WO2018087920A1 - 灰処理水路のメンテナンスシステム - Google Patents
灰処理水路のメンテナンスシステム Download PDFInfo
- Publication number
- WO2018087920A1 WO2018087920A1 PCT/JP2016/083697 JP2016083697W WO2018087920A1 WO 2018087920 A1 WO2018087920 A1 WO 2018087920A1 JP 2016083697 W JP2016083697 W JP 2016083697W WO 2018087920 A1 WO2018087920 A1 WO 2018087920A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- water
- channel
- ash treatment
- clinker
- ash
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B09—DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
- B09B—DISPOSAL OF SOLID WASTE NOT OTHERWISE PROVIDED FOR
- B09B3/00—Destroying solid waste or transforming solid waste into something useful or harmless
- B09B3/30—Destroying solid waste or transforming solid waste into something useful or harmless involving mechanical treatment
- B09B3/35—Shredding, crushing or cutting
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D21/00—Separation of suspended solid particles from liquids by sedimentation
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23J—REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES
- F23J1/00—Removing ash, clinker, or slag from combustion chambers
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23J—REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES
- F23J1/00—Removing ash, clinker, or slag from combustion chambers
- F23J1/02—Apparatus for removing ash, clinker, or slag from ash-pits, e.g. by employing trucks or conveyors, by employing suction devices
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23J—REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES
- F23J3/00—Removing solid residues from passages or chambers beyond the fire, e.g. from flues by soot blowers
Definitions
- the present invention relates to a maintenance system for an ash treatment channel.
- a large amount of ash (such as clinker) is generated with coal combustion at coal-type thermal power plants.
- the clinker is deposited on a clinker hopper provided at the bottom of the boiler.
- the clinker deposited on the clinker hopper is transported to the drainage site by water sent from the ash treatment water reservoir, and separated from the water at the drainage site (see, for example, Patent Document 1).
- troubles have occurred irregularly in which an ash treatment water channel including a water channel that sends water from an ash treatment water reservoir to a clinker hopper and a water channel that continues from the clinker hopper to a drainage site is blocked by needle-like crystals. If these ash treatment channels are blocked by acicular crystals, the boiler may be forced to stop.
- the occurrence pattern of acicular crystal troubles (cause of irregularity) has not been specified, but when it occurs, it is difficult to deal with daily repairs, and when it occurs, a large amount of repair costs are spent.
- Another possible method is to separate the underflow water in the cooling tower drain thickener into drainage and sludge to prevent troubles caused by needle crystals.
- this method has a problem that a large amount of cost is required for installation of equipment, maintenance cost after installation, and the like.
- An object of the present invention is to provide an ash treatment channel maintenance system capable of preventing the precipitation of needle crystals.
- the maintenance system for the ash treatment channel supplies the first water of the ash treatment water reservoir to the clinker hopper, sends the clinker together with the first water from the clinker hopper, and removes the water separated from the clinker.
- An ash treatment channel that returns to the ash treatment water reservoir is provided, and the ash treatment channel can be switched between the first water and the second water different from the first water. is there.
- the water separated from the clinker and the water from which solids are separated from the thickener underflow water provided in the desulfurization facility flow into the ash treatment water reservoir.
- the water flowing through the ash treatment water channel flows into the seal trough of the clinker hopper, flows over the seal trough, and flows inside the clinker hopper.
- the second water is industrial water and preferably has a calcium concentration and a sulfate ion concentration lower than those of the first water.
- a second water channel different from the ash treatment channel through which the second water flows, and the ash treatment channel are connected by a connection channel, and a first valve is provided in the connection channel, and the second channel It is preferable that the 2nd valve is provided downstream from the 1st valve.
- the first valve is closed and the second valve is opened, the first water flow state in which the first water flows through the ash treatment channel, the first valve is opened and the second valve is closed, and the ash You may provide the control part which switches a 2nd water flow state with which the said 2nd water flows through a treated water channel.
- FIG. 1 is a schematic diagram showing a clinker processing facility 1, a cinder processing facility 2, and a desulfurization facility 3 in a coal-type thermal power plant 100.
- the desulfurization facility 3 includes a desulfurization cooling tower 31, a cooling tower thickener 32, a cooling tower pit 33, and a desulfurization cooling tower drain tank 34.
- the desulfurization facility 3 is a device that introduces exhaust gas generated in the boiler 4, removes sulfur oxide (SO X ) from the exhaust gas, and cools the exhaust gas.
- the cooling tower thickener 32 is a sedimentation concentration tank.
- the overflow water 32A of the cooling tower thickener 32 is sent to the desulfurization cooling tower drain tank 34, and the underflow water 32B is sent to the drainage station 5 described later. Further, the water in the desulfurization cooling tower drainage tank 34 is returned to the desulfurization cooling tower 31.
- the ash generated in the boiler 4 of the coal-type thermal power plant 100 includes clinker (clinker ash) that accumulates at the bottom of the boiler 4 and cinder ash that accumulates in the combustion path.
- FIG. 2 is a system diagram of these ash treatment facilities.
- the ash treatment facility includes a clinker treatment facility 1 and a cinder treatment facility 2.
- the cinder treatment facility 2 is provided in the cinder 21, the first water passage 7 extending from the ash treatment water reservoir 6 ⁇ / b> A toward the cinder 21, and the first water passage 7, and the water of the ash treatment water reservoir 6 ⁇ / b> A is supplied to the first water passage 7.
- the 1st pump 71 to send out and the 2nd pump 72 which pumps the water sent with the 1st pump 71 are provided.
- the first water channel 7 is divided into two directions, the second water channel 7 ⁇ / b> A that is one water channel is a water channel that continues to the cinder 21, and the other third water channel 7 ⁇ / b> B is to the clinker hopper 11. It is a continuous waterway.
