WO2017077719A1 - Navire - Google Patents

Navire Download PDF

Info

Publication number
WO2017077719A1
WO2017077719A1 PCT/JP2016/004816 JP2016004816W WO2017077719A1 WO 2017077719 A1 WO2017077719 A1 WO 2017077719A1 JP 2016004816 W JP2016004816 W JP 2016004816W WO 2017077719 A1 WO2017077719 A1 WO 2017077719A1
Authority
WO
WIPO (PCT)
Prior art keywords
gas
boil
engine
pressure
tank
Prior art date
Application number
PCT/JP2016/004816
Other languages
English (en)
Japanese (ja)
Inventor
直樹 成島
崇嗣 安部
康平 橋本
安藤 明洋
宏之 武田
尚子 印藤
Original Assignee
川崎重工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from JP2015247925A external-priority patent/JP6630144B2/ja
Application filed by 川崎重工業株式会社 filed Critical 川崎重工業株式会社
Priority to CN201680063321.3A priority Critical patent/CN108138701A/zh
Priority to KR1020187014895A priority patent/KR20180075608A/ko
Publication of WO2017077719A1 publication Critical patent/WO2017077719A1/fr

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • B63B25/16Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed heat-insulated
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63HMARINE PROPULSION OR STEERING
    • B63H21/00Use of propulsion power plant or units on vessels
    • B63H21/12Use of propulsion power plant or units on vessels the vessels being motor-driven
    • B63H21/14Use of propulsion power plant or units on vessels the vessels being motor-driven relating to internal-combustion engines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63HMARINE PROPULSION OR STEERING
    • B63H21/00Use of propulsion power plant or units on vessels
    • B63H21/38Apparatus or methods specially adapted for use on marine vessels, for handling power plant or unit liquids, e.g. lubricants, coolants, fuels or the like
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63JAUXILIARIES ON VESSELS
    • B63J3/00Driving of auxiliaries
    • B63J3/04Driving of auxiliaries from power plant other than propulsion power plant
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02BINTERNAL-COMBUSTION PISTON ENGINES; COMBUSTION ENGINES IN GENERAL
    • F02B43/00Engines characterised by operating on gaseous fuels; Plants including such engines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02MSUPPLYING COMBUSTION ENGINES IN GENERAL WITH COMBUSTIBLE MIXTURES OR CONSTITUENTS THEREOF
    • F02M21/00Apparatus for supplying engines with non-liquid fuels, e.g. gaseous fuels stored in liquid form
    • F02M21/02Apparatus for supplying engines with non-liquid fuels, e.g. gaseous fuels stored in liquid form for gaseous fuels
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C13/00Details of vessels or of the filling or discharging of vessels
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/10Internal combustion engine [ICE] based vehicles
    • Y02T10/30Use of alternative fuels, e.g. biofuels
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T70/00Maritime or waterways transport
    • Y02T70/50Measures to reduce greenhouse gas emissions related to the propulsion system
    • Y02T70/5218Less carbon-intensive fuels, e.g. natural gas, biofuels

