WO2018166523A1 - Deep-water foundation and construction device and construction method therefor - Google Patents

Deep-water foundation and construction device and construction method therefor Download PDF

Info

Publication number
WO2018166523A1
WO2018166523A1 PCT/CN2018/079257 CN2018079257W WO2018166523A1 WO 2018166523 A1 WO2018166523 A1 WO 2018166523A1 CN 2018079257 W CN2018079257 W CN 2018079257W WO 2018166523 A1 WO2018166523 A1 WO 2018166523A1
Authority
WO
WIPO (PCT)
Prior art keywords
foundation
chain
construction
base
rock
Prior art date
Application number
PCT/CN2018/079257
Other languages
French (fr)
Chinese (zh)
Inventor
王燏斌
Original Assignee
王燏斌
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 王燏斌 filed Critical 王燏斌
Publication of WO2018166523A1 publication Critical patent/WO2018166523A1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water
    • E02D27/525Submerged foundations, i.e. submerged in open water using elements penetrating the underwater ground
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/28Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes

Definitions

  • the invention relates to a deep water foundation and a construction device and a construction method thereof, and belongs to the technical field of civil engineering foundation construction.
  • the existing foundation technology of the sinking well is based on excavation in the well and relies on its own gravity to overcome the frictional resistance of the well wall and sink to the design elevation to seal the bottom.
  • the main defects are: long construction period, high cost, difficult to correct, and encountered well When an obstacle such as a bottom stone is used, the blade foot is difficult to overcome and is prone to suddenness and is prone to accidents.
  • the existing caisson foundation technology needs to input compressed air to provide working conditions and push the water in the working chamber out of the room; its main defects are: complicated equipment, limited working time, low efficiency, high cost, difficult sealing, limited depth, and high pressure Under the conditions, it is prone to occupational diseases.
  • the invention provides a deep water foundation and construction device and a construction method thereof, the purpose of which is to overcome the defects of the prior art, and the main advantages thereof are:
  • the foundation is composed of an upper foundation and a lower foundation; 1) the upper foundation utilizes self weight and negative Pressed into the rock and soil, the construction is simple; 2)
  • the lower foundation is constructed in the cofferdam formed by the upper foundation, and the lower foundation itself has a combination device for excavating the bottom of the foundation rock, the factory section or the whole prefabricated foundation, the construction is simple, the construction period is short ,low cost.
  • the deep water foundation comprises an upper foundation 1 and a lower foundation 2,
  • the construction device comprises a construction device 3 of the upper foundation 1 and a construction device 4 of the lower foundation 2;
  • the upper foundation 1 is hollow, and the foundation is provided with a foundation 2 or the guiding device of the device 4, the bottom of the upper foundation 1 is cut into the rock by the construction device 3 by its own weight or negative pressure;
  • the construction device 4 includes a fixed guiding device 4-1 provided in the inner cavity of the upper foundation 1, and a chain cutter power transmission device 4-2 , spoil disposal device 4-3 and frame 4-4, device 4-2 and device 4-3 are all mounted on the frame 4-4, the device 4-2 and the base 2 and the chain knife 5 constitute a chain excavation device 6.
  • the foundation 2 is a frame of the chain excavating device 6, the chain cutter 5 only excavates the rock at the bottom of the foundation 2, and the chain cutter 5 is composed of a chain 5-1 and a cutter 5-2 for excavating the rock and soil fixed on the chain 5-1.
  • the device 4-1 guides the foundation 2 and/or the frame 4-4 to make the foundation 2 into a vertical state; during construction, the frame 4-4 and the foundation 2
  • the top is connected in one piece
  • the device 4-2 drives the chain cutter 5 to run along the track on the foundation 2, the chain cutter 5 excavates the rock at the bottom of the foundation 2, and brings the excavated geotechnical to the upper
  • the device 4-3 will chain
  • the rock 5 from the bottom of the base 1 is separated from the chain cutter 5, and the frame 4-4 is simultaneously lowered with the foundation 2, and when the foundation 2 reaches the set depth, the construction device 3 and the chain cutter 5 are removed, and the grouting is performed.
  • the foundation 1 and the foundation 2 are solidly integrated into a deep water foundation.
  • the invention has the advantages that the foundation is composed of an upper foundation and a lower foundation, the upper foundation is cut into the rock soil by its own weight and negative pressure, the lower foundation is constructed in the cofferdam formed by the upper foundation, and the lower foundation itself has a combination device for excavating the bottom rock of the foundation. , factory segmentation or overall prefabrication foundation, simple construction, short construction period and low cost.
  • FIG. 1 is a schematic view showing a construction state of a deep water foundation composed of an upper foundation 1 and a lower foundation 2, and is also a schematic structural view of the construction device 3 and the construction device 4;
  • Figure 2 is a view in the direction of arrow A of Figure 1, and is also a schematic structural view of a construction vessel 3-2 composed of a hull 3-2-1 and a lifting device 3-2-2, and the lifting device 3-2-2 is a row frame structure. a moving walking track on the planes x and y;
  • Fig. 3 is a schematic view showing the structure of the pumping unit 3-1 and the construction vessel 3-2 which constitute the construction apparatus 3, and the top of the foundation 1A is higher than the water surface, and the hull 3-2- 1 Schematic diagram of the construction work platform that forms the deep water foundation together;
  • FIG. 4 is a partial enlarged view of FIG. 1 , and is a schematic structural view of the lower base 2 being a mouth base 2A, and is also a fixed guiding device 4-1 constituting the construction device 4, a chain cutter power transmission device 4-2, and a spoil disposal device. 4-3 and the structure of the frame 4-4;
  • Figure 5 is a view in the direction of arrow A of Figure 4, which is also the chain cutter driving device 4-2-1, the chain knife tensioning device 4-2-2 and the sprocket 4-2-3 constituting the chain cutter power transmission device 4-2.
  • the structural schematic diagram is also a structural schematic diagram of a chain excavating device 6 which is provided with only the bottom bottom of each of the foundations;
  • Figure 6 is a BB view of Figure 4, which is also a cross-sectional view of the frame 4-4 of the construction device 4, and is also a structural schematic view of the mud line 7-1 of the mud line device 7 on the frame 4-4, and is also a word
  • the basic structure of the base 2A is composed of four one-word bases, and is also a structural schematic diagram of a chain conveyor composed of a side cover 8 and a chain cutter 5 of the foundation 2A with a bottom edge angle;
  • Figure 7 is a C-C view of Figure 4, and is also a schematic structural view of the mud nozzle 7-2 of the mud pipeline device 7 at the bottom of the foundation 2;
  • Figure 8 is a schematic structural view of the chain cutter 5, which is also a structural diagram of the chain 5-1 and the cutter 5-2, and is also a chain 5- consisting of A 10-byte 5-1-1 and B-decimal 5-1-2.
  • a schematic diagram of the ten-byte structure of 1 is also a schematic diagram of the structure in which the chain 5-1 realizes space bending;
  • Figure 9 is a schematic view showing the structure of a deep water foundation as a bridge foundation
  • Figure 10 is a view in the direction of arrow A of Figure 9, and is also a structural schematic diagram of a bridge foundation composed of four foundations 1A and four foundations 2A, and is also a construction platform for the deep water foundation at the top of the bridge foundation, with a lifting device at the top 3 - Schematic diagram of 2-2;
