WO2018177305A1 - Groove pile for fabricated underground building and construction method thereof - Google Patents

Groove pile for fabricated underground building and construction method thereof Download PDF

Info

Publication number
WO2018177305A1
WO2018177305A1 PCT/CN2018/080789 CN2018080789W WO2018177305A1 WO 2018177305 A1 WO2018177305 A1 WO 2018177305A1 CN 2018080789 W CN2018080789 W CN 2018080789W WO 2018177305 A1 WO2018177305 A1 WO 2018177305A1
Authority
WO
WIPO (PCT)
Prior art keywords
pile
chain
groove
chain cutter
guide rail
Prior art date
Application number
PCT/CN2018/080789
Other languages
French (fr)
Chinese (zh)
Inventor
王燏斌
Original Assignee
王燏斌
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 王燏斌 filed Critical 王燏斌
Publication of WO2018177305A1 publication Critical patent/WO2018177305A1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes

Definitions

  • the invention relates to a groove pile for a prefabricated underground building and a construction method thereof, and belongs to the technical field of civil engineering foundation construction.
  • the existing large-scale basic technology adopts the overall excavation construction method, with long construction period, high labor intensity and poor working environment safety.
  • the invention provides a groove pile for a fabricated underground building and a construction method thereof, the purpose of which is to overcome the defects of the prior art, and the main advantages thereof:
  • the assembled underground building comprises a wall 1 and a groove pile 2
  • the interface between the wall 1 and the pile 2 is composed of a boss and a groove to form a concave-convex embedded structure, and the connection is safe and reliable.
  • the wall 1 and the pile 2 themselves have a chain cutter for excavating the bottom rock, the factory prefabricated wall and pile, and the site is divided. The block or the whole is lowered, the construction is simple, the construction period is short, and the cost is low.
  • the assembled underground building comprises a wall 1 and a groove pile 2, and the interface of the wall 1 and the pile 2 is composed of a boss and a groove to form a concave-convex embedded structure, and the interface of the wall 1 is provided with a boss 1 -1, the groove 2 is provided at the interface of the pile 2, the thickness of the maximum thickness of the boss 1-1 is greater than the thickness t of the joint between the end of the boss 1-1 and the wall 1, and the groove 2-1 is open The width at the location is less than the thickness at the maximum thickness of the boss 1-1 but greater than the thickness t at the junction of the end of the boss 1-1 and the wall 1, and the convex portion 1-1 is embedded in the groove of the recess 2-1; the bottom of the pile 2
  • the rail 4 is provided with a chain cutter 3, and the rail 4 is provided with a chain cutter 3, and the chain cutter 3 is composed of a chain 3-1 and a cutter 3-2 mounted on the chain 3-1.
  • the invention has the advantages that the interface between the wall 1 and the pile 2 is composed of a boss and a groove, and the connection is concave and convex, and the connection is safe and reliable.
  • the wall 1 and the pile 2 themselves have a chain cutter for excavating the bottom rock, the factory prefabricated wall and Piles, on-site block or overall decline, simple construction, short construction period and low cost.
  • FIG. 1 is a partial schematic view of a prefabricated underground building in which the wall 1 and the pile 2 are integrally formed, and is also a structural schematic view of the structure of the boss 1-1 of the wall 1 and the groove 2-1 of the pile 2 adopting a concave-convex embedded structure. It is also a schematic diagram of the thickness t of the joint between the end of the boss 1-1 and the wall 1;
  • FIG. 2 is a schematic view of the A direction of FIG. 1 and a structural view of the construction wall 1 embedded in the grooves 2-1 of the two piles 2, and is also driven by the driving power unit 5-1, the spoil processing unit 5-2 and the frame.
  • 5-3 is a schematic structural view of a chain cutter driving device 5;
  • Figure 3 is a BB view of Figure 2 (with the chain cutter 3 removed), and is also a schematic view of the structure of the rail 4 running on the bottom chain cutter 3 of the wall 1, and also the mud nozzle 6-1 of the mud pipeline device 6 on the wall 1-1. And a schematic view of the structure of the mud pipeline 6-2;
  • FIG. 5 is a schematic structural view of another space-curable chain cutter 3;
  • Figure 6 is a schematic view showing the structure of a pile 2A having two grooves 2-1 on the same straight line;
  • Figure 7 is a schematic view showing the structure in which the two guide rails 2-2 are inserted into the two recesses 2-1 of the pile 2A, and the chain cutter 3 is mounted in the guide rail 2-2;
  • Figure 8 is a schematic structural view showing the construction state of the driving device 5 on which the chain cutter 3 is attached to the pile 2A;
  • Figure 9 is a schematic view showing the structure in which the chain cutter 3 runs the rock at the bottom of the excavation pile 2A along the track, and the pile 2A, the guide rail 2-2 and the bottom chain cutter 3 are simultaneously driven downward;
  • Figure 10 is a schematic view showing the structure of the removal of the driving device 5 and the chain cutter 3 after the pile 2A reaches the set depth;
  • Figure 11 is a schematic view showing the structure of the pile 2A provided with the chain cutter running rail 4 on both sides of the grooveless 2-1, and also the structure of the side cover 7 having the bottom edge of the outer side of the rail 4;
  • Figure 12 is a schematic view showing the structure in which the two-step block 2-3 is inserted into the two grooves 2-1 of the pile 2A, and the chain cutter 3 is attached to the rail 4 on the bottom and side of the pile 2A;
  • Figure 13 is a schematic view showing the structure of the driving device 5 in which the chain cutter 3 is attached to the pile 2A;
  • Figure 14 is a schematic view showing the structure in which the chain cutter 3 runs the rock at the bottom of the excavation pile 2A along the track, and the pile 2, the stopper 2-3 and the bottom chain cutter 3 are simultaneously driven downward;
  • Figure 15 is a schematic view showing the structure after removing the driving device 5 and the chain cutter 3 and pulling out the stopper 2-3;
  • Figure 16 is a schematic view showing the structure of the pile 2B of the two grooves 2-1 at right angles to each other;
  • Figure 17 is the guide rail 2-2 inserted into the groove 2-1 of the pile 2B, the stopper 2-3 is inserted into the other groove 2-1 of the pile 2B, on the rail 4 at the bottom and sides of the pile 2B and the guide rail 2 -2 is a schematic structural view of the chain cutter 3 installed therein;
  • Figure 18 is a schematic view showing the construction state in which the driving device 5 for attaching the chain cutter 3 to the pile 2B is formed;
  • Figure 19 is a schematic view showing the structure of the rock mass at the bottom of the excavation pile 2B along the track, the pile 2, the guide rail 2-2, the stopper 2-3 and the bottom chain cutter 3 simultaneously running downward;
  • Figure 20 is a schematic view showing the structure after removing the driving device 5 and the chain cutter 3, and pulling out the guide rail 2-2 and the stopper 2-3;
  • Figure 21 is a schematic view showing the structure of a pile 2C having three grooves 2-1;
  • Figure 22 is a schematic view showing the structure in which the two guide rails 2-2 are inserted into the pile 2C, the stoppers 2-3 are inserted into the other recesses 2-1 of the pile 2C, and the chain cutters 3 are mounted in the guide rails 2-2;
  • Figure 23 is a schematic view showing the structure of the driving device 5 in which the chain cutter 3 is attached to the pile 2C;
