WO2019218176A1 - Construction method for fitting door casing system to wall - Google Patents

Construction method for fitting door casing system to wall Download PDF

Info

Publication number
WO2019218176A1
WO2019218176A1 PCT/CN2018/086943 CN2018086943W WO2019218176A1 WO 2019218176 A1 WO2019218176 A1 WO 2019218176A1 CN 2018086943 W CN2018086943 W CN 2018086943W WO 2019218176 A1 WO2019218176 A1 WO 2019218176A1
Authority
WO
WIPO (PCT)
Prior art keywords
slot
door
wire
cover
electric wire
Prior art date
Application number
PCT/CN2018/086943
Other languages
French (fr)
Chinese (zh)
Inventor
杨泓斌
陈祥祥
颜旺龙
李缙
胡鸣
Original Assignee
增城市碧桂园物业发展有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 增城市碧桂园物业发展有限公司 filed Critical 增城市碧桂园物业发展有限公司
Priority to CN201880000579.8A priority Critical patent/CN112166236A/en
Priority to PCT/CN2018/086943 priority patent/WO2019218176A1/en
Publication of WO2019218176A1 publication Critical patent/WO2019218176A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/04Frames for doors, windows, or the like to be fixed in openings
    • E06B1/34Coverings, e.g. protecting against weather, for decorative purposes

