WO2018109792A1 - 対基板作業システム - Google Patents

対基板作業システム Download PDF

Info

Publication number
WO2018109792A1
WO2018109792A1 PCT/JP2016/086842 JP2016086842W WO2018109792A1 WO 2018109792 A1 WO2018109792 A1 WO 2018109792A1 JP 2016086842 W JP2016086842 W JP 2016086842W WO 2018109792 A1 WO2018109792 A1 WO 2018109792A1
Authority
WO
WIPO (PCT)
Prior art keywords
communication
confirmation
processing unit
substrate
network
Prior art date
Application number
PCT/JP2016/086842
Other languages
English (en)
French (fr)
Inventor
中井 健二
Original Assignee
株式会社Fuji
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社Fuji filed Critical 株式会社Fuji
Priority to EP16923643.7A priority Critical patent/EP3554017B1/en
Priority to US16/468,579 priority patent/US10979240B2/en
Priority to CN201680091503.1A priority patent/CN110050443B/zh
Priority to JP2018556026A priority patent/JP6764943B2/ja
Priority to PCT/JP2016/086842 priority patent/WO2018109792A1/ja
Publication of WO2018109792A1 publication Critical patent/WO2018109792A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/28Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/28Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
    • H04L12/44Star or tree networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • H04L41/0631Management of faults, events, alarms or notifications using root cause analysis; using analysis of correlation between notifications, alarms or events based on decision criteria, e.g. hierarchy, tree or time analysis
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/08Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
    • H04L43/0823Errors, e.g. transmission errors
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components

