WO2018131797A1 - 배전계통 전원선로 고장시 실시간 탐지/복구시스템 및 그 공사방법 - Google Patents

배전계통 전원선로 고장시 실시간 탐지/복구시스템 및 그 공사방법 Download PDF

Info

Publication number
WO2018131797A1
WO2018131797A1 PCT/KR2017/014469 KR2017014469W WO2018131797A1 WO 2018131797 A1 WO2018131797 A1 WO 2018131797A1 KR 2017014469 W KR2017014469 W KR 2017014469W WO 2018131797 A1 WO2018131797 A1 WO 2018131797A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
phase
recovery
failure
power supply
Prior art date
Application number
PCT/KR2017/014469
Other languages
English (en)
French (fr)
Inventor
김나운
김인태
김도운
Original Assignee
주식회사 나은에너지
김나운
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from KR1020170004231A external-priority patent/KR20180082844A/ko
Priority claimed from KR1020170026270A external-priority patent/KR101803431B1/ko
Priority claimed from KR1020170049489A external-priority patent/KR101746366B1/ko
Application filed by 주식회사 나은에너지, 김나운 filed Critical 주식회사 나은에너지
Priority to US16/477,172 priority Critical patent/US11402437B2/en
Priority to EP17890925.5A priority patent/EP3570306B1/en
Priority to CN201780003523.3A priority patent/CN108604494B/zh
Priority to JP2019558318A priority patent/JP7263251B2/ja
Publication of WO2018131797A1 publication Critical patent/WO2018131797A1/ko

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
    • G01R31/58Testing of lines, cables or conductors
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R19/00Arrangements for measuring currents or voltages or for indicating presence or sign thereof
    • G01R19/165Indicating that current or voltage is either above or below a predetermined value or within or outside a predetermined range of values
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F27/00Details of transformers or inductances, in general
    • H01F27/28Coils; Windings; Conductive connections
    • H01F27/29Terminals; Tapping arrangements for signal inductances
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F27/00Details of transformers or inductances, in general
    • H01F27/28Coils; Windings; Conductive connections
    • H01F27/30Fastening or clamping coils, windings, or parts thereof together; Fastening or mounting coils or windings on core, casing, or other support
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F27/00Details of transformers or inductances, in general
    • H01F27/34Special means for preventing or reducing unwanted electric or magnetic effects, e.g. no-load losses, reactive currents, harmonics, oscillations, leakage fields
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F27/00Details of transformers or inductances, in general
    • H01F27/40Structural association with built-in electric component, e.g. fuse
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F30/00Fixed transformers not covered by group H01F19/00
    • H01F30/06Fixed transformers not covered by group H01F19/00 characterised by the structure
    • H01F30/12Two-phase, three-phase or polyphase transformers
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01HELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
    • H01H33/00High-tension or heavy-current switches with arc-extinguishing or arc-preventing means
    • H01H33/02Details
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H3/00Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
    • H02H3/02Details
    • H02H3/04Details with warning or supervision in addition to disconnection, e.g. for indicating that protective apparatus has functioned
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H3/00Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
    • H02H3/16Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection responsive to fault current to earth, frame or mass
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H3/00Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
    • H02H3/08Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection responsive to excess current
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H5/00Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal non-electric working conditions with or without subsequent reconnection
    • H02H5/10Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal non-electric working conditions with or without subsequent reconnection responsive to mechanical injury, e.g. rupture of line, breakage of earth connection
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • Y04S10/52Outage or fault management, e.g. fault detection or location

