WO2019137205A1 - 轨道交通运营调度系统、方法及设备 - Google Patents
轨道交通运营调度系统、方法及设备 Download PDFInfo
- Publication number
- WO2019137205A1 WO2019137205A1 PCT/CN2018/123571 CN2018123571W WO2019137205A1 WO 2019137205 A1 WO2019137205 A1 WO 2019137205A1 CN 2018123571 W CN2018123571 W CN 2018123571W WO 2019137205 A1 WO2019137205 A1 WO 2019137205A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- rail transit
- professional
- scheduling
- data
- operation scheduling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
Definitions
- the present application relates to the field of rail transit technology, and in particular, to a rail transit operation scheduling system, method and device.
- Each professional system usually adopts a separate chimney deployment mode.
- Each professional system deploys the required hardware devices, servers, software and tools, and then deploys an integrated monitoring system for Power Supervisory Control And Data Acquisition (PSCADA), environment and equipment monitoring.
- PSCADA Power Supervisory Control And Data Acquisition
- System Building Automation System, BAS for short
- Fire Alarm System FAS
- other professional subsystems to form the electrical interconnection or loop as the core, the data interconnection between professional systems and Interaction.
- the integrated monitoring system interacts with the Automatic Train Supervision (ATS) to transmit the data obtained from each professional system to the ATS, and then analyzes the data of each professional system by using the ATS.
- ATS Automatic Train Supervision
- Fig. 1 indicates each professional system, 12 indicates an integrated monitoring system, and 13 indicates an ATS.
- each professional system, integrated monitoring system, and ATS are independently set, so that it is necessary to separately set corresponding hardware devices, servers, tools, and the like. Not only the layout process is cumbersome, but also the cost is high; secondly, the integration methods, communication standards and specifications of the professional systems and integrated monitoring are not uniform, making the unified scheduling difficult; third, the data of each professional system is It is saved by each professional system, which results in the data sharing of each professional system cannot be realized, and the data island is formed, so that the data of each professional system can not be used for extended analysis, which causes the loss of data value and reduces the safety of rail transit operation. And reliability.
- the present application aims to solve at least one of the technical problems in the related art to some extent.
- the first object of the present application is to propose a rail transit operation scheduling system.
- the system realizes the sharing of processing resources among professional systems by uniformly deploying various professional systems, which not only reduces the redundant construction of physical equipment, but also reduces the cost of equipment layout, and realizes data sharing among professional systems. It provides more valuable information for dispatching command and ensures the safety and reliability of rail transit operations.
- the second object of the present application is to propose a method for scheduling rail transit operations.
- a third object of the present application is to propose a computer device.
- a fourth object of the present application is to propose a computer readable storage medium.
- the first aspect of the present application provides a rail transit operation scheduling system, including: an operation scheduling cloud platform and field devices of various professional systems;
- the operation scheduling cloud platform is in communication connection with the field devices of the professional systems, and is configured to perform corresponding linkage control on the field devices of the professional systems according to the driving scheduling plan and the driving scheduling plan change.
- Traffic scheduling is the core of rail transit operation scheduling.
- the rail transit operation scheduling system communicates with the professional system field devices through the operation scheduling cloud platform, so that the operation scheduling cloud platform can be changed according to the driving scheduling plan and the driving scheduling plan, and the field devices of each professional system are sent.
- the data controls the field devices of each professional system to realize the rail transit operation scheduling with the traffic dispatch as the core. Therefore, by uniformly deploying various professional systems to realize processing resource sharing among professional systems, not only the redundant construction of physical equipment is reduced, but also the cost of equipment arrangement is reduced, and data sharing between professional systems is realized. It provides more valuable information for dispatching command and ensures the safety and reliability of rail transit operations.
- the second aspect of the present application provides a rail transit operation scheduling method, where the rail transit operation scheduling system includes: an operation scheduling cloud platform and field devices of each professional system, wherein the operation scheduling cloud platform, Communicating with the field devices of the professional systems; the method includes:
- the rail transit operation scheduling method provided by the embodiment provides linkage control of the field devices of each professional system by acquiring the traffic dispatching plan and the data collected by the professional system equipments, so as to realize the rail transit operation scheduling with the traffic dispatching as the core. Therefore, by uniformly deploying various professional systems to realize processing resource sharing among professional systems, not only the redundant construction of physical equipment is reduced, but also the cost of equipment arrangement is reduced, and data sharing between professional systems is realized. It provides more valuable information for dispatching command and ensures the safety and reliability of rail transit operations.
- a third aspect of the present application provides a computer device, including: a memory, a processor, and a computer program stored on the memory and operable on the processor, when the processor executes the program
- the rail transit operation scheduling method described in the second embodiment is implemented.
- the computer equipment provided in this embodiment performs linkage control on the field devices of each professional system by acquiring the driving scheduling plan and the data collected by each professional system device, so as to realize the rail transit operation scheduling with the traffic scheduling as the core. Therefore, by uniformly deploying various professional systems to realize processing resource sharing among professional systems, not only the redundant construction of physical equipment is reduced, but also the cost of equipment arrangement is reduced, and data sharing between professional systems is realized. It provides more valuable information for dispatching command and ensures the safety and reliability of rail transit operations.
- the fourth aspect of the present application provides a computer readable storage medium, where the computer program is stored, and when the program is executed by the processor, the rail transit operation scheduling method according to the second aspect embodiment is implemented. .
- FIG. 1 is a schematic diagram of setting and interacting with each professional system, integrated monitoring system, and automatic train monitoring system in the related art
- FIG. 2 is a schematic structural diagram of a rail transit operation scheduling system according to an embodiment of the present application.
- FIG. 3 is a schematic structural diagram of a rail transit operation scheduling system according to another embodiment of the present application.
- FIG. 4 is a schematic diagram showing a world-class rail transit operation data of an exhibition platform according to an embodiment of the present application
- FIG. 5 is a schematic diagram showing a national level of rail transit operation data of a display platform according to an embodiment of the present application
- FIG. 6 is a schematic diagram showing the rail transit operation data of the display platform display line level according to an embodiment of the present application.
- FIG. 7 is a schematic diagram showing the rail transit operation data of a station level in a display platform according to an embodiment of the present application.
- FIG. 8 is a schematic diagram showing a rail transit operation data of a vehicle level displayed by a display platform according to an embodiment of the present application
- FIG. 9 is a flowchart of a rail transit operation scheduling method according to an embodiment of the present application.
- FIG. 10 is a flowchart of a rail transit operation scheduling method according to another embodiment of the present application.
- FIG. 11 is a schematic structural diagram of a computer device according to an embodiment of the present application.
- the present application is mainly directed to related technologies, in the operation scheduling of rail transit, each professional system, integrated monitoring system, and ATS are independently set, so that hardware devices, servers, tools, and the like corresponding to separate devices are required, which not only makes the whole The structure is cumbersome and costly. Moreover, the data of each professional system is saved by each professional system, which results in the data sharing between the professional systems cannot be realized, and the data island is formed, so that the data of each professional system cannot be used as the extended analysis, so that the data value is lost. To reduce the safety and reliability of rail transit operations, a rail transit operation dispatching system is proposed.
- the rail transit operation dispatching system proposed by the present application including the operation and dispatching cloud platform of the communication connection and the field equipment of each professional system, directly link the field devices of each professional system according to the driving dispatching plan and the driving dispatching plan change through the operation dispatching platform.
- Control in order to achieve the traffic scheduling as the core of rail transit operation scheduling. Therefore, by distributing the professional systems in a unified manner, the processing resources sharing among the professional systems is realized, which not only reduces the redundant construction of the physical equipment, but also reduces the cost of the equipment arrangement, and realizes the data between the professional systems. Sharing, providing more valuable information for dispatching command, ensures the safety and reliability of rail transit operations.
- FIG. 2 is a schematic structural diagram of a rail transit operation scheduling system according to an embodiment of the present application.
- the rail transit operation scheduling system includes: an operation scheduling cloud platform 10 and field devices 20 of each professional system.
- the operation scheduling cloud platform 10 is communicably connected with the field device 20 of each professional system, and is used for controlling the field device 20 of each professional system according to the driving scheduling plan and the driving scheduling plan change, so as to realize the track with the traffic scheduling as the core. Traffic operation scheduling.
- the traffic dispatching plan may specifically include information such as a train running time, a running line, a route station, and a stop time, which are not specifically limited in this embodiment.
- the change of the driving schedule plan refers to the operation of adjusting the train running time, the passing route, and the running line in the driving dispatching plan, and is not specifically limited herein.
- each professional system may be, but not limited to, an automatic train supervision system (ATS), an automatic Fare Collection System (AFC), and a passenger information system ( Passenger Information System (PIS), Broadcasting System (PA), Closed Circuit Television (CCTV), PSCADA, BAS, FAS, Network Management System , which is abbreviated as: NMS), Uninterruptible Power System (UPS), and clock system, etc., which are not specifically limited in this embodiment.
- ATS automatic train supervision system
- AFC automatic Fare Collection System
- PIS Passenger Information System
- PA Broadcasting System
- CCTV Closed Circuit Television
- PSCADA Broadcasting System
- BAS Closed Circuit Television
- FAS FAS
- NMS Uninterruptible Power System
- clock system etc.
- ATS is a subsystem in the Automatic Train Control (ATC), and is the ATC monitoring system, which can supervise the train and automatically adjust the train running schedule and the dispatcher to the train.
- Information is provided with external systems to enable trains to reduce the adverse effects of unpointed operations.
- ATC includes four subsystems: Automatic Train Protection (ATP), Automatic Train Operation (ATO), ATS, and computer interlocking system.
- ATP Automatic Train Protection
- ATO Automatic Train Operation
- ATS computer interlocking system
- ATS is the core of operation scheduling, and a reasonable and efficient operation plan is prepared for each professional system to meet the needs of passengers' travel; organize train operation to ensure the whole operation of the train; and power supply equipment, environmental control equipment and disaster prevention equipment.
- AFC is a closed automation network system that is controlled centrally by computer (including semi-automatic ticketing), automatic ticket checking, and automatic charging and counting. It is based on computer, communication, network automatic control and other technologies to achieve automated processing of rail transit ticketing, ticket checking, billing, charging, statistics, clearing, and management.
- PIS is a system that provides information services to passengers based on multimedia network technology and computer system as the core, with stations and car broadcast terminals as the medium. It uses modern technology network technology and multimedia technology to display diversified information and deliver various types of information to designated groups according to different information interaction methods.
- the information provided by PIS to passengers may include: information for passengers, service time, train arrival time, train schedule, manager announcement, government announcement, travel reference, stock information, media news, live broadcast, advertisement Real-time dynamic multimedia information; provide dynamic emergency evacuation prompts in abnormal situations such as fires, obstructions, and terrorist attacks.
- PSCADA is used to monitor and collect the power substation equipment, and analyze the operation data of the substation equipment to ensure the safe and reliable operation of the power supply system and the power conversion system.
- BAS utilizes computer network technology, automatic control technology, communication technology and distributed intelligent technology to realize decentralized control of equipment, centralized management of system mode, ventilation of air conditioning in rails and section tunnels, water supply and drainage, lighting, elevators, escalators, safety gates, etc.
- the equipment is fully managed and controlled.
- the FAS is used to receive, process and manage fire alarm information of the networked users, operational status information of the building fire protection facilities, and fire safety management information, and send the confirmed fire alarm information to the city fire communication command center.
- the NMS is used to manage one or several device network management systems, and the device network management directly manages multiple devices and is connected to the device. These devices are distributed in different geographical locations.
- the device network management and integrated network management implement the effective management of equipment resources and performance indicators.
- the field device 20 of each professional system in this embodiment may be classified into an in-vehicle device and a ground device according to the set position.
- the rail transit data is collected in real time through the field device 20 of each professional system, and the collected data is sent to the operation scheduling cloud platform 10, so that the operation scheduling cloud platform 10 analyzes and processes the above data, and then according to the driving schedule.
