WO2018078802A1 - 電力管理システム、制御装置及び電力管理方法 - Google Patents

電力管理システム、制御装置及び電力管理方法 Download PDF

Info

Publication number
WO2018078802A1
WO2018078802A1 PCT/JP2016/082077 JP2016082077W WO2018078802A1 WO 2018078802 A1 WO2018078802 A1 WO 2018078802A1 JP 2016082077 W JP2016082077 W JP 2016082077W WO 2018078802 A1 WO2018078802 A1 WO 2018078802A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
power storage
consumer
generated
storage facility
Prior art date
Application number
PCT/JP2016/082077
Other languages
English (en)
French (fr)
Inventor
一郎 丸山
雄喜 小川
聡司 峯澤
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to PCT/JP2016/082077 priority Critical patent/WO2018078802A1/ja
Priority to JP2018547034A priority patent/JP6644162B2/ja
Publication of WO2018078802A1 publication Critical patent/WO2018078802A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers

Definitions

  • the present invention relates to a power management system, a control device, and a power management method.
  • Patent Document 1 discloses a system in which a power manager purchases electric power generated by an individual using renewable energy.
  • the purchase price of surplus power has been decreasing in recent years. If the purchase price of surplus power falls, it is preferable for consumers who own power generation facilities to store surplus power in the storage facility and consume it when necessary, rather than selling surplus power. It is done. However, it is high for a customer to own a power storage facility for reasons such as cost and location.
  • Patent Document 2 discloses a power network system that enables sharing of a power storage device and can store power even for a user who does not own the power storage device.
  • the present invention has been made to solve the above-described problems, and has an object to provide a power management system and the like that can effectively use power storage facilities shared by a plurality of consumers. To do.
  • a power management system includes: A power management system for managing power stored in a power storage facility shared by a plurality of consumers including the one consumer of power generated by the power generation facility of one consumer, Informing means for informing the one consumer of usage information of the power storage facility; A storage unit that stores the generated power in the power storage facility, or a reception unit that receives from the one consumer a supply instruction to supply the stored power of the power storage facility to the power consumption area of the one consumer; When the receiving unit receives the power storage instruction, the power storage facility stores the generated power, and when the receiving unit receives the supply instruction, the power storage facility supplies the stored power to the power consumption area.
  • Storage control means for managing power stored in a power storage facility shared by a plurality of consumers including the one consumer of power generated by the power generation facility of one consumer, Informing means for informing the one consumer of usage information of the power storage facility; A storage unit that stores the generated power in the power storage facility, or a reception unit that receives from the one consumer a supply instruction to supply the stored power of the power storage
  • the power management system informs one customer of usage information of a power storage facility shared by a plurality of consumers, and a power storage instruction for storing the power generated by the power generation facility of one customer in the power storage facility, Or, when a supply instruction is received from one consumer to supply the power stored in the power storage facility to the power consumption area of one consumer, and when the power storage instruction is received, the generated power is stored in the power storage facility and the supply instruction is received. In such a case, the power storage facility is made to supply the stored power to the power consumption area. Therefore, according to the present invention, a power storage facility shared by a plurality of consumers can be used effectively.
  • the figure which shows the whole structure of the power management system which concerns on embodiment of this invention Diagram showing the configuration of the home system Block diagram showing the hardware configuration of the control device Block diagram showing the hardware configuration of the management server
  • the flowchart which shows the flow of the process performed by a control apparatus and a management server in a discharge phase.
  • FIG. 1 shows an overall configuration of a power management system 1 according to an embodiment of the present invention.
  • the power management system 1 is a system for managing power used in a general home, and is a so-called HEMS (Home Energy Management System). As shown in FIG. 1, the power management system 1 manages the power in the house H of the consumer A, the management server 10 that manages the entire power management system 1, the power storage facilities S1 to S3 that can charge and discharge power. Home system 20 to be included.
  • HEMS Home Energy Management System
  • the power management system 1 transfers the power generated by the power generation facility 5 of the customer A who is one consumer to the power storage facilities S1 to S3 shared by the plurality of consumers A, B, C,. To manage the electricity storage.
  • the plurality of consumers A, B, C,... are, for example, residents, owners, or managers of power consumption areas such as houses, facilities, buildings, factories, etc., and different power consumption areas. The person who demands the electric power to be consumed.
  • the consumer A owns the power generation facility 5 for self-power generation by sunlight, but does not own the power storage facility for storing the generated power.
  • the consumers B and C own both the power generation equipment and the power storage equipment.
  • the management server 10, the power storage facilities S1 to S3, and the home system 20 are communicably connected via the wide area network N.
  • the wide area network N is, for example, the Internet, and relays transmission / reception of information among the management server 10, the power storage facilities S1 to S3, and the home system 20.
  • a thick solid line represents a power line through which power flows
  • a thin solid line represents a communication line through which communication data flows. The same applies to the subsequent drawings.
  • the management server 10 is a server operated by an electric power company and is a server for causing the power management system 1 to function in cooperation with the in-home system 20.
  • An electric power company is a company that buys and sells electric power for a plurality of consumers including the consumers A, B, and C.
  • the electric power company is, for example, an existing electric power company that owns the power generation equipment and the power transmission network, a new electric power company that does not own the power transmission network, or an electric power aggregator that mediates the buying and selling of electric power.
  • the management server 10 can sell the power supplied from the commercial power grid to a plurality of consumers including the consumers A, B, and C, and purchase surplus power generated in the power consumption areas of the plurality of consumers. Can do.
  • the management server 10 can store surplus power generated in the power consumption areas of a plurality of consumers in the power storage facilities S1 to S3, and the power stored in the power storage facilities S1 to S3 can be stored in the plurality of consumers. Can be supplied to the power consumption area. As a result, a plurality of consumers can deposit surplus power in the power storage facilities S1 to S3. Details of the management server 10 will be described later.
  • the power storage facility S1 is a shared facility that is not owned by a specific customer.
  • the power storage facility S1 is managed by an electric power company that operates the management server 10, and stores surplus power generated in power consumption areas of a plurality of consumers.
  • the power storage facilities S2 and S3 are privately owned facilities owned by specific consumers B and C, respectively, but can be shared by consumers other than the consumers B and C.
  • the power storage facilities S2 and S3 are installed in the premises of the consumers B and C, respectively, and store surplus power generated in the power consumption areas of a plurality of consumers including the consumers B and C.
  • the consumers B and C negotiate with the electric power company that operates the management server 10 that the power storage facilities S2 and S3 are shared with other consumers.
  • Each of the power storage facilities S1 to S3 includes a storage battery and a power converter, though not shown.
  • the storage battery is a stationary storage battery or an electric vehicle (EV) such as a nickel-cadmium battery, a nickel hydride battery, a lithium ion battery, or a lead storage battery.
  • EV electric vehicle
  • the power converter includes an AC-DC converter that mutually converts AC power and DC power, a transformer that converts the voltage of DC power, and a switching element that converts the power.
  • the power conversion device includes a CPU (Central Processing Unit), a ROM (Read Only Memory), a RAM (Random Access Memory), a communication interface, a readable / writable nonvolatile semiconductor memory, and the like.
  • the power conversion device acquires a charge / discharge command from the management server 10 via the wide area network N, executes power conversion according to the acquired command, and charges or discharges the storage battery. Specifically, the power conversion device converts AC power supplied from the outside into DC power and charges the storage battery during charging, and converts DC power discharged from the storage battery into AC power during discharging. Supply outside. Further, the power conversion device monitors the storage amount and the storage rate of the storage battery and notifies the management server 10 via the wide area network N.
  • the home system 20 is a system that manages the power consumed in the house H of the consumer A who does not have power storage equipment.
  • the house H is a so-called general residential building, and is a demand area (power consumption area) of power supplied from the commercial power system and the power storage facilities S1 to S3.
  • FIG. 2 shows the configuration of the home system 20.
  • the in-home system 20 measures the control device 2 that controls the entire in-home system 20, the operation terminal 3 that is a user interface, the power generation facility 5 that generates power by sunlight, and the power.
  • the control device 2 is an information collection unit that is installed at an appropriate place in the house H that is a power consumption area and collects information transmitted from each device installed in the house H via a wireless network.
  • the control apparatus 2 is a HEMS controller which can control each apparatus installed in the house H as an example.
  • the control device 2 monitors the power consumed in the house H and displays the power consumption status via the operation terminal 3. Details of the control device 2 will be described later.
  • the operation terminal 3 is, for example, a mobile device such as a smartphone, a tablet terminal, a remote controller, a mobile phone, or a notebook computer.
  • the operation terminal 3 includes an input unit such as a push button, a touch panel or a touch pad, a display unit such as an organic EL (Electro-Luminescence) display or a liquid crystal display, and a communication interface.
  • the operation terminal 3 communicates with the control device 2 in accordance with a known communication standard such as Wi-Fi (registered trademark), Wi-SUN (registered trademark), or wired LAN (Local Area Network).
  • the operation terminal 3 receives an operation from the user and transmits information indicating the received operation content to the control device 2. Further, the operation terminal 3 receives the information transmitted from the control device 2 and presented to the user, and displays the received information.
  • the operation terminal 3 plays a role as a user interface.
  • the power generation facility 5 is a facility that is installed in the house H and generates power using sunlight, which is natural energy. While the commercial power system supplies power to an unspecified number of power consumption areas including the house H, the power generation facility 5 is owned by a consumer in a specific power consumption area and is a house that is a specific power consumption area. This is a facility for supplying power to H. Such a power generation facility 5 is also referred to as a distributed power source.
  • the power generation facility 5 includes a PV panel 13 that performs photovoltaic power generation (PV) and a PV-PCS 14 that is a power conditioning system for PV.
  • the PV panel 13 is a polycrystalline silicon solar panel, for example.
  • the PV panel 13 is installed on the roof of the house H, and generates solar power by converting solar energy into electric energy.
  • the PV-PCS 14 receives supply of power generated by the PV panel 13 and outputs the supplied power to the distribution board 9 via the power line D2. At that time, the PV-PCS 14 converts the power supplied from the PV panel 13 from DC power to AC power with a specified conversion efficiency so that it can be used in the house H, and outputs it.
  • the PV-PCS 14 includes a CPU, a ROM, a RAM, a communication interface, a readable / writable nonvolatile semiconductor memory, and the like, although not shown.
  • the PV-PCS 14 communicates with the control device 2 via a wireless network constructed in the house H.
  • This wireless network is, for example, a network based on Wi-Fi (registered trademark), infrared communication, or ECHONET ⁇ ⁇ ⁇ Lite.
  • the power measuring device 6 includes power P1 transmitted through the power line D1 disposed between the commercial power system and the power storage facilities S1 to S3 and the distribution board 9, and between the PV-PCS 14 and the distribution board 9. The value of the electric power P2 transmitted through the electric power line D2 arranged in is measured.
  • the power measuring device 6 is connected to a CT (Current Transformer) 1 connected to the power line D1 and a CT2 connected to the power line D2 via a communication line.
  • CT1 and CT2 are sensors that measure alternating current.
  • the power P1 measured by the power measuring device 6 corresponds to the power (supplied power) supplied to the house H from the commercial power system or the power storage equipment S1 to S3.
  • the electric power P2 corresponds to the electric power (generated electric power) generated by the power generation facility 5 and output from the PV-PCS 14.
  • the total power consumption of the house H will be described as including not only the power in the house H but also the power consumed in the site of the house H. Hereinafter, the total power consumption is simply referred to as “power consumption”.
  • the power measuring device 6 includes a CPU, a ROM, a RAM, a communication interface, a readable / writable nonvolatile semiconductor memory, and the like, although not shown.
  • the power measuring device 6 includes a wireless communication interface, and communicates with the control device 2 via the above-described wireless network constructed in the house H.
  • the power measurement device 6 generates measurement data that stores the values of the power P1 and the power P2 obtained by the measurement as measurement values, and periodically transmits the measurement data to the control device 2 at a predetermined cycle.
  • the transmitted measurement data also stores the device address of the power measurement device 6, the ID (Identification) of the power line D1 and the power line D2, the measurement time, and the like.
  • the power measurement device 6 may generate measurement data storing the measured values of the power P1 and the power P2 in response to a request from the control device 2 and transmit the measurement data to the control device 2.
  • Each of the plurality of electric devices 7a, 7b,... Is a device that is installed in the house H (including its site) as a power consuming area and consumes power in the house H.
  • the plurality of electric devices 7a, 7b,... Are connected to power lines D4, D5,... Branched by the distribution board 9, and operate by power supplied from the commercial power system or power storage facilities S1 to S3.
  • Each of the plurality of electric devices 7a, 7b,... Has a wireless communication interface, and communicates with the control device 2 via the above-described wireless network built in the house H.
  • Each of the plurality of electric devices 7a, 7b,... May have a specification that is connected to this wireless network via an external communication adapter (not shown).
  • Each of the plurality of electric devices 7a, 7b,... In response to a request from the control device 2, wirelessly stores data (operating state data) storing device ID, current time, and information indicating the current operating state. It transmits to the control apparatus 2 via a network.
  • the distribution board 9 converts the power P1 supplied from the commercial power system or the power storage facilities S1 to S3 and the power P2 generated by the power generation facility 5 into the power measuring device 6 and a plurality of electric devices 7a, 7b,.
  • a wiring board is provided for distribution.
  • the distribution board 9 is provided with the breaker which interrupts
  • the control device 2 includes a control unit 21, a storage unit 22, a timing unit 23, an in-home communication unit 24, and an out-of-home communication unit 25. These units are connected via a bus 29.
  • the control unit 21 includes a CPU, a ROM, a RAM, and the like, although not shown.
  • the CPU is also called a central processing unit, a central processing unit, a processor, a microprocessor, a microcomputer, a DSP (Digital Signal Processor), or the like.
  • the CPU reads a program and data stored in the ROM, and performs overall control of the control device 2 using the RAM as a work area.
  • the storage unit 22 is a non-volatile semiconductor memory such as a flash memory, an EPROM (Erasable Programmable ROM) or an EEPROM (Electrically Erasable Programmable ROM), and serves as a so-called secondary storage device (auxiliary storage device). .
  • the storage unit 22 stores various programs and data used by the control unit 21 to perform various processes, and various data generated or acquired by the control unit 21 performing various processes.
  • the timekeeping unit 23 includes a RTC (Real Time Clock), and is a timekeeping device that keeps timekeeping while the power of the control device 2 is off.
  • RTC Real Time Clock
  • the home communication unit 24 includes a communication interface for communicating with devices in the premises of the house H.
  • the in-home communication unit 24 controls the PV-PCS 14, the power measuring device 6, and the plurality of electric devices 7 a, 7 b,... Via the above-described wireless network built in the house H under the control of the control unit 21. Communicate with each.
  • the in-home communication unit 24 communicates with the operation terminal 3 through the Wi-Fi (registered trademark), Wi-SUN (registered trademark), wired LAN, or the like under the control of the control unit 21.
  • the external communication unit 25 includes a communication interface for connecting to the wide area network N.
  • the outside communication unit 25 communicates with devices outside the house H including the management server 10 via the wide area network N under the control of the control unit 21.
  • the management server 10 includes a control unit 31, a storage unit 32, a timing unit 33, and a communication unit 34. These units are connected via a bus 39.
  • the control unit 31 includes a CPU, a ROM, a RAM, and the like (not shown).
  • the CPU is also called a central processing unit, a central processing unit, a processor, a microprocessor, a microcomputer, or a DSP.
  • the CPU reads the program and data stored in the ROM, and performs overall control of the management server 10 using the RAM as a work area.
  • the storage unit 32 is a non-volatile semiconductor memory such as a flash memory, EPROM, or EEPROM, for example, and plays a role as a so-called secondary storage device (auxiliary storage device).
  • the storage unit 32 stores various programs and data used by the control unit 31 for performing various processes, and various data generated or acquired by the control unit 31 performing various processes.
  • the timekeeping unit 33 includes a RTC and is a timekeeping device that keeps timekeeping even when the management server 10 is powered off.
  • the communication unit 34 includes a communication interface for connecting to the wide area network N.
  • the communication unit 34 communicates with devices external to the management server 10 including the control device 2 of the home system 20 and the power storage facilities S1 to S3 via the wide area network N under the control of the control unit 31.
  • the management server 10 may include a user interface including an input unit that receives an operation input from a user and a display unit that displays an image.
  • the control device 2 functionally includes a measurement value acquisition unit 210, a usage information acquisition unit 220, a notification unit 230, a reception unit 240, and a request transmission unit 250.
  • the management server 10 functionally includes a storage amount acquisition unit 310, a charge calculation unit 320, a usage information transmission unit 330, a request reception unit 340, and a storage control unit 350.
  • control device 2 includes a measurement DB (Database) 290.
  • the measurement DB 290 is constructed in an appropriate storage area of the storage unit 22.
  • the management server 10 includes a management DB 390.
  • the management DB 390 is constructed in an appropriate storage area of the storage unit 32.
  • the measurement value acquisition unit 210 is generated by the power (supply power) P1 supplied to the house H from the commercial power system or the power storage facilities S1 to S3, and the power generation facility 5, and is output from the PV-PCS 14.
  • the measured value of the generated power (generated power) P2 is acquired.
  • the powers P1 and P2 are measured by the power measuring device 6 via CT1 connected to the power line D1 and CT2 connected to the power line D2.
  • the power measuring device 6 periodically transmits the measured values of the powers P1 and P2 obtained by CT1 and CT2 to the control device 2 at a predetermined cycle.
  • the predetermined period is, for example, about 10 seconds to several tens of seconds.
  • the measurement value acquisition unit 210 transmits a request for measurement values of the powers P1 and P2 to the power measurement device 6 as necessary, and the power measurement device 6 responds to the request with the measurement values of the powers P1 and P2. May be transmitted to the control device 2.
