferred development are
Stützelemente dabei entlang einer Kreisbahn angeordnet, wobei der Abstand zwischen zwei benachbarten Stützelementen einen Kreisbogen entlang der Kreisbahn definiert, der größer ist als der jeweilige Kreisbogen des korrespondierenden ersten und zweiten Führungselements. Dadurch wird ermöglicht, dass das erste und zweite Führungselement durch die ausreichend Support elements are arranged along a circular path, the distance between two adjacent support elements defining a circular arc along the circular path which is greater than the respective circular arc of the corresponding first and second guide elements. This enables the first and second guide elements to pass through the sufficiently
beabstandeten Stützelemente, d. h. durch den bestehenden spaced support members, d. H. through the existing
Zwischenraum hindurch demontiert sowie wieder montiert werden kann, was die Wartungsfreundlichkeit des Bauwerks erhöht und somit dazu beiträgt Wartungskosten zu minimieren. The space can be dismantled and reassembled through, which increases the maintenance friendliness of the structure and thus helps to minimize maintenance costs.
In einer alternativen aber gleichermaßen bevorzugten In an alternative but equally preferred
Weiterbildung der Erfindung ist die erste Ankerstruktur im Wesentlichen rechteckig ausgeführt und sind das mindestens eine erste und das mindestens eine zweite Führungselement im Wesentlichen leistenförmig ausgeführt. Diese Aus führungs form eignet sich insbesondere für einachsig feste In a further development of the invention, the first anchor structure is essentially rectangular and the at least one first and the at least one second guide element are in the Essentially run in the form of strips. This embodiment is particularly suitable for single-axis fixed
Horizontalkraftlager (Führungslager), bei denen relativ große Bewegungen entlang beider Halbrichtungen nur einer Horizontal force bearing (guide bearing) with which relatively large movements along both half-directions are only one
horizontalen Achse ermöglicht werden sollen. horizontal axis should be enabled.
Ebenfalls dem Zweck der Realisation eines besonders flachen Horizontalkraftlagers zuträglich ist es, wenn die It is also beneficial to the purpose of realizing a particularly flat horizontal force bearing if the
Stützelemente in die horizontale Projektion der Support elements in the horizontal projection of the
Gleitkontakt zone hineinragen, bevorzugt mindestens bis zur horizontalen Projektion der Schwerelinie der Gleitkontakt zone ragen, besonders bevorzugt die horizontale Projektion der Gleitkontakt zone vollständig überdecken. In allen drei The sliding contact zone protrude, preferably at least as far as the horizontal projection of the center of gravity of the sliding contact zone, particularly preferably completely covering the horizontal projection of the sliding contact zone. In all three
Aus führungs formen lässt sich - wenn auch in unterschiedlich starker Ausprägung - ein äußerst flaches Horizontalkraftlager erzielen, was die weiter oben bereits beschriebenen Vorteile mit sich bringt. In embodiments, an extremely flat horizontal force bearing can be achieved - albeit in different degrees - which has the advantages already described above.
Nachfolgend wird ein Ausführungsbeispiel der Erfindung anhand der Zeichnungen näher erläutert. Dabei zeigt An exemplary embodiment of the invention is explained in more detail below with reference to the drawings. It shows
Fig.l das schematische Schnittbild eines Fig.l the schematic sectional view of a
Ausschnitts eines erfindungsgemäßen Bauwerks in der Seitenansicht, Detail of a building according to the invention in the side view,
Fig .2 das Horizontalkraftlager des Bauwerks nach Fig.l in der Seitenansicht, Fig. 2 the horizontal force bearing of the structure according to Fig.l in a side view,
Fig .3a den unteren und Fig.3b den oberen Teil des Horizontalkraftlagers nach Fig.2 jeweils einzeln in der Draufsicht, um die Übersichtlichkeit zu erhöhen. Fig. 3a the lower and Fig.3b the upper part of the horizontal force bearing according to Fig. 2 each individually in plan view, in order to increase the clarity.
Fig.l veranschaulicht schematisch ein erfindungsgemäßes Fig.l schematically illustrates an inventive
