WO2019218666A1 - Anti-clogging strengthened water-permeable pile and construction method - Google Patents

Anti-clogging strengthened water-permeable pile and construction method Download PDF

Info

Publication number
WO2019218666A1
WO2019218666A1 PCT/CN2018/121825 CN2018121825W WO2019218666A1 WO 2019218666 A1 WO2019218666 A1 WO 2019218666A1 CN 2018121825 W CN2018121825 W CN 2018121825W WO 2019218666 A1 WO2019218666 A1 WO 2019218666A1
Authority
WO
WIPO (PCT)
Prior art keywords
pile
geotextile
permeable
clogging
length
Prior art date
Application number
PCT/CN2018/121825
Other languages
French (fr)
Chinese (zh)
Inventor
崔新壮
李晋
金青
张炯
王洁茹
张小宁
王艺霖
李骏
Original Assignee
山东交通学院
山东大学
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 山东交通学院, 山东大学 filed Critical 山东交通学院
Priority to AU2018424102A priority Critical patent/AU2018424102A1/en
Publication of WO2019218666A1 publication Critical patent/WO2019218666A1/en
Priority to ZA2020/06047A priority patent/ZA202006047B/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/385Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes

Definitions

  • the invention relates to the field of civil engineering, in particular to an anti-clogging and enhanced water-permeable pile and a construction method thereof.
  • the new pile body has high strength and can form a pile body, which can improve the bearing capacity of the foundation.
  • the permeable concrete pile has large porosity and strong permeability, and can form a good vertical drainage channel, which can accelerate the foundation consolidation rate during the construction period and preloading period of the embankment, and reduce post-construction settlement.
  • the permeable piles will encounter clogging problems during the construction process, resulting in a decrease in water permeability; in the consolidation process of the foundation, the movable particles in the piping soil will also enter the pores of the pile material under the action of sufficient penetration force. , causing blockages.
  • the present invention discloses a construction method for preventing clogging and strengthening a permeable pile, strengthening the permeable geotextile, adding a two-way geogrid to form a geotextile, which can increase the pile body.
  • the molding ability can also improve the pile strength of the permeable pile.
  • it is wrapped with the permeable concrete pile to form a bagged permeable concrete pile, which can ensure good permeability, reduce the entry of soil particles and avoid the blockage of the permeable concrete pile; and the large tensile strength of the geogrid itself, the pile
  • the body is tightly enclosed, so that the pile has greater strength and modulus, which improves its ability to resist deformation and damage.
  • An anti-blocking and enhanced water-permeable pile comprising a concrete pile, wherein a geotextile drum is arranged on an outer ring of the concrete pile, and the geotextile drum is composed of a geogrid and a permeable geotextile, and is located at a bottom of the pile body. The lower part of the geotextile is connected to the top of the pile tip of the concrete pile.
  • a connecting ring is arranged on a side of the geotextile cylinder at the bottom of the pile body, and a hook is arranged above the pile tip of the concrete pile, and the hook is hooked on the connecting ring.
  • the connecting ring includes a plurality of connecting rings that are annularly distributed along a lower side surface of the geotextile.
  • the hook comprises a plurality of hooks, and the plurality of hooks are annularly distributed along an upper section of the pile tip.
  • the top of the pile tip is provided with a groove, the groove height is 5-8 cm, and the diameter is 1-2 cm larger than the diameter of the sleeve.
  • the height of the geotextile cylinder is 0.5-1 m higher than that of the concrete pile, and the excess length is tied and fixed at the top of the pile.
  • the geotextile cartridge comprises a plurality of geotextile cylinders distributed up and down along the axial direction of the concrete pile, and the adjacent geotextile cylinders are overlapped by a certain length and bonded together.
  • Step 1 The pile driver enters the site, and determines the height of the frame and the length of the immersed pipe according to the design length and the depth of the immersed pipe, and assembles;
  • Step 2 Place the pile tip according to the design, and the pile tip is prefabricated for concrete or prefabricated with steel;
  • Step 3 designing a geotextile according to the pile diameter and the length of the pile;
  • the geotextile drum is divided into two parts: a permeable geotextile and a two-way geogrid.
  • the two-way geogrid is bent into a tubular shape, and then a permeable geotextile is placed on the outside, and the permeable geotextile and the two-way geogrid are integrally formed, and then the casing is sleeved, and the diameter of the geotextile can be determined according to the pile diameter and the length of the pile. And length;
  • Step 4 The geotextile is first wrapped on the outside of the casing, and the casing is connected with the pile tip.
  • the geotextile is inlaid with a hoop, and then the iron ring is connected with the hook of the top surface of the pile tip, so that the geotextile is in the process of vibration and sinking. Not easy to fall off;
  • Step 5 using a vibrating pipe sink to make holes; the cloth sleeve is sleeved outside the pipe, and is lifted by a lifting machine.
  • the cloth cylinder sinks with the pipe, and after the pipe reaches the design elevation, the water-permeable pile is infused; Pull the tube to the natural ground, and then sink the pile to the bottom of the pile; after filling the casing with permeable concrete, first vibrate for a certain period of time, then start to extubate the tube, and then pull the tube while vibrating, and then pull out the vibration for a certain distance every time. Repeatedly until the pile tube is completely pulled out, and the shape is formed;
  • Step 6 Close the geotextile cylinder of the pile with a wire tie to prevent the debris from contaminating the pile and clean the surrounding of the pile hole.
  • the geogrid has a mesh size of 80 mm ⁇ 80 mm, a transverse rib and a longitudinal rib width of 4-5 mm, and a thickness of 2-3 mm; in order to ensure close contact between the geotextile and the pile wall and the pipe wall, the geotextile
  • the diameter should be larger than the casing 5-8cm, the length should be longer than the design pile length 0.5-1m, and the excess length should be fixed at the top of the pile.
  • a plurality of geotextile cylinders are arranged on the upper and lower sides of a pile body, and the overlap width between adjacent cloth cylinders is ⁇ 200 mm, and the joints are tight and fully bonded.
  • the pile sinking depth of the pile must be determined according to the ground level of the pile and the design elevation of the pile end. After the pile tube sinks and sinks to the design depth, the verticality of the pile tube should be checked in time, and the deviation of the verticality is not more than 1%.
  • the permeable geotextile has the function of allowing moisture to pass through and blocking the loss of sand particles, and combining it with the permeable pile can solve the clogging problem well.