  • the measurement value acquisition unit 210 acquires the measurement values of the powers P1 and P2 obtained by the power measurement device 6 from the power measurement device 6 via the in-home communication unit 24.
  • the measurement value acquisition unit 210 is realized by the control unit 21 cooperating with the home communication unit 24.
  • the measurement DB 290 stores the measurement values of the electric powers P1 and P2 acquired by the measurement value acquisition unit 210.
  • the measurement DB 290 stores the acquired measurement values each time the measurement value acquisition unit 210 acquires the measurement values of the powers P1 and P2, thereby storing the history of the supplied power P1 and the generated power P2.
  • FIG. 6 shows a specific example of measurement data stored in the measurement DB 290.
  • the measurement DB 290 stores the power amount of the supplied power P1 and the power amount of the generated power P2 in chronological order.
  • the electric energy is an integrated value of electric power over a predetermined time.
  • the measurement value acquisition unit 210 acquires the measurement values of the powers P1 and P2
  • the measurement value acquisition unit 210 calculates the power amounts of the powers P1 and P2 and sequentially stores them in the measurement DB 290.
  • the usage information acquisition unit 220 acquires the usage information of the power storage facilities S1 to S3 from the management server 10.
  • the usage information of the power storage facilities S1 to S3 is information related to the use of the power storage facilities S1 to S3, and is information that serves as a judgment criterion for determining whether or not the customer A uses the power storage facilities S1 to S3. .
  • the usage information includes information indicating the current state of the storage amount or storage rate of the storage facilities S1 to S3, and a usage fee paid by the customer A to use the storage facilities S1 to S3. is there.
  • the usage information acquisition unit 220 transmits a usage information acquisition request to the management server 10 via the out-of-home communication unit 25 and the wide area network N according to the presence or absence of surplus power in the house H. Then, the usage information acquisition unit 220 acquires the usage information transmitted from the management server 10 as a response to the transmitted acquisition request via the out-of-home communication unit 25 and the wide area network N. Thus, the usage information acquisition unit 220 is realized by the control unit 21 cooperating with the outside communication unit 25.
  • the surplus power means surplus power that is not consumed in the house H when the generated power P2 generated by the power generation facility 5 is larger than the power consumption P3 in the house H. Specifically, surplus power corresponds to power obtained by subtracting power consumption P3 from generated power P2.
  • FIG. 7 shows the daily transition of the generated power P2 and the power consumption P3 in the house H.
  • the solid line represents the transition of the generated power P2
  • the broken line represents the transition of the power consumption P3.
  • the generated power P2 shows a large value in the daytime with a peak at noon when the amount of solar radiation increases.
  • the power consumption P3 generally shows a large value from the afternoon to the evening when the amount of power consumption at home increases.
  • the generated power P2 is greater than the power consumption P3. Therefore, surplus power (P2-P3) is generated in the house H.
  • the generated surplus power (P2-P3) is output to the outside of the house H through the power line D1. In this case, the supply power P1 measured by CT1 becomes a negative value.
  • the generated power P2 is smaller than the power consumption P3 from the evening to the early morning. Therefore, it is necessary to supply power to the house H from the outside. Necessary power (P3-P2) is supplied from the outside through the power line D1. In this case, the supply power P1 measured by CT1 becomes a positive value.
  • the usage information acquisition unit 220 refers to the value of the supplied power P1 stored in the measurement DB 290 and determines whether or not surplus power is generated and whether or not the house H needs to be supplied with power from the outside. To do.
  • the usage information acquisition unit 220 uses the generated power P2 as the usage information for the power storage facilities S1 to S1.
  • First information for the customer A to select whether or not to store electricity in S3 is acquired from the management server 10.
  • the consumer A can obtain an economic profit by selling surplus power to an electric power company.
  • the customer A can deposit surplus power with an electric power provider by outputting surplus power to any of the power storage facilities S1 to S3 and storing it.
  • the customer A temporarily deposits surplus power in one of the power storage facilities S1 to S3 that are shared facilities, and later pulls out the surplus power that has been deposited. It can be consumed at house H.
  • the usage information acquisition unit 220 acquires from the management server 10 first information that is a criterion for determining whether to sell or store such surplus power.
  • Second information for the customer A to select whether or not to supply the stored power of the power storage facilities S1 to S3 to the house H is acquired from the management server 10.
  • the consumer A can purchase power from an electric power provider when the house H needs to be supplied with electric power from the outside, or the power previously stored in one of the power storage facilities S1 to S3. Can be pulled out.
  • the usage information acquisition unit 220 acquires from the management server 10 second information that is a criterion for determining whether to purchase power or to draw out stored power.
  • the first threshold time and the second threshold time are, for example, 5 minutes or 10 minutes, and are set in advance and stored in the ROM or the storage unit 22. Note that the first threshold time and the second threshold time may be the same or different.
  • the power storage amount acquisition unit 310 acquires the power storage amounts of the power storage facilities S1 to S3. More specifically, the storage amount acquiring unit 310 communicates with the power conversion device provided in each of the storage facilities S1 to S3 via the communication unit 34 and the wide area network N. Then, the storage amount acquisition unit 310 acquires information on the current storage amount stored in the storage battery from each power conversion device in each of the storage facilities S1 to S3.
  • the storage amount acquiring unit 310 is realized by the control unit 31 cooperating with the communication unit 34.
  • the storage amount acquisition unit 310 calculates the storage rate of the entire storage facilities S1 to S3 by comparing the calculated remaining storage amount with the storage capacity of the entire storage facilities S1 to S3. In this way, the storage amount acquisition unit 310 checks the current usage status of the storage facilities S1 to S3 and how much power can be newly stored.
  • the charge calculation unit 320 calculates the usage charges for the power storage facilities S1 to S3.
  • the usage fee is a fee that the customer A pays to the electric power company when depositing power in any of the power storage facilities S1 to S3 or drawing power from any of the power storage facilities S1 to S3.
  • the charge calculation unit 320 is necessary for supplying the house H with the first charge (deposit charge) necessary for storing the generated power P2 (surplus power) in any of the power storage facilities S1 to S3.
  • a second charge (withdrawal charge) is calculated.
  • the charge calculation unit 320 is realized by the control unit 31.
  • the charge calculation unit 320 uses, as the first charge, at least one of the amount of power stored in the power storage facilities S1 to S3 or the time period during which the generated power P2 is stored in any of the power storage facilities S1 to S3. Calculate different charges depending on. Further, the charge calculation unit 320 supplies the house H with the length of the period during which the consumer A has stored the generated power P2 in any of the power storage facilities S1 to S3 or the stored power as the second charge. Calculate different charges depending on at least one of the time zones. This will be specifically described with reference to FIGS.
  • FIG. 8 shows the first fee for depositing power into the power storage facilities S1 to S3 along with the power storage rate for each time period.
  • the power storage rate is an index indicating the amount of power stored in the power storage facilities S1 to S3.
  • the power storage rates of the power storage facilities S1 to S3 show peaks from the daytime to the evening when the amount of power generated by the power generation facilities of each consumer increases.
  • the fee calculation unit 320 calculates the deposit fee so that the higher the power storage rate of the power storage facilities S1 to S3 is, the higher the power storage time is during the daytime than during the night.
  • the fee calculation unit 320 sets the fee per unit amount higher as the first amount to be deposited increases. Specifically, as shown in FIG. 8, the fee calculation unit 320 sets the deposit fee B when the deposit amount is 10 kWh to a fee higher than the deposit fee A when the deposit amount is 5 kWh.
  • FIG. 9 shows the power charges from the power storage facilities S1 to S3, which are the second charges, along with the power purchase price for each time period.
  • the electric power purchase price is a price when electric power is purchased from an electric power company without drawing electric power from the power storage facilities S1 to S3.
  • the power purchase price is assumed to be constant throughout the time.
  • the fee calculation unit 320 sets the withdrawal fee lower than the power purchase price so that it is more economical to use the power storage facilities S1 to S3 than to purchase power.
  • the withdrawal fee has three elements: (1) average deposit fee, (2) incentive according to the deposit period, and (3) incentive according to the withdrawal time zone. It is determined based on.
  • the average deposit fee is an average value of a plurality of deposit fees when the customer A deposits power multiple times in any of the power storage facilities S1 to S3.
  • the incentive according to the deposit period is a value that varies according to the length of the period in which the customer A has stored the generated power P2 in any of the power storage facilities S1 to S3. For example, depositing power over a long period of time occupies the power storage facilities S1 to S3, and also causes a loss of stored power. Therefore, the fee calculation unit 320 sets an incentive so that the customer A loses economically as the deposit period is longer. In other words, the fee calculation unit 320 sets the withdrawal fee so that the longer the period during which the customer A has stored the generated power P2 in any one of the storage facilities S1 to S3, the higher it is.
  • the fee calculation unit 320 acquires information on the deposit period of the customer A with reference to the management data of the customer A stored in the management DB 390. When customer A deposits power multiple times in any one of power storage facilities S1 to S3, fee calculation unit 320 calculates an incentive using the average of a plurality of deposit periods.
  • the incentive according to the withdrawal time zone is a value that varies according to the time zone during which the stored power is supplied to the house H. For example, from the daytime to the evening, the power storage rate and the remaining power storage of the power storage facilities S1 to S3 increase. In this case, since the free capacity of the power storage facilities S1 to S3 is reduced, it is recommended to actively extract the stored power. Therefore, as shown in FIG. 9, the fee calculation unit 320 sets an incentive so that the consumer A can obtain economically when the withdrawal time zone is noon than at night. In other words, the fee calculation unit 320 sets the withdrawal fee so that the time period during which the stored power is supplied to the house H is lower in the daytime than in the nighttime.
  • the usage information transmission unit 330 transmits the usage information of the power storage facilities S1 to S3 to the control device 2.
  • the usage information transmission unit 330 receives the usage information acquisition request transmitted from the usage information acquisition unit 220 of the control device 2, the usage information transmission unit 330 transmits the usage information of the power storage facilities S1 to S3 via the communication unit 34 and the wide area network N. It transmits to the control apparatus 2.
  • the usage information transmission unit 330 is realized by the control unit 31 cooperating with the communication unit 34.
  • the usage information transmission unit 330 selects whether or not the generated power P2 is stored in the power storage facilities S1 to S3 as usage information.
  • the first information to be transmitted is transmitted to the control device 2.
  • the first information includes information on the power storage rate acquired by the power storage amount acquisition unit 310 and the first fee (deposit fee) calculated by the fee calculation unit 320.
  • the usage information transmitting unit 330 determines whether or not the stored power of the power storage facilities S1 to S3 is supplied to the house H as usage information.
  • the second information for A to select is transmitted to the control device 2.
  • the second information includes the second charge (withdrawal charge) calculated by the charge calculation unit 320 and information on the remaining amount of electricity stored in the customer A.
  • the remaining amount of electricity stored by the customer A means the total amount of power that the customer A has deposited in any of the power storage facilities S1 to S3 in the past and can be drawn from the power storage facilities S1 to S3.
  • the usage information transmission unit 330 acquires information on the remaining amount of electricity stored in the customer A with reference to the management data of the customer A stored in the management DB 390.
  • the notification unit 230 notifies the customer A of the usage information of the power storage facilities S1 to S3.
  • the notification unit 230 transmits the usage information acquired by the usage information acquisition unit 220 to the operation terminal 3 by communicating with the operation terminal 3 via the in-home communication unit 24. Then, the notification unit 230 displays the notification image illustrated in FIG. 11 or 12 on the display unit of the operation terminal 3.
  • the notification unit 230 is realized by the control unit 21 cooperating with the home communication unit 24.
  • the notification unit 230 notifies the usage information of at least one of the usage fee of the power storage facilities S1 to S3 or the information indicating the power storage amount of the power storage facilities S1 to S3.
  • the information indicating the storage amount of the storage facilities S1 to S3 is specifically the storage rate or the remaining storage amount of the storage facilities S1 to S3.
  • the notification unit 230 uses the generated power P2 as one of the storage facilities S1 to S3 as usage information when the generated power P2 is larger than the consumed power P3, that is, when surplus power is generated in the house H.
  • the first information for the customer A to select whether or not to store electricity is reported.
  • the notification unit 230 displays the notification image shown in FIG. 11 on the display unit of the operation terminal 3.
  • the notification unit 230 notifies that “deposit” and “power sale” can be selected as the correspondence of surplus power.
  • the notification unit 230 notifies the storage rates and deposit charges of the power storage facilities S1 to S3 acquired as the first information from the management server 10. As a result, the consumer A can easily confirm the current status of the power storage facilities S1 to S3 and the cost necessary for depositing surplus power.
  • the notification unit 230 notifies the power sale price when surplus power is sold together with the deposit fee. By notifying the deposit fee and the power sale price, the consumer A can decide whether to deposit surplus power or sell power while comparing which of deposit and power sale is better.
  • the notification unit 230 demands whether or not to supply the stored power to the house H as usage information.
  • the second information for the house A to select is notified. If it demonstrates concretely, the alerting
  • the notification unit 230 notifies that “withdrawal” and “electricity purchase” can be selected as a power procurement method.
  • the notification unit 230 notifies the customer A of the remaining power storage amount and the withdrawal fee acquired as the second information from the management server 10. As a result, the consumer A can easily confirm the amount of power that can be drawn from the power storage facilities S1 to S3 and the cost required to draw the stored power.
  • the notification unit 230 notifies the purchase price when the power is purchased together with the withdrawal fee.
  • the consumer A can decide whether to draw out the stored power or buy the power while comparing which one of the withdrawal and the power purchase is better. For example, when the withdrawal fee is much lower than the power purchase price, the customer A can determine that it is better to draw out the stored power than to purchase power.
  • the accepting unit 240 supplies the generated power P2 (surplus power) to any of the power storage facilities S1 to S3 or supplies the power stored in the power storage facilities S1 to S3 to the house H.
  • An instruction is received from customer A.
  • the customer A can input a power storage instruction or a supply instruction via the input unit of the operation terminal 3.
  • the customer A can instruct the amount of electricity stored by inputting a numerical value in the item “deposit amount” in FIG. 11. Since the deposit fee varies depending on the deposit amount, the notification unit 230 updates the deposit fee in FIG. 11 every time the receiving unit 240 receives an input of a new deposit amount from the customer A, and responds to the new deposit amount. Notify the deposit fee.
  • the consumer A when it is necessary to supply power to the house H, the consumer A, while looking at the notification image shown in FIG. It is possible to select “Power purchase”.
  • the customer A inputs a numerical value in the item “withdrawal amount” in FIG. 12 to instruct the amount of power supplied from the stored power to the house H within the range of the remaining power stored in the customer A. be able to.
  • the reception unit 240 communicates with the operation terminal 3 via the home communication unit 24. Thereby, the reception unit 240 receives the power storage instruction, the supply instruction, the power sale instruction, or the power purchase instruction input from the consumer A to the operation terminal 3 via the operation terminal 3. Thus, the reception unit 240 is realized by the control unit 21 cooperating with the home communication unit 24.
  • the request transmission unit 250 transmits a power storage request for storing the generated power P2 in any one of the power storage facilities S1 to S3 to the management server 10.
  • the power storage request is a request for the management server 10 to charge any one of the power storage facilities S1 to S3 according to the power storage instruction received from the customer A.
  • the power storage request includes information on the deposit amount (power storage amount) received from the customer A.
  • the request transmitting unit 250 transmits to the management server 10 a supply request that causes any of the power storage facilities S1 to S3 to supply the stored power to the house H.
  • the supply request is a request for the management server 10 to discharge any of the power storage facilities S1 to S3 in accordance with the supply instruction received from the customer A.
  • the supply request includes information on the withdrawal amount (supply amount) received from the consumer A.
  • the request transmission unit 250 transmits a power storage request or a supply request to the management server 10 via the outside communication unit 25 and the wide area network N.
  • the request transmission unit 250 is realized by the control unit 21 cooperating with the outside communication unit 25.
  • the request reception unit 340 receives the power storage request or the supply request transmitted from the request transmission unit 250 of the control device 2 via the communication unit 34.
  • the request receiving unit 340 is realized by the control unit 31 cooperating with the communication unit 34.
  • the power storage control unit 350 stores the generated power P2 in any of the power storage facilities S1 to S3. Specifically, the power storage control unit 350 refers to the free capacity of each of the power storage facilities S1 to S3, and specifies at least one power storage facility that can be newly stored from these. Then, the power storage control unit 350 transmits a charging command to the power conversion device provided in the specified power storage facility via the communication unit 34 and the wide area network N. Thereby, the surplus electric power generated in the house H is stored in the storage battery of this storage facility.
  • the power storage control unit 350 is realized by the control unit 31 cooperating with the communication unit 34.
  • the storage control unit 350 ends the charging of the storage facility. If surplus power remains in the house H, the remaining surplus power is sold. If the surplus power runs out before the stored amount reaches the instructed deposit amount, the storage control unit 350 ends the charging of the storage facility at that time.
  • the power storage control unit 350 When the surplus power is stored, the power storage control unit 350 records the management data of the customer A in the management DB 390. As shown in FIG. 13, the management DB 390 associates a customer name, a storage date and time, a deposit amount, a storage destination, and a deposit fee with each consumer using any of the storage facilities S1 to S3. Is remembered. Each time the surplus power is stored, the power storage control unit 350 records such newly stored power and information on the customer in the management DB 390 and leaves a power storage history.
  • the power storage control unit 350 causes one of the power storage facilities S1 to S3 to supply the stored power to the house H.
  • the power storage control unit 350 refers to the management DB 390 and identifies at least one power storage facility in which the power of the customer A is stored from among the power storage facilities S1 to S3. Then, the power storage control unit 350 transmits a discharge command to the power conversion device provided in the specified power storage facility via the communication unit 34 and the wide area network N. Thereby, the electric power stored in the storage battery of this power storage facility is supplied to the house H.
