WO2019045523A1 - 가압식 액체 화물 이송 장치 및 방법 - Google Patents

가압식 액체 화물 이송 장치 및 방법 Download PDF

Info

Publication number
WO2019045523A1
WO2019045523A1 PCT/KR2018/010156 KR2018010156W WO2019045523A1 WO 2019045523 A1 WO2019045523 A1 WO 2019045523A1 KR 2018010156 W KR2018010156 W KR 2018010156W WO 2019045523 A1 WO2019045523 A1 WO 2019045523A1
Authority
WO
WIPO (PCT)
Prior art keywords
drum
liquid cargo
gas
storage tank
liquid
Prior art date
Application number
PCT/KR2018/010156
Other languages
English (en)
French (fr)
Inventor
이종규
이경원
Original Assignee
삼성중공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from KR1020170111818A external-priority patent/KR102039621B1/ko
Priority claimed from KR1020170111823A external-priority patent/KR101984976B1/ko
Application filed by 삼성중공업 주식회사 filed Critical 삼성중공업 주식회사
Priority to SG11202001852SA priority Critical patent/SG11202001852SA/en
Priority to CN201880056959.3A priority patent/CN111094121B/zh
Priority to US16/643,255 priority patent/US11383794B2/en
Priority to JP2020512583A priority patent/JP7220706B2/ja
Publication of WO2019045523A1 publication Critical patent/WO2019045523A1/ko

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • B63B25/16Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed heat-insulated
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/30Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
    • B63B27/34Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures using pipe-lines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C7/00Methods or apparatus for discharging liquefied, solidified, or compressed gases from pressure vessels, not covered by another subclass
    • F17C7/02Discharging liquefied gases
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C9/00Methods or apparatus for discharging liquefied or solidified gases from vessels not under pressure
    • F17C9/02Methods or apparatus for discharging liquefied or solidified gases from vessels not under pressure with change of state, e.g. vaporisation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • B63B25/14Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed pressurised
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63HMARINE PROPULSION OR STEERING
    • B63H21/00Use of propulsion power plant or units on vessels
    • B63H21/38Apparatus or methods specially adapted for use on marine vessels, for handling power plant or unit liquids, e.g. lubricants, coolants, fuels or the like
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2201/00Vessel construction, in particular geometry, arrangement or size
    • F17C2201/05Size
    • F17C2201/052Size large (>1000 m3)
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2221/00Handled fluid, in particular type of fluid
    • F17C2221/03Mixtures
    • F17C2221/032Hydrocarbons
    • F17C2221/033Methane, e.g. natural gas, CNG, LNG, GNL, GNC, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/01Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the phase
    • F17C2223/0146Two-phase
    • F17C2223/0153Liquefied gas, e.g. LPG, GPL
    • F17C2223/0161Liquefied gas, e.g. LPG, GPL cryogenic, e.g. LNG, GNL, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/03Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the pressure level
    • F17C2223/033Small pressure, e.g. for liquefied gas
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2227/00Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
    • F17C2227/01Propulsion of the fluid
    • F17C2227/0128Propulsion of the fluid with pumps or compressors
    • F17C2227/0135Pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2227/00Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
    • F17C2227/01Propulsion of the fluid
    • F17C2227/0128Propulsion of the fluid with pumps or compressors
    • F17C2227/0171Arrangement
    • F17C2227/0178Arrangement in the vessel
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2227/00Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
    • F17C2227/01Propulsion of the fluid
    • F17C2227/0128Propulsion of the fluid with pumps or compressors
    • F17C2227/0171Arrangement
    • F17C2227/0185Arrangement comprising several pumps or compressors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2265/00Effects achieved by gas storage or gas handling
    • F17C2265/03Treating the boil-off
    • F17C2265/031Treating the boil-off by discharge
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2265/00Effects achieved by gas storage or gas handling
    • F17C2265/03Treating the boil-off
    • F17C2265/032Treating the boil-off by recovery
    • F17C2265/033Treating the boil-off by recovery with cooling
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2265/00Effects achieved by gas storage or gas handling
    • F17C2265/03Treating the boil-off
    • F17C2265/032Treating the boil-off by recovery
    • F17C2265/037Treating the boil-off by recovery with pressurising
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2270/00Applications
    • F17C2270/01Applications for fluid transport or storage
    • F17C2270/0102Applications for fluid transport or storage on or in the water
    • F17C2270/0105Ships
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C6/00Methods and apparatus for filling vessels not under pressure with liquefied or solidified gases