- the cinder ash contained in the cinder 21 is sent out from the cinder 21 in the form of a slurry by the water that has been pumped by the second pump 72 and passed through the second water passage 7A.
- the cinder treatment facility 2 further includes a fourth water channel 8 for sending the slurry-like cinder ash to the water drainage site 5 and a water drainage site 5 provided at an end of the fourth water channel 8.
- the drainage station 5 includes a water tank (not shown), and the slurry-like cinder ash that has flowed into the water tank is precipitated in the water tank.
- the supernatant water overflows as an overflow and is sent to the ash treatment water reservoir 6A.
- the precipitated cinder ash is appropriately discharged and transported to an ash treatment plant (not shown).
- the clinker processing facility 1 includes a clinker hopper 11 that is provided at the furnace bottom of the boiler 4 and is provided to store the dropped clinker.
- the clinker treatment facility 1 is provided with a first water channel 7 that connects the clinker hopper 11 and the ash treatment water reservoir 6 ⁇ / b> A, and the first water channel 7, and sends water from the ash treatment water reservoir 6 ⁇ / b> A to the first water channel 7.
- the 1st pump 71 and the 2nd pump 72 which pumps the water sent with the 1st pump 71 are provided.
- the first water channel 7, the first pump 71, and the second pump 72 are shared with the cinder processing facility 2.
- On the downstream side of the second pump 72 one third water passage 7 ⁇ / b> B divided in two directions continues to the jetting valve 12 that jets the water pumped by the second pump 72.
- a clinker crusher 13 is provided below the clinker hopper 11.
- the clinker crusher 13 crushes the clinker that has fallen on the lower part of the clinker hopper 11.
- the water pumped by the second pump 72 is jetted by the jetting valve 12.
- the clinker crushed in the clinker crusher 13 is mixed with water jetted by the clinker JPP 18 to form a slurry, and is sent out to the fifth water channel 14.
- a drainage station 5 is provided at the end of the fifth water channel 14. This drainage station 5 is shared with the cinder processing facility 2.
- the clinker settles in the water tank as in the cinder ash.
- the supernatant water overflows as an overflow and flows out to the ash treatment water reservoir 6A.
- the settled clinker is appropriately discharged and transported to an ash treatment plant (not shown).
- a seal trough 15 for collecting water is provided on the outer periphery of the upper edge of the clinker hopper 11.
- the seal trough 15 joins the boiler 4 and the clinker hopper 11, and furnace seal water for blocking the outside air from the inside flows in.
- the water flowing through the first water passage 7 via the first pump 71 is branched in front of the second pump 72 and is sent to the seal trough 15 of the clinker hopper 11 as the furnace water through the sixth water passage 7C.
- the water temperature inside the clinker hopper 11 rises due to the radiant heat from the boiler 4 and the clinker that has fallen.
- the water that has flowed into the seal trough 15 overflows into the clinker hopper 11 to wash away the clinker adhering to the inner surface of the clinker hopper 11 and to cool the clinker hopper 11.
- the water that has cooled the clinker hopper 11 is discharged out of the clinker hopper 11 through an overflow port 16 provided on the wall surface of the clinker hopper 11.
- the water discharged from the clinker hopper 11 passes through the seventh water channel 17 and is sent into the water tank of the drainage station 5.
- the supernatant water overflows as an overflow and flows out to the ash treatment water reservoir 6A.
- a work channel 9 through which the working water flows is arranged separately from the first water channel 7 to the seventh water channel 17 through which the water of the ash treatment water reservoir 6A circulates.
- the industrial water channel 9 extends from the upstream side to the industrial water reservoir 6B provided adjacent to the ash treatment water reservoir 6A.
- a connecting water channel 91 is provided between the first water channel 7 and the engineering water channel 9.
- a first valve 92 is attached to the connecting water channel 91.
- a second valve 93 is attached to the downstream side of the working water channel 9 where the connecting water channel 91 is provided.
- the clinker treatment facility 1 opens the second valve 93 in the engineering water channel 9 following the engineering water reservoir 6 ⁇ / b> B, and the first water channel 91 provided between the engineering water channel 9 and the first water channel 7.
- the ash treatment water passage state in which the first valve 92 is closed and the industrial water passage state in which the second valve 93 is closed and the first valve 92 is opened can be taken.
- the valves provided in the vicinity of the first pump 71 and the second pump 72 are in an open state.
- the switching between the ash treatment water flow state and the industrial water flow state may be performed manually every predetermined time, or may be performed automatically by a control unit (not shown).
- the water in the ash treatment water reservoir 6 ⁇ / b> A is sent to the first water channel 7 by the first pump 71.
- a part of the water sent to the first water channel 7 flows to the seal trough 15 through the sixth water channel 7C.
- water other than the water flowing to the seal trough 15 is pumped by the second pump 72, and a part thereof is sent to the cinder 21.
- the pumped water is sent out in the form of a cinder ash in a cinder 21.
- the slurry-like cinder ash is sent to the drainage station 5 through the fourth water channel 8.
- Slurry cinder ash precipitates in the water tank of the drainage station 5 provided at the end of the fourth water channel 8.
- the supernatant water overflows and flows out to the ash treatment water reservoir 6A.
- the precipitated cinder ash is appropriately discharged and transported to an ash treatment plant (not shown).
- water other than the water that has flowed to the cinder 21 guides the clinker to the clinker crusher 13 by the momentum of the jet sprayed by the jetting valve 12, and the clinker crushed in the clinker crusher 13 is: It is mixed with water jetted by the clinker JPP 18 to become a slurry and sent to the fifth water channel 14.
- the slurry-like clinker is sent to the drainage station 5 provided at the end of the fifth water channel 14.