  • the problem of irregular formation of the pile is prone to occur, and the pile of the permeable pile can be reinforced by the geogrid.
  • the permeable geotextile is strengthened and a two-way geogrid is added to form a geotextile, which not only increases the forming ability of the pile but also improves the pile strength of the permeable pile.
  • the permeable concrete pile is wrapped with the permeable concrete pile to form a bagged permeable concrete pile, which can ensure good permeability, reduce the entry of soil particles and avoid the blockage of the permeable concrete pile; and the large tensile strength of the geogrid itself, the pile
  • the body is tightly enclosed, so that the pile has greater strength and modulus, which improves its ability to resist deformation and damage.
  • Figure 1 is a front view of the pile tip
  • Figure 2 is a plan view of the pile tip
  • Figure 3 is a plan view of the geotextile bag
  • Figure 4 is a construction process diagram
  • the two-way geogrid is a grid consisting of two directions, radial and latitudinal.
  • the present application proposes a construction method for preventing clogging and strengthening the permeable pile, strengthening the permeable geotextile and adding a two-way geogrid to form
  • the geotextile can not only increase the forming capacity of the pile, but also improve the pile strength of the permeable pile.
  • the permeable concrete pile is wrapped with the permeable concrete pile to form a bagged permeable concrete pile, which can ensure good permeability, reduce the entry of soil particles and avoid the blockage of the permeable concrete pile; and the large tensile strength of the geogrid itself, the pile
  • the body is tightly enclosed, so that the pile has greater strength and modulus, which improves its ability to resist deformation and damage.
  • An anti-blocking reinforced water permeable pile comprising a concrete pile, a geotextile drum 7 is arranged on an outer ring of the concrete pile, and the geotextile drum 7 is composed of a geogrid and a permeable geotextile, and the geotextile drum
  • a connecting ring 4 is provided on the lower side of the lower part of the pile 7.
  • a hook 2 is provided at the pile tip of the concrete pile, and the hook 2 is attached to the connecting ring 4.
  • the connecting ring 4 includes a plurality of connecting rings which are annularly distributed along the lower side of the geotextile cylinder, that is, a ring connecting ring is provided; the hook 2 includes a plurality of hooks 2 and the upper cross-section of the plurality of hooks 2 along the pile tip Distribution, that is, set a ring of connecting rings; the number of hooks and connecting rings is equal.
  • the top of the pile tip 1 is provided with a groove 3, the groove height is 5-8 cm, and the diameter is 1-2 cm larger than the diameter of the sleeve;
  • the height of the geotextile is 0.5-1 m higher than that of the concrete pile, and the excess length is fixed at the top of the pile.
  • the permeable geotextile 5 is a new type of building material, and the raw material is a synthetic fiber of a polymer such as polyester, polypropylene, acrylic, or nylon.
  • Geotextile has excellent filtration, isolation, reinforcement and protection, high tensile strength, good permeability, high temperature resistance, antifreeze, aging resistance and corrosion resistance.
  • the geogrid 6 is a mesh-shaped reinforced earth material composed of longitudinal ribs and transverse ribs, and is formed by two-dimensional grid or thermoplastic molding of a polymer such as polypropylene or polyvinyl chloride. A highly dimensional three-dimensional grid screen.
  • Attaching the geogrid to the inner side of the permeable geotextile not only enhances the tensile strength of the entire geotextile, but also takes into account the water permeability of the permeable geotextile. The strength of the entire pile is improved, and the blockage of the soil particles to the permeable pile is reduced.
  • the pile driver enters the site, and the height of the frame and the length of the immersed pipe are determined according to the design length and the depth of the immersed pipe, and assembly is carried out.
  • the pile tip is placed as designed, and the pile tip is prefabricated for concrete (also prefabricated with steel).
  • the shape of the pile tip is shown in the figure.
  • the groove height is 5-8cm, and the diameter is 1-2cm larger than the diameter of the casing, so that the casing can be easily pulled out during the extubation process, and the pile tip remains at the bottom of the hole after the tube is extracted.
  • a hook is prefabricated at the top edge of the pile tip for connection to the geotextile.
  • the geotextile can be made according to the design of the pile diameter and the length of the pile.
  • the production process is as follows:
  • the geotextile drum is divided into two parts: a permeable geotextile and a two-way geogrid.
  • the two-way geogrid is bent into a tubular shape, and then a permeable geotextile is placed on the outside, and the permeable geotextile and the two-way geogrid are integrally formed, and then the casing is sleeved, and the diameter of the geotextile can be determined according to the pile diameter and the length of the pile. And length;
  • the geogrid has a mesh size of 80 mm ⁇ 80 mm, a transverse rib and a longitudinal rib width of 4-5 mm, and a thickness of 2-3 mm.
  • the diameter of the geotextile drum should be 5-8cm larger than the casing, and the length should be longer than the design pile length of 0.5-1m. The excess length is fixed at the top of the pile.
  • the geotextile has a lap width of 200mm, and the joints are tight and well bonded. The geotextile is first wrapped on the outside of the casing, and the casing is connected to the pile tip.
  • connection ring connection ring
  • the vibrating pipe sink is used to make the hole.
  • the pile tip sinking depth of the pile must be determined according to the ground level of the pile and the design elevation of the pile end.
  • the verticality of the pile tube should be checked in time, and the deviation of the verticality is not more than 1%.
  • the cloth sleeve is sleeved outside the tube and lifted by a lifting machine. During the hole making process, the cloth tube sinks with the tube. After the immersed tube reaches the design elevation, the permeable pile is infused.
  • the cloth cylinder sinks with the pipe.
  • the immersion pipe is about 0.5m above the ground, open the window to insert the grouting pipe into the casing, start to infiltrate the permeable concrete, and extrude the pipe while filling the concrete. Natural ground, then sink to the bottom of the pile.
  • After filling the casing with permeable concrete first vibrate for 5 ⁇ 10s, then start extubating, and extubate the tube while vibrating. Pull out the vibration for 5 ⁇ 10s every 0.5-1.0m; repeat this until the pile tube is completely pulled out. forming.
  • the geotextile cylinder with more piles is closed with a wire tie to prevent debris from contaminating the pile and clean the surrounding of the pile hole.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