Definitions

  • the present invention relates to a ship including a main gas engine for propulsion and a sub gas engine for power generation.
  • a fuel gas supply system shown in Patent Document 1 is known that is used in ships including a propulsion main gas engine and a power generation sub-gas engine.
  • liquefied gas is loaded in a cargo tank.
  • the boil-off gas naturally generated in the tank is supplied to the main engine through a first fuel gas supply line including a high-pressure gas compressor.
  • the low pressure gas is supplied to the diesel power generation engine through the low pressure fuel gas supply line branched from the high pressure gas compressor.
  • the liquefied gas is pressurized by the high-pressure liquid pump through the second fuel gas supply line connected to the pump in the tank, and is heated and vaporized by the gas heater.
  • the vaporized gas (vaporized gas) is supplied from the second fuel gas supply line to the main engine through the first fuel gas supply line, and from the second fuel gas supply line to the first fuel gas supply line, the communication line, and the low pressure. It is supplied to the diesel generator engine through the fuel gas supply line.
  • boil-off gas is supplied to the main engine, and surplus boil-off gas is supplied to the diesel power generation engine or boiler.
  • boil-off gas is supplied to the main engine and the diesel generator engine, and vaporized gas is supplied to the main engine and the diesel generator as fuel that is insufficient for this.
  • boil-off gas and / or vaporized gas is supplied to the diesel generator according to the relationship between the fuel consumption and the amount of tank generated.
  • it does not describe control for supplying boil-off gas and / or vaporized gas to the diesel generator at a pressure according to the demand.
  • the fuel gas supply system still has room for improvement from the viewpoint of supplying the boil-off gas and / or the vaporized gas to the diesel generator at a pressure according to the demand.
  • an object of the present invention is to provide a ship capable of supplying boil-off gas and / or vaporized gas to a sub-gas engine for power generation at a pressure according to the demand.
  • a ship includes a main gas engine for propulsion, a tank that stores liquefied natural gas, and a boil-off gas that is generated in the tank that leads to a compressor.
  • the liquefied natural gas led to the liquid feeding line is vaporized by the forced vaporizer, and this vaporized gas is led to the second supply line and supplied to the sub gas engine.
  • the control device controls the first adjustment valve of the liquid supply line and the second adjustment valve of the bridge line, thereby adjusting the flow rate of the boil-off gas and / or the vaporized gas supplied to the auxiliary gas engine, and boil-off.
  • Gas and / or vaporized gas can be supplied to the secondary gas engine at a pressure according to its requirements.
  • the ship according to the second aspect of the present invention further includes a pressure gauge for detecting the pressure of the boil-off gas in the tank or the boil-off gas flowing in the air supply line, and the control device is configured to supply liquefied natural gas in the tank.
  • the available amount of boil-off gas is larger than the amount of fuel gas consumed by the main gas engine, the available amount of boil-off gas is calculated from the amount and the pressure of the boil-off gas detected by the pressure gauge. 2 You may open a regulating valve.
  • surplus boil-off gas with respect to the fuel gas consumption of the main gas engine can be flowed to the bridge line via the second adjustment valve and supplied to the auxiliary gas engine.
  • opening the second adjustment valve includes opening the closed second adjustment valve and maintaining the opened second adjustment valve in advance.
  • the control device may calculate a difference between an available amount of the boil-off gas and a sum of a fuel gas consumption amount of the main gas engine and a fuel gas consumption amount of the sub gas engine.
  • the first regulating valve may be controlled accordingly, and the second regulating valve may be controlled according to the fuel gas demand pressure of the auxiliary gas engine.
  • the control device controls the second regulating valve according to a difference between an available amount of the boil-off gas and a fuel gas consumption amount of the main gas engine, The first regulating valve may be controlled in accordance with a fuel gas demand pressure of the auxiliary gas engine.
  • the amount of boil-off gas generated varies depending on the pressure of the boil-off gas in the tank, but substantially depends on the amount of liquefied natural gas in the tank. For this reason, when the amount of boil-off gas supplied to the compressor is determined by comparing the fuel gas consumption of the main gas engine with the amount of boil-off gas generated, the pressure of the boil-off gas in the tank is within an arbitrary required range. It is difficult to adjust. On the other hand, the available amount of boil-off gas is calculated from the amount of liquefied natural gas in the tank and the pressure of the boil-off gas detected by the pressure gauge.
  • the boil-off gas may be actively used when the pressure of the boil-off gas in the tank is high, and the amount of boil-off gas used may be reduced when the pressure of the boil-off gas in the tank is low. it can. Therefore, the pressure of the boil-off gas in the tank can be easily adjusted within the required range.
