WO2019202026A1 - Verfahren und computergestütztes system zur erfassung von lebenszyklusinformationen über einen schaltschrank einer industriellen anlage - Google Patents
Verfahren und computergestütztes system zur erfassung von lebenszyklusinformationen über einen schaltschrank einer industriellen anlage Download PDFInfo
- Publication number
- WO2019202026A1 WO2019202026A1 PCT/EP2019/059984 EP2019059984W WO2019202026A1 WO 2019202026 A1 WO2019202026 A1 WO 2019202026A1 EP 2019059984 W EP2019059984 W EP 2019059984W WO 2019202026 A1 WO2019202026 A1 WO 2019202026A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- information
- control cabinet
- cabinet
- archive database
- commissioning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Program-control systems
- G05B19/02—Program-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Program-control systems
- G05B19/02—Program-control systems electric
- G05B19/04—Program control other than numerical control, i.e. in sequence controllers or logic controllers
- G05B19/042—Program control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Program-control systems
- G05B19/02—Program-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/4188—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by CIM planning or realisation
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/90—Details of database functions independent of the retrieved data types
- G06F16/93—Document management systems
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Program-control systems
- G05B19/02—Program-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/4183—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by data acquisition, e.g. workpiece identification
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/30—Information retrieval; Database structures therefor; File system structures therefor of unstructured textual data
- G06F16/38—Retrieval characterised by using metadata, e.g. metadata not derived from the content or metadata generated manually
- G06F16/381—Retrieval characterised by using metadata, e.g. metadata not derived from the content or metadata generated manually using identifiers, e.g. barcodes, RFIDs
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
Definitions
- the invention relates to a method and a computer-aided system for recording and processing of life cycle information via an electrical
- Control cabinet of an industrial plant also encompasses a computer program product carrying out the computer-assisted method as well as a special data format which contains cabinet-specific lifecycle information.
- cabinets are used for the sheltered housing of electrical and / or electronic components, which are usually designed in the form of standardized built-in modules. For example, automated production plants, process plants,
- the built-in modules in the control cabinet are control components that are not placed directly in the machine as a field device.
- built-in modules come, for example, programmable logic controllers, complete computer units,
- a control cabinet usually also contains electrical terminal strips for connecting the electrical wiring at the place of use, whereby the connection to the power supply and to be driven machines and equipment is manufactured.
- the planning of application-specific switch cabinet equipment is usually software-based, for example via EPLAN Pro Panel® , in the form of a CAD design. Such a planned construction comprises in particular a three-dimensional one
- the planned design also includes data sheet information A of the built-in modules.
- data sheet information may be, for example, the electrical power consumption, the degree of protection, the input / output port configuration, the computing power, the manufacturer and / or the date of manufacture, the serial number, and the like.
- data sheet information depends on the type of the built-in module.
- test and acceptance measures must be carried out before a reliable commissioning of the
- test and acceptance information resulting from the test phase must be documented in order to be able to demonstrate that it is in compliance with planning and in accordance with the regulations.
- DE 101 16 539 B4 discloses an abstract generally valid computer-aided method and system for automatic data preparation in the production, assembly, service or maintenance environment of automation technology.
- augmented reality augmented reality
- Documentation data and the capture of instructions depending on the the database managed data are customizable. This opens up a variety of connectivity.
- the prior art method and system presented is limited to data visualization only.
- the object is achieved procedurally by at the time of the creation of the cabinet based on planned design at least datasheet information A of the built-in modules with function information B on their application in the context of the cabinet equipment are linked to this in a central
- Archive database to the relevant cabinet deposited records are.
- the triggering of the commissioning release involves at least one connection from a power source to the control cabinet and / or at least one connection from the control cabinet to the industrial system in order to activate it. If commissioning of this commissioning of the control cabinet takes place at the place of use, the data sets of the Archive database further supplemented by additional commissioning information D of the control cabinet, which are added via a decentralized user terminal preferably from the place of use of the cabinet from the central archive database.
- a documentation is set up which offers a higher informational depth than an otherwise usual control cabinet folder in paper form, in that not only the built-in modules are named and marked, but also their data sheet information A is implemented in the documentation - linked in the simplest way - are.