  • the power storage control unit 350 causes the power storage facility to terminate the discharge.
  • the necessary electric power is acquired by power purchase.
  • the consumer A can select whether to extract the stored electric power or purchase the power again.
  • the power storage control unit 350 When the stored power is extracted, the power storage control unit 350 records the management data of the customer A in the management DB 390. As shown in FIG. 14, the management DB 390 associates a customer name, a remaining power storage amount, an average deposit fee, an incentive according to a deposit period, and an average deposit period for each consumer who has drawn out the stored power. I remember the data. Each time the power storage control unit 350 extracts the stored power, the power storage control unit 350 records information on the newly drawn power and the customer in the management DB 390 and leaves a power storage history.
  • FIG. 15 shows a flow of processing executed by the control device 2 and the management server 10 in the power storage phase in which the power storage facilities S1 to S3 are charged with surplus power in the house H.
  • the control unit 21 determines whether or not surplus power has been generated for the first threshold time or longer (step S101).
  • control unit 21 refers to the value of the supplied power P1 acquired from the power measurement device 6 by the measurement value acquisition unit 210 and stored in the measurement DB 290. Then, the control unit 21 determines whether or not the supplied power P1 is a negative value, that is, whether or not power is output from the house H to the outside. The control unit 21 determines that surplus power is generated when the supplied power P1 is a negative value.
  • step S101 If surplus power has been generated over the first threshold time (step S101; YES), the control unit 21 proceeds to the power storage phase processing after step S102. On the other hand, when the surplus electric power has not generate
  • the control unit 21 requests usage information from the management server 10 (step S102). Specifically, the control unit 21 sends an acquisition request for the first information for the customer A to select whether or not the surplus power is stored in the power storage facilities S1 to S3. The data is transmitted to the management server 10 via the network N. In steps S101 and S102, the control unit 21 functions as a usage information acquisition unit 220.
  • the control unit 31 acquires the amount of stored electricity (step S201). Specifically, the control unit 31 communicates with the power conversion device provided in each of the power storage facilities S1 to S3, and acquires the respective power storage amounts of the power storage facilities S1 to S3. Then, the control unit 31 calculates the remaining amount of electricity storage and the electricity storage rate in the entire shareable electricity storage facilities S1 to S3 based on the acquired electricity storage amount. In step S ⁇ b> 201, the control unit 31 functions as the stored electricity amount acquisition unit 310.
  • the control unit 31 calculates a usage fee (step S202). More specifically, the control unit 31 sets the surplus power according to at least one of the storage amount of the storage facilities S1 to S3 or the time period during which the generated power P2 is stored in any of the storage facilities S1 to S3. A first fee (deposit fee) necessary to store electricity in any of the storage facilities S1 to S3 is calculated. In addition, the control unit 31 has at least one of the length of the period during which the consumer A has stored the generated power P2 in any one of the power storage facilities S1 to S3, or the time period during which the stored power is supplied to the house H. Accordingly, a second fee (drawer fee) necessary for supplying the stored power to the house H is calculated. In step S ⁇ b> 202, the control unit 31 functions as a fee calculation unit 320.
  • the control unit 31 executes the storage amount acquisition process in step S201 and the charge calculation process in step S202 at a predetermined cycle. Thereby, the control unit 31 periodically updates the storage amount and the usage fee of the storage facilities S1 to S3 to the latest information.
  • the control unit 31 transmits the usage information to the requesting control device 2 (step S203). Specifically, the control unit 31 uses the first information indicating the storage rates of the power storage facilities S1 to S3 obtained in step S201 and the deposit fee calculated in step S202 as usage information. 34 and the wide area network N. In step S ⁇ b> 203, the control unit 31 functions as the usage information transmission unit 330.
  • the control unit 21 acquires the transmitted usage information.
  • the control unit 21 notifies the acquired usage information (step S103). Specifically, as shown in FIG. 11, the control unit 21 causes the display unit of the operation terminal 3 to display a notification image including the storage rates, deposit charges, and power selling prices of the power storage facilities S1 to S3.
  • the control unit 21 functions as the notification unit 230.
  • the control unit 21 determines whether or not a power storage instruction has been accepted (step S104). Specifically, the control unit 21 determines whether or not an instruction to store the surplus power of the house H in any of the power storage facilities S1 to S3 has been received from the customer A via the operation terminal 3. In step S ⁇ b> 104, the control unit 21 functions as the reception unit 240.
  • step S104 When the storage instruction is received (step S104; YES), the control unit 21 requests the management server 10 to store power to the storage facilities S1 to S3 (step S105). Specifically, the control unit 21 transmits a power storage request for storing surplus power in any one of the power storage facilities S1 to S3 to the management server 10 via the outside communication unit 25 and the wide area network N. In step S ⁇ b> 105, the control unit 21 functions as the request transmission unit 250.
  • step S104 when the power storage instruction has not been received (step S104; NO), the control unit 21 skips the process of step S105.
  • the case where the power storage instruction is not received specifically corresponds to the case where the power sale instruction for selling surplus power is received or the case where no instruction is received.
  • the control unit 31 when receiving the power storage request transmitted from the control device 2, the control unit 31 stores the surplus power in any one of the power storage facilities S1 to S3 (step S204). Specifically, the control unit 31 transmits a charge command to the power conversion device of at least one power storage facility that can store power among the power storage facilities S1 to S3. As a result, the control unit 31 causes the power storage facility to store the surplus power generated in the house H up to the instructed amount. In step S ⁇ b> 204, the control unit 31 functions as the power storage control unit 350.
  • control unit 31 updates the management data of the customer A stored in the management DB 390 (step S205). If it demonstrates concretely, the control part 31 will record the information regarding the newly accumulate
  • FIG. 16 shows a flow of processing executed by the control device 2 and the management server 10 in the discharge phase in which the electric power stored in the power storage facilities S1 to S3 is discharged to the house H.
  • the control unit 21 determines whether or not the state where power supply is required to the house H continues for the second threshold time or longer (step S301).
  • control unit 21 refers to the value of the supplied power P1 acquired from the power measurement device 6 by the measurement value acquisition unit 210 and stored in the measurement DB 290. And the control part 21 determines whether the electric power P1 is a positive value, ie, whether electric power is supplied to the house H from the outside. The control unit 21 determines that the house H needs to be supplied with power when the supplied power P1 is a positive value.
  • step S301 When the state where power supply is required for the house H continues for the second threshold time or longer (step S301; YES), the control unit 21 shifts to the discharge phase process after step S302. On the other hand, when the state which requires electric power supply to the house H is not continued over 2nd threshold time or more (step S301; NO), the control part 21 does not transfer to the process of a discharge phase.
  • the control unit 21 requests usage information from the management server 10 (step S302). More specifically, the control unit 21 sends a second information acquisition request for the consumer A to select whether or not to supply the stored power of the power storage facilities S1 to S3 to the house H. 25 and the wide area network N. In steps S301 and S302, the control unit 21 functions as the usage information acquisition unit 220.
  • the control unit 31 acquires the amount of stored electricity (step S401) and calculates a usage fee (step S402).
  • the processes in steps S401 and S402 are the same as steps S201 and S202 in the power storage phase.
  • the control unit 31 executes the storage amount acquisition process in step S401 and the charge calculation process in step S402 at predetermined intervals. Thereby, the control unit 31 periodically updates the storage amount and the usage fee of the storage facilities S1 to S3 to the latest information.
  • the control unit 31 transmits the usage information to the requesting control device 2 (step S403). More specifically, the control unit 31 uses the communication unit 34 and the wide area network N as the usage information for the deposit information calculated in step S402 and the second information indicating the remaining amount of electricity stored in the customer A. To the control device 2. In step S ⁇ b> 403, the control unit 31 functions as the usage information transmission unit 330.
  • control unit 21 when the usage information is transmitted from the management server 10 in step S403, the control unit 21 acquires the transmitted usage information.
  • the control unit 21 notifies the acquired usage information (step S303). Specifically, as shown in FIG. 12, the control unit 21 causes the display unit of the operation terminal 3 to display a notification image including the remaining power storage amount, the withdrawal fee, and the power purchase price of the customer A.
  • the control unit 21 functions as the notification unit 230.
  • the control unit 21 determines whether or not a supply instruction has been accepted (step S304). More specifically, the control unit 21 determines whether or not an instruction to supply any one of the stored power from the power storage facilities S1 to S3 to the house H is received from the customer A via the operation terminal 3. In step S ⁇ b> 304, the control unit 21 functions as the reception unit 240.
  • step S304 When the supply instruction is received (step S304; YES), the control unit 21 requests the management server 10 to supply the stored power (step S305). More specifically, the control unit 21 transmits a supply request to supply power to the house H to any one of the power storage facilities S1 to S3 to the management server 10 via the outside communication unit 25 and the wide area network N. To do. In step S ⁇ b> 305, the control unit 21 functions as the request transmission unit 250.
  • step S304 when the supply instruction has not been received (step S304; NO), the control unit 21 skips the process of step S305.
  • the case where the supply instruction is not received specifically corresponds to the case where the power purchase instruction for purchasing the necessary power is received or the case where no instruction is received.
  • the control unit 31 when receiving the supply request transmitted from the control device 2, the control unit 31 supplies the stored power to the house H (step S404). Specifically, the control unit 31 transmits a discharge command to the power conversion device of at least one power storage facility in which the power of the customer A is stored among the power storage facilities S1 to S3. As a result, the control unit 31 causes the house H to supply the stored power of the power storage facility to the instructed amount. In step S ⁇ b> 404, the control unit 31 functions as the power storage control unit 350.
  • control unit 31 updates the management data of the customer A stored in the management DB 390 (step S405). If it demonstrates concretely, the control part 31 will record the information regarding the newly drawn-out electric power and a consumer in the management data shown in FIG. Thus, the process in the discharge phase is completed.
  • the power management system 1 uses the power storage facilities S1 to S3 shared by a plurality of consumers A, B, C,.
  • the usage information of the power storage facilities S1 to S3 is notified to the customer A.
  • the power management system 1 issues a power storage instruction for storing the generated power in any one of the power storage facilities S1 to S3 or a supply instruction for supplying any power stored in the power storage facilities S1 to S3 to the house H.
  • the power storage instruction is received from A
  • the generated power is stored in one of the power storage facilities S1 to S3.
  • the supply instruction is received, the stored power is supplied to the house H in any of the power storage facilities S1 to S3. .
  • the customer A can determine whether or not to use the power storage facilities S1 to S3 with reference to the usage information. For example, the consumer A can know an appropriate timing at which the power storage facilities S1 to S3 should be used, such as whether to store or sell surplus power, or to draw out or purchase the stored power. In addition, it is possible to reduce the fact that the power storage service cannot be received by overlapping the time zones in which the power storage facilities S1 to S3 are used among the plurality of consumers A, B, C,.
  • the consumer A can effectively use the power storage facilities S1 to S3.
  • the customer A who does not own the power storage facilities S1 to S3 can store surplus power in the power storage facilities S1 to S3 and draw out and consume it when necessary.
  • the range of usage can be expanded. Further, by notifying the usage fee and controlling the demands of the plurality of consumers A, B, C,..., It is possible to prevent concentration of time zones in which the power storage facilities S1 to S3 are used. For this reason, the power manager can effectively operate the power storage facilities S1 to S3.
  • the power storage facilities S1 to S3 are facilities that store power in a chargeable / dischargeable storage battery.
  • the power storage facility may store power by converting power into heat in a heat storage device such as a water heater.
  • the heat storage device stores electricity by boiling hot water with surplus power.
  • the hot water that has been boiled cannot be converted back into electric power, but the electric power that would have been necessary to boil the hot water in the future can be consumed for other purposes. Therefore, storing power in the heat storage device is equivalent to storing power indirectly.
  • the power storage facility may be a facility that stores power indirectly by converting electric power to another form.
  • the power consumption area is not limited to a general house such as the house H described above, but may be an apartment house, a facility, a building, a factory, or the like.
  • the power generation facility 5 is not limited to sunlight, and may generate power using other renewable energy such as wind power or geothermal heat.
  • the deposit fee and the withdrawal fee which are the usage fees for the power storage facilities S1 to S3, may be determined by a contract between the consumer and the electric power company.
  • a contract amount is determined in advance between a consumer and a power company.
  • the charge calculation unit 320 may set a cheaper charge as the usage charge when the stored amount is smaller than the contracted amount, and may set a higher fee when the stored amount is larger than the contracted amount.
  • the consumer A when a plurality of power companies can be used, the consumer A can select a power company that deposits surplus power from the plurality of power companies. More specifically, in the power management system 1 a shown in FIG. 17, the customer A can deposit surplus power with the power company A and the power company B.
  • the control device 2 in the house H acquires the usage information of the power storage facility managed by the power provider A from the management server 10a, and acquires the usage information of the power storage facility managed by the power provider B from the management server 10b. .
  • the power storage control unit 350 controlled charging / discharging of the power storage facilities S1 to S3 according to the power storage instruction or the supply instruction received from the customer A by the reception unit 240.
  • the power storage control unit 350 may control charging / discharging of the power storage facilities S1 to S3 according to a request input in advance from the customer A depending on the situation. For example, when the accepting unit 240 accepts the demand of the customer A to suppress the buying and selling of power by using the power storage facilities S1 to S3 as much as possible, the power storage control unit 350 is capable of surplus power in the power storage phase.
  • the power storage facilities S1 to S3 are charged as much as possible, and the stored power is supplied to the house H as much as possible in the discharge phase.
  • the storage control unit 350 when the accepting unit 240 accepts the demand of the customer A to draw out the stored power on the condition that the difference between the withdrawal fee and the power purchase price is larger than the threshold value, the storage control unit 350 When the difference between the withdrawal fee and the purchase price is larger than the threshold value, the stored power is supplied to the house H.
  • the operation terminal 3 includes the display unit and the input unit, and the control device 2 acquires the input information input to the operation terminal 3 via wireless or wired communication, and operates the display information. It was sent to terminal 3 and displayed.
  • the control device 2 may include a display unit and an input unit. That is, the control device 2 itself may have the function of the operation terminal 3.
  • the notification unit 230 displays the notification images illustrated in FIGS. 11 and 12 not via the operation terminal 3 but via the display unit provided in the control device 2.
  • the receiving unit 240 receives an instruction not via the operation terminal 3 but via an input unit provided in the control device 2.
  • the notification unit 230 is not limited to displaying the notification image shown in FIG. 11 and FIG. 12 on the display unit, but by outputting the content of the notification image by voice, the usage information of the power storage facilities S1 to S3 can be obtained. Notification can also be made.
  • the control apparatus 2 installed in the house H is the measurement value acquisition part 210, the utilization information acquisition part 220, the alerting
  • the management server 10 installed outside the house H includes a storage amount acquisition unit 310, a charge calculation unit 320, a usage information transmission unit 330, a request reception unit 340, and a storage control unit 350. I was prepared.
  • the management server 10 may include the above function of the control device 2, or the control device 2 may include the above function of the management server 10. In other words, either the control device 2 or the management server 10 alone may function as the power management system 1 described above.
  • FIG. 18 shows an example in which the control device 2 is not installed in the house H.
  • the router 12 is replaced with the operation terminal 3, the power generation facility 5, the power measurement device 6, and the plurality of electric devices 7 a, 7 b,. It is connected so as to be communicable, and relays communication between devices.
  • the management server 10 functions as the notification unit 230 and the reception unit 240 in the above embodiment by communicating with the operation terminal 3 via the router 12.
  • control device 2 may include at least one of the power storage amount acquisition unit 310, the charge calculation unit 320, the power storage control unit 350, or the management DB 390 in the above embodiment.
  • the control device 2 can directly connect any of the power storage facilities S1 to S3 via the management server 10 or without going through the management server 10. Send a charge or discharge command.
  • the control device 2 stores the generated power P2 in any one of the power storage facilities S1 to S3 or supplies the stored power to any one of the power storage facilities S1 to S3 to the house H.
  • the CPU executes the program stored in the ROM or the storage unit 22, whereby the measurement value acquisition unit 210, the usage information acquisition unit 220, the notification unit 230, the reception Functions as the unit 240 and the request transmission unit 250.
  • the CPU executes a program stored in the ROM or the storage unit 32, whereby the storage amount acquisition unit 310, the charge calculation unit 320, the usage information transmission unit 330, and the request reception unit 340. And the power storage control unit 350.
  • the control unit 21 and the control unit 31 may be dedicated hardware.
  • the dedicated hardware is, for example, a single circuit, a composite circuit, a programmed processor, an ASIC (Application Specific Integrated ⁇ Circuit), an FPGA (Field-Programmable Gate Array), or a combination thereof.
  • ASIC Application Specific Integrated ⁇ Circuit
  • FPGA Field-Programmable Gate Array
  • each unit may be realized by dedicated hardware, and the other part may be realized by software or firmware.
  • the control units 21 and 31 can realize the above-described functions by hardware, software, firmware, or a combination thereof.
  • control device 2 or the management server 10 By applying an operation program that defines the operation of the control device 2 or the management server 10 according to the present invention to a computer such as an existing personal computer or an information terminal device, the computer is used as the control device 2 or the management server according to the present invention. It is also possible to function as 10.
  • a program distribution method is arbitrary.
  • a computer-readable record such as a CD-ROM (Compact Disk ROM), a DVD (Digital Versatile Disk), an MO (Magneto Optical Disk), or a memory card. It may be distributed by being stored in a medium or distributed via a communication network such as the Internet.
  • the present invention can be suitably employed in a system for managing power.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