Definitions

  • the present invention relates to a technique for dealing with a communication abnormality of a substrate-based work system.
  • FA Vectory Automation
  • Patent Document 1 a technology related to a communication abnormality between the robot controller and the master unit.
  • this FA network when a plurality of communication abnormalities are detected during the robot adjustment operation, only the first communication abnormality is validated (the second and subsequent times are discarded). Thereby, it is suppressed that adjustment work is stopped by detection of communication abnormality.
  • the present invention has been made in view of such circumstances, and it is an object of the present invention to provide an on-board working system capable of shortening the time taken to deal with a communication abnormality by notifying information on the communication abnormality. To do.
  • the present specification is connected to each other via a network and connected to each of the plurality of substrate working apparatuses that perform work on the substrate and each of the plurality of substrate working apparatuses via the network.
  • the management device for managing the plurality of substrate working devices and the plurality of substrate working devices and the management device, and in response to the occurrence of a communication abnormality in the network
  • a first confirmation processing unit for confirming a cause of a communication abnormality in a communication path connecting at least two of the substrate work apparatus and the management apparatus, the fact that a communication abnormality has occurred in the network, and the first confirmation
  • an on-board working system including a notifying unit that notifies a confirmation result by a processing unit.
  • an operator of the substrate work system or the like confirms the notification content of the notification unit, so that a communication abnormality occurs in any communication path or the like in a network connecting a plurality of substrate work devices or management devices. You can see if it may have occurred.
  • FIG. 1 schematically shows the configuration of a substrate-based work system 10 of the present embodiment.
  • the on-board working system 10 includes a plurality of production lines 13 for mounting electronic components 12 on a substrate 11.
  • Each of the plurality of production lines 13 includes, for example, a substrate loading machine 21, a printing machine 22, a plurality of mounting systems 24, a mounting work result inspection machine 25, a reflow furnace 27, and a final inspection machine 28 in order from the upstream side of the line. Is arranged in.
  • the board 11 is mounted with the electronic component 12 through the devices and the like sequentially.
  • the on-board working system 10 includes a management computer 15 that controls each of the above-described substrate loading machines 21 and the like, and a host computer 16 connected to the management computer 15.
  • each apparatus etc. which comprise the above-mentioned production line 13 are examples of the to-substrate working apparatus which performs the operation
  • the printing machine 22 prints a predetermined pattern of solder on the board 11 carried in from the board loading machine 21 on the upstream side.
  • the mounting system 24 mounts the electronic component 12 on the substrate 11 carried from the printing machine 22.
  • the mounting work result inspection machine 25 inspects whether or not the electronic component 12 is mounted on the board 11.
  • the reflow furnace 27 heats the substrate 11 determined to be good by the mounting work result inspection machine 25.
  • the solder printed on the substrate 11 is melted and solidified by being cooled after being heated. As a result, the electronic component 12 is bonded to the substrate 11.
  • the final inspection machine 28 inspects the state and the like of the electronic component 12 bonded to the substrate 11.
  • the management computer 15 is connected to the substrate loading machine 21 and the like via the first network 18.
  • the management computer 15 includes a storage device 15A.
  • the storage device 15A includes, for example, a hard disk and a nonvolatile memory.
  • various information related to a plurality of production lines 13, for example, information on production plans related to the types and production quantities of the substrates 11 produced on each production line 13, and the various substrates 11 are produced. Therefore, a production program for controlling the operation of the substrate loading machine 21 and the like is stored.
  • the storage device 15A stores a process for transmitting a production program or the like to the substrate loading machine 21 or the like, and a management program PG for recording and managing transmission information.
  • the management computer 15 executes a management program PG with the CPU 15E (see FIG. 2), thereby realizing a function of transmitting a production program or the like to the substrate loading machine 21 or the like of each production line 13 via the first network 18.
  • each mounting system 24 mounts the electronic component 12 on the board 11 based on the mounting position set in the received production program.
  • the host computer 16 is connected to the management computer 15 via the second network 19.
  • An operator or the like of the production line 13 can change the production program transmitted from the management computer 15 to the substrate loading machine 21 or the like by operating the input device 16A (see FIG. 2) of the host computer 16, for example. . Thereby, the operator etc. can change the operation
  • one mounting system 24 includes one base 31, two modules 32 arranged side by side on the base 31, and two mounting devices 33 arranged on the module 32. I have.
  • the two mounting devices 33 arranged in the module 32 are connected to each other via a LAN hub 36 provided in the module 32.
  • the LAN hub 36 is connected to each of the two mounting devices 33 via the LAN cable LN1.
  • Each of the LAN hubs 36 is connected to a LAN hub 20 provided in a communication room (not shown) of a production factory via a LAN cable LN2.
  • the two modules 32 provided on the base 31 are connected to each other via the LAN hub 20 and the LAN cable LN2.
  • the LAN hubs 20 and 36 are switching hubs, for example.
  • the LAN hub 20 is connected to a communication circuit 15B included in the management computer 15 via a LAN cable LN3.
  • each of the mounting devices 33 is connected to the management computer 15 by the first network 18 via the LAN cables LN1 to LN3 and the LAN hubs 20 and 36.
  • the first network 18 is constituted by, for example, a star-type local area network in which LAN cables LN2 and the like are concentrated by the LAN hub 20, and can perform communication conforming to the TCP / IP protocol.
  • the network configuration of the first network 18 is an example, and can be changed as appropriate according to the arrangement of the mounting system 24 and the like.
  • the communication protocol adopted for the first network 18 is not limited to the TCP / IP protocol, and other communication protocols may be adopted.
  • the communication of the first network 18 is not limited to wired communication, and may be wireless communication.
  • the management computer 15 includes a storage device 15A, a communication circuit 15B, a communication circuit 15C, a confirmation processing unit 15D, a CPU 15E, and the like.
  • the communication circuits 15B and 15C can execute communication conforming to the TCP / IP protocol, for example.
  • the storage device 15A and the communication circuits 15B and 15C are connected to each other by, for example, an internal bus of a processing board on which the CPU 15E is mounted.
  • the communication circuit 15C is connected to the LAN hub 29 via the LAN cable LN5.
  • the LAN hub 29 is connected to the communication circuit 16B of the host computer 16 via the LAN cable LN6.
  • the host computer 16 is connected to the management computer 15 by the second network 19 via the LAN cables LN5 and LN6 and the LAN hub 29.
  • the second network 19 is a network different from the first network 18 of the production factory, for example, and is an in-house network used in an office or the like.
  • the host computer 16 includes a display device 16C in addition to the input device 16A and the communication circuit 16B. For example, the host computer 16 displays the change contents of the production program input via the input device 16A on the display device 16C.
  • FIG. 3 shows a block diagram of the mounting device 33.
  • the mounting device 33 includes a main control unit 41, a display device 42, a supply device 43, a mounting head 44, a servo substrate 46, an image processing substrate 47, a power supply unit 48, a LAN, And an interface 49.
  • the main control unit 41 is, for example, a processing board provided with a CPU, a memory, and the like, and controls the display device 42, the servo board 46, and the like, and comprehensively controls the operation of the mounting device 33.
  • the display device 42 is, for example, a touch panel, and includes a liquid crystal panel, a light source such as an LED that emits light from the back side of the liquid crystal panel, a contact sensing film bonded to the surface of the liquid crystal panel, and the like.
  • the display device 42 displays information related to the mounting device 33 according to the operation content from the operator.
  • the supply device 43 includes, for example, a plurality of tape feeders that supply the electronic component 12 from a carrier tape obtained by tapering the electronic component 12 (see FIG. 1).
  • the supply device 43 is connected to the main control unit 41 via the communication line 51A.
  • the supply device 43 supplies the electronic component 12 to the supply position at a predetermined timing based on the control of the main control unit 41.
  • the supply device 43 is not limited to the feeder-type supply device, and may be a tray-type supply device that supplies the electronic component 12 arranged on the tray, for example.
  • the mounting head 44 includes a motor 44A that functions as a drive source and a mark camera 44B.
  • the servo board 46 is connected to the main control unit 41 via the communication line 51B.
  • the servo board 46 transmits the encoder information received from the encoder of the motor 44A to the main control unit 41 via the communication line 51B.
  • the servo board 46 controls electric power (such as a three-phase alternating current) supplied to the motor 44A based on control information from the main control unit 41.
  • the motor 44A is controlled in its rotational position and speed.
  • the motor 44A changes the position of the mounting head 44, the position of a suction nozzle (not shown) that sucks and holds the electronic component 12, and the like.
  • the mounting head 44 sucks and mounts the electronic component 12 supplied to the supply position of the supply device 43 on the substrate 11 in accordance with the driving of the motor 44A.
  • the mark camera 44B is a camera for imaging a mark provided on the substrate 11, for example.
  • the mark here is, for example, identification information for identifying the substrate 11.
  • a mark identifies, for example, a defective processing substrate among a plurality of processing substrates when a plurality of processing substrates (such as a small smartphone substrate) are manufactured together on one substrate 11. It is identification information to do.
  • the image processing board 47 is connected to the main control unit 41 via the communication line 51C.
  • the image processing board 47 issues an imaging instruction to the mark camera 44B based on the control of the main control unit 41.
  • the image processing board 47 corrects the image data received from the mark camera 44 ⁇ / b> B and transmits the corrected image data to the main control unit 41. Accordingly, the main control unit 41 can appropriately perform the mounting operation by changing the position or the like for moving the mounting head 44 based on the image data captured by the mark camera 44B.
  • the power supply unit 48 functions as a drive source for supplying power to the main control unit 41, the display device 42, the supply device 43, the mounting head 44, the servo substrate 46, and the image processing substrate 47 described above.
  • the mounting device 33 is connected to the LAN hub 36 (see FIG. 2) via a LAN cable LN1 connected to the LAN interface 49.
  • the supply device 43 is connected to the main control unit 41 via the external interface 52A.
  • the servo board 46 is connected to the main control unit 41 via the external interface 52B.
  • the image processing board 47 is connected to the main control unit 41 via the external interface 52C.
  • Each of the external interfaces 52A, 52B, and 52C outputs, for example, a confirmation signal SI1 indicating whether or not power is supplied from the power supply unit 48 to the main control unit 41.
  • the external interface 52A outputs a high-level confirmation signal SI1 when power is supplied from the power supply unit 48 to the supply device 43.
  • the external interface 52A is at a low level in a state in which power is not supplied from the power supply unit 48 to the supply device 43, or in a state in which power is supplied but is not activated (power is not turned on).
  • the confirmation signal SI1 is output. Accordingly, the main control unit 41 can determine the power supply state of the supply device 43 and the like by detecting the confirmation signal SI1 output from each of the external interfaces 52A to 52C.
  • the supply device 43, the servo board 46, and the image processing board 47 described above are examples of the sub-control unit in the present application.
  • the management computer 15 includes a confirmation processing unit 15D for confirming the cause of the communication abnormality in the communication path of the first network 18 when a communication abnormality occurs.
  • the main control unit 41 of each mounting device 33 includes a first confirmation processing unit 41A and a second confirmation processing unit 41B.
  • the processing by the confirmation processing unit 15D, the first confirmation processing unit 41A, and the second confirmation processing unit 41B may be realized, for example, by executing a program with a CPU provided in the main control unit 41 or the like.
  • the confirmation processing unit 15D and the like may be configured with dedicated hardware. The confirmation of the cause of the communication abnormality by the second confirmation processing unit 41B will be described later.
  • the substrate work system 10 downloads the network configuration information D ⁇ b> 1 from the management computer 15 to each mounting device 33.
  • the network configuration information D1 is information for specifying a transmission destination (such as the mounting device 33) when transmitting data in the first network 18.
  • the network configuration information D1 is, for example, data in which identification information for identifying each mounting device 33 is associated with an IP address set in the LAN interface 49 of each mounting device 33.
  • the network configuration information D1 is used when, for example, when a communication abnormality occurs, the abnormal part of the communication path is confirmed by using the PING data D4 (see FIG.
  • the mounting apparatus 33 can acquire the network configuration information D1 corresponding to the latest network configuration by acquiring the network configuration information D1 every time it is activated.
  • the mounting device 33 may be configured to acquire the network configuration information D1 only when the network configuration is changed.
  • the main control unit 41 of each mounting device 33 stores the network configuration information D1 downloaded from the management computer 15 in, for example, the memory 41C (see FIG. 3).
  • the substrate work system 10 starts a mounting work based on the production program or production plan generated by the worker (S12).
  • the first confirmation processing unit 41A of each mounting device 33 determines whether there is a communication abnormality (S13). 41 A of 1st confirmation process parts repeatedly perform the process of S13, when communication abnormality is not detected (S13: NO).
  • FIG. 6 shows an example of a state where a communication abnormality has occurred.
  • a plurality of mounting devices 33 are sequentially installed from the mounting devices 33 arranged on the upstream side of the production line 13 in order to distinguish them from each other. .. and will be described as 33Z.
  • the mounting devices 33 are collectively referred to without being distinguished from each other, they are referred to as mounting devices 33 without an alphabet after the reference numerals.
  • the most upstream mounting device 33A indicates a defective substrate among the plurality of processing substrates.
  • Check which processing substrate the mark is attached to For example, before the mounting operation of the electronic component 12 on the substrate 11 is started, the mounting device 33A captures and confirms marks on each processing substrate by the mark camera 44B (see FIG. 3).