  • the ship according to the fifth aspect of the present invention branches from the first supply line or the second supply line and is connected to the tank.
  • the return line is provided with an expansion device, and the opening is provided in the return line.
  • a third adjusting valve that can be changed, and the control device may control the third adjusting valve.
  • the ship according to the sixth aspect of the present invention further includes a pressure gauge for detecting the pressure of the boil-off gas in the tank or the boil-off gas flowing in the air supply line, and the control device is configured to supply liquefied natural gas in the tank.
  • the available amount of boil-off gas is calculated from the amount and the pressure of the boil-off gas detected by the pressure gauge, and the available amount of boil-off gas is the fuel gas consumption amount of the main gas engine and the fuel gas consumption of the auxiliary gas engine. When it is larger than the sum of the amounts, the second adjustment valve and the third adjustment valve may be opened.
  • surplus boil-off gas with respect to the fuel gas consumption of the main gas engine can be flowed to the bridge line via the second adjustment valve and supplied to the auxiliary gas engine.
  • surplus boil-off gas with respect to the sum of the fuel gas consumption of each gas engine can be sent to a return line via a 3rd regulating valve, and can be returned to a tank.
  • opening the second adjustment valve and the third adjustment valve means opening the closed second adjustment valve and the third adjustment valve, and opening the second adjustment valve and the third adjustment valve that are opened in advance. Including maintaining.
  • the control device responds to a difference between an available amount of the boil-off gas and a sum of a fuel gas consumption amount of the main gas engine and a fuel gas consumption amount of the sub gas engine.
  • the third adjustment valve may be controlled, and the second adjustment valve may be controlled in accordance with the fuel gas required pressure of the auxiliary gas engine.
  • the boil-off gas in the tank The pressure can be easily adjusted within the required range. Further, if the second regulating valve is controlled according to the fuel gas required pressure of the auxiliary gas engine, the boil-off gas and / or the vaporized gas can be supplied to the auxiliary gas engine at a pressure corresponding to the requirement.
  • boil-off gas and / or vaporized gas can be supplied to the sub-gas engine for power generation at a pressure according to the demand.
  • 1 is a schematic configuration diagram of a ship according to a first embodiment of the present invention. It is a graph which shows the relationship between the deviation of the pressure of the boil-off gas in a tank, and setting pressure, and the available amount of boil-off gas. It is a schematic block diagram of the ship which concerns on 2nd Embodiment of this invention. It is a schematic block diagram of the ship which concerns on 3rd Embodiment of this invention. It is a schematic block diagram of the ship which concerns on 4th Embodiment of this invention. It is a schematic block diagram of the ship which concerns on 5th Embodiment of this invention.
  • FIG. 1 shows a ship 1A according to the first embodiment of the present invention.
  • the ship 1A includes a tank 11 for storing liquefied natural gas (hereinafter referred to as LNG), a main gas engine 13 for propulsion, and a sub gas engine 16 for power generation (that is, for onboard power).
  • LNG liquefied natural gas
  • main gas engine 13 for propulsion
  • sub gas engine 16 for power generation (that is, for onboard power).
  • the ship 1A is an LNG carrier, and the ship 1A is equipped with a plurality of cargo tanks. That is, the tank 11 shown in FIG. 1 is each of a plurality of cargo tanks.
  • one main gas engine 13 and one sub gas engine 16 are provided, but a plurality of main gas engines 13 may be provided, or a plurality of sub gas engines 16 may be provided. Good.
  • the ship 1A is a mechanical propulsion type, and the main gas engine 13 directly rotates and drives a screw propeller (not shown).
  • the ship 1A may be an electric propulsion type, and the main gas engine 13 may rotationally drive the screw propeller via a generator and a motor.
  • the main gas engine 13 is a diesel cycle type two-stroke engine having a high fuel gas injection pressure of about 20 to 35 MPa, for example.
  • the main gas engine 13 may be an Otto cycle type two-stroke engine having a medium pressure of, for example, a fuel gas injection pressure of about 1 to 2 MPa.
  • the main gas engine 13 may be an Otto cycle type four-stroke engine having a low fuel gas injection pressure of, for example, about 0.5 to 1 MPa.
  • the main gas engine 13 may be a gas-only combustion engine that burns only fuel gas, or may be a dual fuel engine that burns one or both of fuel gas and fuel oil (binary fuel engine). In this case, the fuel gas may be burned by the Otto cycle, and the fuel oil may be burned by the diesel cycle).
  • the auxiliary gas engine 16 is an Otto cycle type four-stroke engine having a low fuel gas injection pressure of about 0.5 to 1 MPa, for example, and is connected to a generator (not shown).