Definitions

  • the present invention relates to a pressurized liquid cargo transferring apparatus and method.
  • a LNG carrier using a membrane type cargo hold is formed with a pump tower, which is a pipe structure, inside the cargo hold to ship or discharge the LNG.
  • the pump tower supports various pipelines and LNG cargo pumps and also serves as a pipe for discharging LNG through a pipe.
  • FIG. 1 is a view showing a pump tower installed in a conventional cargo hold.
  • the LNG is transported through the same transport line outside the cargo hold when shipping and discharging the conventional LNG.
  • the LNG is transported through a filling pipe (2)
  • the LNG is loaded and unloaded through a discharge pipe (4).
  • the LNG cargo pump 5 is attached to the lowermost end of the discharge pipe 4 as a submerged type so that when the discharge pipe 4 is used for filling the cargo pump 5, Is reversed and damaged, and when the cooled LNG flows through the discharge pipe for supporting the structure, heat is shrunk to generate stress throughout the structure.
  • each cargo window (1) should have 2 units, and additional line is required to install the emergency pump. Economic costs are incurred.
  • An object of the present invention is to provide a pressurized liquid cargo transferring apparatus and method which can simplify the inflow and outflow structure of a liquid cargo in a cargo hold by unifying a filling pipe and a discharge pipe.
  • a liquid storage tank comprising: a liquid cargo transfer line connected to a liquid cargo storage tank; A drum connected to the liquid cargo transfer line and providing a space for storing the liquid cargo; And a pressurizing portion that pressurizes the liquid cargo storage tank so that the liquid cargo stored in the liquid cargo storage tank is supplied to the drum through the liquid cargo transfer line.
  • the liquid cargo transfer apparatus may further include a filling line connected to the liquid cargo transfer line and supplied with liquid cargo from the outside.
  • the pressurizing unit includes a compressor for receiving and compressing evaporative gas from the drum; And a gas transfer line for supplying the liquid storage tank with the evaporated gas compressed in the compressor.
  • the pressurization portion may further include a terminal gas line connected to the compressor and providing evaporative gas from the liquid cargo storage terminal.
  • the liquid cargo transfer apparatus may further include a cooling unit for preventing a temperature rise of the liquid cargo storage tank when the compressed evaporated gas is supplied to the liquid cargo storage tank.
  • the cooling unit comprises: a spray nozzle installed inside the liquid storage tank to spray the liquid storage; And a cooling supply line connected to the injection nozzle and the drum, the cooling supply line being provided for supplying a part of liquid material stored in the drum to the injection nozzle by an auxiliary pump.
  • the pressurizing portion further includes a detour line connected to the gas transfer line by bypassing the compressor, wherein evaporative gas generated in the liquid cargo storage tank is supplied through the gas transfer line and the bypass line between the compressor and the drum So that it can be compressed by the compressor and then supplied to the gas consumer.
  • the liquid cargo transferring apparatus may further include a recovery line provided to store the residual evaporation gas remaining in the evaporated gas compressed by the compressor into the drum.
  • the liquid cargo transfer apparatus may further include an exhaust line branched from the gas transfer line and exhausting the evaporation gas generated in the drum.
  • the liquid cargo transfer apparatus includes a discharge line connected to a lower portion of the drum to unload the liquid cargo stored in the drum; And a main pump installed in the discharge line for pumping the liquid cargo by providing a transfer pressure to the liquid cargo stored in the drum.
  • the liquid cargo transfer apparatus may further include a drum pressure regulator for regulating the pressure of the drum to maintain a constant flow rate of the liquid cargo discharged through the discharge line.
  • the drum pressure regulating unit comprises: a water level sensing member for measuring a liquid level of the liquid in the drum; A pressure measuring member for measuring the evaporation gas pressure in the drum; And a controller for receiving measured values from the water level sensing member and the pressure measuring member and controlling the amount of evaporated gas discharged in the drum.
  • control unit comprises: a vapor control valve installed on a gas transfer line through which evaporated gas in the drum is exhausted; And controlling the main pump and the control valve installed in the discharge line so that the amount of evaporated gas exhausted through the gas transfer line is reduced when the evaporated gas pressure in the drum is lower than a predetermined ratio with respect to the level of the liquid cargo in the drum
  • the vapor control valve may be controlled to control the vapor control valve so that the amount of evaporated gas exhausted through the gas transfer line is increased if the evaporated gas pressure in the drum with respect to the level of the liquid cargo in the drum is higher than a predetermined ratio .
  • the pressurizing portion is a portion of the vaporizing gas supplied from the liquid cargo storing terminal, the evaporating gas generated in the drum, and the vaporized liquid in the drum when the liquid cargo is shipped from the liquid cargo storing terminal to the liquid cargo storing tank At least one of which is supplied to the liquid cargo storage tank through the gas transfer line, thereby preventing the pressure of the liquid cargo storage tank from being lowered.
  • a method of controlling a liquid storage tank comprising: pressurizing a liquid storage tank using an evaporation gas so that liquid stored in the storage tank is transferred to the drum; And discharging the liquid cargo stored in the drum to the liquid cargo storage terminal through pumping of the main pump, wherein the evaporation gas used to pressurize the liquid cargo storage tank is supplied to the compressor
  • a method of transferring a liquid cargo using a compressed vaporized gas compressed in the apparatus can be provided.
  • the evaporation gas generated in the liquid storage tank may be used.
  • the compressed evaporation gas is injected into the liquid storage tank and pressurized. At the same time, the temperature of the liquid storage tank is prevented from rising by spraying the liquid storage supplied from the drum.
  • the evaporation gas generated during the pump cooldown process may be provided to the liquid cargo storage tank.
  • a certain amount of liquid cargo is stored in the drum, and the liquid cargo stored in the drum is selectively supplied to a gas consumer, and the liquid cargo may include liquefied natural gas (LNG).
  • LNG liquefied natural gas
  • the discharging step adjusts the pressure of the drum to maintain a constant flow rate of the liquid cargo discharged from the drum and the pressure regulation of the drum is such that the evaporation gas pressure in the drum,
  • the amount of evaporated gas exhausted from the drum may be decreased if the ratio is lower than the predetermined ratio, and the amount of evaporated gas exhausted from the drum may be increased if the evaporated gas pressure in the drum is higher than the predetermined ratio.
  • the liquid cargo stored in the drum can be used for various purposes.
  • the flow rate discharged through the adjustment of the pressure of the drum can be always kept constant.
  • FIG. 1 is a view showing a pump tower installed in a conventional cargo hold.
  • FIG. 2 is a view showing a floating ocean structure to which a liquid cargo transfer device is applied.
  • 3 is a view for explaining the process of loading (filling) the liquid cargo into the storage tank.
  • Fig. 4 is a view showing the movement path of the evaporative gas during the voyage.
  • FIG. 5 is a view showing another movement path of the evaporation gas.
  • 6 is a view for explaining the cooldown process of the main pump.
  • FIG. 7 is a view for explaining a process of unloading liquid cargo from a storage tank.
  • FIG. 8 is a view showing a movement path of the evaporative gas during the gull navigation.
  • FIG. 9 is a view showing a configuration for adjusting the pressure of the drum in the liquid cargo transfer apparatus.
  • FIG. 10 is a table showing the pressure curve of the water level and the evaporation gas in the drum.
  • FIG. 11 is a view for explaining a process of preventing sudden pressure drop of a storage tank by using evaporation gas supplied from a liquid cargo storage terminal when a liquid cargo is shipped to a storage tank.
  • FIG. 12 is a view for explaining a process of vaporizing the liquid cargo stored in the drum when the liquid cargo is loaded into the storage tank and supplying it into the storage tank to prevent sudden pressure drop of the storage tank.
  • FIG. 13 is a view for explaining a process of preventing sudden pressure drop of the storage tank by supplying evaporation gas of the drum into the storage tank when the liquid cargo is loaded into the storage tank.
  • first, second, etc. may be used to describe various components, but the components should not be limited by the terms. The terms are used only for the purpose of distinguishing one component from another.
  • FIG. 2 is a view showing a floating ocean structure to which a liquid cargo transfer device is applied.
  • the floating marine structure 10 has a hull 30 comprising a liquid cargo storage tanks 20.
  • the liquid cargo loading / unloading in the liquid cargo storing tank 20 is performed by the liquid cargo transferring apparatus 100 installed in the hull 30.
  • the floating marine structure 10 is a marine floating structure (FPSO) and a natural gas production and storage facility for temporarily storing or treating the natural gas or crude oil when the drilling is performed at sea.
  • FLNG Floating Liquefied Natural Gas
  • FSRU floating storage and regasification unit
  • the present invention is not limited thereto, and it may be a structure having a storage tank for storing liquid cargo.
  • the liquid cargo transfer apparatus 100 of the present invention can perform the loading and unloading of liquid cargo by unifying the filling pipe and the discharge pipe, (Hereinafter referred to as "storage tank") 20 by using the evaporation gas stored in the drum 120 without the configuration of the underwater transfer pump.
  • the liquid cargo transfer apparatus 100 of the present invention may be suitable for applications where a small head pressure such as a small LNG tank or a storage tank of a liquid material having a remarkably low density (for example, liquefied hydrogen) is low.
  • a small head pressure such as a small LNG tank or a storage tank of a liquid material having a remarkably low density (for example, liquefied hydrogen) is low.
  • the liquid cargo transfer apparatus 100 includes a liquid cargo transfer line 110, a drum 120, a peeling line 130, a pressurization unit 200, a cooling unit 300, a discharge line 140, . ≪ / RTI >
  • the liquid cargo transfer line 110 is connected to the drum 120 installed on the deck of the hull 30 from the lower part to the upper part of the storage tank 20.
  • Filling line 130 is connected to the liquid cargo transfer line 110.
  • the drum 120 has a storage space in which the liquid cargo is stored, and has a smaller capacity than the storage tank 20.
  • the pressing portion 200 is provided to pressurize the liquid cargo storage tank 20 so that the liquid cargo stored in the storage tank 20 is supplied to the drum 120 through the liquid cargo transfer line 110.
  • the pressurization unit 200 may include a compressor 220, a gas transfer line 210, a terminal gas line 230, a pump gas line 240 and a bypass line 250.
  • the compressor (220) is installed on the gas transfer line (210).
  • the compressor 220 receives and compresses the evaporated gas from the drum 120 and the evaporated gas compressed by the compressor 220 is supplied to each of the storage tanks 20 through the gas transfer line 210. [ .
  • the gas transfer line 210 is connected to the upper end of the storage tank 20.
  • the gas transfer line 210 can be used as a path for supplying the compressed evaporation gas to the storage tank 20, a path for discharging the evaporation gas of the storage tank 20.
  • the gas transfer line 210 may be connected to a demand source supply line 212 for supplying evaporation gas to a customer.
  • the first drum gas line 214 may be connected to the demand source supply line 212.
  • the first drum gas line 214 is branched from the gas transfer line 210 corresponding to the interval between the compressor 220 and the drum 120 and connected to the demand source supply line 212.
  • the first drum gas line 214 may be connected to the first point P1 on the gas transfer line 210 corresponding to the interval between the compressor 220 and the storage tank 20.
  • the second drum gas line 216 is branched to the first drum gas line 214 and the second drum gas line 216 is branched at the second point P2 where the bypass line 250 and the gas transfer line 210 join .
  • the bypass line 250 may be connected to the gas transfer line 210 to bypass the compressor 220 to pressurize the vapor generated in the storage tank 20.
  • One end of the bypass line 250 is connected to the second point P2 on the gas transfer line between the compressor 220 and the storage tank 20 and the other end is connected to the interval between the compressor 220 and the drum 120 To the third point P3 of the gas transfer line 210, Meanwhile, the surplus evaporated gas remaining in the evaporated gas compressed by the compressor 220 may be transferred from the compressor 220 to the drum 120 through the first drum gas line 214.
