WO2018212449A1 - 콘크리트 흙막이 벽체 조성용 인케이싱 구조 - Google Patents

콘크리트 흙막이 벽체 조성용 인케이싱 구조 Download PDF

Info

Publication number
WO2018212449A1
WO2018212449A1 PCT/KR2018/003875 KR2018003875W WO2018212449A1 WO 2018212449 A1 WO2018212449 A1 WO 2018212449A1 KR 2018003875 W KR2018003875 W KR 2018003875W WO 2018212449 A1 WO2018212449 A1 WO 2018212449A1
Authority
WO
WIPO (PCT)
Prior art keywords
casing
encasing
incasing
construction
wall
Prior art date
Application number
PCT/KR2018/003875
Other languages
English (en)
French (fr)
Inventor
김사문
Original Assignee
김사문
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김사문 filed Critical 김사문
Priority to CN201880002813.0A priority Critical patent/CN109477323A/zh
Publication of WO2018212449A1 publication Critical patent/WO2018212449A1/ko

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1685Shapes cylindrical
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Definitions

  • An embodiment of the present invention relates to an incasing structure for forming a concrete mud wall, and more particularly, to encasing and inking when drawing an in casing after spotting (on-site casting) the concrete mud wall in a continuous construction. It automatically removes the remaining soil film between the casings to improve the constructability and also prevents the inflow of dirt or foreign substances into the casing to prevent defects. This greatly improves the user's various needs (needs) so that they can plant a good image.
  • the order and soil screening methods for underground excavation such as soil clogging method using ordinary H-beam and earth plate, CIP method, MIP method, PIP method, SCW heating method, etc. It had the same advantages and disadvantages.
  • the degree of ordering is good and there is little possibility of soil loss.
  • it has the advantage that it can be applied to soft ground with wall and strength larger than the board pile, high water content, small amount of earth after construction, and less concern for water pollution. It is impossible to construct in the strata that are more than layers and weathered rocks, and because the large equipment is required, the work space should be large, and the construction cost is relatively high, and the durability is inferior to other construction methods.
  • Patent Document 3 Patent Document 3
  • the first hole 2 is formed along the surveyed construction line (L).
  • the cement mortar (3) is filled into the first hole (2) at the same time as the auger machine (1) is drawn out, and the recessed portion (6a) inside the first hole (2)
  • Semi-walled casing (6) having a concave along the construction line (L) adjacent to the second hole (2) is continuously inserted so that the concave inlet portion (6a) is positioned, the stress material (4) and gravel (5) in sequence Is inserted into the cement mortar (3) filled in the second hole (2), and the second hole (2) to the concave inlet (6a) in the same way as the first hole (2) with the auger machine (1)
  • the cement mortar (3) filling and the half-wall casing (6) were carried out in the same manner as the first hole (2), and the third hole (2) was carried out in the auger machine (1).
  • vertical digging degree is high, it can minimize the prevention of surrounding settlement, and the construction cost is low as a reliable order and earth barrier parallel method, and it can be installed with the existing auger machine (1), so no separate large equipment is needed, and continuous work It is to provide a number of effects, such as no need for curing period.
  • the actual construction method is not the form of inserting the casing and the inner member (stress and gravel) after filling the mortar in the ground while drilling, and the half-wall casing first constructed after the insertion of the semi-wall casing continuously into the drilling hole after the drilling. Process is carried out in order to draw a half-wall type casing with a vibratory hammer after inserting the mixed concrete mixed with a member.
  • the prior art also had a big problem that a defect occurs later when the inflow of dirt or foreign matter from the side when the casing continuous construction.
  • Patent Document 1 Korean Registered Patent Publication No. 0375020 (2003. 02. 22) has been registered.
  • Patent Document 2 Korean Registered Patent Publication No. 0832490 (2008. 05. 20) has been registered.
  • Patent Document 3 Korean Registered Patent Publication No. 0406693 (2003. 11. 10) has been registered.
  • Patent Document 4 Korean Unexamined Patent Publication No. 2006-0002291 (January 09, 2006) has been published.
  • Patent Document 5 Korean Unexamined Patent Publication No. 2008-0110355 (December 18, 2008) has been published.
  • the present invention has been made in order to solve the above problems of the prior art, and the first object is to provide a groove portion, a film removing means and a blocking member in the casing, the present invention by the technical configuration described above
  • the second purpose is to improve the workability by automatically removing the remaining soil film between the in- casing and the in-casing when drawing out the casing after spot-casting the concrete wall.
  • the third purpose is to allow the cement mortar to be smoothly combined by the removal of the soil film, and the fourth purpose is to provide a perfect waterproof effect by not forming a gap due to the removal of the soil film.
  • the 6th objective is to secure the construction safety by minimizing settlement prevention.
  • the seventh purpose is to allow continuous construction so that a separate curing period is not necessary.
  • the eighth purpose is to prevent soil or foreign matter from entering into the casing to prevent defects.
  • the purpose of this is to significantly improve the quality and reliability of casing products, thereby providing an incasing structure for the construction of concrete wall walls, which can meet a variety of needs (users) of the user and provide a good image.
  • the present invention automatically removes the remaining soil film between the in- casing and the in-casing when drawing out the casing after successive stroke (on-site casting) of the concrete soil wall. It is formed on one side of the in casing, so as to prevent the occurrence of dirt or foreign matter into the inside of the casing so as to prevent the occurrence of defects, so that the casing can be partially overlapped by successive constructions Grooves formed for; A protruding end portion formed on the lower side surface of the concave portion, and a soil film removing means having a protruding tip formed in the same shape as the outer circumferential surface of the encasing to automatically remove the soil film sandwiched between the encasing and the casing in the process of drawing the encasing; And a blocking member installed at the bottom of the lower end with the same diameter as the outer circumferential surface of the encasing and preventing the inflow of soil or foreign matter from the side of the casing during the continuous construction of the encasing
  • the present invention can improve the workability by automatically removing the remaining soil film between the in- casing and the in-casing when drawing the in casing (on-the-spot) after successive site-to-site (on-site casting) concrete concrete wall wall
  • the recess is formed on one side of the casing, and the recess is formed to allow the partial casing to be sequentially overlapped by the continuous casing.
  • the present invention is to provide a groove portion, an earth film removing means and a blocking member in the casing.
  • the present invention by the above-described technical configuration to improve the workability by automatically removing the remaining soil film between the in casing and the in casing when the incineration (when pulling out) after the concrete soil wall wall (on-site casting) I would have to.
  • the present invention is to allow the cement mortar to be coupled smoothly due to the removal of the soil film.
  • the present invention is expected to be a perfect waterproof effect does not have a gap due to the removal of the soil film.
  • the present invention is to ensure the safety of the construction by minimizing the surrounding settlement due to the removal of the soil film.
  • the present invention is to ensure that the construction cost is cheap with a sure earthen construction method.
  • the present invention is to enable continuous construction so that no separate curing period is required.
  • the present invention is to prevent the inflow of dirt or foreign matter into the inside of the casing to prevent defects.
  • the present invention is a very useful invention that can significantly improve the quality and reliability of the casing products due to the above-described effects to meet a variety of needs (needs) of users to plant a good image.
  • a retaining wall is formed by the order wall retaining method using a conventional half-wall casing
  • Figure 2 is to create a retaining wall by the order wall retaining method using a conventional half-wall type casing
  • Figure 3 shows a state filled with soil between the conventional cylindrical casing and the casing
  • Figure 4 (a) is an encasing sphere for the construction of concrete wall walls applied to the present invention
  • (b) is an encasing sphere for the construction of concrete wall walls applied to the present invention
  • the first embodiment of the combination is a perspective view.
  • Figure 5 (a) is an encasing sphere for the construction of concrete wall walls applied to the present invention
  • (b) is an encasing sphere for the construction of concrete wall walls applied to the present invention
  • a second embodiment of a jaw perspective view is shown.
  • Figure 6 is opened the encasing structure for the construction of the concrete cladding wall applied to the present invention
  • FIG. 7A is a sectional view of the principal parts of the first embodiment
  • the encasing structure for concrete wall wall composition applied to the present invention is configured as shown in FIGS. 4 to 7.