電力管理システム(1)は、一の需要家の発電設備による発電電力の、一の需要家を含む複数の需要家によって共用される蓄電設備への蓄電を管理する。電力管理システム(1)において、報知部(230)は、蓄電設備の利用情報を、一の需要家に報知する。受付部(240)は、発電電力を蓄電設備に蓄電する蓄電指示、又は、蓄電設備の蓄電電力を一の需要家の電力消費地に供給する供給指示を、一の需要家から受け付ける。蓄電制御部(350)は、受付部(240)が蓄電指示を受け付けた場合、蓄電設備に発電電力を蓄電させ、受付部(240)が供給指示を受け付けた場合、蓄電設備に蓄電電力を電力消費地に供給させる。

Description

電力管理システム、制御装置及び電力管理方法
 本発明は、電力管理システム、制御装置及び電力管理方法に関する。
 近年、太陽光及び風力に代表される再生可能エネルギーを活用する技術が注目されており、再生可能エネルギーにより発電する発電設備を需要家自身が所有することが多くなっている。このような需要家は、発電設備による発電電力を自ら消費することができ、また余剰電力を商用電力系統へ供給して、電気事業者に売ることができる。例えば、特許文献1は、再生可能エネルギーを用いて個人が自家発電した電力を電力管理者が買い取るシステムを開示している。
 ところで、余剰電力の買い取り価格は、近年では低下傾向にある。余剰電力の買い取り価格が低下した場合、発電設備を所有する需要家にとって、余剰電力を売るよりは、余剰電力を蓄電設備に蓄電しておき、必要なときに自身で消費する方が望ましいと考えられる。しかしながら、需要家が自身で蓄電設備を所有することは、費用及び場所等の理由から敷居が高い。
 このような課題に対して、例えば、特許文献2は、蓄電装置のシェアを可能とし、蓄電装置を所有していないユーザであっても蓄電できる電力ネットワークシステムを開示している。
特許第5794603号公報 特開2013-169137号公報
 上記のような複数の需要家によって共用される蓄電設備を有効に利用するには、課題がある。例えば、複数の需要家の間で蓄電設備を利用する時間帯が重複することにより、一部の需要家が蓄電設備を利用できないことがある。また、そもそも需要家にとって、蓄電設備を利用すべき適切なタイミングを知ることは容易ではない。以上のようなことから、複数の需要家によって共用される蓄電設備を、より有効に利用することが求められている。
 本発明は、上述のような課題を解決するためになされたものであり、複数の需要家によって共用される蓄電設備を有効に利用することが可能な電力管理システム等を提供することを目的とする。
 上記目的を達成するため、本発明に係る電力管理システムは、
 一の需要家の発電設備による発電電力の、前記一の需要家を含む複数の需要家によって共用される蓄電設備への蓄電を管理する電力管理システムであって、
 前記蓄電設備の利用情報を、前記一の需要家に報知する報知手段と、
 前記発電電力を前記蓄電設備に蓄電する蓄電指示、又は、前記蓄電設備の蓄電電力を前記一の需要家の電力消費地に供給する供給指示を、前記一の需要家から受け付ける受付手段と、
 前記受付手段が前記蓄電指示を受け付けた場合、前記蓄電設備に前記発電電力を蓄電させ、前記受付手段が前記供給指示を受け付けた場合、前記蓄電設備に前記蓄電電力を前記電力消費地に供給させる蓄電制御手段と、を備える。
 本発明では、電力管理システムが、複数の需要家によって共用される蓄電設備の利用情報を一の需要家に報知し、一の需要家の発電設備による発電電力を蓄電設備に蓄電する蓄電指示、又は、蓄電設備の蓄電電力を一の需要家の電力消費地に供給する供給指示を、一の需要家から受け付け、蓄電指示を受け付けた場合、蓄電設備に発電電力を蓄電させ、供給指示を受け付けた場合、蓄電設備に蓄電電力を電力消費地に供給させる。従って、本発明によれば、複数の需要家によって共用される蓄電設備を有効に利用することができる。
本発明の実施の形態に係る電力管理システムの全体構成を示す図 宅内システムの構成を示す図 制御装置のハードウェア構成を示すブロック図 管理サーバのハードウェア構成を示すブロック図 制御装置及び管理サーバの機能的な構成を示すブロック図 供給電力及び発電電力の計測データの例を示す図 消費電力及び発電電力の推移の例を示す図 蓄電設備への電力の預入料金及び蓄電率の推移の例を示す図 蓄電設備からの電力の引出料金及び買電価格の推移の例を示す図 引出料金の計算データの例を示す図 余剰電力が発生した場合における報知例を示す図 家屋に電力の供給が必要な場合における報知例を示す図 電力の預け入れ時に記録される管理データの例を示す図 電力の引き出し時に記録される管理データの例を示す図 蓄電フェーズにおいて制御装置及び管理サーバによって実行される処理の流れを示すフローチャート 放電フェーズにおいて制御装置及び管理サーバによって実行される処理の流れを示すフローチャート 変形例における電力管理システムの第1の構成を示す図 変形例における電力管理システムの第2の構成を示す図
 以下、本発明の実施の形態について、図面を参照しながら詳細に説明する。なお、図中同一又は相当部分には同一符号を付す。
 図1に、本発明の実施の形態に係る電力管理システム1の全体構成を示す。電力管理システム1は、一般家庭で使用される電力を管理するシステムであって、いわゆるHEMS(Home Energy Management System)と呼ばれるシステムである。図1に示すように、電力管理システム1は、電力管理システム1全体を管理する管理サーバ10と、電力を充放電可能な蓄電設備S1~S3と、需要家Aの家屋H内の電力を管理する宅内システム20と、を含む。
 電力管理システム1は、一の需要家である需要家Aの発電設備5による発電電力の、需要家Aを含む複数の需要家A,B,C,…によって共用される蓄電設備S1~S3への蓄電を管理する。複数の需要家A,B,C,…は、例えば、住宅、施設、ビル又は工場等のような電力消費地の居住者、所有者又は管理者等であって、それぞれ、互いに異なる電力消費地において消費する電力を需要する者である。
 図1に示すように、需要家Aは、太陽光により自家発電するための発電設備5を所有しているが、発電電力を蓄電する蓄電設備を所有していない。これに対して、需要家B,Cは、発電設備と蓄電設備との双方を所有している。
 電力管理システム1において、管理サーバ10と、蓄電設備S1~S3と、宅内システム20とは、広域ネットワークNを介して通信可能に接続されている。広域ネットワークNは、例えばインターネット等であって、管理サーバ10、蓄電設備S1~S3及び宅内システム20間における情報の送受信を中継する。なお、図1において、太い実線は電力が流れる電力線を表しており、細い実線は通信データが流れる通信線を表している。以降の図においても同様である。
 管理サーバ10は、電力事業者によって運営されるサーバであって、宅内システム20と連携して電力管理システム1を機能させるためのサーバである。電力事業者とは、需要家A,B,Cを含む複数の需要家に対して、電力を売買する事業者である。電力事業者は、例えば、自身で発電設備及び送電網を所有する既存の電力会社、自身で送電網を所有しない新たな電力会社、又は、電力の売買を仲介する電力アグリゲータ等である。
 管理サーバ10は、商用電力系統から供給された電力を、需要家A,B,Cを含む複数の需要家に売ることができ、複数の需要家の電力消費地において発生した余剰電力を買い取ることができる。また、管理サーバ10は、複数の需要家の電力消費地において発生した余剰電力を、蓄電設備S1~S3に蓄電することができ、蓄電設備S1~S3に蓄電された電力を、複数の需要家の電力消費地に供給することができる。これにより、複数の需要家は、余剰電力を蓄電設備S1~S3に預けることができる。管理サーバ10の詳細については後述する。
 蓄電設備S1は、特定の需要家によって所有されない共用の設備である。蓄電設備S1は、管理サーバ10を運営する電力事業者によって管理され、複数の需要家の電力消費地において発生した余剰電力を蓄電する。
 これに対して、蓄電設備S2,S3は、それぞれ特定の需要家B,Cによって所有される私有の設備であるが、需要家B,C以外の需要家も共用可能な設備である。蓄電設備S2,S3は、それぞれ需要家B,Cの敷地内に設置され、需要家B,Cを含む複数の需要家の電力消費地において発生した余剰電力を蓄電する。需要家B,Cは、管理サーバ10を運営する電力事業者との間で、蓄電設備S2,S3を他の需要家と共用することを、契約によって取り決めている。
 蓄電設備S1~S3は、いずれも図示しないが、それぞれ、蓄電池と電力変換装置とを含む。蓄電池は、定置型の蓄電池、又は電気自動車(EV:Electric Vehicle)であって、例えばニカド電池、ニッケル水素電池、リチウムイオン電池又は鉛蓄電池等である。
 電力変換装置は、交流電力と直流電力とを相互に変換するAC-DCコンバータ、直流電力の電圧を変換する変圧器、及び電力を変換するためのスイッチング素子を備える。また、電力変換装置は、いずれも図示しないが、CPU(Central Processing Unit)、ROM(Read Only Memory)、RAM(Random Access Memory)、通信インタフェース及び読み書き可能な不揮発性の半導体メモリ等を備える。
 電力変換装置は、管理サーバ10から広域ネットワークNを介して充放電の命令を取得し、取得した命令に従って電力変換を実行し、蓄電池に充電又は放電させる。具体的に説明すると、電力変換装置は、充電時には、外部から供給された交流電力を直流電力に変換して蓄電池に充電し、放電時には、蓄電池から放電された直流電力を交流電力に変換して外部に供給する。また、電力変換装置は、蓄電池の蓄電量及び蓄電率を監視して、広域ネットワークNを介して管理サーバ10に通知する。
 宅内システム20は、蓄電設備を有しない需要家Aの家屋Hにおいて消費される電力を管理するシステムである。家屋Hは、いわゆる一般的な住宅建物であって、商用電力系統及び蓄電設備S1~S3から供給される電力の需要地(電力消費地)である。
 図2に、宅内システム20の構成を示す。図2に示すように、宅内システム20は、宅内システム20全体を統括的に制御する制御装置2と、ユーザインタフェースである操作端末3と、太陽光により発電する発電設備5と、電力を計測する電力計測装置6と、電力を消費する複数の電気機器7a,7b,…と、を備える。
 制御装置2は、電力消費地である家屋H内の適切な場所に設置され、家屋H内に設置された各機器から無線ネットワークを介して送信される情報を収集する情報収集ユニットである。制御装置2は、一例として、家屋H内に設置された各機器を統合的に制御することが可能なHEMSコントローラである。制御装置2は、家屋Hにおいて消費される電力を監視し、操作端末3を介して電力の消費状況を表示する。制御装置2の詳細については後述する。
 操作端末3は、例えば、スマートフォン、タブレット端末、リモコン、携帯電話又はノート型パソコン等の携帯機器である。操作端末3は、押しボタン、タッチパネル又はタッチパッド等の入力部と、有機EL(Electro-Luminescence)ディスプレイ又は液晶ディスプレイ等の表示部と、通信インタフェースとを備える。操作端末3は、制御装置2と、Wi-Fi(登録商標)、Wi-SUN(登録商標)又は有線LAN(Local Area Network)等、周知の通信規格に則った通信を行う。操作端末3は、ユーザからの操作を受け付け、受け付けた操作内容を示す情報を制御装置2に送信する。また、操作端末3は、制御装置2から送信された、ユーザに提示するための情報を受信し、受信した情報を表示する。このように、操作端末3は、ユーザインタフェースとしての役割を担う。
 発電設備5は、家屋Hに設置され、自然エネルギーである太陽光によって発電する設備である。商用電力系統が家屋Hを含む不特定多数の電力消費地に電力を供給するのに対して、発電設備5は、特定の電力消費地の需要家によって所有され、特定の電力消費地である家屋Hに電力を供給する設備である。このような発電設備5は、分散型電源ともいう。
 発電設備5は、太陽光発電(PV:Photovoltaic)するPVパネル13と、PV用のパワーコンディショニングシステムであるPV-PCS14と、を備える。PVパネル13は、例えば多結晶シリコン型のソーラーパネルである。PVパネル13は、家屋Hの屋根の上に設置され、太陽光エネルギーを電気エネルギーに変換することで太陽光発電する。
 PV-PCS14は、PVパネル13において発電された電力の供給を受け、供給された電力を、電力線D2を介して分電盤9に出力する。その際、PV-PCS14は、PVパネル13から供給された電力を、家屋H内で使用できるように、直流電力から交流電力に規定の変換効率で変換して出力する。
 PV-PCS14は、いずれも図示しないが、CPU、ROM、RAM、通信インタフェース及び読み書き可能な不揮発性の半導体メモリ等を備える。また、PV-PCS14は、家屋H内に構築された無線ネットワークを介して、制御装置2と通信する。この無線ネットワークは、例えば、Wi-Fi(登録商標)、赤外線通信、又はエコーネットライト(ECHONET Lite)によるネットワークである。
 電力計測装置6は、商用電力系統及び蓄電設備S1~S3と分電盤9との間に配設された電力線D1を送電される電力P1、及び、PV-PCS14と分電盤9との間に配設された電力線D2を送電される電力P2の値を計測する。電力計測装置6は、電力線D1に接続されたCT(Current Transformer)1及び電力線D2に接続されたCT2と、通信線を介して接続されている。CT1及びCT2は、交流電流を計測するセンサである。
 電力計測装置6によって計測される電力P1は、商用電力系統又は蓄電設備S1~S3から家屋Hに供給された電力(供給電力)に相当する。電力P2は、発電設備5によって発電され、PV-PCS14から出力された電力(発電電力)に相当する。また、電力P1と電力P2との和は、家屋Hにおいて複数の電気機器7a,7b,…等によって消費される総消費電力に相当する。すなわち、家屋Hの総消費電力をP3と表すと、P3=P1+P2の関係が成立する。なお、家屋Hの総消費電力は、家屋H内だけでなく、家屋Hの敷地内において消費される電力も含むものとして説明する。以下では、総消費電力を、単に「消費電力」という。
 電力計測装置6は、何れも図示しないが、CPU、ROM、RAM、通信インタフェース及び読み書き可能な不揮発性の半導体メモリ等を備える。また、電力計測装置6は、無線通信インタフェースを備え、家屋H内に構築された前述の無線ネットワークを介して、制御装置2と通信する。
 電力計測装置6は、計測によって得られた電力P1及び電力P2の値を計測値として格納した計測データを生成し、予め定められた周期で定期的に制御装置2に送信する。送信される計測データは、電力計測装置6の機器アドレス、電力線D1及び電力線D2のID(Identification)及び計測時刻等も格納している。なお、電力計測装置6は、制御装置2からの要求に応答して、電力P1及び電力P2の計測値を格納した計測データを生成して、制御装置2に送信してもよい。
 複数の電気機器7a,7b,…のそれぞれは、電力消費地である家屋H内(その敷地も含む)に設置され、家屋Hにおいて電力を消費する機器である。複数の電気機器7a,7b,…のそれぞれは、例えば、IH(Induction Heating)クッキングヒータ(電磁調理器)、洗濯機、テレビ若しくは冷蔵庫等の家電機器、又は、空調機、給湯機、照明機器若しくは換気扇等の設備機器である。複数の電気機器7a,7b,…は、分電盤9により分岐された電力線D4,D5,…にそれぞれ接続されており、商用電力系統又は蓄電設備S1~S3から供給された電力によって動作する。
 複数の電気機器7a,7b,…のそれぞれは、無線通信インタフェースを備え、家屋H内に構築された前述の無線ネットワークを介して、制御装置2と通信する。なお、複数の電気機器7a,7b,…のそれぞれは、外付けの通信アダプタ(図示せず)を介して、この無線ネットワークに接続される仕様であってもよい。複数の電気機器7a,7b,…のそれぞれは、制御装置2からの要求に応答して、機器IDと現在時刻と現在の運転状態を示す情報とを格納したデータ(運転状態データ)を、無線ネットワークを介して制御装置2に送信する。