  • the auxiliary gas engine 16 may be a gas combustion engine that burns only fuel gas, or may be a dual fuel engine that burns one or both of fuel gas and fuel oil.
  • the fuel gas of the main gas engine 13 is mainly boil-off gas (hereinafter referred to as BOG) generated in the tank 11 by natural heat input, and the fuel gas of the auxiliary gas engine 16 is mainly forced by LNG.
  • BOG boil-off gas
  • VG vaporized gas
  • the tank 11 is connected to the compressor 12 by an air supply line 21, and the compressor 12 is connected to the main gas engine 13 by a first supply line 22. Further, a pump 14 is disposed in the tank 11, and the pump 14 is connected to the forced vaporizer 15 by a liquid feed line 31. The forced vaporizer 15 is connected to the auxiliary gas engine 16 by the second supply line 32.
  • the air supply line 21 guides BOG generated in the tank 11 to the compressor 12.
  • the compressor 12 compresses the BOG to a high pressure.
  • the first supply line 22 guides high-pressure BOG discharged from the compressor 12 to the main gas engine 13.
  • the compressor 12 is a five-stage high-pressure compressor.
  • a connection line 12b connects between the inlet of the compressor 12 and the first stage compression unit 12a, between each stage compression unit 12a, and between the outlet of the compressor 12 and the fifth stage compression unit 12a.
  • a bypass line 12c that bypasses each compressor 12a is connected to the connection line 12b, and a bypass valve 12d is provided in the bypass line 12c.
  • the bypass valve 12 d is an adjustment valve whose opening degree can be changed, and the opening degree is controlled by the control device 6.
  • the compressor 12 may be a low-pressure compressor, for example, when the fuel gas injection pressure of the main gas engine 13 is low.
  • the bridge line 51 is connected from the compressor 12 to the second supply line 32.
  • the bridge line 51 is connected to a stage where the pressure of the BOG in the bridge line 51 becomes higher than the required fuel gas pressure of the auxiliary gas engine 16.
  • the larger the pressure difference the more expensive the pressure adjusting device such as a pressure reducing valve for adjusting the pressure of the BOG supplied to the sub gas engine 16 to the required fuel gas pressure of the sub gas engine 16.
  • the bridge line 51 is connected to the compressor 12 between the second-stage compression unit 12a and the third-stage compression unit 12a.
  • the bridge line 51 guides this surplus BOG from the compressor 12 to the second supply line 32 when the BOG is surplus with respect to the fuel gas consumption of the main gas engine 13.
  • the auxiliary gas engine 16 is supplied with VG and BOG (in some cases, only BOG) as fuel gas.
  • the liquid feed line 31 guides LNG discharged from the pump 14 to the forced vaporizer 15.
  • the pump 14 discharges LNG so that the pressure of VG guided from the forced vaporizer 15 to the auxiliary gas engine 16 becomes equal to or higher than the required fuel gas pressure of the auxiliary gas engine 16.
  • the forced vaporizer 15 forcibly vaporizes LNG using, for example, steam generated in a boiler as a heat source, and generates VG.
  • the second supply line 32 guides VG generated by the forced vaporizer 15 to the auxiliary gas engine 16.
  • the second supply line 32 is preferably provided with equipment (for example, a cooler and a gas-liquid separator) for removing heavy components such as ethane having a mass larger than that of methane from the VG. .
  • equipment for example, a cooler and a gas-liquid separator
  • a check valve 33 is provided on the second supply line 32 upstream of the connection point of the bridge line 51.
  • the check valve 33 may not be provided in the second supply line 32.
  • a check valve that prevents BOG or VG from flowing back to the compressor 12 may be provided in the bridge line 51.
  • the liquid supply line 31 is provided with a first adjustment valve 31a, and the bridge line 51 is provided with a second adjustment valve 51a.
  • the opening degree of these regulating valves 31 a and 51 a can be changed, and the opening degree is controlled by the control device 6. In FIG. 1, only some signal lines are drawn for the sake of simplicity.
  • the first adjustment valve 31a plays a role of opening and closing the liquid supply line 31
  • the second adjustment valve 51a plays a role of opening and closing the bridge line 51.
  • an opening / closing valve may be provided in the liquid feeding line 31 separately from the first adjustment valve 31a, or an opening / closing valve may be provided in the bridge line 51 separately from the second adjustment valve 51a.
  • a first pressure gauge 61 for detecting the pressure Pb1 of the BOG flowing through the air supply line 21 is provided in the air supply line 21.
  • the first pressure gauge 61 may be provided in the tank 11 and detect the pressure of the BOG in the tank 11.
  • the first supply line 22 is provided with a second pressure gauge 62 that detects the pressure Pb2 of the BOG flowing through the first supply line 22.
  • a flow meter 63 that detects the flow rate Fl of LNG flowing through the liquid supply line 31 is provided in the liquid supply line 31.
  • the flow meter 63 is provided in the liquid supply line 31 on the upstream side of the first adjustment valve 31a, but may be provided in the liquid supply line 31 on the downstream side of the first adjustment valve 31a. Good.