Definitions

  • the present invention detects real-time when an electrical failure occurs such as disconnection, leakage, half-break, increased resistance, contact failure, etc. in a power supply line of a three-phase or single-phase distribution system and generates an electrical signal by these electrical failures to block or alarm or power outage in real time.
  • the present invention relates to a real-time detection / recovery system and its construction method in case of a distribution system power line failure.
  • the distribution system of FIG. 1 shows an example of a three-phase four-wire distribution system.
  • the main transformer 300 consisting of R phase, S phase, and T phase is generally combined with a neutral line (N) and a power line (R phase, S phase, T phase) by a method such as Y connection, delta connection, and Wydelta connection. Power the load.
  • a load is connected between one power line and another power line, 380V is supplied to the load, and when the load is connected to one power line (for example, R phase) and the neutral line (N), 220V is supplied to the load.
  • the neutral line N refers to a line that processes one line of each phase in common in a multiphase multi-line line.
  • three-phase use requires six strands of wire.However, if the phases of a single-phase two-wire line are twisted by 120 ° and all of the lines are processed in common, the potential is reduced to four strands. It becomes zero by. This zero potential (zero potential) immediately becomes a reference potential and becomes a so-called N phase, that is, a neutral line.
  • the neutral wire should in principle have a zero potential, which is the earth potential, but may actually have some voltage when the phase of each phase is not exactly 120 ° out of the field. At this time, if the neutral line is commonly connected to the ground line, which is the earth potential line, to prevent the rise of the neutral potential, the zero potential is maintained because the phase is in contact with the earth even though the phases are slightly different from each other.
  • a single-phase electric line two lines are connected and used.
  • One of the two wires is connected to the neutral wire, which is the earth and the equipotential, and the other wire is connected to the power line having a potential difference of 220 V from the earth. If you do, there is a high risk of electric shock death or fire.
  • a circuit breaker 110 such as a circuit breaker and / or an earth leakage breaker is installed.
  • the molded case circuit breaker (or molded case circuit breaker) used in the breaker 110 is accommodated in the molded case for protection against overload and short circuit flowing in the wiring. It is used for wiring protection in the circuit of indoor voltage.
  • a circuit breaker is sometimes referred to as an MCCB (breaker).
  • the earth leakage breaker used in the blocking device 110 is a device for preventing an electric shock by detecting a leakage current of about 5 ⁇ 30mA.
  • Most fuses and circuit breakers operate on currents as large as A. Therefore, in order to prevent electric shock due to small leakage current, an earth leakage breaker should be used.
  • a leakage current of about 5 to 30 mA is detected and a time of 25 to 40 msec is detected. Break the circuit inside.
  • the leakage current which is the blocking standard, varies depending on the country and region. In Korea, the leakage current is limited to 1/2000 of the rated current. For example, if the rated current of the earth leakage breaker is 100A, the leakage current is within 50mA.
  • Typical earth leakage breakers measure the difference between the current going into the power line and the current coming into the neutral line. If the sum of the outgoing and incoming currents is not zero, it means that there is a short circuit somewhere. At this time, the earth leakage breaker works to cut off the leakage current. As described above, the earth leakage breaker is complementary to the fuse or the circuit breaker for blocking a large current. Since a circuit breaker for exclusive use of a ground fault cannot prevent overload or short circuit, most circuit breakers are used for both overcurrent and short circuit breaker.
  • a special purpose earth leakage breaker with a leakage breaker current of 500 mA or more is installed in an environment such as a data center where a general earth leakage breaker having a low breaking current specification misses and may be operated accidentally.
  • This special purpose earth leakage breaker is installed to prevent fire rather than to prevent electric shock.
  • the disclosed 'Prior Art 1' detects a contact failure based on a change in an effective current value, a power factor, an instantaneous current value, harmonics, and the like, and protects the user from the risk of fire by cutting off the power supply.
  • the contact failure is detected more accurately by determining the contact failure.
  • the remotely located user can be easily recognized.
  • 'Prior art 2' includes a voltage and current detector for detecting a voltage and a current supplied to a customer, and a power factor calculator for calculating a power factor value based on a predetermined total measurement time and measurement time based on the detected voltage and current values; A contact failure determining unit judging as a contact failure when the predetermined total measurement time and the power factor value calculated in units of measurement time continuously decrease within a range of a value smaller than a predetermined reference value, and the contact failure determination unit as the contact failure If it is determined that the interface unit for transmitting a contact failure signal to the remote server, and prevents the contact failure of the electricity meter is configured to prevent damage to the electrical equipment (wattmeter) due to the contact failure.
  • Prior Art 3 detects power line loss, neutral wire disconnection, and unbalanced abnormal current occurring in power and neutral wires in a three-phase four-wire distribution system, and restores the power line missing, neutral wire disconnection, and power unbalance to normal. It is configured to reduce harmonics and maintain normal power.
  • the prior art as described above is a disconnection, poor contact, half-break, resistance increase, short circuit, etc. on the power supply side supplied from a three-phase four-wire (R, S, T, N) or single-phase two-wire (RN, SN, TN) distribution system.
  • R, S, T, N three-phase four-wire
  • RN, SN, TN single-phase two-wire
  • control functions such as traffic lights, street lamps, fire fighting facilities, drainage pumping stations, etc. are paralyzed, and a malfunction of the switchgear which is automatically opened and closed in case of a power line abnormality occurs, which causes a large-scale accident.
  • real-time detection / recovery system is required in case of failure of distribution system power line that immediately alarms, cuts off, and recovers in real time when disconnection, increased resistance, poor contact, half-break, or short circuit occurs on the power supply side of three-phase or single-phase distribution system.
  • the present invention in order to solve the various problems occurring in the conventional distribution system as described above, the power supplied from the three-phase four-wire (R, S, T, N) or single-phase two-wire (RN, SN, TN) distribution system
  • R, S, T, N three-phase four-wire
  • RN, SN, TN single-phase two-wire
  • the system for preventing power failure, electric shock, fire accident due to power supply disconnection, resistance increase, contact failure, half-break, short circuit in the distribution system the power supply side detection in the distribution system One or more of a repairer and a load side detector / repairer.
  • the power supply side and load side detection / recovery device is a device connected electrically or electronically to a single-phase or three-phase power supply and forms a neutral point and grounds the neutral point to the earth, or detects the potential difference between the neutral point and the earth to supply power to a single-phase or three-phase power supply line.
  • any one or more of recovery, interruption, alarm, notification, and control is performed in case of missing phase, disconnection, contact failure, and resistance increase.
  • the device may include an inductor, a resistor, a capacitor, a varistor, a silicon, a germanium, a carbon, a coil, an integrated circuit. It is characterized in that the selected one.
  • the power supply side detection / recoverer forms a neutral point in the middle (center tap) of the power output coil to ground the neutral point to the ground, or by detecting the potential difference between the neutral point and the ground power supply line of single-phase or three-phase power In the furnace, any one or more of phase loss, disconnection, contact failure, and resistance increase, recovery, interruption, alarm, notification, and control may be performed.
  • the load side detection / recovery device forms a neutral point in the middle of the power output coil.
  • Grounding to earth or connecting to neutral point of detection / repair of power side, or detecting potential difference between neutral point and earth to recover, cut off, alarm in case of missing phase, disconnection, poor contact, resistance increase in power supply line of single phase or three phase power One or more of the following can be performed: notification, control.
  • the power supply side detection / recovery unit may include a primary coil, the first leg, the second leg, the third leg and the core;
  • the secondary coil may have a first winding, a second winding, and a third winding.
  • the second leg is used as a passage for the magnetic flux of two phases, the first winding is wound around the first leg, the second winding is wound around the third leg, and the third winding is the first winding.
  • Windings are zigzagly wound in the first leg and the third leg in a direction opposite to the winding in which the windings and the second windings are wound, and one end of the first winding, the second winding, and the third winding is connected to a neutral wire; In the middle of the first winding, the second winding, or the third winding connected to the neutral wire, an intermediate tap for supplying single phase power may be included.
  • the power supply side detection / recovery device R or S phase or T phase or neutral wire (N) is disconnected or missing from the power supply side by lightning, short circuit, ground fault, equipment burnout, fuse break in the distribution system. Even if it is possible, it is possible to prevent the power failure of the single-phase power supply by supplying the single-phase power supply by recovering the real-time electric failure, and to prevent the electric shock and fire caused by the ground fault by grounding down the earth potential difference of the single-phase power supply.
  • the neutral point of the power supply side detection / recoverer is grounded to the ground and maintains the potential difference between the power supply line and the ground at a predetermined potential (eg, 110V) to prevent electric shock and fire accidents caused by a short circuit. It can be prevented.
  • a predetermined potential eg, 110V
  • the power supply side detection / recovery device is connected to a three-phase four-wire or single-phase three-wire distribution system to prevent the inflow of unbalanced overvoltage during neutral disconnection in the distribution system, thereby preventing overheating and fire. can do.
  • the power supply side detection / recovery device is connected to a three-phase four-wire distribution system, and the three-phase power in real time even in the case of fuse disconnection, line damage disconnection, transformer failure, equipment burnout, phase open, neutral wire disconnection at the power supply side.
  • the neutral point of the load side detection / repair unit is grounded on the ground, and the single-phase power supply line is configured with one line to prevent short circuit accidents by the line, short circuit, reduced line failure, and easy line repair. Therefore, the construction cost can be reduced.
  • the neutral point of the load-side detection / recovery device is connected to the neutral point of the power-side detection / recovery device to generate disconnection or poor contact or half-break or ground fault at the power supply side of the load-side detection / recovery device.
  • an electrical signal may be generated at a power line or a neutral point of the load-side detection / recovery device and transmitted to a failure detector (described later).
  • the fault detector detects an electrical signal generated when a fault occurs in a power line or a neutral point provided in the input and output lines of the load-side detection / recovery device and detects disconnection or contact failure or half-break or ground fault (ground fault). It can be alarmed through an alarm generator, blocked through a breaker, or restored in real time through the load side detection / recovery device.
  • an electronic relay As the fault detector, an electronic relay (SSR), an image transformer, a voltage detector, a current detector, or a relay may be used to detect a faulty electric signal output from the neutral point or the power line.
  • SSR electronic relay
  • an image transformer As the fault detector, an electronic relay (SSR), an image transformer, a voltage detector, a current detector, or a relay may be used to detect a faulty electric signal output from the neutral point or the power line.
  • the power supply side detection / recovery unit having a first neutral point and grounding the neutral point to the ground to step down the potential difference with the earth than the existing potential difference;
  • a load side detection / recovery device having a second neutral point and grounding the neutral point to the ground, or connected to the neutral point of the power side detection / recovery device to recover the power side electrical failure in real time;
  • a fault detector for detecting an input / output current of a power line or a neutral point of the load-side detector / repair unit, or detecting a voltage of the neutral point to alert or cut off or transmit a detected fault detection value to a controller;
  • a controller which compares the detection value provided by the fault detector with a set value and transmits an alarm to the communication module to issue an alarm, cut off the power, or notify the wired / wireless signal, and release the alarm when an alarm release signal is received;
  • An alarm generator for generating an alarm according to the alarm signal provided from the fault detector or the controller;
  • An alarm cancel input unit for releasing
  • a real-time detection / recovery system construction method in the case of a distribution system power line failure, this method is to install the power-side transformer or load-side transformer in the three-phase or single-phase existing distribution system Doing; Installing a detector to ground the neutral point of the power-side transformer to the ground or to the neutral point of the load-side transformer, or to detect the neutral point of the power-side transformer and the potential of the earth; Installing a fault detector to ground the neutral point of the load-side transformer to the ground or to the neutral point of the power-side transformer, or to detect the neutral point of the load-side transformer and the potential of the earth; Connecting the winding of the output coil of the power-side transformer and the load, or electrically connecting the winding of the output coil of the power-side transformer and the winding of the input coil of the load-side transformer; The input power side coil winding of the power side transformer is electrically connected to the three phase or single phase power line of the existing distribution system, and is
  • the present invention by real-time recovery to normal power at the time of disconnection of the power supply side supplied from the single-phase two-wire or single-phase three-wire or three-phase four-wire distribution system, it is possible to prevent a power failure to prevent various occurrences of the power failure. As a result, it is possible to prevent the occurrence of a human accident due to an electric shock, an electric device burnout, an electric fire, or the like caused by disconnection, poor contact, short circuit, or half disconnection on the power supply side.
  • the single-phase power distribution system provided in the three-phase four-wire system not only causes accidents due to neutral wires such as neutral wires and image harmonics, but also lowers the potential of the single-phase power line to the earth, resulting in electric shock and fire accidents caused by a ground fault. Can be prevented.
  • 1 is a configuration diagram of a conventional single-phase two-wire distribution line.
  • FIG. 2 is a block diagram of a real-time detection / recovery system 200 when the power distribution system power line failure of the present invention.
  • FIG. 3 is a circuit diagram of the embodiment of FIG. 2 when it is a single-phase two-wire incoming power source.
  • FIG. 4 is a circuit diagram of the embodiment of FIG. 2 in the modified embodiment of FIG. 3 in the case where the line of the recovery distribution system 150 is constituted by one line.
  • FIG. 5 is a circuit diagram of the embodiment of FIG. 2 in the case of a single-phase three-wire incoming power source.
  • FIG. 6 is a schematic diagram of the circuit diagram of FIG. 2 and a real-time detection / recovery system construction method 150 in case of a distribution system power line failure in accordance with a preferred embodiment of the present invention when a three-phase four-wire incoming power is used.
  • FIG. 7 is a circuit diagram of various embodiments of a power side detector / repairer.
  • the vector diagram 241-a is a phase vector diagram when the power supply side detector / repair unit 240 is in a steady state.
  • the vector diagram 242-b is a recovery sequence vector diagram when the input power source S phase is disconnected or phased out.
  • the vector diagram 243-a is a recovery sequence vector diagram when the input power source R phase is disconnected and phase formed.
  • Vector Fig. 242-b is a recovery sequence vector diagram when the input power source T phase is disconnected or missing.
  • the real-time detection / recovery system at the time of a distribution system power line failure includes: a power supply side detection / recovery unit having a neutral point and grounding the neutral point to the ground to force the potential difference with the ground than the existing potential difference; A load side detection / recovery unit having a neutral point and grounding the neutral point to the ground, or connecting to the neutral point of the power side detection / repairer to recover the power side electrical failure in real time; A fault detector for detecting input and output currents of the power line or the neutral point of the load-side detector / recovery unit, or detecting the voltage of the neutral point and alarming or blocking or transmitting the detected fault detection value to a controller; A controller that compares the detection value provided by the fault detector with a set value and transmits an alarm to the communication module to issue an alarm, cut off the power, or notify the wired / wireless signal, and release the alarm when an alarm release signal is received; An alarm generator for generating an alarm according to the alarm signal provided from the fault detector or the controller; An alarm cancel
  • FIG. 2 is a block diagram of a real-time detection / recovery system 200 when a distribution system power line failure according to an embodiment of the present invention, including the following components.
  • a main transformer for example, FIG. 1 provided in a distribution system (for example, FIG. 1), such as a conventional single-phase or multi-phase polywire (for example, single-phase (2-wire, 3-wire), three-phase (3-wire, 4-wire))
  • the power supply side detection / recovery unit 240 connected to 300. This has a neutral point (first neutral point) which is grounded to itself, and serves to step down the potential difference with the earth than the existing potential difference.
  • a load side detector / repair 230 connected to the load side line of the distribution system. It itself has another neutral point (second neutral point), which grounds the second neutral point or connects with the first neutral point of the power-side detection / repair device to recover the power-side electric failure in real time.
  • -Fault detector 210 that detects disconnection, increased resistance, poor contact, half-break, and short circuit occurrence on the power supply side in conjunction with load-side detection / recovery unit 230.
  • the input / output current of the power line or the second neutral point of the load side detector / repairer is detected or the voltage of the second neutral point is detected to detect a failure and transmit the detected failure detection value to the following controller.