  • the mounting apparatus 33A transmits setting data D2 toward the downstream mounting apparatus 33B prior to transporting the substrate 11 to the downstream side.
  • the setting data D2 is data indicating the position of the defective processing board, that is, the position of the processing board that does not require the mounting operation of the electronic component 12.
  • the setting data D2 is an example of setting data related to the substrate work in the present application.
  • the setting data D2 is not limited to the information on the defective substrate described above.
  • the setting data D2 may be data on the conveyance timing and speed of the substrate 11 commonly used in each apparatus (substrate loading machine 21 and the like) on the production line 13.
  • the second mounting device 33B from the upstream transmits the setting data D2 received from the mounting device 33A to the downstream mounting device 33C.
  • the downstream mounting devices 33 after the mounting device 33B can transfer the setting data D2 to the downstream side, thereby omitting duplicate work (improving work efficiency).
  • the first confirmation processing unit 41A of the mounting device 33B confirms that a communication abnormality has occurred in the first network 18 in response to no response indicating that the setting data D2 has been received from the downstream mounting device 33C. Detect (S13: YES).
  • the first confirmation processing unit 41A detects the occurrence of a communication abnormality when, for example, there is no normal response in communication associated with the mounting operation.
  • the communication error of the setting data D2 may be detected by the confirmation processing unit 15D of the management computer 15.
  • the communication system 10 detects a communication abnormality, the mounting operation is stopped, and a warning sound or the like is generated from the mounting device 33B with the device in a safe state (a state where the mounting head 44 is retracted). Also good.
  • the first confirmation processing unit 41A of the mounting device 33B confirms whether communication with the management computer 15 is possible (S14).
  • the first confirmation processing unit 41 ⁇ / b> A transmits to the management computer 15 data indicating that a communication abnormality has been detected and a response is requested toward the management computer 15.
  • the first confirmation processing unit 41A of the mounting apparatus 33B confirms the response from the management computer 15 (S14: YES). Since the first confirmation processing unit 41A confirms that there is no communication abnormality (S14: YES), the first confirmation processing unit 41A stops the process of confirming the cause of the subsequent communication abnormality (S15).
  • the management computer 15 since the management computer 15 has received a notification that a communication abnormality has occurred from the first confirmation processing unit 41A of the mounting device 33B, the management computer 15 starts a process of confirming the cause of the communication abnormality of the first network 18 (S15).
  • the confirmation processing unit 15D of the management computer 15 confirms for all devices (such as the mounting device 33) connected to the first network 18 every predetermined time after the on-board work system 10 is started, for example.
  • Data D3 (an example of third confirmation data) is transmitted.
  • the confirmation processing unit 15D transmits confirmation data D3 designating a broadcast address as an IP address and confirms a response from each device (the mounting device 33 or the like).
  • the confirmation process part 15D preserve
  • the confirmation processing unit 15D receives all the data informing the occurrence of the communication abnormality in the first network 18 from the mounting device 33B, and all of the devices connected to the first network 18 are received.
  • the confirmation data D3 is transmitted again to the apparatus (S16).
  • the confirmation processing unit 15D compares the result of the response to the normal confirmation data D3 stored in the storage device 15A in advance with the result of the response to the abnormality confirmation data D3 executed in S16, and performs communication on the communication path. Check the cause of the error.
  • the confirmation processing unit 15D detects a communication path in which a communication abnormality has occurred based on the comparison result and the network configuration. In this case, since there is no response from the mounting device 33C among the two mounting devices 33C and 33D connected to the same LAN hub 36, the confirmation processing unit 15D communicates with the communication path from the LAN hub 36 to the mounting device 33C. It is possible to detect that an abnormality has occurred. Therefore, the confirmation processing unit 15D can detect the possibility of disconnection of the LAN cable LN1 that connects the mounting device 33C and the LAN hub 36.
  • the confirmation processing unit 15D executes processing for displaying a communication abnormality and confirmation result (S17).
  • the confirmation processing unit 15D displays, for example, that a communication error has occurred on the display device 16C of the host computer 16 or the display device 42 of the mounting device 33B that has detected the communication error (S17).
  • the first confirmation processing unit 41A of the mounting device 33B switches the display of the display device 42 based on the data received from the confirmation processing unit 15D of the management computer 15.
  • FIG. 7 shows an example of display on the display device 42.
  • the module ID (MID-00A-011) illustrated in FIG. 7 is identification information of the module 32 including the mounting device 33C.
  • the LAN cable LN1 that connects the upstream mounting device 33C and the LAN hub 36 out of the two mounting devices 33C and 33D provided in one module 32 should be confirmed.
  • a message to that effect is displayed on the display device 42 (see FIG. 7).
  • the operator can confirm in which communication path the communication abnormality has occurred by confirming the display on the display device 42.
  • the confirmation result may be displayed not only on the display device 42 but also on the display device 16C (notification unit) of the management computer 15.
  • the mounting device 33B that detects the communication abnormality may notify the operator of the abnormality by turning on a warning light or sounding a buzzer. Further, the mounting device 33B may perform display or notification on the worker's mobile terminal.
  • the management program PG is not correctly executed in the CPU 15E of the management computer 15 described above, or the management program PG is stopped, so that the communication between the mounting device 33 and the management computer 15 is performed.
  • An abnormality may occur.
  • the first confirmation processing unit 41A of each mounting device 33 detects a communication error when there is no response from the management computer 15 even though it is necessary to communicate with the management computer 15 during the mounting operation (see FIG. 4). S13: YES), communication with the management computer 15 is disabled (S14: NO).
  • the first confirmation processing unit 41A confirms the execution of the management program PG in the management computer 15 (S19 in FIG. 5).
  • FIG. 8 shows communication for confirming the management program PG.
  • FIG. 8 shows a simplified configuration of the substrate work system 10 shown in FIG. 2 in order to avoid complication of the drawing.
  • the first confirmation processing unit 41A that has detected an abnormality in communication with the management computer 15 performs a control command CMD (second confirmation for confirming whether or not the management program PG is correctly executed as shown in FIG. Data) is transmitted to the management computer 15.
  • the CPU 15E see FIG. 2) of the management computer 15 executes a monitoring program for monitoring the execution state of the management program PG separately from the management program PG.
  • the first confirmation processing unit 41A transmits a control command CMD to this monitoring program, and confirms whether the management program PG is correctly executed.
  • the first confirmation processing unit 41A may inquire the execution state of the management program PG by transmitting a control command CMD to the operating system (OS) of the management computer 15, for example.
  • OS operating system
  • the first confirmation processing unit 41A When the first confirmation processing unit 41A receives from the management computer 15 that the management program PG is not correctly executed (S19: YES), it executes S17 in FIG.
  • the first confirmation processing unit 41 ⁇ / b> A may display on the display device 42 that the management computer PG execution error has occurred in the management computer 15 together with the communication abnormality occurring.
  • the operator can execute an appropriate response such as operating the host computer 16 to restart the management computer 15.
  • the management computer 15 may automatically restart or the like based on detection of an execution error of the management program PG.
  • the first confirmation processing unit 41A performs a traffic amount determination (S21).
  • the first confirmation processing unit 41A detects the amount of data transmitted / received between the mounting device 33 including the first confirmation processing unit 41A and the first network 18 (S21).
  • the main control unit 41 and the image processing board 47 are connected to the LAN interface 49 (LAN cable LN1) and share a communication path connected to the first network 18. . Therefore, for example, when a large amount of image data is transmitted from the image processing board 47 to the management computer 15 and communication congestion occurs, the main control unit 41 sharing the communication path cannot communicate with the management computer 15 (communication abnormality (communication). Delay).
  • the first confirmation processing unit 41A inquires the LAN interface 49 about the data amount to be transmitted / received, and determines that communication congestion has occurred when data exceeding the predetermined data amount is transmitted / received ( S21: YES).
  • the first confirmation processing unit 41A When congestion has occurred (S21: YES), the first confirmation processing unit 41A notifies the unit (for example, the main control unit 41) waiting for data transmission that the congestion has occurred, and for a predetermined time. After the elapse, the main control unit 41 is instructed to retransmit data (S22). Thereby, when communication congestion is temporary, the main control unit 41 can communicate with the management computer 15. When the main control unit 41 retransmits the data and receives a reception notification from the management computer 15 (S23: YES), the main control unit 41 notifies the first confirmation processing unit 41A to that effect. 41 A of 1st confirmation process parts start the process from S13 of FIG. In this case, since no physical failure such as disconnection has occurred in the first network 18, the implementation work can be continued while avoiding temporary communication congestion.
  • the main control unit 41 notifies the first confirmation processing unit 41A that data retransmission has failed.
  • the first confirmation processing unit 41A executes processing for displaying that a communication abnormality has occurred and a confirmation result (possibility of communication congestion) (S17 in FIG. 4).
  • the first confirmation processing unit 41A may check not only the traffic amount of the LAN interface 49 but also the data traffic amount of the LAN hub 36, for example, and confirm the communication congestion in the LAN hub 36.
  • the first confirmation processing unit 41A executes a confirmation process of the cause of communication abnormality by the PING data D4 (S24).
  • a process in which the first confirmation processing unit 41A of the mounting apparatus 33A transmits the PING data D4 will be described with reference to FIG.
  • the first confirmation processing unit 41A determines the transmission destination of the PING data D4 based on the network configuration information D1 downloaded from the management computer 15 in S11 (S24).
  • the network configuration information D1 in addition to the identification information and the IP address of each mounting device 33, a procedure for identifying an abnormal portion of the communication path is set.
  • the procedure for example, a procedure for separating an abnormal part from the management computer 15 side (upstream side) of the first network 18 is set.
  • the first confirmation processing unit 41A of the mounting device 33A transmits the PING data D4 toward the mounting device 33C connected via the LAN hub 20, as shown in FIG. 9 (FIG. 9). (See the transmission path 61 in the middle).
  • FIG. 9 FIG. 9
  • the communication path of “mounting device 33A ⁇ LAN hub 36 ⁇ LAN hub 20 ⁇ LAN hub 36 ⁇ mounting device 33C” is normal.
  • communication with the management computer 15 is impossible in S14 (S14: NO), and communication between the mounting device 33A and the LAN hub 20 is possible.
  • the first confirmation processing unit 41A of the mounting device 33A determines that there is a possibility of abnormality in the communication path between the LAN hub 20 and the management computer 15 (such as disconnection of the LAN cable LN3). It should be noted that the procedure for isolating the abnormal location based on the PING data D4 and the determination method after the isolation are appropriately changed according to the configuration of the first network 18. In addition, the first confirmation processing unit 41A first transmits the PING data D4 to the management computer 15 before transmitting the PING data D4 to the mounting device 33C, and the communication abnormality with the management computer 15 is detected. You may check again.
  • the first confirmation processing unit 41A of the mounting device 33A transmits the PING data D4 to the mounting device 33B connected to the same LAN hub 36 (transmission path 62 in FIG. 9). reference).
  • the first confirmation processing unit 41A determines that there is a possibility that there is an abnormality in, for example, equipment on the upstream side of the LAN hub 36 (LAN hub 20 or LAN cable LN2). Further, when there is no response from the mounting device 33B, the first confirmation processing unit 41A may have an abnormality on the downstream side of the LAN hub 36 (failure of the LAN hub 36 or disconnection of the LAN cable LN1), for example. judge.
  • the first confirmation processing unit 41A determines in which communication path of the first network 18 the communication abnormality has occurred. Then, the first confirmation processing unit 41A executes, for example, a process of displaying the fact that a communication abnormality has occurred and the confirmation result on the mounting device 33 including the first confirmation processing unit 41A (the mounting device 33A in the above example). (S17 in FIG. 3).
  • each of the supply device 43, the servo board 46, and the image processing board 47 is connected to the main control unit 41 via external interfaces 52A to 52C.
  • the second confirmation processing unit 41B of the main control unit 41 can determine whether or not power is supplied to the supply device 43 and the like by detecting the confirmation signal SI1 output from each of the external interfaces 52A to 52C. Accordingly, the second confirmation processing unit 41B confirms whether the confirmation signal SI1 is output from each of the external interfaces 52A to 52C when a communication abnormality occurs in the communication lines 51A to 51C. It can be confirmed whether the communication is abnormal due to disconnection of 51A to 51C or the communication abnormality due to the fact that power is not supplied to the supply device 43 or the like.
  • the main control unit 41 responds from the supply device 43 even though the initial setting data is transmitted to the supply device 43 via the communication line 51A.
  • the confirmation process by the second confirmation processing unit 41B is executed.
  • the second confirmation processing unit 41B confirms whether or not the normal confirmation signal SI1 (high level confirmation signal SI1) is output from the external interface 52A.
  • the high-level confirmation signal SI1 is output, that is, when power is supplied to the supply device 43
  • the second confirmation processing unit 41B determines, for example, that the communication line 51A is disconnected.
  • the second confirmation processing unit 41B determines that a failure related to the supply of power has occurred in the supply device 43.
  • the second confirmation processing unit 41B displays, on the display device 42, for example, the fact that a communication abnormality has occurred in the communication lines 51A to 51C and the confirmation result. Thereby, the second confirmation processing unit 41B can confirm a communication abnormality that is difficult to find, such as a disconnection of the communication line 51A in the mounting device 33, and can notify the operator.