 分電盤9は、商用電力系統又は蓄電設備S1~S3から供給された電力P1、及び、発電設備5によって発電された電力P2を、電力計測装置6及び複数の電気機器7a,7b,…等に分配する配線基板を備える。また、分電盤9は、異常時に電流を遮断するブレーカを備える。
 次に、図3及び図4を参照して、電力管理システム1における制御装置2及び管理サーバ10のハードウェア構成について説明する。図3に示すように、制御装置2は、制御部21と、記憶部22と、計時部23と、宅内通信部24と、宅外通信部25と、を備える。これら各部はバス29を介して接続されている。
 制御部21は、いずれも図示しないが、CPU、ROM及びRAM等を備える。CPUは、中央処理装置、中央演算装置、プロセッサ、マイクロプロセッサ、マイクロコンピュータ又はDSP(Digital Signal Processor)等ともいう。制御部21において、CPUは、ROMに格納されたプログラム及びデータを読み出し、RAMをワークエリアとして用いて、制御装置2を統括制御する。
 記憶部22は、例えば、フラッシュメモリ、EPROM(Erasable Programmable ROM)又はEEPROM(Electrically Erasable Programmable ROM)等の不揮発性の半導体メモリであって、いわゆる二次記憶装置(補助記憶装置)としての役割を担う。記憶部22は、制御部21が各種処理を行うために使用する各種プログラム及びデータ、並びに、制御部21が各種処理を行うことにより生成又は取得する各種データを記憶する。
 計時部23は、RTC(Real Time Clock)を備えており、制御装置2の電源がオフの間も計時を継続する計時デバイスである。
 宅内通信部24は、家屋Hの敷地内の機器と通信するための通信インタフェースを備える。宅内通信部24は、制御部21の制御のもと、家屋H内に構築された前述の無線ネットワークを介して、PV-PCS14、電力計測装置6、及び複数の電気機器7a,7b,…のそれぞれと通信する。また、宅内通信部24は、制御部21の制御のもと、操作端末3と、Wi-Fi(登録商標)、Wi-SUN(登録商標)又は有線LAN等を介して通信する。
 宅外通信部25は、広域ネットワークNに接続するための通信インタフェースを備える。宅外通信部25は、制御部21の制御のもと、広域ネットワークNを介して、管理サーバ10を含む家屋Hの外部の機器と通信する。
 図4に示すように、管理サーバ10は、制御部31と、記憶部32と、計時部33と、通信部34と、を備える。これら各部はバス39を介して接続されている。
 制御部31は、いずれも図示しないが、CPU、ROM及びRAM等を備える。CPUは、中央処理装置、中央演算装置、プロセッサ、マイクロプロセッサ、マイクロコンピュータ又はDSP等ともいう。制御部31において、CPUは、ROMに格納されたプログラム及びデータを読み出し、RAMをワークエリアとして用いて、管理サーバ10を統括制御する。
 記憶部32は、例えば、フラッシュメモリ、EPROM又はEEPROM等の不揮発性の半導体メモリであって、いわゆる二次記憶装置(補助記憶装置)としての役割を担う。記憶部32は、制御部31が各種処理を行うために使用する各種プログラム及びデータ、並びに、制御部31が各種処理を行うことにより生成又は取得する各種データを記憶する。
 計時部33は、RTCを備えており、管理サーバ10の電源がオフの間も計時を継続する計時デバイスである。
 通信部34は、広域ネットワークNに接続するための通信インタフェースを備える。通信部34は、制御部31の制御のもと、広域ネットワークNを介して、宅内システム20の制御装置2及び蓄電設備S1~S3等を含む管理サーバ10の外部の機器と通信する。
 なお、管理サーバ10は、図4には示していないが、ユーザから操作入力を受け付ける入力部と、画像を表示する表示部と、を含むユーザインタフェースを備えていても良い。
 続いて、図5を参照して、電力管理システム1における制御装置2及び管理サーバ10の機能的な構成について説明する。図5に示すように、制御装置2は、機能的に、計測値取得部210と、利用情報取得部220と、報知部230と、受付部240と、要求送信部250と、を備える。また、管理サーバ10は、機能的に、蓄電量取得部310と、料金計算部320と、利用情報送信部330と、要求受信部340と、蓄電制御部350と、を備える。
 これらの各機能は、ソフトウェア、ファームウェア、又は、ソフトウェアとファームウェアとの組み合わせによって実現される。ソフトウェア及びファームウェアは、プログラムとして記述され、制御装置2のROM又は記憶部22、及び、管理サーバ10のROM又は記憶部32に格納される。そして、制御装置2の制御部21において、CPUが、ROM又は記憶部22に記憶されたプログラムを実行することによって、制御装置2の各部の機能を実現する。また、管理サーバ10の制御部31において、CPUが、ROM又は記憶部32に記憶されたプログラムを実行することによって、管理サーバ10の各部の機能を実現する。
 また、制御装置2は、計測DB(Database)290を備える。計測DB290は、記憶部22の適宜の記憶領域に構築される。管理サーバ10は、管理DB390を備える。管理DB390は、記憶部32の適宜の記憶領域に構築される。
 制御装置2において、計測値取得部210は、商用電力系統又は蓄電設備S1~S3から家屋Hに供給される電力(供給電力)P1、及び、発電設備5によって発電され、PV-PCS14から出力された電力(発電電力)P2の計測値を取得する。電力P1,P2は、前述したように、電力線D1に接続されたCT1及び電力線D2に接続されたCT2を介して、電力計測装置6によって計測される。
 電力計測装置6は、CT1及びCT2によって得られた電力P1,P2の計測値を、予め定められた周期で定期的に制御装置2に送信する。予め定められた周期は、一例として、10秒から数十秒程度である。或いは、計測値取得部210が、必要に応じて電力計測装置6に電力P1,P2の計測値の要求を送信し、電力計測装置6がこの要求に応答する方式で電力P1,P2の計測値を制御装置2に送信しても良い。
 このように、計測値取得部210は、電力計測装置6によって得られた電力P1,P2の計測値を、電力計測装置6から宅内通信部24を介して取得する。計測値取得部210は、制御部21が宅内通信部24と協働することによって実現される。
 計測DB290は、計測値取得部210によって取得された電力P1,P2の計測値を記憶する。計測DB290は、計測値取得部210によって電力P1,P2の計測値が取得される度に、取得された計測値を格納することで、供給電力P1及び発電電力P2の履歴を記憶する。
 図6に、計測DB290に記憶される計測データの具体例を示す。図6に示すように、計測DB290は、供給電力P1の電力量、及び発電電力P2の電力量を時系列順に記憶する。電力量は、予め定められた時間に亘る電力の積算値である。計測値取得部210は、電力P1,P2の計測値を取得すると、電力P1,P2の電力量を計算して計測DB290に順次格納していく。
 図5に戻って、制御装置2において、利用情報取得部220は、蓄電設備S1~S3の利用情報を管理サーバ10から取得する。蓄電設備S1~S3の利用情報とは、蓄電設備S1~S3の利用に関する情報であって、需要家Aが蓄電設備S1~S3を利用するか否かを決めるための判断基準となる情報である。利用情報は、具体的には、蓄電設備S1~S3の蓄電量又は蓄電率等の現在の状態を示す情報、及び、蓄電設備S1~S3を利用するために需要家Aが支払う利用料金等である。
 利用情報取得部220は、家屋Hにおける余剰電力の有無に応じて、利用情報の取得要求を、宅外通信部25及び広域ネットワークNを介して、管理サーバ10に送信する。そして、利用情報取得部220は、送信した取得要求に対する応答として管理サーバ10から送信された利用情報を、宅外通信部25及び広域ネットワークNを介して取得する。このように、利用情報取得部220は、制御部21が宅外通信部25と協働することによって実現される。
 余剰電力とは、発電設備5による発電電力P2が家屋Hにおける消費電力P3より大きい場合に、家屋Hにおいて消費されずに余る電力を意味する。具体的には、余剰電力は、発電電力P2から消費電力P3を減じた電力に相当する。
 図7に、家屋Hにおける発電電力P2及び消費電力P3の1日の推移を示す。図7において、実線は発電電力P2の推移を表しており、破線は消費電力P3の推移を表している。発電電力P2は、日射量が多くなる正午をピークとして昼間に大きな値を示す。これに対して、消費電力P3は、一般的に家庭における消費電力量が多くなる午後から夕方にかけて大きな値を示す。
 朝から夕方までの日中は、発電電力P2は消費電力P3より大きい。そのため、家屋Hにおいて余剰電力(P2-P3)が発生する。発生した余剰電力(P2-P3)は、電力線D1を通って家屋Hの外部に出力される。この場合、CT1によって計測される供給電力P1は、負の値になる。
 これに対して、夕方から早朝にかけては、発電電力P2は消費電力P3より小さい。そのため、家屋Hに外部から電力の供給が必要になる。必要な電力(P3-P2)は、電力線D1を通って外部から供給される。この場合、CT1によって計測される供給電力P1は、正の値になる。
 利用情報取得部220は、計測DB290に記憶された供給電力P1の値を参照して、余剰電力が発生しているか否か、及び、家屋Hに外部から電力の供給が必要か否かを判定する。そして、利用情報取得部220は、第1の閾時間以上に亘って発電電力P2が消費電力P3より大きい、すなわち余剰電力が発生している場合、利用情報として、発電電力P2を蓄電設備S1~S3に蓄電するか否かを需要家Aが選択するための第1の情報を、管理サーバ10から取得する。
 具体的に説明すると、需要家Aは、余剰電力を電気事業者に売電することによって、経済的利益を得ることができる。或いは、需要家Aは、余剰電力を蓄電設備S1~S3のいずれかに出力して蓄電することで、余剰電力を電力事業者に預けることもできる。言い換えると、需要家Aは、例えば売電価格が低い場合に、余剰電力を共用の設備である蓄電設備S1~S3のいずれかに一時的に預けておき、預けた余剰電力を後で引き出して家屋Hで消費することができる。利用情報取得部220は、このような余剰電力を売電するか蓄電するかの判断基準となる第1の情報を管理サーバ10から取得する。
 これに対して、利用情報取得部220は、第2の閾時間以上に亘って発電電力P2が消費電力P3より小さい、すなわち家屋Hに外部からの電力の供給が必要な場合、利用情報として、蓄電設備S1~S3の蓄電電力を家屋Hに供給するか否かを需要家Aが選択するための第2の情報を、管理サーバ10から取得する。
 具体的に説明すると、需要家Aは、家屋Hに外部から電力の供給が必要な場合、電気事業者から買電することもできるし、蓄電設備S1~S3のいずれかに予め預けていた電力を引き出すこともできる。利用情報取得部220は、このような買電するか蓄電電力を引き出すかの判断基準となる第2の情報を管理サーバ10から取得する。
 第1の閾時間及び第2の閾時間は、例えば、5分又は10分等であって、予め設定されてROM又は記憶部22に記憶されている。なお、第1の閾時間と第2の閾時間とは、同じでも良いし、異なっていても良い。
 図5に示した電力管理システム1の機能構成の説明に戻る。管理サーバ10において、蓄電量取得部310は、蓄電設備S1~S3の蓄電量を取得する。具体的に説明すると、蓄電量取得部310は、蓄電設備S1~S3のそれぞれに備えられた電力変換装置と、通信部34及び広域ネットワークNを介して通信する。そして、蓄電量取得部310は、蓄電設備S1~S3のそれぞれにおいて、蓄電池に蓄電されている現在の蓄電量の情報を、電力変換装置から取得する。蓄電量取得部310は、制御部31が通信部34と協働することによって実現される。
 蓄電量取得部310は、蓄電設備S1~S3の蓄電量を取得すると、取得した蓄電設備S1~S3の蓄電量を合計することで、共用可能な蓄電設備S1~S3全体での蓄電残量を計算する。また、蓄電量取得部310は、計算した蓄電残量を蓄電設備S1~S3全体での蓄電容量と比較することによって、蓄電設備S1~S3全体での蓄電率を計算する。このようにして、蓄電量取得部310は、蓄電設備S1~S3の現在の利用状況、及び、どの程度の量の電力を新たに蓄電することが可能かを確認する。
 料金計算部320は、蓄電設備S1~S3の利用料金を計算する。利用料金とは、蓄電設備S1~S3のいずれかに電力を預ける、又は蓄電設備S1~S3のいずれかから電力を引き出す際に、需要家Aが電力事業者に支払う料金である。料金計算部320は、発電電力P2(余剰電力)を蓄電設備S1~S3のいずれかに蓄電するために必要な第1の料金(預入料金)と、蓄電電力を家屋Hに供給するために必要な第2の料金(引出料金)と、を計算する。料金計算部320は、制御部31によって実現される。
 具体的に説明すると、料金計算部320は、第1の料金として、蓄電設備S1~S3の蓄電量、又は、発電電力P2を蓄電設備S1~S3のいずれかに蓄電する時間帯の少なくともいずれかに応じて異なる料金を計算する。また、料金計算部320は、第2の料金として、需要家Aが発電電力P2を蓄電設備S1~S3のいずれかに蓄電していた期間の長さ、又は、蓄電電力を家屋Hに供給する時間帯の少なくともいずれかに応じて異なる料金を計算する。具体的に、図8及び図9を参照して説明する。
 図8は、第1の料金である蓄電設備S1~S3への電力の預入料金を、蓄電率と共に、時間帯別に示している。蓄電率は、蓄電設備S1~S3の蓄電量を示す指標である。図8に示すように、蓄電設備S1~S3の蓄電率は、各需要家の発電設備による発電量が大きくなる昼間から夕方にかけてピークを示す。蓄電率が高くなると、蓄電設備S1~S3の空き容量、すなわち新たに蓄電可能な量が減る。そのため、料金計算部320は、蓄電設備S1~S3の蓄電率が高くなるほど高く、且つ、蓄電を実行する時間帯が夜よりも昼の方が高くなるように、預入料金を計算する。
 また、蓄電設備S1~S3に預け入れる量が多いほど、蓄電設備S1~S3を多く占有することになる。そのため、料金計算部320は、第1の料金として、新規に預け入れる量が多くなるほど、単位量当たりの料金を高く設定する。具体的には、図8に示すように、料金計算部320は、預入量が10kWhである場合の預入料金Bを、預入量が5kWhである場合の預入料金Aよりも高い料金に設定する。
 図9は、第2の料金である蓄電設備S1~S3からの電力の引出料金を、買電価格と共に、時間帯別に示している。買電価格は、蓄電設備S1~S3から電力を引き出さずに、電気事業者から電力を買った場合における価格である。買電価格は、全時間帯で一定であると仮定する。図9に示すように、料金計算部320は、買電するより蓄電設備S1~S3を利用した方が経済的に得するように、引出料金を買電価格よりも低く設定する。
 より詳細に説明すると、図10に示すように、引出料金は、(1)平均預入料金、(2)預入期間に応じたインセンティブ、及び、(3)引出時間帯に応じたインセンティブの3つの要素に基づいて定められる。平均預入料金は、需要家Aが蓄電設備S1~S3のいずれかに複数回電力を預けた場合における、複数の預入料金の平均値である。
 預入期間に応じたインセンティブは、需要家Aが発電電力P2を蓄電設備S1~S3のいずれかに蓄電していた期間の長さに応じて変動する値である。例えば、長期間に亘って電力を預け入れることは、蓄電設備S1~S3を占有することになり、また蓄電電力のロスも生じる。そのため、料金計算部320は、預入期間が長いほど、需要家Aが経済的に損するように、インセンティブを設定する。言い換えると、料金計算部320は、需要家Aが発電電力P2を蓄電設備S1~S3のいずれかに蓄電していた期間が長いほど高くなるように、引出料金を設定する。
 料金計算部320は、需要家Aの預入期間の情報を、管理DB390に記憶された需要家Aの管理データを参照して取得する。なお、需要家Aが蓄電設備S1~S3のいずれかに複数回電力を預けた場合には、料金計算部320は、複数の預入期間の平均を用いてインセンティブを計算する。
 引出時間帯に応じたインセンティブは、蓄電電力を家屋Hに供給する時間帯に応じて変動する値である。例えば、昼間から夕方にかけては、蓄電設備S1~S3の蓄電率及び蓄電残量が高くなる。この場合、蓄電設備S1~S3の空き容量が減るため、蓄電電力を積極的に引き出すことが推奨される。そのため、図9に示すように、料金計算部320は、引出時間帯が夜より昼の方が、需要家Aが経済的に得するように、インセンティブを設定する。言い換えると、料金計算部320は、蓄電電力を家屋Hに供給する時間帯が夜よりも昼の方が低くなるように、引出料金を設定する。
