WO2017175259A1 - 作業管理装置、作業管理システム、作業管理方法、および作業管理プログラム - Google Patents

作業管理装置、作業管理システム、作業管理方法、および作業管理プログラム Download PDF

Info

Publication number
WO2017175259A1
WO2017175259A1 PCT/JP2016/001949 JP2016001949W WO2017175259A1 WO 2017175259 A1 WO2017175259 A1 WO 2017175259A1 JP 2016001949 W JP2016001949 W JP 2016001949W WO 2017175259 A1 WO2017175259 A1 WO 2017175259A1
Authority
WO
WIPO (PCT)
Prior art keywords
work
section
information
worker
evaluation index
Prior art date
Application number
PCT/JP2016/001949
Other languages
English (en)
French (fr)
Inventor
永哉 若山
Original Assignee
日本電気株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本電気株式会社 filed Critical 日本電気株式会社
Priority to PCT/JP2016/001949 priority Critical patent/WO2017175259A1/ja
Priority to JP2018510016A priority patent/JP6493717B2/ja
Publication of WO2017175259A1 publication Critical patent/WO2017175259A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management

Definitions

  • the present invention relates to a work management device, a work management system, a work management method, and a work management program.
  • FIG. 1 is a schematic diagram showing an example of a picking process in a shipping operation in a warehouse.
  • a picking method called relay-type picking is adopted.
  • Relay picking is a picking method in which the shelves 1 are arranged along the conveyor 3 to form one work line.
  • the work line is divided into two work sections 5A and 5B, and workers are assigned to the respective work sections. Specifically, three workers, workers 2-1, 2-2, and 2-3, are arranged in the work section 5A, and workers 2-4, 2-5, 2 are arranged in the work section 5B. There are four workers, -6 and 2-7.
  • container groups 4a and 4b are arranged on the conveyor 3 in the work sections 5A and 5B, respectively.
  • the container groups 4a and 4b may have different shipping destinations.
  • the WMS instructs the workers 2-1 to 2-3 assigned to the work section 5A to pick items for the container group 4a, and the workers 2-4 assigned to the work section 5B. Instructs 2-7 to pick an item for the container group 4b. Then, the workers 2-1 to 2-7 perform item picking / inspection according to instructions from the WMS, and store them in the container groups 4a and 4b. After all work is completed for the work sections 5A and 5B, the conveyor 3 operates.
  • the container group 4a moves to the work section 5B after the work in the work section 5A is completed.
  • the container group 4b passes through this work line and moves to the next work line (downstream process).
  • a new container group is moved to the work section 5A from a work line (for example, an empty container assembly process) in an upstream process.
  • the WMS instructs the worker in each work area to perform the next work.
  • relay type picking one work line is divided into a plurality of work areas and picking is simultaneously performed on a plurality of container groups having different shipping destinations, so that picking can be performed more efficiently.
  • relay-type picking reduces the work loss caused by movement when workers store items in the container group because the distance traveled from the shelves for storing items to the container group is shorter than other methods. can do.
  • the moving distance of the container group is reduced, and work loss due to the operation time of the conveyor 3 can be reduced.
  • relay-type picking the next work instruction cannot be issued to each work area unless all work areas in the work line are completed. For this reason, the relay picking has a problem that the work delay of one work area in the work line spreads over the entire work line and the work efficiency is lowered.
  • a method for optimizing items to be allocated to shelves is known.
  • the items to be allocated to the shelves are determined based on the item delivery frequency so that the total number of operations in each work area is leveled. Thereby, it is avoided that the work load is significantly biased to a specific work area, and improvement in work efficiency is expected.
  • a method for optimizing the number of workers assigned to the work area is known.
  • the work progress for each work area can be made uniform by appropriately changing the work personnel assigned according to the work load for each work area.
  • the work personnel assigned to the work area can be changed in units of work instructions at the shortest. Therefore, the method for optimizing the assignment of work personnel can level the work load in finer units.
  • Patent Documents 1 to 4 disclose specific methods for optimizing work personnel assigned to work areas.
  • Patent Document 1 discloses a work leveling method that assigns work to each worker so as to satisfy certain conditions based on work objects, work forms, and the number of work objects, in accordance with the ability of each worker. is doing.
  • Patent Document 2 discloses a work plan table creation support device that outputs a work plan for each unit time that can level the work load. Specifically, the work plan table creation support apparatus of Patent Document 2 inputs the number of workers, the processing capacity per worker, and the work start time as parameters for each work. Then, with the deadline of work or the maximum number of workers as a constraint, the work end time when the total number of workers per unit time is leveled is calculated, and the work plan table at the time of the calculation Is output.
  • Patent Document 3 discloses a production plan evaluation apparatus that takes into consideration travel time and group unit work efficiency. Specifically, the production plan evaluation apparatus of Patent Document 3 stores in advance work time including travel time. Further, for a group composed of one or more workers, a work combination is stored, and a work time including a travel time for each group is stored. And the production plan evaluation apparatus of patent document 3 calculates the work time per unit period based on work time information.
  • Patent Document 4 discloses a collected item number determination method and a collected item number determination system for determining the number of picking items so that the work waiting time is shortened. Specifically, the collection item number determination method described in Patent Document 4 calculates the average work time for each item by calculating the time required for the work of each worker for each item. And the collection item number determination method of patent document 4 calculates the number of work items for every worker so that the total work time of each worker for every work instruction becomes equal.
  • JP-A-3-217967 Japanese Patent Laid-Open No. 2005-32011 Japanese Patent No. 5194708 JP 2010-70310 A
  • Patent Document 1 and Patent Document 2 determine work assignment in advance in a planned manner by assigning fixed values to information related to work efficiency.
  • work assignment is determined in advance in a planned manner by assigning statistically obtained values based on past information.
  • Patent Documents 1 to 4 have a problem that it is impossible to determine work assignment based on the change of work efficiency every moment.
  • An object of the present invention is to allocate work personnel based on work efficiency information that changes from moment to moment, thereby improving work efficiency in the entire work process, work management system, work management device, work management method, work To provide a management program.
  • a work management apparatus divides a work place into a plurality of sections, and acquires section information including at least section range information that is information indicating a section range for each of the sections.
  • a worker information acquisition unit that acquires worker information including at least a correspondence relationship between the worker and the section in charge of the worker, and first work result information that is the latest work result for each of the sections.
  • the work performance information acquisition unit that acquires the work performance index calculation unit that calculates the first work evaluation index for each section based on the first work performance information, the worker information, and the first An assignment calculation unit for calculating an assignment between the worker and the section based on the work evaluation index.
  • a work management system includes a management system that holds information about items handled in work, and a section that is information indicating a work area by dividing a work place into a plurality of sections.
  • a zone information acquisition unit that acquires zone information including at least range information; a worker information acquisition unit that acquires worker information including at least a correspondence relationship between a worker and a zone in charge of the worker; and For each section, the first work record information that is the latest work record is acquired based on the information related to the item, and each section based on the first work record information.
  • a work evaluation index calculation unit that calculates a first work evaluation index, and assigns the worker and the section based on the worker information and the first work evaluation index. To exit, and a assignment calculation unit.
  • the work management method divides a work place into a plurality of sections, acquires section information including at least section range information, which is information indicating the section range, for each of the sections, And worker information including at least a correspondence relationship with the section in charge of the worker, first work result information which is the latest work result is obtained for each of the sections, and the first work result is obtained. Based on the information, a first work evaluation index is calculated for each section, and an assignment between the worker and the section is calculated based on the worker information and the first work evaluation index.
  • a work management program divides a work place into a plurality of sections and acquires section information including at least section range information, which is information indicating a section range, for each of the sections.
  • the section information acquisition process, the worker information acquisition process for acquiring worker information including at least the correspondence relationship between the worker and the section in charge of the worker, and the first work result for each of the sections.
  • a work performance information acquisition process for obtaining the work performance information, a work evaluation index calculation process for calculating a first work evaluation index for each of the sections based on the first work performance information, the worker information, Based on the first work evaluation index, an assignment calculation process for calculating an assignment between the worker and the section is executed.
  • FIG. 2 is a schematic diagram showing an example of an environment to which the work management system according to the first embodiment of the present invention is applied.
  • the configuration and operation of the present invention will be described by taking the picking process in the warehouse work as an example. However, this is an example, and the present invention is not limited thereto.
  • the work management system 100 includes an action management device 10 and a warehouse management system 20.
  • the work management apparatus 10 acquires information from the warehouse management system 20. Further, the work management apparatus 10 calculates work assignment to each worker based on the information acquired from the warehouse management system 20, and transmits the calculation result to the work manager 2a.
  • the transmission method is not particularly limited. For example, the transmission method may be displayed on a display, an instruction may be printed on paper or the like, or may be transmitted by voice. In this case, the work manager 2a instructs the workers 2-1 to 2-7 to assign work according to the calculation result of the work management apparatus 10.
  • the warehouse management system 20 provides the work management apparatus 10 with status management, entry / exit management, inventory management, work support functions, and the like of items handled in the warehouse.
  • the warehouse management system 20 holds at least item type, the number of items, storage location information, work status information such as picking, etc. as warehouse management information for each delivery instruction item that has received a delivery instruction.
  • the storage location information is information that uniquely determines, for example, a shelf or an area where the item is stored.
  • the warehouse management system 20 adds or updates the warehouse work management information as needed when an item to be shipped or a change in work status information (for example, completion of picking, completion of inspection, etc.) occurs.
  • these functions are general functions in the warehouse management system 20, detailed description is abbreviate
  • FIG. 3 is a block diagram illustrating a configuration of the work management apparatus 10.
  • the work management apparatus 10 includes at least a section information acquisition unit 11, a worker information acquisition unit 12, a work performance information acquisition unit 13, a work evaluation index calculation unit 14, and an assignment calculation unit 15.
  • the block information acquisition unit 11 acquires block information including at least block range information, which is information indicating the range of each block, from the warehouse management system 20 in a work place divided into a plurality of blocks.
  • the section range information is information that uniquely defines the position range of the section in the space.
  • the section range information is, for example, one or a plurality of storage destination information. If it is a line work in a factory or the like, the section range information is. For example, it corresponds to information (for example, a process number or the like) that uniquely indicates one or a plurality of processes.
  • the worker information acquisition unit 12 acquires worker information including at least a correspondence relationship between the worker and the section in charge of the worker.
  • the method of acquiring the section in charge of the worker is not particularly limited.
  • each worker periodically uses an RFID (Radio Frequency Identifier) system that registers worker information at the start and end of work in the relevant section.
  • RFID Radio Frequency Identifier
  • the work manager may visually check the correspondence between the worker and the section in charge and manually input the work management apparatus 10.
  • the work record information acquisition unit 13 acquires first work record information that is a work record for each section.
  • the first work record information is information including at least the work items executed most recently and the number of works, for example.
  • the work performance information acquisition unit 13 acquires warehouse work management information from the warehouse management system 20.
  • the work performance information acquisition unit 13 distributes the warehouse work management information for each section based on the section range information included in the section information and the storage destination information included in the warehouse work management information.
  • the work performance information acquisition part 13 calculates at least the work item performed most recently and the number of work based on the change status of the work state information included in the warehouse work management information for each section and each delivery instruction item. To do.
  • the work evaluation index calculation unit 14 calculates a first work evaluation index for each section based on the worker information and the first work performance information.
  • the 1st work evaluation index means the information which shows work efficiency for every division, for example. More specifically, the information indicates how much work has been performed within a certain time.
  • the assignment calculation unit 15 calculates the assignment between the worker and each section based on the worker information and the first work evaluation index.
  • FIG. 4 is a flowchart showing the operation of the work management system 10 according to the first embodiment of the present invention.
  • the processing procedure shown in FIG. 4 is an exemplification, and does not limit the present invention. Specifically, the processing procedures may be rearranged as long as the order of processing shown in FIG. 4 is consistent.
  • FIG. 5 is a table showing an example of partition information acquired by the partition information acquisition unit 11.
  • partition name means information that can uniquely identify each section, and is, for example, “5A”, “5B”, and the like that are named according to each section.
  • “Division range” means information that can uniquely identify the range indicated by each division name. For example, a work floor (corresponding to “5th floor”), a work line identification name (“rose product first line”). And shelf numbers (corresponding to “shelf 1-6” and “shelf 7-12”) and the like.
  • FIG. 6 is a diagram illustrating an example of worker information acquired in the first embodiment.
  • “worker name” and “department in charge” are registered as worker information.
  • the “worker name” is an example of information for identifying each worker. Therefore, for example, “employee number” may be used as the “worker name”.
  • the “department section” is information indicating the section that the worker is in charge of, and in the first embodiment, a name that matches the “section name” of the section information is used. Specifically, FIG. 6 shows that, for example, the worker “AAA” is in charge of the work section “5A”. As described above, the worker information acquisition unit 12 can acquire allocation information between the worker name and the assigned section at the time of information acquisition by using the worker information.
  • the work performance information acquisition unit 13 acquires first work performance information for each section based on the section information acquired by the section information acquisition unit 11 (step S103).
  • the work performance information acquisition part 13 produces
  • the warehouse work management information will be described with reference to FIG. FIG. 7 is a table showing an example of warehouse work management information in the first embodiment.
  • warehouse work management information is information that means, for example, a shipping number, a floor / line / shelf number where work occurs, the number of items, work contents, and the time when the work occurs. More specifically, referring to FIG. 7, for example, regarding “shipping number 0011”, “3/21” for “5” items on shelf “3” installed on “line 1” on “5th floor”. “10:00:01” indicates that picking has started.
  • FIG. 8 is a table showing an example of the first work record information according to the first embodiment.
  • the first work record information is information indicating, for example, “section name”, “work item”, “work amount”, “work required time”, and the like.
  • “Division name” means information that can uniquely identify each division, and a name that matches the “division name” in the division information is used.
  • the “work item” means information for identifying the work content, and one kind of work “picking / inspection” is defined. In the first embodiment, each work flow from “picking start” to “picking completion” and “inspection completion” is defined as one type of work “picking / inspection”. However, this is merely an example, and picking and inspection may not be combined into one type of work, but may be defined as individual work.
  • “Work amount” and “work required time” are information indicating the number of work items of each work item performed most recently and the time required for the work.
  • the work performance information acquisition unit 13 may acquire the number of work and the time required for the work from, for example, warehouse work management information held by the warehouse management system 20.
  • the work result information acquisition unit 13 first classifies the warehouse work management information for each section according to the information of “floor”, “line”, and “shelf”. Specifically, as shown in FIGS. 5 and 7, the work record information acquisition unit 13 classifies the shelves 3 and 5 into the work section 5A and classifies the shelves 9 and 11 into the work section 5B. To do.
  • the work record information acquisition unit 13 calculates the total number of items shown in FIG. 7 for each section.
  • the total number of items is defined as “work amount”.
  • the work item is “picking / inspection” in the first embodiment, duplicate items are not included in the picking / inspection work for the same shipment number.
  • the work volume of the work section 5A is 9 items
  • the work volume of the work section 5B is 10 items.
  • the work record information acquisition unit 13 calculates the work required time for each section and the work required time for each shipping number.
  • the work required time means, for example, the time from the first picking start to the same section until the inspection is completed in the first embodiment.
  • the work required time corresponding to the work sections 5A and 5B is 2 minutes 21 respectively. Seconds, and 1 minute 48 seconds.
  • the work evaluation index calculation unit 14 calculates a first work evaluation index for each section based on the first work performance information (step S104).
  • the first work evaluation index will be described with reference to FIG.
  • FIG. 9 is a table showing an example of the first work evaluation index in the first embodiment.
  • the work evaluation index means, for example, work efficiency, in other words, the number of work per unit time (for example, 1 minute).
  • the work evaluation index calculation unit 14 can calculate the first work evaluation index of the work section 5A and the work section 5B based on the first work performance information shown in FIG.
  • the first work evaluation indices of the work section 5A and the work section 5B are 3.83 and 5.56, respectively.
  • the assignment calculating unit 15 calculates the assignment between the worker and the section based on the worker information acquired in step S102 and step S104 and the work evaluation index (step S105).
  • the work manager 2a instructs each worker to move based on, for example, the recommended number of workers calculated for each section by the assignment calculation unit 15.
  • the allocation calculation unit 15 calculates a first future index indicating an evaluation index of each section for reassignment based on the worker information and the first work evaluation index.
  • the first future index is not particularly limited, but is an index related to the estimated work efficiency after allocation, for example. More specifically, the allocation calculation unit 15 calculates the first future index using the following formula (1). It is assumed that the first work evaluation index of each section is proportional to the allocated number of people.
  • the allocation calculation unit 15 calculates the first future index for each section, and allocates workers so as to increase the value of the section having the smallest first future index as much as possible.
  • the first future index will be specifically described using the worker information shown in FIG. 6 and the value of the first work evaluation index shown in FIG.
  • FIG. 6 it is shown that three workers “AAA”, “BBB”, and “CCC” are assigned to the work section 5A.
  • the workers “DDD”, “EEE”, “FFF”, and “GGG” are assigned to the work section 5B.
  • FIG. 9 shows a work evaluation index when a worker is assigned as shown in FIG. Specifically, the work evaluation index of the work section 5A is 3.83, and the work evaluation index of the work section 5B is 5.56.
  • the future index of 1 is the largest. More specifically, since the first future indicators of the work sections 5A and 5B are 5.10 and 4.17, respectively, the minimum value is 4.17 of the work section 5B. This is greater than the minimum value of 3.83 before allocation and greater than the minimum value in any allocation.
  • FIG. 10 is a table showing an example of a calculation result of the allocation calculation unit 15 in the first embodiment.
  • the numbers of workers in the work sections 5A and 5B before assignment are 3 and 4, respectively.
  • the number of workers in the assigned work sections 5A and 5B is 4 and 3, respectively. That is, the allocation calculation unit 15 calculates an allocation that increases the number of workers in the work section 5A by one and decreases the number of workers in the work section 5B by one.
  • the work management system 100 can improve work efficiency in the entire work process even in an environment where the work situation changes from moment to moment.
  • the work management system 100 can reflect a work situation that changes from moment to moment by using the latest work item / work number information as the first work performance information.
  • the work management system 100 can increase the efficiency of the bottleneck process by allocating workers and sections between the sections based on the first work evaluation index, and as a result, improves the efficiency of the entire work process. be able to.
  • the work management system 100 can include the most recent work efficiency in the first work evaluation index even if the work efficiency of the specific process is reduced due to, for example, deterioration of the physical condition of the worker. Efficiency can be improved.
  • the work record information may be a work record for a certain number of work instructions counted from the most recent time, or may be a work record within the latest fixed time.
  • the first work evaluation index may be calculated by performing weighting based on the work instruction time or the work occurrence time. As a result, the work management system 100 can suppress shake due to short-time measurement and calculate a work evaluation index that is closer to the actual situation, thereby realizing more efficient assignment.
  • the allocation calculation unit 15 calculates the number of workers to be allocated to each section, but a worker to be moved may be selected from each worker.
  • FIG. 11 is a diagram illustrating another example of the calculation result of the allocation calculation unit 15 in the first embodiment.
  • FIG. 11 shows that the assignment calculation unit 15 has selected a worker “DDD” to be moved. Since the assignment calculation unit 15 selects a worker to be moved, the work manager 2a does not need to determine a worker to be moved, so the burden on the work manager 2a is reduced. Moreover, since the calculation result of the allocation calculation unit 15 becomes a specific instruction to the worker, the work management apparatus 10 can directly instruct the worker, and further labor saving can be expected.
  • the allocation calculation unit 15 first acquires inter-division movement time information that is the time required for movement between the divisions. And the allocation calculation part 15 selects the worker who belongs to the division with the shortest movement time as a movement object based on the movement time information between divisions, for example. Thereby, the work management apparatus 10 can assign workers to the sections more efficiently. In general, in a warehouse, a factory, or the like, workers cannot perform any work during movement, and therefore, if the movement time is long, work efficiency is lowered. Thus, by determining the worker so that the travel time is shorter as described above, it is possible to suppress a decrease in work efficiency associated with the travel.
  • the allocation calculation unit 15 may select a worker having the shortest movement time as a movement target based on the position information of each worker.
  • the worker information acquisition unit 12 can acquire the position information of each worker.
  • the work management apparatus 10 can assign workers to the sections more efficiently.
  • by acquiring the position information in units of workers it is possible to further suppress a decrease in work efficiency associated with movement.
  • the allocation calculation unit 15 may further calculate a worker having the smallest difference in work evaluation indices as a movement target.
  • the work evaluation index for each worker can be calculated by the work evaluation index calculation unit 14 based on the work performance information for each worker.
  • the work record information acquisition unit 13 can acquire the work record information for each worker.
  • the second embodiment is a work management system that considers the presence or absence of inter-compartment correlation for each work item.
  • the inter-compartment correlation means that the work progress in each section affects the work progress in other sections.
  • the picking / inspection work shown in the first embodiment cannot receive the next work instruction unless the work instruction is completed in all sections in the line.
  • the picking / inspection work is a work having a correlation between sections.
  • the replenishment work can proceed regardless of the progress of other sections. Therefore, in this case, the replenishment work is a work with no correlation between sections.
  • FIG. 12 is a schematic diagram showing an application environment example of the work management system 100-2 according to the second embodiment of the present invention.
  • the difference from the work management system 100 according to the first embodiment is that the work management apparatus 10-2 considers the presence or absence of correlation between sections for each work item.
  • FIG. 13 is a block diagram showing the configuration of the work management apparatus 10-2.
  • the work management apparatus 10-2 includes a section information acquisition unit 11, a worker information acquisition unit 12, a work performance information acquisition unit 13-2, a work evaluation index calculation unit 14, and an allocation calculation unit 15.
  • the work management apparatus 10-2 is different from the work management apparatus 10 in that the work record information acquisition unit 13-2 has a correlation between sections as the first work record information (hereinafter referred to as “first work”). The only difference is that you get only work results.
  • the work performance information acquisition unit 13-2 acquires the first work performance information for each section.
  • the first work record information is information including at least the work items that have been performed most recently and the number of works, for example, for work having inter-section correlation.
  • FIG. 14 is a flowchart showing the operation of the work management apparatus 10-2.
  • the processing procedure shown in FIG. 14 is an exemplification, and does not limit the present invention. If the order of processing shown in FIG. 14 is consistent, the processing procedure may be rearranged.