  • the substrate loading machine 21, the printing machine 22, the mounting system 24 (mounting apparatus 33), the mounting work result inspection machine 25, the reflow furnace 27, and the final inspection machine 28 are examples of the substrate working apparatus.
  • the management computer 15 is an example of a management device.
  • the first confirmation processing unit 41A and the confirmation processing unit 15D are examples of a first confirmation processing unit.
  • the display device 42 and the display device 16C are examples of a notification unit.
  • the PING data D4 is an example of first confirmation data.
  • the control command CMD is an example of second confirmation data.
  • the confirmation data D3 is an example of third confirmation data.
  • the electronic component 12 is an example of a component.
  • the supply device 43, the servo substrate 46, and the image processing substrate 47 are examples of the sub control unit.
  • the on-board working system 10 of the present embodiment is connected to each other via the first network 18 (network), and a plurality of on-board working devices (for example, the mounting device 33) that perform work on the substrate 11,
  • a management computer 15 (management device) that is connected to each of the plurality of mounting devices 33 via the first network 18 and manages the plurality of mounting devices 33, and at least one of the plurality of mounting devices 33 and the management computer 15
  • First confirmation processing unit first confirmation processing unit 41A and confirmation processing unit 15D
  • the first network And that communication abnormality has occurred in 8 comprising notifying unit for notifying the verification result of the first checking processor 41A etc.
  • display device 42, a display device 16C the.
  • the first confirmation processing unit 41A or the like confirms the cause of the communication abnormality in the communication path between the two devices in accordance with the occurrence of the communication abnormality in the first network 18, thereby communicating on the communication path. You can check whether an abnormality has occurred.
  • the display device 42 and the like notify the confirmation result of the first confirmation processing unit 41A and the like to the operator of the substrate work system 10 in addition to the fact that the communication abnormality of the first network 18 has occurred.
  • the operator or the like confirms the display content of the display device 42 or the like, and in which communication path or the like has occurred in which communication path in the first network 18 connecting the plurality of mounting devices 33 and the management computer 15. You can check if there is a possibility. An operator or the like can quickly carry out the isolation and grasping of the abnormal part, and thus can shorten the time required for dealing with the communication abnormality.
  • the first confirmation processing unit 41A and the like confirm the cause of communication abnormality in the communication path by performing confirmation communication between at least two of the plurality of mounting devices 33 and the management computer 15.
  • the first confirmation processing unit 41A or the like intentionally performs confirmation communication between the two devices after the occurrence of the communication abnormality, for example, whether or not there is a response to the confirmation data, the content of the response, etc. Based on the above, it is possible to confirm the occurrence of communication abnormality in the communication path.
  • the on-board working system 10 further includes network configuration information D1 necessary for specifying a transmission destination when data is transmitted to each of the plurality of mounting apparatuses 33 via the first network 18.
  • the first confirmation processing unit 41 ⁇ / b> A is provided in at least one mounting device 33 among the plurality of mounting devices 33, and at least one of the other mounting devices 33 and the management computer 15 according to the occurrence of a communication abnormality in the first network 18.
  • PING data D4 (first confirmation data) is transmitted to one apparatus based on the network configuration information D1, and a cause of communication abnormality in the communication path is confirmed according to a response to the PING data D4 (S24 in FIG. 5). ).
  • the first confirmation processing unit 41A in response to the occurrence of the communication abnormality, directs the PING data D4 toward other devices on the first network 18 (devices other than the mounting device 33 that transmits the PING data D4). And check for communication errors in each communication path based on the presence / absence / content of responses from other devices. Thereby, the first confirmation processing unit 41A can confirm on which communication path on the first network 18 the communication abnormality has occurred based on the presence or absence of a response.
  • the management computer 15 executes a management program PG for managing a plurality of mounting devices 33.
  • the first confirmation processing unit 41A is provided in at least one mounting device 33 among the plurality of mounting devices 33, and the management program PG is correctly executed in response to the occurrence of a communication abnormality in the communication path with the management computer 15.
  • Control command CMD second confirmation data
  • Confirm S19 in FIG. 5).
  • the first confirmation processing unit 41A transmits the control command CMD (second confirmation data) to the management computer 15 in response to the occurrence of a communication abnormality in the communication path with the management computer 15.
  • the management computer 15 executes the management program PG (application or process)
  • the management program PG may not be correctly executed (application is started) due to a setting error or the like.
  • the attachment device 33 even if there is no abnormality in the communication path between the attachment device 33 and the management computer 15, it is difficult for the attachment device 33 to obtain a response from the management computer 15 (application or the like), and there is a possibility of detecting a communication abnormality. There is.
  • the first confirmation processing unit 41A determines whether or not the management program PG is correctly executed according to the presence / absence / content of the response of the management computer 15 to the control command CMD. Accordingly, the first confirmation processing unit 41A can confirm whether a communication abnormality has occurred due to a communication path disconnection or the like, or whether a communication abnormality (no response) has occurred due to an application stop or the like. .
  • the first confirmation processing unit 41A is provided in at least one mounting device 33 among the plurality of mounting devices 33, and communicates with the management computer 15 in response to the occurrence of a communication abnormality in the first network 18. The cause of the communication abnormality in the route is confirmed. If it is confirmed that there is no abnormality, the subsequent communication abnormality confirmation process is stopped (S15 in FIG. 4).
  • the first confirmation processing unit 41A is provided in at least one mounting device 33 among the plurality of mounting devices 33. If the communication path to the management computer 15 is normal, the first confirmation processing unit 41A stops the subsequent confirmation processing. Thereby, for example, when the management computer 15 is also provided with a function for confirming an abnormality in the communication path, the management computer 15 can start the confirmation process in place of the first confirmation processing unit 41A. As a result, an appropriate confirmation process can be executed by the management computer 15 that communicates to manage the plurality of mounting devices 33, that is, by the management computer 15 that communicates more generally in the first network 18. In addition, it is possible to prevent duplicate confirmation processing from being executed between the mounting device 33 and the management computer 15, and to suppress communication congestion associated with the confirmation processing.
  • the confirmation processing unit 15D (first confirmation processing unit) is provided in the management computer 15, and is directed to all devices connected to the first network 18 every predetermined time for confirmation data D3 (third (Confirmation data) is transmitted, and the result of the response to the confirmation data D3 in a state where the communication of the first network 18 is normal is stored.
  • the confirmation processing unit 15D retransmits the confirmation data D3 to all devices connected to the first network 18 in response to the occurrence of a communication abnormality in the first network 18 for confirmation of normality and abnormality.
  • the result of the response to the data D3 is compared to confirm the cause of communication abnormality in the communication path (S16 in FIG. 4).
  • the confirmation processing unit 15D (first confirmation processing unit) transmits the confirmation data D3 to all devices on the first network 18, and stores the response result at the normal time in advance. Then, the confirmation processing unit 15D transmits the confirmation data D3 again in response to the occurrence of the communication abnormality, and compares the response results between the normal time and the abnormal time, thereby confirming the communication abnormality of the plurality of communication paths at a time. be able to. Accordingly, the confirmation processing unit 15D can quickly confirm on which communication path the communication abnormality has occurred.
  • the first confirmation processing unit 41A is provided in at least one mounting device 33 among the plurality of mounting devices 33, and the communication abnormality in the communication path connected to the mounting device 33 including the first confirmation processing unit 41A is detected.
  • the amount of data transmitted / received between the mounting device 33 including the first confirmation processing unit 41A and the first network 18 is detected according to the occurrence, and the mounting device including the first confirmation processing unit 41A according to the detection result.
  • the cause of the communication abnormality in the communication path connected to 33 is confirmed (S21 in FIG. 5).
  • the first confirmation processing unit 41A transmits / receives to / from the first network 18 when a communication abnormality occurs in the communication path connected to the mounting device 33 including the first confirmation processing unit 41A. Detect the amount of data. For example, when a large amount of data is transmitted from an arbitrary unit (for example, the image processing board 47) in one mounting device 33 and communication congestion occurs, another unit (for example, the main unit) that shares the communication path is used. In the control unit 41), a communication abnormality (communication disconnection or delay) occurs. For example, when the amount of data transmitted / received is detected and congestion has not occurred, the first confirmation processing unit 41A can notify (display) the possibility of a communication abnormality to the display device 42. Further, the first confirmation processing unit 41A can start confirming other factors (such as disconnection of the LAN cable LN1) as the factors causing the communication abnormality.
  • factors such as disconnection of the LAN cable LN1
  • the first confirmation processing unit 41A notifies the display device 42 that there is no abnormality in the communication path connected to the mounting device 33 including the first confirmation processing unit 41A (display). )it can.
  • the first confirmation processing unit 41A notifies the confirmation result (congestion has occurred) to, for example, a unit waiting for data transmission.
  • the unit waiting for transmission can execute an appropriate response such as executing retransmission of data after a while, that is, after waiting for the end of a large amount of data transmission.
  • the plurality of mounting devices 33 transmit setting data D2 related to the substrate work from the upstream mounting device 33 to the downstream mounting device 33 in the production line 13 that performs the work on the substrate 11. is there.
  • the first confirmation processing unit 41A and the confirmation processing unit 15D confirm the cause of the communication abnormality in the communication path according to the occurrence of the abnormality in the transmission of the setting data D2.
  • the plurality of mounting apparatuses 33 transmit the setting data D2 related to the board work from the upstream apparatus to the downstream apparatus.
  • the downstream mounting device 33 can omit a part of the work (inspection work, etc.) that overlaps with the upstream mounting device 33 and can improve the work efficiency.
  • the first confirmation processing unit 41A and the confirmation processing unit 15D check the cause of the communication abnormality when the transmission of the setting data D2 is abnormal, and if a communication abnormality occurs, for example, instead of the upstream mounting device 33 Appropriate measures such as having the setting data transmitted from the management computer 15 to all mounting devices 33 can be executed.
  • Each of the plurality of mounting devices 33 is a mounting device for mounting the electronic component 12 (component) on the substrate 11, and is connected to the main control unit 41 and the main control unit 41 via the communication lines 51A to 51C.
  • a sub-control unit (a supply device 43, a servo substrate 46, and an image processing substrate 47) that executes processing based on the control of the main control unit 41, and a power supply unit 48 that supplies power to the supply device 43 and the like.
  • the supply device 43 and the like have external interfaces 52A to 52C that output a confirmation signal SI1 indicating whether power is supplied from the power supply unit 48 or not.
  • the main control unit 41 includes a second confirmation processing unit 41B that confirms whether or not the confirmation signal SI1 is output from the external interfaces 52A to 52C in response to the occurrence of a communication abnormality in the communication lines 51A to 51C. .
  • the notification unit (display device 42, display device 16C) notifies that a communication abnormality has occurred in the communication lines 51A to 51C and the confirmation result by the second confirmation processing unit 41B.
  • the second confirmation processing unit 41B receives the confirmation signal SI1 of the external interfaces 52A to 52C in response to the occurrence of a communication abnormality in the communication lines 51A to 51C that connect the main control unit 41 and the supply device 43 and the like. Check the output.
  • the display device 42 and the like notify the operator and the like of the confirmation result by the second confirmation processing unit 41B in addition to the fact that the communication abnormality has occurred in the communication lines 51A to 51C.
  • the operator or the like confirms the notification content of the display device 42 or the like, so that the communication abnormality due to the disconnection of the communication lines 51A to 51C or the like, or the power is supplied to the supply device 43 or the like (sub control unit) in the first place. You can check if there is a communication error due to not being turned on. An operator or the like can quickly carry out the isolation and grasping of the abnormal part, and thus can shorten the time required for dealing with the communication abnormality.
  • the mounting device 33 performs the communication abnormality confirmation process.
  • another substrate work apparatus for example, the substrate loading machine 21
  • the on-board working system 10 performs various communication confirmation processes, S14 and S16 (broadcast) in FIG. 4, S19 (management program PG), S21 (communication amount), and S24 (PING data D4) in FIG. Although executed, at least one of the confirmation processes may be executed.
  • the management computer 15 may determine the location of the communication abnormality by comparing its own confirmation result (confirmation processing unit 15D) with the confirmation result of the first confirmation processing unit 41A.
  • the 1st confirmation process part 41A of the mounting apparatus 33 confirmed the communication amount of the LAN interface 49 with which self is provided, it is not restricted to this.
  • the confirmation processing unit 15D (first confirmation processing unit) of the management computer 15 may confirm the communication amount of the communication circuit 15B according to the communication abnormality of the management computer 15.
  • the supply device 43, the servo substrate 46, and the image processing substrate 47 may not include the external interfaces 52A to 52C.
  • the management computer 15 may be a personal computer having a monitor, a keyboard, or the like, or a server not having a monitor or a keyboard.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Environmental & Geological Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Supply And Installment Of Electrical Components (AREA)
  • Small-Scale Networks (AREA)