- the slurry-like clinker that has flowed into the water tank of the drainage station 5 is precipitated in the water tank.
- the supernatant water overflows and flows out to the ash treatment water reservoir 6A.
- the settled clinker is appropriately discharged and transported to an ash treatment plant (not shown).
- the water that has flowed to the sixth water channel 7 ⁇ / b> C of the first water channel 7 flows to the seal trough 15 as furnace seal water.
- the water that has flowed into the seal trough 15 flows into the clinker hopper 11, drops the clinker inside the clinker hopper 11, and cools the inside of the clinker hopper 11.
- the water is discharged out of the clinker hopper 11 through an overflow port 16 provided on the wall surface of the clinker hopper 11.
- the discharged water flows into the water tank of the drainage station 5, and the overflowed water flows out to the ash treatment water reservoir 6A.
- Such ash treatment water is passed three or four times a day, once for a few hours.
- the underflow of the cooling tower thickener 32 also flows out to the ash treatment water reservoir 6A. Therefore, the water in the ash treatment water reservoir 6A has a high sulfate ion concentration.
- the supernatant water separated from the clinker and cinder ash also flows to the ash treatment water reservoir 6A. Since these waters were mixed with clinker and cinder ash, the calcium concentration was high. For this reason, the water of the ash treatment water reservoir 6A has high sulfate ion concentration and calcium concentration.
- needle-like crystals (dihydrate gypsum, calcium sulfate dihydrate in the water channel). Japanese products) may be generated.
- needle-like crystals the amount of water supplied to the seal trough 15 is reduced, and the overflow rate becomes uneven. If it does so, the variation of the cooling effect of the clinker hopper 11 by overflow will generate
- the second valve 93 that follows the engineering water reservoir 6B in the engineering water channel 9 is provided in a time zone when the ash treatment water is not passed through the clinker hopper 11 and the cinder 21. Close and open the first valve 92 provided in the connecting water channel 91 between the engineering water channel 9 and the first water channel 7. At this time, the valve provided in the vicinity of the first pump 71 is closed. Then, the industrial water flows through the first water channel 7 and flows into the seal trough 15 as the furnace sealing water. The water flowing into the seal trough 15 overflows into the clinker hopper 11 and cools the inside of the clinker hopper 11 while flowing the clinker in the clinker hopper 11.
- the water is discharged out of the clinker hopper 11 through an overflow port 16 provided on the wall surface of the clinker hopper 11.
- the discharged water flows into the water tank of the drainage station 5 and overflows to flow into the ash treatment water reservoir 6A.
- the embodiment has the following effects.
- the industrial water does not include the underflow water of the cooling tower thickener 32 and does not include the supernatant water separated from the clinker and cinder ash. Therefore, compared with the water of the ash treatment water reservoir, the sulfate ion concentration and the calcium concentration are low.