Definitions

  • the invention belongs to the technical field of building construction, and in particular relates to a construction method for installing a door line system on a wall panel.
  • domestic hydropower construction mostly adopts pre-buried methods, equipment pipelines, such as weak electric wires (for example, cables for transmitting information such as network cables, telephone lines, digital television lines, etc.) and strong electric wires (for example, live wire, neutral wire, ground). Cables and other power cables are pre-embedded in the main structural wall panels and floor slabs.
  • weak electric wires for example, cables for transmitting information such as network cables, telephone lines, digital television lines, etc.
  • strong electric wires for example, live wire, neutral wire, ground.
  • Cables and other power cables are pre-embedded in the main structural wall panels and floor slabs.
  • the service life of equipment and cables is generally around 10-20 years. It needs to be replaced several times within the service life of the house, resulting in multiple damage to the main structure. Reduce the life of your home.
  • the interior modification is carried out, it is also necessary to destroy the main structure and re-lay the pipeline to reduce the durability of the house.
  • the traditional hydropower pre-buried method needs to destroy the main structure during maintenance, and the maintenance is difficult, the cost is high, and the maintenance efficiency is low. At the same time, a large amount of construction waste and noise pollution are generated during maintenance, which will greatly affect the downstairs users. Due to the damage to the main structure, it is not conducive to the modification of the internal decoration, the cost of repairing and the time-consuming is long. In addition, since the cable is embedded, the cable and the main structure are integrated, and the cable and the structure are inseparably separated, which is not conducive to the later stage. Modifications make it difficult to meet the needs of residents for diversification and flexibility.
  • the door line is the soft decorative line that wraps the wall, which is the beading, card, and other parts of the door cover.
  • the main production materials are plastic steel, polymer, wood plastic, MDF, logs, gypsum, magnesium alloy, marble and so on.
  • the existing door sleeve line only serves as a decoration, and has no wiring function. At the same time, there is no related process and method.
  • the technical problem to be solved by the present invention is to provide a construction method for installing a door line system on a wall panel, which aims to solve the problem that the line maintenance caused by installing the electric wire line in the main structure by using the pre-buried method in the prior art Damage to the main structure, and maintenance problems, noise problems.
  • Embodiments of the present invention provide a construction method for installing a door pocket system on a wall panel, including the following steps:
  • the cable is pressed into the slot from the slot of the slot, or penetrates into the slot from a port at both ends of the slot;
  • the method further includes the following steps: preparing a slot cover, and forming a structure for engaging with the slot of the slot on the slot cover; and after step S14, the method further includes the following steps: The slot cover is snapped onto the slot of the slot.
  • the preparation of the door pocket body comprises the following steps:
  • the material of the door sleeve wire body comprising a certain amount of PVC matrix resin, wood powder of the same quality as the PVC matrix resin, 1.5%-2% foaming agent of the quality of the PVC matrix resin, PVC matrix resin 40% calcium carbonate of quality, 4% stabilizer of PVC matrix resin quality and 0.7%-1% lubricant of PVC matrix resin quality;
  • a metal mold that matches the shape of the door sleeve body is prepared, and then the door sleeve body is injection molded using the above material in combination with the metal mold.
  • the preparation of the door pocket body comprises the following steps:
  • a wire trough is cut on a plate-shaped profile, and then a snap-fit structure is cut on the side of the profile, that is, the door sleeve wire body is obtained.
  • the wire groove extending through the longitudinal direction of the door sleeve body or including the first wire groove and the second wire groove which are separated from each other and different in size, and in the first line
  • the slot positions of the slot and the second slot are respectively set with the latching positions; before the step S14, the buckles respectively matched with the latching positions of the first slot and the second slot slot are disposed on the slot cover.
  • a plurality of spaced apart gaps are formed or formed on the sidewall of the trunking.
  • preparing or purchasing a cable includes a weak electric wire and a strong electric wire
  • preparing or purchasing a cable includes a first type of weak electric wire and a second type of weak electric wire
  • the first type weak electric wire is removed from the slot of the first trunking
  • the port is pressed into the first slot, or the port from the two ends of the first slot penetrates into the first slot
  • the second type of weak electric wire is pressed from the slot of the second slot In the second trunking, or from the ports at both ends of the second trunking, penetrate into the second trunking.
  • preparing or purchasing a cable includes a first strong electric wire and a second strong electric wire having different specifications
  • the first strong electric wire is taken from the first line
  • the slot of the slot is pressed into the first slot, or the port from both ends of the first slot penetrates into the first slot
  • the second strong electric wire is slotted from the second slot
  • the mouth is pressed into the second slot, or the port at both ends of the second slot is inserted into the second slot.
  • the bottom surface of the door sleeve body is mounted on the periphery of the wall panel door by the bonding material or the buckle auxiliary component.
  • steps S15 and S16 can be replaced by the following steps:
  • a threaded hole is formed in the door sleeve body at a position offset from the wire groove, the bottom of the door sleeve body is attached to the side of the bottom of the wall plate, and finally a screw is screwed into the threaded hole to make the door
  • the sleeve body is mounted on the periphery of the wall panel door together with the cable embedded thereon, and finally, the door pocket cover is capped on the door pocket body.
  • the invention has the beneficial effects that the construction method of the invention can assemble the cable and the door sleeve line into one system, and then install on the wall panel, thereby realizing the separation of the line from the main body structure. It overcomes the drawbacks of the need to excavate the floor and wall when the traditional pre-buried line is repaired, reduces the damage to the structural body, and greatly increases the safety, reliability and durability of the house.
  • the line and the main structure can provide more space for interior installation and equipment renewal.
  • the line and equipment can be updated without destroying the main structure, which greatly saves the cost of later maintenance and modification. It greatly reduces the construction waste and noise pollution generated during the later maintenance and renovation, and reduces the damage to the natural environment. Reducing the impact on the downstairs users during maintenance can greatly improve the satisfaction of the occupants.
  • the occupants can modify the unit according to the needs of each individual to maximize the satisfaction of residential use requirements.
  • FIG. 1 is a flow chart of a construction method for installing a door line system on a wall panel according to an embodiment of the present invention
  • FIG. 2 is a schematic view of the cable in the wire slot of the door body of the door;
  • Figure 3 is a schematic view showing the cover of the door cover wire cover on the body of the door cover wire;
  • FIG. 4 is a schematic exploded view of a door line system according to an embodiment of the present invention.
  • Figure 5 is a schematic view of the slot cover cover after the slot is closed
  • Figure 6 is a schematic view of the door sleeve system of Figure 4 assembled
  • FIG. 7 is a schematic perspective structural view of a wire trough having a continuous wall body according to an embodiment of the present invention
  • 8 is a schematic perspective structural view of a wire slot having a gap in a wall body according to an embodiment of the present invention
  • FIG. 9 is a schematic structural view of a door pocket line system in which a weak electric wire and a strong electric wire are installed in an embodiment of the present invention.
  • FIG. 10 is a schematic structural view of a door pocket line system in which a first type of weak electric wire and a second type of weak electric wire are installed in an embodiment of the present invention
  • FIG. 11 is a schematic structural view of a door sleeve wire system in which a first strong electric wire and a second strong electric wire are installed in an embodiment of the present invention
  • Figure 12 is a schematic view showing the door pocket system of Figure 9 mounted on the periphery of the door panel of the wall panel;
  • Figure 13 is a schematic view of the door pocket system shown in Figure 9 mounted on a wall panel by a snap assembly;
  • Figure 14 is a schematic view of the door pocket system of Figure 9 mounted to a wall panel by screws.
  • a preferred embodiment of the present invention provides a construction method for installing a door line system 100 on a wall panel, comprising the following steps:
  • the door body 10 is prepared. Referring to FIG. 2 and FIG. 3, a wire slot extending through the length direction is formed on the door body 10 and can be opened when different sizes of cables need to be installed.
  • the wire slot of the size, in the embodiment, the wire groove extending through the longitudinal direction of the door sleeve wire main body 10 includes the first wire groove 101 and the second wire groove 102 which are separated from each other and different in size, and The slot positions of the first slot 101 and the second slot 102 are respectively provided with the card position 1011 and the card position 1021; then the buckle structure is opened or formed at the position of both sides of the door pocket body 10
  • a door cover line cover 13 is formed, and a structure is formed on the door cover line cover 13 to be engaged with the buckle structure on the side of the door sleeve body 10, and the buckle structure of the embodiment is a card slot 103. ;
  • the cable includes one or more of a weak electric wire and a strong electric wire;
  • the door cover line cover 13 is covered on the door cover wire main body 10, and the two form a snap connection, that is, the door cover line system is manufactured;
  • step S11 the following steps are further included:
  • a wire slot cover is prepared, and a structure is formed on the wire slot cover to be engaged with the slot of the wire slot.
  • the wire slot of different sizes may be used, in this embodiment a first slot cover 11 and a second slot cover 12 are formed, and a buckle is formed on the slot cover to respectively engage with the slot 1011 and the slot 1021 of the slot of the first slot 101 and the second slot 102. 111, the buckle 112;
  • step S14 the slot cover is snapped onto the slot of the slot
  • the method for preparing the door sleeve body 10 can adopt the following two methods.
  • the first method is as follows: the material of the door sleeve body 10 is prepared, and the material includes a certain amount of PVC ( Polyvinyl chloride) matrix resin, wood powder of the same quality as PVC matrix resin, 1.5%-2% foaming agent of PVC matrix resin quality, 40% calcium carbonate of PVC matrix resin quality, 4% of the quality of PVC matrix resin a stabilizer and a lubricant of 0.7% to 1% by mass of the PVC matrix resin;
  • PVC Polyvinyl chloride
  • a metal mold that matches the shape of the door pocket body 10 is prepared, and then the door sleeve body 10 is injection molded using the above materials in combination with the metal mold.
  • Method 2 cutting a wire groove on a plate-shaped profile, and then cutting a snap structure on the side of the profile, that is, the door sleeve wire body 10 is obtained.
  • the slot width of the slot formed or formed is smaller than the width of the slot space.
  • the slot walls of the slot are resilient so that the cable can be embedded in the slot by pressing.
  • the slot side wall of the slot of the door pocket body 10 of the present embodiment is a continuously extending wall body, so that electrical isolation of adjacent cables can be well provided.
  • the sidewall of the slot may also be provided with a plurality of spaced apart gaps along the length of the slot, so that the slot can save material while fixing the cable.
  • the present embodiment may be equipped with a weak electric wire, a strong electric wire or the above two electric wires in the first trunking slot 101 and the second trunking slot 102.
  • the following is a construction method for simultaneously loading a weak electric wire and a strong electric wire: preparing or purchasing a cable including a weak electric wire 2 and a strong electric wire 3, in the step S14, the weak electric wire 2 is from the The notch of the first wire groove 101 is pressed into the first wire groove 101, or the port from the both ends of the first wire groove 101 penetrates into the first wire groove 101.
  • the high-voltage electric wire 3 is pressed into the second wire groove 102 from the notch of the second wire groove 102, or penetrates into the second wire groove 102 from a port at both ends of the second wire groove 102.
  • preparing or purchasing a cable includes a first type of weak electric wire 21 and a second type weak electric wire 22, and in step S14, The first type of weak electric wires 21 are pressed into the first slot 101 from the slots of the first slot 101, or penetrate the ports from the ends of the first slot 101 into the first slot 101.
  • the second type of weak electric wire 21 is pressed into the second wire groove 102 from the notch of the second wire groove 102, or penetrates into the second wire groove 102 from a port at both ends of the second wire groove 102.
  • the following is a construction method for simultaneously loading two different types of high-voltage electric wires 3: preparing or purchasing a cable including a first strong electric wire 31 and a second strong electric wire 32 having different specifications, the step S14
  • the first strong electric wire 31 is pressed into the first wire slot 101 from the notch of the first wire groove 101, or the first wire is inserted into the first wire groove 101 from the port at the two ends of the first wire groove 101.
  • the second strong electric wire 102 is pressed into the second wire groove 102 from the notch of the second wire groove 102, or the second wire is penetrated from the port at both ends of the second wire groove 102. Inside the slot 102.
  • FIG. 12 the positional relationship between the door pocket system of the present embodiment and the wall panel and the doorway is shown.
  • This embodiment does not limit the specific fixing manner of the door sleeve line system and the wall panel, and may be a bonding, a snap connection or a screw connection.
  • the bottom surface of the door pocket body 10 is mounted on the bottom side of the wall panel 200 by the snap assembly 4.
  • a threaded hole is formed in the door sleeve body 10 at a position offset from the slot, and the bottom of the door sleeve body 10 is adhered to the side of the bottom of the wall panel 200, and finally to the threaded hole. Screwing the screw 5 so that the door sleeve body 10 is mounted on the periphery of the door panel 200 together with the cable embedded thereon, and finally, the door sleeve cover 13 is covered on the door sleeve line On the main body 10.
  • the construction method of the embodiment can assemble the cable and the door sleeve line into one system, and then install on the wall panel 200, thereby realizing the separation of the line from the main structure. It overcomes the drawbacks of the need to excavate the floor and wall when the traditional pre-buried line is repaired, reduces the damage to the structural body, and greatly increases the safety, reliability and durability of the house.
  • the line and the main structure can provide more space for interior installation and equipment renewal.
  • the line and equipment can be updated without destroying the main structure, which greatly saves the cost of later maintenance and modification. It greatly reduces the construction waste and noise pollution generated during the later maintenance and renovation, and reduces the damage to the natural environment. Reducing the impact on the downstairs users during maintenance can greatly improve the satisfaction of the occupants.
  • the occupants can modify the unit according to the needs of each individual to maximize the satisfaction of residential use requirements.