Abstract

通信異常についての情報を通知することで、通信異常の対処に掛かる時間の短縮を図れる対基板作業システムを提供すること。 装着装置33の第一確認処理部41Aは、第一ネットワーク18における通信異常の発生に応じて、2つの装置間の通信経路における通信異常の要因を確認する。表示装置42は、第一ネットワーク18の通信異常が発生した旨に加え、第一確認処理部41Aによる確認結果を表示する。これにより、対基板作業システム10の作業者は、表示装置42の表示内容を確認することで、第一ネットワーク18において、どの通信経路等で通信異常が発生している可能性があるのかを確認できる。

Description

対基板作業システム
 本発明は、対基板作業システムの通信異常に対応するための技術に関するものである。
 例えば、FA(Factory Automation)ネットワークに係わる技術として、ロボットコントローラとマスタユニットとの間の通信異常に係わる技術がある(例えば、特許文献1など)。このFAネットワークでは、ロボットの調整作業中に複数回の通信異常を検出した場合に、1回目の通信異常のみを有効化する(2回目以降を破棄等する)。これにより、調整作業が、通信異常の検出によって中止されるのを抑制している。
特開2000-172320号公報
 ところで、例えば、印刷機や複数の実装機等の対基板作業装置を連結させて生産ラインを構成した対基板作業システムでは、装置の高度化や複雑化にともなって、ネットワークの構成も複雑となっている。また、通信異常を引き起こす要因としては、例えば、通信線の切断、設定ミス、ネットワーク機器の故障など、様々な要因がある。このため、通信異常が発生した場合に、作業者は、その要因を特定することが難しくなっており、その対処に時間が掛かることが問題となる。
 本発明は、そのような実情に鑑みてなされたものであり、通信異常についての情報を通知することで、通信異常の対処に掛かる時間の短縮を図れる対基板作業システムを提供することを課題とする。
 上記課題を解決するために、本明細書は、ネットワークを介して互いに接続され、基板に対する作業を行う複数の対基板作業装置と、前記ネットワークを介して前記複数の対基板作業装置の各々と接続され、前記複数の対基板作業装置を管理する管理装置と、前記複数の対基板作業装置及び前記管理装置のうち少なくとも1つの装置に設けられ、前記ネットワークにおける通信異常の発生に応じて、前記複数の対基板作業装置及び前記管理装置のうち少なくとも2つの装置を接続する通信経路における通信異常の要因を確認する第一確認処理部と、前記ネットワークにおいて通信異常が発生した旨及び、前記第一確認処理部による確認結果を通知する通知部と、を備える対基板作業システムを開示する。
 本開示によれば、対基板作業システムの作業者等は、通知部の通知内容を確認することで、複数の対基板作業装置や管理装置を接続するネットワークにおいて、どの通信経路等で通信異常が発生している可能性があるのかを確認できる。
実施形態における対基板作業システムの構成を示す図である。 管理PCと装着システムを接続する第一ネットワーク及び管理PCとホストコンピュータとを接続する第二ネットワークの構成を示す図である。 装着装置のブロック図である。 第一ネットワークにおいて通信異常が発生した場合の対基板作業システムの処理動作を示すフローチャートである。 第一ネットワークにおいて通信異常が発生した場合の対基板作業システムの処理動作を示すフローチャートである。 通信異常が発生した対基板作業システムの状態を示す図である。 通信異常が発生した際の表示装置の表示を示す図である。 管理プログラムを確認する通信を示す図である。 PINGデータによる通信確認を示す図である。
 以下、本発明を実施するための形態を具体化した一実施形態について、図を参照しつつ詳しく説明する。
(1.対基板作業システムの構成)
 図1は、本実施形態の対基板作業システム10の構成を模式的に示している。本実施形態の対基板作業システム10は、例えば、図1に示すように、基板11に電子部品12を実装する複数の生産ライン13を備えている。複数の生産ライン13の各々は、例えば、ラインの上流側から順に、基板投入機21、印刷機22、複数の装着システム24、装着作業結果検査機25、リフロー炉27、最終検査機28を並んで配置されている。基板11は、それらの機器等を順次通過して電子部品12を実装される。また、対基板作業システム10は、上記した基板投入機21等の各々を統括して制御する管理コンピュータ15と、管理コンピュータ15に接続されたホストコンピュータ16と、を備えている。なお、上記した生産ライン13を構成する各機器等は、本願における基板に対する作業を行う対基板作業装置の一例である。
 印刷機22は、上流側の基板投入機21から搬入された基板11に対して所定のパターンの半田を印刷する。装着システム24は、印刷機22から搬入した基板11に電子部品12を装着する。装着作業結果検査機25は、基板11に対する電子部品12の装着状態の良否を検査する。リフロー炉27は、装着作業結果検査機25によって良好と判定された基板11を加熱する。基板11に印刷された半田は、加熱した後に冷却されることによって、溶融及び固化する。これにより、電子部品12は、基板11に接合される。最終検査機28は、基板11に接合された電子部品12の状態等を検査する。
 管理コンピュータ15は、基板投入機21等と第一ネットワーク18を介して接続されている。管理コンピュータ15は、記憶装置15Aを備えている。記憶装置15Aは、例えば、ハードディスクや不揮発性メモリ等を備えている。記憶装置15Aには、複数の生産ライン13に係わる種々の情報、例えば、各生産ライン13で生産する基板11の種類及び生産量等に係わる生産計画の情報や、それら各種の基板11を生産すために基板投入機21等の動作を制御する生産プログラム等が記憶されている。また、記憶装置15Aには、生産プログラム等を基板投入機21等に送信する処理や、送信情報を記録・管理等するための管理プログラムPGが保存されている。管理コンピュータ15は、CPU15E(図2参照)で管理プログラムPGを実行することで、第一ネットワーク18を介して各生産ライン13の基板投入機21等に生産プログラム等を送信する機能を実現する。例えば、各装着システム24は、受信した生産プログラムに設定された装着位置に基づいて基板11に電子部品12を装着する。
 ホストコンピュータ16は、管理コンピュータ15と第二ネットワーク19を介して接続されている。生産ライン13の作業者等は、例えば、ホストコンピュータ16の入力装置16A(図2参照)を操作することで、管理コンピュータ15から基板投入機21等に送信する生産プログラムの変更を行うことができる。これにより、作業者等は、生産プログラムに基づいた装着システム24の動作態様を変更することができる。
(2.ネットワークの構成)
 次に、対基板作業システム10の第一ネットワーク18及び第二ネットワーク19の構成について説明する。なお、以下の説明では、図2に示すように、対基板作業システム10の第二ネットワーク19のうち、複数の装着システム24と管理コンピュータ15とを接続する部分の構成について説明する。装着システム24以外の基板投入機21等と管理コンピュータ15を接続する第一ネットワーク18の構成については、図2に示す装着システム24の場合と同様の構成であるため、その説明を省略する。また、装着システム24以外の対基板作業装置(基板投入機21等)についても、後述する装着システム24によって実施される第一ネットワーク18の通信障害の確認処理を実行することができる。
 図2に示すように、1つの装着システム24は、1つのベース31と、そのベース31上に並んで配置された2つのモジュール32と、そのモジュール32に配置された2つの装着装置33等を備えている。モジュール32に配置された2つの装着装置33は、モジュール32に設けられたLANハブ36を介して互いに接続されている。
 LANハブ36は、例えば、2つの装着装置33の各々とLANケーブルLN1を介して接続されている。また、LANハブ36の各々は、生産工場の通信室(図示略)等に設けられたLANハブ20とLANケーブルLN2を介して接続されている。従って、ベース31上に設けられた2つのモジュール32は、LANハブ20及びLANケーブルLN2を介して互いに接続されている。LANハブ20,36は、例えば、スイッチングハブである。LANハブ20は、管理コンピュータ15が備える通信回路15BとLANケーブルLN3を介して接続されている。
 従って、装着装置33の各々は、LANケーブルLN1~LN3及びLANハブ20,36を介した第一ネットワーク18によって管理コンピュータ15と接続されている。第一ネットワーク18は、例えば、LANハブ20でLANケーブルLN2等を集線したスター型のローカルエリアネットワークで構成され、TCP/IPプロトコルに準拠した通信を実行可能となっている。なお、第一ネットワーク18のネットワーク構成は一例であり、装着システム24の配置等に応じて適宜変更可能である。また、第一ネットワーク18に採用する通信プロトコルは、TCP/IPプロトコルに限らず、他の通信プロトコルを採用してもよい。また、第一ネットワーク18の通信は、有線通信に限らず、無線通信でもよい。
 管理コンピュータ15は、記憶装置15A、通信回路15B、通信回路15C、確認処理部15D、CPU15Eなどを備えている。通信回路15B,15Cは、例えば、TCP/IPプロトコルに準拠した通信を実行可能となっている。記憶装置15A及び通信回路15B,15Cは、例えば、CPU15Eを実装した処理基板の内部バスによって互いに接続されている。通信回路15Cは、LANケーブルLN5を介してLANハブ29と接続されている。LANハブ29は、LANケーブルLN6を介してホストコンピュータ16の通信回路16Bと接続されている。
 従って、ホストコンピュータ16は、LANケーブルLN5,LN6及びLANハブ29を介した第二ネットワーク19によって管理コンピュータ15と接続されている。第二ネットワーク19は、例えば、生産工場の第一ネットワーク18とは異なるネットワークであり、事務室等で使用される社内ネットワークである。ホストコンピュータ16は、上記した入力装置16A、通信回路16Bの他に、表示装置16Cを備えている。ホストコンピュータ16は、例えば、入力装置16Aを介して入力された生産プログラムの変更内容を、表示装置16Cに表示する。
(3.装着装置の構成)
 次に、装着装置33の構成について説明する。図3は、装着装置33のブロック図を示している。図3に示すように、装着装置33は、メイン制御部41と、表示装置42と、供給装置43と、装着ヘッド44と、サーボ基板46と、画像処理基板47と、電源部48と、LANインタフェース49と、を備えている。メイン制御部41は、例えば、CPUやメモリ等を備えた処理基板であり、表示装置42やサーボ基板46等を制御して、装着装置33の動作を統括的に制御する。
 表示装置42は、例えば、タッチパネルであり、液晶パネル、液晶パネルの背面側から光を照射するLED等の光源、液晶パネルの表面に貼り合わされた接触感知膜等を備えている。表示装置42は、作業者からの操作内容に応じて装着装置33に係わる情報を表示する。
 供給装置43は、例えば、電子部品12(図1参照)をテープ化したキャリアテープから電子部品12を供給する複数のテープフィーダを備えている。供給装置43は、通信線51Aを介してメイン制御部41と接続されている。供給装置43は、メイン制御部41の制御に基づいて、所定のタイミングで電子部品12を供給位置に供給する。なお、供給装置43は、フィーダ型の供給装置に限らず、例えば、トレイの上に配置した電子部品12を供給するトレイ型の供給装置でもよい。
 装着ヘッド44は、駆動源として機能するモータ44Aと、マークカメラ44Bと、を備えている。サーボ基板46は、通信線51Bを介してメイン制御部41と接続されている。サーボ基板46は、モータ44Aのエンコーダから受信したエンコーダ情報を、メイン制御部41へ通信線51Bを介して送信する。サーボ基板46は、メイン制御部41からの制御情報に基づいてモータ44Aに供給する電力(三相交流など)を制御する。これにより、モータ44Aは、回転位置や速度等を制御される。モータ44Aは、例えば、装着ヘッド44の位置や、電子部品12を吸着して保持する吸着ノズル(図示略)の位置等を変更する。装着ヘッド44は、モータ44Aの駆動に応じて、供給装置43の供給位置に供給された電子部品12を吸着して基板11に装着する。
 マークカメラ44Bは、例えば、基板11に設けられたマークを撮像するためのカメラである。ここでいうマークとは、例えば、基板11を識別するための識別情報である。あるいは、マークとは、例えば、1つの基板11に複数個の処理基板(スマートフォン用の小さな基板など)をまとめて製造するような場合に、複数個の処理基板のうち、不良の処理基板を識別するための識別情報である。
 画像処理基板47は、通信線51Cを介してメイン制御部41と接続されている。画像処理基板47は、メイン制御部41の制御に基づいて、マークカメラ44Bに対して撮像指示を行う。画像処理基板47は、マークカメラ44Bから受信した画像データに補正等を施し、補正後の画像データをメイン制御部41へ送信する。これにより、メイン制御部41は、マークカメラ44Bで撮像された画像データに基づいて、装着ヘッド44を移動させる位置等を変更し、装着作業を適切に実施することができる。
 電源部48は、上記したメイン制御部41、表示装置42、供給装置43、装着ヘッド44、サーボ基板46及び画像処理基板47へ電力を供給する駆動源として機能する。また、装着装置33は、LANインタフェース49に接続されたLANケーブルLN1を介してLANハブ36(図2参照)と接続されている。
(3-1.外部インタフェース52A~52Cの構成)
 また、図3に示すように、供給装置43は、外部インタフェース52Aを介してメイン制御部41に接続されている。同様に、サーボ基板46は、外部インタフェース52Bを介してメイン制御部41と接続されている。同様に、画像処理基板47は、外部インタフェース52Cを介してメイン制御部41と接続されている。外部インタフェース52A,52B,52Cの各々は、例えば、電源部48から電力を供給されているか否かを示す確認信号SI1をメイン制御部41へ出力する。例えば、外部インタフェース52Aは、電源部48から供給装置43に電力が供給されている状態では、ハイレベルの確認信号SI1を出力する。また、外部インタフェース52Aは、電源部48から供給装置43に電力が供給されていない状態、あるいは、電力を供給されていても起動していない(電源が投入されていない等)状態では、ローレベルの確認信号SI1を出力する。これにより、メイン制御部41は、各外部インタフェース52A~52Cから出力される確認信号SI1を検出することで、供給装置43等の電力の供給状態を判定できる。なお、上記した供給装置43、サーボ基板46、及び画像処理基板47は、本願におけるサブ制御部の一例である。
(4.通信異常の確認)
 次に、第一ネットワーク18において通信異常が発生した場合の対基板作業システム10の処理動作について説明する。図4及び図5は、通信異常が発生した場合の処理内容を示すフローチャートである。
 ここで、図2に示すように、管理コンピュータ15は、通信異常が発生した場合に、第一ネットワーク18の通信経路における通信異常の要因を確認する確認処理部15Dを備えている。また、図3に示すように、各装着装置33のメイン制御部41は、第一確認処理部41Aと、第二確認処理部41Bと、を備えている。確認処理部15D、第一確認処理部41A、及び第二確認処理部41Bによる処理は、例えば、メイン制御部41等が備えるCPUでプログラムを実行することで実現してもよい。あるいは、確認処理部15D等を専用のハードウェアで構成してもよい。なお、第二確認処理部41Bによる通信異常の要因の確認については後述する。
 対基板作業システム10は、例えば、起動されると、図4及び図5に示す処理を実行する。まず、図4のS11において、対基板作業システム10は、ネットワーク構成情報D1を、管理コンピュータ15から各装着装置33にダウンロードする。このネットワーク構成情報D1は、第一ネットワーク18においてデータを送信する際に送信先(装着装置33等)を特定するための情報である。具体的には、ネットワーク構成情報D1は、例えば、各装着装置33を識別するための識別情報と、各装着装置33のLANインタフェース49に設定されたIPアドレスとを関連付けたデータである。ネットワーク構成情報D1は、例えば、通信異常が発生した場合に、装着装置33の第一確認処理部41Aから送信するPINGデータD4(図9参照)によって通信経路の異常箇所を切り分けて確認する際に使用される。装着装置33は、起動時毎にネットワーク構成情報D1を取得することで、最新のネットワーク構成に応じたネットワーク構成情報D1を取得できる。なお、装着装置33は、ネットワーク構成の変更があった場合のみネットワーク構成情報D1を取得する構成でもよい。