  • An alarm generator 250 which alerts with a visual and / or audio alarm the occurrence of a failure detected by the fault detector 210 or determined by the following controller.
  • An alarm clearing input 260 which receives a signal for canceling the alarm which has occurred (e.g., when operating the alarm clearing switch) and generates an alarm clearing signal.
  • a circuit breaker 270 which cuts off the power supply side and the load side of the distribution system according to the detection of a failure by the fault detector 210 or according to a blocking signal of the following controller.
  • FIG. 3 is an exemplary circuit diagram of a real-time detection / recovery system 200 when a single-phase distribution system power line failure, which is the embodiment of FIG. 2, in the case of a single-phase two-wire incoming power source.
  • FIG. 4 is a circuit diagram of the embodiment of FIG. 2 when the line of the recovery distribution system 150 is composed of one line in a modified embodiment of FIG. 3, which is a single-phase two-wire system, and
  • FIG. 5 is a diagram of a single-phase three-wire input power supply.
  • 2 is a circuit diagram.
  • Fig. 6 is a circuit diagram of the embodiment of Fig. 2 in the case of a three-phase four-wire drawing power supply.
  • the power side detection / recovery unit 240 is connected to the power supply side to receive power from the main voltage transformer (eg, 300 of FIG. 1) of the distribution system (eg, FIG. 1), and by itself, is grounded to the ground. It has a neutral point (first neutral point N1) to act to step down the potential difference with the earth than the existing potential difference.
  • the power supply side detector / recovery unit 240 is connected to the primary coil L5 connected to the R-phase single-phase power output of the main transformer 300 and the primary coil L5 in parallel. It consists of two secondary coils L3 and L4. A first neutral point N1 is formed and grounded between two secondary coils L3 and L4 connected in series. In fact, the secondary coils L3 and L4 are one coil, and the center tap cut out therebetween may be grounded to the first neutral point N1.
  • one load power supply line R2 emerges from the connection point between the primary coil L5 and the secondary coil L3 and terminates the other secondary coil L4 connected to the secondary coil L3.
  • Another load power supply line (R1) comes out to configure the recovery distribution system 150.
  • the power supply side detector / recovery unit 240 includes a primary coil L5 connected to the R-phase single phase power output of the main transformer 300 and one secondary coil connected in series to the primary coil L5. It consists of the coil L3. Termination of the secondary coil L3 connected in series is composed of the first neutral point (N1) and grounded. At the connection point between the primary coil L5 and the secondary coil L3, one load power supply line R1 emerges to form a recovery distribution system 150.
  • the configuration of the power supply side detector / recovery unit 240 is the same as that of FIG. 3.
  • N1 is not grounded by itself, and comes out of the third load power supply line N together with the other two load power supply lines R1 and R2 to form a recovery distribution system 150.
  • the power supply side detection / recovery unit 240-a in the three-phase four-wire incoming power source is configured as shown in FIG. 6 to form three load power supply lines R1, R2, and N to recover the distribution system 150. .
  • the power-side detection / recovery unit 240 will be described in detail. If the power supply voltage of the existing three-phase four-wire (R, S, T, N) or single-phase (RN, SN, TN) distribution system is 220V, the potential difference from the earth is increased. Becomes 220V.
  • the primary coil of the power supply side detector / recovery device 240 or 240-a of FIGS. 6 to 8 is supplied with power of three-phase 380V or single-phase 220V. In order to transform the supplied power supply into the actual power supply, the secondary coil is wound up according to the transformer ratio.
  • a middle tap or a first neutral point N1 is formed in the middle of the secondary coil winding, and the neutral point N1 is grounded to the earth E to secure the power line of the recovery distribution system 150 and to supply the earth of the supply power. Step down the potential to 110V.
  • the transformer ratio of the windings L3 and L4 of the secondary coils of the power supply side detector / recovery devices 240 and 240-a is preferably wound by 1: 1.
  • the power supply side detection / recovery unit 240 reduces the risk of electric shock even in the event of a short circuit by grounding the potential of the single-phase supply to 110 V, and eliminates the neutral wire commonly used in a distribution system having an unbalanced single-phase load. In order to prevent the occurrence of an abnormal voltage introduced by an unbalanced load due to the disconnection of the neutral wire. As a result, the reliability of the recovery distribution system 150 is secured, and in particular, in the single-phase three-wire system, it is possible to recover in real time even if the neutral wire is disconnected, thereby preventing the electrical accident caused by the neutral wire through the load-side detection / repair unit 230. can do.
  • the load-side detector / recovery unit 230 is connected to two wires R1 'and R2' supplied to a load, respectively, and a connection point (or one coil connected to two wires) of each coil L1 and L2 through which single-phase power is input and output.
  • the second neutral point N2 is formed in the center tap of L1-L2 to form a ground.
  • the load side detection / recovery unit 230 of FIG. 4 has a configuration similar to that of the load side detection / recovery unit 230 of FIG. 3, but the load side detection / recovery unit 230 has a recovery distribution system in front of the breaker 270. Connected to 150 is different.
  • the load-side detector / recovery unit 230 is connected to one or more in parallel to perform a kind of redundancy function.
  • the load-side detection / recovery unit 230 is connected to two load power supply lines R1 ′ and R2 ′ behind the breaker 270 as in FIG. 2, and the second neutral point N2 is connected to the third side. It is connected to the load power supply line N '.
  • two load-side detection / recovery units 230 are positioned in front of the circuit breaker 270, and the left side of the load-side detection / repair unit 240-a similarly to the case of FIG. 5. Electrically connected to the first neutral point (N1) of), and the right one grounds the second neutral point (N2) similar to the case of FIG.
  • the fault detector 210 detects the current flowing through the coils L1-L2 of the load-side detection / recovery device 230 or the voltage between both ends thereof using the current / voltage detector, or the second neutral point N2 and the ground ( E) Detect the current between.
  • the controller 220 of FIG. 2 compares the detected value detected by the fault detector 210 with a preset value set in the controller 220 to determine whether there is a failure, and if it is determined to be a failure, the breaker 270. To output a trip signal.
  • the trip signal may be designed to be output from the fault detector 210 as shown in FIG. 2 or may be designed to be output from the controller 220.
  • the fault detector 210 when the fault detector 210 is implemented as a solid state relay (SSR), it is possible to detect disconnection of a power line and allow the controller 220 to determine the disconnection and output an alarm or cutoff signal. .
  • SSR solid state relay
  • the power supply side detector / recovery unit 240 is composed of a coil and an iron core for outputting a voltage transformation of the single-phase power supply.
  • a first neutral point N1 in the middle of the winding of the output coil and grounding the neutral point N1 to the ground E, the potential difference between the single-phase two-wire power supplied and supplied from the power supply side detector / recovery unit 240 is obtained. It reduces the electric shock and fire accidents caused by ground faults by reducing it by half compared to the existing power supply.
  • the neutral wire (N) of the general distribution system commonly used in general single-phase load is not used, it prevents the inflow of abnormal voltage by the neutral wire and prevents the fire hazard caused by the neutral wire disconnection. It performs the function of protecting the property (However, in the single-phase three-wire type of Figure 5, although the neutral wire is used, even if the neutral wire is disconnected, it is immediately recovered on the load side and no abnormal voltage occurs).
  • the single-phase distribution system power line failure real-time detection / recovery system 200 includes a load side detection / recovery unit 230 in the load side path of the distribution line of the recovery distribution system 150. Configure a second neutral point (N2) in the input or output coil of the load-side detection / recovery unit 230 to recover, cut off, alarm, and notify when the power line supplied from the power-side detection / recovery unit 240 is broken
  • the second neutral point N2 is grounded to the ground E, or the second neutral point N2 is electrically connected to the first neutral point N provided in the power supply side detector / recovery unit 240.
  • the fault detector 210 may detect fault voltage generation or fault current flow at a power line or a neutral point when disconnection, increased resistance, poor contact, half break, or short circuit occurs.
  • the second neutral point N2 of the load side detector / repair unit 230 which is electrically connected to the first neutral point N1 of the power side detector / repairer 240, becomes a neutral wire in a single-phase three-wire system, In case of power line disconnection, alarm or shut off or recover immediately.
  • the second neutral point (N2) electrically connected to the first neutral point (N1) is also used in a single-phase two-wire system, it acts as a backup line when the power line is disconnected, and the short-circuit current is distributed and flows in the short circuit at the load side. It is possible to increase the reliability of.
  • the load-side detector / recoverer 230 when the load-side detector / recoverer 230 is described, the load-side detector / recoverer 230 also forms a second neutral point (N2) in the middle of the input and output coil of the power supply to form the second neutral point (N2) Ground or connected to the first neutral point (N1) of the power-side detection / repair unit 240.
  • N2 the neutral point
  • N1 the neutral point of the power-side detection / repair unit 240.
  • disconnection, increased resistance, poor contact, half-break, and short circuit occur in the cable line (R1, R2, etc.) of the recovery distribution system 150, so that an unbalance occurs in the cable line so that the second cable can be recovered or alarmed or cut off in real time. It is to operate using the neutral point (N2).
  • the wire line R1 is disconnected from the power supply side, only one line of wire R2 remains, and the wire line R2 of the load side detector / repair unit 230 Power is supplied to the coil L2.
  • the coil L2 electromagnetically induces the coil L1 in conjunction with the ground E to which the second neutral point N2 of the load-side detection / recovery device 230 is connected to restore single-phase two-wire power.
  • the cable line R2 is disconnected, only one wire line R1 exists in the recovery distribution system 150, and the existing cable line R1 supplies power to the coil L1 of the load side detector / repair unit 230.
  • L1 maintains a potential of 110 V and ground E connected to the second neutral point N2 of the load-side detection / recovery unit 230 to induce the coil L1 to electromagnetically recover the single-phase two-wire power in real time. do. In case of contact failure or disconnection, real time recovery is possible.
  • the leakage current can be detected by monitoring the input / output line of the load-side detector / recovery device 230 with an image current transformer or by monitoring the ground (E) line connected to the N2 terminal of the load-side detector / recovery device 230 with an image current transformer. .
  • a method of detecting only a short circuit as a voltage without connecting the N2 terminal of the load-side detection / recovery unit 230 to the ground is also possible.
  • the controller 220 determines that a short circuit (ground fault) and issues a cutoff or notification (alarm).
  • the controller 220 determines that the N2 terminal and the ground ( E) to connect or to restore, or to transfer the electrical signal to operate the breaker or alarm or communication module. (If you use a circuit breaker on the power supply side, you can cut it off immediately without using controller, trip coil, etc.)
  • the power-side detection / recovery unit 240-a has windings P1, P2, P3, P4 and legs 120, 130, and 140 wound with a voltage ratio of 1: 1, respectively, and is single-phase. It can be seen that the intermediate tap for outputting power and the single-phase lines R1 and R2 of the recovery distribution system 150 connected to the intermediate tap.
  • 240-a shows the power supply side detector / repair device used in the three-phase four-wire system of FIG. 6, and 240-b is another embodiment of the power supply side detection / recovery device 240 of FIG. Designed for isolation, 240-c illustrates another embodiment of the power side detector / recovery device 240 of FIG.
  • the vector diagram 241-a of the steady state of the power supply side detection / recovery unit 240-a, and the recovery vector diagrams 242-a, 242-b, and 242-c at the time of disconnection and phase opening are described. have. 8, recovery will be described.
  • 11 in the vector diagram 242-a is a vector diagram in which the input S-phase is extinguished. When the input S phase is extinguished, the power supply of the coil winding P1 disappears, and only the input R phase, the input T phase, and the neutral wire N, which maintain the phase angle 120 degrees from each other, are supplied with power, and one end thereof is the neutral wire N.
  • the voltage on the input R is applied to the other end of the winding (coil) P2 connected to the winding P2 wound on the same leg 140 as the third leg 140 on which the winding P2 is wound in the opposite direction to the winding P2.
  • a phase voltage of 180 degrees opposite to the phase induced by the winding P2 with respect to the neutral point N is generated as an electromagnetic induction in the winding P4, resulting in a phase vector of 242-a (11).
  • the input T phase having a phase difference of 120 degrees with the input R phase, the 380V potential difference, and the neutral line N and the 220V potential difference is connected to one end of the winding P3 to supply power, and the voltage of the phase generated in the winding P4 is The other end of the input T phase and the input R phase having a phase difference to the other end connected to P3 is turned on, so that the same voltage as that of the phase of the input S phase which has been extinguished also is wound on the winding P3, and thus the state of 242-a (12) The phase vector will appear.
  • the winding P3 causes electromagnetic induction to generate a phase voltage opposite to the phase of the winding P3 in the winding P1 wound in the opposite direction in the same leg 120 in which the winding P3 is wound, so that one end of the winding P3 is in the neutral point N.
  • the connected winding P1 generates an extinguished power input S phase that is 180 degrees out of phase with the winding P3 phase based on a neutral point, thereby recovering the input S phase.
  • the voltage of the same phase is induced to the coil P3 by the coil P1 of the input S phase, and the coil P3 is connected to the input T phase by the electrical position of the input T phase.
  • the phase voltage of the input S phase is induced at the electrical position connected to the coil P3, and the coil P4 connected to one end of the coil P4 generates a neutral difference between the neutral line and a potential of 220 V.
  • the voltage difference is induced at the coil P4 by the potential difference, and eventually the voltage is also applied to the coil winding P2. Is generated and the input R phase is restored.
  • the fault detector 210 at the neutral point (N2) of the load-side detection / repair unit 230 to detect the occurrence of disconnection, short circuit, contact failure, half-break electrical failure, when it detects the electrical failure Alarm or cut off or deliver to the controller 220 to recover, or remotely block the fault electricity, or to notify the outside by wire, wireless.
  • the failure detector 210 may be used to block or alarm without the controller 220.
  • the controller 220 may use a relay, an earth leakage alarm, and the like, which are equipped with a conventional micom function, and may use a communication facility provided in an existing facility.
  • the controller 220 stores a controllable program and can control the entire operation of the real-time detection / recovery system 200 in the event of a distribution system power line failure according to the program.
  • a microcontroller or the like is preferable.
  • the controller 220 operates the alarm 270 immediately or alarms when an abnormal voltage is generated at the neutral point N2 or a current flows due to disconnection or poor contact of the power line or half-break or short circuit.
  • the generator 250 is driven.
  • the alarm generator 250 alarms a disconnection or contact failure or a half disconnection or a short circuit abnormality.
  • an alarm is generated using a visual alarm and / or an audio alarm method. When the administrator recognizes this in the presence of a visual and / or audible alarm, it promptly takes a follow-up action, thereby preventing various electrical accidents that may be caused by a disconnection of the power line or a short circuit or a short circuit.
  • Administrators can clear alarms as needed. For example, when the alarm release switch provided in the alarm release input unit 260 is operated, an alarm release signal is generated by the alarm release input unit 260 and transmitted to the controller 220. When the alarm release signal is transmitted, the controller 220 stops the operation of the alarm generator 250 to release the alarm.
  • the present invention detects the occurrence of disconnection, contact failure, half-break, or short circuit
  • the fault detector 210 detects the occurrence of disconnection, contact failure, half-break, or short circuit.
  • the controller 220 determines the failure in comparison with a predetermined set value and recovers in real time, alarms or cuts the alarm in advance, or notifies the administrator via wired or wireless, so that a power failure that may occur due to disconnection, poor contact, half-break, or short circuit may occur. It prevents electric accidents such as electric shock, control interruption, equipment damage, and fire.
  • the present invention even when the load-side detection / recovery unit 230 is operated by the disconnection or contact failure or half-break to recover, the fault detector 210 detects disconnection or contact failure or half-break or short circuit. In this case, the controller 220 continuously detects a short circuit even though the load-side detection / recovery unit 230 is operated due to an abnormal voltage or current in a power line or a neutral point, or a contact failure or half-break. By using the signal, the circuit breaker (MCCB, ELB, etc.) is automatically operated, alarmed or wired and wireless to prevent power failure, electric shock, load loss and fire.
  • MCCB circuit breaker
  • the present invention by performing automatic recovery of faulty power in case of disconnection at the power supply side of the distribution system, it prevents the occurrence of power failure caused by disconnection, and recovers in case of contact failure or half-break, thereby preventing tracking, sparking, and deterioration. It prevents short circuits, burnout of electrical equipment, overheating, and electric fires, and it can prevent electric shocks and electric fires caused by short circuits when a short circuit occurs.
  • the breaker operation control signal is generated to operate the breaker, thereby preventing damage to the downstream device due to overcurrent or abnormal voltage.
  • the real-time detection / recovery system 200 at the time of the distribution system power line failure of the present invention can be implemented as a single module to be commercialized. This checks for electrical faults (leakage, disconnection, poor contact, half-break) on the single-phase power supply, installs it in a distribution board or switchboard, alarms, or cuts off power in case of power failure in conjunction with a breaker, It can be easily applied to gain the benefit of alarming or interrupting abnormal power or real-time electrical fault recovery.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
  • Emergency Protection Circuit Devices (AREA)

