CN104131556B - The construction method of the mutual foundation drainage pile for prestressed pipe of a kind of soft or hard interlayer - Google Patents
The construction method of the mutual foundation drainage pile for prestressed pipe of a kind of soft or hard interlayer Download PDFInfo
- Publication number
- CN104131556B CN104131556B CN201410348591.1A CN201410348591A CN104131556B CN 104131556 B CN104131556 B CN 104131556B CN 201410348591 A CN201410348591 A CN 201410348591A CN 104131556 B CN104131556 B CN 104131556B
- Authority
- CN
- China
- Prior art keywords
- pile
- prestressed pipe
- cover plate
- cloth bag
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 35
- 239000011229 interlayer Substances 0.000 title claims abstract description 17
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 50
- 239000010959 steel Substances 0.000 claims abstract description 50
- 239000004744 fabric Substances 0.000 claims abstract description 46
- 239000004567 concrete Substances 0.000 claims abstract description 16
- 239000011380 pervious concrete Substances 0.000 claims description 8
- 238000005266 casting Methods 0.000 claims description 6
- 238000005553 drilling Methods 0.000 claims description 5
- 239000011150 reinforced concrete Substances 0.000 claims description 5
- 238000000034 method Methods 0.000 claims description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 4
- 238000005056 compaction Methods 0.000 claims description 3
- 238000002347 injection Methods 0.000 claims description 3
- 239000007924 injection Substances 0.000 claims description 3
- 230000003068 static effect Effects 0.000 claims description 3
- 238000004804 winding Methods 0.000 claims description 3
- 239000002689 soil Substances 0.000 abstract description 15
- 239000010410 layer Substances 0.000 abstract description 8
- 238000007596 consolidation process Methods 0.000 abstract description 7
- 238000007599 discharging Methods 0.000 abstract description 7
- 230000008901 benefit Effects 0.000 abstract description 4
- 230000000694 effects Effects 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 4
- 230000002787 reinforcement Effects 0.000 description 4
- 238000004062 sedimentation Methods 0.000 description 3
- 239000002131 composite material Substances 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 239000004746 geotextile Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000010412 perfusion Effects 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- 229920000728 polyester Polymers 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410348591.1A CN104131556B (en) | 2014-07-22 | 2014-07-22 | The construction method of the mutual foundation drainage pile for prestressed pipe of a kind of soft or hard interlayer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410348591.1A CN104131556B (en) | 2014-07-22 | 2014-07-22 | The construction method of the mutual foundation drainage pile for prestressed pipe of a kind of soft or hard interlayer |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104131556A CN104131556A (en) | 2014-11-05 |
CN104131556B true CN104131556B (en) | 2016-03-30 |
Family
ID=51804395
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410348591.1A Expired - Fee Related CN104131556B (en) | 2014-07-22 | 2014-07-22 | The construction method of the mutual foundation drainage pile for prestressed pipe of a kind of soft or hard interlayer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104131556B (en) |
Families Citing this family (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104674802B (en) * | 2015-01-26 | 2016-03-09 | 重庆大学 | Prestressing force rubble anchorage pile and landslide control construction method thereof |
CN104947654B (en) * | 2015-07-01 | 2017-01-18 | 山东金城建设有限公司 | Complicated water area inclined rock face large-diameter cast-in-place pile construction method |
CN105484279B (en) * | 2016-01-28 | 2018-01-16 | 济南长兴建设集团有限公司 | A kind of construction method of drainage type cast in place concrete thin tunnel pile |