  • Figure 24 is a schematic view showing the structure of the rock mass at the bottom of the excavation pile 2C along the track, the pile 2, the guide rail 2-2, the stopper 2-3 and the bottom chain cutter 3 simultaneously running downward;
  • Figure 25 is a schematic view showing the structure of the pile 2C after the driving device 5 and the chain cutter 3 are removed, and the guide rail 2-2 and the stopper 2-3 are pulled out;
  • Figure 26 is a schematic view showing the structure of a pile 2D having four grooves 2-1;
  • Figure 27 is a schematic view showing the structure in which the two guide rails 2-2 and the two stoppers 2-3 are inserted into the recesses 2-1 of the pile 2D, and the chain cutters 3 are mounted in the guide rails 2-2;
  • 28 is a schematic structural view showing a state in which the driving device 5 for attaching the chain cutter 3 to the pile 2D is formed;
  • Figure 29 is a schematic view showing the structure of the rock mass at the bottom of the excavation pile 2D along the track, the pile 2, the guide rail 2-2, the stopper 2-3 and the bottom chain cutter 3 simultaneously running downward;
  • Figure 30 is a schematic view showing the structure of the pile 2D after the drive unit 5 and the chain cutter 3 are removed, and the guide rail 2-2 and the stopper 2-3 are pulled out.
  • the prefabricated underground building comprises a wall 1 and a grooved pile 2, and the interface between the wall 1 and the pile 2 is composed of a boss and a groove to form a concave-convex embedded structure, and the interface of the wall 1 is provided with a boss 1-1, and the interface of the pile 2
  • the groove 2-1 is provided, and the thickness of the maximum thickness of the boss 1-1 is greater than the thickness of the joint between the end of the boss 1-1 and the wall 1, and the width of the opening of the groove 2-1 is smaller than the boss 1- 1
  • the thickness at the maximum thickness is greater than the thickness at the junction of the end of the boss 1-1 and the wall 1, the convex portion 1-1 is embedded in the groove of the recess 2-1; the bottom of the pile 2 is provided with the track 4 for running the chain cutter 3.
  • the chain 4 is equipped with a chain cutter 3, and the chain cutter 3 is composed of a chain 3-1 and a cutter 3-2 mounted on the chain 3-1.
  • the chain cutter 3 works, the rock at the bottom of the pile 2 is excavated, from bottom to top.
  • the running chain cutter 3 brings the excavated geologic soil at the bottom of the pile 2 to the upper side, and the pile 2 and the bottom chain cutter 3 simultaneously run downward.
  • the construction method is to first construct the pile 2 after the construction of the wall 1.
  • the construction method is to first construct the pile 2 and the construction wall 1 .
  • the guide rail 2-2 When the pile 2 is constructed, the guide rail 2-2 is embedded in the groove, and the guide rail 2-2 is provided with a track on which the chain cutter 3 travels, and after the construction of the pile 2 is completed, the guide rail 2-2 is pulled out.
  • a stopper 2-3 is embedded in the groove, and after the construction of the pile 2 is completed, the stopper 2-3 is pulled out.
  • the pile 2 is provided with two grooves 2-1 on the same straight line, and the construction method is divided into the A method and the B method.
  • the specific steps are as follows:
  • the chain cutter 3 runs the rock and soil at the bottom of the excavation pile 2 along the track, and the excavated geotechnical soil at the bottom of the pile 2 is brought to the top by the chain knife 3 running downwards, the pile 2, the guide rail 2-2 and The bottom chain cutter 3 runs downward at the same time;
  • the pile 2 is provided with two grooves 2-1 at right angles to each other, and the specific construction method steps are as follows:
  • the chain cutter 3 runs the rock soil at the bottom of the excavation pile 2 along the track, and the excavated rock soil at the bottom of the pile 2 is brought to the top by the chain knife 3 running downwards and upwards, the pile 2, the guide rail 2-2, The stopper 2-3 and the bottom chain cutter 3 are simultaneously operated downward;
  • the pile 2 is provided with three grooves 2-1, and the specific construction method steps are as follows:
  • the chain cutter 3 runs the rock soil at the bottom of the excavation pile 2 along the track, and the excavated rock soil at the bottom of the pile 2 is brought to the top by the chain knife 3 running downwards and upwards, the pile 2, the guide rail 2-2, The stopper 2-3 and the bottom chain cutter 3 are simultaneously operated downward;
  • the pile 2 is provided with four grooves 2-1, and the specific construction steps are as follows:
  • the chain cutter 3 runs the rock soil at the bottom of the excavation pile 2 along the track, and the excavated rock soil at the bottom of the pile 2 is brought to the top by the chain knife 3 running downwards and upwards, the pile 2, the guide rail 2-2, The stopper 2-3 and the bottom chain cutter 3 are simultaneously operated downward;
  • the assembled underground building includes a wall 1 and a groove pile 2, and the interface between the wall 1 and the pile 2 is composed of a boss and a groove to form a concave-convex embedded structure, and the interface of the wall 1 is provided with a convex portion.
  • the interface of the pile 2 is provided with a groove 2-1, the thickness of the maximum thickness of the boss 1-1 is greater than the thickness t of the junction of the end of the boss 1-1 and the wall 1, the groove 2 1
  • the width at the opening is smaller than the thickness at the maximum thickness of the boss 1-1 but larger than the thickness t at the junction of the end of the boss 1-1 and the wall 1, and the convex portion 1-1 is embedded in the groove of the recess 2-1;
  • the bottom of the bottom is provided with a track 4 for running the chain cutter 3.
  • the track 4 is provided with a chain cutter 3, and the chain cutter 3 is composed of a chain 3-1 and a cutter 3-2 mounted on the chain 3-1 to drive the power unit 5- 1 drive chain cutter 3, when the chain cutter 3 works, only the rock soil at the bottom of the wall 1 is excavated, and the excavated rock soil at the bottom of the wall 1 is brought to the upper by the chain knife 3 running downward and upward, and the device 5-2 takes the chain cutter 3 from The rock soil brought up at the bottom of the wall 1 is separated from the chain cutter 3, and the wall 1 and the bottom chain cutter 3 are simultaneously operated downward; the mud pipeline device 6 is composed of a mud nozzle 6-1 and a wall 1 or pile on the bottom of the wall 1 or pile 2. 2 internal pipeline 6-2; first construction pile 2 after construction wall 1, pile 2 When guide grooves embedded 2-2, 2-2 are equipped with guide rails running in the chain blade 3, after the pull rails 2 Pile 2-2.
  • the pile 2A has two grooves 2-1 on the same straight line.
  • the specific steps of the A method are as follows:
  • the pile 2A is provided with a chain cutter running rail 4 on both sides of the grooveless 2-1, and a stopper 2-3 is embedded in the groove when the pile 2A is constructed.
  • the specific steps of the B method construction are as follows:
  • the chain cutter 3 starts the driving device, the chain cutter 3 runs the rock and soil at the bottom of the excavation pile 2B along the track, and the excavated rock and soil at the bottom of the pile 2B is brought to the top by the chain knife 3 running downward and upward, the pile 2B and the guide rail 2-2.
  • the stopper 2-3 and the bottom chain cutter 3 are simultaneously operated downward;
  • the concrete construction method of the pile 2C is as follows:
  • the chain cutter 3 runs the rock and soil at the bottom of the excavation pile 2C along the track, and the excavated rock and soil at the bottom of the pile 2C is brought to the top by the chain knife 3 running downward and upward, the pile 2C and the guide rail 2-2.
  • the stopper 2-3 and the bottom chain cutter 3 are simultaneously operated downward;