Abstract

본 발명은 삼상 또는 단상 배전계통의 단상전원측에서 단선, 저항증가, 접촉불량, 반단선, 누전이 발생하면 즉시 경보, 차단, 실시간 복구하는 배전계통 전원선로 고장시 실시간 탐지/복구시스템이 개시된다. 본 발명의 한 측면에 따르면, 배전계통에 전원측 탐지/복구기와 부하측 탐지/복구기 중 하나 이상을 구비할 수 있다. 상기 전원측 및 부하측 탐지/복구기는 단상 또는 삼상전원에 전기/전자적으로 연결되는 소자로 중성점을 형성하여, 이 중성점을 대지에 접지하거나 이 중성점과 대지의 전위차를 검출하여 단상 또는 삼상전원의 전원공급선로에서의 전기고장시에 이를 복구, 차단, 경보, 통보, 또는 제어할 수 있다.

Description

배전계통 전원선로 고장시 실시간 탐지/복구시스템 및 그 공사방법
본 발명은 삼상 또는 단상 배전계통의 전원선로에서 단선, 누전, 반단선, 저항증가, 접촉불량 등의 전기고장 발생시 이를 실시간 탐지하고 이들 전기고장에 의한 전기신호를 발생시켜 차단 또는 경보 또는 정전을 실시간 복구하도록 하는 배전계통 전원선로 고장시 실시간 탐지/복구시스템 및 그 공사방법에 관한 것이다.
도 1의 배전계통은 삼상 4선식 배전계통의 예를 나타낸다. R상, S상, T상으로 이루어지는 메인 변압기(300)는 일반적으로 Y결선, 델타 결선, 와이델타 결선 등의 방법으로 중성선(N)과 전력선(R상, S상, T상)을 결합하여 부하에 전력을 공급한다. 이때 하나의 전력선과 다른 전력선 사이에 부하를 연결하면 380V가 부하에 공급되고 하나의 전력선(예를 들어, R상)과 중성선(N)에 부하를 연결하면 220V가 부하에 공급된다.
여기서 중성선(N)은, 다상 다선식 선로에서 각 상의 한쪽 선로를 공통(common)으로 처리하는 선로를 가리킨다. 원칙적으로 3상을 사용하려면 6가닥의 전선이 필요하지만, 단상 2선식 선로의 위상을 120°씩 틀어서 한쪽 선을 모두 공통으로 처리하면 4가닥으로 줄어들고, 이렇게 공통 처리한 곳의 전위는 벡터적 합에 의하여 제로(0)가 된다. 이러한 제로전위(영 전위)가 바로 기준전위가 되고 이른바 N상, 즉, 중성선이 된다. 중성선은 원칙적으로 대지 전위인 영 전위를 가져야 하나 실제로 현장에서 각상의 위상이 정확히 120°가 나오지 않을 때는 약간의 전압을 가질 수도 있다. 이때 중성선 전위의 상승을 막기 위해 대지 전위선인 접지선에 중성선을 공통연결하면 각상의 위상이 약간 차이가 나게 되어도 대지와 닿아 있기 때문에 영 전위를 유지하게 된다.
단상 전기 선로에서는 두 선을 연결하여 사용하는데, 두 선 중에 하나는 대지와 등전위인 중성선에 연결되고 나머지 하나의 선은 대지와의 전위차가 220V인 전력선에 연결되기 때문에, 전력선에서 누전(지락)이 발생하면 감전 사망이나 화재발생 위험이 높다.
또한, 단상부하가 공통으로 연결된 전원측 중성선이 단선되거나 접촉불량이 발생하면 다른 3상 위상에 연결된 불평형 단상부하에 공통으로 연결된 중성선을 통해서 서로 다른 불평형 부하로 인해 이상전압이 부하로 유입되어, 전기기기의 과열소손 및 그로 인한 화재발생이 빈번하게 발생하고 있는 실정이다. 이를 막기 위해 배선용차단기 및/또는 누전차단기 등의 차단장치(110)가 설치된다.
차단장치(110)에 사용되는 배선용차단기(또는 몰드 케이스 차단기: molded case circuit breaker)는, 배선에 흐르는 과부하 및 단락에 대한 보호를 위하여 몰드 케이스 내에 수용되는 것으로, 교류 600V 이하 또는 직류 250V 이하의 저압 옥내전압의 회로에서 배선보호에 사용된다. 일반적으로 배선용차단기는 MCCB(브레이커)로 호칭되기도 한다.
또한, 차단장치(110)에 사용되는 누전차단기는 5~30mA 정도의 누설전류를 감지하여 감전을 방지하는 장치이다. 대부분의 퓨즈나 배선용차단기는 수 A 정도의 큰 전류에서 작동한다. 따라서 작은 누설 전류에 의한 감전사고를 방지하기 위해서는 누전차단기를 사용하여야 하며, 이는 전기 충격이 감전자의 심장까지 전해져 사망에 이르지 않도록 하기 위하여 5~30mA 정도의 누설전류를 감지하여 25~40msec의 시간 안에 회로를 차단한다. 차단 기준이 되는 누설전류는 국가 및 지역에 따라서 다른데, 우리나라에서는 정격전류의 2000분의 1로 제한하고 있다. 가령, 누전차단기의 정격전류가 100A라면 그 누설전류는 50mA 이내이다.
일반적인 누전차단기는 전력선으로 나가는 전류와 중성선으로 들어오는 전류의 차이를 측정한다. 나가는 전류와 들어오는 전류의 합이 0이 아니라면 어딘가 누전이 되고 있다는 뜻이 된다. 이 때 누전차단기가 작동하여 누설전류를 차단한다. 이와 같이 누전차단기는 큰 전류를 차단하는 퓨즈나 배선용차단기와는 서로 보완 관계이다. 누전전용 차단기만으로는 과부하나 단락을 방지할 수 없어 대부분 과전류(단락) 및 누전 차단 겸용의 차단기를 사용하고 있다.
또한, 누설차단 전류가 500mA 이상인 특수용도의 누전차단기는 낮은 차단전류 스펙을 갖는 일반 누전차단기가 miss하여 사고로 가동될 수 있는 데이터센터 등의 환경에 설치된다. 이러한 특수용도의 누전차단기는 감전방지용보다는 화재방지용으로 설치된다.
이러한 접촉불량 및 단선으로 인해 발생하는 제반 문제점을 해결하기 위해서 종래에 제안된 기술들이 대한민국특허청 공개특허공보 공개번호 10-2009-0004718호(2009.1.12.공개)(발명의 명칭: 접촉불량 감지장치 및 방법)(이하 '종래기술1'), 대한민국특허청 등록특허공보 등록번호 10-1109024호(2012.1.17.등록)(발명의 명칭: 전력량계의 접촉불량 감지장치 및 감지방법)(이하 '종래기술2'), 대한민국특허청 등록특허공보 등록번호 10-1320373호(2013.10.15.등록)(발명의 명칭: 변압기를 구비한 결상복구장치 및 그 설치공사방법)(이하 '종래기술3')에 개시되어 있다.
개시된 '종래기술1'은 전류 실효값, 역률, 전류 순시치, 고조파 등의 변화를 지표로 접촉불량을 감지하고, 이에 따라 전원을 차단함으로써 사용자를 화재의 위험에서 보호할 수 있다. 접촉불량을 감지할 수 있는 다섯 가지 요인 중 두 가지 이상의 요인이 만족되었을 때 접촉불량으로 판정함으로써 보다 정확하게 접촉불량을 감지한다. 나아가, 접촉불량에 따른 차단 상황에 대한 정보를 사용자 단말기로 고지함으로써 원거리에 위치한 사용자도 용이하게 이를 인지할 수 있도록 구성된다.
'종래기술2'는 수용가로 공급되는 전압 및 전류를 검출하는 전압 및 전류 검출부와 상기 검출된 전압 및 전류의 값을 통해 기설정된 총 측정시간 및 측정시간 단위로 역률값을 연산하는 역률연산부와, 상기 기설정된 총 측정시간 및 측정시간 단위로 연산된 역률값이 미리 정해진 기준값보다 작은 값의 범위에서 지속적으로 감소하는 경우 접촉불량으로 판단하는 접촉불량판단부, 및 상기 접촉불량판단부에서 접촉불량으로 판단된 경우 접촉불량 신호를 원격서버로 전송하는 인터페이스부를 포함하며, 전력량계의 접촉불량을 방지하여 접촉불량으로 인한 전기기기(전력량계)의 소손을 예방할 수 있도록 구성된다.
'종래기술3'은 삼상 4선식 배전 계통에서 전력선의 결상, 중성선의 단선, 및 전력선과 중성선에 발생하는 불평형 이상전류를 검출하여, 이들 전력선 결상, 중성선 단선, 및 전력 불평형을 정상으로 복구하고 영상 고조파를 감소시켜 정상전력을 유지시키도록 구성된다.
그러나 상기와 같은 종래 기술은 삼상 4선식(R, S, T, N) 또는 단상 2선식(RN, SN, TN) 배전계통에서 공급받은 전원측의 단선, 접촉불량, 반단선, 저항증가, 누전 등으로 인한 전기고장 발생시에는 이를 전기·전자적으로 탐지하여 차단, 경보, 복구하지 못해 이상전압, 감전, 정전, 화재 등이 발생되는 문제가 있다.
또한, 기존 단상 3선식 배전계통에서의 전원측 단선(R1 또는 N 또는 R2 등), 저항증가, 접촉불량, 반단선, 누전 등으로 전기고장 발생시에 이를 검출하여 차단·경보·복구할 수 있는 방법이 없어 전원측 누전에 의한 감전, 단선에 의한 정전 및 접촉불량, 반단선에 의한 과열, 화재발생을 경보 또는 차단 또는 복구하지 못하는 문제가 있다.
또한, 전원측 선로에서 단선이 발생하면 교통신호등, 가로등, 소방시설, 배수 펌프장 등의 제어기능이 마비되고 전원선로 이상시 자동으로 개폐되는 개폐기의 기능장애가 발생되어 대형사고로 확산되는 문제가 있다.
또한, 단상 전원의 대지와의 전위차가 220V로 전위가 높아 전력선에서 누전이 발생하면 감전이나 화재가 발생하여 인명과 재산피해가 발생하는 문제가 있다.
따라서, 삼상 또는 단상 배전계통의 전원측에서 단선, 저항증가, 접촉불량, 반단선, 누전 등이 발생하면 즉시 경보, 차단, 실시간 복구하는 배전계통 전원선로 고장시 실시간 탐지/복구시스템이 요구되는바, 이에, 본 발명은 상기와 같은 종래 배전계통에서 발생하는 제반 문제점들을 해결하기 위해서, 삼상 4선식(R, S, T, N) 또는 단상 2선식(RN, SN, TN) 배전계통에서 공급받는 전원라인에서 단선, 저항증가, 접촉불량, 반단선, 누전이 발생시에 이러한 이상 발생을 즉시 경보·차단·실시간복구하여 정전, 감전, 기기소손, 화재, 과열, 개폐기 기능마비 등의 사고가 발생하는 것을 방지하기 위한 배전계통 전원선로 고장시 실시간 탐지/복구시스템 및 그 공사방법을 제안한다.
상기 과제를 해결하기 위한 본 발명의 한 측면에 따른, 배전계통에서 전원측 단선, 저항증가, 접촉불량, 반단선, 누전으로 인한 정전, 감전, 화재사고 방지를 위한 시스템은, 상기 배전계통에 전원측 탐지/복구기와 부하측 탐지/복구기 중 하나 이상을 구비할 수 있다.
상기 전원측 및 부하측 탐지/복구기는, 단상 또는 삼상전원에 전기/전자적으로 연결되는 소자로 중성점을 형성하고 이 중성점을 대지에 접지하거나, 이 중성점과 대지의 전위차를 검출하여 단상 또는 삼상전원의 전원공급선로에서 결상, 단선, 접촉불량, 저항증가시에 복구, 차단, 경보, 통보, 제어 중에 어느 하나 이상을 실시하는 것을 특징으로 한다.
여기서 상기 소자는, 인덕터(inductor), 저항(resistance), 커패시터(capacitor), 바리스터(varistor), 실리콘(silicon), 게르마늄(germanium), 탄소(carbon), 코일(coil), 집적회로(integrated circuit) 중에서 선택된 하나인 것을 특징으로 한다.
발명의 일 실시예에서, 상기 전원측 탐지/복구기는 전원출력 코일의 중간(센터탭)에 중성점을 구성하여 이 중성점을 대지에 접지하거나, 중성점과 대지의 전위차를 검출하여 단상 또는 삼상전원의 전원공급선로에서 결상, 단선, 접촉불량, 저항증가시에 복구, 차단, 경보, 통보, 제어 중에 어느 하나 이상을 실시할 수 있고, 상기 부하측 탐지/복구기는 전원출력 코일의 중간에 중성점을 구성하여 이 중성점을 대지에 접지하거나 상기 전원측 탐지/복구기의 중성점에 연결하거나, 중성점과 대지의 전위차를 검출하여 단상 또는 삼상전원의 전원공급선로에서 결상, 단선, 접촉불량, 저항증가시에 복구, 차단, 경보, 통보, 제어 중에 어느 하나 이상을 실시할 수 있다.
한편, 발명의 다른 실시예에서, 상기 전원측 탐지/복구기는 1차코일을 포함할 수 있으며, 철심인 제1 레그, 제2 레그, 제3 레그와; 2차코일인 제1 권선, 제2 권선, 제3 권선을 구비할 수 있다. 여기서 상기 제2 레그는 두 위상의 자속의 통로로 사용하며, 상기 제1 권선은 상기 제1 레그에 권취되고, 상기 제2 권선은 상기 제3 레그에 권취되며, 상기 제3 권선은 상기 제1 권선과 상기 제2 권선이 권취된 권선의 반대방향으로 상기 제1 레그와 상기 제3 레그에서 지그재그로 권취되며, 상기 제1 권선, 상기 제2 권선, 상기 제3 권선의 일단이 중성선에 연결되고, 상기 중성선과 연결된 상기 제1 권선 또는 상기 제2 권선 또는 상기 제3 권선의 중간에는 단상전원을 공급하는 중간탭을 포함할 수 있다.
발명의 또다른 실시예에서, 상기 전원측 탐지/복구기는, 상기 배전계통에서 낙뢰, 합선, 지락, 기자재소손, 퓨즈단선으로 전원측에서 R상 또는 S상 또는 T상 또는 중성선(N)이 단선되거나 결상되어도 실시간 전기고장을 복구하여 단상전원을 공급해 단상전원의 정전을 방지하고, 단상전원의 대지전위차를 강압하여 누전(지락)에 의한 감전, 화재발생을 예방할 수 있다.
발명의 또다른 실시예에서, 상기 전원측 탐지/복구기의 중성점은 대지에 접지하고 전원공급선로와 대지의 전위차를 일정 전위(예, 110V)로 유지하도록 하여 누전발생으로 인한 감전, 화재사고발생을 예방할 수 있다.
발명의 또다른 실시예에서, 상기 전원측 탐지/복구기는, 삼상 4선식 또는 단상 3선식 배전계통에 연결되어 상기 배전계통에서 중성선 단선시 불평형 과전압의 유입을 방지하여 그로 인한 과열, 화재를 원천적으로 방지할 수 있다.
발명의 또다른 실시예에서, 상기 전원측 탐지/복구기는, 삼상 4선식 배전계통에 연결되어 전원측에서 한 상의 퓨즈단선, 선로손상단선, 변압기고장, 기자재소손, 결상, 중성선 단선시에도 실시간으로 삼상 전력을 복구하고 부하측에 단상전원을 정전없이 공급하여 전기고장에 의한 단상전원의 정전을 원천적으로 방지할 수 있다.
한편, 발명의 일 실시예에서, 상기 부하측 탐지/복구기의 중성점을 대지에 접지하고, 단상전원 공급선로를 한 선으로 구성하여 선로에 의한 합선사고 방지, 누전감소, 선로 고장감소, 선로보수 용이, 공사원가 절감을 하도록 할 수 있다.
또한 발명의 다른 실시예에서, 상기 부하측 탐지/복구기의 중성점을 상기 전원측 탐지/복구기의 중성점에 연결하여 상기 부하측 탐지/복구기의 전원측에서 단선 또는 접촉불량 또는 반단선 또는 누전(지락)발생으로 전기고장이 발생하면 상기 부하측 탐지/복구기의 전력선 또는 중성점에서 전기신호를 발생하여 고장검출기(후술)에 전달할 수 있다.
한편, 상기 고장검출기는, 상기 부하측 탐지/복구기의 입, 출력선로에 구비된 전력선 또는 중성점에서 고장시 발생하는 전기신호를 탐지하여 단선 또는 접촉불량 또는 반단선 또는 누전(지락) 발생으로 탐지되면 경보발생기를 통하여 경보하거나, 차단기를 통하여 차단하거나, 상기 부하측 탐지/복구기를 통하여 실시간 복구하도록 할 수 있다.
상기 고장검출기로는, 상기 중성점 또는 전력선에서 출력되는 고장발생 전기신호 검출을 위해 전자식릴레이(SSR) 또는 영상변류기 또는 전압검출기 또는 전류검출기 또는 릴레이를 사용할 수 있다.