- linked function information B provides information on the function of a specific installation module in the context of the
- Control cabinet equipment has to meet, for example, the control of a
- Frequency converter for a three-phase motor of a pump or the like.
- Cabinet related maintenance information E or repair information F can be added to the archive database via a decentralized user terminal to update the information about the current cabinet equipment.
- This update includes, for example, replacement information about defective installation modules, an extension of the control cabinet equipment to further installation modules, such as a remote monitoring unit or the like.
- the decentralized user terminal has access to the three-dimensional planned design required to perform a repair, for example, to make a decision as to whether a required on-site repair is required via supplementary design information H resulting therefrom can be performed, or whether a transfer of the defective cabinet in a local workshop is necessary.
- supplementary design information H resulting therefrom
- Archive database is maintained.
- this documentation update measure is also carried out by the control cabinet manufacturer, which is advantageous in particular for larger changes in the control cabinet equipment in order to ensure data consistency.
- the inventive solution provides dynamic documentation with access from different user levels. This also creates, for example, the prerequisite for being able to certify the standard-compliant conversion from an external point as well, for example in the form of certification according to the standard (DIN / EN / ISO / NEC / UL / CSA) after a change to a control cabinet equipment.
- Fault information G of the control cabinet of the archive database can be added automatically or via a decentralized user terminal. For example, find one Power failure takes place, which interrupts the operation of the cabinet and the connected industrial plant, this incident is added to the complete collection of life cycle information of the archive database.
- a fault information G may for example also be the failure of a built-in module or the exceeding of a permissible operating temperature. From such fault information G, for example, maintenance intervals can be adjusted.
- the accessible via the decentralized user terminal lifecycle information of the cabinet should only after authorized entry of the
- Control cabinet identification with password protection for visualization and adaptation of the information stored in the archive database A to G can be retrieved.
- Life cycle information of the cabinet should be regulated according to a user profile and a corresponding access management so that each user group is provided only the information of interest.
- the user profile of the manufacturer may include all available information about the
- Control cabinet equipment included the user of the control cabinet can be limited by a customized user profile in accessing the relevant operating data, while a programmer of programmable logic controllers
- each module for unambiguous identification is provided with an individual identifier which, for example, from its
- Serial number can be derived.
- This individual identifier can for example be attached to the installation module as a QR code or the like.
- the decentralized user terminal may include a QR code scanner.
- the user terminal is preferably as a mobile computer with display and
- Input keyboard formed. Via common data communication channels, for example by mobile, a data connection to the central server with the hereby
- test and archive contained in the archive database should be selected from the test and archive contained in the archive database.
- This image documentation file can for example consist of a photograph of the control cabinet layout at the respective event time, which is added for documentation purposes in the record of the archive database. In this sense, any change in the cabinet layout after a repair or maintenance in addition image technically
- the at least the information A to D contained documentation is stored in the central archive database.
- this could be stored in the sense of a backup on a shielded stored in the control panel disk.
- a storage of changes in the central archive database is preferably connected to an update of the backup, which from the central server A change assistance system should be enforced to ensure consistent multilocal electronic documentation.
- Fig. 1 is a schematic block diagram representation of a system for detection
- FIG. 2 is a schematic flow diagram of a method for acquiring and processing lifecycle information, which is performed in the system of FIG. 1.
- a system for recording and processing life-cycle information via a switchgear cabinet 1 of an industrial installation essentially a documentation server 2, which is placed centrally from the switchgear cabinet 1 and the life cycle information of a plurality covered by control cabinets and processed.
- This lifecycle information is stored in prepared form in an archive database 3 assigned to the documentation server 2.
- the documentation server 2 extracts, based on a planned construction 4 of the control cabinet 1, which was created in the planning phase of the control cabinet 1,
- Datasheet information A of the individual installation modules 9a to installed in the control cabinet 1 9c may be, for example, programmable logic controllers, input / output modules, electrical terminal strips or the like.
- Documentation server 2 links this data sheet information A with
- Function information B to store them under an individual control cabinet identifier 8 in records in the archive database 3.
- the function information B includes information regarding the purpose of each installation module 9a to 9c, which may include, for example, that a particular programmable logic controller controls operation cycles of a pump.