Disclosed are an anti-clogging strengthened water-permeable pile and a construction method. The anti-clogging strengthened permeable pile is formed by strengthening a water-permeable geotextile (5), adding a two-way geogrid (4), and forming a geotextile cylinder (7), which can not only improve the forming ability of a pile body, but also improve the strength of the pile body of the water-permeable pile; and then wrapping the geotextile cylinder with a water-permeable concrete pile to form a bagged water-permeable concrete pile, which can not only ensure good permeability, but also reduce the entry of soil particles to prevent the water-permeable concrete pile from being clogged. Moreover, the geogrid (4) has a large tensile strength itself and thus closely encloses the pile body, so that the pile body has greater strength and modulus, thereby improving the resistance to deformation and damage.

Description

一种防堵塞强化透水桩及施工方法Anti-blocking enhanced permeable pile and construction method 技术领域Technical field
本发明涉及土木工程领域,尤其涉及一种防堵塞强化透水桩及施工方法。The invention relates to the field of civil engineering, in particular to an anti-clogging and enhanced water-permeable pile and a construction method thereof.
背景技术Background technique
随着透水材料在土木工程中的广泛应用,人们逐渐提出了透水桩的设计理念。该新型桩桩体强度较高,能形成桩体作用,可以提高地基承载力。透水混凝土桩具有较大的孔隙率,渗透性较强,能够形成良好的竖向排水通道,可以加速路堤施工期和预压期的地基固结速率,减小工后沉降。但是,透水桩在施工过程中会遇到堵塞问题,导致其透水性能降低;在地基固结过程中,在足够大的渗透力作用下管涌性土中的可移动颗粒也会进入桩体材料孔隙,造成堵塞。With the wide application of permeable materials in civil engineering, people have gradually proposed the design concept of permeable piles. The new pile body has high strength and can form a pile body, which can improve the bearing capacity of the foundation. The permeable concrete pile has large porosity and strong permeability, and can form a good vertical drainage channel, which can accelerate the foundation consolidation rate during the construction period and preloading period of the embankment, and reduce post-construction settlement. However, the permeable piles will encounter clogging problems during the construction process, resulting in a decrease in water permeability; in the consolidation process of the foundation, the movable particles in the piping soil will also enter the pores of the pile material under the action of sufficient penetration force. , causing blockages.
发明内容Summary of the invention
为了解决现有技术中存在的技术问题,本发明公开了一种防堵塞强化透水桩施工方法,将透水土工布进行强化处理,添加双向土工格栅,形成土工布筒,既能增加桩体的成型能力,又能提高透水桩的桩体强度。然后将其与透水混凝土桩包裹,形成袋装透水混凝土桩,既能保证良好的渗透性,能降低土颗粒进入,避免透水混凝土桩堵塞;而且土工格栅本身的较大张拉强度,将桩体紧密地围护着,使桩体具有较大的强度和模量,提高了其抵抗变形和破坏的能力。In order to solve the technical problems existing in the prior art, the present invention discloses a construction method for preventing clogging and strengthening a permeable pile, strengthening the permeable geotextile, adding a two-way geogrid to form a geotextile, which can increase the pile body. The molding ability can also improve the pile strength of the permeable pile. Then it is wrapped with the permeable concrete pile to form a bagged permeable concrete pile, which can ensure good permeability, reduce the entry of soil particles and avoid the blockage of the permeable concrete pile; and the large tensile strength of the geogrid itself, the pile The body is tightly enclosed, so that the pile has greater strength and modulus, which improves its ability to resist deformation and damage.
本发明采用的具体实施方案如下:The specific implementation adopted by the present invention is as follows:
一种防堵塞强化透水桩,包括混凝土桩,在所述的混凝土桩的外圈设有土工布筒,且所述的土工布筒由土工格栅和透水土工布组成,位于桩体最下方的土工布筒下部与混凝土桩的桩尖顶部相连。An anti-blocking and enhanced water-permeable pile, comprising a concrete pile, wherein a geotextile drum is arranged on an outer ring of the concrete pile, and the geotextile drum is composed of a geogrid and a permeable geotextile, and is located at a bottom of the pile body. The lower part of the geotextile is connected to the top of the pile tip of the concrete pile.
进一步的,位于桩体最下方的土工布筒的侧面上设有连接环,在混凝土桩的桩尖上方设有挂钩,所述的挂钩挂接在所述的连接环上。Further, a connecting ring is arranged on a side of the geotextile cylinder at the bottom of the pile body, and a hook is arranged above the pile tip of the concrete pile, and the hook is hooked on the connecting ring.
进一步的,所述的连接环包括多个,多个连接环沿着土工布筒下部侧面环状分布。Further, the connecting ring includes a plurality of connecting rings that are annularly distributed along a lower side surface of the geotextile.
进一步的,所述的挂钩包括多个,多个挂钩沿着桩尖的上断面环状分布。Further, the hook comprises a plurality of hooks, and the plurality of hooks are annularly distributed along an upper section of the pile tip.
进一步的,所述的桩尖的顶部设有凹槽,凹槽高度为5-8cm,直径比套管直径大1-2cm。Further, the top of the pile tip is provided with a groove, the groove height is 5-8 cm, and the diameter is 1-2 cm larger than the diameter of the sleeve.
进一步的,所述的土工布筒的高度比混凝土桩高0.5-1m,多余长度在桩顶做绑扎固定。Further, the height of the geotextile cylinder is 0.5-1 m higher than that of the concrete pile, and the excess length is tied and fixed at the top of the pile.
进一步的,所述的土工布筒包括多个,多个土工布筒沿着混凝土桩的轴线方向上下分布,且相邻土工布筒之间要搭接一定的长度,且粘结在一起。Further, the geotextile cartridge comprises a plurality of geotextile cylinders distributed up and down along the axial direction of the concrete pile, and the adjacent geotextile cylinders are overlapped by a certain length and bonded together.
上述所述的透水桩的施工方法如下:The construction method of the permeable pile described above is as follows:
步骤1.桩机进入现场,根据设计长、沉管土深度确定架高和沉管长度,并进行组装; Step 1. The pile driver enters the site, and determines the height of the frame and the length of the immersed pipe according to the design length and the depth of the immersed pipe, and assembles;
步骤2按照设计放置桩尖,桩尖为混凝土预制或者钢材预制;Step 2: Place the pile tip according to the design, and the pile tip is prefabricated for concrete or prefabricated with steel;
步骤3依据桩径和桩长设计制作土工布筒;Step 3: designing a geotextile according to the pile diameter and the length of the pile;
所述土工布筒分为透水土工布和双向土工格栅两部分。将双向土工格栅弯成筒状,然后外面套上透水土工布,透水土工布和双向土工格栅形成一个整体,然后将套管套住,可根据桩径和桩长确定土工布筒的直径及长度;The geotextile drum is divided into two parts: a permeable geotextile and a two-way geogrid. The two-way geogrid is bent into a tubular shape, and then a permeable geotextile is placed on the outside, and the permeable geotextile and the two-way geogrid are integrally formed, and then the casing is sleeved, and the diameter of the geotextile can be determined according to the pile diameter and the length of the pile. And length;
步骤4将土工布筒先包裹在套管外侧,套管再与桩尖连接,土工布筒镶嵌铁环,然后铁环再与桩尖顶面的挂钩相连接,使土工布筒在振动沉管过程中不易脱落;Step 4: The geotextile is first wrapped on the outside of the casing, and the casing is connected with the pile tip. The geotextile is inlaid with a hoop, and then the iron ring is connected with the hook of the top surface of the pile tip, so that the geotextile is in the process of vibration and sinking. Not easy to fall off;
步骤5采用振动沉管机造孔;布筒套于管外,用起吊机吊起,造孔过程中布筒随管下沉,管到达设计标高后开始进行透水桩灌注;边灌透水混凝土边拔管至自然地面,然后再沉桩至桩底;套管内灌满透水混凝土后,先振动一定时间,然后再开始拔管,边振动边拔管,每拔一定的距离就停拔振动一定时间;如此反复,直至桩管全部拔出,状体成型;Step 5: using a vibrating pipe sink to make holes; the cloth sleeve is sleeved outside the pipe, and is lifted by a lifting machine. During the hole making process, the cloth cylinder sinks with the pipe, and after the pipe reaches the design elevation, the water-permeable pile is infused; Pull the tube to the natural ground, and then sink the pile to the bottom of the pile; after filling the casing with permeable concrete, first vibrate for a certain period of time, then start to extubate the tube, and then pull the tube while vibrating, and then pull out the vibration for a certain distance every time. Repeatedly until the pile tube is completely pulled out, and the shape is formed;
步骤6将多出桩体的土工布筒用铁丝扎口封闭,避免杂物污染桩体,并清理桩孔周围。 Step 6 Close the geotextile cylinder of the pile with a wire tie to prevent the debris from contaminating the pile and clean the surrounding of the pile hole.
进一步的,所述土工格栅选用网格尺寸80mm×80mm,横肋与纵肋宽度为4-5mm,厚度为2-3mm;为保证土工布筒与桩壁与管壁严密接触,土工布筒直径宜大于套管5-8cm,长度宜长于设计桩长0.5-1m,多余长度在桩顶做绑扎固定。Further, the geogrid has a mesh size of 80 mm×80 mm, a transverse rib and a longitudinal rib width of 4-5 mm, and a thickness of 2-3 mm; in order to ensure close contact between the geotextile and the pile wall and the pipe wall, the geotextile The diameter should be larger than the casing 5-8cm, the length should be longer than the design pile length 0.5-1m, and the excess length should be fixed at the top of the pile.
由于桩体比较长,而土工布筒的结构相对比较短,因此一个桩体上会上下布置多个土工布筒,相邻布筒之间搭接宽度≥200mm,接缝严密、粘接充分。Because the pile body is relatively long, and the structure of the geotextile cylinder is relatively short, a plurality of geotextile cylinders are arranged on the upper and lower sides of a pile body, and the overlap width between adjacent cloth cylinders is ≥200 mm, and the joints are tight and fully bonded.
进一步的,开机沉管前,必须根据本桩位地面标高及桩端设计标高确定该桩的桩尖沉入深度。桩管下沉过程及沉入到设计深度后,都要及时检查桩管垂直度, 垂直度偏差不大于1%。Further, before starting the immersed tube, the pile sinking depth of the pile must be determined according to the ground level of the pile and the design elevation of the pile end. After the pile tube sinks and sinks to the design depth, the verticality of the pile tube should be checked in time, and the deviation of the verticality is not more than 1%.
本发明的有益效果如下:The beneficial effects of the present invention are as follows:
透水土工布具有让水分通过而阻挡砂土颗粒的流失的功能,将其与透水桩结合在一起可以很好的解决堵塞问题。透水桩在施工过程中,容易发生桩体成型不规则等问题,可以通过土工格栅对透水桩桩身进行加固。将透水土工布进行强化处理,添加双向土工格栅,形成土工布筒,既能增加桩体的成型能力,又能提高透水桩的桩体强度。然后将其与透水混凝土桩包裹,形成袋装透水混凝土桩,既能保证良好的渗透性,能降低土颗粒进入,避免透水混凝土桩堵塞;而且土工格栅本身的较大张拉强度,将桩体紧密地围护着,使桩体具有较大的强度和模量,提高了其抵抗变形和破坏的能力。The permeable geotextile has the function of allowing moisture to pass through and blocking the loss of sand particles, and combining it with the permeable pile can solve the clogging problem well. In the process of construction of the permeable pile, the problem of irregular formation of the pile is prone to occur, and the pile of the permeable pile can be reinforced by the geogrid. The permeable geotextile is strengthened and a two-way geogrid is added to form a geotextile, which not only increases the forming ability of the pile but also improves the pile strength of the permeable pile. Then it is wrapped with the permeable concrete pile to form a bagged permeable concrete pile, which can ensure good permeability, reduce the entry of soil particles and avoid the blockage of the permeable concrete pile; and the large tensile strength of the geogrid itself, the pile The body is tightly enclosed, so that the pile has greater strength and modulus, which improves its ability to resist deformation and damage.
附图说明DRAWINGS
构成本申请的一部分的说明书附图用来提供对本申请的进一步理解,本申请的示意性实施例及其说明用于解释本申请,并不构成对本申请的不当限定。The accompanying drawings, which are incorporated in the claims of the claims
图1为桩尖的主视图;Figure 1 is a front view of the pile tip;
图2为桩尖的俯视图;Figure 2 is a plan view of the pile tip;
图3为土工布袋平面展开图;Figure 3 is a plan view of the geotextile bag;
图4为施工过程图;Figure 4 is a construction process diagram;
