WO2019187169A1 - 真空圧密浚渫工法とタワー式気密載荷函体及び専用作業船 - Google Patents
真空圧密浚渫工法とタワー式気密載荷函体及び専用作業船 Download PDFInfo
- Publication number
- WO2019187169A1 WO2019187169A1 PCT/JP2018/014036 JP2018014036W WO2019187169A1 WO 2019187169 A1 WO2019187169 A1 WO 2019187169A1 JP 2018014036 W JP2018014036 W JP 2018014036W WO 2019187169 A1 WO2019187169 A1 WO 2019187169A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- consolidation
- vacuum
- box
- soil
- tower
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/10—Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
Definitions
- the present invention relates to the use of the seabed, riverbed, lake bottom ground for vacuum consolidation, dredging, and consolidation of dredged soil in landfills, seabed embankments, etc., for deepening and maintaining the depth of ships' routes and anchorage.
- Sediment that accumulates in the estuary of large rivers is often soft soil with a high moisture content.
- sediments in the waters of harbors with large cities behind them become super soft soils due to the accumulation of organic matter due to the inflow of domestic wastewater and industrial wastewater.
- the characteristic of soft soil is that the moisture content is very large.
- the moisture content becomes as large as 200%, and the surface layer portion reaches 400%.
- the surface layer is called floating mud and is a fluid viscous soil with extremely low density.
- the water content at the liquid limit is at most about 100%.
- Soft soil with a water content ratio exceeding the liquid limit does not form and is a fluid, viscous soil.
- the vacuum consolidation method has been widely used in the past as a land improvement method on land, but it is also being used for the submarine ground.
- the characteristics of the vacuum consolidation method for submarine ground are to maintain the airtightness of the loaded ground surface in some way and use atmospheric pressure and water pressure for the loaded load.
- the environmental aspect of this construction method is that the strength of the seabed soil can be increased and the volume reduced by consolidation settlement without causing water pollution in situ. If the water depth of the channel is secured only by consolidation settlement, the water depth maintenance method will not cause dredging.
- Patent Document 1 relates to the ground improvement method by vacuum consolidation of the seabed ground, and was developed mainly as a countermeasure for residual settlement of the viscous ground in port facilities. Therefore, there is no dredging process in this method.
- a major feature of this construction method is that a repeated load that is a dynamic load (about 5% of the static load) is used in combination with an atmospheric pressure and a water pressure that are static loads of vacuum consolidation. As a result, the pressure fluctuation is transmitted to the seabed ground, and the wave of excess pore water pressure is generated to realize the rapid consolidation settlement.
- Patent Document 2 is a development of the ground improvement method and the dredging method by vacuum consolidation of Patent Document 1 as a series of methods. There are two major features of Patent Document 2. The first function is to hold the dredged material by opening and closing the bottom of the airtight loading box that realizes dredging with a bottom plate shutter. The second is a mobile spud function that allows a dedicated work ship to move by itself.
- Patent Document 3 is a further advancement of the method of Patent Document 2.
- the hermetic loading box of Patent Document 3 does not use a bottom plate shutter, and holds the clay at the bottom opening. In this method, the moisture content of the padding soil is consolidated to a level below the liquid limit so that the strength can be increased.
- the second is the development of a device for extruding the middle soil of the airtight loading box of Patent Document 3.
- extrusion devices There are two types of extrusion devices: a method in which a movable water-permeable lid that moves up and down in a compartment is pushed with compressed air, and a movable lid driving device.
- the third is a unit panel drain system that counteracts mud consolidation and drain clogging.
- a construction method in which the vacuum consolidation method using the air-tight loading box with the bottom opening and the dredging method are referred to as a vacuum consolidation method.
- This method is a vacuum-consolidated dredging method for submarine soil such as submarine soil, river bottom soil, and lake bottom soil.
- this airtight loading device is set on the seabed or the like, airtightness is ensured.
- the seabed soil etc. will be in the packing state of an airtight loading box. That is, the airtight loading box having the bottom opening has a function as a loading device such as seabed soil and a filling device.
- the filling device is a device that holds and holds the clay.
- the undersea soil in the middle filling state is referred to as middle filling soil.
- the vacuum-consolidated dredging method is a method intended to reduce the generation of dredged soil and improve the minimum necessary dredging at the original seabed, etc. using dredged soil as landfill and fill material.
- the soil to be dredged is an ultra-soft soil with a water content ratio that greatly exceeds the water content limit of the liquid limit, it is even more necessary to improve in-situ dewatering by consolidation. Note that dredging when the target soil is sandy soil is extremely easy even with the box having a bottom opening. It does not require a bottom surface because the friction of the surrounding surface of the sandy soil in the airtight loading box increases due to vibration compaction. The following explanation will focus on cohesive soil.
- the basic structure of the tower-type airtight loading box used in the vacuum consolidation method is to partition the interior ceiling space with a permeable plate to form a ceiling vacuum tank.
- the lower space of the water permeable plate is divided by a partition wall having a drain function to form a compartment.
- the roof vacuum tank for installing the device and the box tower are integrated in the center of the outer surface of the box.
- the function of the water permeable plate is the function of allowing water to pass but not allowing soil particles to pass through, similar to the drain function.
- a ceiling vacuum tank is referred to as a vacuum tank layer
- a roof vacuum tank is referred to as a vacuum tank chamber
- a water permeable plate is referred to as a water permeable lid.
- the common work process of the vacuum consolidation dredging method is divided into an installation process for setting an airtight loading box on the seabed, etc., followed by a consolidation process, a dredging process, and a transporting process for clay.
- the dredging process is a process of lifting the padded soil carried by the box from the seabed and extruding it from the box. This lifting is called loading of dredged soil, and pushing out (extracting) paddy soil is called unloading of dredged soil.
- the basics of the vacuum consolidation method using an airtight loading box with a bottom opening is to make the target seabed soil (viscous soil) a water content ratio below the liquid limit. Mud is the most troublesome. The cause is that the compaction time is extremely long and the clogging of the drain is inevitable. However, these issues are common to submarine soils that exceed the liquid limit.
- the vacuum consolidation dredging method disclosed in Patent Document 3 is a method that also targets floating mud. However, the vacuum consolidation method of Patent Document 3 leaves room for further improvement and progress toward shortening the consolidation time.
- the vacuum consolidation dredging method reduces the generation of dredged soil due to consolidation settlement, but increases the strength of the filling soil and increases the adhesion strength of the box bulkhead, and compressing air and vibration, or a combination of these, removes the filling soil. It was impossible to extrude from the airtight box. Compressed air can pass through the water-permeable lid (plate), but a great resistance occurs. That is, compressed air passing through the fixed water-permeable lid halves the force for pushing out the padded seabed soil. Moreover, a fixed water-permeable lid will be damaged if extremely strong compressed air is continued.
- the water-permeable lid of Patent Document 3 incorporates the interior of the compartment as upper and lower movable water-permeable lids.
- the push-out (push-out) method with the movable water-permeable lid is adopted for the push-out of the padded seabed soil.
- the pressing force is compressed air or a movable lid drive.
- the movable water-permeable lid needs to be kept down and pushed down. If it tilts even a little, it cannot be pushed down. When a large pressing force is required, it is difficult to keep the movable water-permeable lid horizontal with compressed air. Therefore, a reliable movable lid driving device is used.
- Patent Document 3 The explanation of Patent Document 3 in the previous paragraph is only the extrusion of the padded seabed soil, and there is no countermeasure against clogging such as drainage in the consolidation process. It is the unit panel drain system of Patent Document 3 that has taken both measures. In this system, the unit panel drain intermittently moves between the compartment and the ceiling vacuum tank, and when the drain is in the compartment, consolidation of the padded submarine soil proceeds, and when the drain moves, the compartment is compacted. This is a system that repeatedly removes the padded seabed soil adhering to the drain by increasing the density and cleaning the drain surface in the ceiling vacuum tank. However, this system requires a large amount of unit panel drain driving devices, and is not convenient. The same thing applies to the movable lid driving device that lacks simplicity.
- Problem 1 is that there is a risk of failure of the device due to lack of simplicity in measures against clogging of the drainage of the water-permeable lid and box bulkhead in the consolidation process of Patent Document 3 and extrusion of the padded seabed soil.
- Problem 2 is a problem of consolidation time of submarine soil with high water content.
- the seabed soil with a high water content has a longer consolidation time. This is also closely related to issue 1.
- the water permeable plate and the drain material are materials that allow water to pass but not soil particles. These are more clogged as the amount of waste water mixed with fine soil particles increases.
- the floating mud is a fluid mud with an ultra-high water content. Such floating mud has a very long compaction time and clogging is remarkable.
- the basis for shortening the consolidation time is to reduce the drainage distance. In the case of the unit panel drain system of Patent Document 3, the interval between the panel drains is reduced, but there is a limit.
- a powerful method for shortening the consolidation time is a rapid consolidation method using a combination of static load and dynamic load in addition to reducing the consolidation drainage distance.
- the filling of the airtight loading box subjected to vacuum consolidation is compacted so that the isotropic stress increases after the K0 stress state in which only the vertical one-dimensional direction undergoes consolidation deformation.
- the characteristics of consolidation of clay with a super moisture content such as floating mud is that consolidation of several millimeters progresses in ten or more seconds.
- due to clogging the subsequent consolidation speed is extremely slowed down. Therefore, the stress state of the clay with a super moisture content is only the K0 consolidated state.
- the vibration in the vertical direction cannot be expected as the horizontal dynamic load of consolidation due to the vibration in the horizontal direction only by the pressure fluctuation.
- Problem 3 is that the vibration device of Patent Document 3 cannot cope with seabed soil having a high water content.
- the vibration device is used both vertically and horizontally. It is necessary to have a device configuration with a clear purpose.
- the tower-type airtight loading box of the vacuum consolidation dredging method is equipped on a dedicated work ship.
- Large-scale vacuum-consolidated dredging work vessels do not have the structural form of transshipment to clay vessels because they carry dredged materials themselves. This is intended for undersea embankment, because it was necessary for the embankment to carry and embankment.
- the transshipment structure type may become extremely large in size of the device and the dedicated work ship. Problem 4 is that this dredging method is convenient for submarine embankment, but is not suitable for landing on land.
- the means for solving the problem 1 relating to the clogging of the drain and the extrusion of the filling soil further develops the pneumatic control system.
- the means for solving the problem 1 by the airtight loading box is an apparatus of a pneumatic control system equipped with the box.
- the ceiling space inside is partitioned by a fixed water permeable plate to form a ceiling vacuum tank.
- the lower space of the permeable plate is divided by a box partition having a drain function to form a compartment. Up to this point, it is basically the same as the conventional airtight loading box.
- the ceiling vacuum tank is connected to a pressurization device (air compression device) and a decompression device (vacuum device) by an air duct, and the compartment is a circuit network-like compressed air discharge pipe arranged directly or directly under the water permeable plate.
- An air duct is connected to a pressurizing device via an air duct to construct an air pressure control system including the two devices and three air paths.