- Such water having low sulfate ion concentration and calcium concentration flows through the first water channel 7 and into the water channel through the seal trough 15, whereby the first water channel 7, the sixth water channel 7 ⁇ / b> C and the water channels flowing through the seal trough 15
- the seventh water channel 17 is washed. This cleaning reduces the possibility of needle crystals in the water channel flowing through the seal trough 15.
- the amount of water supplied to the seal trough 15 due to the generation of needle-like crystals is reduced, and the non-uniformity of the overflow rate does not occur. Variations in the cooling effect of the clinker hopper 11 occur, and the possibility of breakage of casters due to unbalanced shrinkage thermal expansion is reduced.
- the working water also flows to the water channels 7A and 7B other than the seal trough 15, and the inside of the piping is washed, so that the effect of suppressing or removing the acicular crystals can be expected.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Gasification And Melting Of Waste (AREA)
- Processing Of Solid Wastes (AREA)
Abstract
針状結晶の析出を防止可能な、灰処理水路のメンテナンスシステムを提供する。 本発明の灰処理水路のメンテナンスシステムは、灰処理用水貯水部の第1の水をクリンカホッパ11に送水し、前記第1の水と共にクリンカをクリンカホッパ11から送出し、前記クリンカから分離された水を前記灰処理用水貯水部へと戻す、灰処理水路を備え、前記灰処理水路には、前記第1の水と、前記第1の水とは異なる第2の水とを切り替えて通水可能である。
Description
本発明は、灰処理水路のメンテナンスシステムに関する。
石炭式火力発電所における石炭燃焼に伴い、多量の灰(クリンカ等)が発生する。クリンカは、ボイラの下部に設けられたクリンカホッパに堆積される。クリンカホッパに堆積されたクリンカは、灰処理用水貯水部から送られる水によって水切り場に運ばれ、水切り場において水と分離される(例えば特許文献1参照)。
近年、灰処理用水貯水部からクリンカホッパへ水を送る水路、及びクリンカホッパから水切り場へと続く水路を含む灰処理水路が、針状結晶によって閉塞するトラブルが不定期的に発生している。
これらの灰処理水路が針状結晶によって閉塞すると、ボイラの停止を余儀なくされる恐れがある。針状結晶トラブルの発生パターン(不定期の原因)は特定されていないが、発生した場合、日々の補修対応に苦慮し、発生した際には多額の修繕費が費やされている。
近年、灰処理用水貯水部からクリンカホッパへ水を送る水路、及びクリンカホッパから水切り場へと続く水路を含む灰処理水路が、針状結晶によって閉塞するトラブルが不定期的に発生している。
これらの灰処理水路が針状結晶によって閉塞すると、ボイラの停止を余儀なくされる恐れがある。針状結晶トラブルの発生パターン(不定期の原因)は特定されていないが、発生した場合、日々の補修対応に苦慮し、発生した際には多額の修繕費が費やされている。
灰処理用水貯水部には、脱硫装置の冷却塔のシックナーにおけるアンダーフロー水と、クリンカホッパから流れて水切り場においてクリンカを除去した後の上澄み水と、が流入する。発明者らによる鋭意検討の結果、この針状結晶は二水石膏であり、硫酸イオン濃度の高い、脱硫装置の冷却塔のシックナーにおけるアンダーフロー水と、カルシウム濃度の高い、クリンカ除去後の上澄み水とが、灰処理用水貯水部にて混合され、一定以上の濃度になると針状結晶が生成することが判明した。
冷却塔排水シックナーにおけるアンダーフロー水を、排水と汚泥に分離処理し、針状結晶によるトラブルの未然防止を図る方法も考えられる。しかし、この方法は、設備設置や設置後の維持費等に多額の費用を要するという問題が発生する。
冷却塔排水シックナーにおけるアンダーフロー水を、排水と汚泥に分離処理し、針状結晶によるトラブルの未然防止を図る方法も考えられる。しかし、この方法は、設備設置や設置後の維持費等に多額の費用を要するという問題が発生する。
本発明は、針状結晶の析出を防止可能な、灰処理水路のメンテナンスシステムを提供することを目的とする。
本発明の灰処理水路のメンテナンスシステムは、灰処理用水貯水部の第1の水をクリンカホッパに送水し、前記第1の水と共にクリンカをクリンカホッパから送出し、前記クリンカから分離された水を前記灰処理用水貯水部へと戻す、灰処理水路を備え、前記灰処理水路には、前記第1の水と、前記第1の水とは異なる第2の水とを切り替えて通水可能である。
前記灰処理用水貯水部には、前記クリンカから分離された前記水と、脱硫設備に設けられたシックナーのアンダーフロー水から固形物が分離された水とが流入することが好ましい。
前記灰処理水路を流れる水は、前記クリンカホッパのシールトラフに流入され、前記シールトラフより越流して、前記クリンカホッパの内部を流れることが好ましい。
前記第2の水は、工業用水であり前記第1の水と比べて、カルシウム濃度及び硫酸イオン濃度が低いことが好ましい。
前記第2の水が流れる前記灰処理水路とは異なる第2水路と、前記灰処理水路とは、連結水路で連結され、前記連結水路には第1弁が設けられ、前記第2水路の前記第1弁より下流には、第2弁が設けられていることが好ましい。
前記第1弁が閉じて前記第2弁が開き、前記灰処理水路を前記第1の水が流れる第1の通水状態と、前記第1弁が開いて前記第2弁が閉じ、前記灰処理水路を前記第2の水が流れる第2の通水状態と、を切り替える制御部を備えていてもよい。