  • the first embodiment of the present invention is constructed as shown in Figs. 4 (a) (b) and 7 (a).
  • the present invention is to remove the remaining soil film between the in casing and the in casing when the incineration (when pulling out) after the site (on-the-spot) concrete concrete wall wall in a continuous construction to improve the workability
  • in order to prevent the occurrence of defects such as dirt or foreign matter to the inside of the casing is configured as follows.
  • the present invention is formed on any one side of the in casing 100, the groove portion 101 is formed to be formed so as to be able to partially overlap the casing 100 in a continuous construction.
  • the present invention is formed to protrude to the lower side surface portion of the groove portion 101, so as to automatically remove the soil film sandwiched between the in casing 100 and the in casing 100 in the process of drawing the in casing (100).
  • Protruding end is provided with a soil film removing means 110 formed in the same round as the outer peripheral surface of the casing.
  • the present invention is installed on the bottom surface of the lower end with the same diameter as the outer circumferential surface of the encasing 100, and is provided with a blocking member 120 to prevent the inflow of dirt or foreign matter next to the continuous construction of the encasing (100). .
  • the blocking member 120 applied to the present invention is installed to abut the bottom surface of the casing 100 by welding in a state of the same shape as the in casing 100, the drawing process of the later casing 100
  • the blocking member 120 in the welding portion is preferably made of spot welding to less than four places in part rather than the whole.
  • the second embodiment of the present invention is configured as shown in Figs. 5 (a) and (b).
  • the present invention is to remove the remaining soil film between the in casing and the in casing when the incineration (when pulling out) after the site (on-the-spot) concrete concrete wall wall in a continuous construction to improve the workability
  • in order to prevent the occurrence of defects in the inside of the casing to prevent dirt or foreign matter is configured as follows.
  • the present invention is formed on any one side of the in casing 100, the groove portion 101 is formed to be formed so as to be able to partially overlap the casing 100 in a continuous construction.
  • the present invention is formed to protrude to the lower side surface portion of the groove 101, in order to automatically remove the soil film sandwiched between the in casing 101 and the in casing 101 in the process of drawing the in casing (100)
  • Protruding end is provided with a soil film removing means 130 is formed in the same round as the outer peripheral surface of the encasing (101).
  • the present invention is fitted to the inner inner surface of the lower end with a smaller diameter than the outer circumferential surface of the encasing 100, and is provided with a blocking member 130 to prevent the inflow of soil or foreign matter next to the continuous construction of the encasing 100 do.
  • the blocking member 130 applied to the present invention is in the casing 100 in the shape of the same shape as the in casing 100 in order to easily detach the blocking member 130 in the process of drawing out the encasing 100 later in the casing (100) It is preferable to be fitted with interference fit inside the bottom of the inner.
  • the present invention is provided with a plurality of blocking member locking projections 135 at regular intervals on the inner circumferential surface of the casing 100 so that the blocking member 130 is no longer inserted into the casing 100.
  • the shape of the soil film removing means 110 applied to the present invention is a triangle shape so as to be prevented during the vertical movement and push the soil film in close contact with the outer circumferential surface of the in casing 100 at the same time to be pushed to the side and removed. It is preferably made in a shape.
  • the upper side surface portion of the encasing 100 applied to the present invention is provided with a catching hole 102 to hang the hook (not shown in the figure) when lifting or removing the casing with a crane.
  • the blocking members 120 and 130 pass the water to prevent the encasing 100 from rising by buoyancy. At least one or more holes 121 and 131 are formed.
  • reference numeral 105 denotes concrete filled in the casing
  • 106 denotes an H beam.
  • the present invention may be variously modified and may take various forms in applying the above configuration.
  • the structure of the concrete housing wall structure configured as described above is as follows.
  • the present invention is to improve the workability by automatically removing the remaining soil film between the in- casing and the in-casing when drawing the in casing (on-the-spot) after the successive site (on-site casting) concrete concrete wall wall
  • the present invention is to improve the workability by automatically removing the remaining soil film between the in- casing and the in-casing when drawing the in casing (on-the-spot) after the successive site (on-site casting) concrete concrete wall wall wall wall
  • defects such as to prevent the inflow of dirt or foreign matter into the inside of the casing.
  • Figure 4 (a) applied to the present invention for this purpose shows an exploded perspective view of a first embodiment of the encasing structure for concrete wall construction.
  • FIG. 4 shows a perspective view of a bonded state of the first embodiment of the encasing structure for the concrete wall construction applied to the present invention.
  • Figure 5 (a) shows an exploded perspective view of a second embodiment of the encasing structure for concrete wall construction applied to the present invention.
  • FIG. 5 shows a perspective view of a second embodiment of a bonded state for the concrete housing wall composition applied to the present invention.
  • Figure 6 shows a plan view showing a state in which the construction followed by the construction of the concrete retaining wall wall construction applied to the present invention.
  • Fig. 7A shows a sectional view of the principal parts of the first embodiment.
  • the soil film is naturally sandwiched between the casing 100 for forming the concrete wall and the casing 100 for forming the concrete wall.
  • the present invention automatically removes the remaining soil film between the casing (100) and the casing (100) when drawing out the casing (100) after the concrete site wall (on-site casting) construction workability To improve the
  • the soil removing means 110 protruding in the recess 101 of the concrete casing wall forming one side is in contact with the outer circumferential surface of the other casing on the other side, the casing for forming the concrete wall covering one side
  • the soil film removing unit 110 is raised to automatically push up the soil film so that the soil film remaining between the encasing 100 and the casing 100 can be removed.
  • the protruding end of the soil blocking means 110 is formed in the same round shape as the outer circumferential surface of the incasing 100, the soil film can be removed in a state in which it is in close contact with the outer circumferential surface of the incasing 100. Done.
  • the present invention provides the effect of preventing the occurrence of defects by preventing the inflow of soil or foreign matter from the side due to the blocking member 120, 130 during the continuous construction of the in casing (100).
  • the first embodiment of the present invention is installed on the bottom surface of the lower end with the same diameter as the outer circumferential surface of the encasing 100, the blocking member for preventing the inflow of dirt or foreign matter from the side when the continuous construction of the encasing 100 ( 120 is provided, such a blocking member 120 is installed in contact with the bottom of the bottom of the casing 100 by welding in a state of the same shape as the encasing 100, after the encasing (100)
  • the blocking member 120 in the drawing process of the welding portion is preferably made of spot welding less than four places in part rather than the whole.
  • the welding site is preferably four places or less, but of course, four or more welding sites can be made according to the site situation.
  • the second embodiment of the present invention is inserted into the lower inner inner surface with a smaller diameter than the outer circumferential surface of the encasing 100, the blocking member for preventing the inflow of soil or foreign matter from the side of the continuous casing (100) ( 130 is provided.
  • the blocking member 130 applied to the present invention is in the casing 100 in the form of the same shape as the encasing 100 in order to easily detach the blocking member 130 in the process of drawing out the encasing 100 later in the casing (100) It is preferable to be fitted with interference fit inside the bottom of the inner.
  • the present invention is provided with a plurality of blocking member locking projections 135 at regular intervals on the inner circumferential surface of the casing 100 so that the blocking member 130 is no longer inserted into the casing 100.
  • the blocking member 120, 130 applied to the present invention passes through the water to prevent the encasing 100 from rising by buoyancy As a result, at least one or more holes 121 and 131 are formed to be seated.
  • the technical idea of the encased structure for concrete wall wall composition of the present invention is to be able to actually repeat the same results, in particular, by implementing the present invention, it is possible to promote the technological development and contribute to the industrial development, so it is worth protecting.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

