WO2016208206A1 - サーバ、電力管理システム、及び電力管理方法 - Google Patents

サーバ、電力管理システム、及び電力管理方法 Download PDF

Info

Publication number
WO2016208206A1
WO2016208206A1 PCT/JP2016/003074 JP2016003074W WO2016208206A1 WO 2016208206 A1 WO2016208206 A1 WO 2016208206A1 JP 2016003074 W JP2016003074 W JP 2016003074W WO 2016208206 A1 WO2016208206 A1 WO 2016208206A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
request
customer
server
facility
Prior art date
Application number
PCT/JP2016/003074
Other languages
English (en)
French (fr)
Inventor
寛之 日▲高▼
古川 貴士
Original Assignee
京セラ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from JP2015129181A external-priority patent/JP6664156B2/ja
Priority claimed from JP2015146830A external-priority patent/JP2017027448A/ja
Application filed by 京セラ株式会社 filed Critical 京セラ株式会社
Publication of WO2016208206A1 publication Critical patent/WO2016208206A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Definitions

  • the present invention relates to a server, a power management system, and a power management method.
  • a server includes a control unit that requests a plurality of customer facilities to reduce power demand.
  • the server includes a communication unit that acquires request information including a request date for requesting reduction of the power demand and a request amount indicating a reduction amount of power demand requested on the request date.
  • the control unit determines a request date class to which the request date belongs from among classes indicating a classification of days having a correlation with the power demand.
  • the control unit calculates at least one of the number of requests and the number of participations for the plurality of customer facilities on a day belonging to the request date class for a predetermined number of days.
  • the number of requests indicates the number of times the control unit has requested each of the plurality of customer facilities to reduce the power demand.
  • the number of participations indicates the number of times that the plurality of customer facilities participate in the reduction of the power demand.
  • the control unit is a request destination demand for requesting reduction of the power demand from the plurality of customer facilities based on at least one of the request count, the participation count, and the request amount. Determine home facilities.
  • a power management system includes a first server that requests a plurality of customer facilities to reduce power demand.
  • the power management system includes a second server that generates request information including a request date for requesting reduction of the power demand and a request amount indicating a reduction amount of the power demand requested on the request date.
  • the first server includes a first control unit and a first communication unit that acquires the request information from the second server.
  • the first control unit determines a request date class to which the request date belongs from among classes indicating a classification of a day with the correlation of the power demand.
  • the first control unit calculates at least one of the number of requests and the number of participations for the plurality of customer facilities on a day belonging to the request date class for a predetermined number of days.
  • the number of requests indicates the number of times the first server has requested each of the plurality of customer facilities to reduce the power demand.
  • the number of participations indicates the number of times that the plurality of customer facilities participate in the reduction of the power demand.
  • the first control unit is a request for requesting reduction of the power demand from the plurality of customer facilities based on at least one of the request count, the participation count, and the request amount. Determine the customer facility.
  • the second server includes a second communication unit that acquires power demand record data from the plurality of customer facilities.
  • the second server includes a second control unit that generates the request information based on the power demand record data.
  • the power management method is executed by a server that requests a plurality of customer facilities to reduce power demand.
  • the power management method includes an acquisition step of acquiring request information including a request date for requesting reduction of the power demand and a request amount indicating a reduction amount of the power demand requested on the request date.
  • the power management method includes a class determination step of determining a request date class to which the request date belongs from among classes indicating a classification of days with correlation of the power demand.
  • the power management method includes a calculation step of calculating at least one of a request count and a participation count for the plurality of customer facilities on a day belonging to the request date class for a predetermined number of days.
  • the number of requests indicates the number of times the server has requested each of the plurality of customer facilities to reduce the power demand.
  • the number of participations indicates the number of times that the plurality of customer facilities participate in the reduction of the power demand.
  • the power management method is a request destination for requesting reduction of the power demand from the plurality of customer facilities based on at least one of the request count, the participation count, and the request amount. A selection step of selecting a customer facility;
  • FIG. 1 is a block diagram of a DR request system according to Embodiment 1.
  • FIG. It is a figure which shows an example of the calendar
  • FIG. 2 It is a sequence diagram explaining an example of a power supply start method. It is a sequence diagram explaining an example of the power supply termination method based on a predetermined procedure. It is a sequence diagram explaining an example of the electric power supply end method based on timeout. It is a sequence diagram explaining an example of a power bill settlement method.
  • FIG. 1 is a 1st sequence diagram explaining an example of the electric power supply-and-demand adjustment method. It is a 2nd sequence diagram explaining an example of the electric power supply-and-demand adjustment method. It is a flowchart explaining an example of the supply and demand adjustment apparatus list update method. It is a block diagram which shows the example of schematic structure of the power management system which concerns on Embodiment 3.
  • FIG. 1 is a 1st sequence diagram explaining an example of the electric power supply-and-demand adjustment method. It is a 2nd sequence diagram explaining an example of the electric power supply-and-demand adjustment method. It is a flowchart explaining an example of the supply and demand adjustment apparatus list update method. It is a block diagram which shows the example of schematic structure of the power management system which concerns on Embodiment 3.
  • the demand response is also referred to as DR (Demand Response).
  • DR Demand Response
  • Requesting a reduction in power demand from a power company to a customer facility or between power companies is also referred to as a DR request.
  • Control performed by a customer facility to reduce power consumption in response to a DR request is also referred to as DR control.
  • Incentives may be paid for customer facilities that participate in DR.
  • the customer facility may perform DR control, for example, to turn off the power of the air conditioning equipment or lower the output.
  • the host device close to the network managing the power system may make a DR request to the customer facility or the lower device close to the customer facility.
  • the upper device may make a DR request to all of the plurality of lower devices, or may make a DR request to a part of the lower devices.
  • the higher-level device makes a DR request to some lower-level devices, for example, the DR request may be given priority over the lower-level devices with a small number of DR assignments.
  • the host device close to the network managing the power system may request the DR to the customer facility or the lower device close to the customer facility in ascending order of the number of times the DR is allocated.
  • the operating status of each customer facility may vary depending on the holiday setting. If the host device makes a DR request without considering the operating status of each customer facility, there may be a bias in the frequency of DR requests to each customer facility. It can be said that the situation in which the frequency of DR requests is biased does not give the opportunity to participate in DR fairly for each customer facility.
  • the power demand record on the day when DR control is performed changes.
  • the accuracy of demand prediction may be reduced.
  • the power demand record at the customer facility may differ greatly between the power demand record on a holiday and the power demand record on an operating day. Regardless of the operation status, the accuracy of demand prediction based on the collected power demand results may decrease.
  • the DR request system 1 includes a first server 2, a second server 3, a storage device 4, and an input device 5.
  • the first server 2 is also referred to as a DR request server 2.
  • the second server 3 is also referred to as a demand prediction server 3.
  • the DR request system 1 is connected to a power provider server 71 included in a power provider group 7 that supplies power to the power grid 6.
  • the DR request system 1 is connected to a customer facility 81 included in a customer facility group 8 that is supplied with power from the power system 6.
  • the DR request system 1 is also called a power management system.
  • the DR request system 1 is managed by an aggregator that is a power company that trades negative watts. Negawatt means that a power company or the like purchases a portion of the customer facility where the amount of demand is reduced by power saving or private power generation as power generation.
  • the aggregator may request the customer facility 81 to reduce the power demand when the DR request system 1 is used to request a reduction in power demand from the power provider group 7.
  • the aggregator may request the customer facility 81 to reduce the power demand by using the DR request system 1 and determining that it should request the power demand to be reduced.
  • the power company may request reduction of power demand using the DR request system 1.
  • the power company or aggregator may make a DR contract with the customer facility 81 in advance.
  • the electric power provider or aggregator determines the timing of requesting the DR to the customer facility 81 in the DR contract with the customer facility 81 on the day before the request date or one hour before the DR control start time or 10 It may be either minutes before.
  • the timing for requesting DR is not limited to these.
  • a power network is formed by the power system 6, the power supplier group 7, and the DR request system 1.
  • the power network is also called a power network.
  • the power provider server 71 or the DR request server 2 is also referred to as a network server.
  • the power company server 71 makes a DR request to the DR request server 2.
  • the electric power company server 71 corresponds to a host device of the DR request server 2.
  • the DR request server 2 corresponds to a lower device of the electric power company server 71.
  • the DR request server 2 makes a DR request to the customer facility 81.
  • the DR request server 2 corresponds to a host device of the customer facility 81.
  • the customer facility 81 corresponds to a subordinate device of the DR request server 2.
  • the DR request server 2 includes a first control unit 21 and a first communication unit 22.
  • the first control unit 21 is also referred to as a DR request processing unit 21.
  • the demand prediction server 3 includes a second control unit 31 and a second communication unit 32.
  • the second control unit 31 is also referred to as a demand prediction unit 31.
  • the DR request processing unit 21 and the demand prediction unit 31 are connected to each other.
  • the DR request processing unit 21 and the demand prediction unit 31 are further connected to the storage device 4.
  • the first communication unit 22 is connected to the power provider server 71 and the customer facility 81.
  • the second communication unit 32 is connected to the customer facility 81.
  • the DR request processing unit 21 of the DR request server 2 acquires the DR request information from the power provider server 71 that is a higher-level device via the first communication unit 22.
  • the DR request processing unit 21 acquires DR request information from the demand prediction unit 31 of the demand prediction server 3.
  • the DR request information includes a DR request date for requesting reduction of power demand and a DR request amount indicating a reduction amount of power demand requested on the request date.
  • the DR request information is also simply referred to as request information.
  • the DR request date is also simply called the request date.
  • the DR request amount is also simply referred to as a request amount.
  • the DR request processing unit 21 selects a customer facility that is a target for making a DR request based on the acquired DR request information.
  • the customer facility for which the DR request is made is also referred to as a requested customer facility.
  • the DR request processing unit 21 sends a DR request date and a DR request amount allocated to each requested customer facility via the first communication unit 22 to request the requested customer facility to reduce power demand.
  • a DR request message including the above is transmitted to the requested customer facility.
  • the DR request processing unit 21 stores the DR request message in the storage device 4.
  • the requested customer facility that has acquired the DR request message determines whether or not to participate in the DR, and transmits a DR response message including the fact.
  • the DR request processing unit 21 acquires a DR response message via the first communication unit 22 and confirms whether the requested customer facility participates in DR.
  • the DR request processing unit 21 stores the acquired DR response message in the storage device 4.
  • the DR request processing unit 21 corresponds to the DR request amount included in the DR request information only in the other requested customer facility participating in the DR. Determine whether the reduction in power demand can be achieved.
  • the DR request processing unit 21 determines that it cannot be achieved, the DR request processing unit 21 newly sets a customer facility 81 not selected as the request destination customer facility in order to fill the DR request amount allocated to the request destination customer facility that does not participate in the DR. Will be determined as the requested customer facility.
  • the DR request processing unit 21 may automatically determine that the requested customer facility does not participate in DR when the DR response message cannot be acquired from the requested customer facility within a predetermined period. In this case, the DR request processing unit 21 may store information indicating that the DR response message cannot be acquired in the storage device 4. The DR request processing unit 21 may store a DR response message including no DR participation in the storage device 4.
  • the DR request processing unit 21 receives the DR request from the requested customer facility via the first communication unit 22 or the demand prediction server 3. Acquires DR control performance data for the day.
  • the DR request processing unit 21 confirms whether or not the requested customer facility has achieved a reduction in power demand corresponding to the DR request amount.
  • the DR request processing unit 21 may store information indicating that the requested customer facility has failed in the DR control in the storage device 4. In this case, the DR request processing unit 21 may consider that the requested customer facility has not participated in DR.
  • the DR request processing unit 21 may store information indicating that the requested customer facility has not participated in DR in the storage device 4.
  • the DR request processing unit 21 may acquire the power demand reduction amount of the requested customer facility itself via the first communication unit 22 or the demand prediction server 3 and store it in the storage device 4.
  • the demand prediction unit 31 of the demand prediction server 3 acquires power demand record data in the customer facility 81 from the customer facility 81 via the second communication unit 32 and stores it in the storage device 4.
  • the power demand record data includes a record value of power demand for each predetermined time at each customer facility 81.
  • the demand prediction unit 31 predicts the power demand using the power demand record data stored in the storage device 4 at a predetermined timing, and calculates a power demand prediction value.
  • the predicted power demand value may be, for example, a value predicted power demand for each predetermined time in each customer facility 81.
  • the demand prediction unit 31 determines that it is necessary to reduce the power demand and generates DR request information.