Bauwerk 1, umfassend ein erstes Bauwerksteil 2, ein relativ zu diesem bewegliches zweites Bauwerksteil 3 und mindestens zwei, zwischen den beiden Bauwerksteilen wirkende Bauwerkslager 4, 5, wobei ein erstes Bauwerkslager 4 geeignet ist vertikale Lasten zu übertragen und ein zweites Bauwerkslager 5 als zur Übertragung vertikaler Lasten ungeeignetes, in horizontaler Richtung einachsig festes Horizontalkraftlager 5 ausgeführt ist . Structure 1, comprising a first structure part 2, a second structure part 3 movable relative to this and at least two structure bearings 4 acting between the two structure parts, 5, wherein a first structural bearing 4 is suitable for transferring vertical loads and a second structural bearing 5 is designed as a horizontal force bearing 5 which is uniaxially fixed in the horizontal direction and unsuitable for transferring vertical loads.
Ein Ausführungsbeispiel eines derartigen Horizontalkraftlagers 5 ist in Fig.2 in der Seitenansicht dargestellt. Fig.3a und Fig.3b zeigen das gleiche Horizontalkraftlager 5, allerdings aus Gründen der Übersichtlichkeit getrennt nur den unteren Teil (Fig.3a) bzw. nur den oberen Teil (Fig.3b) - jeweils in der Draufsicht. Das Horizontalkraftlager 5 umfasst eine erste, untere Ankerstruktur 6 sowie eine zweite, obere Ankerstruktur 7. Die erste, untere Ankerstruktur 6 ist als einteilige, im Wesentlichen rechteckige Ankerplatte 8 ausgeführt und über an ihr angeordnete erste Ankerelemente 9, die als erste An embodiment of such a horizontal force bearing 5 is shown in Figure 2 in the side view. Fig.3a and Fig.3b show the same horizontal force bearing 5, but for the sake of clarity only the lower part (Fig.3a) and only the upper part (Fig.3b) - each in a top view. The horizontal force bearing 5 comprises a first, lower anchor structure 6 and a second, upper anchor structure 7. The first, lower anchor structure 6 is designed as a one-piece, essentially rectangular anchor plate 8 and via first anchor elements 9 arranged on it, which are the first
Kopfbolzen 10 ausgeführt sind, fest mit dem ersten Head studs 10 are designed to be fixed to the first
Bauwerksteil 2 verbunden. Die zweite, obere Ankerstruktur 7 ist ebenfalls im Wesentlichen rechteckig ausgeführt und über an ihr angeordnete zweite Ankerelemente 11, die als zweite Kopfbolzen 12 ausgeführt sind, fest mit dem zweiten Structural part 2 connected. The second, upper anchor structure 7 is also substantially rectangular and is fixed to the second via second anchor elements 11, which are arranged on it and are designed as second headed bolts 12
Bauwerksteil 3 verbunden. Die horizontale Ausdehnung der ersten Ankerstruktur 6 sowie der zweiten Ankerstruktur 7 ist dabei mindestens 10-mal größer als deren jeweilige vertikale Ausdehnung. In der ersten Ankerstruktur 6 sind vier erste Durchbrüche 13 und in der zweiten Ankerstruktur 7 vier zweite Durchbrüche 14 angeordnet, wobei jeweils ein erster Durchbruch 13 und ein zweiter Durchbruch 14 miteinander fluchten. Structural part 3 connected. The horizontal extent of the first anchor structure 6 and of the second anchor structure 7 is at least 10 times greater than their respective vertical extent. Four first openings 13 are arranged in the first anchor structure 6 and four second openings 14 are arranged in the second anchor structure 7, a first opening 13 and a second opening 14 being aligned with one another.
Zwei im Wesentlichen leistenförmig ausgeführte erste Two essentially strip-shaped first
Führungselemente 17 mit je einer ersten Gleitoberfläche 18 sind mit der ersten Ankerstruktur 6 lösbar verbunden, und zwei im Wesentlichen leistenförmig ausgeführte zweite Guide elements 17, each with a first sliding surface 18, are detachably connected to the first anchor structure 6, and two second, essentially strip-shaped ones
Führungselemente 19 mit je einer der ersten Gleitoberfläche 18 gegenüberstehenden zweiten Gleitoberfläche 20 sind mit der zweiten Ankerstruktur 7 lösbar verbunden. Die ersten Gleitoberflächen 18 und die zweiten Gleitoberflächen 20 stehen miteinander in Kontakt und überlappen einander in vertikaler Richtung unter Ausbildung zweier Gleitkontaktzonen 21. Die zwei Gleitkontaktzonen 21 überlappen in horizontaler Guide elements 19 each with a second sliding surface 20 opposite the first sliding surface 18 are connected to the second anchor structure 7 releasably connected. The first sliding surfaces 18 and the second sliding surfaces 20 are in contact with each other and overlap each other in the vertical direction to form two sliding contact zones 21. The two sliding contact zones 21 overlap in the horizontal direction