 各装着装置33のメイン制御部41は、管理コンピュータ15からダウンロードしたネットワーク構成情報D1を、例えば、メモリ41Cに記憶する(図3参照)。次に、対基板作業システム10は、作業者によって生成された生産プログラムや生産計画に基づいた実装作業を開始する(S12)。
 次に、各装着装置33の第一確認処理部41Aは、通信異常があるか否かを判定する(S13)。第一確認処理部41Aは、通信異常を検出しない場合(S13:NO)、S13の処理を繰り返し実行する。
 図6は、通信異常が発生した状態の一例を示している。なお、以下の説明では、図6に示すように、複数の装着装置33を、互いに区別するために生産ライン13の上流側に配置された装着装置33から順に、装着装置33A,33B,33C・・・33Zと称して説明する。また、各装着装置33を区別せずに総称する場合には、符号の後にアルファベットを付さずに装着装置33と称する。
 また、上記したように、1つの基板11に複数個の処理基板をまとめて製造するような場合、最も上流側の装着装置33Aは、複数個の処理基板のうち、不良基板であることを示すマークがどの処理基板に付されているのか確認する。装着装置33Aは、例えば、基板11に対する電子部品12の装着作業を開始する前に、マークカメラ44B(図3参照)によって各処理基板のマークを撮像して確認する。次に、装着装置33Aは、基板11を下流側に搬送するのに先立って、下流側の装着装置33Bに向けて設定データD2を送信する。この設定データD2は、不良の処理基板の位置、即ち、電子部品12の装着作業を実施する必要がない処理基板の位置を示すデータである。これにより、下流側の装着装置33Bは、装着作業を開始する前に、マークカメラ44Bによって不良基板の位置を検査する作業、即ち、上流側の装着装置33Aと重複する作業を実施しなくともよい。この設定データD2は、本願における対基板作業に係わる設定データの一例である。なお、設定データD2は、上記した不良基板の情報に限らず、例えば、生産ライン13の各装置(基板投入機21等)で共通に使用する基板11の搬送タイミングや速度のデータでもよい。
 次に、上流から2番目の装着装置33Bは、装着装置33Aから受信した設定データD2を下流側の装着装置33Cへ送信する。このようにして装着装置33B以降の下流側の装着装置33は、設定データD2を下流側へと転送することで、重複作業の省略(作業効率の向上)を図ることができる。この際に、例えば、図6に示すように、装着装置33CとLANハブ36とを接続するLANケーブルLN1で断線が発生したとする。この場合、装着装置33Bの第一確認処理部41Aは、下流側の装着装置33Cから設定データD2を受信した旨の応答がないことに応じて、第一ネットワーク18において通信異常が発生したことを検出する(S13:YES)。このように、第一確認処理部41Aは、例えば、実装作業にともなう通信において正常な応答がない場合に、通信異常の発生を検出する。なお、設定データD2の通信エラーを、管理コンピュータ15の確認処理部15Dによって検出してもよい。また、対基板作業システム10は、通信異常を検出した場合に、実装作業を停止し、装置を安全な状態(装着ヘッド44を退避させた状態)として警告音等を装着装置33Bから発生させてもよい。
 通信異常の発生を検出する(S13:YES)と、装着装置33Bの第一確認処理部41Aは、管理コンピュータ15と通信が可能であるか否かを確認する(S14)。例えば、第一確認処理部41Aは、管理コンピュータ15に向けて通信異常を検出した旨と、応答を要求する旨を示すデータを管理コンピュータ15へ送信する。
(4-1.管理コンピュータ15から応答があった場合)
 図6に示す例では、装着装置33Bと管理コンピュータ15との間の通信経路は正常であるため、装着装置33Bの第一確認処理部41Aは、管理コンピュータ15からの応答を確認する(S14:YES)。第一確認処理部41Aは、通信異常がないことを確認したため(S14:YES)、それ以降の通信異常の要因を確認する処理を中止する(S15)。
 一方で、管理コンピュータ15は、装着装置33Bの第一確認処理部41Aから通信異常が発生した旨を受信したため、第一ネットワーク18の通信異常の要因を確認する処理を開始する(S15)。ここで、管理コンピュータ15の確認処理部15Dは、例えば、対基板作業システム10を起動後、所定時間ごとに第一ネットワーク18に接続されている全ての装置(装着装置33等)に向けて確認用データD3(第三確認用データの一例)を送信する。確認処理部15Dは、例えば、IPアドレスとしてブロードキャストアドレスを指定した確認用データD3を送信して各装置(装着装置33等)からの応答を確認する。そして、確認処理部15Dは、予め、第一ネットワーク18の通信が正常である状態における確認用データD3に対する応答の結果を記憶装置15Aに保存しておく。
 次に、通信異常が発生しS15の処理において、確認処理部15Dは、装着装置33Bから第一ネットワーク18における通信異常の発生を知らせるデータを受信すると、第一ネットワーク18に接続されている全ての装置に向けて確認用データD3を再度送信する(S16)。確認処理部15Dは、予め記憶装置15Aに保存した正常時の確認用データD3に対する応答の結果と、S16で実行した異常時の確認用データD3に対する応答の結果とを比較し、通信経路における通信異常の要因を確認する。
 図6に示す例では、正常時においては全ての装着装置33から応答があり、通信異常においては装着装置33Cからの応答がなくなる。確認処理部15Dは、例えば、比較結果とネットワーク構成とに基づいて通信異常が発生した通信経路を検出する。この場合、同じLANハブ36に接続された2つの装着装置33C,33Dのうち、装着装置33Cからの応答がないため、確認処理部15Dは、LANハブ36から装着装置33C側の通信経路で通信異常が発生したことを検出できる。従って、確認処理部15Dは、装着装置33CとLANハブ36とを接続するLANケーブルLN1の断線の可能性を検出できる。
 次に、確認処理部15Dは、通信異常が発生した旨及び確認結果の表示処理を実行する(S17)。確認処理部15Dは、例えば、ホストコンピュータ16の表示装置16Cや通信異常を検出した装着装置33Bの表示装置42に通信異常が発生した旨等を表示させる(S17)。例えば、装着装置33Bの第一確認処理部41Aは、管理コンピュータ15の確認処理部15Dから受信したデータに基づいて表示装置42の表示を切り替える。
 図7は、表示装置42の表示の一例を示している。図7に示すモジュールID(MID-00A-011)は、装着装置33Cを備えるモジュール32の識別情報である。図6に示す例では、1つのモジュール32に設けられた2つの装着装置33C,33Dのうち、上流側の装着装置33CとLANハブ36とを接続するLANケーブルLN1を確認すべきであるため、その旨を表示装置42に表示する(図7参照)。これにより、作業者は、表示装置42の表示を確認することで、どの通信経路等で通信異常が発生しているのかを確認できる。なお、確認結果は、表示装置42に限らず、管理コンピュータ15の表示装置16C(通知部)に表示してもよい。また、通信異常を検出した装着装置33Bは、表示装置42の表示に加えて、警告灯を点灯させたりブザーを鳴らしたりして作業者に異常を通知してもよい。また、装着装置33Bは、作業者の携帯端末に表示や通知を実施してもよい。
(4-2.管理コンピュータ15から応答がない場合)
 次に、上記したS14において管理コンピュータ15から応答がなかった場合について説明する。S14において、管理コンピュータ15からの応答がなかった場合(S14:NO)、第一確認処理部41Aは、通信異常の他の要因を確認する。
 ここで、他の要因としては、例えば、上記した管理コンピュータ15のCPU15Eにおいて管理プログラムPGが正しく実行されていない、あるいは管理プログラムPGが停止したために、装着装置33と管理コンピュータ15との間で通信異常が発生する場合が考えられる。例えば、各装着装置33の第一確認処理部41Aは、実装作業中に管理コンピュータ15と通信する必要があるにも係わらず管理コンピュータ15から応答がない場合、通信異常を検出し(図4のS13:YES)、管理コンピュータ15と通信不能になる(S14:NO)。第一確認処理部41Aは、管理コンピュータ15における管理プログラムPGの実行を確認する(図5のS19)。
 図8は、管理プログラムPGを確認する通信を示している。なお、図8は、図面が煩雑となるのを避けるため、図2に示す対基板作業システム10の構成を簡略化して示している。S19において、管理コンピュータ15との通信異常を検出した第一確認処理部41Aは、図8に示すように、管理プログラムPGが正しく実行されているか否かを確認する制御コマンドCMD(第二確認用データ)を管理コンピュータ15に送信する。例えば、管理コンピュータ15のCPU15E(図2参照)は、管理プログラムPGの実行状態を監視する監視プログラムを、管理プログラムPGとは別に実行している。そして、第一確認処理部41Aは、この監視プログラムに対して制御コマンドCMDを送信し、管理プログラムPGが正しく実行されているか否かを確認する。あるいは、第一確認処理部41Aは、例えば、管理コンピュータ15のオペレーティングシステム(OS)に対して制御コマンドCMDを送信して管理プログラムPGの実行状態を問い合わせてもよい。
 第一確認処理部41Aは、管理コンピュータ15から管理プログラムPGが正しく実行されていない旨を受信すると(S19:YES)、図4のS17を実行する。第一確認処理部41Aは、例えば、管理コンピュータ15で管理プログラムPGの実行エラーが発生している旨を、通信異常が発生している旨とともに表示装置42に表示してもよい。これにより、作業者は、ホストコンピュータ16を操作して管理コンピュータ15を再起動するなど適切な対応を実行できる。なお、管理コンピュータ15は、管理プログラムPGの実行エラーの検出に基づいて、自動的に再起動等を実行してもよい。
 また、通信異常の他の要因としては、例えば、通信の輻輳が考えられる。そこで、第一確認処理部41Aは、管理コンピュータ15において管理プログラムPGが正しく実行されている場合(S19:NO)、通信量の判定を実行する(S21)。第一確認処理部41Aは、その第一確認処理部41Aを備える装着装置33と第一ネットワーク18との間で送受信されるデータの量を検出する(S21)。
 例えば、図3に示すように、メイン制御部41と画像処理基板47とは、LANインタフェース49(LANケーブルLN1)に接続されており、第一ネットワーク18に接続される通信経路を共有している。このため、例えば、画像処理基板47から管理コンピュータ15へ大量の画像データが送信され通信の輻輳が発生した場合、通信経路を共有するメイン制御部41では、管理コンピュータ15と通信できない通信異常(通信の遅延など)が発生する。
 そこで、第一確認処理部41Aは、例えば、送受信するデータ量をLANインタフェース49に問い合わせて、所定のデータ量以上のデータを送受信していた場合、通信の輻輳が発生していると判定する(S21:YES)。
 輻輳が発生している場合(S21:YES)、第一確認処理部41Aは、データの送信を待っているユニット(例えば、メイン制御部41)に輻輳が発生した旨を通知し、所定時間の経過後に、メイン制御部41に対してデータの再送を指示する(S22)。これにより、通信の輻輳が一時的であった場合、メイン制御部41は、管理コンピュータ15と通信可能となる。メイン制御部41は、データを再送し管理コンピュータ15から受信通知を受けると(S23:YES)、その旨を第一確認処理部41Aに通知する。第一確認処理部41Aは、図4のS13からの処理を開始する。この場合、第一ネットワーク18に断線等の物理的な障害は発生していないため、一時的な通信の輻輳を回避して実装作業を継続することができる。
 一方、データの再送に失敗した場合(S23:NO)、通信の輻輳が一時的でない可能性がある。例えば、プログラムの不具合などによって画像処理基板47が大量のデータを送信し続けている可能性がある。この場合、メイン制御部41は、データの再送に失敗した旨を第一確認処理部41Aに通知する。第一確認処理部41Aは、通信異常が発生した旨及び確認結果(通信の輻輳の可能性)を表示する処理を実行する(図4のS17)。なお、第一確認処理部41Aは、LANインタフェース49の通信量だけでなく、例えば、LANハブ36にデータ通信量を問い合わせて、LANハブ36における通信の輻輳を確認してもよい。
 また、通信の輻輳が発生していない場合(S21:NO)、第一確認処理部41Aは、PINGデータD4による通信異常の要因の確認処理を実行する(S24)。一例として、図9を用いて装着装置33Aの第一確認処理部41AがPINGデータD4を送信する処理について説明する。
 装着装置33Aの第一確認処理部41A(図3参照)は、S11で管理コンピュータ15からダウンロードしたネットワーク構成情報D1に基づいて、PINGデータD4の送信先を決定する(S24)。ネットワーク構成情報D1には、各装着装置33の識別情報及びIPアドレスに加え、通信経路の異常箇所を切り分けるための手順が設定されている。手順としては、例えば、第一ネットワーク18の管理コンピュータ15側(上流側)から異常箇所を切り分ける手順が設定されている。なお、異常箇所を切り分ける手順の情報を、ネットワーク構成情報D1とは別の情報として準備してもよい。
 具体的には、例えば、装着装置33Aの第一確認処理部41Aは、図9に示すように、LANハブ20を介して接続される装着装置33Cに向けてPINGデータD4を送信する(図9中の送信経路61参照)。これにより、装着装置33CからPINGデータD4に対する応答があった場合、「装着装置33A→LANハブ36→LANハブ20→LANハブ36→装着装置33C」の通信経路は、正常であると判断できる。この場合、S14で管理コンピュータ15と通信不能であり(S14:NO)、且つ装着装置33AとLANハブ20との間の通信は可能となる。このため、装着装置33Aの第一確認処理部41Aは、LANハブ20と管理コンピュータ15との間の通信経路の異常(LANケーブルLN3の断線など)の可能性があると判定する。なお、PINGデータD4による異常箇所の切り分け手順や切り分けた後の判定方法は、第一ネットワーク18の構成に応じて適宜変更される。また、第一確認処理部41Aは、装着装置33Cに対してPINGデータD4を送信する前に、まず、管理コンピュータ15に向けてPINGデータD4を送信し、管理コンピュータ15との間の通信異常を再度確認してもよい。
 装着装置33Cから応答がなかった場合、装着装置33Aの第一確認処理部41Aは、同じLANハブ36に接続された装着装置33Bに向けてPINGデータD4を送信する(図9中の送信経路62参照)。装着装置33Bから応答があった場合、第一確認処理部41Aは、例えば、LANハブ36よりも上流側の機器等(LANハブ20やLANケーブルLN2)の異常の可能性があると判定する。また、装着装置33Bから応答がなかった場合、第一確認処理部41Aは、例えば、LANハブ36よりも下流側の異常(LANハブ36の故障やLANケーブルLN1の断線)の可能性があると判定する。このようにして第一確認処理部41Aは、第一ネットワーク18のどの通信経路で通信異常が発生しているのかを切り分ける。そして、第一確認処理部41Aは、例えば、通信異常が発生した旨及び確認結果を、その第一確認処理部41Aを備える装着装置33(上記例では装着装置33A)に表示する処理を実行する(図3のS17)。
(4-3.第二確認処理部41Bによる確認処理)