  • the flow meter 63 may be provided downstream of the forced vaporizer 15 in the second supply line 32 and upstream of the connection point of the bridge line 51. In this case, the flow meter 63 detects the flow rate of VG flowing from the forced vaporizer 15 to the second supply line 32.
  • the second supply line 32 is provided with a third pressure gauge 64 for detecting the pressure Pv of VG and / or BOG flowing through the second supply line 32. The third pressure gauge 64 is located downstream of the connection point of the bridge line 51 in the second supply line 32.
  • the control device 6 supplies the fuel gas (BOG and / or VG) to each gas engine 13 and 16 at the required fuel gas pressure of each gas engine 13 and 16 and keeps the pressure in the tank 11 within the required range.
  • the control valves 31a and 51a are controlled based on the detected values of the flow meter 63 and the pressure gauges 61, 62 and 64.
  • the required fuel gas pressure of each gas engine 13, 16 is a pressure determined in advance or arbitrarily according to the request of each gas engine 13, 16. Further, the required range of the internal pressure of the tank 11 is a pressure determined in advance or arbitrarily according to the performance of the tank 11 or the like.
  • the control device 6 controls the pressure of the BOG supplied to the main gas engine 13 based on the detection value of the second pressure gauge 62.
  • the detection value signal is transmitted from the second pressure gauge 62 to the control device 6.
  • the control device 6 acquires the pressure Pb2 of BOG that is pumped from the compressor 12 and supplied to the main gas engine 13 via the first supply line 22.
  • the control device 6 controls the bypass valve 12d of the compressor 12 so that the BOG pressure Pb2 becomes the required fuel gas pressure of the main gas engine 13.
  • BOG is supplied to the main gas engine 13 at the required fuel gas pressure of the main gas engine 13.
  • control device 6 controls the pressures of VG and BOG supplied to the auxiliary gas engine 16 based on the detected values of the first pressure gauge 61, the third pressure gauge 64, and the flow meter 63. Therefore, first, the control device 6 calculates the fuel gas consumption amount Q1 of the main gas engine 13 and the fuel gas consumption amount Q2 of the auxiliary gas engine 16.
  • the control device 6 includes a first gas engine controller (not shown) for controlling the fuel gas injection timing of the main gas engine 13 and the second gas engine for controlling the fuel gas injection timing of the auxiliary gas engine 16.
  • Various signals are transmitted from a controller (not shown).
  • the control device 6 calculates the fuel gas consumption Q1 of the main gas engine 13 from the signal transmitted from the first gas engine controller, and the auxiliary gas engine 16 from the signal transmitted from the second gas engine controller.
  • the fuel gas consumption Q2 is calculated.
  • the control device 6 may acquire the fuel gas consumption Q1 directly from the first gas engine controller. Further, the control device 6 may acquire the fuel gas consumption Q2 directly from the second gas engine controller.
  • the set pressure Ps is a pressure at which the BOG usable amount Qa becomes equal to the BOG generation amount Qn.
  • the BOG generation amount Qn varies depending on the pressure of the BOG in the tank 11, but substantially depends on the amount of LNG in the tank 11.
  • the control device 6 calculates the available amount Qa of BOG from the amount of LNG in the tank 11 and the pressure deviation ⁇ P.
  • the control device 6 compares the available amount Qa of the BOG with the fuel gas consumption amounts Q1 and Q2 of the gas engines 13 and 16, respectively.
  • the available amount Qa of BOG is larger than the fuel gas consumption amount Q1 of the main gas engine 13 (when BOG is more than the fuel gas consumption amount Q1 of the main gas engine 13)
  • the control device 6 uses the available amount Qa.
  • Q2- ⁇ Q1) is calculated.
  • the control apparatus 6 calculates
  • the opening degree of the regulating valve 31a is controlled. Thereby, VG of ⁇ Q2 flows from the forced vaporizer 15 to the second supply line 32, and surplus BOG of ⁇ Q1 flows from the bridge line 51 to the second supply line 32.
  • control device 6 controls the opening degree of the second adjustment valve 51 a so that the pressure Pv detected by the third pressure gauge 64 becomes the required fuel gas pressure of the auxiliary gas engine 16. As a result, VG and BOG are supplied to the auxiliary gas engine 16 at the required fuel gas pressure of the auxiliary gas engine 16.
  • LNG is forcibly vaporized by the forced vaporizer 15 and the VG is supplied to the secondary gas engine 16, so that the secondary gas engine is not used without using a high-pressure pump.
  • 16 can be supplied with a sufficient amount of fuel gas.
  • the surplus BOG can be supplied from the compressor 12 to the sub gas engine 16 through the bridge line 51 and the second supply line 32. Accordingly, the amount of VG vaporized by the forced vaporizer 15 can be reduced, and the amount of heat used for forced vaporization by the forced vaporizer 15 can be suppressed.