  • the demand prediction unit 31 transmits DR request information to the DR request processing unit 21 of the DR request server 2.
  • the storage device 4 stores the DR response message acquired by the DR request processing unit 21.
  • the storage device 4 stores power demand record data acquired by the demand prediction unit 31.
  • the storage device 4 stores electric power company information and customer facility information input by the input device 5.
  • the electric power company information is information related to the electric power company that manages the electric power company server 71.
  • the power company information may include an upper limit of the amount of reduction in power demand when making a DR request, a restriction on timing of making a DR request, and the like.
  • the customer facility information is information regarding the customer facility 81.
  • the customer facility information can be information on the electric power company with which the customer facility 81 has contracted, information on holidays and operating days in the customer facility 81, reduction amount of power demand when making a DR request, or DR request. Timing restrictions may be included.
  • the amount of power demand reduction when making a DR request is also referred to as DR contract capacity.
  • Information on holidays and working days included in the customer facility information may be used for the aggregation processing of the power demand record data in the customer facility 81.
  • the power demand record data in the customer facility 81 may differ depending on whether the customer facility 81 is a holiday or an operating day.
  • the power demand record data may be totaled separately for the power demand record data on holidays and the power demand record data on working days. By doing in this way, the electric power demand on a holiday and the electric power demand on an operation day can be accurately estimated, respectively.
  • a class indicating a classification of days having a correlation of power demand, such as holidays and working days may be defined.
  • the power demand record data may be classified by class. By doing in this way, the prediction accuracy of a power demand can be raised more easily.
  • the input device 5 may be a terminal provided with a keyboard, a touch panel, a pointing device, a voice input device, or the like.
  • the input device 5 may be any form of terminal such as a PC terminal, a tablet terminal, or a smartphone.
  • the power system 6 may be a power network.
  • the power system 6 may transmit the power supplied by the power provider group 7 to the customer facility group 8.
  • the customer facility group 8 includes a plurality of customer facilities 81.
  • the power company server 71 sets a power demand reduction target for the purpose of peak shift of power demand and the like.
  • the electric power company server 71 makes a DR request to the DR request system 1 or the customer facility 81 managed by the aggregator.
  • the electric power company that manages the electric power company server 71 that makes the DR request may be an electric power company or a specific scale electric power company.
  • a specific scale electric power company is also called PPS (Power Producer and Supplier).
  • the customer facility group 8 may include customer facilities of various sizes from large to small.
  • the customer facility group 8 may include various customer facilities from a customer facility 81 having a high number of DR participations to a customer facility 81 having a low number of DR participations.
  • the demand prediction unit 31 of the demand prediction server 3 uses the power demand record data acquired from each customer facility 81 to predict the power demand of each customer facility 81 and calculates a power demand prediction value.
  • the demand prediction unit 31 predicts the power demand of each customer facility 81, the prediction accuracy increases as the power demand record data of each customer facility increases.
  • the power demand when DR control is performed may be different from normal.
  • the demand prediction unit 31 may calculate a power demand prediction value except for power demand record data when DR control is performed. By doing in this way, also when the frequency
  • the day in which the numbers are circled is the day on which the DR control is performed.
  • Tuesday has 5 days.
  • DR control is carried out in four of these days.
  • the number of days belonging to the class is five days.
  • the power demand record data used for the prediction is for one day when DR control is not performed.
  • the number of days belonging to the class is 22 days.
  • the power demand record data used for the prediction is for 12 days when the DR control is not performed.
  • the power demand record data used for prediction of power demand can be larger than that in the calendar shown in FIG. 2A.
  • the prediction accuracy of the power demand can be higher.
  • the power demand prediction accuracy of the customer facility 81 may be lowered.
  • the power demand prediction accuracy of the customer facility 81 can be increased.
  • the number of DR implementations in each customer facility 81 may be set so as not to be biased.
  • the DR request processing unit 21 of the DR request server 2 totals the DR performance of each customer facility 81.
  • the DR performance may include the number of DR requests indicating the number of DR requests to each customer facility 81 during a predetermined number of days. The number of DR requests is also simply called the number of requests.
  • the DR performance may include a DR participation count indicating the number of times each customer facility 81 has participated in DR. The number of DR participation is also simply called the number of participation.
  • the DR request processing unit 21 acquires the DR request information from the power provider server 71 or the demand prediction unit 31 of the demand prediction server 3 (step S101).
  • the DR request information includes a DR request date for requesting reduction of power demand and a DR request amount indicating a reduction amount of power demand requested on the DR request date.
  • the DR request processing unit 21 starts a loop process for counting the DR results for each customer facility 81 included in the customer facility group 8 (step S102).
  • the customer facility 81 that is a target of the loop processing is also referred to as a processing target customer facility c.
  • the DR request processing unit 21 acquires customer facility information stored in the storage device 4 (step S103).
  • the customer facility information may include information on holidays and working days in the processing target customer facility c.
  • the DR request processing unit 21 determines whether the DR request date corresponds to a holiday or an operation day in the processing target customer facility c based on the holiday and operation day information included in the customer facility information (step S104). In other words, in step S104, the class to which the DR request date belongs is determined. The class to which the DR request date belongs is also called the request date class.
  • the DR request processing unit 21 calculates N (X, c) (step S105).
  • N (X, c) indicates the number of DR participations when the processing target customer facility c is a holiday among the DR participation counts during the predetermined number of days of the processing target customer facility c.
  • the DR request processing unit 21 determines that the processing target customer facility c is a holiday out of the number of DR requests during the predetermined number of days of the processing target customer facility c.
  • M (X, c) indicating the number of DR requests in a certain case may be calculated.
  • the DR request processing unit 21 calculates N (X, c) (step S106).
  • N (X, c) indicates the number of DR participations when the processing target customer facility c is an operating day among the DR participation counts during the predetermined number of days of the processing target customer facility c.
  • the DR request processing unit 21 determines that the processing target customer facility c is an operating day out of the number of DR requests during the predetermined number of days of the processing target customer facility c.
  • M (X, c) indicating the number of DR requests in the case of
  • the number of DR participations and the number of DR requests may be calculated by an analysis process such as a DR request message, a DR response message, or DR control result data related to the processing target customer facility c stored in the storage device 4.
  • the DR request processing unit 21 ends the process of the flowchart of FIG. 3 when the process of calculating the number of DR participations or the number of DR requests for all the customer facilities 81 in the customer facility group 8 has been completed.
  • the DR request processing unit 21 returns to step S102 and continues the loop process for the customer facility 81 different from the processing target customer facility c.
  • N (X, c) indicating the number of DR participations for the day belonging to the same class as the DR request date
  • M (X, c) indicating the number of DR requests by the processing of the flowchart of FIG. Is calculated.
  • N (31, A) 3 (N (X, c) indicating the number of DR participations for the day belonging to the same class as the DR request date) or M (X, c) indicating the number of DR requests by the processing of the flowchart of FIG. Is calculated.
  • N (31, A) 3.
  • the DR request processing unit 21 of the DR request server 2 selects a customer facility that is a target of the DR request based on at least one of the DR participation frequency and the DR request frequency.
  • the customer facility that is the target of the DR request is also called the requested customer facility.
  • the DR participation frequency or DR request frequency is included in the DR performance of the customer facility 81 calculated by the process of the flowchart of FIG.
  • the DR request processing unit 21 sets the order in the customer facility 81 in order to determine the priority order for making a DR request to the customer facility 81 (step S201).
  • the process in step S201 is performed according to the flowchart shown in FIG.
  • the DR request processing unit 21 sets the customer facilities 81 included in the processing target customer facility c in ascending order based on N (X, c) indicating the number of DR participations calculated in the DR performance aggregation process. Sorting is performed (step S302a). Sorting in ascending order means rearranging in ascending order. In the left column of the table shown in FIG. 6, the DR participation frequency of each of the customer facilities AE when the DR request date is 31 is described without sorting. In the right column of the table shown in FIG. 6, customer facilities AE sorted in ascending order based on the number of DR participations are listed. The customer facilities AE are listed in the order of B, E, A, C, and D.
  • the DR request processing unit 21 sets a rank for each processing target customer facility c based on the result of sorting in ascending order (step S303).
  • the customer facility B is set to the first place.
  • the customer facility E is set in the second place.
  • Customer facility A is set to the third place.
  • the customer facility C is set in the fourth place.
  • the customer facility D is set in the fifth place.
  • the DR request processing unit 21 ends the process of FIG. 5, returns to the process of FIG. 4, and proceeds to step S202.
  • DR request processing unit 21 resets E, which indicates an estimated amount of reduction in power demand when a DR request is made to customer facility 81, to a list (set of request destination customer facilities). ) L is reset to the empty set ⁇ (step S202).
  • the DR request processing unit 21 sequentially starts a loop process for requesting a DR according to the rank of the customer facility AE set based on the number of DR participations in step S201 (step S203).
  • the DR request processing unit 21 acquires customer facility information related to the processing target customer facility c (step S204).
  • the customer facility information includes a reduction amount of power demand when a DR request is made, that is, a DR contract capacity.
  • the reduction amount, that is, the DR contract capacity is expressed as D (c).
  • the DR request processing unit 21 adds D (c) indicating the power demand reduction amount of the processing target customer facility c to E indicating the power demand reduction amount value, and a list L indicating the request destination customer facility To the processing target customer facility c (step S205).
  • the DR request processing unit 21 determines whether or not E indicating the estimated power demand reduction amount is equal to or greater than D indicating the DR request amount (step S206). When E is equal to or greater than D (step S206: YES), the DR request processing unit 21 ends the process and determines the customer facility 81 included in the list L as the requested customer facility. If E is not equal to or greater than D (step S206: NO), the DR request processing unit 21 proceeds to step S207 and continues the loop that returns to step S203.
  • N (X, c) indicating the number of DR participations is completed by the processing according to the flowchart of FIG.
  • requirement of the consumer facility 81 can be equalized. It is possible to prevent bias in each customer facility 81 from participating in DR. It can be prevented that the prediction accuracy of the power demand for each customer facility 81 is biased.
  • DR request processing unit 21 may perform DR request destination selection processing based on the number of DR requests instead of based on the number of DR participations.
  • the DR request processing unit 21 selects a DR request destination by performing a loop process from step S203 to step S207 shown in FIG.
  • the DR request processing unit 21 adds each customer facility 81 to the DR request destination list L based on the order of each customer facility 81 set in step S201.
  • the processing content of step S201 is processing for setting the rank of the customer facility shown in FIG.
  • the DR request processing unit 21 sorts each customer facility 81 in ascending order based on M (X, c) indicating the number of DR requests as the process of step 302a in FIG. 5, and sets the rank for each customer facility. To do.
  • the loop processing from step S203 to step S207 in FIG. 4 is performed in order from the customer facility 81 where the number of DR requests is small.
  • the case where the number of DR participation does not reflect the DR performance of each customer facility 81 is, for example, the case where the DR request processing unit 21 transmits a DR request but cannot acquire a DR response message from the customer facility 81. It may be.
  • the case where the DR response message cannot be acquired from the customer facility 81 may include a case where a communication failure is the cause.
  • the case where the DR response message cannot be acquired from the customer facility 81 may include the case where the customer facility 81 does not or cannot transmit the DR response message in the first place.
  • the DR request processing unit 21 may perform a DR request destination selection process by setting a rank for each customer facility 81 based on both the DR participation frequency and the DR request frequency. As shown in FIG. 7, the DR request processing unit 21 performs processing target customer facility c based on the fact that M (X, c) indicating the number of DR requests calculated in the DR performance totaling process is equal to or less than a predetermined number. Select. The DR request processing unit 21 determines the selected processing target customer facility c as a set of processing target customer facilities c to be sorted (step S301). As shown in FIG. 8, the DR request processing unit 21 may set a rank for each customer facility 81. In the left column of FIG.
  • the number of DR participations and the number of DR requests of each of the customer facilities AE when the DR request date is 31 are described without sorting.
  • the processing target customer facility c selected on the basis that the DR request count is 8 or less is described.
  • the customer facility E whose DR request count is 9 is not selected.
  • the above-mentioned predetermined number of times is set to 8, but the number of times is not limited to this, and the predetermined number of times may be appropriately determined according to the DR request condition.
  • the DR request processing unit 21 sorts the processing target customer facilities c in ascending order based on the number of DR participations in the set of processing target customer facilities c selected in Step S301 (Step S302b).
  • processing target customer facilities c sorted in ascending order based on the number of DR participations are described.