- the solution of Problem 1 by the construction method is performed by the pneumatic control system of the consolidation process and the dredging process, and the basic work is as follows.
- the start of the consolidation process closes the two pressurized air paths and opens the decompression air path of the ceiling vacuum tank, and advances the vacuum consolidation with the ceiling vacuum tank and the compartment as negative pressure.
- the work procedure of the means for solving the clogging problem 1 is as follows. First, the air path state at the time of vacuum compaction is set, and the compartment is brought into a negative pressure state through the drainage of the ceiling vacuum tank, the water permeable plate and the box partition. Thus, the filling soil is in a state of being sucked by the permeable plate and the box partition. That is, the boundary surface between the water permeable plate and the box partition and the filling soil is a suction surface. Then, the ceiling vacuum tank is instantaneously changed from the negative pressure state to the positive pressure state by closing the pressure reducing air path of the ceiling vacuum tank and simultaneously opening the pressure air path of the ceiling vacuum tank. Thereby, two phenomena advance continuously.
- the boundary surface instantaneously reverses and transitions from the suction surface to the repulsive surface.
- the second phenomenon is that a large pressure difference is created by instantaneously switching the ceiling vacuum tank to a high positive pressure state with respect to the negative pressure state compartment, and an instantaneous short jet stream opposite to that during vacuum consolidation. Will occur.
- the fine clay particles that have entered the drains of the permeable plate and the box partition are discharged to the repulsive surface by the jet air flow, and clogging is eliminated. If the progress of compaction is reduced due to clogging during vacuum compaction, this reverse injection is performed as needed.
- the solving means for shortening the consolidation time in Problem 2 basically advances the vacuum consolidation by repeating the work described in the previous paragraph. Reverse injection is performed when the consolidation speed decreases rapidly. Also promote vacuum consolidation. Repeat this process.
- the work procedure and the phenomenon at that time are as follows.
- the air path at the time of vacuum consolidation is a state in which only the decompression air path of the ceiling vacuum tank is opened.
- the boundary surface at this time is a suction surface, and is a drainage surface of the filling soil. Consolidation proceeds from the drainage surface. Filled soil that has been consolidated is attached to the boundary surface. As the consolidation progresses, the thickness of the padded soil increases. And soon, the consolidation speed drops rapidly.
- the characteristics of consolidation of clay with a super moisture content such as floating mud is that consolidation of several millimeters progresses in ten or more seconds. However, due to clogging, the subsequent consolidation speed is extremely slowed down.
- the thickness of the pre-consolidated floating mud which is a consolidation progress part for 10 seconds with a loading of 200 kN / m 2 is about 4 mm. If the consolidation drainage distance is about 4 mm, the primary consolidation is completed in about 10 seconds.
- the interval inside the bulkhead of the tower-type loading box must be 8 mm. This is not realistic.
- the procedure for pushing out the middle soil of the solution of the problem 1 is the same as the clogging eliminating operation until the boundary surface moves from the suction surface to the repulsive surface.
- the depressurized air path of the ceiling vacuum tank is closed and simultaneously the pressurized air path of the vacuum tank is opened, so that the boundary surface is instantaneously shifted from the suction surface to the repulsive surface. This is to cut the adhesion strength between the padding soil, the water permeable plate and the box partition.
- the pressurized air path of the ceiling vacuum tank is open.
- the pressurized air path of the compartment is opened, and the pressure in the ceiling vacuum tank and the compartment is increased while pushing the balance so that both surfaces of the water-permeable plate have the same pressure, thereby pushing out the padded seabed soil.
- the purpose of balancing the pressure is to prevent damage to the water permeable plate.
- the air path for pressurizing the compartment is via a compressed air discharge pipe. This is to uniformly pressurize the surfaces of the water-permeable board and the filling soil.
- a wet density measuring device such as a fluid undersea soil is installed immediately below a water permeable plate which is a surface layer position of filling soil.
- the wet density and specific gravity of fluid submarine soil and the like are determined by automatically measuring the buoyancy of a sealed measuring container having a fixed volume with a load cell.
- the wet density of the surface layer of the middle soil is measured in a state where the tower type airtight loading box with the measuring device is installed on the seabed or the like. And if this fluid filling is below a regulation value, it will discharge
- the solution of the vibration device corresponding to the submarine soil having a high water content ratio in Problem 3 is to have a separate vertical vibration device and a horizontal vibration device and to clarify the purpose of each.
- This is related to a pneumatic reversal compaction system. It is the peeling of the pre-consolidated paddy soil adhering to the box bulkhead by reverse injection of the system. In the case of floating mud, even if it peels off, it may not come off.
- the horizontal vibration device causes a horizontal elastic vibration in the box bulkhead of the hermetic loading box and creates a new fluid-like unconsolidated between the surface of the box bulkhead and the already-packed padding. Pull the padding soil and promote adhesion.
- it is important that the horizontal vibration device is accurately orthogonal to the direction of the box bulkhead.
- the solving means by the horizontal and vertical vibration device group of the problem 3 is a combination of two vibration devices in which the horizontal vibration device is installed at the center position of the horizontal surface of the airtight loading box and the directions intersect. .
- the box compartment is composed of two-way box partitions.
- the intersection angle is usually a right angle.
- the reason why the center position of the horizontal plane of the box is used is to prevent rotational motion from being generated by the two vibration devices.
- a plurality of vertical vibration devices were installed at symmetrical positions on the horizontal plane of the box because the horizontal vibration device occupies the center position of the horizontal plane of the box.
- the number of installation is usually four.
- the tower type airtight loading box equipped with the vibration device group described in the previous paragraph is used as the solution of the problem 3 construction method.
- the rapid compaction process causes horizontal elastic vibration of the box bulkhead of the hermetic loading box due to the operation of the horizontal vibration device, thereby promoting the adhesion of new fluid unconsolidated padding to the surface of the box bulkhead.
- the ceiling vacuum tank of the box is placed in a vacuum state so that the atmospheric pressure and water pressure of the static load are vertically loaded on the filled soil and the vertical vibration device is operated to apply a pressure fluctuation to the filled soil. Realize rapid vacuum compaction with dynamic vertical loading.
- the floating mud contains a lot of organic substances in addition to clay particles.
- the cause of the ultra high water content of the floating mud is that they have a negative charge and repel each other and are in a dispersed state. In particular, the charge amount of organic matter is large.
- Such floating mud is difficult to consolidate. Therefore, a rapid compaction is realized by using a flocculant only for the middle seabed soil of the airtight loading box. It should be noted here that the flocculating agent cations are evenly dispersed in the interstitial water of the filling soil. If this is not the case, the effect will be partial.
- a network-like flocculant injection tube having an infinite number of horizontal nozzles is fixedly disposed at the tip of the wall that forms the bottom of the tower-type airtight loading box. And this is connected with the coagulant
- the fact that the flocculant spray tube is in the form of a circuit is intended for spray mixing as uniform as possible.
- the solution of the dredging material transportation method of Problem 4 is that the dedicated work ship of the present invention can carry dredging material on its own, and transships it to the earth carrying ship in consideration of the unloading to land. It was also possible to use a structural form.
- the dedicated work ship of the present invention is a catamaran type work ship, and the catamaran ship is integrated by an upper connecting gate beam and a lower connecting beam.
- This catamaran has a ballast tank inside.
- the space between the catamaran is used as the installation space for the tower-type airtight loading box, and the work space for loading dredged soil is taken into the space.
- the tower-type airtight loading box of the present invention can move in the vertical direction alone but not in the horizontal direction. For this reason, the ship was moved.
- the tower-type airtight loading box can be structured to move horizontally, but this is not a good idea because the catamaran becomes huge and the horizontal moving device becomes large.
- the catamaran can be integrated only with the upper connecting portal beam, but the integrated structure is large and this is not a good idea.
- the draft of the dedicated work ship decreases with the progress of the transshipment work of the dredged soil to the ship, and the draft of the ship increases. As a result, the draft of the ship becomes insufficient. As countermeasures against this, the draft of the ship is secured by pouring water into the ballast tank and lowering the draft of the dedicated work ship.
- the vacuum consolidation method of the present invention uses a tower type airtight loading box equipped with a system for controlling the air pressure of three air paths.
- a system for controlling the air pressure of three air paths With this system, the problem of clogging such as extrusion of drained soil and drain in the dredging process was solved easily.
- the ceiling vacuum tank of the unit panel drain system of Patent Document 3 needs to have the same height as the compartment, but the ceiling vacuum tank of the present invention may have the original minimum necessary height. And it brought about the effect of realizing consolidation and drought in a series of processes with simple equipment and functions with extremely low failure risk.
- the air pressure reversal compaction system has achieved the effect of realizing rapid compaction of floating mud by realizing a compact drainage distance as small as several millimeters.
- Elevated view of tower-type airtight loading box installed on the seabed Elevated view of airtight loading box Elevated view of a dedicated work ship equipped with a tower-type airtight loading box Same side view A top view of the upper connection gate beam Elevated view in the installation process of tower-type airtight loading box of dedicated work ship Elevated view in the same consolidation process Elevated view of lifting of tower type airtight loading box in the same dredging process Elevated view of dredging transshipment process from dedicated work ship to earth transport ship Similarly, side view of dredging transshipment process
- FIG. 1 is an elevational view of the tower-type airtight loading box 1 installed on the sea floor 6.
- FIG. 2 is an elevation view of the airtight loading box 11.
- the tower-type airtight loading box 1 includes an airtight loading box 11 and a box tower 12.
- the hermetic loading box 11 forms a ceiling vacuum tank 111 by partitioning an internal ceiling space by a water permeable plate 112.
- the lower space of the water permeable plate 112 is divided by a box partition 113 having a drain function to form a compartment 114.
- the roof vacuum tank 115 which installs an apparatus and the box tower 12 are united in the center part of the outer upper surface of the said box.
- the size of the airtight loading box 11 has a bottom area of 20 m ⁇ 20 m to 30 m ⁇ 30 m and a height of about 1 m.
- the surface of the box bulkhead 113 is coated with a filter cloth or a metal mesh for filtration on the surface of the box bulkhead 113 with numerous small grooves to be drained in the vertical direction. It is fixed. In other words, it is a drain only for drainage.
- 1a is a decompression device (vacuum device)
- 1b is a drainage device (drainage pump)
- 1c is a pressurization device (compressor)
- 1d is a coagulant pumping device
- 1e1 is A vertical vibration device 1e2 is a horizontal vibration device.
- the vacuum compaction of the tower type airtight loading box 1 and the operation of the apparatus in the dredging are performed by control of two systems of air pressure and water pressure.
- the air pressure is controlled by an air pressure control system including a pressure reducing device 1a, a pressure device 1c, and three air paths.
- the three air paths of the air pressure control system are: the ceiling vacuum tank 111-the air duct 12a of the decompression device-the path of the decompression device (vacuum device) 1a, the ceiling vacuum tank 111-the air duct 12c of the pressurization device-the pressurization device (compressor) 1c, and the passage 114-compressed air discharge pipe 1f-pressurizing device air duct 12c1-pressurizing device (compressor) 1c.