 次に、第二確認処理部41Bによる通信異常の確認処理について説明する。図3に示すように、供給装置43、サーボ基板46及び画像処理基板47の各々は、外部インタフェース52A~52Cを介してメイン制御部41と接続されている。メイン制御部41の第二確認処理部41Bは、各外部インタフェース52A~52Cから出力される確認信号SI1を検出することで、供給装置43等に電力が供給されているか否かを判定できる。これにより、第二確認処理部41Bは、通信線51A~51Cにおいて通信異常が発生した場合に、各外部インタフェース52A~52Cから確認信号SI1が出力されているか否かを確認することで、通信線51A~51Cの切断等による通信異常か、あるいはそもそも供給装置43等に電源が供給又は投入されていないことによる通信異常かを確認できる。
 例えば、対基板作業システム10(装着装置33)の起動時において、メイン制御部41は、通信線51Aを介して供給装置43に初期設定のデータを送信したにも係わらず、供給装置43から応答がなかった場合、第二確認処理部41Bによる確認処理を実行する。第二確認処理部41Bは、外部インタフェース52Aから正常な確認信号SI1(ハイレベルの確認信号SI1)が出力されているか否かを確認する。ハイレベルの確認信号SI1が出力されている、即ち、供給装置43に電力が供給されている場合、第二確認処理部41Bは、例えば、通信線51Aの断線であると判定する。また、ローレベルの確認信号SI1が出力されている場合、第二確認処理部41Bは、供給装置43に電力の供給に関する障害が発生していると判定する。第二確認処理部41Bは、通信線51A~51Cにおいて通信異常が発生した旨及び確認結果を、例えば、表示装置42に表示する。これにより、第二確認処理部41Bは、装着装置33内の通信線51Aの断線など、発見が難しい通信異常を確認し作業者に通知できる。
 因みに、基板投入機21、印刷機22、装着システム24(装着装置33)、装着作業結果検査機25、リフロー炉27及び最終検査機28は、対基板作業装置の一例である。管理コンピュータ15は、管理装置の一例である。第一確認処理部41A及び確認処理部15Dは、第一確認処理部の一例である。表示装置42及び表示装置16Cは、通知部の一例である。PINGデータD4は、第一確認用データの一例である。制御コマンドCMDは、第二確認用データの一例である。確認用データD3は、第三確認用データの一例である。電子部品12は、部品の一例である。供給装置43、サーボ基板46及び画像処理基板47は、サブ制御部の一例である。
(5.効果)
 以上、詳細に説明した上記実施形態によれば以下の効果を奏する。
(効果1)本実施形態の対基板作業システム10は、第一ネットワーク18(ネットワーク)を介して互いに接続され、基板11に対する作業を行う複数の対基板作業装置(例えば、装着装置33)と、第一ネットワーク18を介して複数の装着装置33の各々と接続され、複数の装着装置33を管理する管理コンピュータ15(管理装置)と、複数の装着装置33及び管理コンピュータ15のうち少なくとも1つの装置に設けられ、第一ネットワーク18における通信異常の発生に応じて、複数の装着装置33及び管理コンピュータ15のうち少なくとも2つの装置を接続するLANケーブルLN1など(通信経路)における通信異常の要因を確認する第一確認処理部(第一確認処理部41A及び確認処理部15D)と、第一ネットワーク18において通信異常が発生した旨及び、第一確認処理部41A等による確認結果を通知する通知部(表示装置42、表示装置16C)と、を備える。
 これによれば、第一確認処理部41A等は、第一ネットワーク18における通信異常の発生に応じて、2つの装置間の通信経路における通信異常の要因を確認することで、当該通信経路において通信異常が発生しているのか否かを確認できる。表示装置42等(通知部)は、第一ネットワーク18の通信異常が発生した旨に加え、第一確認処理部41A等による確認結果を対基板作業システム10の作業者等に通知する。これにより、作業者等は、表示装置42等の表示内容を確認することで、複数の装着装置33や管理コンピュータ15を接続する第一ネットワーク18において、どの通信経路等で通信異常が発生している可能性があるのかを確認できる。作業者等は、異常箇所の切り分けや把握等を迅速に実施できるため、通信異常の対処に掛かる時間の短縮を図ることができる。
(効果2)第一確認処理部41A等は、複数の装着装置33及び管理コンピュータ15のうち少なくとも2つの装置間で確認用の通信を行うことにより、通信経路における通信異常の要因を確認する。
 これによれば、第一確認処理部41A等は、通信異常の発生後に、2つの装置間で確認用の通信を意図的に行って、例えば、確認用データに対する応答の有無や応答の内容等に基づいて、通信経路における通信異常の発生を確認することができる。
(効果3)対基板作業システム10は、第一ネットワーク18を介して複数の装着装置33の各々にデータを送信する際に、送信先を特定するために必要なネットワーク構成情報D1を、さらに備える。第一確認処理部41Aは、複数の装着装置33のうち少なくとも1つの装着装置33に設けられ、第一ネットワーク18における通信異常の発生に応じて、他の装着装置33及び管理コンピュータ15のうち少なくとも1つの装置に向けてPINGデータD4(第一確認用データ)をネットワーク構成情報D1に基づいて送信し、PINGデータD4に対する応答に応じて通信経路における通信異常の要因を確認する(図5のS24)。
 これによれば、第一確認処理部41Aは、通信異常の発生に応じて、第一ネットワーク18上の他の装置(PINGデータD4を送信する装着装置33以外の装置)に向けてPINGデータD4を送信し、他の装置からの応答の有無・内容等から各通信経路における通信異常を確認する。これにより、第一確認処理部41Aは、応答の有無等から第一ネットワーク18上のどの通信経路で通信異常が発生しているのかを確認できる。
(効果4)管理コンピュータ15は、複数の装着装置33を管理するための管理プログラムPGを実行するものである。第一確認処理部41Aは、複数の装着装置33のうち少なくとも1つの装着装置33に設けられ、管理コンピュータ15との間の通信経路における通信異常の発生に応じて、管理プログラムPGが正しく実行されているか否かを確認する制御コマンドCMD(第二確認用データ)を管理コンピュータ15に向けて送信し、管理コンピュータ15の応答に応じて管理コンピュータ15との間の通信経路における通信異常の要因を確認する(図5のS19)。
 これによれば、第一確認処理部41Aは、管理コンピュータ15との間の通信経路における通信異常の発生に応じて、制御コマンドCMD(第二確認用データ)を管理コンピュータ15に送信する。例えば、管理コンピュータ15において管理プログラムPG(アプリケーションやプロセス)を実行する構成では、設定ミス等の要因で管理プログラムPGが正しく実行(アプリケーションが起動等)されない可能性がある。この場合、装着装置33と管理コンピュータ15との間の通信経路に異常がなくとも、装着装置33は、管理コンピュータ15(アプリケーション等)から応答を得ることが困難となり、通信異常を検出する可能性がある。そこで、第一確認処理部41Aは、制御コマンドCMDに対する管理コンピュータ15の応答の有無・内容等に応じて、管理プログラムPGが正しく実行されているか否かを判定する。これにより、第一確認処理部41Aは、通信経路の切断等によって通信異常が発生しているのか、あるいは、アプリケーションの停止等によって通信異常(応答がない状態)が発生しているのかを確認できる。
(効果5)第一確認処理部41Aは、複数の装着装置33のうち少なくとも1つの装着装置33に設けられ、第一ネットワーク18における通信異常の発生に応じて、管理コンピュータ15との間の通信経路における通信異常の要因を確認し、異常がないことを確認した場合、それ以降の通信異常の確認処理を中止する(図4のS15)。
 これによれば、第一確認処理部41Aは、複数の装着装置33のうち少なくとも1つの装着装置33に設けられる。管理コンピュータ15との間の通信経路が正常である場合、第一確認処理部41Aは、それ以降の確認処理を中止する。これにより、例えば、通信経路の異常を確認する機能を管理コンピュータ15も備えている場合、管理コンピュータ15は、第一確認処理部41Aに代わって確認処理を開始できる。その結果、複数の装着装置33を管理するために通信を行う管理コンピュータ15によって、即ち、第一ネットワーク18においてより全体的に通信を行う管理コンピュータ15によって、適切な確認処理を実行できる。また、装着装置33と管理コンピュータ15とで重複した確認処理が実行されるのを防止し、確認処理にともなう通信の輻輳を抑制できる。
(効果6)確認処理部15D(第一確認処理部)は、管理コンピュータ15に設けられ、所定時間ごとに第一ネットワーク18に接続されている全ての装置に向けて確認用データD3(第三確認用データ)を送信し第一ネットワーク18の通信が正常である状態における確認用データD3に対する応答の結果を保存する。確認処理部15Dは、第一ネットワーク18における通信異常の発生に応じて第一ネットワーク18に接続されている全ての装置に向けて確認用データD3を再度送信し正常時と異常時との確認用データD3に対する応答の結果を比較して通信経路における通信異常の要因を確認する(図4のS16)。
 これによれば、確認処理部15D(第一確認処理部)は、第一ネットワーク18上の全ての装置に確認用データD3を送信し、正常時の応答結果を予め保存しておく。そして、確認処理部15Dは、通信異常の発生に応じて確認用データD3を再度送信し、正常時と異常時の応答結果を比較することで、複数の通信経路の通信異常をまとめて確認することができる。これにより、確認処理部15Dは、どの通信経路で通信異常が発生しているのかを迅速に確認できる。
(効果7)第一確認処理部41Aは、複数の装着装置33のうち少なくとも1つの装着装置33に設けられ、第一確認処理部41Aを備える装着装置33に接続された通信経路における通信異常の発生に応じて、第一確認処理部41Aを備える装着装置33と第一ネットワーク18との間で送受信されるデータの量を検出し、検出結果に応じて第一確認処理部41Aを備える装着装置33に接続された通信経路における通信異常の要因を確認する(図5のS21)。
 これによれば、第一確認処理部41Aは、この第一確認処理部41Aを備える装着装置33に接続された通信経路で通信異常が発生した場合、第一ネットワーク18との間で送受信されるデータの量を検出する。例えば、1つの装着装置33内における任意のユニット(例えば、画像処理基板47)から大量のデータが送信され通信の輻輳が発生した場合、通信経路を共有する装置内の他のユニット(例えば、メイン制御部41)では、通信異常(通信の切断や遅延)が発生する。例えば、送受信されるデータ量を検出し輻輳が発生していない場合、第一確認処理部41Aは、通信異常が発生している可能性を表示装置42に通知(表示)できる。また、第一確認処理部41Aは、通信異常を引き起した要因として他の要因(LANケーブルLN1の切断など)について確認を開始できる。
 一方、輻輳が発生している場合、第一確認処理部41Aは、例えば、第一確認処理部41Aを備える装着装置33に接続された通信経路に異常はない旨を表示装置42に通知(表示)できる。また、第一確認処理部41Aは、例えば、データの送信を待っているユニット等に確認結果(輻輳が発生した旨)を通知する。これにより、送信待ちのユニットは、時間をおいてから、即ち、大量のデータ送信の終了を待ってからデータの再送を実行する等、適切な対応を実行できる。
(効果8)複数の装着装置33は、基板11に対する作業を行う生産ライン13における上流側の装着装置33から下流側の装着装置33に向けて対基板作業に係わる設定データD2を伝送するものである。第一確認処理部41Aや確認処理部15Dは、設定データD2の伝送における異常の発生に応じて、通信経路における通信異常の要因を確認する。
 これによれば、複数の装着装置33は、対基板作業に係わる設定データD2を上流側の装置から下流側の装置へと伝送する。これにより、下流側の装着装置33は、上流側の装着装置33と重複する作業(検査作業など)の一部を省略し、作業の効率化を図ることができる。また、第一確認処理部41Aや確認処理部15Dは、設定データD2の伝送の異常時に通信異常の要因を確認し通信異常が発生していた場合、例えば、上流側の装着装置33に代わって管理コンピュータ15から全ての装着装置33へ設定データを送信してもらう等、適切な対応を実行することができる。
(効果9)複数の装着装置33の各々は、基板11に電子部品12(部品)を装着する装着装置であり、メイン制御部41と、メイン制御部41と通信線51A~51Cを介して接続され、メイン制御部41の制御に基づいた処理を実行するサブ制御部(供給装置43、サーボ基板46、画像処理基板47)と、供給装置43等に電力を供給する電源部48と、を備える。供給装置43等は、電源部48から電力を供給されているか否かを示す確認信号SI1を出力する外部インタフェース52A~52Cを有している。メイン制御部41は、通信線51A~51Cにおける通信異常の発生に応じて、外部インタフェース52A~52Cから確認信号SI1が出力されているか否かを確認する第二確認処理部41Bを有している。通知部(表示装置42、表示装置16C)は、通信線51A~51Cにおいて通信異常が発生した旨及び、第二確認処理部41Bによる確認結果を通知する。
 これによれば、第二確認処理部41Bは、メイン制御部41と供給装置43等とを接続する通信線51A~51Cにおける通信異常の発生に応じて、外部インタフェース52A~52Cの確認信号SI1の出力を確認する。表示装置42等は、通信線51A~51Cの通信異常が発生した旨に加え、第二確認処理部41Bによる確認結果を作業者等に通知する。これにより、作業者等は、表示装置42等の通知内容を確認することで、通信線51A~51Cの切断等による通信異常か、あるいはそもそも供給装置43等(サブ制御部)に電源が供給又は投入されていないことによる通信異常かを確認できる。作業者等は、異常箇所の切り分けや把握等を迅速に実施できるため、通信異常の対処に掛かる時間の短縮を図ることができる。
(6.変形態様)
 なお、本発明は、上記実施形態に限定されるものではなく、当業者の知識に基づいて種々の変更、改良を施した形態で実施することが可能である。
 例えば、上記実施形態では、装着装置33が通信異常の確認処理を実施したが、他の対基板作業装置(例えば、基板投入機21)が通信異常の確認処理を実施してもよい。
 また、対基板作業システム10は、各種の通信確認処理、図4のS14、S16(ブロードキャスト)、図5のS19(管理プログラムPG)、S21(通信量)、及びS24(PINGデータD4)などを実行したが、これらのうち少なくとも1つの確認処理を実行する構成でもよい。
 また、上記実施形態では、管理コンピュータ15との間の通信経路が正常である場合、第一確認処理部41Aは、それ以降の確認処理を中止したが、中止せずに継続してもよい。この場合、管理コンピュータ15は、自己(確認処理部15D)の確認結果と第一確認処理部41Aの確認結果とを比較して通信異常の箇所を判定してもよい。
 また、上記実施形態では、装着装置33(対基板作業装置)の第一確認処理部41Aが、自己が備えるLANインタフェース49の通信量を確認したが、これに限らない。例えば、管理コンピュータ15の確認処理部15D(第一確認処理部)が、管理コンピュータ15の通信異常に応じて通信回路15Bの通信量を確認してもよい。
 また、供給装置43、サーボ基板46及び画像処理基板47は、外部インタフェース52A~52Cを備えなくともよい。
 また、管理コンピュータ15は、モニターやキーボード等を備えたパーソナルコンピュータでもよく、モニターやキーボードを備えていないサーバでもよい。
 10 対基板作業システム、11 基板、12 電子部品(部品)、13 生産ライン、15 管理コンピュータ(管理装置)、15D 確認処理部(第一確認処理部)、16C 表示装置(通知部)、18 第一ネットワーク(ネットワーク)、21 基板投入機(対基板作業装置)、22 印刷機(対基板作業装置)、25 装着作業結果検査機(対基板作業装置)、27 リフロー炉(対基板作業装置)、28 最終検査機(対基板作業装置)、33 装着装置(対基板作業装置)、41 メイン制御部、41A 第一確認処理部、41B 第二確認処理部、42 表示装置(通知部)、43 供給装置(サブ制御部)、46 サーボ基板(サブ制御部)、47 画像処理基板(サブ制御部)、48 電源部、51A~51C 通信線、52A~52C 外部インタフェース、CMD 制御コマンド(第二確認用データ)、D1 ネットワーク構成情報、D2 設定データ、D3 確認用データ(第三確認用データ)、D4 PINGデータ(第一確認用データ)、PG 管理プログラム、SI1 確認信号。