Projektion die erste Ankerstruktur 6. Die ersten Projection the first anchor structure 6. The first
Führungselemente 17 und zweiten Führungselemente 19 befinden sich dabei außerhalb der vertikalen Projektion der ersten Ankerstruktur 6. Guide elements 17 and second guide elements 19 are located outside the vertical projection of the first anchor structure 6.
Die zweite Ankerstruktur 7 umfasst eine zweite Ankerplatte 22 und unlösbar mit der Ankerplatte 22 verbundene, als The second anchor structure 7 comprises a second anchor plate 22 and non-detachably connected to the anchor plate 22, as
Stützrippen 23 ausgeführte Stützelemente 24. Supporting ribs 23 designed support elements 24.
Die zweiten Führungselemente 19 stützen sich jeweils The second guide elements 19 are each supported
formschlüssig mit horizontaler Kraftübertragung mit der ihrer zweiten Gleitoberfläche 20 gegenüberliegenden Seite an den zugeordneten Stützelementen 24 ab. Die Stützrippen 23 der zweiten Ankerstruktur 7, die zweiten Führungselemente 19 und die beiden Gleitkontaktzonen 21 überlappen in der horizontalen Projektion dabei das erste Bauwerksteil 2. Ferner überdecken die Stützelemente 24 die horizontale Projektion der beiden Gleitkontaktzonen 21 vollständig. Die zweite Ankerstruktur 7 ist dabei mittels Zuganker 25, die außerhalb der vertikalen Projektion der ersten Ankerstruktur 6 zwischen zwei einander benachbarten Stützrippen 23 angreifen, mit dem zweiten positively with horizontal force transmission with the side opposite its second sliding surface 20 on the associated support elements 24. The support ribs 23 of the second anchor structure 7, the second guide elements 19 and the two sliding contact zones 21 overlap the first structural part 2 in the horizontal projection. Furthermore, the supporting elements 24 completely cover the horizontal projection of the two sliding contact zones 21. The second anchor structure 7 is connected to the second by means of tie rods 25 which engage outside of the vertical projection of the first anchor structure 6 between two mutually adjacent support ribs 23
Bauwerksteil 3 fest verbunden. Bei der ersten Ankerstruktur 6 sind keine diese mit dem ersten Bauwerksteil 2 verbindende Zuganker vorgesehen. Structural part 3 firmly connected. In the case of the first anchor structure 6, no tie rods connecting it to the first structural part 2 are provided.
Die jeweilige Gleitoberfläche 20 beider zweiten The respective sliding surface 20 of both second
Führungselemente 19 ist durch Oberflächenbehandlung, Guide elements 19 is through surface treatment,
beispielsweise durch Härten und/oder Polieren, in besonderer Weise dazu geeignet, eine reibungsarme Gleitpaarung mit der jeweiligen Gleitoberfläche 18 der korrespondierenden, for example by hardening and / or polishing, particularly suitable for achieving a low-friction sliding pairing with the respective sliding surface 18 of the corresponding,
angrenzenden ersten Führungselemente 17 auszubilden. Die beiden ersten Führungselemente 17 umfassen jeweils ein to form adjacent first guide elements 17. The two first guide elements 17 each include a
Gleitelement 26 und einen Gleitelementträger 27, wobei eine Oberfläche des Gleitelements 26 die Gleitoberfläche 18 des jeweiligen ersten Führungselements 17 ausbildet. Das Sliding element 26 and a sliding element carrier 27, one surface of the sliding element 26 forming the sliding surface 18 of the respective first guide element 17. The
Gleitelement 26 ist insbesondere aus PTFE, UHMWPE oder einem anderen gleichermaßen geeigneten Material ausgeführt. Sliding element 26 is made in particular of PTFE, UHMWPE or another equally suitable material.
Durch Entnahme und Wiedereinsetzen der Führungselemente 17, 19 und/oder der Gleitelemente 26 entlang der durch die By removing and reinserting the guide elements 17, 19 and / or the sliding elements 26 along the through the
Leistenform der Führungselemente 17, 19 definierten Achsen sind die Führungselemente 17, 19 und/oder die Gleitelemente 26 bei unverändertem vertikalem Abstand der zwei Ankerstrukturen 6, 7 zueinander austauschbar, wobei die Zuganker 25 hierbei ihre Position beibehalten können und somit nicht entfernt werden müssen. The guide elements 17, 19 and / or the sliding elements 26 are interchangeable with the same vertical spacing of the two anchor structures 6, 7 from one another, the tie rods 25 being able to maintain their position and therefore not having to be removed.