  • customer facilities AD excluding the customer facility E that was not selected in step S301 are listed in the order of B, A, C, and D.
  • the DR request processing unit 21 sets a rank for each processing target customer facility c based on the result of sorting in ascending order (step S303).
  • the customer facility B is set to the first place.
  • Customer facility A is set to the second place.
  • the customer facility C is set to the third place.
  • the customer facility D is set in the fourth place. No order is set for the customer facility E.
  • the DR request processing unit 21 ends the process of FIG. 7, returns to the process of FIG. 4, and proceeds to step S202.
  • each customer facility 81 is biased in the opportunity to participate in DR.
  • the number of customer facilities 81 for which the ranking is set can be reduced.
  • the processing performed by the DR request processing unit 21 can be simplified.
  • the DR request processing unit 21 does not perform the accumulation of E indicating the estimated reduction amount in steps S203 to S207 in FIG. 4, and requests all customer facilities 81 whose DR participation frequency or DR request frequency is a predetermined number or less. It may be selected as a customer facility. Through the processing of the flowchart shown in FIG. 9, the DR request processing unit 21 may select all the customer facilities 81 whose DR participation frequency or DR request frequency is a predetermined number or less as the request destination customer facilities. The DR request processing unit 21 adds all the customer facilities 81 whose DR participation frequency or DR request frequency is a predetermined number or less to the list L indicating the requested customer facility (step S401). In the process of FIG.
  • the request destination customer facility is selected without providing a step for setting the rank in each customer facility 81.
  • the determination process of a request destination consumer facility can be simplified more.
  • the number of DR participations or the number of DR requests of the customer facility 81 can be leveled. It is possible to prevent bias in each customer facility 81 from participating in DR.
  • the DR request processing unit 21 does not perform the integration of E indicating the estimated reduction amount in steps S203 to S207 in FIG. 4, and requests all the customer facilities 81 set with a rank higher than a predetermined rank determined in advance. It may be selected as a customer facility. By doing in this way, the determination process of a request destination consumer facility can be simplified more.
  • the number of DR participations or the number of DR requests of the customer facility 81 can be leveled. It is possible to prevent bias in each customer facility 81 from participating in DR.
  • the DR request processing unit 21 may perform selection based on the number of DR non-requests instead of performing selection based on the number of DR requests when selecting the requested customer facility.
  • the DR non-request number indicates the number of times that the customer facility 81 has not made a DR request.
  • the number of DR non-requests related to a certain customer facility 81 is the number of times that the DR request system 1 has not made a DR request to the customer facility 81 even though the DR request system 1 has acquired DR request information from the host device.
  • the sum of the DR request count and the DR non-request count is equal to the number of times that the DR request system 1 acquires the DR request information from the higher-level device.
  • the DR request processing unit 21 may perform selection based on the number of DR non-participations instead of making a selection based on the number of DR participations when selecting the requested customer facility.
  • the DR non-participation count indicates the number of times the customer facility 81 has not participated in DR.
  • the definition that a certain customer facility 81 did not participate in the DR may be that the customer facility 81 did not participate in the DR only when the customer facility 81 did not participate in the DR even though it acquired the DR request. In this case, the sum of the number of DR participations and the number of DR non-participations related to a certain customer facility 81 is equal to the number of DR requests of the customer facility 81.
  • the definition that a certain customer facility 81 did not participate in DR may include the number of DR non-requests included in the number of DR non-participations. In this case, the sum of the number of DR participations and the number of DR non-participations related to a certain customer facility 81 is equal to the number of times that the DR request system 1 acquires DR request information from the host device.
  • the definition that the customer facility 81 did not participate in the DR may be, for example, that the content of the DR request could not be achieved or that the DR request was not answered.
  • the definition that a certain customer facility 81 did not participate in DR is not limited to the above example, but is appropriately determined.
  • the DR request processing unit 21 can provide different selection criteria by selecting the requested customer facility based on the DR non-request count or the DR non-participation count. In particular, when the number of days belonging to the requested date class is different in each customer facility 81, various selection criteria can be combined. For example, the DR request processing unit 21 may select the requested customer facility on the basis of a combination of the DR request count and the DR non-participation count. The DR request processing unit 21 may select the requested customer facility according to a standard that combines the DR non-request count and the DR participation count. If the definition of the number of DR non-participations is different from the above example, the number of criteria that can be combined increases. The present invention is not limited to the above example, and any combination may be applied.
  • Embodiment 2 A customer who contracts to receive power with an electric power company is mainly provided with a service for receiving power in the customer facility. Consumers are demanding services for receiving electricity outside the customer facility. When a service for receiving power outside the customer facility is provided, maintenance of the power quality of the power grid may be considered.
  • the power management system 100 includes a power network 110, a first watt hour meter 111, a second watt hour meter 112, an in-facility watt hour meter 113, and an outside facility power amount.
  • a total 114 and a power system monitoring device 115 are provided.
  • the power management system 100 includes a first power plant 120, a second power plant 130, a power transmission / distribution server 140, a first power company server 150, a second power company server 160, a customer facility 170, Power receiving device 180.
  • the power management system 100 includes a secretary server 191, a receiving device management server 192, an authentication storage unit 200, an aggregator server 210, and a communication network 220 such as the Internet.
  • the customer facility 170 includes a first device 171, a second device 172, and a power management device 173.
  • the secretary server 191 and the receiving device management server 192 may be the management server 190 that is one organization.
  • the power network 110 supplies and delivers power to each connected component.
  • the power network 110 is connected to a first watt-hour meter 111, a second watt-hour meter 112, an in-facility watt-hour meter 113, an off-facility watt-hour meter 114, and a power system monitoring device 115.
  • the first watt-hour meter 111 includes a storage unit 111a, a control unit 111b, and a communication unit 111c.
  • the 1st watt-hour meter 111 measures the electric power generated in the 1st power plant 120 using the control part 111b, and memorize
  • the second watt-hour meter 112 includes a storage unit 112a, a control unit 112b, and a communication unit 112c. The second watt-hour meter 112 measures the electric power generated at the second power plant 130 using the control unit 112b and stores it in the storage unit 112a.
  • the in-facility watt-hour meter 113 includes a storage unit 113a, a control unit 113b, and a communication unit 113c.
  • the in-facility watt-hour meter 113 measures the power consumed and generated in the customer facility 170 using the control unit 113b, and stores it in the storage unit 113a.
  • the external facility energy meter 114 includes a storage unit 114a, a control unit 114b, and a communication unit 114c.
  • the non-facility watt-hour meter 114 measures the power consumed and generated by the power receiving device 180 using the control unit 114b, and stores it in the storage unit 114a.
  • the storage units 111a to 114a of the first watt-hour meter 111, the second watt-hour meter 112, the in-facility watt-hour meter 113, and the off-facility watt-hour meter 114 each store unique identification information. Identification information unique to each watt-hour meter is also referred to as a watt-hour meter ID.
  • the power system monitoring device 115 includes a storage unit 115a, a control unit 115b, and a communication unit 115c.
  • the power system monitoring device 115 monitors the state of the power network 110 using the control unit 115b.
  • the power system monitoring apparatus 115 transmits information related to the state of the power network 110 to the power transmission / distribution server 140 using the communication unit 115c.
  • the information regarding the state of the power network 110 transmitted from the power system monitoring apparatus 115 to the power transmission / distribution server 140 is information for maintaining the power quality of the power network 110.
  • Information for maintaining power quality is also referred to as ancillary information.
  • the power quality may include, for example, frequency or voltage.
  • the first power plant 120 and the second power plant 130 are power plants owned by the first power company and the second power company, respectively, and supply the generated power to the power grid 110.
  • the power transmission / distribution server 140 includes a storage unit 140a, a control unit 140b, and a communication unit 140c.
  • the power transmission / distribution server 140 is communicably connected to the first watt-hour meter 111, the second watt-hour meter 112, the in-facility watt-hour meter 113, and the outside watt-hour meter 114 using the communication unit 140c.
  • the power transmission / distribution server 140 stores the ancillary information acquired from the power system monitoring apparatus 115 using the communication unit 140c in the storage unit 140a. Based on the ancillary information, the power transmission / distribution server 140 monitors the state of the power network 110 using the control unit 140b.
  • the power transmission / distribution server 140 transmits a command to the power supply side or the demand side as necessary to stabilize the power network 110.
  • wired communication or wireless communication may be used.
  • the power transmission / distribution server 140 is also referred to as a server device.
  • the first electric power company server 150 includes a storage unit 150a, a control unit 150b, and a communication unit 150c.
  • the second electric power company server 160 includes a storage unit 160a, a control unit 160b, and a communication unit 160c.
  • the first electric power company server 150 and the second electric power company server 160 are servers owned by the first electric power company and the second electric power company, respectively, which conduct electric power sales business.
  • the first electric power company server 150 and the second electric power company server 160 use the control units 150b and 160b to control the power supply to contract customers of each electric power company.
  • the power management system 100 may further include a server owned by another power company.
  • the customer facility 170 is a facility of a customer who has a power supply contract with the first electric power company.
  • the customer facility 170 may receive power supply from the first power company based on the contract.
  • the customer facility 170 may supply the generated power to the first power company.
  • the customer facility 170 is an example of a customer facility provided in the power management system 100.
  • the power management system 100 may also include customer facilities of other customers including customers contracted with the second power company.
  • the customer facility 170 includes a first device 171, a second device 172, and a power management device 173.
  • the first device 171 and the second device 172 are examples of devices that receive power provided in the customer facility 170.
  • the first device 171 includes a storage unit 171a, a control unit 171b, and a communication unit 171c.
  • the second device 172 includes a storage unit 172a, a control unit 172b, and a communication unit 172c.
  • the first device 171 and the second device 172 may store customer identification information in the storage units 171a and 172a, respectively.
  • the customer identification information is also referred to as a customer ID.
  • the first device 171 and the second device 172 may be devices such as electronic devices and storage batteries.
  • the second device 172 may be taken out of the customer facility 170 and used.
  • the second device 172 can receive power from the power network 110 via the power receiving device 180 outside the customer facility 170.
  • the second device 172 can execute communication via the communication network 220 using the communication unit 172c.
  • the power management apparatus 173 includes a storage unit 173a, a control unit 173b, and a communication unit 173c.
  • the power management apparatus 173 may have a function of an energy management system, for example.
  • the energy management system is also referred to as EMS (Energy Management System).
  • the EMS function may be a function of adjusting the supply and demand of electric power in the customer facility 170 in response to an instruction from the aggregator server 210.
  • the power management apparatus 173 stores, in the storage unit 173a, a management device list in which devices managed by the customer facility 170 are registered and a supply / demand adjustment device list in which devices that can be used for power supply / demand adjustment are registered.
  • the power management apparatus 173 can execute in-facility communication, which is communication in the facility, using the communication unit 173c.
  • the power management apparatus 173 can execute external communication via the communication network 220 using the communication unit 173c.
  • the power receiving apparatus 180 includes a storage unit 180a, a control unit 180b, and a communication unit 180c.
  • the power receiving device 180 is managed by the receiving device management server 192.
  • the power receiving device 180 is installed outside the customer facility 170.
  • the power receiving device 180 is grid-connected to the power network 110.
  • the power receiving device 180 may be able to supply power to an external device such as the connected second device 172.
  • the power receiving device 180 may be able to supply power to the power network 110 by reverse power flow.
  • a plurality of power receiving devices 180 may be installed.
  • the secretary server 191 includes a storage unit 191a, a control unit 191b, and a communication unit 191c.
  • the secretary server 191 is a server operated by a secretary operator that is a balancing group.
  • the secretary server 191 cooperates with the receiving device management server 192, the first in-power company server 150, and the second in-power company server 160 to perform power supply prediction, power supply, and settlement of electricity charges.
  • the secretary server 191 stores, in the storage unit 191a, information on a power supply plan of a power company such as a first power company or a second power company that supplies power to the power network 110.
  • the receiving device management server 192 includes a storage unit 192a, a control unit 192b, and a communication unit 192c.
  • the receiving device management server 192 is operated by a receiving device management company.
  • the power receiving device management server 192 manages the power receiving device 180 and provides a power service through the power receiving device 180.
  • the receiving device management server 192 can refer to the authentication storage unit 200 using the communication unit 192c.
  • the authentication storage unit 200 includes a customer ID that is customer identification information and correspondence information between a contracted power company, a first watt-hour meter 111, a second watt-hour meter 112, an in-facility watt-hour meter 113, and It is a database which memorize
  • the storage content of the authentication storage unit 200 may be stored in the storage unit 192a of the receiving device management server 192.