  • the BOG generation amount Qn varies depending on the pressure of the BOG in the tank 11, but substantially depends on the amount of LNG in the tank 11. Therefore, when the first adjustment valve 31a is controlled by comparing the fuel gas consumption amount Q1 of the main gas engine 13 with the BOG generation amount Qn, the pressure of the BOG in the tank 11 is adjusted within an arbitrary required range. Difficult to do. In contrast, in the present embodiment, the available amount Qa of BOG is calculated from the amount of LNG in the tank 11 and the BOG pressure Pb 1 detected by the pressure gauge 61.
  • the first regulating valve 31a is controlled in accordance with the difference ⁇ Q2 between the available amount Qa of BOG and the sum of the fuel gas consumption Q1 of the main gas engine 13 and the fuel gas consumption Q2 of the auxiliary gas engine 16. .
  • first adjustment valve 31a is controlled according to the difference ⁇ Q2
  • second adjustment valve 51a is controlled according to the fuel gas required pressure of the auxiliary gas engine 16.
  • VG and BOG are supplied to the auxiliary gas engine 16 at the required fuel gas pressure of the auxiliary gas engine 16.
  • the bypass valve 12 d of the compressor 12 is controlled according to the fuel gas required pressure of the main gas engine 13.
  • BOG is supplied to the main gas engine 13 at the required fuel gas pressure of the main gas engine 13.
  • the flow meter 63 is provided in the liquid feeding line 31.
  • the flow meter 65 is provided on the bridge line 51.
  • the control device 6 controls the first adjustment valve 31a according to the difference ⁇ Q2, and controls the second adjustment valve 51a according to the fuel gas required pressure of the auxiliary gas engine 16.
  • the control apparatus 6 controls the 2nd adjustment valve 51a according to difference (DELTA) Q1, and controls the 1st adjustment valve 31a according to the fuel gas request
  • DELTA difference
  • the flow meter 65 detects the BOG flow rate Fb 1 flowing from the compressor 12 to the bridge line 51. This detected value is transmitted to the control device 6.
  • the control device 6 controls the pressure of the BOG supplied to the main gas engine 13 based on the fuel gas consumption Q1 of the main gas engine 13 and the detected value of the second pressure gauge 62.
  • the control device 6 also supplies VG and BOG supplied to the auxiliary gas engine 16 based on the detected values of the fuel gas consumption Q2 of the auxiliary gas engine 16, the first pressure gauge 61, the third pressure gauge 64, and the flow meter 65. To control the pressure.
  • the available amount Qa of BOG is larger than the fuel gas consumption amount Q1 of the main gas engine 13 and is equal to or less than the sum of the fuel gas consumption amounts Q1 and Q2 of the gas engines 13 and 16.
  • the control apparatus 6 controls the opening degree of the 2nd adjustment valve 51a so that the flow volume Fb1 detected by the flowmeter 65 may become difference (DELTA) Q1. Thereby, surplus BOG of the flow rate Fb1 flows from the compressor 12 to the bridge line 51.
  • control device 6 controls the opening degree of the first adjustment valve 31 a so that the pressure Pv detected by the third pressure gauge 64 becomes the required fuel gas pressure of the auxiliary gas engine 16. As a result, VG and BOG are supplied to the auxiliary gas engine 16 at the required fuel gas pressure.
  • the control device 6 controls the opening degree of the first adjustment valve 31a so that the pressure Pv detected by the third pressure gauge 64 becomes the required fuel gas pressure of the auxiliary gas engine 16. .
  • the control device 6 calculates the difference (Q1 + Q2-Qa) between the sum of the fuel gas consumption amount Q1 of the main gas engine 13 and the fuel gas consumption amount Q2 of the auxiliary gas engine 16 and the available amount Qa of BOG.
  • the first adjustment valve 31a is controlled as the set flow rate of LNG.
  • the control apparatus 6 correct
  • a ship 1C according to the third embodiment further includes a return line 23 in addition to the configuration of the ship 1A according to the first embodiment.
  • the flow meter 63 is provided in the liquid supply line 31, whereas in the third embodiment, the flow meter 66 is provided in the return line 23.
  • the flow meter 66 detects the flow rate Fb2 of the BOG flowing through the return line 23. This detected value is transmitted to the control device 6.
  • the return line 23 branches from the first supply line 22 and is connected to the tank 11.
  • the tip of the return line 23 may be located above the liquid level of LNG in the tank 11 or may be located below the liquid level.
  • the return line 23 is provided with an expansion device 72 such as an expansion valve.
  • the return line 23 is provided with a third adjustment valve 23a whose opening degree can be changed, and an opening / closing valve 23b for opening and closing the return line 23.
  • the third adjusting valve 23 a and the on-off valve 23 b are controlled by the control device 6.
  • the return line 23 may not be provided with the opening / closing valve 23b.
  • the available amount Qa of BOG is larger than the fuel gas consumption Q1 of the main gas engine 13 and is equal to or less than the sum of the fuel gas consumptions Q1 and Q2 of the gas engines 13 and 16.
  • the VG and BOG pressure control for the auxiliary gas engine 16 in (Q1 ⁇ Qa ⁇ Q1 + Q2) has been described.
  • the usable amount Qa of BOG is larger than the sum of the fuel gas consumptions Q1 and Q2 of the gas engines 13 and 16 (Qa> Q1 + Q2), The pressure control will be described.
  • the control apparatus 6 stops the operation of the forced vaporizer 15, and fully closes the 1st regulating valve 31a.