Claims (9)

  1.  ネットワークを介して互いに接続され、基板に対する作業を行う複数の対基板作業装置と、
     前記ネットワークを介して前記複数の対基板作業装置の各々と接続され、前記複数の対基板作業装置を管理する管理装置と、
     前記複数の対基板作業装置及び前記管理装置のうち少なくとも1つの装置に設けられ、前記ネットワークにおける通信異常の発生に応じて、前記複数の対基板作業装置及び前記管理装置のうち少なくとも2つの装置を接続する通信経路における通信異常の要因を確認する第一確認処理部と、
     前記ネットワークにおいて通信異常が発生した旨及び、前記第一確認処理部による確認結果を通知する通知部と、
    を備える対基板作業システム。
  2.  前記第一確認処理部は、前記複数の対基板作業装置及び前記管理装置のうち少なくとも2つの装置間で確認用の通信を行うことにより、前記通信経路における通信異常の要因を確認する、請求項1に記載の対基板作業システム。
  3.  前記ネットワークを介して前記複数の対基板作業装置の各々にデータを送信する際に、送信先を特定するために必要なネットワーク構成情報を、さらに備え、
     前記第一確認処理部は、前記複数の対基板作業装置のうち少なくとも1つの対基板作業装置に設けられ、前記ネットワークにおける通信異常の発生に応じて、他の対基板作業装置及び前記管理装置のうち少なくとも1つの装置に向けて第一確認用データを前記ネットワーク構成情報に基づいて送信し、前記第一確認用データに対する応答に応じて前記通信経路における通信異常の要因を確認する、請求項2に記載の対基板作業システム。
  4.  前記管理装置は、前記複数の対基板作業装置を管理するための管理プログラムを実行するものであり、
     前記第一確認処理部は、前記複数の対基板作業装置のうち少なくとも1つの対基板作業装置に設けられ、前記管理装置との間の前記通信経路における通信異常の発生に応じて、前記管理プログラムが正しく実行されているか否かを確認する第二確認用データを前記管理装置に向けて送信し、前記管理装置の応答に応じて前記管理装置との間の前記通信経路における通信異常の要因を確認する、請求項2又は3に記載の対基板作業システム。
  5.  前記第一確認処理部は、前記複数の対基板作業装置のうち少なくとも1つの対基板作業装置に設けられ、前記ネットワークにおける通信異常の発生に応じて、前記管理装置との間の前記通信経路における通信異常の要因を確認し、異常がないことを確認した場合、それ以降の通信異常の確認処理を中止する、請求項2乃至4の何れかに記載の対基板作業システム。
  6.  前記第一確認処理部は、前記管理装置に設けられ、所定時間ごとに前記ネットワークに接続されている全ての装置に向けて第三確認用データを送信し前記ネットワークの通信が正常である状態における前記第三確認用データに対する応答の結果を保存し、前記ネットワークにおける通信異常の発生に応じて前記ネットワークに接続されている全ての装置に向けて前記第三確認用データを再度送信し正常時と異常時との前記第三確認用データに対する応答の結果を比較して前記通信経路における通信異常の要因を確認する、請求項2乃至5の何れかに記載の対基板作業システム。
  7.  前記第一確認処理部は、前記複数の対基板作業装置のうち少なくとも1つの対基板作業装置に設けられ、前記第一確認処理部を備える対基板作業装置に接続された前記通信経路における通信異常の発生に応じて、前記第一確認処理部を備える対基板作業装置と前記ネットワークとの間で送受信されるデータの量を検出し、検出結果に応じて前記第一確認処理部を備える対基板作業装置に接続された前記通信経路における通信異常の要因を確認する、請求項1乃至6の何れかに記載の対基板作業システム。
  8.  前記複数の対基板作業装置は、前記基板に対する作業を行う生産ラインにおける上流側の対基板作業装置から下流側の対基板作業装置に向けて対基板作業に係わる設定データを伝送するものであり、
     前記第一確認処理部は、前記設定データの伝送における異常の発生に応じて、前記通信経路における通信異常の要因を確認する、請求項1乃至7の何れかに記載の対基板作業システム。
  9.  前記複数の対基板作業装置の各々は、前記基板に部品を装着する装着装置であり、メイン制御部と、前記メイン制御部と通信線を介して接続され、前記メイン制御部の制御に基づいた処理を実行するサブ制御部と、前記サブ制御部に電力を供給する電源部と、を備え、
     前記サブ制御部は、前記電源部から電力を供給されているか否かを示す確認信号を出力する外部インタフェースを有し、
     前記メイン制御部は、前記通信線における通信異常の発生に応じて、前記外部インタフェースから前記確認信号が出力されているか否かを確認する第二確認処理部を有し、
     前記通知部は、前記通信線において通信異常が発生した旨及び、前記第二確認処理部による確認結果を通知する、請求項1乃至8の何れかに記載の対基板作業システム。
PCT/JP2016/086842 2016-12-12 2016-12-12 対基板作業システム WO2018109792A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
EP16923643.7A EP3554017B1 (en) 2016-12-12 2016-12-12 Substrate work system
US16/468,579 US10979240B2 (en) 2016-12-12 2016-12-12 Substrate work system
CN201680091503.1A CN110050443B (zh) 2016-12-12 2016-12-12 对基板作业系统
JP2018556026A JP6764943B2 (ja) 2016-12-12 2016-12-12 対基板作業システム
PCT/JP2016/086842 WO2018109792A1 (ja) 2016-12-12 2016-12-12 対基板作業システム

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2016/086842 WO2018109792A1 (ja) 2016-12-12 2016-12-12 対基板作業システム

Publications (1)

Publication Number Publication Date
WO2018109792A1 true WO2018109792A1 (ja) 2018-06-21

Family

ID=62558147

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/086842 WO2018109792A1 (ja) 2016-12-12 2016-12-12 対基板作業システム

Country Status (5)

Country Link
US (1) US10979240B2 (ja)
EP (1) EP3554017B1 (ja)
JP (1) JP6764943B2 (ja)
CN (1) CN110050443B (ja)
WO (1) WO2018109792A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPWO2020136705A1 (ja) * 2018-12-25 2021-09-09 株式会社Fuji 多重通信装置、及び作業機

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000172320A (ja) 1998-12-07 2000-06-23 Denso Corp Faネットワーク及びロボットコントローラ
JP2002271100A (ja) * 2001-03-13 2002-09-20 Matsushita Electric Ind Co Ltd 電子部品実装システムのデータ通信方法及び電子部品実装システム
JP2006229512A (ja) * 2005-02-17 2006-08-31 Nec Engineering Ltd サーバ切替方法,サーバ及びサーバ切替プログラム
JP2016048507A (ja) * 2014-08-28 2016-04-07 三菱電機株式会社 通信制御装置および計算装置
JP2016103675A (ja) * 2014-11-27 2016-06-02 日本電気株式会社 通信装置、通信システム、通信方法および通信プログラム

Family Cites Families (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020057018A1 (en) * 2000-05-20 2002-05-16 Equipe Communications Corporation Network device power distribution scheme
US20040062362A1 (en) * 2002-09-18 2004-04-01 Yasuyuki Matsuya Data communication method, data transmitting apparatus, data receiving apparatus, and data transmission program
US7523184B2 (en) * 2002-12-31 2009-04-21 Time Warner Cable, Inc. System and method for synchronizing the configuration of distributed network management applications
US9077611B2 (en) * 2004-07-07 2015-07-07 Sciencelogic, Inc. Self configuring network management system
US9537731B2 (en) * 2004-07-07 2017-01-03 Sciencelogic, Inc. Management techniques for non-traditional network and information system topologies
US7813047B2 (en) * 2006-12-15 2010-10-12 Hand Held Products, Inc. Apparatus and method comprising deformable lens element
EP2392099B1 (en) * 2009-02-02 2017-10-04 Nokia Solutions and Networks Oy Communicating a network event
WO2010137063A1 (ja) * 2009-05-26 2010-12-02 株式会社日立製作所 管理サーバ及び管理システム
GB2497932A (en) * 2011-12-21 2013-07-03 Ibm Network device modelling of configuration commands to predict the effect of the commands on the device.
JP6180750B2 (ja) * 2012-02-22 2017-08-16 Juki株式会社 対基板作業システム
US9124491B2 (en) * 2012-05-30 2015-09-01 Nec Corporation Internet protocol (IP) network device, network system, method thereof
KR101642793B1 (ko) * 2012-11-02 2016-08-10 무라다기카이가부시끼가이샤 통신 디바이스와 통신 기기 및 통신 시스템
CN103534983B (zh) * 2012-11-30 2016-03-09 华为技术有限公司 线缆插接情况的检测方法及装置
US20160033581A1 (en) * 2013-03-14 2016-02-04 Automotive Energy Supply Corporation Abnormality diagnosis device
CN105191219B (zh) * 2013-05-09 2017-06-23 三菱电机株式会社 Fa网络用lsi以及通信装置
JP6297591B2 (ja) * 2013-11-29 2018-03-20 富士機械製造株式会社 対回路基板作業システムのデータ更新方法及び対回路基板作業システム
JP5833203B2 (ja) * 2014-09-02 2015-12-16 株式会社ユニバーサルエンターテインメント 遊技機
US11010576B2 (en) * 2017-07-20 2021-05-18 Fuji Corporation Substrate work system
US10735269B2 (en) * 2018-08-31 2020-08-04 QOS Networking, Inc. Apparatus and method for dynamic discovery and visual mapping of computer networks

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000172320A (ja) 1998-12-07 2000-06-23 Denso Corp Faネットワーク及びロボットコントローラ
JP2002271100A (ja) * 2001-03-13 2002-09-20 Matsushita Electric Ind Co Ltd 電子部品実装システムのデータ通信方法及び電子部品実装システム
JP2006229512A (ja) * 2005-02-17 2006-08-31 Nec Engineering Ltd サーバ切替方法,サーバ及びサーバ切替プログラム
JP2016048507A (ja) * 2014-08-28 2016-04-07 三菱電機株式会社 通信制御装置および計算装置
JP2016103675A (ja) * 2014-11-27 2016-06-02 日本電気株式会社 通信装置、通信システム、通信方法および通信プログラム

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPWO2020136705A1 (ja) * 2018-12-25 2021-09-09 株式会社Fuji 多重通信装置、及び作業機
JP7209014B2 (ja) 2018-12-25 2023-01-19 株式会社Fuji 作業機

Also Published As

Publication number Publication date
CN110050443B (zh) 2021-06-29
CN110050443A (zh) 2019-07-23
US20200084059A1 (en) 2020-03-12
EP3554017A4 (en) 2019-12-18
EP3554017B1 (en) 2021-01-20
JPWO2018109792A1 (ja) 2019-08-08
US10979240B2 (en) 2021-04-13
JP6764943B2 (ja) 2020-10-07
EP3554017A1 (en) 2019-10-16

Similar Documents

Publication Publication Date Title
JP6624598B2 (ja) 基板生産ラインの生産管理装置
JP2012089634A (ja) 部品実装ラインの管理装置
US10571897B2 (en) Manufacturing system and control method of manufacturing system
JP6738696B2 (ja) 多重通信装置及び作業機
WO2018109792A1 (ja) 対基板作業システム
CN109478054B (zh) 基板生产管理装置及基板生产管理方法
US9778638B2 (en) Programmable logic controller communication system
WO2014073088A1 (ja) 部品実装ラインの生産監視システム及び生産監視方法
JP2007149817A (ja) 実装ライン、実装ラインの管理方法および検査機
JP4301873B2 (ja) 対基板作業機支援装置
WO2014049871A1 (ja) 情報表示システム
JPH11146033A (ja) 無線通信システム制御方法及び無線通信システム並びにそれに用いられる情報処理装置
JP2021057392A (ja) 表面実装機、実装ライン、表面実装機の基板検査方法
JP7065294B2 (ja) 製造システムおよび製造方法
JP5234374B2 (ja) 差動信号伝送回路、ディスクアレイコントローラ及び差動信号伝送ケーブル
JP2003060399A (ja) 回路基板加工装置の管理方法及び管理システム
JP4257159B2 (ja) 検査装置
JP6219579B2 (ja) 部品ライブラリデータ作成方法、電子部品装着装置の機種切り替え方法及び電子部品装着装置
EP3588423B1 (en) Failure information sharing system
JP5316594B2 (ja) 部品実装システム及び部品実装方法
JP7556756B2 (ja) マルチユニットシステム
JP6839512B2 (ja) 多重通信システム及び作業機
JP7507416B2 (ja) 作業ライン管理装置および作業ライン管理方法ならびに電子回路基板製造システム
KR100321734B1 (ko) 웨이퍼 카세트 운송장치의 감시방법
WO2014196078A1 (ja) プログラマブルコントローラシステムおよびエンジニアリングツール

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16923643

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2018556026

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2016923643

Country of ref document: EP