본 발명은 콘크리트 흙막이 벽체 조성용 인케이싱 구조에 관한 것이다. 본 발명은 이를 위해 인케이싱의 어느 일측에 형성되며, 인케이싱을 연속시공으로 연이어 일부 중첩 시공할 수 있도록 하기 위해 형성된 요홈부; 요홈부의 하단 측면부에 돌출 형성되며, 인케이싱을 인발하는 과정에서 인케이싱과 인케이싱의 사이에 끼인 흙막을 자동으로 제거시키도록 하기 위해 돌출 선단이 인케이싱의 외주면과 같은 라운드로 형성된 흙막제거수단; 및 인케이싱의 외주면과 같은 직경으로 하단부 밑면에 설치되며, 인케이싱의 연속시공시 옆에서 흙이나 이물질의 유입을 방지하는 차단부재;가 포함된다. 상기와 같이 구성된 본 발명은 콘크리트 흙막이 벽체를 연속시공으로 연이어 현장치기(현장타설) 후 인케이싱을 인발(빼낼 때)할 때 인케이싱과 인케이싱의 사이에 잔존하는 흙막을 자동으로 제거하여 시공성을 향상시킬 수 있도록 함은 물론 하자가 발생하지 않도록 인케이싱 내부로 흙이나 이물질 등이 유입되지 않도록 한 것이고, 이로 인해 인케이싱 제품의 품질과 신뢰성을 대폭 향상시키므로 사용자들의 다양한 욕구(니즈)를 충족시켜 좋은 이미지를 심어줄 수 있도록 한 것이다.