- an installer has a decentralized user terminal 5, which is designed here as a laptop with data transmission interface. Via the data transmission interface, for example mobile phone, the installer is able to retrieve information about the control cabinet 1 from the documentation server 2 and further data under the individual control cabinet identifier 8 of the
- the installer performs prior to commissioning of the cabinet 1 required test and acceptance measures on the cabinet 1 and adds the resulting test and acceptance information C of the cabinet 1 of the archive database 3.
- the installer previously accesses the data sheet information A of the individual mounting modules 4a to 4c. For example, it may be noted here with which test voltage a prescribed test is to be carried out.
- the Documentation Server 2 supports the installer as part of the commissioning preparatory work by the necessary test and
- Acceptance information C are detected gapless and the documentation server 2 only then over the decentralized user terminal 5 a commissioning release for the
- Switching cabinet 1 triggers when all the necessary test and acceptance information C in the Archive database 3 are recorded. It can be provided that a first commissioning of the cabinet 1 can be triggered only via the decentralized user terminal 5, for example, by an initial power-on control instruction to the
- Control cabinet 1 is output.
- the decentralized user terminal 5 can have an NFC communication interface for the control cabinet 1.
- the decentralized user terminal 5 of this exemplary embodiment is equipped with a QR code scanner 7 with which a QR code attached to the control cabinet 1 can be identified as unique
- Switch cabinet identifier is read. After reading in the individual control cabinet identifier 8 of the control cabinet 1, fever cycle information of the control cabinet 1 processed there via the decentralized user terminal 5 in remote access to the documentation server 2 can be retrieved and further fever cycle information can be added to the archive database 3 in the reverse direction.
- the QR code scanner 7 in this embodiment can also be used for reading in also formed as a QR code individual identifiers of the individual installation modules 9a to 9c to an identification in the context of
- the records of the archive database 3 include a reference to the control cabinet 1 underlying three-dimensional planned construction 4, so that the decentralized user terminal 5 can also be accessed in addition to stored in a CAD database 11 design information H for the control cabinet equipment.
- FIG. 2 illustrates individual method steps for the detection and processing of
- a test loop is used to check whether all the necessary test and acceptance information C is available for the control cabinet. As long as this necessary information is not available, the system waits for the completion of the test and acceptance information C. If the necessary test and acceptance information C for the control cabinet equipment is available, then a
- This commissioning information D may include, for example, the date and time of commissioning and the name of the installer performing the commissioning for documentation purposes.
- Event IV identifies maintenance or repair events that limit or interrupt the normal operation of the cabinet.
- a maintenance can
- an exchange of calibrated measuring instruments such as electricity meters include, and pertinent maintenance information E is added to the archive database.
- a repair measure of a defective built-in module is detected by a related repair information F and added to the archive database.
- This repair information F for example, the identifier of a comprise replaced module, which is replaced by the new identifier of the replacement device.
- the date of the repair and the responsible installer are logged.
- the dynamic documentation of the life cycle information of the control cabinet supports a repair process in that by resorting to
- Data Sheet Information A or Design Information H can decide whether to perform an on-site repair X or in a local workshop Y.
- Caching of this information is temporarily in a buffer of the cabinet and the next time the cache is read by a
- User terminal can be a transfer to the archive database.
- the key identifier represents the unique identifier 8 of the cabinet.
- This key identifier can be implemented, for example, by a number code.
- the record is given an identifier each in the
- test and validation information B are added via the cabinet to the record.
- Maintenance information E generated in the later lifecycle, repair information F and fault information G complete the data format of the dynamic documentation over the life cycle of the control cabinet.