- the planning, and data analysis processing results are correspondingly controlled for each professional system field device 20.
- the operation scheduling cloud platform 10 automatically triggers the broadcasting system to perform a fire emergency broadcast, and controls the closed circuit television monitoring system to automatically switch the video monitoring screen to the fire scene, and simultaneously sends the fire to the access control system according to the fire.
- the mode releases the controlled door, and triggers the station multimedia device to display the fire mode information to guide the passengers to evacuate.
- the operation scheduling cloud platform 10 can also send a fire clock signal to each professional system when determining the alarm of the fire alarm system, thereby ensuring that the clocks of the professional systems are kept synchronized.
- each professional system field device 20 and the operation scheduling cloud platform 10 can communicate by wireless communication, and the wireless communication mode can be ZigBee, wireless LAN wifi, cellular network, Bluetooth, LET-U, etc. There is no specific limit.
- the operation scheduling cloud platform 10 in the rail transit operation scheduling system of the present application can be divided into: a software level 110 and a physical level 111.
- the software level 110 and the physical level 111 are set in a top-down manner, and the software level 110 and the physical level 111 are connected to each other.
- the physical layer level 111 is used to provide the operational scheduling cloud platform 10 with the physical resources required for operation;
- the software level 110 is used for the physical resources provided by the physical layer level 111, with the traffic scheduling as the core, and the software level is run.
- Different functional modules in 110 realize operation scheduling for various professional systems.
- the physical resources provided by the physical layer level 111 to the operation scheduling cloud platform 10 may include, but are not limited to, a server, a network, a storage unit, and the like, which is not specifically limited in this embodiment.
- the different functional modules of the software hierarchy 110 running based on the physical resources provided by the physical hierarchy 111 may include, but are not limited to, a universal setting module, a configuration tool module, a power supply module, a train monitoring module, a passenger scheduling module, etc. No specific limitation.
- the software level 110 in this embodiment may be adjusted to physical resources divided by different functional modules according to the amount of data collected by the field device 20 of each professional system.
- the operation scheduling cloud platform 10 may divide corresponding physical resources for different functional modules in advance, and set corresponding thresholds.
- the operation scheduling cloud platform 10 After the operation scheduling cloud platform 10 obtains the data collected by the field device 20 of each professional system, the data amount collected by the field device 20 of each professional system may be compared with the set threshold, if the field device 20 of each professional system is determined. When the amount of data collected exceeds the corresponding threshold, the operation scheduling cloud platform 10 automatically expands the physical resources of the function module, and vice versa, when the amount of data collected by the field device 20 of each professional system is less than the corresponding threshold, The physical resources of the function module are automatically reclaimed, thereby realizing flexible resource allocation.
- the physical resources may be adjusted by dividing the physical resources of the same level for each functional module, and then according to the processing speed of each functional module; or, the processing data is more
- the physical resources of the function module are divided by one or more times than the physical resources of the function module that generally processes the data, and the like, which is not limited in this embodiment.
- the thresholds set by different functional modules can be adaptively set according to the allocated physical resources and the type of data to be processed, and are not specifically limited herein.
- the initial physical resources are all 120 Gigabit (Giga, G for short), and the data volume threshold of each functional module is 110 G. Then, after receiving the data collected by the field device 20 of each professional system, the collected data amount is respectively compared with the thresholds of the five functional modules. If the data collected by the function module B exceeds the threshold, the operation scheduling is performed at this time.
- the cloud platform 10 can augment the physical resources of B.
- the present application implements flexible resource allocation by using a threshold configuration. That is, when the amount of data accessed by any function module increases and is greater than the threshold of the function module, the operation scheduling cloud platform 10 can enter an automatic capacity expansion mechanism to meet the service requirements at any time without additional workload, and when any function module is accessed. When the data volume is lower than the threshold, the operation scheduling cloud platform 10 will automatically reclaim the allocated resources, thereby realizing the allocation of fully automatic resources, ensuring that the physical resources allocated by the functional modules are increased or decreased as needed, so that the expansion is simple and easy to implement.
- the software hierarchy 110 of the present application may also analyze historical operation data of each professional system to generate a scenario linkage mode, wherein the scenario linkage mode may include trigger conditions of each professional system and The control commands of each professional system, and when it is determined that at least one professional system satisfies the trigger condition, initiates a scenario linkage mode to perform operation scheduling for each professional system.
- scenario linkage mode may include trigger conditions of each professional system and The control commands of each professional system, and when it is determined that at least one professional system satisfies the trigger condition, initiates a scenario linkage mode to perform operation scheduling for each professional system.
- the trigger conditions and control commands corresponding to each professional system are: when the smoke data collected by the FAS device reaches the first threshold, triggering Fire alarm, parallel control broadcast system for fire emergency broadcast, while controlling CCTV monitoring system to play the fire scene screen, the access control system releases the controlled door, the station multimedia equipment displays the fire information and guides the passengers to evacuate.
- the rail transit operation dispatching system will automatically start the fire linkage mode, that is, trigger the fire alarm, and the broadcast system will perform the fire emergency broadcast, closed circuit television.
- the monitoring system automatically switches the video monitoring screen to the fire scene, and sends the controlled door to the access control system according to the fire mode, and simultaneously triggers the display of the multimedia mode fire mode information of the station to guide the passengers to evacuate.
- the rail transit operation scheduling system when the rail transit operation scheduling system is initially created, the historical operation data of each professional system is not recorded in the operation scheduling cloud platform 10, so the application needs to be scheduled when the rail transit operation scheduling system is used for the first time.
- the personnel manually handles the different operation situations, so that the operation scheduling cloud platform 10 can record the processing operations of the dispatcher on different operational situations, and then use the big data to perform autonomous learning according to the above-mentioned recorded dispatcher processing operations to generate different The plan linkage mode.
- the operation scheduling cloud platform 10 After the scenario linkage mode is generated, the operation scheduling cloud platform 10 performs real-time analysis on the data collected by each professional system. When it is determined that any professional system reaches the trigger condition, the scenario linkage mode is automatically started, and the professional system is automatically used by using the scenario linkage mode. Operation scheduling, not only can reduce the operation of the operation and maintenance personnel, but also automatically operate and dispatch the professional systems according to the plan linkage mode, which improves the reliability and security of the system.
- the plan linkage mode can be implemented by the sequence control function of the system; or, the execution can be activated automatically or semi-automatically between the professional systems; or can be manually executed by the dispatcher as a control sequence, etc. This embodiment does not specifically limit this.
- the present application formulates a plan linkage mode by introducing a big data calculation technology, and uses the plan linkage mode to analyze and formulate a reasonable threshold for the data of each professional system in the scenario in which the operational process needs to be performed, and formulate corresponding
- the system automatically starts the scenario linkage mode, so that each professional system automatically linkages for operation scheduling.
- the rail transit operation scheduling system communicates with the field devices of each professional system through the operation scheduling cloud platform, so that the operation scheduling cloud platform can be changed according to the driving scheduling plan and the driving scheduling plan, and the field devices of each professional system.
- the transmitted data is linked to the field devices of each professional system to realize the rail transit operation scheduling with the traffic dispatch as the core. Therefore, by uniformly deploying and processing resource sharing of various professional systems, not only the repeated construction of physical equipment is reduced, but also the cost of equipment arrangement is reduced, and data sharing between professional systems is realized, and scheduling is performed. Provides more valuable information to ensure the safety and reliability of rail transit operations.
- FIG. 3 is a schematic structural diagram of a rail transit operation scheduling system according to another embodiment of the present application.
- the rail transit operation scheduling system further includes: a display platform 30 communicatively coupled to the operation scheduling cloud platform 10.
- the display platform 30 is configured to obtain the operational data of the rail transit from the operation scheduling cloud platform 10, and display the display in the display platform 30 according to a preset splicing rule.
- the preset splicing rule may be the default of the system, or may be set according to the user privilege or the user level, which is not specifically limited in this embodiment.
- the security maintenance interface can be displayed to the user after the user logs in to the system through the privilege policy, so that the security maintenance personnel can view the security maintenance interface corresponding to their position.
- this application can integrate information related to driving command, disaster prevention safety, passenger service management, etc., and provide users with a friendly, complete and unified display platform (human-machine interface) to facilitate the operation of dispatchers.
- the professional system in the human-machine interface provided to the user may separately set the corresponding page, so that the dispatcher can enter the responsible system by clicking the professional system page that needs to be browsed or operated, thereby making the rail transit operation system More applicability.
- the display platform 30 of the present embodiment can also be used to display guidance information to assist the rail transit operator in performing manual operations.
- the rail transit operator can timely and accurately perform operation scheduling on each professional system, but when an emergency occurs, such as a fire or a power failure, the operation personnel are not timely due to external factors. Accurate and adversely affected.
- the present application displays the guidance information through the display platform 30 to guide and assist the dispatcher to perform some sequence operations.
- the sequences are composed of picture and sequence logic to prompt the dispatcher to manually complete a process, or The dispatcher starts an operation sequence to automatically perform the corresponding operation, realizes the emergency command, and can timely and accurately handle the emergency.
- the display platform 30 In order to prevent the dispatcher from being nervous and trigger some operations, the display platform 30 also configures an interlock in the display interface to warn or prohibit certain operations, and when the dispatcher needs to take immediate action, the display platform 30 can automatically pop up correspondingly.
- the control sequence is such that the user can directly trigger the control sequence and perform corresponding processing.
- the display platform 30 will automatically navigate the display screen to the control sequence screen that should be triggered at present to ensure better scheduling security and reliability.
- the above screen can be set as the control sequence screen at the time of the alarm occurrence, and the operator is required to take immediate action.
- the rail transit operation data acquired from the operation dispatching platform 10 in the display platform 30 of the present embodiment is displayed in accordance with the preset splicing rules in conjunction with FIG. 4-8. The situation is specified.
- the operation scheduling system can provide services for users at different levels, such as city level, vehicle level, station level, etc. Accordingly, the operation scheduling platform 10 can provide different data splicing rules for different levels of users, and further The operation data is spliced and displayed in the display platform with different data splicing rules, so that the control display platform 30 provides different display interfaces for different levels of users.
- each level of the rail transit operation data display interface may include: a home page module 210, an electromechanical module 220, a power supply module 230, a train monitoring module 240, and a passenger service module 250.
- Figure 4 is a schematic diagram showing the platform to display world-level rail transit operation data.
- the display interface including the current opening rail transit country 40, the current open rail transit city 41, the current number of open rail transit 42, the total number of rail transit lines 43, the total length of rail transit lines 44, the total number of rail transit stations 45, passenger flow
- the statistics 46, the traffic ranking 47, the operation plan 48, the number of safe operation days 49, the current number of passengers 410, and the like, and each of the above units may further include a plurality of data information, which may be determined according to the actual operation of the rail transit. It is not specifically limited.
- FIG. 5 is a schematic diagram showing the platform showing country-level rail transit operational data.
- the display unit may include the following units: an operator distribution 50, a stock trading trend 51, an acceptance leaderboard 52, a passenger experience indicator 53, a trend graph 54, and the like.
- the operator can display the passenger experience indicator 53 displayed on the platform to understand whether the passenger's riding experience is good, so as to achieve corresponding adjustment of the riding environment and improve the passenger experience.
- FIG. 6 is a schematic diagram showing the rail transit operational data of the platform display line level.
- the rail transit operation data interface of the line level may include: a unit number average number of people 60, an average vehicle interval time 61, a daily average number of vehicles 62, a vehicle full load rate 63, a device failure rate 64, an operation chart 65, and the like. In other words, the operation of each line can be clearly understood through the rail transit operation data at the line level.
- Figure 7 is a schematic diagram showing the platform showing rail transit operational data at the station level.
- the interface may include: the station passenger flow 70, the local station departure interval 71, the local station equipment failure 72, and the CCTV1 to CCTV n73.
- the station passenger flow 70 the local station departure interval 71
- the local station equipment failure 72 the local station equipment failure 72
- the CCTV1 to CCTV n73 the CCTV1 to CCTV n73.