  • the section information acquisition unit 11 acquires section information (step S101).
  • the worker information acquisition unit 12 acquires worker information (step S102).
  • the work record acquisition unit 13-2 acquires work record information for each section in parallel with step S102 (step S103-2).
  • the work record acquisition unit 13-2 acquires a work record for the first work performed in the section as the work record information. More specifically, the work record acquisition unit 13-2 acquires at least the work items and the number of work performed most recently.
  • the work record acquisition unit 13-2 generates work record information based on the warehouse work management information acquired from the warehouse management system 20.
  • FIG. 15 is a table showing an example of warehouse work management information in the second embodiment of the present invention.
  • the warehouse work management information is information including the shipping number, the floor / line / shelf number where the work occurs, the number of items, the work, the time of occurrence of the work, and the like.
  • FIG. 16 is a table showing an example of information related to the presence / absence of inter-compartment correlation for each work item in the second embodiment of the present invention.
  • the correlation between sections is recorded as “present”.
  • the inter-section correlation is recorded as “none”. Note that information regarding the target section may be further added as information regarding the presence or absence of the correlation between sections.
  • the work record acquisition unit 13-2 extracts only work items having inter-section correlation from the work item information.
  • there are four types of work items “Picking start”, “Picking complete”, “Inspection complete”, and “Shelve complete”.
  • the flow of each work from “picking start” to “picking completion” to “inspection completion” is defined as “picking / inspection” work.
  • “shelf placement” is defined as “shelf placement” work.
  • the work management apparatus 10-2 performs the same processing as the work management apparatus 10 of the first embodiment based on the information extracted by the work record acquisition unit 13-2. Is omitted.
  • the work management apparatus 10-2 can realize efficient allocation of workers based on the inter-compartment correlation for each work item.
  • the work having the inter-compartment correlation also affects the work progress in other sections, it is desirable that the assignment is made in consideration of raising the efficiency of the bottleneck process.
  • work that does not have inter-compartment correlation is not affected by work progress in other sections, and therefore, work may be performed using idle time. Therefore, the work management apparatus 10-2 acquires the first work performance information only for the work having the inter-section correlation, thereby eliminating the influence of the work performance having no inter-section correlation and more accurately. Inquiries about the efficiency of the bottleneck process can be obtained.
  • the work management apparatus 10-2 may further include a storage unit (not shown) that holds information indicating the relationship between the sections.
  • the allocation calculation unit 15 further selects the number of workers to be allocated to each section and the workers in consideration of the relationship between the sections held by the storage unit.
  • the work management apparatus 10-2 can select the number of workers to be assigned to each section and the workers based on the strength of correlation between the sections. Therefore, the work management apparatus 10-2 can realize an efficient allocation with an awareness of raising the efficiency of the bottleneck process.
  • the storage unit may further hold information regarding the parallel relationship, the order relationship, and the like of the operations between the sections.
  • the work management system according to the third embodiment is a work management system that considers the remaining work amount in each section.
  • FIG. 17 is a schematic diagram showing a work management system 100-3 according to the third embodiment of the present invention.
  • the difference from the application environment in the first embodiment is that the work management system 100-3 considers the remaining work amount in each section.
  • FIG. 18 is a block diagram showing the configuration of the work management apparatus 10-3 in the third embodiment of the present invention.
  • the work management apparatus 10-3 includes a section information acquisition unit 11, a worker information acquisition unit 12, a work performance information acquisition unit 13, a work evaluation index calculation unit 14-3, an allocation calculation unit 15, and a remaining work amount. And an information acquisition unit 16.
  • the work management device 10-3 is different from the work management device 10 in that it further includes a remaining work amount information acquisition unit 16, and the work evaluation index calculation unit 14-3 further uses the remaining work amount information to calculate a work evaluation index. Is different.
  • the work evaluation index calculation unit 14-3 calculates a work evaluation index for each section based on the work performance information and the remaining work amount information. Here, the work evaluation index calculation unit 14-3 calculates a work evaluation index based on the remaining work amount information in addition to the work time for each section.
  • the remaining work amount information acquisition unit 16 acquires the remaining work amount information for each section.
  • the remaining work amount information is information including at least a work item and the number of work that has not been performed for each work item.
  • FIG. 19 is a flowchart showing the operation of the work management system 10-3 according to the third embodiment of the present invention.
  • the operation of the work management system 10-3 will be described based on the environment example shown in FIG. Note that the processing procedure shown in FIG. 19 is an exemplification, and does not limit the present invention. If the order of processing shown in FIG. 19 is consistent, the processing procedure may be rearranged.
  • the section information acquisition unit 11 acquires section information (step S101).
  • the worker information acquisition unit 12 acquires worker information (step S102).
  • the work record information acquisition unit 13 acquires first work record information (step S103).
  • the remaining work amount information acquisition unit 16 calculates the remaining work amount information for each section (step S106).
  • the remaining work amount information acquisition unit 16 can calculate the remaining work amount information using, for example, warehouse work management information acquired from the warehouse management system 20. More specifically, the remaining work amount information acquisition unit 16 first determines the warehouse name based on the section name and section range information included in the section information, and the floor / line / shelf number information included in the warehouse work management information. Distribute work management information by partition. The remaining work amount information acquisition unit 16 calculates at least the work item and the number of unexecuted work for each work item based on the work information included in the warehouse work management information.
  • FIG. 20 is a table showing an example of warehouse work management information in the third embodiment of the present invention.
  • a “WMS import” operation indicating that the shipping information is registered in the warehouse management system 20 is registered as status information before “start picking”.
  • FIG. 21 is a diagram showing an example of the remaining work amount information in the third embodiment of the present invention.
  • the remaining work amount information includes a section name, a work item, and a remaining work amount.
  • a method for calculating the remaining work amount information will be described in detail.
  • the remaining work amount information acquisition unit 16 classifies floors, lines, and shelves for each section based on the section information and the warehouse work management information. Specifically, the remaining work amount information acquisition unit 16 sets the shelves 3, 4, 5, and 6 as the work sections 5 ⁇ / b> A and the shelves 8, 9, 11, and 12 as the work sections based on the section information shown in FIG. 5. Classify into 5B. Then, the remaining work amount information acquisition unit 16 calculates the sum of the work items and the number of work items in which the work items are not performed for each section. In the third embodiment, the three operations “start picking”, “picking complete”, and “inspection complete” in the warehouse work management information correspond to “picking / inspection”. Then, in FIG. 20, “WMS import” is performed, and a shipping instruction for which “inspection completion” is not performed corresponds to an unexecuted work item. Then, the total number of unexecuted work items is defined as the remaining work amount.
  • the shelves that are not subjected to “inspection completion” among the shelves classified in the work section 5 ⁇ / b> A are the shelves 4 and 6. That is, the number of work items that have not been performed in the work section 5A is six items.
  • the shelves on which “inspection completion” is not performed are the shelves 8 and 12. That is, the number of work items that have not been performed in the work section 5B is 17 items.
  • FIG. 21 shows the number of unexecuted work items for each of the work sections 5A and 5B.
  • the work evaluation index calculation unit 14-3 After acquiring the first work result information and the remaining work amount information, the work evaluation index calculation unit 14-3 performs the first work for each section based on the first work result information and the remaining work amount information. An evaluation index is calculated (step S104-3).
  • FIG. 22 is a diagram illustrating an example of the first work evaluation index.
  • a value obtained by dividing the number of work per unit time (for example, 1 minute) by the remaining work amount is defined as a first work evaluation index.
  • the work evaluation index calculation unit 14-3 can calculate a more appropriate index as the work progress with respect to the remaining work amount. Specifically, when the first work evaluation index in the work sections 5A and 5B is calculated based on the first work performance information shown in FIG. 8 and the remaining work amount information shown in FIG. 64 and 0.33.
  • the assignment calculation unit 15 calculates the assignment between the worker and the section based on the worker information and the first work evaluation index (step S105). Since the operation of the allocation calculation unit 15 is the same as the operation in the first embodiment of the present invention, the description thereof is omitted.
  • the assignment of the work sections 5A and 5B when the number of people is 2 and 5 respectively, the minimum value of the first future index is the largest. More specifically, the first future indicators of the work sections 5A and 5B are 0.43 and 0.41, respectively, and the minimum value is 0.41. This is larger than the index difference in any allocation including the pre-allocation value of 0.31.
  • the work management apparatus 10-3 can allocate workers based on the remaining work amount in addition to the work efficiency of each section by acquiring the remaining work amount information and incorporating it into the work evaluation index. . Therefore, the work management apparatus 10-3 can further improve the work efficiency of the entire work process.
  • the remaining work amount information all unexecuted work registered in the warehouse work management information is targeted, but this is an example and does not limit the present invention.
  • the remaining work amount information for example, only unexecuted work corresponding to a work instruction of the latest fixed number of times that will occur in the future may be targeted.
  • the unexecuted work may be weighted according to the work instruction times.
  • the work management apparatus 10-3 can determine the assignment based on the work amount in the most recent work round. Further, the work management apparatus 10-3 can flexibly determine the assignment even when there is a variation in the work amount for each work instruction by repeatedly calculating the assignment. As a result, the work management apparatus 10-3 can realize more efficient allocation.
  • the fourth embodiment is a work management system that further considers intra-partition correlation in addition to the work management system shown in the second embodiment.
  • the intra-compartment correlation means that the work progress of a certain work affects the work progress of another work in the same section. That is, the work management system according to the fourth embodiment assigns intra-partition work in consideration of correlation between works in the same section in addition to assignment of workers and sections in consideration of inter-partition correlation.
  • the preceding picking method By introducing the preceding picking method, it is possible to proceed with picking / inspection work in its own section regardless of the progress of work in other sections.
  • container storage work occurs in addition to picking / inspection work. This is to enable the picking / inspection work to proceed before arrival of the container.
  • the work of storing items in a container has a correlation between sections. This is because if the container storing work in the own section is delayed, the conveyor cannot be moved, and as a result, the work progress in other sections will be affected.
  • each worker can proceed with the picking / inspection work itself regardless of the work progress in the other sections, and thus does not directly affect the work progress in the other sections.
  • the picking / inspection work for the target item is not completed when the container arrives, the work for storing the item in the container is delayed. That is, the picking / inspection work in the preceding picking method correlates with the work of storing items in containers in the same section.
  • having a correlation with other work in the same section is expressed as “having an intra-section correlation”.
  • FIG. 23 is a schematic diagram showing an application environment example of the work management system in the fourth embodiment of the present invention.
  • the difference between the fourth embodiment and the second embodiment is that a pre-picking method is introduced (not shown) and the configuration and operation of the work management system 10-4 are different between work in the same section. This is a point that takes into account the correlation.
  • FIG. 24 is a block diagram showing a configuration of a work management apparatus according to the fourth embodiment of the present invention.
  • the work management apparatus 10-4 includes a section information acquisition unit 11, a worker information acquisition unit 12-4, a work performance information acquisition unit 13-4, a work evaluation index calculation unit 14-4, and an allocation calculation unit 15-. 4.
  • a section information acquisition unit 11 a worker information acquisition unit 12-4, a work performance information acquisition unit 13-4, a work evaluation index calculation unit 14-4, and an allocation calculation unit 15-. 4.
  • the worker information acquisition unit 12-4 acquires the worker information including the work items of the worker as worker information.
  • the work performance information acquisition unit 13-4 acquires the work performance of the first work, which is a work having a correlation between sections, as the first work performance information, and a work having a correlation with the first work (hereinafter, “ The work result for “second work” is acquired as second work result information.
  • the work evaluation index calculation unit 14-4 calculates a first work evaluation index for each section based on the first work performance information, and calculates a second work evaluation index for each section based on the second work performance information. To calculate.
  • the assignment calculation unit 15-4 calculates the assignment between the worker and each section based on the worker information and the first work evaluation index. Further, the assignment calculating unit 15-4 calculates the assignment between the worker and the first work and the second work in the section based on the first work evaluation index and the second work evaluation index. .
  • FIG. 25 is a flowchart showing the operation of the work management system 10-4 according to the fourth embodiment of the present invention.
  • the operation of the work management system 10-4 will be described based on the environment example shown in FIG. Note that the processing procedure shown in FIG. 25 is an exemplification, and does not limit the present invention. If the order of processing shown in FIG. 25 is consistent, the processing procedure may be rearranged.
  • the section information acquisition unit 11 acquires section information (step S101).
  • the worker information acquisition unit 12-4 acquires worker information (step S102).
  • the worker information includes at least a worker name, a section in charge of the worker, and a work item in charge of the worker.
  • FIG. 26 is a table showing an example of worker information in the fourth embodiment.
  • the work item is information that can identify the work content that the worker is in charge of, and here, two types of work items of “picking / inspection” and “container storage” are defined.
  • the worker information acquisition unit 12-4 acquires the first work result information in parallel with step S102 (step S103-2).
  • the work record acquisition unit 13-4 acquires the second work record information in parallel with step S102 and step S103-2 (step S103-4). At this time, the work record acquisition unit 13-4 acquires the work record for the second work in the section as the work record information. Specifically, the work record acquisition unit 13-4 acquires at least the work item and the number of work performed most recently. In the fourth embodiment, as an example, the work record acquisition unit 13-4 generates work record information based on the warehouse work management information acquired from the warehouse management system 20. In addition, since the specific acquisition method is the same as the acquisition method of the 1st work performance information in 1st to 3rd embodiment, description is abbreviate
  • FIG. 27 is a table showing an example of information regarding the presence or absence of inter-compartment correlation and intra-compartment correlation. Referring to FIG. 27, it is shown that the “picking / inspection” operation has no intra-compartment correlation but has intra-compartment correlation. Further, it is shown that the “container storage” operation is an operation having an inter-compartment correlation and no intra-compartment correlation.
  • FIG. 28 is a table showing an example of the first work record information.
  • the first work that is, the work having the inter-compartment correlation, includes work results for the “container storage” work. Specifically, in the work section 5A, the fact that it took 15 minutes to store 52 items in the container is included as the first work result information. In the work section 5B, the fact that it took 15 minutes to store 86 items in the container is included as the first work performance information.
  • FIG. 29 is a diagram illustrating an example of second work performance information.
  • the second work that is, the work having the intra-compartment correlation, includes work results for the “picking / inspection” work.
  • the fact that it took 15 minutes to pick and inspect 52 items is included as the second work performance information.
  • the second work performance information that it takes 15 minutes to pick and inspect 134 items in the work section 5B.
  • the work evaluation index acquisition unit 14-4 calculates the first work evaluation index based on the first work performance information. (Step S104-2).
  • the work evaluation index acquisition unit 14-4 calculates a second work evaluation index based on the second work performance information after the work performance acquisition unit 13-4 acquires the second work performance information. (Step S104-4).
  • work efficiency can be used as the first work evaluation index and the second work evaluation index.
  • the specific calculation method of the 1st work evaluation index and the 2nd work evaluation index is the same as that of 1st and 2nd embodiment, description is abbreviate
  • FIG. 30 is a table showing a specific example of the first work evaluation index in the fourth embodiment.
  • the first work evaluation indices for the work sections 5A and 5B are calculated using the numerical values shown in FIG. 28, they are 3.47 and 5.73, respectively.
  • FIG. 31 is a diagram showing a specific example of the second work evaluation index in the fourth embodiment.
  • the second work evaluation index of the work section 5A and the work section 5B is calculated using the numerical values shown in FIG. 29, they are 3.47 and 8.93, respectively.
  • the allocation calculation unit 15-4 first adds the worker information and the first information Based on one work evaluation index, an assignment between a worker and a section is calculated (step S105). Specifically, the allocation calculation unit 15-4 calculates the first future index according to the equation (1) using the worker information shown in FIG. 6 and the first work evaluation index shown in FIG. Workers are assigned so that the minimum value of the first future index after assignment is the largest.
  • FIG. 32 is a diagram illustrating an example of a calculation result of the allocation calculation unit 15-4 in the fourth embodiment.
  • an example of allocation calculation by the allocation calculation unit 15-4 will be described in detail with reference to FIG.
  • the work evaluation index of the container storing work in the work section 5A is 3.47.
  • the work evaluation index of picking / inspection work which is work having intra-section correlation in the work section 5A, is also 3.47. That is, in the work section 5A, the picking / inspection work is a bottleneck, and it is possible that the work efficiency of the container storage work is affected. If this is correct, it is assumed that the work evaluation index of the container storage work shows a higher value depending on the work efficiency of the picking / inspection work. Therefore, for convenience, the work evaluation index value for which the influence of intra-compartment correlation can be considered is displayed with an asterisk (*) added to the numerical value.
  • the first future index is 4.62 and 4.30, respectively, and the index difference between the sections Becomes the smallest.
  • the assignment calculating unit 15-4 assigns the worker to the first work and the second work based on the worker information, the first work evaluation index, and the second work evaluation index. Is calculated (step S105-4). Specifically, the assignment calculation unit 15-4 calculates the number of persons assigned to the first work and the second work, the first work evaluation index, and the second work evaluation index, for example. By calculating (1), the second future index is calculated.
  • the second future index is, for example, the work efficiency for the first work and the second work after the reallocation, but is not limited thereto. Then, the assignment calculating unit 15-4 determines the assignment of the number of workers to each work so that the value of the second future index having the smallest value becomes larger.
  • the smallest value among the second future indices corresponds to the first work efficiency after the assignment.
  • a work evaluation index value marked with * in FIG. 32
  • the possibility of actually becoming a higher work evaluation index may be considered.
  • the work evaluation index is corrected by multiplying by a constant coefficient, but this is merely an example and does not limit the present invention.
  • the future evaluation index is corrected to 3.82 by multiplying the work evaluation index 3.47 by 1.1, but this is an example. The present invention is not limited to this.
  • the number of persons allocated to the container storage work is two, and the number of persons allocated to each work of picking / inspection is two.
  • the second future index of the container storing operation is 3.82, and the second future index of the picking / inspection operation is 6.93, so the minimum value is 3.82.
  • the number of people assigned to each agricultural work in the container is 1, and the number of people assigned to the picking / inspection work is 2.
  • the second future index of the container storing operation is 5.73, which is 5.96, so the minimum value is 5.73.
  • the second future index of the work section 5A after the allocation calculation is 3.82
  • the second future index of the work section 5B is 5.73
  • the minimum value is 3.82. This is larger than 3.47 which is the minimum value of the first work evaluation index before allocation.
  • the work efficiency can be improved by applying the fourth embodiment even in an environment having a correlation between more complicated works.
  • the work management apparatus 10-4 can further improve the work efficiency in the entire process by taking into account the reduction in work efficiency due to intra-partition correlation and performing work assignment within the section.
  • the assignment calculation unit 15-4 performs the assignment calculation between the worker and the section, and the assignment calculation between the worker, the first work, and the second work only once. However, it may be repeated.
  • the work management apparatus 10-4 stores, for example, the assignment before calculation, and applies the assignment before calculation when the evaluation by the assignment after calculation falls below the evaluation by the assignment before calculation. May be. As a result, the work management apparatus 10-4 can search for a more efficient assignment, so that the work efficiency of the entire work process can be further improved.
  • the work results for the last 15 minutes are employed as the first work result information and the second work result information, but this is an example and does not limit the present invention.
  • the work management apparatus 10-4 may calculate the work results by performing weighting according to the work instruction times or the work occurrence time. As a result, the work management apparatus 10-4 can calculate a work evaluation index that is closer to the actual situation, thereby realizing more efficient assignment.
  • the work management apparatus 10-4 may further acquire, for example, the remaining work amount for each section and each work item and reflect it in the first work evaluation index and the second work evaluation index.
  • the work management apparatus 10-4 may target only unexecuted work corresponding to a work instruction of the latest fixed number of times that will occur in the future, or calculate the unexecuted work by weighting according to the work instruction time. You may do it. As a result, the work management apparatus 10-4 can perform the assignment in consideration of the amount of remaining work of each section and each work item, and thus the work efficiency in the whole work process can be further improved.
  • the work management apparatus 10-4 may further include a storage unit (not shown) that holds information indicating the relationship of work within a section.
  • the allocation calculation unit 15-4 selects the number of workers to be allocated to each partition and the workers in consideration of the relationship within each partition held by the storage unit.
  • the work management apparatus 10-4 can select the number of workers to be assigned to each section and the workers based on the strength of the correlation of the work in each section. Therefore, the work management apparatus 10-4 can realize efficient allocation in consideration of raising the efficiency of the bottleneck process in the work in the section.
  • the storage unit may hold information indicating the relationship between sections as in the second embodiment.
  • the allocation calculation unit 15-4 selects the number of workers to be allocated to each section and the workers in consideration of not only the relationship of the work in each section but also the relationship between the sections.
  • the work management apparatus 10-4 can select the number of workers to be assigned to each section and the workers even in a complicated environment having a correlation between the work in the section and the work between the sections. .
  • the work management system according to the fifth embodiment is a work management system that assigns workers and sections by changing the sections.
  • FIG. 33 is a schematic diagram showing an application environment example of the work management system according to the fifth embodiment of the present invention.
  • the fifth embodiment is different from the first embodiment in that assignment of workers and sections is performed by changing the sections.
  • FIG. 34 is a block diagram showing a configuration of a work management apparatus 10-5 according to the fifth embodiment of the present invention.
  • the work management apparatus 10-5 includes a section information acquisition unit 11-5, a worker information acquisition unit 12, a work performance information acquisition unit 13, a work evaluation index calculation unit 14, an assignment calculation unit 15-5, And a change unit 17.
  • a section information acquisition unit 11-5 includes a worker information acquisition unit 12, a work performance information acquisition unit 13, a work evaluation index calculation unit 14, an assignment calculation unit 15-5, And a change unit 17.
  • the section information acquisition unit 11-5 divides the work place into a plurality of sections, and acquires section information including at least section range information for each of the divided sections.
  • the section range information means information including at least information indicating the range of the small section for each of the small sections constituting the section.
  • the small section is defined as a further division of the section. In other words, the section is composed of one or a plurality of small sections.
  • the assignment calculation unit 15-5 calculates the assignment between the worker and the section based on the worker information and the first work evaluation index. At this time, the allocation is calculated by changing the section to which the small section belongs.
  • the partition change unit 17 reflects the allocation calculated by the allocation calculation unit 15-5, that is, the change of the partition to which the small partition belongs. Specifically, in addition to being reflected in the section range information acquired by the section information acquiring unit 11-5, the calculated assignment is also reflected at the work site.