Claims

Ansprüche Expectations
1. Bauwerk (1), umfassend ein erstes Bauwerksteil (2), ein 1. Building (1), comprising a first building part (2)
relativ zu diesem bewegliches zweites Bauwerksteil (3) und mindestens zwei, zwischen den beiden Bauwerksteilen wirkende Bauwerkslager (4, 5), wobei ein erstes Bauwerkslager (4) zur Übertragung vertikaler Lasten geeignet ist und ein zweites Bauwerkslager (5) folgende Merkmale aufweist: relative to this second structural part (3) that is movable and at least two structural bearings (4, 5) acting between the two structural parts, a first structural bearing (4) being suitable for transferring vertical loads and a second structural bearing (5) having the following features:
- Das zweite Bauwerkslager (5) ist ein zur Übertragung - The second building warehouse (5) is a transfer
vertikaler Lasten ungeeignetes, in horizontaler Richtung einachsig oder zweiachsig festes Horizontalkraftlager (5); unsuitable for vertical loads, uniaxially or biaxially fixed horizontal force bearing (5);
- das Horizontalkraftlager (5) umfasst eine erste - The horizontal force bearing (5) comprises a first
Ankerstruktur (6), die über an ihr angeordnete erste Anchor structure (6), the first arranged on it
Ankerelemente (9) fest mit dem ersten Bauwerksteil (2) verbunden ist, und eine zweite Ankerstruktur (7), die über an ihr angeordnete zweite Ankerelemente (11) fest mit dem zweiten Bauwerksteil (3) verbunden ist; Anchor elements (9) are firmly connected to the first structural part (2), and a second anchor structure (7) which is firmly connected to the second structural part (3) via second anchor elements (11) arranged on it;
- mindestens ein erstes Führungselement (17) mit einer - At least one first guide element (17) with a
ersten Gleitoberfläche (18) ist mit der ersten first sliding surface (18) is with the first
Ankerstruktur (6) lösbar verbunden, und mindestens ein zweites Führungselement (19) mit einer der ersten Anchoring structure (6) releasably connected, and at least one second guide element (19) with one of the first
Gleitoberfläche (18) gegenüberstehenden zweiten Sliding surface (18) opposite second
Gleitoberfläche (20) ist mit der zweiten Ankerstruktur (7) lösbar verbunden, wobei die erste Gleitkontaktfläche (18) und die zweite Gleitoberfläche (20) miteinander in Kontakt stehen und einander in vertikaler Richtung unter The sliding surface (20) is detachably connected to the second anchor structure (7), the first sliding contact surface (18) and the second sliding surface (20) being in contact with one another and below one another in the vertical direction
Ausbildung mindestens einer Gleitkontaktzone (21) Formation of at least one sliding contact zone (21)
überlappen; overlap;
- die mindestens eine Gleitkontaktzone (21) überlappt in horizontaler Projektion die erste Ankerstruktur (6); - The at least one sliding contact zone (21) overlaps the first anchor structure (6) in a horizontal projection;
- die zweite Ankerstruktur (7) umfasst Stützelemente (24), an denen sich das zugeordnete mindestens eine zweite - The second anchor structure (7) comprises support elements (24) on which the associated at least one second
Führungselement (19) gegenüberliegend seiner zweiten Guide element (19) opposite its second
Gleitoberfläche (20) mit horizontaler Kraftübertragung formschlüssig abstützt; - die zweite Ankerstruktur (7) und/oder das mindestens eine zweite Führungselement (19) überlappt in der horizontalen Projektion das erste Bauwerksteil (2) . Supports sliding surface (20) in a form-fitting manner with horizontal force transmission; - The second anchor structure (7) and / or the at least one second guide element (19) overlaps the first structural part (2) in the horizontal projection.
2. Bauwerk (1) nach Anspruch 1, dadurch gekennzeichnet, dass sich der erste Bauwerksteil (2) in die horizontale 2. Building (1) according to claim 1, characterized in that the first building part (2) is in the horizontal
Projektion der Gleitkontaktzone (21) hineinerstreckt. Projection of the sliding contact zone (21) extends into it.
