WO2020049663A1 - ヒートポンプ式蒸気生成装置 - Google Patents

ヒートポンプ式蒸気生成装置 Download PDF

Info

Publication number
WO2020049663A1
WO2020049663A1 PCT/JP2018/032911 JP2018032911W WO2020049663A1 WO 2020049663 A1 WO2020049663 A1 WO 2020049663A1 JP 2018032911 W JP2018032911 W JP 2018032911W WO 2020049663 A1 WO2020049663 A1 WO 2020049663A1
Authority
WO
WIPO (PCT)
Prior art keywords
water
steam
heated
control unit
heat pump
Prior art date
Application number
PCT/JP2018/032911
Other languages
English (en)
French (fr)
Inventor
賢哲 安嶋
岩崎 正道
祐輔 大西
中村 淳
修平 柴田
泰二 森
Original Assignee
富士電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 富士電機株式会社 filed Critical 富士電機株式会社
Priority to CN201880077881.3A priority Critical patent/CN111433514B/zh
Priority to JP2019529946A priority patent/JP6645624B1/ja
Priority to PCT/JP2018/032911 priority patent/WO2020049663A1/ja
Publication of WO2020049663A1 publication Critical patent/WO2020049663A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B1/00Methods of steam generation characterised by form of heating method
    • F22B1/02Methods of steam generation characterised by form of heating method by exploitation of the heat content of hot heat carriers
    • F22B1/16Methods of steam generation characterised by form of heating method by exploitation of the heat content of hot heat carriers the heat carrier being hot liquid or hot vapour, e.g. waste liquid, waste vapour
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B1/00Methods of steam generation characterised by form of heating method
    • F22B1/28Methods of steam generation characterised by form of heating method in boilers heated electrically
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B3/00Other methods of steam generation; Steam boilers not provided for in other groups of this subclass
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B37/00Component parts or details of steam boilers
    • F22B37/02Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
    • F22B37/56Boiler cleaning control devices, e.g. for ascertaining proper duration of boiler blow-down
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B1/00Compression machines, plants or systems with non-reversible cycle