CN106337413A (en) * | 2016-09-07 | 2017-01-18 | 东南大学 | Water-draining stiff geo-textile bag cement-soil composite pile and construction method thereof |
CN107217661A (en) * | 2017-05-23 | 2017-09-29 | 浙江省水利水电勘测设计院 | A kind of Soft Ground Improved By Vacuum Preloading ruggedized construction of base expanding and base expanding Pressure water discharging joint inflation drainage |
CN107288125A (en) * | 2017-06-30 | 2017-10-24 | 上海二十冶建设有限公司 | Prefabricated pile stake core anti-blocking method |
CN108442357B (en) * | 2018-05-16 | 2024-10-18 | 浙江大学城市学院 | Pre-stressing anchor cable combined drainage plate pre-pressing device and foundation treatment method |
CN109056713B (en) * | 2018-09-25 | 2023-05-26 | 山东科技大学 | Construction method for steel structure anchor-increasing pouring anti-pulling pile |
CN109577318B (en) * | 2018-12-03 | 2020-06-26 | 福建省龙祥建设集团有限公司 | Construction method for water drainage and grouting bamboo joint pile by spiral heat pipe annular convex rib |
CN111608171A (en) * | 2020-05-27 | 2020-09-01 | 中国一冶集团有限公司 | Sandbar underground soft base pipe, well precipitation anti-floating pipe pile structure and construction method |
CN112323790B (en) * | 2020-11-18 | 2021-11-16 | 太原理工大学 | A crowded expanding flange pile extension structure for prestressed pipe pile |
CN112482371B (en) * | 2020-12-18 | 2022-05-10 | 郑州大学综合设计研究院有限公司 | Anchor tensioning device for integrated tubular pile |
CN113463626A (en) * | 2021-05-20 | 2021-10-01 | 杨学林 | Anti-pulling combined pile with built-in prestressed pile core |
CN114561934B (en) * | 2022-03-11 | 2023-11-07 | 山东电力工程咨询院有限公司 | Prefabricated pipe pile structure suitable for composite foundation of storage yard and construction method |
CN115075228A (en) * | 2022-05-11 | 2022-09-20 | 中铁时代建筑设计院有限公司 | Connecting device of cast-in-place pipe pile water storage system, water storage system and construction method |
CN115305905A (en) * | 2022-07-14 | 2022-11-08 | 北京中岩大地科技股份有限公司 | Method for reinforcing soft foundation interlayer combined with pile foundation construction |
CN115419056B (en) * | 2022-09-08 | 2023-07-07 | 中铁二院工程集团有限责任公司 | Reinforcing structure for resisting expansion and shrinkage deformation of foundation and design method |
CN118273312B (en) * | 2024-05-30 | 2024-08-30 | 保利长大工程有限公司 | Reinforcement cage construction technology for solving karst cave |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102433876A (en) * | 2011-08-31 | 2012-05-02 | 浙江大学城市学院 | Multi-compartment casing composite pile and construction method thereof |
CN103061332A (en) * | 2013-01-29 | 2013-04-24 | 新宇建设有限公司 | Integrally-arranged and externally-wrapped double-layered water discharging body and middle concrete combined pile and construction method |
CN103510511A (en) * | 2013-09-26 | 2014-01-15 | 鸿厦建设有限公司 | Top-reinforced cast-in-place concrete thin-wall pipe pile and construction method |
CN204000859U (en) * | 2014-07-22 | 2014-12-10 | 冠鲁建设股份有限公司 | The mutual foundation drainage pile for prestressed pipe of a kind of soft or hard interlayer |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3771871B2 (en) * | 2002-03-15 | 2006-04-26 | 三菱重工業株式会社 | Steel pipe pile foundation and steel pipe pile foundation construction method |
-
2014
- 2014-07-22 CN CN201410348591.1A patent/CN104131556B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102433876A (en) * | 2011-08-31 | 2012-05-02 | 浙江大学城市学院 | Multi-compartment casing composite pile and construction method thereof |
CN103061332A (en) * | 2013-01-29 | 2013-04-24 | 新宇建设有限公司 | Integrally-arranged and externally-wrapped double-layered water discharging body and middle concrete combined pile and construction method |
CN103510511A (en) * | 2013-09-26 | 2014-01-15 | 鸿厦建设有限公司 | Top-reinforced cast-in-place concrete thin-wall pipe pile and construction method |
CN204000859U (en) * | 2014-07-22 | 2014-12-10 | 冠鲁建设股份有限公司 | The mutual foundation drainage pile for prestressed pipe of a kind of soft or hard interlayer |
Also Published As
Publication number | Publication date |
---|---|
CN104131556A (en) | 2014-11-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104131556B (en) | The construction method of the mutual foundation drainage pile for prestressed pipe of a kind of soft or hard interlayer | |