  • the first drum gas line 214 can be used as a recovery line for recovering vaporized gas as needed.
  • the exhaust line 260 is connected to the bypass line 250.
  • the exhaust line 260 may be connected to another consumer (additional consumer) that requires evaporative gas.
  • the compressor 220 is connected to a terminal gas line 230 which is supplied with evaporative gas from a liquid cargo storage terminal (not shown).
  • the pressurization portion 200 can be supplied with the evaporation gas from the liquid cargo storage terminal through the terminal gas line 230 when the compressed evaporation gas to be supplied to the storage tank 20 is insufficient.
  • the pump 220 may be connected to a pump gas line 240 that is supplied with evaporative gas from the main pump 150.
  • the discharge line 140 is connected to the lower portion of the drum 120.
  • a main pump 150 is installed on the discharge line 140.
  • the main pump 150 is provided to impart the transfer pressure to the liquid cargo stored in the drum 120.
  • the cooling unit 300 is provided to prevent a temperature rise of the storage tank 20 when compressed evaporation gas is supplied to the storage tank 20.
  • the cooling unit 300 may include an injection nozzle 310, a cooling supply line 320, and an auxiliary pump 330.
  • the injection nozzle 310 is installed in the upper part of the inside of the storage tank 20 to inject liquid cargo.
  • the cooling supply line 320 connects the spray nozzle 310 and the drum 120.
  • the auxiliary pump 330 applies a transfer pressure for supplying a part of the liquid cargo stored in the drum 120 to the injection nozzle 310.
  • FIGS. 3 to 8 and 11 to 13 are views for explaining the process of loading (filling) the liquid cargo into the storage tank.
  • the conveyance path of the liquid cargo is indicated by a dotted line and the conveyance path of the evaporated gas is indicated by a thick solid line.
  • the valve in which the inside is indicated in black indicates a closed state, and the other valves in an open state.
  • the liquid cargo is stored in the storage tank 20 via the filling line 130, the liquid cargo transfer line 110, and the like. At this time, a part of the liquid cargo is stored in the storage space of the drum 120.
  • the liquid cargo stored in the storage space of the drum 120 may be used for cooldown of the main pump 150.
  • the evaporation gas generated in the storage space of the drum 120 and the evaporation gas generated in the storage tank 20 can be supplied to the additional consumers through the exhaust line 260 connected to the bypass line 250.
  • an additional customer needs evaporative gas and can be driven by using it as raw material.
  • the additional customer may be, but is not limited to, a generator (e.g., DFDG), a gas fired unit (GCU), a boiler (e.g.
  • Fig. 4 is a view showing the movement path of the evaporative gas during the voyage.
  • the conveyance path of the liquid cargo is indicated by a dotted line and the conveyance path of the evaporated gas is indicated by a thick solid line.
  • the evaporation gas generated in the storage tank 20 at the time of laden voyage filled with liquid cargo in the storage tank passes through the gas transfer line 210 and the bypass line 250 to the compressor 220 And then supplied to the customer through the demand-supply line 212.
  • the evaporated gas in the drum 120 may be supplied when the amount of evaporative gas generated in the storage tank 20 is insufficient.
  • the liquid supply can be supplied to the customer by utilizing the auxiliary pump 330 installed in the cooling supply line 320.
  • a customer can use a vaporized gas (or liquefied gas) which is pressurized to about 200 to 400 bar by a compressor and vaporized, can be a high-pressure engine using a high-pressure evaporation gas of about 300 bar, An engine for rotating the propeller shaft directly or an engine for generating other power.
  • a vaporized gas or liquefied gas
  • a compressor and vaporized can be a high-pressure engine using a high-pressure evaporation gas of about 300 bar, An engine for rotating the propeller shaft directly or an engine for generating other power.
  • FIG. 5 is a view showing another movement path of the evaporation gas.
  • the conveying path of the evaporation gas is indicated by a thick solid line.
  • 6 is a view for explaining the cooldown process of the main pump.
  • the conveying path of the evaporation gas is indicated by a thick solid line.
  • the main pump 150 since the main pump 150 is exposed to the outside atmosphere unlike the submerged pump installed in the storage tank, the main pump 150 must perform a cool-down operation before performing the lowering operation.
  • the cool down of the main pump 150 is performed using the liquid cargo stored in the drum 120.
  • the evaporated gas generated in the main pump 150 is supplied to the compressor 220 through the pump gas line 240.
  • evaporative gas in the drum 120 and in the storage tank on the right can also be provided to the compressor 220.
  • the evaporated gas compressed in the compressor 220 (hereinafter referred to as compressed evaporation gas) is supplied to the storage tank on the left side of the two storage tanks through the gas transfer line 210.
  • the liquid cargo is transferred to the drum 120 through the liquid cargo transfer line 110 by the pressing force of the compressed evaporative gas. Accordingly, the drum 120 receives the liquid cargo used for cooldown of the main pump 150.
  • FIG. 7 is a view for explaining a process of unloading liquid cargo from a storage tank.
  • the conveyance path of the liquid cargo is indicated by a dotted line and the conveyance path of the evaporated gas is indicated by a thick solid line.
  • the loading operation presses the two storage tanks 20 by the pressurizing unit 200, and the liquid cargo stored in the storage tank 20 by the pressurizing force of the compressed evaporative gas is discharged to the liquid cargo transfer line 110, To the drum (120).
  • the compressed evaporation gas passing through the compressor 220 may cause the temperature inside the storage tank 20 to rise because the temperature is higher than the liquidus temperature in the storage tank 20 at a normal temperature.
  • the internal temperature of the storage tank 20 is prevented from rising through the cooling unit 300.
  • the low-temperature liquid refrigerant cools the compressed evaporative gas and the temperature of the storage tank 20 It is possible to reduce the capacity of the compressor 220 by preventing a rise of the compressor 220 and reducing a required amount of the compressed evaporative gas discharged through the compressor 220.
  • the liquid cargo injected into the storage tank 20 is supplied from the drum 120.
  • the liquid cargo transferred from the storage tank 20 to the drum 120 is transferred to the liquid cargo storage terminal (for example, a carrier or a ground storage tank) (not shown) through the discharge line 140,
  • the transfer of the liquid cargo is performed by the main pump 150.
  • FIG. 8 is a view showing a movement path of the evaporative gas during the gull navigation.
  • the conveying path of the evaporation gas is indicated by a thick solid line.
  • the evaporative gas necessary for the operation can be supplied from the liquid cargo stored in the drum 120. That is, the liquid cargo in the drum 120 may be supplied to an evaporator (not shown) through a cooling supply line 320 and then supplied to a customer.
  • FIG. 9 is a view showing a configuration for adjusting the pressure of the drum in the liquid cargo transfer apparatus.
  • the liquid cargo transfer apparatus 100 has a drum pressure regulator 122.
  • the drum pressure regulator 122 regulates the pressure of the drum 120 to maintain a constant flow rate of the liquid cargo discharged through the discharge line 140.
  • the drum pressure regulating portion 122 includes a water level detecting member 124 for measuring the level of liquid cargo in the drum 120, a pressure measuring member 126 for measuring the evaporated gas pressure in the drum 120, And a control unit 128 for controlling the amount of evaporated gas discharged from the drum 120 by receiving measured values from the pressure measuring member 124 and the pressure measuring member 126.
  • the control unit 128 controls the vapor control valve 211, the main pump 150 and the control valve 142 installed on the discharge line 140, which are installed on the gas transfer line 210 on which the evaporation gas in the drum 120 is exhausted Respectively.
  • the control unit 128 controls the amount of the evaporated gas discharged through the gas transfer line 210 to be reduced so that the liquid level of the liquid cargo in the drum 120 is raised to a predetermined level and the evaporated gas pressure in the drum 120 is low, (211).
  • the control unit 128 controls the amount of evaporated gas discharged through the gas transfer line 210 to be increased so that the level of the liquid cargo in the drum 120 is raised to a predetermined level and the pressure of the evaporated gas in the drum 120 is high. Thereby controlling the valve 211.
  • the flow rate of the water flowing into the drum 120 is greater than the flow rate of the water flowing into the discharge line 140, the water level of the drum 120 is increased and the pressure of the drum 120 is increased accordingly. As a result, the pressure difference between the storage tank 20 and the drum 120 is reduced, and the flow rate of the water flowing into the drum 120 is reduced naturally.
  • the water level of the drum 120 is lowered, the pressure in the drum 120 is reduced, and the flow rate of the water flowing into the drum 120 is increased.
  • the liquid refrigerant in the drum 120 is vaporized by the incoming heat and is thus pressurized in the drum 120. This portion of the liquid 120 is pressurized in the drum by the water level and the pressure curve P of the evaporated gas as the reference Can be controlled.
  • FIG. 11 is a view for explaining a process of preventing sudden pressure drop of a storage tank by using evaporation gas supplied from a liquid cargo storage terminal when a liquid cargo is shipped to a storage tank.
  • the liquid cargo stored in the storage tank 20 and the storage tank 20 when the liquid cargo is shipped from an external tank such as a carrier or a liquid cargo storage terminal (for example, a storage tank on the ground) to the storage tank 20
  • an external tank such as a carrier or a liquid cargo storage terminal (for example, a storage tank on the ground)
  • the residual gas in the storage tank 20 may sharply contract due to the difference in temperature of the liquid cargo, and the pressure may drop rapidly.
  • a terminal gas line 230, a bypass line 250, an exhaust line 260 and a gas transfer line are connected to the storage tank 20 from an external tank such as a terminal or a bunker line when the liquid cargo is shipped.
  • the evaporation gas may be supplied to the storage tank 20 sequentially.
  • natural gas is supplied to the storage tank 20 from an external tank such as a terminal or a bunker line when the liquid cargo is delivered to the storage tank 20 and stored in the storage tank 20, It is possible to prevent rapid shrinkage of the gas in the tank 20 to prevent the membrane barrier of the storage tank 20 from being damaged.
  • FIG. 12 is a view for explaining a process of vaporizing the liquid cargo stored in the drum when the liquid cargo is loaded into the storage tank and supplying it into the storage tank to prevent sudden pressure drop of the storage tank.
  • the liquid supply line 410 is connected to the cooling supply line 320.
  • the liquid cargo stored in the drum 120 is supplied to the vaporizer 420 through the cooling supply line 320 and the liquid cargo supply line 410 and is vaporized in the vaporizer 420 to be supplied to the gas And is supplied to the supply line 430.
  • the gas vaporized in the vaporizer 420 is sequentially transferred through the gas supply line 430, the terminal gas line 230, the bypass line 250, the exhaust line 260, and the gas transfer line 210, 20).
  • the liquid in the storage tank 20 can be supplied to the storage tank 20 without losing the speed of shipment of the liquid cargo by vaporizing the liquid cargo supplied from the drum 120 when the liquid cargo is shipped to the storage tank 20, It is possible to prevent the membrane barrier of the storage tank 20 from being damaged. Further, according to the embodiment shown in Fig. 12, it is possible to prevent the abrupt pressure decrease of the storage tank 20 even if a sufficient amount of evaporative gas is not supplied from the tank of the terminal or the bunker vessel.
  • FIG. 13 is a view for explaining a process of preventing sudden pressure drop of the storage tank by supplying evaporation gas of the drum into the storage tank when the liquid cargo is loaded into the storage tank.
  • a method of supplying evaporated gas supplied from an external tank such as a terminal or a bunker line into the storage tank 20, a method of supplying the evaporated gas of the drum 120 into the storage tank 20, And a method of supplying a gas vaporized from the liquid cargo supplied from the storage tank 20 into the storage tank 20 may be used at the same time to prevent a sudden pressure drop of the storage tank 20 when the liquid cargo is shipped.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Ocean & Marine Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)
  • Loading And Unloading Of Fuel Tanks Or Ships (AREA)