本発明によれば、針状結晶の析出を防止可能な、灰処理水路のメンテナンスシステムを提供することができる。
図1は、石炭式火力発電所100におけるクリンカ処理設備1、シンダー処理設備2及び、脱硫設備3を示す概略図である。
まず、脱硫設備3について説明する。脱硫設備3は、脱硫冷却塔31と、冷却塔シックナー32と、冷却塔ピット33と、脱硫冷却塔排水槽34と、を備える。
脱硫設備3は、ボイラ4において発生された排ガスが導入され、排ガスから硫黄酸化物(SOX)を除去するとともに、排ガスを冷却する装置である。
冷却塔シックナー32は、沈降濃縮槽である。冷却塔シックナー32のオーバフロー水32Aは、脱硫冷却塔排水槽34へ送られ、アンダーフロー水32Bは、後述の水切り場5へ送られる。また、脱硫冷却塔排水槽34の水は、脱硫冷却塔31へ戻される。
脱硫設備3は、ボイラ4において発生された排ガスが導入され、排ガスから硫黄酸化物(SOX)を除去するとともに、排ガスを冷却する装置である。
冷却塔シックナー32は、沈降濃縮槽である。冷却塔シックナー32のオーバフロー水32Aは、脱硫冷却塔排水槽34へ送られ、アンダーフロー水32Bは、後述の水切り場5へ送られる。また、脱硫冷却塔排水槽34の水は、脱硫冷却塔31へ戻される。
石炭式火力発電所100のボイラ4において発生する灰(アッシュ)は、ボイラ4の底に溜まるクリンカ(クリンカアッシュ)と、燃焼経路に溜まるシンダーアッシュとを含む。図2は、これらの灰の処理設備の系統図であり、灰処理設備は、クリンカ処理設備1と、シンダー処理設備2とを含む。
シンダー処理設備2は、シンダー21と、灰処理用水貯水部6Aからシンダー21方向へ延びる第1水路7と、第1水路7に設けられ、灰処理用水貯水部6Aの水を第1水路7に送り出す第1ポンプ71と、第1ポンプ71で送られた水の圧送する第2ポンプ72とを備える。
第2ポンプ72の下流側において、第1水路7は二方向に分かれ、一方の水路である第2水路7Aはシンダー21へと続く水路であり、他方の第3水路7Bはクリンカホッパ11へと続く水路である。
第2ポンプ72により圧送されて第2水路7Aを通った水によって、シンダー21内に含まれるシンダーアッシュは、スラリー状になってシンダー21より送り出される。シンダー処理設備2は、さらに、そのスラリー状のシンダーアッシュを水切り場5に送る第4水路8と、第4水路8の端部に設けられた水切り場5とを備える。
第2ポンプ72の下流側において、第1水路7は二方向に分かれ、一方の水路である第2水路7Aはシンダー21へと続く水路であり、他方の第3水路7Bはクリンカホッパ11へと続く水路である。
第2ポンプ72により圧送されて第2水路7Aを通った水によって、シンダー21内に含まれるシンダーアッシュは、スラリー状になってシンダー21より送り出される。シンダー処理設備2は、さらに、そのスラリー状のシンダーアッシュを水切り場5に送る第4水路8と、第4水路8の端部に設けられた水切り場5とを備える。
水切り場5は、図示しない水槽を備え、その水槽内に流入されたスラリー状のシンダーアッシュは、水槽内において沈殿する。上澄み水は、オーバフローとして越流し、灰処理用水貯水部6Aへ送られる。沈殿したシンダーアッシュは、適宜排出されて図示しない灰処理場に輸送される。
クリンカ処理設備1は、ボイラ4の炉底に設けられ、落下したクリンカを貯留するために設けられたクリンカホッパ11を備える。また、クリンカ処理設備1は、クリンカホッパ11と灰処理用水貯水部6Aとを連結する第1水路7と、第1水路7設けられ、灰処理用水貯水部6Aの水を第1水路7に送り出す第1ポンプ71と、第1ポンプ71で送られた水を圧送する第2ポンプ72とを備える。これらの第1水路7と、第1ポンプ71と、第2ポンプ72とは、シンダー処理設備2と共用である。
第2ポンプ72より下流側において、二方向に分かれた一方の第3水路7Bは、第2ポンプ72により圧送された水をジェット噴射するジェッチング弁12へと続く。クリンカホッパ11の下部にはクリンカクラッシャ13が設けられている。
第2ポンプ72より下流側において、二方向に分かれた一方の第3水路7Bは、第2ポンプ72により圧送された水をジェット噴射するジェッチング弁12へと続く。クリンカホッパ11の下部にはクリンカクラッシャ13が設けられている。
クリンカクラッシャ13は、クリンカホッパ11の下部に落下したクリンカを粉砕する。クリンカ処理設備1において、第2ポンプ72により圧送された水は、ジェッチング弁12によってジェット噴射される。クリンカクラッシャ13において粉砕されたクリンカは、クリンカJPP18によってジェット噴射された水と混合されてスラリー状になり、第5水路14に送り出される。第5水路14の端部には水切り場5が設けられている。この水切り場5はシンダー処理設備2と共用である。
水切り場5において、シンダーアッシュと同様に、クリンカは水槽内において沈殿する。上澄み水は、オーバフローとして越流して灰処理用水貯水部6Aへ流出する。沈殿したクリンカは、適宜排出されて図示しない灰処理場に輸送される。
図2に示すようにクリンカホッパ11の上部の縁部の外周には、水が溜まるシールトラフ15が設けられている。シールトラフ15は、ボイラ4とクリンカホッパ11とを接合し、外気と内部とを遮断するための火炉封水が流入する。
第1ポンプ71を経て第1水路7を流れる水は、第2ポンプ72の前で分岐され第6水路7Cを通って火炉封水としてクリンカホッパ11のシールトラフ15に送られる。
第1ポンプ71を経て第1水路7を流れる水は、第2ポンプ72の前で分岐され第6水路7Cを通って火炉封水としてクリンカホッパ11のシールトラフ15に送られる。
ここで、クリンカホッパ11内部の水温は、ボイラ4からの輻射熱および落下したクリンカによって上昇する。シールトラフ15に流入した水は、クリンカホッパ11内部へ越流し、クリンカホッパ11の内面に付着したクリンカを洗い流すとともに、クリンカホッパ11内を冷却する。クリンカホッパ11を冷却した水は、クリンカホッパ11の壁面に設けられたオーバフロー口16からクリンカホッパ11の外へ排出される。クリンカホッパ11より排出された水は、第7水路17を通って、水切り場5の水槽内に送られ。上澄み水は、オーバフローとして越流して灰処理用水貯水部6Aへ流出する。
また、石炭式火力発電所100において、灰処理用水貯水部6Aの水が循環するこれらの第1水路7~第7水路17とは別に、工水が流れる工水路9が配置されている。工水路9は、上流側から、灰処理用水貯水部6Aと隣接して設けられた工水貯水部6Bまで延びている。
実施形態において、第1水路7と工水路9との間に連結水路91が設けられている。連結水路91には第1バルブ92が取り付けられている。また工水路9における連結水路91が設けられている部分よりも下流側には、第2バルブ93が取り付けられている。
本実施形態において、クリンカ処理設備1は、工水路9における、工水貯水部6Bに続く第2バルブ93を開き、工水路9と第1水路7との間の連結水路91に設けられた第1バルブ92が閉じた灰処理用水通水状態と、第2バルブ93が閉じ、第1バルブ92が開いた工水通水状態と、を取ることができる。なお、この際、第1ポンプ71及び第2ポンプ72近傍に設けられたバルブは開いた状態である。