또한 과제를 해결하기 위한 본 발명의 다른 측면에 따르면, 제1 중성점을 구비하고 이 중성점을 대지에 접지하여 대지와의 전위차를 기존 전위차 보다 강압하는 전원측 탐지/복구기와; 제2 중성점을 구비하고 이 중성점을 대지에 접지하거나, 상기 전원측 탐지/복구기의 중성점과 연결하여 전원측 전기고장을 실시간 복구하는 부하측 탐지/복구기와; 상기 부하측 탐지/복구기의 전력선 또는 중성점의 입출력 전류를 검출하거나, 상기 중성점의 전압을 탐지하여 경보 또는 차단하거나 검출한 고장검출 값을 제어기에 전달하는 고장검출기와; 상기 고장검출기가 제공한 검출 값을 설정치와 비교하여 고장으로 판단되면 경보를 발령하거나, 전원을 차단하거나, 유무선으로 통보하도록 통신모듈에 전달하고 경보해제신호가 접수되면 경보를 해제하는 제어기와; 상기 고장검출기 또는 제어기에서 제공받은 경보신호에 따라 경보를 발생하는 경보발생기와; 상기 경보발생기의 경보발령을 해제하기 위한 경보해제 입력부와; 상기 고장검출기 또는 제어기의 차단신호에 따라 고장전원을 차단하기 위한 차단기를 포함하는 배전계통 전원선로 고장시 실시간 탐지/복구시스템이 제공된다.
과제를 해결하기 위한 본 발명의 또다른 측면에 따르면, 배전계통 전원선로 고장시 실시간 탐지/복구시스템 공사방법이 제공되는데, 이 방법은, 삼상 또는 단상의 기존 배전계통에 전원측 트랜스포머 또는 부하측 트랜스포머를 설치하는 단계; 상기 전원측 트랜스포머의 중성점을 대지에 접지하거나 상기 부하측 트랜스포머의 중성점에 연결하거나, 상기 전원측 트랜스포머의 중성점과 대지의 전위를 검출하기 위해 검출기를 설치하는 단계; 상기 부하측 트랜스포머의 중성점을 대지에 접지하거나 상기 전원측 트랜스포머의 중성점에 연결하거나, 상기 부하측 트랜스포머의 중성점과 대지의 전위를 검출하기 위해 고장검출기를 설치하는 단계; 상기 전원측 트랜스포머의 출력코일의 권선과 부하를 연결하거나, 상기 전원측 트랜스포머의 출력코일의 권선과 상기 부하측 트랜스포머의 입력코일의 권선을 전기적으로 연결하는 단계; 상기 전원측 트랜스포머의 입력전원측 코일권선을 기존 배전계통의 삼상 또는 단상전원 선로에 전기적으로 연결하여, 상기 전원측 트랜스포머와 전원설비 또는 상기 전원측 트랜스포머와 상기 부하측 트랜스포머의 단상 또는 삼상전원의 전원공급설비에서 결상, 단선, 접촉불량, 저항증가시에 복구, 차단, 경보, 통보, 제어 중에 어느 하나 이상을 실시하는 단계를 포함한다.
본 발명에 따르면, 단상 2선식 또는 단상 3선식 또는 삼상 4선식 배전계통에서 공급받는 전원측의 단선시에 정상전력으로 실시간 복구를 함으로써, 정전을 방지하여 정전에 의한 각종 사고발생을 방지할 수 있다. 이로써, 전원측의 단선, 접촉불량, 누전, 반단선 등에 의한 감전, 전기기기 소손, 전기화재 등으로 인명사고가 발생되는 것을 방지할 수 있다.
또한 단상(2선식, 3선식) 또는 삼상(3선식, 4선식) 배전계통에서 전원측의 누전, 단선, 접촉불량, 반단선, 저항증가 등에 의한 전기고장을 즉시 차단하거나, 실시간으로 통보(경보)함으로써 전기고장을 신속하게 보수하도록 하여 사고가 확산되는 것을 방지할 수 있다.
또한 삼상 4선식에 구비된 단상 배전계통에서 중성선 때문에 발생하는 단선, 영상고조파 등 중성선으로 인한 사고는 물론 단상 전력선의 대지에 대한 전위를 강압하여, 누전(지락)에 의한 감전 및 화재사고가 발생되는 것을 예방할 수 있다.
도 1은 기존의 단상 2선식 배전선로의 구성도.
도 2는 본 발명의 배전계통 전원선로 고장시 실시간 탐지/복구시스템(200)의 구성도.
도 3은 단상 2선식 인입전원일 때 도 2의 실시예 회로도.
도 4는 도 3의 변형 실시예로, 복구배전계통(150)의 선로를 1선으로 구성하는 경우의 도 2의 실시예 회로도.
도 5는 단상 3선식 인입전원일 때 도 2의 실시예 회로도.
도 6은 삼상 4선식 인입전원일 때 도 2의 회로도 및 본 발명의 바람직한 실시예에 따른 배전계통 전원선로 고장시 실시간 탐지/복구시스템 공사방법(150)의 구성도.
도 7은 전원측 탐지/복구기의 여러 가지 실시예의 회로도.
도 8은 삼상 4선식 전원측 탐지/복구기의 결상시 전력복구원리(순서)를 설명하기 위한 벡터도로,
벡터도 241-a는 전원측 탐지/복구기(240)의 정상상태일 때의 위상벡터도,
벡터도 242-b는 입력전원 S상이 단선, 결상되었을 때의 복구순서 벡터도,
벡터도 243-a는 입력전원 R상이 단선, 결상되었을 때의 복구순서 벡터도,
벡터도 242-b는 입력전원 T상이 단선, 결상되었을 때의 복구순서 벡터도.
본 발명에 따른 '배전계통 전원선로 고장시 실시간 탐지/복구시스템'은, 중성점을 구비하고 이 중성점을 대지에 접지하여 대지와의 전위차를 기존 전위차보다 강압하는 전원측 탐지/복구기와; 중성점을 구비하고 이 중성점을 대지에 접지하거나, 상기 전원측 탐지/복구기의 중성점과 연결하여 전원측 전기고장을 실시간 복구하는 부하측 탐지/복구기와; 상기 부하측 탐지/복구기의 전력선 또는 중성점의 입, 출력 전류를 검출하거나, 상기 중성점의 전압을 탐지하여 경보 또는 차단하거나 검출한 고장검출 값을 제어기에 전달하는 고장검출기와; 상기 고장검출기가 제공한 검출값을 설정치와 비교하여 고장으로 판단되면 경보를 발령하거나, 전원을 차단하거나, 유무선으로 통보하도록 통신모듈에 전달하고 경보해제신호가 접수되면 경보를 해제하는 제어기와; 상기 고장검출기 또는 제어기에서 제공받은 경보신호에 따라 경보를 발생하는 경보발생기와; 상기 경보발생기의 경보발령을 해제하기 위한 경보해제 입력부와; 상기 고장검출기 또는 제어기의 차단신호에 따라 고장전원을 차단하기 위한 차단기가 구비된다. 도면을 참조하여 보다 구체적으로 설명한다.
도 2는 본 발명의 바람직한 일실시예에 따른 배전계통 전원선로 고장시 실시간 탐지/복구시스템(200)의 구성도로, 아래의 구성요소들을 포함한다.
- 기존의 단상 또는 다상의 다선식(예를 들어, 단상(2선식, 3선식), 삼상(3선식, 4선식) 등 배전계통(예컨대, 도 1)에 구비된 메인 변압기(예컨대, 도 1의 300)에 연결되는 전원측 탐지/복구기(240). 이는 자체적으로 대지에 접지되는 중성점(제1중성점)을 구비하여서 대지와의 전위차를 기존 전위차보다 강압하는 역할을 한다.
- 배전계통의 부하측 선로에 연결되는 부하측 탐지/복구기(230). 이는 자체적으로 또다른 중성점(제2중성점)을 구비하는데, 이 제2중성점을 대지에 접지하거나 상기 전원측 탐지/복구기의 제1중성점과 연결하여 전원측 전기고장을 실시간 복구하도록 한다.
- 부하측 탐지/복구기(230)와 연동하여 전원측의 단선, 저항증가, 접촉불량, 반단선, 누전발생을 탐지하는 고장검출기(210). 상기 부하측 탐지/복구기의 전력선 또는 제2중성점의 입출력 전류를 검출하거나 제2중성점의 전압을 검출하여 고장을 탐지하고 검출한 고장검출값을 하기 제어기에 전달한다.
- 고장검출기(210)에 의해 검출되거나 하기 제어기에 의해 판단된 고장 발생을 시각적 및/또는 청각적 경보로 경보하는 경보발생기(250).
- 발생한 경보를 해제하는 신호를 입력받아(예컨대 경보해제 스위치의 조작시) 경보해제 신호를 발생하는 경보해제 입력기(260).
- 고장검출기(210)에 의해 고장 발생이 검출에 따라 또는 하기 제어기의 차단신호에 따라 배전계통의 전원측과 부하측을 차단하는 차단기(270).
- 상기 고장검출기(210)의 출력으로부터 배전계통의 고장을 판단하여 상기 경보발생기(250) 또는 차단기(270)를 작동시키는 경보 또는 차단신호를 출력하고, 통신 모듈을 이용하여 유무선으로 외부의 관리자에게 통보하는 제어기(220).
이하, 도 2의 각 구성요소의 세부사항에 관하여 도 3~6을 참조하여 구체적인 실시예들을 통해 설명한다. 도 3은 단상 2선식 인입전원인 경우의 도 2의 실시예인 단상배전계통 전원선로 고장시 실시간 탐지/복구시스템(200)의 실시예 회로도이다. 도 4는 단상 2선식인 도 3의 변형 실시예로 복구배전계통(150)의 선로를 1선으로 구성하는 경우의 도 2의 실시예 회로도이고, 도 5는 단상 3선식 인입전원일 때의 도 2의 실시예 회로도이다. 도 6은 삼상 4선식 인입전원일 때의 도 2의 실시예 회로도이다.
전원측 탐지/복구기(240)는 배전계통(예컨대, 도 1)의 메인 변압기(main voltage transformer)(예컨대, 도 1의 300)에서 전원을 공급받기 위해 전원측에 연결되며, 자체적으로, 대지에 접지되는 중성점(제1중성점 N1)을 가져서 대지와의 전위차를 기존 전위차보다 강압하는 역할을 한다.
구체적인 예시로, 도 3에서 전원측 탐지/복구기(240)는 메인 변압기(300)의 R상 단상전원 출력에 연결되는 1차코일(L5)과 이 1차코일(L5)에 직렬로 나란히 연결되는 2개의 2차코일(L3, L4)로 구성된다. 직렬 연결된 2개의 2차코일 L3과 L4 사이에는 제1중성점(N1)이 형성되고 접지된다. 실제로 2차코일 L3과 L4는 하나의 코일이며 그 중간에 낸 센터탭을 제1중성점(N1)으로 접지할 수도 있다. 도 3 실시예의 전원측 탐지/복구기(240)에서는, 1차코일 L5와 2차코일 L3 사이의 연결점에서 하나의 부하전력공급선(R2)이 나오고 2차코일 L3과 연결된 다른 2차코일 L4의 종단부레서 또 하나의 부하전력공급선(R1)이 나와서 복구배전계통(150)을 구성한다.
또한 도 4에서 전원측 탐지/복구기(240)는 메인 변압기(300)의 R상 단상전원 출력에 연결되는 1차코일(L5)과 이 1차코일(L5)에 직렬로 연결되는 1개의 2차코일(L3)로 구성된다. 직렬 연결된 2차코일 L3의 종단부가 제1중성점(N1)으로 구성되고 접지된다. 1차코일 L5와 2차코일 L3 사이의 연결점에서 하나의 부하전력공급선(R1)이 나와 복구배전계통(150)을 구성한다.
또한 도 5의 단상 3선식 인입전원 실시예에서 전원측 탐지/복구기(240)의 구성은 도 3의 경우와 같다. 다만, N1이 자체적으로 접지되지 않고, 다른 두 개의 부하전력공급선(R1, R2)과 더불어 제3의 부하전력공급선(N)으로 나와 복구배전계통(150)을 이룬다.
한편, 삼상 4선식 인입전원일 때의 전원측 탐지/복구기(240-a)는 도 6와 같이 구성되어 세 개의 부하전력공급선(R1, R2, N)이 나와 복구배전계통(150)을 구성한다.
종합적으로 전원측 탐지/복구기(240)를 자세하게 설명하자면, 기존의 삼상 4선식(R, S, T, N) 또는 단상(R-N, S-N, T-N) 배전계통의 전원전압이 220V라면 대지와의 전위차는 220V가 된다. 여기서, 전원측 탐지/복구기(240, 또는 도 6~8의 240-a)의 1차코일은 삼상 380V 또는 단상 220V의 전원을 공급받는다. 공급받은 전원을 실사용 전원으로 변압하기 위해 변압비에 따라 2차코일을 권취한다. 2차코일 권선의 중간에는 중간탭 또는 제1중성점(N1)을 구성하고 이 중성점(N1)을 대지(E)에 접지하여, 복구배전계통(150)의 전원라인을 확보하고 공급전원의 대지와의 전위를 110V로 강압한다. 여기서, 전원측 탐지/복구기(240, 240-a)의 2차코일의 권선(L3, L4)의 변압비는 1:1로 권취하는 것이 바람직하다.
이러한 전원측 탐지/복구기(240)는, 단상 공급전원의 전위를 110V로 강압함으로써 누전(지락)시에도 감전의 위험을 줄일 수 있으며, 불평형 단상부하를 갖는 배전계통에서 공통으로 사용되는 중성선을 배제시켜, 중성선의 단선으로 인해 불평형 부하에 의해 유입되는 이상전압의 발생을 원천 차단한다. 이로써, 복구배전계통(150)의 신뢰성을 확보하고, 특히 단상 3선식에서는 중성선이 단선되더라도 실시간으로 복구할 수 있도록 하여, 중성선에 의한 전기사고를 부하측 탐지/복구기(230)를 통해 원천적으로 방지할 수 있다.
다음, 부하측에 연결되는 부하측 탐지/복구기(230)에 대해 설명한다.
도 3에서, 부하측 탐지/복구기(230)는 부하에 공급되는 2선 R1', R2'에 각각 연결되어 단상전원이 입출력되는 각 코일 L1과 L2의 연결점(또는 2선에 연결되는 하나의 코일 L1-L2의 센터탭)에 제2중성점(N2)을 형성하여 접지하는 구성을 갖는다.
도 4의 부하측 탐지/복구기(230)는 그 자체 구성은 도 3의 부하측 탐지/복구기(230)와 유사하지만, 부하측 탐지/복구기(230)가 차단기(270)보다 앞단에서 복구배전계통(150)에 연결되는 것이 다르다. 또한 도 4에서 부하측 탐지/복구기(230)는 한 개 이상 다수로 병렬 연결되어 일종의 리던던시 기능을 하고 있다.
도 5에서 부하측 탐지/복구기(230)는 차단기(270) 후단의 두 개의 부하전력공급선(R1', R2')에 도 2의 경우와 같이 연결되고 그 제2중성점(N2)은 제3의 부하전력공급선(N')에 연결된다.
또, 도 6에서 부하측 탐지/복구기(230)는 두 개가 차단기(270) 전단에 위치하는데, 왼쪽 것은 도 5의 경우와 유사하게 제2중성점(N2)을 전원측 탐지/복구기(240-a)의 제1중성점(N1)과 전기적 연결하고, 오른쪽 것은 도 4의 경우와 유사하게 제2중성점(N2)을 접지한다.
다음, 고장검출기(210)로는 전류/전압 검출기를 사용하여 부하측 탐지/복구기(230)의 코일(L1-L2)에 흐르는 전류 또는 그 양단 전압을 검출하거나, 제2중성점(N2)과 접지(E) 사이의 전류를 검출한다. 이 경우에 제어기(도 2의 220)는, 고장검출기(210)가 검출한 검출값과 제어기(220)에 미리 설정한 설정치를 비교 판단하여 고장 여부를 판단하고, 고장으로 판단하면 차단기(270)로 트립신호를 출력하도록 한다. 트립신호는 도 2에 나타낸 것과 같이 고장검출기(210)에서 출력되도록 설계할 수도 있고 제어기(220)에서 출력되도록 설계할 수도 있다.
한편, 다른 실시예로서 고장검출기(210)를 무접점릴레이(SSR)로 구현하면, 전원선의 단선을 탐지하고 이로부터 제어기(220)로 하여금 단선을 판단하여 경보 또는 차단신호를 출력하도록 할 수 있다.
이제, 도 3~도 5에 나타낸 실시예별로 단상배전계통 전원선로 고장시 실시간 탐지/복구시스템(200)의 작용을 구체적으로 설명한다.
전원측 탐지/복구기(240)는 단상전원을 변압(voltage transformation)하여 출력하는 코일과 철심으로 구성된다. 출력코일의 권선 중간에는 제1중성점(N1)을 형성하고 이 중성점(N1)을 대지(E)에 접지함으로써, 상기 전원측 탐지/복구기(240)에서 출력되어 공급되는 단상2선 전원의 전위차를 기존의 공급전원 대비 절반으로 감소시켜서 지락(누전)에 의한 감전, 화재사고를 대폭 완화시킨다. 그리고 일반적인 단상부하에서 공통으로 사용하는 일반 배전계통의 중성선(N)을 사용하지 않으므로 중성선에 의한 이상전압의 유입을 원천 방지하여 중성선 단선에 의한 화재위험이 원천적으로 생기지 못하도록 함으로써, 전기화재로부터 인명과 재산을 보호하는 기능을 수행한다(단, 도 5의 단상 3선식에서는 중성선을 사용하지만 중성선이 단선되더라도 부하측에서 즉시 복구가 되어 이상전압 미발생).