图中:1桩尖,2挂钩,3凹槽,4土工格栅,5透水土工布,6连接环,7土工布筒,8套管。In the picture: 1 pile tip, 2 hooks, 3 grooves, 4 geogrid, 5 permeable geotextile, 6 connecting ring, 7 geotextile, 8 casing.
具体实施方式Detailed ways
应该指出,以下详细说明都是例示性的,旨在对本申请提供进一步的说明。除非另有指明,本文使用的所有技术和科学术语具有与本申请所属技术领域的普通技术人员通常理解的相同含义。It should be noted that the following detailed description is illustrative and is intended to provide a further description of the application. All technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs, unless otherwise indicated.
需要注意的是,这里所使用的术语仅是为了描述具体实施方式,而非意图限制根据本申请的示例性实施方式。如在这里所使用的,除非上下文另外明确指出,否则单数形式也意图包括复数形式,此外,还应当理解的是,当在本说明书中使用术语“包含”和/或“包括”时,其指明存在特征、步骤、操作、器件、组件和/或它们的组合;It is to be noted that the terminology used herein is for the purpose of describing particular embodiments, and is not intended to limit the exemplary embodiments. As used herein, the singular " " " " " " There are features, steps, operations, devices, components, and/or combinations thereof;
为了方便叙述,本发明中如果出现“上”、“下”、“左”“右”字样,仅表示 与附图本身的上、下、左、右方向一致,并不对结构起限定作用,仅仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的设备或元件必须具有特定的方位,以特定的方位构造和操作,因此不能理解为对本发明的限制。For convenience of description, if the words "upper", "lower", "left" and "right" appear in the present invention, it only indicates the upper, lower, left and right directions of the drawing itself, and does not limit the structure, only It is to be understood that the invention is not to be construed as a limitation of the invention.
术语解释部分:所述的双向土工格栅是由径向和纬向两个方向组成的格栅。Term Explanation Part: The two-way geogrid is a grid consisting of two directions, radial and latitudinal.
正如背景技术所介绍的,现有技术中存在透水桩在施工过程中会遇到堵塞问题,导致其透水性能降低;在地基固结过程中,在足够大的渗透力作用下管涌性土中的可移动颗粒也会进入桩体材料孔隙,造成堵塞,为了解决如上的技术问题,本申请提出了一种防堵塞强化透水桩施工方法,将透水土工布进行强化处理,添加双向土工格栅,形成土工布筒,既能增加桩体的成型能力,又能提高透水桩的桩体强度。然后将其与透水混凝土桩包裹,形成袋装透水混凝土桩,既能保证良好的渗透性,能降低土颗粒进入,避免透水混凝土桩堵塞;而且土工格栅本身的较大张拉强度,将桩体紧密地围护着,使桩体具有较大的强度和模量,提高了其抵抗变形和破坏的能力。As described in the background art, in the prior art, there is a clogging problem in the construction process of the permeable pile, which leads to a decrease in the water permeability; in the consolidation process of the foundation, under the action of sufficient penetration force in the piping soil The movable particles also enter the pores of the pile material to cause clogging. In order to solve the above technical problems, the present application proposes a construction method for preventing clogging and strengthening the permeable pile, strengthening the permeable geotextile and adding a two-way geogrid to form The geotextile can not only increase the forming capacity of the pile, but also improve the pile strength of the permeable pile. Then it is wrapped with the permeable concrete pile to form a bagged permeable concrete pile, which can ensure good permeability, reduce the entry of soil particles and avoid the blockage of the permeable concrete pile; and the large tensile strength of the geogrid itself, the pile The body is tightly enclosed, so that the pile has greater strength and modulus, which improves its ability to resist deformation and damage.
具体的技术方案如下:The specific technical solutions are as follows:
防堵塞强化透水桩,包括混凝土桩,在所述的混凝土桩的外圈设有土工布筒7,且所述的土工布筒7由土工格栅和透水土工布组成,所述的土工布筒7下部的侧面上设有连接环4,在混凝土桩的桩尖设有挂钩2,所述的挂钩2挂接在所述的连接环4上。An anti-blocking reinforced water permeable pile, comprising a concrete pile, a geotextile drum 7 is arranged on an outer ring of the concrete pile, and the geotextile drum 7 is composed of a geogrid and a permeable geotextile, and the geotextile drum A connecting ring 4 is provided on the lower side of the lower part of the pile 7. A hook 2 is provided at the pile tip of the concrete pile, and the hook 2 is attached to the connecting ring 4.
所述的连接环4包括多个,多个连接环沿着土工布筒下部侧面环状分布,即设置一圈连接环;挂钩2包括多个,多个挂钩2沿着桩尖的上断面环状分布,即设置一圈连接环;挂钩和连接环的个数相等。The connecting ring 4 includes a plurality of connecting rings which are annularly distributed along the lower side of the geotextile cylinder, that is, a ring connecting ring is provided; the hook 2 includes a plurality of hooks 2 and the upper cross-section of the plurality of hooks 2 along the pile tip Distribution, that is, set a ring of connecting rings; the number of hooks and connecting rings is equal.
进一步的,优选的,所述的桩尖1的顶部设有凹槽3,凹槽高度为5-8cm,直径比套管直径大1-2cm;Further, preferably, the top of the pile tip 1 is provided with a groove 3, the groove height is 5-8 cm, and the diameter is 1-2 cm larger than the diameter of the sleeve;
进一步的,优选的,土工布筒的高度比混凝土桩高0.5-1m,多余长度在桩顶做绑扎固定。Further, preferably, the height of the geotextile is 0.5-1 m higher than that of the concrete pile, and the excess length is fixed at the top of the pile.
进一步的,透水土工布5是一种新型建筑材料,原料是涤纶、丙纶、腈纶、锦纶等高分子聚合物的合成纤维。土工布具有优秀的过滤、隔离、加固防护作用、抗拉强度高、渗透性好、耐高温、抗冷冻、耐老化、耐腐蚀。土工格栅6是一种由纵肋和横肋构成的网状加筋土材料,用聚丙烯、聚氯乙烯等高分子聚合物经热 塑或模压而成的二维网格状或具有一定高度的三维立体网格屏栅。将土工格栅附在透水土工布筒内侧,不仅使整个土工布筒的抗拉强度增强,又兼顾了透水土工布的透水功能。整个桩体的强度得到提升,同时减少了土颗粒对透水桩的堵塞。Further, the permeable geotextile 5 is a new type of building material, and the raw material is a synthetic fiber of a polymer such as polyester, polypropylene, acrylic, or nylon. Geotextile has excellent filtration, isolation, reinforcement and protection, high tensile strength, good permeability, high temperature resistance, antifreeze, aging resistance and corrosion resistance. The geogrid 6 is a mesh-shaped reinforced earth material composed of longitudinal ribs and transverse ribs, and is formed by two-dimensional grid or thermoplastic molding of a polymer such as polypropylene or polyvinyl chloride. A highly dimensional three-dimensional grid screen. Attaching the geogrid to the inner side of the permeable geotextile not only enhances the tensile strength of the entire geotextile, but also takes into account the water permeability of the permeable geotextile. The strength of the entire pile is improved, and the blockage of the soil particles to the permeable pile is reduced.