Abstract

본 발명은 액체 화물 이송 장치 및 액체 화물 이송 방법을 제공한다. 본 발명의 액체 화물 이송 장치는 액체 화물 저장탱크에 연결되는 액체화물 이송 라인; 상기 액체화물 이송 라인과 연결되고, 액체 화물이 저장되는 공간을 제공하는 드럼; 및 상기 액체 화물 저장탱크에 저장된 액체 화물이 상기 액체화물 이송 라인을 통해 상기 드럼으로 공급되도록 상기 액체 화물 저장탱크를 가압하는 가압부를 포함할 수 있다.

Description

가압식 액체 화물 이송 장치 및 방법
본 발명은 가압식 액체 화물 이송 장치 및 방법에 관한 것이다.
종래 멤브레인(Membrane) 타입의 화물창을 적용한 LNG 운반선에는 LNG를 선적하거나 배출하기 위해 화물창 내부에 파이프(Pipe) 구조물인 펌프 타워(Pump tower)가 형성된다. 상기 펌프 타워(Pump tower)는 각종 배관류와 LNG 카고 펌프(Cargo Pump)를 지지하는 동시에 파이프(Pipe)를 통해 LNG를 배출하는 배관으로도 사용된다.
도 1은 종래 화물창에 설치되는 펌프 타워를 보여주는 도면이다.
도 1을 참조하면, 종래 LNG의 선적 및 배출 시 화물창 외부에서는 동일한 수송 배관(Liquid line)을 통해 LNG를 운송하지만, 화물창 내에서는 선적시에는 필링 파이프(Filling Pipe;2)를 통해, 배출시에는 방출 파이프(Discharge Pipe,4)를 통해 LNG를 로딩 및 언로딩시킨다. 이는 LNG 카고 펌프(Cargo Pump;5)가 수중(Submerged) 타입으로 방출 파이프(4)의 최하단에 부착되어 있기 때문에 상기 방출 파이프(4)가 필링(Filling)용으로 사용되면 상기 카고 펌프(5)가 역회전하여 손상될 수 있고 구조 지지용인 방출 파이프를 통해 냉각된 LNG가 유입되면 열 수축에 의해 구조 전체에 응력을 발생시키기 때문이다.
특히, LNG 카고 펌프(Cargo Pump;5)의 고장 발생시 곧바로 수리가 불가능 하기 때문에 각 화물창(1)마다 2대씩 구성해야 하며, 비상 펌프를 설치할 수 있도록 별도의 추가 라인이 요구됨으로 설비의 구축에 많은 경제적 비용이 부담된다.
또한, 별도의 분기 배관(branch line)을 구성하여 상기 문제를 해결하기 위해서는 원격 조종 가능한 밸브가 필요한데 극저온의 환경에서 작동 가능한 작동장치(Actuator)의 개발에 어려움이 있기 때문에 이 방법 역시 불가능하다. 따라서 종래 선박의 탱크 내 LNG의 유입 및 배출 시스템에서는 방출 파이프(4)와는 별도로 필링 파이프(2)를 형성하여 LNG를 선적하고 있다.
그러나, 종래 선박의 탱크 내 유체 유입 및 배출 구조물의 경우 별도의 필링 파이프(2)가 요구되기 때문에 그 구조가 복잡하고, 필링 파이프(2) 외에도 상기 필링 파이프(2)의 지지에 소요되는 부재가 요구됨으로 설비의 구축에 많은 경제적 비용이 부담된다. 따라서 관련 배관품의 사용을 최소화하여 경제성을 높인 탱크 내 유체 유입 및 배출 구조물의 개발이 요구된다.
탱크 내 유체의 유입 및 배출 구조물이 이러한 요구사항을 만족시키기 위해서는 방출 파이프(4)를 통해 유체의 필링(Filling)이 가능하도록 하는 기술의 개발이 요구된다.
본 발명의 일 과제는, 필링 파이프(Filling Pipe)와 방출 파이프(Discharge Pipe)를 단일화하여 화물창 내 액체화물의 유입 및 배출 구조를 간단히 할 수 있는 가압식 액체 화물 이송 장치 및 방법을 제공하는데 있다.
본 발명이 해결하고자 하는 과제는 여기에 제한되지 않으며, 언급되지 않은 또 다른 과제들은 아래의 기재로부터 당업자에게 명확하게 이해될 수 있을 것이다.
본 발명의 일 측면에 따르면, 액체 화물 저장탱크에 연결되는 액체화물 이송 라인; 상기 액체화물 이송 라인과 연결되고, 액체 화물이 저장되는 공간을 제공하는 드럼; 및 상기 액체 화물 저장탱크에 저장된 액체 화물이 상기 액체화물 이송 라인을 통해 상기 드럼으로 공급되도록 상기 액체 화물 저장탱크를 가압하는 가압부를 포함하는 액체 화물 이송 장치가 제공될 수 있다.
상기 액체 화물 이송 장치는 상기 액체화물 이송 라인에 연결되고, 외부로부터 액체 화물을 공급받는 필링 라인을 더 포함할 수 있다.
상기 가압부는 상기 드럼으로부터 증발가스를 제공 받아 압축하는 압축기; 및 상기 압축기에서 압축된 증발가스를 상기 액체 화물 저장탱크에 제공하는 가스 이송 라인을 포함할 수 있다.
상기 가압부는 상기 압축기와 연결되고, 액체 화물 저장 터미널로부터 증발가스를 제공하는 터미널 가스라인을 더 포함할 수 있다.
상기 액체 화물 이송 장치는 상기 압축된 증발가스가 상기 액체 화물 저장탱크에 공급될 때 상기 액체 화물 저장탱크의 온도 상승을 방지하는 쿨링부를 더 포함할 수 있다.
상기 쿨링부는 상기 액체 화물 저장탱크 내부에 설치되어 상기 액체 화물을 분사하는 분사 노즐; 및 상기 분사 노즐과 상기 드럼을 연결하며, 보조 펌프에 의해 상기 드럼에 저장된 액체 화물의 일부를 상기 분사 노즐로 공급하기 위해 제공되는 쿨링용 공급 라인을 포함할 수 있다.
상기 가압부는 상기 가스 이송 라인에 상기 압축기를 우회하여 연결되는 우회 라인을 더 포함하고, 상기 액체 화물 저장탱크에서 발생되는 증발가스는 상기 가스 이송 라인과 상기 우회 라인을 통해 상기 압축기와 상기 드럼 사이로 공급되어 상기 압축기에서 압축된 후 가스 수요처로 공급될 수 있다.
상기 액체 화물 이송 장치는 상기 압축기에서 압축된 증발가스 중에 상기 가스 수요처로 공급되고 남은 잉여 증발가스를 상기 드럼에 저장하기 위해 제공되는 회수 라인을 더 포함할 수 있다.
상기 액체 화물 이송 장치는 상기 가스 이송 라인으로부터 분기되고, 상기 드럼에서 발생되는 증발가스를 배기하기 위한 배기라인을 더 포함할 수 있다.
상기 액체 화물 이송 장치는 상기 드럼에 저장된 액체 화물을 하역하기 위해 상기 드럼의 하부에 연결되는 방출 라인; 및 상기 방출 라인에 설치되고, 상기 드럼에 저장되어 있는 액체 화물에 이송압력을 제공하여 상기 액체 화물을 펌핑하는 메인 펌프를 더 포함할 수 있다.
상기 액체 화물 이송 장치는 상기 방출 라인을 통해 배출되는 액체 화물의 유량을 일정하게 유지시키기 위해 상기 드럼의 압력을 조절하는 드럼 압력 조절부를 더 포함할 수 있다.
상기 드럼 압력 조절부는 상기 드럼 내의 액체 화물 수위를 측정하는 수위 감지부재; 상기 드럼 내의 증발가스 압력을 측정하는 압력 측정부재; 및 상기 수위 감지부재 및 상기 압력 측정부재로부터 측정값을 제공받아 상기 드럼 내의 증발가스 배출량을 제어하는 제어부를 포함할 수 있다.
상기 제어부는 상기 드럼 내의 증발가스가 배기되는 가스 이송 라인상에 설치된 베이퍼 컨트롤 밸브; 및 상기 메인 펌프와 상기 방출 라인에 설치된 컨트롤 밸브를 제어하고, 상기 드럼 내의 액체 화물 수위에 대한 상기 드럼 내의 증발가스 압력이 기설정된 비율보다 낮으면 상기 가스 이송 라인을 통해 배기되는 증발가스량이 감소되도록 상기 베이퍼 컨트롤 밸브를 제어하고, 상기 드럼 내의 액체 화물 수위에 대한 상기 드럼 내의 증발가스 압력이 기 설정된 비율보다 높으면 상기 가스 이송 라인을 통해 배기되는 증발가스량이 증가되도록 상기 베이퍼 컨트롤 밸브를 제어할 수 있다.
상기 가압부는 액체 화물 저장 터미널로부터 상기 액체 화물 저장탱크로 액체 화물 선적시, 상기 액체 화물 저장 터미널로부터 제공되는 증발가스, 상기 드럼 내에서 발생되는 증발가스 및 상기 드럼 내에 저장된 액체 화물을 기화시킨 가스 중의 적어도 하나를 상기 가스 이송 라인을 통해 상기 액체 화물 저장탱크에 공급하여, 상기 액체 화물 저장탱크의 압력이 저하되는 것을 방지할 수 있다.
본 발명의 다른 측면에 따르면, 액체 화물 저장탱크에 저장된 액체 화물이 드럼까지 이송되도록 증발가스를 이용하여 액체 화물 저장탱크를 가압하는 단계; 상기 드럼에 저장되는 액체 화물을 메인 펌프의 펌핑을 통해 액체 화물 저장 터미널로 방출하는 단계를 포함하되, 상기 액체 화물 저장탱크를 가압하는데 사용되는 증발가스는, 상기 드럼 내에서 발생되는 증발가스를 압축기에서 압축한 압축 증발 가스를 사용하는 액체 화물 이송 방법이 제공될 수 있다.
상기 가압하는 단계에서 상기 액체 화물 저장탱크를 가압하는데 사용되는 증발가스가 부족한 경우 상기 액체 화물 저장 터미널에서 발생되는 증발가스를 제공받아 사용할 수 있다.
상기 가압하는 단계에서 상기 압축 증발가스를 상기 액체 화물 저장탱크 내부로 주입하여 가압함과 동시에 상기 드럼으로부터 제공받은 액체 화물을 분사하여 상기 액체 화물 저장탱크의 온도 상승을 방지할 수 있다.
상기 액체 화물 저장탱크에 액체 화물이 하역될 때 액체화물 일부가 상기 드럼에 저장되며, 상기 메인 펌프를 사용하기 전에 진행하는 펌프 쿨다운은 상기 드럼에 저장되어 있는 액체 화물을 이용하여 수행하고, 상기 펌프 쿨다운 과정에서 발생되는 증발가스는 상기 액체 화물 저장탱크로 제공될 수 있다.
상기 드럼에는 일정량의 액체 화물이 저장되며, 상기 드럼에 저장된 액체 화물은 선택적으로 가스 수요처로 제공되고, 상기 액체 화물은 액화 천연 가스(LNG)를 포함할 수 있다.
상기 방출하는 단계는 상기 드럼으로부터 방출되는 액체 화물의 유량을 일정하게 유지시키기 위해 상기 드럼의 압력을 조절하고, 상기 드럼의 압력 조절은 상기 드럼 내의 액체 화물 수위에 대한 상기 드럼 내의 증발가스 압력이 기 설정된 비율보다 낮으면 상기 드럼으로부터 배기되는 증발가스량을 감소시키고, 상기 드럼 내의 액체 화물 수위에 대한 상기 드럼 내의 증발가스 압력이 기 설정된 비율보다 높으면 상기 드럼으로부터 배기되는 증발가스량을 증가시킬 수 있다.
본 발명의 실시예에 의하면, 액체화물 이송 라인을 통해 액체 화물의 필링 및 방출이 가능함으로써 저장탱크 내부에 별도의 펌프 타워(Pump tower)를 구현할 필요가 없어 구성이 단순해지고 가격 경쟁력을 높일 수 있다.
본 발명의 실시예에 의하면, 드럼에 저장되어 있는 액체 화물을 다용도로 활용할 수 있는 각별한 효과를 갖는다.
본 발명의 실시예에 의하면, 드럼의 압력 조절을 통해 배출되는 유량을 항상 일정하게 유지할 수 있다.
본 발명의 효과가 상술한 효과들로 제한되는 것은 아니며, 언급되지 아니한 효과들은 본 명세서 및 첨부된 도면으로부터 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에게 명확히 이해될 수 있을 것이다.
도 1은 종래 화물창에 설치되는 펌프 타워를 보여주는 도면이다.
도 2는 액체 화물 이송 장치가 적용된 부유식 해양 구조물을 보여주는 도면이다.
도 3은 저장탱크에 액체 화물을 선적(필링)하는 과정을 설명하기 위한 도면이다.
도 4는 만선 항해시 증발 가스의 이동 경로를 보여주는 도면이다.
도 5는 증발 가스의 또 다른 이동 경로를 보여주는 도면이다.
도 6은 메인 펌프의 쿨다운 과정을 설명하기 위한 도면이다.
도 7은 저장탱크로부터 액체 화물을 하역하는 과정을 설명하기 위한 도면이다.