- the drainage path is a path of the ceiling vacuum tank 111-drainage device 1b-drainage water pipe 12b.
- the route of the flocculant is the route of the flocculant pressure feeding device 1d-the pressure feeding tube 12d of the flocculant device-the flocculant injection tube 1g.
- 1h is a wet density measuring device
- 1i is an automatic mud discharging device. 4 is the seabed ground (seabed soil), 5 is the sea surface, and 6 is the seabed.
- FIG. 3 is an elevation view of a dedicated work ship 2 equipped with a tower type airtight loading box 1.
- the dedicated work ship 2 of the present invention is a catamaran type work ship in which two carrier ships 21 are connected.
- the catamaran ship is integrated by an upper connection gate-shaped beam 22 and a lower connection beam 23.
- the catamaran is provided with a ballast tank 25 therein.
- the space sandwiched between the catamaran is used as an installation space for the tower-type airtight loading box 1 and a work space for loading dredged soil by drawing in the earth ship 3.
- Reference numeral 24 denotes a guide tower.
- the box tower 12 of the tower type airtight loading box 1 freely moves up and down in the guide tower 24.
- FIG. 4 is also a side view of the tower type airtight loading box 1 in an example of three stations.
- FIG. 5 is also a plan view.
- FIG. 6 is an elevation view of the tower-type airtight loading box 1 installed in the dedicated work ship 2 in the seabed installation process.
- the submarine soil 4 is brought into a state of filling in the airtight loading box 11 while slightly operating the drainage device 1b.
- the wet density and specific gravity of the outermost surface layer of the seabed soil 4 are automatically measured by the wet density measuring device 1h. If the specific gravity is out of the dredging target, it is discharged directly out of the box 11 by the automatic mud discharger 1i.
- the tower-type airtight loading box 1 equipped with a flocculant injection system is used in the vacuum consolidation method of the present invention as necessary.
- the coagulant spraying operation is performed in parallel with the operation of setting the box on the sea bottom.
- the start of spray mixing is the time when the submarine soil 4 is cut off from seawater in the process of setting the box.
- the lower part of the compartment 114 of the box is submarine soil 4, and the upper part is seawater.
- the box 11 is set while the seawater in the upper part of the compartment 114 is discharged by the drainage device 1b.
- FIG. 7 is also an elevation view in the consolidation process.
- the decompression device 1a and the drainage device 1b are operated to load a static load of atmospheric pressure and water pressure on the medium-filled soil and the seabed soil 4 (seabed ground). If the moisture content of the padded soil is larger than the liquid limit, the strength is reduced by compaction to below the water limit of the liquid limit.
- the vertical vibration device 1e1 is operated in parallel with the static load loading. As a result, in addition to the static load of atmospheric pressure and water pressure, the pressure filling due to the dynamic load of vibration is transmitted to the filling soil to promote rapid consolidation.
- the vacuum consolidation method of the present invention implements a consolidation system with air pressure reversal.
- the consolidation of the medium-filled soil proceeds on five surfaces excluding the bottom surface of the airtight loading box 11. These five surfaces are the boundary surfaces between the filling soil, the water permeable plate 112 and the box partition 113, and serve as drainage surfaces during vacuum consolidation.
- a practical compaction time from the start of vacuum compaction until the compaction speed rapidly decreases is measured, and an air pressure inversion cycle time is set from this.
- the compaction system is operated automatically.
- the air path state at the time of vacuum compaction is such that only the decompression air path of the ceiling vacuum tank 111 is open and the pressurization air path is closed.
- the boundary surface is a suction surface, and consolidation of the padded submarine soil proceeds.
- the air pressure at the boundary surface is reversed.
- the padding soil adhering to the boundary surface is peeled off.
- the boundary surface is replaced with unconsolidated floating mud.
- the compaction system when the air path is returned to the vacuum compaction state, the suction and repulsion of the boundary surface are reversed and the compaction continues.
- ⁇ Efficient efficiency is achieved if the pre-consolidated and unconsolidated sludge are exchanged at a very short time.
- the practical compaction time is extremely short, and the compaction speed decreases rapidly in about 10 seconds.
- the thickness at which consolidation progressed in 10 seconds is about 4 mm.
- the horizontal cross section is 50 cm ⁇ 50 cm and the height is 100 cm.
- a member having no drain function is linearly attached to the portion of the compartment 114 corresponding to the box portion to be separated.
- the corner portion of the compartment 114 and also each surface are attached horizontally and vertically at intervals of 25 cm.
- This attachment material advantageously serves also as an attachment material for fixing a filter cloth or a metal mesh for filtration covering the surface of the box partition 113 having a drain function.
- a powerful method of replacing the pre-consolidated floating mud and the unconsolidated floating mud is elastic vibration of the box partition 113 of the air-tight loading box 11.