Definitions

  • the present invention relates to a heat pump type steam generator.
  • One of the steam generators is a heat pump type steam generator using a heat pump cycle.
  • heat is recovered from waste heat source water such as factory wastewater or used cooling water to generate steam.
  • waste heat source water such as factory wastewater or used cooling water
  • there are advantages such as a lower running cost and a reduction in carbon dioxide emissions as compared with a combustion steam generator using combustion heat of fuel such as a boiler facility. is there.
  • Water to be heated which is a raw material for steam, contains scale-causing substances such as silica (silicon dioxide). For this reason, when steam is continuously generated, the scale-causing substance of the water to be heated is concentrated, which causes scale adhesion.
  • a blowdown channel is provided in the steam separator in which the heated water is stored, and the heated water stored in the steam separator is discharged from the blowdown channel periodically or temporarily.
  • the present invention has been made in view of the above circumstances, and has as its object to provide a heat pump type steam generation device capable of preventing scale adhesion.
  • a heat pump type steam generation device includes a heat pump type steam generation device in which a refrigerant absorbs heat from a heat source water and transmits the absorbed heat to heated water to generate steam.
  • the control unit ends the dilution process when a preset dilution process end condition is satisfied, and drains the heated water of the steam generation unit to the outside. It is characterized by carrying out wastewater treatment.
  • control unit may be configured such that when the amount of water to be heated in the steam generation unit exceeds a preset water amount, or when the dilution process is continued for a preset time.
  • the scale-causing substance contained in the water to be heated in the steam generation section is lower than a preset concentration, it is determined that the dilution processing end condition is satisfied.
  • control unit may perform a sealing process of terminating the drainage process and closing the steam generation unit when a preset drainage treatment end condition is satisfied. It is characterized in that it is implemented.
  • control unit may be configured to perform the control when the pressure of the steam generation unit decreases to a preset value or when the drainage process is continued for a preset time. It is characterized in that it is determined that the drainage treatment end condition is satisfied.
  • the control unit closes the expansion mechanism until the suction pressure of the compressor falls below a preset value when an operation stop command is given. And performing a pump-down process for operating the compressor in a state where the compressor is operated.
  • the control unit terminates the pump-down process when the suction pressure of the compressor falls below a preset value.
  • the control unit continuously performs the dilution process until the pump down process ends, and the heated water of the steam generation unit is set in advance.
  • the amount of water is exceeded, or when the dilution process is continued for a preset time, a drainage process of draining the heated water to the outside is performed.
  • control unit is configured such that, when the pressure of the steam generation unit decreases to a preset value, or when the drainage process is continued for a preset time,
  • the present invention is characterized in that a sealing process is performed in which the drainage process is terminated and the steam generation unit is closed.
  • control unit is configured to, when a start command is given, when the refrigerant pressure from the compressor to the expansion mechanism exceeds a preset value. It is characterized in that introduction of heated water from the outside into the generation unit is started.
  • the control unit starts the operation of the compressor when a temperature of the evaporator reaches a preset value when a start command is given. It is characterized by the following.
  • the scale-causing substance contained in the heated water is diluted, and the scale adheres. Can be prevented more reliably.
  • FIG. 1 is a diagram showing a configuration of a heat pump type steam generator according to Embodiment 1 of the present invention.
  • FIG. 2 is a diagram schematically showing a configuration of a steam generation unit applied to the heat pump type steam generation device of FIG.
  • FIG. 3 is a flowchart illustrating an example of a steam generation process performed by the control unit illustrated in FIG. 1.
  • FIG. 4 is a flowchart showing the contents of the activation process shown in FIG.
  • FIG. 5 is a flowchart showing the contents of the operation stop processing shown in FIG.
  • FIG. 6 is a flowchart showing the contents of the dilution sealing process shown in FIG.
  • FIG. 7 is a flowchart showing the contents of the pump-down process shown in FIG. FIG.
  • FIG. 8 is a diagram showing a configuration of a heat pump type steam generator according to Embodiment 2 of the present invention.
  • FIG. 9 is a flowchart illustrating the content of the startup process performed in the second embodiment.
  • FIG. 10 is a flowchart showing the contents of the operation stop processing performed in the second embodiment.
  • FIG. 11 is a flowchart showing the contents of the dilution sealing process performed in the second embodiment.
  • FIG. 1 shows a configuration of a heat pump type steam generator according to Embodiment 1 of the present invention.
  • the heat pump type steam generator exemplified here collects waste heat from waste heat water (heat source water) such as factory wastewater, and generates steam using the collected waste heat.
  • the apparatus includes a supply section A, a steam generation section B through which water to be heated introduced from the outside flows, and a heat pump section C interposed between the heat source water supply system A and the steam generation section B.
  • the heat source water supply section A circulates waste hot water in the hot water circulation path 1.
  • a hot water tank and a hot water supply pump are provided upstream of the hot water distribution path 1.
  • the operation of the hot water supply pump causes the exhaust hot water stored in the hot water tank to flow through the hot water supply passage at a predetermined flow rate.
  • the steam generation section B circulates heated water for generating steam, and includes the steam separator 10.
  • the steam separator 10 is constituted by a cylindrical container extending in a vertical direction.
  • the steam separator 10 is provided with a pressure sensor and a water level sensor 12, as well as a delivery path 13 and a circulating water path 14.
  • the pressure sensor 11 detects the pressure inside the steam separator 10, and the water level sensor 12 detects the level of the heated water stored in the steam separator 10. The detection results of these sensors 11 and 12 are transmitted to a control unit 20 described later.
  • the delivery path 13 is connected to an external steam utilization facility (not shown), and communicates with the inside at the upper end of the steam separator 10.
  • the delivery path 13 is provided with a delivery valve 15.
  • the delivery valve 15 is a pressure regulating valve that can adjust the pressure of the delivery path 13 by changing the opening in accordance with a given command.
  • the delivery valve 15 can shut off the delivery path 13 when a fully closed command is given. The function of shutting off the delivery path 13 does not need to be provided in the delivery valve 15, and a dedicated on-off valve may be added.
  • the circulating water path 14 has one end communicating with the inside at the lower end of the steam separator 10 and the other end communicating with the inside at the upper peripheral surface of the steam separator 10.
  • the circulating water path 14 is connected to a water supply path 30, a first blow-down path 40, and a second blow-down path 50.
  • the water supply path 30 supplies heated water from an external water supply source to the circulating water path 14, and includes a water supply valve 31 and a water supply pump 32.
  • the water supply valve 31 is an on-off valve that opens and closes the water supply path 30 by changing an opening degree according to a given command.
  • the flow rate of the heated water supplied to the circulating water path 14 can be changed by controlling the rotation speed of the water supply pump 32.
  • the level of the heated water stored in the steam separator 10 also changes.
  • the first blow-down path 40 and the second blow-down path 50 are for draining the heated water in the circulating water path 14 to the outside.
  • the first blow-down path 40 is provided with a first on-off valve 41
  • the second blow-down path 50 is provided with a second on-off valve 51 and a check valve 52.
  • the first blow-down path 40 has an inner diameter larger than that of the second blow-down path 50.
  • the first opening / closing valve 41 and the second opening / closing valve 51 are opening / closing valves that open and close the corresponding blowdown paths 40 and 50 by changing the opening in accordance with the respective commands.
  • the check valve 52 allows only the passage of the heated water from the circulating water path 14 to the outside in the second blowdown path 50.
  • the first blowdown path 40 is connected to the lowest position on the downstream side of the connection part of the water supply path 30 in the circulating water path 14.
  • the second blowdown path 50 is connected between the steam separator 10 and the water supply path 30 in the circulating water path 14.
  • a drainage tank is connected to an open end of each of the blow-down paths 40 and 50.
  • the heat pump section C transfers the heat of the waste hot water flowing through the hot water flow path 1 of the heat source water supply section A to the heated water flowing through the circulating water path 14 of the steam generation section B by the circulating refrigerant.
  • the heat pump unit C of the first embodiment includes an evaporator 61, a compressor 62, a condenser 63, a subcooler 64, and an expansion mechanism 65 that are sequentially connected by a refrigerant circulation path 60. I have.
  • the evaporator 61 evaporates the circulating refrigerant by performing heat exchange with waste hot water circulated in the hot water circulation path 1 of the heat source water supply unit A.
  • the compressor 62 compresses the refrigerant after passing through the evaporator 61.
  • the condenser 63 exchanges heat between the refrigerant discharged from the compressor 62 and the heated water flowing through the circulating water path 14.
  • the supercooler 64 exchanges heat between the refrigerant having passed through the condenser 63 and the heated water flowing through the water supply path 30.
  • the expansion mechanism 65 reduces the pressure of the refrigerant after passing through the subcooler 64.
  • an electronic expansion valve whose opening can be changed according to a given command is applied.
  • the expansion mechanism 65 can shut off the refrigerant circulation path 60 when a fully closed command is given.
  • the condenser 63 is installed at a lower position in the height direction than the steam separator 10. More specifically, the condenser 63 is positioned above the steam separator 10 so that the discharge port 63a of the heated water is lower than the surface of the heated water stored in the steam separator 10. It is installed with the position in the vertical direction defined. As a result, in the steam generator B, a water level difference W (head difference on the water surface) is formed between the water level of the steam separator 10 and the water level of the condenser 63, and a separate circulation pump is required due to the thermosiphon phenomenon. Without heating, the heated water of the steam separator 10 can be reliably circulated to the condenser 63.
  • W head difference on the water surface
  • the heat pump section C includes a suction pressure sensor 66, a discharge pressure sensor 67, a suction temperature sensor 68, and an evaporator temperature sensor 69.
  • the suction pressure sensor 66 detects the pressure of the refrigerant drawn into the compressor 62
  • the discharge pressure sensor 67 detects the pressure of the refrigerant discharged from the compressor 62.
  • the suction temperature sensor 68 detects the temperature of the refrigerant sucked into the compressor 62
  • the evaporator temperature sensor 69 detects the surface temperature of the evaporator 61.
  • the surface temperature of the evaporator 61 is, for example, a brazing plate type evaporation in which a plurality of heat transfer plates are overlapped between a front cover and a back cover, and a flow path of the refrigerant and a flow path of the waste water are alternately formed.
  • a heater it is the temperature of the front cover that is the supply side of the refrigerant and the waste water.
  • the detection result of the suction pressure sensor 66, the detection result of the discharge pressure sensor 67, the detection result of the suction temperature sensor 68, and the detection result of the evaporator temperature sensor 69 are respectively given to the control unit 20.
  • the control unit 20 includes an operation command input from an operation input unit such as a start switch, a start timer, and an operation stop switch (not shown), or the above-described pressure sensor 11, water level sensor 12, suction pressure sensor 66, discharge pressure sensor 67,
  • an operation input unit such as a start switch, a start timer, and an operation stop switch (not shown)
  • a state detection unit such as the evaporator temperature sensor 69, the compressor 62, the expansion mechanism 65, the water supply pump 32, and the delivery valve 15 are preliminarily stored on the basis of programs and data stored in a memory (not shown).
  • the water supply valve 31, the first opening / closing valve 41, and the second opening / closing valve 51 are preliminarily stored on the basis of programs and data stored in a memory (not shown).
  • the control unit 20 may be realized by causing a processing device such as a CPU (Central Processing Unit) to execute a program, that is, by software, or by hardware such as an IC (Integrated Circuit). good. Further, the control unit 20 may be realized by using both software and hardware.
  • a processing device such as a CPU (Central Processing Unit) to execute a program, that is, by software, or by hardware such as an IC (Integrated Circuit). good. Further, the control unit 20 may be realized by using both software and hardware.
  • a processing device such as a CPU (Central Processing Unit) to execute a program, that is, by software, or by hardware such as an IC (Integrated Circuit). good. Further, the control unit 20 may be realized by using both software and hardware.
  • IC Integrated Circuit
  • FIGS. 3 to 7 show the contents of the steam generation process repeatedly executed by the control unit 20 at a predetermined cycle time.
  • the contents of the steam generation processing performed by the control unit 20 will be described with reference to these flowcharts as appropriate.
  • the heat pump type steam generator is in an operation stop state.
  • the expansion mechanism 65, the delivery valve 15, the water supply valve 31, the first opening / closing valve 41, and the second opening / closing valve 51 are each in a fully closed state, and the water supply pump 32 and the compressor 62 are each stopped. I have.
  • the steam generator B all the paths are empty.
  • a hot water supply pump (not shown) is constantly operated, and the hot water discharged from the hot water tank is flowing through the hot water flow path 1.
  • the route does not necessarily need to be empty, and the amount of the water to be heated may be smaller than that in the normal operation. It does not matter if it remains.
  • the control unit 20 monitors the presence or absence of an operation start command (step S1).
  • the operation start command includes, for example, a command output when a start switch (not shown) is operated and a command output when a start timer expires.
  • the control unit 20 does not receive the operation start command, the control unit 20 ends the current process without performing the subsequent processes (step S1: NO).
  • step S2 When the operation start command is received (step S1: YES), the control unit 20 performs a start-up process (step S2).
  • the control unit 20 acquires the surface temperature T1 of the evaporator 61 through the evaporator temperature sensor 69 (step S11), and the acquired surface temperature T1 is set to a preset allowable start temperature T0 (step S11).
  • the temperature reaches (eg, 60 ° C.)
  • the operation of the compressor 62 is started (step S12).
  • the control unit 20 that has started the operation of the compressor 62 obtains the pressure P1 of the refrigerant discharged from the compressor 62 through the discharge pressure sensor 67 (step S14), and the obtained pressure P1 of the refrigerant is set to a preset operation allowable pressure.
  • the system is in a water supply standby state until it reaches P0 (step S15). Accordingly, in the steam generation section B, the water supply valve 31 is fully closed and the water supply pump 32 is maintained in a stopped state, so that the heated water is not supplied to the circulating water path 14.
  • step S15 when the pressure P1 of the refrigerant discharged from the compressor 62 reaches the allowable operating pressure P0 (step S15: YES), the control unit 20 opens the water supply valve 31 and starts the operation of the water supply pump 32. Then, a process of opening the second on-off valve 51 of the second blow-down path 50 is performed (step S16), and the current startup process ends. Thereby, the external heated water is supplied to the circulating water path 14 through the water supply path 30, and a part of the heated water circulating in the steam separator 10 and the circulating water path 14 is kept constant through the second blowdown path 50. Drained to the outside by volume.
  • the high-pressure liquid-phase refrigerant that has passed through the condenser 63 undergoes heat exchange with the heated water that passes through the water supply path 30 when passing through the subcooler 64, is further depressurized by the expansion mechanism 65, and then evaporates. Is supplied to the vessel 61.
  • the low-pressure refrigerant supplied to the evaporator 61 evaporates by heat exchange with the waste water, and is supplied to the compressor 62.
  • the heated water circulating in the circulating water path 14 is drained to the outside by a fixed amount through the second blow-down path 50, so that there is no possibility that the scale-causing substance is excessively concentrated. It is possible to prevent the scale from being deposited.
  • the check valve 52 functions. Therefore, there is a possibility that water or air may flow into the steam generator B from outside. Absent.
  • the pressure P1 of the refrigerant discharged from the compressor 62 does not reach the preset operation allowable pressure P0, the supply of the heated water to the circulating water path 14 is caused by the refrigerant circulating through the refrigerant circulating path 60.
  • This is for use in preheating of each part of the heat pump section C. Accordingly, the temperature of each part of the heat pump unit C can be increased in a short time, and the generation of steam can be started in a short time by supplying the heated water thereafter.
  • the control unit 20 performs a normal operation, and the rotation speed control of the water supply pump 32 is repeatedly performed until an operation stop command described later is input (step). S3).
  • the control of the rotation speed of the feed water pump 32 is based on correlation data indicating the correlation between the heat exchange amount (load) of the condenser 63 and the water level of the steam separator 10 stored in advance in the memory, and the generation of steam in the condenser 63. Implemented to maximize efficiency.
  • the details of the control during the normal operation can be appropriately selected from general heating output control, steam amount control, constant water amount control, constant pressure control, and the like according to the purpose, and a detailed description thereof will be omitted.
  • the circulating water path 14 is arranged in order from the bottom to the top, in which the liquid phase of the heated water, the gas-liquid mixed phase in which the heated water and the steam are mixed, and the vapor phase of the steam It has a three-layer state.
  • the water to be heated has a low heat exchange efficiency in a liquid state because of poor heat conductivity, and has the highest heat transfer efficiency and a high heat exchange efficiency in a gas-liquid mixed state.
  • the amount of steam generated in the condenser 63 and the The amount of water to be heated supplied to 63 can be matched to maximize the efficiency of steam generation in condenser 63.
  • the heated water (liquid phase) in the condenser 63 is increased. As the percentage increases, the water level rises and the amount of resulting steam decreases.
  • the flow rate of the heated water supplied to the condenser 63 in a state where the amount of heat exchange between the refrigerant and the heated water in the condenser 63 is large the heated water is completely evaporated in the condenser 63. And the resulting steam is not sufficient.
  • the height position of the condenser 63 is arranged below the steam separator 10 to form the water level difference W. Therefore, if the flow rate of the heated water from the outside is adjusted by controlling the rotation speed of the water supply pump 32 and the water level of the steam separator 10 is changed, the heated water supplied to the condenser 63 based on the water level difference W is obtained. Since the flow rate of water is changed, the efficiency of generating steam in the condenser 63 can be maximized.
  • the control unit 20 provides the heat exchange amount between the water to be heated and the refrigerant in the condenser 63 and the water level at which the steam generation efficiency is maximized at the heat exchange amount (that is, the water level).
  • Correlation data indicating a correlation with the supply flow rate of water to the condenser 63) is stored in the memory.
  • the correlation between the heat exchange amount and the water level can be obtained by performing an experiment.
  • the correlation data may be in, for example, a table format or a mathematical formula or a graph format. More specifically, the water level of the steam separator 10 is raised when the heat exchange amount increases, and the water level of the steam separator 10 is lowered when the heat exchange amount decreases.
  • the heat exchange amount of the condenser 63 increases, the water level of the steam separator 10 is increased to increase the supply amount of the water to be heated to the condenser 63, and the condenser 63 adjusts the gas-liquid mixed phase appropriately. Promote the generation of steam while maintaining the amount to maximize the efficiency and amount of steam generation.
  • the heat exchange amount of the condenser 63 decreases, the water level of the steam separator 10 is lowered to prevent the water to be heated from being supplied to the condenser 63 excessively, and the gas-liquid mixed phase Promotes the generation of steam while maintaining an appropriate amount of steam, thereby maximizing the efficiency and amount of steam generation.
  • the control unit 20 when acquiring the current heat exchange amount of the condenser 63, the control unit 20 derives the water level of the steam separator 10 at which the steam generation efficiency becomes maximum at the time of the heat exchange amount based on the correlation data, The rotation speed of the water supply pump 32 is controlled so that the water level of the steam separator 10 obtained through the water level sensor 12 matches the water level derived from the correlation data.
  • the amount of heat input from the refrigerant to the condenser 63 is used. If the amount of heat input from the refrigerant to the condenser 63 is obtained, the optimum supply flow rate of the heated water to the condenser 63 at this input heat amount is determined. Will be controlled. Since the displacement of the compressor 62 is known, the amount of heat input is, for example, the suction pressure of the refrigerant to the compressor 62 of the heat pump unit C, the suction temperature of the refrigerant, and the number of revolutions of the compressor 62.
  • the amount of refrigerant circulating to the refrigerant can be calculated, and can be estimated from the amount of refrigerant circulating.
  • the control unit 20 can obtain the suction pressure and the suction temperature of the refrigerant through the suction pressure sensor 66 and the suction temperature sensor 68, respectively, and the control unit 20 knows the rotation speed of the compressor 62. Further, as another parameter of the amount of heat exchange between the water to be heated and the refrigerant in the condenser 63, the flow rate of steam sent out from the delivery path 13 to the outside may be used. The flow rate of the steam delivered from the delivery path 13 can be detected, for example, by installing a flow meter (not shown) in the delivery path 13.
  • the water level of the steam separator 10 may be controlled so that the delivered flow rate of the steam is equal to the flow rate of the heated water circulated and supplied to the condenser 63.
  • the control unit 20 performs control to raise the water level to reduce the amount of circulating heated water. increase.