도 8은 공선 항해시 증발가스의 이동 경로를 보여주는 도면이다.
도 9는 액체 화물 이송 장치에서 드럼의 압력 조절을 위한 구성을 보여주는 도면이다.
도 10은 드럼 내에 수위와 증발가스의 압력 곡선을 보여주는 표이다.
도 11은 저장탱크에 액체 화물을 선적시 액체 화물 저장 터미널로부터 공급되는 증발가스를 이용하여 저장탱크의 급격한 압력 저하를 방지하는 과정을 설명하기 위한 도면이다.
도 12는 저장탱크에 액체 화물을 선적시 드럼 내에 저장된 액체 화물을 기화시켜 저장탱크 내에 공급하여 저장탱크의 급격한 압력 저하를 방지하는 과정을 설명하기 위한 도면이다.
도 13은 저장탱크에 액체 화물을 선적시 드럼의 증발가스를 저장탱크 내에 공급하여 저장탱크의 급격한 압력 저하를 방지하는 과정을 설명하기 위한 도면이다.
본 발명은 다양한 변환을 가할 수 있고 여러 가지 실시 예를 가질 수 있는 바, 특정 실시 예들을 도면에 예시하고 상세한 설명에서 상세하게 설명하고자 한다. 그러나, 이는 본 발명을 특정한 실시 형태에 대해 한정하려는 것이 아니며, 본 발명의 사상 및 기술 범위에 포함되는 모든 변환, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다. 본 발명을 설명함에 있어서 관련된 공지 기술에 대한 구체적인 설명이 본 발명의 요지를 흐릴 수 있다고 판단되는 경우 그 상세한 설명을 생략한다.
본 출원에서 사용한 용어는 단지 특정한 실시예를 설명하기 위해 사용된 것으로, 본 발명을 한정하려는 의도가 아니다. 단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한, 복수의 표현을 포함한다. 본 출원에서, "포함하다" 또는 "가지다" 등의 용어는 명세서상에 기재된 특징, 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것이 존재함을 지정하려는 것이지, 하나 또는 그 이상의 다른 특징들이나 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해되어야 한다.
제1, 제2 등의 용어는 다양한 구성요소들을 설명하는데 사용될 수 있지만, 상기 구성요소들은 상기 용어들에 의해 한정되어서는 안 된다. 상기 용어들은 하나의 구성요소를 다른 구성요소로부터 구별하는 목적으로만 사용된다.
이하, 첨부한 도면들을 참조하여 본 발명에 따른 실시예들을 상세히 설명하기로 하며, 첨부 도면을 참조하여 설명함에 있어 도면 부호에 상관없이 동일하거나 대응하는 구성 요소는 동일한 참조번호를 부여하고 이에 대한 중복되는 설명은 생략하기로 한다.
도 2는 액체 화물 이송 장치가 적용된 부유식 해양 구조물을 보여주는 도면이다.
도 2에서 알 수 있듯이, 부유식 해상 구조물(10)은 액체 화물 저장탱크(20)들을 포함하는 선체(30)를 갖는다. 액체 화물 저장탱크(20)에서의 액체 화물 하역은 선체(30)에 설치되는 액체 화물 이송 장치(100)에 의해 이루어진다.
여기서, 부유식 해상 구조물(10)은 천연가스나 원유의 시추가 해상에서 이루어지는 경우 일시적으로 저장을 하거나 그 처리를 위한 해양 부유 구조물인 FPSO (Floating Production, Storage and Offloading) 및 천연가스 생산저장 설비인 FLNG(Floating Liquefied Natural Gas), 또는 부유식 액화물 저장선(FSRU; Floating Storage and Regasification Unit)일 수 있으나, 이에 한정되지 않고 액화물을 저장하는 저장탱크가 설치된 구조물일 수 있다.
본 발명의 액체 화물 이송 장치(100)는 필링 파이프(Filling Pipe)와 방출 파이프(Discharge Pipe)를 단일화하여 액체 화물의 선적 및 하적을 실시할 수 있으며, 하적 작업시에는 액체 화물에 이송압력을 부여하기 위한 수중 이송펌프의 구성없이 드럼(120)에 저장된 증발가스를 이용하여 액체 화물 저장탱크(이하 저장탱크라고 함; 20)에 저장된 액체 화물을 가압함으로써 이송할 수 있는 장치이다.
본 발명의 액체 화물 이송 장치(100)는 소형 LNG 탱크나 밀도가 현저하게 낮은 액체 화물(예를 들면, 액화 수소)의 저장탱크와 같은 수두압이 낮은 경우에 적용하기 적합할 수 있다.
액체 화물 이송 장치(100)는 액체화물 이송 라인(110), 드럼(120), 필링 라인(130), 가압부(200), 쿨링부(300), 방출 라인(140) 그리고 메인 펌프(150)를 포함할 수 있다.
액체화물 이송 라인(110)은 저장탱크(20)의 하부로부터 상부를 거쳐 선체(30)의 데크 상에 설치되는 드럼(120)과 연결된다. 액체화물 이송 라인(110)에는 필링 라인(130)이 연결된다.
드럼(120)은 액체 화물이 저장되는 저장 공간을 가지며, 저장탱크(20)보다 적은 용량을 갖는다.
가압부(200)는 저장탱크(20)에 저장된 액체 화물이 액체화물 이송 라인(110)을 통해 드럼(120)으로 공급되도록 액체 화물 저장탱크(20)를 가압하기 위해 제공된다.
일 예로, 가압부(200)는 압축기(220), 가스 이송 라인(210), 터미널 가스라인(230), 펌프 가스라인(240) 그리고 우회 라인(250)을 포함할 수 있다. 압축기(220)는 가스 이송 라인(210) 상에 설치된다. 압축기(220)는 드럼(120)으로부터 증발가스를 제공 받아 압축하고, 압축기(220)에서 압축된 증발가스(이하, 압축 증발가스)는 가스 이송 라인(210)을 통해 각각의 저장탱크(20)로 제공된다.
가스 이송 라인(210)은 저장탱크(20)의 상단에 연결된다. 가스 이송 라인(210)은 압축 증발가스를 저장탱크(20)에 공급하기 위한 경로, 저장탱크(20)의 증발가스를 방출시키는 경로로 사용될 수 있다. 가스 이송 라인(210)에는 수요처로 증발 가스를 공급하기 위한 수요처 공급 라인(212)이 연결될 수 있다. 수요처 공급라인(212)에는 제1드럼 가스 라인(214)이 연결될 수 있다. 제1드럼 가스 라인(214)은 압축기(220)와 드럼(120) 사이 구간에 해당되는 가스 이송 라인(210)으로부터 분기되어 수요처 공급라인(212)과 연결된다. 제1드럼 가스 라인(214)은 압축기(220)와 저장탱크(20) 사이 구간에 해당되는 가스 이송 라인(210) 상의 제1지점(P1)과 연결될 수 있다.
제1드럼 가스 라인(214)에는 제2드럼 가스 라인(216)이 분기되며, 제2드럼 가스 라인(216)은 우회라인(250)과 가스 이송 라인(210)이 합류하는 제2지점(P2)에 연결될 수 있다.
우회 라인(250)은 저장탱크(20)에서 발생되는 증발가스를 가압하기 위해 압축기(220)를 우회하도록 가스 이송 라인(210)에 연결될 수 있다. 우회 라인(250)의 일단은 압축기(220)와 저장탱크(20) 사이 구간의 가스 이송 라인 상의 제2지점(P2)에 연결되고, 타단은 압축기(220)와 드럼(120) 사이 구간에 해당되는 가스 이송 라인(210)의 제3지점(P3)에 연결될 수 있다. 한편, 압축기(220)에서 압축된 증발가스 중에 가스 수요처로 공급되고 남은 잉여 증발가스는 제1드럼 가스 라인(214)을 통해 압축기(220)로부터 드럼(120)으로 이동될 수 있다. 이처럼, 제1드럼 가스 라인(214)은 필요에 따라 증발가스를 회수하기 위한 회수 라인으로 사용될 수 있다.
배기 라인(260)은 우회 라인(250)과 연결된다. 배기 라인(260)은 증발 가스를 필요로 하는 또 다른 수요처(추가 수요처)와 연결될 수 있다.
압축기(220)에는 액체 화물 저장 터미널(미도시됨)로부터 증발가스를 제공받는 터미널 가스라인(230)이 연결된다. 가압부(200)는 저장탱크(20)로 제공되어야 할 압축 증발 가스가 부족한 경우 터미널 가스라인(230)을 통해 액체 화물 저장 터미널로부터 증발가스를 공급받을 수 있다. 또한, 압축기(220)에는 메인 펌프(150)로부터 증발가스를 제공받는 펌프 가스 라인(240)이 연결될 수 있다.
방출 라인(140)은 드럼(120)의 하부에 연결된다. 방출 라인(140) 상에는 메인 펌프(150)가 설치된다. 메인 펌프(150)는 드럼(120)에 저장되어 있는 액체 화물에 이송압력을 부여하기 위해 제공된다.
쿨링부(300)는 압축 증발가스가 저장탱크(20)에 공급될 때 저장탱크(20)의 온도 상승을 방지하기 위해 제공된다. 일 예로, 쿨링부(300)는 분사 노즐(310), 쿨링용 공급 라인(320) 그리고 보조 펌프(330)를 포함할 수 있다.
분사 노즐(310)은 저장탱크(20) 내부의 상부에 설치되어 액체 화물을 분사한다.
쿨링용 공급 라인(320)은 분사 노즐(310)과 드럼(120)을 연결한다. 보조 펌프(330)는 드럼(120)에 저장된 액체 화물의 일부를 분사 노즐(310)로 공급하기 위한 이송 압력을 부여한다.
도 3은 저장탱크에 액체 화물을 선적(필링)하는 과정을 설명하기 위한 도면이다. 참고로, 설명 편의상 액체 화물의 이송 경로는 점선으로 표시하였고, 증발 가스의 이송 경로는 굵은 실선으로 표시하였다. 그리고, 도 3 내지 도 8, 도 11 내지 도 13에서 각 라인들에 설치된 밸브들 중 내부가 검은색으로 표시된 밸브는 닫힌 상태를 나타내고, 그렇지 않은 밸브는 오픈된 상태를 나타낸다.
도 3에서와 같이, 액체 화물은 필링 라인(130)을 통해 액체화물 이송 라인(110)을 거쳐 저장탱크(20)에 저장된다. 이때, 액체 화물 일부는 드럼(120)의 저장 공간에 저장된다. 드럼(120)의 저장 공간에 저장된 액체 화물은 메인펌프(150)의 쿨다운에 사용될 수 있다. 드럼(120)의 저장 공간에서 발생되는 증발가스 및 저장탱크(20)에서 발생되는 증발가스는 우회 라인(250)과 연결된 배기 라인(260)을 통해 추가 수요처로 제공될 수 있다.
여기서 추가 수요처는 증발가스를 필요로 하며 이를 원료로 하여 구동될 수 있다. 일 예로, 추가 수요처는 발전기(예를 들어 DFDG), 가스연소장치(GCU), 보일러(예를 들어 스팀을 생성하는 보일러)일 수 있으며, 이에 한정되지 않는다.
도 4는 만선 항해시 증발 가스의 이동 경로를 보여주는 도면이다.
참고로, 설명 편의상 액체 화물의 이송 경로는 점선으로 표시하였고, 증발 가스의 이송 경로는 굵은 실선으로 표시하였다.
도 4를 참조하면, 저장탱크에 액체 화물이 가득 실은 만선항해(Laden Voyage)시에 저장탱크(20)에서 발생되는 증발가스는 가스 이송라인(210)과 우회라인(250)을 거쳐 압축기(220)에서 압축된 후 수요처 공급라인(212)을 통해 수요처로 공급될 수 있다. 그리고 저장탱크(20)에서 발생되는 증발 가스량이 부족한 경우 드럼(120) 내의 증발 가스를 제공받을 수 있다. 또 다른 방법으로, 쿨링용 공급라인(320)에 설치된 보조펌프(330)를 활용하여 액체 화물을 수요처로 공급할 수도 있다.
참고로, 수요처는, 압축기에 의해 약 200 내지 400bar로 가압되고 기화된 증발가스(또는 액화가스)를 사용할 수 있고, 약 300bar 정도의 고압 증발가스를 사용하는 고압용 엔진일 수 있으며, 프로펠러를 구동하기 위해 직접 프로펠러 축을 회전시키는 엔진 또는 기타 동력을 발생시키기 위한 엔진일 수 있다.