- FIG. 8 is a schematic diagram showing a platform displaying vehicle level rail transit operation data, wherein the vehicle level rail transit operation data interface includes: traction system 80, brake system 81, high voltage power distribution system 82, battery system 83, and pressure sensing system. 84. Current vehicle speed 85, current position 86, current operating mode 87, distance from next station 88, device status summary 89, CCTV1 to CCTV n8100, and the like.
- buttons such as a main interface, an export, a forward, a backward, and the like are respectively included, so that the user can perform operations such as switching interfaces by triggering a button such as forward or export to obtain the required hierarchical information, and further Improve the user experience.
- the content and the form shown in FIG. 4-8 are only examples of the present application, and are not specifically limited to the present application. In specific implementation, the content and display form may be adapted according to requirements.
- the application may also set a configuration function module on the operation scheduling cloud platform 10, so that when a new node is added, for example, a new running line is added, or When the site is docked, the addition of the new node can be completed by operating the configuration function module in the operation scheduling platform 10.
- the rail transit operation dispatching system provided by the embodiment can display the operational data or the guiding information of the rail transit to the dispatching personnel through the display platform, so as to help the dispatching personnel to take different operations according to the requirements, thereby making the rail transit operation Scheduling security and reliability are higher.
- an embodiment of the present application further provides a method for scheduling a rail transit operation.
- FIG. 9 is a flow chart of a method of rail transit operation scheduling according to an embodiment of the present application.
- the rail transit operation scheduling method can be applied to the rail transit operation scheduling system implemented above to implement control or management of rail transit operation scheduling.
- the rail transit operation scheduling system comprises: an operation scheduling cloud platform and field devices of each professional system, wherein the operation scheduling platform is in communication connection with the field devices of each professional system.
- the rail transit operation scheduling method may include the following steps:
- Step 501 Obtain a driving schedule and device data of each professional system.
- the rail transit scheduling plan may specifically refer to information such as the train running time, the running line, the route site, and the stopping time. This embodiment does not specifically limit this.
- Step 502 Perform linkage control on the field devices of each professional system according to the driving scheduling plan and the change of the driving scheduling plan, so as to realize the rail transit operation scheduling with the traffic scheduling as the core.
- the rail transit data is acquired, and the rail transit data is analyzed, and then the field devices of each professional system are correspondingly controlled according to the rail transit driving schedule and the data analysis result.
- each professional system when controlling the field devices of each professional system, it may be based on the driving schedule and the driving schedule change, and corresponding linkage plans and changes are made to each professional system; then the traffic scheduling plan and the driving schedule change occur. Before, mobilize the professional systems to enter the corresponding working state.
- the driving route of train A in the traffic dispatching plan is Beijing-Guangzhou South
- the departure time is 12:20
- the arrival time is 20:20
- the transit station is Baoding Station, Wuhan, Changsha, etc.
- the train A is powered on, and the professional systems such as CCTV, PA, and NMS are started to enter the working state, so that the train A can perform detection operations on each professional system before the departure, so that the train A can start on time and improve the dispatch of the train A. reliability.
- the rail transit operation scheduling method of the present application can also analyze the historical operation data of each professional system, and generate a plan linkage mode, wherein the plan linkage mode includes trigger conditions of each professional system, and corresponding linkages of the professional systems respectively. Control instruction.
- the embodiment may also acquire data collected by the field device of each professional system in real time during the rail transit operation process; and according to the data collected in real time, determine whether at least one professional system satisfies the scenario linkage triggering condition; If yes, the at least one professional system is linkedly controlled according to the corresponding linkage control command.
- the rail transit operation scheduling system automatically starts when the data collected by the FAS device meets the triggering fire alarm condition.
- the fire linkage mode is activated to control the broadcast system for fire emergency broadcast, and the closed-circuit television monitoring system is automatically switched to the fire scene, and the controlled door is released according to the fire mode to the access control system, and the multimedia mode fire mode of the station is triggered.
- Information shows that the passengers are evacuated.
- the rail transit operation dispatching system when the rail transit operation dispatching system is initially created, the historical operational data of each professional system is not recorded in the rail transit information system cloud platform, so the present application needs to use the rail transit operation scheduling system for the first time.
- the dispatcher manually handles different operational situations, so that the rail transit information system cloud platform can record the dispatcher's processing operations on different operational situations, and then use the big data to perform autonomous learning according to the recorded dispatcher processing operations. Generate different scenario linkage modes.
- the rail transit information system cloud platform After generating the plan linkage mode, the rail transit information system cloud platform will analyze the data collected by each professional system in real time. When it is determined that any professional system reaches the trigger condition, the plan linkage mode is automatically started to use the plan linkage mode to the above professional system. Operation scheduling, not only can reduce the operation of the operation and maintenance personnel, but also automatically operate and dispatch the professional systems according to the plan linkage mode, which improves the reliability and security of the system.
- the plan linkage mode can be implemented by the sequence control function of the system; or, the execution can be activated automatically or semi-automatically between the professional systems; or can be manually executed by the dispatcher as a control sequence, etc. This embodiment does not specifically limit this.
- the present application formulates a plan linkage mode by introducing a big data calculation technology, and uses the plan linkage mode to analyze and formulate a reasonable threshold for the data of each professional system in the scenario in which the operational process needs to be performed, and formulate corresponding
- the system automatically starts the scenario linkage mode, so that each professional system automatically linkages for operation scheduling.
- the rail transit operation scheduling method provided by the embodiment provides linkage control of the field devices of each professional system by acquiring the traffic dispatching plan and the data collected by the professional system equipments, so as to realize the rail transit operation scheduling with the traffic dispatching as the core. Therefore, by uniformly deploying various professional systems, the processing resources sharing of each professional system is realized, which not only reduces the redundant construction of physical equipment, but also reduces the cost of equipment arrangement, and also realizes data sharing among professional systems. It provides more valuable information for dispatching command and ensures the safety and reliability of rail transit operations.
- the present application obtains the rail transit driving plan and other professional system equipment data to control the on-site equipment of each professional system according to the rail transit driving plan, so as to realize the rail transit operation scheduling with the driving dispatch as the core.
- the embodiment in order to facilitate the operation of the dispatcher, can also display the running data of the rail transit through the display platform, or help the rail transit operator to perform the manual operation guiding information to realize the visualization of the rail transit operation traffic control. operating.
- the rail transit operation scheduling method in the above case will be further described below with reference to FIG.
- FIG. 10 is a flowchart of a rail transit operation scheduling method according to another embodiment of the present application.
- the rail transit operation scheduling method may include the following steps:
- Step 601 Acquire a driving schedule and device data of each professional system.
- Step 602 Perform linkage control on the field devices of each professional system according to the change of the driving schedule and the driving schedule.
- Step 603 Display operation data of the rail transit in the display platform according to the running status of each professional system, or display the information for assisting the rail transit operator to perform manual operation guidance.
- this application can integrate information related to driving command, disaster prevention safety, passenger service management, etc., and provide users with a friendly, complete and unified display platform (human-machine interface) to facilitate the operation of dispatchers.
- the professional system in the human-machine interface provided to the user may separately set a corresponding page, and the dispatching personnel may enter the system in charge by clicking a professional system page that needs to be browsed or operated, thereby making the rail transit operation system More applicability.
- the embodiment needs to obtain the operation scheduling system login request, where the login request includes the user authority; and the target operation data collected by the target professional system field device corresponding to the user authority is acquired, and the target is acquired.
- Operational data is presented in the form of presentations corresponding to the target professional system.
- the system displays the system page corresponding to the user rights to the user.
- the security maintenance interface can be displayed to the user after the user logs in to the system through the privilege policy, so that the security maintenance personnel can view the security maintenance interface corresponding to their position.
- the target operation data is displayed in the form of the target professional system, which may be the system default or may be set according to the control personnel later. This embodiment does not specifically limit this.
- the rail transit operators can perform the operation scheduling of each professional system in time and during normal operation, when an emergency occurs, such as a fire or a power failure, the operation personnel are not operated in time due to external factors. Accurate and adversely affected.
- the present application displays guidance information through the display platform to guide and assist the dispatcher to perform some sequence operations, and the sequences are composed of picture and sequence logic to prompt the dispatcher to manually complete a process, or let the schedule The personnel initiates an operation sequence to automatically perform the corresponding operation, realizes the emergency command, and can timely and accurately handle the emergencies.
- the display platform In order to prevent the dispatcher from being nervous and trigger some operations, the display platform also configures an interlock in the display interface to warn or prohibit certain operations, and when the dispatcher needs to take immediate action, the display platform can automatically pop up corresponding control.
- the sequence is such that the user can directly trigger the control sequence and perform the corresponding processing.
- the display platform will automatically navigate the display screen to the control sequence screen that should be triggered at present to ensure better scheduling security and reliability.
- the above screen can be set as the control sequence screen at the time of the alarm occurrence, and the operator is required to take immediate action.
- the following describes the situation of the display platform in the embodiment, the rail transit operation data obtained from the operation scheduling platform, and the display according to the preset splicing rules. .
- each level of the rail transit operation data display interface may include: a home page module 210, an electromechanical module 220, a power supply module 230, a train monitoring module 240, and a passenger service module 250.
- Figure 4 is a schematic diagram showing the platform to display world-level rail transit operation data.
- the display interface including the current opening rail transit country 40, the current open rail transit city 41, the current number of open rail transit 42, the total number of rail transit lines 43, the total length of rail transit lines 44, the total number of rail transit stations 45, passenger flow
- the statistics 46, the traffic ranking 47, the operation plan 48, the number of safe operation days 49, the current number of passengers 410, and the like, and each of the above units may further include a plurality of data information, which may be determined according to the actual operation of the rail transit. It is not specifically limited.
- FIG. 5 is a schematic diagram showing the platform showing country-level rail transit operational data.
- the display unit may include the following units: an operator distribution 50, a stock trading trend 51, an acceptance leaderboard 52, a passenger experience indicator 53, a trend graph 54, and the like.
- the operator can display the passenger experience indicator 53 displayed on the platform to understand whether the passenger's riding experience is good, so as to achieve corresponding adjustment of the riding environment and improve the passenger experience.
- FIG. 6 is a schematic diagram showing the rail transit operational data of the platform display line level.
- the rail transit operation data interface of the line level may include: a unit number average number of people 60, an average vehicle interval time 61, a daily average number of vehicles 62, a vehicle full load rate 63, a device failure rate 64, an operation chart 65, and the like. In other words, the operation of each line can be clearly understood through the rail transit operation data at the line level.
- Figure 7 is a schematic diagram showing the platform showing rail transit operational data at the station level.
- the interface may include: the station passenger flow 70, the local station departure interval 71, the local station equipment failure 72, and the CCTV1 to CCTV n73.
- the station passenger flow 70 the local station departure interval 71
- the local station equipment failure 72 the local station equipment failure 72
- the CCTV1 to CCTV n73 the CCTV1 to CCTV n73.
- FIG. 8 is a schematic diagram showing a platform displaying vehicle level rail transit operation data, wherein the vehicle level rail transit operation data interface includes: traction system 80, brake system 81, high voltage power distribution system 82, battery system 83, and pressure sensing system. 84. Current vehicle speed 85, current position 86, current operating mode 87, distance from next station 88, device status summary 89, CCTV1 to CCTV n8100, and the like.
- buttons such as a main interface, an export, a forward, a backward, and the like are respectively included, so that the user can perform operations such as switching interfaces by triggering a button such as forward or export to obtain the required hierarchical information, and further Improve the user experience.
- the content and the form shown in FIG. 4-8 are only examples of the present application, and are not specifically limited to the present application. In specific implementation, the content and display form may be adapted according to requirements.
- the present application can also set a configuration function module on the rail transit information system cloud platform, so that when adding a new node, for example, adding a new running line, or When the site is docked, the new node can be added by operating the configuration function module in the operation scheduling platform.
- This realizes a set of software adaptation to all lines, component design and development, on-demand configuration, reducing construction difficulty and speeding up construction.