CN101532290B (en) | Granule grouting pile of ripple plastic sleeve with hole for strengthening soft soil foundation and strengthening method | |
CN103835284A (en) | Karst area drilling cast-in-place pile structure and construction method | |
CN102650128B (en) | Cement mixing pile with stiffness core capable of draining and pre-pressing firstly and then grouting as well as construction method thereof | |
CN104005404B (en) | A kind of pile for prestressed pipe of outsourcing active material pile body and construction method | |
CN203924036U (en) | A kind of pile for prestressed pipe of outsourcing active material pile body | |
CN107513995A (en) | A kind of bridge struction pile post grouting construction method | |
CN201358456Y (en) | Plastic sleeve concrete pile | |
CN203741820U (en) | Cast-in-situ bored pile structure for karst area | |
CN103061328A (en) | Post-grouting gravel pile with sand wall wing plates and construction method | |
CN105220714B (en) | Built-in anchor cable fills core compound prestress pile tube float Structure construction method | |
CN103711122A (en) | Cloth bag squeezing concrete branch pile and construction method | |
CN103993598A (en) | Crashed stone grouting pile with lead holes implanted in cloth bag and construction method | |
CN107012861B (en) | A kind of discrete material core expansive concrete stake and its construction method | |
CN204000859U (en) | The mutual foundation drainage pile for prestressed pipe of a kind of soft or hard interlayer | |
CN110016909A (en) | Hydraulic squeezed joint pouch slip casting pile body expands reinforcement bored pile construction method | |
CN203066056U (en) | Post-grouting gravel pile with sand wall wing plates, and special immersed pipe for post-grouting gravel pile | |
CN204098028U (en) | Reinforcing thick-covering and deep-burying soft soil rigid-flexible mechanical arm | |
CN104846809A (en) | Prefabricated tubular pile capable of draining water and increasing frictional resistance and construction method thereof | |
CN208201874U (en) | A kind of open-cell cloth bag grouting structure | |
CN105625302B (en) | A kind of variable cross-section strength core enhancing active material composite pile structure and construction method | |
CN105256790B (en) | Prefabricated skirt type pipe pile used for drainage and added with pile body inclined support and construction method thereof | |
CN104294822B (en) | Reinforcing thick-covering and deep-burying soft soil rigid-flexible mechanical arm construction method | |
CN104196013B (en) | A kind of composite Y shape stake and construction method thereof | |
CN202559340U (en) | First-drainage post-preloading grouting stiff-core cement mixing pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
CB03 | Change of inventor or designer information |
Inventor after: Wang Xinquan Inventor before: Wen Xinde Inventor before: Zhou Junling Inventor before: Wang Shuhui Inventor before: Wang Youjian Inventor before: Liu Yuguo Inventor before: Shen Zhizhuang Inventor before: Sun Lu Inventor before: Li Hui Inventor before: Gu Hongwei Inventor before: Wang Ning |
|
COR | Change of bibliographic data | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20160219 Address after: 310015 Hangzhou, Gongshu District Wanda Commercial Center, building 3, room 3, unit 1901, room Applicant after: Hangzhou Jiang Run Science and Technology Ltd. Address before: 273300, Shandong, Linyi Province, Pingyi County, South Ring Road, West Road Construction Applicant before: GUANLU CONSTRUCTION CO., LTD. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180709 Address after: 430014 Liu Song Avenue 6, Huangpi Economic Development Zone, Wuhan, Hubei Patentee after: Wuhan Panlong Mingda Building Co., Ltd. Address before: 310015 room 1901, unit 3, 3 Wanda Commercial Center, Gongshu District, Hangzhou, Zhejiang. Patentee before: Hangzhou Jiang Run Science and Technology Ltd. |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160330 Termination date: 20200722 |