도 5는 증발 가스의 또 다른 이동 경로를 보여주는 도면이다.
참고로, 설명 편의상 증발 가스의 이송 경로는 굵은 실선으로 표시하였다.
도 5를 참조하면, 서행 운항으로 수요처에서 사용되는 증발 가스량이 감소되는 경우, 잉여 증발가스는 압축기(220)를 통해 압축된 후 제1지점(P1)에서 제1드럼 가스 라인(214)을 통해 드럼(120)에 저장될 수 있다.
도 6은 메인 펌프의 쿨다운 과정을 설명하기 위한 도면이다.
참고로, 설명 편의상 증발 가스의 이송 경로는 굵은 실선으로 표시하였다.
도 6을 참조하면, 메인 펌프(150)는 기존에 저장탱크 내에 설치되는 수중 펌프와는 다르게 외부의 대기 중에 노출됨으로, 하적 작업을 실시하기 전에 쿨-다운을 수행해야 한다. 메인 펌프(150)의 쿨다운은 드럼(120) 내에 저장되어 있는 액체화물을 이용하여 선 수행한다.
이 과정에서 메인 펌프(150)에서 발생되는 증발가스는 펌프 가스 라인(240)을 통해 압축기(220)로 제공된다. 또한, 드럼(120) 및 우측의 저장탱크 내의 증발가스도 압축기(220)로 제공될 수 있다. 압축기(220)에서 압축된 증발가스(이하, 압축 증발가스)는 가스 이송 라인(210)을 통해 2개의 저장탱크 중에서 좌측의 저장탱크로 공급된다. 좌측의 저장탱크에서는 압축 증발가스의 가압력에 의해 액체 화물이 액체 화물 이송라인(110)을 통해 드럼(120)으로 이송된다. 따라서, 드럼(120)은 메인 펌프(150)의 쿨 다운에 사용되는 액체 화물을 공급받게 된다.
도 7은 저장탱크로부터 액체 화물을 하역하는 과정을 설명하기 위한 도면이다. 참고로, 설명 편의상 액체 화물의 이송 경로는 점선으로 표시하였고, 증발 가스의 이송 경로는 굵은 실선으로 표시하였다.
도 7에서와 같이, 하역 작업은 가압부(200)가 두 개의 저장탱크(20)를 가압하고, 압축 증발가스의 가압력에 의해 저장탱크(20)에 저장된 액체 화물은 액체화물 이송 라인(110)을 통해 드럼(120)으로 이동된다.
이러한 가압 과정에서 압축기(220)를 통과한 압축 증발가스는 온도가 상온으로 저장탱크(20) 내부의 액체 화물 대비 온도가 높기 때문에 저장탱크(20) 내부의 온도를 상승시키는 원인이 될 수 있다. 이러한 문제를 최소화하기 위해, 가압 과정에서는 쿨링부(300)를 통해 저장탱크(20) 내부 온도 상승을 억제시킨다. 즉, 압축 증발가스를 저장탱크(20) 내부로 주입하여 가압함과 동시에 액체 화물을 저장탱크(20) 내부에서 분사하면 저온의 액체화물이 압축 증발가스를 냉각시키게 되면서 저장탱크(20)의 온도 상승을 방지하고, 압축기(220)를 통해 배출되는 압축 증발가스의 필요량을 줄일 수 있게 됨으로써 압축기(220)의 용량을 줄일 수 있다. 저장탱크(20) 내부로 분사되는 액체 화물은 드럼(120)으로부터 제공받는다.
한편, 저장탱크(20)에서 드럼(120)으로 이동된 액체 화물은 방출 라인(140)을 통해 액체 화물 저장 터미널(일 예로, 운반선 또는 지상의 저장탱크)(미도시됨)로 이송되며, 이때 액체 화물의 이송은 메인 펌프(150)에 의해 이루어진다.
도 8은 공선항해시 증발가스의 이동 경로를 보여주는 도면이다.
참고로, 설명 편의상 증발 가스의 이송 경로는 굵은 실선으로 표시하였다.
도 8을 참조하면, 공선 항해시에는 저장탱크(20)로부터 발생되는 증발가스 발생량이 줄어들기 때문에 운항하기 위해 필요한 증발가스는 드럼(120)에 저장된 액체 화물로부터 제공받을 수 있다. 즉, 드럼(120)의 액체 화물은 쿨링용 공급라인(320)을 통해 증발기(미도시됨)로 제공된 후 수요처로 제공될 수 있다.
도 9는 액체 화물 이송 장치에서 드럼의 압력 조절을 위한 구성을 보여주는 도면이다.
도 9를 참조하면, 액체 화물 이송 장치(100)는 드럼 압력 조절부(122)를 갖는다. 드럼 압력 조절부(122)는 방출 라인(140)을 통해 배출되는 액체 화물의 유량을 일정하게 유지시키기 위해 드럼(120)의 압력을 조절한다.
일 예로, 드럼 압력 조절부(122)는 드럼(120) 내의 액체 화물 수위를 측정하는 수위 감지부재(124), 드럼(120) 내의 증발가스 압력을 측정하는 압력 측정부재(126) 및 수위 감지부재(124) 및 압력 측정부재(126)로부터 측정값을 제공받아 드럼(120) 내의 증발가스 배출량을 제어하는 제어부(128)를 포함할 수 있다.
제어부(128)는 드럼(120) 내의 증발가스가 배기되는 가스 이송 라인(210)상에 설치된 베이퍼 컨트롤 밸브(211), 메인 펌프(150) 그리고 방출 라인(140)에 설치된 컨트롤 밸브(142)를 각각 제어할 수 있다.
제어부(128)는 드럼(120) 내의 액체 화물 수위가 기설정된 수위보다 상승되고, 드럼(120) 내의 증발가스 압력이 낮으면 가스 이송 라인(210)을 통해 배기되는 증발가스량이 감소되도록 베이퍼 컨트롤 밸브(211)를 제어한다. 또한, 제어부(128)는 드럼(120) 내의 액체 화물 수위가 기설정된 수위보다 상승되고, 드럼(120) 내의 증발가스 압력이 높으면 가스 이송 라인(210)을 통해 배기되는 증발가스량이 증가되도록 베이퍼 컨트롤 밸브(211)를 제어한다.
이와 같이, 드럼(120)에 유입되는 유량이 방출 라인(140)으로 나가는 유량보다 많으면 드럼(120)의 수위가 상승되게 되고, 이에 따라 드럼(120) 내 압력도 올라가게 된다. 이는 저장탱크(20)와 드럼(120) 간 압력차가 줄어들게 되어 자연적으로 드럼(120)으로 유입되는 유량이 줄어들게 된다. 반대로, 드럼(120)의 수위가 내려가면 드럼(120) 내의 압력이 줄어들게 되면서 드럼(120)으로 유입되는 유량이 증가하게 되어 드럼(120)으로 유입되는 유량과 나가는 유량을 일정하게 조절할 수 있다. 다만, 유입되는 열에 의하여 드럼(120) 내의 액체 화물이 기화하게 되고 이 때문에 드럼(120) 내에 가압되는데 이 부분은 도 10에서와 같이 드럼 내에 압력을 수위와 증발가스의 압력 곡선(P)을 기준으로 컨트롤할 수 있다.
도 11은 저장탱크에 액체 화물을 선적시 액체 화물 저장 터미널로부터 공급되는 증발가스를 이용하여 저장탱크의 급격한 압력 저하를 방지하는 과정을 설명하기 위한 도면이다.
운반선 또는 액체 화물 저장 터미널(일 예로, 지상의 저장탱크) 등의 외부 탱크로부터 저장탱크(20)로 액체 화물 선적시, 저장탱크(20) 내에 저장되어 있던 액체 화물과 저장탱크(20)로 공급되는 액체 화물의 온도 차로 인해 저장탱크(20) 내의 잔존 가스가 급속도로 수축하여 압력이 급격히 떨어지는 현상이 발생할 수 있다.
멤브레인 탱크로 이루어진 저장탱크(20) 내 압력이 음압으로 떨어질 경우, 저장탱크(20)의 액체 화물과 접촉하는 1차 방벽의 파손 가능성이 매우 높아진다. 저장탱크(20)로의 액체 화물 선적 속도를 늦추면 저장탱크(20) 내 가스의 급속 수축을 방지할 수 있으나, 선적 시간이 길어져 생산성이 저하되고, 지속적 모니터링이 필요한 단점이 있다.
도 11에 도시된 바와 같이, 저장탱크(20)로 액체 화물 선적시 터미널 또는 벙커선 등의 외부 탱크로부터 터미널 가스라인(230), 우회라인(250), 배기라인(260) 및 가스 이송 라인(210)을 통해 순차적으로 증발가스가 이송되어 저장탱크(20) 내에 공급될 수 있다. 이와 같이, 저장탱크(20)로 액체 화물 선적시 터미널 또는 벙커선 등의 외부 탱크로부터 증발가스(천연가스)를 공급받아 저장탱크(20) 내에 주입하면, 액체 화물의 선적 속도를 늦추지 않으면서 저장탱크(20) 내 가스의 급속 수축을 방지하여 저장탱크(20)의 멤브레인 방벽 손상을 방지할 수 있다.
도 12는 저장탱크에 액체 화물을 선적시 드럼 내에 저장된 액체 화물을 기화시켜 저장탱크 내에 공급하여 저장탱크의 급격한 압력 저하를 방지하는 과정을 설명하기 위한 도면이다.
도 12에 도시된 실시예에서, 쿨링용 공급 라인(320)에는 액체화물 공급라인(410)이 연결된다. 드럼(120) 내에 저장된 액체 화물은 쿨링용 공급 라인(320), 액체화물 공급라인(410)을 통해 기화기(420)로 공급되고, 기화기(420)에서 기화되어 터미널 가스라인(230)과 연결된 가스 공급라인(430)으로 공급된다. 기화기(420)에서 기화된 가스는 가스 공급라인(430), 터미널 가스라인(230), 우회라인(250), 배기라인(260) 및 가스 이송 라인(210)을 통해 순차적으로 이송되어 저장탱크(20) 내에 공급될 수 있다.
이와 같이, 저장탱크(20)로 액체 화물 선적시 드럼(120)으로부터 공급되는 액체 화물을 기화시킨 후 저장탱크(20) 내에 공급함으로써, 액체 화물의 선적 속도를 늦추지 않고 저장탱크(20) 내 가스의 급속 수축을 방지하여 저장탱크(20)의 멤브레인 방벽 손상을 방지할 수 있다. 또한, 도 12에 도시된 실시예에 의하면, 터미널 또는 벙커링 선박의 탱크로부터 충분한 양의 증발가스가 공급되지 않더라도, 저장탱크(20)의 급격한 압력 감소를 방지할 수 있다.
도 13은 저장탱크에 액체 화물을 선적시 드럼의 증발가스를 저장탱크 내에 공급하여 저장탱크의 급격한 압력 저하를 방지하는 과정을 설명하기 위한 도면이다.
도 13에 도시된 바와 같이, 저장탱크(20)로 액체 화물 선적시 드럼(120)의 증발가스(천연가스)를 제2드럼 가스 라인(216), 가스 이송 라인(210)을 통해 순차적으로 이송하여 저장탱크(20) 내에 공급함으로써, 액체 화물의 선적 속도를 늦추지 않으면서 저장탱크(20) 내 가스의 급속 수축을 방지하여 저장탱크(20)의 멤브레인 방벽 손상을 방지할 수 있다. 또한, 도 13에 도시된 실시예에 의하면, 터미널 또는 벙커링 선박의 탱크로부터 충분한 양의 증발가스가 공급되지 않더라도, 저장탱크(20)의 급격한 압력 감소를 방지할 수 있다.
도시되지 않았으나, 터미널 또는 벙커선 등의 외부 탱크로부터 공급되는 증발가스를 저장탱크(20) 내에 공급하는 방법, 드럼(120)의 증발가스를 저장탱크(20) 내에 공급하는 방법, 드럼(120)으로부터 공급된 액체 화물을 기화시킨 가스를 저장탱크(20) 내에 공급하는 방법 중 2 이상의 방법을 동시에 사용하여 액체 화물 선적시 저장탱크(20)의 급격한 압력 저하를 방지할 수도 있다.
이상의 설명은 본 발명의 기술 사상을 예시적으로 설명한 것에 불과한 것으로서, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 본 발명의 본질적인 특성에서 벗어나지 않는 범위에서 다양한 수정 및 변형이 가능할 것이다. 따라서, 본 발명에 개시된 실시 예들은 본 발명의 기술 사상을 한정하기 위한 것이 아니라 설명하기 위한 것이고, 이러한 실시 예에 의하여 본 발명의 기술 사상의 범위가 한정되는 것은 아니다. 본 발명의 보호 범위는 아래의 청구범위에 의하여 해석되어야 하며, 그와 동등한 범위 내에 있는 모든 기술 사상은 본 발명의 권리범위에 포함되는 것으로 해석되어야 할 것이다.