  • the opening of the first adjustment valve 31a is set to the minimum opening at which the operation of the forced vaporizer 15 can be continued without stopping the operation of the forced vaporizer 15. Also good.
  • the control device 6 controls the opening degree of the third adjustment valve 23a so that the flow rate Fb2 detected by the flow meter 66 becomes the difference ⁇ Q3. Further, the control device 6 controls the opening degree of the second adjustment valve 51 a so that the pressure Pv detected by the third pressure gauge 64 becomes the required fuel gas pressure of the auxiliary gas engine 16.
  • the remaining BOG of ⁇ Q3 with respect to the sum of the fuel gas consumptions Q1 and Q2 of the gas engines 13 and 16 flows to the return line 23.
  • the BOG of the fuel gas consumption Q2 of the auxiliary gas engine 16 flows to the bridge line 51, and BOG is supplied to the auxiliary gas engine 16 at the required fuel gas pressure.
  • a ship 1D according to the fourth embodiment further includes a heat exchanger 81 in addition to the configuration of the ship 1C according to the third embodiment.
  • the heat exchanger 81 is provided in the liquid supply line 31, the return line 23, and the air supply line 21.
  • the heat exchanger 81 cools the BOG flowing in the return line 23 upstream of the expansion device 72 (BOG returned to the tank 11) by the LNG flowing in the liquid supply line 31 and the BOG flowing in the air supply line 21. After this cooling, the BOG returned to the tank 11 is partially liquefied by being expanded by the expansion device 72.
  • the LNG flowing in the liquid feeding line 31 may be partially vaporized by taking heat from the BOG.
  • the BOG flowing in the return line 23 is cooled by LNG and BOG used as fuel for the ship 1D, and thus a device and a medium for this cooling are separately prepared. There is no need to do. Also in this embodiment, the same effect as that of the first embodiment can be obtained.
  • a ship 1E according to the fifth embodiment includes a return line 34 and a flow meter 67 instead of the return line 23 and the flow meter 66 according to the third embodiment.
  • the return line 34 branches off from the second supply line 32 downstream of the connection point of the bridge line 51 and is connected to the tank 11. However, the return line 34 may branch from the second supply line 32 upstream of the connection point of the bridge line 51. Moreover, the front end of the return line 34 may be located above the liquid level of LNG in the tank 11 or may be located below the liquid level.
  • the return line 34 is provided with a third adjustment valve 34a whose opening degree can be changed.
  • the third adjustment valve 34 a is controlled by the control device 6. Further, the flow meter 67 detects the BOG flow rate Fb3 flowing through the return line 34. This detected value is transmitted to the control device 6.
  • the remaining BOG of ⁇ Q1 with respect to the fuel gas consumption Q1 of the main gas engine 13 flows to the bridge line 51, and among this, the BOG of ⁇ Q3 flows to the return line 34. Therefore, the BOG of the fuel gas consumption Q2 of the auxiliary gas engine 16 flows to the second supply line 32 downstream of the branch point of the return line 34, and the BOG is supplied to the auxiliary gas engine 16 at the required fuel gas pressure.
  • the ship 1E according to the fifth embodiment may include the return line 23 according to the third embodiment.
  • the ship 1E according to the fifth embodiment may further include a heat exchanger. This heat exchanger is provided in the liquid feed line 31 and the return line 34. The heat exchanger cools BOG flowing through the return line 34 (BOG returned to the tank 11) with LNG flowing through the liquid supply line 31.
  • the pump 14 may have a function of pumping up LNG up to the forced vaporizer 15, and a compressor may be provided in the second supply line 32.
  • a compressor may be provided in the second supply line 32.
  • the fuel gas injection pressure of the auxiliary gas engine 16 is secured by the pump 14, it is not necessary to provide a compressor in the second supply line 32, and the cost can be reduced.
  • main gas engine 13 and the auxiliary gas engine 16 are not necessarily a reciprocating engine, and may be a gas turbine engine.
  • a bridge line that guides VG from the second supply line 32 to the air supply line 21 may be further provided. This bridge line guides VG from the second supply line 32 to the air supply line 21 when the BOG is insufficient with respect to the fuel gas consumption Q1 of the main gas engine 13. As a result, BOG and VG are supplied to the main gas engine 13 as fuel gas.
  • flow meters 63, 65, 66, and 67 were used for the flow control of LNG, BOG, and VG.
  • this flow rate control is performed based on the relationship between the opening degree of each of the regulating valves 31a, 51a, 23a, and 34a and the flow rates of LNG, BOG, and VG.
  • this cost can be reduced by not using a flow meter.
  • 1A to 1C Ship 6: Control device 11: Tank 12: Compressor 13: Main gas engine 14: Pump 15: Forced vaporizer 16: Sub gas engine 21: Air supply line 22: First supply line 31: Liquid supply line 31a: First adjustment valve 32: Second supply line 23: Return line 34: Return line 23a: Third adjustment valve 51: Bridge line 51a: Second adjustment valve 61: First pressure gauge (pressure gauge) 72: expansion device 34a: third adjusting valve

