WO2017072991A1 - 電力変換システム及び制御装置 - Google Patents

電力変換システム及び制御装置 Download PDF

Info

Publication number
WO2017072991A1
WO2017072991A1 PCT/JP2016/003701 JP2016003701W WO2017072991A1 WO 2017072991 A1 WO2017072991 A1 WO 2017072991A1 JP 2016003701 W JP2016003701 W JP 2016003701W WO 2017072991 A1 WO2017072991 A1 WO 2017072991A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
converter
storage unit
power storage
remaining capacity
Prior art date
Application number
PCT/JP2016/003701
Other languages
English (en)
French (fr)
Inventor
祐一郎 寺本
智彦 豊永
利哉 岩崎
中島 武
Original Assignee
パナソニックIpマネジメント株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パナソニックIpマネジメント株式会社 filed Critical パナソニックIpマネジメント株式会社
Priority to EP16859232.7A priority Critical patent/EP3370322A4/en
Priority to AU2016344885A priority patent/AU2016344885A1/en
Publication of WO2017072991A1 publication Critical patent/WO2017072991A1/ja
Priority to US15/964,098 priority patent/US20180248376A1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0013Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries acting upon several batteries simultaneously or sequentially
    • H02J7/0014Circuits for equalisation of charge between batteries
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • H02J7/35Parallel operation in networks using both storage and other dc sources, e.g. providing buffering with light sensitive cells
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0047Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries with monitoring or indicating devices or circuits
    • H02J7/0048Detection of remaining charge capacity or state of charge [SOC]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/70Hybrid systems, e.g. uninterruptible or back-up power supplies integrating renewable energies
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers

Definitions

  • the present invention relates to a power conversion system that converts DC power into AC power and a control device used in the power conversion system.
  • a system that supplies power to the load in cooperation with the plurality of power storage systems after switching from the grid connection mode to the self-sustaining operation mode due to a power failure, etc. is there.
  • power is supplied to a load at a predetermined voltage from a master power storage system (hereinafter referred to as a main power storage system), and a slave power storage system (hereinafter referred to as a sub power storage system) is connected to the main power storage system.
  • a plurality of power storage systems cooperate by superimposing current on the output (see, for example, Patent Document 1).
  • the main power storage system outputs a current obtained by subtracting the current output from the sub power storage system from the current consumed by the load.
  • the current output from each power storage system is controlled to a value obtained by dividing the current consumed by the load by the number of power storage systems connected in parallel. For example, in a system having one main power storage system and one sub power storage system, current is supplied to the load at a current ratio of 1: 1.
  • the load voltage cannot be defined even if the capacity of the sub power storage system has not reached the lower limit, and the operation of the sub power storage system Will also stop.
  • the present invention has been made in view of such a situation, and an object of the present invention is to continue supplying power to a load for as long as possible when a plurality of power storage systems connected in parallel cooperate to supply power to the load.
  • An object of the present invention is to provide a power conversion system and a control device that can be used.
  • a power conversion system includes a first DC-AC conversion unit that converts DC power supplied from a first power storage unit into AC power, and monitoring from the first power storage unit.
  • a first control unit that acquires data and controls the first DC-AC conversion unit
  • a second DC-AC conversion unit that converts DC power supplied from the second power storage unit into AC power
  • the second power storage A second control unit that obtains monitoring data from the unit and controls the second DC-AC conversion unit.
  • the AC output path of the first DC-AC converter and the AC output path of the second DC-AC converter are coupled, and the AC output current of the first DC-AC converter and the second DC-AC converter
  • the total current of the AC output current is supplied to the load
  • the first control unit sets the output voltage of the first DC-AC conversion unit, and notifies the second control unit of the remaining capacity of the first power storage unit
  • the second control unit is configured to calculate the remaining capacity of the first power storage unit based on the total current supplied to the load, the remaining capacity of the first power storage unit, and the remaining capacity of the second power storage unit.
  • the output current of the second DC-AC converter is controlled so that the remaining capacity of the second power storage unit approaches.
  • This device is a DC-AC conversion unit in which an output voltage is set, and is supplied from a first DC-AC conversion unit that converts DC power supplied from the first power storage unit into AC power, and from a second power storage unit.
  • a second DC-AC converter that converts direct current power to alternating current power, the AC output path of the first DC-AC converter, and the AC output path of the second DC-AC converter Are combined, and a total current of the AC output current of the first DC-AC conversion unit and the AC output current of the second DC-AC conversion unit is supplied to the load, and the controller is a total supplied to the load Based on the current, the remaining capacity of the first power storage unit, and the remaining capacity of the second power storage unit, the second DC ⁇ so that the remaining capacity of the first power storage unit and the remaining capacity of the second power storage unit approach each other. Controls the output current of the AC converter.
  • FIG. 10 is a flowchart for explaining a specific example of an assist ratio calculation method according to the second embodiment.
  • FIG. 1 is a diagram showing a configuration of a power storage system 1 according to Embodiment 1 of the present invention.
  • the power storage system 1 includes a first power storage unit 20a, a second power storage unit 20b, and a power conversion system 10.
  • the power conversion system 10 includes a first DC-AC converter 11a, a first controller 12a, a storage battery first DC-DC converter 13a, a second DC-AC converter 11b, a second controller 12b, and a storage battery second DC-DC converter 13b. including.
  • the power conditioner functions of the first power storage unit 20a and the second power storage unit 20b are installed together in one housing.
  • the first power storage unit 20a includes a first storage battery 21a and a first monitoring unit 22a.
  • the first storage battery 21a is composed of a plurality of storage battery cells connected in series or in series-parallel.
  • a lithium ion storage battery, a nickel metal hydride storage battery, etc. can be used for a storage battery cell.
  • An electric double layer capacitor may be used instead of the first storage battery 21a.
  • the 1st monitoring part 22a monitors the state (for example, voltage, electric current, temperature) of the said some storage battery cell, and transmits the monitoring data of the said some storage battery cell to the 1st control part 12a via a communication line.
  • the second power storage unit 20b includes a second storage battery 21b and a second monitoring unit 22b.
  • the configuration and operation of the second storage battery 21b and the second monitoring unit 22b are the same as the configuration and operation of the first storage battery 21a and the first monitoring unit 22a.
  • the type and / or capacity of the storage battery may be different between the first storage battery 21a and the second storage battery 21b.
  • the first monitoring unit 22a and the first control unit 12a, the second monitoring unit 22b and the second control unit 12b, and the first control unit 12a and the second control unit 12b are connected by serial communication.
  • data is communicated with each other by half-duplex communication conforming to the RS-485 standard.
  • the storage battery first DC-DC converter 13a is a bidirectional DC-DC converter, and charges and discharges the first storage battery 21a with the voltage value or current value set by the first control unit 12a.
  • the first DC-AC converter 11a is a bidirectional DC-AC converter. When discharging from the first storage battery 21a, the first DC-AC converter 11a converts the DC power supplied from the first storage battery 21a via the storage battery first DC-DC converter 13a to AC power. Convert to and output. When charging the first storage battery 21a, AC power input from the system is converted to DC power and output. The first DC-AC converter 11a outputs AC power or DC power at the voltage value or current value set by the first control unit 12a.
  • the AC terminal of the first DC-AC converter 11a is selectively connected to a grid connection terminal or an independent output terminal according to an instruction from the first control unit 12a.
  • the AC terminal of the first DC-AC converter 11a is connected to the grid connection terminal.
  • the grid connection terminal is connected to the grid via a distribution board (not shown).
  • the first DC-AC converter 11a converts the DC power supplied from the first power storage unit 20a into AC power, and is connected to a distribution line branched from the distribution board. (Not shown).
  • the first controller 12a sets a voltage value corresponding to the system voltage in the first DC-AC converter 11a or the first DC-DC converter for storage battery 13a.
  • the first control unit 12a defines the operation timing of the first DC-AC converter 11a so that an alternating current synchronized with the frequency and phase of the alternating current supplied from the system to the load is output from the first DC-AC converter 11a. To do.
  • the first DC-AC converter 11a converts AC power supplied from the grid into DC power and supplies it to the first power storage unit 20a via the storage battery first DC-DC converter 13a. To do.
  • the first control unit 12a sets a current value corresponding to the charging rate in the first DC-AC converter 11a or the first DC-DC converter for storage battery 13a.
  • the AC terminal of the first DC-AC converter 11a is connected to the autonomous output terminal.
  • the first control unit 12a manages and controls the first power storage unit 20a, the first DC-AC converter 11a, and the storage battery first DC-DC converter 13a.
  • the configuration of the first control unit 12a can be realized by cooperation of hardware resources and software resources, or only by hardware resources.
  • hardware resources a CPU, a DSP (Digital Signal Processor), an FPGA (Field-Programmable Gate Array), a ROM, a RAM, and other LSIs can be used.
  • Firmware and other programs can be used as software resources.
  • the first control unit 12a estimates the remaining capacity of the first storage battery 21a based on the monitoring data acquired from the first monitoring unit 22a. For example, the acquired current value is integrated to estimate the remaining capacity of the first storage battery 21a.
  • the remaining capacity of the first storage battery 21a can also be estimated from the open circuit voltage (OCV) of the first storage battery 21a.
  • OCV open circuit voltage
  • the remaining capacity can be considered as the dischargeable capacity from the storage battery.
  • the remaining capacity may be defined by a capacity value [Ah] or may be defined by SOC (State Of Of Charge) [%].
  • the first control unit 12a detects an abnormality such as overvoltage or overcurrent based on the monitoring data acquired from the first monitoring unit 22a, the first control unit 12a is inserted between the first storage battery 21a and the first DC-DC converter 13a for storage battery. Open the relay (not shown) to protect the first storage battery 21a.
  • the first control unit 12a receives peak cut setting information input by the user from the operation unit (not shown). For example, a charging time zone, a charging rate, a discharging time zone, and a discharging rate are accepted as peak cut setting information.
  • the first controller 12a controls the first DC-AC converter 11a and the storage battery first DC-DC converter 13a based on the setting information. In addition, you may use the 1st storage battery 21a only for a backup use, without using it for a peak cut use.
  • the basic operations of the storage battery second DC-DC converter 13b, the second DC-AC converter 11b, and the second controller 12b are the same as those of the storage battery first DC-DC converter 13a, the first DC-AC converter 11a, and the first controller 12a. This is the same as the basic operation.
  • the grid connection terminal of the first DC-AC converter 11a and the grid connection terminal of the second DC-AC converter 11b may be connected to different distribution lines or may be connected to the same distribution line.
  • the first DC-AC converter 11a and the second DC-AC converter 11b supply AC power to different loads in the grid connection mode, respectively, which are connected to different distribution lines.
  • the first control unit 12a and the second control unit 12b switch the operation mode of the first DC-AC converter 11a and the second DC-AC converter 11b, respectively, from the grid interconnection mode to the independent operation mode. Specifically, the connection destination of the AC terminals of the first DC-AC converter 11a and the second DC-AC converter 11b is switched from the grid connection terminal to the independent output terminal.
  • the AC output path connected to the self-supporting output terminal of the first DC-AC converter 11a and the AC output path connected to the self-supporting output terminal of the second DC-AC converter 11b are combined into one.
  • a load 2 is connected to the combined AC output path.
  • the load 2 may be a specific load (for example, an illuminating lamp or an elevator) that can receive power supply preferentially at the time of a power failure, or may be a general load.
  • an AC outlet may be connected to the combined AC output path. The user can use the electrical product by plugging the AC plug of the electrical product into the AC outlet during a power failure.
  • the current sensor CT is installed in the coupled AC output path, and the current sensor CT notifies the detected current value to the second control unit 12b.
  • FIG. 1 shows an example in which AC power is supplied to the load 2 by a single-phase two-wire distribution line, but AC power may be supplied by a single-phase three-wire distribution line.
  • a transformer having a single-phase two-wire primary side and a single-phase three-wire secondary side is inserted into an AC output path connected to the self-sustained output terminal of the first DC-AC converter 11a.
  • the first voltage line (U phase) is connected to one terminal of the secondary winding of the transformer, and the second voltage line (V phase) is connected to the other terminal of the secondary winding.
  • a neutral wire (N phase) is connected to the midpoint.
  • a voltage that is half the voltage applied to the primary winding of the transformer can be extracted from between the UN phase and the NV phase.
  • the voltage applied to the primary winding is 200 V
  • 100 V can be taken out between the UN phase and the NV phase.
  • 200V can be taken out from between the U-V phases.
  • One wiring of the single-phase two-wire system connected to the self-sustained output terminal of the second DC-AC converter 11b is coupled to the first voltage line (U phase), and the other wiring is coupled to the second voltage line (V phase). Is done.
  • the current sensor CT is installed on each of the first voltage line (U phase) and the second voltage line (V phase), and the current values detected by the two current sensors are the second control unit. 12b is notified. Based on the two current values, the second control unit 12b calculates a total current flowing through one or two loads connected to the single-phase three-wire distribution line.
  • the first control unit 12a notifies the second control unit 12b of the remaining capacity of the first storage battery 21a.
  • the first controller 12a sets the target value of the output voltage of the first DC-AC converter 11a to a predetermined voltage value (for example, 100V / 200V).
  • the drive circuit of the inverter circuit in the first DC-AC converter 11a adaptively changes the duty ratio of the inverter circuit so that the output voltage value of the first DC-AC converter 11a maintains the target voltage value.
  • the second control unit 12b acquires the load current IL supplied to the load 2 from the current sensor CT.
  • the load current IL is a total current of the AC output current output from the self-supporting output terminal of the first DC-AC converter 11a and the AC output current output from the self-supporting output terminal of the second DC-AC converter 11b.
  • the second control unit 12b estimates the remaining capacity of the second storage battery 21b based on the monitoring data acquired from the second monitoring unit 22b. Moreover, the 2nd control part 12b acquires the remaining capacity of the 1st storage battery 21a from the 1st control part 12a.
  • the second control unit 12b determines a target value of the output current of the second DC-AC converter 11b based on the load current IL, the remaining capacity of the first storage battery 21a, and the remaining capacity of the second storage battery 21b, and the second DC- Set to AC converter 11b.