具体的施工方法如下:The specific construction methods are as follows:
1.桩机进入现场,根据设计长、沉管土深度确定架高和沉管长度,并进行组装。按照设计放置桩尖,桩尖为混凝土预制(也可用钢材预制)。桩尖造型如图所示。桩尖中间有凹槽,这样可以与套管结合牢靠,避免在沉管过程中脱落,影响桩体质量。凹槽高度为5-8cm,直径比套管直径大1-2cm,这样套管在拔管过程中能轻易拔出,拔管后桩尖留在孔底。桩尖顶面边缘预制一圈挂钩,用于和土工布筒相连。1. The pile driver enters the site, and the height of the frame and the length of the immersed pipe are determined according to the design length and the depth of the immersed pipe, and assembly is carried out. The pile tip is placed as designed, and the pile tip is prefabricated for concrete (also prefabricated with steel). The shape of the pile tip is shown in the figure. There is a groove in the middle of the pile tip, so that it can be firmly coupled with the casing to avoid falling off during the sinking process and affecting the quality of the pile. The groove height is 5-8cm, and the diameter is 1-2cm larger than the diameter of the casing, so that the casing can be easily pulled out during the extubation process, and the pile tip remains at the bottom of the hole after the tube is extracted. A hook is prefabricated at the top edge of the pile tip for connection to the geotextile.
2.土工布筒依据设计桩径和桩长制作,具提制作过程如下:2. The geotextile can be made according to the design of the pile diameter and the length of the pile. The production process is as follows:
所述土工布筒分为透水土工布和双向土工格栅两部分。将双向土工格栅弯成筒状,然后外面套上透水土工布,透水土工布和双向土工格栅形成一个整体,然后将套管套住,可根据桩径和桩长确定土工布筒的直径及长度;The geotextile drum is divided into two parts: a permeable geotextile and a two-way geogrid. The two-way geogrid is bent into a tubular shape, and then a permeable geotextile is placed on the outside, and the permeable geotextile and the two-way geogrid are integrally formed, and then the casing is sleeved, and the diameter of the geotextile can be determined according to the pile diameter and the length of the pile. And length;
进一步的优选的,土工格栅选用网格尺寸80mm×80mm,横肋与纵肋宽度为4-5mm,厚度为2-3mm。为保证土工布筒与桩壁与管壁严密接触,土工布筒直径宜大于套管5-8cm,长度宜长于设计桩长0.5-1m,多余长度在桩顶做绑扎固定。土工布筒搭接宽度为200mm,接缝严密、粘接充分。土工布筒先包裹在套管外侧,套管再与桩尖连接,土工布筒底部镶嵌铁环(连接环),然后铁环(连接环)再与桩尖顶面的挂钩相连接,使土工布筒在振动沉管过程中不易脱落。Further preferably, the geogrid has a mesh size of 80 mm×80 mm, a transverse rib and a longitudinal rib width of 4-5 mm, and a thickness of 2-3 mm. In order to ensure that the geotextile drum and the pile wall are in close contact with the pipe wall, the diameter of the geotextile drum should be 5-8cm larger than the casing, and the length should be longer than the design pile length of 0.5-1m. The excess length is fixed at the top of the pile. The geotextile has a lap width of 200mm, and the joints are tight and well bonded. The geotextile is first wrapped on the outside of the casing, and the casing is connected to the pile tip. The bottom of the geotextile is inlaid with a hoop (connection ring), and then the iron ring (connection ring) is connected with the hook of the top surface of the pile to make the geotextile It is not easy to fall off during the vibration immersed tube process.
3.采用振动沉管机造孔,开机沉管前,必须根据本桩位地面标高及桩端设计标高确定该桩的桩尖沉入深度。桩管下沉过程及沉入设计深度后,都要及时检查桩管垂直度,垂直度偏差不大于1%。布筒套于管外,用起吊机吊起,造孔过程中布筒随管下沉。沉管到达设计标高后开始进行透水桩灌注。3. The vibrating pipe sink is used to make the hole. Before the immersed pipe is started, the pile tip sinking depth of the pile must be determined according to the ground level of the pile and the design elevation of the pile end. After the pile tube sinking process and sinking into the design depth, the verticality of the pile tube should be checked in time, and the deviation of the verticality is not more than 1%. The cloth sleeve is sleeved outside the tube and lifted by a lifting machine. During the hole making process, the cloth tube sinks with the tube. After the immersed tube reaches the design elevation, the permeable pile is infused.
4.造孔过程中布筒随管下沉,当沉管至投料口位于地面以上约0.5m时,打开窗口将注浆管插入套管,开始灌注透水混凝土,边灌透水混凝土边拔管至自然地面,然后再沉桩至桩底。套管内灌满透水混凝土后,先振动5~10s,再开始拔管,边振动边拔管,每拔0.5-1.0m停拔振动5~10s;如此反复,直至桩管全部拔出,状体成型。将多出桩体的土工布筒用铁丝扎口封闭,避免杂物污染桩体, 并清理桩孔周围。4. During the hole making process, the cloth cylinder sinks with the pipe. When the immersion pipe is about 0.5m above the ground, open the window to insert the grouting pipe into the casing, start to infiltrate the permeable concrete, and extrude the pipe while filling the concrete. Natural ground, then sink to the bottom of the pile. After filling the casing with permeable concrete, first vibrate for 5~10s, then start extubating, and extubate the tube while vibrating. Pull out the vibration for 5~10s every 0.5-1.0m; repeat this until the pile tube is completely pulled out. forming. The geotextile cylinder with more piles is closed with a wire tie to prevent debris from contaminating the pile and clean the surrounding of the pile hole.
以上所述仅为本申请的优选实施例而已,并不用于限制本申请,对于本领域的技术人员来说,本申请可以有各种更改和变化。凡在本申请的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本申请的保护范围之内。The above description is only the preferred embodiment of the present application, and is not intended to limit the present application, and various changes and modifications may be made to the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of this application are intended to be included within the scope of the present application.