  • Figure 11 is a schematic view showing the structure of floating the prefabricated base 1A to a set position
  • Figure 12 is a schematic view of the bottom water injection of the foundation 1A, so that the foundation 1A is erected; and the bottom of the foundation 1A is embedded in the rock under the action of the self-weight of the foundation 1A, and the bottom of the foundation 1A forms a closed cavity structure;
  • Figure 13 is a schematic view showing the structure of the apparatus 1 - 3 pumping the water in the bottom of the base 1A to form a negative pressure, and the foundation 1A is lowered to a set depth under the action of the self-weight and the negative pressure;
  • Figure 14 is a schematic view showing the structure of the device 1 - 4 in the base 1A cavity by extracting the water in the cavity of the base 1A, removing the device 3-1;
  • Figure 15 is a schematic view showing the structure of the first section (i.e., the bottom section) of the base 2A-1 loading device 4-1, the chain cutter 5, the mud line 7-1, and the mounting device 4-2;
  • 16 is a schematic structural view of the rack 4-4 being synchronously lowered to a set depth along with the first segment base 2A-1;
  • Figure 17 is a schematic view showing the structure after the device 4 is separated from the first segment base 2A-1 and removed;
  • Figure 18 is a schematic view showing the structure of the second stage 2A-2 loading device 4-1, the chain cutter 5, the mud line 7-1 and the mounting device 4-2;
  • Figure 19 is a frame 4-4, the first segment base 2A-1 and the second segment base 2A-2 are simultaneously descended to a set depth;
  • Figure 20 is a schematic view showing the structure of the device 4 separated from the second segment base 2A-2 and removed;
  • Figure 21 is a schematic view showing the structure of the deep water foundation after the removal device 4 withdraws the chain cutter 5 after repeated construction.
  • 1 in the figure is the upper foundation; 1A is the upper foundation is the cylindrical foundation; 2 is the lower foundation; 2A is the lower foundation for the word foundation; 2A-1 is the first segment foundation of the foundation 2A; 2A-2 is the foundation 2A
  • the deep water foundation comprises an upper foundation 1 and a lower foundation 2, the construction device comprising a construction device 3 of the upper foundation 1 and a construction device 4 of the lower foundation 2; the upper foundation 1 is hollow, and the guiding device of the foundation 2 or the device 4 is provided in the cavity
  • the bottom of the upper foundation 1 is cut into the rock by the construction device 3 by its own weight or negative pressure; when the foundation 1 reaches the set depth, the water in the foundation 1 cavity is discharged, and the lower foundation 2 is placed in the upper foundation 1 In the cavity, the bottom of the lower foundation 2 is constructed with a chain cutter 5;
  • the construction device 4 includes a fixed guiding device 4-1 disposed in the inner cavity of the upper foundation 1, a chain cutter power transmission device 4-2, and a spoil disposal device 4- 3 and the frame 4-4, the device 4-2 and the device 4-3 are both mounted on the frame 4-4, the device 4-2 and the base 2 and the chain knife 5 constitute a chain excavating device 6, and the base 2 is chained
  • the chain cutter 5 only
  • the construction device 3 includes a pumping device 3-1 and a construction vessel 3-2.
  • the device 3-1 is integrated with the foundation 1 to generate a negative pressure at the bottom of the foundation 1.
  • the device 4-2 is composed of a chain knife driving device 4-2-1, a chain knife tensioning device 4-2-2 and a sprocket 4-2-3.
  • the foundation 1 described is a cylindrical foundation 1A.
  • the base 2 is a word base 2A, and the word base 2A is composed of four one-word bases, each of which is provided with a chain excavating device 6 for excavating only the respective bottom rock, that is, a rack of the device 4. There are four devices 4-2 on the 4-4.
  • the deep water foundation is the bridge foundation, and the bridge foundation includes several foundations 1A and several foundations 2A.
  • the frame 4-4 and the base 2 in the apparatus 4 further include a mud line device 7 connected to the mud nozzle 7-2 at the bottom of the base 2.
  • the top of the foundation 1 is above the water surface.
  • the top of the foundation 1 is a deep water-based construction work platform, and a lifting device is arranged above.
  • the frame 4-4 is synchronously lowered to the set depth along with the first segment base 2-1;
  • the removing device 4 draws the chain cutter 5 and then injects the concrete to complete the construction of the deep water foundation.
  • the deep water foundation includes an upper foundation 1A and a lower foundation 2A
  • the construction device includes a construction device 3 of the upper foundation 1A and a construction device 4 of the lower foundation 2A;
  • the upper foundation 1A is hollow, and the cavity is provided therein.
  • the lower foundation 2 is placed in the cavity of the upper foundation 1, and the bottom of the lower foundation 2 is constructed with a chain cutter 5;
  • the construction device 3 includes a pumping device 3-1 and a construction vessel 3-2, and the device 3-1 is connected to the foundation 1 Integral, the bottom of the foundation 1 generates negative pressure, 3-2 is the construction vessel, including the hull 3-2-1 and the lifting device 3-2-2, and the lifting device 3-2-2 is a row structure, which can be The x and y directions move.
  • the top of the foundation 1A is higher than the water surface.
  • the top of the foundation 1A and the hull 3-2-1 form a deep water foundation construction work platform, and the lifting device 3-2-2 is arranged above.
  • the construction device 4 includes a fixed guide 4-1, a chain cutter power transmission device 4-2, a spoil treatment device 4-3, and a frame 4-4 provided in the inner cavity of the upper base 1A.
  • the device 4-2 and the device 4-3 are both mounted on the frame 4-4, the device 4-2 and the base 2 and the chain knife 5 constitute a chain excavating device 6, and the foundation 2 is a frame of the chain excavating device 6,
  • the chain cutter 5 only excavates the rock at the bottom of the foundation 2, and the chain cutter 5 is composed of a chain 5-1 and a cutter 5-2 fixed to the rock shovel on the chain 5-1;
  • the device 4-1 is for the base 2 and/or the frame 4-4 guides to make the foundation 2A into a vertical state; during construction, the frame 4-4 is integrated with the top of the foundation 2, and the device 4-2 drives the chain cutter 5 to run along the track on the foundation 2, the chain cutter 5 Excavate the rock at the bottom of the foundation 2A and bring the excavated rock to the top.
  • the device 4-3 separates the rock from the bottom of the base 2A with the chain cutter 5, and the frame 4-4 follows
  • the foundation 2A is simultaneously lowered synchronously.
  • the construction device 3 and the chain cutter 5 are removed, and the foundation 1A and the base 2A are solidly joined to form a deep water foundation.
  • the deep water foundation is the bridge foundation, and the bridge foundation includes several foundations 1A and several foundations 2A.
  • the construction method is divided into the following steps:
  • the bottom of the foundation 1A is embedded in the rock soil, and the bottom of the foundation 1A forms a closed cavity;
  • device 4-2 drives the chain cutter 5 to run along the track on the foundation 2A-1, and the chain cutter 5 excavates the rock at the bottom of the first segment of the base 2A-1, and the excavated rock and soil Bringing to the upper, the device 4-3 separates the rock from the bottom of the base 2A-1 with the chain cutter 5;
  • the frame 4-4 is synchronously lowered to the set depth along with the first segment base 2A-1;
  • the removing device 4 draws the chain cutter 5 and then injects the concrete to complete the construction of the deep water foundation.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