Abstract

A groove pile (2) for a fabricated underground building. The fabricated underground building comprises walls (1) and groove piles (2); a concave-convex embedded structure comprising a protrusion and a groove is provided at a joint between a wall (1) and a pile (2); the protrusion (1-1) is provided at the joint part of the wall (1) and the groove (2-1) is provided at the joint part of the pile (2); the protrusion (1-1) is embedded in the recess of the groove (2-1); a track (4) for operating a chain cutter (3) is provided at the bottom of the pile (2); the chain cutter (3) is mounted on the track (4) during construction; the chain cutter (3) is composed of a chain (3-1) and a cutter (3-2) mounted on the chain (3-1); during construction, the chain cutter (3) excavates rock at the bottom of the pile (2); and the chain cutter (3) running from bottom to top brings the excavated rock upward from the bottom of the pile (3); and the pile (3) and the bottom chain cutter (3) move downwards simultaneously. Also disclosed is a construction method of the groove pile (2) for a fabricated underground building.

Description

一种用于装配式地下建筑的凹槽桩及其施工法Groove pile for prefabricated underground building and construction method thereof 技术领域Technical field
本发明涉及的是一种用于装配式地下建筑的凹槽桩及其施工法,属于土木工程基础施工技术领域。The invention relates to a groove pile for a prefabricated underground building and a construction method thereof, and belongs to the technical field of civil engineering foundation construction.
背景技术Background technique
现有大型基础技术采用整体开挖施工方式,施工周期长,劳动强度大,工作环境安全度差。The existing large-scale basic technology adopts the overall excavation construction method, with long construction period, high labor intensity and poor working environment safety.
发明内容Summary of the invention
本发明提出的是一种用于装配式地下建筑的凹槽桩及其施工法,其目的旨在克服现有技术存在的缺陷,其主要优点:装配式地下建筑包括墙1和凹槽桩2,墙1和桩2的接口由凸台和凹槽组成凹凸型嵌入式结构,连接安全可靠,墙1和桩2自身带有挖掘其底部岩土的链刀,工厂预制墙和桩,现场分块或者整体下降,施工简单,施工周期短,成本低。The invention provides a groove pile for a fabricated underground building and a construction method thereof, the purpose of which is to overcome the defects of the prior art, and the main advantages thereof: the assembled underground building comprises a wall 1 and a groove pile 2 The interface between the wall 1 and the pile 2 is composed of a boss and a groove to form a concave-convex embedded structure, and the connection is safe and reliable. The wall 1 and the pile 2 themselves have a chain cutter for excavating the bottom rock, the factory prefabricated wall and pile, and the site is divided. The block or the whole is lowered, the construction is simple, the construction period is short, and the cost is low.
本发明的技术解决方案:装配式地下建筑包括墙1和凹槽桩2,墙1和桩2的接口由凸台和凹槽组成凹凸型嵌入式结构,墙1的接口处设有凸台1-1,桩2的接口处设有凹槽2-1,凸台1-1的最大厚度处的厚度大于凸台1-1尾端与墙1连接处的厚度t,凹槽2-1开口处的宽度小于凸台1-1最大厚度处的厚度但大于凸台1-1尾端与墙1连接处的厚度t,凸部1-1嵌入凹部2-1的槽内;桩2的底部设有运行链刀3的轨道4,施工时轨道4上装有链刀3,链刀3由链条3-1和安装在链条3-1上的刀具3-2组成,链刀3工作时挖掘桩2底部的岩土,由下向上运行的链刀3将桩2底部已挖掘的岩土带至上方,桩2和底部链刀3同时向下运行。Technical solution of the invention: the assembled underground building comprises a wall 1 and a groove pile 2, and the interface of the wall 1 and the pile 2 is composed of a boss and a groove to form a concave-convex embedded structure, and the interface of the wall 1 is provided with a boss 1 -1, the groove 2 is provided at the interface of the pile 2, the thickness of the maximum thickness of the boss 1-1 is greater than the thickness t of the joint between the end of the boss 1-1 and the wall 1, and the groove 2-1 is open The width at the location is less than the thickness at the maximum thickness of the boss 1-1 but greater than the thickness t at the junction of the end of the boss 1-1 and the wall 1, and the convex portion 1-1 is embedded in the groove of the recess 2-1; the bottom of the pile 2 The rail 4 is provided with a chain cutter 3, and the rail 4 is provided with a chain cutter 3, and the chain cutter 3 is composed of a chain 3-1 and a cutter 3-2 mounted on the chain 3-1. 2 At the bottom of the rock, the excavated rock at the bottom of the pile 2 is brought up to the top by the chain knife 3 running up and down, and the pile 2 and the bottom chain knife 3 are simultaneously operated downward.
本发明的优点:墙1和桩2的接口由凸台和凹槽组成凹凸型嵌入式结构,连接安全可靠,墙1和桩2自身带有挖掘其底部岩土的链刀,工厂预制墙和桩,现场分块或者整体下降,施工简单,施工周期短,成本低。The invention has the advantages that the interface between the wall 1 and the pile 2 is composed of a boss and a groove, and the connection is concave and convex, and the connection is safe and reliable. The wall 1 and the pile 2 themselves have a chain cutter for excavating the bottom rock, the factory prefabricated wall and Piles, on-site block or overall decline, simple construction, short construction period and low cost.
附图说明DRAWINGS
图1是墙1与桩2连接成一体形成的装配式地下建筑的局部示意图,也是墙1的凸台1-1与桩2的凹槽2-1的结构采用凹凸型嵌入式结构的结构示意图,也是凸台1-1尾端与墙1连接处厚度t结构示意图;1 is a partial schematic view of a prefabricated underground building in which the wall 1 and the pile 2 are integrally formed, and is also a structural schematic view of the structure of the boss 1-1 of the wall 1 and the groove 2-1 of the pile 2 adopting a concave-convex embedded structure. It is also a schematic diagram of the thickness t of the joint between the end of the boss 1-1 and the wall 1;
图2是图1的A向示意图,也是在两个桩2的凹槽2-1内嵌入施工墙1的结构示意图,也是由驱动动力装置5-1、弃土处理装置5-2和机架5-3组成的链刀驱动装置5的结构示意图;2 is a schematic view of the A direction of FIG. 1 and a structural view of the construction wall 1 embedded in the grooves 2-1 of the two piles 2, and is also driven by the driving power unit 5-1, the spoil processing unit 5-2 and the frame. 5-3 is a schematic structural view of a chain cutter driving device 5;
图3是图2的B-B视图(去除链刀3),也是墙1-的底部链刀3运行的轨道4的结构示意图,也是泥浆管路装置6在墙1-1上的泥浆喷嘴6-1和泥浆管路6-2的结构示意图;Figure 3 is a BB view of Figure 2 (with the chain cutter 3 removed), and is also a schematic view of the structure of the rail 4 running on the bottom chain cutter 3 of the wall 1, and also the mud nozzle 6-1 of the mud pipeline device 6 on the wall 1-1. And a schematic view of the structure of the mud pipeline 6-2;
图4是链刀3的结构示意图,也是链条3-1和刀具3-2的结构示意图;4 is a schematic structural view of the chain cutter 3, and is also a schematic structural view of the chain 3-1 and the cutter 3-2;
图5是另一种可空间弯曲链刀3的结构示意图;FIG. 5 is a schematic structural view of another space-curable chain cutter 3;
图6是在同一直线上有两处凹槽2-1的桩2A的结构示意;Figure 6 is a schematic view showing the structure of a pile 2A having two grooves 2-1 on the same straight line;
图7是将两导轨2-2插入桩2A的两凹槽2-1内,在导轨2-2内安装链刀3的结构示意图;Figure 7 is a schematic view showing the structure in which the two guide rails 2-2 are inserted into the two recesses 2-1 of the pile 2A, and the chain cutter 3 is mounted in the guide rail 2-2;
图8是在桩2A上安装链刀3的驱动装置5形成施工状态的结构示意图;Figure 8 is a schematic structural view showing the construction state of the driving device 5 on which the chain cutter 3 is attached to the pile 2A;
图9是链刀3沿着轨道运行挖掘桩2A底部的岩土,桩2A、导轨2-2和底部链刀3同时向下运行到位的结构示意图;Figure 9 is a schematic view showing the structure in which the chain cutter 3 runs the rock at the bottom of the excavation pile 2A along the track, and the pile 2A, the guide rail 2-2 and the bottom chain cutter 3 are simultaneously driven downward;
图10是桩2A达到设定的深度后,拆除驱动装置5和链刀3,拔出导轨2-2结构示意图;Figure 10 is a schematic view showing the structure of the removal of the driving device 5 and the chain cutter 3 after the pile 2A reaches the set depth;
图11是无凹槽2-1的两侧面设有链刀运行轨道4的桩2A的结构示意图,也是轨道4外侧的底部带刃角的侧面罩7的结构示意图;Figure 11 is a schematic view showing the structure of the pile 2A provided with the chain cutter running rail 4 on both sides of the grooveless 2-1, and also the structure of the side cover 7 having the bottom edge of the outer side of the rail 4;
图12是将两档块2-3插入桩2A的两凹槽2-1内,在桩2A的底部和侧面的轨道4上安装链刀3的结构示意图;Figure 12 is a schematic view showing the structure in which the two-step block 2-3 is inserted into the two grooves 2-1 of the pile 2A, and the chain cutter 3 is attached to the rail 4 on the bottom and side of the pile 2A;