Claims (10)

  1. 一种防堵塞强化透水桩,其特征在于,包括混凝土桩,在所述的混凝土桩的外圈设有土工布筒,且所述的土工布筒由土工格栅和透水土工布组成,位于桩体最下方的土工布筒下部与混凝土桩的桩尖顶部相连。An anti-blocking enhanced water-permeable pile, characterized in that it comprises a concrete pile, a geotextile drum is arranged on the outer ring of the concrete pile, and the geotextile drum is composed of a geogrid and a permeable geotextile, and is located in the pile The lower part of the geotextile at the bottom of the body is connected to the top of the pile tip of the concrete pile.
  2. 如权利要求1所述的一种防堵塞强化透水桩,其特征在于,位于桩体最下方的土工布筒的侧面上设有连接环,在混凝土桩的桩尖上方设有挂钩,所述的挂钩挂接在所述的连接环上。The anti-clogging and reinforced water-permeable pile according to claim 1, wherein a connecting ring is arranged on a side of the geotextile cylinder at the bottom of the pile body, and a hook is arranged above the pile tip of the concrete pile. The hook is attached to the connecting ring.
  3. 如权利要求2所述的一种防堵塞强化透水桩,其特征在于,所述的连接环包括多个,多个连接环沿着土工布筒下部侧面环状分布。The anti-clogging enhanced water-permeable pile according to claim 2, wherein the connecting ring comprises a plurality of connecting rings which are annularly distributed along a lower side surface of the geotextile.
  4. 如权利要求2所述的一种防堵塞强化透水桩,其特征在于,所述的挂钩包括多个,多个挂钩沿着桩尖的上断面环状分布。The anti-clogging enhanced water-permeable pile according to claim 2, wherein the hook comprises a plurality of hooks, and the plurality of hooks are annularly distributed along an upper section of the pile tip.
  5. 如权利要求1所述的一种防堵塞强化透水桩,其特征在于,所述的桩尖的顶部设有凹槽,凹槽高度为5-8cm,直径比套管直径>1-2cm。The anti-clogging enhanced water-permeable pile according to claim 1, wherein the top of the pile tip is provided with a groove having a groove height of 5-8 cm and a diameter of >1-2 cm.
  6. 如权利要求1所述的一种防堵塞强化透水桩,其特征在于,所述的土工布筒的高度比混凝土桩高0.5-1m,多余长度在桩顶做绑扎固定。The anti-clogging enhanced water-permeable pile according to claim 1, wherein the height of the geotextile cylinder is 0.5-1 m higher than that of the concrete pile, and the excess length is tied and fixed at the top of the pile.
  7. 如权利要求1所述的一种防堵塞强化透水桩,其特征在于,所述的土工布筒包括多个,多个土工布筒沿着混凝土桩的轴线方向上下分布,且相邻土工布筒之间要搭接一定的长度,且粘结在一起。The anti-clogging and reinforced water permeable pile according to claim 1, wherein the geotextile cylinder comprises a plurality of geotextile cylinders distributed up and down along the axial direction of the concrete pile, and the adjacent geotextile cylinders It must be lapped to a certain length and bonded together.
  8. 如权利要求1所述的一种防堵塞强化透水桩的施工方法,其特征在于,如下:The method for constructing an anti-clogging enhanced water-permeable pile according to claim 1, wherein the method is as follows:
    步骤1.桩机进入现场,根据设计长、沉管土深度确定架高和沉管长度,并进行组装;Step 1. The pile driver enters the site, and determines the height of the frame and the length of the immersed pipe according to the design length and the depth of the immersed pipe, and assembles;
    步骤2按照设计放置桩尖,桩尖为混凝土预制或者钢材预制;Step 2: Place the pile tip according to the design, and the pile tip is prefabricated for concrete or prefabricated with steel;
    步骤3依据桩径和桩长设计制作土工布筒;Step 3: designing a geotextile according to the pile diameter and the length of the pile;
    所述土工布筒分为透水土工布和双向土工格栅两部分。将双向土工格栅弯成筒状,然后外面套上透水土工布,透水土工布和双向土工格栅形成一个整体,然后将套管套住,可根据桩径和桩长确定土工布筒的直径及长度;The geotextile drum is divided into two parts: a permeable geotextile and a two-way geogrid. The two-way geogrid is bent into a tubular shape, and then a permeable geotextile is placed on the outside, and the permeable geotextile and the two-way geogrid are integrally formed, and then the casing is sleeved, and the diameter of the geotextile can be determined according to the pile diameter and the length of the pile. And length;
    步骤4将土工布筒先包裹在套管外侧,套管再与桩尖连接,土工布筒镶嵌铁环,然后铁环再与桩尖顶面的挂钩相连接,使土工布筒在振动沉管过程中不易脱落;Step 4: The geotextile is first wrapped on the outside of the casing, and the casing is connected with the pile tip. The geotextile is inlaid with a hoop, and then the iron ring is connected with the hook of the top surface of the pile tip, so that the geotextile is in the process of vibration and sinking. Not easy to fall off;
    步骤5采用振动沉管机造孔;布筒套于管外,用起吊机吊起,造孔过程中布筒随管下沉,管到达设计标高后开始进行透水桩灌注;边灌透水混凝土边拔管至自然地面,然后再沉桩至桩底;套管内灌满透水混凝土后,先振动一定时间,然后再开始拔管,边振动边拔管,每拔 一定的距离就停拔振动一定时间;如此反复,直至桩管全部拔出,状体成型;Step 5: using a vibrating pipe sink to make holes; the cloth sleeve is sleeved outside the pipe, and is lifted by a lifting machine. During the hole making process, the cloth cylinder sinks with the pipe, and after the pipe reaches the design elevation, the water-permeable pile is infused; Pull the tube to the natural ground, and then sink the pile to the bottom of the pile; after filling the casing with permeable concrete, first vibrate for a certain period of time, then start to extubate the tube, and then pull the tube while vibrating, and then pull out the vibration for a certain distance every time. Repeatedly until the pile tube is completely pulled out, and the shape is formed;
    步骤6将多出桩体的土工布筒用铁丝扎口封闭,避免杂物污染桩体,并清理桩孔周围。Step 6 Close the geotextile cylinder of the pile with a wire tie to prevent the debris from contaminating the pile and clean the surrounding of the pile hole.
  9. 如权利要求8所述的一种防堵塞强化透水桩的施工方法,其特征在于,所述土工格栅选用网格尺寸80mm×80mm,横肋与纵肋宽度为4-5mm,厚度为2-3mm;土工布筒直径宜大于套管5-8cm,长度宜长于设计桩长0.5-1m,多余长度在桩顶做绑扎固定;The method for constructing an anti-clogging and reinforced water-permeable pile according to claim 8, wherein the geogrid has a mesh size of 80 mm×80 mm, the transverse rib and the longitudinal rib have a width of 4-5 mm, and the thickness is 2- 3mm; the diameter of the geotextile should be 5-8cm larger than the casing, and the length should be longer than the length of the designed pile 0.5-1m, and the excess length should be fixed at the top of the pile;
    相邻布筒之间搭接宽度≥200mm。The overlap width between adjacent cloth cylinders is ≥200mm.
  10. 如权利要求8所述的一种防堵塞强化透水桩的施工方法,其特征在于,开机沉管前,必须根据本桩位地面标高及桩端设计标高确定该桩的桩尖沉入深度。桩管下沉过程及沉入到设计深度后,都要及时检查桩管垂直度,垂直度偏差不大于1%。The method for constructing an anti-clogging enhanced water-permeable pile according to claim 8, characterized in that before the immersed tube is pressed, the pile tip sinking depth of the pile must be determined according to the ground level of the pile position and the design elevation of the pile end. After the pile tube sinks and sinks to the design depth, the verticality of the pile tube should be checked in time, and the deviation of the verticality is not more than 1%.
PCT/CN2018/121825 2018-05-18 2018-12-18 Anti-clogging strengthened water-permeable pile and construction method WO2019218666A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
AU2018424102A AU2018424102A1 (en) 2018-05-18 2018-12-18 Anti-clogging strengthened water-permeable pile and construction method
ZA2020/06047A ZA202006047B (en) 2018-05-18 2020-09-30 Anti-clogging strengthened water-permeable pile and construction method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201810482308.2 2018-05-18
CN201810482308.2A CN108442365B (en) 2018-05-18 2018-05-18 Anti-blocking reinforced permeable pile and construction method