A deep-water foundation and construction device. The deep-water foundation comprises an upper foundation (1) and a lower foundation (2); the upper foundation (1) is hollow, and a guide device of the lower foundation (2) or a lower foundation construction device (4) is provided in the cavity; the bottom of the upper foundation (1) is cut into the rock and soil by means of an upper foundation construction device (3) using the self-weight or the negative pressure; the bottom of the lower foundation (2) is provided with chain cutters (5) during construction; the lower foundation construction device (4) comprises a fixed guiding device (4-1), a chain cutter power transmission device (4-2), a spoil treatment device (4-3), and a rack (4-4) which are provided in the cavity of the upper foundation (1). Also disclosed is a construction method for the deep-water foundation and construction device.

Description

一种深水基础和施工装置及其施工法Deep water foundation and construction device and construction method thereof 技术领域Technical field
本发明涉及的是一种深水基础和施工装置及其施工法,属于土木工程基础施工技术领域。The invention relates to a deep water foundation and a construction device and a construction method thereof, and belongs to the technical field of civil engineering foundation construction.
背景技术Background technique
现有沉井基础技术,它是以井内挖土,依靠自身重力克服井壁摩擦阻力下沉到设计标高后进行封底而成的基础;其主要缺陷:施工周期长造价高,纠偏难,遇井底孤石等障碍物时,刃脚难于克服易出现突沉,易出事故等。The existing foundation technology of the sinking well is based on excavation in the well and relies on its own gravity to overcome the frictional resistance of the well wall and sink to the design elevation to seal the bottom. The main defects are: long construction period, high cost, difficult to correct, and encountered well When an obstacle such as a bottom stone is used, the blade foot is difficult to overcome and is prone to suddenness and is prone to accidents.
现有沉箱基础技术需要输入压缩空气来提供工作条件,把工作室内的水压出室外;其主要缺陷:设备复杂,作业时间受限,工效低费用大,封底困难,深度受到限制,工人在高压条件下易患职业病。The existing caisson foundation technology needs to input compressed air to provide working conditions and push the water in the working chamber out of the room; its main defects are: complicated equipment, limited working time, low efficiency, high cost, difficult sealing, limited depth, and high pressure Under the conditions, it is prone to occupational diseases.
发明内容Summary of the invention
本发明提出的是一种深水基础和施工装置及其施工法,其目的旨在克服现有技术存在的缺陷,其主要优点:基础由上部基础和下部基础组成;1)上部基础利用自重和负压切入岩土,施工简单;2)下部基础在上部基础形成的围堰内施工,下部基础自身带有挖掘基础底部岩土的组合装置,工厂分段或整体预制基础,施工简单,施工周期短,成本低。The invention provides a deep water foundation and construction device and a construction method thereof, the purpose of which is to overcome the defects of the prior art, and the main advantages thereof are: the foundation is composed of an upper foundation and a lower foundation; 1) the upper foundation utilizes self weight and negative Pressed into the rock and soil, the construction is simple; 2) The lower foundation is constructed in the cofferdam formed by the upper foundation, and the lower foundation itself has a combination device for excavating the bottom of the foundation rock, the factory section or the whole prefabricated foundation, the construction is simple, the construction period is short ,low cost.
本发明的技术解决方案,深水基础包括上部基础1和下部基础2,施工装置包括上部基础1的施工装置3和下部基础2的施工装置4;上部基础1是中空的,空腔内设有基础2或装置4的导向装置,上部基础1的底部是通过施工装置3利用自重或负压切入岩土的;当基础1达到设定的深度后,排出基础1空腔中的水,将下部基础2放入上部基础1的腔内,下部基础2的底部施工时带有链刀5;施工装置4包括设在上部基础1内腔的固定导向装置4-1、链刀动力传动装置4-2、弃土处理装置4-3和机架4-4,装置4-2和装置4-3均安装在机架4-4上,装置4-2和基础2及链刀5组成链式挖掘装置6,基础2是链式挖掘装置6的机架,链刀5仅挖掘基础2底部的岩土,链刀5由链条5-1和固定于链条5-1上挖掘岩土的刀具5-2组成;装置4-1对基础2和/或机架4-4进行导向,使基础2成铅直状态;施工时,机架4-4与基础2的顶部连接成一体,装置4-2驱动链刀5沿着基础2上的轨道运行,链刀5挖掘基础2底部的岩土,并将已挖掘的岩土 带至上方,装置4-3将链刀5从基础1底部带上来的岩土与链刀5分离,机架4-4随着基础2一起同步下降,当基础2达到设定的深度,拆除施工装置3和链刀5,灌浆并使基础1和基础2固连一体成深水基础。The technical solution of the present invention, the deep water foundation comprises an upper foundation 1 and a lower foundation 2, the construction device comprises a construction device 3 of the upper foundation 1 and a construction device 4 of the lower foundation 2; the upper foundation 1 is hollow, and the foundation is provided with a foundation 2 or the guiding device of the device 4, the bottom of the upper foundation 1 is cut into the rock by the construction device 3 by its own weight or negative pressure; when the foundation 1 reaches the set depth, the water in the cavity of the foundation 1 is discharged, and the lower foundation is 2 is placed in the cavity of the upper foundation 1, and the bottom of the lower foundation 2 is constructed with a chain cutter 5; the construction device 4 includes a fixed guiding device 4-1 provided in the inner cavity of the upper foundation 1, and a chain cutter power transmission device 4-2 , spoil disposal device 4-3 and frame 4-4, device 4-2 and device 4-3 are all mounted on the frame 4-4, the device 4-2 and the base 2 and the chain knife 5 constitute a chain excavation device 6. The foundation 2 is a frame of the chain excavating device 6, the chain cutter 5 only excavates the rock at the bottom of the foundation 2, and the chain cutter 5 is composed of a chain 5-1 and a cutter 5-2 for excavating the rock and soil fixed on the chain 5-1. The device 4-1 guides the foundation 2 and/or the frame 4-4 to make the foundation 2 into a vertical state; during construction, the frame 4-4 and the foundation 2 The top is connected in one piece, the device 4-2 drives the chain cutter 5 to run along the track on the foundation 2, the chain cutter 5 excavates the rock at the bottom of the foundation 2, and brings the excavated geotechnical to the upper, the device 4-3 will chain The rock 5 from the bottom of the base 1 is separated from the chain cutter 5, and the frame 4-4 is simultaneously lowered with the foundation 2, and when the foundation 2 reaches the set depth, the construction device 3 and the chain cutter 5 are removed, and the grouting is performed. The foundation 1 and the foundation 2 are solidly integrated into a deep water foundation.
本发明的优点:基础由上部基础和下部基础组成,上部基础利用自重和负压切入岩土,下部基础在上部基础形成的围堰内施工,下部基础自身带有挖掘基础底部岩土的组合装置,工厂分段或整体预制基础,施工简单,施工周期短,成本低。The invention has the advantages that the foundation is composed of an upper foundation and a lower foundation, the upper foundation is cut into the rock soil by its own weight and negative pressure, the lower foundation is constructed in the cofferdam formed by the upper foundation, and the lower foundation itself has a combination device for excavating the bottom rock of the foundation. , factory segmentation or overall prefabrication foundation, simple construction, short construction period and low cost.
附图说明DRAWINGS
图1是由上部基础1和下部基础2组成的深水基础的施工状态示意图,也是施工装置3和施工装置4的结构示意图;1 is a schematic view showing a construction state of a deep water foundation composed of an upper foundation 1 and a lower foundation 2, and is also a schematic structural view of the construction device 3 and the construction device 4;
图2是图1的A向视图,也是由船体3-2-1和起重装置3-2-2组成的施工船3-2的结构示意图,起重装置3-2-2是行架结构,在平面x和y设有移动的行走轨道;Figure 2 is a view in the direction of arrow A of Figure 1, and is also a schematic structural view of a construction vessel 3-2 composed of a hull 3-2-1 and a lifting device 3-2-2, and the lifting device 3-2-2 is a row frame structure. a moving walking track on the planes x and y;
图3是上部基础1为筒形基础1A,也是组成施工装置3的抽水装置3-1和施工船3-2的结构示意图,也是基础1A的顶部是高于水面,且与船体3-2-1一起构成深水基础的施工作业平台的结构示意图;Fig. 3 is a schematic view showing the structure of the pumping unit 3-1 and the construction vessel 3-2 which constitute the construction apparatus 3, and the top of the foundation 1A is higher than the water surface, and the hull 3-2- 1 Schematic diagram of the construction work platform that forms the deep water foundation together;
图4是图1的Ⅰ局部放大视图,也是下部基础2为口字基础2A的结构示意图,也是组成施工装置4的固定导向装置4-1、链刀动力传动装置4-2、弃土处理装置4-3和机架4-4的结构示意图;4 is a partial enlarged view of FIG. 1 , and is a schematic structural view of the lower base 2 being a mouth base 2A, and is also a fixed guiding device 4-1 constituting the construction device 4, a chain cutter power transmission device 4-2, and a spoil disposal device. 4-3 and the structure of the frame 4-4;