  • the drive circuit of the inverter circuit in the second DC-AC converter 11b adaptively changes the duty ratio of the inverter circuit so that the output current value of the second DC-AC converter 11b maintains the target current value.
  • the second control unit 12b determines the target value of the output current of the second DC-AC converter 11b so that the remaining capacity of the first storage battery 21a approaches the remaining capacity of the second storage battery 21b.
  • the target value is determined according to the ratio of the load current IL and the remaining capacity of the first storage battery 21a and the remaining capacity of the second storage battery 21b. Specifically, first, the ratio of the current supplied from the first storage battery 21a to the current supplied from the second storage battery 21b in the total current supplied from the first storage battery 21a and the second storage battery 21b to the load 2 is determined as the first storage battery. It determines according to the ratio of the remaining capacity of 21a and the remaining capacity of the 2nd storage battery 21b. Next, the target value of the output current of the second DC-AC converter 11b is determined by multiplying the detected load current IL by the ratio of the current supplied from the second storage battery 21b.
  • the ratio of the current supplied from the second storage battery 21b is 20%.
  • the sub storage battery supplies power to the load 2 with an assist ratio of 20%.
  • the load 2 appears to drop by the amount of current supplied from the sub storage battery.
  • the current obtained by subtracting the current supplied from the sub storage battery from the total current consumption of the load 2 is supplied from the main storage battery. Electric power will continue to be output from the main storage battery unless an overload condition occurs.
  • FIG. 2 is a flowchart showing an example of the operation in the self-sustaining operation mode of the power storage system 1 according to the first embodiment.
  • an offset is given to the remaining capacity of the main storage battery. That is, when the remaining capacity of the sub storage battery reaches the lower limit, the target value of the output current of the second DC-AC converter 11b is determined so that the remaining capacity of the main storage battery becomes the lower limit value + offset value.
  • the remaining capacity MC ofst obtained by subtracting the offset value OFST from the actual remaining capacity MC of the main storage battery can be treated as the remaining capacity of the main storage battery in the calculation of the current ratio between the main storage battery and the sub storage battery. That's fine.
  • the second control unit 12b specifies the load current IL [A], the remaining capacity MC ofst [Ah] taking into account the offset of the main storage battery, and the remaining capacity SC [Ah] of the sub storage battery (S10).
  • the load current IL [A] is acquired from the current sensor CT.
  • the remaining capacity MC ofst [Ah] taking into account the offset of the main storage battery is obtained by subtracting the offset value OFST from the remaining capacity MC of the main storage battery acquired from the first control unit 12a.
  • the remaining capacity SC [Ah] of the sub storage battery is obtained based on the monitoring data acquired from the second monitoring unit 22b.
  • the second control unit 12b calculates the ratio of the remaining capacity SC [Ah] of the sub storage battery to the total remaining capacity obtained by adding the remaining capacity MC ofst [Ah] with the offset of the main storage battery and the remaining capacity SC [Ah] of the sub storage battery. Is calculated as the assist ratio a [%] of the sub storage battery (S11). The second controller 12b multiplies the load current IL by the assist ratio a [%] to calculate the current value Is to be supplied from the sub storage battery (S12). The second controller 12b sets the calculated current value Is in the second DC-AC converter 11b as a target current value (S13).
  • step S10 to step S13 are repeatedly executed (N in S14) until the self-sustaining operation mode ends (Y in S14). Since the power consumption of the load 2 fluctuates, the load current IL [A], the remaining capacity MC ofst [Ah] taking into account the offset of the main storage battery, and the remaining capacity SC [Ah] of the sub storage battery are specified in a predetermined cycle.
  • the current value Is to be supplied from the sub storage battery is calculated (S12). As a result, the constantly updated current value Is is set in the second DC-AC converter 11b (S13), and the current output from the first DC-AC converter 11a also constantly varies.
  • the respective output currents are determined so that the remaining capacities of the main storage battery and the sub storage battery connected in parallel reach the lower limit almost simultaneously. It can be avoided that the remaining capacity of the storage battery reaches the lower limit first. Therefore, the backup power can be continuously supplied to the load 2 from the storage battery as long as possible.
  • the remaining capacity of the main storage battery that defines the load voltage reaches the lower limit
  • power cannot be supplied to the load 2 even if the capacity of the sub storage battery remains. Therefore, it is necessary to avoid that the remaining capacity of the main storage battery reaches the lower limit before the remaining capacity of the sub storage battery.
  • the amount of current output from the main storage battery to the load 2 and the output from the sub storage battery to the load 2 according to the ratio between the remaining capacity of the main storage battery and the remaining capacity of the sub storage battery. Since the amount of current is adjusted, the remaining capacities of the main storage battery and the sub storage battery can reach the lower limit almost simultaneously. If the remaining capacity of the main storage battery is offset, it is possible to more reliably avoid the remaining capacity of the main storage battery reaching the lower limit before the remaining capacity of the sub storage battery.
  • the remaining capacity of the main storage battery and the sub storage battery may be greatly different when switching to the independent operation mode due to a power failure. is there.
  • the amount of current output from the main storage battery to the load 2 is controlled to be equal to the amount of current output from the sub storage battery to the load 2, the remaining capacities of the main storage battery and the sub storage battery reach the lower limit. The timing will be greatly shifted. According to the present embodiment, such a situation can also be avoided.
  • the first DC-DC converter for storage battery 13a and the second DC-DC converter for storage battery 13b are omitted, and the first DC-AC converter 11a and the first storage battery 21a, the second DC-AC converter 11b and the second storage battery are omitted.
  • a configuration in which 21b is directly connected is also possible.
  • the voltage value or current value of the first storage battery 21a is all defined by the first DC-AC converter 11a
  • the voltage value or current value of the second storage battery 21b is all defined by the second DC-AC converter 11b.
  • FIG. 3 is a diagram showing a configuration of power storage system 1 according to Embodiment 2 of the present invention.
  • the power storage system 1 according to the second embodiment is different from the power storage system 1 according to the first embodiment in FIG. 1 in that the first solar power generation system 30a, the first DC-DC converter 14a for solar cells, and the second solar power generation system 30b.
  • the second DC-DC converter 14b for solar cells is added.
  • First solar power generation system 30a includes a plurality of solar cells connected in series and parallel, converts solar energy into electric power, and outputs the electric power.
  • the first DC-DC converter 14a for solar cells converts the DC power output from the first photovoltaic power generation system 30a into DC power having a voltage value set by the first control unit 12a and outputs the converted DC power.
  • the first DC-DC converter for solar cell 14a has an MPPT (Maximum Power Point Tracking) function
  • the first DC-DC converter for solar cell 14a can generate power at the maximum operating point of the first photovoltaic power generation system 30a. Determine the voltage value.
  • the output path of the solar cell first DC-DC converter 14a is connected to a node Na between the first DC-AC converter 11a and the storage battery first DC-DC converter 13a.
  • the generated current of the first photovoltaic power generation system 30a is added to the charging current / discharge current of the first storage battery 21a and output to the DC terminal of the first DC-AC converter 11a.
  • the configuration and operation of the second solar power generation system 30b and the second DC-DC converter for solar cell 14b are the same as the configuration and operation of the first solar power generation system 30a and the first DC-DC converter for solar cell 14a.
  • the power generation capacity of the solar power generation system may be different between the first solar power generation system 30a and the second solar power generation system 30b.
  • FIG. 3 shows an example in which AC power is supplied to the load 2 by a single-phase two-wire distribution line. However, as described above, even if AC power is supplied by a single-phase three-wire distribution line. Good.
  • the first solar power generation system 30a and the second solar power generation system 30b are provided as in the second embodiment. It is necessary to consider the power generation amount of the photovoltaic power generation system 30b. Since the first solar power generation system 30a and the first storage battery 21a are DC-linked, in the self-sustaining operation mode, the power generation amount of the first solar power generation system 30a can be estimated from the charge / discharge amount of the first storage battery 21a. it can. Similarly, the power generation amount of the second solar power generation system 30b can be estimated from the charge / discharge amount of the second storage battery 21b.
  • the first control unit 12a estimates the charge / discharge amount and remaining capacity of the first storage battery 21a based on the current value and voltage value output from the first monitoring unit 22a. Whether the first storage battery 21a is charged or discharged can be specified by the direction of current. The first control unit 12a notifies the second control unit 12b of the estimated charge / discharge amount of the first storage battery 21a and the remaining capacity of the first storage battery 21a. Similarly to the first embodiment, the first controller 12a sets the target value of the output voltage of the first DC-AC converter 11a to a predetermined voltage value (for example, 100V / 200V).
  • a predetermined voltage value for example, 100V / 200V.
  • the second control unit 12b estimates the charge / discharge power and remaining capacity of the second storage battery 21b based on the current value and voltage value output from the second monitoring unit 22b.
  • the second control unit 12b is based on the load current IL, the remaining capacity of the first storage battery 21a, the charge / discharge amount of the first storage battery 21a, the remaining capacity of the second storage battery 21b, and the charge / discharge amount of the second storage battery 21b.
  • the target value of the output current of the second DC-AC converter 11b is determined and set in the second DC-AC converter 11b.
  • the second control unit 12b sets the target of the output current of the second DC-AC converter 11b so that the remaining capacity of the first storage battery 21a approaches the remaining capacity of the second storage battery 21b. Determine the value.
  • FIGS. 4A to 4C are diagrams schematically showing an example of control in the self-sustaining operation mode in the power storage system 1 according to the second embodiment.
  • the remaining capacity of the main storage battery is 40 [Ah]
  • the remaining capacity of the sub storage battery is 10 [Ah].
  • 1 [kW] is supplied from the second DC-AC converter 11b to the load 2
  • 4 [kW] is supplied from the first DC-AC converter 11a to the load 2.
  • the assist ratio a (20%) is a value calculated without considering the power generation amounts of the first solar power generation system 30a and the second solar power generation system 30b.
  • FIG. 4A is an example in which the first solar power generation system 30a generates 5 [kW] and the second solar power generation system 30b does not generate power. Since the output power of the first DC-AC converter 11a is controlled to 4 [kW], when the first solar power generation system 30a generates 5 [kW], the main storage battery is charged by 1 [kW]. Since the output power of the second DC-AC converter 11b is controlled to 1 [kW], the sub-storage battery discharges 1 [kW] when the second photovoltaic power generation system 30b is not generating power. In this example, since the main storage battery is charged and the sub storage battery is discharged, the remaining capacities of the main storage battery and the sub storage battery are increased.
  • FIG. 4B shows an example in which the first solar power generation system 30a generates 5 [kW] and the second solar power generation system 30b generates 1 [kW]. Since the output power of the first DC-AC converter 11a is controlled to 4 [kW], when the first solar power generation system 30a generates 5 [kW], the main storage battery is charged by 1 [kW]. Since the output power of the second DC-AC converter 11b is controlled to 1 [kW], it is not necessary to discharge 1 [kW] from the sub storage battery when the second photovoltaic power generation system 30b generates 1 [kW]. become. However, since the sub storage battery is not charged but the main storage battery is charged, the remaining capacity of the main storage battery and the sub storage battery is increased in this example as well.
  • FIG. 4C shows an example in which the first solar power generation system 30a generates 1 [kW] and the second solar power generation system 30b generates 5 [kW]. Since the output power of the first DC-AC converter 11a is controlled to 4 [kW], when the first solar power generation system 30a generates 1 [kW], 3 [kW] is discharged from the main storage battery. Since the output power of the second DC-AC converter 11b is controlled to 1 [kW], when the second solar power generation system 30b generates 5 [kW], the sub storage battery is charged with 4 [kW]. In this example, since the main storage battery is discharged and the sub storage battery is charged, the remaining capacities of the main storage battery and the sub storage battery are reduced.
  • the assist ratio a when the assist ratio a is determined from the ratio of the remaining capacity of the main storage battery and the sub storage battery, the remaining capacity of the main storage battery and the sub storage battery may be increased.
  • the second control unit 12b determines the assist ratio a as follows.
  • the 2nd control part 12b is the remaining capacity of a main storage battery, the remaining capacity of a sub storage battery, and the 1st photovoltaic power generation system 30a.
  • the assist ratio a is determined based on the power generation amount and the power generation amount of the second solar power generation system 30b.
  • the second control unit 12b determines the assist ratio a based on the remaining capacity of the main storage battery and the remaining capacity of the sub storage battery. This determination process is the same as the determination process according to the first embodiment.
  • the second control unit 12b uses the generated power of the photovoltaic power generation system 30 to charge the storage battery with the smaller remaining capacity. Control to turn.
  • the assist ratio a is determined so that the discharge from the storage battery with the smaller remaining capacity becomes zero.
  • the assist ratio a is increased, and when the storage battery is the sub storage battery, the assist ratio a is decreased.