- the air pressure reversal compaction system operates the horizontal vibration device 1e2 during its implementation. This applies vibration in accordance with the natural frequency of the box bulkhead 113 and resonates it to force separation of the pre-consolidated floating mud and replacement with the unconsolidated floating mud.
- the box partition 113 is structured to easily cause elastic vibration. For example, it is the structure cut
- the vacuum time for vacuum compaction is 10 seconds
- the pressurization time is 2 seconds for exfoliation of preconsolidated floating mud
- the air pressure is neutral for switching between preconsolidated floating mud and unconsolidated floating mud. If the time is 3 seconds, the cycle time is 15 seconds.
- FIG. 8 is an elevational view of lifting of the tower-type airtight loading box 1 in the dredging process of the tower-type airtight loading box 1 equipped on the dedicated work ship 2. At the time of lifting, the decompression device 1a is in an operating state.
- FIG. 9 is an elevational view of the transshipment process of dredged soil in which the ship carrier 3 is drawn into the dedicated work ship 2.
- the draft of the dedicated work ship 2 decreases with the progress of the transshipment work of dredged soil to the ship 3 and the draft of the ship 3 increases. As a result, the draft of the ship 3 becomes insufficient.
- the draft of the earth ship 3 is secured by pouring water into the ballast tank 25 and lowering the draft of the dedicated work ship 2.
- Fig. 10 is a side view of the dredging transshipment process.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- Agronomy & Crop Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
大規模浚渫工事において、海底地盤の真空圧密工法を発展させて底面開口の箱型の気密載荷函体を使い真空圧密と浚渫を一連の工程で実施する。圧密沈下が進行すれば浚渫土の発生が減少する。反面、圧密過程のドレーンの目詰まり、気密載荷函体からの中詰海底土の押し出しが難しくなる。特に浮泥は圧密時間が長く目詰まりの課題が顕著である。本発明は3つの空気経路から構成される空圧制御システムによってドレーンの目詰まり、中詰海底土の押し出しの課題を簡便に解消した。また、気密載荷函体の圧密排水面(境界面)の吸引,斥力反転の圧密システムにより、浮泥の急速圧密を実現した。
Description
本発明は船舶の航路・泊地の増深・水深維持における海底,河底,湖底地盤の真空圧密,浚渫そして圧密した浚渫土を埋立,海底盛土等の材料に再使用に関する。
大きな河川の河口の水域に堆積する土砂は、含水比が大きい軟弱土であることが多い。特に背後に大都市を持つ港湾の水域の堆積土は,生活廃水や工業排水の流入で有機物を多く含んで堆積して超軟弱土となる。軟弱土の特徴は含水比が非常に大きいことであるが、有機物が含むとその含水比は200%と非常に大きくなり、表層部は400%にも及ぶ。表層部は浮泥と呼ばれ、密度が極めて小さい流体状の粘性土である。一般に高塑性粘土であってもこれの液性限界の含水比は高くても100%程度である。液性限界を超える含水比の軟弱土は形を作らず流体状の粘性土である。
船舶の航行の可否は水深で決まる。そこを航行する最大の船舶の喫水の水深を常に維持しなければならない。このため、恒常的な維持浚渫が必要となる。浚渫した土砂は他の場所へ移動させ埋立などに利用する。海洋,港湾の土木分野では、浚渫工事と埋立工事は一連の工事とすることが多い。浚渫の目的はさまざまである。新規に航路や泊地をつくるための浚渫もあれば、既存の航路の拡幅や増深のための浚渫、水深維持のための浚渫がある。さらには埋立のための土砂の採取、環境対策のための水底汚泥の除去の浚渫などである。
日本において、真空圧密工法は、従来、陸上の地盤改良工法として多く利用されてきたが、海底地盤等にも利用が進められている。海底地盤の真空圧密工法の特徴は何らかの方法で載荷地盤面の気密を保持して、載荷重には大気圧,水圧を利用する。この工法を環境面から見た特徴は、原位置で水質汚濁を発生させることなく、圧密沈下により海底土の強度増加と減容化が図れることにある。もしも、圧密沈下だけで航路等の水深が確保されたならば浚渫土を一切発生させない水深維持工法となる。
特許文献1の工法は海底地盤の真空圧密による地盤改良工法に関するもので、主に港湾施設の粘性土地盤の残留沈下対策として開発された。従って、この工法には浚渫の工程は無い。この工法の大きな特徴は、真空圧密の静荷重である大気圧及び水圧に、動荷重(静荷重の5%程度)である繰り返し荷重を併用する。これにより海底地盤に圧力変動を伝達させることで過剰間隙水圧の波動を発生させて急速圧密沈下を実現している。
特許文献2の工法は、特許文献1の真空圧密による地盤改良工法と浚渫工法を一連の工法として発展させたものである。特許文献2の大きな特徴は二つある。一つ目は浚渫を実現する気密載荷函体の底面を底板シャッターで開閉して浚渫土を保持する機能である。二つ目は専用作業船の自行移動を実現する移動式スパッド機能である。
特許文献3の工法は特許文献2の工法をさらに進歩させたものである。大きく進歩させたものは三つある。一つ目は、特許文献3の気密載荷函体は底板シャッターを用いず底面開口で浚渫土の保持を実現している。その方法は中詰土の含水比を液性限界以下まで圧密して浚渫可能な強度以上とするものである。
二つ目は特許文献3の気密載荷函体の中詰土の押し出し装置の開発である。押し出し装置は隔室内を上下に移動する可動透水性蓋を圧縮空気で押す方式と可動蓋駆動装置方式がある。
三つ目は浮泥の圧密とドレーンの目詰まり対策のユニットパネルドレーンシステムである。
二つ目は特許文献3の気密載荷函体の中詰土の押し出し装置の開発である。押し出し装置は隔室内を上下に移動する可動透水性蓋を圧縮空気で押す方式と可動蓋駆動装置方式がある。
三つ目は浮泥の圧密とドレーンの目詰まり対策のユニットパネルドレーンシステムである。
以降、底面開口の気密載荷函体を用いた真空圧密工法と浚渫工法を一連とした工法は、真空圧密浚渫工法と称する。当該工法は海底土,川底土,湖底土等の水底土を対象とした真空圧密浚渫工法であるが、ここでは海底等,海底土等で統一する。
この気密載荷装置は海底等にセットされると気密性が確保される。そして、海底土等は気密載荷函体の中詰状態となる。つまり、底面開口の気密載荷函体は、海底土等の載荷装置と中詰装置としての機能を持ち合わせる。中詰装置とは浚渫土を抱え込んで保持したり降ろしたりする装置である。以降、中詰状態の海底土等を中詰土と称する。
この気密載荷装置は海底等にセットされると気密性が確保される。そして、海底土等は気密載荷函体の中詰状態となる。つまり、底面開口の気密載荷函体は、海底土等の載荷装置と中詰装置としての機能を持ち合わせる。中詰装置とは浚渫土を抱え込んで保持したり降ろしたりする装置である。以降、中詰状態の海底土等を中詰土と称する。
真空圧密浚渫工法は浚渫土を埋立土材,盛土材として原位置の海底等において、脱水改良して浚渫土の発生を抑制して必要最小限の浚渫をすることを意図した工法である。浚渫の対象土が液性限界の含水比を大きく超える含水比の超軟弱土であれば、なおさらのこと圧密による原位置での脱水改良が必要である。
なお、対象土が砂質土の場合の浚渫は、底面開口の当該函体でも極めて容易である。それは振動締め固めにより気密載荷函体の中詰砂質土の周面摩擦が増加するので底面を必要としない。以降の説明は粘性土を中心に記述する。
なお、対象土が砂質土の場合の浚渫は、底面開口の当該函体でも極めて容易である。それは振動締め固めにより気密載荷函体の中詰砂質土の周面摩擦が増加するので底面を必要としない。以降の説明は粘性土を中心に記述する。
真空圧密浚渫工法に使用されるタワー式気密載荷函体の基本構造は、内部の天井空間に透水性板で仕切って天井真空タンクを形成する。透水性板の下部空間はドレーン機能のある隔壁で分割して隔室を形成する。そして、函体の外面の中央部には装置を設置するための屋上真空タンクと函体タワーが一体となった構造である。透水性板の機能は、ドレーン機能と同じく、水は通すが土粒子は通さない役目である。なお、特許文献3は天井真空タンクを真空タンク層,屋上真空タンクを真空タンク室,透水性板を透水性蓋と称している。
真空圧密浚渫工法の共通な作業工程は、気密載荷函体を海底等にセットする据付け工程、次に圧密工程,浚渫工程,浚渫土の運搬工程に分けられる。浚渫工程は当該函体が抱え込んだ中詰土を海底等から吊り上げ,そして函体から押出す工程である。この吊り上げを浚渫土の積み込み、中詰土の押し出し(抜き出し)を浚渫土の積み下ろしと称している。
底面開口の気密載荷函体を用いる真空圧密浚渫工法の基本は、対象の海底土等(粘性土)を液性限界以下の含水比にすることである。浮泥は最も厄介である。その原因は、圧密時間が極めて長いこと,ドレーンの目詰まりは避けられないことである。しかし、これらの課題は液性限界を超える海底土に共通することである。特許文献3の真空圧密浚渫工法は、浮泥も対象とした工法である。しかしながら、特許文献3の真空圧密浚渫工法は、圧密時間の短縮に向けてさらなる改良,進歩の余地が残されている。
真空圧密浚渫工法は圧密沈下により、浚渫土の発生が減少となる反面、中詰土の強度増加で函体隔壁の付着強度が増加して圧縮空気や振動、或いはこれらの併用では中詰土を気密載荷函体から押し出すことが不能となった。圧縮空気は透水性蓋(板)を通過することはできるが大きな抵抗が生じる。つまり、固定透水性蓋を通過する圧縮空気は中詰海底土を押し出す力が半減する。また、固定透水性蓋は極端に強い圧縮空気を継続させると損壊に至る。これに対して特許文献3の透水性蓋は、隔室内部を上下の可動透水性蓋として組み込んだ。そして、中詰海底土の押し出しは可動透水性蓋ごと押し下げる(押し出す)方式を採用している。押し下げる力は圧縮空気又は可動蓋駆動装置である。可動透水性蓋は水平に保って押し下げる必要がある。少しでも傾くと押し下げ不能となる。大きな押し下げる力が必要な場合は、圧縮空気では可動透水性蓋を水平に保つのは難しい。従って確実な可動蓋の駆動装置を用いている。
前段落の特許文献3の説明は、浚渫工程の中詰海底土の押し出しだけで、圧密工程のドレーン等の目詰まりの対策がない。両方の対策ができているのは、特許文献3のユニットパネルドレーンシステムである。このシステムはユニットパネルドレーンが隔室と天井真空タンクを断続的に移動して、ドレーンが隔室に在るときは中詰海底土の圧密が進行し、ドレーンの移動時においては隔室では圧密により密度増加してドレーンに付着した中詰海底土を削ぎ落とし、天井真空タンクではドレーン表面を洗浄することを繰り返すシステムである。しかしながら、このシステムはユニットパネルドレーンの駆動装置を大量に必要としていて簡便性に欠ける。なお、簡便性に欠けるのは可動蓋駆動装置も同様である。