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Installation Of Indoor Wiring (AREA)

Abstract

A construction method for fitting a door casing system to a wall comprises the following steps: fabricating a door casing main body and a door casing cover; fabricating or purchasing a cable; pressing the cable into a wire channel via a channel opening of the wire channel, or passing the cable through the wire channel via an end opening of the wire channel; covering the door casing main body with the door casing cover, and forming an engagement connection therebetween; and fixing a bottom surface of the door casing main body to a periphery of a door opening in a wall. The invention achieves separation of a circuit from a main structure, thereby facilitating maintenance and repair.

Description

一种将门套线系统安装于墙板上的施工方法Construction method for installing door line system on wall panel
本发明属于建筑施工技术领域,尤其涉及一种将门套线系统安装于墙板上的施工方法。The invention belongs to the technical field of building construction, and in particular relates to a construction method for installing a door line system on a wall panel.
推动建筑产业现代化最重要的是要促进建设发展方式的转变,必须要摆脱传统建造的模式,寻求一种建筑产业现代化为目标的发展路径。The most important thing to promote the modernization of the construction industry is to promote the transformation of the construction mode. It is necessary to get rid of the traditional construction model and seek a development path aiming at the modernization of the construction industry.
目前,国内水电施工多采用预埋方式,设备管线,如弱电电线(例如,网线、电话线、数字电视线等用于传输信息的线缆)与强电电线(例如,火线、零线、地线等电力线缆)多预埋于主体结构墙板和楼板中,然而设备及线缆使用年限一般在10-20年左右,在房屋使用年限内需要多次更换,导致多次破坏主体结构,降低房屋使用寿命。另外,在进行内装修改时,也需要破坏主体结构,重新铺设管线,降低了房屋耐久性。At present, domestic hydropower construction mostly adopts pre-buried methods, equipment pipelines, such as weak electric wires (for example, cables for transmitting information such as network cables, telephone lines, digital television lines, etc.) and strong electric wires (for example, live wire, neutral wire, ground). Cables and other power cables are pre-embedded in the main structural wall panels and floor slabs. However, the service life of equipment and cables is generally around 10-20 years. It needs to be replaced several times within the service life of the house, resulting in multiple damage to the main structure. Reduce the life of your home. In addition, when the interior modification is carried out, it is also necessary to destroy the main structure and re-lay the pipeline to reduce the durability of the house.
可见,传统水电预埋方法,维修时需要破坏主体结构,且维修难度较大,成本高,维修效率较低;同时,维修时产生大量建筑垃圾及噪音污染,会对楼下用户影响较大。由于主体结构受到损害,不利于后期内装修改,改修成本及耗时较长,此外,由于线缆采用预埋方式,线缆与主体结构形成一体,线缆与结构主体不便分离,不利于后期户型修改,难以满足居住者多样化及灵活化的需求。It can be seen that the traditional hydropower pre-buried method needs to destroy the main structure during maintenance, and the maintenance is difficult, the cost is high, and the maintenance efficiency is low. At the same time, a large amount of construction waste and noise pollution are generated during maintenance, which will greatly affect the downstairs users. Due to the damage to the main structure, it is not conducive to the modification of the internal decoration, the cost of repairing and the time-consuming is long. In addition, since the cable is embedded, the cable and the main structure are integrated, and the cable and the structure are inseparably separated, which is not conducive to the later stage. Modifications make it difficult to meet the needs of residents for diversification and flexibility.
门套线是包裹墙体的柔和性装饰线条,就是门套的压条、卡条、等部分。主要制作材质有塑钢、高分子、木塑、密度板、原木、石膏、镁铝合金,大理石等。现有门套线仅起到装饰作用,并没有布线功能,同时,也没有相关的工艺及方法。The door line is the soft decorative line that wraps the wall, which is the beading, card, and other parts of the door cover. The main production materials are plastic steel, polymer, wood plastic, MDF, logs, gypsum, magnesium alloy, marble and so on. The existing door sleeve line only serves as a decoration, and has no wiring function. At the same time, there is no related process and method.
发明内容Summary of the invention
本发明所要解决的技术问题在于提供一种将门套线系统安装于墙板上的施工方法,旨在解决现有技术中采用预埋方式将电线线路设置于主体结构中所导致的线路维修时会损害主体结构,且维修麻烦,噪音大的问题。The technical problem to be solved by the present invention is to provide a construction method for installing a door line system on a wall panel, which aims to solve the problem that the line maintenance caused by installing the electric wire line in the main structure by using the pre-buried method in the prior art Damage to the main structure, and maintenance problems, noise problems.
本发明实施例提供了一种将门套线系统安装于墙板上的施工方法,包括以下步骤:Embodiments of the present invention provide a construction method for installing a door pocket system on a wall panel, including the following steps:
S10、制备门套线主体,于所述门套线主体上开设或形成贯穿其长度方向的线槽,然后于所述门套线主体两侧面的位置开设或形成卡扣结构;S10, preparing a door sleeve body, opening or forming a wire slot extending through the length direction of the door sleeve wire body, and then opening or forming a snap structure at positions on both sides of the door sleeve wire body;
S11、制备门套线盖子,于所述门套线盖子上制作出与所述门套线主体侧面的卡扣结构相卡扣的结构;S11, preparing a door cover line cover, and forming a structure on the door cover line cover to buckle with a buckle structure on a side of the door sleeve line body;
S12、确定需要的线缆类型,并制备或购买线缆;S12. Determine a required cable type and prepare or purchase a cable.
S13、将所述门套线主体、门套线盖子以及线缆运输至施工现场;S13. Transport the door sleeve body, the door cover wire cover and the cable to the construction site;
S14、将所述线缆从所述线槽的槽口压入线槽内,或者,从所述线槽两端的端口穿入所述线槽内;S14, the cable is pressed into the slot from the slot of the slot, or penetrates into the slot from a port at both ends of the slot;
S15、将所述门套线盖子盖罩于所述门套线主体上,并使两者形成卡扣连接,即制作出所述门套线系统;S15, covering the door cover line cover on the door sleeve wire body, and forming a snap connection between the two, that is, making the door cover line system;
S16、将所述门套线系统的门套线主体的底面固定在墙板门口的周缘上。S16. Fix a bottom surface of the door sleeve body of the door sleeve system to a periphery of the door panel door.
进一步地,所述的步骤S10之后,还包括以下步骤:制备线槽盖,于所述线槽盖上制作出与所述线槽槽口相卡扣的结构;步骤S14之后还包括以下步骤:将所述线槽盖卡扣于所述线槽的槽口上。Further, after the step S10, the method further includes the following steps: preparing a slot cover, and forming a structure for engaging with the slot of the slot on the slot cover; and after step S14, the method further includes the following steps: The slot cover is snapped onto the slot of the slot.
进一步地,所述的步骤S10中,制备门套线主体包括以下步骤:Further, in the step S10, the preparation of the door pocket body comprises the following steps:
制备出所述门套线主体的材料,所述材料包括一定量的PVC基体树脂、与PVC基体树脂质量相同的木材粉末、PVC基体树脂质量的1.5%-2%的发泡剂、PVC基体树脂质量的40%的碳酸钙、PVC基体树脂质量的4%的稳定剂以及PVC基体树脂质量的0.7%-1%的润滑剂;Preparing the material of the door sleeve wire body, the material comprising a certain amount of PVC matrix resin, wood powder of the same quality as the PVC matrix resin, 1.5%-2% foaming agent of the quality of the PVC matrix resin, PVC matrix resin 40% calcium carbonate of quality, 4% stabilizer of PVC matrix resin quality and 0.7%-1% lubricant of PVC matrix resin quality;