- the rail transit operation scheduling method provided by the embodiment displays the operation data or the guidance information of the rail transit to the dispatcher through the display platform, so as to help the dispatcher to take corresponding trigger or control operations on the display platform according to the demand, thereby making the track Traffic operation scheduling is more secure and reliable.
- the present application also proposes a computer device.
- FIG. 11 is a schematic structural diagram of a computer device according to an embodiment of the present application.
- the computer device includes a memory 120, a processor 130, and a computer program stored on the memory 120 and operable on the processor 130.
- the processor 130 executes the program, the second aspect is implemented.
- the rail transit operation scheduling method comprises: obtaining a driving dispatch plan and equipment data of each professional system; and performing linkage control on the field devices of each professional system according to the rail transit driving schedule and the driving scheduling plan change, to realize driving scheduling Dispatched for the core rail transit operations.
- the computer equipment provided in this embodiment performs linkage control on the field devices of each professional system by acquiring the driving scheduling plan and the data collected by each professional system device, so as to realize the rail transit operation scheduling with the traffic scheduling as the core. Therefore, by uniformly deploying various professional systems, the processing resources sharing of each professional system is realized, which not only reduces the redundant construction of physical equipment, but also reduces the cost of equipment arrangement, and also realizes data sharing among professional systems. It provides more valuable information for dispatching command and ensures the safety and reliability of rail transit operations.
- the present application also proposes a computer readable storage medium.
- the computer readable storage medium having stored thereon a computer program that, when executed by the processor, implements the rail transit operation scheduling method of the second aspect.
- the rail transit operation scheduling method comprises: obtaining a driving dispatch plan and equipment data of each professional system; and performing linkage control on the field devices of each professional system according to the rail transit driving schedule and the driving scheduling plan change, to realize driving scheduling Dispatched for the core rail transit operations.
- the terms "set”, “connected” and the like shall be understood broadly, and may be either mechanical or electrical, as may be directly connected or passed through, unless otherwise specifically defined and defined.
- the intermediate medium is indirectly connected, and may be an internal connection of two elements or an interaction of two elements unless explicitly defined otherwise.
- the specific meanings of the above terms in the present application can be understood on a case-by-case basis.
- first and second are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated.
- features defining “first” or “second” may include at least one of the features, either explicitly or implicitly.
- portions of the application can be implemented in hardware, software, firmware, or a combination thereof.
- multiple steps or methods may be implemented in software or firmware stored in a memory and executed by a suitable instruction execution system.
- a suitable instruction execution system For example, if implemented in hardware, as in another embodiment, it can be implemented by any one or combination of the following techniques well known in the art: having logic gates for implementing logic functions on data signals. Discrete logic circuits, application specific integrated circuits with suitable combinational logic gates, programmable gate arrays (PGAs), field programmable gate arrays (FPGAs), etc.
- the above mentioned storage medium may be a read only memory, a magnetic disk or an optical disk or the like. While the embodiments of the present application have been shown and described above, it is understood that the above-described embodiments are illustrative and are not to be construed as limiting the scope of the present application. The embodiments are subject to variations, modifications, substitutions and variations.
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Tourism & Hospitality (AREA)
- Economics (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- Educational Administration (AREA)
- Theoretical Computer Science (AREA)
- General Business, Economics & Management (AREA)
- Development Economics (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
一种轨道交通运营调度系统、方法及设备,其中轨道交通运营调度系统包括:运营调度云平台(10)及各专业系统的现场设备(20);其中运营调度云平台(10),与各专业系统的现场设备(20)通信连接,用于根据行车调度计划及行车调度计划变更,对各专业系统的现场设备进行相应的联动控制,从而实现以行车调度为核心的轨道交通运营调度。该系统通过将各专业系统统一部署,实现了各专业系统间处理资源共享,这样不仅减少了物理设备的重复建设,而且还降低了设备布置所花费的成本,并且实现了各专业系统间的数据共享,为调度指挥提供了更有价值的信息,保证了轨道交通运营的安全性和可靠性。
Description
相关申请的交叉引用
本申请要求比亚迪股份有限公司于2018年1月9日提交的、申请名称为“轨道交通运营调度系统、方法及设备”的、中国专利申请号“201810018402.2”的优先权。
本申请涉及轨道交通技术领域,尤其涉及一种轨道交通运营调度系统、方法及设备。
随着轨道交通技术的蓬勃发展,轨道交通运营安全变得越来越重要。相关技术中轨道交通运营调度系统如图1所示,各专业系统通常采用单独烟囱式部署方式。各专业系统自行部署所需要的硬件设备、服务器、软件及工具,之后再通过部署一个综合监控系统,用于集成电力监控系统(Power Supervisory Control And Data Acquisition,简称为:PSCADA)、环境与设备监控系统(Building Automation System,简称为:BAS)、火灾报警系统(Fire Alarm System,简称为:FAS)等各专业子系统,以形成以电调或环调为核心,各专业系统间的数据互联和交互。并且综合监控系统再与自动列车监控系统(Automatic Train Supervision,简称为:ATS)进行信息交互,以将从各专业系统中获取到的数据发送给ATS,然后利用ATS对各专业系统的数据进行分析处理,并根据分析处理结果向综合监控系统发送相应的控制信息,以使综合监控系统根据控制信息向对应的专业系统进行分发控制指令,从而实现对轨道交通的运营调度。其中,在图1中11表示各专业系统,12表示综合监控系统、13表示ATS。
然而,发明人发现上述实现方式中,至少存在以下几方面的缺陷:其一,各专业系统、综合监控系统以及ATS相互独立设置的,因此就需要单独设置对应的硬件设备、服务器及工具等设备,不仅布置过程繁琐,且花费成本也较高;其二,各专业系统与综合监控的集成方式、通信标准及规范均不统一,使得统一调度实现较难;其三,各专业系统的数据是由各专业系统自行保存,这就造成各专业系统的数据无法实现数据共享,形成了数据孤岛,从而无法利用各专业系统的数据进行扩展分析,使得数据价值流失,降低了轨道交通运营的安全性和可靠性。
发明内容
本申请旨在至少在一定程度上解决相关技术中的技术问题之一。