Publications (1)

Publication Number Publication Date
WO2019218666A1 true WO2019218666A1 (en) 2019-11-21

Family

ID=63204907

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2018/121825 WO2019218666A1 (en) 2018-05-18 2018-12-18 Anti-clogging strengthened water-permeable pile and construction method

Country Status (4)

Country Link
CN (1) CN108442365B (en)
AU (2) AU2018424102A1 (en)
WO (1) WO2019218666A1 (en)
ZA (1) ZA202006047B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114293573A (en) * 2022-01-19 2022-04-08 中国长江三峡集团有限公司 Drainable anti-slide pile and construction method thereof
CN115165489A (en) * 2022-07-01 2022-10-11 天津城建大学 Method for preparing circumferential reinforced pile sample
CN115233745A (en) * 2022-07-26 2022-10-25 中交三航局第三工程有限公司 Geotextile wrapping method for preventing penetration around pile body of pipe pile of revetment structure
CN115492087A (en) * 2022-09-28 2022-12-20 中铁二院昆明勘察设计研究院有限责任公司 Construction method of high-speed railway stone-sandwiched soft plastic soil foundation reinforcing pile

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442365B (en) * 2018-05-18 2020-11-06 山东大学 Anti-blocking reinforced permeable pile and construction method
CN110593253A (en) * 2019-08-28 2019-12-20 山东交通学院 Steel slag permeable concrete pile, concrete pile anti-blocking device and method
CN114718013B (en) * 2022-05-07 2023-11-24 何炳坤 Quick processing device for dam piping
CN114892649A (en) * 2022-05-26 2022-08-12 重庆电子工程职业学院 Water-resisting bolt of cast-in-place pile and use method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201202116Y (en) * 2008-05-28 2009-03-04 徐立新 Geotextile bag bulk material follow-up grouting pile
EP2537986A1 (en) * 2011-06-24 2012-12-26 Schokindustrie B.V. Narrowed foundation pile
CN203129159U (en) * 2013-04-12 2013-08-14 罗敖 Simple earth retaining structure
CN203200741U (en) * 2013-04-07 2013-09-18 交通运输部天津水运工程科学研究所 Spiral reinforced sand bag well
CN105544502A (en) * 2015-12-04 2016-05-04 中铁第四勘察设计院集团有限公司 Novel construction method of strengthening pile for deep soft soil foundation
CN108442365A (en) * 2018-05-18 2018-08-24 山东大学 A kind of anti-clogging strengthening water penetration pile and construction method
CN208266857U (en) * 2018-05-18 2018-12-21 山东大学 A kind of anti-clogging strengthening water penetration pile

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4827020B2 (en) * 2007-04-20 2011-11-30 株式会社光建設 Ground improvement method
CN101343874B (en) * 2007-07-13 2010-06-23 陕西长嘉实业发展有限公司 Method for processing foundation by wrapping piles in salty soil area
CN101949150B (en) * 2010-10-15 2012-08-22 安徽亚坤建设集团有限公司 Fabricated permeable thin wall tapered pile
CN103590390B (en) * 2013-11-26 2016-06-01 郑州中核岩土工程有限公司 A kind of stream is moulded shape reinforced soft soil ground structure and adds solid method
CN104131555B (en) * 2014-07-21 2016-06-08 杭州江润科技有限公司 A kind of outsourcing water penetration concrete reinforced pipe crushed stone grouting pile and construction method thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201202116Y (en) * 2008-05-28 2009-03-04 徐立新 Geotextile bag bulk material follow-up grouting pile
EP2537986A1 (en) * 2011-06-24 2012-12-26 Schokindustrie B.V. Narrowed foundation pile
CN203200741U (en) * 2013-04-07 2013-09-18 交通运输部天津水运工程科学研究所 Spiral reinforced sand bag well
CN203129159U (en) * 2013-04-12 2013-08-14 罗敖 Simple earth retaining structure
CN105544502A (en) * 2015-12-04 2016-05-04 中铁第四勘察设计院集团有限公司 Novel construction method of strengthening pile for deep soft soil foundation
CN108442365A (en) * 2018-05-18 2018-08-24 山东大学 A kind of anti-clogging strengthening water penetration pile and construction method
CN208266857U (en) * 2018-05-18 2018-12-21 山东大学 A kind of anti-clogging strengthening water penetration pile

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114293573A (en) * 2022-01-19 2022-04-08 中国长江三峡集团有限公司 Drainable anti-slide pile and construction method thereof
CN114293573B (en) * 2022-01-19 2024-02-06 中国长江三峡集团有限公司 Drainage type anti-skid pile and construction method thereof
CN115165489A (en) * 2022-07-01 2022-10-11 天津城建大学 Method for preparing circumferential reinforced pile sample
CN115165489B (en) * 2022-07-01 2024-05-14 天津城建大学 Method for preparing annular reinforced pile sample
CN115233745A (en) * 2022-07-26 2022-10-25 中交三航局第三工程有限公司 Geotextile wrapping method for preventing penetration around pile body of pipe pile of revetment structure
CN115233745B (en) * 2022-07-26 2023-06-30 中交三航局第三工程有限公司 Geotextile wrapping method for preventing permeation around pile body of pile in revetment structure
CN115492087A (en) * 2022-09-28 2022-12-20 中铁二院昆明勘察设计研究院有限责任公司 Construction method of high-speed railway stone-sandwiched soft plastic soil foundation reinforcing pile

Also Published As

Publication number Publication date
ZA202006047B (en) 2021-09-29
AU2018102180A4 (en) 2020-10-01
CN108442365A (en) 2018-08-24
AU2018102180A6 (en) 2020-10-22
AU2018424102A1 (en) 2020-09-10
CN108442365B (en) 2020-11-06

Similar Documents

Publication Publication Date Title
WO2019218666A1 (en) Anti-clogging strengthened water-permeable pile and construction method
CN102433876B (en) Multi-compartment casing composite pile and construction method thereof
CN101532290B (en) Granule grouting pile of ripple plastic sleeve with hole for strengthening soft soil foundation and strengthening method
CN103526770B (en) A kind of construction method of high antiseepage anti-floating pile raft structure
CN104131556B (en) The construction method of the mutual foundation drainage pile for prestressed pipe of a kind of soft or hard interlayer
CN104005404B (en) A kind of pile for prestressed pipe of outsourcing active material pile body and construction method
CN203924036U (en) A kind of pile for prestressed pipe of outsourcing active material pile body
CN103993598B (en) One is drawn hole and is implanted cloth bag crushed stone grouting pile and construction method
CN109989396A (en) In conjunction with the novel extruding-enlarging branch tray molding machine and its operating method of post grouting process
CN107513995A (en) A kind of bridge struction pile post grouting construction method
JP4803472B1 (en) Ground stabilization method
CN102330436B (en) Composite retaining structure and composite retaining method for half geotechnical layer ultradeep round spiral flow tank
CN112144511B (en) Vacuum-assisted post grouting device and method for cast-in-situ bored pile
CN2931575Y (en) Composite reinforcement water-absorbing well tube
CN112176992A (en) Construction method of manual hole digging pile and manual hole digging pile
CN203594041U (en) Piled raft structure with good resistance to seepage and buoyancy
CN108277800B (en) Reinforced concrete pipe joint gravel pile with consolidated sand layer and construction method thereof
CN201411687Y (en) Corrugated plastic sleeve pipe granule grouting pile with hole
CN101793027A (en) Core-grouted static pressure anchor rod pile
CN110670579A (en) Hoop pile for pile foundation engineering and foundation treatment and construction process thereof
CN207846409U (en) A kind of consolidation layer of sand concrete reinforced pipe section broken stone pile
CN201635072U (en) Centrally grouted static-pressured anchor pile former
KR100920688B1 (en) Structure for reinforced of soft ground by using top pile
CN203866821U (en) Lead hole implant cloth bag gravel grouting pile
CN106567397A (en) Method and device for controlling underground water of deep foundation pit

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18918906

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2018424102

Country of ref document: AU

Date of ref document: 20181218

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18918906

Country of ref document: EP

Kind code of ref document: A1

32PN Ep: public notification in the ep bulletin as address of the adressee cannot be established

Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 03/05/2021)

122 Ep: pct application non-entry in european phase

Ref document number: 18918906

Country of ref document: EP

Kind code of ref document: A1