Claims (15)

  1. 액체 화물 저장탱크에 연결되는 액체화물 이송 라인;
    상기 액체화물 이송 라인과 연결되고, 액체 화물이 저장되는 공간을 제공하는 드럼; 및
    상기 액체 화물 저장탱크에 저장된 액체 화물이 상기 액체화물 이송 라인을 통해 상기 드럼으로 공급되도록 상기 액체 화물 저장탱크를 가압하는 가압부를 포함하는 액체 화물 이송 장치.
  2. 제 1 항에 있어서,
    상기 액체화물 이송 라인에 연결되고, 외부로부터 액체 화물을 공급받는 필링 라인을 더 포함하는 액체 화물 이송 장치.
  3. 제 1 항에 있어서,
    상기 가압부는
    상기 드럼으로부터 증발가스를 제공 받아 압축하는 압축기; 및
    상기 압축기에서 압축된 증발가스를 상기 액체 화물 저장탱크에 제공하는 가스 이송 라인을 포함하는 액체 화물 이송 장치.
  4. 제 3 항에 있어서,
    상기 가압부는
    상기 압축기와 연결되고, 액체 화물 저장 터미널로부터 증발가스를 제공하는 터미널 가스라인을 더 포함하는 액체 화물 이송 장치.
  5. 제 3 항에 있어서,
    상기 압축된 증발가스가 상기 액체 화물 저장탱크에 공급될 때 상기 액체 화물 저장탱크의 온도 상승을 방지하는 쿨링부를 더 포함하는 액체 화물 이송 장치.
  6. 제 5 항에 있어서,
    상기 쿨링부는
    상기 액체 화물 저장탱크 내부에 설치되어 상기 액체 화물을 분사하는 분사 노즐; 및
    상기 분사 노즐과 상기 드럼을 연결하며, 보조 펌프에 의해 상기 드럼에 저장된 액체 화물의 일부를 상기 분사 노즐로 공급하기 위해 제공되는 쿨링용 공급 라인을 포함하는 액체 화물 이송 장치.
  7. 제 3 항에 있어서,
    상기 가압부는
    상기 가스 이송 라인에 상기 압축기를 우회하여 연결되는 우회 라인을 더 포함하고,
    상기 액체 화물 저장탱크에서 발생되는 증발가스는 상기 가스 이송 라인과 상기 우회 라인을 통해 상기 압축기와 상기 드럼 사이로 공급되어 상기 압축기에서 압축된 후 가스 수요처로 공급되는 액체 화물 이송 장치.
  8. 제 7 항에 있어서,
    상기 압축기에서 압축된 증발가스 중에 상기 가스 수요처로 공급되고 남은 잉여 증발가스를 상기 드럼에 저장하기 위해 제공되는 회수 라인; 및
    상기 가스 이송 라인으로부터 분기되고, 상기 드럼에서 발생되는 증발가스를 배기하기 위한 배기라인을 더 포함하는 액체 화물 이송 장치.
  9. 제 1 항에 있어서,
    상기 드럼에 저장된 액체 화물을 하역하기 위해 상기 드럼의 하부에 연결되는 방출 라인; 및
    상기 방출 라인에 설치되고, 상기 드럼에 저장되어 있는 액체 화물에 이송압력을 제공하여 상기 액체 화물을 펌핑하는 메인 펌프를 더 포함하는 액체 화물 이송 장치.
  10. 제 9 항에 있어서,
    상기 방출 라인을 통해 배출되는 액체 화물의 유량을 일정하게 유지시키기 위해 상기 드럼의 압력을 조절하는 드럼 압력 조절부를 더 포함하는 액체 화물 이송 장치.
  11. 제 10 항에 있어서,
    상기 드럼 압력 조절부는
    상기 드럼 내의 액체 화물 수위를 측정하는 수위 감지부재;
    상기 드럼 내의 증발가스 압력을 측정하는 압력 측정부재; 및
    상기 수위 감지부재 및 상기 압력 측정부재로부터 측정값을 제공받아 상기 드럼 내의 증발가스 배출량을 제어하는 제어부를 포함하고,
    상기 제어부는
    상기 드럼 내의 증발가스가 배기되는 가스 이송 라인상에 설치된 베이퍼 컨트롤 밸브; 및 상기 메인 펌프와 상기 방출 라인에 설치된 컨트롤 밸브를 제어하고,
    상기 제어부는
    상기 드럼 내의 액체 화물 수위에 대한 상기 드럼 내의 증발가스 압력이 기설정된 비율보다 낮으면 상기 가스 이송 라인을 통해 배기되는 증발가스량이 감소되도록 상기 베이퍼 컨트롤 밸브를 제어하고,
    상기 드럼 내의 액체 화물 수위에 대한 상기 드럼 내의 증발가스 압력이 기 설정된 비율보다 높으면 상기 가스 이송 라인을 통해 배기되는 증발가스량이 증가되도록 상기 베이퍼 컨트롤 밸브를 제어하는 액체 화물 이송 장치.
  12. 제 3 항에 있어서,
    상기 가압부는
    액체 화물 저장 터미널로부터 상기 액체 화물 저장탱크로 액체 화물 선적시, 상기 액체 화물 저장 터미널로부터 제공되는 증발가스, 상기 드럼 내에서 발생되는 증발가스 및 상기 드럼 내에 저장된 액체 화물을 기화시킨 가스 중의 적어도 하나를 상기 가스 이송 라인을 통해 상기 액체 화물 저장탱크에 공급하여, 상기 액체 화물 저장탱크의 압력이 저하되는 것을 방지하는 액체 화물 이송 장치.
  13. 액체 화물 저장탱크에 저장된 액체 화물이 드럼까지 이송되도록 증발가스를 이용하여 액체 화물 저장탱크를 가압하는 단계;
    상기 드럼에 저장되는 액체 화물을 메인 펌프의 펌핑을 통해 액체 화물 저장 터미널로 방출하는 단계를 포함하되,
    상기 액체 화물 저장탱크를 가압하는데 사용되는 증발가스는, 상기 드럼 내에서 발생되는 증발가스를 압축기에서 압축한 압축 증발 가스를 사용하는 액체 화물 이송 방법.
  14. 제 13 항에 있어서,
    상기 가압하는 단계에서
    상기 액체 화물 저장탱크를 가압하는데 사용되는 증발가스가 부족한 경우 상기 액체 화물 저장 터미널에서 발생되는 증발가스를 제공받아 사용하고,
    상기 압축 증발가스를 상기 액체 화물 저장탱크 내부로 주입하여 가압함과 동시에 상기 드럼으로부터 제공받은 액체 화물을 분사하여 상기 액체 화물 저장탱크의 온도 상승을 방지하는 액체 화물 이송 방법.
  15. 제 14 항에 있어서,
    상기 액체 화물 저장탱크에 액체 화물이 하역될 때 액체화물 일부가 상기 드럼에 저장되며,
    상기 메인 펌프를 사용하기 전에 진행하는 펌프 쿨다운은 상기 드럼에 저장되어 있는 액체 화물을 이용하여 수행하고, 상기 펌프 쿨다운 과정에서 발생되는 증발가스는 상기 액체 화물 저장탱크로 제공하는 액체 화물 이송 방법.
PCT/KR2018/010156 2017-09-01 2018-08-31 가압식 액체 화물 이송 장치 및 방법 WO2019045523A1 (ko)