この、灰処理用水通水状態と工水通水状態との切換は、所定時間ごとに手動で切り換えても良く、また、図示しない制御部において、自動で切り換えてもよい。
この、灰処理用水通水状態と工水通水状態との切換は、所定時間ごとに手動で切り換えても良く、また、図示しない制御部において、自動で切り換えてもよい。
灰処理用水通水状態において、灰処理用水貯水部6Aの水は、第1ポンプ71によって第1水路7に送られる。第1水路7に送られた水の一部は、第6水路7Cを通ってシールトラフ15へと流れる。
第1水路7を流れる水のうちの、シールトラフ15へ流れる水以外の水は、第2ポンプ72によって、圧送され、その一部は、シンダー21へ送られる。圧送された水は、シンダー21においてシンダーアッシュをスラリー状にして送り出す。スラリー状のシンダーアッシュは水切り場5に第4水路8を通って送られる。スラリー状のシンダーアッシュは、第4水路8の端部に設けられた水切り場5の水槽内において沈殿する。上澄み水は、越流して灰処理用水貯水部6Aへ流出する。沈殿したシンダーアッシュは、適宜排出されて図示しない灰処理場に輸送される。
圧送された水のうち、シンダー21へ流された水以外の水は、ジェッチング弁12においてジェット噴射された水の勢いにより、クリンカをクリンカクラッシャ13へ導き、クリンカクラッシャ13において粉砕されたクリンカは、クリンカJPP18によってジェット噴射された水と混合されてスラリー状になり第5水路14に送り出す。スラリー状のクリンカは、第5水路14の端部に設けられた水切り場5に送られる。水切り場5の水槽内に流入されたスラリー状のクリンカは、水槽内において沈殿する。上澄み水は、越流して灰処理用水貯水部6Aへ流出する。沈殿したクリンカは、適宜排出されて図示しない灰処理場に輸送される。
一方、第1水路7の第6水路7Cに流れた水は、火炉封水としてシールトラフ15に流れる。シールトラフ15に流入した水は、クリンカホッパ11の内部へ越流し、クリンカホッパ11の内部のクリンカを落下させるとともにクリンカホッパ11の内部を冷却する。
その後、水は、クリンカホッパ11の壁面に設けられたオーバフロー口16からクリンカホッパ11外へ排出される。排出された水は、水切り場5の水槽に流入されて、越流した水は灰処理用水貯水部6Aへ流れ出る。
なお、このような灰処理用水の通水は、一日に3,4回、1回2,3時間程度行われる。
その後、水は、クリンカホッパ11の壁面に設けられたオーバフロー口16からクリンカホッパ11外へ排出される。排出された水は、水切り場5の水槽に流入されて、越流した水は灰処理用水貯水部6Aへ流れ出る。
なお、このような灰処理用水の通水は、一日に3,4回、1回2,3時間程度行われる。
ここで、上述のように、冷却塔シックナー32のアンダーフローも、灰処理用水貯水部6Aへ流れ出る。したがって灰処理用水貯水部6Aの水は硫酸イオン濃度が高い。一方、水切り場5において、クリンカやシンダーアッシュと分離された上澄みの水も灰処理用水貯水部6Aへ流れる。これらの水は、クリンカやシンダーアッシュと混合されていたため、カルシウム濃度が高い。このため灰処理用水貯水部6Aの水は、硫酸イオン濃度及びカルシウム濃度が高い。
このような、硫酸イオン濃度及びカルシウム濃度が高い灰処理用水貯水部6Aの水が、第1水路7、第6水路7Cを流れると、水路中に針状結晶(二水石膏,硫酸カルシウム二水和物)が生成される場合がある。
針状結晶が発生すると、シールトラフ15に供給される水量が減少し、越流量が不均一になる。そうすると、越流によるクリンカホッパ11の冷却効果のバラツキが発生、収縮熱膨張のアンバランスによるキャスター破損が懸念される。
また、針状結晶の生成が更に進行すると,シールトラフ15への火炉封水の供給が困難になるともに、冷却することが困難となる。
針状結晶が発生すると、シールトラフ15に供給される水量が減少し、越流量が不均一になる。そうすると、越流によるクリンカホッパ11の冷却効果のバラツキが発生、収縮熱膨張のアンバランスによるキャスター破損が懸念される。
また、針状結晶の生成が更に進行すると,シールトラフ15への火炉封水の供給が困難になるともに、冷却することが困難となる。
そこで、本実施形態においては、上述の灰処理用水によるクリンカホッパ11及びシンダー21への通水が行われていない時間帯に、工水路9における、工水貯水部6Bに続く第2バルブ93を閉じ、工水路9と第1水路7との間の連結水路91に設けられた第1バルブ92を開ける。なお、この際、第1ポンプ71近傍に設けられたバルブは閉じる。
そうすると、工水は、第1水路7を通り、火炉封水としてシールトラフ15に流れる。
シールトラフ15に流入した水は、クリンカホッパ11の内部へ越流し、クリンカホッパ11内のクリンカを流しながらクリンカホッパ11の内部を冷却する。その後、水は、クリンカホッパ11の壁面に設けられたオーバフロー口16からクリンカホッパ11外へ排出される。
排出された水は、水切り場5の水槽に流入されて、オーバフローして灰処理用水貯水部6Aへ流れる。
そうすると、工水は、第1水路7を通り、火炉封水としてシールトラフ15に流れる。
シールトラフ15に流入した水は、クリンカホッパ11の内部へ越流し、クリンカホッパ11内のクリンカを流しながらクリンカホッパ11の内部を冷却する。その後、水は、クリンカホッパ11の壁面に設けられたオーバフロー口16からクリンカホッパ11外へ排出される。
排出された水は、水切り場5の水槽に流入されて、オーバフローして灰処理用水貯水部6Aへ流れる。
実施形態によると、以下の効果を有する。
工水は、冷却塔シックナー32のアンダーフロー水を含まず、またクリンカやシンダーアッシュと分離された上澄みの水も含まない。ゆえに、灰処理用水貯水部の水と比べて硫酸イオン濃度及びカルシウム濃度が低い。このような硫酸イオン濃度及びカルシウム濃度が低い水が、第1水路7を流れシールトラフ15を流れる水路に流されることにより、シールトラフ15を流れる水路である第1水路7、第6水路7C及び第7水路17が洗浄される。
この洗浄によって、シールトラフ15を流れる水路における針状結晶の可能性が低減される。
したがって、針状結晶の発生による、シールトラフ15に供給される水量の減少し、越流量の不均一等が発生しない。
クリンカホッパ11の冷却効果のバラツキが発生、収縮熱膨張のアンバランスによるキャスター破損の可能性が低減する。
また、シールトラフ15以外の水路7A・7Bへも工水が流れ、配管内が洗浄され針状結晶の付着抑制または除去効果が期待できる。
工水は、冷却塔シックナー32のアンダーフロー水を含まず、またクリンカやシンダーアッシュと分離された上澄みの水も含まない。ゆえに、灰処理用水貯水部の水と比べて硫酸イオン濃度及びカルシウム濃度が低い。このような硫酸イオン濃度及びカルシウム濃度が低い水が、第1水路7を流れシールトラフ15を流れる水路に流されることにより、シールトラフ15を流れる水路である第1水路7、第6水路7C及び第7水路17が洗浄される。
この洗浄によって、シールトラフ15を流れる水路における針状結晶の可能性が低減される。
したがって、針状結晶の発生による、シールトラフ15に供給される水量の減少し、越流量の不均一等が発生しない。