 図5に示した電力管理システム1の機能構成の説明に戻る。管理サーバ10において、利用情報送信部330は、蓄電設備S1~S3の利用情報を制御装置2に送信する。利用情報送信部330は、制御装置2の利用情報取得部220から送信された利用情報の取得要求を受信すると、蓄電設備S1~S3の利用情報を、通信部34及び広域ネットワークNを介して、制御装置2に送信する。利用情報送信部330は、制御部31が通信部34と協働することによって実現される。
 具体的に説明すると、利用情報送信部330は、家屋Hにおいて余剰電力が発生している場合、利用情報として、発電電力P2を蓄電設備S1~S3に蓄電するか否かを需要家Aが選択するための第1の情報を、制御装置2に送信する。第1の情報は、蓄電量取得部310によって取得された蓄電率、及び、料金計算部320によって計算された第1の料金(預入料金)の情報を含んでいる。
 これに対して、利用情報送信部330は、家屋Hに外部からの電力の供給が必要な場合、利用情報として、蓄電設備S1~S3の蓄電電力を家屋Hに供給するか否かを需要家Aが選択するための第2の情報を、制御装置2に送信する。第2の情報は、料金計算部320によって計算された第2の料金(引出料金)、及び、需要家Aの蓄電残量の情報を含んでいる。需要家Aの蓄電残量とは、需要家Aが蓄電設備S1~S3のいずれかに過去に預けた電力の総量であって、蓄電設備S1~S3から引き出し可能な電力量を意味する。利用情報送信部330は、需要家Aの蓄電残量の情報を、管理DB390に記憶された需要家Aの管理データを参照して取得する。
 制御装置2において、報知部230は、蓄電設備S1~S3の利用情報を、需要家Aに報知する。報知部230は、宅内通信部24を介して操作端末3と通信することにより、利用情報取得部220によって取得された利用情報を操作端末3に送信する。そして、報知部230は、図11又は図12に示す報知画像を操作端末3の表示部に表示する。報知部230は、制御部21が宅内通信部24と協働することによって実現される。
 具体的に説明すると、報知部230は、利用情報として、蓄電設備S1~S3の利用料金、又は、蓄電設備S1~S3の蓄電量を示す情報の少なくともいずれかを報知する。蓄電設備S1~S3の蓄電量を示す情報とは、具体的には、蓄電設備S1~S3の蓄電率又は蓄電残量である。
 より詳細に説明すると、報知部230は、発電電力P2が消費電力P3より大きい場合、すなわち家屋Hにおいて余剰電力が発生している場合、利用情報として、発電電力P2を蓄電設備S1~S3のいずれかに蓄電するか否かを需要家Aが選択するための第1の情報を報知する。具体的に説明すると、報知部230は、図11に示す報知画像を操作端末3の表示部に表示する。
 図11に示すように、報知部230は、余剰電力の対応として「預け入れ」と「売電」とを選択可能である旨を報知する。また、報知部230は、管理サーバ10から第1の情報として取得された蓄電設備S1~S3の蓄電率と預入料金とを報知する。これにより、需要家Aは、蓄電設備S1~S3の現在の状況と、余剰電力を預け入れる場合に必要な費用とを、容易に確認することができる。
 また、報知部230は、預入料金と共に、余剰電力を売電する場合における売電価格を報知する。預入料金と売電価格とを報知することによって、需要家Aは、預け入れと売電とのどちらの方が得かを比較しながら、余剰電力を預け入れるか売電するかを決めることができる。
 これに対して、発電電力P2が消費電力P3より小さい場合、すなわち家屋Hに電力の供給が必要な場合、報知部230は、利用情報として、蓄電電力を家屋Hに供給するか否かを需要家Aが選択するための第2の情報を報知する。具体的に説明すると、報知部230は、図12に示す報知画像を操作端末3の表示部に表示する。
 図12に示すように、報知部230は、電力調達の方法として「引き出し」と「買電」とを選択可能である旨を報知する。また、報知部230は、管理サーバ10から第2の情報として取得された需要家Aの蓄電残量と引出料金とを報知する。これにより、需要家Aは、蓄電設備S1~S3から引き出し可能な電力量と、蓄電電力を引き出す場合に必要な費用とを、容易に確認することができる。
 また、報知部230は、引出料金と共に、買電した場合における買電価格を報知する。引出料金と買電価格とを報知することによって、需要家Aは、引き出しと買電とのどちらの方が得かを比較しながら、蓄電電力を引き出すか買電するかを決めることができる。例えば、引出料金が買電価格よりも大きく低い場合には、需要家Aは、買電するよりも蓄電電力を引き出した方が良いと判断することができる。
 図5に戻って、受付部240は、発電電力P2(余剰電力)を蓄電設備S1~S3のいずれかに蓄電する蓄電指示、又は、蓄電設備S1~S3の蓄電電力を家屋Hに供給する供給指示を、需要家Aから受け付ける。需要家Aは、操作端末3の入力部を介して、蓄電指示又は供給指示を入力することができる。
 具体的に説明すると、家屋Hにおいて余剰電力が発生している場合、需要家Aは、図11に示した報知画像を見ながら、余剰電力の対応として、蓄電指示である「預け入れ」と、売電指示である「売電」と、を選択することができる。
 また、需要家Aは、図11における「預入量」の項目に数値を入力することで、蓄電量を指示することができる。預入料金は預入量に応じて異なるため、報知部230は、受付部240が需要家Aから新たな預入量の入力を受け付ける度に、図11における預入料金を更新し、新たな預入量に対応する預入料金を報知する。
 これに対して、家屋Hに電力の供給が必要な場合、需要家Aは、図12に示した報知画像を見ながら、電力調達の方法として、供給指示である「引き出し」と、買電指示である「買電」と、を選択することができる。また、需要家Aは、図12における「引出量」の項目に数値を入力することで、蓄電電力から家屋Hへの電力の供給量を、需要家Aの蓄電残量の範囲内で指示することができる。
 受付部240は、宅内通信部24を介して操作端末3と通信する。これにより、受付部240は、需要家Aから操作端末3に入力された蓄電指示、供給指示、売電指示又は買電指示を、操作端末3を介して受け付ける。このように、受付部240は、制御部21が宅内通信部24と協働することによって実現される。
 要求送信部250は、受付部240が蓄電指示を受け付けた場合、蓄電設備S1~S3のいずれかに発電電力P2を蓄電させる蓄電要求を、管理サーバ10に送信する。蓄電要求は、需要家Aから受け付けた蓄電指示に従って、蓄電設備S1~S3のいずれかを充電させるための、管理サーバ10に対する要求である。蓄電要求は、需要家Aから受け付けた預入量(蓄電量)の情報を含んでいる。
 これに対して、受付部240が供給指示を受け付けた場合、要求送信部250は、蓄電設備S1~S3のいずれかに蓄電電力を家屋Hに供給させる供給要求を、管理サーバ10に送信する。供給要求は、需要家Aから受け付けた供給指示に従って蓄電設備S1~S3のいずれかを放電させるための、管理サーバ10に対する要求である。供給要求は、需要家Aから受け付けた引出量(供給量)の情報を含んでいる。
 要求送信部250は、蓄電要求又は供給要求を、宅外通信部25及び広域ネットワークNを介して管理サーバ10に送信する。要求送信部250は、制御部21が宅外通信部25と協働することによって実現される。
 管理サーバ10において、要求受信部340は、制御装置2の要求送信部250から送信された蓄電要求又は供給要求を、通信部34を介して受信する。要求受信部340は、制御部31が通信部34と協働することによって実現される。
 蓄電制御部350は、要求受信部340が蓄電要求を受信した場合、蓄電設備S1~S3のいずれかに発電電力P2を蓄電させる。具体的に説明すると、蓄電制御部350は、蓄電設備S1~S3のそれぞれの空き容量を参照して、これらのうちから新たに蓄電可能な少なくとも1つの蓄電設備を特定する。そして、蓄電制御部350は、特定した蓄電設備に備えられた電力変換装置に、通信部34及び広域ネットワークNを介して、充電の命令を送信する。これにより、家屋Hで発生している余剰電力は、この蓄電設備の蓄電池に蓄電される。蓄電制御部350は、制御部31が通信部34と協働することによって実現される。
 蓄電制御部350は、余剰電力の蓄電量が指示された預入量に到達すると、蓄電設備に充電を終了させる。なおも家屋Hに余剰電力が残っている場合、この残りの余剰電力は売電される。なお、蓄電量が指示された預入量に到達する前に余剰電力が無くなった場合は、蓄電制御部350は、その時点で蓄電設備に充電を終了させる。
 余剰電力を蓄電すると、蓄電制御部350は、需要家Aの管理データを、管理DB390に記録する。図13に示すように、管理DB390は、蓄電設備S1~S3のいずれかを利用した需要家毎に、需要家名、蓄電日時、預入量、蓄電先、及び、預入料金を対応付けた管理データを記憶している。蓄電制御部350は、余剰電力を蓄電する毎に、このような新たに蓄電された電力及び需要家に関する情報を管理DB390に記録し、蓄電の履歴を残す。
 これに対して、要求受信部340が供給要求を受け付けた場合、蓄電制御部350は、蓄電設備S1~S3のいずれかに蓄電電力を家屋Hに供給させる。具体的に説明すると、蓄電制御部350は、管理DB390を参照して、蓄電設備S1~S3のうちから、需要家Aの電力が蓄電されている少なくとも1つの蓄電設備を特定する。そして、蓄電制御部350は、特定した蓄電設備に備えられた電力変換装置に、通信部34及び広域ネットワークNを介して、放電の命令を送信する。これにより、この蓄電設備の蓄電池に蓄電された電力は、家屋Hに供給される。
 蓄電制御部350は、放電量が指示された引出量に到達すると、蓄電設備に放電を終了させる。なおも家屋Hで電力が必要である場合、必要な電力は買電によって取得される。なお、放電後に需要家Aの蓄電電力が残っている場合には、需要家Aは、再度、蓄電電力を引き出すか、或いは買電するかを選択することができる。
 蓄電電力を引き出すと、蓄電制御部350は、需要家Aの管理データを、管理DB390に記録する。図14に示すように、管理DB390は、蓄電電力を引き出した需要家毎に、需要家名、蓄電残量、平均預入料金、預入期間に応じたインセンティブ、及び、平均預入期間を対応付けた管理データを記憶している。蓄電制御部350は、蓄電電力を引き出す毎に、このような新たに引き出された電力及び需要家に関する情報を管理DB390に記録し、蓄電の履歴を残す。
 以上のように構成された電力管理システム1において実行される処理の流れについて、図15及び図16に示すフローチャートを参照して、説明する。
 図15は、家屋Hにおける余剰電力によって蓄電設備S1~S3を充電する蓄電フェーズにおいて、制御装置2及び管理サーバ10によって実行される処理の流れを示している。制御装置2において、制御部21は、第1の閾時間以上に亘って余剰電力が発生したか否かを判定する(ステップS101)。
 具体的に説明すると、制御部21は、計測値取得部210によって電力計測装置6から取得され、計測DB290に記憶された供給電力P1の値を参照する。そして、制御部21は、供給電力P1が負の値であるか否か、すなわち家屋Hから外部に電力が出力されているか否かを判定する。制御部21は、供給電力P1が負の値である場合に、余剰電力が発生していると判定する。
 第1の閾時間以上に亘って余剰電力が発生している場合(ステップS101;YES)、制御部21は、ステップS102以降の蓄電フェーズの処理に移行する。これに対して、第1の閾時間以上に亘って余剰電力が発生していない場合(ステップS101;NO)、制御部21は、蓄電フェーズの処理には移行しない。
 蓄電フェーズの処理に移行すると、制御部21は、管理サーバ10に対して利用情報を要求する(ステップS102)。具体的に説明すると、制御部21は、余剰電力を蓄電設備S1~S3に蓄電するか否かを需要家Aが選択するための第1の情報の取得要求を、宅外通信部25及び広域ネットワークNを介して、管理サーバ10に送信する。ステップS101,S102において、制御部21は、利用情報取得部220として機能する。
 管理サーバ10において、制御部31は、蓄電量を取得する(ステップS201)。具体的に説明すると、制御部31は、蓄電設備S1~S3のそれぞれに備えられた電力変換装置と通信し、蓄電設備S1~S3のそれぞれの蓄電量を取得する。そして、制御部31は、取得した蓄電量に基づいて、共用可能な蓄電設備S1~S3全体での蓄電残量及び蓄電率を計算する。ステップS201において、制御部31は、蓄電量取得部310として機能する。
 蓄電量を取得すると、制御部31は、利用料金を計算する(ステップS202)。具体的に説明すると、制御部31は、蓄電設備S1~S3の蓄電量、又は、発電電力P2を蓄電設備S1~S3のいずれかに蓄電する時間帯の少なくともいずれかに応じて、余剰電力を蓄電設備S1~S3のいずれかに蓄電するために必要な第1の料金(預入料金)を計算する。また、制御部31は、需要家Aが発電電力P2を蓄電設備S1~S3のいずれかに蓄電していた期間の長さ、又は、蓄電電力を家屋Hに供給する時間帯の少なくともいずれかに応じて、蓄電電力を家屋Hに供給するために必要な第2の料金(引出料金)を計算する。ステップS202において、制御部31は、料金計算部320として機能する。
 制御部31は、ステップS201における蓄電量の取得処理と、ステップS202における料金の計算処理とを、予め定められた周期で実行する。これにより、制御部31は、蓄電設備S1~S3の蓄電量及び利用料金を、定期的に最新の情報に更新する。
 続いて、制御部31は、ステップS102において制御装置2から利用情報を要求されると、要求元の制御装置2に利用情報を送信する(ステップS203)。具体的に説明すると、制御部31は、利用情報として、ステップS201において得られた蓄電設備S1~S3の蓄電率、及び、ステップS202において計算された預入料金を示す第1の情報を、通信部34及び広域ネットワークNを介して、制御装置2に送信する。ステップS203において、制御部31は、利用情報送信部330として機能する。
 制御装置2において、制御部21は、ステップS203において管理サーバ10から利用情報が送信されると、送信された利用情報を取得する。利用情報を取得すると、制御部21は、取得した利用情報を報知する(ステップS103)。具体的に説明すると、制御部21は、図11に示したように、蓄電設備S1~S3の蓄電率、預入料金及び売電価格を含む報知画像を、操作端末3の表示部に表示させる。ステップS103において、制御部21は、報知部230として機能する。
 蓄電設備S1~S3の利用情報を報知すると、制御部21は、蓄電指示を受け付けたか否かを判定する(ステップS104)。具体的に説明すると、制御部21は、家屋Hの余剰電力を蓄電設備S1~S3のいずれかに蓄電する指示を、操作端末3を介して需要家Aから受け付けたか否かを判定する。ステップS104において、制御部21は、受付部240として機能する。
 蓄電指示を受け付けた場合(ステップS104;YES)、制御部21は、管理サーバ10に、蓄電設備S1~S3への蓄電を要求する(ステップS105)。具体的に説明すると、制御部21は、蓄電設備S1~S3のいずれかに余剰電力を蓄電させる蓄電要求を、宅外通信部25及び広域ネットワークNを介して、管理サーバ10に送信する。ステップS105において、制御部21は、要求送信部250として機能する。
 これに対して、蓄電指示を受け付けていない場合(ステップS104;NO)、制御部21は、ステップS105の処理をスキップする。蓄電指示を受け付けていない場合とは、具体的には、余剰電力を売電する売電指示を受け付けた場合、又は、何の指示も受け付けていない場合に該当する。
 管理サーバ10において、制御部31は、制御装置2から送信された蓄電要求を受信すると、余剰電力を蓄電設備S1~S3のいずれかに蓄電させる(ステップS204)。具体的に説明すると、制御部31は、蓄電設備S1~S3のうちの、蓄電可能な少なくとも1つの蓄電設備の電力変換装置に、充電の命令を送信する。これにより、制御部31は、家屋Hにおいて発生している余剰電力を、指示された量まで、蓄電設備に蓄電させる。ステップS204において、制御部31は、蓄電制御部350として機能する。