- Acceptance information C, the commissioning information D and maintenance and repair information E / F can be supplemented with image documentation files 12, which, for example, a created at this time layout photo of
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Automation & Control Theory (AREA)
- Quality & Reliability (AREA)
- Manufacturing & Machinery (AREA)
- Databases & Information Systems (AREA)
- Business, Economics & Management (AREA)
- Geometry (AREA)
- Data Mining & Analysis (AREA)
- General Business, Economics & Management (AREA)
- Mathematical Optimization (AREA)
- Computational Mathematics (AREA)
- Evolutionary Computation (AREA)
- Computer Hardware Design (AREA)
- Pure & Applied Mathematics (AREA)
- Mathematical Analysis (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Educational Administration (AREA)
- Library & Information Science (AREA)
- Tourism & Hospitality (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Marketing (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
- Testing And Monitoring For Control Systems (AREA)
Abstract
Description
Claims
Priority Applications (8)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| BR112020021339-0A BR112020021339B1 (pt) | 2018-04-20 | 2019-04-17 | Método e sistema auxiliado por computador para processamento de informações de ciclo de vida sobre um quadro de distribuição de uma planta industrial, portadora de dados localizada em um quadro de distribuição e meio legível por computador |
| CA3095546A CA3095546C (en) | 2018-04-20 | 2019-04-17 | Method and computer-aided system for detecting life cycle information about a switchgear cabinet of an industrial installation |
| US17/049,009 US11740616B2 (en) | 2018-04-20 | 2019-04-17 | Method and computer-aided system for detecting life cycle information about a switchgear cabinet of an industrial installation |
| CN201980027130.5A CN112005178B (zh) | 2018-04-20 | 2019-04-17 | 检测与工业装置开关柜相关的生命周期信息的方法和计算机辅助系统 |
| JP2021506056A JP7112587B2 (ja) | 2018-04-20 | 2019-04-17 | 工業プラントのスイッチキャビネットに関するライフサイクル情報を処理する方法及びコンピュータ支援システム |
| MX2020011055A MX2020011055A (es) | 2018-04-20 | 2019-04-17 | Metodo y sistema asistido por computadora para el procesamiento de la informacion del ciclo de vida de un gabinete de distribucion de una planta industrial. |
| IL278127A IL278127B2 (en) | 2018-04-20 | 2019-04-17 | Method and computer-aided system for detecting life cycle information about a switchgear cabinet of an industrial installation |
| RU2020137844A RU2752025C1 (ru) | 2018-04-20 | 2019-04-17 | Способ и компьютеризованная система обработки информации эксплуатационного цикла распределительного шкафа промышленной установки |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP18168446.5A EP3557352B1 (de) | 2018-04-20 | 2018-04-20 | Verfahren und computergestütztes system zur erfassung von lebenszyklusinformationen über einen schaltschrank einer industriellen anlage |
| EP18168446.5 | 2018-04-20 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2019202026A1 true WO2019202026A1 (de) | 2019-10-24 |
Family
ID=62046678
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/EP2019/059984 Ceased WO2019202026A1 (de) | 2018-04-20 | 2019-04-17 | Verfahren und computergestütztes system zur erfassung von lebenszyklusinformationen über einen schaltschrank einer industriellen anlage |
Country Status (11)
| Country | Link |
|---|---|
| US (1) | US11740616B2 (de) |
| EP (1) | EP3557352B1 (de) |
| JP (1) | JP7112587B2 (de) |
| CN (1) | CN112005178B (de) |
| CA (1) | CA3095546C (de) |
| ES (1) | ES2858322T3 (de) |
| IL (1) | IL278127B2 (de) |
| MX (1) | MX2020011055A (de) |
| PL (1) | PL3557352T3 (de) |