  • FIG. 35 is a schematic diagram for explaining the relationship between the sections and the small sections in the fifth embodiment.
  • the work range for the shelf 1 is divided into a work section 5A and a work section 5B.
  • one row of the shelf 1 is defined as a small section.
  • the small sections 5-1, 5-2,..., 5-12 are defined.
  • the work section 5A includes small sections 5-1 to 5-6
  • the work section 5B includes small sections 5-7 to 5-12.
  • FIG. 36 is a flowchart showing the operation of the work management system 100-5 according to the fifth embodiment. Note that the processing procedure shown in FIG. 36 is an exemplification, and does not limit the present invention. In the fifth embodiment, the processing procedure may be rearranged as long as the order of processing shown in FIG. 36 is consistent.
  • the section information acquisition unit 11-5 acquires section information (step S101-5). At this time, the section information acquisition unit 11-5 acquires the small section information as the section range information.
  • FIG. 37 is a diagram showing partition information according to the fifth embodiment.
  • the section name and the section range information are registered as the section information.
  • small block information including a small block name and a small block range is registered as the block range information.
  • the worker information acquisition unit 12 acquires worker information (step S102).
  • the work performance information acquisition unit 13 acquires first work performance information in parallel with step S102 (step S103). Then, the work evaluation index calculation unit 14 calculates a first work evaluation index based on the first work performance information (step S104).
  • the allocation calculating unit 15-5 calculates the allocation of the sections based on the section information, the worker information, and the first work evaluation index (Step S105-5).
  • the allocation calculating unit 15-5 uses, for example, the first work evaluation index as the work efficiency, and is based on the worker information shown in FIG. 6 and the first work evaluation index shown in FIG. The partition allocation is calculated. The operation of the allocation calculation unit 15-5 will be described.
  • the allocation calculation unit 15-5 first sets the first future index for each partition based on the partition information and the first work evaluation index. calculate.
  • the first future index is, for example, an index related to the estimated required time after allocation, but is not limited thereto. Then, with respect to the first future index in each section, the allocation of the small section to each section is determined so that the value of the first future index having the smallest value becomes larger. More specifically, in the fifth embodiment, for example, the first future index is calculated based on the following equation.
  • the allocation calculating unit 15-5 assumes that the amount of work in each small section is constant, and based on the first future index, that is, the estimated required time, the estimated used time of the section serving as a bottleneck.
  • the number of small sections to be allocated is determined according to the work efficiency of each section so as to increase.
  • FIG. 38 is a table showing an example of a calculation result by the allocation calculation unit 15-5 according to the fifth embodiment of the present invention.
  • the allocation calculating unit 15-5 calculates the number of assigned chapter sections to the work section 5A as 5, and sets the number of assigned small sections to the work section 5B as 7. When doing so, the minimum value of the first future index of both sections becomes the largest.
  • small sections 5-1 to 5-6 are allocated to the work section 5A, and small sections 5-7 to 5-12 are allocated to the work section 5B.
  • the allocation calculating unit 15-5 calculates a change instruction to allocate the small section 5-6 closest to the work section 5B among the small sections allocated to the work section 5A to the work section 5B.
  • the section changing unit 17 reflects the assignment based on the calculation result obtained in step S105-5 (step S107). Specifically, the section changing unit 17 reflects the calculated assignment in the work site in addition to reflecting the section range information acquired by the section information acquiring unit 11-5. For example, the section changing unit 17 may change the section assignment information (not shown) referred to by the warehouse management system 20, or may notify the user via a speaker or display provided at the work site.
  • the operation of the partition changing unit 17 is an example, and is not limited to the above-described operation.
  • the work management apparatus 10-5 appropriately changes the range of the section based on the first work evaluation index so that the work amount in each section becomes a more appropriate amount according to the work efficiency in each section. Can be adjusted. Thereby, the work amount of the division used as a bottleneck can be reduced, and the work efficiency in the whole work process can be improved.
  • the allocation calculation unit 15-5 has been described as changing the allocation of a small partition to each partition. Further, as shown in the first to fourth embodiments, The assignment of workers to each section may be further changed. For example, the assignment calculation unit 15-5 may further change the assignment of small sections to each section after determining the assignment of workers to each section. Alternatively, the assignment calculating unit 15-5 may determine the assignment of workers to each section after changing the assignment of the small sections to each section. Therefore, the work management apparatus 10-5 can calculate the assignment between the worker and the section more finely, so that the work efficiency in the whole work process can be improved.
  • the work management system 10-5 may further include a section range notification unit.
  • the section range notifying unit notifies the section changing unit 17 of the section range according to the calculation result.
  • a notification method for example, an incandescent bulb, a fluorescent lamp, an LED (light emitting diode), and a display or the like are installed for each boundary of the small section as a section range notification section, and the light or display of those lighting apparatuses is used. You may alert
  • the display unit of the DPS may include a partition range notification unit and display information in a different color for each partition.
  • reporting part mentioned above is an illustration, and does not limit this invention.
  • FIG. 39 is a schematic diagram illustrating an example of a section range notifying unit according to the fifth embodiment.
  • lighting devices 6-1 to 6-6 each having a section range notification unit are installed at the boundaries of the small sections 5-1 to 5-7, respectively.
  • the section changing unit 17 assigns the small sections 5-1 to 5-3 to one section and assigns the small sections 5-4 to 5-6 to another section, respectively. Notify each section range notifying unit included in 6-6.
  • an illuminating device 6-3 installed at the boundary between the small section 5-3 and the small section 5-4
  • an illuminating device 6-6 installed at the boundary between the small section 5-6 and the small section 5-7.
  • the workers assigned to the respective sections can recognize the change of the section range by a method that can be intuitively understood.
  • the operation in the relay type picking has been described as an example, but the present invention is not limited to this.
  • the shipping operation cannot be performed unless the picking operation in all sections is completed and the products are ready.
  • the work management system according to the present invention the work load in the picking section can be leveled, and the work efficiency in the whole work process can be improved.
  • the work management system according to the present invention is applied to improve the work efficiency of the whole shipping work including the picking to the shipping work. be able to.
  • the present invention can be applied to various areas such as warehouse operations in warehouses, assembly processes in factories, loading and unloading at ports, and supply chain management including truck loading and unloading.
  • a program for realizing all or part of the functions of the work management system in the present invention is recorded on a computer-readable recording medium, and the program recorded on the recording medium is recorded.
  • the processing of each unit may be performed by being read and executed by a computer system.
  • the “computer system” here includes an OS and hardware such as peripheral devices.
  • the “computer-readable recording medium” refers to a portable medium such as a magneto-optical disk, ROM, and nonvolatile semiconductor memory, and a storage device such as a hard disk built in the computer system. Further, the “computer-readable recording medium” is a program that dynamically holds a program for a short time, like a communication line when a program is transmitted via a network such as the Internet or a communication line such as a telephone line. In this case, a volatile memory in a computer system serving as a server or a client in that case, and a program that holds a program for a certain period of time are also included. The program may be for realizing a part of the above-described functions, and may be capable of realizing the above-described functions in combination with a program already recorded in the computer system.
  • a section information acquisition unit that divides a work place into a plurality of sections and acquires section information including at least section range information that is information indicating a section range for each of the sections;
  • a worker information acquisition unit that acquires worker information including at least a correspondence relationship between the worker and the section in charge of the worker;
  • For each section a work performance information acquisition unit that acquires first work performance information that is the latest work performance;
  • a work evaluation index calculation unit that calculates a first work evaluation index for each section based on the first work performance information;
  • a work management apparatus comprising: an assignment calculation unit that calculates an assignment between the worker and the section based on the worker information and the first work evaluation index.
  • Appendix 2 The work management apparatus according to appendix 1, wherein the first work record information is information including a most recent work record for a first work that is a work having a correlation between sections.
  • the allocation calculation unit calculates a first future index that is an evaluation index of the partition with respect to the allocation, and a value of the first future index that takes the smallest value is calculated for the first future index in the partition.
  • the work management apparatus according to appendix 1 or 2, wherein an assignment between the worker and the section is calculated so as to be larger.
  • Appendix 4 The work management apparatus according to any one of appendices 1 to 3, wherein the first work evaluation index is work efficiency.
  • the first work evaluation index is a work progress estimate, The work according to any one of appendices 1 to 3, further comprising a remaining work amount information acquisition unit that acquires remaining work amount information including at least a work item for each section and a remaining work amount for each work item. Management device.
  • the work performance information acquisition unit further acquires the first work performance information for each worker
  • the work evaluation index calculation unit further calculates the first work evaluation index for each worker
  • the allocation calculation unit further calculates the allocation between the worker and the section so that the difference in the sum of the first work evaluation indexes for each section between the sections is minimized.
  • the worker information acquisition unit acquires the worker information further including work item information that is information about work performed by the worker,
  • the work record information acquisition unit further acquires second work record information that is a work record of a second work that is a work having a correlation with the first work in the section,
  • the work evaluation index calculation unit further calculates a second work evaluation index for each section based on the second work performance information,
  • the allocation calculation unit further includes the worker, the first work to the second work in the section, based on the worker information in the first period, the first work evaluation index, and the second work evaluation index.
  • the work management apparatus according to any one of appendices 2 to 6, which calculates an assignment with a work.
  • the allocation calculation unit further calculates a second future index that is an evaluation index of each work for allocation to the first work and the second work in the section, and the first work evaluation index And the first work or the second work in the section so that the value of the work evaluation index that takes the smallest value among the second work evaluation indices becomes larger.
  • the work management apparatus according to appendix 7, which calculates an assignment.
  • the first work evaluation index is a work efficiency for the first work
  • the first work evaluation index is a work progress estimate for the first work
  • the second work evaluation index is a work progress estimate for the second work
  • the work evaluation index calculation unit includes at least a remaining work amount for the first work for each of the sections.
  • the first work evaluation index is further calculated based on the remaining work amount information
  • the second work evaluation is performed based on the second remaining work amount information including at least the remaining work amount for the second work.
  • the work management apparatus according to appendix 7 or 8, further calculating an index.
  • the worker information acquisition unit further acquires position information of the worker
  • the assignment calculation unit further calculates the assignment between the worker and the section so that the total movement time of the worker is minimized in the movement associated with the assignment between the worker and the section.
  • the work management apparatus according to any one of 1 to 10.
  • (Appendix 12) Further comprising a section changing unit that changes a section to which the small section belongs based on the assignment;
  • the section is composed of one to a plurality of small sections,
  • the section information acquisition unit acquires, as information indicating the range of the section, all the small sections constituting the section, and information indicating the range of the small section,
  • the work management device according to any one of appendices 1 to 11, wherein the assignment calculation unit calculates an assignment between the worker and the section by changing a section to which the small section belongs.
  • the remaining work amount information acquisition unit acquires remaining work amount information for each of the small sections, The work management apparatus according to appendix 12, wherein the assignment calculation unit further calculates an assignment between the worker and the section in consideration of a change in a remaining work amount when the section to which the small section belongs is changed.
  • Appendix 14 The work management apparatus according to appendix 12 or 13, further comprising a section range notifying section that notifies a worker of the section range based on the section changing section.
  • a management system that holds information about items handled in the work;
  • a section information acquisition unit that divides a work place into a plurality of sections and acquires section information including at least section range information that is information indicating a section range for each of the sections;
  • a worker information acquisition unit for acquiring worker information including at least a correspondence relationship between the worker and the section in charge of the worker;
  • For each section a work performance information acquisition unit that acquires first work performance information that is the latest work performance based on information about the item;
  • a work evaluation index calculating unit that calculates a first work evaluation index for each of the sections based on the first work performance information;
  • An work management system comprising: an assignment calculation unit that calculates an assignment between the worker and the section based on the worker information and the first work evaluation index.
  • the work management system according to supplementary note 15, wherein the first work record information is information including a most recent work record for a first work that is a work having an inter-compartment correlation.
  • the allocation calculation unit calculates a first future index that is an evaluation index of the partition with respect to the allocation, and a value of the first future index that takes the smallest value is calculated for the first future index in the partition.
  • the work management system according to appendix 15 or 16, wherein an assignment between the worker and the section is calculated so as to be larger.
  • Appendix 18 The work management system according to any one of appendices 15 to 17, wherein the first work evaluation index is work efficiency.
  • the first work evaluation index is a work progress estimate, The work according to any one of appendices 15 to 17, further comprising a remaining work amount information acquisition unit that acquires remaining work amount information including at least a work item for each section and a remaining work amount for each work item. Management system.
  • the work performance information acquisition unit further acquires the first work performance information for each worker,
  • the work evaluation index calculation unit further calculates the first work evaluation index for each worker,
  • the allocation calculation unit further calculates the allocation between the worker and the section so that the difference in the sum of the first work evaluation indexes for each section is the smallest between the sections.
  • the worker information acquisition unit acquires the worker information further including work item information that is information about work performed by the worker,
  • the work record information acquisition unit further acquires second work record information that is a work record of a second work that is a work having a correlation with the first work in the section,
  • the work evaluation index calculation unit further calculates a second work evaluation index for each section based on the second work performance information,
  • the allocation calculation unit further includes the worker, the first work to the second work in the section, based on the worker information in the first period, the first work evaluation index, and the second work evaluation index. 21.
  • the work management system according to any one of appendices 16 to 20, which calculates an assignment with a work.
  • the allocation calculation unit further calculates a second future index that is an evaluation index of each work for allocation to the first work and the second work in the section, and the first work evaluation index And the first work or the second work in the section so that the value of the work evaluation index that takes the smallest value among the second work evaluation indices becomes larger.
  • the work management system according to appendix 21, which calculates an assignment.
  • the first work evaluation index is a work efficiency for the first work
  • the first work evaluation index is a work progress estimate for the first work
  • the second work evaluation index is a work progress estimate for the second work
  • the work evaluation index calculation unit includes at least a remaining work amount for the first work for each of the sections.
  • the first work evaluation index is further calculated based on the remaining work amount information
  • the second work evaluation is performed based on the second remaining work amount information including at least the remaining work amount for the second work.
  • the work management system according to appendix 21 or 22, further calculating an index.
  • the worker information acquisition unit further acquires position information of the worker
  • the assignment calculation unit further calculates the assignment between the worker and the section so that the total movement time of the worker is minimized in the movement associated with the assignment between the worker and the section.
  • the work management system according to any one of 15 to 24.
  • (Appendix 26) Further comprising a section changing unit that changes a section to which the small section belongs based on the assignment;
  • the section is composed of one to a plurality of small sections,
  • the section information acquisition unit acquires, as information indicating the range of the section, all the small sections constituting the section, and information indicating the range of the small section,
  • the work management system according to any one of appendices 15 to 25, wherein the assignment calculation unit calculates an assignment between the worker and the section by changing a section to which the small section belongs.
  • the remaining work amount information acquisition unit acquires remaining work amount information for each of the small sections, 27.
  • Appendix 28 28.
  • (Appendix 29) Dividing the work place into a plurality of sections, for each of the sections, obtaining section information including at least section range information that is information indicating the section range; Obtaining worker information including at least a correspondence relationship between the worker and the section in charge of the worker; For each section, obtain the first work performance information that is the latest work performance, Based on the first work record information, a first work evaluation index is calculated for each section, A work management method for calculating an assignment between the worker and the section based on the worker information and the first work evaluation index.
  • a first future index that is an evaluation index of the partition for the allocation is calculated, and the value of the first future index that takes the smallest value for the first future index in the partition is larger.
  • the first work evaluation index is a work progress estimate, The work management method according to any one of appendices 29 to 32, wherein remaining work amount information including at least a work item for each section and a remaining work amount for each work item is acquired.
  • Appendix 34 Further acquiring the first work performance information for each worker, Further calculating the first work evaluation index for each worker; 35. The assignment according to any one of appendices 29 to 34, wherein an assignment between the worker and the section is calculated so that a difference in the sum of the first work evaluation indices for each section between the sections is minimized. Work management method.
  • (Appendix 35) Obtaining the worker information further including work item information which is information about the work in charge of the worker; Further obtaining second work record information that is a work record of a second work that is a work having a correlation with the first work in the section; Further calculating a second work evaluation index for each of the sections based on the second work performance information, Based on the previous-term worker information, the first work evaluation index, and the second work evaluation index, further allocation of the worker and the first work or the second work in the section is further calculated.
  • the work management method according to any one of supplementary notes 30 to 34.
  • a second future index which is an evaluation index of each work with respect to assignment to the first work and the second work in the section, is calculated, respectively, and the first work evaluation index and the second work evaluation are calculated. Supplement 35. The allocation of the worker and the first work or the second work in the section is calculated so that the value of the work evaluation index that takes the smallest value among the indices is larger. The work management method described in 1.
  • the first work evaluation index is a work efficiency for the first work, 37.
  • the first work evaluation index is a work progress estimate for the first work
  • the second work evaluation index is a work progress estimate for the second work, and for each section, based on first remaining work amount information including at least a remaining work amount for the first work
  • the first work evaluation index is further calculated
  • the second work evaluation index is further calculated based on second remaining work amount information including at least the remaining work amount for the second work.
  • the work management method of 36 is a work progress estimate for the first work
  • the second work evaluation index is a work progress estimate for the second work, and for each section, based on first remaining work amount information including at least a remaining work amount for the first work.
  • the first work evaluation index is further calculated
  • the second work evaluation index is further calculated based on second remaining work amount information including at least the remaining work amount for the second work.
  • the work management method of 36 is a work management method of 36.
  • (Appendix 40) Change the section to which the small section belongs based on the assignment,
  • the section is composed of one to a plurality of small sections, As the information indicating the range of the section, all the small sections constituting the section, and information indicating the range of the small section are obtained, 40.
  • the work management method according to any one of appendices 29 to 39, wherein an assignment between the worker and the section is calculated by changing a section to which the small section belongs.
  • Appendix 41 Obtain the remaining work amount information for each of the small sections, 41.
  • Appendix 42 42.
  • Division information acquisition processing for dividing the work place into a plurality of divisions, and for each of the divisions, obtaining division information including at least division range information that is information indicating the range of the division;
  • Worker information acquisition processing for acquiring worker information including at least a correspondence relationship between a worker and a section in charge of the worker;
  • work result information acquisition processing for acquiring first work result information that is the latest work result;
  • a work evaluation index calculation process for calculating a first work evaluation index for each of the sections based on the first work record information;
  • a work management program for executing an assignment calculation process for calculating an assignment between the worker and the section based on the worker information and the first work evaluation index.
  • (Appendix 44) 44 The work management program according to appendix 43, wherein the first work performance information is information including a most recent work performance for a first work that is a work having an inter-section correlation.
  • Appendix 45 In the computer, A first future index that is an evaluation index of the partition for the allocation is calculated, and the value of the first future index that takes the smallest value for the first future index in the partition is larger. 45.
  • Appendix 46 The work management program according to any one of appendices 43 to 45, wherein the first work evaluation index is work efficiency.
  • the first work evaluation index is a work progress estimate, In the computer, The work according to any one of appendices 43 to 45, wherein a remaining work amount information acquisition process for acquiring remaining work amount information including at least a work item for each section and a remaining work amount for each work item is executed. Management device.
  • Appendix 48 In the computer, Obtaining the first work performance information for each worker; Calculating the first work evaluation index for each worker; Any one of appendices 43 to 47, wherein a process of calculating an assignment between the worker and the section is executed so that a difference in the sum of the first work evaluation indexes for each section between the sections is minimized. Work management program described in one.
  • a second future index which is an evaluation index of each work with respect to assignment to the first work and the second work in the section, is calculated, respectively, and the first work evaluation index and the second work evaluation are calculated.
  • a process of calculating an assignment between the worker and the first work or the second work in the section so that the value of the work evaluation index that takes the smallest value among the indices is larger is executed.
  • the first work evaluation index is a work efficiency for the first work
  • the first work evaluation index is a work progress estimate for the first work
  • the second work evaluation index is a work progress estimate for the second work
  • the first work evaluation index is further calculated based on the first remaining work amount information including at least the remaining work amount for the first work, and the remaining work for the second work is calculated.
  • 51. The work management apparatus according to appendix 49 or 50, wherein a process of further calculating the second work evaluation index is executed based on second remaining work amount information including at least an amount.
  • the worker information acquisition unit further acquires position information of the worker
  • the assignment calculation unit further calculates the assignment between the worker and the section so that the total movement time of the worker is minimized in the movement associated with the assignment between the worker and the section.
  • the work management program according to any one of 43 to 52.
  • the section is composed of one to a plurality of small sections.
  • the assignment calculation unit causes a process of calculating an assignment between the worker and the section by changing a section to which the small section belongs.
  • Appendix 55 In the computer, Obtain the remaining work amount information for each of the small sections, 55.
  • Appendix 56 In the computer, 56.