图5是图4的A向视图,也是组成链刀动力传动装置4-2的链刀驱动装置4-2-1、链刀张紧装置4-2-2和链轮4-2-3的结构示意图,也是每个一字基础均设有仅挖掘各自底部岩土的链式挖掘装置6的结构示意图;Figure 5 is a view in the direction of arrow A of Figure 4, which is also the chain cutter driving device 4-2-1, the chain knife tensioning device 4-2-2 and the sprocket 4-2-3 constituting the chain cutter power transmission device 4-2. The structural schematic diagram is also a structural schematic diagram of a chain excavating device 6 which is provided with only the bottom bottom of each of the foundations;
图6是图4的B-B视图,也是施工装置4的机架4-4的截面视图,也是泥浆管路装置7在机架4-4上的泥浆管路7-1的结构示意图,也是口字基础2A由四个一字基础组成的结构示意图,也是底部带刃角的基础2A的侧面罩8与链刀5组成的链式输送机的结构示意图;Figure 6 is a BB view of Figure 4, which is also a cross-sectional view of the frame 4-4 of the construction device 4, and is also a structural schematic view of the mud line 7-1 of the mud line device 7 on the frame 4-4, and is also a word The basic structure of the base 2A is composed of four one-word bases, and is also a structural schematic diagram of a chain conveyor composed of a side cover 8 and a chain cutter 5 of the foundation 2A with a bottom edge angle;
图7是图4的C-C视图,也是泥浆管路装置7在基础2底部的泥浆喷嘴7-2的结构示意图;Figure 7 is a C-C view of Figure 4, and is also a schematic structural view of the mud nozzle 7-2 of the mud pipeline device 7 at the bottom of the foundation 2;
图8是链刀5的结构示意图,也是链条5-1和刀具5-2的结构示意图,也是 由A十字节5-1-1和B十字节5-1-2组成的链条5-1的十字节的结构示意图,也是链条5-1实现空间弯曲的结构示意图;Figure 8 is a schematic structural view of the chain cutter 5, which is also a structural diagram of the chain 5-1 and the cutter 5-2, and is also a chain 5- consisting of A 10-byte 5-1-1 and B-decimal 5-1-2. A schematic diagram of the ten-byte structure of 1 is also a schematic diagram of the structure in which the chain 5-1 realizes space bending;
图9是深水基础为桥梁基础的结构示意图;Figure 9 is a schematic view showing the structure of a deep water foundation as a bridge foundation;
图10是图9的A向视图,也是由四个基础1A和四个基础2A组成的桥梁基础的结构示意图,也是桥梁基础的顶部是深水基础的施工作业平台,上方设有起重装置3-2-2的结构示意图;Figure 10 is a view in the direction of arrow A of Figure 9, and is also a structural schematic diagram of a bridge foundation composed of four foundations 1A and four foundations 2A, and is also a construction platform for the deep water foundation at the top of the bridge foundation, with a lifting device at the top 3 - Schematic diagram of 2-2;
图11是将预制的基础1A水平浮运至设定位置的结构示意图;Figure 11 is a schematic view showing the structure of floating the prefabricated base 1A to a set position;
图12是础1A的底部注水,使基础1A竖起的结构示意图;也是利用装置3在基础1A自重的作用下,使基础1A的底部嵌入岩土,基础1A的底部形成封闭腔体结构示意图;Figure 12 is a schematic view of the bottom water injection of the foundation 1A, so that the foundation 1A is erected; and the bottom of the foundation 1A is embedded in the rock under the action of the self-weight of the foundation 1A, and the bottom of the foundation 1A forms a closed cavity structure;
图13是装置3-1抽基础1A底部封闭腔体内的水,使之形成负压,基础1A在自重和负压的作用下,基础1A下降至设定深度的结构示意图;Figure 13 is a schematic view showing the structure of the apparatus 1 - 3 pumping the water in the bottom of the base 1A to form a negative pressure, and the foundation 1A is lowered to a set depth under the action of the self-weight and the negative pressure;
图14是抽出基础1A腔体内的水,拆除装置3-1,在基础1A腔内安装装置4-1的结构示意图;Figure 14 is a schematic view showing the structure of the device 1 - 4 in the base 1A cavity by extracting the water in the cavity of the base 1A, removing the device 3-1;
图15是第一段(即底段)基础2A-1装入装置4-1内,安装链刀5、接通泥浆管路7-1和安装装置4-2的结构示意图;Figure 15 is a schematic view showing the structure of the first section (i.e., the bottom section) of the base 2A-1 loading device 4-1, the chain cutter 5, the mud line 7-1, and the mounting device 4-2;
图16是机架4-4随着第一段基础2A-1一起同步下降至设定深度的结构示意图;16 is a schematic structural view of the rack 4-4 being synchronously lowered to a set depth along with the first segment base 2A-1;
图17是将装置4与第一段基础2A-1分离并移走后的结构示意图;Figure 17 is a schematic view showing the structure after the device 4 is separated from the first segment base 2A-1 and removed;
图18是第二段基础2A-2装入装置4-1内,安装链刀5、接通泥浆管路7-1和安装装置4-2的结构示意图;Figure 18 is a schematic view showing the structure of the second stage 2A-2 loading device 4-1, the chain cutter 5, the mud line 7-1 and the mounting device 4-2;
图19是机架4-4、第一段基础2A-1和第二段基础2A-2一起同步下降至设定深度;Figure 19 is a frame 4-4, the first segment base 2A-1 and the second segment base 2A-2 are simultaneously descended to a set depth;
图20是装置4与第二段基础2A-2分离并移走后的结构示意图;Figure 20 is a schematic view showing the structure of the device 4 separated from the second segment base 2A-2 and removed;
图21是重复施工后,拆除装置4抽出链刀5后完成深水基础的结构示意图。Figure 21 is a schematic view showing the structure of the deep water foundation after the removal device 4 withdraws the chain cutter 5 after repeated construction.
图中的1是上部基础;1A是上部基础为筒形基础;2是下部基础;2A是下部基础为口字基础;2A-1是基础2A的第一段基础;2A-2是基础2A的第二段基础;3是上部基础1的施工装置,包括抽水装置3-1和施工船3-2;3-1是抽水装置;3-2是施工船,包括船体3-2-1和起重装置3-2-2;4是下部基础2的施工装 置,包括设在上部基础1内腔的固定导向装置4-1、链刀动力传动装置4-2、弃土处理装置4-3和机架4-4;4-1是施工装置4的固定导向装置;4-2是施工装置4的链刀动力传动装置,由链刀驱动装置4-2-1、链刀张紧装置4-2-2和链轮4-2-3组成;4-2-1是链刀驱动装置;4-2-2是链刀张紧装置;4-2-3是链轮;4-3是施工装置4的弃土处理装置;4-4是施工装置4的机架;5是挖掘岩土的链刀,由链条5-1和固定于链条5-1上的刀具5-2组成;5-1是组成链刀5的链条;5-1-1是组成链条十字节的A十字节;5-1-2是组成链条十字节的B十字节;5-2是组成链刀5的刀具;6是链式挖掘装置,由装置4-2-1和基础2A及链刀5组成;7是泥浆管路装置,包括泥浆管路7-1与基础2底部的泥浆喷嘴7-2;7-1是泥浆管路装置7的泥浆管路;7-2是泥浆管路装置7在基础2底部的泥浆喷嘴;8是底部带刃角的基础1的侧面罩。1 in the figure is the upper foundation; 1A is the upper foundation is the cylindrical foundation; 2 is the lower foundation; 2A is the lower foundation for the word foundation; 2A-1 is the first segment foundation of the foundation 2A; 2A-2 is the foundation 2A The second stage foundation; 3 is the construction device of the upper foundation 1, including the pumping device 3-1 and the construction vessel 3-2; 3-1 is the pumping device; 3-2 is the construction vessel, including the hull 3-2-1 and The heavy device 3-2-2; 4 is a construction device of the lower foundation 2, comprising a fixed guiding device 4-1, a chain cutter power transmission device 4-2, a spoil disposal device 4-3 and a fixed space device 4-1 provided in the inner cavity of the upper foundation 1. The frame 4-4; 4-1 is a fixed guiding device of the construction device 4; 4-2 is a chain knife power transmission device of the construction device 4, and the chain knife driving device 4-2-1 and the chain knife tensioning device 4 2-2 and sprocket 4-2-3; 4-2-1 is chain cutter drive; 4-2-2 is chain knife tensioner; 4-2-3 is sprocket; 4-3 is construction a spoil disposal device of the device 4; 4-4 is a frame of the construction device 4; 5 is a chain cutter for excavating geotechnical, consisting of a chain 5-1 and a cutter 5-2 fixed to the chain 5-1; 1 is a chain constituting the chain cutter 5; 5-1-1 is A ten bytes constituting a chain of ten bytes; 5-1-2 is a chain 10 B octet of bytes; 5-2 is the tool constituting the chain cutter 5; 6 is a chain excavation device composed of the device 4-2-1 and the base 2A and the chain cutter 5; 7 is a mud pipeline device, including Mud line 7-1 and mud nozzle 7-2 at the bottom of foundation 2; 7-1 is the mud line of mud line device 7; 7-2 is the mud nozzle of mud line device 7 at the bottom of foundation 2; The side cover of the base 1 with a beveled corner at the bottom.
具体实施方式detailed description