  • the aggregator server 210 includes a storage unit 210a, a control unit 210b, and a communication unit 210c.
  • the aggregator server 210 monitors the power supply and demand of each customer facility including the customer facility 170.
  • the aggregator server 210 transmits a demand / supply adjustment request via the communication network 220 to each customer facility including the customer facility 170 in response to a request from the first power company server 150.
  • the aggregator server 210 stores information such as equipment, power generation devices, or storage batteries owned by each customer facility including the customer facility 170 in the storage unit 210a.
  • the aggregator server 210 stores the power supply / demand adjustment range information indicating how much power supply / demand adjustment is possible in the storage unit 210a.
  • An aggregator server similar to the aggregator server 210 may be connected to the second power company server 160 via the communication network 220.
  • a method for the second device 172 to receive an electric supply from the power receiving device 180 that is the movement destination when the customer takes the second device 172 out of the customer facility 170 will be described. As shown in FIG. 11, in the power management system 100 according to the present embodiment, power supply from the power receiving device 180 to the second device 172 may be started.
  • the information transmission between the second device 172 and the receiving device management server 192 may be performed using communication via the communication network 220.
  • Information transmission between the receiving device management server 192 and the external energy meter 114 may be performed using communication via the power transmission / distribution server 140.
  • Information transmission between the second device 172 and the power receiving device 180 or the external energy meter 114 may be performed using wired or wireless communication.
  • the second device 172 When the second device 172 is moved by the customer, the second device 172 requests power supply from the power receiving device 180 managed by the receiving device management server 192 at the destination (step S111). Specifically, for example, the second device 172 is connected to the power receiving device 180 and receives a predetermined operation for receiving power supply input by a consumer.
  • the second device 172 acquires the identification information of the external energy meter 114 in response to the request (step S112). Specifically, the second device 172 transmits a transmission request for the identification information of the off-site watt-hour meter 114 to the off-site watt-hour meter 114 using the communication unit 172c. When receiving the transmission request for the identification information, the non-facility watt-hour meter 114 transmits the watt-hour meter ID, which is identification information of the non-facility watt-hour meter 114, to the second device 172 using the communication unit 114c.
  • the second device 172 uses the communication unit 172c to receive both the application for starting power reception, the customer ID stored in the storage unit 172a, and the acquired watt-hour meter ID. It transmits to the management server 192 (step S113).
  • the customer ID may include a customer identification number.
  • the receiving device management server 192 authenticates the received customer ID and watt-hour meter ID using the authentication storage unit 200.
  • the receiving device management server 192 transmits a notification that the application is approved to the power transmission / distribution server 140 using the communication unit 192c (step S114).
  • the receiving device management server 192 determines that the customer ID satisfies the condition when the customer ID matches the contractor identification information of the electric power company stored in the authentication storage unit 200.
  • the power receiving device management server 192 determines that the power meter ID satisfies the condition when the power meter ID matches the identification information of the power meter managed by the receiving device management server 192 stored in the authentication storage unit 200. .
  • the receiving device management server 192 determines that the authentication is successful when it is determined that both the customer ID and the watt-hour meter ID satisfy the condition.
  • the receiving device management server 192 determines that the authentication has failed when it is determined that at least one of the customer ID and the electricity meter ID does not satisfy the condition. If the receiving device management server 192 determines that the authentication has failed, the receiving device management server 192 transmits a notification that the application has been rejected to the second device 172 using the communication unit 192c, and ends the process.
  • the power transmission / distribution server 140 determines whether to approve the power supply to the second device 172 based on the ancillary information acquired from the power system monitoring device 115. If the power transmission / distribution server 140 determines to approve the power supply, the power transmission / distribution server 140 transmits a notification to the effect that the application has been approved to the second device 172 (step S115). When determining that the power supply is not approved, the power transmission / distribution server 140 transmits a notification that the application is rejected to the second device 172 using the communication unit 140c, and ends the process.
  • the receiving device management server 192 enters a procedure for starting power supply to the second device 172.
  • the receiving device management server 192 checks the current state of the facility-internal energy meter 114 (step S116). Specifically, the receiving device management server 192 transmits an inquiry about the current state to the external energy meter 114 using the communication unit 192c.
  • the in-facility watt-hour meter 114 transmits the current state to the receiving device management server 192 using the communication unit 114c in response to receiving the inquiry.
  • the current state of the off-facility watt-hour meter 114 may include a measured value of the supplied power amount of the off-facility watt-hour meter 114 and an open / closed state of the breaker.
  • the current state of the off-facility watt-hour meter 114 may include the watt-hour meter ID and the consumer ID of the power supply destination device when the breaker is in the open state.
  • the open state of the breaker means a state in which the breaker in the off-facility watt-hour meter 114 is open with the electric circuit conducted.
  • the closed state of the breaker means a state in which the breaker in the facility watt-hour meter 114 shuts off the electric circuit.
  • the receiving device management server 192 determines whether or not power can be supplied based on the current state of the power meter 114 outside the facility. When the receiving device management server 192 determines that the power supply is possible, the receiving device management server 192 transmits an opening instruction for supplying power to the second device 172 to the external power meter 114 using the communication unit 192c (step S117). ). Specifically, the receiving device management server 192 determines that the power can be supplied when the breaker is in the closed state as the current state of the off-facility watt-hour meter 114, and issues an opening instruction to the off-site watt-hour meter 114. Send to.
  • the receiving device management server 192 checks the customer ID and the watt-hour meter ID received in step S116 as the current state of the off-site watt-hour meter 114. If the customer ID and the watt-hour meter ID received in step S113 are an application for this combination, the receiving device management server 192 determines that power has already been supplied and does not transmit the opening instruction. When the combination of the received customer ID and the watt-hour meter ID is different, the receiving device management server 192 transmits a closing instruction to the off-facility watt-hour meter 114 and then transmits the opening instruction again.
  • the facility outside energy meter 114 When the facility outside energy meter 114 receives the opening instruction, it changes the breaker to the open state.
  • the off-facility watt-hour meter 114 starts power supply to the second device 172 and measurement of the supplied power amount.
  • the non-facility watt-hour meter 114 transmits a report to the effect that the opening has been completed to the receiving device management server 192 using the communication unit 114c (step S118).
  • the second device 172 After the start of power supply by the above-described power supply start method, as shown in FIG. 12, the second device 172 receives a power reception end instruction by an operation of a user such as a customer (step S121). When the second device 172 receives a power reception end instruction, the second device 172 transmits a power reception end application together with the customer ID and the electricity meter ID to the power receiving device management server 192 using the communication unit 172c (step S122).
  • the receiving device management server 192 authenticates the received customer ID and watt-hour meter ID using the authentication storage unit 200. If the authentication is successful, the receiving device management server 192 transmits a notification that the application is approved to the second device 172 using the communication unit 192c (step S123). Specifically, the receiving device management server 192 determines in the same manner as in step S114 in the power supply start method shown in FIG. The receiving device management server 192 determines that the customer ID satisfies the condition when the customer ID matches the contractor identification information of the electric power company stored in the authentication storage unit 200.
  • the power receiving device management server 192 determines that the power meter ID satisfies the condition when the power meter ID matches the identification information of the power meter managed by the receiving device management server 192 stored in the authentication storage unit 200. .
  • the receiving device management server 192 determines that the authentication is successful when it is determined that the customer ID and the watt-hour meter ID satisfy the conditions.
  • the receiving device management server 192 determines that the authentication has failed when it is determined that at least one of the customer ID and the electricity meter ID does not satisfy the condition.
  • the receiving device management server 192 enters a procedure for terminating power supply to the second device 172.
  • the receiving device management server 192 confirms the measured value of the current power supply amount of the external energy meter 114 (step S124). Specifically, the receiving device management server 192 transmits an inquiry about the current measured value of the supplied power amount to the power meter 114 outside the facility using the communication unit 192c. In response to receipt of the inquiry, the off-site power meter 114 transmits the current measured value of the supplied power to the receiving device management server 192 using the communication unit 114c.
  • the receiving device management server 192 uses the second device 172 from the power reception device 180.
  • the amount of supplied electric power is associated with the customer ID (step S125).
  • the amount of power supplied by the customer from the power receiving device 180 using the second device 172 is also referred to as off-facility power.
  • the receiving device management server 192 stores the off-facility power amount associated with the customer ID in the storage unit 192a as off-facility use information.
  • the measured value of the supplied power amount at the start of power supply is obtained in step S114 in the power supply start method.
  • the receiving device management server 192 transmits a breaker closing instruction to the off-facility watt-hour meter 114 using the communication unit 192c (step S126).
  • the facility-internal watt-hour meter 114 When the facility-internal watt-hour meter 114 receives the closing instruction, it changes the breaker to the closed state, and ends the power supply to the second device 172.
  • the non-facility watt-hour meter 114 transmits a report to the effect that the closure has been completed to the receiving device management server 192 using the communication unit 114c (step S127).
  • the power management system 100 may end the power supply from the power receiving device 180 to the second device 172 based on a timeout due to the elapse of a predetermined time.
  • the receiving device management server 192 confirms the measured value of the current power supply amount of the external power meter 114 at a certain frequency (step S131). Specifically, the receiving device management server 192 transmits an inquiry about the current measured value of the supplied power amount to the off-facility watt-hour meter 114 using the communication unit 192c at a certain frequency. The off-facility watt-hour meter 114 transmits the current measured value of the supplied power amount to the receiving device management server 192 using the communication unit 114c each time an inquiry is received.
  • the power supply from the power receiving device 180 is stopped (step S132).
  • the power supply from the power receiving device 180 is not limited to the above-described event, and may be stopped when another event occurs.
  • the receiving device management server 192 determines that a time-out has occurred (step S135) when it is confirmed that the measured value of the supplied power amount of the external energy meter 114 does not change for a certain period (steps S133 and S134). If the receiving device management server 192 determines that a timeout has occurred, the receiving device management server 192 regards that the power usage of the second device 172 has ended. The receiving device management server 192 associates the power amount outside the facility with the customer ID based on the received measurement value of the current power supply amount and the measurement value of the power supply amount at the start of power supply (step S136). The receiving device management server 192 stores the off-facility power amount associated with the customer ID in the storage unit 192a as off-facility use information.
  • the measured value of the supplied power amount at the start of power supply is obtained in step S114 in the power supply start method.
  • Receiving device management server 192 transmits a breaker closure instruction to off-facility watt-hour meter 114 using communication unit 192c (step S136).
  • the facility-internal watt-hour meter 114 When the facility-internal watt-hour meter 114 receives the closing instruction, it changes the breaker to the closed state, and ends the power supply to the second device 172.
  • the non-facility watt-hour meter 114 transmits a report to the effect that the closure has been completed to the receiving device management server 192 using the communication unit 114c (step S137).
  • power supply for supplying power from the second device 172 to the power network 110 may be executed in the same procedure.
  • the power charges between each company and business may be settled as shown in FIG.
  • the power transmission / distribution server 140 creates billing information about the power flowing through the power transmission / distribution network at a predetermined cycle, and transmits it to the secretary server 191 using the communication unit 140c (step S141).
  • the predetermined period may be, for example, once a month or once a day (24 hours).
  • the power transmission / distribution server 140 creates charge payment billing information for each of the first power company server 150, the second power company server 160, and the receiving device management server 192, and transmits them together to the managing server 191. To do.
  • the billing information for the first power company server 150 and the second power company server 160 is based on the information on the amount of power received or supplied by the customer facility 170 by the contract customer of each of the first power company and the second power company. May be created.
  • Information on the amount of power received or supplied by the customer facility 170 is also referred to as in-facility use information.
  • the billing information for the receiving device management server 192 is based on information on the amount of electric power received or supplied by a contract customer of each of the first electric power company and the second electric power company with a supply / demand device outside the customer facility such as the electric power receiving device 180. May be created.
  • the secretary server 191 When receiving the billing information, the secretary server 191 transmits a billing information notification to the receiving apparatus management server 192 using the communication unit 191c (step S142).
  • the process of step S142 is executed to create billing information based on the amount of power used by the contract customers of the first power company and the second power company outside the customer facility.
  • the secretary server 191 collectively pays the settlement amount of the billing information for each received server to the power transmission and distribution server 140 (step S143).
  • the receiving device management server 192 classifies the off-facility use information for each electric power company corresponding to the customer identification information.
  • the receiving device management server 192 generates billing information about the power usage outside the customer facility 170 for the contract customer of each power company (step S144).