 余剰電力を蓄電すると、制御部31は、管理DB390に記憶された需要家Aの管理データを更新する(ステップS205)。具体的に説明すると、制御部31は、新たに蓄電された電力及び需要家に関する情報を、図13に示した管理データに記録する。以上により、蓄電フェーズにおける処理は終了する。
 図16は、蓄電設備S1~S3に蓄電された電力を家屋Hへ放電する放電フェーズにおいて、制御装置2及び管理サーバ10によって実行される処理の流れを示している。制御装置2において、制御部21は、第2の閾時間以上に亘って家屋Hに電力供給が必要な状態が継続しているか否かを判定する(ステップS301)。
 具体的に説明すると、制御部21は、計測値取得部210によって電力計測装置6から取得され、計測DB290に記憶された供給電力P1の値を参照する。そして、制御部21は、供給電力P1が正の値であるか否か、すなわち外部から家屋Hに電力が供給されているか否かを判定する。制御部21は、供給電力P1が正の値である場合に、家屋Hに電力供給が必要であると判定する。
 第2の閾時間以上に亘って家屋Hに電力供給が必要な状態が継続している場合(ステップS301;YES)、制御部21は、ステップS302以降の放電フェーズの処理に移行する。これに対して、第2の閾時間以上に亘って家屋Hに電力供給が必要な状態が継続していない場合(ステップS301;NO)、制御部21は、放電フェーズの処理には移行しない。
 放電フェーズの処理に移行すると、制御部21は、管理サーバ10に対して利用情報を要求する(ステップS302)。具体的に説明すると、制御部21は、蓄電設備S1~S3の蓄電電力を家屋Hに供給するか否かを需要家Aが選択するための第2の情報の取得要求を、宅外通信部25及び広域ネットワークNを介して、管理サーバ10に送信する。ステップS301,S302において、制御部21は、利用情報取得部220として機能する。
 管理サーバ10において、制御部31は、蓄電量を取得し(ステップS401)、利用料金を計算する(ステップS402)。ステップS401,S402の処理は、蓄電フェーズにおけるステップS201,S202と同様である。制御部31は、ステップS401における蓄電量の取得処理と、ステップS402における料金の計算処理とを、予め定められた周期で実行する。これにより、制御部31は、蓄電設備S1~S3の蓄電量及び利用料金を、定期的に最新の情報に更新する。
 続いて、制御部31は、ステップS302において制御装置2から利用情報を要求されると、要求元の制御装置2に利用情報を送信する(ステップS403)。具体的に説明すると、制御部31は、利用情報として、ステップS402において計算された預入料金、及び、需要家Aの蓄電残量を示す第2の情報を、通信部34及び広域ネットワークNを介して、制御装置2に送信する。ステップS403において、制御部31は、利用情報送信部330として機能する。
 制御装置2において、制御部21は、ステップS403において管理サーバ10から利用情報が送信されると、送信された利用情報を取得する。利用情報を取得すると、制御部21は、取得した利用情報を報知する(ステップS303)。具体的に説明すると、制御部21は、図12に示したように、需要家Aの蓄電残量、引出料金及び買電価格を含む報知画像を、操作端末3の表示部に表示させる。ステップS303において、制御部21は、報知部230として機能する。
 蓄電設備S1~S3の利用情報を報知すると、制御部21は、供給指示を受け付けたか否かを判定する(ステップS304)。具体的に説明すると、制御部21は、蓄電設備S1~S3のいずれかの蓄電電力を家屋Hに供給する指示を、操作端末3を介して需要家Aから受け付けたか否かを判定する。ステップS304において、制御部21は、受付部240として機能する。
 供給指示を受け付けた場合(ステップS304;YES)、制御部21は、管理サーバ10に、蓄電電力の供給を要求する(ステップS305)。具体的に説明すると、制御部21は、蓄電設備S1~S3のいずれかに蓄電電力を家屋Hに供給させる供給要求を、宅外通信部25及び広域ネットワークNを介して、管理サーバ10に送信する。ステップS305において、制御部21は、要求送信部250として機能する。
 これに対して、供給指示を受け付けていない場合(ステップS304;NO)、制御部21は、ステップS305の処理をスキップする。供給指示を受け付けていない場合とは、具体的には、必要な電力を買電する買電指示を受け付けた場合、又は、何の指示も受け付けていない場合に該当する。
 管理サーバ10において、制御部31は、制御装置2から送信された供給要求を受信すると、蓄電電力を家屋Hに供給させる(ステップS404)。具体的に説明すると、制御部31は、蓄電設備S1~S3のうちの、需要家Aの電力が蓄電された少なくとも1つの蓄電設備の電力変換装置に、放電の命令を送信する。これにより、制御部31は、蓄電設備の蓄電電力を、指示された量まで、家屋Hに供給させる。ステップS404において、制御部31は、蓄電制御部350として機能する。
 蓄電電力を引き出すと、制御部31は、管理DB390に記憶された需要家Aの管理データを更新する(ステップS405)。具体的に説明すると、制御部31は、新たに引き出された電力及び需要家に関する情報を、図14に示した管理データに記録する。以上により、放電フェーズにおける処理は終了する。
 以上説明したように、本実施の形態に係る電力管理システム1は、需要家Aの発電設備5による発電電力の、複数の需要家A,B,C,…によって共用される蓄電設備S1~S3への蓄電を管理するシステムにおいて、蓄電設備S1~S3の利用情報を需要家Aに報知する。そして、電力管理システム1は、発電電力を蓄電設備S1~S3のいずれかに蓄電する蓄電指示、又は、蓄電設備S1~S3のいずれかの蓄電電力を家屋Hに供給する供給指示を、需要家Aから受け付け、蓄電指示を受け付けた場合、蓄電設備S1~S3のいずれかに発電電力を蓄電させ、供給指示を受け付けた場合、蓄電設備S1~S3のいずれかに蓄電電力を家屋Hに供給させる。
 蓄電設備S1~S3の利用情報を報知することで、需要家Aは、利用情報を参照して、蓄電設備S1~S3を利用するか否かを決めることができる。例えば、需要家Aは、余剰電力を蓄電するか売電するか、又は蓄電電力を引き出すか買電するか等、蓄電設備S1~S3を利用すべき適切なタイミングを知ることができる。また、複数の需要家A,B,C,…の間で蓄電設備S1~S3を利用する時間帯が重複することによって、蓄電サービスが受けられないということを減らすことができる。
 このように、需要家Aは、蓄電設備S1~S3を有効に利用することができる。その結果、蓄電設備S1~S3を所有していない需要家Aであっても、余剰電力を蓄電設備S1~S3に蓄電しておき、必要なときに引き出して消費することができ、余剰電力の使い方の幅を広げることができる。また、利用料金を報知して複数の需要家A,B,C,…の要望を制御することで、蓄電設備S1~S3を利用する時間帯が集中しないようにすることができる。そのため、電力管理者にとっても、蓄電設備S1~S3を効率良く運用することができるという効果が得られる。
 (変形例)
 以上、本発明の実施の形態を説明したが、本発明を実施するにあたっては、種々の形態による変形及び応用が可能である。
 例えば、上記実施の形態では、蓄電設備S1~S3は、充放電可能な蓄電池に蓄電する設備であった。しかしながら、本発明において、蓄電設備は、例えば給湯機等の蓄熱機器に、電力を熱に変換することで蓄電しても良い。蓄熱機器は、余剰電力で湯を沸き上げることで蓄電する。この場合、沸き上げた湯を電力に再変換することはできないが、将来的にその湯を沸き上げるために必要となるはずであった電力を他の用途に消費可能になる。そのため、蓄熱機器に蓄電することは、間接的に電力を貯めることに相当する。このように、本発明において、蓄電設備は、電力を他の形態に変換して間接的に蓄電する設備であっても良い。
 本発明において、電力消費地は、上述した家屋Hのような一般住宅であることに限らず、集合住宅、施設、ビル又は工場等であってもよい。また、発電設備5は、太陽光に限らず、風力又は地熱等の他の再生可能エネルギーによって発電するものであっても良い。
 本発明において、蓄電設備S1~S3の利用料金である預入料金及び引出料金は、需要家と電力事業者との間の契約によって定められても良い。例えば、需要家と電力事業者との間で予め契約量を定めておく。料金計算部320は、利用料金として、蓄電量が契約量より少ない場合は割安な料金を設定し、蓄電量が契約量より多い場合は割高な料金を設定しても良い。
 本発明において、複数の電力事業者を利用することができる場合、需要家Aは、複数の電力事業者のうちから余剰電力を預ける電力事業者を選ぶことができる。具体的に説明すると、図17に示す電力管理システム1aでは、需要家Aは、電力事業者Aと電力事業者Bとに余剰電力を預けることができる。この場合、家屋Hにおける制御装置2は、管理サーバ10aから電力事業者Aが管理する蓄電設備の利用情報を取得し、管理サーバ10bから電力事業者Bが管理する蓄電設備の利用情報を取得する。そして、制御装置2は、取得した2つの利用情報をどちらも報知する。これにより、需要家Aは、2つの利用情報を比較しながら、余剰電力を預ける電力事業者を選ぶことができる。
 上記実施の形態では、蓄電制御部350は、受付部240が需要家Aから受け付けた蓄電指示又は供給指示に従って、蓄電設備S1~S3の充放電を制御した。しかしながら、本発明において、蓄電制御部350は、状況に応じて、需要家Aから予め入力された要望に従って、蓄電設備S1~S3の充放電を制御しても良い。例えば、可能な限り蓄電設備S1~S3を利用することで電力の売買を抑えるとの需要家Aの要望を、受付部240が受け付けた場合、蓄電制御部350は、蓄電フェーズでは余剰電力を可能な限り蓄電設備S1~S3に蓄電させ、放電フェーズでは蓄電電力を可能な限り家屋Hに供給させる。或いは、引出料金と買電価格との差が閾値より大きいことを条件として蓄電電力を引き出すとの需要家Aの要望を、受付部240が受け付けた場合、蓄電制御部350は、放電フェーズにおいて、引出料金と買電価格との差が閾値より大きい場合に、蓄電電力を家屋Hに供給させる。
 上記実施の形態では、操作端末3が表示部及び入力部を備えており、制御装置2は、操作端末3に入力された入力情報を、無線又は有線通信を介して取得し、表示情報を操作端末3に送信して表示した。しかしながら、本発明において、制御装置2が表示部及び入力部を備えていてもよい。すなわち、制御装置2自身に、操作端末3の機能が備わっていてもよい。この場合、報知部230は、操作端末3を介してではなく、制御装置2に備えられた表示部を介して、図11及び図12に示した報知画像を表示する。また、受付部240は、操作端末3を介してではなく、制御装置2に備えられた入力部を介して、指示を受け付ける。また、報知部230は、図11及び図12に示した報知画像を表示部に表示することに限らず、この報知画像の内容を音声で出力することによって、蓄電設備S1~S3の利用情報を報知することもできる。
 また、上記実施の形態では、家屋H内に設置された制御装置2が、計測値取得部210と、利用情報取得部220と、報知部230と、受付部240と、要求送信部250と、を備えており、家屋H外に設置された管理サーバ10が、蓄電量取得部310と、料金計算部320と、利用情報送信部330と、要求受信部340と、蓄電制御部350と、を備えていた。しかしながら、本発明において、制御装置2の上記の機能を管理サーバ10が備えていても良いし、管理サーバ10の上記の機能を制御装置2が備えていても良い。言い換えると、制御装置2又は管理サーバ10のどちらか単体で、上述した電力管理システム1として機能しても良い。
 図18に、家屋Hに制御装置2が設置されていない場合の例を示す。図18に示す電力管理システム1b及び宅内システム20bでは、ルータ12が、制御装置2の代わりに、操作端末3、発電設備5、電力計測装置6及び複数の電気機器7a,7b,…のそれぞれと通信可能に接続され、各機器間における通信を中継する。管理サーバ10は、ルータ12を介して操作端末3と通信することにより、上記実施の形態における報知部230及び受付部240として機能する。
 また、制御装置2が、上記実施の形態における蓄電量取得部310、料金計算部320、蓄電制御部350、又は管理DB390のうちの少なくともいずれかを備えていても良い。制御装置2が蓄電制御部350の機能を備えている場合、制御装置2が、蓄電設備S1~S3のいずれかに対して、管理サーバ10を介して、又は管理サーバ10を介さずに直接、充電又は放電の命令を送信する。これにより、制御装置2が、蓄電設備S1~S3のいずれかに発電電力P2を蓄電させ、又は、蓄電設備S1~S3のいずれかに蓄電電力を家屋Hに供給させる。
 上記実施の形態では、制御装置2の制御部21において、CPUがROM又は記憶部22に記憶されたプログラムを実行することによって、計測値取得部210、利用情報取得部220、報知部230、受付部240及び要求送信部250のそれぞれとして機能した。また、管理サーバ10の制御部31において、CPUがROM又は記憶部32に記憶されたプログラムを実行することによって、蓄電量取得部310、料金計算部320、利用情報送信部330、要求受信部340及び蓄電制御部350のそれぞれとして機能した。しかしながら、本発明において、制御部21及び制御部31は、専用のハードウェアであってもよい。専用のハードウェアとは、例えば単一回路、複合回路、プログラム化されたプロセッサ、ASIC(Application Specific Integrated Circuit)、FPGA(Field-Programmable Gate Array)、又は、これらの組み合わせ等である。制御部21及び制御部31が専用のハードウェアである場合、各部の機能それぞれを個別のハードウェアで実現してもよいし、各部の機能をまとめて単一のハードウェアで実現してもよい。
 また、各部の機能のうち、一部を専用のハードウェアによって実現し、他の一部をソフトウェア又はファームウェアによって実現してもよい。このように、制御部21,31は、ハードウェア、ソフトウェア、ファームウェア、又は、これらの組み合わせによって、上述の各機能を実現することができる。
 本発明に係る制御装置2又は管理サーバ10の動作を規定する動作プログラムを既存のパーソナルコンピュータ又は情報端末装置等のコンピュータに適用することで、当該コンピュータを、本発明に係る制御装置2又は管理サーバ10として機能させることも可能である。
 また、このようなプログラムの配布方法は任意であり、例えば、CD-ROM(Compact Disk ROM)、DVD(Digital Versatile Disk)、MO(Magneto Optical Disk)、又は、メモリカード等のコンピュータ読み取り可能な記録媒体に格納して配布してもよいし、インターネット等の通信ネットワークを介して配布してもよい。
 本発明は、本発明の広義の精神と範囲を逸脱することなく、様々な実施の形態及び変形が可能とされるものである。また、上述した実施の形態は、この発明を説明するためのものであり、本発明の範囲を限定するものではない。すなわち、本発明の範囲は、実施の形態ではなく、請求の範囲によって示される。そして請求の範囲内及びそれと同等の発明の意義の範囲内で施される様々な変形が、この発明の範囲内とみなされる。
 本発明は、電力を管理するシステム等に好適に採用され得る。
1,1a,1b 電力管理システム、2 制御装置、3 操作端末、5 発電設備、6 電力計測装置、7a,7b 電気機器、9 分電盤、10,10a,10b 管理サーバ、12 ルータ、13 PVパネル、14 PV-PCS、20,20b 宅内システム、21 制御部、22 記憶部、23 計時部、24 宅内通信部、25 宅外通信部、29 バス、31 制御部、32 記憶部、33 計時部、34 通信部、39 バス、210 計測値取得部、220 利用情報取得部、230 報知部、240 受付部、250 要求送信部、290 計測DB、310 蓄電量取得部、320 料金計算部、330 利用情報送信部、340 要求受信部、350 蓄電制御部、390 管理DB、D1~D5 電力線、H 家屋、N 広域ネットワーク、S1,S2,S3 蓄電設備