  • control is performed to lower the water level to prevent the heated water from being excessively supplied to the condenser 63, and to maintain the gas-liquid mixed phase at an appropriate amount. I do.
  • Step S4 the control unit 20 monitors the presence or absence of the operation stop command (Step S4), and receives the operation stop command (Step S4: YES).
  • the procedure shifts to the operation stop processing of step S5.
  • the operation stop command is output, for example, by operating a stop switch (not shown).
  • the control unit 20 performs the dilution sealing processing of the steam generation unit B (step S21) and the pump down processing of the heat pump unit C (step S22).
  • the dilution sealing process and the pump-down process are performed at the same time.
  • these processes may be performed as a sequence process that is performed sequentially, or each process may be performed independently. You may do it.
  • the pump-down process may be started after a lapse of a preset time. In this case, since the temperature of the condenser 63 decreases before the pump-down processing is started, it is possible to reliably condense the refrigerant in the condenser 63 when performing the pump-down processing.
  • an operation command for example, a command for maximizing the rotation speed is given from the control unit 20 to the water supply pump 32 (step S31).
  • the control unit 20 monitors whether or not the water level L1 of the steam separator 10 obtained through the water level sensor 12 has reached a preset dilution stop water level L0 (step S32 ⁇ step S33).
  • the dilution stop water level L0 is desirably set to a water level higher than the connection position between the circulating water path 14 from the condenser 63 and the steam separator 10. Further, the water level may be set such that the steam separator 10 is filled with the heated water. With such a setting, the concentration of the scale-causing substance in the entire circulating water path 14 can be reliably diluted.
  • the control unit 20 continues the operation of the water supply pump 32 (step S33: NO).
  • step S33 when the water level L1 of the steam separator 10 reaches the dilution stop water level L0 (step S33: YES), the control unit 20 stops the water supply pump 32 and sets the first open / close valve 41 of the first blowdown path 40 to the first open / close valve 41. An opening process is performed (step S34). As a result, the heated water stored in the circulating water path 14 and the steam separator 10 is drained to the outside through the first blowdown path 40 (drainage treatment). As described above, since the first blow-down path 40 has a larger inner diameter than the second blow-down path 50, the flow rate at which the heated water is drained to the outside per unit time is also large.
  • the heated water discharged to the outside is introduced from the outside through the water supply pump 32 after receiving the operation stop command, for the water stored in the steam generation unit B before receiving the operation stop command. And a mixture with Therefore, even if the scale-causing substance is concentrated in the heated water in the circulating water path 14 by repeatedly performing the steam generation until the operation stop command is received, the heated water introduced from outside after the operation stop command is received. Will be diluted by As a result, the heated water is drained from the first blow-down path 40 to the outside in a diluted state, so that there is no possibility that scale will be deposited later on the portion where the heated water has come into contact, and the steam generation, etc. The situation where the scale adheres to the portion B can be more reliably prevented.
  • the water supply pump 32 is stopped to end the dilution processing, but it is not necessarily limited to this. Not done.
  • the amount of water to be heated in the steam generator B is calculated from the flow rate of the water to be heated, and when the calculated amount of water reaches a predetermined amount of water, the dilution processing end condition is satisfied and the water supply pump 32 is stopped.
  • the scale-causing substance contained in the heated water stored from the steam separator 10 to the junction of the circulating water path 14 and the water supply path 30 was detected, and the detection result was lower than a preset concentration.
  • the water supply pump 32 may be stopped assuming that the dilution processing end condition is satisfied. Further, the dilution process may be started after a part of the heated water is discharged from the circulating water path 14. After the part of the diluted heated water is discharged, the water supply pump 32 is operated again to perform the dilution process. It may be repeated several times.
  • the control unit 20 monitors whether or not the internal pressure P2 of the steam separator 10 obtained through the pressure sensor 11 has decreased to a preset drainage end pressure P3 (Step S35 ⁇ Step S36).
  • the drainage end pressure P3 is set to a value slightly larger than the pressure of the steam separator 10 when all the water to be heated in the steam separator 10 and the circulating water path 14 is drained. Specifically, it may be set to a value slightly larger than the atmospheric pressure.
  • the control unit 20 determines whether the delivery valve 15, the water supply valve 31, the first on-off valve 41, the A sealing process for closing all the two on-off valves 51 is performed (step S36 ⁇ step S37), and the current dilution sealing process ends. Thereby, the inside of the steam generation unit B is in a sealed state. Therefore, even if the pressure in the circulating water passage 14 is reduced due to a temperature decrease during operation stoppage, there is no possibility that water or air will flow in from the outside.
  • the condition for ending the drainage process is not necessarily limited to the above condition. For example, the drainage may be ended when the drainage process is continued for a preset time. In this case, a part of the water to be heated may remain in the steam generator B.
  • the control unit 20 issues a command to the expansion mechanism 65 to completely close the opening (step S41). ).
  • the expansion mechanism 65 since the operation of the compressor 62 is continued, when the expansion mechanism 65 is fully closed, the refrigerant in the refrigerant circulation path 60 is stored between the compressor 62 and the expansion mechanism 65 and expanded. Between the mechanism 65 and the compressor 62, there is almost no refrigerant.
  • the pump-down process is performed in the heat pump unit C, the dilution process is performed in the steam generation unit B. Therefore, since the refrigerant is condensed in the condenser 63, the pump-down process can be performed efficiently.
  • the control unit 20 monitors whether the pressure P4 of the refrigerant obtained through the suction pressure sensor 66 is lower than a preset end permission pressure P5 (step S42 ⁇ step S43). .
  • the control unit 20 stops the operation of the compressor 62 and ends the pump-down process (step S44), and executes the current pump-down process. finish.
  • the dilution process is performed to increase the flow rate of the heated water introduced into the steam generator B from the outside. Therefore, in the steam generation section B, the scale-causing substance is diluted, and it is possible to more reliably prevent the scale from adhering.
  • the circulating water path 14 is sealed after draining the water to be heated in the steam generator B to the outside. For this reason, even when the pressure is reduced due to condensation of water vapor in the circulating water path 14, the inflow of water or air from the outside is prevented. Further, at the next start-up, even in a state where the compressor 62 is operated in the heat pump section C and the refrigerant is circulated, heat exchange with the heated water is not performed in the condenser 63. That is, the circulating refrigerant is used for preheating each part of the heat pump unit C. Therefore, the temperature of each part of the heat pump section C rises faster than when the heated water is present in the circulating water path 14, and the startup time can be shortened.
  • the refrigerant is stored in the heat pump section C between the compressor 62 and the expansion mechanism 65.
  • the liquid-phase refrigerant is stored in the evaporator 61 at startup. Therefore, when the operation of the compressor 62 is started, a situation in which the liquid-phase refrigerant is sucked can be prevented.
  • the diluted heated water of the steam generation unit B is drained to the outside. However, it is not always necessary to drain the water to the outside, and the operation is stopped in a diluted state. You may do it.
  • the heated water may be circulated through the circulating water path 14 by continuing the operation of the water supply pump 32 and opening the first on-off valve 41 until the pump-down process is completed. In this case, the effect of condensing the refrigerant in the heat pump section C in the condenser 63 during the pump-down process is more remarkable.
  • the dilution process and the pump-down process do not necessarily need to be started at the same time, and the pump-down process may be started after the dilution process is started.
  • the pump-down process is started when the temperature of the condenser 63 falls below a preset value after the dilution process is started, or is started after the dilution process is continued for a preset time. good.
  • the dilution process is started before the pump-down process is performed, the temperature of the heated water flowing through the condenser 63 decreases, so that the refrigerant in the heat pump unit C is more efficiently condensed. It becomes possible.
  • FIG. 8 shows a configuration of a heat pump type steam generator that performs the above-described control.
  • the heat pump type steam generation device exemplified here has the same configuration as that of the first embodiment, and is different from the first embodiment in that the discharge temperature is set in the refrigerant circulation path 60 between the compressor 62 and the condenser 63. The difference is that a sensor 161 is added, and a supercooling temperature sensor 162 and a supercooling pressure sensor 163 are added to the refrigerant circulation path 60 between the supercooler 64 and the expansion mechanism 65.
  • points different from the first embodiment will be described in detail, and the same components as those in the first embodiment will be denoted by the same reference numerals and detailed description thereof will be omitted.
  • the discharge temperature sensor 161 detects the temperature of the refrigerant discharged from the compressor 62, and the subcooling temperature sensor 162 detects the temperature of the refrigerant after passing through the subcooler 64.
  • the subcooling pressure sensor 163 detects the pressure of the refrigerant after passing through the subcooler 64.
  • the detection result of the discharge temperature sensor 161, the detection result of the supercooling temperature sensor 162, and the detection result of the supercooling pressure sensor 163 are given to the control unit 20.
  • FIGS. 9 to 11 show only the steam generation processing which is repeatedly executed by the control unit 20 of the second embodiment at a predetermined cycle time, which is different from that of the first embodiment.
  • the contents of the steam generation processing performed by the control unit 20 will be described with respect to differences from the first embodiment. I will mainly explain.
  • the heat pump type steam generator is in an operation stop state, the expansion mechanism 65, the delivery valve 15, the water supply valve 31, the first opening / closing valve 41, and the second opening / closing valve 51 are completely closed, and the water supply is stopped. It is assumed that the pump 32 and the compressor 62 are stopped.
  • the steam generation section B the water to be heated remains in the circulation water path 14 and the steam separator 10, respectively.
  • FIG. 9 shows the content of the start-up process performed in the second embodiment after receiving the operation start command in the steam generation process shown in FIG.
  • the control unit 20 determines whether or not the preset heated water drainage condition is satisfied (step S51).
  • the necessity of draining the heated water is determined based on the value of the degree of supercooling of the refrigerant obtained from the combination of the temperature and the pressure.
  • the degree of supercooling is a temperature difference between the saturation temperature of the refrigerant at a certain pressure and the detected supercooled liquid refrigerant temperature.
  • the saturation temperature of the refrigerant at a certain pressure can be obtained from a pressure temperature table or the like.
  • step S51 If it is determined in the above determination that the heated water drainage condition has been satisfied (step S51: YES), the control unit 20 shifts the procedure to step S52 to perform low-temperature startup, and the steam generation unit B performs the first step. The on-off valve 41 is opened, and the drainage processing of the heated water is performed.
  • the completion condition of the drainage treatment may be, for example, the elapsed time from the start of drainage. That is, when the elapsed time from the start of drainage reaches a preset time, it can be determined that the drainage processing has been completed. Alternatively, when the water level of the condenser 63 and the water level of the steam separator 10 are linked, it is determined that the drainage treatment is completed on condition that the water level of the steam separator 10 falls below a preset value. Is also good.
  • step S53 YES ⁇ step S54.
  • the control unit 20 acquires the surface temperature T1 of the evaporator 61 through the evaporator temperature sensor 69 (step S55), and determines whether the acquired surface temperature T1 has reached a preset allowable starting temperature T0 (for example, 60 ° C.). It is determined whether or not it is (step S56).
  • a preset allowable starting temperature T0 for example, 60 ° C.
  • the surface temperature T1 of the evaporator 61 is already at the start allowable temperature when the operation start command is given. Since the state has exceeded T0, the procedure immediately proceeds to step S57, and the operation of the compressor 62 is started.
  • the control unit 20 that has started the operation of the compressor 62 acquires the pressure P1 of the refrigerant discharged from the compressor 62 through the discharge pressure sensor 67 (step S58), and the acquired pressure P1 of the refrigerant is set to a preset allowable operating pressure.
  • the water supply standby state is set until the water reaches P0 (step S59). Accordingly, in the steam generation section B, the water supply valve 31 is fully closed and the water supply pump 32 is maintained in a stopped state, so that the heated water is not supplied to the circulating water path 14.
  • step S59 when the pressure P1 of the refrigerant discharged from the compressor 62 reaches the allowable operating pressure P0 (step S59: YES), the control unit 20 opens the water supply valve 31 and starts the operation of the water supply pump 32. Then, a process of opening the second on-off valve 51 of the second blow-down path 50 is performed (step S60), and the current startup process ends. Thereby, the external heated water is supplied to the circulating water path 14 through the water supply path 30, and a part of the heated water circulating in the steam separator 10 and the circulating water path 14 is kept constant through the second blowdown path 50. Drained to the outside by volume.
  • the high-pressure liquid-phase refrigerant that has passed through the condenser 63 undergoes heat exchange with the heated water that passes through the water supply path 30 when passing through the subcooler 64, is further depressurized by the expansion mechanism 65, and then evaporates. Is supplied to the vessel 61.
  • the low-pressure refrigerant supplied to the evaporator 61 evaporates by heat exchange with the waste water, and is supplied to the compressor 62.
  • the heated water circulating in the circulating water path 14 is drained to the outside by a fixed amount through the second blow-down path 50, so that there is no possibility that the scale-causing substance is excessively concentrated. It is possible to prevent the scale from being deposited.
  • the check valve 52 functions. Therefore, there is a possibility that water or air may flow into the steam generator B from outside. Absent.
  • the condition for starting the supply of the heated water is not necessarily limited to the case where the pressure of the refrigerant discharged from the compressor 62 reaches the allowable operating pressure P0.
  • the temperature of the refrigerant obtained through the supercooling temperature sensor 162 becomes equal to or higher than a preset temperature.
  • the location of the supercooling temperature sensor 162 that detects the temperature of the refrigerant may be provided at another location as long as the location is between the compressor 62 and the expansion mechanism 65.
  • the difference between the refrigerant temperature at the inlet of the condenser 63 obtained through the discharge temperature sensor 161 and the refrigerant temperature at the outlet of the condenser 63 obtained through the supercooling temperature sensor 162 may be used as a criterion for determining the supply condition of the heated water. In this case, when the temperature difference detected by the two temperature sensors 161 and 162 becomes less than a certain value, it is determined that the condenser 63 has been sufficiently preheated, and the operation of the water supply pump 32 may be started.
  • the degree of supercooling of the refrigerant at the outlet of the condenser 63 may be obtained from the detection result of the supercooling temperature sensor 162 and the detection result of the supercooling pressure sensor 163, and may be used as a criterion for determining the supply condition of heated water.
  • the operation of the water supply pump 32 may be started when the degree of supercooling falls below a certain value.
  • the detection result of the discharge temperature sensor 161 may be used instead of the detection result of the supercooling temperature sensor 162. That is, the position of the subcooling temperature sensor 162 can be appropriately selected between the compressor 62 and the expansion mechanism 65. The position of the supercooling pressure sensor 163 can be appropriately selected between the condenser 63 and the expansion mechanism 65.
  • a timer after drainage is completed it may be used as a criterion for determining a condition for starting supply of heated water.
  • the time set in the timer elapses after the drainage is completed, it is determined that the condenser 63 has been sufficiently preheated, and the operation of the feedwater pump 32 may be started.
  • the heated water drainage condition and the heated water supply condition may determine whether or not the condition is satisfied by referring to the same detection result, or may determine whether or not the condition is satisfied using different detection results.
  • the combination of the detection results serving as the criterion is free, and may be appropriately selected according to the design and the operating condition.
  • step S51 if it is determined in step S51 that the heated water drainage condition is not satisfied, the control unit 20 shifts the procedure to step S61 to perform high-temperature startup, immediately opens the water supply valve 31, and sets the compressor The operations of the water supply pump 62 and the water supply pump 32 are started, and the second on-off valve 51 of the second blowdown path 50 is opened.
  • the refrigerant circulates in the heat pump section C, and the water to be heated is circulated in the steam generation section B.
  • the heat of the exhaust hot water flowing through the hot water flow path 1 of the heat source water supply section A is converted into the heat of the steam generation section.
  • the steam is transmitted to the heated water flowing through the circulating water path 14 of B, and steam is generated sequentially from the heated water.
  • control unit 20 repeatedly controls the rotation speed of the water supply pump 32 until a later-described operation stop command is input.
  • the control of the rotation speed of the water supply pump 32 is the same as that of the first embodiment, and thus the detailed description is omitted.
  • the control unit 20 performs the operation stop processing when receiving the operation stop command, as shown in FIG. FIG. 10 shows the contents of the operation stop processing performed in the second embodiment after receiving the operation stop command in the steam generation processing shown in FIG.
  • the control section 20 performs the dilution sealing processing of the steam generation section B (step S71), and performs the pump down processing of the heat pump section C (step S22).
  • the pump-down processing is the same as that in the first embodiment, and thus a detailed description is omitted (see FIG. 7).
  • a command to increase the rotation speed for example, a command to maximize the rotation speed is given from the control unit 20 to the water supply pump 32 (step S81).
  • the supply of the heated water through the water supply path 30 is increased, so that the level of the heated water stored in the steam separator 10 is also increased (dilution process).
  • control unit 20 monitors whether the water level L1 of the steam separator 10 obtained through the water level sensor 12 has reached a preset dilution stop water level L0 (step S82 ⁇ step S83). When the water level L1 of the steam separator 10 has not reached the dilution stop water level L0, the control unit 20 continues the operation of the water supply pump 32 (step S83: NO).
  • step S83 when the water level L1 of the steam separator 10 reaches the dilution stop water level L0 (step S83: YES), the control unit 20 stops the water supply pump 32, and further sends the delivery valve 15, the water supply valve 31, and the first opening / closing valve 41. Then, a sealing process for closing all the second on-off valves 51 is performed (step S84), and the current dilution sealing process is ended. Thereby, the inside of the steam generation unit B is in a sealed state. Therefore, even if the pressure in the circulating water passage 14 is reduced due to the temperature decrease, the inflow of water or air from the outside is prevented.
  • the steam generation unit B controls the water supply pump 32 for the heated water stored before receiving the operation stop command, after receiving the operation stop command. Due to the increase in the number of revolutions, heated water introduced from outside in large quantities is mixed. Therefore, even if the scale-causing substance is concentrated in the water to be heated in the circulating water path 14 by repeatedly performing the steam generation until the operation stop command is received, a large amount of the substance introduced from outside after the operation stop command is received. It will be diluted by heated water. This makes it possible to more reliably prevent the scale from adhering to the steam generator B.
  • the control unit 20 determines whether or not the heated water drainage condition is satisfied (step S72).
  • the drainage processing is started (Step S73).
  • the heated water drainage conditions (1) when a preset time has elapsed after the operation is stopped, (2) one of the values detected by the supercooling temperature sensor 162 and the supercooling pressure sensor 163 during the operation stoppage, (3) When the degree of supercooling of the refrigerant obtained from the temperature detected by the supercooling temperature sensor 162 and the pressure detected by the supercooling pressure sensor 163 becomes a certain value or more, There is.
  • the first on-off valve 41 When these conditions are satisfied, the first on-off valve 41 is opened, and the water to be heated in the circulating water path 14 and the steam separator 10 is drained to the outside through the first blow-down path 40. .
  • the first opening / closing valve 41 is closed by the control unit 20. Note that this drainage treatment can be omitted.
  • the apparatus is stopped while the heated water after the dilution process remains in the steam generation unit B, and the above-described determination of the necessity of drainage is performed at startup.
  • the steam generator B When the heated water is drained, the determination as to whether or not the heated water drain condition is satisfied at the next startup is omitted, and the procedure proceeds to step S55 in FIG.
  • the start-up process may be performed from the procedure for determining whether or not the temperature T1 has reached the preset allowable start-up temperature T0.
  • the dilution process is always performed when the operation stop command is received, but the present invention is not limited to this.
  • the operation stop command when the operation stop command is given, the scale-causing substance detected in the heated water stored in the steam generating unit B is detected, and only when the detected concentration of the scale-causing substance exceeds a preset value.
  • a dilution process may be performed. By performing such a process, for example, when an operation stop command is given immediately after the operation start command is given, the dilution process can be omitted, and the time until the completion of the operation can be shortened. There is.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)
  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Abstract