深水基础包括上部基础1和下部基础2,施工装置包括上部基础1的施工装置3和下部基础2的施工装置4;上部基础1是中空的,空腔内设有基础2或装置4的导向装置,上部基础1的底部是通过施工装置3利用自重或负压切入岩土的;当基础1达到设定的深度后,排出基础1空腔中的水,将下部基础2放入上部基础1的腔内,下部基础2的底部施工时带有链刀5;施工装置4包括设在上部基础1内腔的固定导向装置4-1、链刀动力传动装置4-2、弃土处理装置4-3和机架4-4,装置4-2和装置4-3均安装在机架4-4上,装置4-2和基础2及链刀5组成链式挖掘装置6,基础2是链式挖掘装置6的机架,链刀5仅挖掘基础2底部的岩土,链刀5由链条5-1和固定于链条5-1上挖掘岩土的刀具5-2组成;装置4-1对基础2和/或机架4-4进行导向,使基础2成铅直状态;施工时,机架4-4与基础2的顶部连接成一体,装置4-2驱动链刀5沿着基础2上的轨道运行,链刀5挖掘基础2底部的岩土,并将已挖掘的岩土带至上方,装置4-3将链刀5从基础1底部带上来的岩土与链刀5分离,机架4-4随着基础2一起同步下降,当基础2达到设定的深度,拆除施工装置3和链刀5,灌浆并使基础1和基础2固连一体成深水基础。The deep water foundation comprises an upper foundation 1 and a lower foundation 2, the construction device comprising a construction device 3 of the upper foundation 1 and a construction device 4 of the lower foundation 2; the upper foundation 1 is hollow, and the guiding device of the foundation 2 or the device 4 is provided in the cavity The bottom of the upper foundation 1 is cut into the rock by the construction device 3 by its own weight or negative pressure; when the foundation 1 reaches the set depth, the water in the foundation 1 cavity is discharged, and the lower foundation 2 is placed in the upper foundation 1 In the cavity, the bottom of the lower foundation 2 is constructed with a chain cutter 5; the construction device 4 includes a fixed guiding device 4-1 disposed in the inner cavity of the upper foundation 1, a chain cutter power transmission device 4-2, and a spoil disposal device 4- 3 and the frame 4-4, the device 4-2 and the device 4-3 are both mounted on the frame 4-4, the device 4-2 and the base 2 and the chain knife 5 constitute a chain excavating device 6, and the base 2 is chained For the frame of the excavating device 6, the chain cutter 5 only excavates the rock at the bottom of the foundation 2, and the chain cutter 5 is composed of a chain 5-1 and a cutter 5-2 fixed to the rock shovel fixed on the chain 5-1; The foundation 2 and/or the frame 4-4 are guided to make the foundation 2 into a vertical state; during construction, the frame 4-4 is integrated with the top of the foundation 2, and the device 4-2 The drive chain cutter 5 runs along the track on the foundation 2, the chain cutter 5 excavates the rock at the bottom of the foundation 2, and brings the excavated geotechnical to the upper, and the device 4-3 brings the chain cutter 5 from the bottom of the foundation 1 The rock and soil are separated from the chain cutter 5, and the frame 4-4 is synchronously descended along with the foundation 2. When the foundation 2 reaches the set depth, the construction device 3 and the chain cutter 5 are removed, and the foundation 1 and the foundation 2 are integrally joined. Into the deep water foundation.
所述的施工装置3包括抽水装置3-1和施工船3-2,装置3-1与基础1连接成一体,使基础1的底部产生负压。The construction device 3 includes a pumping device 3-1 and a construction vessel 3-2. The device 3-1 is integrated with the foundation 1 to generate a negative pressure at the bottom of the foundation 1.
所述的装置4-2由链刀驱动装置4-2-1、链刀张紧装置4-2-2和链轮4-2-3组成。The device 4-2 is composed of a chain knife driving device 4-2-1, a chain knife tensioning device 4-2-2 and a sprocket 4-2-3.
所述的基础1是筒形基础1A。The foundation 1 described is a cylindrical foundation 1A.
所述的基础2是口字基础2A,口字基础2A由四个一字基础组成,每个一字基础均设有仅挖掘各自底部岩土的链式挖掘装置6,即装置4的机架4-4上设有四个装置4-2。The base 2 is a word base 2A, and the word base 2A is composed of four one-word bases, each of which is provided with a chain excavating device 6 for excavating only the respective bottom rock, that is, a rack of the device 4. There are four devices 4-2 on the 4-4.
所述的深水基础是桥梁基础,桥梁基础包括若干个基础1A和若干个基础2A。The deep water foundation is the bridge foundation, and the bridge foundation includes several foundations 1A and several foundations 2A.
所述的装置4中的机架4-4和基础2中还包括泥浆管路装置7,泥浆管路7-1与基础2底部的泥浆喷嘴7-2相连。The frame 4-4 and the base 2 in the apparatus 4 further include a mud line device 7 connected to the mud nozzle 7-2 at the bottom of the base 2.
所述的基础1的顶部是高于水面的。The top of the foundation 1 is above the water surface.
所述的基础1的顶部是深水基础的施工作业平台,上方设有起重装置。The top of the foundation 1 is a deep water-based construction work platform, and a lifting device is arranged above.
所述的施工法分如下歩骤:The construction method described is divided into the following steps:
1)在工厂预制基础1,分段或整体预制基础2;1) Prefabrication of foundation 1, segmentation or integral prefabrication foundation 2 at the factory;
2)将基础1水平浮运至设定位置;2) Floating the base 1 level to the set position;
3)在基础1的底部注水,使基础1竖起;3) Fill the bottom of the foundation 1 to make the foundation 1 erect;
4)利用装置3在自重的作用下,使基础1的底部嵌入岩土,基础1的底部形成封闭腔体;4) using the device 3 under the action of its own weight, the bottom of the foundation 1 is embedded in the rock soil, and the bottom of the foundation 1 forms a closed cavity;
5)启动装置3-1,抽基础1底部封闭腔体内的水,使之形成负压;5) Starting device 3-1, pumping the water in the bottom of the base 1 to make a negative pressure;
6)在基础1自重和负压的作用下,基础1下降至设定深度;6) Under the action of the foundation 1 self-weight and negative pressure, the foundation 1 is lowered to the set depth;
7)抽出基础1腔体内的水,拆除装置3-1,在基础1腔内安装装置4-1;7) Pull out the water in the foundation 1 cavity, remove the device 3-1, and install the device 4-1 in the base 1 cavity;
8)将基础2的第一段即底段基础2-1运至现场,装入装置4-1内,安装链刀5和泥浆管路7-1;8) transport the first section of the foundation 2, the bottom section foundation 2-1, to the site, into the device 4-1, install the chain knife 5 and the mud pipeline 7-1;
9)将装置4中的机架4-4的底部与第一段基础2-1的顶部相连,将装置4底部的链刀5与第一段基础2-1顶部的链刀5相连组成链式挖掘装置6,将装置4底部的泥浆管路7-1与第一段基础2-1顶部的泥浆管路7-1相连;9) Connect the bottom of the frame 4-4 in the device 4 to the top of the first segment base 2-1, and connect the chain knife 5 at the bottom of the device 4 with the chain knife 5 at the top of the first segment base 2-1 to form a chain. The excavating device 6 connects the mud pipeline 7-1 at the bottom of the device 4 with the mud pipeline 7-1 at the top of the first section foundation 2-1;
10)启动装置4-2,装置4-2带动链刀5沿着基础2-1上的轨道运行,链刀5挖掘第一段基础2-1底部的岩土,并将已挖掘的岩土带至上方,装置4-3将链刀5从基础2-1底部带上来的岩土与链刀5分离;10) Starting device 4-2, device 4-2 drives the chain cutter 5 to run along the track on the foundation 2-1, and the chain cutter 5 excavates the rock at the bottom of the first section of the foundation 2-1, and the excavated rock and soil Bringing to the upper, the device 4-3 separates the rock from the bottom of the base 2-1 with the chain cutter 5;
11)机架4-4随着第一段基础2-1一起同步下降至设定深度;11) The frame 4-4 is synchronously lowered to the set depth along with the first segment base 2-1;
12)将装置4与第一段基础2-1分离并移走;12) separating and removing the device 4 from the first segment base 2-1;
13)将第二段基础2-2装入装置4-1内;13) loading the second stage foundation 2-2 into the device 4-1;
14)将第二段基础2-2的底部与第一段基础2-1的顶部相连,将第二段基础2-2底部的链刀5与第一段基础2-1顶部的链刀5相连,将第二段基础2-2底部的泥浆管路7-1与第一段基础2-1顶部的泥浆管路7-1相连;14) connecting the bottom of the second section foundation 2-2 with the top of the first section foundation 2-1, the second section of the base 2-2 bottom chain knife 5 and the first section of the base 2-1 top chain knife 5 Connected, connecting the mud line 7-1 at the bottom of the second stage foundation 2-2 to the mud line 7-1 at the top of the first stage foundation 2-1;
15)将装置4中的机架4-4的底部与第二段基础2-2的顶部相连,将装置4底部的链刀5与第二段基础2-2顶部的链刀5相连,组成链式挖掘装置6,将装置4底部的泥浆管路7-1与第二段基础2-2顶部的泥浆管路7-1相连;15) connecting the bottom of the frame 4-4 in the device 4 to the top of the second segment base 2-2, connecting the chain knife 5 at the bottom of the device 4 with the chain knife 5 at the top of the second segment base 2-2, The chain excavating device 6 connects the mud pipeline 7-1 at the bottom of the device 4 with the mud pipeline 7-1 at the top of the second section foundation 2-2;
16)启动装置4-2,装置4-2带动链刀5沿着基础2上的轨道运行,链刀5挖掘第一段基础2-1底部的岩土,并将已挖掘的岩土带至上方,装置4-3将链刀5从基础2底部带上来的岩土与链刀5分离;16) Starting device 4-2, device 4-2 drives the chain cutter 5 to run along the track on the foundation 2, and the chain cutter 5 excavates the rock at the bottom of the first section of the foundation 2-1, and brings the excavated geotechnical to the upper The device 4-3 separates the rock from the bottom of the base 2 with the chain cutter 5 from the chain cutter 5;
17)机架4-4、第一段基础2-1和第二段基础2-2一起同步下降至设定深度;17) The frame 4-4, the first segment base 2-1 and the second segment base 2-2 are synchronously descended to a set depth;
18)将装置4与第二段基础2-2分离并移走;18) separating and removing the device 4 from the second segment base 2-2;
重复上述13、14、15、16、17、18完成基础2各段的连接和下降到设定的深度后,拆除装置4抽出链刀5后灌注混凝土,完成深水基础的施工。After repeating the above-mentioned 13, 14, 15, 16, 17, and 18 to complete the connection of the sections of the foundation 2 and descending to the set depth, the removing device 4 draws the chain cutter 5 and then injects the concrete to complete the construction of the deep water foundation.
下面结合附图进一步描述本发明的技术方案:The technical solution of the present invention is further described below with reference to the accompanying drawings:
如图1~图3所示,深水基础包括上部基础1A和下部基础2A,施工装置包括上部基础1A的施工装置3和下部基础2A的施工装置4;上部基础1A是中空的,空腔内设有基础2或装置4的导向装置,上部基础1A的底部是通过施工装置3利用自重或负压切入岩土的;当基础1达到设定的深度后,排出基础1空腔中的水,将下部基础2放入上部基础1的腔内,下部基础2的底部施工时带有链刀5;施工装置3包括抽水装置3-1和施工船3-2,装置3-1与基础1连接成一体,使基础1的底部产生负压,3-2是施工船,包括船体3-2-1和起重装置3-2-2,起重装置3-2-2是行架结构,可以在x和y方向移动,基础1A的顶部是高于水面的,基础1A的顶部与船体3-2-1构成深水基础的施工作业平台,上方设有起重装置3-2-2。As shown in FIGS. 1 to 3, the deep water foundation includes an upper foundation 1A and a lower foundation 2A, and the construction device includes a construction device 3 of the upper foundation 1A and a construction device 4 of the lower foundation 2A; the upper foundation 1A is hollow, and the cavity is provided therein. With the guiding device of the foundation 2 or the device 4, the bottom of the upper foundation 1A is cut into the rock by the construction device 3 by its own weight or negative pressure; when the foundation 1 reaches the set depth, the water in the cavity of the foundation 1 is discharged. The lower foundation 2 is placed in the cavity of the upper foundation 1, and the bottom of the lower foundation 2 is constructed with a chain cutter 5; the construction device 3 includes a pumping device 3-1 and a construction vessel 3-2, and the device 3-1 is connected to the foundation 1 Integral, the bottom of the foundation 1 generates negative pressure, 3-2 is the construction vessel, including the hull 3-2-1 and the lifting device 3-2-2, and the lifting device 3-2-2 is a row structure, which can be The x and y directions move. The top of the foundation 1A is higher than the water surface. The top of the foundation 1A and the hull 3-2-1 form a deep water foundation construction work platform, and the lifting device 3-2-2 is arranged above.
如图4~图8所示,施工装置4包括设在上部基础1A内腔的固定导向装置4-1、链刀动力传动装置4-2、弃土处理装置4-3和机架4-4,装置4-2和装置 4-3均安装在机架4-4上,装置4-2和基础2及链刀5组成链式挖掘装置6,基础2是链式挖掘装置6的机架,链刀5仅挖掘基础2底部的岩土,链刀5由链条5-1和固定于链条5-1上挖掘岩土的刀具5-2组成;装置4-1对基础2和/或机架4-4进行导向,使基础2A成铅直状态;施工时,机架4-4与基础2的顶部连接成一体,装置4-2驱动链刀5沿着基础2上的轨道运行,链刀5挖掘基础2A底部的岩土,并将已挖掘的岩土带至上方,装置4-3将链刀5从基础2A底部带上来的岩土与链刀5分离,机架4-4随着基础2A一起同步下降,当基础2A达到设定的深度,拆除施工装置3和链刀5,灌浆并使基础1A和基础2A固连一体成深水基础。As shown in FIGS. 4 to 8, the construction device 4 includes a fixed guide 4-1, a chain cutter power transmission device 4-2, a spoil treatment device 4-3, and a frame 4-4 provided in the inner cavity of the upper base 1A. The device 4-2 and the device 4-3 are both mounted on the frame 4-4, the device 4-2 and the base 2 and the chain knife 5 constitute a chain excavating device 6, and the foundation 2 is a frame of the chain excavating device 6, The chain cutter 5 only excavates the rock at the bottom of the foundation 2, and the chain cutter 5 is composed of a chain 5-1 and a cutter 5-2 fixed to the rock shovel on the chain 5-1; the device 4-1 is for the base 2 and/or the frame 4-4 guides to make the foundation 2A into a vertical state; during construction, the frame 4-4 is integrated with the top of the foundation 2, and the device 4-2 drives the chain cutter 5 to run along the track on the foundation 2, the chain cutter 5 Excavate the rock at the bottom of the foundation 2A and bring the excavated rock to the top. The device 4-3 separates the rock from the bottom of the base 2A with the chain cutter 5, and the frame 4-4 follows The foundation 2A is simultaneously lowered synchronously. When the foundation 2A reaches the set depth, the construction device 3 and the chain cutter 5 are removed, and the foundation 1A and the base 2A are solidly joined to form a deep water foundation.
如图9~图10所示,深水基础是桥梁基础,桥梁基础包括若干个基础1A和若干个基础2A。As shown in Fig. 9 to Fig. 10, the deep water foundation is the bridge foundation, and the bridge foundation includes several foundations 1A and several foundations 2A.
如图11~图21所示,施工法分如下歩骤:As shown in Fig. 11 to Fig. 21, the construction method is divided into the following steps:
1)在工厂预制基础1A,分段或整体预制基础2A;1) prefabricated foundation 1A at the factory, segmented or integral prefabricated foundation 2A;
2)将基础1A水平浮运至设定位置;2) Floating the base 1A level to the set position;
3)在基础1A的底部注水,使基础1A竖起;3) Filling the bottom of the foundation 1A to make the foundation 1A erect;
4)利用装置3在自重的作用下,使基础1A的底部嵌入岩土,基础1A的底部形成封闭腔体;4) using the device 3 under the action of its own weight, the bottom of the foundation 1A is embedded in the rock soil, and the bottom of the foundation 1A forms a closed cavity;
5)启动装置3-1,抽基础1A底部封闭腔体内的水,使之形成负压;5) Starting device 3-1, pumping the water in the bottom of the base 1A to close the cavity to form a negative pressure;
6)在基础1A自重和负压的作用下,基础1A下降至设定深度;6) Under the action of the foundation 1A dead weight and negative pressure, the foundation 1A is lowered to the set depth;
7)抽出基础1A腔体内的水,拆除装置3-1,在基础1A腔内安装装置4-1;7) Pull out the water in the base 1A cavity, remove the device 3-1, and install the device 4-1 in the base 1A cavity;
8)将基础2A的第一段即底段基础2A-1运至现场,装入装置4-1内,安装链刀5和泥浆管路7-1;8) transport the first section of the foundation 2A, the bottom section foundation 2A-1, to the site, into the device 4-1, install the chain knife 5 and the mud pipeline 7-1;
9)将装置4中的机架4-4的底部与第一段基础2A-1的顶部相连,将装置4底部的链刀5与第一段基础2A-1顶部的链刀5相连组成链式挖掘装置6,将装置4底部的泥浆管路7-1与第一段基础2A-1顶部的泥浆管路7-1相连;9) Connect the bottom of the frame 4-4 in the device 4 to the top of the first segment base 2A-1, and connect the chain knife 5 at the bottom of the device 4 with the chain knife 5 at the top of the first segment base 2A-1 to form a chain. The excavating device 6 connects the mud pipeline 7-1 at the bottom of the device 4 with the mud pipeline 7-1 at the top of the first section foundation 2A-1;
10)启动装置4-2,装置4-2带动链刀5沿着基础2A-1上的轨道运行,链刀5挖掘第一段基础2A-1底部的岩土,并将已挖掘的岩土带至上方,装置4-3将链刀5从基础2A-1底部带上来的岩土与链刀5分离;10) Starting device 4-2, device 4-2 drives the chain cutter 5 to run along the track on the foundation 2A-1, and the chain cutter 5 excavates the rock at the bottom of the first segment of the base 2A-1, and the excavated rock and soil Bringing to the upper, the device 4-3 separates the rock from the bottom of the base 2A-1 with the chain cutter 5;
11)机架4-4随着第一段基础2A-1一起同步下降至设定深度;11) The frame 4-4 is synchronously lowered to the set depth along with the first segment base 2A-1;
12)将装置4与第一段基础2A-1分离并移走;12) separating and removing the device 4 from the first segment base 2A-1;
13)将第二段基础2A-2装入装置4-1内;13) loading the second stage foundation 2A-2 into the device 4-1;
14)将第二段基础2A-2的底部与第一段基础2A-1的顶部相连,将第二段基础2A-2底部的链刀5与第一段基础2A-1顶部的链刀5相连,将第二段基础2A-2底部的泥浆管路7-1与第一段基础2A-1顶部的泥浆管路7-1相连;14) connecting the bottom of the second section foundation 2A-2 with the top of the first section foundation 2A-1, the second section of the base 2A-2 bottom chain knife 5 and the first section of the base 2A-1 top chain knife 5 Connected, connecting the mud line 7-1 at the bottom of the second stage foundation 2A-2 to the mud line 7-1 at the top of the first stage foundation 2A-1;
15)将装置4中的机架4-4的底部与第二段基础2A-2的顶部相连,将装置4底部的链刀5与第二段基础2A-2顶部的链刀5相连,组成链式挖掘装置6,将装置4底部的泥浆管路7-1与第二段基础2A-2顶部的泥浆管路7-1相连;15) connecting the bottom of the frame 4-4 in the device 4 to the top of the second segment base 2A-2, connecting the chain knife 5 at the bottom of the device 4 with the chain knife 5 at the top of the second segment base 2A-2, a chain excavating device 6, connecting the mud line 7-1 at the bottom of the device 4 with the mud line 7-1 at the top of the second stage base 2A-2;
16)启动装置4-2,装置4-2带动链刀5沿着基础2A上的轨道运行,链刀5挖掘第一段基础2A-1底部的岩土,并将已挖掘的岩土带至上方,装置4-3将链刀5从基础2A底部带上来的岩土与链刀5分离;16) Starting device 4-2, device 4-2 drives the chain cutter 5 to run along the track on the foundation 2A, and the chain cutter 5 excavates the rock at the bottom of the first section of the foundation 2A-1, and brings the excavated rock and soil to the upper Fang, the device 4-3 separates the rock from the bottom of the base 2A with the chain cutter 5;
17)机架4-4、第一段基础2A-1和第二段基础2A-2一起同步下降至设定深度;17) the frame 4-4, the first segment base 2A-1 and the second segment base 2A-2 are synchronously descended to a set depth;
18)将装置4与第二段基础2A-2分离并移走;18) separating and removing the device 4 from the second segment base 2A-2;
重复上述13、14、15、16、17、18完成基础2A各段的连接和下降到设定的深度后,拆除装置4抽出链刀5后灌注混凝土,完成深水基础的施工。After repeating the above-mentioned 13, 14, 15, 16, 17, and 18 to complete the connection of each section of the foundation 2A and descending to the set depth, the removing device 4 draws the chain cutter 5 and then injects the concrete to complete the construction of the deep water foundation.