制备出与所述门套线主体的形状相配合的金属模具,然后采用上述材料并结合所述金属模具注塑出所述门套线主体。A metal mold that matches the shape of the door sleeve body is prepared, and then the door sleeve body is injection molded using the above material in combination with the metal mold.
进一步地,所述的步骤S10中,制备门套线主体包括以下步骤:Further, in the step S10, the preparation of the door pocket body comprises the following steps:
于一块板状的型材上切割出线槽,然后于所述型材的侧面上切割出卡扣结构,即制得所述门套线主体。A wire trough is cut on a plate-shaped profile, and then a snap-fit structure is cut on the side of the profile, that is, the door sleeve wire body is obtained.
进一步地,所述步骤S10中,于所述门套线主体上开设或形成贯穿其长度方向的线槽包括相互隔离且大小不同的第一线槽以及第二线槽,并于所述第一线槽以及第二线槽的槽口位置分别设置卡位;所述步骤S14前,于线槽盖上设置与所述第一线槽以及第二线槽槽口的卡位分别相配合的卡扣。Further, in the step S10, the wire groove extending through the longitudinal direction of the door sleeve body or including the first wire groove and the second wire groove which are separated from each other and different in size, and in the first line The slot positions of the slot and the second slot are respectively set with the latching positions; before the step S14, the buckles respectively matched with the latching positions of the first slot and the second slot slot are disposed on the slot cover.
进一步地,所述步骤S10中,于线槽的侧壁开设或形成有若干间隔分布的空隙。Further, in the step S10, a plurality of spaced apart gaps are formed or formed on the sidewall of the trunking.
进一步地,所述步骤S12中,制备或购买线缆包括弱电电线以及强电电线,所述步骤S14中,将所述弱电电线从所述第一线槽的槽口压入第一线槽内,或者,从所述第一线槽两端的端口穿入所述第一线槽内;将所述强电电线从所述第二线槽的槽口压入第二线槽内,或者,从所述第二线槽两端的端口穿入所述第二线槽内。Further, in the step S12, preparing or purchasing a cable includes a weak electric wire and a strong electric wire, and in the step S14, pressing the weak electric wire from the slot of the first trunk into the first slot Or penetrating into the first wire slot from a port at both ends of the first wire groove; pressing the high-voltage electric wire from the notch of the second wire groove into the second wire groove, or from the The ports at both ends of the second wire slot penetrate into the second wire groove.
进一步地,所述步骤S12中,制备或购买线缆包括第一类弱电电线以及第二类弱电电线,所述步骤S14中,将所述第一类弱电电线从所述第一线槽的槽口压入第一线槽内,或者,从所述第一线槽两端的端口穿入所述第一线槽内;将所述第二类弱电电线从所述第二线槽的槽口压入第二线槽内,或者,从所述第二线槽两端的端口穿入所述第二线槽内。Further, in the step S12, preparing or purchasing a cable includes a first type of weak electric wire and a second type of weak electric wire, and in the step S14, the first type weak electric wire is removed from the slot of the first trunking The port is pressed into the first slot, or the port from the two ends of the first slot penetrates into the first slot; the second type of weak electric wire is pressed from the slot of the second slot In the second trunking, or from the ports at both ends of the second trunking, penetrate into the second trunking.
进一步地,所述步骤S12中,制备或购买线缆包括规格不同的第一强电电线以及第二强电电线,所述步骤S14中,将所述第一强电电线从所述第一线槽的槽口压入第一线槽内,或者,从所述第一线槽两端的端口穿入所述第一线槽内;将所述第二强电电线从所述第二线槽的槽口压入第二线槽内,或者,从所述第二线槽两端的端口穿入所述第二线槽内。Further, in the step S12, preparing or purchasing a cable includes a first strong electric wire and a second strong electric wire having different specifications, and in the step S14, the first strong electric wire is taken from the first line The slot of the slot is pressed into the first slot, or the port from both ends of the first slot penetrates into the first slot; the second strong electric wire is slotted from the second slot The mouth is pressed into the second slot, or the port at both ends of the second slot is inserted into the second slot.
进一步地,所述步骤S16中,将所述门套线主体的底面通过粘贴材料或者卡扣辅助组件安装在墙板门口的周缘上。Further, in the step S16, the bottom surface of the door sleeve body is mounted on the periphery of the wall panel door by the bonding material or the buckle auxiliary component.
进一步地,所述步骤S15与S16可替换为以下步骤:Further, the steps S15 and S16 can be replaced by the following steps:
于所述门套线主体上错开所述线槽的位置开设螺纹孔,将所述门套线主体底部贴紧墙板底部的侧面,最后往所述螺纹孔内拧入螺钉,使所述门套线主体连同其上嵌置的线缆一起安装于墙板门口的周缘上,最后,将所述门套线盖子盖罩于所述门套线主体上。a threaded hole is formed in the door sleeve body at a position offset from the wire groove, the bottom of the door sleeve body is attached to the side of the bottom of the wall plate, and finally a screw is screwed into the threaded hole to make the door The sleeve body is mounted on the periphery of the wall panel door together with the cable embedded thereon, and finally, the door pocket cover is capped on the door pocket body.
本发明与现有技术相比,有益效果在于:本发明的施工方法能将线缆以及门套线集合成一个系统,然后再安装于墙板上,实现了线路与主体结构分离。克服了传统预埋线路维修时需开凿楼板、墙体的弊端,减少对结构主体的破坏,大大增加了房屋安全可靠性、耐久性。 Compared with the prior art, the invention has the beneficial effects that the construction method of the invention can assemble the cable and the door sleeve line into one system, and then install on the wall panel, thereby realizing the separation of the line from the main body structure. It overcomes the drawbacks of the need to excavate the floor and wall when the traditional pre-buried line is repaired, reduces the damage to the structural body, and greatly increases the safety, reliability and durability of the house.
通过线路与主体结构采用分离式设计,为内装及设备更新提供更大空间,线路及设备可在不破坏主体结构情况下进行更新,大大节约后期维修及改装成本。极大减少了后期维修及改造时产生的建筑垃圾及噪音污染,减少对自然环境的破坏。减少维修时对楼下用户影响,可极大提升居住者满足度。另外,居住者可根据各人需求对户型进行改造,最大化满足住宅使用要求。Separate design is adopted by the line and the main structure to provide more space for interior installation and equipment renewal. The line and equipment can be updated without destroying the main structure, which greatly saves the cost of later maintenance and modification. It greatly reduces the construction waste and noise pollution generated during the later maintenance and renovation, and reduces the damage to the natural environment. Reducing the impact on the downstairs users during maintenance can greatly improve the satisfaction of the occupants. In addition, the occupants can modify the unit according to the needs of each individual to maximize the satisfaction of residential use requirements.
附图说明DRAWINGS
一个或多个实施例通过与之对应的附图中的图片进行示例性说明,这些示例性说明并不构成对实施例的限定,附图中具有相同参考数字标号的元件表示为类似的元件,除非有特别申明,附图中的图不构成比例限制。The one or more embodiments are exemplified by the accompanying drawings in the accompanying drawings, and FIG. The figures in the drawings do not constitute a scale limitation unless otherwise stated.
图1是本发明实施例提供的一种将门套线系统安装于墙板上的施工方法的流程图;1 is a flow chart of a construction method for installing a door line system on a wall panel according to an embodiment of the present invention;
图2是于门套线主体的线槽内装入线缆后的示意图;2 is a schematic view of the cable in the wire slot of the door body of the door;
图3是将门套线盖子盖罩在门套线主体上的示意图;Figure 3 is a schematic view showing the cover of the door cover wire cover on the body of the door cover wire;
图4是本发明实施例提供的一种将门套线系统的分解结构示意图;4 is a schematic exploded view of a door line system according to an embodiment of the present invention;