スケールの付着を防止するため、熱源水から冷媒に熱を吸収し、冷媒が吸収した熱を被加熱水に伝達することにより蒸気の生成を行うヒートポンプ式蒸気生成装置であって、蒸発器、圧縮機、凝縮器及び膨張機構の間に順次冷媒が循環流通されるヒートポンプ部と、蒸発器に対して熱源水を流通させる熱源水供給部と、凝縮器に対して外部から導入された被加熱水を流通させることによって蒸気を生成する蒸気生成部と、運転停止指令が与えられた場合、蒸気生成部に対して外部からの被加熱水の導入流量を増大させる希釈処理を実施する制御部を備える。

Description

ヒートポンプ式蒸気生成装置
 本発明は、ヒートポンプ式蒸気生成装置に関するものである。
 蒸気生成装置の一つとして、ヒートポンプサイクルを利用したヒートポンプ式蒸気生成装置がある。ヒートポンプ式蒸気生成装置では、工場排水や使用済冷却水等の排熱源水から熱を回収して蒸気を生成するようにしている。この種のヒートポンプ式蒸気生成装置によれば、ボイラ設備等のように燃料の燃焼熱を利用した燃焼系蒸気生成装置に比べてランニングコストが低く、二酸化炭素の排出量も低減できる等のメリットがある。
 ところで、蒸気の原料となる被加熱水には、シリカ(二酸化ケイ素)等のスケール原因物質が含まれている。このため、蒸気を連続生成した場合には、被加熱水のスケール原因物質が濃縮され、スケール付着の原因となる。こうした問題を防止するため、被加熱水が貯留される水蒸気分離器にブローダウン流路を設け、水蒸気分離器に貯留された被加熱水をブローダウン流路から定期的に、または一時的に外部に排水するようにしたものが提供されている(例えば、特許文献1参照)。
特開2012-247146号公報
 しかしながら、スケール原因物質が濃縮された状態では、単に被加熱水を外部に排水したとしても、被加熱水に触れていた部分についてはスケールが析出する事態を招来する懸念がある。
 本発明は、上記実情に鑑みて、スケール付着を防止することのできるヒートポンプ式蒸気生成装置を提供することを目的とする。
 上記の目的を達成するため、本発明に係るヒートポンプ式蒸気生成装置は、冷媒が熱源水から熱を吸収し、吸収した熱を被加熱水に伝達することにより蒸気の生成を行うヒートポンプ式蒸気生成装置であって、蒸発器、圧縮機、凝縮器及び膨張機構の間に順次冷媒が循環流通されるヒートポンプ部と、前記蒸発器に対して熱源水を流通させる熱源水供給部と、前記凝縮器に対して外部から導入された被加熱水を流通させることによって蒸気を生成する蒸気生成部と、運転停止指令が与えられた場合、前記蒸気生成部に対して外部から被加熱水を導入する希釈処理を実施する制御部を備えたことを特徴とする。
 また本発明は、上述したヒートポンプ式蒸気生成装置において、記制御部は、予め設定した希釈処理終了条件が成立した場合に前記希釈処理を終了し、前記蒸気生成部の被加熱水を外部に排水する排水処理を実施することを特徴とする。
 また本発明は、上述したヒートポンプ式蒸気生成装置において、前記制御部は、前記蒸気生成部の被加熱水が予め設定した水量を超えた場合、または前記希釈処理が予め設定した時間継続された場合、または前記蒸気生成部の被加熱水に含まれるスケール原因物質が予め設定した濃度を下回った場合、前記希釈処理終了条件が成立し
たと判断することを特徴とする。
 また本発明は、上述したヒートポンプ式蒸気生成装置において、前記制御部は、予め設定した排水処理終了条件が成立した場合に前記排水処理を終了して前記蒸気生成部を密閉状態とする密閉処理を実施することを特徴とする。
 また本発明は、上述したヒートポンプ式蒸気生成装置において、記制御部は、前記蒸気生成部の圧力が予め設定した値まで低下した場合、あるいは前記排水処理が予め設定した時間継続された場合に前記排水処理終了条件が成立したと判断することを特徴とする。
 また本発明は、上述したヒートポンプ式蒸気生成装置において、記制御部は、運転停止指令が与えられた場合、前記圧縮機の吸入圧力が予め設定した値を下回るまでの間、前記膨張機構を閉じた状態で前記圧縮機の運転を行うポンプダウン処理を実施することを特徴とする。
 また本発明は、上述したヒートポンプ式蒸気生成装置において、前記制御部は、前記圧縮機の吸入圧力が予め設定した値を下回った場合にポンプダウン処理を終了することを特徴とする。
 また本発明は、上述したヒートポンプ式蒸気生成装置において、記制御部は、前記ポンプダウン処理が終了するまで前記希釈処理を継続して実施し、かつ前記蒸気生成部の被加熱水が予め設定した水量を超えた場合、あるいは前記希釈処理が予め設定した時間継続された場合、前記被加熱水を外部に排水する排水処理を実施することを特徴とする。
 また本発明は、上述したヒートポンプ式蒸気生成装置において、記制御部は、前記蒸気生成部の圧力が予め設定した値まで低下した場合、あるいは前記排水処理が予め設定した時間継続された場合に、前記排水処理を終了して前記蒸気生成部を密閉状態とする密閉処理を実施することを特徴とする。
 また本発明は、上述したヒートポンプ式蒸気生成装置において、前記制御部は、起動指令が与えられた場合、前記圧縮機から前記膨張機構までの冷媒圧力が予め設定した値を超えた際に前記蒸気生成部に対する外部からの被加熱水の導入を開始することを特徴とする。
 また本発明は、上述したヒートポンプ式蒸気生成装置において、前記制御部は、起動指令が与えられた場合、前記蒸発器の温度が予め設定した値に到達した際に前記圧縮機の運転を開始することを特徴とする。
 本発明によれば、運転停止指令が与えられた場合に外部から導入される被加熱水の流量を増大するようにしているため、被加熱水に含まれるスケール原因物質が希釈され、スケールが付着する事態をより確実に防止することが可能となる。
図1は、本発明の実施の形態1であるヒートポンプ式蒸気生成装置の構成を示す図である。 図2は、図1のヒートポンプ式蒸気生成装置に適用する蒸気生成部の構成を模式的に示す図である。 図3は、図1に示す制御部が実施する蒸気生成処理の一例を示すフローチャートである。 図4は、図3に示した起動処理の内容を示すフローチャートである。 図5は、図3に示した運転停止処理の内容を示すフローチャートである。 図6は、図5に示した希釈密閉処理の内容を示すフローチャートである。 図7は、図5に示したポンプダウン処理の内容を示すフローチャートである。 図8は、本発明の実施の形態2であるヒートポンプ式蒸気生成装置の構成を示す図である。 図9は、実施の形態2で実施される起動処理の内容を示すフローチャートである。 図10は、実施の形態2で実施される運転停止処理の内容を示すフローチャートである。 図11は、実施の形態2で実施される希釈密閉処理の内容を示すフローチャートである。
 以下、添付図面を参照しながら本発明に係るヒートポンプ式蒸気生成装置の好適な実施の形態について詳細に説明する。
(実施の形態1)
 図1は、本発明の実施の形態1であるヒートポンプ式蒸気生成装置の構成を示すものである。ここで例示するヒートポンプ式蒸気生成装置は、工場排水等の排温水(熱源水)から排熱を回収し、回収した排熱を利用して蒸気を生成するもので、排温水を流通させる熱源水供給部Aと、外部から導入された被加熱水を流通する蒸気生成部Bと、これら熱源水供給系A及び蒸気生成部Bの間に介在するヒートポンプ部Cとを備えている。
 熱源水供給部Aは、温水流通経路1において排温水を流通するものである。図には明示していないが、温水流通経路1の上流には、温水タンク及び温水供給ポンプが設けられている。この熱源水供給部Aでは、温水供給ポンプの運転により、温水タンクに貯留されている排温水が所定の流量で温水供給経に流通されることになる。
 蒸気生成部Bは、蒸気を生成するための被加熱水を流通するもので、水蒸気分離器10を備えている。水蒸気分離器10は、鉛直方向に沿った円筒状容器によって構成したものである。この水蒸気分離器10には、圧力センサ及び水位センサ12が設けてあるとともに、送出経路13及び循環水経路14が設けてある。圧力センサ11は、水蒸気分離器10の内部の圧力を検出するものであり、水位センサ12は、水蒸気分離器10に貯留された被加熱水の水位を検出するものである。これらのセンサ11,12の検出結果は、後述する制御部20に送信される。
 送出経路13は、図示せぬ外部の蒸気利用設備に接続されたもので、水蒸気分離器10の上端において内部に連通している。この送出経路13には、送出弁15が設けてある。送出弁15は、与えられた指令に応じて開度を変更することにより、送出経路13の圧力を調整することのできる圧力調整弁である。この送出弁15は、全閉指令が与えられた場合、送出経路13を遮断することが可能である。なお、送出経路13を遮断する機能は、送出弁15が備えている必要はなく、専用の開閉弁を追加するようにしても良い。
 循環水経路14は、一端が水蒸気分離器10の下端部において内部に連通し、かつ他端が水蒸気分離器10の上部周面において内部に連通したものである。この循環水経路14には、給水経路30、第1ブローダウン経路40及び第2ブローダウン経路50が接続してある。
 給水経路30は、外部の給水源から循環水経路14に被加熱水を供給するもので、給水弁31及び給水ポンプ32を備えている。給水弁31は、与えられた指令に応じて開度を変更することにより給水経路30を開閉する開閉弁である。給水弁31を開いた状態で給水ポンプ32が運転されると、給水経路30を通じて外部の被加熱水を循環水経路14に供給することができる。循環水経路14に供給される被加熱水の流量は、給水ポンプ32の回転数を制御することによって変更することができる。給水ポンプ32によって供給される被加熱水の流量が変更された場合には、水蒸気分離器10に貯留される被加熱水の水位も変化することになる。
 第1ブローダウン経路40及び第2ブローダウン経路50は、それぞれが循環水経路14の被加熱水を外部に排水するためのものである。第1ブローダウン経路40には第1開閉弁41が設けてあり、第2ブローダウン経路50には第2開閉弁51及び逆止弁52が設けてある。図には明示していないが、第1ブローダウン経路40としては、第2ブローダウン経路50よりも大きな内径を有したものを適用している。
 第1開閉弁41及び第2開閉弁51は、それぞれ与えられた指令に応じて開度を変更することにより、対応するブローダウン経路40,50を開閉する開閉弁である。逆止弁52は、第2ブローダウン経路50において循環水経路14から外部への被加熱水の通過のみを許容するものである。図2に示すように、第1ブローダウン経路40は、循環水経路14において給水経路30の接続部位よりも下流側でもっとも低位となる位置に接続してある。第2ブローダウン経路50は、循環水経路14において水蒸気分離器10と給水経路30との間に接続してある。図には明示していないが、それぞれのブローダウン経路40,50の開口端部には、排水タンクが接続してある。
 ヒートポンプ部Cは、循環する冷媒により、熱源水供給部Aの温水流通経路1を流通する排温水の熱を、蒸気生成部Bの循環水経路14を流通する被加熱水に伝達するものである。本実施の形態1のヒートポンプ部Cは、図1に示すように、冷媒循環経路60によって順次接続された蒸発器61、圧縮機62、凝縮器63、過冷却器64、膨張機構65を備えている。蒸発器61は、熱源水供給部Aの温水流通経路1において流通される排温水との間で熱交換を行うことにより、流通する冷媒を蒸発させるものである。圧縮機62は、蒸発器61を通過した後の冷媒を圧縮するものである。凝縮器63は、圧縮機62から吐出された冷媒と、循環水経路14を流通する被加熱水との間で熱交換を行うものである。過冷却器64は、凝縮器63を通過した後の冷媒と、給水経路30を流通する被加熱水との間において熱交換を行うものである。膨張機構65は、過冷却器64を通過した後の冷媒を減圧するものである。本実施の形態1では、膨張機構65として、与えられた指令に応じて開度を変更することのできる電子膨張弁を適用している。この膨張機構65は、全閉指令が与えられた場合に冷媒循環経路60を遮断することが可能である。
 図2からも明らかなように、凝縮器63は、水蒸気分離器10よりも高さ方向で低位置に設置されている。より具体的に説明すると、凝縮器63は、被加熱水の吐出口63aが、水蒸気分離器10に貯留された被加熱水の水面よりも低位置となるように、水蒸気分離器10との高さ方向の位置が規定された状態で設置してある。これにより、蒸気生成部Bにおいては、水蒸気分離器10の水位と、凝縮器63の水位との間に水位差W(水面のヘッド差)が形成され、サーモサイフォン現象により、別途循環ポンプを要することなく、水蒸気分離器10の被加熱水を確実に凝縮器63に循環させることが可能である。
 上述のヒートポンプ部Cには、図1に示すように、吸入圧力センサ66、吐出圧力センサ67、吸入温度センサ68及び蒸発器温度センサ69が設けてある。吸入圧力センサ66は、圧縮機62へ吸入される冷媒の圧力を検出するもので、吐出圧力センサ67は、圧縮機62から吐出された冷媒の圧力を検出するものである。吸入温度センサ68は、圧縮
機62へ吸入される冷媒の温度を検出するもので、蒸発器温度センサ69は、蒸発器61の表面温度を検出するものである。蒸発器61の表面温度とは、例えばフロンドカバーとバックカバーとの間に複数の伝熱プレートを重ね合わせて冷媒の流路と、排温水の流路とが交互に形成されたブレージングプレート式蒸発器の場合、冷媒及び排温水の供給側となるフロントカバーの温度である。これら吸入圧力センサ66の検出結果、吐出圧力センサ67の検出結果、吸入温度センサ68の検出結果及び蒸発器温度センサ69の検出結果は、それぞれ制御部20に与えられることになる。