3. Bauwerk (1) nach mindestens einem der vorhergehenden 3. Building (1) according to at least one of the preceding
Ansprüche, dadurch gekennzeichnet, dass mindestens eines der Führungselemente (17, 19) bei unverändertem vertikalem Claims, characterized in that at least one of the guide elements (17, 19) with unchanged vertical
Abstand der zwei Ankerstrukturen (6, 7) zueinander Distance between the two anchor structures (6, 7)
austauschbar ist. is interchangeable.
4. Bauwerk (1) nach mindestens einem der vorhergehenden 4. Structure (1) according to at least one of the preceding
Ansprüche, dadurch gekennzeichnet, dass die Gleitoberfläche Claims, characterized in that the sliding surface
(18, 20) mindestens eines der Führungselemente (17, 19) durch Oberflächenbehandlung, insbesondere durch Härten und/oder Polieren, in besonderer Weise dazu geeignet ist, eine reibungsarme Gleitpaarung mit der Gleitoberfläche (18, 20) des korrespondierenden, angrenzenden Führungselements (17, 19) auszubilden. (18, 20) at least one of the guide elements (17, 19) by surface treatment, in particular by hardening and / or polishing, is particularly suitable for achieving a low-friction sliding pairing with the sliding surface (18, 20) of the corresponding, adjacent guide element (17 , 19) to train.
5. Bauwerk (1) nach mindestens einem der vorhergehenden 5. Structure (1) according to at least one of the preceding
Ansprüche, dadurch gekennzeichnet, dass mindestens eines der Führungselemente (17, 19) ein Gleitelement (26) und einen Gleitelementträger (27) umfasst, wobei eine Oberfläche des Gleitelements (26) die Gleitoberfläche (18, 20) des Claims, characterized in that at least one of the guide elements (17, 19) comprises a sliding element (26) and a sliding element carrier (27), one surface of the sliding element (26) being the sliding surface (18, 20) of the
mindestens einen Führungselements (17, 19) ausbildet, und wobei das Gleitelement (26) insbesondere aus PTFE oder at least one guide element (17, 19) forms, and wherein the sliding element (26) in particular made of PTFE or
UHMWPE ausgeführt ist. UHMWPE is executed.
6. Bauwerk (1) nach Anspruch 5, dadurch gekennzeichnet, dass mindestens eines der Gleitelemente (26) bei unverändertem vertikalem Abstand der zwei Ankerstrukturen (6, 7) zueinander austauschbar ist. 6. Building (1) according to claim 5, characterized in that at least one of the sliding elements (26) with unchanged vertical distance between the two anchor structures (6, 7) is interchangeable.
7. Bauwerk (1) nach mindestens einem der vorhergehenden 7. Structure (1) according to at least one of the preceding
Ansprüche, dadurch gekennzeichnet, dass die Stützelemente Claims, characterized in that the support elements
(24) als Stützrippen (23) ausgeführt sind. (24) are designed as support ribs (23).
8. Bauwerk (1) nach mindestens einem der vorhergehenden 8. Structure (1) according to at least one of the preceding
Ansprüche, dadurch gekennzeichnet, dass keine die erste Ankerstruktur (6) mit dem ersten Bauwerksteil (2) Claims, characterized in that none of the first anchor structure (6) with the first structural part (2)
verbindenden Zuganker vorgesehen sind. connecting tie rods are provided.
9. Bauwerk (1) nach mindestens einem der vorhergehenden 9. Structure (1) according to at least one of the preceding
Ansprüche, dadurch gekennzeichnet, dass keine die zweite Ankerstruktur (7) mit dem zweiten Bauwerksteil (3) Claims, characterized in that none of the second anchor structure (7) with the second structural part (3)
verbindenden Zuganker vorgesehen sind. connecting tie rods are provided.
10. Bauwerk (1) nach mindestens einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, dass die zweite Ankerstruktur (7) mittels Zuganker (25) , die außerhalb der vertikalen 10. Building (1) according to at least one of claims 1 to 8, characterized in that the second anchor structure (7) by means of tie rods (25) which are outside the vertical
Projektion der ersten Ankerstruktur (6) angreifen, mit dem zweiten Bauwerksteil (3) fest verbunden ist. Attack projection of the first anchor structure (6), is firmly connected to the second structural part (3).