이러한, 단상배전계통 전원선로 고장시 실시간 탐지/복구시스템(200)은, 복구배전계통(150)의 배전선로의 부하측 전로에 부하측 탐지/복구기(230)를 포함한다. 상기 전원측 탐지/복구기(240)에서 공급하는 전원라인이 고장시 이를 복구, 차단, 경보, 통보하기 위해 부하측 탐지/복구기(230)의 입력 또는 출력 코일에 제2중성점(N2)을 구성하고, 이 제2중성점(N2)을 대지(E)에 접지하거나, 제2중성점(N2)을 상기 전원측 탐지/복구기(240)에 구비된 제1중성점(N)에 전기적으로 연결한다. 이로써 단상 2선식 또는 단상 3선식 전원이 단선, 접촉불량, 또는 반단선시 실시간으로 복구한다. 또는, 단선, 저항증가, 접촉불량, 반단선, 누전발생시, 전력선 또는 중성점에서 고장전압 발생 또는 고장전류 흐름을 고장검출기(210)가 탐지할 수 있다.
또한, 상기 전원측 탐지/복구기(240)의 제1중성점(N1)과 전기적으로 연결되는 상기 부하측 탐지/복구기(230)의 제2중성점(N2)은 단상 3선식에서는 중성선이 되어, 단상3선식에서 전원측 단선 발생시 즉시 경보 또는 차단 또는 복구하게 된다. 상기 제1중성점(N1)과 전기적으로 연결된 제2중성점(N2)을 단상 2선식 계통에서도 사용하게 되면 전원선로 단선시 예비선로로서의 역할을 하게 되고 부하측에서 합선시에는 단락전류가 분산되어 흐르게 됨으로써 계통의 신뢰성을 높일 수 있게 된다.
한편, 상기 부하측 탐지/복구기(230)에 대해 설명하면, 부하측 탐지/복구기(230) 또한 공급전원의 입출력코일의 중간에 제2중성점(N2)을 형성하여 그 제2중성점(N2)을 대지에 접지하거나, 상기 전원측 탐지/복구기(240)의 제1중성점(N1)과 연결한다. 이로써 복구배전계통(150)의 전선로(R1, R2 등)에서 단선, 저항증가, 접촉불량, 반단선, 누전이 발생하여 상기 전선로에 불평형이 발생하면 이를 실시간 복구하거나 경보 또는 차단할 수 있도록 제2중성점(N2)을 이용하여 동작하게 되는 것이다.
여기서, 상기 전선로 중 단상 2선식의 R1의 단선시 복구과정을 살펴보면, 전원측에서 전선로 R1이 단선되면 전선로 R2 한 선만이 남게 되고, 상기 전선로 R2가 부하측 탐지/복구기(230)의 코일(L2)에 전원을 공급한다. 이 코일(L2)은 부하측 탐지/복구기(230)의 제2중성점(N2)이 연결된 대지(E)와 연계하여 코일(L1)을 전자기유도하여 단상 2선식 전원을 복구하게 된다. 상기 전선로 R2가 단선되면, 전선로 R1 한 선만이 복구배전계통(150)에 존재하게 되고 현존 전선로 R1은 부하측 탐지/복구기(230)의 코일(L1)에 전원을 공급하게 되어 이 코일(L1)은 부하측 탐지/복구기(230)의 제2중성점(N2)에 연결된 대지(E)와 110V의 전위를 유지함으로써 코일(L1)을 전자기유도하게 되어 단상 2선식 전원을 실시간으로 복구하게 된다. 접촉불량이나 반단선의 경우에도 위와 같은 이유로 실시간 복구가 된다.
단상 3선식도 단상 2선식과 마찬가지로 대지(E)를 대신하여 중성점을 이용함으로써 동일한 원리로 복구가 되므로, 상기 단상 3선식에 대한 자세한 설명은 생략한다. 결국 도 4에 도시한 회로처럼 단상전원 선로를 한 선으로 구성하여도 정상적인 전기사용이 기능함은 자명하다.
또한, 상기 복구배전계통(150)의 선로(R1, R2)에서 누전(지락)이 발생하면 누전된 회로에만 누설전류가 흐르게 되고 부하측 탐지/복구기(230)의 복구전력에 의해 누설전류가 공급되므로, 부하측 탐지/복구기(230)의 입출력 선로를 영상변류기로 감시하거나 부하측 탐지/복구기(230)의 N2단자와 연결된 접지(E)선을 영상변류기로 감시하면 누설전류를 검출할 수 있다. 또는, 부하측 탐지/복구기(230)의 N2 단자와 접지를 연결하지 않고 누전만을 전압으로 검출하는 방법도 또한 가능하다.
여기서, 부하측 탐지/복구기(230)의 N2 단자와 접지를 연결하지 않고 전압을 검출하면, 단선, 접촉불량, 반단선의 경우에도 상기 N2 단자와 접지(E)에서 전압을 검출할 수가 있으므로 상기 선로 R1 또는 R2에서 누설전류가 검출된다. 상기 N2 단자와 접지(E)에서 전압이 검출되면, 제어기(220)는 누전(지락)으로 판단하여 차단 또는 통보(경보)를 발령한다. 만일 선로 R1 또는 R2에서 누설전류가 검출됨이 없이 상기 N2단자와 접지(E)에서 전압이 검출되면, 단선, 접촉불량, 반단선 발생으로 판단하고, 제어기(220)는 상기 N2단자와 접지(E)를 연결하도록 하여서 복구를 하거나, 차단기 또는 경보기 또는 통신모듈이 작동하도록 전기신호를 전달하는 기능을 수행하게 된다. (여기서 전원 측에 누전차단기를 사용하면 제어기, 트립코일 등을 사용하지 않아도 즉시 차단할 수도 있다.)
이번에는 도 6~8을 참조하여, 삼상 4선식 전원의 경우의 단선 및 결상 복구에 관하여 설명하고자 한다. 도 6 및 도 7에서, 전원측 탐지/복구기(240-a)는 전압비가 각각 1:1로 권취된 권선(P1, P2, P3, P4)과 레그(120, 130, 140)를 구비하고 단상전원을 출력하는 중간탭과 이 중간탭에 연결된 복구배전계통(150)의 단상선로 R1과 R2를 볼 수 있다.
도 7은 전원측 탐지/복구기(240)의 여러 가지 실시예를 나타낸다. 240-a는 도 6의 3상4선식 계통에 사용된 전원측 탐지/복구기를 나타내고 있고, 240-b는 도 3의 전원측 탐지/복구기(240)의 다른 실시예로, 1차측과 2차측을 격리(isolation)하기 위한 구조로 되어 있고, 240-c는 도 4의 전원측 탐지/복구기(240)의 다른 실시예를 나타낸다.
도 8에서는 전원측 탐지/복구기(240-a)의 정상상태의 벡터도(241-a)와, 단선, 결상시의 복구벡터도(242-a, 242-b, 242-c)가 기술되어 있다. 도 8을 보고 복구에 대한 설명을 한다. 벡터도(242-a)의 11은 입력 S상이 소멸된 상태의 벡터도이다. 입력 S상이 소멸되면, 코일 권선(P1)의 전원은 없어지고, 서로 위상각 120도를 유지하는 입력 R상과 입력 T상과 중성선(N)만 전원이 입력되게 되어, 일단이 중성선(N)과 연결된 권선(코일) P2의 타단에 입력 R상의 전압이 투입되게 되고, 상기 권선 P2가 권취된 제3 레그(140)와 동일한 레그(140)에 상기 권선 P2의 반대방향으로 권취된 권선 P4에는 중성점(N)을 기준으로 상기 권선 P2에 유기된 전압과 위상의 180도 반대방향의 위상 전압이 상기 권선 P4에 전자기유도로 발생되어, 242-a(11) 상태의 위상벡터가 나타나게 된다. 한편, 상기 입력 R상과 120도의 위상차와 380V 전위차 및 중성선(N)과 220V 전위차를 갖는 상기 입력 T상은 권선 P3의 일단에 연결되어 전원이 투입되고 상기 권선 P4에서 발생된 위상의 전압은 상기 권선 P3와 연결된 타단에 입력 T상과 위상차를 갖는 입력 R상의 반대방향의 전원을 투입하게 되어, 결국은 상기 권선 P3에도 소멸된 입력 S상의 위상과 같은 전압이 유기되어 242-a(12) 상태의 위상벡터가 나타나게 된다. 또한 상기 권선 P3는 권선 P3가 권취된 동일한 레그(120)에서 반대방향으로 권취된 권선 P1에 권선 P3가 갖는 위상의 반대 위상전압을 발생하는 전자기유도를 일으키게 되어서, 상기 중성점(N)에 일단이 연결되어 있던 상기 권선 P1은 중성점을 기준으로 상기 권선 P3 위상의 180도 반대위상인 소멸된 전원 입력 S상을 발생하게 되어 입력 S상을 복구하게 된다.
또한 도 8의 벡터도 242-c(31)에서처럼 T상이 단선되어 없어지면 입력 R상과 입력 S상과 중성선(N) 전원만이 코일권선 P1, P2에 입력되게 되어 코일권선 P2는 같은 레그(140)에 권취된 코일 P4를 전자기유도하여 코일 P4에 전압이 유기되고, 코일 P3는 입력 S상과 같은 레그(120)에 권취된 코일권선 P1에 의해 전자기 유도되어 T상이 복구된다. 마찬가지로 벡터도 242-b(21)처럼 입력 R상이 단선되어 소멸되면 입력 S상의 코일 P1에 의해 코일 P3에 같은 상의 전압이 유도되고, 입력 T상의 대지와의 전기적 위치에 의하여 코일 P3은 입력 T상과 연결된 전기적 위치에서 입력 S상의 위상전압이 유기되어 코일 P3과 일단이 연결된 코일 P4에는 중성선과 전위차가 220V가 발생되게 되며 그 전위차에 의해 코일 P4에 전압이 유기되어, 코일권선 P2에도 결국 전압이 발생되어 입력 R상이 원상 복구된다.
또한 앞에서 언급한 것과 같이, 부하측 탐지/복구기(230)의 중성점(N2)에 고장검출기(210)를 설치하여 단선, 누전, 접촉불량, 반단선의 전기고장 발생을 탐지하고 탐지시 그 전기고장을 경보 또는 차단하거나 제어기(220)에 전달하여 복구하도록 하거나, 고장전기를 원격차단 하거나, 외부에 유, 무선으로 통보하여 경보하도록 할 수 있다. 또는, 고장검출기(210)만을 사용하여 제어기(220) 없이 차단이나 경보를 하는 것도 가능하다.
차단 또는 경보를 제어기(220) 없이 하는 것을 자세하게 설명하자면, 단선 또는 접촉불량 또는 반단선이 발생하면 부하측 탐지/복구기(230)에 구비된 중성점(N2)과 대지(E)에 전압이 발생한다. 이 때 발생한 전압을 고장검출기(210)로 구현된 무접점릴레이(SSR)가 탐지하여 동작하게 되면 이 무접점릴레이(SSR)는 자체 구비된 스위치를 사용하여 트립코일을 작동시켜 차단기(270)를 차단하거나 경보발생기(250)를 작동하도록 할 수 있고, 고장전기를 실시간으로 복구하기 위해 상기 부하측 탐지/복구기(230)에 구비된 중성점(N2)과 대지(E)를 연결하여 복구할 수 있다. 또한 중성점(N2)과 대지(E)에 흐르는 전류를 고장검출기(210)로 검출하면 복구되어 있는 것을 외부에 알릴 수 있다.
여기서, 고장검출기(210)가 전원측 단선, 접촉불량, 반단선을 탐지하는 방식은, 1) 단선, 접촉불량, 반단선을 복구할 때 발생되는 대지(E)와 중성점(N2)의 전압이나 전류를 탐지, 2) 단상 2선식 전선로의 전류검출 값이 어떤 값인지를 검출하여 R1+R2=0일 때 정상으로 판단하고 R1+R2≠0로 검출되면 복구배전계통(150)에 이상이 발생한 것으로 판단, 3) 단상 3선식 전선로에서는 고장 복구시 발생되는 전류가 R1+N2≠0이거나 R2+N2≠0으로 검출되면 복구배전계통(150)에 이상이 발생한 것으로 판단하는 것을 적용할 수 있다. 마찬가지로 누전발생의 경우에도 1) 대지(E)와 중성점(N2)의 전압 또는 전류를 탐지할 수 있고, 2) 단상 2선식 전선로의 전류검출 값이 어떤 값인지를 검출하여 R1+R2=0 일 때 정상으로 판단하고 R1+R2≠0로 검출되면 복구배전계통(150)에 이상이 발생한 것으로 판단할 수 있다. 고장발생으로 판단되면 경보 발령 또는 차단기(270) 차단을 수행하거나 검출값을 제어기(220)에 전달하여 제어기(220)에서 원격으로 차단기 차단신호를 보내거나 통신모듈을 통하여 유무선으로 고장발생을 관리자에게 통보하도록 할 수 있다.
여기서 제어기(220)로는 기존의 마이콤기능이 구비되어 있는 계전기, 누전경보기 등을 이용할 수 있고 기존 시설에 구비된 통신시설을 이용할 수도 있다. 단, 본 발명에서 제어기(220)는 제어가능한 프로그램을 저장하고 이 프로그램에 따라 배전계통 전원선로 고장시 실시간 탐지/복구시스템(200)의 전체 동작을 제어할 수 있는 마이컴, 마이크로프로세서, 중앙처리장치, 마이크로컨트롤러 등으로 구현하는 것이 바람직하다.
한편, 제어기(220)는 주지한 바와 같이 전력선의 단선 또는 접촉불량 또는 반단선 또는 누전으로 중성점(N2)에서 이상 전압이 발생하거나, 전류가 흐르는 것으로 판단이 되면 즉시 차단기(270)를 작동하거나 경보발생기(250)를 구동시키게 된다. 경보발생기(250)는 단선 또는 접촉불량 또는 반단선 또는 누전 이상을 경보하게 되는데, 본 발명에서는 시각적인 경보 및/또는 청각적인 경보 방법을 이용하여 경보를 하게 된다. 시각 및/또는 청각 경보가 발생한 상태에서 관리자가 이를 인식하면 신속하게 후속 조치를 취하게 되고, 이로써 전력선의 단선 접촉불량 또는 반단선 또는 누전으로 인해 발생할 수 있는 각종 전기사고를 방지하게 된다,
관리자는 필요에 따라 발생한 경보를 해제할 수 있다. 예컨대, 경보해제 입력기(260)에 구비된 경보해제 스위치를 조작하면, 경보해제 입력기(260)에서 경보해제 신호를 발생하여 제어기(220)에 전달한다. 제어기(220)는 경보 해제신호가 전달되면, 경보발생기(250)의 동작을 정지시켜 경보를 해제하게 된다.
또한, 본 발명은 단선 또는 접촉불량 또는 반단선 또는 누전이 발생을 고장검출기(210)가 검출하여 단선, 접촉불량, 반단선, 누전발생이면 하이신호를, 정상일 때에는 로우신호를 제어기(220)에 전달하고, 제어기(220)는 기 설정한 설정치와 비교하여 고장을 판단하고 미리 정한대로 실시간 복구하거나 경보하거나 차단하거나 관리자에게 유무선으로 통보하여 단선, 접촉불량, 반단선, 누전으로 인해 발생할 수 있는 정전, 감전, 제어중단, 기기소손, 화재 등의 전기사고를 미리 방지하게 된다.
또한, 본 발명은 주지한 바와 같이, 단선 또는 접촉불량 또는 반단선에 의해 부하측 탐지/복구기(230)를 동작시켜 복구시킨 상태에서도 단선 또는 접촉불량 또는 반단선 또는 누전발생을 고장검출기(210)를 통해 지속적으로 검출하게 되는데, 이때 전력선 또는 중성점에 이상전압, 전류로 인해 부하측 탐지/복구기(230)를 동작시켰는데도 불구하고 누전이 검출되거나, 접촉불량 또는 반단선이면 제어기(220)에서 제어신호를 이용하여 자동으로 차단기(MCCB, ELB, 기타 등)를 동작시키거나 경보하거나 유무선으로 통보하여 정전, 감전, 부하 소손, 화재발생을 방지하게 된다.
예컨대, 본 발명에 따르면 배전계통의 전원측에서 단선시 자동으로 고장전력 자동복구를 수행하여, 단선으로 인해 발생하는 정전사고발생을 방지하고, 접촉불량, 반단선 시에는 복구하여 트래킹, 스파크, 열화에 의한 합선(단락), 전기기기의 소손, 과열, 전기화재를 방지하며, 누전 발생시 누전으로 인한 감전, 전기화재를 줄일 수 있어 고장전기로 인한 사고를 방지할 수 있게 되는 것이다.
또한, 고장전력 복구에 실패한 경우에는 차단기 동작 제어신호를 발생하여 차단기를 동작시킴으로써, 과전류, 이상전압 등에 의해 후단 기기가 손상되는 것을 방지하게 되는 것이다
본 발명의 배전계통 전원선로 고장시 실시간 탐지/복구시스템(200)은 하나의 모듈로 구현하여 제품화할 수 있다. 이로써 전기고장(단상전원측의 누전, 단선, 접촉불량, 반단선)을 점검하거나, 분전반 또는 배전반에 설치하여 경보하거나, 차단기와 연계하여 전력이상시 전력을 차단하거나, 기존에 설치된 전력공급용 기기에 쉽게 적용하여 이상전력을 경보하거나 차단하거나 실시간 전기고장복구를 할 수 있는 이득을 얻을 수 있다.