为此,本申请的第一个目的在于提出一种轨道交通运营调度系统。该系统通过将各专业系统统一部署,实现了各专业系统间处理资源共享,不仅减少了物理设备的重复建设,而且还降低了设备布置所花费的成本,并且实现了各专业系统间的数据共享,为调度指挥提供了更有价值的信息,保证了轨道交通运营的安全性和可靠性。
本申请的第二个目的在于提出一种轨道交通运营调度方法。
本申请的第三个目的在于提出一种计算机设备。
本申请的第四个目的在于提出一种计算机可读存储介质。
为达上述目的,本申请第一方面实施例提出了一种轨道交通运营调度系统,包括:运营调度云平台及各专业系统现场设备;
其中,所述运营调度云平台,与所述各专业系统的现场设备通信连接,用于根据行车调度计划及行车调度计划变更,对所述各专业系统的现场设备进行相应的联动控制,以实现行车调度为核心的轨道交通运营调度。
本实施例提供的轨道交通运营调度系统,通过运营调度云平台与各专业系统现场设备进行通信,以使得运营调度云平台能够根据行车调度计划及行车调度计划变更,以及各专业系统的现场设备发送的数据,对各专业系统的现场设备进行控制,以实现行车调度为核心的轨道交通运营调度。由此,通过将各专业系统统一部署,实现各专业系统间处理资源共享,不仅减少了物理设备的重复建设,而且还降低了设备布置所花费的成本,并且实现了各专业系统间的数据共享,为调度指挥提供了更有价值的信息,保证了轨道交通运营的安全性和可靠性。
为达上述目的,本申请第二方面实施例提出了一种轨道交通运营调度方法,轨道交通运营调度系统包括:运营调度云平台及各专业系统的现场设备,其中,所述运营调度云平台,与所述各专业系统的现场设备通信连接;该方法包括:
获取行车调度计划及各专业系统的设备数据,根据所述行车调度计划及行车调度计划变更,对各专业系统的现场设备进行联动控制,以实现行车调度为核心的轨道交通运营调度。
本实施例提供的轨道交通运营调度方法,通过获取行车调度计划,及各专业系统设备采集的数据,对各专业系统的现场设备进行联动控制,以实现行车调度为核心的轨道交通运营调度。由此,通过将各专业系统统一部署,实现各专业系统间处理资源共享,不仅减少了物理设备的重复建设,而且还降低了设备布置所花费的成本,并且实现了各专业系统间的数据共享,为调度指挥提供了更有价值的信息,保证了轨道交通运营的安全性和可靠性。
为达上述目的,本申请第三方面实施例提出了一种计算机设备,包括:存储器、处理器及存储在存储器上并可在处理器上运行的计算机程序,所述处理器执行所述程序时,实现第二个实施例所述的轨道交通运营调度方法。
本实施例提供的计算机设备,通过获取行车调度计划,及各专业系统设备采集的数据,对各专业系统的现场设备进行联动控制,以实现行车调度为核心的轨道交通运营调度。由 此,通过将各专业系统统一部署,实现各专业系统间处理资源共享,不仅减少了物理设备的重复建设,而且还降低了设备布置所花费的成本,并且实现了各专业系统间的数据共享,为调度指挥提供了更有价值的信息,保证了轨道交通运营的安全性和可靠性。
为达上述目的,本申请第四方面实施例提出了一种计算机可读存储介质,其上存储有计算机程序,该程序被处理器执行时实现第二方面实施例所述的轨道交通运营调度方法。
本申请附加的方面和优点将在下面的描述中部分给出,部分将从下面的描述中变得明显,或通过本申请的实践了解到。
本申请上述的和/或附加的方面和优点从下面结合附图对实施例的描述中将变得明显和容易理解,其中:
图1是相关技术中各专业系统、综合监控系统以及自动列车监控系统三者设置与交互的示意图;
图2是本申请一个实施例的轨道交通运营调度系统的结构示意图;
图3是本申请另一个实施例的轨道交通运营调度系统的结构示意图;
图4是本申请一个实施例的展示平台展示世界层级的轨道交通运营数据的示意图;
图5是本申请一个实施例的展示平台展示国家层级的轨道交通运营数据的示意图;
图6是本申请一个实施例的展示平台展示线路层级的轨道交通运营数据的示意图;
图7是本申请一个实施例的展示平台展示车站层级的轨道交通运营数据的示意图;
图8是本申请一个实施例的展示平台展示车辆层级的轨道交通运营数据的示意图;
图9是本申请一个实施例的轨道交通运营调度方法的流程图;
图10是本申请另一个实施例的轨道交通运营调度方法的流程图;
图11是本申请一个实施例的计算机设备的结构示意图。
附图标记说明:
运营调度云平台-10、软件层级-110、物理层级-111、各专业系统的现场设备-20、展示平台30。
下面详细描述本申请的实施例,所述实施例的示例在附图中示出,其中自始至终相同或类似的标号表示相同或类似的元件或具有相同或类似功能的元件。下面通过参考附图描述的实施例是示例性的,旨在用于解释本申请,而不能理解为对本申请的限制。
本申请主要针对相关技术中,在对轨道交通进行运营调度时,各专业系统、综合监控系统以及ATS是相互独立设置的,因此需要单独设备对应的硬件设备、服务器及工具等设备,不仅使得整体结构布置繁琐,且花费成本也较高。并且,各专业系统的数据是由各专 业系统自行保存,这就造成各专业系统间的数据无法实现数据共享,形成了数据孤岛,从而无法利用各专业系统的数据作为扩展分析,使得数据价值流失,降低了轨道交通运营的安全性和可靠性的问题,提出一种轨道交通运营调度系统。
本申请提出的轨道交通运营调度系统,包括通信连接的运营调度云平台及各专业系统的现场设备,通过运营调度平台根据行车调度计划及行车调度计划变更,直接对各专业系统的现场设备进行联动控制,以实现行车调度为核心的轨道交通运营调度。由此,通过将各专业系统统一部署,实现了各专业系统间处理资源共享,不仅减少了物理设备的重复建设,而且还降低了设备布置所花费的成本,并且实现了各专业系统间的数据共享,为调度指挥提供了更有价值的信息,保证了轨道交通运营的安全性和可靠性。
下面结合附图对本申请实施例提供的轨道交通运营调度系统进行详细描述。
图2是本申请一个实施例的轨道交通运营调度系统的结构示意图。
如图2所示,该轨道交通运营调度系统包括:运营调度云平台10和各专业系统的现场设备20。
其中,运营调度云平台10,与各专业系统的现场设备20通信连接,用于根据行车调度计划以及行车调度计划变更,对各专业系统的现场设备20进行控制,以实现行车调度为核心的轨道交通运营调度。
其中,行车调度计划,具体的可以包括列车运行时间、运行线路、途径站点、以及停靠时间等信息,本实施例对此不作具体限定。
行车调度计划变更,是指对行车调度计划中列车运行时间、途经站点、以及运行线路等信息进行相应调整的操作,此处对其不作具体限定。
在本实施例中各专业系统可以是,但不限于:自动列车监控系统(Automatic Train Supervision,简称为:ATS)、自动售检票系统(Automatic Fare Collection System,简称为:AFC)、乘客信息系统(Passenger Information System,简称为:PIS)、广播系统(Public Address,简称为:PA)、闭路电视监控系统(Closed Circuit Television,简称为:CCTV)、PSCADA、BAS、FAS、综合网管系统(Network Management System,简称为:NMS)、不间断供电系统(Uninterruptible Power System,简称为:UPS)、以及时钟系统等等,本实施例对此不作具体限定。
其中,ATS为列车自动控制系统(Automatic Train Control,简称为:ATC)中的子系统,且是ATC的监控系统,可对列车进行监督,且能够自动调整列车运行时刻表,以及向行车调度员和外部系统提供信息,以使列车能够减少未正点运行所造成的不利影响。
需要说明的是,ATC包括四个子系统,分别为:列车自动防护(Automatic Train Protection,简称为:ATP)、列车自动运行(Automatic Train Operation,简称为:ATO)、ATS、计算机联锁系统。
也就是说,将ATS作为运营调度的核心,为各专业系统制定合理高效的运行计划,满足乘客出行的需要;组织列车运行,保证列车整点运营;对供电设备、环控设备及防灾设备进行监控,确保列车运行的安全可靠;对网络及设备进行管理,保持设备状态良好,通 讯顺畅;实现应急指挥,处置突发事件,实现真正意义的以行车调度为核心的综合运营调度系统。
AFC是一种由计算机集中控制的自动售票(包括半自动售票)、自动检票以及自动收费和统计的封闭式自动化网络系统。它是基于计算机、通信、网络自动控制等技术,实现对轨道交通售票、检票、计费、收费、统计、清分、管理的自动化处理。
PIS是依托多媒体网络技术,以计算机系统为核心,以车站和车载播放终端为媒介向乘客提供信息服务的系统。它运用现代科技网络技术与多媒体技术,进行信息的多样化显示,根据不同的信息交互方式,将各类信息传递给指定人群。
在正常情况下,PIS向乘客提供的信息可包括:乘车须知、服务时间、列车到发时间、列车时刻表、管理者公告、政府公告、出行参考、股票信息、媒体新闻、赛事直播、广告等实时动态的多媒体信息;在火灾、阻塞及恐怖袭击等非正常情况下,提供动态紧急疏散提示。
PSCADA用于对权限的变电设备进行监控并采集,分析变电设备的运行数据,以确保供电系统和权限的电力变配系统安全可靠的运行。
BAS利用计算机网络技术,自动控制技术,通讯技术及分布智能技术,实现设备分散控制,集中管理的系统模式,对轨道及区间隧道内的空调通风,给排水,照明,电梯,扶梯,安全门等机电设备进行全面额运行管理与控制。
FAS用于对联网用户的火灾报警信息,建筑消防设施运行状态信息,消防安全管理信息进行接收、处理和管理,向城市消防通信指挥中心发送经确认的火灾报警信息。
NMS用于管理一个或若干个设备网管,而设备网管直接管理着多个设备,与设备相连接。这些设备分布在不同的地理位置,通过设备网管和综合网管很好的实现了对设备资源和性能等指标的有效管理。
具体实现时,本实施例中各专业系统的现场设备20根据设置位置,可以分为:车载设备及地面设备。
具体实现时,通过各专业系统的现场设备20实时采集轨道交通数据,并将采集到的数据发送给运营调度云平台10,以使运营调度云平台10对上述数据进行分析处理,然后根据行车调度计划,及数据分析处理结果对各专业系统现场设备20进行相应控制。
例如,当确定列车的火灾报警系统在报警时,运营调度云平台10自动触发广播系统进行火灾应急广播,并控制闭路电视监控系统自动将视频监控画面切换到火灾现场,同时向门禁系统发送按照火灾模式释放被控门,及触发车站多媒体设备进行火灾模式信息显示,引导乘客疏散。
需要说明的是,运营调度云平台10,还可以在确定火灾报警系统报警时,向各专业系统发送火灾时钟信号,从而保证各专业系统的时钟保持同步。
在本实施例中,各专业系统现场设备20与运营调度云平台10之间可通过无线通信方式进行通信,无线通信方式可以为ZigBee、无线局域网wifi、蜂窝网络、蓝牙、LET-U等,此处不作具体限定。
具体实现时,如图2所示,本申请的轨道交通运营调度系统中的运营调度云平台10,可以分为:软件层级110及物理层级111。
其中,软件层级110与物理层级111的设置方式是以自顶至下的方式设置,且软件层级110与物理层级111之间相互通信连接。
可选的,物理层级111用于向运营调度云平台10提供运行所需要的物理资源;软件层级110则是用于基于物理层级111所提供的物理资源,以行车调度为核心,通过运行软件层级110中不同的功能模块,实现对各专业系统的运营调度。
其中,在本实施例中,物理层级111向运营调度云平台10提供的物理资源,可以包括,但不限于:服务器、网络、储存单元等等,本实施例对此不作具体限定。
软件层级110基于物理层级111提供的物理资源运行的不同功能模块,可以包括,但不限于:通用设置模块、组态工具模块、供电模块、列车监控模块、乘客调度模块等等,此处对其不作具体限定。
具体实现时,本实施例中的软件层级110,可以根据各专业系统的现场设备20采集的数据量,调整为不同的功能模块划分的物理资源。
可选的,运营调度云平台10可预先为不同的功能模块划分相应的物理资源,并且设置对应的阈值。
当运营调度云平台10获取到各专业系统的现场设备20采集的数据后,可将各专业系统的现场设备20采集的数据量与设置的阈值进行比对,若确定各专业系统的现场设备20采集的数据量超过对应的阈值时,运营调度云平台10对上述功能模块的物理资源进行自动扩充,反之,当各专业系统的现场设备20采集的数据量小于对应的阈值时,则可对上述功能模块的物理资源进行自动回收,从而实现了资源弹性分配。
其中,为不同的功能模块划分对应物理资源时,可以通过为每个功能模块划分相同等级的物理资源,再根据各功能模块的处理速度等,进行物理资源调整;或者,将处理数据较多的功能模块的物理资源,划分的比一般处理数据的功能模块的物理资源多一倍,或两倍等等,本实施例对此不作限定。
相应的,不同的功能模块设置的阈值,可根据所分配的物理资源及所处理的数据类型进行适应性设置,在此不对其进行具体限定。
举例说明,若5个功能模块,分别为A、B、C、D、E,初始划分的物理资源均为120千兆(Giga,简称G),且每个功能模块的数据量阈值为110G,那么当接收到各专业系统的现场设备20采集的数据之后,将采集到数据量分别与5个功能模块的阈值进行比对,若功能模块B采集的数据量超过了阈值,则此时运营调度云平台10可对B的物理资源进行扩充。
也就是说,本申请通过使用阈值配置的方式,实现弹性资源分配。即当任意功能模块接入的数据量增加,且大于功能模块的阈值时,运营调度云平台10可进入自动扩容机制,随时满足业务需求,且没有额外的工作量,并且当任意功能模块接入的数据量低于阀值时,运营调度云平台10也会自动收回分配的资源,从而实现全自动资源的分配,保证了功能模 块划分的物理资源随需求进行增减,使得扩容简单易实现。
进一步的,在本申请的一个实施例中,本申请的软件层级110还可对各专业系统的历史运营数据进行分析,生成预案联动模式,其中预案联动模式中可以包括各专业系统的触发条件及各专业系统的控制指令,并在确定至少一个专业系统满足触发条件时,启动预案联动模式,以对各专业系统进行运营调度。