クリンカホッパ11の冷却効果のバラツキが発生、収縮熱膨張のアンバランスによるキャスター破損の可能性が低減する。
また、シールトラフ15以外の水路7A・7Bへも工水が流れ、配管内が洗浄され針状結晶の付着抑制または除去効果が期待できる。
1 クリンカ処理設備
2 シンダー処理設備
3 脱硫設備
4 ボイラ
5 水切り場
6A 灰処理用水貯水部
6B 工水貯水部
7 第1水路
7A 第2水路
7B 第3水路
7C 第6水路
8 第4水路
9 工水路
11 クリンカホッパ
14 第5水路
15 シールトラフ
17 第7水路
21 シンダー
32 冷却塔シックナー
32B アンダーフロー水
71 第1ポンプ
72 第2ポンプ
91 連結水路
92 第1バルブ
93 第2バルブ
100 石炭式火力発電所
2 シンダー処理設備
3 脱硫設備
4 ボイラ
5 水切り場
6A 灰処理用水貯水部
6B 工水貯水部
7 第1水路
7A 第2水路
7B 第3水路
7C 第6水路
8 第4水路
9 工水路
11 クリンカホッパ
14 第5水路
15 シールトラフ
17 第7水路
21 シンダー
32 冷却塔シックナー
32B アンダーフロー水
71 第1ポンプ
72 第2ポンプ
91 連結水路
92 第1バルブ
93 第2バルブ
100 石炭式火力発電所
Claims (6)
- 灰処理用水貯水部の第1の水をクリンカホッパに送水し、前記第1の水と共にクリンカをクリンカホッパから送出し、前記クリンカから分離された水を前記灰処理用水貯水部へと戻す、灰処理水路を備え、
前記灰処理水路には、前記第1の水と、前記第1の水とは異なる第2の水とを切り替えて通水可能である、
灰処理水路のメンテナンスシステム。 - 前記灰処理用水貯水部には、前記クリンカから分離された前記水と、脱硫設備に設けられたシックナーのアンダーフロー水から固形物が分離された水とが流入する、
請求項1に記載の灰処理水路のメンテナンスシステム。 - 前記灰処理水路を流れる水は、前記クリンカホッパのシールトラフに流入され、前記シールトラフより越流して、前記クリンカホッパの内部を流れる、
請求項1または2に記載の灰処理水路のメンテナンスシステム。 - 前記第2の水は、前記第1の水と比べて、カルシウム濃度及び硫酸イオン濃度が低い、
請求項1から3のいずれか1項に記載の灰処理水路のメンテナンスシステム。 - 前記第2の水が流れる前記灰処理水路とは異なる第2水路と、前記灰処理水路とは、連結水路で連結され、
前記連結水路には第1弁が設けられ、
前記第2水路の前記第1弁より下流には、第2弁が設けられている
請求項1から4のいずれか1項に記載の灰処理水路のメンテナンスシステム。 - 前記第1弁が閉じて前記第2弁が開き、前記灰処理水路を前記第1の水が流れる第1の通水状態と、
前記第1弁が開いて前記第2弁が閉じ、前記灰処理水路を前記第2の水が流れる第2の通水状態と、を切り替える制御部を備える
請求項5に記載の灰処理水路のメンテナンスシステム。
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/JP2016/083697 WO2018087920A1 (ja) | 2016-11-14 | 2016-11-14 | 灰処理水路のメンテナンスシステム |
| JP2017521260A JP6269898B1 (ja) | 2016-11-14 | 2016-11-14 | 灰処理水路のメンテナンスシステム |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/JP2016/083697 WO2018087920A1 (ja) | 2016-11-14 | 2016-11-14 | 灰処理水路のメンテナンスシステム |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2018087920A1 true WO2018087920A1 (ja) | 2018-05-17 |
Family
ID=61074673
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/JP2016/083697 Ceased WO2018087920A1 (ja) | 2016-11-14 | 2016-11-14 | 灰処理水路のメンテナンスシステム |
Country Status (2)
| Country | Link |
|---|---|
| JP (1) | JP6269898B1 (ja) |
| WO (1) | WO2018087920A1 (ja) |
Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4300457A (en) * | 1980-04-14 | 1981-11-17 | Combustion Engineering, Inc. | Adjustable submerged scraper conveyor seal trough |
| JPS5733717A (en) * | 1980-08-06 | 1982-02-23 | Mitsubishi Heavy Ind Ltd | Reusing method for bottom water |
| JPS61116214A (ja) * | 1984-11-12 | 1986-06-03 | Mitsubishi Heavy Ind Ltd | 灰処理装置 |
| JPS62233615A (ja) * | 1986-03-31 | 1987-10-14 | Kawasaki Heavy Ind Ltd | クリンカアツシユのスラリ−輸送装置 |
| JPH0712325A (ja) * | 1993-06-23 | 1995-01-17 | Mitsubishi Heavy Ind Ltd | 水封式炉底灰コンベア装置 |
| JPH08219434A (ja) * | 1995-02-14 | 1996-08-30 | Babcock Hitachi Kk | クリンカホッパ設備とその運転方法 |
| JPH0979561A (ja) * | 1995-09-14 | 1997-03-28 | Plant Giken Kk | 石炭燃焼炉のクリンカ灰処理方法および処理装置 |
| JPH09105511A (ja) * | 1995-10-06 | 1997-04-22 | Mitsubishi Heavy Ind Ltd | クリンカ回収装置 |
| JP2005224672A (ja) * | 2004-02-10 | 2005-08-25 | Chugoku Electric Power Co Inc:The | クリンカ及びフライアッシュ汚泥の脱水処理システム並びに方法 |
| JP2009030880A (ja) * | 2007-07-27 | 2009-02-12 | Chugoku Electric Power Co Inc:The | クリンカ処理方法 |
| JP2011031207A (ja) * | 2009-08-04 | 2011-02-17 | Chugoku Electric Power Co Inc:The | Ep灰の処理システム、ep灰の処理方法、及びep灰の処理用プログラム |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5932834U (ja) * | 1982-08-27 | 1984-02-29 | バブコツク日立株式会社 | クリンカ灰処理装置 |