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Development Economics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

時々刻々と変化する作業効率情報をもとに作業人員を割り当てることで、作業工程全体での作業効率を向上させること。作業管理装置は、作業場所を複数の区画に分割し、区画のそれぞれについて、区画の範囲を指し示す情報である区画範囲情報を少なくとも含む区画情報を取得する区画情報取得部と、作業員と、作業員の担当する区画との対応関係を少なくとも含む作業員情報を取得する作業員情報取得部と、区画ごとに、直近の作業実績である第1の作業実績情報を取得する作業実績情報取得部と、第1の作業実績情報に基づいて、区画ごとに第1の作業評価指標を算出する作業評価指標算出部と、作業員情報、および第1の作業評価指標に基づいて、作業員と区画との割り当てを算出する割当算出部とを備える。

Description

作業管理装置、作業管理システム、作業管理方法、および作業管理プログラム
 本発明は、作業管理装置、作業管理システム、作業管理方法、および作業管理プログラムに関する。
 近年、工場や倉庫といった作業現場のIT化が進んでいる。倉庫を例にとると、例えばWMS(Warehouse Management System:倉庫管理システム)やDPS(Digital Picking System:デジタルピッキングシステム)等の作業支援システムが導入されている。それに加え、倉庫にはコンベヤやロボットアームをはじめとするマテハン(マテリアルハンドラ)、および自動倉庫システム等の作業機械化システムについても導入が進んでいる。これを導入することで、倉庫内における作業ミスの低下や、作業効率の向上といった効果を得ることができる。
 しかしながら、多くの工場・倉庫において、作業における人手の占める割合は大きい。このため、作業効率をより向上させるためには、作業人員の割り当てが重要な要素となる。具体的には、作業区画ごとに作業負荷の偏りが生じたときに、作業全体でみたときの作業効率が低下することが知られている。
 図1は、倉庫での出庫作業におけるピッキング工程の一例を示す模式図である。バラ品等のピッキング工程においては、例えばリレー式ピッキングと呼ばれるピッキング方式が採用されている。リレー式ピッキングとは、コンベヤ3に沿うように棚1を配置し、ひとつの作業ラインを形成するピッキング方式である。
 図1に示すように、リレー式ピッキングを採用する工程においては、例えば作業ラインを作業区画5A、および5Bの2つに分割し、それぞれの作業区画に作業員を割り当てる。具体的には、作業区画5Aには作業員2-1、2-2、および2-3の3人の作業員が配置され、作業区画5Bには作業員2-4、2-5、2-6、および2-7の4人の作業員が配置されている。また、作業区画5A、および5B内のコンベヤ3上には、それぞれ、コンテナ群4a、および4bが配置されている。
 ここで、コンテナ群4a、および4bは、それぞれ出荷先が異なることがある。この場合、WMSは、作業区画5Aに割り当てられた作業員2-1~2-3に対してコンテナ群4a向けのアイテムをピッキングするよう指示し、作業区画5Bに割り当てられた作業員2-4~2-7に対してコンテナ群4b向けのアイテムをピッキングするよう指示する。そして、作業員2-1~2-7は、WMSからの指示にしたがってアイテムのピッキング・検品を行い、コンテナ群4a、および4bに格納する。作業区画5A、および5Bについてすべての作業が終了した後、コンベヤ3が動作する。
 ここで、作業区画5Aが作業区画5Bの上流工程である場合、コンテナ群4aは、作業区画5Aでの作業の終了後、作業区画5Bに移動する。同様に、コンテナ群4bは、作業区画5Bでの作業の終了後、本作業ラインを抜けて、次の作業ライン(下流工程)へと移動する。また、作業区画5Aには、さらに上流工程の作業ライン(例えば、空コンテナ組立工程等)から、新たなコンテナ群が移動してくる。WMSは、上流の工程から新たなコンテナ群が移動してくるたびに、各作業エリアの作業員に対して次の作業を指示する。
 このように、リレー式ピッキングは、ひとつの作業ラインを複数の作業エリアに分割し、出荷先の異なる複数のコンテナ群に対して同時にピッキングを行うので、より効率的にピッキングすることができる。また、リレー式ピッキングは、アイテムを保管する棚からコンテナ群への移動距離が他の方式と比べて短くなるので、作業員がコンテナ群へアイテムを格納する際の移動に起因する作業ロスを低減することができる。さらに、リレーピッキング方式は、作業エリア間の距離が他の方式と比べて短くなるので、コンテナ群の移動距離が短くなり、コンベヤ3の動作時間に起因する作業ロスを低減することができる。
 しかしながら、リレー式ピッキングでは、作業ライン内のすべて作業エリアの作業が完了しないと、それぞれの作業エリアに次の作業指示を出すことができない。このため、リレー式ピッキングには、作業ライン内に1箇所の作業エリアの作業遅延が、作業ライン全体へと波及し、作業効率が低下する問題がある。
 作業効率の低下を避けるために、特定の作業エリアに負荷が偏らないよう、作業負荷を平準化するための取組みが数多く検討されている。
 作業負荷の平準化する方法のひとつとして、例えば棚へ割り付けるアイテムを最適化する手法が知られている。この手法は、アイテムの出庫頻度に基づいて、各作業エリアの作業総数を平準化するように、棚へ割り付けるアイテムを決定する。これにより、特定の作業エリアに作業負荷が著しく偏ることは回避され、作業効率の向上が期待される。
 しかしながら、このような手法は、日次や月次単位での平準化は実現できるが、例えば作業指示単位等の短い時間単位の作業負荷を平準化することができない。また、棚に割り付けるアイテムを変更する作業自体に、多大な工数を割く可能性がある。よって、棚へ割り付けるアイテムを最適化する手法では、作業指示単位の作業負荷を平準化することは困難である。
 作業負荷を平準化する別の手法として、作業エリアに割り当てる作業人員を最適化する手法が知られている。この手法は、作業エリアごとの作業負荷に応じて割り当てる作業人員を適宜変更することで、作業エリアごとの作業進捗を揃えることができる。この手法の場合、最短では作業指示単位で作業エリアに割り当てる作業人員を変更することができる。よって、作業人員割り当てを最適化手法は、よりきめ細かい単位で作業負荷を平準化することができる。
 特許文献1~4は、作業エリアに割り当てる作業人員を最適化するための具体的な手法を開示している。
 特許文献1は、作業者個人別の能力に合わせ、作業対象物、作業形態、および作業対象数に基づいて、一定の条件を満たすように各作業者に作業を割り付ける作業量平準化方法を開示している。
 特許文献2は、作業負荷を平準化させることのできる単位時間ごとの作業計画を出力する作業計画表作成支援装置を開示している。具体的には、特許文献2の作業計画表作成支援装置は、作業人数と作業者一人あたりの処理能力、および作業開始時刻を作業別にパラメータとして入力する。そして、作業の締め切り時刻あるいは最大のべ作業人数を制約条件とし、単位時間あたりの総作業者数が平準化されるようにしたときの作業終了時刻を計算するとともに、当該計算時における作業計画表を出力する。
 特許文献3は、移動時間やグループ単位の作業効率を考慮した生産計画評価装置を開示している。具体的には、特許文献3の生産計画評価装置は、移動時間を含めた作業時間をあらかじめ記憶している。また、1人以上の作業員から構成されるグループについては作業組み合わせを記憶し、グループごとの移動時間を含めた作業時間を記憶している。そして、特許文献3に記載の生産計画評価装置は、作業時間情報に基づいて、単位期間あたりの作業時間を算出する。
 特許文献4は、作業待ち時間が短くなるようにピッキングアイテム数を決定する集品品目数決定手法、および集品品目数決定システムを開示している。具体的には、特許文献4に記載の集品品目数決定手法は、各作業者の作業に要した時間を品目ごとに算出することで、品目ごとの平均作業時間を算出する。そして、特許文献4に記載の集品品目数決定手法は、作業指示ごとの各作業者の総作業時間が等しくなるように作業品目数を作業者ごとに算出する。
特開平3-217967号公報 特開2005-32011号公報 特許第5194708号公報 特開2010-70310号公報
 作業員は人であるので、作業効率は日、および時間に応じて変化すると考えるのが自然である。具体的には、作業効率は、例えば各棚への商品の割り付けの変更、作業員の体調変化、および疲労蓄積等の要因によって時々刻々と変化する。したがって、作業工程全体の作業効率を向上させるためには、作業効率の時々刻々の変化をとらえ、その時々に応じた最適な作業の割り当てを行うことが好ましい。
 しかしながら、特許文献1、および特許文献2は、作業効率に関わる情報について固定的な値を割り付けることで事前計画的に作業割り付けを決定している。また、特許文献3、および特許文献4は、過去の情報に基づいて統計的に得られた値を割りつけることで事前計画的に作業割り付けを決定している。このため、特許文献1~4は、時々刻々の作業効率の変化をとらえ、これに基づき作業割り当てを決定することはできない問題がある。
 本発明の目的は、時々刻々と変化する作業効率情報に基づいて作業人員を割り当てることで、作業工程全体での作業効率を向上させることができる作業管理システム、作業管理装置、作業管理方法、作業管理プログラムを提供することにある。
 本発明の一態様の作業管理装置は、作業場所を複数の区画に分割し、前記区画のそれぞれについて、区画の範囲を指し示す情報である区画範囲情報を少なくとも含む区画情報を取得する区画情報取得部と、作業員と、前記作業員の担当する区画との対応関係を少なくとも含む作業員情報を取得する作業員情報取得部と、前記区画ごとに、直近の作業実績である第1の作業実績情報を取得する作業実績情報取得部と、前記第1の作業実績情報に基づいて、前記区画ごとに第1の作業評価指標を算出する作業評価指標算出部と、前記作業員情報、および前記第1の作業評価指標に基づいて、前記作業員と前記区画との割り当てを算出する割当算出部とを備える。
 本発明の他の態様の作業管理システムは、作業で取り扱うアイテムに関する情報を保持する管理システムと、作業場所を複数の区画に分割し、前記区画のそれぞれについて、区画の範囲を指し示す情報である区画範囲情報を少なくとも含む区画情報を取得する、区画情報取得部と、作業員と、前記作業員の担当する区画との対応関係を少なくとも含む作業員情報を取得する、作業員情報取得部と、前記区画ごとに、直近の作業実績である第1の作業実績情報を、前記アイテムに関する情報に基づいて取得する、作業実績情報取得部と、前記第1の作業実績情報をもとに、前記区画ごとに第1の作業評価指標を算出する、作業評価指標算出部と、前記作業員情報および前記第1の作業評価指標をもとに、前記作業員と前記区画との割り当てを算出する、割当算出部とを備える。
 本発明の他の態様の作業管理方法は、作業場所を複数の区画に分割し、前記区画のそれぞれについて、区画の範囲を指し示す情報である区画範囲情報を少なくとも含む区画情報を取得し、作業員と、前記作業員の担当する区画との対応関係を少なくとも含む作業員情報を取得し、前記区画ごとに、直近の作業実績である第1の作業実績情報を取得すし、前記第1の作業実績情報をもとに、前記区画ごとに第1の作業評価指標を算出し、前記作業員情報および前記第1の作業評価指標をもとに、前記作業員と前記区画との割り当てを算出する。
 本発明の他の態様の作業管理プログラムは、コンピュータに、作業場所を複数の区画に分割し、前記区画のそれぞれについて、区画の範囲を指し示す情報である区画範囲情報を少なくとも含む区画情報を取得する区画情報取得処理と、作業員と、前記作業員の担当する区画との対応関係を少なくとも含む作業員情報を取得する作業員情報取得処理と、前記区画ごとに、直近の作業実績である第1の作業実績情報を取得する作業実績情報取得処理と、前記第1の作業実績情報に基づいて、前記区画ごとに第1の作業評価指標を算出する作業評価指標算出処理と、前記作業員情報、および前記第1の作業評価指標に基づいて、前記作業員と前記区画との割り当てを算出する割当算出処理とを実行させる。
 本発明によれば、時々刻々と変化する作業効率情報に基づいて作業人員を割り当てることで、作業工程全体での作業効率を向上させることができる。
倉庫の出庫作業におけるピッキング工程の一例を示す模式図である。 本発明の第1の実施形態に係る作業管理システムを示す模式図である。 本発明の第1の実施形態に係る作業管理装置の構成を示すブロック図である。 本発明の第1の実施形態に係る作業管理システムの動作を示すフローチャートである。 本発明の第1の実施形態に係る区画情報の一例を示す表である。 本発明の第1の実施形態に係る作業員情報の一例を示す表である。 本発明の第1の実施形態に係る倉庫作業管理情報の一例を示す表である。 本発明の第1の実施形態に係る第1の作業実績情報の一例を示す表である。 本発明の第1の実施形態に係る第1の作業評価指標の一例を示す表である。 本発明の第1の実施形態に係る作業管理装置の算出結果の一例を示す表である。 本発明の第1の実施形態に係る作業管理装置の算出結果の別の一例を示す表である。 本発明の第2の実施形態に係る作業管理システムを示す模式図である。 本発明の第2の実施形態に係る作業管理装置の構成を示すブロック図である。 本発明の第2の実施形態に係る作業管理システムの動作を示すフローチャートである。 本発明の第2の実施形態に係る倉庫作業管理情報の一例を示す表である。 本発明の第2の実施形態に係る作業項目ごとの区画間相関の有無に関する情報の一例を示す表である。 本発明の第3の実施形態に係る作業管理システムを示す模式図である。 本発明の第3の実施形態に係る作業管理装置の構成を示すブロック図である。 本発明の第3の実施形態に係る作業管理システムの動作を示すフローチャートである。 本発明の第3の実施形態に係る倉庫作業管理情報の一例を示す表である。 本発明の第3の実施形態に係る残作業量情報の一例を示す表である。 本発明の第3の実施形態に係る第1の作業評価指標の一例を示す表である。 本発明の第4の実施形態に係る作業管理システムを示す模式図である。 本発明の第4の実施形態に係る作業管理装置の構成を示すブロック図である。 本発明の第4の実施形態に係る作業管理システムの動作を示すフローチャートである。 本発明の第4の実施形態に係る作業員情報の一例を示す表である。 本発明の第4の実施形態に係る区画間相関、および区画内相関の有無に関する情報の一例を示す表である。 本発明の第4の実施形態に係る第1の作業実績情報の一例を示す表である。 本発明の第4の実施形態に係る第2の作業実績情報の一例を示す表である。 本発明の第4の実施形態に係る第1の作業評価指標の具体例を示す表である。 本発明の第4の実施形態に係る第2の作業評価指標の具体例を示す表である。 本発明の第4の実施形態に係る作業管理装置の算出結果の一例を示す図である。 本発明の第5の実施形態に係る作業管理システムを示す模式図である。 本発明の第5の実施形態に係る作業管理装置の構成を示すブロック図である。 本発明の第5の実施形態に係る区画と小区画との関係を説明するための模式図である。 本発明の第5の実施形態に係る作業管理システムの動作を示すフローチャートである。 本発明の第5の実施形態に係る区画情報を示す表である。 本発明の第5の実施形態に係る作業管理装置の算出結果の一例を示す表である。 本発明の第5の実施形態に係る区画境界報知部の一例を示す模式図である。
 以下、図面を参照しながら、本発明の実施形態について詳細に説明する。なお、繰り返し説明することによる煩雑さを避けるため、各図において同一、または相当する部分には同一の符号を付して適宜説明は省略する。
[第1の実施形態]
 以下、本発明の第1の実施形態に係る作業管理システムの構成および動作について説明する。具体的には、まず倉庫内の人員配置に適用した場合の構成および動作について説明する。
 図2は、本発明の第1の実施形態に係る作業管理システムを適用する環境例を示す模式図である。なお、以下では、倉庫の出庫作業におけるピッキング工程を例にして本発明の構成、および動作について説明するが、これは例示であり、本発明を限定するものではない。
 第1の実施形態に係る作業管理システム100は、作用管理装置10と、倉庫管理システム20とを備える。
 作業管理装置10は、倉庫管理システム20から情報を取得する。また、作業管理装置10は、倉庫管理システム20から取得した情報に基づいて、各作業員への作業の割当を算出するとともに算出結果を作業管理者2aに伝達する。ここで、伝達方法は、特に限定しないが、例えばディスプレイに表示したり、紙等へ指示を印刷したりしてもよいし、音声で伝えてもよい。この場合、作業管理者2aは、作業管理装置10の算出結果にしたがって、作業員2-1~2-7に対してそれぞれ作業割当を指示する。
 倉庫管理システム20は、倉庫内で取り扱うアイテムの状態管理、入出庫管理、在庫管理、および作業支援機能等を作業管理装置10に提供する。また、倉庫管理システム20は、例えば出庫指示を受けた各出庫指示アイテムについて、アイテム種別、アイテム数、格納先情報、およびピッキング等の作業状態情報等を倉庫管理情報として少なくとも保持する。ここで、格納先情報とは、例えば当該アイテムの格納先である棚やエリアを一意に決定付ける情報である。さらに、倉庫管理システム20は、出庫アイテムの追加や、作業状態情報の変更(例えば、ピッキング完了、検品完了等)が発生した場合には、倉庫作業管理情報を適宜追加あるいは更新する。なお、これらの機能は、倉庫管理システム20において一般的な機能であるため、詳細説明は省略する。
 次に、図3を参照して、作業管理システム10の構成、および動作について説明する。図3は、作業管理装置10の構成を示すブロック図である。
 作業管理装置10は、区画情報取得部11、作業員情報取得部12、作業実績情報取得部13、作業評価指標算出部14、および割当算出部15を少なくとも備える。
 区画情報取得部11は、複数の区画に分割された作業場所において、それぞれの区画の範囲を示す情報である区画範囲情報を少なくとも含む区画情報を倉庫管理システム20から取得する。ここで、区画範囲情報とは、区画の空間上の位置範囲を一意に定める情報である。具体的には、第1の実施形態において、区画範囲情報は、例えば1または複数の格納先情報である。なお、工場等におけるライン作業であれば、区画範囲情報は。例えば1または複数の工程を一意に指し示す情報(例えば、工程番号等)に相当する。
 作業員情報取得部12は、作業員と、その作業員の担当区画との対応関係を少なくとも含む作業員情報を取得する。作業員の担当区画を取得する方法は、特に限定しないが、例えば各作業員が当該区画での作業開始時、および終了時に作業員情報を登録するRFID(Radio Frequency Identifier)システムを用いることで定期的に各作業員の位置情報を取得することができる。また、例えば作業管理者が、目視で作業員と担当区画との対応関係を確認し、作業管理装置10に手動で入力するようにしてもよい。
 作業実績情報取得部13は、区画ごとの作業実績である第1の作業実績情報を取得する。第1の実施形態において、第1の作業実績情報は、例えば直近に実施された作業項目、および作業数を少なくとも含む情報である。ここで、第1の作業実績情報の取得方法の一例について以下に説明する。まず、作業実績情報取得部13は、倉庫管理システム20から倉庫作業管理情報を取得する。次に、作業実績情報取得部13は、区画情報に含まれる区画範囲情報、および倉庫作業管理情報に含まれる格納先情報に基づいて、倉庫作業管理情報を区画ごとに振り分ける。そして、作業実績情報取得部13は、区画ごと・出庫指示アイテムごとに、倉庫作業管理情報に含まれる作業状態情報の変更状況に基づいて、直近に実施された作業項目、および作業数を少なくとも算出する。
 作業評価指標算出部14は、作業員情報、および第1の作業実績情報に基づいて第1の作業評価指標を区画ごとに算出する。ここで、第1の作業評価指標とは、例えば区画ごとの作業能率を示す情報を意味する。より具体的には、一定時間内にどの程度の作業量を実施できたかを示す情報である。
 割当算出部15は、作業員情報、および第1の作業評価指標に基づいて、作業員と各区画との割り当てを算出する。
 次に、図4を参照して、本発明の第1の実施形態に係る作業管理システム10の動作について詳細に説明する。図4は、本発明の第1の実施形態に係る作業管理システム10の動作を示すフローチャートである。なお、図4に示した処理手順は、例示であり、本発明を限定するものではない。具体的には、図4に示した処理の前後関係について整合がとれていれば、処理手順を組み替えてもよい。
 まず、区画情報取得部11は、区画情報を取得する(ステップS101)。ここで、図5を参照して、第1の実施形態に係る区画情報について説明する。図5は、区画情報取得部11が取得する区画情報の一例を示す表である。第1の実施形態において、倉庫管理システム20には、例えば「区画名」と「区画範囲」とが区画情報として登録されている。ここで、「区画名」とは、各区画を一意に識別可能な情報を意味しており、例えば各区画に応じて名付けられた「5A」、および「5B」等である。「区画範囲」とは、各区画名の指し示す範囲を一意に識別可能な情報を意味しており、例えば作業階(「5階」に相当)、作業ライン識別名(「バラ品第1ライン」に相当)、および棚番号(「棚1-6」および「棚7-12」に相当)等である。
 次に、作業員情報取得部12は、区画情報取得部11が取得した区画情報に基づいて、作業員情報を取得する(ステップS102)。ここで、図6を参照して、第1の実施形態に係る作業員情報について説明する。図6は、第1の実施形態において取得された作業員情報の一例を示した図である。具体的には、RFIDシステム等には、例えば「作業員名」、および「担当区画」が作業員情報として登録されている。ここで、「作業員名」は、各作業員を識別するための情報の一例である。そのため、「作業員名」として、例えば「社員番号」等を用いてもよい。また、「担当区画」は、当該作業者が担当する区画を指し示す情報であり、第1の実施形態においては、区画情報の「区画名」と合致する名称を用いている。具体的には、図6は、例えば作業員「AAA」が作業区画「5A」を担当することを示している。上述のように、作業員情報取得部12は、作業員情報を用いることで、情報取得時点における、作業員名と担当区画との割り当て情報を取得できる。
 次に、作業実績情報取得部13は、区画情報取得部11が取得した区画情報に基づいて、区画ごとに第1の作業実績情報を取得する(ステップS103)。第1の実施形態では、作業実績情報取得部13は、例えば倉庫管理システム20から取得した倉庫作業管理情報に基づいて第1の作業実績情報を生成する。ここで、図7を参照して、倉庫作業管理情報について説明する。図7は、第1の実施形態における、倉庫作業管理情報の一例を示す表である。第1の実施形態において、倉庫作業管理情報とは、例えば出荷番号、作業が発生する階・ライン・棚番号、アイテム数、作業内容、および当該作業の発生時刻等を意味する情報である。図7を参照して具体的に説明すると、例えば「出荷番号0011」に関して、「5階」の「ライン1」に設置されている棚「3」のアイテム「5」個について、「3/21 10:00:01」に、ピッキングが開始されたことを示している。
 次に、図8を参照して、第1の作業情報について説明する。図8は、第1の実施形態に係る第1の作業実績情報の一例を示す表である。ここで、第1の作業実績情報とは、例えば「区画名」、「作業項目」、「作業量」、および「作業所要時間」等を示す情報である
 「区画名」とは、各区画を一意に識別することのできる情報を意味しており、区画情報における「区画名」と合致する名称を用いている。「作業項目」とは、作業内容を識別できる情報を意味しており、「ピッキング・検品」の1種類の作業が定義されている。なお、第1の実施形態においては「ピッキング開始」から「ピッキング完了」を経て「検品完了」となる各作業の流れを、「ピッキング・検品」の1種類の作業とし定義している。しかしながら、これは例示であり、ピッキングと検品をまとめて1種類の作業としないで、それぞれ個別の作業として定義してもよい。