举例来说,若根据各专业系统的历史运营数据的分析结果,生成火灾联动预案模式中,各专业系统对应的触发条件及控制指令为:当FAS设备采集的烟雾数据达到第一阈值时,触发火灾报警,并联动控制广播系统进行火灾应急广播,同时依次控制闭路电视监控系统播放火灾现场画面、门禁系统释放被控门、车站多媒体设备显示火灾信息并引导乘客疏散。
那么,在轨道交通运行时,当FAS的设备采集的烟雾数据到达第一阈值时,轨道交通运营调度系统就会自动启动火灾联动模式,即触发火灾报警,广播系统即进行火灾应急广播,闭路电视监控系统自动将视频监控画面切换到火灾现场,并向门禁系统发送按照火灾模式释放被控门,同时触发车站多媒体设备火灾模式信息显示,引导乘客疏散。
可选的,在实际使用时,轨道交通运营调度系统在初始创建时,运营调度云平台10中没有记录各专业系统的历史运行数据,因此本申请在首次使用轨道交通运营调度系统时,需要调度人员对不同运营情况进行人工处理,以使得运营调度云平台10能够记录调度人员对不同运营情况的处理操作,然后根据上述记录的调度人员处理操作,利用大数据的方式进行自主学习,以生成不同的预案联动模式。
在生成预案联动模式之后,运营调度云平台10会对各专业系统采集的数据进行实时分析,当确定任意专业系统达到触发条件时,自动启动预案联动模式,以使用预案联动模式自动对上述专业系统进行运营调度,从而不仅可以减少运维人员的操作,而且根据预案联动模式,对各专业系统进行自动运营调度,提高了系统的可靠性和安全性。
其中,预案联动模式可以通过系统的序列控制功能来实现;或者,也可以在各专业系统之间以自动方式或半自动方式激活执行;或者,也可以作为一个控制序列由调度人员手动执行等等,本实施例对此不作具体限定。
可以理解的是,本申请通过引入大数据计算技术,制定预案联动模式,以利用预案联动模式针对发生过的需要运营处理的场景中,各专业系统的数据进行分析并制定合理阀值,制定相应预案,当再次出现单个系统或多个系统数据达到阀值时,系统自动启动预案联动模式,以使得各专业系统自动联动进行运营调度。
本实施例提供的轨道交通运营调度系统,通过运营调度云平台与各专业系统的现场设备进行通信,以使得运营调度云平台能够根据行车调度计划及行车调度计划变更,以及各专业系统的现场设备发送的数据,对各专业系统的现场设备进行联动控制,以实现行车调度为核心的轨道交通运营调度。由此,通过将各专业系统进行统一部署、处理资源共享,不仅减少了物理设备的重复建设,而且还降低了设备布置所花费的成本,并且实现了各专业系统间的数据共享,为调度指挥提供了更有价值的信息,保证了轨道交通运营的安全性和可靠性。
图3是本申请另一个实施例的轨道交通运营调度系统的结构示意图。
如图3所示,该轨道交通运营调度系统还包括:与运营调度云平台10通信连接的展示平台30。
其中,展示平台30用于从运营调度云平台10中获取轨道交通的运营数据,并在展示平台30中按照预设的拼接规则进行展示。
在本实施例中,预设的拼接规则可以是系统默认的,也可以是根据用户权限或用户级别进行设置的,本实施例对此不作具体限定。
例如,若用户为安全维护人员,则在根据自身的角色,通过权限策略登录系统后可向用户显示安全维护界面,以便于安全维护人员查阅自身职位所对应的安全维护界面。
可选的,为实现轨道交通运营调度“安全、可靠、经济、适用”的运营目标,满足环保与节能的要求,保证与相关系统间信息迅速、准确、可靠的传送,以及保证实现被集成系统的全部功能,本申请可以将与行车指挥、防灾安全、乘客服务管理等有关的信息进行整合,向用户提供一个友好、完整和统一的展示平台(人机界面),方便调度人员的操作。
其中,向用户提供的人机界面中各专业系统可以是单独设置对应的页面,从而调度人员可通过点击需要浏览或操作的专业系统页面,即可进入所负责的系统,从而使得轨道交通运营系统适用性更强。
另外,本实施例的展示平台30还可以用于展示引导信息,以帮助轨道交通运营人员进行人工操作。
可选的,在正常操作时,轨道交通运营人员能够及时准确对各专业系统进行运行调度,但是当突发紧急事件时,比如发生火灾,或者供电故障时,运营人员由于外界因素导致操作不及时准确,而造成不利影响。对此,本申请为了避免上述情况时,通过展示平台30显示引导信息,以引导和帮助调度人员进行一些序列操作,这些序列由画面和序列逻辑组成,以提示调度人员人工完成一个过程,或者让调度人员启动一个操作序列自动执行对应操作,实现了应急指挥,能够及时准确的处置突发事件。
其中,为了防止调度人员紧张而误触发一些操作,展示平台30还会在显示界面中配置互锁以警告或者禁止某些操作,并当调度人员需要立即采取行动时,展示平台30可自动弹出对应的控制序列,以使得用户可以直接触发控制序列,进行相应的处理。
若调度人员实际触发控制序列时,误触发了警告或者禁止的某些操作时,展示平台30还会将显示画面自动导航到当前应当触发的控制序列画面,以保证调度安全性和可靠性更高。上述画面可被设定为该告警发生时的控制序列画面,且要求操作员立即采取行动。
为了清楚描述本申请中展示平台30所展示的内容,下面结合图4-8对本实施例中展示平台30,从运营调度平台10中获取的轨道交通运营数据并按照预设的拼接规则进行展示的情况具体说明。
具体实现时,由于该运营调度系统,可以为不同级别,比如城市级、车辆级、车站级等用户提供服务,相应的,运营调度平台10可以为不同级别的用户提供不同的数据拼接规 则,进而在展示平台中以不同的数据拼接规则,将运营数据进行拼接展示,从而使得控制展示平台30为不同级别的用户提供不同的展示界面。
举例来说,可参见图4至图8所示,在展示平台30中,对不同级别的轨道交通运营数据的展示情况进行说明。
需要说明的是,在图4至图8中,每个层级的轨道交通运营数据展示界面中均可以包括:首页模块210、机电模块220、供电模块230、列车监控模块240、乘客服务模块250、视频监控模块260、售检票模块270、综合网管模块280、告警联动模块290、时钟模块2100。
其中,图4为展示平台展示世界层级的轨道交通运营数据的示意图。其中在展示界面中,包括当前开通轨道交通国家40、当前开通轨道交通城市41、当前开通轨道交通数量42、轨道交通运行线路总数43、轨道交通运行线路总长44、轨道交通开通车站总数45、客流统计情况46、运量排名47、运营计划48、安全运营天数49、当前搭乘人数410等单元,并且上述每个单元还可包括多个数据信息,具体可根据轨道交通实际运营情况进行确定,此处对其不作具体限定。
图5为展示平台展示国家层级的轨道交通运营数据的示意图。其中,在该展示界面中,可以包括以下单元:运营人员分布50、股票交易趋势51、应收排行榜52、乘客体验指标53、趋势图54等。例如,运营人员可以通过展示平台展示的乘客体验指标53,可以了解到乘客的乘坐体验是否良好,以实现对乘车环境进行对应调节,提高乘客体验。
图6为展示平台展示线路层级的轨道交通运营数据的示意图。其中,该线路层级的轨道交通运营数据界面中,可以包括:单位车站平均人数60、平均车辆间隔时间61、日平均发车数量62、车辆满载率63、设备故障率64、运营图表65等单元。也就是说,可通过线路层级的轨道交通运营数据,可以清楚了解每条线路的运营情况。
图7为展示平台展示车站层级的轨道交通运营数据的示意图。其中,该界面中可以包括:本站客流70、本站发车间隔71、本站设备故障72、CCTV1至CCTV n73。也就是说,通过展示车站层级的轨道交通运营数据,可以了解每个车站的运营情况。
图8为展示平台展示车辆层级的轨道交通运营数据的示意图,其中,车辆层级的轨道交通运营数据界面包括:牵引系统80、制动系统81、高压配电系统82、蓄电池系统83、触压系统84、当前车速85、当前位置86、当前运行模式87、距下一站距离88、设备状态汇总89、CCTV1至CCTV n8100等多个单元。
此外,在上述图4-图8中,还分别包括主界面、导出、前进、后退等功能按键,使得用户可以通过触发前进或者导出等按键进行切换界面等操作,以获取需求的层级信息,进一步提高用户体验。需要说明的是,上述图4-8所示的内容及形式仅作为本申请的示例,不作为对本申请的具体限制,在具体实现时,可根据需要显示内容及显示形式等进行适应性调整。
进一步的,为了使得轨道交通运营调度系统具有更高的灵活性,本申请还可在运营调度云平台10上设置配置功能模块,从而使得在增加新的节点时,比如增加新的运行线路,或者停靠站点时,通过操作运营调度平台10中的配置功能模块,即可完成新节点的添加。 由此实现了一套软件适配所有线路,组件化设计开发,按需配置,减轻建设难度,加快建设速度。
本实施例提供的轨道交通运营调度系统,通过展示平台将轨道交通的运营数据或者引导信息能够可视化的显示给调度人员,以帮助调度人员能够根据需求,采取不同的操作,从而使得对轨道交通运营调度安全性和可靠性更高。
为了实现上述目的,本申请实施例还提出了一种轨道交通运营调度方法。
图9是本申请的一个实施例的轨道交通运营调度方法的流程图。
需要说明的是,在本实施例中,该轨道交通运营调度方法可应用于上述实施的轨道交通运营调度系统,以实现对轨道交通运行调度进行控制或管理。其中,轨道交通运行调度系统包括:运营调度云平台及各专业系统的现场设备,其中运营调度平台,与各专业系统的现场设备通信连接。
可选地,如图9所示,该轨道交通运营调度方法可以包括以下步骤:
步骤501,获取行车调度计划及各专业系统的设备数据。
其中,轨道交通行车调度计划,具体的可以是指列车运行时间、运行线路、途径站点、以及停靠时间等信息,本实施例对此不作具体限定。
步骤502,根据行车调度计划及行车调度计划变更,对各专业系统的现场设备进行联动控制,以实现行车调度为核心的轨道交通运营调度。
可选的,本实施例通过获取轨道交通数据,并对轨道交通数据进行分析,然后再根据轨道交通行车调度计划及数据分析结果,对各专业系统的现场设备进行相应控制。
具体实现时,在对各专业系统的现场设备进行控制时,可以是根据行车调度计划及行车调度计划变更,对各专业系统进行相应联动计划及变更;然后在行车调度计划及行车调度计划变更发生前,调动各专业系统进入相应的工作状态。
例如,若行车调度计划中列车A的行车路线为北京-广州南,发车时间为12:20,到达时间为20:20,途经站为保定站、武汉、长沙等等,那么在发车前两个小时,对列车A进行上电操作,并启动CCTV、PA、NMS等专业系统进入工作状态,使得列车A发车前对各专业系统进行检测操作,保证列车A能够按时发车,提高对列车A调度的可靠性。
也就是说,为了能够更高效、准确、安全的对列车运行进行管理和控制,当确定轨道交通行车调度计划之后,可在列车发车前预先启动所有专业系统,以便于检测各专业系统是否运行良好,若良好,则保持各专业系统处于待触发状态,从而保证了列车在发车时间点时,能够准确无误的发生,提高了轨道交通运营调度的准确性和可靠性。
进一步的,本申请的轨道交通运营调度方法,还可以对各专业系统的历史运营数据进行分析,生成预案联动模式,预案联动模式中包括各专业系统的触发条件,及各专业系统分别对应的联动控制指令。
并且,在生成预案联动模式之后,本实施例还可获取轨道交通运营过程中,各专业系统的现场设备实时采集的数据;根据实时采集的数据,判断至少一个专业系统是否满足预 案联动触发条件;若是,则根据对应的联动控制指令,对至少一个专业系统进行联动控制。
举例来说,若根据各专业系统的历史运营数据的分析结果,生成的预案联动模式为火灾联动模式,那么当FAS的设备采集的数据满足触发火灾报警条件时,轨道交通运营调度系统就会自动启动火灾联动模式,以控制广播系统进行火灾应急广播,并控制闭路电视监控系统自动将视频监控画面切换到火灾现场,同时向门禁系统发送按照火灾模式释放被控门,以及触发车站多媒体设备火灾模式信息显示,引导乘客疏散。
可选的,在实际使用时,轨道交通运营调度系统在初始创建时,轨道交通信息系统云平台中没有记录各专业系统的历史运行数据,因此本申请在首次使用轨道交通运营调度系统时,需要调度人员对不同运营情况进行人工处理,以使得轨道交通信息系统云平台能够记录调度人员对不同运营情况的处理操作,然后根据上述记录的调度人员处理操作,利用大数据的方式进行自主学习,以生成不同的预案联动模式。
在生成预案联动模式之后,轨道交通信息系统云平台会对各专业系统采集的数据进行实时分析,当确定任意专业系统达到触发条件时,自动启动预案联动模式,以使用预案联动模式对上述专业系统进行运营调度,从而不仅可以减少运维人员的操作,而且根据预案联动模式,对各专业系统进行自动运营调度,提高了系统的可靠性和安全性。
其中,预案联动模式可以通过系统的序列控制功能来实现;或者,也可以在各专业系统之间以自动方式或半自动方式激活执行;或者,也可以作为一个控制序列由调度人员手动执行等等,本实施例对此不作具体限定。
可以理解的是,本申请通过引入大数据计算技术,制定预案联动模式,以利用预案联动模式针对发生过的需要运营处理的场景中,各专业系统的数据进行分析并制定合理阀值,制定相应预案,当再次出现单个系统或多个系统数据达到阀值时,系统自动启动预案联动模式,以使得各专业系统自动联动进行运营调度。
本实施例提供的轨道交通运营调度方法,通过获取行车调度计划,及各专业系统设备采集的数据,对各专业系统的现场设备进行联动控制,以实现行车调度为核心的轨道交通运营调度。由此,通过将各专业系统统一部署,实现各专业系统处理资源共享,不仅减少了物理设备的重复建设,而且还降低了设备布置所花费的成本,并且还实现了各专业系统间的数据共享,为调度指挥提供了更有价值的信息,保证了轨道交通运营的安全性和可靠性。
通过上述分析可知,本申请通过获取轨道交通行车计划及其他专业系统设备数据,以根据轨道交通行车调度计划,对各专业系统的现场设备进行联动控制,以实现行车调度为核心的轨道交通运营调度。在具体实现时,为了方便调度人员进行操作,本实施例还可通过展示平台展示轨道交通的运行数据,或者帮助轨道交通运营人员进行人工操作的引导信息,以实现对轨道交通运营交通控制的可视化操作。下面结合图10,对上述情况下的轨道交通运营调度方法进行进一步说明。
图10是本申请的另一个实施例的轨道交通运营调度方法的流程图。
如图10所示,该轨道交通运营调度方法可以包括以下几个步骤:
步骤601,获取行车调度计划及各专业系统的设备数据。
步骤602,根据行车调度计划及行车调度计划变更,对各专业系统的现场设备进行联动控制。
步骤603,根据各专业系统的运行状态,在展示平台中展示轨道交通的运营数据,或展示用于帮助轨道交通运营人员进行人工操作引导信息。
可选的,为实现轨道交通运营调度“安全、可靠、经济、适用”的运营目标,满足环保与节能的要求,保证与相关系统间信息迅速、准确、可靠的传送,以及保证实现被集成系统的全部功能,本申请可以将与行车指挥、防灾安全、乘客服务管理等有关的信息进行整合,向用户提供一个友好、完整和统一的展示平台(人机界面),方便调度人员的操作。
其中,向用户提供的人机界面中各专业系统可以是单独设置对应的页面,从调度人员可通过点击需要浏览或操作的专业系统页面,即可进入所负责的系统,从而使得轨道交通运营系统适用性更强。
可选的,展示轨道交通的运营数据之前,本实施例需要获取运营调度系统登录请求,登录请求中包括用户权限;获取与用户权限对应的目标专业系统现场设备采集的目标运营数据,并将目标运营数据以目标专业系统对应的展示形式进行展示。
也就是说,不同的用户具有不同的权限,且在用户登录运营调度系统之后,系统向用户展示用户权限对应的系统页面。例如,若用户为安全维护人员,则在根据自身的角色,通过权限策略登录系统后可向用户显示安全维护界面,以便于安全维护人员查阅自身职位所对应的安全维护界面。
其中,将目标运营数据以目标专业系统对应的展示形式,可以是系统默认的,也可以是根据控制人员后期设置的,本实施例对此不作具体限定。
进一步的,由于在正常操作时,轨道交通运营人员能够及时准确对各专业系统进行运行调度,但是当突发紧急事件时,比如发生火灾,或者供电故障时,运营人员由于外界因素导致操作不及时准确,而造成不利影响。对此,本申请为了避免上述情况时,通过展示平台显示引导信息,以引导和帮助调度人员进行一些序列操作,这些序列由画面和序列逻辑组成,以提示调度人员人工完成一个过程,或者让调度人员启动一个操作序列自动执行对应操作,实现了应急指挥,能够及时准确的处置突发事件。
其中,为了防止调度人员紧张而误触发一些操作,展示平台还会在显示界面中配置互锁以警告或者禁止某些操作,并当调度人员需要立即采取行动时,展示平台可自动弹出对应的控制序列,以使得用户可以直接触发控制序列,进行相应的处理。
若调度人员实际触发控制序列时,误触发了警告或者禁止的某些操作时,展示平台还会将显示画面自动导航到当前应当触发的控制序列画面,以保证调度安全性和可靠性更高。上述画面可被设定为该告警发生时的控制序列画面,且要求操作员立即采取行动。
为了清楚描述本申请中展示平台所展示的内容,下面结合图4-8对本实施例中展示平台,从运营调度平台中获取的轨道交通运营数据并按照预设的拼接规则进行展示的情况具 体说明。
举例来说,可参见图4至图8所示,在展示平台30中,对不同级别的轨道交通运营数据的展示情况进行说明。
需要说明的是,在图4至图8中,每个层级的轨道交通运营数据展示界面中均可以包括:首页模块210、机电模块220、供电模块230、列车监控模块240、乘客服务模块250、视频监控模块260、售检票模块270、综合网管模块280、告警联动模块290、时钟模块2100。
其中,图4为展示平台展示世界层级的轨道交通运营数据的示意图。其中在展示界面中,包括当前开通轨道交通国家40、当前开通轨道交通城市41、当前开通轨道交通数量42、轨道交通运行线路总数43、轨道交通运行线路总长44、轨道交通开通车站总数45、客流统计情况46、运量排名47、运营计划48、安全运营天数49、当前搭乘人数410等单元,并且上述每个单元还可包括多个数据信息,具体可根据轨道交通实际运营情况进行确定,此处对其不作具体限定。
图5为展示平台展示国家层级的轨道交通运营数据的示意图。其中,在该展示界面中,可以包括以下单元:运营人员分布50、股票交易趋势51、应收排行榜52、乘客体验指标53、趋势图54等。例如,运营人员可以通过展示平台展示的乘客体验指标53,可以了解到乘客的乘坐体验是否良好,以实现对乘车环境进行对应调节,提高乘客体验。
图6为展示平台展示线路层级的轨道交通运营数据的示意图。其中,该线路层级的轨道交通运营数据界面中,可以包括:单位车站平均人数60、平均车辆间隔时间61、日平均发车数量62、车辆满载率63、设备故障率64、运营图表65等单元。也就是说,可通过线路层级的轨道交通运营数据,可以清楚了解每条线路的运营情况。
图7为展示平台展示车站层级的轨道交通运营数据的示意图。其中,该界面中可以包括:本站客流70、本站发车间隔71、本站设备故障72、CCTV1至CCTV n73。也就是说,通过展示车站层级的轨道交通运营数据,可以了解每个车站的运营情况。
图8为展示平台展示车辆层级的轨道交通运营数据的示意图,其中,车辆层级的轨道交通运营数据界面包括:牵引系统80、制动系统81、高压配电系统82、蓄电池系统83、触压系统84、当前车速85、当前位置86、当前运行模式87、距下一站距离88、设备状态汇总89、CCTV1至CCTV n8100等多个单元。
此外,在上述图4-图8中,还分别包括主界面、导出、前进、后退等功能按键,使得用户可以通过触发前进或者导出等按键进行切换界面等操作,以获取需求的层级信息,进一步提高用户体验。需要说明的是,上述图4-8所示的内容及形式仅作为本申请的示例,不作为对本申请的具体限制,在具体实现时,可根据需要显示内容及显示形式等进行适应性调整。
此外,为了使得轨道交通运营调度系统具有更高的灵活性,本申请还可在轨道交通信息系统云平台上设置配置功能模块,从而使得在增加新的节点时,比如增加新的运行线路,或者停靠站点时,通过操作运营调度平台中的配置功能模块,即可完成新节点的添加。由此实现了一套软件适配所有线路,组件化设计开发,按需配置,减轻建设难度,加快建设 速度。
本实施例提供的轨道交通运营调度方法,通过展示平台将轨道交通的运营数据或者引导信息显示给调度人员,以帮助调度人员能够根据需求在展示平台上采取相应触发或者控制操作,从而使得对轨道交通运营调度安全性和可靠性更高。
为了实现上述目的,本申请还提出了一种计算机设备。
图11是本申请一个实施例的计算机设备的结构示意图。
如图11所示,该计算机设备包括:存储器120、处理器130及存储在存储器120上并可在处理器130上运行的计算机程序,所述处理器130执行所述程序时,实现第二方面实施例的轨道交通运营调度方法。其中,轨道交通运营调度方法包括:获取行车调度计划及各专业系统的设备数据;根据所述轨道交通行车调度计划及行车调度计划变更,对各专业系统的现场设备进行联动控制,以实现行车调度为核心的轨道交通运营调度。
需要说明的是,本实施例的计算机设备的实施过程和技术原理参见前述对第二方面实施例所述的轨道交通运营调度方法的解释说明,此处不再赘述。
本实施例提供的计算机设备,通过获取行车调度计划,及各专业系统设备采集的数据,对各专业系统的现场设备进行联动控制,以实现行车调度为核心的轨道交通运营调度。由此,通过将各专业系统统一部署,实现各专业系统处理资源共享,不仅减少了物理设备的重复建设,而且还降低了设备布置所花费的成本,并且还实现了各专业系统间的数据共享,为调度指挥提供了更有价值的信息,保证了轨道交通运营的安全性和可靠性。
为了实现上述实施例,本申请还提出了一种计算机可读存储介质。
该计算机可读存储介质,其上存储有计算机程序,该程序被处理器执行时实现第二方面实施例的轨道交通运营调度方法。其中,轨道交通运营调度方法包括:获取行车调度计划及各专业系统的设备数据;根据所述轨道交通行车调度计划及行车调度计划变更,对各专业系统的现场设备进行联动控制,以实现行车调度为核心的轨道交通运营调度。
在本申请中,除非另有明确的规定和限定,术语“设置”、“连接”等术语应做广义理解,例如,可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系,除非另有明确的限定。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本申请中的具体含义。
在本说明书的描述中,参考术语“一个实施例”、“一些实施例”、“示例”、“具体示例”、或“一些示例”等的描述意指结合该实施例或示例描述的具体特征、结构、材料或者特点包含于本申请的至少一个实施例或示例中。
此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括至少一个该特征。
流程图中或在此以其他方式描述的任何过程或方法描述可以被理解为,表示包括一个或更多个用于实现特定逻辑功能或过程的步骤的可执行指令的代码的模块、片段或部分,并且本申请的优选实施方式的范围包括另外的实现,其中可以不按所示出或讨论的顺序, 包括根据所涉及的功能按基本同时的方式或按相反的顺序,来执行功能,这应被本申请的实施例所属技术领域的技术人员所理解。
应当理解,本申请的各部分可以用硬件、软件、固件或它们的组合来实现。在上述实施方式中,多个步骤或方法可以用存储在存储器中且由合适的指令执行系统执行的软件或固件来实现。例如,如果用硬件来实现,和在另一实施方式中一样,可用本领域公知的下列技术中的任一项或他们的组合来实现:具有用于对数据信号实现逻辑功能的逻辑门电路的离散逻辑电路,具有合适的组合逻辑门电路的专用集成电路,可编程门阵列(PGA),现场可编程门阵列(FPGA)等。
本技术领域的普通技术人员可以理解实现上述实施例方法携带的全部或部分步骤是可以通过程序来指令相关的硬件完成,所述的程序可以存储于一种计算机可读存储介质中,该程序在执行时,包括方法实施例的步骤之一或其组合。
上述提到的存储介质可以是只读存储器,磁盘或光盘等。尽管上面已经示出和描述了本申请的实施例,可以理解的是,上述实施例是示例性的,不能理解为对本申请的限制,本领域的普通技术人员在本申请的范围内可以对上述实施例进行变化、修改、替换和变型。
Claims (16)
- 一种轨道交通运营调度系统,其特征在于,包括:运营调度云平台及各专业系统的现场设备;其中,所述运营调度云平台,与所述各专业系统的现场设备通信连接,用于根据行车调度计划及行车调度计划变更,对所述各专业系统的现场设备进行相应的联动控制,以实现行车调度为核心的轨道交通运营调度。
- 如权利要求1所述的运营调度系统,其特征在于,所述各专业系统的现场设备包括:车载设备及地面设备。
- 如权利要求1所述的运营调度系统,其特征在于,所述运营调度云平台自顶至下包括依次通信连接的软件层级及物理层级;其中,所述物理层级,用于提供所述运营调度云平台运行所需的物理资源;所述软件层级,用于基于所述物理层级提供的物理资源,以行车调度为核心,通过运行所述软件层级内的不同的功能模块,实现对各专业系统的运营调度。
- 如权利要求3所述的运营调度系统,其特征在于,所述软件层级,还用于根据所述各专业系统的现场设备采集的数据量,调整为所述不同的功能模块分配的物理资源。
- 如权利要求3所述运营调度系统,其特征在于,所述软件层级,还用于对所述各专业系统的历史运营数据进行分析,生成预案联动模式,所述预案联动模式中包括各专业系统的触发条件及各专业系统的控制指令,并在确定至少一个专业系统满足触发条件时,启动所述预案联动模式,对各专业系统进行运营调度。
- 如权利要求1-5任一所述的运营调度系统,其特征在于,还包括与所述运营调度云平台通信连接的展示平台;所述展示平台,用于从所述运营调度云平台中获取轨道交通的运营数据,并在所述展示平台中按照预设的拼接规则进行展示。
- 如权利要求6所述的运营调度系统,其特征在于,所述展示平台,还用于展示引导信息,以帮助轨道交通运营人员进行人工操作。
- 一种轨道交通运营调度方法,其特征在于,轨道交通运营调度系统包括:运营调度云平台及各专业系统的现场设备,其中,所述运营调度云平台,与所述各专业系统的现场设备通信连接;所述轨道交通运营调度方法,包括:获取行车调度计划及各专业系统的设备数据,根据所述行车调度计划及行车调度计划变更,对各专业系统的现场设备进行联动控制,以实现行车调度为核心的轨道交通运营调度。
- 如权利要求8所述的方法,其特征在于,所述对各专业系统的现场设备进行联动控制,包括:根据行车调度计划及行车调度计划变更,对所述各专业系统进行相应联动计划及变更;在行车调度计划及行车调度计划变更发生前,调动各专业系统进入相应工作状态。
- 如权利要求8所述的方法,其特征在于,还包括:对各专业系统的历史运营数据进行分析,生成预案联动模式,所述预案联动模式中包括各专业系统的触发条件,及各专业系统分别对应的联动控制指令。
- 如权利要求10所述的方法,其特征在于,所述生成预案联动模式之后,还包括:在所述轨道交通运营过程中,获取所述各专业系统的现场设备实时采集的数据;根据所述实时采集的数据,判断至少一个专业系统是否满足预案联动触发条件;若是,则根据对应的联动控制指令,对所述至少一个专业系统进行联动控制。
- 如权利要求8-11任一所述的方法,其特征在于,还包括:根据各专业系统的运行状态,在展示平台中展示轨道交通的运营数据,或展示用于帮助轨道交通运营人员进行人工操作引导信息。
- 如权利要求12所述的方法,其特征在于,在展示平台中展示轨道交通的运营数据之前,还包括:获取运营调度系统登录请求,所述登录请求中包括用户权限;获取与所述用户权限对应的目标专业系统的现场设备采集的目标运营数据,并将所述目标运营数据以所述目标专业系统对应的展示形式进行展示。
- 如权利要求12所述的方法,其特征在于,所述根据各专业系统的运行状态,在展示平台中展示轨道交通的运营数据,包括:确定当前展示平台所属的运营级别对应的运营数据拼接规则;根据所运营数据拼接规则,在展示平台中将各专业系统的运营数据拼接展示。
- 一种计算机设备,其特征在于,包括:存储器、处理器及存储在存储器上并可在处理器上运行的计算机程序,所述处理器执行所述程序时,实现如权利要求8-14任一所述的轨道交通运营调度方法。
- 一种计算机可读存储介质,其上存储有计算机程序,其特征在于,该程序被处理器执行时实现如权利要求8-14任一所述的轨道交通运营调度方法。