| RU (1) | RU2752025C1 (de) |
| WO (1) | WO2019202026A1 (de) |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111274588A (zh) * | 2019-11-06 | 2020-06-12 | 苏州朗威电子机械股份有限公司 | 一种面向sr整机柜自动化配置机柜套餐的方法 |
| CN112153064B (zh) * | 2020-09-28 | 2022-11-22 | 上海缓存命中科技有限公司 | 应用商店及其使用方法 |
| EP4071564A1 (de) | 2021-04-08 | 2022-10-12 | Viessmann Climate Solutions SE | Verfahren und system zur inbetriebnahme eines hlk-systems |
| CN114184229B (zh) * | 2021-11-30 | 2022-09-13 | 山东汇能电气有限公司 | 一种开关柜运行环境监测系统 |
| CN116865932B (zh) * | 2023-09-04 | 2023-12-05 | 国网江苏省电力有限公司无锡供电分公司 | 一种用于变电站基建的临时开关箱系统及其监控方法 |
| CN119622839B (zh) * | 2024-11-22 | 2025-07-08 | 山东中医药大学第二附属医院(山东省中西医结合医院) | 档案数据储存系统及硬盘储存装置 |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0637029A2 (de) * | 1993-07-23 | 1995-02-01 | Weidmüller Interface GmbH & Co. | Einrichtung mit Selbstauskunft und Verfahren zu deren Herstellung |
| DE10116539B4 (de) | 2000-08-22 | 2004-02-26 | Siemens Ag | System und ein Verfahren zur automatischen Datenaufbereitung insbesondere im Umfeld Produktion, Montage, Service oder Wartung |
| WO2010054143A1 (en) * | 2008-11-07 | 2010-05-14 | Abb Technology Ag | Switchgear data system |
| WO2011154212A1 (de) * | 2010-06-10 | 2011-12-15 | Endress+Hauser Process Solutions Ag | Verfahren zur inbetriebnahme, zum betreiben, zum warten und/oder bedienen von feldgeräten |
| DE102013102635A1 (de) * | 2013-03-14 | 2014-09-18 | Stego-Holding Gmbh | Netzwerksystem und Verfahren zum Aufrufen und Darstellen von Netzwerkinformationen bezüglich einer Mehrzahl von Netzwerkkomponenten |
| EP3229175A1 (de) * | 2016-04-08 | 2017-10-11 | Abb Ag | Computersystem und verfahren zur erzeugung von eingabedaten zur gebäudeautomationskonfiguration aus schrankbildern |
Family Cites Families (20)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH06203040A (ja) * | 1992-12-28 | 1994-07-22 | Honda Motor Co Ltd | 製造経歴管理システム |
| JP3307701B2 (ja) * | 1992-12-28 | 2002-07-24 | 本田技研工業株式会社 | 製造経歴管理システム |
| US6868370B1 (en) * | 1999-05-17 | 2005-03-15 | General Electric Company | Methods and apparatus for system and device design |
| US6965855B1 (en) * | 1999-05-17 | 2005-11-15 | General Electric Company | Methods and apparatus for system and device design and control |
| DE102005002314A1 (de) * | 2005-01-17 | 2006-07-27 | Rittal Gmbh & Co. Kg | Schaltschranksteuerungs- und Überwachungssystem |
| WO2008007160A2 (en) * | 2006-07-11 | 2008-01-17 | Abb Research Ltd. | A life cycle management system for intelligent electronic devices |
| US8630819B2 (en) * | 2008-02-18 | 2014-01-14 | The Boeing Company | System and method for electronic inspection and record creation of assembly, repair and maintenance operations |
| WO2012047756A1 (en) * | 2010-10-04 | 2012-04-12 | Avocent | System and method for monitoring and managing data center resources incorporating a common data model repository |
| DE102011082415A1 (de) * | 2011-09-09 | 2013-03-14 | Siemens Aktiengesellschaft | Technisches Gerät und System zum Bereitstellen von technischen Informationen für ein technisches Gerät |
| US9471819B2 (en) * | 2012-05-29 | 2016-10-18 | Echorfid Llc. | System and method for quality control, inspection and audit of utility assets |
| US9158863B2 (en) * | 2012-12-12 | 2015-10-13 | Imagine Communications Corp. | Data acquisition |
| CN104536960A (zh) * | 2014-10-21 | 2015-04-22 | 深圳供电局有限公司 | 一种开关柜智能监测及专家诊断系统 |
| JP6272249B2 (ja) * | 2015-02-09 | 2018-01-31 | 株式会社日立製作所 | 組立ナビゲーションシステム及び組立ナビゲーション方法 |
| US20160282859A1 (en) * | 2015-03-27 | 2016-09-29 | Rockwell Automation Technologies, Inc. | Systems and methods for maintaining equipment in an industrial automation environment |