  • the billing information regarding the use of power outside the customer facility 170 is also referred to as off-facility billing information.
  • Receiving device management server 192 transmits out-of-facility billing information for each power company server to managing server 191 using communication unit 192c (step S145).
  • the secretary server 191 Based on the billing information for each power company server and the off-facility billing information for contract customers of each power company, the secretary server 191 adds information on the sum billed amount of the billing information billed to each power company. Generate.
  • the billing information for each power company server is received from the power transmission and distribution server 140.
  • the out-of-facility billing information for contract customers of each electric power company is received from the receiving device management server 192.
  • the secretary server 191 compares the sum billed amount with an estimated bill amount based on the power supply plan of each power company stored in the storage unit 191a.
  • the secretary server 191 adjusts the amount charged for the server in the electric power company connected to the power network 110, and generates information on the adjusted amount charged (step S146).
  • the secretary server 191 generates an adjusted billing amount in which the combined billing amount approaches the assumed billing amount. For example, the secretary server 191 determines the excess amount of the first electric power company when the total invoiced amount for the first electric power company server 150 exceeds the assumed invoiced amount and the total invoiced amount for the second electric power company is lower than the assumed invoiced amount. 2 It is considered that the electric power company has compensated. In this case, the secretary server 191 reduces the sum of the sum billed to the first electric power company from the sum bill of the second electric power company, and adjusts so that the total amount of the bill is not changed.
  • the secretary server 191 transmits the adjusted billed amount as billing information to the first power company server 150, the second power company server 160, and the receiving device management server 192 using the communication unit 191c (step S147).
  • a power receiving device 180 specialized for power supply outside the customer facility 170 is used.
  • an electric power company that does not have power supply and demand facilities outside the customer facility 170 feels as if it is an in-house service without contracting the power supply and demand service contracted with the customer. Can be provided. Even if there is a difference between the actual power supply and demand results of each power company and the power supply plan, the actual value can be brought closer to the power supply plan by adjusting the amount charged to the servers in the power company. sell.
  • the power management system 100 can adjust the power supply and demand. 15 and 16, it is assumed that the second device 172 is brought outside from the customer facility 170 and is supplied with electricity from the power receiving device 180.
  • the request for power supply and demand adjustment in FIGS. 15 and 16 may be the DR request in the first embodiment.
  • the power transmission / distribution server 140 monitors the operation status of the power grid 110 using the power system monitoring device 115 (step S151).
  • the power transmission / distribution server 140 determines that the power supply / demand adjustment of the power network 110 is necessary
  • the power transmission / distribution server 140 transmits a demand / supply adjustment request to the first power company server 150 using the communication unit 140c.
  • the first power company server 150 transmits the adjustment request to the aggregator server 210 using the communication unit 150c (step S152).
  • the case where it is determined that the supply and demand adjustment is necessary may be, for example, a case where a significant difference occurs between the demand and supply of power.
  • the case where it is determined that the supply and demand adjustment is necessary may be a case where a significant difference is predicted to occur between the power supply and demand.
  • it may be a case where ancillary information such as voltage or frequency indicating power quality exceeds a predetermined range.
  • ancillary information such as voltage or frequency indicating power quality is predicted to exceed a predetermined range.
  • the aggregator server 210 When the aggregator server 210 receives a demand / supply adjustment instruction from the first electric power company server 150, the aggregator server 210 formulates an overall adjustment plan as to which consumer is requested to make a supply / demand adjustment based on the power supply / demand adjustment range information (Ste S153). The aggregator server 210 transmits a demand / supply adjustment request based on the overall adjustment plan to the power management apparatus 173 installed in the customer facility 170 using the communication unit 210c (step S154).
  • the power management apparatus 173 formulates an individual adjustment plan based on the past operation status of the first device 171 and the second device 172.
  • the power management apparatus 173 starts adjustment when the adjustment time specified by the individual adjustment plan is reached (step S155).
  • the power management apparatus 173 transmits an instruction for supply and demand adjustment to the first device 171 and / or the second device 172 using the communication unit 173c.
  • the first device 171 and the second device 172 return a notification that the adjustment instruction has been received to the power management apparatus 173 using the communication unit 171c and the communication unit 172c, respectively (step S156).
  • the power management apparatus 173 transmits an adjustment instruction to the devices registered in the supply and demand adjustment target list through in-facility communication.
  • the power management apparatus 173 transmits the adjustment instruction by external communication.
  • the power management apparatus 173 transmits an adjustment instruction in advance while the device is communicable by in-facility communication before the adjustment time comes after the individual adjustment plan is formulated.
  • the second device 172 brought to the outside from the customer facility 170 may make a response indicating that all adjustments according to the requested adjustment instruction are performed, and use outside the facility It is possible to respond that the necessary capacity is left.
  • the supply and demand adjustment may be performed by a power saving operation, a power generation operation, a charge / discharge operation of a storage battery, or the like.
  • the second device 172 communicates with the power receiving device 180 or the off-site watt-hour meter 114 that receives power supply, and acquires each measurement value of the current power, frequency, and voltage before starting the adjustment.
  • the second device 172 transmits each acquired measurement value to the power management apparatus 173 installed in the customer facility 170 using the communication unit 172c (step S157).
  • the first device 171 and the second device 172 perform supply and demand adjustment (step S158).
  • the power management apparatus 173 transmits a supply / demand adjustment end instruction to the first device 171 and the second device 172 using the communication unit 173c (Ste S160).
  • the second device 172 communicates with the power receiving device 180 or the off-site watt-hour meter 114, and acquires the current power, frequency, and voltage measurement values at the end of adjustment (step S161).
  • the power management apparatus 173 confirms the adjustment result of the second device 172 (step S162).
  • the power management apparatus 173 adds up the adjustment results of the first device 171 and the like in the customer facility 170 and adds up (Step S163).
  • the power management apparatus 173 transmits the adjustment result of each device of the customer facility 170 to the aggregator server 210 using the communication unit 173c (step S164).
  • the aggregator server 210 totals the adjustment results from each customer facility (step S165). Aggregator server 210 transmits the tabulated adjustment results to first power company server 150 using communication unit 210c (step S166). The first power company internal server 150 transmits the result to the power transmission / distribution server 140 using the communication unit 150c (step S167).
  • the second device 172 taken out of the customer facility 170 can adjust the supply and demand while using the power receiving device 180.
  • the power supply and demand adjustment method according to the present embodiment not only the devices in the customer facility 170 but also the second device 172 taken out of the customer facility 170 is requested to the customer facility 170. It can contribute to supply and demand adjustment. By doing in this way, a consumer can cooperate with maintenance of the electric power quality of the electric power network 110, and it can be made easy to contribute to stabilization of the electric power grid
  • the power management apparatus 173 can update the supply and demand adjustment device list as shown in FIG.
  • the power management apparatus 173 reads the management device list and confirms the locations of the first device 171 and the second device 172 that are registered in the management device list (step S201). Specifically, the power management apparatus 173 may confirm manually or automatically according to each device, or may confirm the connection status of wired communication or wireless communication.
  • the confirmation processing in step S201 may be performed simultaneously on the devices located inside the customer facility 170 and outside the customer facility 170 by different methods.
  • the power management apparatus 173 determines whether there is an exclusion target device in the first device 171 or the second device 172 registered in the management device list (step S202).
  • the exclusion target device may be a device whose location cannot be confirmed or a device that cannot be used for supply and demand adjustment.
  • the power management apparatus 173 generates / updates the supply / demand adjustment device list excluding the exclusion target device (step S203).
  • the power management apparatus 173 ends the process.
  • the power management apparatus 173 can always grasp the locations of the first device 171 and the second device 172 by performing this confirmation at regular intervals.
  • this adjustment technique is operating, the receiving device management server 192 does not have to do anything. That is, even when the first power company provides a supply and demand adjustment service and the second power company does not provide a supply and demand adjustment service, the power connection service constructed by the receiving device management server 192 is not affected. .
  • the power management system 100 includes a receiving device management server 192 that manages the power receiving device 180 provided outside the customer's facility.
  • the power management system 100 according to the present embodiment includes a power transmission and distribution server 140 that acquires ancillary information for maintaining the power quality of the power network 110.
  • the power management system 100 according to the present embodiment includes a second device 172 of a consumer who applies for the start of power reception or power supply via the power reception device 180.
  • the power transmission / distribution server 140 approves or rejects the application for power reception or start by the second device 172 based on the ancillary information. Therefore, the power quality of the power network 110 can be maintained.
  • the power management system 100 ′ includes a power network 110, a first watt hour meter 111, a second watt hour meter 112, an in-facility watt-hour meter 113, and an outside facility power A dynamometer 114 and a power system monitoring device 115 are provided.
  • the power management system 100 ′ includes a first power plant 120, a second power plant 130, a power transmission / distribution server 140, a first power company server 150, a second power company server 160, and a customer facility 170. And a power receiving device 180.
  • the power management system 100 ′ includes an aggregator server 210 and a communication network 220 such as the Internet.
  • the customer facility 170 includes a first device 171, a second device 172, and a power management device 173.
  • the first electric power company server 150 and the second electric power company server 160 include a storage unit similar to the authentication storage unit 200 included in the power management system 100 according to the second embodiment. Since the components other than the first power company server 150 and the second power company server 160 are the same as those in the second embodiment, the description thereof is omitted.
  • a power supply start method and a power supply end method from the power receiving device 180 to the second device 172 may be implemented.
  • the power supply start method and the power supply end method according to the present embodiment may be implemented by causing the first power company server 150 to execute processing related to the receiving device management server 192 in FIGS. 11 to 13.
  • the power supply / demand adjustment method and the supply / demand adjustment device list update method may be implemented.
  • the power supply and demand adjustment method and the supply and demand adjustment device list update method according to the present embodiment may be implemented by executing the processing of each step of FIGS. 15 to 17.
  • the power management system 100 ′ includes a power transmission / distribution server 140 that acquires ancillary information for maintaining the power quality of the power network 110.
  • the power management system 100 ′ according to the present embodiment includes a second device 172 of a consumer who applies for the start of power reception or power supply via the power reception device 180.
  • the power transmission / distribution server 140 approves or rejects the application for power reception or start by the second device 172 based on the ancillary information. Therefore, the power quality of the power network 110 can be maintained.
  • the power transmission / distribution server 140, the first electric power company server 150, the second electric power company server 160, the secretary server 191, the receiving device management server 192, and the aggregator server 210 are servers in which some or all of these functions are integrated. May be a device.
  • the power transmission / distribution server 140, the first power company server 150, the second power company server 160, the secretary server 191, the receiving device management server 192, and the aggregator server 210 may be further subdivided server devices. These server devices may be provided in the form of a cloud computing service.
  • the configuration according to the present disclosure can be realized as a method including steps executed by each component of the device.
  • the configuration according to the present disclosure can also be realized as a method, a program, or a storage medium storing the program executed by a processor included in the apparatus, and it should be understood that these are also included in the scope of the present disclosure. .
  • the control of the present disclosure is shown as a series of operations executed by a computer system or other hardware capable of executing program instructions.
  • the computer system and other hardware may include, for example, a general-purpose computer, a PC (Personal Computer), a dedicated computer, a workstation, or other programmable data processing device. It should be noted that in each embodiment, the various operations are performed by dedicated circuitry implemented with program instructions, logical blocks executed by one or more processors, program modules, or the like.
  • the program instructions may be software.
  • a dedicated circuit may be, for example, individual logic gates that are interconnected to perform a specific function.
  • processors that execute logic blocks, program modules, and the like include, for example, one or more microprocessors, CPU (Central Processing Unit), ASIC (Application Specific Integrated Circuit), DSP (Digital Signal Processor) mm, PLD Devices), FPGAs (Field Programmable Gate Array), controllers, microcontrollers, electronics, other devices designed to perform the functions described herein, and / or any combination thereof.
  • the illustrated embodiments may be implemented, for example, by hardware, software, firmware, middleware, microcode, or any combination thereof.
  • the network used here may include the Internet, an ad hoc network, a LAN (Local Area Network), a cellular network, other networks, or any combination thereof.