11. Bauwerk (1) nach Anspruch 10, dadurch gekennzeichnet, dass mindestens eines der Führungselemente (17, 19) unter 11. Building (1) according to claim 10, characterized in that at least one of the guide elements (17, 19) below
Beibehaltung der Position der Zuganker (25) austauschbar ist . Retaining the position of the tie rod (25) is replaceable.
12. Bauwerk (1) nach Anspruch 10 oder 11, dadurch 12. Building (1) according to claim 10 or 11, characterized
gekennzeichnet, dass die Stützelemente (24) als Stützrippen (23) ausgeführt sind und dass die Zuganker (25) zwischen zwei einander benachbarten Stützrippen (23) angreifen. characterized in that the support elements (24) are designed as support ribs (23) and that the tie rods (25) engage between two adjacent support ribs (23).
13. Bauwerk (1) nach mindestens einem der vorhergehenden 13. Structure (1) according to at least one of the preceding
Ansprüche, dadurch gekennzeichnet, dass die erste Ankerstruktur (6) eine obere Ankerstruktur und die zweite Ankerstruktur (7) eine untere Ankerstruktur bildet. Claims, characterized in that the first Anchoring structure (6) forms an upper anchor structure and the second anchor structure (7) forms a lower anchor structure.
14. Bauwerk (1) nach mindestens einem der Ansprüche 1 bis 12, dadurch gekennzeichnet, dass die erste Ankerstruktur (6) eine untere Ankerstruktur (6) und die zweite Ankerstruktur (7) eine obere Ankerstruktur (7) bildet. 14. Building (1) according to at least one of claims 1 to 12, characterized in that the first anchor structure (6) forms a lower anchor structure (6) and the second anchor structure (7) forms an upper anchor structure (7).
15. Bauwerk (1) nach mindestens einem der vorhergehenden 15. Structure (1) according to at least one of the preceding
Ansprüche, dadurch gekennzeichnet, dass sich das erste Claims, characterized in that the first
Führungselement (17) und zweite Führungselement (19) Guide element (17) and second guide element (19)
außerhalb der vertikalen Projektion der ersten Ankerstruktur (6) befinden. located outside the vertical projection of the first anchor structure (6).
16. Bauwerk (1) nach mindestens einem der vorhergehenden 16. Structure (1) according to at least one of the preceding
Ansprüche, dadurch gekennzeichnet, dass die erste Claims, characterized in that the first
Ankerstruktur (6) als Ankerplatte (8) ausgeführt ist Anchoring structure (6) is designed as an anchor plate (8)
und/oder die zweite Ankerstruktur (7) eine Ankerplatte (22) sowie unlösbar mit dieser verbundene Stützelemente (24) umfasst . and / or the second anchor structure (7) comprises an anchor plate (22) and support elements (24) permanently connected to this.
17. Bauwerk (1) nach mindestens einem der vorhergehenden 17. Structure (1) according to at least one of the preceding
Ansprüche, dadurch gekennzeichnet, dass die horizontale Ausdehnung der ersten Ankerstruktur (6) mindestens 10-mal größer ist als deren vertikale Ausdehnung und/oder dass die horizontale Ausdehnung der zweiten Ankerstruktur (7) Claims, characterized in that the horizontal extent of the first anchor structure (6) is at least 10 times greater than its vertical extent and / or that the horizontal extent of the second anchor structure (7)
mindestens 10-mal größer ist als deren vertikale Ausdehnung. is at least 10 times larger than their vertical extent.
18. Bauwerk (1) nach mindestens einem der vorhergehenden 18. Structure (1) according to at least one of the preceding
Ansprüche, dadurch gekennzeichnet, dass in der ersten Claims, characterized in that in the first
Ankerstruktur (6) mindestens ein erster Durchbruch (13) und in der zweiten Ankerstruktur (7) mindestens ein zweiter Durchbruch (14) angeordnet ist, wobei jeweils ein erster Durchbruch (13) und ein zweiter Durchbruch (14) miteinander fluchten . Anchoring structure (6) at least one first opening (13) and at least one second opening (14) in the second anchor structure (7), a first opening (13) and a second opening (14) being aligned with one another.
19. Bauwerk (1) nach mindestens einem der vorhergehenden 19. Structure (1) according to at least one of the preceding