 「作業量」、および「作業所要時間」は、それぞれ、直近に実施された各作業項目の作業数、および当該作業の所要時間を示す情報である。ここで、作業実績情報取得部13は、作業数、および作業の所要時間を、例えば倉庫管理システム20が保持する倉庫作業管理情報から取得してもよい。
 ここで、作業実績情報取得部13が第1の作業実績情報の算出する方法の一例について、図7に示した倉庫作業管理情報を例に説明する。
 第1の作業実績情報を算出するために、作業実績情報取得部13は、まず、「階」、「ライン」、および「棚」の情報にしたがって、倉庫作業管理情報を区画ごとに分類する。具体的に説明すると、作業実績情報取得部13は、図5、および図7に示したように、棚3、および5を作業区画5Aに分類し、棚9、および11を作業区画5Bに分類する。
 次に、作業実績情報取得部13は、図7に示されたアイテム数の総和を区画ごとに算出する。第1の実施形態において、アイテム数の総和を「作業量」と定義する。ただし、図8に示すように、第1の実施形態において作業項目は「ピッキング・検品」なので、同一出荷番号に対するピッキング・検品作業については重複するアイテムを含めないようにする。この場合、図8に示すように、作業区画5Aの作業量は9アイテム、作業区画5Bの作業量は10アイテムである。
 また、作業実績情報取得部13は、区画ごとの作業所要時間、および出荷番号ごとの作業所要時間を算出する。ここで、所業所要時間とは、第1の実施形態において、例えば同一区画に対する最初のピッキング開始から、検品完了するまでの時間を意味している。具体的には、図8に示すように、図7に示す出荷アイテム状態情報に基づいて「作業所要時間」を算出すると、作業区画5A、および5Bに対応する作業所要時間はそれぞれ、2分21秒、および1分48秒である。
 次に、作業評価指標算出部14は、第1の作業実績情報に基づいて第1の作業評価指標を区画ごとに算出する(ステップS104)。ここで、図9を参照して、第1の作業評価指標について説明する。図9は、第1の実施形態における、第1の作業評価指標の一例を示す表である。第1の実施形態において、作業評価指標とは、例えば作業能率、言い換えれば単位時間(例えば、1分とする)あたりの作業数のことを意味している。この場合、作業評価指標算出部14は、図8に示した第1の作業実績情報に基づいて、作業区画5A、および作業区画5Bの第1の作業評価指標を算出することができる。具体的には、作業区画5A、および作業区画5Bの第1の作業評価指標は、それぞれ3.83、および5.56である。
 最後に、割当算出部15は、ステップS102、およびステップS104において取得された作業員情報、および作業評価指標に基づいて作業員と区画との割り当てを算出する(ステップS105)。第1の実施形態における作業員と区画との割り当て方法は、作業管理者2aが、例えば割当算出部15が区画ごとに算出した推奨作業員数に基づいて各作業員へ移動を指示する。
 ここで、第1の実施形態において、作業員の割り当てを算出する具体的な方法の一例について説明する。割当算出部15は、作業員情報、および第1の作業評価指標に基づいて再割り当てに対する各区画の評価指標を示す第1の将来指標を算出する。ここで、第1の将来指標とは、特に限定しないが、例えば割り当て後の推定作業能率に関する指標である。より具体的には、割当算出部15は、以下の式(1)を用いて第1の将来指標を算出する。なお、各区画の第1の作業評価指標は割当人数に比例すると仮定する。
 (第1の将来指標)=(第1の作業評価指標)÷(割り当て前の作業者数)×(割り当て後の作業者数) ・・・式(1)
 割当算出部15は、第1の将来指標を区画ごとに算出し、第1の将来指標が最も小さい区画の値を極力大きくするように作業員を割り当てる。
 ここで、図6に示された作業員情報、および図9に示された第1の作業評価指標の値を用いて第1の将来指標を具体的に説明する。
 図6を参照すると、作業区画5Aには、作業員「AAA」、「BBB」、および「CCC」の3人が割り当てられていることが示されている。一方、作業区画5Bには作業員「DDD」、「EEE」、「FFF」、および「GGG」の4人が割り当てられている。図9には、図6に示すように作業員が割り当てられた時の作業評価指標が示されている。具体的には、作業区画5Aの作業評価指標は3.83であり、作業区画5Bの作業評価指標は5.56である。
 図6、および図9に示す例の場合、作業区画5Aに作業員を4人割り当てて、作業区画5Bに作業員を3人割り当てた時に、作業区画5A、および5Bの内、小さい方の第1の将来指標が最も大きくなる。より詳細には、作業区画5A、および5Bの第1の将来指標は、それぞれ5.10、および4.17となるので最小の値は作業区画5Bの4.17である。これは、割り当て前の最小の値3.83よりも大きく、またいずれの割り当てにおける最小の値よりも大きくなる。
 図10は、第1の実施形態における、割当算出部15の算出結果の一例を示す表である。上述したように、割り当て前の作業区画5A、および5Bの作業員の人数は、それぞれ、3人、および4人である。それに対し、割り当て後の作業区画5A、および5Bの作業員の人数は、それぞれ、4人および3人となる。つまり、割当算出部15は、作業区画5Aの作業員を1人増員し、作業区画5Bの作業員を1人減員するような割り当てを算出したことになる。
 以上、本発明の第1の実施形態に係る作業管理システム100は、作業状況が時々刻々と変化する環境においても、作業工程全体での作業効率を向上させることができる。具体的には、作業管理システム100は、第1の作業実績情報として直近に実施された作業項目・作業数情報を用いることで、時々刻々と変化する作業状況を反映することができる。また、作業管理システム100は、区画間で第1の作業評価指標に基づき作業員と区画とを割り当てることで、ボトルネック工程の効率を引き上げることができ、結果として作業工程全体の効率を向上させることができる。
 以上より、作業管理システム100は、例えば作業員が体調悪化等により特定工程の作業効率が低下したとしても、直近の作業効率を第1の作業評価指標に含むことができるので、作業工程全体の効率を向上させることができる。なお、作業実績情報として、第1の実施形態は、最も直近の作業指示に対する作業実績のみを対象としていたが、これに限定されない。例えば、作業実績情報は、直近から数えて一定回の作業指示に対する作業実績であってもよいし、直近一定時間内での作業実績であってもよい。また、作業指示回あるいは作業発生時間に基づき重みづけを行って第1の作業評価指標を算出するようにしてもよい。これにより、作業管理システム100は、短時間計測に起因するぶれを抑制し、より実情に近い作業評価指標を算出することができるので、より効率的な割り当てを実現できる。
 なお、第1の実施形態において、割当算出部15は、各区画に割り当てる作業員数を算出したが、移動対象となる作業員を各作業員の中から選出してもよい。
 図11は、第1の実施形態における割当算出部15の算出結果の別の一例を示した図である。図11は、割当算出部15が移動対象となる作業員「DDD」を選出したことを示している。割当算出部15が移動対象となる作業員を選出することで、作業管理者2aは、移動対象となる作業員を決定する必要がなくなるので、作業管理者2aの負担は低減される。また、割当算出部15の算出結果が作業員への具体的な指示となるので、作業管理装置10は、作業員へ直接指示することができるようになり、さらなる省力化が期待できる。
 ここで、移動対象となる作業員を選出する方法の一例について説明する。割当算出部15は、作業員を選出するために、まず区画間の移動に要する時間である区画間移動時間情報を取得する。そして、割当算出部15は、区画間移動時間情報に基づいて、例えば移動時間が最も短い区画に所属する作業員を移動対象として選出する。これにより、作業管理装置10は、さらに効率的に作業員を区画に割り当てることができる。一般的に倉庫や工場等において、作業員は、移動中には何ら作業を行うことができないので、移動時間が長くなると作業効率の低下につながる。そこで、上述のように移動時間がより短くなるように作業員を決定することで、移動に伴う作業効率の低下を抑制することができる。
 また、割当算出部15は、各作業員の位置情報に基づいて、移動時間が最も短い作業員を移動対象として選出してもよい。この場合、各作業員の位置情報は、作業員情報取得部12が取得することができる。これにより、作業管理装置10は、さらに効率的に作業員を区画に割り当てることができる。ここで、作業員単位で位置情報を取得することで、移動に伴う作業効率の低下をさらに抑制することができる。
 移動対象となる作業員のさらに別の算出方法として、割当算出部15はさらに、作業評価指標の差が最も小さくなるような作業員を移動対象として算出するようにしてもよい。この場合、作業員ごとの作業評価指標は、作業評価指標算出部14が作業員ごとの作業実績情報に基づいて算出することができる。なお、作業員ごとの作業実績情報は、作業実績情報取得部13が取得することができる。これにより、作業管理装置10は、作業員ごとの作業効率の差を考慮して移動対象となる作業員を決定できるので、作業工程全体での作業効率をさらに向上させることができる。
[第2の実施形態]
 次に、本発明の第2の実施形態に係る作業管理システムの構成および動作について説明する。具体的には後述するが、第2の実施形態は、作業項目ごとの区画間相関の有無を考慮した作業管理システムである。
 なお、第2の実施形態において、区画間相関とは、各区画での作業進捗が、他区画での作業進捗に影響を及ぼすことを意味する。具体的には、例えば第1の実施形態で示したピッキング・検品作業は、ライン中の全区画で作業指示が完了しないと、次の作業指示を受けることができない。このため、ピッキング・検品作業は、区画間相関のある作業となる。また、補充作業は、他区画の進捗と関係なく作業を進めることができる。よって、この場合、補充作業は、区画間相関のない作業となる。
 図12を参照して第2の実施形態について詳細に説明する。図12は、本発明の第2の実施形態に係る作業管理システム100-2の適用環境例を示す模式図である。第1の実施形態に係る作業管理システム100との差異は、作業管理装置10-2は、作業項目ごとの区画間相関の有無を考慮している点である。
 次に、図13を参照して、作業管理装置10-2の構成について説明する。図13は、作業管理装置10-2の構成を示すブロック図である。
 作業管理装置10-2は、区画情報取得部11と、作業員情報取得部12と、作業実績情報取得部13-2と、作業評価指標算出部14と、割当算出部15とを備える。作業管理装置10-2は、作業管理装置10とは、作業実績情報取得部13-2が、第1の作業実績情報として区画間相関を有する作業(以下、「第1の作業」と呼ぶ)についての作業実績のみを取得する点で異なっている。
 作業実績情報取得部13-2は、第1の作業実績情報を区画ごとに取得する。第2の実施形態において、第1の作業実績情報は、例えば区画間相関を有する作業について、直近に実施された作業項目、および作業数を少なくとも含む情報である。
 次に、図14を参照して、作業管理装置10-2の動作について詳細に説明する。図14は、作業管理装置10-2の動作を示すフローチャートである。なお、図14に示した処理手順は、例示であり、本発明を限定するものでない。図14に示した処理の前後関係について整合がとれていれば、処理手順を組み替えてもよい。
 まず、区画情報取得部11は、区画情報を取得(ステップS101)する。次に、作業員情報取得部12は、作業員情報を取得(ステップS102)する。
 このとき、作業実績取得部13-2は、ステップS102とは並行に、作業実績情報を区画ごとに取得する(ステップS103-2)。ここで、作業実績取得部13-2は、作業実績情報として、区画内で実施された第1の作業についての作業実績を取得する。より具体的には、作業実績取得部13-2は、直近に実施された作業項目、および作業数を少なくとも取得する。また、第2の実施形態では一例として、作業実績取得部13-2は、倉庫管理システム20から取得した倉庫作業管理情報に基づいて作業実績情報を生成する。
 図15は、本発明の第2の実施形態における、倉庫作業管理情報の一例を示した表である。倉庫作業管理情報は、上述したように、出荷番号、作業発生する階・ライン・棚番号、アイテム数、作業、および当該作業の発生時刻等を含む情報である。
 次に、図16を参照して、区画間相関について説明する。図16は、本発明の第2の実施形態における、作業項目ごとの区画間相関の有無に関する情報の一例を示す表である。
 図16に示すように、「ピッキング・検品」作業については、区画間相関が「有」と記録されている。一方、「棚入れ」については、区画間相関が「無」と記録されている。なお、区画間相関の有無に関する情報として、対象となる区画に関する情報がさらに追加されてもよい。
 次に、第2の実施形態における第1の作業実績情報の取得方法の一例について、図15、および図16に示した各情報を例に説明する。
 まず、作業実績取得部13-2は、作業項目情報のうち、区画間相関を有する作業項目のみを抽出する。図15に示すように、作業項目には「ピッキング開始」、「ピッキング完了」、「検品完了」、および「棚入れ完了」の4種類の作業が存在する。ここで、「ピッキング開始」から「ピッキング完了」を経て「検品完了」となる各作業の流れを、「ピッキング・検品」作業と定義する。他方、「棚入れ完了」は、「棚入れ」作業と定義する。
 まず、図16に示すように、「ピッキング・検品」作業、すなわち、「ピッキング開始」「ピッキング完了」「検品完了」の各作業は区画間相関を有する。よって、作業実績取得部13-2は、これらの情報を抽出する。他方、「棚入れ」作業、すなわち「棚入れ完了」の作業は区画間相関をもたない。このため、作業実績取得部13-2は、「棚入れ」作業に関する情報は抽出しない。
 なお、作業管理装置10-2は、作業実績取得部13-2が抽出した情報に基づいて、第1の実施形態の作業管理装置10と同様の処理を実施するので、これ以降の動作の説明を省略する。
 第2の実施形態によれば、作業管理装置10-2は、作業項目ごとの区画間相関に基づくことで作業員の効率的な割り当てを実現できる。なお、区画間相関を有する作業は、他区画での作業進行にも影響を及ぼすため、ボトルネック工程の効率引き上げを意識した割り当てが望ましい。他方、区画間相関を有しない作業は、他区画での作業進行の影響を受けないため、空き時間を活用して作業してもよい。よって、作業管理装置10-2は、区画間相関を有する作業のみを対象として第1の作業実績情報を取得することで、区画間相関をもたない作業実績の影響を排除し、より正確にボトルネック工程の効率を引き合が得ることができる。
 上述したように、第2の実施形態に係る作業における区画間相関は、各区画の作業を同時に終了することが好ましいため、並列関係にあるといえる。そのため、作業管理装置10-2は、区画間の関係性を示す情報を保持する記憶部(図示しない)をさらに備えていてもよい。この場合、割当算出部15は、記憶部が保持する各区間の関係性をさらに考慮して、それぞれの区画に割り当てる作業員数、および作業員を選出する。
 これにより、作業管理装置10-2は、各区画間の作業の相関の強弱に基づいてそれぞれの区画に割り当てる作業員数、および作業員を選出することができる。そのため、作業管理装置10-2は、ボトルネック工程の効率引き上げを意識した効率的な割り当てを実現することができる。なお、記憶部は、各区画間の作業の並列関係、および順序関係等に関する情報をさらに保持していてもよい。
[第3の実施形態]
 次に、本発明の第3の実施形態に係る作業管理システムの構成および動作について説明する。第3の実施形態の作業管理システムは、各区画における残作業量を考慮した作業管理システムである。
 図17を参照して第3の実施形態について説明する。図17は、本発明の第3の実施形態に係る作業管理システム100-3を示す模式図である。第1の実施形態における適用環境との違いは、作業管理システム100-3は、各区画における残作業量を考慮している点である。
 図18を参照して、作業管理装置10-3の構成について説明する。図18は、本発明の第3の実施形態における作業管理装置10-3の構成を示すブロック図である。
 作業管理装置10-3は、区画情報取得部11と、作業員情報取得部12と、作業実績情報取得部13と、作業評価指標算出部14-3と、割当算出部15と、残作業量情報取得部16とを備える。作業管理装置10-3は、作業管理装置10とは、残作業量情報取得部16をさらに備える点、および作業評価指標算出部14-3が残作業量情報をさらに用いて作業評価指標を算出する点で異なっている。
 作業評価指標算出部14-3は、作業実績情報、および残作業量情報に基づいて、作業評価指標を区画ごとに算出する。ここで、作業評価指標算出部14-3は、区画ごとの作業所用時間に加え、さらに残作業量情報に基づいて作業評価指標を算出する。
 残作業量情報取得部16は、残作業量情報を区画ごとに取得する。ここで、残作業量情報とは、作業項目と、および各作業項目について未実施となっている作業数とを少なくとも含む情報である。
 次に、図19を参照して、本発明の第3の実施形態に係る作業管理システム10-3の動作について詳細に説明する。図19は、本発明の第3の実施形態に係る作業管理システム10-3の動作を示すフローチャートである。以下では、図17に示した環境例をもとに、作業管理システム10-3の動作について説明する。なお、図19に示した処理手順は、例示であり、本発明を限定するものではない。図19に示した処理の前後関係について整合がとれていれば、処理手順を組み替えてもよい。
 まず、区画情報取得部11は、区画情報を取得する(ステップS101)。
 次に、作業員情報取得部12は作業員情報を取得(ステップS102)する。また、ステップS102とは並行して、作業実績情報取得部13は、第1の作業実績情報を取得する(ステップS103)。さらに、ステップS102、およびステップS103と並行に、残作業量情報取得部16は、残作業量情報を区画ごとに算出する(ステップS106)。
 ここで、残作業量情報を算出する方法ついて説明する。第3の実施形態において、残作業量情報取得部16は、例えば倉庫管理システム20から取得した倉庫作業管理情報を用いて残作業量情報を算出することができる。より具体的には、残作業量情報取得部16は、まず区画情報に含まれる区画名、および区画範囲情報と、倉庫作業管理情報に含まれる階・ライン・棚番号の情報に基づいて、倉庫作業管理情報を区画ごとに振り分ける。そして、残作業量情報取得部16は、倉庫作業管理情報に含まれる作業情報に基づいて、作業項目、および作業項目ごとに未実施となっている作業数を区画ごとに、少なくとも算出する。
 図20は、本発明の第3の実施形態における倉庫作業管理情報の一例を示す表である。第3の実施形態においては、図20に示すように「ピッキング開始」の前に、当該出荷情報が倉庫管理システム20に登録されたことを示す「WMSインポート」作業が状態情報として登録される。
 図21は、本発明の第3の実施形態における残作業量情報の一例を示した図である。第3の実施形態において、残作業量情報は、区画名、作業項目、および残作業量を含む。ここで、残作業量情報の算出方法の一例について、詳細に説明する。
 まず、残作業量情報取得部16は、区画情報、および倉庫作業管理情報に基づいて、階・ライン・棚を区画ごとに分類する。具体的には、残作業量情報取得部16は、図5に示す区画情報に基づいて、棚3、4、5、および6を作業区画5A、棚8、9、11、および12を作業区画5Bに分類する。そして、残作業量情報取得部16は、作業項目と当該作業項目が未実施となっている作業アイテム数の総和を区画ごとに算出する。第3の実施形態においては、倉庫作業管理情報における「ピッキング開始」「ピッキング完了」「検品完了」の3作業が「ピッキング・検品」に対応する。すると、図20において、「WMSインポート」が実施され、「検品完了」が実施されていない出荷指示が、未実施の作業アイテムに相当する。そして、未実施の作業アイテム数の総和を残作業量と定義する。
 図20に示す倉庫作業管理情報の場合、作業区画5Aに分類された棚の内、「検品完了」が実施されていない棚は、棚4、および6である。すなわち、作業区画5Aにおいて未実施の作業アイテム数は6アイテムである。一方、作業区画5Bに分類された棚の内、「検品完了」が実施されていない棚は、棚8、および12である。すなわち、作業区画5Bにおいて未実施の作業アイテム数は17アイテムである。図21は、作業区画5A、および5Bのそれぞれの未実施の作業アイテム数を示している。
 第1の作業実績情報、および残作業量情報を取得した後に、作業評価指標算出部14-3は、第1の作業実績情報、および残作業量情報に基づいて、区画ごとに第1の作業評価指標を算出する(ステップS104-3)。
 図22を参照して、第3の実施形態における第1の作業評価指標について説明する。図22は、第1の作業評価指標の一例を示した図である。第3の実施形態は、例えば単位時間(例えば1分)あたりの作業数を残作業量で除した値を、第1の作業評価指標と定義する。これにより、作業評価指標算出部14-3は、残作業量に対する作業進捗として、より適切な指標を算出できる。具体的に、作業区画5A、および5Bにおける第1の作業評価指標は、図8に示した第1の作業実績情報、および図21に示した残作業量情報に基づいて算出すると、それぞれ0.64、および0.33となる。
 そして、割当算出部15は、作業員情報、および第1の作業評価指標に基づいて、作業員と区画との割り当てを算出する(ステップS105)。割り当て算出部15の動作は、本発明の第1の実施形態における動作と同様なので説明は省略する。
 なお、第3の実施形態において、図6に示した作業員情報、および図22に示した第1の作業評価指標に基づいて第1の将来指標を算出すると、作業区画5A、および5Bの割り当て人数をそれぞれ2人、5人としたときに、第1の将来指標の最小値が最も大きくなる。より詳細には、作業区画5Aおよび5Bの第1の将来指標は、それぞれ0.43、0.41となり、最小値は0.41となる。これは、割り当て前の値0.31をはじめ、いずれの割り当てにおける指標差よりも大きくなる。
 第3の実施形態によれば、各区画における残作業量の多寡を考慮した割り当てが可能となる。単位時間当たりの作業量が多い区画であっても、作業量そのものが多い場合には工程上のボトルネックとなる可能性がある。そこで、作業管理装置10-3は、残作業量情報を取得し、かつ作業評価指標に織り込むことにより、各区画の作業効率に加え、残作業量の多寡に基づいて作業員を割り当てることができる。よって、作業管理装置10-3は、作業工程全体の作業効率をより向上させることができる。
 なお、第3の実施形態において、残作業量情報として、倉庫作業管理情報に登録済みのすべての未実施作業を対象としていたが、これは例示であり、本発明を限定するものではない。具体的には、残作業量情報として、例えば今後発生する直近一定回の作業指示に対応する未実施作業のみを対象としてもよい。またさらに、残作業量情報を算出する際に、未実施作業に作業指示回に応じた重みを付けてもよい。これにより、作業管理装置10-3は、直近の作業回における作業量に基づいて割り当てを決定することができる。また、作業管理装置10-3は、繰り返し割り当てを算出することによって、作業指示ごとに作業量のばらつきがある場合にも、柔軟に割り当てを決定することができる。その結果、作業管理装置10-3は、より効率的な割り当てを実現できる。
[第4の実施形態]
 次に、本発明の第4の実施形態に係る作業管理システムの構成、および動作について説明する。第4の実施形態は、第2の実施形態に示した作業管理システムに加えてさらに、区画内相関を考慮した作業管理システムである。
 第4の実施形態において、区画内相関とは、ある作業の作業進捗が、同一区画内の別作業の作業進捗に影響を及ぼすことを意味する。すなわち、第4の実施形態の作業管理システムは、区画間相関を考慮した作業員と区画との割り当てに加え、同一区画内の作業間での相関を考慮し、区画内作業の割り当てを行う。
 ここで、第4の実施形態に係る作業管理システムを適用することができるピッキング方式として、先行ピッキング方式を例に説明する。