  • Power management system 2 First server (DR request server) 21 1st control part (DR request processing part) 22 1st communication part 3 2nd server (demand prediction server) 31 2nd control part (demand prediction part) 32 2nd communication part 4 Storage device 5 Input device 6 Electric power system 7 Electric power provider group 71 Electric power provider server 8 Customer facility group 81 Customer facility 100,100 'Power management system 110 Electric power network 111 1st electricity meter 112 1st 2 watt-hour meter 113 watt-hour meter in facility 114 watt-hour meter outside facility 115 power system monitoring device 120 first power plant 130 second power plant 140 power transmission and distribution server (server device) DESCRIPTION OF SYMBOLS 150 1st electric power company server 160 2nd electric power company server 170 Consumer facility 171 1st apparatus 172 2nd apparatus 173 Power management apparatus 180 Power receiving apparatus 190 Management server 191 Executive server 192 Receiving apparatus management server 200 Authentication memory

Landscapes

  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

複数の需要家施設に対して電力需要の削減を要請する制御部と、電力需要の削減が要請される要請日と要請日に要請される電力需要の削減量を示す要請量とを含む要請情報を取得する通信部とを備え、制御部は、電力需要の相関がある日の分類を示すクラスの中から、要請日が属する要請日クラスを決定し、所定日数の間の要請日クラスに属する日において、制御部が複数の需要家施設のそれぞれに対して電力需要の削減を要請した回数を示す要請回数及び複数の需要家施設が電力需要の削減に参加した回数を示す参加回数の少なくとも一方を複数の需要家施設について算出し、要請回数及び参加回数の少なくとも一方と要請量とに基づいて、複数の需要家施設の中から電力需要の削減を要請する対象とする要請先需要家施設を決定するサーバ。

Description

サーバ、電力管理システム、及び電力管理方法 関連出願へのクロスリファレンス
 本出願は、日本国特許出願2015-129181号(2015年6月26日出願)及び日本国特許出願2015-146830号(2015年7月24日出願)の優先権を主張するものであり、当該出願の開示全体を、ここに参照のために取り込む。
 本発明は、サーバ、電力管理システム、及び電力管理方法に関する。
 従来、電力を送配電する電力網の安定化が求められている。例えば、電力需要のピークシフト等を目的として、電力需要のピーク時の消費電力量を削減する取り組みがなされている。消費電力量の削減を実施する一つの手法として、消費電力量削減目標として需要家施設毎にデマンドレスポンスが設定される(例えば、特許文献1参照)。
特開2013-117769号公報
 本開示の一実施形態に係るサーバは、複数の需要家施設に対して電力需要の削減を要請する制御部を備える。前記サーバは、前記電力需要の削減が要請される要請日と該要請日に要請される電力需要の削減量を示す要請量とを含む要請情報を取得する通信部を備える。前記制御部は、前記電力需要の相関がある日の分類を示すクラスの中から、前記要請日が属する要請日クラスを決定する。前記制御部は、所定日数の間の前記要請日クラスに属する日において、要請回数、及び、参加回数の少なくとも一方を前記複数の需要家施設について算出する。前記要請回数は、前記制御部が前記複数の需要家施設のそれぞれに対して前記電力需要の削減を要請した回数を示す。前記参加回数は、前記複数の需要家施設が前記電力需要の削減に参加した回数を示す。前記制御部は、前記要請回数、及び、前記参加回数の少なくとも一方と、前記要請量とに基づいて、前記複数の需要家施設の中から前記電力需要の削減を要請する対象とする要請先需要家施設を決定する。
 本開示の一実施形態に係る電力管理システムは、複数の需要家施設に対して電力需要の削減を要請する第1サーバを備える。前記電力管理システムは、前記電力需要の削減が要請される要請日と該要請日に要請される電力需要の削減量を示す要請量とを含む要請情報を生成する第2サーバを備える。前記第1サーバは、第1制御部と、前記第2サーバから前記要請情報を取得する第1通信部とを備える。前記第1制御部は、前記電力需要の相関がある日の分類を示すクラスの中から、前記要請日が属する要請日クラスを決定する。前記第1制御部は、所定日数の間の前記要請日クラスに属する日において、要請回数、及び、参加回数の少なくとも一方を前記複数の需要家施設について算出する。前記要請回数は、前記第1サーバが前記複数の需要家施設のそれぞれに対して前記電力需要の削減を要請した回数を示す。前記参加回数は、前記複数の需要家施設が前記電力需要の削減に参加した回数を示す。前記第1制御部は、前記要請回数、及び、前記参加回数の少なくとも一方と、前記要請量とに基づいて、前記複数の需要家施設の中から前記電力需要の削減を要請する対象とする要請先需要家施設を決定する。前記第2サーバは、前記複数の需要家施設から電力需要実績データを取得する第2通信部を備える。前記第2サーバは、前記電力需要実績データに基づいて前記要請情報を生成する第2制御部を備える。
 本開示の一実施形態に係る電力管理方法は、複数の需要家施設に対して電力需要の削減を要請するサーバが実行する。前記電力管理方法は、前記電力需要の削減が要請される要請日と該要請日に要請される電力需要の削減量を示す要請量とを含む要請情報を取得する取得ステップを含む。前記電力管理方法は、前記電力需要の相関がある日の分類を示すクラスの中から、前記要請日が属する要請日クラスを決定するクラス決定ステップを含む。前記電力管理方法は、所定日数の間の前記要請日クラスに属する日において、要請回数、及び、参加回数の少なくとも一方を前記複数の需要家施設について算出する算出ステップを含む。前記要請回数は、前記サーバが前記複数の需要家施設のそれぞれに対して前記電力需要の削減を要請した回数を示す。前記参加回数は、前記複数の需要家施設が前記電力需要の削減に参加した回数を示す。前記電力管理方法は、前記要請回数、及び、前記参加回数の少なくとも一方と、前記要請量とに基づいて、前記複数の需要家施設の中から前記電力需要の削減を要請する対象とする要請先需要家施設を選択する選択ステップを含む。
実施形態1に係るDR要請システムのブロック図である。 DR制御を実施する回数が比較的多い需要家施設のカレンダーの一例を示す図である。 DR制御を実施する回数が比較的少ない需要家施設のカレンダーの一例を示す図である。 需要家施設のDR実績の集計処理の一例を示すフローチャートである。 DR要請する需要家施設の選択処理の一例を示すフローチャートである。 需要家施設に順位をつける処理の一例を示すフローチャートである。 DR参加回数でソートした例を示す表である。 需要家施設に順位をつける処理の一例を示すフローチャートである。 DR要請回数で選択し、DR参加回数でソートした例を示す表である。 DR要請する需要家施設の選択処理の一例を示すフローチャートである。 実施形態2に係る電力管理システムの概略構成例を示すブロック図である。 電力供給開始方法の一例を説明するシーケンス図である。 予め決められた手順に基づく電力供給終了方法の一例を説明するシーケンス図である。 タイムアウトに基づく電力供給終了方法の一例を説明するシーケンス図である。 電力料金精算方法の一例を説明するシーケンス図である。 電力需給調整方法の一例を説明する第1のシーケンス図である。 電力需給調整方法の一例を説明する第2のシーケンス図である。 需給調整機器リスト更新方法の一例を説明するフローチャートである。 実施形態3に係る電力管理システムの概略構成例を示すブロック図である。
(実施形態1)
 本実施形態においては、デマンドレスポンスをDR(Demand Response)ともいう。電力事業者から需要家施設に対して、又は、電力事業者間で電力需要の削減を要請することをDR要請ともいう。DR要請を受けた需要家施設又は電力事業者が電力需要の削減を実施することをDR参加ともいう。需要家施設がDR要請に応じて消費電力量を削減するために行う制御をDR制御ともいう。
 DR参加した需要家施設に対しては、インセンティブが支払われてもよい。需要家施設は、DR要請に応じて消費電力量を削減するために、例えば、空調設備の電源を切ったり、出力を低くしたりするDR制御を行ってよい。電力系統の電力需要を削減する必要が生じた場合、電力系統を管理するネットワーク側に近い上位装置は、需要家施設又は需要家施設に近い下位装置に対して、DR要請してよい。上位装置は、複数ある下位装置の全てにDR要請してよいし、下位装置の一部にDR要請してよい。上位装置が一部の下位装置にDR要請する場合、例えば、DRが割り当てられた回数の少ない下位装置に優先してDR要請してよい。
 電力系統を管理するネットワーク側に近い上位装置が、需要家施設又は需要家施設に近い下位装置に対して、単純にDRが割り当てられた回数の少ない順にDR要請することがある。各需要家施設の稼働状況は、休日の設定等によって異なることがある。上位装置が各需要家施設の稼働状況を考慮されずにDR要請した場合、各需要家施設へのDR要請の頻度の偏りが生じることがある。DR要請の頻度の偏りが生じる状況は、各需要家施設にとってDR参加の機会が公平に与えられていないともいえる。
 需要家施設においてDR制御を行った場合、DR制御を行った日の電力需要実績が変化する。DR制御を行った日の電力需要実績が需要予測の基礎データとされた場合、需要予測の精度が低下することがある。需要家施設における電力需要実績は、休日の電力需要実績と稼働日の電力需要実績とで大きく異なることがある。稼働状況にかかわらず集められた電力需要実績に基づく需要予測の精度は低下することがある。
[全体構成]
 図1に示されるように、DR要請システム1は、第1サーバ2、第2サーバ3、記憶装置4、及び入力装置5を備える。第1サーバ2は、DR要請サーバ2ともいう。第2サーバ3は、需要予測サーバ3ともいう。DR要請システム1は、電力系統6に電力を供給する電力事業者群7に含まれる電力事業者サーバ71に接続される。DR要請システム1は、電力系統6から電力の供給を受けている需要家施設群8に含まれる需要家施設81に接続される。DR要請システム1は、電力管理システムともいう。
 本実施形態において、DR要請システム1を管理するのは、ネガワットを取引する電力事業者であるアグリゲータである。ネガワットは、需要家施設において、節電や自家発電によって需要量を減らした分を、発電したものとみなして、電力会社等が買い取ったりすることをいう。アグリゲータは、DR要請システム1を用いて、電力事業者群7から電力需要の削減を要請されることにより、需要家施設81に対して電力需要の削減を要請してよい。アグリゲータは、DR要請システム1を用いて、自らが電力需要の削減を要請すべきと判断することにより、需要家施設81に対して電力需要の削減を要請してよい。電力事業者は、DR要請システム1を用いて電力需要の削減を要請してよい。電力事業者又はアグリゲータは、需要家施設81に対してDR要請をするに際して、事前に需要家施設81とDRの契約を交わしておいてよい。電力事業者又はアグリゲータは、需要家施設81と交わされるDRの契約において、需要家施設81に対してDRの要請をするタイミングを、要請日の前日、又はDR制御開始時刻の1時間前若しくは10分前のいずれかとしてよい。DRの要請をするタイミングは、これらに限られるものではない。
 本実施形態において、電力系統6と電力事業者群7とDR要請システム1とによって、電力網が形成されている。電力網は、電力ネットワークともいう。電力事業者サーバ71又はDR要請サーバ2のことをネットワーク側のサーバともいう。本実施形態においては、電力事業者サーバ71がDR要請サーバ2に対してDR要請をする。電力事業者サーバ71は、DR要請サーバ2の上位装置に該当する。DR要請サーバ2は、電力事業者サーバ71の下位装置に該当する。DR要請サーバ2は、需要家施設81に対してDR要請をする。DR要請サーバ2は、需要家施設81の上位装置に該当する。需要家施設81は、DR要請サーバ2の下位装置に該当する。