課題1は、特許文献3の圧密工程の透水性蓋及び函体隔壁のドレーンの目詰まり対策及び浚渫工程の中詰海底土の押し出しが簡便性に欠けていて装置に故障のリスクがある。
課題2は、含水比の高い海底土等の圧密時間の問題である。含水比の高い海底土等ほど圧密時間が長い。これは、課題1にも密接に関連する。透水性板およびドレーン材は、水は通すが土粒子は通さない材料である。これらは微細な土粒子混じりの排水の通過量が多いほど目詰まりが多い。浮泥は超高含水比の流体状の泥土である。このような浮泥は圧密時間が極めて長く、目詰まりも顕著である。圧密時間の短縮の基本は排水距離の縮小である。特許文献3のユニットパネルドレーンシステムの場合はパネルドレーンの間隔を縮小しているが限界がある。
圧密時間の短縮に有力な方法は、圧密排水距離の縮小以外に静荷重と動荷重の併用による急速圧密工法がある。真空圧密を受ける気密載荷函体の中詰土は、鉛直の一次元方向のみが圧密変形するK0応力状態を初期状態として、その後等方応力も増加するような圧密である。しかし、浮泥のような超含水比の粘土の圧密進行の特徴は、十数秒で数ミリメートルの圧密が進行する。しかし、目詰まりもあってその後の圧密速度は極端に減速する。従って、超含水比の粘土の応力状態はK0圧密状態だけである。つまり、鉛直方向の振動は圧力変動のみでの水平方向の振動は圧密の水平動荷重としては期待できない。
課題3は、特許文献3の振動装置は含水比の高い海底土等には対応できていないことである。振動装置は鉛直,水平方向が兼用になっている。目的を明確にした装置の構成とする必要がある。
課題3は、特許文献3の振動装置は含水比の高い海底土等には対応できていないことである。振動装置は鉛直,水平方向が兼用になっている。目的を明確にした装置の構成とする必要がある。
真空圧密浚渫工法のタワー式気密載荷函体は、専用作業船に装備される。大規模な真空圧密浚渫工法の専用作業船は、浚渫土を自分自身で運搬するので土運船に積み替える構造形式になってない。これは海底盛土を意図したもので、自分自身が運搬して盛土施工をする必要があったからである。また、積み替え構造形式は装置及び専用作業船の極端な巨大化になる恐れがあった。
課題4は、この浚渫土の運搬方式は海底盛土には都合がよいが陸上への揚土には不都合である。
課題4は、この浚渫土の運搬方式は海底盛土には都合がよいが陸上への揚土には不都合である。
ドレーンの目詰まり,中詰土の押し出しに関する課題1の解決手段は、空圧制御方式をさらに発展させる。
まず、課題1の気密載荷函体による解決手段は、当該函体の装備した空圧制御システムの装置である。当該函体は内部の天井空間は、固定の透水性板で仕切って天井真空タンクを形成する。透水性板の下部空間はドレーン機能のある函体隔壁で分割して隔室を形成する。ここまでは従来の気密載荷函体と基本的には変わらない。ここで、天井真空タンクはエアダクトで加圧装置(空気圧縮装置)及び減圧装置(真空装置)に接続させ、隔室は直接または透水性板の直下に配備された回路網状の圧縮空気放出管を介してエアダクトで加圧装置に接続させて、前記2つの装置と3つの空気経路から成る空圧制御システムを構築する。ここで、気密載荷函体が超大型の場合、加圧装置,減圧装置あるいは空圧制御システムを複数装備することになる。
まず、課題1の気密載荷函体による解決手段は、当該函体の装備した空圧制御システムの装置である。当該函体は内部の天井空間は、固定の透水性板で仕切って天井真空タンクを形成する。透水性板の下部空間はドレーン機能のある函体隔壁で分割して隔室を形成する。ここまでは従来の気密載荷函体と基本的には変わらない。ここで、天井真空タンクはエアダクトで加圧装置(空気圧縮装置)及び減圧装置(真空装置)に接続させ、隔室は直接または透水性板の直下に配備された回路網状の圧縮空気放出管を介してエアダクトで加圧装置に接続させて、前記2つの装置と3つの空気経路から成る空圧制御システムを構築する。ここで、気密載荷函体が超大型の場合、加圧装置,減圧装置あるいは空圧制御システムを複数装備することになる。
課題1の工法による解決手段は、圧密工程,浚渫工程の空圧制御システムで行い、基本作業は次の通りである。
圧密工程のスタートは2つの加圧の空気経路を閉じて天井真空タンクの減圧の空気経路を開き、天井真空タンク及び隔室を負圧として真空圧密を進める。次に、真空圧密時の空気経路状態から、天井真空タンクと隔室の空圧の状態を一体的に、ときには別々に制御することで、圧密工程における透水性板及び函体隔壁のドレーンの目詰まりの解消、さらには、浚渫工程における中詰土の押し出し作業を実施する。
圧密工程のスタートは2つの加圧の空気経路を閉じて天井真空タンクの減圧の空気経路を開き、天井真空タンク及び隔室を負圧として真空圧密を進める。次に、真空圧密時の空気経路状態から、天井真空タンクと隔室の空圧の状態を一体的に、ときには別々に制御することで、圧密工程における透水性板及び函体隔壁のドレーンの目詰まりの解消、さらには、浚渫工程における中詰土の押し出し作業を実施する。
課題1の目詰まり解消の解決手段の作業手順は、次の通りである。
まず、真空圧密時の空気経路状態にして、天井真空タンク、そして透水性板及び函体隔壁のドレーンを通して隔室を負圧状態とする。これで中詰土は透水性板及び函体隔壁に吸引された状態にある。つまり、透水性板及び函体隔壁と中詰土との境界面は吸引面である。続いて、天井真空タンクの減圧の空気経路を閉じると同時に天井真空タンクの加圧の空気経路を開くことで、瞬時に天井真空タンクを負圧状態から正圧状態とする。これにより、二つの現象が連続的に進行する。一つ目の現象は、境界面が吸引面から斥力面へと瞬時に反転移行する。二つ目の現象は、負圧状態の隔室に対して天井真空タンクが瞬時に高い正圧状態に切り替わることで大きな圧力差がつくられ、真空圧密時とは逆向きの瞬時の短い噴射気流が発生する。透水性板及び函体隔壁のドレーンの内部に入り込んだ微細な粘土粒子は、噴射気流により斥力面へと吐き出されて目詰まりが解消される。真空圧密中に目詰まりで圧密進行が低下したときは、この逆噴射を随時行う。目詰まり解消の作業で使われる空気経路は天井真空タンクの減圧の空気経路と加圧の空気経路の2経路で、隔室の加圧の空気経路は使われない。
まず、真空圧密時の空気経路状態にして、天井真空タンク、そして透水性板及び函体隔壁のドレーンを通して隔室を負圧状態とする。これで中詰土は透水性板及び函体隔壁に吸引された状態にある。つまり、透水性板及び函体隔壁と中詰土との境界面は吸引面である。続いて、天井真空タンクの減圧の空気経路を閉じると同時に天井真空タンクの加圧の空気経路を開くことで、瞬時に天井真空タンクを負圧状態から正圧状態とする。これにより、二つの現象が連続的に進行する。一つ目の現象は、境界面が吸引面から斥力面へと瞬時に反転移行する。二つ目の現象は、負圧状態の隔室に対して天井真空タンクが瞬時に高い正圧状態に切り替わることで大きな圧力差がつくられ、真空圧密時とは逆向きの瞬時の短い噴射気流が発生する。透水性板及び函体隔壁のドレーンの内部に入り込んだ微細な粘土粒子は、噴射気流により斥力面へと吐き出されて目詰まりが解消される。真空圧密中に目詰まりで圧密進行が低下したときは、この逆噴射を随時行う。目詰まり解消の作業で使われる空気経路は天井真空タンクの減圧の空気経路と加圧の空気経路の2経路で、隔室の加圧の空気経路は使われない。
課題2の圧密時間短縮の解決手段は、基本的には前段落で説明した作業を繰り返して真空圧密を進める。圧密速度が急速に低下したら逆噴射を行う。また真空圧密を進める。この作業を繰り返す。作業手順およびその時の現象は次の通りである。
真空圧密時の空気経路は、天井真空タンクの減圧の空気経路だけを開いた状態である。この時の境界面は吸引面であり、中詰土の排水面である。圧密は排水面から進行する。境界面には圧密が進行した中詰土が付着する。圧密の進行に伴い付着した中詰土の厚さは増加する。そして、じきに圧密速度は急低下する。そこで、天井真空タンクの減圧の空気経路を閉じると同時に天井真空タンクの加圧の空気経路を開くことで、天井真空タンクと隔室の間に大きな圧力差をつくる。これにより瞬時の逆噴射が起こると同時に境界面が吸引面から斥力面へと瞬時に反転する。目詰まりが解消され、付着している中詰土の圧密進行部分である既圧密の中詰土が剥落する。続いて、真空圧密時の空気経路状態に戻す。隔室は負圧状態となり、境界面は斥力面から吸引面と反転して未圧密の新たな流体状の中詰土が付着して圧密が続行される。
境界面が吸引面,斥力面と反転する空圧反転のサイクルのシステムを必要なだけ実施する。以降、このシステムを空圧反転の圧密システムと称する。
真空圧密時の空気経路は、天井真空タンクの減圧の空気経路だけを開いた状態である。この時の境界面は吸引面であり、中詰土の排水面である。圧密は排水面から進行する。境界面には圧密が進行した中詰土が付着する。圧密の進行に伴い付着した中詰土の厚さは増加する。そして、じきに圧密速度は急低下する。そこで、天井真空タンクの減圧の空気経路を閉じると同時に天井真空タンクの加圧の空気経路を開くことで、天井真空タンクと隔室の間に大きな圧力差をつくる。これにより瞬時の逆噴射が起こると同時に境界面が吸引面から斥力面へと瞬時に反転する。目詰まりが解消され、付着している中詰土の圧密進行部分である既圧密の中詰土が剥落する。続いて、真空圧密時の空気経路状態に戻す。隔室は負圧状態となり、境界面は斥力面から吸引面と反転して未圧密の新たな流体状の中詰土が付着して圧密が続行される。
境界面が吸引面,斥力面と反転する空圧反転のサイクルのシステムを必要なだけ実施する。以降、このシステムを空圧反転の圧密システムと称する。
浮泥のような超含水比の粘土の圧密進行の特徴は、十数秒で数ミリメートルの圧密が進行する。しかし、目詰まりもあってその後の圧密速度は極端に減速する。一例として200kN/m2の載荷重で10秒の圧密進行部分である既圧密浮泥の厚さは4mm程度である。圧密排水距離を4mm程度とすれば一次圧密はほぼ10秒程度で終了する。空圧反転の圧密システムを使わないで、圧密排水距離4mmを確保するためには、タワー式載荷函体の隔壁の内側の間隔を8mmとしなければならない。これは現実的にありえない。
課題1の解決手段の中詰土の押し出し作業手順は、境界面が吸引面から斥力面に移行するところまでは目詰まり解消作業と同じである。
まず、真空圧密時の空気経路状態から天井真空タンクの減圧の空気経路を閉じると同時に真空タンクの加圧の空気経路を開くことで、境界面を吸引面から斥力面へと瞬時に移行させる。これは中詰土と透水性板及び函体隔壁との付着強度を切るためである。この斥力面に移行する時点では天井真空タンクの加圧の空気経路のみが開かれている。次に、隔室の加圧の空気経路を開き、透水性板の両面が同圧となるようにバランスを図りながら天井真空タンクと隔室の加圧を上げて中詰海底土を押し出す。
ここで、圧力のバランスを図る目的は透水性板の損壊を防ぐためである。また、隔室を加圧する空気経路は圧縮空気放出管を介する。これは透水性板及び中詰土の表面を均等に加圧するためである。中詰土の押し出しの作業で使われる空気経路は、天井真空タンクの減圧の空気経路及び加圧の空気経路と隔室の加圧の空気経路の3経路である。
まず、真空圧密時の空気経路状態から天井真空タンクの減圧の空気経路を閉じると同時に真空タンクの加圧の空気経路を開くことで、境界面を吸引面から斥力面へと瞬時に移行させる。これは中詰土と透水性板及び函体隔壁との付着強度を切るためである。この斥力面に移行する時点では天井真空タンクの加圧の空気経路のみが開かれている。次に、隔室の加圧の空気経路を開き、透水性板の両面が同圧となるようにバランスを図りながら天井真空タンクと隔室の加圧を上げて中詰海底土を押し出す。
ここで、圧力のバランスを図る目的は透水性板の損壊を防ぐためである。また、隔室を加圧する空気経路は圧縮空気放出管を介する。これは透水性板及び中詰土の表面を均等に加圧するためである。中詰土の押し出しの作業で使われる空気経路は、天井真空タンクの減圧の空気経路及び加圧の空気経路と隔室の加圧の空気経路の3経路である。
流体状の中詰土、例えば浮泥において、比重が規定値以下であれば浚渫の対象外とする。このような浮泥はドレーン及び透水性板の使用を避けたい。その理由はドレーン材等の目詰まりは微細な土粒子混じりの水の通過によるからである。本発明の気密載荷函体は、中詰土の表層の位置となる透水性板の直下に流体状の海底土等の湿潤密度の計測装置を設置する。この湿潤密度計測装置は、一定体積の密閉の測定容器の浮力をロードセルにより自動計測することで流体状の海底土等の湿潤密度,比重が求められる。中詰土の表層の湿潤密度の計測は、前記測定装置を取り付けたタワー式気密載荷函体を海底等に据え付けた状態で行う。そして、この流体状の中詰土が規定値以下であれば、自動排泥装置によって当該函体の隔室から外部へと直接排出する。