 リレー式ピッキングでは、作業ライン内のすべての区画での作業が完了するまで、コンベヤを動かすことができない。このため、自区画での作業完了後、全区画での作業完了まで、ピッキング作業を進めることができず、作業効率の低下要因となっている。そこで、先行ピッキング方式では、ピッキング・検品完了後のアイテムを一時的に置いておくための保管スペースを用意する。この場合、各作業員は、自区画での作業が完了し、かつ残作業が存在する場合には、保管スペースに作業が完了したアイテムを置き、次のピッキング・検品作業を開始することができる。そして、各作業員は、対応するコンテナ群が到着し次第、作業が完了したアイテムをコンテナに格納する。
 先行ピッキング方式を導入することで、他区画での作業進捗に関わらず、自区画でのピッキング・検品作業を進めることができる。また、先行ピッキング方式を導入した場合、ピッキング・検品作業に加え、コンテナ格納作業が発生する。これは、コンテナ到着前にピッキング・検品作業を進められるようにするためである。
 コンテナにアイテムを格納する作業は、区画間相関を有する。これは、自区画でのコンテナ格納作業が遅延すれば、コンベヤを動かすことができず、結果として他区画の作業進捗に影響を及ぼすこととなるためである。
 他方、上述したように、各作業員は、ピッキング・検品作業自体は、他区画での作業進捗に関わらず進めることができるので、他区画の作業進捗に直接影響を及ぼさない。しかしながら、コンテナが到着する時点で対象アイテムのピッキング・検品作業が終わっていなければ、コンテナにアイテムを格納する作業が遅延する。すなわち、先行ピッキング方式におけるピッキング・検品作業は、同一区画のコンテナにアイテムを格納する作業と相関している。以下ではこのような、同一区画内の他作業と相関を有することを、「区画内相関を有する」と表現する。
 図23は、本発明の第4の実施形態における作業管理システムの適用環境例を示す模式図である。第4の実施形態と第2の実施形態との違いは、先行ピッキング方式を導入している点(図示せず)と、作業管理システム10-4の構成および動作として、同一区画内の作業間での相関を考慮している点である。
 図24は、本発明の第4の実施形態に係る作業管理装置の構成を示すブロック図である。作業管理装置10-4は、区画情報取得部11と、作業員情報取得部12-4と、作業実績情報取得部13-4と、作業評価指標算出部14-4と、割当算出部15-4とを備える。なお、以下では、作業管理装置10-4と、第2の実施形態に係る作業管理装置10-2との異なる点についてのみ説明する。
 作業員情報取得部12-4は、作業員情報として作業員の作業項目をさらに含めて取得する。
 作業実績情報取得部13-4は、区画間相関を有する作業である第1の作業についての作業実績を第1の作業実績情報として取得し、第1の作業と相関を有する作業(以下、「第2の作業」と呼ぶ)についての作業実績を第2の作業実績情報として取得する。
 作業評価指標算出部14-4は、第1の作業実績情報に基づいて第1の作業評価指標を区画ごとに算出し、第2の作業実績情報に基づいて第2の作業評価指標を区画ごとに算出する。
 割当算出部15-4は、作業員情報、および第1の作業評価指標に基づいて、作業員と各区画との割り当てを算出する。また、割当算出部15-4は、第1の作業評価指標、および第2の作業評価指標に基づいて、作業員と区画内における第1の作業、および第2の作業との割り当てを算出する。
 次に、図25を参照して、本発明の第4の実施形態に係る作業管理システム10-4の動作について詳細に説明する。図25は、本発明の第4の実施形態に係る作業管理システム10-4の動作を示すフローチャートである。以降では、図23に示した環境例をもとに、作業管理システム10-4の動作について説明する。なお、図25に示した処理手順は、例示であり、本発明を限定するものではない。図25に示した処理の前後関係について整合がとれていれば、処理手順を組み替えてもよい。
 まず、区画情報取得部11は、区画情報を取得(ステップS101)する。次いで、作業員情報取得部12-4は、作業員情報を取得する(ステップS102)。このとき、作業員情報は、作業員名、作業員の担当区画、および作業員の担当する作業項目を少なくとも含む。
 次に、図26を参照して、第4の実施形態に係る作業員情報について説明する。図26は、第4の実施形態における作業員情報の一例を示す表である。なお、作業員名、および担当区画については、第1~第3の実施形態における情報と同様であるため、説明を省略する。作業項目は、作業員の担当する作業内容を識別することのできる情報であり、ここでは「ピッキング・検品」と「コンテナ格納」の2種類の作業項目が規定されている。
 また、作業員情報取得部12-4は、ステップS102と並行に、第1の作業実績情報を取得する(ステップS103-2)。
 ここで、作業実績取得部13-4は、ステップS102、およびステップS103-2と並行に、第2の作業実績情報を取得する(ステップS103-4)。このとき、作業実績取得部13-4は、作業実績情報として、区画内の第2の作業についての作業実績を取得する。具体的には、作業実績取得部13-4は、直近に実施された作業項目、作業数を少なくとも取得する。第4の実施形態では一例として、作業実績取得部13-4は、倉庫管理システム20から取得した倉庫作業管理情報に基づいて、作業実績情報を生成する。なお、具体的な取得方法は、第1から第3の実施形態における第1の作業実績情報の取得方法と同様であるため、説明は省略する。
 図27を参照して、区画間相関、および区画内相関について説明する。図27は、区画間相関、および区画内相関の有無に関する情報の一例を示す表である。図27を参照すると、「ピッキング・検品」作業は、区画間相関は無いが、区画内相関を有する作業であることが示されている。また、「コンテナ格納」作業は、区画間相関を有する作業であり、区画内相関は無い作業であることが示されている。
 図28を参照して、第4の実施形態に係る第1の作業実績情報について説明する。図28は、第1の作業実績情報の一例を示す表である。第4の実施形態において、第1の作業、すなわち区画間相関を有する作業として、「コンテナ格納」作業についての作業実績が含まれる。具体的には、作業区画5Aにおいて、52個のアイテムをコンテナに格納するために、15分の時間を要したことが第1の作業実績情報として含まれている。また、作業区画5Bにおいて、86個のアイテムをコンテナに格納するために、15分の時間を要したことが第1の作業実績情報として含まれている。
 図29を参照して、第4の実施形態に係る第2の作業実績情報について説明する。図29は、第2の作業実績情報の一例を示す図である。第4の実施形態において、第2の作業、すなわち区画内相関を有する作業として、「ピッキング・検品」作業についての作業実績が含まれる。具体的には、作業区画5Aにおいて、52個のアイテムをピッキング・検品するために、15分の時間を要したことが第2の作業実績情報として含まれている。また、作業区画5Bにおいて、134個のアイテムをピッキング・検品するために、15分の時間を要したことが第2の作業実績情報として含まれている。
 続いて、作業員情報取得部12-4が第1の作業実績情報を取得した後、作業評価指標取得部14-4は、第1の作業実績情報に基づいて第1の作業評価指標を算出する(ステップS104-2)。また、作業評価指標取得部14-4は、作業実績取得部13-4が第2の作業実績情報を取得した後、第2の作業実績情報をもとに第2の作業評価指標を算出する(ステップS104-4)。第4の実施形態において、第1の作業評価指標、および第2の作業評価指標として、例えば作業能率を用いることができる。なお、第1の作業評価指標、および第2の作業評価指標の具体的な算出手法は、第1、および第2の実施形態と同様であるため、説明は省略する。
 図30を参照して、第4の実施形態における第1の作業評価指標の具体例について説明する。図30は、第4の実施形態における、第1の作業評価指標の具体例を示した表である。図28に示した数値を用いて作業区画5A、および5Bの第1の作業評価指標を算出すると、それぞれ3.47、および5.73となる。
 図31を参照して、第4の実施形態における第2の作業評価指標の具体例について説明する。図31は、第4の実施形態における、第2の作業評価指標の具体例を示した図である。図29に示した数値を用いて作業区画5A、および作業区画5Bの第2の作業評価指標を算出すると、それぞれ3.47、および8.93となる。
 そして、区画情報取得部11が区画情報を取得し、作業評価指標取得部14-4が第1の作業評価指標を算出した後、割当算出部15-4は、まず、作業員情報、および第1の作業評価指標に基づいて、作業員と区画との割り当てを算出する(ステップS105)。具体的には、割当算出部15-4は、図6に示す作業員情報および図30に示す第1の作業評価指標を用いて、式(1)に従い第1の将来指標を算出し、再割り当て後の第1の将来指標の最小値が最も大きくなるように作業員を割り当てる。
 図32を参照して、割当算出部15-4の算出結果について説明する。図32は、第4の実施形態における、割当算出部15-4の算出結果の一例を示す図である。以下、本図を用いて、割当算出部15-4による割り当て算出の一例について、詳細に説明する。
 図32に示すように、作業区画5Aにおけるコンテナ格納作業の作業評価指標は、3.47である。一方、作業区画5Aにおける区画内相関を有する作業であるピッキング・検品作業の作業評価指標も、3.47である。つまり、作業区画5Aにおいては、ピッキング・検品作業がボトルネックとなっており、コンテナ格納作業の作業能率に影響を与えている可能性が考えられる。仮にこれが正しければ、コンテナ格納作業の作業評価指標は、ピッキング・検品作業の作業能率次第では、より高い値を示すことが想定される。そこで便宜的に、区画内相関の影響が考えらえる作業評価指標値については、数値に*印を付与して表示する。
 図32において、作業区画5A、および5Bへの割り当て人数をそれぞれ4人、および3人としたときに、第1の将来指標はそれぞれ4.62、および4.30となり、区画間での指標差は最も小さくなる。
 次に、割当算出部15-4は、作業員情報、第1の作業評価指標、および第2の作業評価指標に基づいて、作業員と、第1の作業、および第2の作業との割り当てを算出する(ステップS105-4)。具体的には、割当算出部15-4は、例えば第1の作業、および第2の作業へのそれぞれの割り当て人数と、第1の作業評価指標、および第2の作業評価指標に基づいて式(1)を計算することで、第2の将来指標を算出する。ここで、第2の将来指標は、例えば再割り当て後における第1の作業、および第2の作業に対する作業能率であるが、これに限定されるものではない。そして、割当算出部15-4は、最も小さい値をとる第2の将来指標の値がより大きくなるように、各作業への作業者数の割り当てを決定する。このとき、第2の将来指標のうち最も小さい値が、割り当て後における第1の作業能率に相当する。ここで、区画内相関の影響が考えられる作業評価指標(図32において、*印のついた値)については、実際にはより高い作業評価指標となる可能性を考慮してもよい。具体的には、第4の実施形態において、一定の係数を乗じて作業評価指標の補正を行うようにするが、これは例示であり、本発明を限定するものではない。また、一定の係数を乗じる場合、第4の実施形態においては、作業評価指標3.47に1.1を乗じることで将来指標を3.82に補正をしているが、これは例示であり、本発明を限定するものではない。
 作業者数の割り当てを算出すると、作業区画5Aについては、コンテナ格納作業に割り当てる人数は2人となり、ピッキング・検品の各作業に割り当て人数は2人となる。このとき、コンテナ格納作業の第2の将来指標は3.82となり、ピッキング・検品作業の第2の将来指標は6.93となるので、最小の値は3.82である。
 作業区画5Bについては、コンテナ各農作業に割り当てる人数は1人となり、ピッキング・検品作業に割り当てる人数は2人となる。このとき、コンテナ格納作業の第2の将来指標は5.73となり、5.96となるので、最小の値は5.73である。
 したがって、割当算出後における、作業区画5Aの第2の将来指標は3.82となり、作業区画5Bの第2の将来指標は5.73となるので、最小値は3.82である。これは、割当前の第1の作業評価指標の最小値である3.47よりも大きくなる。
 以上、より複雑な作業間の相関を有する環境においても、第4の実施形態を適用し、作業効率を向上させることができる。特に、作業管理装置10-4は、区画内相関による作業効率の低下を考慮し、区画内での作業割り当てを併せて行うことで、より工程全体での作業効率を向上させることができる。
 なお、割当算出部15-4は、第4の実施形態において、作業員と区画との割り当て算出と、作業員と第1の作業、および第2の作業との割当算出をそれぞれ1度のみ実施したが、繰り返し実施するようにしてもよい。
 また、作業管理装置10-4は、例えば算出前の割り当てを記憶しておき、算出後の割り当てによる評価が算出前の割り当てによる評価を下回った場合には、算出前の割り当てを適用するようにしてもよい。これにより、作業管理装置10-4は、より効率の高い割り当てを探索することができるようになるので、作業工程全体の作業効率をさらに向上させることができる。
 さらに、第4の実施形態において、第1の作業実績情報、および第2の作業実績情報として、直近15分間の作業実績を採用したが、これは例示であり、本発明を限定するものではない。作業管理装置10-4は、作業実績について、作業指示回、または作業発生時間に応じた重み付けを行って算出するようにしてもよい。これにより、作業管理装置10-4は、より実情に近い作業評価指標を算出することができるので、より効率的な割り当てを実現できる。
 さらにまた、第4の実施形態において、第1の作業評価指標、および第2の作業評価指標として作業能率を用いたが、他の指標を用いてもよい。具体的には、作業管理装置10-4は、例えば区画ごと・作業項目ごとの残作業量をさらに取得し、第1の作業評価指標、および第2の作業評価指標に反映させてもよい。
 また、残作業量として、倉庫作業管理情報に登録済みのすべての未実施作業を対象としてもよいが、これに限定されない。作業管理装置10-4は、例えば今後発生する直近一定回の作業指示に対応する未実施作業のみを対象としてもよいし、未実施作業について、作業指示回に応じた重みづけを行って算出するようにしてもよい。これにより、作業管理装置10-4は、各区画、および各作業項目の残作業量の多寡を考慮して割り当てができるので、作業工程全体での作業効率をより向上させることができる。
 上述したように、第4の実施形態に係る作業における区画内相関は、各区画内において、前の作業が終わっていないと自作業が完了できないため、順列関係にあるといえる。そのため、作業管理装置10-4は、区画内の作業の関係性を示す情報を保持する記憶部(図示しない)をさらに備えていてもよい。この場合、割当算出部15-4は、記憶部が保持する各区画内の関係性を考慮して、それぞれの区画に割り当てる作業員数、および作業員を選出する。
 これにより、作業管理装置10-4は、各区画内の作業の相関の強弱に基づいて各区画に割り当てる作業員数、および作業員を選出することができる。そのため、作業管理装置10-4は、区画内の作業においてボトルネック工程の効率引き上げを意識した効率的な割り当てを実現することができる。
 また、作業管理装置10-4において、記憶部は、第2の実施形態のように区画間の関係性を示す情報を保持していてもよい。この場合、割当算出部15-4は、各区画内の作業の関係性だけでなく、各区画間の関係性も考慮して、それぞれの区画に割り当てる作業員数、および作業員を選出する。これにより、作業管理装置10-4は、区画内の作業、および区画間の作業に相関を有する複雑な環境であっても、それぞれの区画に割り当てる作業員数、および作業員を選出することができる。
[第5の実施形態]
 次に、本発明の第5の実施形態に係る作業管理システムの構成および動作について説明する。第5の実施形態に係る作業管理システムは、区画の変更によって、作業員と区画との割り当てを行う作業管理システムである。
 図33は、本発明の第5の実施形態に係る作業管理システムの適用環境例を示す模式図である。第5の実施形態は、第1の実施形態と比較して、区画の変更によって作業員と区画との割り当てを行う点で異なっている。
 図34を参照して、第5の実施形態に係る作業管理装置10-5の構成について説明する。図34は、本発明の第5の実施形態に係る作業管理装置10-5の構成を示すブロック図である。
 作業管理装置10-5は、区画情報取得部11-5と、作業員情報取得部12と、作業実績情報取得部13と、作業評価指標算出部14と、割当算出部15-5と、区画変更部17とを備える。なお、以下では、作業管理装置10と異なる点についてのみ説明する。
 区画情報取得部11-5は、作業場所を複数の区画に分割し、分割した区画のそれぞれについて、区画範囲情報を少なくとも含む区画情報を取得する。ここで区画範囲情報とは、当該区画を構成する小区画のそれぞれについて、小区画の範囲を指し示す情報を少なくとも含む情報を意味している。ここで小区画とは、区画をさらに分割したものとして定義する。言い換えると、区画は、1ないし複数の小区画から構成されている。
 割当算出部15-5は、作業員情報、および第1の作業評価指標に基づいて、作業員と区画との割り当てを算出する。このとき、小区画の属する区画を変更することで、割り当てを算出する。
 区画変更部17は、割当算出部15-5が算出した割り当て、すなわち小区画の属する区画の変更を反映する。具体的には、区画情報取得部11-5が取得する区画範囲情報に反映させるほか、作業現場においても算出後の割り当てが反映されるようにする。
 ここで、図35を参照して、第5の実施形態における区画と小区画との関係について説明する。図35は、第5の実施形態における、区画と小区画との関係を説明するための模式図である。
 図35においては、棚1を対象とする作業範囲が、作業区画5A、および作業区画5Bに分割されている。ここで、第5の実施形態において、例えば棚1について1列ずつを小区画として規定する。このとき、棚1の列数が12列あるとすると、小区画5-1、5-2、・・・、5-12が規定される。この場合、作業区画5Aは小区画5-1~5-6を含み、作業区画5Bは小区画5-7~5-12を含んでいる。
 図36を参照して、本発明の第5の実施形態に係る作業管理システム100-5の動作について詳細に説明する。図36は、第5の実施形態に係る作業管理システム100-5の動作を示すフローチャートである。なお、図36に示した処理手順は、例示であり、本発明を限定するものではない。第5の実施形態において、図36に示した処理の前後関係について整合がとれていれば、処理手順を組み替えてもよい。
 まず、区画情報取得部11-5は、区画情報を取得する(ステップS101-5)。このとき、区画情報取得部11-5は、区画範囲情報として、小区画情報を取得する。
 ここで、図37を参照して、第5の実施形態における区画情報について説明する。図37は、第5の実施形態における区画情報を示した図である。図37に示すように、第5の実施形態は、区画情報として、区画名と、区画範囲情報とが登録されている。また、区画範囲情報として、小区画名と小区画範囲とを含む小区画情報が登録されている。
 その後、作業員情報取得部12は、作業員情報を取得する(ステップS102)。
 また、作業実績情報取得部13は、ステップS102とは並行に第1の作業実績情報を取得する(ステップS103)。そして、作業評価指標算出部14は、第1の作業実績情報に基づいて、第1の作業評価指標を算出する(ステップS104)。
次いで、割当算出部15-5は、区画情報、作業員情報、および第1の作業評価指標に基づいて、区画の割り当てを算出する(ステップS105-5)。第5の実施形態において、割当算出部15-5は、例えば第1の作業評価指標を作業能率とし、図6に示した作業員情報、および図9に示した第1の作業評価指標に基づいて、区画の割当を算出する。割当算出部15-5の動作を説明する。
 割り当てを算出する具体的な方法の一例として、第5の実施形態において、割当算出部15-5は、まず区画情報および第1の作業評価指標に基づいて、第1の将来指標を区画ごとに算出する。ここで、第1の将来指標は、例えば割り当て後の推定所用時間に関する指標とするが、これに限定されるものではない。そして、各区画における第1の将来指標について、最も小さい値をとる第1の将来指標の値がより大きくなるように、各区画への小区画の割り当てを決定する。より具体的には、第5の実施形態では、例えば以下の式に基づいて第1の将来指標を算出する。
 (第1の将来指標)=(第1の作業評価指標)÷(割り当て後の小区画数) ・・・式(2)
 言い換えると、割当算出部15-5は、各小区画での作業量が一定であると仮定し、第1の将来指標、すなわち推定所用時間に基づいて、ボトルネックとなる区画の推定所用時間が増えるように、各区画の作業能率に応じて割り当てる小区画数を決定する。
 図38は、本発明の第5の実施形態に係る割当算出部15-5による算出結果の一例を示す表である。
 割当算出部15-5は、式(2)に基づいて最適な割り当て小区画数を算出すると、作業区画5Aへの割当章区画数を5と算出し、作業区画5Bへの割り当て小区画数を7としたときに、両区画の第1の将来指標の最小値が最も大きくなる。ここで、再び図35を参照すると、現状では、作業区画5Aには小区画5-1~5-6が割り当てられ、作業区画5Bには小区画5-7~5-12が割り当てられている。この場合、割当算出部15-5は、作業区画5Aに割り当てられている小区画のうち、最も作業区画5Bに近い小区画5-6を、作業区画5Bに割り当てるような変更指示を算出する。
 最後に、区画変更部17は、ステップS105-5において得られた算出結果に基づいて、割り当てを反映する(ステップS107)。具体的には、区画変更部17は、区画情報取得部11-5が取得する区画範囲情報に反映させるほか、作業現場においても算出後の割り当てを反映させる。例えば、区画変更部17は、倉庫管理システム20が参照する区画割り当て情報(図示せず)を変更する、作業現場に備えられたスピーカーあるいはディスプレイを介して通知する等の方法が挙げられる。なお、区画変更部17の動作は例示であり、上述の動作に限定するものではない。
 以上、第5の実施形態によれば、作業状況が時々刻々と変化する環境においても、作業工程全体での作業効率を向上させることができる。作業管理装置10-5は、第1の作業評価指標に基づいて区画の範囲を適宜変更することで、各区画での作業能率に応じて各区画の作業量をより適切な量となるように調整することができる。これにより、ボトルネックとなる区画の作業量を減らし、作業工程全体での作業効率を向上させることができる。
 なお、第5の実施形態では、割当算出部15-5は、各区画への小区画の割り当てを変更するものとして説明したが、さらに、第1から第4の実施形態に示したように、各区画への作業員の割り当てをさらに変更するようにしてもよい。例えば、割当算出部15-5は、各区画への作業員の割り当てを決定した後に、さらに各区画への小区画の割り当てを変更するようにしてもよい。または、割当算出部15-5は、各区画への小区画の割当を変更した後に、各区画への作業員の割り当てを決定してもよい。したがって、作業管理装置10-5は、作業員と区画との割り当てをより細かく算出することができるので、作業工程全体での作業効率を向上させることができる。
 また、第5の実施形態に係る作業管理システム10-5は、区画範囲報知部をさらに備える構成としてもよい。この場合、区画範囲報知部は、区画変更部17に算出結果に応じて、区画の範囲を作業者に報知することを特徴とする。報知する方法としては、例えば、区画範囲報知部として小区画の境界ごとに白熱電球、蛍光灯、LED(発光ダイオード)、およびディスプレイ等の照明装置を設置し、それらの照明装置の光や表示によって区画の範囲を報知してよい。または、DPSの表示部が区画範囲報知部を備え、区画ごとに異なる色で情報を表示してもよい。なお、上述した区画範囲報知部は、例示であり、本発明を限定するものではない。
 図39は、第5の実施形態に係る区画範囲報知部の一例を示した模式図である。ここでは、例えば区画範囲報知部を備えた照明装置6-1~6-6が、それぞれ、各小区画5-1~5-7の境界に設置されている。ここで、区画変更部17は、小区画5-1~5-3をひとつの区画に、また小区画5-4~5-6を別の区画に、それぞれ割り当てたことを照明装置6-1~6-6が備える各区画範囲報知部に通知する。すると、小区画5-3と小区画5-4の境界に設置された照明装置6-3と、小区画5-6と小区画5-7の境界に設置された照明装置6-6とがそれぞれ発光し、作業員に区画範囲を報知する。これにより、それぞれ区画に割り当てられている作業員は、直感的に理解できる方法で、区画の範囲の変更を認識することができる。