Claims (15)

  1. 배전계통의 전원측 단선, 저항증가, 접촉불량, 반단선, 누전으로 인한 정전, 감전, 화재사고 방지를 위한 시스템에 있어서,
    상기 배전계통에 전원측 탐지/복구기와 부하측 탐지/복구기 중 적어도 하나를 구비하되,
    상기 전원측 탐지/복구기는 전원 출력코일의 중간에 중성점을 구성하여, 이 중성점을 대지에 접지하거나 중성점과 대지의 전위차를 검출하여, 단상 또는 삼상전원의 전원공급선로에서 결상, 단선, 접촉불량, 저항증가시에 복구, 차단, 경보, 통보, 제어 중에 어느 하나 이상을 실시하고,
    상기 부하측 탐지/복구기는 전원 출력코일의 중간에 중성점을 구성하여, 이 중성점을 대지에 접지하거나 상기 전원측 탐지/복구기의 중성점에 연결하거나 중성점과 대지의 전위차를 검출하여, 단상 또는 삼상전원의 전원공급선로에서 결상, 단선, 접촉불량, 저항증가시에 복구, 차단, 경보, 통보, 제어 중에 어느 하나 이상을 실시하는 것을 특징으로 하는 배전계통 전원선로 고장시 실시간 탐지/복구시스템.
  2. 배전계통의 전원측 단선, 저항증가, 접촉불량, 반단선, 누전으로 인한 정전, 감전, 화재사고 방지를 위한 시스템에 있어서,
    전원측에 연결되는 전원측 탐지/복구기와, 부하측에 연결되는 부하측 탐지/복구기를 포함하되,
    상기 전원측 탐지/북구기는, 제1 레그, 제2 레그, 제3 레그와; 제1 권선, 제2 권선, 제3 권선으로 구성되며,
    상기 제1 권선은 상기 제1 레그에 권취되고, 상기 제2권선은 상기 제3 레그에 권취되며, 상기 제3 권선은 상기 제1 권선과 상기 제2 권선이 권취된 권선의 반대방향으로 상기 제1 레그와 상기 제3 레그에서 지그재그로 권취되어; 상기 제1 권선, 상기 제2 권선, 상기 제3 권선의 일단이 대지(중성선)에 연결되고, 상기 대지(중성선)와 연결된 상기 제1 권선 또는 상기 제2 권선 또는 상기 제3 권선에서 상기 부하측 탐지/복구기로 전원을 공급하여 상기 전원측 탐지/복구기의 전원측 단선 또는 부하측 탐지/복구기의 전원측 단선시 그 고장전원을 복구하는 것을 특정으로 하는 배전계통 전원선로 고장시 실시간 탐지/복구시스템.
  3. 청구항 2항에 있어서, 상기 전원측 탐지/복구기는,
    1차코일을 구비하며, 상기 2항의 배전계통의 전원측에서 R상 또는 S상 또는 T상 또는 중성선(N)이 단선되거나 결상되어도 실시간 전기고장을 복구 단상전원을 공급하여 단상전원의 정전을 방지하고 단상전원의 대지전위차를 강압하여 누전(지락)에 의한 감전, 화재발생을 예방하는 것을 특징으로 하는 배전계통 전원선로 고장시 실시간 탐지/복구시스템.
  4. 청구항 1항 또는 2항에 있어서, 상기 부하측 탐지/복구기는,
    상기 부하측 탐지/복구기의 중성점을 대지에 접지하고, 단상전원공급선로를 한 선으로 구성하여 선로에 의한 합선사고 방지와 누전감소, 선로 고장감소, 선로보수를 용이, 공사원가를 절감하는 것을 특징으로 하는 배전계통 전원선로 고장시 실시간 탐지/복구시스템.
  5. 청구항 1항 또는 2항에 있어서, 상기 부하측 탐지/복구기는,
    상기 부하측 탐지/복구기의 전원측에서 단선, 저항증가, 접촉불량, 반단선, 또는 누전(지락)발생으로 전기고장이 발생하면 상기 부하측 탐지/복구기의 중성점과 대지 또는 전력선(R 또는 S 또는 T)에서 전기신호를 발생하여 고장검출기에 전달하는 것을 특징으로 하는 배전계통 전원선로 고장시 실시간 탐지/복구시스템.
  6. 청구항 1항 또는 2항에 있어서, 상기 전원측 탐지/복구기 및 상기 부하측 탐지/복구기는,
    단상 또는 삼상전원에 전기/전자적으로 연결되는 소자로 중성점을 구성하고 이 중성점을 대지에 접지하거나, 이 중성점과 대지의 전위차를 검출하여 단상 또는 삼상전원의 전원공급선로에서 결상, 단선, 접촉불량, 저항증가시에 복구, 차단, 경보, 통보, 제어 중에 어느 하나 이상을 실시하는 것을 특징으로 하는 배전계통 전원선로 고장시 실시간 탐지/복구시스템.
  7. 청구항 6항에 있어서, 상기 소자는,
    인덕터, 저항, 커패시터, 바리스터, 실리콘 또는 게르마늄, 탄소, 코일, 집적회로 중에서 선택된 하나 이상을 포함하는 배전계통 전원선로 고장시 실시간 탐지/복구시스템.
  8. 청구항 5항에 있어서, 상기 고장검출기는,
    상기 부하측 탐지/복구기의 입출력선로에 구비된 전력선 또는 중성점에서 고장시 발생하는 전기신호를 탐지하여 단선, 저항증가, 접촉불량, 반단선, 또는 누전(지락) 발생이 탐지되면 경보발생기를 통하여 경보하거나 차단기를 통하여 차단하거나 상기 부하측 탐지/복구기를 통하여 실시간 복구하도록 하는 것을 특징으로 하는 배전계통 전원선로 고장시 실시간 탐지/복구시스템.
  9. 청구항 5항에 있어서, 상기 고장검출기는,
    상기 중성점 또는 전력선에서 출력되는 고장발생 전기신호 검출을 위해 전자식릴레이(SSR) 또는 영상변류기 또는 전압검출기 또는 전류검출기 또는 릴레이를 사용하는 것을 특징으로 하는 배전계통 전원선로 고장시 실시간 탐지/복구시스템.
  10. 청구항 1항 또는 2항에 있어서, 상기 전원측 탐지/복구기는,
    상기 전원측 탐지/복구기에서 전원을 공급하는 코일의 중간에 중성점을 구성하여 대지에 접지하고 상기 전원 공급선로와 대지의 전위차를 일정하게 유지하도록 하여 누전발생으로 인한 감전, 화재사고 발생을 예방하는 것을 특징으로 하는 배전계통 전원선로 고장시 실시간 탐지/복구시스템.
  11. 청구항 1항 또는 2항에 있어서, 상기 전원측 탐지/복구기는,
    단상 3선식 또는 삼상 4선식의 부하선로를 갖는 배전계통에 연결되어 상기 배전계통에서 중성선 단선시 불평형 과전압의 유입을 방지하여 그로 인한 과열, 화재를 원천적으로 방지하는 것을 특징으로 하는 배전계통 전원선로 고장시 실시간 탐지/복구시스템.
  12. 청구항 2항에 있어서, 상기 전원측 탐지/복구기는,
    삼상 또는 삼상4선식 배전계통에 연결되어 전원측에서 한 상의 퓨즈단선, 선로손상단선, 변압기고장, 기자재소손, 결상, 중성선 단선시에 실시간으로 삼상 전력을 복구하고 부하측에 단상전원을 정전 없이 공급하여 전기고장에 의한 단상전원의 정전을 원천적으로 방지하는 것을 특징으로 하는 배전계통 전원선로 고장시 실시간 탐지/복구시스템.
  13. 단상 또는 삼상전원 배전계통의 전원측 단선, 저항증가, 접촉불량, 반단선, 누전으로 인한 정전, 감전, 화재사고 방지를 위한 시스템에 있어서,
    제1중성점을 구비하고 이 중성점을 대지에 접지하여 대지와의 전위차를 기존전위차 보다 강압하는 전원측 탐지/복구기와;
    제2중성점을 구비하고 이 중성점을 대지에 접지하거나, 상기 전원측 탐지/복구기의 중성점과 연결하여 전원측 전기고장을 실시간 복구하는 부하측 탐지/복구기와;
    상기 부하측 탐지/복구기의 전력선 또는 중성점의 입출력 전류를 검출하거나, 상기 중성점과 대지 전압을 탐지하여 경보 또는 차단하거나 검출한 고장검출 값을 제어기에 전달하는 고장검출기와;
    상기 고장검출기가 제공한 검출값을 기 설정치와 비교하여 고장으로 판단되면 경보를 발령하거나, 전원을 차단하거나, 유무선으로 통보하도록 통신모듈에 전달하고 경보해제신호가 접수되면 경보를 해제하는 제어기와;
    상기 고장검출기 또는 제어기에서 제공받은 경보신호에 따라 경보를 발생하는 경보발생기와;
    상기 경보발생기의 경보발령을 해제하기 위한 경보해제 입력부와;
    상기 고장검출기 또는 제어기의 차단신호에 따라 고장전원을 차단하기 위한 차단기를 포함하는 배전계통 전원선로 고장시 실시간 탐지/복구시스템.
  14. 단상 또는 삼상전원 배전계통의 결상, 단선, 저항증가, 접촉불량, 반단선, 누전으로 인한 정전, 감전, 화재사고 방지를 위한 공사 방법에 있어서,
    a. 단상 또는 삼상전원 배전계통에 전원측 탐지/복구기와 부하측 탐지/복구기 중 적어도 하나를 설치하는 단계;
    b. 상기 전원측 탐지/복구기의 중성점을 대지에 접지하거나 상기 부하측 탐지/복구기의 중성점에 연결하고, 상기 부하측 탐지/복구기의 중성점을 대지에 접지하거나 상기 전원측 탐지/복구기의 중성점에 연결하는 단계;
    c. 상기 전원측 탐지/복구기의 출력코일의 권선과 부하를 연결하거나, 상기 전원측 탐지/복구기의 출력코일의 권선과 상기 부하측 탐지/복구기의 입력코일의 권선을 전기적으로 연결하는 단계;
    d. 상기 전원측 탐지/복구기의 입력전원측 코일권선을 배전계통의 단상 또는 삼상 전원선로에 전기적으로 연결하여, 상기 전원측 탐지/복구기와 전원설비 또는 상기 전원측 탐지/복구기와 상기 부하측 탐지/복구기의 단상 또는 삼상전원의 전원공급설비에서의 결상, 단선, 접촉불량, 또는 저항증가시 복구, 차단, 경보, 통보, 제어 중에 어느 하나 이상을 실시하는 단계를 포함하는 배전계통 전원선로 고장시 실시간 탐지/복구시스템의 공사 방법.
  15. 단상 또는 삼상전원 배전계통의 결상, 단선, 접촉불량, 반단선, 누전으로 인한 정전, 감전, 화재사고 방지를 위한 공사 방법에 있어서,
    a. 단상 또는 삼상전원 배전계통에 전원측 탐지/복구기와 부하측 탐지/복구기 중 적어도 하나를 설치하는 단계;
    b. 상기 전원측 탐지/복구기와 상기 부하측 탐지/복구기의 적어도 하나의 중성점과 대지의 전위를 검출하기 위해 고장검출기를 설치하는 단계;
    c. 상기 전원측 탐지/복구기의 출력코일의 권선과 부하를 연결하거나, 상기 전원측 탐지/복구기의 출력코일의 권선과 상기 부하측 탐지/복구기의 입력코일의 권선을 전기적으로 연결하는 단계;
    e. 상기 전원측 탐지/복구기의 입력전원측 코일권선을 배전계통의 단상 또는 삼상 전원선로에 전기적으로 연결하여, 상기 전원측 탐지/복구기와 전원설비 또는 상기 전원측 탐지/복구기와 상기 부하측 탐지/복구기의 단상 또는 삼상전원의 전원공급설비에서의 결상, 단선, 접촉불량, 또는 저항증가시 복구, 차단, 경보, 통보, 제어 중에 어느 하나 이상을 실시하는 단계를 포함하는 배전계통 전원선로 고장시 실시간 탐지/복구시스템의 공사 방법.
PCT/KR2017/014469 2017-01-11 2017-12-11 배전계통 전원선로 고장시 실시간 탐지/복구시스템 및 그 공사방법 WO2018131797A1 (ko)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US16/477,172 US11402437B2 (en) 2017-01-11 2017-12-11 Real-time detection/recovery system of power line failure in power distribution system and construction method therefor
EP17890925.5A EP3570306B1 (en) 2017-01-11 2017-12-11 Real-time detection/recovery system of power line failure in power distribution system and construction method therefor
CN201780003523.3A CN108604494B (zh) 2017-01-11 2017-12-11 配电系统电源线路故障时的实时检测/修复系统及其施工方法
JP2019558318A JP7263251B2 (ja) 2017-01-11 2017-12-11 配電系統電源線路故障時のリアルタイム探知/復旧システム及びその工事方法