  • the second control unit 12b determines the assist ratio a so that the discharge from the storage battery with the smaller remaining capacity is minimized. To do.
  • the assist ratio a is maximized, and when the storage battery is the sub storage battery, the assist ratio a is minimized.
  • the state of the power storage system 1 is classified into nine patterns.
  • the value of the charging / discharging power MBP of the main storage battery is positive, it means charging, and when it is negative, it means discharging.
  • the charging / discharging power SBP of the sub storage battery is positive, it means charging, and when it is negative, it means discharging.
  • FIG. 5 is a diagram illustrating a table that defines determination conditions used in a specific example of the method for calculating the assist ratio a according to the second embodiment.
  • FIG. 6 is a flowchart for explaining a specific example of a method for calculating the assist ratio a according to the second embodiment.
  • the variation range of the assist ratio a is 0.00 to 1.00 (0 to 100%), and the step width in which the assist ratio a varies per update is 0.01 (1%). .
  • the second control unit 12b sets 0.5 as the initial value of the assist ratio a (S20). That is, the ratio of the current output from the first DC-AC converter 11a and the current output from the second DC-AC converter 11b starts from 1: 1.
  • a value corresponding to the ratio of the remaining capacity of the main storage battery and the sub storage battery may be used as the initial value of the assist ratio a.
  • the second control unit 12b includes a load current IL [A], a main storage battery charge / discharge power MBP [W], a main storage battery remaining capacity MC ofst [Ah], a sub storage battery charge / discharge power SBP [W], and The remaining capacity SC [Ah] of the sub storage battery is specified (S21).
  • the second control unit 12b refers to the table shown in FIG. 5 and determines whether or not any of the conditions 1 to 3 is satisfied (S22). When applicable (Y in S22), the second control unit 12b decrements the assist ratio a by one unit. Specifically, a new assist ratio a is calculated by subtracting 0.01 from the assist ratio pre a one cycle before (S26). Conditions 1 to 3 are cases where the remaining capacities of the main storage battery and the sub storage battery are expanded (the remaining capacity of the sub storage battery is decreased relative to the remaining capacity of the main storage battery), and the sub storage battery is reduced by lowering the assist ratio a. Suppresses the relative decrease in the remaining capacity.
  • the second controller 12b determines whether any of the conditions 4 to 6 is satisfied (S23). If applicable (Y in S23), the second control unit 12b increments the assist ratio a by one unit. Specifically, a new assist ratio a is calculated by adding 0.01 to the assist ratio pre a one cycle before (S27).
  • Conditions 4 to 6 are cases where the remaining capacities of the main storage battery and the sub storage battery increase (the remaining capacity of the main storage battery decreases relative to the remaining capacity of the sub storage battery), and the main storage battery is increased by increasing the assist ratio a. Suppresses the relative decrease in the remaining capacity.
  • the second control unit 12b compares the latest actual assist ratio a with the assist ratio prea one cycle before. When the latest actual assist ratio a is greater than the assist ratio pre a one cycle ago (Y in S24), the second control unit 12b adds 0.01 to the assist ratio pre a one cycle ago and creates a new one.
  • the assist ratio a is calculated (S27). In this specific example, since the assist ratio a is increased or decreased by 0.01 units, the assist ratio pre a one cycle before is not changed to the latest actual assist ratio a at all, and the latest actual assist ratio a is reduced to 0. .01 approach.
  • the second control unit 12b When the calculated latest actual assist ratio a is smaller than the assist ratio pre-a one cycle ago (N in S24, Y in S25), the second control unit 12b is 0.01 from the assist ratio pre-a one cycle ago. Is subtracted to calculate a new assist ratio a (S26).
  • the second control unit 12b When the calculated latest actual assist ratio a is equal to the assist ratio pre-a one cycle before (N in S24, N in S25), the second control unit 12b newly sets the assist ratio pre-a one cycle ago as it is.
  • the assist ratio is a (S28). In this case, it is not necessary to change the assist ratio a.
  • the second controller 12b multiplies the load current IL by a new assist ratio a to calculate a current value Is to be supplied from the second DC-AC converter 11b (S29).
  • the second controller 12b sets the calculated current value Is in the second DC-AC converter 11b as a target current value (S30).
  • step S21 to step S30 is repeatedly executed (N in S31) until the self-sustaining operation mode ends (Y in S31). Since the power consumption of the load 2, the power generation amount of the first solar power generation system 30a, and the power generation amount of the second solar power generation system 30b are fluctuating, the load current IL [A] and the main storage battery charge / The discharge power MBP [W], the charge / discharge power SBP [W] of the sub storage battery, the remaining capacity MC ofst [Ah] taking into account the offset of the main storage battery, and the remaining capacity SC [Ah] of the sub storage battery are specified (S21) Then, the current value Is to be supplied from the second DC-AC converter 11b is calculated (S29). As a result, the constantly updated current value Is is set in the second DC-AC converter 11b (S30), and the current output from the first DC-AC converter 11a also constantly varies.
  • the power storage system 1 including the first solar power generation system 30a and the second solar power generation system 30b has the same effect as the first embodiment. That is, in consideration of the power generation amount of the first photovoltaic power generation system 30a and the second photovoltaic power generation system 30b, the remaining capacities of the main storage battery and the sub storage battery connected in parallel are made to reach the lower limit almost simultaneously in the self-sustaining operation mode. be able to. Accordingly, it is possible to continue supplying backup power to the load 2 as long as possible from both the first DC-AC converter 11a and the second DC-AC converter 11b.
  • the remaining capacity of the main storage battery and the sub storage battery reaches the lower limit by constantly updating the target current value of the second DC-AC converter 11b in consideration of fluctuations in the load current IL and the power generation amount of the photovoltaic power generation system. Timing can be matched with high accuracy.
  • the target current value of the second DC-AC converter 11b is controlled so as to gradually approach the target current value reflecting the latest condition, hunting of the output current of the second DC-AC converter 11b can be suppressed. . As a result, hunting of the output current of the first DC-AC converter 11a can also be suppressed.
  • a solar power generation system is used as a power generation device that generates power based on renewable energy.
  • other power generation devices such as a wind power generation device and a micro hydropower generation device may be used.
  • Any of the power generation devices is a power generation device in which the amount of power generation is changed by a change in natural environment.
  • the DC-DC converter at the rear stage of the power generator is replaced with an AC-DC converter.
  • the assist ratio a is increased or decreased by a step width of 0.01 (1%).
  • the assist ratio a may be increased or decreased by a finer step width, or may be increased or decreased by a coarser step width. Also good.
  • the designer determines the step width of the assist ratio a and the update interval of the target current value of the second DC-AC converter 11b based on the specifications, experimental values, and simulation values of the storage battery, solar battery, DC-AC converter, and the like.
  • the designer may adopt a control that instantaneously adjusts the target current value of the second DC-AC converter 11b to the target current value reflecting the latest condition.
  • first control unit 12a and the second control unit 12b are provided on separate substrates, but both may be integrally mounted on one substrate. In this case, communication processing between the first control unit 12a and the second control unit 12b is not necessary.
  • the first DC-AC converter 11a, the first control unit 12a, the storage battery first DC-DC converter 13a (the solar cell first DC-DC converter 14a), the second DC-AC converter 11b The example in which the two control units 12b, the second DC-DC converter for storage battery 13b, and the (second DC-DC converter for solar battery 14b) are installed together in one casing has been described.
  • the second DC-DC converter 13b for storage battery and the second DC-DC converter 14b for solar battery may be installed in separate casings.
  • the converter 14b) has a separate casing from the first DC-AC converter 11a, the first control unit 12a, the first DC-DC converter 13a for storage battery, and the first DC-DC converter 14a for solar cell. 12a and the 2nd control part 12b are connected by a communication line.
  • control according to the first and second embodiments can be applied to the power storage system 1 in which three or more storage batteries are connected in parallel in the self-sustaining operation mode.
  • the output current values of two or more DC-AC converters to which two or more sub-storage batteries are connected may be determined so that the remaining capacity of three or more storage batteries reaches the lower limit almost simultaneously.
  • a first DC-AC converter (11a) for converting DC power supplied from the first power storage unit (20a) into AC power
  • a first control unit (12a) for obtaining monitoring data from the first power storage unit (20a) and controlling the first DC-AC conversion unit (11a)
  • a second DC-AC converter (11b) for converting DC power supplied from the second power storage unit (20b) into AC power
  • a second control unit (12b) for obtaining monitoring data from the second power storage unit (20b) and controlling the second DC-AC conversion unit (11b)
  • the AC output path of the first DC-AC converter (11a) and the AC output path of the second DC-AC converter (11b) are coupled, and the AC output current of the first DC-AC converter (11a).
  • the first control unit (12a) sets the output voltage of the first DC-AC conversion unit (11a), and notifies the second control unit (12b) of the remaining capacity of the first power storage unit (20a).
  • the second control unit (12b) is based on the total current supplied to the load (2), the remaining capacity of the first power storage unit (20a), and the remaining capacity of the second power storage unit (20b).
  • the output current of the second DC-AC converter (11b) is controlled so that the remaining capacity of the first power storage unit (20a) and the remaining capacity of the second power storage unit (20b) are close to each other. Conversion system (10).
  • the second control unit (12b) depends on a ratio of a total current supplied to the load (2) and a remaining capacity of the first power storage unit (20a) and a remaining capacity of the second power storage unit (20b).
  • a DC output path from the first power generation device (30a) that generates power based on renewable energy is connected to a node (Na) between the first DC-AC conversion unit (11a) and the first power storage unit (20a).
  • a DC output path from a second power generation device (30b) that generates power based on renewable energy is connected to a node (Nb) between the second DC-AC conversion unit (11b) and the second power storage unit (20b).
  • the first control unit (12a) determines the remaining capacity of the first power storage unit (20a), the discharge amount from the first power storage unit (20a) / the charge amount to the first power storage unit (20a).
  • the second control unit (12b) includes a total current supplied to the load (2), a remaining capacity of the first power storage unit (20a), a discharge amount from the first power storage unit (20a) / the first Based on the amount of charge to the power storage unit (20a), the remaining capacity of the second power storage unit (20b), the amount of discharge from the second power storage unit (20b) / the amount of charge to the second power storage unit (20b)
  • the output current of the second DC-AC converter (12b) is controlled so that the remaining capacity of the first power storage unit (20a) and the remaining capacity of the second power storage unit (20b) are close to each other.
  • the power conversion system (10) according to 1.
  • the second control unit (12b) sets the remaining capacity of the first power storage unit (20a) to a value obtained by adding an offset value to the lower limit value.
  • the power conversion system (20) according to any one of items 1 to 3, wherein the output current is controlled so as to be. According to this, it is possible to more reliably avoid the remaining capacity of the first power storage unit (20a) reaching the lower limit before the second power storage unit (20b).
  • the AC output path of the first DC-AC converter (11a) and the AC output path of the second DC-AC converter (11b) are coupled, and the AC output current of the first DC-AC converter (11a).
  • the control units (12a, 12b) are based on the total current supplied to the load (2), the remaining capacity of the first power storage unit (20a), and the remaining capacity of the second power storage unit (20b).
  • the output current of the second DC-AC converter (11b) is controlled so that the remaining capacity of the first power storage unit (20a) and the remaining capacity of the second power storage unit (20b) are close to each other. Conversion system (10). According to this, it is possible to continue supplying power to the load (2) for a longer time from both the first power storage unit (20a) and the second power storage unit (20b).
  • a DC-AC conversion unit for which an output voltage is set a first DC-AC conversion unit (11a) that converts DC power supplied from the first power storage unit (20a) into AC power, and a second power storage unit ( A second DC-AC converter (11b) for converting DC power supplied from 20b) into AC power, and a control device (12b) for controlling the second DC-AC converter (11b),
  • the AC output path of the first DC-AC converter (11a) and the AC output path of the second DC-AC converter (11b) are coupled, and the AC output current of the first DC-AC converter (11a).
  • the control device (12b) Based on the total current supplied to the load (2), the remaining capacity of the first power storage unit (20a), and the remaining capacity of the second power storage unit (20b), the first power storage unit (20a) The control device (12b), wherein the output current of the second DC-AC converter (11b) is controlled so that the remaining capacity approaches the remaining capacity of the second power storage unit (20b). According to this, it is possible to continue supplying power to the load (2) for a longer time from both the first power storage unit (20a) and the second power storage unit (20b).
  • 1 power storage system 2 loads, 10 power conversion system, 11a first DC-AC converter, 12a first control unit, 13a first DC-DC converter for storage battery, 14a first DC-DC converter for solar cell, 20a first power storage unit, 21a 1st storage battery, 22a 1st monitoring part, 11b 2nd DC-AC converter, 12b 2nd control part, 13b 2nd DC-DC converter for storage battery, 14b 2nd DC-DC converter for solar battery, 20b 2nd power storage part, 21b 2nd storage battery, 22b 2nd monitoring part, CT current sensor, 30a 1st solar power generation system, 30b 2nd solar power generation system.
  • the present invention can be used in a power storage system in which a plurality of storage batteries are connected in parallel.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