图5是将线槽盖板盖封线槽后的示意图;Figure 5 is a schematic view of the slot cover cover after the slot is closed;
图6是将图4中的门套线系统组装后的示意图;Figure 6 is a schematic view of the door sleeve system of Figure 4 assembled;
图7是本发明实施例提供的具有连续壁体的线槽的立体结构示意图;
图8是本发明实施例提供的壁体具有间隙的线槽的立体结构示意图;
7 is a schematic perspective structural view of a wire trough having a continuous wall body according to an embodiment of the present invention;
8 is a schematic perspective structural view of a wire slot having a gap in a wall body according to an embodiment of the present invention;
图9是本发明实施例安装有弱电电线以及强电电线的门套线系统的结构示意图;9 is a schematic structural view of a door pocket line system in which a weak electric wire and a strong electric wire are installed in an embodiment of the present invention;
图10是本发明实施例安装有第一类弱电电线以及第二类弱电电线的门套线系统的结构示意图;10 is a schematic structural view of a door pocket line system in which a first type of weak electric wire and a second type of weak electric wire are installed in an embodiment of the present invention;
图11是本发明实施例安装有第一强电电线以及第二强电电线的门套线系统的结构示意图;11 is a schematic structural view of a door sleeve wire system in which a first strong electric wire and a second strong electric wire are installed in an embodiment of the present invention;
图12是图9所示门套线系统安装于墙板门口周缘上的示意图;Figure 12 is a schematic view showing the door pocket system of Figure 9 mounted on the periphery of the door panel of the wall panel;
图13是图9所示的门套线系统通过卡扣组件安装于墙板上的示意图;Figure 13 is a schematic view of the door pocket system shown in Figure 9 mounted on a wall panel by a snap assembly;
图14是图9所示的门套线系统通过螺钉安装于墙板上的示意图。Figure 14 is a schematic view of the door pocket system of Figure 9 mounted to a wall panel by screws.
具体实施方式Detailed ways
为了使本发明所要解决的技术问题、技术方案及有益效果更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。The present invention will be further described in detail below with reference to the accompanying drawings and embodiments. It is understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
如图1所示,为本发明的较佳实施例,提供了一种将门套线系统100安装于墙板上的施工方法,包括以下步骤:As shown in FIG. 1 , a preferred embodiment of the present invention provides a construction method for installing a door line system 100 on a wall panel, comprising the following steps:
S10、制备门套线主体10,请参见图2及图3,于所述门套线主体10上开设或形成贯穿其长度方向的线槽,当需要安装不同尺寸的线缆时,可以开设不同尺寸的线槽,本实施例中,于所述门套线主体10上开设或形成贯穿其长度方向的线槽包括相互隔离且大小不同的第一线槽101以及第二线槽102,并于所述第一线槽101以及第二线槽102的槽口位置分别设置卡位1011、卡位1021;然后于所述门套线主体10两侧面的位置开设或形成卡扣结构S10. The door body 10 is prepared. Referring to FIG. 2 and FIG. 3, a wire slot extending through the length direction is formed on the door body 10 and can be opened when different sizes of cables need to be installed. The wire slot of the size, in the embodiment, the wire groove extending through the longitudinal direction of the door sleeve wire main body 10 includes the first wire groove 101 and the second wire groove 102 which are separated from each other and different in size, and The slot positions of the first slot 101 and the second slot 102 are respectively provided with the card position 1011 and the card position 1021; then the buckle structure is opened or formed at the position of both sides of the door pocket body 10
S11、制备门套线盖子13,于所述门套线盖子13上制作出与所述门套线主体10侧面的卡扣结构相卡扣的结构,本实施例的卡扣结构为卡槽103;S11, a door cover line cover 13 is formed, and a structure is formed on the door cover line cover 13 to be engaged with the buckle structure on the side of the door sleeve body 10, and the buckle structure of the embodiment is a card slot 103. ;
S12、根据需要确定线缆类型,制备或购买线缆,本实施例中,线缆包括弱电电线、强电电线中的一种或以上两种电线;S12. Determine a cable type according to requirements, and prepare or purchase a cable. In this embodiment, the cable includes one or more of a weak electric wire and a strong electric wire;
S13、将所述门套线主体10、门套线盖子13以及线缆运输至施工现场;S13, transporting the door sleeve body 10, the door sleeve cover 13 and the cable to the construction site;
S14、将需要的某种线缆从所述线槽的槽口压入线槽内,或者,从所述线槽两端的端口穿入所述线槽内,当需要两种线缆时,分别将两种线缆压入或穿入与其匹配的线槽内;S14, pressing a certain cable required from the slot of the slot into the slot, or penetrating into the slot from the port at both ends of the slot. When two cables are required, respectively Pressing or threading the two cables into their matching slots;
S15、将所述门套线盖子13盖罩于所述门套线主体10上,并使两者形成卡扣连接,即制作出所述门套线系统;S15, the door cover line cover 13 is covered on the door cover wire main body 10, and the two form a snap connection, that is, the door cover line system is manufactured;
S16、将所述门套线系统的门套线主体10的底面固定在墙板门口的周缘上。S16. Fix the bottom surface of the door pocket body 10 of the door sleeve system to the periphery of the wall panel door.
进一步地,请参见图4至图6,上述步骤S11之后,还包括以下步骤:Further, referring to FIG. 4 to FIG. 6 , after the above step S11, the following steps are further included:
制备线槽盖,于所述线槽盖上制作出与所述线槽槽口相卡扣的结构,当需要盖罩不同尺寸的线槽时,可以根据不同尺寸的线槽,本实施例中,制作第一线槽盖11以及第二线槽盖12,于线槽盖上设置与所述第一线槽101以及第二线槽102槽口的卡位1011、卡位1021分别相配合的卡扣111、卡扣112;A wire slot cover is prepared, and a structure is formed on the wire slot cover to be engaged with the slot of the wire slot. When a wire slot of different sizes is required to be covered, the wire slot of different sizes may be used, in this embodiment a first slot cover 11 and a second slot cover 12 are formed, and a buckle is formed on the slot cover to respectively engage with the slot 1011 and the slot 1021 of the slot of the first slot 101 and the second slot 102. 111, the buckle 112;
步骤S14之后,将所述线槽盖卡扣于所述线槽的槽口上;After step S14, the slot cover is snapped onto the slot of the slot;
具体地,上述的步骤S10中,制备门套线主体10的方法可以采用以下两种方法,其中,方法一:制备出所述门套线主体10的材料,所述材料包括一定量的PVC(聚氯乙烯)基体树脂、与PVC基体树脂质量相同的木材粉末、PVC基体树脂质量的1.5%-2%的发泡剂、PVC基体树脂质量的40%的碳酸钙、PVC基体树脂质量的4%的稳定剂以及PVC基体树脂质量的0.7%-1%的润滑剂;Specifically, in the above step S10, the method for preparing the door sleeve body 10 can adopt the following two methods. The first method is as follows: the material of the door sleeve body 10 is prepared, and the material includes a certain amount of PVC ( Polyvinyl chloride) matrix resin, wood powder of the same quality as PVC matrix resin, 1.5%-2% foaming agent of PVC matrix resin quality, 40% calcium carbonate of PVC matrix resin quality, 4% of the quality of PVC matrix resin a stabilizer and a lubricant of 0.7% to 1% by mass of the PVC matrix resin;
制备出与所述门套线主体10的形状相配合的金属模具,然后采用上述材料并结合所述金属模具注塑出所述门套线主体10。A metal mold that matches the shape of the door pocket body 10 is prepared, and then the door sleeve body 10 is injection molded using the above materials in combination with the metal mold.
方法二:于一块板状的型材上切割出线槽,然后于所述型材的侧面上切割出卡扣结构,即制得所述门套线主体10。Method 2: cutting a wire groove on a plate-shaped profile, and then cutting a snap structure on the side of the profile, that is, the door sleeve wire body 10 is obtained.