 DR要請サーバ2は、第1制御部21と第1通信部22とを備える。第1制御部21は、DR要請処理部21ともいう。需要予測サーバ3は、第2制御部31と第2通信部32とを備える。第2制御部31は、需要予測部31ともいう。DR要請処理部21と需要予測部31とは、互いに接続される。DR要請処理部21及び需要予測部31はさらに、記憶装置4と接続される。第1通信部22は、電力事業者サーバ71及び需要家施設81と接続される。第2通信部32は、需要家施設81と接続される。
 DR要請サーバ2のDR要請処理部21は、第1通信部22を介して、上位装置である電力事業者サーバ71からDR要請情報を取得する。DR要請処理部21は、需要予測サーバ3の需要予測部31からDR要請情報を取得する。DR要請情報には、電力需要の削減が要請されるDR要請日と、当該要請日に要請される電力需要の削減量を示すDR要請量とが含まれる。DR要請情報は、単に要請情報ともいう。DR要請日は、単に要請日ともいう。DR要請量は、単に要請量ともいう。
 DR要請処理部21は、取得したDR要請情報に基づいてDR要請を行う対象となる需要家施設を選択する。DR要請を行う対象となる需要家施設のことを、要請先需要家施設ともいう。DR要請処理部21は、要請先需要家施設に対して電力需要の削減を要請するために、第1通信部22を介して、DR要請日と各要請先需要家施設に割り当てられるDR要請量とを含むDR要請メッセージを要請先需要家施設に送信する。DR要請処理部21は、DR要請メッセージを記憶装置4に格納する。
 DR要請メッセージを取得した要請先需要家施設は、DR参加するか否か決定し、その旨を含むDR応答メッセージを送信する。DR要請処理部21は、第1通信部22を介してDR応答メッセージを取得し、要請先需要家施設がDR参加するか否かを確認する。DR要請処理部21は、取得したDR応答メッセージを記憶装置4に格納する。
 要請先需要家施設から取得したDR応答メッセージがDR参加しない旨を含む場合、DR要請処理部21は、他のDR参加する要請先需要家施設だけでDR要請情報に含まれるDR要請量に相当する電力需要の削減を達成できるかどうか判定する。DR要請処理部21は、達成できないと判定した場合、DR参加しない要請先需要家施設に割り当てられるDR要請量を穴埋めするために、要請先需要家施設として選択されていない需要家施設81を新たに要請先需要家施設として決定する。
 DR要請処理部21は、要請先需要家施設から所定期間内にDR応答メッセージを取得できない場合、自動的に当該要請先需要家施設がDR参加しないと決定してよい。この場合、DR要請処理部21は、DR応答メッセージが取得できなかったことを示す情報を記憶装置4に格納してよい。DR要請処理部21は、DR参加しない旨を含むDR応答メッセージを記憶装置4に格納してよい。
 要請先需要家施設からDR参加する旨を含むDR応答メッセージを取得した場合、DR要請処理部21は、第1通信部22又は需要予測サーバ3を介して、当該要請先需要家施設からDR要請日におけるDR制御の実績データを取得する。DR要請処理部21は、当該要請先需要家施設がDR要請量に相当する電力需要の削減を達成できたかどうか確認する。DR要請処理部21は、電力需要の削減を達成できなかったことを確認した場合、当該要請先需要家施設がDR制御に失敗したことを示す情報を記憶装置4に格納してよい。この場合、DR要請処理部21は、当該要請先需要家施設がDR参加しなかったとみなしてよい。DR要請処理部21は、当該要請先需要家施設がDR参加しなかったことを示す情報を記憶装置4に格納してよい。DR要請処理部21は、当該要請先需要家施設の電力需要の削減量そのものを第1通信部22又は需要予測サーバ3を介して取得し、記憶装置4に格納してよい。
 需要予測サーバ3の需要予測部31は、第2通信部32を介して需要家施設81から需要家施設81における電力需要実績データを取得し、記憶装置4に格納する。電力需要実績データは、各需要家施設81における所定時間毎の電力需要の実績値を含む。需要予測部31は所定のタイミングで、記憶装置4に格納されている電力需要実績データを用いて電力需要を予測し、電力需要予測値を算出する。電力需要予測値は、例えば、各需要家施設81における所定時間毎の電力需要を予測した値であってよい。需要予測部31は、電力需要予測値が所定の値を超える場合、電力需要の削減が必要であると判定して、DR要請情報を生成する。需要予測部31は、DR要請情報をDR要請サーバ2のDR要請処理部21に送信する。
 記憶装置4は、DR要請処理部21が取得したDR応答メッセージを格納する。記憶装置4は、需要予測部31が取得した電力需要実績データを格納する。記憶装置4は、入力装置5によって入力される、電力事業者情報や需要家施設情報を格納する。電力事業者情報は、電力事業者サーバ71を管理する電力事業者に関する情報である。電力事業者情報は、DR要請をされる際の電力需要の削減量の上限や、DR要請をされるタイミングの制限などを含んでよい。需要家施設情報は、需要家施設81に関する情報である。需要家施設情報は、需要家施設81が契約している電力事業者の情報、需要家施設81における休日及び稼働日の情報、DR要請する際の電力需要の削減量、又は、DR要請をできるタイミングの制限等を含んでよい。DR要請する際の電力需要の削減量は、DR契約容量ともいう。
 需要家施設情報に含まれる休日及び稼働日の情報は、需要家施設81における電力需要実績データの集計処理に利用されてよい。需要家施設81における電力需要実績データは、需要家施設81が休日である場合と稼働日である場合とで異なってよい。電力需要実績データは、休日の電力需要実績データと稼働日の電力需要実績データとに分けてそれぞれ集計されてよい。このようにすることで、休日の電力需要と稼働日の電力需要とは、それぞれ精度よく予測されうる。言い換えれば、休日と稼働日のように、それぞれ電力需要の相関がある日の分類を示すクラスが定義されてよい。電力需要実績データは、クラス別に分類されてよい。このようにすることで電力需要の予測精度は、より容易に高められうる。
 入力装置5は、キーボード、タッチパネル、ポインティングデバイス、又は音声入力デバイス等を備えた端末であってよい。入力装置5は、PC端末、タブレット端末、又はスマートフォン等あらゆる形態の端末であってよい。
 電力系統6は電力網であってよい。電力系統6は、電力事業者群7によって供給される電力を需要家施設群8に送電してよい。需要家施設群8は、複数の需要家施設81を含む。電力事業者サーバ71は、電力系統6に電力を安定して供給するために、電力需要のピークシフト等を目的として、電力需要の削減目標を立てる。電力事業者サーバ71は、アグリゲータが管理するDR要請システム1又は需要家施設81に対してDR要請をする。DR要請をする電力事業者サーバ71を管理する電力事業者は、電力会社、又は、特定規模電気事業者であってよい。特定規模電気事業者は、PPS(Power Producer and Supplier)ともいう。
 需要家施設群8は、大口から小口まで様々な規模の需要家施設を含んでよい。需要家施設群8は、DR参加の回数が多い需要家施設81からDR参加の回数が少ない需要家施設81まで様々な需要家施設を含んでよい。
[需要予測処理]
 需要予測サーバ3の需要予測部31は、各需要家施設81から取得した電力需要実績データを用いて、各需要家施設81の電力需要を予測し、電力需要予測値を算出する。需要予測部31が各需要家施設81の電力需要を予測するに際して、各需要家施設の電力需要実績データが多いほど、予測精度は高められる。DR制御が実施された場合の電力需要は、通常と異なることがある。需要予測部31は、DR制御が実施された場合の電力需要実績データを除いて、電力需要予測値を算出してよい。このようにすることによって、需要家施設81においてDR制御を実施する回数が増えた場合にも、当該需要家施設81の電力需要の予測精度は、高められうる。
 図2A及び図2Bに示されるカレンダーにおいて、数字に丸印が付されている日がDR制御を実施した日である。
 図2Aに示されるカレンダーにおいて、例えば火曜日は5日ある。DR制御は、このうちの4日で実施されている。火曜日だけが属するクラスが定義される場合、当該クラスに属する日数は5日分である。当該クラスについて電力需要の予測が行われる場合、予測に用いられる電力需要実績データは、DR制御が実施されていない1日分となる。月曜日から金曜日までが属するクラスが定義される場合、当該クラスに属する日数は22日分である。当該クラスについて電力需要の予測が行われる場合、予測に用いられる電力需要実績データは、DR制御が実施されていない12日分となる。
 一方、図2Bに示されるカレンダーにおいて、例えば火曜日は全くDR制御が実施されていない。火曜日だけが属するクラスが定義され、当該クラスについて電力需要の予測が行われる場合、5日分の電力需要実績データが用いられうる。月曜日から金曜日までが属するクラスが定義される場合、当該クラスに属する日数は22日分である。当該クラスについて電力需要の予測が行われる場合、20日分の電力需要実績データが用いられうる。
 図2Bに示されるカレンダーにおいては、図2Aに示されるカレンダーと比較して電力需要の予測に用いる電力需要実績データが多くなりうる。図2Bに示されるカレンダーのようにDR制御が実施される需要家施設81においては、電力需要の予測精度がより高くなりうる。需要家施設81におけるDR実施回数が多い場合、当該需要家施設81の電力需要の予測精度が低くなりうる。一方で、需要家施設81におけるDR実施回数が少ない場合、当該需要家施設81の電力需要の予測精度が高くなりうる。各需要家施設81におけるDR実施回数は、偏らないようにされてよい。
[DR実績集計処理]
 図3に示されるように、DR要請サーバ2のDR要請処理部21は、各需要家施設81のDR実績を集計する。DR実績は、所定日数の間において、各需要家施設81に対するDR要請の回数を示すDR要請回数を含んでよい。DR要請回数のことを、単に要請回数ともいう。DR実績は、各需要家施設81がDR参加した回数を示すDR参加回数を含んでよい。DR参加回数のことを、単に参加回数ともいう。
 DR要請処理部21は、電力事業者サーバ71又は需要予測サーバ3の需要予測部31からDR要請情報を取得する(ステップS101)。DR要請情報は、電力需要の削減が要請されるDR要請日と該DR要請日に要請される電力需要の削減量を示すDR要請量とを含む。DR要請日及びDR要請量はそれぞれ、X及びDとも表される。例えば31日にDR要請される場合、X=31と表される。
 DR要請処理部21は、需要家施設群8に含まれる各需要家施設81について、DR実績を集計するループ処理を開始する(ステップS102)。当該ループ処理の対象となる需要家施設81は、処理対象需要家施設cともいう。
 DR要請処理部21は、記憶装置4に格納された需要家施設情報を取得する(ステップS103)。需要家施設情報は、処理対象需要家施設cにおける休日及び稼働日の情報を含んでよい。
 DR要請処理部21は、需要家施設情報に含まれる休日及び稼働日の情報に基づいて、DR要請日が処理対象需要家施設cにおける休日にあたるか稼働日にあたるか判定する(ステップS104)。言い換えれば、ステップS104では、DR要請日が属するクラスが決定される。DR要請日が属するクラスのことを、要請日クラスともいう。
 DR要請日が処理対象需要家施設cにおける休日にあたる場合(ステップS104:休日)、DR要請処理部21は、N(X,c)を算出する(ステップS105)。この場合、N(X,c)は、処理対象需要家施設cの所定日数の間におけるDR参加回数のうち、処理対象需要家施設cが休日である場合のDR参加回数を示す。DR要請処理部21は、ステップS105において、N(X,c)を算出する代わりに、処理対象需要家施設cの所定日数の間におけるDR要請回数のうち、処理対象需要家施設cが休日である場合のDR要請回数を示すM(X,c)を算出してよい。
 DR要請日が処理対象需要家施設cにおける稼働日にあたる場合(ステップS104:稼働日)、DR要請処理部21は、N(X,c)を算出する(ステップS106)。この場合、N(X,c)は、処理対象需要家施設cの所定日数の間におけるDR参加回数のうち、処理対象需要家施設cが稼働日である場合のDR参加回数を示す。DR要請処理部21は、ステップS106において、N(X,c)を算出する代わりに、処理対象需要家施設cの所定日数の間におけるDR要請回数のうち、処理対象需要家施設cが稼働日である場合のDR要請回数を示すM(X,c)を算出してよい。
 DR参加回数及びDR要請回数は、記憶装置4に格納された、処理対象需要家施設cに関するDR要請メッセージ、DR応答メッセージ、又はDR制御の実績データ等の解析処理により算出されてよい。
 DR要請処理部21は、需要家施設群8の全ての需要家施設81についてDR参加回数又はDR要請回数を算出する処理が終わっている場合、図3のフローチャートの処理を終了する。当該処理が終わっていない需要家施設81が残っている場合、DR要請処理部21は、ステップS102に戻って処理対象需要家施設cとは異なる需要家施設81についてループ処理を続ける。
 図3のフローチャートの処理によって、全ての処理対象需要家施設cについてDR要請日と同じクラスに属する日のDR参加回数を示すN(X,c)又はDR要請回数を示すM(X,c)が算出される。例えば、DR要請日が31日であって、需要家施設Aが処理対象需要家施設cとされる場合、需要家施設AのDR参加回数は、N(31,A)と表される。所定日数の間における需要家施設AのDR参加回数が3回である場合、N(31,A)=3と表される。
[DR要請先選択処理]