電力変換システム(10)において、第1制御部(12a)は、第1蓄電部(20a)から監視データを取得し、第1蓄電部(20a)の残容量を第2制御部12bに通知し、第1DC-AC変換部(11a)の出力電圧を設定する。第2制御部(12b)は、負荷(2)に供給される合計電流と、第1蓄電部(20a)の残容量と、第2蓄電部(20b)の残容量を基に、第1蓄電部(20a)の残容量と第2蓄電部(20b)の残容量が近づくように第2DC-AC変換部(11b)の出力電流を制御する。

Description

電力変換システム及び制御装置
 本発明は、直流電力を交流電力に変換する電力変換システム、及び電力変換システムで使用される制御装置に関する。
 蓄電池や太陽光発電システム等を備える蓄電システムを複数設置する場合において、停電等により系統連系モードから自立運転モードに切り替わった後、複数の蓄電システムが連携して負荷に電力を供給するシステムがある。このシステムではマスタとなる蓄電システム(以下、メインの蓄電システムという)から所定の電圧で負荷に電力を供給し、スレーブとなる蓄電システム(以下、サブの蓄電システムという)が、メインの蓄電システムの出力に電流を重畳することにより複数の蓄電システムが連携する(例えば、特許文献1参照)。
 メインの蓄電システムからは、負荷で消費される電流の内、サブの蓄電システムから出力される電流を差し引いた電流が出力される。一般的に、各蓄電システムから出力される電流は、負荷で消費される電流を、並列接続される蓄電システムの台数で割った値に制御される。例えば、メインの蓄電システムが1台、サブの蓄電システムが1台のシステムでは、1:1の電流比で負荷に電流が供給される。
特開2005-295707号公報
 上述の複数の蓄電システムでは、メインの蓄電システムの容量が下限に達してしまうと、サブの蓄電システムの容量が下限に達していない状態でも、負荷電圧を規定できなくなり、サブの蓄電システムの動作も停止してしまう。
 本発明はこうした状況に鑑みなされたものであり、その目的は、並列接続された複数の蓄電システムが連携して負荷に電力を供給する場合において、負荷にできるだけ長い時間電力を供給し続けることを可能とする電力変換システム及び制御装置を提供することにある。
 上記課題を解決するために、本発明のある態様の電力変換システムは、第1蓄電部から供給される直流電力を交流電力に変換する第1DC-AC変換部と、前記第1蓄電部から監視データを取得するとともに、前記第1DC-AC変換部を制御する第1制御部と、第2蓄電部から供給される直流電力を交流電力に変換する第2DC-AC変換部と、前記第2蓄電部から監視データを取得するとともに、前記第2DC-AC変換部を制御する第2制御部と、を備える。前記第1DC-AC変換部の交流出力経路と、前記第2DC-AC変換部の交流出力経路は結合されており、前記第1DC-AC変換部の交流出力電流と前記第2DC-AC変換部の交流出力電流の合計電流が負荷に供給され、前記第1制御部は、前記第1DC-AC変換部の出力電圧を設定し、前記第1蓄電部の残容量を前記第2制御部に通知し、前記第2制御部は、前記負荷に供給される合計電流と、前記第1蓄電部の残容量と、前記第2蓄電部の残容量を基に、前記第1蓄電部の残容量と前記第2蓄電部の残容量が近づくように前記第2DC-AC変換部の出力電流を制御する。
 本発明の別の態様は、制御装置である。この装置は、出力電圧が設定されているDC-AC変換部であり、第1蓄電部から供給される直流電力を交流電力に変換する第1DC-AC変換部と、第2蓄電部から供給される直流電力を交流電力に変換する第2DC-AC変換部と、を制御する制御装置であって、前記第1DC-AC変換部の交流出力経路と、前記第2DC-AC変換部の交流出力経路は結合されており、前記第1DC-AC変換部の交流出力電流と前記第2DC-AC変換部の交流出力電流の合計電流が負荷に供給され、前記制御装置は、前記負荷に供給される合計電流と、前記第1蓄電部の残容量と、前記第2蓄電部の残容量を基に、前記第1蓄電部の残容量と前記第2蓄電部の残容量が近づくように前記第2DC-AC変換部の出力電流を制御する。
 なお、以上の構成要素の任意の組み合わせ、本発明の表現を方法、装置、システムなどの間で変換したものもまた、本発明の態様として有効である。
 本発明によれば、並列接続された複数の蓄電システムが連携して負荷に電力を供給する場合において、負荷にできるだけ長い時間電力を供給し続けることが可能となる。
本発明の実施の形態1に係る蓄電システムの構成を示す図である。 実施の形態1に係る蓄電システムの自立運転モードにおける動作の一例を示すフローチャートである。 本発明の実施の形態2に係る蓄電システムの構成を示す図である。 図4(a)-(c)は、実施の形態2に係る蓄電システムにおける自立運転モード時の制御例を模式的に示す図である。 実施の形態2に係るアシスト比の算出方法の具体例で使用する判定条件を規定したテーブルを示す図である。 実施の形態2に係るアシスト比の算出方法の具体例を説明するためのフローチャートである。
 (実施の形態1)
 図1は、本発明の実施の形態1に係る蓄電システム1の構成を示す図である。蓄電システム1は、第1蓄電部20a、第2蓄電部20b、及び電力変換システム10を備える。電力変換システム10は、第1DC-ACコンバータ11a、第1制御部12a、蓄電池用第1DC-DCコンバータ13a、第2DC-ACコンバータ11b、第2制御部12b、及び蓄電池用第2DC-DCコンバータ13bを含む。電力変換システム10は、第1蓄電部20a、第2蓄電部20bのパワーコンディショナ機能を1つの筐体にまとめて設置したものである。
 第1蓄電部20aは第1蓄電池21aおよび第1監視部22aを含む。第1蓄電池21aは、直列または直並列接続された複数の蓄電池セルにより構成される。蓄電池セルにはリチウムイオン蓄電池、ニッケル水素蓄電池などを使用できる。なお第1蓄電池21aの代わりに電気二重層コンデンサを使用してもよい。第1監視部22aは当該複数の蓄電池セルの状態(例えば、電圧、電流、温度)を監視し、当該複数の蓄電池セルの監視データを通信線を介して第1制御部12aに送信する。
 第2蓄電部20bは第2蓄電池21bおよび第2監視部22bを含む。第2蓄電池21bおよび第2監視部22bの構成および動作は、第1蓄電池21aおよび第1監視部22aの構成および動作と同様である。なお蓄電池の種類および/または容量は第1蓄電池21aと第2蓄電池21bで異なっていてもよい。
 第1監視部22aと第1制御部12a間、第2監視部22bと第2制御部12b間、第1制御部12aと第2制御部12b間はそれぞれシリアル通信で接続される。例えば、RS-485規格に準拠した半二重通信で相互にデータが通信される。
 蓄電池用第1DC-DCコンバータ13aは、双方向DC-DCコンバータであり、第1制御部12aから設定された電圧値または電流値で第1蓄電池21aを充放電する。第1DC-ACコンバータ11aは、双方向DC-ACコンバータであり、第1蓄電池21aからの放電時、蓄電池用第1DC-DCコンバータ13aを介して第1蓄電池21aから供給される直流電力を交流電力に変換して出力する。また第1蓄電池21aへの充電時、系統から入力される交流電力を直流電力に変換して出力する。第1DC-ACコンバータ11aは、第1制御部12aから設定された電圧値または電流値で交流電力または直流電力を出力する。
 第1DC-ACコンバータ11aの交流端は、第1制御部12aからの指示に応じて系統連系端子または自立出力端子に選択的に接続される。蓄電システム1が系統連系モードで動作している場合、第1DC-ACコンバータ11aの交流端は、系統連系端子に接続される。系統連系端子は分電盤(不図示)を介して系統に接続されている。
 系統連系モードにおける放電時間帯では、第1DC-ACコンバータ11aは第1蓄電部20aから供給される直流電力を交流電力に変換し、分電盤から分岐される配電線に接続されている負荷(不図示)に供給する。第1制御部12aは第1DC-ACコンバータ11aまたは蓄電池用第1DC-DCコンバータ13aに、系統電圧に対応する電圧値を設定する。また第1制御部12aは、系統から負荷に供給される交流電流の周波数および位相に同期した交流電流が第1DC-ACコンバータ11aから出力されるよう、第1DC-ACコンバータ11aの動作タイミングを規定する。
 系統連系モードにおける充電時間帯では、第1DC-ACコンバータ11aは系統から供給される交流電力を直流電力に変換して、蓄電池用第1DC-DCコンバータ13aを介して第1蓄電部20aに供給する。第1制御部12aは充電レートに対応する電流値を、第1DC-ACコンバータ11aまたは蓄電池用第1DC-DCコンバータ13aに設定する。
 蓄電システム1が自立運転モードで動作している場合、第1DC-ACコンバータ11aの交流端は、自立出力端子に接続される。
 第1制御部12aは、第1蓄電部20a、第1DC-ACコンバータ11a、及び蓄電池用第1DC-DCコンバータ13aを管理制御する。第1制御部12aの構成は、ハードウェア資源とソフトウェア資源の協働、またはハードウェア資源のみにより実現できる。ハードウェア資源として、CPU、DSP(Digital Signal Processor)、FPGA(Field-Programmable Gate Array)、ROM、RAM、その他のLSIを利用できる。ソフトウェア資源としてファームウェア等のプログラムを利用できる。
 第1制御部12aは、第1監視部22aから取得した監視データをもとに第1蓄電池21aの残容量を推定する。例えば、取得した電流値を積算して第1蓄電池21aの残容量を推定する。また第1蓄電池21aの開回路電圧(OCV)から第1蓄電池21aの残容量を推定することもできる。残容量は蓄電池からの放電可能容量と考えることができる。残容量は容量値[Ah]で規定されてもよいし、SOC(State Of Charge)[%]で規定されてもよい。
 また第1制御部12aは、第1監視部22aから取得した監視データをもとに過電圧、過電流等の異常を検出すると、第1蓄電池21aと蓄電池用第1DC-DCコンバータ13a間に挿入されているリレー(不図示)をオープンして第1蓄電池21aを保護する。
 また第1制御部12aは、操作部(不図示)からユーザにより入力されたピークカットの設定情報を受け付ける。例えばピークカットの設定情報として、充電時間帯、充電レート、放電時間帯、放電レートを受け付ける。第1制御部12aは当該設定情報をもとに第1DC-ACコンバータ11aおよび蓄電池用第1DC-DCコンバータ13aを制御する。なお第1蓄電池21aをピークカット用途に使用せずバックアップ用途のみに使用してもよい。
 蓄電池用第2DC-DCコンバータ13b、第2DC-ACコンバータ11b、及び第2制御部12bの基本動作も、蓄電池用第1DC-DCコンバータ13a、第1DC-ACコンバータ11a、及び第1制御部12aの基本動作と同様である。
 第1DC-ACコンバータ11aの系統連系端子と第2DC-ACコンバータ11bの系統連系端子は、それぞれ別の配電線に接続されてもよいし、同じ配電線に接続されてもよい。以下の説明ではそれぞれ別の配電線に接続されており、系統連系モードにおいて、第1DC-ACコンバータ11aおよび第2DC-ACコンバータ11bはそれぞれ別の負荷に交流電力を供給する例を想定する。
 第1制御部12aまたは第2制御部12bの一方が停電を検知すると、他方に停電発生を通知する。第1制御部12aおよび第2制御部12bは、それぞれ第1DC-ACコンバータ11aおよび第2DC-ACコンバータ11bの運転モードを、系統連系モードから自立運転モードに切り替える。具体的には第1DC-ACコンバータ11aおよび第2DC-ACコンバータ11bの交流端の接続先を、それぞれ系統連系端子から自立出力端子に切り替える。
 本実施の形態では、第1DC-ACコンバータ11aの自立出力端子に接続される交流出力経路と、第2DC-ACコンバータ11bの自立出力端子に接続される交流出力経路が1つに結合される。当該結合された交流出力経路に負荷2が接続される。負荷2は、停電時において優先的に電力供給を受けることができる特定の負荷(例えば、照明灯やエレベータ)であってもよいし、一般の負荷であってもよい。また当該結合された交流出力経路にACコンセントが接続される構成であってもよい。停電時にユーザが当該ACコンセントに電気製品のACプラグを差し込むことにより、当該電気製品を使用することができる。
 当該結合された交流出力経路には電流センサCTが設置されており、当該電流センサCTは検出した電流値を第2制御部12bに通知する。
 図1では負荷2に単相2線式の配電線で交流電力が供給される例を示しているが、単相3線式の配電線で交流電力が供給されてもよい。具体的には第1DC-ACコンバータ11aの自立出力端子に接続される交流出力経路に、1次側が単相2線式で2次側が単相3線式のトランスを挿入する。当該トランスの2次巻線の一方の端子に第1電圧線(U相)が接続され、2次巻線の他方の端子に第2電圧線(V相)が接続され、2次巻線の中点に中性線(N相)が接続される。
 U-N相間、及びN-V相間からそれぞれ、当該トランスの1次巻線に印加された電圧の半分の電圧を取り出すことができる。1次巻線に印加された電圧が200Vの場合、U-N相間、及びN-V相間からそれぞれ100Vを取り出すことができる。なおU-V相間からは200Vを取り出すことができる。
 第2DC-ACコンバータ11bの自立出力端子に接続される単相2線式の一方の配線は第1電圧線(U相)に結合され、他方の配線は第2電圧線(V相)に結合される。単相3線式の場合、電流センサCTは第1電圧線(U相)と第2電圧線(V相)にそれぞれ設置され、2つの電流センサによりそれぞれ検出された電流値が第2制御部12bに通知される。第2制御部12bは当該2つの電流値をもとに、単相3線式の配電線に接続された、1つ又は2つの負荷に流れる合計電流を算出する。
 自立運転モードにおいて第1制御部12aは、第1蓄電池21aの残容量を第2制御部12bに通知する。また第1制御部12aは、第1DC-ACコンバータ11aの出力電圧の目標値を所定の電圧値(例えば、100V/200V)に設定する。第1DC-ACコンバータ11a内のインバータ回路の駆動回路は、第1DC-ACコンバータ11aの出力電圧値が目標電圧値を維持するよう、当該インバータ回路のデューティ比を適応的に変化させる。
 自立運転モードにおいて第2制御部12bは、電流センサCTから負荷2に供給されている負荷電流ILを取得する。負荷電流ILは、第1DC-ACコンバータ11aの自立出力端子から出力されている交流出力電流と第2DC-ACコンバータ11bの自立出力端子から出力されている交流出力電流の合計電流である。
 また第2制御部12bは、第2監視部22bから取得した監視データをもとに第2蓄電池21bの残容量を推定する。また第2制御部12bは、第1制御部12aから第1蓄電池21aの残容量を取得する。
 第2制御部12bは、負荷電流IL、第1蓄電池21aの残容量、第2蓄電池21bの残容量をもとに、第2DC-ACコンバータ11bの出力電流の目標値を決定し、第2DC-ACコンバータ11bに設定する。第2DC-ACコンバータ11b内のインバータ回路の駆動回路は、第2DC-ACコンバータ11bの出力電流値が目標電流値を維持するよう、当該インバータ回路のデューティ比を適応的に変化させる。