 制御部20は、図示せぬ起動スイッチ、起動タイマ、運転停止スイッチ等の操作入力部から入力された操作指令、あるいは上述した圧力センサ11、水位センサ12、吸入圧力センサ66、吐出圧力センサ67、蒸発器温度センサ69等の状態検出部から検出結果が与えられると、予めメモリ(図示せぬ)に格納されたプログラムやデータに基づいて圧縮機62、膨張機構65、給水ポンプ32、送出弁15、給水弁31、第1開閉弁41、第2開閉弁51の制御を行うものである。この制御部20は、例えば、CPU(Central Processing Unit)等の処理装置にプログラムを実行させること、すなわち、ソフトウェアにより実現しても良いし、IC(Integrated Circuit)等のハードウェアにより実現しても良い。また、ソフトウェア及びハードウェアを併用して制御部20を実現しても良い。
 図3~図7は、制御部20が所定のサイクルタイムで繰り返し実行する蒸気生成処理の内容を示すものである。以下、これらのフローチャートを適宜参照し、制御部20で実施される蒸気生成処理の内容について説明する。なお、以下においては便宜上、ヒートポンプ式蒸気生成装置は運転停止状態にあるものとする。この運転停止状態では、膨張機構65、送出弁15、給水弁31、第1開閉弁41及び第2開閉弁51がそれぞれ全閉状態にあり、かつ給水ポンプ32及び圧縮機62がそれぞれ停止されている。蒸気生成部Bにおいては、すべての経路が空の状態となっている。一方、熱源水供給部Aにおいては、図示せぬ温水供給ポンプが常時運転されており、温水タンクの排温水が温水流通経路1を流通した状態にある。なお、運転停止状態においては、必ずしも経路が空の状態である必要はなく、通常運転時と比較して被加熱水の量が減少していれば良く、経路内の一部に被加熱水が残っていても構わない。
 図3に示すように、蒸気生成処理においては、制御部20によって運転開始指令の有無が監視されている(ステップS1)。運転開始指令とは、例えば図示しない起動スイッチの操作によって出力されるものや起動タイマのタイムアップによって出力されるものがある。制御部20は、運転開始指令を受信しない場合、以降の処理を実施することなく今回の処理を終了する(ステップS1:NO)。
 これに対して運転開始指令を受信すると(ステップS1:YES)、制御部20は、起動処理を実施する(ステップS2)。起動処理において制御部20は、図4に示すように、蒸発器温度センサ69を通じて蒸発器61の表面温度T1を取得し(ステップS11)、取得した表面温度T1が予め設定した起動許容温度T0(例えば60℃)に到達した時点で圧縮機62の運転を開始する(ステップS12)。
 このヒートポンプ式蒸気生成装置では、上述したように、熱源水供給部Aにおいて温水流通経路1に排温水が常時流通しているため、起動開始時においても排温水によって蒸発器61が昇温されている。このため、通常においては、運転開始指令が与えられた時点で既に蒸発器61の表面温度T1が起動許容温度T0を超えた状態にあり、手順が直ちにステップS13に移行して圧縮機62の運転が開始されることになる。
 圧縮機62の運転を開始した制御部20は、吐出圧力センサ67を通じて圧縮機62か
ら吐出される冷媒の圧力P1を取得し(ステップS14)、取得した冷媒の圧力P1が予め設定した運転許容圧力P0に到達するまで給水待機状態となる(ステップS15)。従って、蒸気生成部Bにおいては、給水弁31が全閉状態で、給水ポンプ32が停止状態に維持されるため、循環水経路14に対して被加熱水が供給されることはない。
 これに対して圧縮機62から吐出される冷媒の圧力P1が運転許容圧力P0に到達した場合(ステップS15:YES)、制御部20は、給水弁31を開くとともに、給水ポンプ32の運転を開始し、さらに、第2ブローダウン経路50の第2開閉弁51を開く処理を実施し(ステップS16)、今回の起動処理を終了する。これにより、給水経路30を通じて外部の被加熱水が循環水経路14に供給されるとともに、水蒸気分離器10及び循環水経路14を循環する被加熱水の一部が第2ブローダウン経路50を通じて一定量ずつ外部に排水される。
 被加熱水が供給された状態で圧縮機62が運転されると、ヒートポンプ部Cにおいて高圧の気相冷媒が凝縮器63に供給され、この気相冷媒と凝縮器63を通過する被加熱水との間において熱交換が行われる。この結果、被加熱水が加熱されるとともに、気相の冷媒が凝縮されて液相の冷媒となる。加熱された被加熱水は、水蒸気分離器10において重力により分離され、液相部分が下方に貯留されて再び蒸気生成に供される。一方、被加熱水の加熱によって生成された蒸気は、水蒸気分離器10の上方に貯留された状態となる。従って、送出弁15を適宜開閉すれば、送出経路13を通じて蒸気利用設備に蒸気を供給することができる。
 凝縮器63を通過した高圧の液相冷媒は、過冷却器64を通過する際に給水経路30を通過する被加熱水との間において熱交換され、さらに膨張機構65において減圧された後、蒸発器61に供給される。蒸発器61に供給された低圧冷媒は、排温水との間の熱交換により蒸発し、圧縮機62に供給されることになる。
 以降、このヒートポンプ式蒸気生成装置では、ヒートポンプ部Cにおいて冷媒が循環することにより、熱源水供給部Aの温水流通経路1を流通する排温水の熱が、蒸気生成部Bの循環水経路14を流通する被加熱水に伝達され、被加熱水から順次蒸気が生成されることになる。
 この間、循環水経路14を循環する被加熱水は、第2ブローダウン経路50を通じて一定の少量ずつ外部に排水されるため、スケール原因物質が過剰に濃縮されるおそれがなく、蒸気生成部Bにおいてスケールが析出する事態を防止することが可能となる。なお、第2ブローダウン経路50については、常時第2開閉弁51を開いた状態としても、逆止弁52が機能するため、蒸気生成部Bに対して外部から水や空気が流入するおそれはない。
 蒸発器61の表面温度T1が起動許容温度T0に到達していない場合に圧縮機62の運転を開始しないのは、冷媒が液相のままで圧縮機62に供給される事態を未然に防止するためである。つまり、運転開始指令を受信した時点で熱源水供給部Aの温水流通経路1に排温水が流通していない場合には、蒸発器61の表面温度T1が起動許容温度T0に到達するまで圧縮機62の運転が開始されないことになり、液相の冷媒が圧縮機62に供給されるおそれがない。また、圧縮機62から吐出される冷媒の圧力P1が予め設定した運転許容圧力P0に到達しない場合に、循環水経路14に被加熱水を供給しないのは、冷媒循環経路60を循環する冷媒をヒートポンプ部C各部の予熱に利用するためである。これにより、ヒートポンプ部Cの各部を短時間に昇温することができ、その後に被加熱水を供給することで蒸気の生成を短時間に開始することが可能となる。
 図3に示すように、上述の蒸気生成中においては、制御部20により通常運転が行われ
、後述する運転停止指令が入力されるまで給水ポンプ32の回転数制御が繰り返し行われている(ステップS3)。この給水ポンプ32の回転数制御は、予めメモリに格納した凝縮器63の熱交換量(負荷)と水蒸気分離器10の水位との相関関係を示す相関データに基づき、凝縮器63において蒸気の生成効率が最大となるように実施される。なお、通常運転時の制御詳細は、目的に応じて一般的な加熱出力制御、蒸気量制御、水量一定制御、圧力一定制御等が適宜選択可能であり、ここでの詳細説明は省略する。
 すなわち、凝縮器63の内部においては、循環水経路14が下方から上方に向かって順に、被加熱水の液相と、被加熱水及び蒸気が混在する気液混合相と、蒸気の気相との三層状態となっている。一般に被加熱水は、液相の状態では伝熱性が悪いため熱交換効率が低く、気液混合相の状態でもっとも伝熱性が良好となって熱交換効率が高くなる。従って、凝縮器63の内部において気液混合相の割合が最適となるように凝縮器63に流入する被加熱水の流量を制御することで、凝縮器63で生成される蒸気の量と凝縮器63へ供給される被加熱水の量とを一致させ、凝縮器63において蒸気の生成効率を最大化することができる。
 例えば、凝縮器63における冷媒と被加熱水との間の熱交換量が小さい状態で凝縮器63に供給される被加熱水の流量が大きくなると、凝縮器63において被加熱水(液相)の割合が増えて水位が上昇し、結果として生成される蒸気の量が低下する。一方、凝縮器63における冷媒と被加熱水との間の熱交換量が大きい状態で凝縮器63に供給される被加熱水の流量が小さくなると、凝縮器63において被加熱水がすべて蒸発することになり、結果として生成される蒸気が十分量とならない。また、凝縮器63において冷媒と被加熱水との間の熱交換量が大きい状態であっても、凝縮器63に供給される被加熱水の流量が過剰に大きくなると、一部の被加熱水は蒸発せず、気液混合相の状態で水蒸気分離器10に供給されることになる。
 上述のヒートポンプ式蒸気生成装置では、凝縮器63の高さ位置を水蒸気分離器10よりも下方に配置して水位差Wを形成している。従って、給水ポンプ32の回転数制御によって外部からの被加熱水の導入流量を調整し、水蒸気分離器10の水位を変化させれば、水位差Wに基づいて凝縮器63へ供給される被加熱水の流量が変更されるため、凝縮器63における蒸気の生成効率を最大化することができる。
 上述の制御を行うため、制御部20には、凝縮器63における被加熱水と冷媒との間の熱交換量と、その熱交換量のときに蒸気の生成効率が最大となる水位(つまり、凝縮器63への水の供給流量)との相関関係を示す相関データがメモリに格納してある。熱交換量と水位との相関関係は、実験を行うことにより取得することができる。この相関データは、例えば、表形式のものであっても良いし、数式やグラフ形式のものでも良い。より具体的には、熱交換量が増加した場合に水蒸気分離器10の水位を高くし、熱交換量が減少した場合に水蒸気分離器10の水位を低くするという内容である。凝縮器63の熱交換量が増加した場合には、水蒸気分離器10の水位を高くすることで、凝縮器63への被加熱水の供給量を増やし、凝縮器63で気液混合相を適正量に維持しつつ蒸気の生成を促進して蒸気の生成効率及び生成量を最大化する。一方、凝縮器63の熱交換量が減少した場合には、水蒸気分離器10の水位を低くすることで、凝縮器63に過剰に被加熱水が供給されることを防止し、気液混合相を適正量に維持しつつ蒸気の生成を促進して蒸気の生成効率及び生成量を最大化する。
 制御部20は、例えば、現在の凝縮器63の熱交換量を取得すると、相関データに基づいてその熱交換量の際に蒸気の生成効率が最大となる水蒸気分離器10の水位を導出し、水位センサ12を通じて取得される水蒸気分離器10の水位が相関データから導出した水位と一致するように給水ポンプ32の回転数制御を行う。
 水位の制御の指標となる凝縮器63での被加熱水と冷媒との間の熱交換量の具体的なパラメータとしては、例えば、冷媒から凝縮器63へ入力される熱量が用いられる。冷媒から凝縮器63に入力される熱量が得られれば、この入力熱量における凝縮器63への最適な被加熱水の供給流量が決まるため、この供給流量が得られる水位となるように給水ポンプ32の回転数を制御することになる。入力熱量は、圧縮機62の排除容積が既知のため、例えば、ヒートポンプ部Cの圧縮機62に対する冷媒の吸入圧力、冷媒の吸入温度、圧縮機62の回転数を取得することにより、凝縮器63への冷媒循環量を演算することができ、この冷媒循環量から推定することが可能である。冷媒の吸入圧力及び吸入温度はそれぞれ吸入圧力センサ66及び吸入温度センサ68を通じて制御部20が取得可能であり、圧縮機62の回転数は制御部20において既知である。また、凝縮器63での被加熱水と冷媒との間の熱交換量の別のパラメータとしては、送出経路13から外部に送り出される蒸気の流量を用いても良い。送出経路13から送出される蒸気の流量は、例えば、送出経路13に流量計(図示せず)を設置することによって検出することが可能である。送出経路13から送り出される蒸気の流量が取得できれば、蒸気の送出流量と凝縮器63に循環供給される被加熱水の流量とを一致させるように、水蒸気分離器10の水位を制御すれば良い。この場合、制御部20は、蒸気の送出流量と水位との相関関係のデータに基づき、蒸気の送出流量が増加した際には、水位を上昇させる制御を行って循環する被加熱水の量を増やす。一方、蒸気の送出流量が減少した際には、水位を低下させる制御を行って凝縮器63に過剰に被加熱水が供給されることを防止し、気液混合相を適正量に維持する制御を行う。なお、図4に示すステップS16において給水弁31を開いた際に仮に循環水経路14が負圧であったとしても、上述のように給水ポンプ32の回転数が制御されているため、循環水経路14に対して過度に被加熱水が流入されることはない。
 図3に示すように、上述した給水ポンプ32の回転数制御の間、制御部20は、運転停止指令の有無を監視し(ステップS4)、運転停止指令を受信した場合(ステップS4:YES)、手順をステップS5の運転停止処理に移行する。運転停止指令とは、例えば、図示しない停止スイッチの操作によって出力されるものがある。