Claims (10)

  1. 一种深水基础和施工装置,其特征是深水基础包括上部基础(1)和下部基础(2),施工装置包括上部基础(1)的施工装置(3)和下部基础(2)的施工装置(4);上部基础(1)是中空的,空腔内设有基础(2)或装置(4)的导向装置,上部基础(1)的底部是通过施工装置(3)利用自重或负压切入岩土的;当基础(1)达到设定的深度后,排出基础(1)空腔中的水,将下部基础(2)放入上部基础(1)的腔内,下部基础(2)的底部施工时带有链刀(5);施工装置(4)包括设在上部基础(1)内腔的固定导向装置(4-1)、链刀动力传动装置(4-2)、弃土处理装置(4-3)和机架(4-4),装置(4-2)和装置(4-3)均安装在机架(4-4)上,装置(4-2)和基础(2)及链刀(5)组成链式挖掘装置(6),基础(2)是链式挖掘装置(6)的机架,链刀(5)仅挖掘基础(2)底部的岩土,链刀(5)由链条(5-1)和固定于链条(5-1)上挖掘岩土的刀具(5-2)组成;装置(4-1)对基础(2)和/或机架(4-4)进行导向,使基础(2)成铅直状态;施工时,机架(4-4)与基础(2)的顶部连接成一体,装置(4-2)驱动链刀(5)沿着基础(2)上的轨道运行,链刀(5)挖掘基础(2)底部的岩土,并将已挖掘的岩土带至上方,装置(4-3)将链刀(5)从基础(1)底部带上来的岩土与链刀(5)分离,机架(4-2)随着基础(2)一起同步下降,当基础(2)达到设定的深度,拆除施工装置(3)和链刀(5),灌浆并使基础(1)和基础(2)固连一体成深水基础。A deepwater foundation and construction apparatus characterized in that the deep water foundation comprises an upper foundation (1) and a lower foundation (2), and the construction device comprises a construction device (3) of the upper foundation (1) and a construction device of the lower foundation (2) ( 4); the upper foundation (1) is hollow, and the guiding device of the foundation (2) or the device (4) is provided in the cavity, and the bottom of the upper foundation (1) is cut by the construction device (3) by its own weight or negative pressure. After the foundation (1) reaches the set depth, the water in the foundation (1) cavity is discharged, and the lower foundation (2) is placed in the cavity of the upper foundation (1), and the lower foundation (2) The bottom part is constructed with a chain knife (5); the construction device (4) includes a fixed guiding device (4-1), a chain cutter power transmission device (4-2), and spoil disposal in the inner cavity of the upper foundation (1). The device (4-3) and the frame (4-4), the device (4-2) and the device (4-3) are both mounted on the frame (4-4), the device (4-2) and the base (2) And the chain knife (5) constitutes the chain excavation device (6), the foundation (2) is the frame of the chain excavation device (6), the chain knife (5) only excavates the rock at the bottom of the foundation (2), the chain knife (5) consisting of a chain (5-1) and a cutter (5-2) fixed to the rock (1) on the chain (5-1); the device (4-1) is based on the foundation ( 2) and / or the frame (4-4) is guided to make the foundation (2) into a vertical state; during construction, the frame (4-4) is integrated with the top of the foundation (2), and the device (4- 2) The drive chain cutter (5) runs along the track on the foundation (2), the chain cutter (5) excavates the rock at the bottom of the foundation (2), and brings the excavated rock to the top, the device (4-3) The geotechnical belt (5) is separated from the chain knife (5) from the bottom of the foundation (1), and the frame (4-2) is simultaneously lowered with the foundation (2), when the foundation (2) is set. The depth is determined, the construction device (3) and the chain knife (5) are removed, the grouting is made and the foundation (1) and the foundation (2) are solidly joined to form a deep water foundation.
  2. 根据权利要求1所述的一种深水基础和施工装置,其特征是所述的施工装置(3)包括抽水装置(3-1)和施工船(3-2),装置(3-1)与基础(1)连接成一体,使基础(1)的底部产生负压。A deep water foundation and construction apparatus according to claim 1, wherein said construction apparatus (3) comprises a water pumping device (3-1) and a construction vessel (3-2), the device (3-1) and The foundation (1) is joined together to create a negative pressure at the bottom of the foundation (1).
  3. 根据权利要求1所述的一种深水基础和施工装置,其特征是所述的装置(4-2)由链刀驱动装置(4-2-1)、链刀张紧装置(4-2-2)和链轮(4-2-3)组成。A deep water foundation and construction apparatus according to claim 1, wherein said apparatus (4-2) is driven by a chain cutter (4-2-1) and a chain knife tensioning device (4-2-). 2) and sprocket (4-2-3).
  4. 根据权利要求1所述的一种深水基础和施工装置,其特征是所述的基础(1)是筒形基础(1A)。A deep water foundation and construction apparatus according to claim 1, characterized in that said foundation (1) is a cylindrical foundation (1A).
  5. 根据权利要求1所述的一种深水基础和施工装置,其特征是所述的基础(2)是口字基础(2A),口字基础(2A)由四个一字基础组成,每个一字基础均设有仅挖掘各自底部岩土的链式挖掘装置(6),即装置(4)的机架(4-4)上设有四个装置(4-2)。A deep water foundation and construction apparatus according to claim 1, wherein said foundation (2) is a word base (2A), and the word base (2A) is composed of four one-word bases, each of which The word base is provided with a chain excavation device (6) for excavating only the respective bottom rock, that is, four devices (4-2) are provided on the frame (4-4) of the device (4).
  6. 根据权利要求1所述的一种深水基础和施工装置,其特征是所述的深水基础是桥梁基础,桥梁基础包括若干个基础(1A)和若干个基础(2A)。A deepwater foundation and construction apparatus according to claim 1, wherein said deep water foundation is a bridge foundation, and the bridge foundation comprises a plurality of foundations (1A) and a plurality of foundations (2A).
  7. 根据权利要求1所述的一种深水基础和施工装置,其特征是所述的装置(4)中的机架(4-4)和基础(2)中还包括泥浆管路装置(7),泥浆管路(7-1)与基础(2)底部的泥浆喷嘴(7-2)相连。A deep water foundation and construction apparatus according to claim 1, wherein the frame (4-4) and the foundation (2) in the apparatus (4) further comprise a mud pipeline device (7). The mud line (7-1) is connected to the mud nozzle (7-2) at the bottom of the foundation (2).
  8. 根据权利要求1所述的一种深水基础和施工装置,其特征是所述的基础(1)的顶部是高于水面的。A deepwater foundation and construction apparatus according to claim 1 wherein the top of said foundation (1) is above the water surface.
  9. 根据权利要求8所述的一种深水基础和施工装置,其特征是所述的基础(1)的顶部是深水基础的施工作业平台,上方设有起重装置。A deep water foundation and construction apparatus according to claim 8, wherein the top of the foundation (1) is a deep water foundation construction work platform, and a lifting device is arranged above.
  10. 根据权利要求1所述的一种深水基础和施工装置的施工法,其特征是所述的施工法分如下歩骤:A construction method for a deep water foundation and a construction apparatus according to claim 1, wherein said construction method is as follows:
    1)在工厂分段或整体基础(1),分段或整体预制基础(2);1) in the factory segmentation or overall basis (1), segmentation or overall prefabrication basis (2);
    2)将基础(1)水平浮运至设定位置;2) float the base (1) level to the set position;
    3)在基础(1)的底部注水,使基础(1)竖起;3) Fill the bottom of the foundation (1) to make the foundation (1) erect;
    4)利用装置(3)在自重的作用下,使基础(1)的底部嵌入岩土,基础(1)的底部形成封闭腔体;4) using the device (3) under the action of its own weight, the bottom of the foundation (1) is embedded in the rock, and the bottom of the foundation (1) forms a closed cavity;
    5)启动装置(3-1),抽基础(1)底部封闭腔体内的水,使之形成负压;5) Starting device (3-1), pumping the bottom of the foundation (1) to close the water in the cavity to form a negative pressure;
    6)在基础(1)自重和负压的作用下,基础(1)下降至设定深度;6) Under the action of the foundation (1) self-weight and negative pressure, the foundation (1) is lowered to the set depth;
    7)抽出基础(1)腔体内的水,拆除装置(3-1),在基础(1)腔内安装装置(4-1);7) Pull out the water in the foundation (1), remove the device (3-1), and install the device (4-1) in the base (1) cavity;
    8)将基础(2)的第一段(即底段)基础(2-1)运至现场,装入装置(4-1)内,安装链刀(5)和泥浆管路(7-1);8) Transport the first (ie bottom) foundation (2-1) of the foundation (2) to the site, install the device (4-1), install the chain cutter (5) and the mud pipeline (7-1) );
    9)将装置(4)中的机架(4-4)的底部与第一段基础(2-1)的顶部相连,将装置(4)底部的链刀(5)与第一段基础(2-1)顶部的链刀(5)相连组成链式挖掘装置(6),将装置(4)底部的泥浆管路(7-1)与第一段基础(2-1)顶部的泥浆管路(7-1)相连;9) Connect the bottom of the frame (4-4) in the device (4) to the top of the first segment base (2-1), and the chain knife (5) at the bottom of the device (4) with the first segment foundation ( 2-1) The top chain cutter (5) is connected to form a chain excavation device (6), and the mud pipe (7-1) at the bottom of the device (4) and the mud pipe at the top of the first segment foundation (2-1) Road (7-1) connected;
    10)启动装置(4-2),装置(4-2)带动链刀(5)沿着基础(2-1)上的轨道运行,链刀(5)挖掘第一段基础(2-1)底部的岩土,并将已挖掘的岩土带至上方,装置(4-3)将链刀(5)从基础(2-1)底部带上来的岩土与链刀(5)分离;10) Starting device (4-2), the device (4-2) drives the chain cutter (5) to run along the track on the foundation (2-1), and the chain knife (5) excavates the first segment foundation (2-1) The bottom of the rock and soil, and the excavated rock and soil is brought to the top, the device (4-3) separates the rock and soil brought from the bottom of the base (2-1) by the chain cutter (5) and the chain cutter (5);
    11)机架(4-4)随着第一段基础(2-1)一起同步下降至设定深度;11) The rack (4-4) is synchronously descended to the set depth along with the first stage base (2-1);
    12)将装置(4)与第一段基础(2-1)分离并移走;12) separating and removing the device (4) from the first segment foundation (2-1);
    13)将第二段基础(2-2)装入装置(4-1)内;13) loading the second stage foundation (2-2) into the device (4-1);
    14)将第二段基础(2-2)的底部与第一段基础(2-1)的顶部相连,将第二段基础(2-2)底部的链刀(5)与第一段基础(2-1)顶部的链刀(5)相连,将第二段基础(2-2)底部的泥浆管路(7-1)与第一段基础(2-1)顶部的泥浆管路(7-1)相连;14) Connect the bottom of the second section foundation (2-2) to the top of the first section foundation (2-1), and the chain knife (5) at the bottom of the second section foundation (2-2) with the first section foundation (2-1) The top chain cutter (5) is connected, and the mud pipeline (7-1) at the bottom of the second section foundation (2-2) and the mud pipeline at the top of the first section foundation (2-1) ( 7-1) connected;
    15)将装置(4)中的机架(4-4)的底部与第二段基础(2-2)的顶部相连,将装置(4)底部的链刀(5)与第二段基础(2-2)顶部的链刀(5)相连,组成链式挖掘装置(6),将装置(4)底部的泥浆管路(7-1)与第二段基础(2-2)顶部的泥浆管路(7-1)相连;15) Connect the bottom of the frame (4-4) in the device (4) to the top of the second section foundation (2-2), and the chain knife (5) at the bottom of the device (4) and the second section foundation ( 2-2) The top chain cutters (5) are connected to form a chain excavation device (6), and the mud pipe (7-1) at the bottom of the device (4) and the mud at the top of the second segment foundation (2-2) The pipeline (7-1) is connected;
    16)启动装置(4-2),装置(4-2)带动链刀(5)沿着基础(2)上的轨道运行,链刀(5)挖掘第一段基础(2-1)底部的岩土,并将已挖掘的岩土带至上方,装置(4-3)将链刀(5)从基础(2)底部带上来的岩土与链刀(5)分离;16) Starting device (4-2), the device (4-2) drives the chain knife (5) to run along the track on the foundation (2), and the chain knife (5) excavates the bottom of the first segment base (2-1) Geotechnical, and the excavated geotechnical soil is brought to the top, and the device (4-3) separates the rock and soil brought by the chain cutter (5) from the bottom of the foundation (2) with the chain cutter (5);
    17)机架(4-4)、第一段基础(2-1)和第二段基础(2-2)一起同步下降至设定深度;17) The frame (4-4), the first segment base (2-1) and the second segment base (2-2) are synchronously descended to a set depth;
    18)将装置(4)与第二段基础(2-2)分离并移走;18) separating and removing the device (4) from the second segment foundation (2-2);
    重复上述13)、14)、15)、16)、17)、18)完成基础(2)各段的连接和下降到设定的深度后,拆除装置(4)抽出链刀(5)后灌注混凝土,完成深水基础的施工。Repeat steps 13), 14), 15), 16), 17), 18) to complete the connection of each section of the foundation (2) and descend to the set depth, and then remove the chain cutter (5) and then infuse the removal device (4). Concrete, complete the construction of deep water foundation.
PCT/CN2018/079257 2017-03-17 2018-03-16 Deep-water foundation and construction device and construction method therefor WO2018166523A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201710162353.5 2017-03-17
CN201710162353.5A CN106801435A (en) 2017-03-17 2017-03-17 A kind of deep water foundation and constructing device and its construction method