課題3の含水比の高い海底土等に対応する振動装置の解決手段は、鉛直方向と水平方向の振動装置を別個に設け、それぞれの目的を明確にした装置の構成とする。これは空圧反転の圧密システムに関係する。当該システムの逆噴射による函体隔壁に付着している既圧密の中詰土の剥落である。浮泥の場合、剥離しても剥落に至らないこともある。このような時に水平方向の振動装置は、気密載荷函体の函体隔壁に水平方向の弾性振動を起こして函体隔壁の表面と既圧密の中詰土の間に新たな流体状の未圧密中詰土を引き込み、付着を促進する。ここで、水平方向の振動装置は函体隔壁の方向に対して正確に直交しているのが肝要である。
課題3の水平方向,鉛直方向の振動装置群による解決手段は、水平方向の振動装置は気密載荷函体の水平面の中心位置に設置されて方向が交差する2つの振動装置を組み合わせたものである。これは当該函体の隔室は2方向の函体隔壁で構成されていることによる。交差角度は通常直角である。また、当該函体の水平面の中心位置としたのは2つの振動装置で回転運動を生じさせないためである。次に鉛直振動装置は当該函体の水平面の中心位置を水平振動装置が占めているため、当該函体の水平面の対称位置に複数設置した。設置数は通常4基である。
次に、課題3の工法による解決手段は、前段落で説明した振動装置群を装備したタワー式気密載荷函体が使用される。急速圧密工程は水平振動装置の稼動により前記気密載荷函体の函体隔壁に水平方向の弾性振動を起こして函体隔壁表面に新たな流体状の未圧密中詰土の付着を促進させる。併行して前記函体の天井真空タンクを真空状態とすることで中詰土に静荷重の大気圧,水圧を鉛直載荷すると共に鉛直振動装置を稼働して中詰土に圧力変動を加えた静動の合成鉛直載荷で急速真空圧密を実現する。
浮泥は粘土粒子の他に有機物質が多く含まれている。浮泥の超高含水の原因はこれらがマイナスの電荷を持っていて互いに反発しあって分散状態になっていることにある。特に有機物の電荷量は大きい。このような浮泥は圧密が困難である。そこで、気密載荷函体の中詰海底土に限定して凝集剤を使い、急速圧密を実現する。ここで留意すべきことは中詰土の間隙水に凝集剤の陽イオンが均等に分散されることである。このようにならないと効果が部分的になる。
本発明のタワー式気密載荷函体は、これの底面となる壁の先端部には無数の水平方向のノズルを有する回路網状の凝集剤噴射管を固定配置する。そして、これが凝集剤圧送装置に圧送管で接続されて凝集剤噴射システムとする。凝集剤噴射管が回路網状としてあるのは、可能な限り均一な噴射混合を意図している。タワー式気密載荷函体は、海底等にセットされると気密状態が確保され、中詰土は海水等からも遮断された状態となる。真空圧密浚渫工法は、このような状態で圧密促進剤を噴射混合し、さらに振動装置を稼働して圧密促進剤を中詰土の間隙水に拡散させる。
課題4の浚渫土の運搬方式の解決手段は、本発明の専用作業船が、自分自身で浚渫土を運搬することも出来て、且つ陸上への揚土なども鑑みて土運船に積み替えることも可能な構造形式とした。
本発明の専用作業船は双胴型の作業船とし、双胴船を上部連結門型梁と下部連結梁で一体化している。この双胴船は内部にはバラストタンクを設けている。そして、双胴船に挟まれた空間はタワー式気密載荷函体の設置空間とすると共に土運船を引き入れて浚渫土の積み込み作業空間としている。本発明のタワー式気密載荷函体は、単独では鉛直方向の移動が出来るが水平方向は出来ない。このため土運船の方が移動してくるようにした。タワー式気密載荷函体は単独で水平移動をさせる構造とすることも可能であるが、双胴船が巨大化し水平移動装置が大規模となり得策ではない。また、双胴船は上部連結門型梁だけで一体化が可能であるが、一体化構造は大規模となりこれも得策ではない。
当該専用作業船の喫水は、前記土運船への浚渫土の積み替え作業の進捗に伴い減少して土運船の喫水が増加する。結果として土運船の喫水が不足となってくる。これの対策として、前記バラストタンクに注水して専用作業船の喫水を下げることで土運船の喫水を確保する。
本発明の真空圧密浚渫工法は、3つの空気経路の空気圧を制御するシステムが装備されたタワー式気密載荷函体を使用する。このシステムによって浚渫工程における中詰土の押し出し及びドレーン等の目詰まりの課題を簡便に解消した。これにより、特許文献3のユニットパネルドレーンシステムの天井真空タンクは隔室と同じ高さが必要であったが、本発明の天井真空タンクは本来の必要最小限の高さでよい。そして、故障リスクの極めて小さいシンプルな装置,機能で圧密と浚渫を一連の工程で実現するという効果をもたらした。
また、空圧反転の圧密システムにより、圧密排水距離を数ミリメートルという微小の長さを実現して浮泥の急速圧密を実現するという効果をもたらした。
また、空圧反転の圧密システムにより、圧密排水距離を数ミリメートルという微小の長さを実現して浮泥の急速圧密を実現するという効果をもたらした。
以下、本発明の実施形態を図1~図10に基づいて説明する。
図1はタワー式気密載荷函体1を海底面6に据付けた状態の立面図である。図2は気密載荷函体11の立面図である。タワー式気密載荷函体1は、気密載荷函体11と函体タワー12から成る。気密載荷函体11は内部の天井空間を透水性板112で仕切って天井真空タンク111を形成する。透水性板112の下部空間はドレーン機能のある函体隔壁113で分割して隔室114を形成する。そして、当該函体の外部上面の中央部には装置を設置する屋上真空タンク115と函体タワー12が一体となった構造である。気密載荷函体11のサイズは底面積が20m×20m~30m×30m,高さが1m程度である。
ここで、ドレーン機能のある函体隔壁113の一例として、函体隔壁113の表面に鉛直方向にドレーンとなる無数の小さい溝が付けられた上に濾過布または濾過用の金属網を被覆して固定したものである。つまり、排水のみを対象としたドレーンである。
ここで、ドレーン機能のある函体隔壁113の一例として、函体隔壁113の表面に鉛直方向にドレーンとなる無数の小さい溝が付けられた上に濾過布または濾過用の金属網を被覆して固定したものである。つまり、排水のみを対象としたドレーンである。
タワー式気密載荷函体1に装備された装置として、1aは減圧装置(真空装置),1bは排水装置(排水ポンプ),1cは加圧装置(コンプレッサー),1dは凝集剤圧送装置,1e1は鉛直振動装置,1e2は水平振動装置である。
タワー式気密載荷函体1の真空圧密及び浚渫における装置の作動は、空圧と水圧の2系統の制御で行われる。また、空圧の制御は減圧装置1a,加圧装置1cと3つの空気経路から構成される空圧制御システムで行われる。
空圧制御システムの3つの空気経路は、天井真空タンク111−減圧装置のエアダクト12a−減圧装置(真空装置)1aの経路,天井真空タンク111−加圧装置のエアダクト12c2−加圧装置(コンプレッサー)1cの経路,そして、隔室114−圧縮空気放出管1f−加圧装置のエアダクト12c1−加圧装置(コンプレッサー)1cの経路である。また、排水の経路は、天井真空タンク111−排水装置1b−排水装置の送水管12bの経路である。また、凝集剤の経路は凝集剤圧送装置1d−凝集剤装置の圧送管12d−凝集剤噴射管1gの経路である。また、1hは湿潤密度計測装置,1iは自動排泥装置である。また、4は海底地盤(海底土),5は海面,6は海底面である。
タワー式気密載荷函体1の真空圧密及び浚渫における装置の作動は、空圧と水圧の2系統の制御で行われる。また、空圧の制御は減圧装置1a,加圧装置1cと3つの空気経路から構成される空圧制御システムで行われる。
空圧制御システムの3つの空気経路は、天井真空タンク111−減圧装置のエアダクト12a−減圧装置(真空装置)1aの経路,天井真空タンク111−加圧装置のエアダクト12c2−加圧装置(コンプレッサー)1cの経路,そして、隔室114−圧縮空気放出管1f−加圧装置のエアダクト12c1−加圧装置(コンプレッサー)1cの経路である。また、排水の経路は、天井真空タンク111−排水装置1b−排水装置の送水管12bの経路である。また、凝集剤の経路は凝集剤圧送装置1d−凝集剤装置の圧送管12d−凝集剤噴射管1gの経路である。また、1hは湿潤密度計測装置,1iは自動排泥装置である。また、4は海底地盤(海底土),5は海面,6は海底面である。
図3はタワー式気密載荷函体1を装備した専用作業船2の立面図である。本発明の専用作業船2は台船21が二隻連結した双胴型の作業船で、双胴船を上部連結門型梁22と下部連結梁23で一体化している。この双胴船は内部にはバラストタンク25を設けている。そして、双胴に挟まれた空間はタワー式気密載荷函体1の設置空間とすると共に土運船3を引き入れて浚渫土の積み込み作業空間としている。24はガイドタワーである。タワー式気密載荷函体1の函体タワー12はガイドタワー24内を自在に上下移動する。
図4は同じく側面図で、タワー式気密載荷函体1を3連とした例である。
図5は同じく平面図である。
図6は専用作業船2に装備されたタワー式気密載荷函体1の海底据付工程における立面図である。据え付け工程は排水装置1bを僅かに稼働させながら、海底土4を気密載荷函体11の中詰状態とする。ここで、海底土4の最表層部の湿潤密度,比重を湿潤密度計測装置1hで自動計測する。比重が浚渫対象外であればこれを自動排泥装置1iで当該函体11の外に直接排出する。
海底土が有機物の多い浮泥の場合、本発明の真空圧密浚渫工法は必要に応じて凝集剤噴射システムを装備したタワー式気密載荷函体1が使用される。
凝集剤の噴射作業は当該函体を海底面にセットする作業と併行して行われる。噴射混合の開始は当該函体のセットの過程で海底土4が海水と遮断状態になった時点である。この時点では当該函体の隔室114の下部は海底土4,上部は海水である。当該函体11のセット作業は隔室114の上部の海水を排水装置1bで排出しながら行われる。
凝集剤の噴射作業は当該函体を海底面にセットする作業と併行して行われる。噴射混合の開始は当該函体のセットの過程で海底土4が海水と遮断状態になった時点である。この時点では当該函体の隔室114の下部は海底土4,上部は海水である。当該函体11のセット作業は隔室114の上部の海水を排水装置1bで排出しながら行われる。
図7は同じく圧密工程における立面図である。圧密工程は減圧装置1a,排水装置1bを稼動させることで中詰土及び海底土4(海底地盤)に大気圧及び水圧の静荷重を載荷する。中詰土の含水比がこれの液性限界よりも大きい場合は、圧密により液性限界の含水比以下まで下げて強度増加を図る。
急速圧密工法は静荷重載荷に並行して鉛直振動装置1e1を稼働させる。これにより中詰土には大気圧及び水圧の静荷重に加えて、振動の動荷重による圧力変動を伝達させることで急速圧密を促す。
急速圧密工法は静荷重載荷に並行して鉛直振動装置1e1を稼働させる。これにより中詰土には大気圧及び水圧の静荷重に加えて、振動の動荷重による圧力変動を伝達させることで急速圧密を促す。
海底土4の含水比がこれの液性限界を大きく超える場合、本発明の真空圧密浚渫工法は空圧反転の圧密システムを実施する。中詰土の圧密は気密載荷函体11の底面を除く5面で進行する。この5面が中詰土と透水性板112及び函体隔壁113の境界面で、真空圧密時には排水面となる。
まず、真空圧密の開始時から圧密速度が急激に低下するまでの実用圧密時間を測定して、これから空圧反転サイクル時間を設定する。当該圧密システムは自動運行される。真空圧密時の空気経路状態は、天井真空タンク111の減圧の空気経路だけが開かれていて加圧の空気経路は閉じられている。この時の境界面は吸引面で中詰海底土の圧密が進行する。天井真空タンク111の減圧の空気経路を閉じると同時に天井真空タンク111の加圧の空気経路を開くことで、境界面の空圧が反転する。境界面で付着している中詰土が剥落される。
浮泥の場合、圧密進行部分である既圧密浮泥と未圧密浮泥では密度の差がついて、既圧密浮泥は未圧密浮泥の中を沈降する。そして、境界面は未圧密浮泥と入れ替わる。当該圧密システムは、空気経路を真空圧密状態に戻すと境界面の吸引,斥力が逆転して圧密が継続する。
まず、真空圧密の開始時から圧密速度が急激に低下するまでの実用圧密時間を測定して、これから空圧反転サイクル時間を設定する。当該圧密システムは自動運行される。真空圧密時の空気経路状態は、天井真空タンク111の減圧の空気経路だけが開かれていて加圧の空気経路は閉じられている。この時の境界面は吸引面で中詰海底土の圧密が進行する。天井真空タンク111の減圧の空気経路を閉じると同時に天井真空タンク111の加圧の空気経路を開くことで、境界面の空圧が反転する。境界面で付着している中詰土が剥落される。