 運転停止処理において制御部20は、図5に示すように、蒸気生成部Bの希釈密閉処理(ステップS21)及びヒートポンプ部Cのポンプダウン処理を行う(ステップS22)。なお、本実施の形態では希釈密閉処理とポンプダウン処理とを同時に実施するようにしているが、これらの処理も順番に実施するシーケンス処理としても良いし、それぞれの処理を独立して実施するようにしても良い。例えば、希釈密閉処理を開始した後、予め設定した時間の経過後にポンプダウン処理を開始しても良い。この場合、ポンプダウン処理を開始する以前に凝縮器63の温度が低下するため、ポンプダウン処理を実施する際に凝縮器63において冷媒を確実に凝縮させることが可能となる。
 希釈密閉処理では、図6に示すように、制御部20から給水ポンプ32に対して運転指令、例えば回転数を最大とする指令が与えられる(ステップS31)。これにより、給水経路30を通じて被加熱水が供給されるため、水蒸気分離器10に貯留される被加熱水の水位も上昇することになる(希釈処理)。
 次いで、制御部20は、水位センサ12を通じて取得した水蒸気分離器10の水位L1が予め設定した希釈停止水位L0に到達したか否かを監視する(ステップS32→ステップS33)。この希釈停止水位L0は、凝縮器63からの循環水経路14と水蒸気分離器10との接続位置よりも高い水位に設定されることが望ましい。また、水蒸気分離器10が被加熱水で満たされるような水位に設定しても良い。このような設定にすることにより、循環水経路14全体のスケール原因物質濃度を確実に希釈することができる。水蒸気分離器10の水位L1が希釈停止水位L0に到達していない場合、制御部20は、給水ポン
プ32の運転を継続する(ステップS33:NO)。
 一方、水蒸気分離器10の水位L1が希釈停止水位L0に到達すると(ステップS33:YES)、制御部20は、給水ポンプ32を停止するとともに、第1ブローダウン経路40の第1開閉弁41を開く処理を行う(ステップS34)。この結果、循環水経路14及び水蒸気分離器10に貯留されている被加熱水が第1ブローダウン経路40を通じて外部に排水される(排水処理)。上述したように、第1ブローダウン経路40は、第2ブローダウン経路50よりも内径が大きいため、被加熱水が単位時間当たりに外部に排水される流量も大きなものとなる。
 ここで、外部に排水される被加熱水は、運転停止指令を受信する以前に蒸気生成部Bに貯留されていたものに対して、運転停止指令を受信した後に給水ポンプ32を通じて外部から導入されたものとの混合物となる。従って、運転停止指令を受信するまで蒸気生成を繰り返し行うことによって循環水経路14の被加熱水にスケール原因物質が濃縮されていたとしても、運転停止指令の受信後に外部から導入された被加熱水によって希釈されることになる。これにより、希釈された状態で第1ブローダウン経路40から被加熱水が外部に排水されるため、被加熱水が接触していた部分についてもその後にスケールが析出するおそれがなくなる等、蒸気生成部Bにスケールが付着する事態をより確実に防止することができるようになる。
 なお、水蒸気分離器10の水位L1が希釈停止水位L0となった場合(希釈処理終了条件が成立)に、給水ポンプ32を停止して希釈処理を終了するようにしているが、必ずしもこれに限定されない。例えば、被加熱水の流量から蒸気生成部Bにおける被加熱水の水量を算出し、算出した水量が予め設定した水量となった場合に希釈処理終了条件が成立したとして給水ポンプ32を停止しても良いし、水蒸気分離器10から循環水経路14と給水経路30との合流点までに貯留された被加熱水に含まれるスケール原因物質を検出し、その検出結果が予め設定した濃度を下回った場合に希釈処理終了条件が成立したとして給水ポンプ32を停止しも良い。さらに、循環水経路14から被加熱水の一部を排出した後に希釈処理を開始しても良く、希釈された被加熱水の一部を排出した後に再度給水ポンプ32を運転して希釈処理を複数回繰り返しても良い。
 第1開閉弁41を開いた後、制御部20は、圧力センサ11を通じて取得する水蒸気分離器10の内部圧力P2が予め設定した排水終了圧力P3まで低下したか否かを監視する(ステップS35→ステップS36)。排水終了圧力P3は、水蒸気分離器10及び循環水経路14の被加熱水がすべて排水された際の水蒸気分離器10の圧力よりもわずかに大きい値に設定されるものである。具体的は大気圧よりもわずかに大きな値に設定すれば良い。
 制御部20は、ステップS35において取得した水蒸気分離器10の内部圧力P2が排水終了圧力P3まで低下した場合(排水処理終了条件成立)、送出弁15、給水弁31、第1開閉弁41、第2開閉弁51をすべて閉じる密閉処理を行い(ステップS36→ステップS37)、今回の希釈密閉処理を終了する。これにより、蒸気生成部Bの内部が密閉された状態となる。従って、仮に運転停止中の温度低下によって循環水経路14の圧力が低下した場合であっても、外部から水や空気が流入するおそれはない。なお、排水処理を終了する条件としては、必ずしも上記のものに限らず、例えば、排水処理が予め設定した時間継続された場合に排水を終了するようにしても良い。この場合、蒸気生成部B内に被加熱水の一部が残っていても構わない。
 一方、運転停止処理で実施されるポンプダウン処理では、図7に示すように、まず、制御部20から膨張機構65に対して開度を全閉とする指令が与えられる(ステップS41
)。ヒートポンプ部Cにおいては、圧縮機62の運転が継続しているため、膨張機構65が全閉状態となると、冷媒循環経路60の冷媒が圧縮機62から膨張機構65までの間に貯留され、膨張機構65から圧縮機62までの間は冷媒がほとんどなくなった状態となる。上述したように、ヒートポンプ部Cでポンプダウン処理が実施される間、蒸気生成部Bにおいては希釈処理を実施している。従って、凝縮器63において冷媒が凝縮されるため、ポンプダウン処理を効率良く行うことが可能である。
 上述のポンプダウン処理の間、制御部20は、吸入圧力センサ66を通じて取得される冷媒の圧力P4が予め設定した終了許可圧力P5を下回ったか否かを監視している(ステップS42→ステップS43)。制御部20は、ステップS42において取得した冷媒の圧力P4が終了許可圧力P5を下回った場合に圧縮機62の運転を停止してポンプダウン処理を終了し(ステップS44)、今回のポンプダウン処理を終了する。
 このように、上記のヒートポンプ式蒸気生成装置では、運転を停止する際に希釈処理を実施し、外部から蒸気生成部Bに導入する被加熱水の流量を増大するようにしている。従って、蒸気生成部Bにおいては、スケール原因物質が希釈されることになり、スケールが付着する事態をより確実に防止することが可能となる。
 また、希釈密閉処理においては、蒸気生成部Bの被加熱水を外部に排水した後に循環水経路14を密閉するようにしている。このため、循環水経路14で水蒸気が凝縮する等して圧力が下がった場合であっても外部からの水や空気の流入が防止される。さらに、次回の起動時には、ヒートポンプ部Cにおいて圧縮機62が運転されて冷媒が循環されている状態においても、凝縮器63において被加熱水との間の熱交換は行われない。つまり、循環する冷媒は、ヒートポンプ部Cの各部を予熱するために用いられる。従って、循環水経路14に被加熱水がある場合に比べてヒートポンプ部Cの各部の温度が早く上昇することになり、起動時間の短縮化を図ることが可能となる。
 また、運転を停止する際には、ヒートポンプ部Cにおいて冷媒を圧縮機62から膨張機構65までの間に貯留するようにしているため、換言すれば起動時において蒸発器61に液相冷媒が貯留されていないため、圧縮機62の運転を開始した場合に液相冷媒が吸入される事態を防止することができる。
 なお、上述した希釈処理においては、希釈した蒸気生成部Bの被加熱水を外部に排水するようにしているが、必ずしも外部に排水する必要はなく、希釈した状態のままで運転を停止するようにしても良い。また、希釈処理は、ポンプダウン処理が終了するまで給水ポンプ32の運転を継続するとともに第1開閉弁41を開くことにより、循環水経路14に被加熱水を循環させるようにしても良い。この場合には、ポンプダウン処理を実施している間、凝縮器63においてヒートポンプ部Cの冷媒を凝縮させる効果がより顕著となる。さらに、希釈処理とポンプダウン処理とは、必ずしも同時に開始する必要はなく、希釈処理を開始した後、ポンプダウン処理を開始するようにしても良い。この場合、ポンプダウン処理は、例えば、希釈処理を開始した後、凝縮器63の温度が予め設定した値を下回った時点で開始したり、希釈処理が予め設定した時間継続された後に開始すれば良い。このように、ポンプダウン処理を実施する以前において希釈処理を予め開始しておけば、凝縮器63を流通する被加熱水の温度が低下するため、ヒートポンプ部Cの冷媒をより効率的に凝縮することが可能となる。
(実施の形態2)
 実施の形態2では、(1)希釈処理中や排水処理中に起動指令があった場合、(2)排水処理開始後の時間経過により排水処理を終了し、蒸気生成部B内に被加熱水の一部が残った状態で装置を停止した場合、(3)緊急停止等の理由により、通常の排水処理を経ず
に装置を停止した場合等、循環水経路14及び水蒸気分離器10にそれぞれ被加熱水が残留した状態で装置の起動を行った場合に実施する制御について説明を行う。
 図8は、上述した制御を行うヒートポンプ式蒸気生成装置の構成を示すものである。ここで例示するヒートポンプ式蒸気生成装置は、実施の形態1と同様の構成を有したもので、実施の形態1とは、圧縮機62から凝縮器63までの間の冷媒循環経路60に吐出温度センサ161を追加した点、過冷却器64と膨張機構65との間の冷媒循環経路60に過冷却温度センサ162及び過冷却圧力センサ163を追加した点が異なる。以下、実施の形態1と異なる点について詳述し、実施の形態1と同様の構成については同一の符号を付してそれぞれの詳細説明を省略する。
 吐出温度センサ161は、圧縮機62から吐出された冷媒の温度を検出するものであり、過冷却温度センサ162は、過冷却器64を通過した後の冷媒の温度を検出するものである。過冷却圧力センサ163は、過冷却器64を通過した後の冷媒の圧力を検出するものである。これら吐出温度センサ161の検出結果、過冷却温度センサ162の検出結果、過冷却圧力センサ163の検出結果は、それぞれ制御部20に与えられることになる。
 図9~図11は、実施の形態2の制御部20が所定のサイクルタイムで繰り返し実行する蒸気生成処理において、実施の形態1と異なるもののみを示したものである。以下、これらの図9~図11に示すフローチャート及び実施の形態1で示した図3のフローチャートを適宜参照し、制御部20で実施される蒸気生成処理の内容を実施の形態1と異なる点について主に説明する。なお、以下においては便宜上、ヒートポンプ式蒸気生成装置が運転停止状態にあり、膨張機構65、送出弁15、給水弁31、第1開閉弁41及び第2開閉弁51がそれぞれ全閉され、かつ給水ポンプ32及び圧縮機62がそれぞれ停止しているものとする。蒸気生成部Bにおいては、循環水経路14及び水蒸気分離器10にそれぞれ被加熱水が残留したままとなっている。
 図9は、図3に示す蒸気生成処理において運転開始指令の受信後に実施の形態2で実施される起動処理の内容を示したものである。この起動処理では、まず、制御部20によって予め設定した被加熱水排水条件が成立するか否かの判定が行われる(ステップS51)。この判定では、蒸気生成部Bに被加熱水が残留されている可能性を考慮し、過冷却温度センサ162、吐出温度センサ161、過冷却圧力センサ163を通じて検出される冷媒の温度及び圧力のいずれか、またはこれらの温度及び圧力の組み合せから求められる冷媒の過冷却度の値を基準として被加熱水の排水の要否を決定する。
 蒸気生成部B内に被加熱水が残留した状態で装置を起動した場合の処理について例示する。冷媒の温度もしくは圧力を判断基準とした場合には、検出値が予め設定した値以上であれば排水処理を行うことなくそのままの起動(高温起動)とする。この高温起動では、装置を停止してから間もない状態等、装置全体を予熱する必要がない場合、排水処理を待つことなくすぐに起動処理を行うことができる。一方、検出値が予め設定した値を下回る場合は排水処理を行った後の起動(低温起動)とする。この低温起動では、装置を停止した後に時間が経過し、装置が常温まで冷却されている場合に、起動時間の長大化を防止するための処理を行う。すなわち、起動処理を実施する前に被加熱水の排水処理を行うことにより装置全体の熱容量を低下させ、起動処理の際の装置の昇温時間を短縮化する。冷媒の過冷却度を判断基準とした場合には、求められた過冷却度が予め設定した値以上であれば低温起動し、求められた過冷却度が予め設定した値を下回れば高温起動する。過冷却度とは、ある圧力における冷媒の飽和温度と、検出した過冷却液冷媒温度との温度差である。ある圧力における冷媒の飽和温度は、圧力温度表等から求めることができる。凝縮器63を通過した冷媒の過冷却度を一定値未満に制御することにより、膨張機構65において冷媒を確実に気化させることが可能となる。これらの基準となる値は設計値によって設定
しても良いし、運用もしくは装置の構成によって適宜設定しても良い。
 上述の判定において被加熱水排水条件が成立したと判定されると(ステップS51:YES)、制御部20により、低温起動を実施すべく手順がステップS52に移行され、蒸気生成部Bにおいて第1開閉弁41が開かれて被加熱水の排水処理が実施される。