 以上、図面を参照して本発明の第1から第5の実施形態について詳細に説明してきたが、具体的な構成は上述のものに限られることはなく、本発明の要旨を逸脱しない範囲内において様々な設計変更等が可能である。
 例えば、本発明の第1から第5の実施形態では、リレー式ピッキングでの作業を例に挙げて説明したが、これに限定されるものではない。例えば、カート式ピッキングにおいても、すべての区画でのピッキング作業が完了し商品が揃わないと、出荷作業を行うことができない。このとき、本発明に係る作業管理システムを用いることで、ピッキング区画内での作業負荷を平準化し、作業工程全体での作業効率を向上させることができる。
 またさらに、ピッキング作業と出荷作業とが区画間相関を有する点に着目し、本発明に係る作業管理システムを適用することで、ピッキングから出荷作業を含めた出荷作業全体での作業効率を向上させることができる。同様に、倉庫における入庫作業や、工場における組立工程、港湾における積荷の上げ下ろし、トラックの入出庫を含めたサプライチェーン管理等、さまざまな領域に本発明を適用することが可能である。
[その他の実施形態]
 また、実施形態に示したように、本発明における作業管理システムの全部又は一部の機能を実現するためのプログラムをコンピュータ読み取り可能な記録媒体に記録して、この記録媒体に記録されたプログラムをコンピュータシステムに読み込ませ、実行することにより各部の処理を行ってもよい。なおまた、ここでいう「コンピュータシステム」とは、OSや周辺機器等のハードウェアを含むものとする。
 また、「コンピュータ読み取り可能な記録媒体」とは、光磁気ディスク、ROM、不揮発性半導体メモリ等の可搬媒体、コンピュータシステムに内蔵されるハードディスク等の記憶装置のことをいう。更に「コンピュータ読み取り可能な記録媒体」とは、インターネット等のネットワークや電話回線等の通信回線を介してプログラムを送信する場合の通信線のように、短時間の間、動的にプログラムを保持するもの、その場合のサーバやクライアントとなるコンピュータシステム内部の揮発性メモリのように、一定時間プログラムを保持しているものも含むものとする。また上記プログラムは、前述した機能の一部を実現するためのものであってもよく、更に前述した機能をコンピュータシステムにすでに記録されているプログラムとの組み合わせで実現できるものであってもよい。
 以上、本発明を実施形態に基づいて説明したが、本発明の技術的範囲は、上記実施形態に記載の範囲には限定されない。上記実施形態に、多様な変更又は改良を加えることが可能であることが当業者に明らかである。そのような変更又は改良を加えた形態も本発明の技術的範囲に含まれ得ることが、特許請求の範囲の記載から明らかである。
 上記の各実施形態の一部、または全部は、以下の付記のようにも記載されうる。なお、以下の付記は本発明をなんら限定するものではない。
(付記1)
 作業場所を複数の区画に分割し、前記区画のそれぞれについて、区画の範囲を指し示す情報である区画範囲情報を少なくとも含む区画情報を取得する区画情報取得部と、
 作業員と、前記作業員の担当する区画との対応関係を少なくとも含む作業員情報を取得する作業員情報取得部と、
 前記区画ごとに、直近の作業実績である第1の作業実績情報を取得する作業実績情報取得部と、
 前記第1の作業実績情報に基づいて、前記区画ごとに第1の作業評価指標を算出する作業評価指標算出部と、
 前記作業員情報、および前記第1の作業評価指標に基づいて、前記作業員と前記区画との割り当てを算出する割当算出部と
 を備える、作業管理装置。
(付記2)
 前記第1の作業実績情報は、区画間相関を有する作業である第1の作業についての直近の作業実績を含む情報である、付記1に記載の作業管理装置。
(付記3)
 前記割当算出部は、前記割り当てに対する前記区画の評価指標である第1の将来指標を算出し、前記区画における前記第1の将来指標について、最も小さい値をとる前記第1の将来指標の値がより大きくなるように、前記作業員と前記区画との割り当てを算出する、付記1または2に記載の作業管理装置。
(付記4)
 前記第1の作業評価指標は、作業能率である、付記1から3のいずれか1つに記載の作業管理装置。
(付記5)
 前記第1の作業評価指標は、作業進捗見込みであり、
 前記区画ごとの作業項目と、前記作業項目ごとの残作業量とを少なくとも含む残作業量情報を取得する残作業量情報取得部をさらに備える、付記1から3のいずれか1つに記載の作業管理装置。
(付記6)
 前記作業実績情報取得部はさらに、前記作業員ごとに前記第1の作業実績情報を取得し、
 前記作業評価指標算出部はさらに、前記作業員ごとに前記第1の作業評価指標を算出し、
 前記割当算出部はさらに、区画間の、区画ごとの前記第1の作業評価指標の和の差が最も小さくなるように、前記作業員と前記区画との割り当てを算出する、付記1から5のいずれか1つに記載の作業管理装置。
(付記7)
 前記作業員情報取得部は、前記作業員の担当する作業についての情報である作業項目情報をさらに含む前記作業員情報を取得し、
 前記作業実績情報取得部はさらに、区画内における前記第1の作業に対して相関を有する作業である第2の作業についての作業実績である第2の作業実績情報を取得し、
 前記作業評価指標算出部はさらに、前記第2の作業実績情報に基づいて、前記区画ごとに第2の作業評価指標を算出し、
 前記割当算出部はさらに、前期作業員情報と、前記第1の作業評価指標と、前記第2の作業評価指標に基づいて、前記作業員と、前記区画内における第1の作業ないし第2の作業との割り当てを算出する、付記2から6のいずれか1つに記載の作業管理装置。
(付記8)
 前記割当算出部はさらに、前記区画内における前記第1の作業および前記第2の作業への割り当てに対する各作業の評価指標である第2の将来指標をそれぞれ算出し、前記第1の作業評価指標と前記第2の作業評価指標のうち、最も小さい値をとる作業評価指標の値がより大きくなるように、前記作業員と、前記区画内における前記第1の作業ないし前記第2の作業との割り当てを算出する、付記7に記載の作業管理装置。
(付記9)
 前記第1の作業評価指標は、前記第1の作業についての作業能率であり、
 前記第2の作業評価指標は、前記第2の作業についての作業能率である、付記7または8に記載の作業管理装置。
(付記10)
 前記第1の作業評価指標は、前記第1の作業についての作業進捗見込みであり、
 前記第2の作業評価指標は、前記第2の作業についての作業進捗見込みであり
 前記作業評価指標算出部は、前記区画ごとに、前記第1の作業についての残作業量を少なくとも含む第1の残作業量情報に基づいて、前記第1の作業評価指標をさらに算出し、前記第2の作業についての残作業量を少なくとも含む第2の残作業量情報に基づいて、前記第2の作業評価指標をさらに算出する、付記7または8に記載の作業管理装置。
(付記11)
 前記作業員情報取得部は、前記作業員の位置情報をさらに取得し、
 前記割当算出部は、前記作業員と前記区画との割り当てに伴う移動において、前記作業員の移動時間の総和が最も小さくなるように、前記作業員と前記区画との割り当てをさらに算出する、付記1から10のいずれか1つに記載の作業管理装置。
(付記12)
 前記割り当てに基づいて前記小区画の属する区画を変更する区画変更部をさらに備え、
 前記区画は、1ないし複数の小区画から構成され、
 前記区画情報取得部は、前記区画の範囲を指し示す情報として、前記区画を構成するすべての小区画と、前記小区画の範囲を指し示す情報とを取得し、
 前記割当算出部は、前記小区画の属する区画を変更することで、前記作業員と前記区画との割り当てを算出する、付記1から11のいずれか1つに記載の作業管理装置。
(付記13)
 前記残作業量情報取得部は、前記小区画ごとに残作業量情報を取得し、
 前記割当算出部は、前記小区画の属する区画が変更したときの残作業量の変化を考慮して、前記作業員と前記区画との割り当てをさらに算出する、付記12に記載の作業管理装置。
(付記14)
 前記区画変更部に基づいて、区画の範囲を作業員に報知する区画範囲報知部をさらに備える、付記12または13に記載の作業管理装置。
(付記15)
 作業で取り扱うアイテムに関する情報を保持する管理システムと、
 作業場所を複数の区画に分割し、前記区画のそれぞれについて、区画の範囲を指し示す情報である区画範囲情報を少なくとも含む区画情報を取得する、区画情報取得部と、
 作業員と、前記作業員の担当する区画との対応関係を少なくとも含む作業員情報を取得する、作業員情報取得部と、
 前記区画ごとに、直近の作業実績である第1の作業実績情報を、前記アイテムに関する情報に基づいて取得する、作業実績情報取得部と、
 前記第1の作業実績情報をもとに、前記区画ごとに第1の作業評価指標を算出する、作業評価指標算出部と、
 前記作業員情報および前記第1の作業評価指標をもとに、前記作業員と前記区画との割り当てを算出する、割当算出部と
 を備える、作業管理システム。
(付記16)
 前記第1の作業実績情報は、区画間相関を有する作業である第1の作業についての直近の作業実績を含む情報である、付記15に記載の作業管理システム。
(付記17)
 前記割当算出部は、前記割り当てに対する前記区画の評価指標である第1の将来指標を算出し、前記区画における前記第1の将来指標について、最も小さい値をとる前記第1の将来指標の値がより大きくなるように、前記作業員と前記区画との割り当てを算出する、付記15または16に記載の作業管理システム。
(付記18)
 前記第1の作業評価指標は、作業能率である、付記15から17のいずれか1つに記載の作業管理システム。
(付記19)
 前記第1の作業評価指標は、作業進捗見込みであり、
 前記区画ごとの作業項目と、前記作業項目ごとの残作業量とを少なくとも含む残作業量情報を取得する残作業量情報取得部をさらに備える、付記15から17のいずれか1つに記載の作業管理システム。
(付記20)
 前記作業実績情報取得部はさらに、前記作業員ごとに前記第1の作業実績情報を取得し、
 前記作業評価指標算出部はさらに、前記作業員ごとに前記第1の作業評価指標を算出し、
 前記割当算出部はさらに、区画間の、区画ごとの前記第1の作業評価指標の和の差が最も小さくなるように、前記作業員と前記区画との割り当てを算出する、付記15から19のいずれか1つに記載の作業管理システム。
(付記21)
 前記作業員情報取得部は、前記作業員の担当する作業についての情報である作業項目情報をさらに含む前記作業員情報を取得し、
 前記作業実績情報取得部はさらに、区画内における前記第1の作業に対して相関を有する作業である第2の作業についての作業実績である第2の作業実績情報を取得し、
 前記作業評価指標算出部はさらに、前記第2の作業実績情報に基づいて、前記区画ごとに第2の作業評価指標を算出し、
 前記割当算出部はさらに、前期作業員情報と、前記第1の作業評価指標と、前記第2の作業評価指標に基づいて、前記作業員と、前記区画内における第1の作業ないし第2の作業との割り当てを算出する、付記16から20のいずれか1つに記載の作業管理システム。
(付記22)
 前記割当算出部はさらに、前記区画内における前記第1の作業および前記第2の作業への割り当てに対する各作業の評価指標である第2の将来指標をそれぞれ算出し、前記第1の作業評価指標と前記第2の作業評価指標のうち、最も小さい値をとる作業評価指標の値がより大きくなるように、前記作業員と、前記区画内における前記第1の作業ないし前記第2の作業との割り当てを算出する、付記21に記載の作業管理システム。
(付記23)
 前記第1の作業評価指標は、前記第1の作業についての作業能率であり、
 前記第2の作業評価指標は、前記第2の作業についての作業能率である、付記21または22に記載の作業管理システム。
(付記24)
 前記第1の作業評価指標は、前記第1の作業についての作業進捗見込みであり、
 前記第2の作業評価指標は、前記第2の作業についての作業進捗見込みであり
 前記作業評価指標算出部は、前記区画ごとに、前記第1の作業についての残作業量を少なくとも含む第1の残作業量情報に基づいて、前記第1の作業評価指標をさらに算出し、前記第2の作業についての残作業量を少なくとも含む第2の残作業量情報に基づいて、前記第2の作業評価指標をさらに算出する、付記21または22に記載の作業管理システム。
(付記25)
 前記作業員情報取得部は、前記作業員の位置情報をさらに取得し、
 前記割当算出部は、前記作業員と前記区画との割り当てに伴う移動において、前記作業員の移動時間の総和が最も小さくなるように、前記作業員と前記区画との割り当てをさらに算出する、付記15から24のいずれか1つに記載の作業管理システム。
(付記26)
 前記割り当てに基づいて前記小区画の属する区画を変更する区画変更部をさらに備え、
 前記区画は、1ないし複数の小区画から構成され、
 前記区画情報取得部は、前記区画の範囲を指し示す情報として、前記区画を構成するすべての小区画と、前記小区画の範囲を指し示す情報とを取得し、
 前記割当算出部は、前記小区画の属する区画を変更することで、前記作業員と前記区画との割り当てを算出する、付記15から25のいずれか1つに記載の作業管理システム。
(付記27)
 前記残作業量情報取得部は、前記小区画ごとに残作業量情報を取得し、
 前記割当算出部は、前記小区画の属する区画が変更したときの残作業量の変化を考慮して、前記作業員と前記区画との割り当てをさらに算出する、付記26に記載の作業管理システム。
(付記28)
 前記区画変更部に基づいて、区画の範囲を作業員に報知する区画範囲報知部をさらに備える、付記26または27に記載の作業管理システム。
(付記29)
 作業場所を複数の区画に分割し、前記区画のそれぞれについて、区画の範囲を指し示す情報である区画範囲情報を少なくとも含む区画情報を取得し、
 作業員と、前記作業員の担当する区画との対応関係を少なくとも含む作業員情報を取得し、
 前記区画ごとに、直近の作業実績である第1の作業実績情報を取得すし、
 前記第1の作業実績情報をもとに、前記区画ごとに第1の作業評価指標を算出し、
 前記作業員情報および前記第1の作業評価指標をもとに、前記作業員と前記区画との割り当てを算出する、作業管理方法。
(付記30)
 前記第1の作業実績情報は、区画間相関を有する作業である第1の作業についての直近の作業実績を含む情報である、付記29に記載の作業管理方法。
(付記31)
 前記割り当てに対する前記区画の評価指標である第1の将来指標を算出し、前記区画における前記第1の将来指標について、最も小さい値をとる前記第1の将来指標の値がより大きくなるように、前記作業員と前記区画との割り当てを算出する、付記29または30に記載の作業管理方法。
(付記32)
 前記第1の作業評価指標は、作業能率である、付記29から31のいずれか1つに記載の作業管理方法。
(付記33)
 前記第1の作業評価指標は、作業進捗見込みであり、
 前記区画ごとの作業項目と、前記作業項目ごとの残作業量とを少なくとも含む残作業量情報を取得する、付記29から32のいずれか1つに記載の作業管理方法。
(付記34)
 前記作業員ごとに前記第1の作業実績情報をさらに取得し、
 前記作業員ごとに前記第1の作業評価指標をさらに算出し、
 区画間の、区画ごとの前記第1の作業評価指標の和の差が最も小さくなるように、前記作業員と前記区画との割り当てを算出する、付記29から34のいずれか1つに記載の作業管理方法。
(付記35)
 前記作業員の担当する作業についての情報である作業項目情報をさらに含む前記作業員情報を取得し、
 区画内における前記第1の作業に対して相関を有する作業である第2の作業についての作業実績である第2の作業実績情報をさらに取得し、
 前記第2の作業実績情報に基づいて、前記区画ごとに第2の作業評価指標をさらに算出し、
 前期作業員情報と、前記第1の作業評価指標と、前記第2の作業評価指標に基づいて、前記作業員と、前記区画内における第1の作業ないし第2の作業との割り当てをさらに算出する、付記30から34のいずれか1つに記載の作業管理方法。
(付記36)
 前記区画内における前記第1の作業および前記第2の作業への割り当てに対する各作業の評価指標である第2の将来指標をそれぞれ算出し、前記第1の作業評価指標と前記第2の作業評価指標のうち、最も小さい値をとる作業評価指標の値がより大きくなるように、前記作業員と、前記区画内における前記第1の作業ないし前記第2の作業との割り当てを算出する、付記35に記載の作業管理方法。
(付記37)
 前記第1の作業評価指標は、前記第1の作業についての作業能率であり、
 前記第2の作業評価指標は、前記第2の作業についての作業能率である、付記35または36に記載の作業管理方法。
(付記38)
 前記第1の作業評価指標は、前記第1の作業についての作業進捗見込みであり、
 前記第2の作業評価指標は、前記第2の作業についての作業進捗見込みであり
 前記区画ごとに、前記第1の作業についての残作業量を少なくとも含む第1の残作業量情報に基づいて、前記第1の作業評価指標をさらに算出し、前記第2の作業についての残作業量を少なくとも含む第2の残作業量情報に基づいて、前記第2の作業評価指標をさらに算出する、付記35または36に記載の作業管理方法。
(付記39)
 前記作業員の位置情報をさらに取得し、
 前記作業員と前記区画との割り当てに伴う移動において、前記作業員の移動時間の総和が最も小さくなるように、前記作業員と前記区画との割り当てをさらに算出する、付記29から38のいずれか1つに記載の作業管理方法。
(付記40)
 前記割り当てに基づいて前記小区画の属する区画を変更し、
 前記区画は、1ないし複数の小区画から構成され、
 前記区画の範囲を指し示す情報として、前記区画を構成するすべての小区画と、前記小区画の範囲を指し示す情報とを取得し、
 前記小区画の属する区画を変更することで、前記作業員と前記区画との割り当てを算出する、付記29から39のいずれか1つに記載の作業管理方法。
(付記41)
 前記小区画ごとに残作業量情報を取得し、
 前記小区画の属する区画が変更したときの残作業量の変化を考慮して、前記作業員と前記区画との割り当てをさらに算出する、付記40に記載の作業管理方法。
(付記42)
 前記区画変更部に基づいて、区画の範囲を作業員に報知する、付記40または41に記載の作業管理方法。
(付記43)
 コンピュータに、
 作業場所を複数の区画に分割し、前記区画のそれぞれについて、区画の範囲を指し示す情報である区画範囲情報を少なくとも含む区画情報を取得する区画情報取得処理と、
 作業員と、前記作業員の担当する区画との対応関係を少なくとも含む作業員情報を取得する作業員情報取得処理と、
 前記区画ごとに、直近の作業実績である第1の作業実績情報を取得する作業実績情報取得処理と、
 前記第1の作業実績情報に基づいて、前記区画ごとに第1の作業評価指標を算出する作業評価指標算出処理と、
 前記作業員情報、および前記第1の作業評価指標に基づいて、前記作業員と前記区画との割り当てを算出する割当算出処理とを実行させる、作業管理プログラム。
(付記44)
 前記第1の作業実績情報は、区画間相関を有する作業である第1の作業についての直近の作業実績を含む情報である、付記43に記載の作業管理プログラム。
(付記45)
 前記コンピュータに、
 前記割り当てに対する前記区画の評価指標である第1の将来指標を算出し、前記区画における前記第1の将来指標について、最も小さい値をとる前記第1の将来指標の値がより大きくなるように、前記作業員と前記区画との割り当てを算出する処理を実行させる、付記43または44に記載の作業管理プログラム。
(付記46)
 前記第1の作業評価指標は、作業能率である、付記43から45のいずれか1つに記載の作業管理プログラム。
(付記47)
 前記第1の作業評価指標は、作業進捗見込みであり、
 前記コンピュータに、
 前記区画ごとの作業項目と、前記作業項目ごとの残作業量とを少なくとも含む残作業量情報を取得する残作業量情報取得処理を実行させる、付記43から45のいずれか1つに記載の作業管理装置。
(付記48)
 前記コンピュータに、
 前記作業員ごとに前記第1の作業実績情報を取得し、
 前記作業員ごとに前記第1の作業評価指標を算出し、
 区画間の、区画ごとの前記第1の作業評価指標の和の差が最も小さくなるように、前記作業員と前記区画との割り当てを算出する処理を実行させる、付記43から47のいずれか1つに記載の作業管理プログラム。
(付記49)
 前記コンピュータに、
 前記作業員の担当する作業についての情報である作業項目情報をさらに含む前記作業員情報を取得し、
 区画内における前記第1の作業に対して相関を有する作業である第2の作業についての作業実績である第2の作業実績情報を取得し、
 前記第2の作業実績情報に基づいて、前記区画ごとに第2の作業評価指標を算出し、
 前期作業員情報と、前記第1の作業評価指標と、前記第2の作業評価指標に基づいて、前記作業員と、前記区画内における第1の作業ないし第2の作業との割り当てを算出する、処理を実行させる、付記44から48のいずれか1つに記載の作業管理プログラム。
(付記50)
 前記コンピュータに、
 前記区画内における前記第1の作業および前記第2の作業への割り当てに対する各作業の評価指標である第2の将来指標をそれぞれ算出し、前記第1の作業評価指標と前記第2の作業評価指標のうち、最も小さい値をとる作業評価指標の値がより大きくなるように、前記作業員と、前記区画内における前記第1の作業ないし前記第2の作業との割り当てを算出する処理を実行させる、付記49に記載の作業管理プログラム。
(付記51)
 前記第1の作業評価指標は、前記第1の作業についての作業能率であり、
 前記第2の作業評価指標は、前記第2の作業についての作業能率である、付記49または50に記載の作業管理プログラム。
(付記52)
 前記第1の作業評価指標は、前記第1の作業についての作業進捗見込みであり、
 前記第2の作業評価指標は、前記第2の作業についての作業進捗見込みであり、
 前記コンピュータに、
 前記区画ごとに、前記第1の作業についての残作業量を少なくとも含む第1の残作業量情報に基づいて、前記第1の作業評価指標をさらに算出し、前記第2の作業についての残作業量を少なくとも含む第2の残作業量情報に基づいて、前記第2の作業評価指標をさらに算出する処理を実行させる、付記49または50に記載の作業管理装置。
(付記53)
 前記作業員情報取得部は、前記作業員の位置情報をさらに取得し、
 前記割当算出部は、前記作業員と前記区画との割り当てに伴う移動において、前記作業員の移動時間の総和が最も小さくなるように、前記作業員と前記区画との割り当てをさらに算出する、付記43から52のいずれか1つに記載の作業管理プログラム。
(付記54)
 前記コンピュータに、
 前記割り当てに基づいて前記小区画の属する区画を変更する処理を実行させ、
 前記区画は、1ないし複数の小区画から構成され、
 前記コンピュータにさらに、
 前記区画の範囲を指し示す情報として、前記区画を構成するすべての小区画と、前記小区画の範囲を指し示す情報とを取得し、
 前記割当算出部は、前記小区画の属する区画を変更することで、前記作業員と前記区画との割り当てを算出する処理を実行させる、付記43から53のいずれか1つに記載の作業管理プログラム。
(付記55)
 前記コンピュータに、
 前記小区画ごとに残作業量情報を取得し、
 前記小区画の属する区画が変更したときの残作業量の変化を考慮して、前記作業員と前記区画との割り当てをさらに算出する処理を実行させる、付記54に記載の作業管理プログラム。
(付記56)
 前記コンピュータに、
 前記区画を変更する処理に基づいて、区画の範囲を作業員に報知する処理を実行させる、付記54または55に記載の作業管理プログラム。
1   棚
2-1~2-7   作業員
2a   作業管理者
3   コンベヤ
4a,4b   コンテナ群
5A,5B   作業区画
5-1~5-12   小区画
6-1~6-6   照明装置
10,10-2,10-3,10-4,10-5   作業管理装置
11   区画情報取得部
12   作業員情報取得部
13,13-2   作業実績情報取得部
14,14-3   作業評価指標算出部
15   割当算出部
16   残作業量情報取得部
17   区画変更部
20   倉庫管理システム
100,100-2,100-3,100-4,100-5   作業管理システム