Priority Applications (4)

Application Number Priority Date Filing Date Title
SG11202001852SA SG11202001852SA (en) 2017-09-01 2018-08-31 Method and apparatus for transferring liquid cargo in pressurization type
CN201880056959.3A CN111094121B (zh) 2017-09-01 2018-08-31 加压型用于输送液体货物的装置和方法
US16/643,255 US11383794B2 (en) 2017-09-01 2018-08-31 Method and apparatus for transferring liquid cargo in pressurization type
JP2020512583A JP7220706B2 (ja) 2017-09-01 2018-08-31 加圧式液体貨物移送装置及び方法

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
KR1020170111818A KR102039621B1 (ko) 2017-09-01 2017-09-01 가압식 액체 화물 이송 장치 및 방법
KR1020170111823A KR101984976B1 (ko) 2017-09-01 2017-09-01 가압식 액체 화물 이송 장치 및 방법
KR10-2017-0111823 2017-09-01
KR10-2017-0111818 2017-09-01

Publications (1)

Publication Number Publication Date
WO2019045523A1 true WO2019045523A1 (ko) 2019-03-07

Family

ID=65527651

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2018/010156 WO2019045523A1 (ko) 2017-09-01 2018-08-31 가압식 액체 화물 이송 장치 및 방법

Country Status (5)

Country Link
US (1) US11383794B2 (ko)
JP (1) JP7220706B2 (ko)
CN (1) CN111094121B (ko)
SG (1) SG11202001852SA (ko)
WO (1) WO2019045523A1 (ko)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3106391B1 (fr) * 2020-01-17 2022-04-29 Air Liquide Installation et un procédé de stockage et de distribution de fluide cryogénique

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100034851A (ko) * 2008-09-25 2010-04-02 대우조선해양 주식회사 하역 전용 파이프 라인을 갖춘 부유식 구조물
KR20110002152A (ko) * 2009-07-01 2011-01-07 최시열 바이너리 씨디엠에이를 이용한 영상 정보 관리 시스템 및 관리 방법
KR20150093003A (ko) * 2014-02-06 2015-08-17 현대중공업 주식회사 액화가스 처리 시스템
KR20160074983A (ko) * 2014-12-19 2016-06-29 삼성중공업 주식회사 연료가스 공급시스템
KR101770917B1 (ko) * 2015-11-17 2017-08-23 현대중공업 주식회사 액화가스 재기화 시스템 및 이를 구비하는 선박

Family Cites Families (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS505477B1 (ko) 1969-12-12 1975-03-04
US4449543A (en) * 1981-04-13 1984-05-22 Greene Jr George J Fluid injecting method and apparatus
JPS6145837A (ja) 1984-08-09 1986-03-05 Kawasaki Heavy Ind Ltd Lng二次基地におけるlngの揚荷方法
JPS6328998U (ko) 1986-08-08 1988-02-25
US5203828A (en) * 1991-05-29 1993-04-20 Strain Patrick J Guide and control means for diaphragm
FI118680B (fi) * 2003-12-18 2008-02-15 Waertsilae Finland Oy Kaasunsyöttöjärjestely vesikulkuneuvossa ja menetelmä kaasun paineen ohjaamiseksi vesikulkuneuvon kaasunsyöttöjärjestelyssä
DE102009028109A1 (de) 2009-07-30 2011-02-03 Tge Marine Gas Engineering Gmbh Brenngas-System für Handelsschiffe
KR101059870B1 (ko) 2009-08-26 2011-08-29 삼성중공업 주식회사 액화천연가스의 재기화 설비
KR101447512B1 (ko) 2012-07-31 2014-10-08 대우조선해양 주식회사 Lng 운반선의 하역 시스템
KR101606574B1 (ko) 2012-08-01 2016-03-25 대우조선해양 주식회사 Cgl 운반선의 적하역 시스템
EP2933183A1 (en) 2012-12-11 2015-10-21 Daewoo Shipbuilding & Marine Engineering Co., Ltd. Liquefied gas processing system for ship
WO2014091060A1 (en) 2012-12-14 2014-06-19 Wärtsilä Finland Oy Method of filling a fuel tank with liquefied gas and liquefied gas fuel system
JP5746301B2 (ja) 2013-10-11 2015-07-08 三井造船株式会社 液化ガス運搬船用燃料ガス供給システム
WO2015130701A1 (en) 2014-02-25 2015-09-03 Excelerate Energy Limited Partnership Retractable lng cargo transfer bow manifold for tandem marine cargo transfers
KR20150101620A (ko) 2014-02-27 2015-09-04 삼성중공업 주식회사 선박의 연료가스 공급시스템
WO2016114515A1 (ko) * 2015-01-13 2016-07-21 삼성중공업 주식회사 선박 및 연료가스 공급방법
JP6541059B2 (ja) 2015-04-10 2019-07-10 三井E&S造船株式会社 液化ガス運搬船用燃料ガス供給システム
KR20160129403A (ko) 2015-04-30 2016-11-09 대우조선해양 주식회사 부유식 해양 구조물에서의 lng 하역 시스템 및 방법

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100034851A (ko) * 2008-09-25 2010-04-02 대우조선해양 주식회사 하역 전용 파이프 라인을 갖춘 부유식 구조물
KR20110002152A (ko) * 2009-07-01 2011-01-07 최시열 바이너리 씨디엠에이를 이용한 영상 정보 관리 시스템 및 관리 방법
KR20150093003A (ko) * 2014-02-06 2015-08-17 현대중공업 주식회사 액화가스 처리 시스템
KR20160074983A (ko) * 2014-12-19 2016-06-29 삼성중공업 주식회사 연료가스 공급시스템
KR101770917B1 (ko) * 2015-11-17 2017-08-23 현대중공업 주식회사 액화가스 재기화 시스템 및 이를 구비하는 선박

Also Published As

Publication number Publication date
US20200255099A1 (en) 2020-08-13
JP2020532688A (ja) 2020-11-12
US11383794B2 (en) 2022-07-12
CN111094121B (zh) 2022-06-14
CN111094121A (zh) 2020-05-01
SG11202001852SA (en) 2020-04-29
JP7220706B2 (ja) 2023-02-10

Similar Documents

Publication Publication Date Title
WO2014065621A1 (ko) 선박의 액화가스 처리 시스템
WO2011105712A2 (ko) 부유식 lng 충전소
WO2015130122A1 (ko) 증발가스 처리 시스템
WO2010101356A2 (ko) 재액화 기능을 가지는 전기추진 lng 운반선의 증발가스 처리장치 및 방법
WO2016126037A1 (ko) 선박의 증발가스 처리장치 및 처리방법
KR101559404B1 (ko) 질소를 이용한 액화가스 저장탱크의 치환장치
WO2015167214A1 (ko) 선박의 연료가스공급시스템
WO2019045523A1 (ko) 가압식 액체 화물 이송 장치 및 방법
WO2019088308A1 (ko) 선박의 연료유 공급 시스템 및 방법
KR20190060743A (ko) 가압식 액체 화물 이송 장치 및 방법
WO2021256644A1 (ko) 액화가스 운반선의 연료공급시스템 및 방법
WO2021157855A1 (ko) 선박의 액화가스 재기화 시스템 및 방법
WO2023043030A1 (ko) 증발가스 재액화 시스템 및 이를 포함하는 선박
WO2020251104A1 (ko) 천연가스하이드레이트를 이용하여 최소평형수 선박 내 연료공급, 평형수 대체 및 청수공급이 가능한 시스템
WO2017135804A1 (ko) 가스 재기화 시스템을 구비하는 선박
WO2018124815A1 (ko) 연료가스 공급 시스템
KR101052533B1 (ko) 화물창 쿨다운 배관 시스템 및 이를 구비한 액화천연가스 운반선
WO2018074834A2 (ko) 액화가스 재기화 시스템 및 운전 방법
KR20180113019A (ko) 선박용 가스 공급 배관 시스템 및 가스 공급 방법
JP2024511643A (ja) 船舶のガス消費装置用ガス供給システムの熱交換器を冷却するための方法
KR20190025313A (ko) 가압식 액체 화물 이송 장치 및 방법
KR20190025316A (ko) 가압식 액체 화물 이송 장치 및 방법
WO2018056768A1 (ko) Lng 재기화 시스템
WO2024010114A1 (ko) 액화수소 증발가스 제어 시스템 및 방법
WO2024029653A1 (ko) 액화수소 공급 시스템 및 방법

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18851263

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2020512583

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18851263

Country of ref document: EP

Kind code of ref document: A1