为了防止线缆出现松脱现象,上述步骤S10中,开设或形成的线槽的槽口宽度小于槽内空间的宽度。优化地,线槽的槽壁具有弹性,以便线缆能通过按压的方式嵌入于线槽内。In order to prevent the cable from being loosened, in the above step S10, the slot width of the slot formed or formed is smaller than the width of the slot space. Preferably, the slot walls of the slot are resilient so that the cable can be embedded in the slot by pressing.
于本实施例中,请参见图7,本实施例的门套线主体10的线槽的槽侧壁为连续延伸的壁体,从而能很好地为相邻的线缆提供电气隔离。此外,请参见图8,所述槽侧壁也可沿线槽的长度方向开设有若干间距分布的空隙,从而线槽在固定线缆的同时,还可以节省材料。In this embodiment, referring to FIG. 7, the slot side wall of the slot of the door pocket body 10 of the present embodiment is a continuously extending wall body, so that electrical isolation of adjacent cables can be well provided. In addition, referring to FIG. 8 , the sidewall of the slot may also be provided with a plurality of spaced apart gaps along the length of the slot, so that the slot can save material while fixing the cable.
当需要安装两种线缆时,本实施例可以于第一线槽101与第二线槽102内装入弱电电线、强电电线或以上两种电线。When two types of cables need to be installed, the present embodiment may be equipped with a weak electric wire, a strong electric wire or the above two electric wires in the first trunking slot 101 and the second trunking slot 102.
请参见图9,以下为同时装入弱电电线以及强电电线的施工方法:制备或购买线缆包括弱电电线2以及强电电线3,所述步骤S14中,将所述弱电电线2从所述第一线槽101的槽口压入第一线槽101内,或者,从所述第一线槽101两端的端口穿入所述第一线槽101内。将所述强电电线3从所述第二线槽102的槽口压入第二线槽102内,或者,从所述第二线槽102两端的端口穿入所述第二线槽102内。Referring to FIG. 9, the following is a construction method for simultaneously loading a weak electric wire and a strong electric wire: preparing or purchasing a cable including a weak electric wire 2 and a strong electric wire 3, in the step S14, the weak electric wire 2 is from the The notch of the first wire groove 101 is pressed into the first wire groove 101, or the port from the both ends of the first wire groove 101 penetrates into the first wire groove 101. The high-voltage electric wire 3 is pressed into the second wire groove 102 from the notch of the second wire groove 102, or penetrates into the second wire groove 102 from a port at both ends of the second wire groove 102.
请参见图10,以下为同时装入两种不同类型的弱电电线2的施工方法:制备或购买线缆包括第一类弱电电线21以及第二类弱电电线22,所述步骤S14中,将所述第一类弱电电线21从所述第一线槽101的槽口压入第一线槽101内,或者,从所述第一线槽101两端的端口穿入所述第一线槽101内;将所述第二类弱电电线21从所述第二线槽102的槽口压入第二线槽102内,或者,从所述第二线槽102两端的端口穿入所述第二线槽102内。Referring to FIG. 10, the following is a construction method for simultaneously loading two different types of weak electric wires 2: preparing or purchasing a cable includes a first type of weak electric wire 21 and a second type weak electric wire 22, and in step S14, The first type of weak electric wires 21 are pressed into the first slot 101 from the slots of the first slot 101, or penetrate the ports from the ends of the first slot 101 into the first slot 101. The second type of weak electric wire 21 is pressed into the second wire groove 102 from the notch of the second wire groove 102, or penetrates into the second wire groove 102 from a port at both ends of the second wire groove 102.
请参见图11,以下为同时装入两种不同类型的强电电线3的施工方法:制备或购买线缆包括规格不同的第一强电电线31以及第二强电电线32,所述步骤S14中,将所述第一强电电线31从所述第一线槽101的槽口压入第一线槽101内,或者,从所述第一线槽101两端的端口穿入所述第一线槽101内;将所述第二强电电线102从所述第二线槽102的槽口压入第二线槽102内,或者,从所述第二线槽102两端的端口穿入所述第二线槽102内。Referring to FIG. 11, the following is a construction method for simultaneously loading two different types of high-voltage electric wires 3: preparing or purchasing a cable including a first strong electric wire 31 and a second strong electric wire 32 having different specifications, the step S14 The first strong electric wire 31 is pressed into the first wire slot 101 from the notch of the first wire groove 101, or the first wire is inserted into the first wire groove 101 from the port at the two ends of the first wire groove 101. The second strong electric wire 102 is pressed into the second wire groove 102 from the notch of the second wire groove 102, or the second wire is penetrated from the port at both ends of the second wire groove 102. Inside the slot 102.
请参见图12,示出了本实施例的门套线系统与墙板及门口的位置关系。本实施例不限定门套线系统与墙板的具体固定方式,可以采用粘接、卡扣连接或者螺钉连接的方式。 Referring to FIG. 12, the positional relationship between the door pocket system of the present embodiment and the wall panel and the doorway is shown. This embodiment does not limit the specific fixing manner of the door sleeve line system and the wall panel, and may be a bonding, a snap connection or a screw connection.
以下为采用卡扣连接的施工步骤:The following are the construction steps for a snap connection:
请参见图13,将所述门套线主体10的底面通过卡扣组件4安装在墙板200的底部侧面上。Referring to FIG. 13, the bottom surface of the door pocket body 10 is mounted on the bottom side of the wall panel 200 by the snap assembly 4.
以下为采用螺钉5连接的施工步骤:The following are the construction steps for connecting with screws 5:
请参见图14,于所述门套线主体10上错开所述线槽的位置开设螺纹孔,将所述门套线主体10底部贴紧墙板200底部的侧面,最后往所述螺纹孔内拧入螺钉5,使所述门套线主体10连同其上嵌置的线缆一起安装于墙板200门口的周缘上,最后,将所述门套线盖子13盖罩于所述门套线主体10上。Referring to FIG. 14 , a threaded hole is formed in the door sleeve body 10 at a position offset from the slot, and the bottom of the door sleeve body 10 is adhered to the side of the bottom of the wall panel 200, and finally to the threaded hole. Screwing the screw 5 so that the door sleeve body 10 is mounted on the periphery of the door panel 200 together with the cable embedded thereon, and finally, the door sleeve cover 13 is covered on the door sleeve line On the main body 10.
本实施例的施工方法能将线缆以及门套线集合成一个系统,然后再安装于墙板200上,实现了线路与主体结构分离。克服了传统预埋线路维修时需开凿楼板、墙体的弊端,减少对结构主体的破坏,大大增加了房屋安全可靠性、耐久性。 The construction method of the embodiment can assemble the cable and the door sleeve line into one system, and then install on the wall panel 200, thereby realizing the separation of the line from the main structure. It overcomes the drawbacks of the need to excavate the floor and wall when the traditional pre-buried line is repaired, reduces the damage to the structural body, and greatly increases the safety, reliability and durability of the house.
通过线路与主体结构采用分离式设计,为内装及设备更新提供更大空间,线路及设备可在不破坏主体结构情况下进行更新,大大节约后期维修及改装成本。极大减少了后期维修及改造时产生的建筑垃圾及噪音污染,减少对自然环境的破坏。减少维修时对楼下用户影响,可极大提升居住者满足度。另外,居住者可根据各人需求对户型进行改造,最大化满足住宅使用要求。Separate design is adopted by the line and the main structure to provide more space for interior installation and equipment renewal. The line and equipment can be updated without destroying the main structure, which greatly saves the cost of later maintenance and modification. It greatly reduces the construction waste and noise pollution generated during the later maintenance and renovation, and reduces the damage to the natural environment. Reducing the impact on the downstairs users during maintenance can greatly improve the satisfaction of the occupants. In addition, the occupants can modify the unit according to the needs of each individual to maximize the satisfaction of residential use requirements.
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。The above is only the preferred embodiment of the present invention, and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection of the present invention. Within the scope.