 排水処理を実施している間、制御部20は、予め設定した排水処理の完了条件が成立したか否かを監視する(ステップS53)。排水処理の完了条件としては、例えば排水を開始してからの経過時間とすれば良い。つまり、排水を開始してからの経過時間が予め設定した時間となった場合に排水処理が完了したと判断することができる。あるいは凝縮器63の水位と水蒸気分離器10の水位とが連動している場合には、水蒸気分離器10の水位が予め設定した値を下回ったことを条件として排水処理が完了したと判断しても良い。排水処理の完了条件が成立した場合には、制御部20によって第1開閉弁41が閉じた状態となる(ステップS53:YES→ステップS54)。この結果、蒸気生成部Bにおいては、貯留されていた被加熱水のほぼすべてが外部に排水された状態となる。
 次いで制御部20は、蒸発器温度センサ69を通じて蒸発器61の表面温度T1を取得し(ステップS55)、取得した表面温度T1が予め設定した起動許容温度T0(例えば60℃)に到達しているか否かを判断する(ステップS56)。実施の形態1と同様、熱源水供給部Aにおいて温水流通経路1に排温水が流通している場合には、運転開始指令が与えられた時点で既に蒸発器61の表面温度T1が起動許容温度T0を超えた状態にあり、手順が直ちにステップS57に移行して圧縮機62の運転が開始されることになる。
 圧縮機62の運転を開始した制御部20は、吐出圧力センサ67を通じて圧縮機62から吐出される冷媒の圧力P1を取得し(ステップS58)、取得した冷媒の圧力P1が予め設定した運転許容圧力P0に到達するまで給水待機状態となる(ステップS59)。従って、蒸気生成部Bにおいては、給水弁31が全閉状態で、給水ポンプ32が停止状態に維持されるため、循環水経路14に対して被加熱水が供給されることはない。
 これに対して圧縮機62から吐出される冷媒の圧力P1が運転許容圧力P0に到達した場合(ステップS59:YES)、制御部20は、給水弁31を開くとともに、給水ポンプ32の運転を開始し、さらに、第2ブローダウン経路50の第2開閉弁51を開く処理を実施し(ステップS60)、今回の起動処理を終了する。これにより、給水経路30を通じて外部の被加熱水が循環水経路14に供給されるとともに、水蒸気分離器10及び循環水経路14を循環する被加熱水の一部が第2ブローダウン経路50を通じて一定量ずつ外部に排水される。
 被加熱水が供給された状態で圧縮機62が運転されると、ヒートポンプ部Cにおいて高圧の気相冷媒が凝縮器63に供給され、この気相冷媒と凝縮器63を通過する被加熱水との間において熱交換が行われる。この結果、被加熱水が加熱されるとともに、気相の冷媒が凝縮されて液相の冷媒となる。加熱された被加熱水は、水蒸気分離器10において重力により分離され、液相部分が下方に貯留されて再び蒸気生成に供される。一方、被加熱水の加熱によって生成された蒸気は、水蒸気分離器10の上方に貯留された状態となる。従って、送出弁15を適宜開閉すれば、送出経路13を通じて蒸気利用設備に蒸気を供給することができる。
 凝縮器63を通過した高圧の液相冷媒は、過冷却器64を通過する際に給水経路30を通過する被加熱水との間において熱交換され、さらに膨張機構65において減圧された後、蒸発器61に供給される。蒸発器61に供給された低圧冷媒は、排温水との間の熱交換により蒸発し、圧縮機62に供給されることになる。
 以降、このヒートポンプ式蒸気生成装置では、ヒートポンプ部Cにおいて冷媒が循環することにより、熱源水供給部Aの温水流通経路1を流通する排温水の熱が、蒸気生成部Bの循環水経路14を流通する被加熱水に伝達され、被加熱水から順次蒸気が生成されることになる。
 この間、循環水経路14を循環する被加熱水は、第2ブローダウン経路50を通じて一定の少量ずつ外部に排水されるため、スケール原因物質が過剰に濃縮されるおそれがなく、蒸気生成部Bにおいてスケールが析出する事態を防止することが可能となる。なお、第2ブローダウン経路50については、常時第2開閉弁51を開いた状態としても、逆止弁52が機能するため、蒸気生成部Bに対して外部から水や空気が流入するおそれはない。
 なお、被加熱水の供給を開始する条件としては、必ずしも圧縮機62から吐出される冷媒の圧力が運転許容圧力P0に到達した場合に限らない。例えば、過冷却温度センサ162を通じて取得した冷媒の温度が予め設定した温度以上になった場合が挙げられる。冷媒の温度を検出する過冷却温度センサ162の配設位置は、圧縮機62から膨張機構65までの間であれば、その他の部位に設けられていても良い。
 また、吐出温度センサ161を通じて取得される凝縮器63入口の冷媒温度及び過冷却温度センサ162を通じて取得される凝縮器63出口の冷媒温度との差を被加熱水供給条件の判定基準としても良い。この場合、2つの温度センサ161,162の検出する温度差が一定値未満になった時点で凝縮器63が十分に予熱されたと判断し、給水ポンプ32の運転を開始すれば良い。
 さらに、過冷却温度センサ162の検出結果と過冷却圧力センサ163の検出結果とから凝縮器63の出口における冷媒の過冷却度を求め、被加熱水供給条件の判定基準としても良い。この場合、過冷却度が一定値未満になった場合に、給水ポンプ32の運転を開始すれば良い。なお、過冷却温度センサ162の検出結果に換えて、吐出温度センサ161の検出結果を利用しても良い。つまり、過冷却温度センサ162の位置は圧縮機62から膨張機構65の間において適宜選択することができる。過冷却圧力センサ163の位置については、凝縮器63から膨張機構65の間において適宜選択することができる。
 また、排水完了後にタイマ設定を行うことにより、被加熱水の供給を開始する条件の判定基準としても良い。この場合、排水完了後、タイマに設定した時間が経過した場合に、凝縮器63が十分に予熱されたと判断して給水ポンプ32の運転を開始すれば良い。
 なお、被加熱水排水条件と被加熱水供給条件とは、同一の検出結果を参照して成立の可否を判断しても良いし、異なる検出結果を用いて成立の可否を判断しても良い。また、判断基準となる検出結果の組み合せは自由であり、設計や運転状況に応じて適宜選択すれば良い。
 一方、ステップS51において被加熱水排水条件が成立していないと判定されると、制御部20により、高温起動を実施すべく手順がステップS61に移行され、直ちに給水弁31が開くとともに、圧縮機62及び給水ポンプ32の運転が開始され、さらに、第2ブローダウン経路50の第2開閉弁51が開かれることになる。これによりヒートポンプ部Cにおいて冷媒が循環するとともに、蒸気生成部Bにおいて被加熱水が循環されることになり、熱源水供給部Aの温水流通経路1を流通する排温水の熱が、蒸気生成部Bの循環水経路14を流通する被加熱水に伝達され、被加熱水から順次蒸気が生成されることになる。
 なお、上述の蒸気生成中においては、実施の形態1と同様、制御部20により、後述する運転停止指令が入力されるまで給水ポンプ32の回転数制御が繰り返し行われている。給水ポンプ32の回転数制御は、実施の形態1と同様であるため、詳細説明は省略する。
 上述した給水ポンプ32の回転数制御の間、制御部20は、図3に示すように、運転停止指令を受信した場合、運転停止処理を実施する。図10は、図3に示す蒸気生成処理において運転停止指令の受信後に実施の形態2で実施される運転停止処理の内容を示したものである。この運転停止処理では、制御部20によって、蒸気生成部Bの希釈密閉処理が行われるとともに(ステップS71)、ヒートポンプ部Cのポンプダウン処理が行われる(ステップS22)。ポンプダウン処理については、実施の形態1と同様であるため、詳細説明は省略する(図7参照)。
 一方、希釈密閉処理では、図11に示すように、制御部20から給水ポンプ32に対して回転数を増大させる指令、例えば回転数を最大とする指令が与えられる(ステップS81)。これにより、給水経路30を通じた被加熱水の供給が増大するため、水蒸気分離器10に貯留される被加熱水の水位も上昇することになる(希釈処理)。
 次いで、制御部20は、水位センサ12を通じて取得した水蒸気分離器10の水位L1が予め設定した希釈停止水位L0に到達したか否かを監視する(ステップS82→ステップS83)。水蒸気分離器10の水位L1が希釈停止水位L0に到達していない場合、制御部20は、給水ポンプ32の運転を継続する(ステップS83:NO)。
 一方、水蒸気分離器10の水位L1が希釈停止水位L0に到達すると(ステップS83:YES)、制御部20は、給水ポンプ32を停止し、さらに送出弁15、給水弁31、第1開閉弁41、第2開閉弁51をすべて閉じる密閉処理を行い(ステップS84)、今回の希釈密閉処理を終了する。これにより、蒸気生成部Bの内部が密閉された状態となる。従って、仮に温度低下によって循環水経路14の圧力が低下した場合であっても、外部からの水や空気の流入が防止される。
 ここで、上述の希釈処理が実施された場合、蒸気生成部Bにおいては、運転停止指令を受信する以前に貯留されていた被加熱水に対して、運転停止指令を受信した後に給水ポンプ32の回転数増大によって外部から大量に導入された被加熱水が混合されることになる。従って、運転停止指令を受信するまで蒸気生成を繰り返し行うことによって循環水経路14の被加熱水にスケール原因物質が濃縮されていたとしても、運転停止指令の受信後に外部から大量に導入された被加熱水によって希釈されることになる。これにより、蒸気生成部Bにスケールが付着する事態をより確実に防止することができるようになる。
 希釈密閉処理及びポンプダウン処理が終了した後においては、図10に示すように、制御部20によって被加熱水排水条件が成立するか否かの判断が行われ(ステップS72)、被加熱水排水条件が成立した場合、排水処理が開始される(ステップS73)。被加熱水排水条件としては、(1)運転停止後に予め設定した時間が経過した場合、(2)運転停止中に過冷却温度センサ162、過冷却圧力センサ163で検出された値のいずれかが予め設定した値を下回った場合、(3)過冷却温度センサ162で検出された温度及び過冷却圧力センサ163で検出された圧力から求められる冷媒の過冷却度が一定値以上になった場合、がある。これらの条件が成立した場合には、第1開閉弁41が開いた状態となり、循環水経路14及び水蒸気分離器10の被加熱水が第1ブローダウン経路40を通じて外部に排水されることになる。被加熱水の排水が完了した場合には、制御部20によって第1開閉弁41が閉じた状態となる。なお、この排水処理は省略可能である。排水処理を省略した場合には、希釈処理後の被加熱水を蒸気生成部B内に残留させたまま装置を停止し、起動時において上述した排水要否の判定を行う。運転停止時において蒸気生成部B
の被加熱水を排水した場合には、次回の起動時において被加熱水排水条件が成立しているか否かの判定を省略し、図9において手順をステップS55に移行し、蒸発器61の表面温度T1が予め設定した起動許容温度T0に到達しているか否かの判断を行う手順から起動処理を行えば良い。
 上記のように排水処理を実施した場合には、次回の起動時にヒートポンプ部Cにおいて圧縮機62が運転されて冷媒が循環されていても、凝縮器63において被加熱水との間の熱交換が行われない。つまり、循環する冷媒は、ヒートポンプ部Cの各部を予熱するために用いられる。従って、循環水経路14に被加熱水がある場合に比べてヒートポンプ部Cの各部の温度が早く上昇することになり、次の起動時間を短縮することができるようになる。また、運転停止時に蒸気生成部Bに被加熱水が滞留しないため、スケールが付着する事態をより確実に防止することが可能となる。なお、ステップS72において被加熱水排水条件が成立していないと判断した場合には、上述の排水処理を実施することなく今回の運転停止処理を終了する。
 なお、上述した実施の形態1及び実施の形態2では、運転停止指令を受信した場合に必ず希釈処理を実施するようにしているが、本発明はこれに限定されない。例えば、運転停止指令が与えられた場合に蒸気生成部Bに貯留されている被加熱水のスケール原因物質を検出し、検出したスケール原因物質の濃度が予め設定した値を超えていた場合にのみ希釈処理を実施するようにしても良い。こうした処理を行えば、例えば、運転開始指令が与えられた後にすぐに運転停止指令が与えられた場合、希釈処理を省略することが可能であり、運転停止完了までの時間が短縮化できるという効果がある。
  1   温水流通経路
 10   水蒸気分離器
 11   圧力センサ
 12   水位センサ
 13   送出経路
 14   循環水経路
 15   送出弁
 20   制御部
 30   給水経路
 31   給水弁
 32   給水ポンプ
 40   第1ブローダウン経路
 41   第1開閉弁
 50   第2ブローダウン経路
 51   第2開閉弁
 52   逆止弁
 60   冷媒循環経路
 61   蒸発器
 62   圧縮機
 63   凝縮器
 63a   吐出口
 64   過冷却器
 65   膨張機構
 66   吸入圧力センサ
 67   吐出圧力センサ
 68   吸入温度センサ
 69   蒸発器温度センサ
161   吐出温度センサ
162   過冷却温度センサ
163   過冷却圧力センサ
A   熱源水供給部
B   蒸気生成部
C   ヒートポンプ部