Description

콘크리트 흙막이 벽체 조성용 인케이싱 구조
본 발명의 실시예는 콘크리트 흙막이 벽체 조성용 인케이싱 구조에 관한 것으로, 보다 상세하게는 콘크리트 흙막이 벽체를 연속시공으로 연이어 현장치기(현장타설) 후 인케이싱을 인발(빼낼 때)할 때 인케이싱과 인케이싱의 사이에 잔존하는 흙막을 자동으로 제거하여 시공성을 향상시킬 수 있도록 함은 물론 하자가 발생하지 않도록 인케이싱 내부로 흙이나 이물질 등이 유입되지 않도록 한 것이고, 이로 인해 인케이싱 제품의 품질과 신뢰성을 대폭 향상시키므로 사용자들의 다양한 욕구(니즈)를 충족시켜 좋은 이미지를 심어줄 수 있도록 한 것이다.
주지하다시피 토목 공사용 케이싱은 지하 터파기 공사를 할 때 축조되는 옹벽 시공을 위한 차수 흙막이 공법에 사용되는 것이다.
상기 토목 공사용 케이싱을 이용한 지하 터파기 공사를 행할 시 주위에 옹벽 등을 축조하기 위하여 사용하고 있는 차수벽 흙막이 공법은 다음과 같은 다수의 공법들이 사용되어 오고 있다.
즉, 일반 H-비임과 토류판을 이용한 흙막이 공법, 현장타설 CIP 공법, MIP 공법, PIP 공법, SCW 주열식 공법 등 수많은 지하 터파기를 위한 차수 및 흙막이 공법을 현재까지 건설현장에서 사용하고 있으나, 이는 아래와 같은 장단점을 가지고 있었던 것이다.
기존 CIP 공법의 경우는 기존 터파기 구조물과의 근접시공이 가능하고, 터파기 폭을 최소화할 수 있으며, 토류판 시공이 불필요하므로 사고위험이 적다는 장점을 가지고 있지만, 이는 기둥간의 연결성이 좋지 못하며, 차수성이 나쁘고 토사 유실의 가능성이 크다는 단점이 있었고, 구멍(孔)과 구멍 사이에 누수에 대한 별도의 보조방법이 필요하다는 문제점을 안고 있었던 것이다.
그리고 SCW 공법의 경우는 차수성이 좋으며, 토사유실의 가능성은 적다. 또한 벽체와 강도가 널말뚝 보다 크고, 함수비가 높은 연약지반에 시공이 가능하고, 시공 후 잔토가 소량이고 수질 오염의 우려가 적다는 장점은 가지고 있으나, 토사 지역에서만 시공이 가능하고, 자갈 지반이나 전석층, 풍화암 이상인 지층에서는 시공이 불가능하며, 대형장비가 필요하므로 작업공간이 넓어야 하며, 비교적 공사비가 비싸다는 단점과 함께 타 공법에 비하여 내구성이 떨어지는 등의 문제점을 안고 있었던 것이다.
이에 종래에는 기존의 CIP 공법이 가진 장점을 최대한 반영하면서 구멍과 구멍 사이의 연결이 잘되지 않아 차수가 되지 않는 단점을 반월형 케이싱을 이용한 차수벽 흙막이 공법을 개발하여 기존 공법들이 가진 제반 문제점을 일소할 수 있는 차수벽 흙막이 공법을 특허 출원하여 등록(10-0406693)한바 있다.(특허문헌 3)
상기 등록특허의 경우 도 1 내지 도 2 에 도시된 바와 같이 지하 터파기 공사를 위하여 옹벽을 축조하는 차수벽 흙막이 공법을 수행함에 있어서, 기 측량된 시공라인(L)을 따라 1번 구멍(2)을 오거머신(1)을 사용하여 천공한 후 오거머신(1) 인발과동시에 시멘트 모르타르(3)를 1번 구멍(2) 내부에 충진하고, 상기 1번 구멍(2) 내부에 요입부(6a)를 가진 반월형 케이싱(6)을 시공라인(L)을 따라 이웃하여 연속 천공하는 2번 구멍(2)에 요입부(6a)가 위치되도록 타삽하며, 순차적으로 응력재(4)와 자갈(5)을 2번 구멍(2) 내부에 충진된 시멘트 모르타르(3)상으로 타삽하며, 상기 2번 구멍(2)을 오거머신(1)으로 1번 구멍(2)과 동일하게 요입부(6a)에 겹쳐서 천공 후 시멘트 모르타르(3) 충진과 반월형 케이싱(6)을 전기한 1번 구멍(2)과 동일하게 수행하며, 3번 구멍(2)을 오거머신(1)으로 상기 1,2번 구멍(2)과 동일하게 요입부(6a)에 겹쳐서 천공한 후 1번 구멍(2)상에 결합된 반월형 케이싱(6)을 인발하는 제 과정을 연속적으로 시공라인(L)을 따라 행하여 옹벽을 축조할 수 있도록 한 것으로서, 기존 터파기 구조물과의 근접시공이 가능하며, 터파기 폭을 최소화할 수 있고, 토류판 시공이 불필요하므로 사고위험이 적고, 구멍(2)과 구멍(2) 사이에 누수에 따른 보조공법이 필요 없으며, 모든 지반에 굴착이 가능하며, 연속시공이 가능하고 따라서 차수가 완벽하고 강도가 높다. 또한 수직 굴착도가 높으며, 주변 침하방지를 최소화할 수 있고, 확실한 차수 및 흙막이 병행 공법으로서는 시공비가 저렴하며, 기존 오거머신(1)으로 시공이 가능하므로 별도의 대형장비가 불필요하며, 연속적인 작업으로 양생 기간이 필요 없는 등 다수의 효과를 제공하는 것이다.
(실제 시공방법은 천공하면서 모르타르를 지반내 충진한 후 케이싱과 내부부재(응력제 및 자갈)를 삽입하는 형태가 아니고, 천공 후 반월형케이싱을 천공홀에 연속적으로 삽입한 후 최초 기시공된 반월형케이싱부터 내부에 부재를 넣고 배합된 레미콘을 충진한 후 진동햄머로 반월형케이싱을 인발하는 순서로 공정이 진행된다)
그러나 상기한 등록특허의 경우에도 상기와 같은 다수의 효과를 제공함에도 불구하고, 옹벽을 완성한 상태에서 누수가 발생하는 문제점이 있었다.
즉, 상기와 같이 반월형 케이싱(6)을 삽입한 상태에서 이웃하는 구멍(2)을 천공하고 시멘트 모르타르(3)를 충진한 후 먼저 타삽되어 있는 반월형 케이싱(6)을 인발하여 이웃하는 구멍(2)상의 시멘트 모르타르(3)가 서로 결합되는 과정에서 반월형케이싱(6)의 요입부(6a) 표면에 묻어 있는 흙 등의 이물질에 의해 흙막(P)이 형성되므로 양측 시멘트 모르타르(3)가 원활하게 결합되지 않고 틈이 생겨 완벽한 방수 시공 상태를 제공하지 못하게 되었던 것이다.
상기와 유사한 도 3 도 원통형 케이싱과 케이싱 사이에 흙막이 끼워진 것으로, 이와 같은 기술도 전술한 바와 같이 양측 시멘트 모르타르(3)가 원활하게 결합되지 않고 틈이 생겨 완벽한 방수 시공 상태를 제공하지 못하게 된다.
아울러 상기 종래 기술은 케이싱 연속 시공시 옆에서 흙이나 이물질 등이 유입되면 추후 하자가 발생하게 되는 커다란 문제점도 발생 되었다.
상기한 문제점을 해결하기 위해 종래에는 아래와 같은 선행기술문헌이 개발되었으나, 여전히 상기한 종래 기술의 문제점을 일거에 해결하지 못하는 커다란 문제점이 발생 되었다.
[선행기술문헌]
(특허문헌 1) 대한민국 등록특허공보 제0375020호(2003. 02. 22)가 등록된바 있다.
(특허문헌 2) 대한민국 등록특허공보 제0832490호(2008. 05. 20)가 등록된바 있다.
(특허문헌 3) 대한민국 등록특허공보 제0406693호(2003. 11. 10)가 등록된바 있다.
(특허문헌 4) 대한민국 공개특허공보 제2006-0002291호(2006. 01. 09)가 공개된바 있다.
(특허문헌 5) 대한민국 공개특허공보 제2008-0110355호(2008. 12. 18)가 공개된바 있다.
본 발명은 상기와 같은 종래 기술의 제반 문제점을 해소하기 위하여 안출한 것으로, 인케이싱에 요홈부와 흙막제거수단 그리고 차단부재가 구비됨을 제1목적으로 한 것이고, 상기한 기술적 구성에 의한 본 발명의 제2목적은 콘크리트 흙막이 벽체를 현장치기(현장타설) 후 인케이싱을 인발(빼낼 때)할 때 인케이싱과 인케이싱의 사이에 잔존하는 흙막을 자동으로 제거하여 시공성을 향상시킬 수 있도록 한 것이고, 제3목적은 흙막 제거로 인해 양측 시멘트 모르타르가 원활하게 결합되도록 한 것이며, 제4목적은 흙막 제거로 인해 틈이 생기지 않아 완벽한 방수효과를 기대할 수 있도록 한 것이고, 제5목적은 흙막 제거로 인해 주변 침하방지를 최소화하여 공사의 안전성을 보장할 수 있도록 한 것이며, 제6목적은 확실한 흙막이 공법으로 시공비가 저렴하도록 한 것이고, 제7목적은 연속시공이 가능하여 별도의 양생 기간이 필요 없도록 한 것이며, 특히 제8목적은 하자가 발생하지 않도록 인케이싱 내부로 흙이나 이물질 등이 유입되지 않도록 한 것이고, 제9목적은 이로 인해 케이싱 제품의 품질과 신뢰성을 대폭 향상시키므로 사용자들의 다양한 욕구(니즈)를 충족시켜 좋은 이미지를 심어줄 수 있도록 한 콘크리트 흙막이 벽체 조성용 인케이싱 구조를 제공한다.