图13是在桩2A上安装链刀3的驱动装置5形成施工状态的结构示意图;Figure 13 is a schematic view showing the structure of the driving device 5 in which the chain cutter 3 is attached to the pile 2A;
图14是链刀3沿着轨道运行挖掘桩2A底部的岩土,桩2、挡块2-3和底部链刀3同时向下运行到位的结构示意图;Figure 14 is a schematic view showing the structure in which the chain cutter 3 runs the rock at the bottom of the excavation pile 2A along the track, and the pile 2, the stopper 2-3 and the bottom chain cutter 3 are simultaneously driven downward;
图15是拆除驱动装置5和链刀3,拔出挡块2-3后的结构示意图;Figure 15 is a schematic view showing the structure after removing the driving device 5 and the chain cutter 3 and pulling out the stopper 2-3;
图16是互成直角的两处凹槽2-1的桩2B的结构示意图;Figure 16 is a schematic view showing the structure of the pile 2B of the two grooves 2-1 at right angles to each other;
图17是导轨2-2插入桩2B的凹槽2-1内,将挡块2-3插入桩2B的另一凹槽2-1内,在桩2B底部和侧面的轨道4上和导轨2-2内安装链刀3的结构示意图;Figure 17 is the guide rail 2-2 inserted into the groove 2-1 of the pile 2B, the stopper 2-3 is inserted into the other groove 2-1 of the pile 2B, on the rail 4 at the bottom and sides of the pile 2B and the guide rail 2 -2 is a schematic structural view of the chain cutter 3 installed therein;
图18是在桩2B上安装链刀3的驱动装置5形成施工状态的结构示意图;Figure 18 is a schematic view showing the construction state in which the driving device 5 for attaching the chain cutter 3 to the pile 2B is formed;
图19是链刀3沿着轨道运行挖掘桩2B底部的岩土,桩2、导轨2-2、挡块2-3 和底部链刀3同时向下运行到位的结构示意图;Figure 19 is a schematic view showing the structure of the rock mass at the bottom of the excavation pile 2B along the track, the pile 2, the guide rail 2-2, the stopper 2-3 and the bottom chain cutter 3 simultaneously running downward;
图20是拆除驱动装置5和链刀3,拔出导轨2-2和挡块2-3后的结构示意图;Figure 20 is a schematic view showing the structure after removing the driving device 5 and the chain cutter 3, and pulling out the guide rail 2-2 and the stopper 2-3;
图21是有三处凹槽2-1的桩2C的结构示意图;Figure 21 is a schematic view showing the structure of a pile 2C having three grooves 2-1;
图22是将两导轨2-2插入桩2C,将挡块2-3插入桩2C的另一凹槽2-1内,在导轨2-2内安装链刀3的结构示意图;Figure 22 is a schematic view showing the structure in which the two guide rails 2-2 are inserted into the pile 2C, the stoppers 2-3 are inserted into the other recesses 2-1 of the pile 2C, and the chain cutters 3 are mounted in the guide rails 2-2;
图23是在桩2C上安装链刀3的驱动装置5形成施工状态的结构示意图;Figure 23 is a schematic view showing the structure of the driving device 5 in which the chain cutter 3 is attached to the pile 2C;
图24是链刀3沿着轨道运行挖掘桩2C底部的岩土,桩2、导轨2-2、挡块2-3和底部链刀3同时向下运行到位的结构示意图;Figure 24 is a schematic view showing the structure of the rock mass at the bottom of the excavation pile 2C along the track, the pile 2, the guide rail 2-2, the stopper 2-3 and the bottom chain cutter 3 simultaneously running downward;
图25是拆除驱动装置5和链刀3,拔出导轨2-2和挡块2-3后的桩2C结构示意图;Figure 25 is a schematic view showing the structure of the pile 2C after the driving device 5 and the chain cutter 3 are removed, and the guide rail 2-2 and the stopper 2-3 are pulled out;
图26是有四处凹槽2-1的桩2D的结构示意图;Figure 26 is a schematic view showing the structure of a pile 2D having four grooves 2-1;
图27是将两导轨2-2和两挡块2-3插入桩2D的凹槽2-1内,在导轨2-2内安装链刀3的结构示意图;Figure 27 is a schematic view showing the structure in which the two guide rails 2-2 and the two stoppers 2-3 are inserted into the recesses 2-1 of the pile 2D, and the chain cutters 3 are mounted in the guide rails 2-2;
图28是在桩2D上安装链刀3的驱动装置5形成施工状态的结构示意图;28 is a schematic structural view showing a state in which the driving device 5 for attaching the chain cutter 3 to the pile 2D is formed;
图29是链刀3沿着轨道运行挖掘桩2D底部的岩土,桩2、导轨2-2、挡块2-3和底部链刀3同时向下运行到位的结构示意图;Figure 29 is a schematic view showing the structure of the rock mass at the bottom of the excavation pile 2D along the track, the pile 2, the guide rail 2-2, the stopper 2-3 and the bottom chain cutter 3 simultaneously running downward;
图30是拆除驱动装置5和链刀3,拔出导轨2-2和挡块2-3后的桩2D结构示意图。Figure 30 is a schematic view showing the structure of the pile 2D after the drive unit 5 and the chain cutter 3 are removed, and the guide rail 2-2 and the stopper 2-3 are pulled out.
图中的1是装配式地下建筑的墙;1-1是墙1的接口处的凸台;2是装配式地下建筑的凹槽桩,有2A、2B、2C和2D四种结构;2A是在同一直线上有两处凹槽2-1的桩;2B是互成直角有两处凹槽2-1的桩;2C是有三处凹槽2-1的桩;2D是有四处凹槽2-1的桩;2-1是桩2的接口处的凹槽;2-2是桩2施工时凹槽内嵌的导轨,施工结束后拔出导轨;2-3是桩2施工时凹槽2-1内嵌的挡块,施工结束后拔出挡块;3是挖掘岩土的链刀,由链条3-1和安装在链条3-1上的刀具3-2组成;3-1是组成链刀3的链条;3-2是组成链刀3的刀具;4是墙1或桩2的底部或侧面运行链刀3的轨道;5是链刀驱动装置,由驱动动力装置5-1、弃土处理装置5-2和机架5-3组成;5-1是驱动动力装置;5-2是弃土处理装置;5-3是机架;6是泥浆管路装置;6-1是墙1或桩2底部上的泥浆喷嘴;6-2是墙1或桩2内部的泥浆管路;7是墙1或者桩2上轨道4外侧的底部带刃角的 侧面罩;t是凸台1-1尾端与墙1连接处的厚度。1 is the wall of the assembled underground building; 1-1 is the boss at the interface of the wall 1; 2 is the grooved pile of the assembled underground building, which has 2A, 2B, 2C and 2D structures; 2A is There are two grooves 2-1 on the same line; 2B are piles with two grooves 2-1 at right angles; 2C is a pile with three grooves 2-1; 2D has four grooves 2 -1 pile; 2-1 is the groove at the interface of pile 2; 2-2 is the guide rail embedded in the groove when the pile 2 is constructed, and the guide rail is pulled out after the construction is completed; 2-3 is the groove when the pile 2 is constructed 2-1 embedded stopper, pull out the stopper after construction; 3 is a chain cutter for excavating rock and soil, consisting of chain 3-1 and cutter 3-2 mounted on chain 3-1; 3-1 is a chain constituting the chain cutter 3; 3-2 is a cutter constituting the chain cutter 3; 4 is a rail running the chain cutter 3 at the bottom or side of the wall 1 or the pile 2; 5 is a chain cutter driving device, driven by the power unit 5-1 , spoil disposal device 5-2 and frame 5-3; 5-1 is the drive power device; 5-2 is the spoil treatment device; 5-3 is the frame; 6 is the mud pipeline device; 6-1 Is the mud nozzle on the bottom of the wall 1 or the pile 2; 6-2 is the mud pipeline inside the wall 1 or the pile 2; 7 is the rail 1 on the wall 1 or the pile 2 Side of the bottom-side corner edge of the cover strip; t is from a thickness of 1-1 and a trailing end wall connecting boss.
具体实施方式detailed description
装配式地下建筑包括墙1和凹槽桩2,墙1和桩2的接口由凸台和凹槽组成凹凸型嵌入式结构,墙1的接口处设有凸台1-1,桩2的接口处设有凹槽2-1,凸台1-1的最大厚度处的厚度大于凸台1-1尾端与墙1连接处的厚度,凹槽2-1开口处的宽度小于凸台1-1最大厚度处的厚度但大于凸台1-1尾端与墙1连接处的厚度,凸部1-1嵌入凹部2-1的槽内;桩2的底部设有运行链刀3的轨道4,施工时轨道4上装有链刀3,链刀3由链条3-1和安装在链条3-1上的刀具3-2组成,链刀3工作时挖掘桩2底部的岩土,由下向上运行的链刀3将桩2底部已挖掘的岩土带至上方,桩2和底部链刀3同时向下运行。The prefabricated underground building comprises a wall 1 and a grooved pile 2, and the interface between the wall 1 and the pile 2 is composed of a boss and a groove to form a concave-convex embedded structure, and the interface of the wall 1 is provided with a boss 1-1, and the interface of the pile 2 The groove 2-1 is provided, and the thickness of the maximum thickness of the boss 1-1 is greater than the thickness of the joint between the end of the boss 1-1 and the wall 1, and the width of the opening of the groove 2-1 is smaller than the boss 1- 1 The thickness at the maximum thickness is greater than the thickness at the junction of the end of the boss 1-1 and the wall 1, the convex portion 1-1 is embedded in the groove of the recess 2-1; the bottom of the pile 2 is provided with the track 4 for running the chain cutter 3. During the construction, the chain 4 is equipped with a chain cutter 3, and the chain cutter 3 is composed of a chain 3-1 and a cutter 3-2 mounted on the chain 3-1. When the chain cutter 3 works, the rock at the bottom of the pile 2 is excavated, from bottom to top. The running chain cutter 3 brings the excavated geologic soil at the bottom of the pile 2 to the upper side, and the pile 2 and the bottom chain cutter 3 simultaneously run downward.
所述的施工法是先施工墙1后施工桩2。The construction method is to first construct the pile 2 after the construction of the wall 1.
所述的施工法是先施工桩2后施工墙1。The construction method is to first construct the pile 2 and the construction wall 1 .