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810018402.2A CN109740831A (zh) | 2018-01-09 | 2018-01-09 | 轨道交通运营调度系统、方法及设备 |
| CN201810018402.2 | 2018-01-09 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2019137205A1 true WO2019137205A1 (zh) | 2019-07-18 |
Family
ID=66354295
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/CN2018/123571 Ceased WO2019137205A1 (zh) | 2018-01-09 | 2018-12-25 | 轨道交通运营调度系统、方法及设备 |
Country Status (2)
| Country | Link |
|---|---|
| CN (1) | CN109740831A (zh) |
| WO (1) | WO2019137205A1 (zh) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114089684A (zh) * | 2021-09-30 | 2022-02-25 | 中国铁道科学研究院集团有限公司 | 轨道交通运营控制方法、装置、电子设备和系统 |
| CN114970975A (zh) * | 2022-05-06 | 2022-08-30 | 上海电气泰雷兹交通自动化系统有限公司 | 一种结合数字孪生技术的智能ats系统 |
| CN115794264A (zh) * | 2021-09-09 | 2023-03-14 | 上海宝信软件股份有限公司 | 监控工作站桌面多应用整合调度方法及系统 |
| CN117031988A (zh) * | 2023-08-01 | 2023-11-10 | 中国长江电力股份有限公司 | 一种大坝消防联动系统 |
Families Citing this family (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110329319B (zh) * | 2019-06-28 | 2021-09-03 | 卡斯柯信号有限公司 | 一种面向智慧城轨的全自动运行系统 |
| CN110378581A (zh) * | 2019-07-03 | 2019-10-25 | 中国铁道科学研究院集团有限公司电子计算技术研究所 | 铁路客运站与客运列车应急状态设备设施配置方法及装置 |
| CN112441085B (zh) * | 2019-08-30 | 2022-03-18 | 比亚迪股份有限公司 | 车辆运行图编制处理方法、计算机设备及存储介质 |
| CN113085952A (zh) * | 2020-01-08 | 2021-07-09 | 株洲中车时代电气股份有限公司 | 列车监控系统 |
| CN111137328B (zh) * | 2020-01-22 | 2024-02-20 | 卡斯柯信号有限公司 | 一种有轨电车行车调度管理系统 |
| CN112261356B (zh) * | 2020-09-15 | 2023-04-21 | 四川天翼网络股份有限公司 | 一种铁路可视化指挥调度系统 |
| CN112265571A (zh) * | 2020-10-10 | 2021-01-26 | 通号城市轨道交通技术有限公司 | 列车控制系统 |
| CN112350326B (zh) * | 2020-10-23 | 2023-08-11 | 株洲中车时代电气股份有限公司 | 轨道交通牵引供电系统及其控制方法、系统及相关组件 |
| CN112508419A (zh) * | 2020-12-10 | 2021-03-16 | 中国铁路设计集团有限公司 | 车站综合自动化系统、调度方法和控制终端 |
| CN113393162A (zh) * | 2021-07-09 | 2021-09-14 | 中国铁路设计集团有限公司 | 一种综合调度方法、装置、系统、电子设备及存储介质 |
| CN113810374B (zh) * | 2021-08-11 | 2023-03-14 | 交控科技股份有限公司 | 适用于轨道交通多运营场景条件下的车站设备联动方法 |
| CN115630815A (zh) * | 2022-10-26 | 2023-01-20 | 厦门蓝斯通信股份有限公司 | 一种公共交通辅助调度方法、系统及存储介质 |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103455887A (zh) * | 2013-09-10 | 2013-12-18 | 河南辉煌科技股份有限公司 | 城市轨道交通信息集成平台 |
| CN104317603A (zh) * | 2014-11-13 | 2015-01-28 | 国电南京自动化股份有限公司 | 一种基于scada系统的智能报警系统 |
| US20170024936A1 (en) * | 2011-09-08 | 2017-01-26 | Ivsc Ip Llc | Regulating driver vehicle input choices in for-hire vehicles |
| US20170098181A1 (en) * | 2015-10-06 | 2017-04-06 | Numerica Corporation | Systems and methods for dynamically generating patrol schedules based on historic demand data |
| CN107330593A (zh) * | 2017-06-20 | 2017-11-07 | 北京市运输管理技术支持中心 | 一种交通监管巡查与信用信誉管理系统 |
| CN107331156A (zh) * | 2017-08-22 | 2017-11-07 | 佛山市城市规划设计研究院 | 城市交通综合调查云平台与系统 |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN100588580C (zh) * | 2006-12-28 | 2010-02-10 | 上海轨道交通设备发展有限公司 | 一种轨道交通综合监控系统及方法 |
| CN104376494B (zh) * | 2013-08-14 | 2018-04-27 | 北京北智天成科技发展有限公司 | 基于云系统的交通信息管理与服务系统 |
| CN104678773B (zh) * | 2015-02-03 | 2017-07-28 | 厦门中智信系统集成有限公司 | 基于公共云服务的智能化建筑群及其控制方法 |
| CN206537292U (zh) * | 2017-02-27 | 2017-10-03 | 中国铁路设计集团有限公司 | 承载城市轨道交通调度指挥及运营自动化系统的云平台 |
| CN107241397A (zh) * | 2017-05-24 | 2017-10-10 | 清华大学 | 一种基于云平台的多级列车调度指挥系统 |
-
2018
- 2018-01-09 CN CN201810018402.2A patent/CN109740831A/zh active Pending
- 2018-12-25 WO PCT/CN2018/123571 patent/WO2019137205A1/zh not_active Ceased
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20170024936A1 (en) * | 2011-09-08 | 2017-01-26 | Ivsc Ip Llc | Regulating driver vehicle input choices in for-hire vehicles |
| CN103455887A (zh) * | 2013-09-10 | 2013-12-18 | 河南辉煌科技股份有限公司 | 城市轨道交通信息集成平台 |
| CN104317603A (zh) * | 2014-11-13 | 2015-01-28 | 国电南京自动化股份有限公司 | 一种基于scada系统的智能报警系统 |
| US20170098181A1 (en) * | 2015-10-06 | 2017-04-06 | Numerica Corporation | Systems and methods for dynamically generating patrol schedules based on historic demand data |
| CN107330593A (zh) * | 2017-06-20 | 2017-11-07 | 北京市运输管理技术支持中心 | 一种交通监管巡查与信用信誉管理系统 |
| CN107331156A (zh) * | 2017-08-22 | 2017-11-07 | 佛山市城市规划设计研究院 | 城市交通综合调查云平台与系统 |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115794264A (zh) * | 2021-09-09 | 2023-03-14 | 上海宝信软件股份有限公司 | 监控工作站桌面多应用整合调度方法及系统 |
| CN114089684A (zh) * | 2021-09-30 | 2022-02-25 | 中国铁道科学研究院集团有限公司 | 轨道交通运营控制方法、装置、电子设备和系统 |
| CN114089684B (zh) * | 2021-09-30 | 2024-05-31 | 中国铁道科学研究院集团有限公司 | 轨道交通运营控制方法、装置、电子设备和系统 |
| CN114970975A (zh) * | 2022-05-06 | 2022-08-30 | 上海电气泰雷兹交通自动化系统有限公司 | 一种结合数字孪生技术的智能ats系统 |
| CN117031988A (zh) * | 2023-08-01 | 2023-11-10 | 中国长江电力股份有限公司 | 一种大坝消防联动系统 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN109740831A (zh) | 2019-05-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US11565734B2 (en) | Weak-current unified system for rail transit | |
| CN110329319B (zh) | 一种面向智慧城轨的全自动运行系统 | |
| JP3234013U (ja) | 軌道交通用のインテリジェント化情報化運輸規制システム | |
| CN109740831A (zh) | 轨道交通运营调度系统、方法及设备 | |
| CN114089684B (zh) | 轨道交通运营控制方法、装置、电子设备和系统 | |
| CN108725522A (zh) | 实现自动列车监控和综合监控集成的列车综合自动化系统 | |
| CN101394549A (zh) | 一种铁路综合视频监控系统 | |
| CN206900395U (zh) | 实现自动列车监控和综合监控集成的列车综合自动化系统 | |
| CN105425711A (zh) | 一种智能建筑集成管理系统 | |
| CN103455887A (zh) | 城市轨道交通信息集成平台 | |
| CN111627310A (zh) | 基于全自动无人驾驶的智慧地铁演示和验证装置及其方法 | |
| WO2017088119A1 (zh) | 控制列车运营自动化等级的方法和系统 | |
| CN113501032A (zh) | 一种车站控制器sic、车站控制设备及列车车站控制系统 | |
| CN105197071A (zh) | 一种轨道交通中列车阻塞后的系统联动方法 | |
| CN101795398A (zh) | 具有安全监控中心的多层地下交通枢纽综合监控系统 | |
| CN117565941A (zh) | 一种全自动列车监控系统、方法、设备及储存介质 | |
| CN115723813A (zh) | 一种列车的自动监控维护支持系统 | |
| CN115953885A (zh) | 一种车站火灾应急控制方法及系统 | |
| CN110837944A (zh) | 调度方法、装置及系统 | |
| CN113542087B (zh) | 一种数字轨道电车车载人机交互系统及其通信控制方法 | |
| CN215752433U (zh) | 车站控制器sic、车站控制设备及列车车站控制系统 | |
| CN113371038B (zh) | 一种有轨电车管理方法及系统 | |
| CN104442932A (zh) | 一种基于轨道交通综合自动化系统的远程车辆管理系统 | |
| CN107995228A (zh) | 用于专用车控制系统权限远程管理的智能终端 | |
| Deng | Application of intelligent transportation system based on 5G |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 18899842 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 18899842 Country of ref document: EP Kind code of ref document: A1 |