| US10387669B1 (en) * | 2015-09-17 | 2019-08-20 | Nextlabs, Inc. | Protecting documents with centralized and discretionary policies |
| US10007579B2 (en) * | 2016-03-11 | 2018-06-26 | Microsoft Technology Licensing, Llc | Memory backup management in computing systems |
| DE102016107560B4 (de) * | 2016-04-22 | 2024-09-26 | Festo Se & Co. Kg | Lebenszyklus-Managementsystem für Anlagenkomponenten |
| US20170351226A1 (en) * | 2016-06-01 | 2017-12-07 | Rockwell Automation Technologies, Inc. | Industrial machine diagnosis and maintenance using a cloud platform |
| KR102365292B1 (ko) * | 2017-03-01 | 2022-02-22 | 조인트-스톡 컴퍼니 에이에스이 엔지니어링 컴퍼니 | 복잡한 엔지니어링 객체의 수명주기를 관리하는 방법 및 그 구현을 위한 시스템 |
| JP2017194952A (ja) * | 2017-03-13 | 2017-10-26 | 株式会社スタディスト | 電子マニュアルベースの作業ログ管理を行うためのプログラム、サーバおよびシステム |
-
2018
- 2018-04-20 EP EP18168446.5A patent/EP3557352B1/de active Active
- 2018-04-20 ES ES18168446T patent/ES2858322T3/es active Active
- 2018-04-20 PL PL18168446T patent/PL3557352T3/pl unknown
-
2019
- 2019-04-17 JP JP2021506056A patent/JP7112587B2/ja active Active
- 2019-04-17 MX MX2020011055A patent/MX2020011055A/es unknown
- 2019-04-17 RU RU2020137844A patent/RU2752025C1/ru active
- 2019-04-17 WO PCT/EP2019/059984 patent/WO2019202026A1/de not_active Ceased
- 2019-04-17 IL IL278127A patent/IL278127B2/en unknown
- 2019-04-17 CA CA3095546A patent/CA3095546C/en active Active
- 2019-04-17 US US17/049,009 patent/US11740616B2/en active Active
- 2019-04-17 CN CN201980027130.5A patent/CN112005178B/zh active Active
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0637029A2 (de) * | 1993-07-23 | 1995-02-01 | Weidmüller Interface GmbH & Co. | Einrichtung mit Selbstauskunft und Verfahren zu deren Herstellung |
| DE10116539B4 (de) | 2000-08-22 | 2004-02-26 | Siemens Ag | System und ein Verfahren zur automatischen Datenaufbereitung insbesondere im Umfeld Produktion, Montage, Service oder Wartung |
| WO2010054143A1 (en) * | 2008-11-07 | 2010-05-14 | Abb Technology Ag | Switchgear data system |
| WO2011154212A1 (de) * | 2010-06-10 | 2011-12-15 | Endress+Hauser Process Solutions Ag | Verfahren zur inbetriebnahme, zum betreiben, zum warten und/oder bedienen von feldgeräten |
| DE102013102635A1 (de) * | 2013-03-14 | 2014-09-18 | Stego-Holding Gmbh | Netzwerksystem und Verfahren zum Aufrufen und Darstellen von Netzwerkinformationen bezüglich einer Mehrzahl von Netzwerkkomponenten |
| EP3229175A1 (de) * | 2016-04-08 | 2017-10-11 | Abb Ag | Computersystem und verfahren zur erzeugung von eingabedaten zur gebäudeautomationskonfiguration aus schrankbildern |
Non-Patent Citations (1)
| Title |
|---|
| BIRGIT ADAM: "Inbetriebnahmeprotokoll", FÜR FACHKRÄFTE DER ELEKTROTECHNIK UND ELEKTROSICHERHEIT, 14 February 2018 (2018-02-14), pages 1 - 3, XP055521389, Retrieved from the Internet <URL:https://www.elektrofachkraft.de/pruefung/inbetriebnahmeprotokoll> [retrieved on 20181106] * |
Also Published As
| Publication number | Publication date |
|---|---|
| EP3557352B1 (de) | 2020-12-02 |
| IL278127B1 (en) | 2024-08-01 |
| CA3095546C (en) | 2024-04-30 |
| CA3095546A1 (en) | 2019-10-24 |
| IL278127A (en) | 2020-11-30 |
| CN112005178A (zh) | 2020-11-27 |
| BR112020021339A2 (pt) | 2021-01-19 |
| ES2858322T3 (es) | 2021-09-30 |
| CN112005178B (zh) | 2023-12-12 |
| US11740616B2 (en) | 2023-08-29 |
| MX2020011055A (es) | 2020-11-24 |
| EP3557352A1 (de) | 2019-10-23 |
| JP7112587B2 (ja) | 2022-08-03 |
| RU2752025C1 (ru) | 2021-07-22 |
| US20210271231A1 (en) | 2021-09-02 |
| IL278127B2 (en) | 2024-12-01 |
| JP2021522626A (ja) | 2021-08-30 |
| PL3557352T3 (pl) | 2021-06-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2019202026A1 (de) | Verfahren und computergestütztes system zur erfassung von lebenszyklusinformationen über einen schaltschrank einer industriellen anlage | |