Claims (11)

  1.  冷媒が熱源水から熱を吸収し、吸収した熱を被加熱水に伝達することにより蒸気の生成を行うヒートポンプ式蒸気生成装置であって、
     蒸発器、圧縮機、凝縮器及び膨張機構の間に順次冷媒が循環流通されるヒートポンプ部
    と、
     前記蒸発器に対して熱源水を流通させる熱源水供給部と、
     前記凝縮器に対して外部から導入された被加熱水を流通させることによって蒸気を生成する蒸気生成部と、
     運転停止指令が与えられた場合、前記蒸気生成部に対して外部から被加熱水を導入する希釈処理を実施する制御部を備えたことを特徴とするヒートポンプ式蒸気生成装置。
  2.  前記制御部は、予め設定した希釈処理終了条件が成立した場合に前記希釈処理を終了し、前記蒸気生成部の被加熱水を外部に排水する排水処理を実施することを特徴とする請求項1に記載のヒートポンプ式蒸気生成装置。
  3.  前記制御部は、前記蒸気生成部の被加熱水が予め設定した水量を超えた場合、または前記希釈処理が予め設定した時間継続された場合、または前記蒸気生成部の被加熱水に含まれるスケール原因物質が予め設定した濃度を下回った場合、前記希釈処理終了条件が成立したと判断することを特徴とする請求項2に記載のヒートポンプ式蒸気生成装置。
  4.  前記制御部は、予め設定した排水処理終了条件が成立した場合に前記排水処理を終了して前記蒸気生成部を密閉状態とする密閉処理を実施することを特徴とする請求項3に記載のヒートポンプ式蒸気生成装置。
  5.  前記制御部は、前記蒸気生成部の圧力が予め設定した値まで低下した場合、あるいは前記排水処理が予め設定した時間継続された場合に前記排水処理終了条件が成立したと判断することを特徴とする請求項4に記載のヒートポンプ式蒸気生成装置。
  6.  前記制御部は、運転停止指令が与えられた場合、前記圧縮機の吸入圧力が予め設定した値を下回るまでの間、前記膨張機構を閉じた状態で前記圧縮機の運転を行うポンプダウン処理を実施することを特徴とする請求項1に記載のヒートポンプ式蒸気生成装置。
  7.  前記制御部は、前記圧縮機の吸入圧力が予め設定した値を下回った場合にポンプダウン処理を終了することを特徴とする請求項6に記載のヒートポンプ式蒸気生成装置。
  8.  前記制御部は、前記ポンプダウン処理が終了するまで前記希釈処理を継続して実施し、かつ前記蒸気生成部の被加熱水が予め設定した水量を超えた場合、あるいは前記希釈処理が予め設定した時間継続された場合、前記被加熱水を外部に排水する排水処理を実施することを特徴とする請求項6に記載のヒートポンプ式蒸気生成装置。
  9.  前記制御部は、前記蒸気生成部の圧力が予め設定した値まで低下した場合、あるいは前記排水処理が予め設定した時間継続された場合に、前記排水処理を終了して前記蒸気生成部を密閉状態とする密閉処理を実施することを特徴とする請求項8に記載のヒートポンプ式蒸気生成装置。
  10.  前記制御部は、起動指令が与えられた場合、前記圧縮機から前記膨張機構までの冷媒圧力が予め設定した値を超えた際に前記蒸気生成部に対する外部からの被加熱水の導入を開始することを特徴とする請求項1に記載のヒートポンプ式蒸気生成装置。
  11.  前記制御部は、起動指令が与えられた場合、前記蒸発器の温度が予め設定した値に到達した際に前記圧縮機の運転を開始することを特徴とする請求項10に記載のヒートポンプ式蒸気生成装置。
PCT/JP2018/032911 2018-09-05 2018-09-05 ヒートポンプ式蒸気生成装置 WO2020049663A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201880077881.3A CN111433514B (zh) 2018-09-05 2018-09-05 热泵式蒸汽生成装置
JP2019529946A JP6645624B1 (ja) 2018-09-05 2018-09-05 ヒートポンプ式蒸気生成装置
PCT/JP2018/032911 WO2020049663A1 (ja) 2018-09-05 2018-09-05 ヒートポンプ式蒸気生成装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2018/032911 WO2020049663A1 (ja) 2018-09-05 2018-09-05 ヒートポンプ式蒸気生成装置

Publications (1)

Publication Number Publication Date
WO2020049663A1 true WO2020049663A1 (ja) 2020-03-12

Family

ID=69568005

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/032911 WO2020049663A1 (ja) 2018-09-05 2018-09-05 ヒートポンプ式蒸気生成装置

Country Status (3)

Country Link
JP (1) JP6645624B1 (ja)
CN (1) CN111433514B (ja)
WO (1) WO2020049663A1 (ja)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0277403U (ja) * 1988-11-28 1990-06-14
JP2012021717A (ja) * 2010-07-15 2012-02-02 Fuji Electric Co Ltd ヒートポンプ式蒸気生成装置
CN104713057A (zh) * 2013-12-17 2015-06-17 苟仲武 热泵电蒸汽锅炉
JP2016128727A (ja) * 2015-01-09 2016-07-14 三浦工業株式会社 蒸気発生システム
JP2016138714A (ja) * 2015-01-28 2016-08-04 ヤンマー株式会社 ヒートポンプ
JP2017040395A (ja) * 2015-08-18 2017-02-23 富士電機株式会社 蒸気生成装置
JP2017161105A (ja) * 2016-03-07 2017-09-14 富士電機株式会社 ヒートポンプ式蒸気生成装置

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6477415B2 (ja) * 2015-10-26 2019-03-06 富士電機株式会社 ヒートポンプ式蒸気生成装置およびヒートポンプ式蒸気生成装置の起動方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0277403U (ja) * 1988-11-28 1990-06-14
JP2012021717A (ja) * 2010-07-15 2012-02-02 Fuji Electric Co Ltd ヒートポンプ式蒸気生成装置
CN104713057A (zh) * 2013-12-17 2015-06-17 苟仲武 热泵电蒸汽锅炉
JP2016128727A (ja) * 2015-01-09 2016-07-14 三浦工業株式会社 蒸気発生システム
JP2016138714A (ja) * 2015-01-28 2016-08-04 ヤンマー株式会社 ヒートポンプ
JP2017040395A (ja) * 2015-08-18 2017-02-23 富士電機株式会社 蒸気生成装置
JP2017161105A (ja) * 2016-03-07 2017-09-14 富士電機株式会社 ヒートポンプ式蒸気生成装置

Also Published As

Publication number Publication date
CN111433514B (zh) 2022-04-08
JP6645624B1 (ja) 2020-02-14
CN111433514A (zh) 2020-07-17
JPWO2020049663A1 (ja) 2020-09-10

Similar Documents

Publication Publication Date Title
JP2008008595A (ja) ヒートポンプ式熱回収装置
US6332328B1 (en) Absorption heat pump and process for operation of an absorption heat pump
JP2017146033A (ja) 給水加温システム
JP6645624B1 (ja) ヒートポンプ式蒸気生成装置
JP5605557B2 (ja) ヒートポンプ式蒸気発生装置
JP6497111B2 (ja) ヒートポンプ式蒸気生成装置
JP2017161105A (ja) ヒートポンプ式蒸気生成装置
JP4502785B2 (ja) 貯湯式温水器
JP6421496B2 (ja) 給水加温システム
JP6341465B2 (ja) 給水加温システム
JP6844256B2 (ja) 蒸気生成システム
KR100437669B1 (ko) 목욕탕용 히트펌프 시스템
JP5560515B2 (ja) 蒸気製造システム、および蒸気製造システムの立ち上げ制御方法
JP5821411B2 (ja) 蒸気発生装置
JP2013238336A (ja) 給水加温システム
JP7056246B2 (ja) ヒートポンプ式蒸気生成システム
JP6613886B2 (ja) ヒートポンプ式蒸気生成装置、蒸気生成システムおよびその運転方法
JP2001300512A (ja) 蒸発濃縮装置
JP2006090564A (ja) 潜熱回収型温水暖房装置
US5782099A (en) Method for controlling an absorption system
JP6455348B2 (ja) ヒートポンプ式蒸気生成装置及び該ヒートポンプ式蒸気生成装置の運転方法
JP6394525B2 (ja) ヒートポンプ式蒸気生成装置
JP7462453B2 (ja) ヒートポンプ式温水装置
JP2019158173A (ja) ヒートポンプ式蒸気生成システム
JP7135618B2 (ja) 蒸気生成ヒートポンプ装置

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2019529946

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18932583

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18932583

Country of ref document: EP

Kind code of ref document: A1