 第2制御部12bは、第1蓄電池21aの残容量と第2蓄電池21bの残容量が近づくように、第2DC-ACコンバータ11bの出力電流の目標値を決定する。例えば、負荷電流ILと、第1蓄電池21aの残容量と第2蓄電池21bの残容量の比率に応じて当該目標値を決定する。具体的にはまず、第1蓄電池21aと第2蓄電池21bから負荷2に供給する総電流の内、第1蓄電池21aから供給する電流と第2蓄電池21bから供給する電流の比率を、第1蓄電池21aの残容量と第2蓄電池21bの残容量の比率に応じて決定する。次に第2蓄電池21bから供給する電流の比率を、検出された負荷電流ILに乗じて、第2DC-ACコンバータ11bの出力電流の目標値を決定する。
 例えば、第1蓄電池21aの残容量が40[Ah]で、第2蓄電池21bの残容量が10[Ah]の場合、第2蓄電池21bから供給する電流の比率は20%になる。第1蓄電池21aをメイン蓄電池、第2蓄電池21bをサブ蓄電池と考えた場合、サブ蓄電池が20%のアシスト比で負荷2に電力を供給することになる。第1DC-ACコンバータ11aからは、サブ蓄電池から供給される電流の分、負荷2が低下して見える。負荷2の総消費電流の内、サブ蓄電池から供給される電流を差し引いた電流がメイン蓄電池から供給されることになる。メイン蓄電池からは、過負荷状態にならない限り電力が出力され続けることになる。
 図2は、実施の形態1に係る蓄電システム1の自立運転モードにおける動作の一例を示すフローチャートである。上述の説明ではメイン蓄電池の残容量とサブ蓄電池の残容量が、ほぼ同時に放電下限値に到達する例を示したが、本フローチャートではメイン蓄電池の残容量にオフセットを持たせる。すなわち、サブ蓄電池の残容量が下限に達したとき、メイン蓄電池の残容量が下限値+オフセット値になるように、第2DC-ACコンバータ11bの出力電流の目標値を決定する。
 この制御を実現するには、上述のメイン蓄電池とサブ蓄電池の電流比の算出において、メイン蓄電池の実際の残容量MCからオフセット値OFSTを差し引いた残容量MC ofstを、メイン蓄電池の残容量として扱えばよい。
 第2制御部12bは、負荷電流IL[A]、メイン蓄電池のオフセットを加味した残容量MC ofst[Ah]、及びサブ蓄電池の残容量SC[Ah]を特定する(S10)。負荷電流IL[A]は電流センサCTから取得する。メイン蓄電池のオフセットを加味した残容量MC ofst[Ah]は、第1制御部12aから取得したメイン蓄電池の残容量MCからオフセット値OFSTを引いて求める。サブ蓄電池の残容量SC[Ah]は第2監視部22bから取得した監視データをもとに求める。
 第2制御部12bは、メイン蓄電池のオフセットを加味した残容量MC ofst[Ah]とサブ蓄電池の残容量SC[Ah]を加算した全体の残容量に対するサブ蓄電池の残容量SC[Ah]の比率を、サブ蓄電池のアシスト比a[%]として算出する(S11)。第2制御部12bは、負荷電流ILにアシスト比a[%]を乗じて、サブ蓄電池から供給すべき電流値Isを算出する(S12)。第2制御部12bは算出した電流値Isを第2DC-ACコンバータ11bに目標電流値として設定する(S13)。
 以上のステップS10~ステップS13までの処理が自立運転モードが終了するまで(S14のY)、繰り返し実行される(S14のN)。負荷2の消費電力は変動しているため、所定の周期で負荷電流IL[A]、メイン蓄電池のオフセットを加味した残容量MC ofst[Ah]、及びサブ蓄電池の残容量SC[Ah]を特定し(S10)、サブ蓄電池から供給すべき電流値Isを算出する(S12)。これにより、絶えず更新された電流値Isが第2DC-ACコンバータ11bに設定され(S13)、第1DC-ACコンバータ11aから出力される電流も絶えず変動する。
 以上説明したように実施の形態1によれば、自立運転モードにおいて、並列接続されたメイン蓄電池とサブ蓄電池の残容量がほぼ同時に下限に到達するよう、それぞれの出力電流が決定されるため、メイン蓄電池の残容量が先に下限に到達することを回避できる。従って、負荷2にできるだけ長く蓄電池からバックアップ電力を供給し続けることができる。
 負荷電圧を規定しているメイン側の蓄電池の残容量が下限に達した時点で、サブ蓄電池の容量が残っていても、負荷2に電力を供給することができなくなる。従って、メイン蓄電池の残容量がサブ蓄電池の残容量より先に下限に到達することを回避する必要がある。これに対して本実施の形態によれば、メイン蓄電池の残容量とサブ蓄電池の残容量の比率に応じて、メイン蓄電池から負荷2に出力される電流量とサブ蓄電池から負荷2に出力される電流量が調整されるため、メイン蓄電池とサブ蓄電池の残容量をほぼ同時に下限に到達させることができる。なおメイン蓄電池の残容量にオフセットを持たせておけば、より確実に、メイン蓄電池の残容量がサブ蓄電池の残容量より先に下限に到達することを回避することができる。
 なおサブ蓄電池の残容量がメイン蓄電池の残容量より先に下限に到達した場合、メイン蓄電池からの放電は継続できる。しかしながら、メイン蓄電池から負荷2への系とサブ蓄電池から負荷2への系のいずれかに不具合が発生しても負荷2への給電を継続するという観点からは、メイン蓄電池とサブ蓄電池の両方から給電できる状態をできるだけ維持することが望ましい。
 系統連系モードにおいて、メイン蓄電池とサブ蓄電池がそれぞれ別々の負荷に電力を供給している場合、停電により自立運転モードに切り替わった時点でメイン蓄電池とサブ蓄電池の残容量が大きく異なっていることがある。このような場合において、メイン蓄電池から負荷2に出力される電流量とサブ蓄電池から負荷2に出力される電流量が等しくなるように制御すると、メイン蓄電池とサブ蓄電池の残容量が下限に到達するタイミングが大きくずれることになる。本実施の形態によれば、このような事態も回避することができる。
 なお実施の形態1において、蓄電池用第1DC-DCコンバータ13a及び蓄電池用第2DC-DCコンバータ13bを省略し、第1DC-ACコンバータ11aと第1蓄電池21a、第2DC-ACコンバータ11bと第2蓄電池21bを直接接続する構成も可能である。この場合、第1蓄電池21aの電圧値または電流値は第1DC-ACコンバータ11aで全て規定され、第2蓄電池21bの電圧値または電流値は第2DC-ACコンバータ11bで全て規定される。
 (実施の形態2)
 図3は、本発明の実施の形態2に係る蓄電システム1の構成を示す図である。実施の形態2に係る蓄電システム1は、図1の実施の形態1に係る蓄電システム1に、第1太陽光発電システム30a、太陽電池用第1DC-DCコンバータ14a、第2太陽光発電システム30b、太陽電池用第2DC-DCコンバータ14bが追加された構成である。
 第1太陽光発電システム30aは、直並列接続された複数の太陽電池セルを含み、太陽光エネルギーを電力に変換して出力する。太陽電池用第1DC-DCコンバータ14aは、第1太陽光発電システム30aから出力される直流電力を、第1制御部12aから設定された電圧値の直流電力に変換して出力する。なお太陽電池用第1DC-DCコンバータ14aにMPPT(Maximum Power Point Tracking)機能が搭載されている場合、太陽電池用第1DC-DCコンバータ14aは第1太陽光発電システム30aが最大動作点で発電できるよう電圧値を決定する。
 太陽電池用第1DC-DCコンバータ14aの出力経路は、第1DC-ACコンバータ11aと蓄電池用第1DC-DCコンバータ13aの間のノードNaに接続される。すなわち、第1太陽光発電システム30aの発電電流は、第1蓄電池21aの充電電流/放電電流と合算されて第1DC-ACコンバータ11aの直流端に出力される。
 第2太陽光発電システム30bおよび太陽電池用第2DC-DCコンバータ14bの構成および動作は、第1太陽光発電システム30aおよび太陽電池用第1DC-DCコンバータ14aの構成および動作と同様である。なお太陽光発電システムの発電容量は、第1太陽光発電システム30aと第2太陽光発電システム30bで異なっていてもよい。
 なお図3では、負荷2に単相2線式の配電線で交流電力が供給される例を示しているが、上述したように単相3線式の配電線で交流電力が供給されてもよい。
 実施の形態2のように第1太陽光発電システム30a及び第2太陽光発電システム30bが設けられる蓄電システム1では、上述のアシスト比aの演算において、第1太陽光発電システム30a及び第2太陽光発電システム30bの発電量を考慮する必要がある。第1太陽光発電システム30aと第1蓄電池21aはDCリンクしているため、自立運転モードでは、第1蓄電池21aの充電/放電量から第1太陽光発電システム30aの発電量を推定することができる。同様に第2蓄電池21bの充電/放電量から第2太陽光発電システム30bの発電量を推定することができる。
 自立運転モードにおいて第1制御部12aは、第1監視部22aから出力される電流値、電圧値をもとに第1蓄電池21aの充電/放電量と残容量を推定する。第1蓄電池21aが充電しているか放電しているかは電流の向きにより特定できる。第1制御部12aは、推定した第1蓄電池21aの充電/放電量と、第1蓄電池21aの残容量を第2制御部12bに通知する。また実施の形態1と同様に第1制御部12aは、第1DC-ACコンバータ11aの出力電圧の目標値を所定の電圧値(例えば、100V/200V)に設定する。
 第2制御部12bは、第2監視部22bから出力される電流値、電圧値をもとに第2蓄電池21bの充電/放電電力と残容量を推定する。第2制御部12bは、負荷電流IL、第1蓄電池21aの残容量、第1蓄電池21aの充電/放電量、第2蓄電池21bの残容量、第2蓄電池21bの充電/放電量をもとに、第2DC-ACコンバータ11bの出力電流の目標値を決定し、第2DC-ACコンバータ11bに設定する。実施の形態2でも実施の形態1と同様に第2制御部12bは、第1蓄電池21aの残容量と第2蓄電池21bの残容量が近づくように、第2DC-ACコンバータ11bの出力電流の目標値を決定する。
 図4(a)-(c)は、実施の形態2に係る蓄電システム1における自立運転モード時の制御例を模式的に示す図である。図4(a)-(c)に示す例ではメイン蓄電池の残容量が40[Ah]、サブ蓄電池の残容量が10[Ah]の例を示している。実施の形態1に示したアシスト比aの演算により、第2DC-ACコンバータ11bから負荷2に1[kW]が供給され、第1DC-ACコンバータ11aから負荷2に4[kW]が供給されている。このアシスト比a(20%)は第1太陽光発電システム30a及び第2太陽光発電システム30bの発電量を考慮せずに算出された値である。
 図4(a)は第1太陽光発電システム30aが5[kW]を発電し、第2太陽光発電システム30bが発電していない例である。第1DC-ACコンバータ11aの出力電力が4[kW]に制御されているため、第1太陽光発電システム30aが5[kW]を発電するとメイン蓄電池に1[kW]充電されることになる。第2DC-ACコンバータ11bの出力電力は1[kW]に制御されているため、第2太陽光発電システム30bが発電していない状態ではサブ蓄電池から1[kW]放電されることになる。この例ではメイン蓄電池が充電でサブ蓄電池が放電であるため、メイン蓄電池とサブ蓄電池の残容量が拡大することになる。
 図4(b)は第1太陽光発電システム30aが5[kW]を発電し、第2太陽光発電システム30bが1[kW]を発電する例である。第1DC-ACコンバータ11aの出力電力が4[kW]に制御されているため、第1太陽光発電システム30aが5[kW]を発電するとメイン蓄電池に1[kW]充電されることになる。第2DC-ACコンバータ11bの出力電力は1[kW]に制御されているため、第2太陽光発電システム30bが1[kW]を発電するとサブ蓄電池から1[kW]を放電しなくてすむことになる。ただしサブ蓄電池が充電されるわけではなくメイン蓄電池は充電されるため、この例でもメイン蓄電池とサブ蓄電池の残容量が拡大することになる。
 図4(c)は第1太陽光発電システム30aが1[kW]を発電し、第2太陽光発電システム30bが5[kW]を発電する例である。第1DC-ACコンバータ11aの出力電力が4[kW]に制御されているため、第1太陽光発電システム30aが1[kW]を発電するとメイン蓄電池から3[kW]放電されることになる。第2DC-ACコンバータ11bの出力電力は1[kW]に制御されているため、第2太陽光発電システム30bが5[kW]を発電するとサブ蓄電池に4[kW]充電されることになる。この例ではメイン蓄電池が放電でサブ蓄電池が充電であるため、メイン蓄電池とサブ蓄電池の残容量が縮小することになる。
 図4(a)、(b)に示す例のように、メイン蓄電池とサブ蓄電池の残容量の比率からアシスト比aを決定するとメイン蓄電池とサブ蓄電池の残容量が拡大してしまう場合がある。以上を踏まえ、第2制御部12bは次のようにアシスト比aを決定する。
 第1太陽光発電システム30aと第2太陽光発電システム30bの両方が発電している場合、第2制御部12bはメイン蓄電池の残容量、サブ蓄電池の残容量、第1太陽光発電システム30aの発電量、第2太陽光発電システム30bの発電量に基づきアシスト比aを決定する。
 第1太陽光発電システム30aと第2太陽光発電システム30bの両方が発電していない場合、第2制御部12bはメイン蓄電池の残容量、サブ蓄電池の残容量に基づきアシスト比aを決定する。この決定処理は実施の形態1に係る決定処理と同様になる。
 残容量が少ない方の蓄電池に接続された太陽光発電システム30のみが発電している場合、第2制御部12bは当該太陽光発電システム30の発電電力を残容量が少ない方の蓄電池の充電に回すよう制御する。例えば、残容量が少ない方の蓄電池からの放電がゼロになるようにアシスト比aを決定する。残容量が少ない方の蓄電池がメイン蓄電池である場合はアシスト比aが大きくなり、サブ蓄電池である場合はアシスト比aが小さくなる。
 残容量が多い方の蓄電池に接続された太陽光発電システム30のみが発電している場合、第2制御部12bは残容量が少ない方の蓄電池からの放電が最小になるようアシスト比aを決定する。残容量が少ない方の蓄電池がメイン蓄電池である場合はアシスト比aが最大になり、サブ蓄電池である場合はアシスト比aが最小になる。
 以下、実施の形態2に係るアシスト比aの算出方法の具体例を示す。この例ではメイン蓄電池の充電/放電電力MBP[W]、サブ蓄電池の充電/放電電力SBP[W]、メイン蓄電池のオフセットを加味した残容量MC ofst[Ah]、及びサブ蓄電池の残容量SC[Ah]をもとに、蓄電システム1の状態を9パターンに分類する。なおメイン蓄電池の充電/放電電力MBPの値が正のときは充電を意味し、負のときは放電を意味する。サブ蓄電池の充電/放電電力SBPも同様である。
 図5は、実施の形態2に係るアシスト比aの算出方法の具体例で使用する判定条件を規定したテーブルを示す図である。図6は、実施の形態2に係るアシスト比aの算出方法の具体例を説明するためのフローチャートである。この具体例では、アシスト比aの変動範囲を0.00~1.00(0~100%)とし、1回の更新につきアシスト比aが変動するステップ幅は0.01(1%)とする。
 図6のフローチャートにおいて、第2制御部12bはアシスト比aの初期値として0.5を設定する(S20)。すなわち第1DC-ACコンバータ11aから出力される電流と第2DC-ACコンバータ11bから出力される電流の比率を1:1から始める。なおアシスト比aの初期値として、メイン蓄電池とサブ蓄電池の残容量の比率に応じた値を使用してもよい。
 第2制御部12bは、負荷電流IL[A]、メイン蓄電池の充電/放電電力MBP[W]、メイン蓄電池の残容量MC ofst[Ah]、サブ蓄電池の充電/放電電力SBP[W]、及びサブ蓄電池の残容量SC[Ah]を特定する(S21)。