| EP3070556B1 (de) | Verfahren, recheneinrichtung, benutzer-einheit und system zum parametrieren eines elektrischen gerätes | |
| EP4345556B1 (de) | Verfahren für eine computer-gestützte installation von räumlich dezentral angeordneten komponenten einer maschine | |
| EP3605758B1 (de) | Einrichtung und verfahren zum prüfen eines schaltschrankinhalts nach planungsbasierter montage | |
| EP1233317B1 (de) | Vorrichtung und Verfahren zur Erstellung von Bedienungskomponenten | |
| DE102007043769B4 (de) | Gerät, Verfahren zur Adressierung, Umrichter und Verfahren zur sicheren Datenübertragung | |
| DE102007013324A1 (de) | Verfahren zur Erfassung wenigstens eines Bestandteils einer medizintechnischen Anlage sowie zugehörige medizintechnische Anlage | |
| EP3557454B1 (de) | Verfahren und system zur optimierbaren konfiguration eines schaltschranks | |
| DE10201021A1 (de) | Verfahren zum Instandhalten einer Fabrikationsanlage | |
| DE102009049931B4 (de) | Diagnose- und Wartungseinrichtung für eine Schaltanlage sowie demgemäße Schaltanlage | |
| EP4432034B1 (de) | Verfahren und system zur erkennung einer konfiguration einer modularen sicherheitssteuerung | |
| EP1854055A1 (de) | Engineeringsystem | |
| DE10254080B4 (de) | Verfahren zur Datenspeicherung und Vorrichtung | |
| EP2093639B1 (de) | Verfahren zur Inbetriebnahme einer Numerischen Steuerung | |
| EP4616356A1 (de) | Verfahren für eine computer-gestützte prüfung eines installationselements für eine installationsumgebung | |
| DE102023212389B3 (de) | Ladevorrichtung zum Laden eines elektrisch angetriebenen Fahrzeugs | |
| WO2014183793A1 (de) | Verfahren und vorrichtung zum betreiben einer prozess- und/oder fertigungsanlage | |
| WO2019101999A1 (de) | Verfahren zum ermitteln eines zustands einer von mehreren maschinenkomponenten einer maschine und zustandsermittlungssystem | |
| WO2024068458A1 (de) | Verfahren für eine computer-gestützte installation von räumlich dezentral angeordneten, elektrischen komponenten einer maschine | |
| DE102017219864A1 (de) | Verfahren zur Diagnose wenigstens einer Automatisierungsanlage und System | |
| BR112020021339B1 (pt) | Método e sistema auxiliado por computador para processamento de informações de ciclo de vida sobre um quadro de distribuição de uma planta industrial, portadora de dados localizada em um quadro de distribuição e meio legível por computador | |
| WO2024068899A1 (de) | Verfahren zur computer-gestützten bereitstellung einer anpassungsspezifikation für eine elektrotechnische installationstechnik | |
| DE202006017554U1 (de) | Vakuumpumpe | |
| EP2839348A1 (de) | Verfahren zum konfigurieren eines automatisierungssystems | |
| EP2515261A1 (de) | Dokumentationssystem für eine Anlage und Verfahren zu dessen Betrieb |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 19717336 Country of ref document: EP Kind code of ref document: A1 |
|
| DPE1 | Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101) | ||
| ENP | Entry into the national phase |
Ref document number: 3095546 Country of ref document: CA |
|
| ENP | Entry into the national phase |
Ref document number: 2021506056 Country of ref document: JP Kind code of ref document: A |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: 112020021339 Country of ref document: BR |
|
| ENP | Entry into the national phase |
Ref document number: 112020021339 Country of ref document: BR Kind code of ref document: A2 Effective date: 20201019 |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 19717336 Country of ref document: EP Kind code of ref document: A1 |