所述的桩2施工时凹槽内嵌有导轨2-2,导轨2-2内设有链刀3行走的轨道,桩2施工结束后拔出导轨2-2。When the pile 2 is constructed, the guide rail 2-2 is embedded in the groove, and the guide rail 2-2 is provided with a track on which the chain cutter 3 travels, and after the construction of the pile 2 is completed, the guide rail 2-2 is pulled out.
所述的桩2施工时凹槽内嵌有挡块2-3,桩2施工结束后拔出挡块2-3。When the pile 2 is constructed, a stopper 2-3 is embedded in the groove, and after the construction of the pile 2 is completed, the stopper 2-3 is pulled out.
所述的桩2设有在同一直线上的两处凹槽2-1,其施工法分A法和B法,具体步骤如下:The pile 2 is provided with two grooves 2-1 on the same straight line, and the construction method is divided into the A method and the B method. The specific steps are as follows:
A法:Method A:
1)预制桩2和导轨2-2,并运至现场;1) Precast pile 2 and guide rail 2-2, and transported to the site;
2)将两导轨2-2插入桩2的两凹槽2-1内;2) inserting the two guide rails 2-2 into the two recesses 2-1 of the pile 2;
3)在桩2底部的轨道4上和导轨2-2内安装链刀3;3) mounting the chain cutter 3 on the rail 4 at the bottom of the pile 2 and in the guide rail 2-2;
4)安装链刀3的驱动装置等;4) mounting the drive device of the chain cutter 3, etc.;
5)启动驱动装置,链刀3沿着轨道运行挖掘桩2底部的岩土,由下向上运行的链刀3将桩2底部已挖掘的岩土带至上方,桩2、导轨2-2和底部链刀3同时向下运行;5) Starting the driving device, the chain cutter 3 runs the rock and soil at the bottom of the excavation pile 2 along the track, and the excavated geotechnical soil at the bottom of the pile 2 is brought to the top by the chain knife 3 running downwards, the pile 2, the guide rail 2-2 and The bottom chain cutter 3 runs downward at the same time;
6)桩2达到设定的深度后,拆除驱动装置和链刀;6) After the pile 2 reaches the set depth, the drive unit and the chain cutter are removed;
7)拔出导轨2-2;7) Pull out the guide rail 2-2;
B法:Method B:
1)预制桩2和挡块2-3,并运至现场,桩2无凹槽2-1的两侧面设有链刀3 运行的轨道4;1) Precast pile 2 and stop 2-3, and transported to the site, the two sides of the pile 2 without groove 2-1 are provided with the track 4 running by the chain cutter 3;
2)将两档块2-3插入桩2的两凹槽2-1内;2) insert two blocks 2-3 into the two grooves 2-1 of the pile 2;
3)在桩2的底部和侧面的轨道4上安装链刀3;3) mounting a chain cutter 3 on the bottom and side rails 4 of the pile 2;
4)安装链刀3的驱动装置等;4) mounting the drive device of the chain cutter 3, etc.;
5)启动驱动装置,链刀3沿着轨道运行挖掘桩2底部的岩土,由下向上运行的链刀3将桩2底部已挖掘的岩土带至上方,桩2、挡块2-3和底部链刀3同时向下运行;5) Start the driving device, the chain cutter 3 runs the rock and soil at the bottom of the excavation pile 2 along the track, and the excavated rock soil at the bottom of the pile 2 is brought to the top by the chain knife 3 running downwards, the pile 2, the stop block 2-3 Running down with the bottom chain cutter 3 at the same time;
6)桩2达到设定的深度后,拆除驱动装置和链刀3;6) After the pile 2 reaches the set depth, the drive device and the chain cutter 3 are removed;
7)拔出挡块2-3。7) Pull out the stop 2-3.
所述的桩2设有互成直角的两处凹槽2-1,其具体施工法步骤如下:The pile 2 is provided with two grooves 2-1 at right angles to each other, and the specific construction method steps are as follows:
1)预制桩2、导轨2-2和挡块2-3,并运至现场;1) Prefabricated pile 2, guide rail 2-2 and stop 2-3, and transported to the site;
2)将导轨2-2插入桩2的凹槽2-1内,桩2位于导轨2-2对面的侧面上设有链刀3运行的轨道4;2) insert the guide rail 2-2 into the groove 2-1 of the pile 2, the pile 2 is located on the side opposite the guide rail 2-2 on the side of the track 4 with the chain knife 3 running;
3)将挡块2-3插入桩2的另一凹槽2-1内;3) inserting the stopper 2-3 into the other groove 2-1 of the pile 2;
4)在桩2底部和侧面的轨道4上和导轨2-2内安装链刀3;4) mounting the chain cutter 3 on the rail 4 at the bottom and sides of the pile 2 and in the guide rail 2-2;
5)安装链刀3的驱动装置等;5) mounting the drive device of the chain cutter 3, etc.;
6)启动驱动装置,链刀3沿着轨道运行挖掘桩2底部的岩土,由下向上运行的链刀3将桩2底部已挖掘的岩土带至上方,桩2、导轨2-2、挡块2-3和底部链刀3同时向下运行;6) Starting the driving device, the chain cutter 3 runs the rock soil at the bottom of the excavation pile 2 along the track, and the excavated rock soil at the bottom of the pile 2 is brought to the top by the chain knife 3 running downwards and upwards, the pile 2, the guide rail 2-2, The stopper 2-3 and the bottom chain cutter 3 are simultaneously operated downward;
7)桩2达到设定的深度后,拆除驱动装置和链刀3;7) after the pile 2 reaches the set depth, the drive device and the chain cutter 3 are removed;
8)拔出导轨2-2和挡块2-3。8) Pull out the guide rail 2-2 and the stopper 2-3.
所述的桩2设有三处凹槽2-1,其具体施工法步骤如下:The pile 2 is provided with three grooves 2-1, and the specific construction method steps are as follows:
1)预制桩2、导轨2-2和挡块2-3,并运至现场;1) Prefabricated pile 2, guide rail 2-2 and stop 2-3, and transported to the site;
2)将两导轨2-2插入桩2的位于同一直线的两凹槽2-1内;2) inserting the two guide rails 2-2 into the two grooves 2-1 of the pile 2 which are in the same straight line;
3)将挡块2-3插入桩2的另一凹槽2-1内;3) inserting the stopper 2-3 into the other groove 2-1 of the pile 2;
4)在桩2底部的轨道4上和导轨2-2内安装链刀3;4) mounting the chain cutter 3 on the rail 4 at the bottom of the pile 2 and in the guide rail 2-2;
5)安装链刀3的驱动装置等;5) mounting the drive device of the chain cutter 3, etc.;
6)启动驱动装置,链刀3沿着轨道运行挖掘桩2底部的岩土,由下向上运行的链刀3将桩2底部已挖掘的岩土带至上方,桩2、导轨2-2、挡块2-3和底部 链刀3同时向下运行;6) Starting the driving device, the chain cutter 3 runs the rock soil at the bottom of the excavation pile 2 along the track, and the excavated rock soil at the bottom of the pile 2 is brought to the top by the chain knife 3 running downwards and upwards, the pile 2, the guide rail 2-2, The stopper 2-3 and the bottom chain cutter 3 are simultaneously operated downward;
7)桩2达到设定的深度后,拆除驱动装置和链刀3;7) after the pile 2 reaches the set depth, the drive device and the chain cutter 3 are removed;
8)拔出导轨2-2和挡块2-3。8) Pull out the guide rail 2-2 and the stopper 2-3.
所述的桩2设有四处凹槽2-1,其具体施工法步骤如下:The pile 2 is provided with four grooves 2-1, and the specific construction steps are as follows:
1)预制桩2、导轨2-2和挡块2-3,并运至现场;1) Prefabricated pile 2, guide rail 2-2 and stop 2-3, and transported to the site;
2)将两导轨2-2插入桩2的位于同一直线的两凹槽2-1内;2) inserting the two guide rails 2-2 into the two grooves 2-1 of the pile 2 which are in the same straight line;
3)将两挡块2-3插入桩2的另外两个凹槽2-1内;3) Insert the two stops 2-3 into the other two grooves 2-1 of the pile 2;
4)在桩2底部的轨道4上和导轨2-2内安装链刀3;4) mounting the chain cutter 3 on the rail 4 at the bottom of the pile 2 and in the guide rail 2-2;
5)安装链刀3的驱动装置等;5) mounting the drive device of the chain cutter 3, etc.;
6)启动驱动装置,链刀3沿着轨道运行挖掘桩2底部的岩土,由下向上运行的链刀3将桩2底部已挖掘的岩土带至上方,桩2、导轨2-2、挡块2-3和底部链刀3同时向下运行;6) Starting the driving device, the chain cutter 3 runs the rock soil at the bottom of the excavation pile 2 along the track, and the excavated rock soil at the bottom of the pile 2 is brought to the top by the chain knife 3 running downwards and upwards, the pile 2, the guide rail 2-2, The stopper 2-3 and the bottom chain cutter 3 are simultaneously operated downward;
7)桩2达到设定的深度后,拆除驱动装置和链刀3;7) after the pile 2 reaches the set depth, the drive device and the chain cutter 3 are removed;
8)拔出导轨2-2和挡块2-3。8) Pull out the guide rail 2-2 and the stopper 2-3.
下面结合附图进一步描述本发明:The invention is further described below in conjunction with the drawings:
如图1~图5所示,装配式地下建筑包括墙1和凹槽桩2,墙1和桩2的接口由凸台和凹槽组成凹凸型嵌入式结构,墙1的接口处设有凸台1-1,桩2的接口处设有凹槽2-1,凸台1-1的最大厚度处的厚度大于凸台1-1尾端与墙1连接处的厚度t,凹槽2-1开口处的宽度小于凸台1-1最大厚度处的厚度但大于凸台1-1尾端与墙1连接处的厚度t,凸部1-1嵌入凹部2-1的槽内;桩2的底部设有运行链刀3的轨道4,施工时轨道4上装有链刀3,链刀3由链条3-1和安装在链条3-1上的刀具3-2组成,驱动动力装置5-1驱动链刀3,链刀3工作时仅挖掘墙1底部的岩土,由下向上运行的链刀3将墙1底部已挖掘的岩土带至上方,装置5-2将链刀3从墙1底部带上来的岩土与链刀3分离,墙1和底部链刀3同时向下运行;泥浆管路装置6由墙1或桩2底部上的泥浆喷嘴6-1和墙1或桩2内部的管路6-2组成;先施工桩2后施工墙1,桩2施工时凹槽内嵌有导轨2-2,导轨2-2内设有链刀3行走的轨道,桩2施工结束后拔出导轨2-2。As shown in FIG. 1 to FIG. 5, the assembled underground building includes a wall 1 and a groove pile 2, and the interface between the wall 1 and the pile 2 is composed of a boss and a groove to form a concave-convex embedded structure, and the interface of the wall 1 is provided with a convex portion. Table 1-1, the interface of the pile 2 is provided with a groove 2-1, the thickness of the maximum thickness of the boss 1-1 is greater than the thickness t of the junction of the end of the boss 1-1 and the wall 1, the groove 2 1 The width at the opening is smaller than the thickness at the maximum thickness of the boss 1-1 but larger than the thickness t at the junction of the end of the boss 1-1 and the wall 1, and the convex portion 1-1 is embedded in the groove of the recess 2-1; The bottom of the bottom is provided with a track 4 for running the chain cutter 3. During the construction, the track 4 is provided with a chain cutter 3, and the chain cutter 3 is composed of a chain 3-1 and a cutter 3-2 mounted on the chain 3-1 to drive the power unit 5- 1 drive chain cutter 3, when the chain cutter 3 works, only the rock soil at the bottom of the wall 1 is excavated, and the excavated rock soil at the bottom of the wall 1 is brought to the upper by the chain knife 3 running downward and upward, and the device 5-2 takes the chain cutter 3 from The rock soil brought up at the bottom of the wall 1 is separated from the chain cutter 3, and the wall 1 and the bottom chain cutter 3 are simultaneously operated downward; the mud pipeline device 6 is composed of a mud nozzle 6-1 and a wall 1 or pile on the bottom of the wall 1 or pile 2. 2 internal pipeline 6-2; first construction pile 2 after construction wall 1, pile 2 When guide grooves embedded 2-2, 2-2 are equipped with guide rails running in the chain blade 3, after the pull rails 2 Pile 2-2.
如图6~图10所示,桩2A在同一直线上有两处凹槽2-1的桩,其A法施工具体步骤如下:As shown in Fig. 6 to Fig. 10, the pile 2A has two grooves 2-1 on the same straight line. The specific steps of the A method are as follows:
1)预制桩2A和导轨2-2,并运至现场;1) Precast pile 2A and guide rail 2-2, and transported to the site;
2)将两导轨2-2插入桩2A的两凹槽2-1内;2) inserting the two guide rails 2-2 into the two recesses 2-1 of the pile 2A;
3)在桩2A底部的轨道4上和导轨2-2内安装链刀3;3) mounting the chain cutter 3 on the rail 4 at the bottom of the pile 2A and in the guide rail 2-2;
4)安装链刀3的驱动装置等;4) mounting the drive device of the chain cutter 3, etc.;
5)启动驱动装置,链刀3)沿着轨道运行挖掘桩2A底部的岩土,由下向上运行的链刀3将桩2A底部已挖掘的岩土带至上方,桩2A、导轨2-2和底部链刀3同时向下运行;5) Start the drive device, the chain cutter 3) Run the rock and soil at the bottom of the excavation pile 2A along the track, and carry the excavated rock at the bottom of the pile 2A to the top by the chain knife 3 running up and down, the pile 2A, the guide rail 2-2 Running down with the bottom chain cutter 3 at the same time;
6)桩2A达到设定的深度后,拆除驱动装置5和链刀3;6) after the pile 2A reaches the set depth, the drive device 5 and the chain cutter 3 are removed;
7)拔出导轨2-2。7) Pull out the guide rail 2-2.
如图11~图15所示,桩2A在无凹槽2-1的两侧面设有链刀运行轨道4,桩2A施工时凹槽内嵌有挡块2-3,桩2施工结束后拔出挡块2-3,其B法法施工具体步骤如下:As shown in FIG. 11 to FIG. 15, the pile 2A is provided with a chain cutter running rail 4 on both sides of the grooveless 2-1, and a stopper 2-3 is embedded in the groove when the pile 2A is constructed. Out of the block 2-3, the specific steps of the B method construction are as follows:
1)预制桩2A和挡块2-3,并运至现场,桩2A无凹槽2-1的两侧面设有链刀3运行的轨道4;1) Prefabricated pile 2A and stop 2-3, and transported to the site, the two sides of the pile 2A without groove 2-1 are provided with the track 4 running by the chain cutter 3;
2)将两档块2-3插入桩2A的两凹槽2-1内;2) insert two blocks 2-3 into the two grooves 2-1 of the pile 2A;
3)在桩2A的底部和侧面的轨道4上安装链刀3;3) mounting the chain cutter 3 on the bottom and side rails 4 of the pile 2A;
4)安装链刀3的驱动装置等;4) mounting the drive device of the chain cutter 3, etc.;
5)启动驱动装置,链刀3沿着轨道运行挖掘桩2A底部的岩土,由下向上运行的链刀3将桩2A底部已挖掘的岩土带至上方,桩2A、挡块2-3和底部链刀3同时向下运行;5) Start the driving device, the chain cutter 3 runs along the track, the rock and soil at the bottom of the excavation pile 2A, and the excavated geotechnical soil at the bottom of the pile 2A is brought to the top by the chain knife 3 running up and down, the pile 2A, the stopper 2-3 Running down with the bottom chain cutter 3 at the same time;
6)桩2A达到设定的深度后,拆除驱动装置和链刀3;6) After the pile 2A reaches the set depth, the drive device and the chain cutter 3 are removed;
7)拔出挡块2-3。7) Pull out the stop 2-3.
如图16~图20所示,桩2B的具体施工法步骤如下:As shown in Fig. 16 to Fig. 20, the specific construction method of the pile 2B is as follows:
1)预制桩2B、导轨2-2和挡块2-3,并运至现场;1) Precast pile 2B, guide rail 2-2 and stop 2-3, and transported to the site;
2)将导轨2-2插入桩2B的凹槽2-1内,桩2B位于导轨2-2对面的侧面上设有链刀3运行的轨道4;2) insert the guide rail 2-2 into the groove 2-1 of the pile 2B, the pile 2B is located on the side opposite the guide rail 2-2 on the side of the track 4 with the chain knife 3 running;
3)将挡块2-3插入桩2B的另一凹槽2-1内;3) insert the stopper 2-3 into the other groove 2-1 of the pile 2B;
4)在桩2B底部和侧面的轨道4上和导轨2-2内安装链刀3;4) mounting the chain cutter 3 on the rail 4 at the bottom and side of the pile 2B and in the guide rail 2-2;
5)安装链刀3的驱动装置等;5) mounting the drive device of the chain cutter 3, etc.;
6)启动驱动装置,链刀3沿着轨道运行挖掘桩2B底部的岩土,由下向上运行的链刀3将桩2B底部已挖掘的岩土带至上方,桩2B、导轨2-2、挡块2-3和底部链刀3同时向下运行;6) Start the driving device, the chain cutter 3 runs the rock and soil at the bottom of the excavation pile 2B along the track, and the excavated rock and soil at the bottom of the pile 2B is brought to the top by the chain knife 3 running downward and upward, the pile 2B and the guide rail 2-2. The stopper 2-3 and the bottom chain cutter 3 are simultaneously operated downward;
7)桩2B达到设定的深度后,拆除驱动装置和链刀3;7) After the pile 2B reaches the set depth, the drive device and the chain cutter 3 are removed;
8)拔出导轨2-2和挡块2-3。8) Pull out the guide rail 2-2 and the stopper 2-3.
如图21~图25所示,桩2C具体施工法步骤如下:As shown in Fig. 21 to Fig. 25, the concrete construction method of the pile 2C is as follows:
1)预制桩2C、导轨2-2和挡块2-3,并运至现场;1) Precast pile 2C, guide rail 2-2 and stop 2-3, and transported to the site;
2)将两导轨2-2插入桩2C的位于同一直线的两凹槽2-1内;2) inserting the two guide rails 2-2 into the two grooves 2-1 of the pile 2C in the same straight line;
3)将挡块2-3插入桩2C的另一凹槽2-1内;3) insert the stopper 2-3 into the other groove 2-1 of the pile 2C;
4)在桩2C底部的轨道4上和导轨2-2内安装链刀3;4) mounting the chain cutter 3 on the rail 4 at the bottom of the pile 2C and in the guide rail 2-2;
5)安装链刀3的驱动装置等;5) mounting the drive device of the chain cutter 3, etc.;
6)启动驱动装置,链刀3沿着轨道运行挖掘桩2C底部的岩土,由下向上运行的链刀3将桩2C底部已挖掘的岩土带至上方,桩2C、导轨2-2、挡块2-3和底部链刀3同时向下运行;6) Starting the driving device, the chain cutter 3 runs the rock and soil at the bottom of the excavation pile 2C along the track, and the excavated rock and soil at the bottom of the pile 2C is brought to the top by the chain knife 3 running downward and upward, the pile 2C and the guide rail 2-2. The stopper 2-3 and the bottom chain cutter 3 are simultaneously operated downward;
7)桩2C达到设定的深度后,拆除驱动装置和链刀3;7) After the pile 2C reaches the set depth, the drive device and the chain cutter 3 are removed;
8)拔出导轨2-2和挡块2-3。8) Pull out the guide rail 2-2 and the stopper 2-3.
如图26~图30所示,桩2D的具体施工法步骤如下:As shown in Fig. 26 to Fig. 30, the specific construction method of the pile 2D is as follows:
1)预制桩2D、导轨2-2和挡块2-3,并运至现场;1) Precast pile 2D, guide rail 2-2 and stop 2-3, and transported to the site;
2)将两导轨2-2插入桩2D的位于同一直线的两凹槽2-1内;2) inserting the two guide rails 2-2 into the two grooves 2-1 of the pile 2D in the same straight line;
3)将两挡块2-3插入桩2D的另外两个凹槽2-1内;3) Insert the two stops 2-3 into the other two grooves 2-1 of the pile 2D;
4)在桩2D底部的轨道4上和导轨2-2内安装链刀3;4) mounting the chain cutter 3 on the rail 4 at the bottom of the pile 2D and in the guide rail 2-2;
5)安装链刀3的驱动装置等;5) mounting the drive device of the chain cutter 3, etc.;
6)启动驱动装置,链刀3沿着轨道运行挖掘桩2D底部的岩土,由下向上运行的链刀3将桩2D底部已挖掘的岩土带至上方,桩2D、导轨2-2、挡块2-3和底部链刀3同时向下运行;6) Start the driving device, the chain cutter 3 runs along the track, the rock and soil at the bottom of the excavation pile 2D, and the excavated geotechnical soil at the bottom of the pile 2D is brought to the top by the chain knife 3 running downwards, the pile 2D, the guide rail 2-2, The stopper 2-3 and the bottom chain cutter 3 are simultaneously operated downward;
7)桩2D达到设定的深度后,拆除驱动装置和链刀3;7) After the pile 2D reaches the set depth, the drive device and the chain cutter 3 are removed;
8)拔出导轨2-2和挡块2-3。8) Pull out the guide rail 2-2 and the stopper 2-3.