 第2制御部12bは、図5に示すテーブルを参照して条件1~3のいずれかに該当するか否か判定する(S22)。該当する場合(S22のY)、第2制御部12bは、アシスト比aを1単位デクリメントする。具体的には1周期前のアシスト比pre aから0.01を減算して新たなアシスト比aを算出する(S26)。条件1~3はメイン蓄電池とサブ蓄電池の残容量が拡大する(サブ蓄電池の残容量がメイン蓄電池の残容量に対して相対的に減少する)場合であり、アシスト比aを下げることによりサブ蓄電池の残容量の相対的な減少を抑える。
 条件1~3のいずれにも該当しない場合(S22のN)、第2制御部12bは条件4~6のいずれかに該当するか否か判定する(S23)。該当する場合(S23のY)、第2制御部12bは、アシスト比aを1単位インクリメントする。具体的には1周期前のアシスト比pre aに0.01を加算して新たなアシスト比aを算出する(S27)。条件4~6はメイン蓄電池とサブ蓄電池の残容量が拡大する(メイン蓄電池の残容量がサブ蓄電池の残容量に対して相対的に減少する)場合であり、アシスト比aを上げることによりメイン蓄電池の残容量の相対的な減少を抑える。
 条件1~6のいずれにも該当しない場合(S23のN)、第2制御部12bは直近に取得した、メイン蓄電池のオフセットを加味した残容量MC ofst[Ah]と、サブ蓄電池の残容量SC[Ah]を、演算式[a=SC/(MC ofst+SC)]にあてはめて、最新の実際のアシスト比aを算出する。
 第2制御部12bは最新の実際のアシスト比aと1周期前のアシスト比pre aを比較する。最新の実際のアシスト比aが1周期前のアシスト比pre aより大きい場合(S24のY)、第2制御部12bは、1周期前のアシスト比pre aに0.01を加算して新たなアシスト比aを算出する(S27)。本具体例では、アシスト比aを0.01単位で増減させるため、1周期前のアシスト比pre aを最新の実際のアシスト比aまでいっきに変更せずに、最新の実際のアシスト比aに0.01近づける処理となる。
 算出した最新の実際のアシスト比aが1周期前のアシスト比pre aより小さい場合(S24のN、S25のY)、第2制御部12bは、1周期前のアシスト比pre aから0.01を減算して新たなアシスト比aを算出する(S26)。
 算出した最新の実際のアシスト比aが1周期前のアシスト比pre aと等しい場合(S24のN、S25のN)、第2制御部12bは、1周期前のアシスト比pre aをそのまま新たなアシスト比aとする(S28)。この場合、アシスト比aを変更する必要はない。
 第2制御部12bは、負荷電流ILに新たなアシスト比aを乗じて、第2DC-ACコンバータ11bから供給すべき電流値Isを算出する(S29)。第2制御部12bは算出した電流値Isを第2DC-ACコンバータ11bに目標電流値として設定する(S30)。
 以上のステップS21~ステップS30までの処理が自立運転モードが終了するまで(S31のY)、繰り返し実行される(S31のN)。負荷2の消費電力、第1太陽光発電システム30aの発電量、第2太陽光発電システム30bの発電量は変動しているため、所定の周期で負荷電流IL[A]、メイン蓄電池の充電/放電電力MBP[W]、サブ蓄電池の充電/放電電力SBP[W]、メイン蓄電池のオフセットを加味した残容量MC ofst[Ah]、及びサブ蓄電池の残容量SC[Ah]を特定し(S21)、第2DC-ACコンバータ11bから供給すべき電流値Isを算出する(S29)。これにより、絶えず更新された電流値Isが第2DC-ACコンバータ11bに設定され(S30)、第1DC-ACコンバータ11aから出力される電流も絶えず変動する。
 なお本具体例ではアシスト比aが1周期で0.01単位でしか変動しないため、第2DC-ACコンバータ11b及び第1DC-ACコンバータ11aから出力される電流の変動は緩やかになる。
 以上説明したように実施の形態2によれば、第1太陽光発電システム30a及び第2太陽光発電システム30bを備える蓄電システム1においても実施の形態1と同様の効果を奏する。すなわち、第1太陽光発電システム30a及び第2太陽光発電システム30bの発電量を考慮した上で、自立運転モードにおいて、並列接続されたメイン蓄電池とサブ蓄電池の残容量をほぼ同時に下限に到達させることができる。従って、第1DC-ACコンバータ11aと第2DC-ACコンバータ11bの両方から負荷2にできるだけ長くバックアップ電力を供給し続けることができる。
 また第2DC-ACコンバータ11bの目標電流値を、負荷電流IL、太陽光発電システムの発電量の変動を考慮して常時更新し続けることにより、メイン蓄電池とサブ蓄電池の残容量が下限に到達するタイミングを高精度に一致させることができる。
 また第2DC-ACコンバータ11bの目標電流値を、直近の条件を反映した目標電流値に漸次的に近づけるように制御するため、第2DC-ACコンバータ11bの出力電流のハンチングを抑制することができる。その結果、第1DC-ACコンバータ11aの出力電流のハンチングも抑制することができる。
 以上、本発明を実施の形態をもとに説明した。実施の形態は例示であり、それらの各構成要素や各処理プロセスの組み合わせにいろいろな変形例が可能なこと、またそうした変形例も本発明の範囲にあることは当業者に理解されるところである。
 実施の形態2では、再生可能エネルギーをもとに発電する発電装置として太陽光発電システムを使用する例を説明したが、風力発電装置やマイクロ水力発電装置など他の発電装置を使用してもよい。いずれの発電装置も自然環境の変化により発電量が変化する発電装置である。なお発電装置の出力が交流の場合、発電装置の後段のDC-DCコンバータは、AC-DCコンバータに置き換えられる。
 実施の形態2では、アシスト比aを0.01(1%)のステップ幅で増減させる例を説明したが、より細かなステップ幅で増減させてもよいし、より粗いステップ幅で増減させてもよい。設計者は、蓄電池、太陽電池、DC-ACコンバータ等の仕様、実験値、シミュレーション値をもとにアシスト比aのステップ幅、第2DC-ACコンバータ11bの目標電流値の更新間隔を決定する。なお設計者は、第2DC-ACコンバータ11bの目標電流値を、直近の条件を反映した目標電流値に瞬時に合わせる制御を採用してもよい。
 また実施の形態1、2では第1制御部12aと第2制御部12bを別々の基板に設ける例を説明したが、両者を1つの基板に一体的に実装してもよい。その場合、第1制御部12aと第2制御部12b間の通信処理は不要になる。
 また実施の形態1、2では第1DC-ACコンバータ11a、第1制御部12a、蓄電池用第1DC-DCコンバータ13a、(太陽電池用第1DC-DCコンバータ14a)、第2DC-ACコンバータ11b、第2制御部12b、蓄電池用第2DC-DCコンバータ13b、(太陽電池用第2DC-DCコンバータ14b)を1つの筐体内にまとめて設置する例を説明した。この点、第1DC-ACコンバータ11a、第1制御部12a、蓄電池用第1DC-DCコンバータ13a、(太陽電池用第1DC-DCコンバータ14a)と、第2DC-ACコンバータ11b、第2制御部12b、蓄電池用第2DC-DCコンバータ13b、(太陽電池用第2DC-DCコンバータ14b)をそれぞれ別々の筐体内に設置してもよい。例えば、第2蓄電部20bと第2太陽光発電システム30bを後付けした場合、第2DC-ACコンバータ11b、第2制御部12b、蓄電池用第2DC-DCコンバータ13b、(太陽電池用第2DC-DCコンバータ14b)は、第1DC-ACコンバータ11a、第1制御部12a、蓄電池用第1DC-DCコンバータ13a、(太陽電池用第1DC-DCコンバータ14a)と別々の筐体になり、第1制御部12aと第2制御部12bは通信線で接続されることになる。
 また実施の形態1、2に係る制御は、自立運転モードにおいて、蓄電池が3つ以上並列接続される蓄電システム1にも適用可能である。3つ以上の蓄電池の残容量がほぼ同時に下限に到達するよう、2つ以上のサブ蓄電池がそれぞれ接続された2つ以上のDC-ACコンバータの出力電流値が決定されればよい。
 なお、実施の形態は、以下の項目によって特定されてもよい。
[項目1]
 第1蓄電部(20a)から供給される直流電力を交流電力に変換する第1DC-AC変換部(11a)と、
 前記第1蓄電部(20a)から監視データを取得するとともに、前記第1DC-AC変換部(11a)を制御する第1制御部(12a)と、
 第2蓄電部(20b)から供給される直流電力を交流電力に変換する第2DC-AC変換部(11b)と、
 前記第2蓄電部(20b)から監視データを取得するとともに、前記第2DC-AC変換部(11b)を制御する第2制御部(12b)と、を備え、
 前記第1DC-AC変換部(11a)の交流出力経路と、前記第2DC-AC変換部(11b)の交流出力経路は結合されており、前記第1DC-AC変換部(11a)の交流出力電流と前記第2DC-AC変換部(11b)の交流出力電流の合計電流が負荷(2)に供給され、
 前記第1制御部(12a)は、前記第1DC-AC変換部(11a)の出力電圧を設定し、前記第1蓄電部(20a)の残容量を前記第2制御部(12b)に通知し、
 前記第2制御部(12b)は、前記負荷(2)に供給される合計電流と、前記第1蓄電部(20a)の残容量と、前記第2蓄電部(20b)の残容量を基に、前記第1蓄電部(20a)の残容量と前記第2蓄電部(20b)の残容量が近づくように前記第2DC-AC変換部(11b)の出力電流を制御することを特徴とする電力変換システム(10)。
 これによれば、第1蓄電部(20a)と第2蓄電部(20b)の両方から、より長く負荷(2)に電力を供給し続けることができる。
[項目2]
 前記第2制御部(12b)は、前記負荷(2)に供給される合計電流と、前記第1蓄電部(20a)の残容量と前記第2蓄電部(20b)の残容量の比率に応じて前記第2DC-AC変換部(11b)の出力電流を制御することを特徴とする項目1に記載の電力変換システム(10)。
 これによれば、第1蓄電部(20a)と第2蓄電部(20b)の残容量が下限に到達するタイミングをほぼ同時期に合わせることができる。
[項目3]
 前記第1DC-AC変換部(11a)と前記第1蓄電部(20a)との間のノード(Na)に、再生可能エネルギーに基づき発電する第1発電装置(30a)からの直流出力経路が接続され、
 前記第2DC-AC変換部(11b)と前記第2蓄電部(20b)との間のノード(Nb)に、再生可能エネルギーに基づき発電する第2発電装置(30b)からの直流出力経路が接続され、
 前記第1制御部(12a)は、前記第1蓄電部(20a)の残容量、前記第1蓄電部(20a)からの放電量/前記第1蓄電部(20a)への充電量を前記第2制御部(12b)に通知し、
 前記第2制御部(12b)は、前記負荷(2)に供給される合計電流、前記第1蓄電部(20a)の残容量、前記第1蓄電部(20a)からの放電量/前記第1蓄電部(20a)への充電量、前記第2蓄電部(20b)の残容量、前記第2蓄電部(20b)からの放電量/前記第2蓄電部(20b)への充電量を基に、前記第1蓄電部(20a)の残容量と前記第2蓄電部(20b)の残容量が近づくように前記第2DC-AC変換部(12b)の出力電流を制御することを特徴とする項目1に記載の電力変換システム(10)。
 これによれば、発電装置(30a、30b)が接続されている構成において、第1DC-ACコンバータ(11a)と第2DC-ACコンバータ(11b)の両方から、より長く負荷(2)に電力を供給し続けることができる。
[項目4]
 前記第2制御部(12b)は、前記第2蓄電部(20b)の残容量が下限に達したとき、前記第1蓄電部(20a)の残容量が下限値にオフセット値を加えた値になるよう、前記出力電流を制御することを特徴とする項目1から3のいずれかに記載の電力変換システム(20)。
 これによれば、第1蓄電部(20a)の残容量が、第2蓄電部(20b)より先に下限に到達することを、より確実に回避することができる。
[項目5]
 前記第2制御部(12b)は、前記第2DC-AC変換部(11b)の出力電流を制御することを特徴とする項目1から4のいずれかに記載の電力変換システム(10)。
 これによれば、時々刻々と変化する環境変化を、第2DC-AC変換部(11b)の出力電流の目標値に即座に反映させることができる。
[項目6]
 前記第2制御部(12b)は、直近に推定された前記第2DC-AC変換部(11b)の出力電流に、1単位前に推定された前記第2DC-AC変換部(11b)の出力電流の目標値を漸次的に近づけることを特徴とする項目1から5のいずれかに記載の電力変換システム(10)。
 これによれば、第2DC-ACコンバータ(11b)及び第1DC-ACコンバータ(11a)の出力電流の変動を緩やかにすることができる。
[項目7]
 第1蓄電部(20a)から供給される直流電力を交流電力に変換する第1DC-AC変換部(11a)と、
 第2蓄電部(20b)から供給される直流電力を交流電力に変換する第2DC-AC変換部(11b)と、
 前記第1蓄電部(20a)と前記第2蓄電部(20b)から監視データを取得するとともに、前記第1DC-AC変換部(11a)と前記第2DC-AC変換部(11b)を制御する制御部(12a、12b)と、を備え、
 前記第1DC-AC変換部(11a)の交流出力経路と、前記第2DC-AC変換部(11b)の交流出力経路は結合されており、前記第1DC-AC変換部(11a)の交流出力電流と前記第2DC-AC変換部(11b)の交流出力電流の合計電流が負荷(2)に供給され、
 前記制御部(12a、12b)は、前記負荷(2)に供給される合計電流と、前記第1蓄電部(20a)の残容量と、前記第2蓄電部(20b)の残容量を基に、前記第1蓄電部(20a)の残容量と前記第2蓄電部(20b)の残容量が近づくように前記第2DC-AC変換部(11b)の出力電流を制御することを特徴とする電力変換システム(10)。
 これによれば、第1蓄電部(20a)と第2蓄電部(20b)の両方から、より長く負荷(2)に電力を供給し続けることができる。
[項目8]
 出力電圧が設定されているDC-AC変換部であり、第1蓄電部(20a)から供給される直流電力を交流電力に変換する第1DC-AC変換部(11a)と、第2蓄電部(20b)から供給される直流電力を交流電力に変換する第2DC-AC変換部(11b)と、を制御する制御装置(12b)であって、
 前記第1DC-AC変換部(11a)の交流出力経路と、前記第2DC-AC変換部(11b)の交流出力経路は結合されており、前記第1DC-AC変換部(11a)の交流出力電流と前記第2DC-AC変換部(11b)の交流出力電流の合計電流が負荷(2)に供給され、
 前記制御装置(12b)は、
 前記負荷(2)に供給される合計電流と、前記第1蓄電部(20a)の残容量と、前記第2蓄電部(20b)の残容量を基に、前記第1蓄電部(20a)の残容量と前記第2蓄電部(20b)の残容量が近づくように前記第2DC-AC変換部(11b)の出力電流を制御することを特徴とする制御装置(12b)。
 これによれば、第1蓄電部(20a)と第2蓄電部(20b)の両方から、より長く負荷(2)に電力を供給し続けることができる。
 1 蓄電システム、 2 負荷、 10 電力変換システム、 11a 第1DC-ACコンバータ、 12a 第1制御部、 13a 蓄電池用第1DC-DCコンバータ、 14a 太陽電池用第1DC-DCコンバータ、 20a 第1蓄電部、 21a 第1蓄電池、 22a 第1監視部、 11b 第2DC-ACコンバータ、 12b 第2制御部、 13b 蓄電池用第2DC-DCコンバータ、 14b 太陽電池用第2DC-DCコンバータ、 20b 第2蓄電部、 21b 第2蓄電池、 22b 第2監視部、 CT 電流センサ、 30a 第1太陽光発電システム、 30b 第2太陽光発電システム。
 本発明は、複数の蓄電池を並列接続された蓄電システムに利用可能である。