| JPH09273708A (ja) * | 1996-04-01 | 1997-10-21 | Nippon Steel Corp | 石炭焚きボイラ |
-
2016
- 2016-11-14 WO PCT/JP2016/083697 patent/WO2018087920A1/ja not_active Ceased
- 2016-11-14 JP JP2017521260A patent/JP6269898B1/ja active Active
Patent Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4300457A (en) * | 1980-04-14 | 1981-11-17 | Combustion Engineering, Inc. | Adjustable submerged scraper conveyor seal trough |
| JPS5733717A (en) * | 1980-08-06 | 1982-02-23 | Mitsubishi Heavy Ind Ltd | Reusing method for bottom water |
| JPS61116214A (ja) * | 1984-11-12 | 1986-06-03 | Mitsubishi Heavy Ind Ltd | 灰処理装置 |
| JPS62233615A (ja) * | 1986-03-31 | 1987-10-14 | Kawasaki Heavy Ind Ltd | クリンカアツシユのスラリ−輸送装置 |
| JPH0712325A (ja) * | 1993-06-23 | 1995-01-17 | Mitsubishi Heavy Ind Ltd | 水封式炉底灰コンベア装置 |
| JPH08219434A (ja) * | 1995-02-14 | 1996-08-30 | Babcock Hitachi Kk | クリンカホッパ設備とその運転方法 |
| JPH0979561A (ja) * | 1995-09-14 | 1997-03-28 | Plant Giken Kk | 石炭燃焼炉のクリンカ灰処理方法および処理装置 |
| JPH09105511A (ja) * | 1995-10-06 | 1997-04-22 | Mitsubishi Heavy Ind Ltd | クリンカ回収装置 |
| JP2005224672A (ja) * | 2004-02-10 | 2005-08-25 | Chugoku Electric Power Co Inc:The | クリンカ及びフライアッシュ汚泥の脱水処理システム並びに方法 |
| JP2009030880A (ja) * | 2007-07-27 | 2009-02-12 | Chugoku Electric Power Co Inc:The | クリンカ処理方法 |
| JP2011031207A (ja) * | 2009-08-04 | 2011-02-17 | Chugoku Electric Power Co Inc:The | Ep灰の処理システム、ep灰の処理方法、及びep灰の処理用プログラム |
Also Published As
| Publication number | Publication date |
|---|---|
| JP6269898B1 (ja) | 2018-01-31 |
| JPWO2018087920A1 (ja) | 2018-11-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105627339B (zh) | 循环除渣系统 | |
| CN108723022A (zh) | 一种采用冰浆清洗船舶管道的方法 | |
| JP6269898B1 (ja) | 灰処理水路のメンテナンスシステム | |
| AU2009207850A1 (en) | Method and plant for removing accumulating slag from a slag bath | |
| JP5154405B2 (ja) | スラグの水砕のための方法及び設備 | |
| KR101249058B1 (ko) | 고로의 대탕도 | |
| CN105821168B (zh) | 冷却密封系统 | |
| CN205383620U (zh) | 循环除渣系统 | |
| WO2014065925A1 (en) | System and method for controlling scale build-up in a wfgd | |
| KR101697095B1 (ko) | 더스트 막힘을 방지할 수 있는 배가스 청정 라인의 실탱크 | |
| CN207805274U (zh) | 节流式气液交换装置 | |
| CN106458747B (zh) | 水碎炉渣制造装置以及水碎炉渣制造方法 | |
| CN201162000Y (zh) | 煤气发生炉自动除渣装置 | |
| KR101087462B1 (ko) | 대탕도용 슬래그 제거장치 | |
| JP3870132B2 (ja) | 廃棄物溶融処理におけるスラグ水砕処理設備 | |
| JP6740958B2 (ja) | 流体の濾過装置 | |
| CN208250246U (zh) | 气化炉辐射废锅的排渣装置 | |
| JP3759764B2 (ja) | クリンカホッパ設備とその運転方法 | |
| KR101975141B1 (ko) | 가스 쿨러의 세정 배수 처리 방법과 장치 | |
| CN219355507U (zh) | 一种冲洗装置 | |
| KR100868503B1 (ko) | 슬래그 회수장치 | |
| KR102468748B1 (ko) | 폐열 회수 시스템 및 방법 | |
| KR102307704B1 (ko) | 고로 가스 내의 더스트 제거 장치 | |
| JP4533764B2 (ja) | 加圧型石炭ガス化炉および石炭ガス化複合発電設備 | |
| KR0163260B1 (ko) | 냉각수 순환장치 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| WWE | Wipo information: entry into national phase |
Ref document number: 2017521260 Country of ref document: JP |
|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 16921338 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 16921338 Country of ref document: EP Kind code of ref document: A1 |