浮泥の場合、圧密進行部分である既圧密浮泥と未圧密浮泥では密度の差がついて、既圧密浮泥は未圧密浮泥の中を沈降する。そして、境界面は未圧密浮泥と入れ替わる。当該圧密システムは、空気経路を真空圧密状態に戻すと境界面の吸引,斥力が逆転して圧密が継続する。
境界面で既圧密浮泥と未圧密浮泥が極めて短い時間に入れ替われば効率が良い。浮泥の一例として、実用圧密時間は極めて短く10秒程度で圧密速度は急速に低下する。10秒で圧密が進行した厚さは4mm程度である。隔室114の内空間の大きさの一例として、水平断面は50cm×50cm,高さ100cmである。中詰土の真空圧密が開始されて10秒後に、未圧密浮泥の詰まった厚さ4mmの既圧密浮泥の箱ができあがる。この箱は一体ものである。この箱は5面がばらばらになり、各面も適当な大きさでばらばらになれば、既圧密浮泥と未圧密浮泥の入れ替わりに都合が良い。この対策として、ばらばらにしたい箱部分に対応する隔室114の部分を線的にドレーン機能の無い部材を取り付ける。例えば、隔室114のコーナー部分、さらには各面も25cm間隔で水平,鉛直方向に取り付ける。この取付け材はドレーン機能のある函体隔壁113の表面を被覆する濾過布または濾過用の金属網を固定する取付け材と兼ねるのが好都合である。
既圧密浮泥と未圧密浮泥の入れ替えの強力な方法は気密載荷函体11の函体隔壁113の弾性振動である。空圧反転の圧密システムは、これの実施中において水平振動装置1e2を稼動させる。これは函体隔壁113の固有振動数に合わせて振動を加え、これを共振させることで既圧密浮泥の剥離,未圧密浮泥との入れ替えを強制する。また必要に応じて、函体隔壁113が弾性振動を起こりやすい構造とする。例えば、函体隔壁113の上,下部分を残してある一定幅で縦方向に切断した構造である。
今、当該圧密システムのサイクル時間において、真空圧密の真空時間10秒,既圧密浮泥の剥落のための加圧時間2秒,既圧密浮泥と未圧密浮泥の入れ替わりのための空圧中立時間3秒とすると、サイクル時間は15秒である。
今、当該圧密システムのサイクル時間において、真空圧密の真空時間10秒,既圧密浮泥の剥落のための加圧時間2秒,既圧密浮泥と未圧密浮泥の入れ替わりのための空圧中立時間3秒とすると、サイクル時間は15秒である。
図8は専用作業船2に装備されたタワー式気密載荷函体1の浚渫工程におけるタワー式気密載荷函体1の吊り揚げの立面図である。吊り上げ時は、減圧装置1aは稼動状態である。
図9は専用作業船2に土運船3を引き入れた浚渫土の積み替え工程の立面図である。当該専用作業船2の喫水は、土運船3への浚渫土の積み替え作業の進捗に伴い減少して土運船3の喫水が増加する。結果として土運船3の喫水が不足となってくる。これの対策として、バラストタンク25に注水して専用作業船2の喫水を下げることで土運船3の喫水を確保する。
図10は同じく浚渫土積み替え工程の側面図である。
1 タワー式気密載荷函体
1a 減圧装置(真空装置)
1b 排水装置
1c 加圧装置(コンプレッサー)
1d 凝集剤圧送装置
1e1 鉛直振動装置
1e2 水平振動装置
1f 圧縮空気放出管
1g 凝集剤噴射管
1h 湿潤密度計測装置
1i 自動排泥装置
11 気密載荷函体
111 天井真空タンク
112 透水性板
113 函体隔壁
114 隔室
115 屋上真空タンク
12 函体タワー
12a 減圧装置のエアダクト
12b 排水装置の送水管
12c1 隔室と加圧装置のエアダクト
12c2 天井真空タンクと加圧装置のエアダクト
12d 凝集剤装置の圧送管
2 専用作業船
21 台船
22 上部連結門型梁
23 下部連結梁
24 ガイドタワー
25 バラスとタンク
3 土運船
4 海底地盤(海底土)
5 海面
6 海底面
1a 減圧装置(真空装置)
1b 排水装置
1c 加圧装置(コンプレッサー)
1d 凝集剤圧送装置
1e1 鉛直振動装置
1e2 水平振動装置
1f 圧縮空気放出管
1g 凝集剤噴射管
1h 湿潤密度計測装置
1i 自動排泥装置
11 気密載荷函体
111 天井真空タンク
112 透水性板
113 函体隔壁
114 隔室
115 屋上真空タンク
12 函体タワー
12a 減圧装置のエアダクト
12b 排水装置の送水管
12c1 隔室と加圧装置のエアダクト
12c2 天井真空タンクと加圧装置のエアダクト
12d 凝集剤装置の圧送管
2 専用作業船
21 台船
22 上部連結門型梁
23 下部連結梁
24 ガイドタワー
25 バラスとタンク
3 土運船
4 海底地盤(海底土)
5 海面
6 海底面
Claims (13)
- 海底土等の真空圧密と浚渫を一連の工程とするための底面開口のタワー式気密載荷函体において、前記気密載荷函体の内部天井空間は透水性板で仕切って天井真空タンクを形成し、透水性板の下部空間はドレーン機能のある函体隔壁で分割して複数の隔室を形成、さらに、天井真空タンクは、エアダクトで加圧装置および減圧装置に接続させ、隔室は直接または透水性板の直下に配備された回路網状の圧縮空気放出管を介してエアダクトで加圧装置に接続させて、前記の2つの装置と3つの空気経路から構成される空圧制御システムを1乃至2以上備えていることを特徴とするタワー式気密載荷函体。
- 海底土等の真空圧密浚渫工法において、前記工法の専用作業船に装備されるタワー式気密載荷函体の天井真空タンクは、エアダクトで加圧装置および減圧装置に接続させ、隔室は直接または透水性板の直下に配備された回路網状の圧縮空気放出管を介してエアダクトで加圧装置に接続させて、前記の2つの装置と3つの空気経路から構成される空圧制御システムを用いて、2つの加圧の空気経路を閉じて天井真空タンクの減圧の空気経路を開き、天井真空タンク及び隔室を負圧とした真空圧密時の空気経路状態から、天井真空タンクと隔室の空圧の状態を一体的に、ときには別々に制御することで、圧密工程における透水性板及び函体隔壁のドレーンの目詰まりの解消、さらには、浚渫工程における中詰土の押し出し作業を空圧制御システムで実施することを特徴とする真空圧密浚渫工法。
- 請求項2の真空圧密浚渫工法における圧密工程の透水性板及び函体隔壁のドレーンの目詰まりの解消において、真空圧密時の空気経路状態から天井真空タンクの減圧の空気経路を閉じると同時に天井真空タンクの加圧の空気経路を開くことで、天井真空タンクと隔室の間に大きな圧力差をつくり、これにより透水性板及び函体隔壁のドレーンに真空圧密時とは逆向きの噴射気流を瞬時に発生させて目詰まりを解消する保全工程を特徴とする真空圧密浚渫工法。
- 請求項2の流体状の海底土等の真空圧密浚渫工法における圧密工程において、真空圧密時の空気経路状態から天井真空タンクの減圧の空気経路を閉じると同時に天井真空タンクの加圧の空気経路を開くことで、天井真空タンクと隔室の間に大きな圧力差をつくり、これにより中詰土と透水性板及び函体隔壁の境界面が吸引面から斥力面へと瞬時に移行させて付着している中詰土の圧密進行部分を剥落させ、続いて真空圧密時の空気経路状態に戻すことで境界面を斥力面から吸引面に反転させて未圧密の新たな流体状の中詰土を付着させて圧密を続行させることを繰返す空圧反転の圧密システムを特徴とする真空圧密浚渫工法。
- 請求項2の真空圧密浚渫工法における浚渫工程の中詰土の押し出し作業において、真空圧密時の空気経路状態から天井真空タンクの減圧の空気経路を閉じると同時に天井真空タンクの加圧の空気経路を開くことで、中詰土と透水性板及び函体隔壁の境界面が吸引面から斥力面へと瞬時に移行させて中詰土の付着強度を切り、次に隔室の加圧の空気経路を開き、透水性板の両面が同圧となるようにバランスを図りながら天井真空タンクと隔室の加圧を上げて中詰土を押し出す工程を特徴とする真空圧密浚渫工法。
- 請求項1のタワー式気密載荷函体の隔室が中詰土状態において、隔室の最上部に設置した一定体積の密閉測定容器の浮力を自動計測することで中詰土の湿潤密度を自動計測する湿潤密度計測装置と自動排泥装置が装備されていることを特徴とするタワー式気密載荷函体。
- 請求項2の流体状の海底土等の真空圧密浚渫工法における圧密の前工程において、タワー式気密載荷函体の隔室の最上部に設置した中詰土の湿潤密度計測装置で自動計測し、これが浚渫の規定値以下であれば自動排泥装置によって当該函体の隔室から外部へ直接排出する工程を特徴とする真空圧密浚渫工法。
- 請求項1のタワー式気密載荷函体において、装備される振動装置群は当該函体の水平面の中心位置に設置される方向が交差する2つの振動装置を組み合わせた水平振動装置と当該函体の水平面の対称位置に設置される複数の鉛直振動装置から成ることを特徴とするタワー式気密載荷函体。
- タワー式気密載荷函体に水平振動装置と鉛直振動装置を装備した請求項2の真空圧密浚渫工法において、急速真空圧密工程における空圧反転の圧密システムは水平振動装置の稼動により前記気密載荷函体の函体隔壁に水平方向の弾性振動を起こし、函体隔壁の表面に付着している既圧密中詰土の剥落と新たな流体状の未圧密中詰土の付着を促進させ、併行して気密載荷函体の天井真空タンクを真空状態とすることで中詰土に静荷重の大気圧,水圧を鉛直載荷すると共に鉛直振動装置の稼動により中詰土に圧力変動を加えて静動の合成鉛直載荷をする急速真空圧密工程の函体隔壁の水平弾性振動を特徴とする真空圧密浚渫工法。
- 請求項1のタワー式気密載荷函体において、当該函体の底面部に配備された無数の水平方向のノズルを有する回路網状の圧密促進剤噴射管が圧密促進剤圧送装置と圧送管で接続された圧密促進剤の装置が装備されていることを特徴とするタワー式気密載荷函体。
- タワー式気密載荷函体に当該函体の底面部に配備された圧密促進剤噴射管が圧密促進剤圧送装置と圧送管で接続された圧密促進剤の装置及び振動装置を装備した請求項2の真空圧密浚渫工法において、当該函体を海底にセットして中詰海底土が海水と遮断された状態で圧密促進剤を噴射混合し、さらに振動装置を稼働して圧密促進剤を中詰土の間隙水に拡散させることを特徴とする真空圧密浚渫工法。
- 請求項1のタワー式気密載荷函体を装備した専用作業船において、当該専用作業船を双胴型の作業船とし、双胴に挟まれた空間はタワー式気密載荷函体の設置空間とすると共に、土運船を引き入れて浚渫土の積み替えの作業空間とすることで、自分自身で浚渫土を運搬することも出来、且つ土運船に積み替えることも可能な構造形式としたことを特徴とする専用作業船。
- 請求項2の真空圧密浚渫工法に使用される専用作業船において、当該専用作業船を双胴型の作業船とし、双胴の内部にバラストタンクを設け、さらには双胴に挟まれた空間はタワー式気密載荷函体の設置空間とすると共に、土運船を引き入れて浚渫土の積み替えの作業空間とし、浚渫土の積み込み作業の進捗に伴い土運船の喫水が不足しないように前記バラストタンクに注水して専用作業船の喫水を下げることで土運船の喫水を確保することを特徴とする真空圧密浚渫工法。
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2018/014036 WO2019187169A1 (ja) | 2018-03-27 | 2018-03-27 | 真空圧密浚渫工法とタワー式気密載荷函体及び専用作業船 |
PCT/JP2018/019707 WO2019187174A1 (ja) | 2018-03-27 | 2018-05-22 | 真空圧密浚渫工法とタワー式気密載荷函体及び専用作業船 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2018/014036 WO2019187169A1 (ja) | 2018-03-27 | 2018-03-27 | 真空圧密浚渫工法とタワー式気密載荷函体及び専用作業船 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2019187169A1 true WO2019187169A1 (ja) | 2019-10-03 |
Family
ID=68058090
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2018/014036 WO2019187169A1 (ja) | 2018-03-27 | 2018-03-27 | 真空圧密浚渫工法とタワー式気密載荷函体及び専用作業船 |
PCT/JP2018/019707 WO2019187174A1 (ja) | 2018-03-27 | 2018-05-22 | 真空圧密浚渫工法とタワー式気密載荷函体及び専用作業船 |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2018/019707 WO2019187174A1 (ja) | 2018-03-27 | 2018-05-22 | 真空圧密浚渫工法とタワー式気密載荷函体及び専用作業船 |