Claims (9)

  1. 一种用于装配式地下建筑的凹槽桩,其特征是装配式地下建筑包括墙(1)和凹槽桩(2),墙(1)和桩(2)的接口由凸台和凹槽组成凹凸型嵌入式结构,墙(1)的接口处设有凸台(1-1),桩(2)的接口处设有凹槽(2-1),凸台(1-1)的最大厚度处的厚度大于凸台(1-1)尾端与墙(1)连接处的厚度,凹槽(2-1)开口处的宽度小于凸台(1-1)最大厚度处的厚度但大于凸台(1-1)尾端与墙(1)连接处的厚度,凸部(1-1)嵌入凹部(2-1)的槽内;桩(2)的底部设有运行链刀(3)的轨道(4),施工时轨道(4)上装有链刀(3),链刀(3)由链条(3-1)和安装在链条(3-1)上的刀具(3-2)组成,链刀(3)工作时挖掘桩(2)底部的岩土,由下向上运行的链刀(3)将桩(2)底部已挖掘的岩土带至上方,桩(2)和底部链刀(3)同时向下运行。A groove pile for a fabricated underground building, characterized in that the assembled underground building comprises a wall (1) and a groove pile (2), and the interface of the wall (1) and the pile (2) is supported by a boss and a groove The concave-convex embedded structure is formed, and the interface of the wall (1) is provided with a boss (1-1), and the interface of the pile (2) is provided with a groove (2-1), and the maximum of the boss (1-1) The thickness at the thickness is greater than the thickness at the junction of the end of the boss (1-1) and the wall (1), and the width at the opening of the groove (2-1) is smaller than the thickness at the maximum thickness of the boss (1-1) but greater than The thickness of the joint between the end of the boss (1-1) and the wall (1), the convex portion (1-1) is embedded in the groove of the concave portion (2-1); the bottom of the pile (2) is provided with a running chain knife (3) The track (4), the chain knife (3) is attached to the track (4) during construction, the chain knife (3) is chained (3-1) and the tool (3-2) mounted on the chain (3-1) Composition, the chain knife (3) works to excavate the rock at the bottom of the pile (2), and the excavated rock at the bottom of the pile (2) is brought to the top, the pile (2) and the bottom by the chain knife (3) running downwards and upwards. The chain knife (3) runs down at the same time.
  2. 根据权利要求1所述的一种用于装配式地下建筑的凹槽桩,其特征是所述的施工法是先施工墙(1)后施工桩(2)。A groove pile for a fabricated underground building according to claim 1, characterized in that the construction method is a construction pile (1) after the construction wall (1).
  3. 根据权利要求1所述的一种用于装配式地下建筑的凹槽桩,其特征是所述的施工法是先施工桩(2)后施工墙(1)。A groove pile for a fabricated underground building according to claim 1, characterized in that the construction method is a construction pile (2) and a construction wall (1).
  4. 根据权利要求3所述的一种用于装配式地下建筑的凹槽桩,其特征是所述的桩(2)施工时凹槽内嵌有导轨(2-2),导轨(2-2)内设有链刀(3)行走的轨道,桩(2)施工结束后拔出导轨(2-2)。A groove pile for a fabricated underground building according to claim 3, characterized in that the pile (2) is embedded with a guide rail (2-2), a guide rail (2-2) There is a track in which the chain knife (3) walks, and the pile (2) is pulled out after the construction of the pile (2).
  5. 根据权利要求3所述的一种用于装配式地下建筑的凹槽桩,其特征是所述的桩(2)施工时凹槽内嵌有挡块(2-3),桩(2)施工结束后拔出挡块(2-3)。A groove pile for a fabricated underground building according to claim 3, characterized in that the pile (2) is embedded with a stopper (2-3) and a pile (2) during construction. Pull out the stop (2-3) after the end.
  6. 根据权利要求4、5所述的一种用于装配式地下建筑的凹槽桩,其特征是所述的桩(2)设有在同一直线上的两处凹槽(2-1),其施工法分A法和B法,具体步骤如下:A groove pile for a fabricated underground building according to claims 4 and 5, characterized in that said pile (2) is provided with two grooves (2-1) on the same straight line, The construction method is divided into the A method and the B method. The specific steps are as follows:
    A法:Method A:
    1)预制桩(2)和导轨(2-2),并运至现场;1) Precast piles (2) and guide rails (2-2) are transported to the site;
    2)将两导轨(2-2)插入桩(2)的两凹槽(2-1)内;2) Insert the two guide rails (2-2) into the two grooves (2-1) of the pile (2);
    3)在桩(2)底部的轨道(4)上和导轨(2-2)内安装链刀(3);3) Install a chain cutter (3) on the rail (4) at the bottom of the pile (2) and in the guide rail (2-2);
    4)安装链刀(3)的驱动装置等;4) mounting the drive device of the chain cutter (3), etc.;
    5)启动驱动装置,链刀(3)沿着轨道运行挖掘桩(2)底部的岩土,由下向上运行的链刀(3)将桩(2)底部已挖掘的岩土带至上方,桩(2)、导轨(2-2) 和底部链刀(3)同时向下运行;5) Start the drive device, the chain cutter (3) runs the rock at the bottom of the excavation pile (2) along the track, and the excavated rock at the bottom of the pile (2) is brought up to the top by the chain knife (3) running downwards and upwards. The pile (2), the guide rail (2-2) and the bottom chain cutter (3) run downward simultaneously;
    6)桩(2)达到设定的深度后,拆除驱动装置和链刀;6) After the pile (2) reaches the set depth, the drive unit and the chain cutter are removed;
    7)拔出导轨(2-2);7) Pull out the guide rail (2-2);
    B法:Method B:
    1)预制桩(2)和挡块(2-3),并运至现场,桩(2)无凹槽(2-1)的两侧面设有链刀(3)运行的轨道(4);1) Precast pile (2) and stop (2-3), and transported to the site, the pile (2) without grooves (2-1) on both sides is provided with a chain knife (3) running track (4);
    2)将两档块(2-3)插入桩(2)的两凹槽(2-1)内;2) Insert two blocks (2-3) into the two grooves (2-1) of the pile (2);
    3)在桩(2)的底部和侧面的轨道(4)上安装链刀(3);3) Install a chain knife (3) on the bottom and side rails (4) of the pile (2);
    4)安装链刀(3)的驱动装置等;4) mounting the drive device of the chain cutter (3), etc.;
    5)启动驱动装置,链刀(3)沿着轨道运行挖掘桩(2)底部的岩土,由下向上运行的链刀(3)将桩(2)底部已挖掘的岩土带至上方,桩(2)、挡块(2-3)和底部链刀(3)同时向下运行;5) Start the drive device, the chain cutter (3) runs the rock at the bottom of the excavation pile (2) along the track, and the excavated rock at the bottom of the pile (2) is brought up to the top by the chain knife (3) running downwards and upwards. The pile (2), the stop (2-3) and the bottom chain cutter (3) run downward simultaneously;
    6)桩(2)达到设定的深度后,拆除驱动装置和链刀(3);6) After the pile (2) reaches the set depth, the drive unit and the chain cutter (3) are removed;
    7)拔出挡块(2-3)。7) Pull out the stop (2-3).
  7. 根据权利要求1所述的一种用于装配式地下建筑的凹槽桩,其特征是所述的桩(2)设有互成直角的两处凹槽(2-1),其具体施工法步骤如下:A groove pile for a fabricated underground building according to claim 1, wherein said pile (2) is provided with two grooves (2-1) at right angles to each other, and the concrete construction method thereof Proceed as follows:
    1)预制桩(2)、导轨(2-2)和挡块(2-3),并运至现场;1) Precast piles (2), guide rails (2-2) and stops (2-3) are transported to the site;
    2)将导轨(2-2)插入桩(2)的凹槽(2-1)内,桩(2)位于导轨(2-2)对面的侧面上设有链刀(3)运行的轨道(4);2) Insert the guide rail (2-2) into the groove (2-1) of the pile (2), and the pile (2) is located on the side opposite to the guide rail (2-2) with the track of the chain cutter (3) running ( 4);
    3)将挡块(2-3)插入桩(2)的另一凹槽(2-1)内;3) insert the stopper (2-3) into the other groove (2-1) of the pile (2);
    4)在桩(2)底部和侧面的轨道(4)上和导轨(2-2)内安装链刀(3);4) Install a chain knife (3) on the rail (4) at the bottom and side of the pile (2) and the guide rail (2-2);
    5)安装链刀(3)的驱动装置等;5) Mounting the drive device of the chain cutter (3), etc.;
    6)启动驱动装置,链刀(3)沿着轨道运行挖掘桩(2)底部的岩土,由下向上运行的链刀(3)将桩(2)底部已挖掘的岩土带至上方,桩(2)、导轨(2-2)、挡块(2-3)和底部链刀(3)同时向下运行;6) Start the drive device, the chain cutter (3) runs the rock at the bottom of the excavation pile (2) along the track, and the excavated rock at the bottom of the pile (2) is brought to the top by the chain knife (3) running downwards and upwards. The pile (2), the guide rail (2-2), the stopper (2-3) and the bottom chain cutter (3) are simultaneously operated downward;
    7)桩(2)达到设定的深度后,拆除驱动装置和链刀(3);7) After the pile (2) reaches the set depth, remove the drive unit and the chain knife (3);
    8)拔出导轨(2-2)和挡块(2-3)。8) Pull out the guide rail (2-2) and the stopper (2-3).
  8. 根据权利要求3所述的一种用于装配式地下建筑的凹槽桩,其特征是所述的桩(2)设有三处凹槽(2-1),其具体施工法步骤如下:A groove pile for a fabricated underground building according to claim 3, characterized in that the pile (2) is provided with three grooves (2-1), and the specific construction method steps are as follows:
    1)预制桩(2)、导轨(2-2)和挡块(2-3),并运至现场;1) Precast piles (2), guide rails (2-2) and stops (2-3) are transported to the site;
    2)将两导轨(2-2)插入桩(2)的位于同一直线的两凹槽(2-1)内;2) Insert the two guide rails (2-2) into the two grooves (2-1) of the pile (2) in the same straight line;
    3)将挡块(2-3)插入桩(2)的另一凹槽(2-1)内;3) insert the stopper (2-3) into the other groove (2-1) of the pile (2);
    4)在桩(2)底部的轨道(4)上和导轨(2-2)内安装链刀(3);4) Install a chain knife (3) on the rail (4) at the bottom of the pile (2) and in the guide rail (2-2);
    5)安装链刀(3)的驱动装置等;5) Mounting the drive device of the chain cutter (3), etc.;
    6)启动驱动装置,链刀(3)沿着轨道运行挖掘桩(2)底部的岩土,由下向上运行的链刀(3)将桩(2)底部已挖掘的岩土带至上方,桩(2)、导轨(2-2)、挡块(2-3)和底部链刀(3)同时向下运行;6) Start the drive device, the chain cutter (3) runs the rock at the bottom of the excavation pile (2) along the track, and the excavated rock at the bottom of the pile (2) is brought to the top by the chain knife (3) running downwards and upwards. The pile (2), the guide rail (2-2), the stopper (2-3) and the bottom chain cutter (3) are simultaneously operated downward;
    7)桩(2)达到设定的深度后,拆除驱动装置和链刀(3);7) After the pile (2) reaches the set depth, remove the drive unit and the chain knife (3);
    8)拔出导轨(2-2)和挡块(2-3)。8) Pull out the guide rail (2-2) and the stopper (2-3).
  9. 根据权利要求3所述的一种用于装配式地下建筑的凹槽桩,其特征是所述的桩(2)设有四处凹槽(2-1),其具体施工法步骤如下:A groove pile for a fabricated underground building according to claim 3, characterized in that the pile (2) is provided with four grooves (2-1), and the specific construction method steps are as follows:
    1)预制桩(2)、导轨(2-2)和挡块(2-3),并运至现场;1) Precast piles (2), guide rails (2-2) and stops (2-3) are transported to the site;
    2)将两导轨(2-2)插入桩(2)的位于同一直线的两凹槽(2-1)内;2) Insert the two guide rails (2-2) into the two grooves (2-1) of the pile (2) in the same straight line;
    3)将两挡块(2-3)插入桩(2)的另外两个凹槽(2-1)内;3) Insert the two stops (2-3) into the other two grooves (2-1) of the pile (2);
    4)在桩(2)底部的轨道(4)上和导轨(2-2)内安装链刀(3);4) Install a chain knife (3) on the rail (4) at the bottom of the pile (2) and in the guide rail (2-2);
    5)安装链刀(3)的驱动装置等;5) Mounting the drive device of the chain cutter (3), etc.;
    6)启动驱动装置,链刀(3)沿着轨道运行挖掘桩(2)底部的岩土,由下向上运行的链刀(3)将桩(2)底部已挖掘的岩土带至上方,桩(2)、导轨(2-2)、挡块(2-3)和底部链刀(3)同时向下运行;6) Start the drive device, the chain cutter (3) runs the rock at the bottom of the excavation pile (2) along the track, and the excavated rock at the bottom of the pile (2) is brought to the top by the chain knife (3) running downwards and upwards. The pile (2), the guide rail (2-2), the stopper (2-3) and the bottom chain cutter (3) are simultaneously operated downward;
    7)桩(2)达到设定的深度后,拆除驱动装置和链刀(3);7) After the pile (2) reaches the set depth, remove the drive unit and the chain knife (3);
    8)拔出导轨(2-2)和挡块(2-3)。8) Pull out the guide rail (2-2) and the stopper (2-3).
PCT/CN2018/080789 2017-03-29 2018-03-28 Groove pile for fabricated underground building and construction method thereof WO2018177305A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201710195841.6 2017-03-29
CN201710195841.6A CN106836188A (en) 2017-03-29 2017-03-29 A kind of groove for assembled hypogee and its construction method