Claims (10)

  1. 一种将门套线系统安装于墙板上的施工方法,其特征在于,包括以下步骤:
    S10、制备门套线主体,于所述门套线主体上开设或形成贯穿其长度方向的线槽,然后于所述门套线主体两侧面的位置开设或形成卡扣结构;
    S11、制备门套线盖子,于所述门套线盖子上制作出与所述门套线主体侧面的卡扣结构相卡扣的结构;
    S12、确定需要的线缆类型,并制备或购买线缆;
    S13、将所述门套线主体、门套线盖子以及线缆运输至施工现场;
    S14、将所述线缆从所述线槽的槽口压入线槽内,或者,从所述线槽两端的端口穿入所述线槽内;
    S15、将所述门套线盖子盖罩于所述门套线主体上,并使两者形成卡扣连接,即制作出所述门套线系统;
    S16、将所述门套线系统的门套线主体的底面固定在墙板门口的周缘上。
    A construction method for installing a door pocket system on a wall panel, comprising the steps of:
    S10, preparing a door sleeve body, opening or forming a wire slot extending through the length direction of the door sleeve wire body, and then opening or forming a snap structure at positions on both sides of the door sleeve wire body;
    S11, preparing a door cover line cover, and forming a structure on the door cover line cover to buckle with a buckle structure on a side of the door sleeve line body;
    S12. Determine a required cable type and prepare or purchase a cable.
    S13. Transport the door sleeve body, the door cover wire cover and the cable to the construction site;
    S14, the cable is pressed into the slot from the slot of the slot, or penetrates into the slot from a port at both ends of the slot;
    S15, covering the door cover line cover on the door sleeve wire body, and forming a snap connection between the two, that is, making the door cover line system;
    S16. Fix a bottom surface of the door sleeve body of the door sleeve system to a periphery of the door panel door.
  2. 如权利要求1所述的施工方法,其特征在于,所述的步骤S10之后,还
    包括以下步骤:制备线槽盖,于所述线槽盖上制作出与所述线槽槽口相卡扣的结构;步骤S14之后还包括以下步骤:将所述线槽盖卡扣于所述线槽的槽口上。
    The construction method according to claim 1, wherein after the step S10, the method further comprises the steps of: preparing a slot cover, and forming a buckle with the slot on the slot cover. After the step S14, the method further includes the step of: snapping the slot cover to the slot of the slot.
  3. 如权利要求1所述的施工方法,其特征在于,所述的步骤S10中,制备门套线主体包括以下步骤:
    制备出所述门套线主体的材料,所述材料包括一定量的PVC基体树脂、与PVC基体树脂质量相同的木材粉末、PVC基体树脂质量的1.5%-2%的发泡剂、PVC基体树脂质量的40%的碳酸钙、PVC基体树脂质量的4%的稳定剂以及PVC基体树脂质量的0.7%-1%的润滑剂;
    制备出与所述门套线主体的形状相配合的金属模具,然后采用所述塑料并结合所述金属模具注塑出所述门套线主体。
    The construction method according to claim 1, wherein in the step S10, the preparation of the door pocket body comprises the following steps:
    Preparing the material of the door sleeve wire body, the material comprising a certain amount of PVC matrix resin, wood powder of the same quality as the PVC matrix resin, 1.5%-2% foaming agent of the quality of the PVC matrix resin, PVC matrix resin 40% calcium carbonate of quality, 4% stabilizer of PVC matrix resin quality and 0.7%-1% lubricant of PVC matrix resin quality;
    A metal mold that matches the shape of the door sleeve body is prepared, and then the door sleeve body is injection molded using the plastic in combination with the metal mold.
  4. 如权利要求1所述的施工方法,其特征在于,所述的步骤S10中,制备门套线主体包括以下步骤:
    于一块板状的型材上切割出线槽,然后于所述型材的侧面上切割出卡扣结构,即制得所述门套线主体。
    The construction method according to claim 1, wherein in the step S10, the preparation of the door pocket body comprises the following steps:
    A wire trough is cut on a plate-shaped profile, and then a snap-fit structure is cut on the side of the profile, that is, the door sleeve wire body is obtained.
  5. 如权利要求2所述的施工方法,其特征在于,所述步骤S10中,于所述门套线主体上开设或形成贯穿其长度方向的线槽包括相互隔离且大小不同的第一线槽以及第二线槽,并于所述第一线槽以及第二线槽的槽口位置分别设置卡位;所述步骤S11中,于线槽盖上设置与所述第一线槽以及第二线槽槽口的卡位分别相配合的卡扣。The construction method according to claim 2, wherein in the step S10, the wire groove extending through the longitudinal direction of the door sleeve wire body or the first wire groove having different sizes and a second slot, and a slot is respectively disposed at a slot position of the first slot and the second slot; and in the step S11, the first slot and the second slot are disposed on the slot cover The card positions are respectively matched with the buckles.
  6. 如权利要求1所述的施工方法,其特征在于,所述步骤S10中,于线槽的侧壁开设或形成有若干间隔分布的空隙。The construction method according to claim 1, wherein in the step S10, a plurality of spaced apart gaps are formed or formed in the side walls of the wire groove.
  7. 如权利要求5所述的施工方法,其特征在于,所述步骤S12中,制备或购买线缆包括弱电电线以及强电电线,所述步骤S14中,将所述弱电电线从所述第一线槽的槽口压入第一线槽内,或者,从所述第一线槽两端的端口穿入所述第一线槽内;将所述强电电线从所述第二线槽的槽口压入第二线槽内,或者,从所述第二线槽两端的端口穿入所述第二线槽内。The construction method according to claim 5, wherein in the step S12, the cable is prepared or purchased including a weak electric wire and a strong electric wire, and in the step S14, the weak electric wire is taken from the first line. The slot of the slot is pressed into the first slot, or the port from the two ends of the first slot penetrates into the first slot; the strong electric wire is pressed from the slot of the second slot The second wire slot is inserted into the second wire slot, or the port from the two ends of the second wire groove is inserted into the second wire groove.
  8. 如权利要求5所述的施工方法,其特征在于,所述步骤S12中,制备或购买线缆包括第一类弱电电线以及第二类弱电电线,所述步骤S14中,将所述第一类弱电电线从所述第一线槽的槽口压入第一线槽内,或者,从所述第一线槽两端的端口穿入所述第一线槽内;将所述第二类弱电电线从所述第二线槽的槽口压入第二线槽内,或者,从所述第二线槽两端的端口穿入所述第二线槽内。The construction method according to claim 5, wherein in the step S12, the cable for preparing or purchasing comprises a first type of weak electric wire and a second type of weak electric wire, and in the step S14, the first type is The weak electric wire is pressed into the first trunking from the slot of the first trunking, or penetrates into the first trunking from the port at both ends of the first trunking; the second type of weak electric wire is Pressing into the second slot from the slot of the second slot, or penetrating into the second slot from a port at both ends of the second slot.
  9. 如权利要求5所述的施工方法,其特征在于,所述步骤S12中,制备或购买线缆包括规格不同的第一强电电线以及第二强电电线,所述步骤S14中,将所述第一强电电线从所述第一线槽的槽口压入第一线槽内,或者,从所述第一线槽两端的端口穿入所述第一线槽内;将所述第二强电电线从所述第二线槽的槽口压入第二线槽内,或者,从所述第二线槽两端的端口穿入所述第二线槽内。The construction method according to claim 5, wherein in the step S12, the cable is prepared or purchased to include a first high-voltage electric wire and a second high-voltage electric wire having different specifications, and in the step S14, the The first strong electric wire is pressed into the first trunking slot from the slot of the first slot, or penetrates into the first slot from the port at both ends of the first slot; the second The high-voltage electric wire is pressed into the second wire groove from the notch of the second wire groove, or penetrates into the second wire groove from a port at both ends of the second wire groove.
  10. 如权利要求1或5所述的施工方法,其特征在于,所述步骤S15与S16可替换为以下步骤:
    于所述门套线主体上错开所述线槽的位置开设螺纹孔,将所述门套线主体底部贴紧墙板底部的侧面,最后往所述螺纹孔内拧入螺钉,使所述门套线主体连同其上嵌置的线缆一起安装于墙板门口的周缘上,最后,将所述门套线盖子盖罩于所述门套线主体上。
    The construction method according to claim 1 or 5, wherein the steps S15 and S16 are replaced by the following steps:
    a threaded hole is formed in the door sleeve body at a position offset from the wire groove, the bottom of the door sleeve body is attached to the side of the bottom of the wall plate, and finally a screw is screwed into the threaded hole to make the door The sleeve body is mounted on the periphery of the wall panel door together with the cable embedded thereon, and finally, the door pocket cover is capped on the door pocket body.
PCT/CN2018/086943 2018-05-16 2018-05-16 Construction method for fitting door casing system to wall WO2019218176A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201880000579.8A CN112166236A (en) 2018-05-16 2018-05-16 Construction method for installing door pocket line system on wallboard
PCT/CN2018/086943 WO2019218176A1 (en) 2018-05-16 2018-05-16 Construction method for fitting door casing system to wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2018/086943 WO2019218176A1 (en) 2018-05-16 2018-05-16 Construction method for fitting door casing system to wall