Abstract

L'invention concerne un navire comportant : un moteur à gaz principal destiné à la propulsion ; un réservoir destiné au stockage de gaz naturel liquéfié ; une conduite d'alimentation en gaz pour guider le gaz d'évaporation généré à l'intérieur du réservoir vers un compresseur ; une première conduite d'alimentation pour guider le gaz d'évaporation évacué du compresseur vers le moteur à gaz principal ; un moteur à gaz auxiliaire destiné à générer de l'énergie électrique ; une conduite d'alimentation en liquide pour guider le gaz naturel liquéfié évacué d'une pompe disposée à l'intérieur du réservoir vers un vaporiseur forcé ; une seconde conduite d'alimentation pour guider le gaz vaporisé généré par le vaporiseur forcé vers le moteur à gaz auxiliaire ; une conduite de liaison pour guider le gaz d'évaporation du compresseur vers la seconde conduite d'alimentation ; une première soupape de régulation qui est disposée sur la conduite d'alimentation en liquide, dont le degré d'ouverture peut être changé ; une seconde soupape de régulation qui est disposée sur la conduite de liaison, dont le degré d'ouverture peut être changé ; et un dispositif de commande pour commander la première soupape de régulation et la seconde soupape de régulation.
PCT/JP2016/004816 2015-11-06 2016-11-04 Navire WO2017077719A1 (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201680063321.3A CN108138701A (zh) 2015-11-06 2016-11-04 船舶
KR1020187014895A KR20180075608A (ko) 2015-11-06 2016-11-04 선박

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP2015218109 2015-11-06
JP2015-218109 2015-11-06
JP2015247925A JP6630144B2 (ja) 2015-11-06 2015-12-18 船舶
JP2015-247925 2015-12-18

Publications (1)

Publication Number Publication Date
WO2017077719A1 true WO2017077719A1 (fr) 2017-05-11

Family

ID=58662450

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/004816 WO2017077719A1 (fr) 2015-11-06 2016-11-04 Navire

Country Status (1)

Country Link
WO (1) WO2017077719A1 (fr)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080276627A1 (en) * 2007-05-08 2008-11-13 Daewoo Shipbuilding & Marine Engineering Co., Ltd. Fuel gas supply system and method of a ship
JP2012076561A (ja) * 2010-09-30 2012-04-19 Mitsubishi Heavy Ind Ltd 舶用燃料供給システム
US20140290279A1 (en) * 2012-10-24 2014-10-02 Daewoo Shipbuilding & Marine Engineering Co., Ltd Liquefied gas treatment system for vessel
JP2015074418A (ja) * 2013-10-11 2015-04-20 三井造船株式会社 液化ガス運搬船用燃料ガス供給システム
JP2015145243A (ja) * 2015-04-30 2015-08-13 三井造船株式会社 液化ガス運搬船用燃料ガス供給システム

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080276627A1 (en) * 2007-05-08 2008-11-13 Daewoo Shipbuilding & Marine Engineering Co., Ltd. Fuel gas supply system and method of a ship
JP2012076561A (ja) * 2010-09-30 2012-04-19 Mitsubishi Heavy Ind Ltd 舶用燃料供給システム
US20140290279A1 (en) * 2012-10-24 2014-10-02 Daewoo Shipbuilding & Marine Engineering Co., Ltd Liquefied gas treatment system for vessel
JP2015074418A (ja) * 2013-10-11 2015-04-20 三井造船株式会社 液化ガス運搬船用燃料ガス供給システム
JP2015145243A (ja) * 2015-04-30 2015-08-13 三井造船株式会社 液化ガス運搬船用燃料ガス供給システム

Similar Documents

Publication Publication Date Title
JP6630144B2 (ja) 船舶
WO2017104633A1 (fr) Navire
KR101464118B1 (ko) 선박, 연료가스 공급장치 및 연료가스 공급방법
KR101758993B1 (ko) 액화가스 처리 시스템
EP2659120B1 (fr) Système d'alimentation en carburant et procédé de fonctionnement d'un système d'alimentation en carburant
US10654552B2 (en) Fuel supply system and method for ship engine
JP2017110797A (ja) 船舶
WO2017078155A1 (fr) Navire
JP2016037935A (ja) ガス供給システム及びそれを備える船舶
KR20180048572A (ko) 선박용 연료 가스 공급 시스템
KR20180090369A (ko) 선박
WO2017077719A1 (fr) Navire
CN210179314U (zh) 船用lng供气系统
KR101761981B1 (ko) 액화가스 처리 시스템
JP6757217B2 (ja) 船舶
JP2018048608A (ja) 船舶
CN115095452B (zh) 一种燃气发动机试验台供气系统及控制方法
JP2018103955A (ja) 船舶
JP2018103960A (ja) 船舶
KR20150140094A (ko) 선박용 연료 공급 시스템 및 방법

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16861790

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 20187014895

Country of ref document: KR

Kind code of ref document: A

122 Ep: pct application non-entry in european phase

Ref document number: 16861790

Country of ref document: EP

Kind code of ref document: A1