Ansprüche, dadurch gekennzeichnet, dass die erste Claims, characterized in that the first
Ankerstruktur (6) mindestens zwei erste Anchor structure (6) at least two first
Transportsicherungselementaufnahmen umfasst und die zweite Ankerstruktur (7) mindestens zwei zweite Includes transport securing element receptacles and the second anchor structure (7) at least two second
Transportsicherungselementaufnahmen umfasst, wobei je eine erste Transportsicherungselementaufnahme und je eine zweite Transportsicherungselementaufnahme miteinander fluchten. Includes transport securing element receptacles, a first transport securing element receptacle and a second transport securing element receptacle being aligned with one another.
20. Bauwerk (1) nach mindestens einem der vorhergehenden 20. Building (1) according to at least one of the preceding
Ansprüche, dadurch gekennzeichnet, dass mindestens eine der Ankerstrukturen (6, 7) einteilig ausgeführt ist. Claims, characterized in that at least one of the anchor structures (6, 7) is made in one piece.
21. Bauwerk (1) nach mindestens einem der vorhergehenden 21. Structure (1) according to at least one of the preceding
Ansprüche, dadurch gekennzeichnet, dass die erste Claims, characterized in that the first
Ankerstruktur (6) im Wesentlichen rotationssymmetrisch ausgeführt ist und das mindestens eine erste und das mindestens eine zweite Führungselement (17, 19) im The anchor structure (6) is essentially rotationally symmetrical and the at least one first and the at least one second guide element (17, 19) in the
Wesentlichen kreisbogenförmig ausgeführt sind. Are made substantially circular arc.
22. Bauwerk (1) nach Anspruch 21, dadurch gekennzeichnet, dass die Stützelemente (24) entlang einer Kreisbahn angeordnet sind, wobei der Abstand zwischen zwei benachbarten 22. Building (1) according to claim 21, characterized in that the support elements (24) are arranged along a circular path, the distance between two adjacent ones
Stützelementen (24) einen Kreisbogen entlang der Kreisbahn definiert, der größer ist als der jeweilige Kreisbogen des korrespondierenden ersten und zweiten Führungselements (17, 19) . Supporting elements (24) defines a circular arc along the circular path which is larger than the respective circular arc of the corresponding first and second guide elements (17, 19).
23. Bauwerk (1) nach mindestens einem der Ansprüche 1 bis 20, dadurch gekennzeichnet, dass die erste Ankerstruktur (6) im Wesentlichen rechteckig ausgeführt ist und das mindestens eine erste und das mindestens eine zweite Führungselement (17, 19) im Wesentlichen leistenförmig ausgeführt sind. 23. Building (1) according to at least one of claims 1 to 20, characterized in that the first anchor structure (6) is essentially rectangular and the at least one first and the at least one second guide element (17, 19) are essentially strip-shaped are.
24. Bauwerk (1) nach mindestens einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Stützelemente24. Building (1) according to at least one of the preceding claims, characterized in that the support elements
(24) in die horizontale Projektion der Gleitkontaktzone (21) hineinragen . (24) protrude into the horizontal projection of the sliding contact zone (21).
25. Bauwerk (1) nach Anspruch 24, dadurch gekennzeichnet, dass die Stützelemente (24) mindestens bis zur horizontalen 25. Building (1) according to claim 24, characterized in that the support elements (24) at least up to the horizontal
Projektion der Schwerelinie der Gleitkontaktzone (21) ragen. Projection of the line of gravity of the sliding contact zone (21).
26. Bauwerk (1) nach Anspruch 25, dadurch gekennzeichnet, dass die Stützelemente (24) die horizontale Projektion der 26. Building (1) according to claim 25, characterized in that the support elements (24) the horizontal projection of the
Gleitkontaktzone (21) vollständig überdecken. Completely cover the sliding contact zone (21).
PCT/EP2020/065078 2019-06-05 2020-05-29 Building structure WO2020245065A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP20733900.3A EP3980600B1 (en) 2019-06-05 2020-05-29 Building structure