이러한 목적 달성을 위하여 본 발명은 콘크리트 흙막이 벽체를 연속시공으로 연이어 현장치기(현장타설) 후 인케이싱을 인발(빼낼 때)할 때 인케이싱과 인케이싱의 사이에 잔존하는 흙막을 자동으로 제거하여 시공성을 향상시킬 수 있도록 함은 물론 하자가 발생하지 않도록 인케이싱 내부로 흙이나 이물질이 유입되지 않도록 하기 위해, 인케이싱의 어느 일측에 형성되며, 인케이싱을 연속시공으로 연이어 일부 중첩 시공할 수 있도록 하기 위해 형성된 요홈부; 요홈부의 하단 측면부에 돌출 형성되며, 인케이싱을 인발하는 과정에서 인케이싱과 인케이싱의 사이에 끼인 흙막을 자동으로 제거시키도록 하기 위해 돌출 선단이 인케이싱의 외주면과 같은 라운드로 형성된 흙막제거수단; 및 인케이싱의 외주면과 같은 직경으로 하단부 밑면에 설치되며, 인케이싱의 연속시공시 옆에서 흙이나 이물질의 유입을 방지하는 차단부재;가 포함됨을 특징으로 하는 콘크리트 흙막이 벽체 조성용 인케이싱 구조를 제공한다.
또한 본 발명은 콘크리트 흙막이 벽체를 연속시공으로 연이어 현장치기(현장타설) 후 인케이싱을 인발(빼낼 때)할 때 인케이싱과 인케이싱의 사이에 잔존하는 흙막을 자동으로 제거하여 시공성을 향상시킬 수 있도록 함은 물론 하자가 발생하지 않도록 인케이싱 내부로 흙이나 이물질이 유입되지 않도록 하기 위해, 인케이싱의 어느 일측에 형성되며, 인케이싱을 연속시공으로 연이어 일부 중첩 시공할 수 있도록 하기 위해 형성된 요홈부; 요홈부의 하단 측면부에 돌출 형성되며, 인케이싱을 인발하는 과정에서 인케이싱과 인케이싱의 사이에 끼인 흙막을 자동으로 제거시키도록 하기 위해 돌출 선단이 인케이싱의 외주면과 같은 라운드로 형성된 흙막제거수단; 및 인케이싱의 외주면 보다 작은 직경으로 하단 내부 안쪽 면에 끼워지며, 인케이싱의 연속시공시 옆에서 흙이나 이물질의 유입을 방지하는 차단부재;가 포함됨을 특징으로 하는 콘크리트 흙막이 벽체 조성용 인케이싱 구조를 제공한다.
상기에서 상세히 살펴본 바와 같이 본 발명은 인케이싱에 요홈부와 흙막제거수단 그리고 차단부재가 구비되도록 한 것이다.
상기한 기술적 구성에 의한 본 발명은 콘크리트 흙막이 벽체를 현장치기(현장타설) 후 인케이싱을 인발(빼낼 때)할 때 인케이싱과 인케이싱의 사이에 잔존하는 흙막을 자동으로 제거하여 시공성을 향상시킬 수 있도록 한 것이다.
그리고 본 발명은 흙막 제거로 인해 양측 시멘트 모르타르가 원활하게 결합되도록 한 것이다.
또한 본 발명은 흙막 제거로 인해 틈이 생기지 않아 완벽한 방수효과를 기대할 수 있도록 한 것이다.
그리고 본 발명은 흙막 제거로 인해 주변 침하방지를 최소화하여 공사의 안전성을 보장할 수 있도록 한 것이다.
아울러 본 발명은 확실한 흙막이 공법으로 시공비가 저렴하도록 한 것이다.
더하여 본 발명은 연속시공이 가능하여 별도의 양생 기간이 필요 없도록 한 것이다.
특히 본 발명은 하자가 발생하지 않도록 인케이싱 내부로 흙이나 이물질 등이 유입되지 않도록 한 것이다.
본 발명은 상기한 효과로 인해 케이싱 제품의 품질과 신뢰성을 대폭 향상시키므로 사용자들의 다양한 욕구(니즈)를 충족시켜 좋은 이미지를 심어줄 수 있도록 한 매우 유용한 발명인 것이다.
이하에서는 이러한 효과 달성을 위한 본 발명의 바람직한 실시 예를 첨부된 도면에 따라 상세히 설명하면 다음과 같다.
도 1 은 종래 반월형 케이싱을 이용한 차수벽 흙막이 공법으로 옹벽을 조성
하는 과정을 순차적으로 보인 단면도.
도 2 는 종래 반월형 케이싱을 이용한 차수벽 흙막이 공법으로 옹벽을 조성
하는 과정을 순차적으로 보인 평면도.
도 3 은 종래 원통형 케이싱과 케이싱의 사이에 흙막이 채워진 상태를 보인
현장 사진.
도 4 의 (a)는 본 발명에 적용된 콘크리트 흙막이 벽체 조성용 인케이싱 구
조의 제1실시예 분해 사시도이고,
(b)는 본 발명에 적용된 콘크리트 흙막이 벽체 조성용 인케이싱 구
조의 제1실시예 결합상태 사시도이다.
도 5 의 (a)는 본 발명에 적용된 콘크리트 흙막이 벽체 조성용 인케이싱 구
조의 제2실시예 분해 사시도이고,
(b)는 본 발명에 적용된 콘크리트 흙막이 벽체 조성용 인케이싱 구
조의 제2실시예 결합상태 사시도이다.
도 6 은 본 발명에 적용된 콘크리트 흙막이 벽체 조성용 인케이싱 구조를 연
이어서 시공하는 상태를 도시한 평면도.
도 7 의 (a)는 상기 제1실시예 요부 단면도이고,
(b)는 상기 제2실시예 요부 단면도이다.
<도면의 주요 부분에 대한 부호의 설명>
100: 인케이싱
101: 요홈부
110: 흙막제거수단
120; 차단부재
130: 차단부재
본 발명에 적용된 콘크리트 흙막이 벽체 조성용 인케이싱 구조은 도 4 내지 도 7 에 도시된 바와 같이 구성되는 것이다.
하기에서 본 발명을 설명함에 있어, 관련된 공지 기능 또는 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명은 생략할 것이다.
그리고 후술되는 용어들은 본 발명에서의 기능을 고려하여 설정된 용어들로서 이는 생산자의 의도 또는 관례에 따라 달라질 수 있으므로 그 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.
또한 도면에서 나타난 각 구성의 크기 및 두께는 설명의 편의를 위해 임의로 나타내었으므로, 본 발명이 반드시 도면에 도시된 바에 한정되지 않는다.
먼저, 본 발명의 제1실시예는 도4(a)(b) 및 도 7(a)와 같이 구성된다.
본 발명은 콘크리트 흙막이 벽체를 연속시공으로 연이어 현장치기(현장타설) 후 인케이싱을 인발(빼낼 때)할 때 인케이싱과 인케이싱의 사이에 잔존하는 흙막을 자동으로 제거하여 시공성을 향상시킬 수 있도록 함은 물론 하자가 발생하지 않도록 인케이싱 내부로 흙이나 이물질 등이 유입되지 않도록 하기 위해 다음과 같이 구성된다.
즉, 본 발명은 인케이싱(100)의 어느 일측에 형성되며, 인케이싱(100)을 연속시공으로 연이어 일부 중첩 시공할 수 있도록 하기 위해 형성된 요홈부(101)가 형성된다.
또한 본 발명은 상기 요홈부(101)의 하단 측면부에 돌출 형성되며, 인케이싱(100)을 인발하는 과정에서 인케이싱(100)과 인케이싱(100)의 사이에 끼인 흙막을 자동으로 제거시키도록 하기 위해 돌출 선단이 인케이싱의 외주면과 같은 라운드로 형성된 흙막제거수단(110)이 구비된다.
그리고 본 발명은 상기 인케이싱(100)의 외주면과 같은 직경으로 하단부 밑면에 설치되며, 인케이싱(100)의 연속시공시 옆에서 흙이나 이물질 등의 유입을 방지하는 차단부재(120)가 구비된다.
특히 본 발명에 적용된 상기 차단부재(120)는 인케이싱(100)과 같은 형상 모양으로 이루어진 상태에서 인케이싱(100)의 하단 밑면에 용접으로 맞닿게 설치되되, 추후 인케이싱(100)의 인발 과정에서 차단부재(120)를 쉽게 이탈시키기 위해 용접부위가 전체가 아닌 부분적으로 4군데 미만으로 점용접으로 이루어짐이 바람직하다.
한편, 본 발명의 제2실시예는 도5(a)(b) 및 도 7(b)와 같이 구성된다.
본 발명은 콘크리트 흙막이 벽체를 연속시공으로 연이어 현장치기(현장타설) 후 인케이싱을 인발(빼낼 때)할 때 인케이싱과 인케이싱의 사이에 잔존하는 흙막을 자동으로 제거하여 시공성을 향상시킬 수 있도록 함은 물론 하자가 발생하지 않도록 인케이싱 내부로 흙이나 이물질이 유입되지 않도록 하기 위해 다음과 같이 구성된다.