Publications (1)

Publication Number Publication Date
WO2018177305A1 true WO2018177305A1 (en) 2018-10-04

Family

ID=59141450

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2018/080789 WO2018177305A1 (en) 2017-03-29 2018-03-28 Groove pile for fabricated underground building and construction method thereof

Country Status (2)

Country Link
CN (1) CN106836188A (en)
WO (1) WO2018177305A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836188A (en) * 2017-03-29 2017-06-13 王燏斌 A kind of groove for assembled hypogee and its construction method
CN114108699A (en) * 2021-10-21 2022-03-01 王树生 Movable construction device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5985021A (en) * 1982-11-05 1984-05-16 Kajima Corp Method and apparatus for construction of underground continuous wall
JPS62233328A (en) * 1986-04-01 1987-10-13 Fusao Sakano Method and apparatus for setting retaining wall by excavator
JPH04179726A (en) * 1990-11-13 1992-06-26 Kazutoshi Isachi Wall member in simplified underground continuous wall construction method and simplified underground continuous wall construction method using the same
CN2260103Y (en) * 1996-08-05 1997-08-20 郭同元 Pile
KR101331261B1 (en) * 2013-04-05 2013-11-20 주식회사 아라엔텍 Underground prefabricated precast concrete rainwater recycling facility using precast concrete continuous wall in strut structure or earth anchor and construction method of the same
CN103835316A (en) * 2014-01-24 2014-06-04 中国建筑第八工程局有限公司 Connector structure of precast underground continuous wall and construction method
CN106836188A (en) * 2017-03-29 2017-06-13 王燏斌 A kind of groove for assembled hypogee and its construction method
CN207419440U (en) * 2017-03-29 2018-05-29 王燏斌 A kind of groove stake for assembled hypogee

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4326399B2 (en) * 2004-05-25 2009-09-02 日本コンクリート工業株式会社 Prestressed concrete structure
CN103334422B (en) * 2013-06-26 2015-07-15 中国建筑股份有限公司 Assembled embedded type prefabricated hollow underground continuous wall and construction method thereof

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5985021A (en) * 1982-11-05 1984-05-16 Kajima Corp Method and apparatus for construction of underground continuous wall
JPS62233328A (en) * 1986-04-01 1987-10-13 Fusao Sakano Method and apparatus for setting retaining wall by excavator
JPH04179726A (en) * 1990-11-13 1992-06-26 Kazutoshi Isachi Wall member in simplified underground continuous wall construction method and simplified underground continuous wall construction method using the same
CN2260103Y (en) * 1996-08-05 1997-08-20 郭同元 Pile
KR101331261B1 (en) * 2013-04-05 2013-11-20 주식회사 아라엔텍 Underground prefabricated precast concrete rainwater recycling facility using precast concrete continuous wall in strut structure or earth anchor and construction method of the same
CN103835316A (en) * 2014-01-24 2014-06-04 中国建筑第八工程局有限公司 Connector structure of precast underground continuous wall and construction method
CN106836188A (en) * 2017-03-29 2017-06-13 王燏斌 A kind of groove for assembled hypogee and its construction method
CN207419440U (en) * 2017-03-29 2018-05-29 王燏斌 A kind of groove stake for assembled hypogee

Also Published As

Publication number Publication date
CN106836188A (en) 2017-06-13

Similar Documents

Publication Publication Date Title
WO2018177307A1 (en) Fabricated underground building and construction method thereof
CN110043264B (en) Construction method for jacking prefabricated rectangular vertical shaft structural type
WO2018177305A1 (en) Groove pile for fabricated underground building and construction method thereof
CN103726495A (en) Offshore deep foundation pit supporting structure and construction method thereof
WO2018177304A1 (en) Fabricated underground building and construction method thereof
WO2023066327A1 (en) Construction method for underground building consisting of sinking wall foundation
WO2018133746A1 (en) Underground building formed of piles and walls, and method for constructing same
CN103742154A (en) Shield tunnel ventilation shaft construction method
CN102486091B (en) Construction method for oblique tunneling of rectangular pipe jacking machine in closed space
WO2018177306A1 (en) Fabricated underground wall and construction method thereof
WO2018166522A1 (en) Construction device for revetment and construction method therefor
WO2023066326A1 (en) Sunken wall foundation, and construction devices and method therefor
WO2018177308A1 (en) Fabricated underground building interface structure and construction method thereof
CN103866787B (en) A kind of spacious reverse masonry method concrete cut that digs builds construction technology
WO2018166523A1 (en) Deep-water foundation and construction device and construction method therefor
CN108005083B (en) Anchor cable processing method within the scope of a kind of foundation pit enclosure structure
CN207419440U (en) A kind of groove stake for assembled hypogee
WO2018133748A1 (en) Construction ship for underwater tunnel and construction method therefor
CN108951677A (en) The open caisson construction method of the muck soil position underground space
CN207727550U (en) A kind of assembled subterranean wall
CN111636440A (en) Structure for supporting and waterproof curtain to penetrate through old bottom plate obstacle and construction method thereof
WO2018166516A1 (en) Composite device connected with top of foundation during construction and construction method therefor
CN207714369U (en) A kind of assembled hypogee
CN104695966A (en) Construction method of underground arch roof plate
CN207727624U (en) A kind of assembled hypogee interface structure

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18774852

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18774852

Country of ref document: EP

Kind code of ref document: A1