Claims (15)

  1.  一の需要家の発電設備による発電電力の、前記一の需要家を含む複数の需要家によって共用される蓄電設備への蓄電を管理する電力管理システムであって、
     前記蓄電設備の利用情報を、前記一の需要家に報知する報知手段と、
     前記発電電力を前記蓄電設備に蓄電する蓄電指示、又は、前記蓄電設備の蓄電電力を前記一の需要家の電力消費地に供給する供給指示を、前記一の需要家から受け付ける受付手段と、
     前記受付手段が前記蓄電指示を受け付けた場合、前記蓄電設備に前記発電電力を蓄電させ、前記受付手段が前記供給指示を受け付けた場合、前記蓄電設備に前記蓄電電力を前記電力消費地に供給させる蓄電制御手段と、を備える、
     電力管理システム。
  2.  前記報知手段は、前記利用情報として、前記蓄電設備の利用料金、又は、前記蓄電設備の蓄電量を示す情報の少なくともいずれかを報知する、
     請求項1に記載の電力管理システム。
  3.  前記報知手段は、前記発電電力が前記電力消費地における消費電力より大きい場合、前記利用情報として、前記発電電力を前記蓄電設備に蓄電するか否かを前記一の需要家が選択するための第1の情報を報知する、
     請求項1又は2に記載の電力管理システム。
  4.  前記報知手段は、前記第1の情報として、前記発電電力を前記蓄電設備に蓄電するために必要な第1の料金を報知する、
     請求項3に記載の電力管理システム。
  5.  前記報知手段は、前記第1の料金として、前記蓄電設備の蓄電量、又は、前記発電電力を前記蓄電設備に蓄電する時間帯の少なくともいずれかに応じて異なる料金を報知する、
     請求項4に記載の電力管理システム。
  6.  前記報知手段は、前記発電電力が前記消費電力より大きい場合、前記第1の料金と共に、売電価格を報知する、
     請求項4又は5に記載の電力管理システム。
  7.  前記報知手段は、前記発電電力が前記電力消費地における消費電力より小さい場合、前記利用情報として、前記蓄電電力を前記電力消費地に供給するか否かを前記一の需要家が選択するための第2の情報を報知する、
     請求項1から6のいずれか1項に記載の電力管理システム。
  8.  前記報知手段は、前記第2の情報として、前記蓄電電力を前記電力消費地に供給するために必要な第2の料金を報知する、
     請求項7に記載の電力管理システム。
  9.  前記報知手段は、前記第2の料金として、前記一の需要家が前記発電電力を前記蓄電設備に蓄電していた期間の長さ、又は、前記蓄電電力を前記電力消費地に供給する時間帯の少なくともいずれかに応じて異なる料金を報知する、
     請求項8に記載の電力管理システム。
  10.  前記報知手段は、前記発電電力が前記消費電力より小さい場合、前記第2の料金と共に、買電価格を報知する、
     請求項8又は9に記載の電力管理システム。
  11.  前記電力管理システムは、制御装置と、管理サーバと、を備え、
     前記制御装置は、
     前記報知手段と、
     前記受付手段と、
     前記受付手段が前記蓄電指示を受け付けた場合、前記蓄電設備に前記発電電力を蓄電させる蓄電要求を前記管理サーバに送信し、前記受付手段が前記供給指示を受け付けた場合、前記蓄電設備に前記蓄電電力を前記電力消費地に供給させる供給要求を前記管理サーバに送信する要求送信手段と、を備え、
     前記管理サーバは、
     前記制御装置から送信された前記蓄電要求又は前記供給要求を受信する要求受信手段と、
     前記蓄電制御手段と、を備え、
     前記蓄電制御手段は、前記要求受信手段が前記蓄電要求を受信した場合、前記蓄電設備に前記発電電力を蓄電させ、前記要求受信手段が前記供給要求を受信した場合、前記蓄電設備に前記蓄電電力を前記電力消費地に供給させる、
     請求項1から10のいずれか1項に記載の電力管理システム。
  12.  前記制御装置は、
     前記利用情報を前記管理サーバから取得する利用情報取得手段、を更に備え、
     前記報知手段は、前記利用情報取得手段によって取得された前記利用情報を、前記一の需要家に報知する、
     請求項11に記載の電力管理システム。
  13.  前記利用情報取得手段は、第1の閾時間以上に亘って前記発電電力が前記電力消費地における消費電力より大きい場合、前記利用情報として、前記発電電力を前記蓄電設備に蓄電するか否かを前記一の需要家が選択するための第1の情報を、前記管理サーバから取得し、第2の閾時間以上に亘って前記発電電力が前記消費電力より小さい場合、前記利用情報として、前記蓄電電力を前記電力消費地に供給するか否かを前記一の需要家が選択するための第2の情報を、前記管理サーバから取得する、
     請求項12に記載の電力管理システム。
  14.  一の需要家の発電設備による発電電力の、前記一の需要家を含む複数の需要家によって共用される蓄電設備への蓄電を制御する制御装置であって、
     前記蓄電設備の利用情報を、前記一の需要家に報知する報知手段と、
     前記発電電力を前記蓄電設備に充電する蓄電指示、又は、前記蓄電設備の蓄電電力を前記一の需要家の電力消費地へ放電する供給指示を、前記一の需要家から受け付ける受付手段と、
     前記受付手段が前記蓄電指示を受け付けた場合、前記蓄電設備に前記発電電力を充電させ、前記受付手段が前記供給指示を受け付けた場合、前記蓄電設備に前記蓄電電力を前記電力消費地へ放電させる蓄電制御手段と、を備える、
     制御装置。
  15.  複数の需要家によって共用される蓄電設備の利用情報を、前記複数の需要家のうちの一の需要家に報知し、
     前記一の需要家の発電設備による発電電力を前記蓄電設備に蓄電する指示を前記一の需要家から受け付けた場合、前記蓄電設備に前記発電電力を蓄電させ、
     前記蓄電設備の蓄電電力を前記一の需要家の電力消費地に供給する指示を前記一の需要家から受け付けた場合、前記蓄電設備に前記蓄電電力を前記電力消費地に供給させる、
     電力管理方法。
PCT/JP2016/082077 2016-10-28 2016-10-28 電力管理システム、制御装置及び電力管理方法 WO2018078802A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
PCT/JP2016/082077 WO2018078802A1 (ja) 2016-10-28 2016-10-28 電力管理システム、制御装置及び電力管理方法
JP2018547034A JP6644162B2 (ja) 2016-10-28 2016-10-28 電力管理システム、制御装置及び電力管理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2016/082077 WO2018078802A1 (ja) 2016-10-28 2016-10-28 電力管理システム、制御装置及び電力管理方法

Publications (1)

Publication Number Publication Date
WO2018078802A1 true WO2018078802A1 (ja) 2018-05-03

Family

ID=62023319

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/082077 WO2018078802A1 (ja) 2016-10-28 2016-10-28 電力管理システム、制御装置及び電力管理方法

Country Status (2)

Country Link
JP (1) JP6644162B2 (ja)
WO (1) WO2018078802A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020171181A (ja) * 2019-04-05 2020-10-15 シャープ株式会社 制御装置及び太陽光発電システム
KR102613399B1 (ko) * 2023-04-17 2023-12-13 주식회사 코원이앤씨 공동주택에 효율적으로 전력을 공급하는 시스템

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011107846A1 (ja) * 2010-03-01 2011-09-09 パナソニック電工株式会社 電力供給システム
JP2013169137A (ja) * 2012-01-17 2013-08-29 Keio Gijuku 電力ネットワークシステム
JP2013219908A (ja) * 2012-04-06 2013-10-24 Toyota Home Kk 地域内給電システム
WO2016006205A1 (ja) * 2014-07-10 2016-01-14 パナソニックIpマネジメント株式会社 蓄電池管理装置及びその方法
WO2016136263A1 (ja) * 2015-02-25 2016-09-01 京セラ株式会社 電力制御システム、電力制御装置、及び電力制御方法

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012060775A (ja) * 2010-09-09 2012-03-22 Tokyo Electric Power Co Inc:The 蓄電池運用装置
JP5907753B2 (ja) * 2011-02-28 2016-04-26 積水化学工業株式会社 地域内電力需要管理システム
JP5675727B2 (ja) * 2012-08-10 2015-02-25 株式会社東芝 充放電指示装置、プログラム
JP2014187830A (ja) * 2013-03-25 2014-10-02 Captex Co Ltd 集合住宅用の電力管理システム
JP6299860B2 (ja) * 2014-10-23 2018-03-28 日本電気株式会社 分散蓄電システム、電力制御方法、及びプログラム
JP6587336B2 (ja) * 2015-05-08 2019-10-09 秀一 石原田 再生可能エネルギー電力の分散型蓄電システム

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011107846A1 (ja) * 2010-03-01 2011-09-09 パナソニック電工株式会社 電力供給システム
JP2013169137A (ja) * 2012-01-17 2013-08-29 Keio Gijuku 電力ネットワークシステム
JP2013219908A (ja) * 2012-04-06 2013-10-24 Toyota Home Kk 地域内給電システム
WO2016006205A1 (ja) * 2014-07-10 2016-01-14 パナソニックIpマネジメント株式会社 蓄電池管理装置及びその方法
WO2016136263A1 (ja) * 2015-02-25 2016-09-01 京セラ株式会社 電力制御システム、電力制御装置、及び電力制御方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020171181A (ja) * 2019-04-05 2020-10-15 シャープ株式会社 制御装置及び太陽光発電システム
JP7488028B2 (ja) 2019-04-05 2024-05-21 シャープ株式会社 制御装置及び太陽光発電システム
KR102613399B1 (ko) * 2023-04-17 2023-12-13 주식회사 코원이앤씨 공동주택에 효율적으로 전력을 공급하는 시스템

Also Published As

Publication number Publication date
JPWO2018078802A1 (ja) 2019-03-22
JP6644162B2 (ja) 2020-02-12

Similar Documents

Publication Publication Date Title
US11625059B2 (en) Appliance load manager that cycles an air conditioner to reduce peak demand
US8975779B2 (en) Load management controller
JP6578050B2 (ja) 電力管理システム、電力管理方法及びプログラム
JP2010016989A (ja) 発電システム
WO2013057516A9 (en) Smart meter apparatus
JP6644162B2 (ja) 電力管理システム、制御装置及び電力管理方法
JP2021096872A (ja) 電力供給システム及び、電力管理方法
JP7063749B2 (ja) 電力制御装置および電力制御方法
KR102590224B1 (ko) 전력 관리 시스템
JP6719669B2 (ja) 制御装置、電力管理システム、機器の制御方法及びプログラム
JP6762297B2 (ja) 機器制御システムおよび制御方法
JP6719672B2 (ja) 制御装置、電力管理システム、情報提示方法及びプログラム
KR20120000018A (ko) 네트워크 시스템
JP2005333751A (ja) 電力供給システム及び電力供給方法
KR101677765B1 (ko) 네트워크 시스템 및 에너지 소비부
KR20120000015A (ko) 네트워크 시스템
IES85091Y1 (en) A load management controller
IE20080292U1 (en) A load management controller
KR20120000009A (ko) 네트워크 시스템
KR20120066848A (ko) 네트워크 시스템

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2018547034

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16919753

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16919753

Country of ref document: EP

Kind code of ref document: A1