즉, 본 발명은 인케이싱(100)의 어느 일측에 형성되며, 인케이싱(100)을 연속시공으로 연이어 일부 중첩 시공할 수 있도록 하기 위해 형성된 요홈부(101)가 형성된다.
그리고 본 발명은 상기 요홈부(101)의 하단 측면부에 돌출 형성되며, 인케이싱(100)을 인발하는 과정에서 인케이싱(101)과 인케이싱(101)의 사이에 끼인 흙막을 자동으로 제거시키도록 하기 위해 돌출 선단이 인케이싱(101)의 외주면과 같은 라운드로 형성된 흙막제거수단(130)이 구비된다.
또한 본 발명은 상기 인케이싱(100)의 외주면 보다 작은 직경으로 하단 내부 안쪽 면에 끼워지며, 인케이싱(100)의 연속시공시 옆에서 흙이나 이물질의 유입을 방지하는 차단부재(130)이 구비된다.
특히 본 발명에 적용된 상기 차단부재(130)는 인케이싱(100)과 같은 형상 모양으로 이루어진 상태에서 추후 인케이싱(100)의 인발 과정에서 차단부재(130)를 쉽게 이탈시키기 위해 인케이싱(100)의 하단 내부 안쪽에 억지끼움으로 끼워지도록 함이 바람직하다.
아울러 본 본 발명은 상기 차단부재(130)가 더 이상 인케이싱(100)이 내부로 삽입되지 않도록 인케이싱(100)의 내주면에는 일정 간격으로 복수개의 차단부재걸림돌기(135)가 구비된다.
또 한편, 본 발명에 적용된 상기 흙막제거수단(110)의 형상 모양은 상하 이동시 걸림 방지와 흙막을 인케이싱(100)의 외주면에 밀착된 상태로 밀어 올리는 동시에 양옆으로 밀어내어 제거할 수 있도록 삼각형의 형상 모양으로 이루어짐이 바람직하다.
특히 본 발명에 적용된 상기 인케이싱(100)의 상단 측면부에는 기중기로 인케이싱을 들어 올리거나 빼낼 때 걸고리(도면상 미 도시함)를 걸 수 있도록 한 걸림공(102)이 구비된다.
마지막으로 본 발명에 적용된 상기 차단부재(120)(130)에는 인케이싱(100)의 연속 시공시 땅속에서 물이 발생하게 되면 부력에 의해 인케이싱(100)이 떠오르는 것을 방지하기 위해 물을 통과시키는 적어도 하나 이상의 구멍(121)(131)이 형성된다.
도면상 미 설명부호 105는 케이싱 내부에 채워지는 콘크리트이고, 106은 H빔이다.
한편 본 발명은 상기의 구성부를 적용함에 있어 다양하게 변형될 수 있고 여러 가지 형태를 취할 수 있다.
그리고 본 발명은 상기의 상세한 설명에서 언급되는 특별한 형태로 한정되는 것이 아닌 것으로 이해되어야 하며, 오히려 첨부된 청구범위에 의해 정의되는 본 발명의 정신과 범위 내에 있는 모든 변형물과 균등물 및 대체물을 포함하는 것으로 이해되어야 한다.
상기와 같이 구성된 본 발명 콘크리트 흙막이 벽체 조성용 인케이싱 구조의 작용효과를 설명하면 다음과 같다.
우선, 본 발명은 콘크리트 흙막이 벽체를 연속시공으로 연이어 현장치기(현장타설) 후 인케이싱을 인발(빼낼 때)할 때 인케이싱과 인케이싱의 사이에 잔존하는 흙막을 자동으로 제거하여 시공성을 향상시킬 수 있도록 함은 물론 하자가 발생하지 않도록 인케이싱 내부로 흙이나 이물질 등이 유입되지 않도록 한 것이다.
이를 위해 본 발명에 적용된 도 4 의 (a)는 콘크리트 흙막이 벽체 조성용 인케이싱 구조의 제1실시예 분해 사시도를 나타낸 것이다.
그리고 도 4 의 (b)는 본 발명에 적용된 콘크리트 흙막이 벽체 조성용 인케이싱 구조의 제1실시예 결합상태 사시도를 나타낸 것이다.
또한 도 5 의 (a)는 본 발명에 적용된 콘크리트 흙막이 벽체 조성용 인케이싱 구조의 제2실시예 분해 사시도를 나타낸 것이다.
그리고 도 5 의 (b)는 본 발명에 적용된 콘크리트 흙막이 벽체 조성용 인케이싱 구조의 제2실시예 결합상태 사시도를 나타낸 것이다.
아울러 도 6 은 본 발명에 적용된 콘크리트 흙막이 벽체 조성용 인케이싱 구조를 연이어서 시공하는 상태를 도시한 평면도를 나타낸 것이다.
더하여 도 7 의 (a)는 상기 제1실시예 요부 단면도를 나타낸 것이다.
그리고 도 7 의 (b)는 상기 제2실시예 요부 단면도를 나타낸 것이다.
상기한 본원발명의 작용효과를 보다 상세히 설명하면 다음과 같다.
도 6 과 같이 콘크리트 흙막이 벽체 조성용 인케이싱(100)을 어느 일측으로 연이어서 시공하는 과정에서 콘크리트 흙막이 벽체 조성용 인케이싱(100)과 콘크리트 흙막이 벽체 조성용 인케이싱(100)의 사이에는 흙막이 자연스럽게 끼게 된다.
이때 본 발명은 콘크리트 흙막이 벽체 현장치기(현장타설) 후 인케이싱(100)을 인발(빼낼 때)할 때 인케이싱(100)과 인케이싱(100)의 사이에 잔존하는 흙막을 자동으로 제거하여 시공성을 향상시킬 수 있도록 하게 된다.
즉, 일측 콘크리트 흙막이 벽체 조성용 인케이싱(100)의 요홈부(101)에 돌출 형성된 흙막제거수단(110)이 타측 또 다른 인케이싱의 외주면에 맞닿은 상태로 위치하기 때문에 상기 일측 콘크리트 흙막이 벽체 조성용 인케이싱(100)을 인발하게 되면 흙막제거수단(110)이 상승하면서 흙막을 자동으로 밀어올리게 되어 결국 인케이싱(100)과 인케이싱(100)의 사이에 잔존하는 흙막을 제거할 수 있도록 하게 된다.
상기 흙막게거수단(110)의 돌출된 선단은 인케이싱(100)의 외주면과 같은 라운드 모양으로 형성되므로 인케이싱(100)의 외주면에 긴밀히 밀착된 상태로 흙막을 깨끗히 제거시킬 수 있는 효과를 제공하게 된다.
한편, 본 발명은 인케이싱(100)의 연속시공시 차단부재(120)(130)로 인해 옆에서 흙이나 이물질 등의 유입을 방지하여 하자 발생을 방지하는 효과를 제공하게 된다.
즉, 본 발명의 제1실시예는 인케이싱(100)의 외주면과 같은 직경으로 하단부 밑면에 설치되며, 인케이싱(100)의 연속시공시 옆에서 흙이나 이물질 등의 유입을 방지하는 차단부재(120)가 구비되는 것으로, 이와 같은 차단부재(120)는 인케이싱(100)과 같은 형상 모양으로 이루어진 상태에서 인케이싱(100)의 하단 밑면에 용접으로 맞닿게 설치되되, 추후 인케이싱(100)의 인발 과정에서 차단부재(120)를 쉽게 이탈시키기 위해 용접부위가 전체가 아닌 부분적으로 4군데 미만으로 점용접으로 이루어짐이 바람직하다.
물론, 상기 용접부위는 4군데 이하가 바람직하나, 현장 상황에 맞게 용접부위를 4군데 이상 할 수 있음은 물론이다.
또한 본 발명의 제2실시예는 인케이싱(100)의 외주면 보다 작은 직경으로 하단 내부 안쪽 면에 끼워지며, 인케이싱(100)의 연속시공시 옆에서 흙이나 이물질의 유입을 방지하는 차단부재(130)이 구비된다.
이때 본 발명에 적용된 상기 차단부재(130)는 인케이싱(100)과 같은 형상 모양으로 이루어진 상태에서 추후 인케이싱(100)의 인발 과정에서 차단부재(130)를 쉽게 이탈시키기 위해 인케이싱(100)의 하단 내부 안쪽에 억지끼움으로 끼워지도록 함이 바람직하다.
아울러 본 본 발명은 상기 차단부재(130)가 더 이상 인케이싱(100)이 내부로 삽입되지 않도록 인케이싱(100)의 내주면에는 일정 간격으로 복수개의 차단부재걸림돌기(135)가 구비된다.
마지막으로 본 발명에 적용된 상기 차단부재(120)(130)에는 인케이싱(100)의 연속 시공시 땅속에서 물이 발생하게 되면 부력에 의해 인케이싱(100)이 떠오르는 것을 방지하기 위해 물을 통과시켜 결과적으로 안착시킬 수 있도록 한 적어도 하나 이상의 구멍(121)(131)이 형성되는 것이다.
상기 물이 인케이싱(100) 내부로 유입되어도 콘크리트를 타설하게 되면 물이 오버플로워되어서 콘크리트를 타설하는데에는 문제가 없게 된다.
본 발명 콘크리트 흙막이 벽체 조성용 인케이싱 구조의 기술적 사상은 실제로 동일결과를 반복 실시 가능한 것으로, 특히 이와 같은 본원발명을 실시함으로써 기술발전을 촉진하여 산업발전에 이바지할 수 있어 보호할 가치가 충분히 있다.