 

Claims (10)

  1.  作業場所を複数の区画に分割し、前記区画のそれぞれについて、区画の範囲を指し示す情報である区画範囲情報を少なくとも含む区画情報を取得する区画情報取得部と、
     作業員と、前記作業員の担当する区画との対応関係を少なくとも含む作業員情報を取得する作業員情報取得部と、
     前記区画ごとに、直近の作業実績である第1の作業実績情報を取得する作業実績情報取得部と、
     前記第1の作業実績情報に基づいて、前記区画ごとに第1の作業評価指標を算出する作業評価指標算出部と、
     前記作業員情報、および前記第1の作業評価指標に基づいて、前記作業員と前記区画との割り当てを算出する割当算出部と
     を備える、作業管理装置。
  2.  前記第1の作業実績情報は、区画間相関を有する作業である第1の作業についての直近の作業実績を含む情報である、請求項1に記載の作業管理装置。
  3.  前記割当算出部は、前記割り当てに対する前記区画の評価指標である第1の将来指標を算出し、前記区画における前記第1の将来指標について、最も小さい値をとる前記第1の将来指標の値がより大きくなるように、前記作業員と前記区画との割り当てを算出する、請求項1または2に記載の作業管理装置。
  4.  前記第1の作業評価指標は、作業能率である、請求項1から3のいずれか1項に記載の作業管理装置。
  5.  前記第1の作業評価指標は、作業進捗見込みであり、
     前記区画ごとの作業項目と、前記作業項目ごとの残作業量とを少なくとも含む残作業量情報を取得する残作業量情報取得部をさらに備える、請求項1から3のいずれか1項に記載の作業管理装置。
  6.  作業で取り扱うアイテムに関する情報を保持する管理システムと、
     作業場所を複数の区画に分割し、前記区画のそれぞれについて、区画の範囲を指し示す情報である区画範囲情報を少なくとも含む区画情報を取得する、区画情報取得部と、
     作業員と、前記作業員の担当する区画との対応関係を少なくとも含む作業員情報を取得する、作業員情報取得部と、
     前記区画ごとに、直近の作業実績である第1の作業実績情報を、前記アイテムに関する情報に基づいて取得する、作業実績情報取得部と、
     前記第1の作業実績情報をもとに、前記区画ごとに第1の作業評価指標を算出する、作業評価指標算出部と、
     前記作業員情報および前記第1の作業評価指標をもとに、前記作業員と前記区画との割り当てを算出する、割当算出部と
     を備える、作業管理システム。
  7.  前記第1の作業実績情報は、区画間相関を有する作業である第1の作業についての直近の作業実績を含む情報である、請求項6に記載の作業管理システム。
  8.  前記割当算出部は、前記割り当てに対する前記区画の評価指標である第1の将来指標を算出し、前記区画における前記第1の将来指標について、最も小さい値をとる前記第1の将来指標の値がより大きくなるように、前記作業員と前記区画との割り当てを算出する、請求項6または7に記載の作業管理システム。
  9.  作業場所を複数の区画に分割し、前記区画のそれぞれについて、区画の範囲を指し示す情報である区画範囲情報を少なくとも含む区画情報を取得し、
     作業員と、前記作業員の担当する区画との対応関係を少なくとも含む作業員情報を取得し、
     前記区画ごとに、直近の作業実績である第1の作業実績情報を取得すし、
     前記第1の作業実績情報をもとに、前記区画ごとに第1の作業評価指標を算出し、
     前記作業員情報および前記第1の作業評価指標をもとに、前記作業員と前記区画との割り当てを算出する、作業管理方法。
  10.  コンピュータに、
     作業場所を複数の区画に分割し、前記区画のそれぞれについて、区画の範囲を指し示す情報である区画範囲情報を少なくとも含む区画情報を取得する区画情報取得処理と、
     作業員と、前記作業員の担当する区画との対応関係を少なくとも含む作業員情報を取得する作業員情報取得処理と、
     前記区画ごとに、直近の作業実績である第1の作業実績情報を取得する作業実績情報取得処理と、
     前記第1の作業実績情報に基づいて、前記区画ごとに第1の作業評価指標を算出する作業評価指標算出処理と、
     前記作業員情報、および前記第1の作業評価指標に基づいて、前記作業員と前記区画との割り当てを算出する割当算出処理とを実行させる、作業管理プログラム。

     
PCT/JP2016/001949 2016-04-07 2016-04-07 作業管理装置、作業管理システム、作業管理方法、および作業管理プログラム WO2017175259A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
PCT/JP2016/001949 WO2017175259A1 (ja) 2016-04-07 2016-04-07 作業管理装置、作業管理システム、作業管理方法、および作業管理プログラム
JP2018510016A JP6493717B2 (ja) 2016-04-07 2016-04-07 作業管理装置、作業管理システム、作業管理方法、および作業管理プログラム

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2016/001949 WO2017175259A1 (ja) 2016-04-07 2016-04-07 作業管理装置、作業管理システム、作業管理方法、および作業管理プログラム

Publications (1)

Publication Number Publication Date
WO2017175259A1 true WO2017175259A1 (ja) 2017-10-12

Family

ID=60001094

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/001949 WO2017175259A1 (ja) 2016-04-07 2016-04-07 作業管理装置、作業管理システム、作業管理方法、および作業管理プログラム

Country Status (2)

Country Link
JP (1) JP6493717B2 (ja)
WO (1) WO2017175259A1 (ja)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019087275A1 (ja) * 2017-10-31 2019-05-09 株式会社日立製作所 作業分析装置、及び作業分析方法
JP2019128772A (ja) * 2018-01-24 2019-08-01 日本電気株式会社 リソース割当最適化システム、リソース割当最適化方法およびリソース割当最適化プログラム
JP2019175209A (ja) * 2018-03-29 2019-10-10 株式会社デンソー 車両の遠隔支援システムおよび方法
JP2021532436A (ja) * 2019-09-25 2021-11-25 クーパン コーポレイション 集中型の物流監視のためのコンピュータによって実現されるシステムおよび方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03217967A (ja) * 1990-01-23 1991-09-25 Nec Corp 作業量平準化方法
JP2003104520A (ja) * 2001-09-28 2003-04-09 Daifuku Co Ltd ピッキング設備
JP2005032011A (ja) * 2003-07-04 2005-02-03 Kao Corp 作業計画表作成支援装置
JP2005165789A (ja) * 2003-12-03 2005-06-23 Pioneer Electronic Corp 進捗管理支援装置、進捗管理支援方法、進捗管理支援プログラムおよび記録媒体
JP2009099039A (ja) * 2007-10-18 2009-05-07 Nissan Motor Co Ltd 生産計画評価装置、およびその方法
JP2010055167A (ja) * 2008-08-26 2010-03-11 Kimura Unity Co Ltd 作業状況表示装置および作業状況表示方法
JP2010070310A (ja) * 2008-09-18 2010-04-02 Yamaha Corp 物流倉庫における作業者毎の集品品目数決定方法および集品品目数決定システム
JP2014211766A (ja) * 2013-04-18 2014-11-13 三菱化学エンジニアリング株式会社 要員管理システム、及び要員管理方法

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03217967A (ja) * 1990-01-23 1991-09-25 Nec Corp 作業量平準化方法
JP2003104520A (ja) * 2001-09-28 2003-04-09 Daifuku Co Ltd ピッキング設備
JP2005032011A (ja) * 2003-07-04 2005-02-03 Kao Corp 作業計画表作成支援装置
JP2005165789A (ja) * 2003-12-03 2005-06-23 Pioneer Electronic Corp 進捗管理支援装置、進捗管理支援方法、進捗管理支援プログラムおよび記録媒体
JP2009099039A (ja) * 2007-10-18 2009-05-07 Nissan Motor Co Ltd 生産計画評価装置、およびその方法
JP2010055167A (ja) * 2008-08-26 2010-03-11 Kimura Unity Co Ltd 作業状況表示装置および作業状況表示方法
JP2010070310A (ja) * 2008-09-18 2010-04-02 Yamaha Corp 物流倉庫における作業者毎の集品品目数決定方法および集品品目数決定システム
JP2014211766A (ja) * 2013-04-18 2014-11-13 三菱化学エンジニアリング株式会社 要員管理システム、及び要員管理方法

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019087275A1 (ja) * 2017-10-31 2019-05-09 株式会社日立製作所 作業分析装置、及び作業分析方法
CN111164622A (zh) * 2017-10-31 2020-05-15 株式会社日立制作所 作业分析装置以及作业分析方法
JPWO2019087275A1 (ja) * 2017-10-31 2020-07-27 株式会社日立製作所 作業分析装置、及び作業分析方法
CN111164622B (zh) * 2017-10-31 2024-02-02 株式会社日立制作所 作业分析装置以及作业分析方法
JP2019128772A (ja) * 2018-01-24 2019-08-01 日本電気株式会社 リソース割当最適化システム、リソース割当最適化方法およびリソース割当最適化プログラム
JP7135326B2 (ja) 2018-01-24 2022-09-13 日本電気株式会社 リソース割当最適化システム、リソース割当最適化方法およびリソース割当最適化プログラム
JP2019175209A (ja) * 2018-03-29 2019-10-10 株式会社デンソー 車両の遠隔支援システムおよび方法
JP7124382B2 (ja) 2018-03-29 2022-08-24 株式会社デンソー 車両の遠隔支援システムおよび方法
JP2021532436A (ja) * 2019-09-25 2021-11-25 クーパン コーポレイション 集中型の物流監視のためのコンピュータによって実現されるシステムおよび方法
US11361396B2 (en) 2019-09-25 2022-06-14 Coupang Corp. Computer-implemented systems and methods for centralized logics monitoring

Also Published As

Publication number Publication date
JP6493717B2 (ja) 2019-04-03
JPWO2017175259A1 (ja) 2018-09-13

Similar Documents

Publication Publication Date Title
JP7024094B2 (ja) コンピュータ化されたバランスの取れた配達ルート事前割当用のシステムと方法
JP6968136B2 (ja) 連続バッチ式受注オーダー処理方法
KR102313493B1 (ko) 컴퓨터 밸런싱된 배달 루트 할당을 위한 시스템 및 방법
Žulj et al. Picker routing and storage-assignment strategies for precedence-constrained order picking
CN111415122B (zh) 一种拣货方法和拣货系统
Sternbeck et al. An integrative approach to determine store delivery patterns in grocery retailing
JP6493717B2 (ja) 作業管理装置、作業管理システム、作業管理方法、および作業管理プログラム
US8626548B2 (en) Access point triangulation for task assignment of warehouse employees
JP7006682B2 (ja) 作業管理装置、作業管理方法およびプログラム
CN110599090B (zh) 一种仓储出库管理方法、服务器和存储介质
Bahrami et al. Enhancing the order picking process through a new storage assignment strategy in forward-reserve area
JP7337853B2 (ja) コンピュータ化されたバランスの取れた配送ルート割り当ておよびインセンティブ構造のためのシステムおよび方法
JP2022511185A (ja) 配送作業員の自動スケジューリングのためのシステムおよび方法
WO2014145676A1 (en) Overnight productivity dashboard
TWI754410B (zh) 用於智能化分配產品的電腦實施系統以及方法
Gagliardi et al. Space allocation and stock replenishment synchronization in a distribution center
WO2020144879A1 (ja) 入出庫管理装置、入出庫管理システム、入出庫管理方法およびプログラム
JP2017068555A (ja) 配車方法及び配車システム
KR20220010409A (ko) 제품 할당 검증을 이용한 인바운드 제품의 지능적 분배에 의해 제품 재고를 최적화하는 컴퓨터 구현 시스템 및 방법
KR102463117B1 (ko) 집품 카트에 집품 및 진열 작업을 함께 할당하는 방법 및 장치
US20160019493A1 (en) Overnight productivity dashboard
US10699223B1 (en) System and method for resource allocation across distinct processes of a materials handling facility
JPH1087036A (ja) 物流システムにおける在庫引当方法、及び、配送形態と在庫位置との決定方法
JP5461280B2 (ja) 作業管理システム、作業管理方法及び作業管理プログラム
Chiká et al. Analysis of a logistics flow int the light of VSM 4.0: a case study of in a Distribution Center (DC) in Brazil

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2018510016

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16897818

Country of ref document: EP

Kind code of ref document: A1

122 Ep: pct application non-entry in european phase

Ref document number: 16897818

Country of ref document: EP

Kind code of ref document: A1