Applications Claiming Priority (6)

Application Number Priority Date Filing Date Title
KR1020170004231A KR20180082844A (ko) 2017-01-11 2017-01-11 전기고장 만능 복구(차단)기
KR10-2017-0004231 2017-01-11
KR1020170026270A KR101803431B1 (ko) 2017-02-28 2017-02-28 단상전원선로 고장 시 실시간복구변압시스템 및 그 공사 방법
KR10-2017-0026270 2017-02-28
KR10-2017-0049489 2017-04-18
KR1020170049489A KR101746366B1 (ko) 2017-04-18 2017-04-18 친환경 절전형 하이브리드 변압기(배전용변압기, 전력용변압기, 지상변압기)

Publications (1)

Publication Number Publication Date
WO2018131797A1 true WO2018131797A1 (ko) 2018-07-19

Family

ID=62839794

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2017/014469 WO2018131797A1 (ko) 2017-01-11 2017-12-11 배전계통 전원선로 고장시 실시간 탐지/복구시스템 및 그 공사방법

Country Status (5)

Country Link
US (1) US11402437B2 (ko)
EP (1) EP3570306B1 (ko)
JP (1) JP7263251B2 (ko)
CN (1) CN108604494B (ko)
WO (1) WO2018131797A1 (ko)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020167950A1 (en) * 2019-02-15 2020-08-20 Virga Systems Llc End of line protection

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6678051B2 (ja) * 2016-03-18 2020-04-08 Ntn株式会社 漏電検出装置
WO2020005577A1 (en) * 2018-06-28 2020-01-02 Kci Licensing, Inc. Distributed negative pressure wound therapy system incorporating an absorbent dressing and piezo-electric pump
KR102046589B1 (ko) * 2018-11-30 2019-12-02 한국전기연구원 자동점검 누전차단기
JP7484550B2 (ja) * 2020-08-07 2024-05-16 富士通株式会社 トランス接続相判定プログラム、装置、及び方法
WO2024090973A1 (en) * 2022-10-25 2024-05-02 Samsung Electronics Co., Ltd. Method and apparatus for coordinated service recovery in wireless network

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10201097A (ja) * 1997-01-10 1998-07-31 Ain:Kk 単相3線式低圧配電システム
KR20090004718A (ko) 2007-07-03 2009-01-12 (주)제일피앤피 접촉불량 감지장치 및 방법
KR101109024B1 (ko) 2010-11-25 2012-02-20 한국전력공사 전력량계의 접촉불량 감지장치 및 감지방법
KR101302806B1 (ko) * 2013-04-29 2013-09-02 김나운 친환경 절전형 전력품질 복구장치를 내장한 수배전반(고압반, 저압반, 전동제어반, 분전반)
KR101320373B1 (ko) 2013-03-21 2013-10-23 (주)계도건설 변압기를 구비한 결상복구장치 및 그 설치공법
KR20150013105A (ko) * 2014-12-29 2015-02-04 김나운 전력계통의 결상 시 결상복구장치
KR20150134563A (ko) * 2014-05-22 2015-12-02 김나운 전력계통에서 고장전력 발생 시 복구장치
KR20160092788A (ko) * 2015-01-28 2016-08-05 동인시스템 주식회사 중성선 전류 제거 장치

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3909672A (en) * 1974-02-07 1975-09-30 Westinghouse Electric Corp Capacitor bank protection relay
JPS5974615A (ja) * 1982-10-22 1984-04-27 Hitachi Ltd 共用変圧器
CN2152330Y (zh) * 1993-04-09 1994-01-05 朱江兰 电器设备智能安全用电监控保护器
JP2948106B2 (ja) * 1994-08-31 1999-09-13 大成建設株式会社 高圧負荷開閉器投入警報装置
JPH10285788A (ja) * 1997-03-31 1998-10-23 Mitsubishi Electric Corp 漏電警報機能付き配線用遮断器
JP2003309033A (ja) * 2002-04-15 2003-10-31 Aiko Denki Kk コイルの巻回方法とそのトランス類
US7295016B2 (en) * 2004-06-18 2007-11-13 Kokusan Denki Co., Ltd. Electric leakage detection system
CN2775810Y (zh) * 2004-12-25 2006-04-26 曹麾 无触电式电力变压器
CN1979989A (zh) * 2005-12-05 2007-06-13 孙斌 低压供电系统的保护方法
CN100547421C (zh) * 2006-03-23 2009-10-07 田忠孝 一种利用中性线取配电线路故障信号的方法及应用
JP5711478B2 (ja) * 2010-08-05 2015-04-30 日立三菱水力株式会社 二重給電同期機の地絡検出装置
US20120147508A1 (en) * 2010-12-08 2012-06-14 Caterpillar Inc. Three phase multi-generator ground fault circuit
US8964423B2 (en) * 2011-08-17 2015-02-24 Honeywell International Inc. Low weight 3-phase 5-output wire power conversion system for micro-grid
CN105375436A (zh) * 2015-12-14 2016-03-02 重庆市亚东亚集团变压器有限公司 中性点电阻柜超时运行自动切除保护装置及方法
CN205982461U (zh) * 2016-08-08 2017-02-22 国网山东省电力公司巨野县供电公司 一种低压配电柜用电检测装置

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10201097A (ja) * 1997-01-10 1998-07-31 Ain:Kk 単相3線式低圧配電システム
KR20090004718A (ko) 2007-07-03 2009-01-12 (주)제일피앤피 접촉불량 감지장치 및 방법
KR101109024B1 (ko) 2010-11-25 2012-02-20 한국전력공사 전력량계의 접촉불량 감지장치 및 감지방법
KR101320373B1 (ko) 2013-03-21 2013-10-23 (주)계도건설 변압기를 구비한 결상복구장치 및 그 설치공법
KR101302806B1 (ko) * 2013-04-29 2013-09-02 김나운 친환경 절전형 전력품질 복구장치를 내장한 수배전반(고압반, 저압반, 전동제어반, 분전반)
KR20150134563A (ko) * 2014-05-22 2015-12-02 김나운 전력계통에서 고장전력 발생 시 복구장치
KR20150013105A (ko) * 2014-12-29 2015-02-04 김나운 전력계통의 결상 시 결상복구장치
KR20160092788A (ko) * 2015-01-28 2016-08-05 동인시스템 주식회사 중성선 전류 제거 장치

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3570306A4

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020167950A1 (en) * 2019-02-15 2020-08-20 Virga Systems Llc End of line protection

Also Published As

Publication number Publication date
JP2020515228A (ja) 2020-05-21
EP3570306A4 (en) 2020-09-09
US11402437B2 (en) 2022-08-02
US20190348216A1 (en) 2019-11-14
CN108604494B (zh) 2021-04-20
EP3570306A1 (en) 2019-11-20
EP3570306B1 (en) 2023-04-12
CN108604494A (zh) 2018-09-28
JP7263251B2 (ja) 2023-04-24

Similar Documents

Publication Publication Date Title
WO2018131797A1 (ko) 배전계통 전원선로 고장시 실시간 탐지/복구시스템 및 그 공사방법
WO2019216626A1 (ko) 전기고장 만능탐지 및 복구 배전시스템 및 그 공사방법
KR101803431B1 (ko) 단상전원선로 고장 시 실시간복구변압시스템 및 그 공사 방법
KR102277716B1 (ko) 배전계통 전원선로 고장시 실시간 탐지/복구시스템 및 그 공사방법
KR102005080B1 (ko) 고장전원 탐지 및 복구가 가능한 자동제어시스템
JP4873763B2 (ja) 貰いロック付漏電検出装置
EP2206208B1 (en) Differential protection method, system and device
KR102169232B1 (ko) 전기고장에 의한 감전 및 화재방지 장치와 방법
KR20190067564A (ko) 배전계통 전원선로 고장시 실시간 탐지/복구시스템 및 그 공사방법
KR20220056052A (ko) 감전에 대한 기본보호, 고장보호 및/또는 추가 보호장치
KR102068625B1 (ko) 전기고장 마스터 탐지기
KR102415477B1 (ko) 전기고장 감지 관리장치
KR101101981B1 (ko) 에스피디 단로장치
KR20160008857A (ko) 하이브리드 변압기
KR20190049662A (ko) 전기고장 만능 복구(차단)기
KR20220056064A (ko) 전기고장 사고(누전, 침수, 서지, 감전, 화재, 정전 등)방지 교통시설 전원공급장치
KR20220056060A (ko) 누전, 지락, 서지에 의한 감전, 화재, 정전사고방지 자동제어반
KR20220056319A (ko) 누전, 지락에 의한 감전, 화재방지 임시배전반(분전반)
Roberts et al. Trip and restore distribution circuits at transmission speeds
KR20230051409A (ko) 스마트 파력원격제어기를 이용하여 원격에서 결상위치 검출 및 차단이 용이한 전력설비 보호용 수배전반
KR20180082844A (ko) 전기고장 만능 복구(차단)기
KR20170042070A (ko) 전력계통에서의 단락 발생시 재해 방지장치 및 방법
JP7505686B2 (ja) 漏電および地絡時の感電および火災を防止する装置、方法および配電システム
RU2695643C1 (ru) Способ трансформации систем электроснабжения TN-C-S и ТТ и система электроснабжения для осуществления способа с защитным вводным разнономинальным коммутационным аппаратом (ВРКА)
KR20220056062A (ko) 누전, 지락에 의한 감전사고 및 화재방지 배전반(분전반, 전동기제어반, 저압반, 고압반)

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17890925

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2019558318

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2017890925

Country of ref document: EP

Effective date: 20190812