Publications (1)

Publication Number Publication Date
WO2019218176A1 true WO2019218176A1 (en) 2019-11-21

Family

ID=68539226

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2018/086943 WO2019218176A1 (en) 2018-05-16 2018-05-16 Construction method for fitting door casing system to wall

Country Status (2)

Country Link
CN (1) CN112166236A (en)
WO (1) WO2019218176A1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2160590A1 (en) * 1971-11-18 1973-06-29 Nordiske Kabel Traad
CN202810496U (en) * 2012-08-02 2013-03-20 上海英科实业有限公司 Door frame lines with trunking
CN206571334U (en) * 2017-01-20 2017-10-20 青岛有住信息技术有限公司 Door pocket
CN206888251U (en) * 2017-03-31 2018-01-16 浙江晶通塑胶有限公司 Wood plastic wall board

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1489064A (en) * 1975-05-21 1977-10-19 Smith R Detachable trim coverings
CN2415086Y (en) * 2000-03-03 2001-01-17 海尔集团公司 Skirting board with skirting board fixing clamp
CN201146352Y (en) * 2008-01-11 2008-11-05 胡永千 Wire groove
CN204538604U (en) * 2015-04-22 2015-08-05 李�浩 A kind of wire branch apparatus
CN105375410A (en) * 2015-11-02 2016-03-02 康力电梯股份有限公司 Machine room wire duct
CN206360298U (en) * 2016-12-09 2017-07-28 东莞市万科建筑技术研究有限公司 Architecture indoor cable system
CN206250507U (en) * 2016-12-16 2017-06-13 合肥联宝信息技术有限公司 Buckle and electronic equipment
CN207283095U (en) * 2017-06-27 2018-04-27 浙江未来加电子商务有限公司 House wiring system
CN207283107U (en) * 2017-09-15 2018-04-27 深圳市现代城市建筑设计有限公司 One kind separates wire casing

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2160590A1 (en) * 1971-11-18 1973-06-29 Nordiske Kabel Traad
CN202810496U (en) * 2012-08-02 2013-03-20 上海英科实业有限公司 Door frame lines with trunking
CN206571334U (en) * 2017-01-20 2017-10-20 青岛有住信息技术有限公司 Door pocket
CN206888251U (en) * 2017-03-31 2018-01-16 浙江晶通塑胶有限公司 Wood plastic wall board

Also Published As

Publication number Publication date
CN112166236A (en) 2021-01-01

Similar Documents

Publication Publication Date Title
WO2019218176A1 (en) Construction method for fitting door casing system to wall
WO2019218172A1 (en) Construction method for fitting baseboard system to wall panel
WO2019218193A1 (en) Cable routing member embeddable in recess of wall
WO2019218177A1 (en) Construction method for house having pipe and wire separate from main structure
WO2019218217A1 (en) Wall system integrating high-voltage and low-voltage cables
WO2019218171A1 (en) Construction method for fitting decorative cove ceiling system to main structure
WO2019218204A1 (en) Door casing system integrated with high-voltage cable, and wall having same
WO2019218203A1 (en) Door casing for cable fitting
WO2019218194A1 (en) Wall system integrating high-voltage cable
WO2019218237A1 (en) Construction method for fitting decorative coved ceiling system to main structure
WO2019218173A1 (en) Method for construction of wall system
WO2019218214A1 (en) Wall and wall system capable of integrating pipes and cables
WO2019218222A1 (en) Door casing system integrated with low-voltage cable, and wall having same
WO2019218249A1 (en) Method for construction of wall system
WO2019218195A1 (en) Wall system integrating low-voltage cable
WO2019218248A1 (en) Wall system
WO2019218242A1 (en) Construction method for decorative wall system
WO2019218254A1 (en) Wall system integrating water pipe and high-voltage and low-voltage cables
WO2019218259A1 (en) Door casing system integrated with low-voltage and high-voltage cables, and wall having same
WO2019218229A1 (en) Method for construction of suspended ceiling system
WO2019218216A1 (en) Wall system integrating water pipe and low-voltage cable
WO2019218215A1 (en) Wall system integrating water pipe and high-voltage cable
WO2019218174A1 (en) Construction method for floor board system
WO2019218175A1 (en) Construction method for decorative wall system
WO2019218247A1 (en) Wall system integrating high-voltage cable

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18918747

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18918747

Country of ref document: EP

Kind code of ref document: A1