Claims (8)

  1.  第1蓄電部から供給される直流電力を交流電力に変換する第1DC-AC変換部と、
     前記第1蓄電部から監視データを取得するとともに、前記第1DC-AC変換部を制御する第1制御部と、
     第2蓄電部から供給される直流電力を交流電力に変換する第2DC-AC変換部と、
     前記第2蓄電部から監視データを取得するとともに、前記第2DC-AC変換部を制御する第2制御部と、を備え、
     前記第1DC-AC変換部の交流出力経路と、前記第2DC-AC変換部の交流出力経路は結合されており、前記第1DC-AC変換部の交流出力電流と前記第2DC-AC変換部の交流出力電流の合計電流が負荷に供給され、
     前記第1制御部は、前記第1DC-AC変換部の出力電圧を設定し、前記第1蓄電部の残容量を前記第2制御部に通知し、
     前記第2制御部は、前記負荷に供給される合計電流と、前記第1蓄電部の残容量と、前記第2蓄電部の残容量を基に、前記第1蓄電部の残容量と前記第2蓄電部の残容量が近づくように前記第2DC-AC変換部の出力電流を制御することを特徴とする電力変換システム。
  2.  前記第2制御部は、前記負荷に供給される合計電流と、前記第1蓄電部の残容量と前記第2蓄電部の残容量の比率に応じて前記第2DC-AC変換部の出力電流を制御することを特徴とする請求項1に記載の電力変換システム。
  3.  前記第1DC-AC変換部と前記第1蓄電部との間のノードに、再生可能エネルギーに基づき発電する第1発電装置からの直流出力経路が接続され、
     前記第2DC-AC変換部と前記第2蓄電部との間のノードに、再生可能エネルギーに基づき発電する第2発電装置からの直流出力経路が接続され、
     前記第1制御部は、前記第1蓄電部の残容量、前記第1蓄電部からの放電量/前記第1蓄電部への充電量を前記第2制御部に通知し、
     前記第2制御部は、前記負荷に供給される合計電流、前記第1蓄電部の残容量、前記第1蓄電部からの放電量/前記第1蓄電部への充電量、前記第2蓄電部の残容量、前記第2蓄電部からの放電量/前記第2蓄電部への充電量を基に、前記第1蓄電部の残容量と前記第2蓄電部の残容量が近づくように前記第2DC-AC変換部の出力電流を制御することを特徴とする請求項1に記載の電力変換システム。
  4.  前記第2制御部は、前記第2蓄電部の残容量が下限に達したとき、前記第1蓄電部の残容量が下限値にオフセット値を加えた値になるよう、前記出力電流の目標値を決定することを特徴とする請求項1から3のいずれかに記載の電力変換システム。
  5.  前記第2制御部は、前記第2DC-AC変換部の出力電流を所定時間毎に算出することを特徴とする請求項1から4のいずれかに記載の電力変換システム。
  6.  前記第2制御部は、直近に推定された前記第2DC-AC変換部の出力電流に、1単位前に推定された前記第2DC-AC変換部の出力電流の目標値を漸次的に近づけることを特徴とする請求項1から5のいずれかに記載の電力変換システム。
  7.  第1蓄電部から供給される直流電力を交流電力に変換する第1DC-AC変換部と、
     第2蓄電部から供給される直流電力を交流電力に変換する第2DC-AC変換部と、
     前記第1蓄電部と前記第2蓄電部から監視データを取得するとともに、前記第1DC-AC変換部と前記第2DC-AC変換部を制御する制御部と、を備え、
     前記第1DC-AC変換部の交流出力経路と、前記第2DC-AC変換部の交流出力経路は結合されており、前記第1DC-AC変換部の交流出力電流と前記第2DC-AC変換部の交流出力電流の合計電流が負荷に供給され、
     前記制御部は、前記負荷に供給される合計電流と、前記第1蓄電部の残容量と、前記第2蓄電部の残容量を基に、前記第1蓄電部の残容量と前記第2蓄電部の残容量が近づくように前記第2DC-AC変換部の出力電流を制御することを特徴とする電力変換システム。
  8.  出力電圧が設定されているDC-AC変換部であり、第1蓄電部から供給される直流電力を交流電力に変換する第1DC-AC変換部と、第2蓄電部から供給される直流電力を交流電力に変換する第2DC-AC変換部と、を制御する制御装置であって、
     前記第1DC-AC変換部の交流出力経路と、前記第2DC-AC変換部の交流出力経路は結合されており、前記第1DC-AC変換部の交流出力電流と前記第2DC-AC変換部の交流出力電流の合計電流が負荷に供給され、
     前記制御装置は、
     前記負荷に供給される合計電流と、前記第1蓄電部の残容量と、前記第2蓄電部の残容量を基に、前記第1蓄電部の残容量と前記第2蓄電部の残容量が近づくように前記第2DC-AC変換部の出力電流を制御することを特徴とする制御装置。
PCT/JP2016/003701 2015-10-28 2016-08-10 電力変換システム及び制御装置 WO2017072991A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
EP16859232.7A EP3370322A4 (en) 2015-10-28 2016-08-10 Power conversion system and control device
AU2016344885A AU2016344885A1 (en) 2015-10-28 2016-08-10 Power conversion system and control device
US15/964,098 US20180248376A1 (en) 2015-10-28 2018-04-27 Power conversion system and control device

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2015-211540 2015-10-28
JP2015211540A JP2017085769A (ja) 2015-10-28 2015-10-28 電力変換システム及び制御装置

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US15/964,098 Continuation US20180248376A1 (en) 2015-10-28 2018-04-27 Power conversion system and control device

Publications (1)

Publication Number Publication Date
WO2017072991A1 true WO2017072991A1 (ja) 2017-05-04

Family

ID=58630054

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/003701 WO2017072991A1 (ja) 2015-10-28 2016-08-10 電力変換システム及び制御装置

Country Status (5)

Country Link
US (1) US20180248376A1 (ja)
EP (1) EP3370322A4 (ja)
JP (1) JP2017085769A (ja)
AU (1) AU2016344885A1 (ja)
WO (1) WO2017072991A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2023073396A (ja) * 2020-12-16 2023-05-25 株式会社MR Japan 電力供給システム

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6716070B2 (ja) * 2016-08-23 2020-07-01 株式会社日立製作所 アグリゲーションシステム及びその制御方法並びに制御装置
US11165280B2 (en) * 2016-09-27 2021-11-02 Kyocera Corporation Power management method, power management apparatus, power conversion apparatus, and power management system
US11309714B2 (en) * 2016-11-02 2022-04-19 Tesla, Inc. Micro-batteries for energy generation systems
US10587118B2 (en) * 2016-11-15 2020-03-10 Solaredge Technologies Ltd. Smart outlet
JP6902917B2 (ja) 2017-04-25 2021-07-14 新日本無線株式会社 定電圧電源回路
CN109473972B (zh) * 2018-08-31 2021-07-13 长沙理工大学 基于多功率曲线协整的源荷储优化控制方法
KR102577911B1 (ko) * 2018-11-16 2023-09-14 상라오 징코 솔라 테크놀러지 디벨롭먼트 컴퍼니, 리미티드 전력변환장치, 이를 구비하는 태양광 모듈, 및 태양광 시스템
FR3091055A1 (fr) * 2018-12-20 2020-06-26 Orange Procédé et dispositif de commande de recharge et de décharge de batteries d’un ensemble desdites batteries.
EP3716441A1 (de) * 2019-03-25 2020-09-30 VARTA Microbattery GmbH Modulares gerät zur stromversorgung
JP7346155B2 (ja) * 2019-08-21 2023-09-19 東芝エネルギーシステムズ株式会社 電池容量推定装置、電池容量推定方法、及びプログラム
JP7191873B2 (ja) * 2020-01-17 2022-12-19 株式会社東芝 充放電制御装置、充放電システム、充放電制御方法及び充放電制御プログラム
US11569668B2 (en) * 2020-07-14 2023-01-31 Igrenenergi, Inc. System and method for dynamic balancing power in a battery pack
JP7077436B1 (ja) 2021-02-26 2022-05-30 株式会社日立物流 作業支援システム、作業支援方法及びプログラム
WO2022198635A1 (zh) * 2021-03-26 2022-09-29 华为数字能源技术有限公司 储能系统及其控制方法
US11621566B1 (en) * 2022-10-05 2023-04-04 8Me Nova, Llc Seasonal electrical resource allocation

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014020644A1 (ja) * 2012-07-31 2014-02-06 三洋電機株式会社 電力供給システム、マスタ蓄電システム及びスレーブ蓄電システム
JP2014207790A (ja) * 2013-04-12 2014-10-30 パナソニック株式会社 蓄電池の管理システム及び蓄電池の管理方法
JP2015082954A (ja) * 2013-10-24 2015-04-27 富士電機株式会社 自立運転システム、自立運転制御装置および蓄電池システム

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5385698B2 (ja) * 2009-06-25 2014-01-08 パナソニック株式会社 電源供給装置
KR20130099022A (ko) * 2010-10-01 2013-09-05 삼성에스디아이 주식회사 에너지 저장 시스템용 전력 변환 시스템 및 이의 제어방법
EP2629389A1 (en) * 2010-10-15 2013-08-21 Sanyo Electric Co., Ltd. Power supply system
JP5884020B2 (ja) * 2011-03-31 2016-03-15 パナソニックIpマネジメント株式会社 電力制御装置、電力制御方法、プログラム、集積回路、および、蓄電池ユニット
JP5253690B1 (ja) * 2011-09-29 2013-07-31 パナソニック株式会社 電力供給システムおよびその制御方法
CN102447285A (zh) * 2011-10-10 2012-05-09 南方电网科学研究院有限责任公司 一种大容量电池换流器及其控制方法
JP5959289B2 (ja) * 2012-04-23 2016-08-02 株式会社東芝 蓄電池システム
US9200541B2 (en) * 2012-07-20 2015-12-01 Jacobs Vehicle Systems, Inc. Systems and methods for hydraulic lash adjustment in an internal combustion engine
CN104426157B (zh) * 2013-09-10 2017-04-19 台达电子企业管理(上海)有限公司 储能模块以及储能装置
KR102222305B1 (ko) * 2014-10-14 2021-03-03 삼성전자주식회사 배터리 관리 장치 및 방법
KR102332337B1 (ko) * 2015-01-30 2021-11-29 삼성에스디아이 주식회사 배터리 시스템 및 이를 포함하는 에너지 저장 시스템
US10164448B2 (en) * 2015-02-17 2018-12-25 Mitsubishi Electric Corporation Power conversion system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014020644A1 (ja) * 2012-07-31 2014-02-06 三洋電機株式会社 電力供給システム、マスタ蓄電システム及びスレーブ蓄電システム
JP2014207790A (ja) * 2013-04-12 2014-10-30 パナソニック株式会社 蓄電池の管理システム及び蓄電池の管理方法
JP2015082954A (ja) * 2013-10-24 2015-04-27 富士電機株式会社 自立運転システム、自立運転制御装置および蓄電池システム

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3370322A4 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2023073396A (ja) * 2020-12-16 2023-05-25 株式会社MR Japan 電力供給システム
JP7408108B2 (ja) 2020-12-16 2024-01-05 株式会社MR Japan 電力供給システム

Also Published As

Publication number Publication date
EP3370322A4 (en) 2018-10-17
EP3370322A1 (en) 2018-09-05
AU2016344885A1 (en) 2018-05-10
US20180248376A1 (en) 2018-08-30
JP2017085769A (ja) 2017-05-18

Similar Documents

Publication Publication Date Title
WO2017072991A1 (ja) 電力変換システム及び制御装置
JP6731607B2 (ja) 電力変換システム
EP3148037B1 (en) Energy storage system
US20130181519A1 (en) Power conversion system for energy storage system and controlling method of the same
JP2013085459A (ja) 電力貯蔵システムおよびその制御方法
TWI774142B (zh) 交流負荷供電系統和方法
JP2011130655A (ja) 共同住宅のエネルギー保存システム、並びに統合電力管理システム及びその制御方法
JP2008099527A (ja) 電力系統に接続された自家発電設備における蓄電池設備および蓄電池設備の運転方法
WO2018139164A1 (ja) 蓄電池と電力変換装置の連携システムの制御方法、およびパワーコンディショニングシステム
JP7450176B2 (ja) 電力変換システム
JP6376997B2 (ja) 電力システムおよび電力システムの制御方法
EP2941805B1 (en) Power supply control
JP2017184607A (ja) 配電システム及び電力合成回路
JP2018098820A (ja) 電力変換システム
EP3487034B1 (en) Power conversion system, power supply system, and power conversion apparatus
JP6677186B2 (ja) 直流給電システム
KR20190143084A (ko) 독립형 마이크로그리드 운용 시스템
JP2009247185A (ja) 系統連系インバータ装置およびその自立運転方法
JP6479516B2 (ja) 入力制御蓄電システム
US9917473B2 (en) Power system, power management method, and program
Ullah et al. A distributed secondary control strategy for power sharing and voltage regulation by multiple converters in DC micro-grids
JP2014183601A (ja) 分散型電源装置
KR102591100B1 (ko) 분산형 직류 나노 그리드에서 에너지 흐름 제어 및 전압 유지 방법
JP2019126110A (ja) 電力制御装置、電力制御装置の制御方法
Sauer et al. State of Charge balancing in primary control for dc/dc microgrids

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16859232

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2016344885

Country of ref document: AU

Date of ref document: 20160810

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 2016859232

Country of ref document: EP