Claims (7)

  1. 콘크리트 흙막이 벽체를 연속시공으로 연이어 현장치기(현장타설) 후 인케이싱을 인발(빼낼 때)할 때 인케이싱과 인케이싱의 사이에 잔존하는 흙막을 자동으로 제거하여 시공성을 향상시킬 수 있도록 함은 물론 하자가 발생하지 않도록 인케이싱 내부로 흙이나 이물질이 유입되지 않도록 하기 위해,
    인케이싱의 어느 일측에 형성되며, 인케이싱을 연속시공으로 연이어 일부 중첩 시공할 수 있도록 하기 위해 형성된 요홈부;
    요홈부의 하단 측면부에 돌출 형성되며, 인케이싱을 인발하는 과정에서 인케이싱과 인케이싱의 사이에 끼인 흙막을 자동으로 제거시키도록 하기 위해 돌출 선단이 인케이싱의 외주면과 같은 라운드로 형성된 흙막제거수단; 및
    인케이싱의 외주면과 같은 직경으로 하단부 밑면에 설치되며, 인케이싱의 연속시공시 옆에서 흙이나 이물질의 유입을 방지하는 차단부재;가 포함됨을 특징으로 하는 콘크리트 흙막이 벽체 조성용 인케이싱 구조.
  2. 청구항 1 에 있어서,
    상기 차단부재는,
    인케이싱과 같은 형상 모양으로 이루어진 상태에서 인케이싱의 하단 밑면에 용접으로 맞닿게 설치되되, 추후 인케이싱의 인발 과정에서 차단부재를 쉽게 이탈시키기 위해 용접부위가 전체가 아닌 부분적으로 4군데 미만으로 점용접으로 이루어짐을 특징으로 하는 콘크리트 흙막이 벽체 조성용 인케이싱 구조.
  3. 콘크리트 흙막이 벽체를 연속시공으로 연이어 현장치기(현장타설) 후 인케이싱을 인발(빼낼 때)할 때 인케이싱과 인케이싱의 사이에 잔존하는 흙막을 자동으로 제거하여 시공성을 향상시킬 수 있도록 함은 물론 하자가 발생하지 않도록 인케이싱 내부로 흙이나 이물질이 유입되지 않도록 하기 위해,
    인케이싱의 어느 일측에 형성되며, 인케이싱을 연속시공으로 연이어 일부 중첩 시공할 수 있도록 하기 위해 형성된 요홈부;
    요홈부의 하단 측면부에 돌출 형성되며, 인케이싱을 인발하는 과정에서 인케이싱과 인케이싱의 사이에 끼인 흙막을 자동으로 제거시키도록 하기 위해 돌출 선단이 인케이싱의 외주면과 같은 라운드로 형성된 흙막제거수단; 및
    인케이싱의 외주면 보다 작은 직경으로 하단 내부 안쪽 면에 끼워지며, 인케이싱의 연속시공시 옆에서 흙이나 이물질의 유입을 방지하는 차단부재;가 포함됨을 특징으로 하는 콘크리트 흙막이 벽체 조성용 인케이싱 구조.
  4. 청구항 3 에 있어서,
    상기 차단부재는,
    인케이싱과 같은 형상 모양으로 이루어진 상태에서 추후 인케이싱의 인발 과정에서 차단부재를 쉽게 이탈시키기 위해 인케이싱의 하단 내부 안쪽에 억지끼움으로 끼워지고,
    차단부재가 더 이상 인케이싱이 내부로 삽입되지 않도록 인케이싱의 내주면에는 일정 간격으로 복수개의 차단부재걸림돌기;가 더 포함됨을 특징으로 하는 콘크리트 흙막이 벽체 조성용 인케이싱 구조.
  5. 청구항 1 또는 3 에 있어서,
    상기 흙막제거수단의 형상 모양은,
    상하 이동시 걸림 방지와 흙막을 인케이싱의 외주면에 밀착된 상태로 밀어 올리는 동시에 양옆으로 밀어내어 제거할 수 있도록 삼각형의 형상 모양으로 이루어짐을 특징으로 하는 콘크리트 흙막이 벽체 조성용 인케이싱 구조.
  6. 청구항 1 또는 3 에 있어서,
    상기 인케이싱의 상단 측면부에는,
    기중기로 인케이싱을 들어 올리거나 빼낼 때 걸고리를 걸 수 있도록 한 걸림공;이 더 포함됨을 특징으로 하는 콘크리트 흙막이 벽체 조성용 인케이싱 구조.
  7. 청구항 1 또는 3 에 있어서,
    상기 차단부재에는,
    인케이싱의 연속 시공시 땅속에서 물이 발생하게 되면 부력에 의해 인케이싱이 떠오르는 것을 방지하기 위해 물을 통과시키는 적어도 하나 이상의 구멍;이 더 포함됨을 특징으로 하는 콘크리트 흙막이 벽체 조성용 인케이싱 구조.
PCT/KR2018/003875 2017-05-18 2018-04-02 콘크리트 흙막이 벽체 조성용 인케이싱 구조 WO2018212449A1 (ko)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201880002813.0A CN109477323A (zh) 2017-05-18 2018-04-02 用于形成混凝土挡土墙的嵌入套管结构