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102019115124.4A DE102019115124A1 (en) 2019-06-05 2019-06-05 Building
DE102019115124.4 2019-06-05

Publications (1)

Publication Number Publication Date
WO2020245065A1 true WO2020245065A1 (en) 2020-12-10

Family

ID=71111391

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2020/065078 WO2020245065A1 (en) 2019-06-05 2020-05-29 Building structure

Country Status (3)

Country Link
EP (1) EP3980600B1 (en)
DE (1) DE102019115124A1 (en)
WO (1) WO2020245065A1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100741718B1 (en) * 2007-03-14 2007-07-23 매크로드 주식회사 A prestressed rubbing control type a shear key
DE102010033159A1 (en) * 2010-08-03 2012-02-09 Db Netz Ag Device for supporting railway bridge, has calotte that pushes away sliding metal sheet at steel box which is secured in base plate through head bolt dowel, over lubricating layer

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT509074B1 (en) * 2009-10-23 2011-06-15 Rw Sollinger Huette Gmbh BUILDING BEARING

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100741718B1 (en) * 2007-03-14 2007-07-23 매크로드 주식회사 A prestressed rubbing control type a shear key
DE102010033159A1 (en) * 2010-08-03 2012-02-09 Db Netz Ag Device for supporting railway bridge, has calotte that pushes away sliding metal sheet at steel box which is secured in base plate through head bolt dowel, over lubricating layer

Also Published As

Publication number Publication date
EP3980600A1 (en) 2022-04-13
EP3980600B1 (en) 2023-01-18
DE102019115124A1 (en) 2020-12-10

Similar Documents

Publication Publication Date Title
DE3734390C2 (en) Composite for formwork
DE69923038T2 (en) Connecting device for metallic grid elements
EP3077133A1 (en) Bending press
EP1785546B1 (en) Anchor bracket for fixing a cladding onto a building wall
DE102012214396A1 (en) Wall formwork with connection device
DE202007007307U1 (en) Transport bridge for an injection mold
EP3529430B1 (en) Post for a post-and-beam construction
WO2018141475A1 (en) Joint bridging apparatus
AT507412A4 (en) BENDING PEG WITH SUPPORT BEARING DEVICE FOR DRIVE AGENTS
EP3980600B1 (en) Building structure
EP0400198A1 (en) Device for resiliently clamping supporting beams in a roadway bridging construction
EP1031668B1 (en) Building element for heat insulation
EP3775434B1 (en) Boom with an internal screw fastening for a pipe retainer
EP3330110A1 (en) Bearing block for fixing a beam axle longitudinal arm with component affecting operating load case
DE202017007410U1 (en) Device for non-positive and / or positive fastening of a component to a vehicle frame
DE202006010169U1 (en) Dismounting equipment for vehicle shock absorbers and springs, includes base plate with fixed and moveable supports carrying swinging arms to engage vehicle springs
EP4065773B1 (en) Expansion joint bridging device
AT521639B1 (en) Steel mast
DE102019219001B4 (en) Hook block for a crane
DE102016014659A1 (en) Working machine with a ballast device
DE2358146C3 (en) Building ceiling
AT414250B (en) LENGTH CONNECTION OF TWO METAL SUPPLEMENTS BELONGING TO THEIR HEADS
WO2021152073A1 (en) Structure sliding bearing and structure bearing system
WO2023110417A1 (en) Assembly of a hollow rail in a lift shaft of a lift installation
WO2023241941A1 (en) Hoistway module for forming a hoistway composed of stacked hoistway modules for a lift installation

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20733900

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2020733900

Country of ref document: EP

Effective date: 20220105