Country Status (1)
Country | Link |
---|---|
WO (2) | WO2019187169A1 (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2022201730A1 (ja) * | 2021-03-24 | 2022-09-29 | 正佳 近藤 | 真空圧密工法と真空圧密浚渫工法及び真空圧密試験のシステムと鉛直ドレーン打設機と気密載荷函体 |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS59217825A (ja) * | 1983-05-24 | 1984-12-08 | Shimaji Kasuya | 海中に鉄筋コンクリ−ト建造物を建造する方法 |
JPH01169021A (ja) * | 1987-12-25 | 1989-07-04 | Kumamoto Pref Gov | ケーソンの据付方法及び装置 |
JPH11131465A (ja) * | 1997-08-22 | 1999-05-18 | Maruyama Kogyo Kk | 軟弱地盤の改良工法 |
JP2000144706A (ja) * | 1998-11-06 | 2000-05-26 | Maruyama Kogyo Kk | 軟弱地盤の改良工法 |
JP2000171376A (ja) * | 1998-12-03 | 2000-06-23 | Toto Denki Kogyo Kk | 液体密度の測定方法及び装置 |
JP2002143894A (ja) * | 2000-11-09 | 2002-05-21 | Ohbayashi Corp | 浚渫泥土の処理方法 |
JP2003181465A (ja) * | 2001-12-13 | 2003-07-02 | Nishino Kensetsu Kk | 水底浄化工法 |
JP2007309073A (ja) * | 2006-05-19 | 2007-11-29 | Masayoshi Kondo | 圧密沈下工法と工法に使用する載荷装置及び作業船。 |
JP2013023810A (ja) * | 2011-07-14 | 2013-02-04 | Nippon Solid Co Ltd | 浚渫時の水底近傍の汚濁拡散防止工法 |
JP2016196791A (ja) * | 2015-04-03 | 2016-11-24 | 正佳 近藤 | 海底地盤の切土・盛土のシステム工法と工法に使用する載荷函体及び作業船。 |
JP2017014880A (ja) * | 2015-07-03 | 2017-01-19 | 正佳 近藤 | 航路等の水深維持管理のシステム工法と工法に使用する載荷函体及び作業船 |
JP2017067472A (ja) * | 2015-09-28 | 2017-04-06 | 株式会社タツノ | 校正装置及び校正方法 |
WO2017159692A1 (ja) * | 2016-03-18 | 2017-09-21 | 正佳 近藤 | 真空圧密浚渫工法とタワー式気密載荷函体及び専用作業船 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0612524U (ja) * | 1992-07-14 | 1994-02-18 | バンドー化学株式会社 | ドレーン材 |
JP2789407B2 (ja) * | 1992-09-18 | 1998-08-20 | 信越化学工業株式会社 | 土壌改良方法 |
JPH07305510A (ja) * | 1994-05-11 | 1995-11-21 | Kiyuuken Sangyo Kk | 真空コンクリート工法 |
JP2000080896A (ja) * | 1998-09-03 | 2000-03-21 | Maeda Kosen Kk | 排水材 |
JP3731201B2 (ja) * | 2000-11-02 | 2006-01-05 | 五洋建設株式会社 | 中間深さ位置に砂層を有する軟弱地盤の真空圧密による地盤改良工法 |
JP4609793B2 (ja) * | 2005-01-20 | 2011-01-12 | 国立大学法人広島大学 | プラスチックボードドレーン材 |
JP6722493B2 (ja) * | 2016-04-08 | 2020-07-15 | 鹿島建設株式会社 | 油類の回収方法 |
-
2018
- 2018-03-27 WO PCT/JP2018/014036 patent/WO2019187169A1/ja active Application Filing
- 2018-05-22 WO PCT/JP2018/019707 patent/WO2019187174A1/ja active Application Filing
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS59217825A (ja) * | 1983-05-24 | 1984-12-08 | Shimaji Kasuya | 海中に鉄筋コンクリ−ト建造物を建造する方法 |
JPH01169021A (ja) * | 1987-12-25 | 1989-07-04 | Kumamoto Pref Gov | ケーソンの据付方法及び装置 |
JPH11131465A (ja) * | 1997-08-22 | 1999-05-18 | Maruyama Kogyo Kk | 軟弱地盤の改良工法 |
JP2000144706A (ja) * | 1998-11-06 | 2000-05-26 | Maruyama Kogyo Kk | 軟弱地盤の改良工法 |
JP2000171376A (ja) * | 1998-12-03 | 2000-06-23 | Toto Denki Kogyo Kk | 液体密度の測定方法及び装置 |
JP2002143894A (ja) * | 2000-11-09 | 2002-05-21 | Ohbayashi Corp | 浚渫泥土の処理方法 |
JP2003181465A (ja) * | 2001-12-13 | 2003-07-02 | Nishino Kensetsu Kk | 水底浄化工法 |
JP2007309073A (ja) * | 2006-05-19 | 2007-11-29 | Masayoshi Kondo | 圧密沈下工法と工法に使用する載荷装置及び作業船。 |
JP2013023810A (ja) * | 2011-07-14 | 2013-02-04 | Nippon Solid Co Ltd | 浚渫時の水底近傍の汚濁拡散防止工法 |
JP2016196791A (ja) * | 2015-04-03 | 2016-11-24 | 正佳 近藤 | 海底地盤の切土・盛土のシステム工法と工法に使用する載荷函体及び作業船。 |
JP2017014880A (ja) * | 2015-07-03 | 2017-01-19 | 正佳 近藤 | 航路等の水深維持管理のシステム工法と工法に使用する載荷函体及び作業船 |
JP2017067472A (ja) * | 2015-09-28 | 2017-04-06 | 株式会社タツノ | 校正装置及び校正方法 |
WO2017159692A1 (ja) * | 2016-03-18 | 2017-09-21 | 正佳 近藤 | 真空圧密浚渫工法とタワー式気密載荷函体及び専用作業船 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2022201730A1 (ja) * | 2021-03-24 | 2022-09-29 | 正佳 近藤 | 真空圧密工法と真空圧密浚渫工法及び真空圧密試験のシステムと鉛直ドレーン打設機と気密載荷函体 |
JP2022151445A (ja) * | 2021-03-24 | 2022-10-07 | 正佳 近藤 | 真空圧密工法と真空圧密浚渫工法及び真空圧密試験のシステムと鉛直ドレーン打設機と気密載荷函体 |
JP7325701B2 (ja) | 2021-03-24 | 2023-08-15 | 正佳 近藤 | 真空圧密工法と真空圧密浚渫工法及び真空圧密試験のシステムと鉛直ドレーン打設機と気密載荷函体 |
CN116917575A (zh) * | 2021-03-24 | 2023-10-20 | 近藤正佳 | 真空压密施工方法、真空压密疏浚施工方法、真空压密试验系统、铅垂排出打桩机和气密载置箱体 |
CN116917575B (zh) * | 2021-03-24 | 2024-02-09 | 近藤正佳 | 真空压密施工方法、真空压密疏浚施工方法、真空压密试验系统、铅垂排出打桩机和气密载置箱体 |
Also Published As
Publication number | Publication date |
---|---|
WO2019187174A1 (ja) | 2019-10-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6582361B2 (ja) | 真空圧密浚渫工法とタワー式気密載荷函体及び専用作業船。 | |
US10144892B2 (en) | System and method for dewatering coal combustion residuals | |
CN108360496A (zh) | 一种多功能模块式土体施压成型装置 | |
CN108330948A (zh) | 适用于深浅层软土地基处理的模块式土体施压成型装置 | |
WO2019214701A1 (zh) | 一种模块式土体施压成型装置及软土地基的处理方法 | |
CN108385659A (zh) | 一种拼装结构的模块式土体施压成型装置 | |
CN108532581A (zh) | 一种具有综合处理功能的模块式土体施压成型装置 | |
US8882397B2 (en) | Methods for waterproofing depositing sites | |
WO2019187169A1 (ja) | 真空圧密浚渫工法とタワー式気密載荷函体及び専用作業船 | |
CN108330949A (zh) | 一种具有快速排水功能的模块式土体施压成型装置 | |
JP2016196791A (ja) | 海底地盤の切土・盛土のシステム工法と工法に使用する載荷函体及び作業船。 | |
KR101029978B1 (ko) | 진공가압 기능을 갖는 탈 함수 장치 | |
KR100996969B1 (ko) | 진공가압 기능을 갖는 탈 함수 장치를 이용한 고함수비 토사의 탈 함수 공법 | |
WO2021065690A1 (ja) | 真空圧密浚渫工法と気密載荷函体及び真空圧密浚渫船 | |
WO2019214700A1 (zh) | 一种适用于浅层或中浅层软土地基的土体施压成型装置 | |
CN217297629U (zh) | 一种振动土工管袋的防於堵自动化试验装置 | |
US10458087B2 (en) | System and method for dewatering sediment ponds | |
Lam | Land reclamation & soil improvement using dredged slurry as fill | |
JP2020105743A (ja) | 埋立地の仕切り方法 | |
CN204491572U (zh) | 多功能集成管井排水振冲一体化装置 | |
CN108360497A (zh) | 一种具有挡土功能的模块式土体施压成型装置 | |
JP2016007562A (ja) | 埋立地廃棄物処分場における廃棄物減容処理工法 | |
CN209211431U (zh) | 一种具有快速排水功能的模块式土体施压成型装置 | |
KR100579701B1 (ko) | 해안의 연약지반에 준설토와 모래를 이용하여 지지력이강화된 매립지 및 이의 조성방법 | |
CN209211432U (zh) | 适用于深浅层软土地基处理的模块式土体施压成型装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 18911382 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 18911382 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: JP |