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020170061808A KR101824926B1 (ko) 2017-05-18 2017-05-18 콘크리트 흙막이 벽체 조성용 인케이싱 구조
KR10-2017-0061808 2017-05-18

Publications (1)

Publication Number Publication Date
WO2018212449A1 true WO2018212449A1 (ko) 2018-11-22

Family

ID=61223147

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2018/003875 WO2018212449A1 (ko) 2017-05-18 2018-04-02 콘크리트 흙막이 벽체 조성용 인케이싱 구조

Country Status (3)

Country Link
KR (1) KR101824926B1 (ko)
CN (1) CN109477323A (ko)
WO (1) WO2018212449A1 (ko)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102070735B1 (ko) 2019-01-24 2020-01-29 김양형 주열식 벽체파일 조성용 홀을 연속 천공하기 위한 베어링가이드빔과 이를 이용하여 구축한 흙막이벽체 및 차수벽 시공방법
KR102228553B1 (ko) 2020-07-13 2021-03-16 (주)서아건설 흙막이벽체 조성용 지반 천공 가이드부재
KR102325623B1 (ko) 2021-02-17 2021-11-15 (주)서아건설 흙막이 벽체 시공방법
KR102478308B1 (ko) 2022-03-04 2022-12-16 뉴콘텍이앤씨(주) 연속주열식 벽체시공용 인케이싱 및 이를 이용한 연속주열식 벽체 시공방법

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200167842Y1 (ko) * 1999-09-01 2000-02-15 김일근 공사용 파일의 인발 보조장치
KR20030091836A (ko) * 2003-07-25 2003-12-03 케이엠토건 주식회사 원통기둥을 이용한 주열식 차수벽 및 그 설치공법
KR100445260B1 (ko) * 2001-04-27 2004-08-21 극동엔지니어링(주) 볼트식 강관말뚝 선단부 보강판 및 이를 이용한 강관말뚝시공방법
KR200388384Y1 (ko) * 2005-03-31 2005-06-30 주식회사 카멜 말뚝용 첨단부재
KR20060093081A (ko) * 2006-03-03 2006-08-23 차재선 매입말뚝의 선단 지지력 향상을 위한 폐쇄형 선단슈와선단 지반 헴머다짐 공법
KR20170042069A (ko) * 2015-10-08 2017-04-18 포엠 주식회사 복공판 체결장치 및 이에 의한 복공판 구조물

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2528801Y (zh) * 2002-02-06 2003-01-01 李兰英 一种软基插板机的套管
WO2009139510A1 (en) * 2008-05-14 2009-11-19 Kwang Min Kim Construction method for continuous cut-off wall using overlap casing
CN202466577U (zh) * 2012-03-01 2012-10-03 上海市政工程设计研究总院(集团)有限公司 一种钻孔灌注桩土体摩阻力消除装置
CN105714826A (zh) * 2016-04-20 2016-06-29 上海宝冶集团有限公司 预应力混凝土管桩桩芯清孔装置及操作方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200167842Y1 (ko) * 1999-09-01 2000-02-15 김일근 공사용 파일의 인발 보조장치
KR100445260B1 (ko) * 2001-04-27 2004-08-21 극동엔지니어링(주) 볼트식 강관말뚝 선단부 보강판 및 이를 이용한 강관말뚝시공방법
KR20030091836A (ko) * 2003-07-25 2003-12-03 케이엠토건 주식회사 원통기둥을 이용한 주열식 차수벽 및 그 설치공법
KR200388384Y1 (ko) * 2005-03-31 2005-06-30 주식회사 카멜 말뚝용 첨단부재
KR20060093081A (ko) * 2006-03-03 2006-08-23 차재선 매입말뚝의 선단 지지력 향상을 위한 폐쇄형 선단슈와선단 지반 헴머다짐 공법
KR20170042069A (ko) * 2015-10-08 2017-04-18 포엠 주식회사 복공판 체결장치 및 이에 의한 복공판 구조물

Also Published As

Publication number Publication date
CN109477323A (zh) 2019-03-15
KR101824926B1 (ko) 2018-02-02

Similar Documents

Publication Publication Date Title
WO2018212449A1 (ko) 콘크리트 흙막이 벽체 조성용 인케이싱 구조
WO2018221933A1 (ko) 지반 굴착기용 케이싱 가이드 장치 및 이를 이용한 굴착방법
WO2020197061A1 (ko) 토목섬유거푸집을 이용한 지하의 수중구조물과 그 시공방법
WO2020145483A1 (ko) 구조물 시공방법
WO2022059977A1 (ko) 프리캐스트 벽체의 겹침철근 연속화 장치 및 그 시공방법
CN106284314A (zh) 喀斯特地貌旋挖成孔灌注桩施工方法
WO2011126170A1 (ko) 프리스트레스를 도입한 현장타설 콘크리트말뚝 시공방법 및 그 구조
WO2012044091A2 (ko) 지하 구조물 구축장치 및 공법
GB2179083A (en) Making a cast-in-place prestressing pile by means of movable casing set
CN110847207B (zh) 地铁隧道穿越既有桥桩新建桥梁的构造及施工方法
WO2020085590A1 (ko) 변단면 각관을 이용한 환형 가물막이 및 터파기 공사 가시설 구조물 그리고 시공 방법
WO2018043969A1 (ko) 콘크리트 흙막이 벽체 조성용 케이싱
CN113668612A (zh) 模块化组合预制电力工作井及其施工方法
CN108801346B (zh) 竖向预制构件的并联式套筒灌浆检测结构和方法
WO2023096110A1 (ko) 지하 안전관리 및 사후점검까지 가능한 지하측정 다목적 토탈 검측장치 및 그를 이용한 지중보강구조물 디지털 시공공법
WO2022182027A1 (ko) 수중 콘크리트 블록 구조물 및 그 시공 방법
CN106812131B (zh) 一种永久板桩地下结构及其施工方法
WO2020013543A1 (ko) 내진용 파일보강 구조 및 그 시공방법
WO2024014729A1 (ko) 해저 연약지반에서의 침하 방지를 위한 수중 콘크리트 구조물 및 그 시공 방법
WO2018080105A1 (ko) 프리캐스트 철근콘크리트 말뚝 및 이를 이용한 흙막이 벽체 시공방법
WO2011059145A1 (ko) 강관 말뚝을 이용한 구조물
CN110512594A (zh) 旋挖钻机遇空洞成孔成桩的简易方法
WO2021045440A1 (ko) 수중 콘크리트 블록 구조물 및 그 시공 방법
WO2021015442A1 (ko) 건축기초시스템에 있어 임플란트식 파일 설치구 및 이를 이용한 임플란트식 파일공법
KR101025075B1 (ko) 연속압출방식의 지중터널 구조물 및 그의 시공방법

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18802251

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

32PN Ep: public notification in the ep bulletin as address of the adressee cannot be established

Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 13/03/2020)

122 Ep: pct application non-entry in european phase

Ref document number: 18802251

Country of ref document: EP

Kind code of ref document: A1