Publications (1)

Publication Number Publication Date
WO2018166523A1 true WO2018166523A1 (en) 2018-09-20

Family

ID=58988205

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2018/079257 WO2018166523A1 (en) 2017-03-17 2018-03-16 Deep-water foundation and construction device and construction method therefor

Country Status (2)

Country Link
CN (1) CN106801435A (en)
WO (1) WO2018166523A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106801435A (en) * 2017-03-17 2017-06-06 王燏斌 A kind of deep water foundation and constructing device and its construction method
CN110498347B (en) * 2018-05-20 2021-05-11 王燏斌 Construction device for prefabricated building and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5985021A (en) * 1982-11-05 1984-05-16 Kajima Corp Method and apparatus for construction of underground continuous wall
JPS62233328A (en) * 1986-04-01 1987-10-13 Fusao Sakano Method and apparatus for setting retaining wall by excavator
JPH04179726A (en) * 1990-11-13 1992-06-26 Kazutoshi Isachi Wall member in simplified underground continuous wall construction method and simplified underground continuous wall construction method using the same
CN1412391A (en) * 2002-07-12 2003-04-23 天津大学 Large-sized concrete cylindrical structure whose wall end possesses excavating device and sinking method
CN103015455A (en) * 2012-04-25 2013-04-03 中交第二航务工程局有限公司 Bridge pile-bucket combined foundation and construction method thereof
CN105544597A (en) * 2015-12-14 2016-05-04 中铁大桥局集团有限公司 Combined foundation structure suitable for lagoon face island-reef environment and construction method thereof
CN106801435A (en) * 2017-03-17 2017-06-06 王燏斌 A kind of deep water foundation and constructing device and its construction method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3388665B2 (en) * 1996-02-02 2003-03-24 株式会社テノックス Continuous lightweight improvement method for deep ground
CN102493484B (en) * 2011-12-23 2014-01-15 中铁大桥局股份有限公司 Skirt type large-scale deepwater foundation and construction method thereof
CN105735337A (en) * 2016-03-17 2016-07-06 王燏斌 Bridge deep water open caisson foundation construction method
CN105821874A (en) * 2016-03-28 2016-08-03 王燏斌 Construction method for spiral barrel-shaped foundation

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5985021A (en) * 1982-11-05 1984-05-16 Kajima Corp Method and apparatus for construction of underground continuous wall
JPS62233328A (en) * 1986-04-01 1987-10-13 Fusao Sakano Method and apparatus for setting retaining wall by excavator
JPH04179726A (en) * 1990-11-13 1992-06-26 Kazutoshi Isachi Wall member in simplified underground continuous wall construction method and simplified underground continuous wall construction method using the same
CN1412391A (en) * 2002-07-12 2003-04-23 天津大学 Large-sized concrete cylindrical structure whose wall end possesses excavating device and sinking method
CN103015455A (en) * 2012-04-25 2013-04-03 中交第二航务工程局有限公司 Bridge pile-bucket combined foundation and construction method thereof
CN105544597A (en) * 2015-12-14 2016-05-04 中铁大桥局集团有限公司 Combined foundation structure suitable for lagoon face island-reef environment and construction method thereof
CN106801435A (en) * 2017-03-17 2017-06-06 王燏斌 A kind of deep water foundation and constructing device and its construction method

Also Published As

Publication number Publication date
CN106801435A (en) 2017-06-06

Similar Documents

Publication Publication Date Title
WO2018133739A1 (en) Foundation having chain cutter at base during construction and construction method of same
WO2018166518A1 (en) Foundation construction device and construction method therefor
WO2018133740A1 (en) Underground building and construction method for same
CN105625425A (en) Construction method for carrying out pile sinking based on floating walking platform
WO2018166523A1 (en) Deep-water foundation and construction device and construction method therefor
WO2018133746A1 (en) Underground building formed of piles and walls, and method for constructing same
WO2018166519A1 (en) Bridge building device and construction method therefor
CN104790449A (en) Submersible type dredger
WO2018133711A1 (en) Pier foundation and construction method therefor
WO2018166521A1 (en) Construction device for shore foundation and construction method therefor
CN103088820B (en) Waterpower self-excited oscillation jet flow vibratory pile sinking device and pile sinking technology
CN101824825B (en) Deep foundation pit open cutting construction method
WO2018166522A1 (en) Construction device for revetment and construction method therefor
CN113737834A (en) Recyclable negative pressure injection type open caisson structure and construction method
WO2018133745A1 (en) Pipe jacking tunneling device for underwater tunnels and construction method thereof
CN204590129U (en) A kind of submersible type bagger
KR101620789B1 (en) Small bore drain pipe burial method of soft ground condition
WO2018133748A1 (en) Construction ship for underwater tunnel and construction method therefor
WO2018177305A1 (en) Groove pile for fabricated underground building and construction method thereof
WO2018166520A1 (en) Workboat for underwater foundation and construction method therefor
CN115596453A (en) Micro-brush slope tunnel entering method for tunnel long-distance side to pass through accumulation body
CN103835240A (en) Buoyancy tank type deepwater pile group bridge abutment construction platform and construction method thereof
CN113969581A (en) Construction method for rock-entering pile planting
CN207228150U (en) A kind of deep water foundation
CN202323934U (en) Hole forming device for cast-in-situ triangular composite foundation pile

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18767301

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18767301

Country of ref document: EP

Kind code of ref document: A1