 図4に示されるように、DR要請サーバ2のDR要請処理部21は、DR参加回数及びDR要請回数の少なくとも一方に基づいて、DR要請の対象とする需要家施設を選択する。DR要請の対象とする需要家施設のことを要請先需要家施設ともいう。DR参加回数又はDR要請回数は、図3のフローチャートの処理で算出される需要家施設81のDR実績に含まれる。
 図4を参照して、DR要請処理部21がDR参加回数に基づいて要請先需要家施設を選択する処理について説明する。DR要請処理部21は、需要家施設81に対してDR要請をする優先順位を決めるために、需要家施設81に順位を設定する(ステップS201)。ステップS201における処理は、図5に示されるフローチャートに従って行われる。
 図5において、DR要請処理部21は、DR実績の集計処理で算出したDR参加回数を示すN(X,c)を基準として、処理対象需要家施設cに含まれる需要家施設81を昇順でソートする(ステップS302a)。昇順でソートするとは、数が少ない方から順に並び替えることである。図6に示される表の左列には、DR要請日が31日の場合における需要家施設A-EそれぞれのDR参加回数がソートせずに記載されている。図6に示される表の右列には、DR参加回数を基準として昇順でソートされた需要家施設A-Eが記載されている。需要家施設A-Eは、B、E、A、C、Dの順に並べ替えて記載されている。
 DR要請処理部21は、昇順でソートした結果に基づいて、各処理対象需要家施設cに順位を設定する(ステップS303)。図6の例では、需要家施設Bは、1位に設定される。需要家施設Eは、2位に設定される。需要家施設Aは、3位に設定される。需要家施設Cは、4位に設定される。需要家施設Dは、5位に設定される。DR要請処理部21は、図5の処理を終了し、図4の処理に戻ってステップS202に進む。
 図4を参照して、DR要請処理部21は、需要家施設81にDR要請した場合の電力需要の削減量見込み値を示すEを0にリセットし、要請先需要家施設を示すリスト(集合)Lを空集合φにリセットする(ステップS202)。
 DR要請処理部21は、ステップS201でDR参加回数に基づいて設定された需要家施設A-Eの順位に応じて、順次DR要請するループ処理を開始する(ステップS203)。
 DR要請処理部21は、処理対象需要家施設cに関する需要家施設情報を取得する(ステップS204)。需要家施設情報は、DR要請する際の電力需要の削減量、すなわちDR契約容量を含む。当該削減量、すなわちDR契約容量は、D(c)と表される。
 DR要請処理部21は、電力需要の削減量見込み値を示すEに、処理対象需要家施設cの電力需要の削減量を示すD(c)を加算し、要請先需要家施設を示すリストLに処理対象需要家施設cを加える(ステップS205)。
 DR要請処理部21は、電力需要の削減量見込み値を示すEがDR要請量を示すD以上となったかどうか判定する(ステップS206)。EがD以上となった場合(ステップS206:YES)、DR要請処理部21は、処理を終了し、リストLに含まれる需要家施設81を要請先需要家施設として確定する。EがD以上となっていない場合(ステップS206:NO)、DR要請処理部21はステップS207に進み、ステップS203に戻るループを続行する。
 図4のフローチャートに従う処理によって、DR参加回数を示すN(X,c)に基づく要請先需要家施設の選択が完了する。このようにすることで、需要家施設81のDR参加回数又はDR要請回数が平準化されうる。各需要家施設81がDRに参加する機会に偏りが生じることが防がれうる。各需要家施設81についての電力需要の予測精度に偏りが生じることが防がれうる。
 DR要請処理部21は、DR参加回数に基づく代わりに、DR要請回数に基づいてDR要請先選択処理を行ってよい。DR要請処理部21は、図4に示されるステップS203からステップS207までのループ処理を行うことによってDR要請先を選択する。この際、DR要請処理部21は、ステップS201で設定された各需要家施設81の順位に基づいて、各需要家施設81をDR要請先リストLに追加する。ステップS201の処理内容は、図5に示す需要家施設の順位を設定する処理である。DR要請処理部21は、図5のステップ302aの処理として、DR要請回数を示すM(X,c)を基準として、各需要家施設81を昇順でソートし、各需要家施設に順位を設定する。これにより、図4のステップS203からステップS207までのループ処理は、DR要請回数が少ない需要家施設81から順に行われる。
 このようにすることで、DR参加回数が各需要家施設81のDR実績を反映していない場合でも、各需要家施設81がDRに参加する機会に偏りが生じることが防がれうる。DR参加回数が各需要家施設81のDR実績を反映していない場合とは、例えば、DR要請処理部21がDR要請を送信しても、需要家施設81からDR応答メッセージを取得できない場合であってよい。需要家施設81からDR応答メッセージを取得できない場合は、通信障害が原因である場合を含んでよい。需要家施設81からDR応答メッセージを取得できない場合は、そもそも需要家施設81がDR応答メッセージを送信しない又はできない場合等を含んでよい。
 DR要請処理部21は、DR参加回数及びDR要請回数の両方に基づいて各需要家施設81に順位を設定してDR要請先選択処理を行ってよい。図7に示されるように、DR要請処理部21は、DR実績の集計処理で算出したDR要請回数を示すM(X,c)が所定回数以下であることを基準として処理対象需要家施設cを選択する。DR要請処理部21は、選択した処理対象需要家施設cを、ソートの対象とする処理対象需要家施設cの集合として決定する(ステップS301)。DR要請処理部21は、図8に示されるように、各需要家施設81に順位を設定してよい。図8の左列には、DR要請日が31日の場合における需要家施設A-EそれぞれのDR参加回数及びDR要請回数がソートせずに記載されている。図8の中列には、DR要請回数が8以下であることを基準として選択された処理対象需要家施設cが記載されている。図8の例では、DR要請回数が9である需要家施設Eが選択されていない。図8の例では、上述の所定回数が8と設定されているがこれに限られるものではなく、所定回数はDR要請の条件に応じて適宜決められてよい。
 DR要請処理部21は、ステップS301で選択された処理対象需要家施設cの集合の中で、DR参加回数を基準として各処理対象需要家施設cを昇順でソートする(ステップS302b)。図8の右列には、DR参加回数に基づいて昇順でソートされた処理対象需要家施設cが記載されている。図8の右列には、ステップS301で選択されなかった需要家施設Eを除く需要家施設A-Dが、B、A、C、Dの順に並べ替えて記載されている。
 DR要請処理部21は、昇順でソートした結果に基づいて、各処理対象需要家施設cに順位を設定する(ステップS303)。図8の例では、需要家施設Bが1位に設定される。需要家施設Aは、2位に設定される。需要家施設Cは、3位に設定される。需要家施設Dは、4位に設定される。需要家施設Eには順位が設定されない。DR要請処理部21は、図7の処理を終了し、図4の処理に戻ってステップS202に進む。
 このようにすることで、各需要家施設81がDRに参加する機会に偏りが生じることが防がれうる。順位を設定する対象となる需要家施設81の数が減らされうる。DR要請処理部21が行う処理が簡易化されうる。
 DR要請処理部21は、図4のステップS203からステップS207における削減量見込み値を示すEの積算を行わず、DR参加回数又はDR要請回数が所定回数以下である需要家施設81全てを要請先需要家施設として選択してよい。図9に示されるフローチャートの処理によって、DR要請処理部21は、DR参加回数又はDR要請回数が所定回数以下である需要家施設81全てを要請先需要家施設として選択してよい。DR要請処理部21は、DR参加回数又はDR要請回数が所定回数以下である需要家施設81全てを、要請先需要家施設を示すリストLに加える(ステップS401)。図9の処理では各需要家施設81に順位を設定するステップを設けずに要請先需要家施設の選択処理を行っている。このようにすることで、要請先需要家施設の決定処理がより簡易化されうる。需要家施設81のDR参加回数又はDR要請回数が平準化されうる。各需要家施設81がDRに参加する機会に偏りが生じることが防がれうる。
 DR要請処理部21は、図4のステップS203からステップS207における削減量見込み値を示すEの積算を行わず、予め決定される所定順位以上の順位が設定された需要家施設81を全て要請先需要家施設として選択してよい。このようにすることで、要請先需要家施設の決定処理がより簡易化されうる。需要家施設81のDR参加回数又はDR要請回数が平準化されうる。各需要家施設81がDRに参加する機会に偏りが生じることが防がれうる。
 DR要請処理部21は、要請先需要家施設を選択する際にDR要請回数に基づいて選択を行う代わりに、DR非要請回数に基づいて選択を行ってよい。DR非要請回数とは、需要家施設81に対してDR要請しなかった回数を示す。ある需要家施設81に係るDR非要請回数は、DR要請システム1が上位装置からDR要請情報を取得したにもかかわらず、当該需要家施設81に対してDR要請しなかった回数である。DR要請回数とDR非要請回数との和は、DR要請システム1が上位装置からDR要請情報を取得した回数に等しい。
 DR要請処理部21は、要請先需要家施設を選択する際にDR参加回数に基づいて選択を行う代わりに、DR不参加回数に基づいて選択を行ってよい。DR不参加回数とは、需要家施設81がDR参加しなかった回数を示す。ある需要家施設81がDR参加しなかったことの定義は、需要家施設81がDR要請を取得したにもかかわらずDR参加しなかった場合のみをDR参加しなかったとするものであってよい。この場合、ある需要家施設81に係るDR参加回数とDR不参加回数との和は、当該需要家施設81のDR要請回数に等しい。ある需要家施設81がDR参加しなかったことの定義は、DR非要請回数をDR不参加回数に含むとするものであってよい。この場合、ある需要家施設81に係るDR参加回数とDR不参加回数との和は、DR要請システム1が上位装置からDR要請情報を取得した回数に等しい。需要家施設81がDR参加しなかったことの定義は、例えば、DR要請の内容を達成できなかったことであってもよいし、DR要請に対して回答しなかったことであってもよい。ある需要家施設81がDR参加しなかったことの定義は上記の例に限られるものではなく、適宜定められるものである。
 DR要請処理部21は、DR非要請回数又はDR不参加回数に基づいて要請先需要家施設を選択することによって、異なる選択基準を提供できる。特に、需要家施設81のそれぞれで要請日クラスに属する日数が異なる場合に種々の選択基準を組み合わせることが可能となる。DR要請処理部21は、例えば、DR要請回数とDR不参加回数とを組み合わせた基準によって要請先需要家施設を選択してよい。DR要請処理部21は、DR非要請回数とDR参加回数とを組み合わせた基準によって要請先需要家施設を選択してよい。DR不参加回数の定義が上述の例と異なるものとされる場合、組み合わせてできる基準の数は増える。以上の例に限られず、あらゆる組み合わせが適用されてよい。
(実施形態2)
 電力会社と電力の受給を契約する需要家は、主に需要家施設内での電力受給のサービスを提供される。需要家は、需要家施設の外部での電力受給のサービスを求めている。需要家施設の外部での電力受給のサービスが提供される場合、電力網の電力品質の維持が考慮されてよい。
 図10に示されるように、実施形態2に係る電力管理システム100は、電力網110と、第1電力量計111と、第2電力量計112と、施設内電力量計113と、施設外電力量計114と、電力系統監視装置115とを備える。電力管理システム100は、第1発電所120と、第2発電所130と、送配電サーバ140と、第1電力会社内サーバ150と、第2電力会社内サーバ160と、需要家施設170と、電力受給装置180とを備える。電力管理システム100は、幹事サーバ191と、受給装置管理サーバ192と、認証記憶部200と、アグリゲータサーバ210と、インターネット等の通信網220とを備える。需要家施設170は、第1機器171と、第2機器172と、電力管理装置173とを備える。幹事サーバ191及び受給装置管理サーバ192は、1つの組織体である管理サーバ190であってよい。
 電力網110は、接続される各構成部に電力を供給・配送する。電力網110は、第1電力量計111、第2電力量計112、施設内電力量計113、施設外電力量計114、及び電力系統監視装置115と、それぞれ接続される。
 第1電力量計111は、記憶部111a、制御部111b、及び通信部111cを備える。第1電力量計111は、第1発電所120で発電した電力を、制御部111bを用いて計測し、記憶部111aに記憶する。第2電力量計112は、記憶部112a、制御部112b、及び通信部112cを備える。第2電力量計112は、第2発電所130で発電した電力を、制御部112bを用いて計測し、記憶部112aに記憶する。施設内電力量計113は、記憶部113a、制御部113b、及び通信部113cを備える。施設内電力量計113は、需要家施設170で消費・発生した電力を、制御部113bを用いて計測し、記憶部113aに記憶する。施設外電力量計114は、記憶部114a、制御部114b、及び通信部114cを備える。施設外電力量計114は、電力受給装置180で消費・発生した電力を、制御部114bを用いて計測し、記憶部114aに記憶する。第1電力量計111、第2電力量計112、施設内電力量計113、及び施設外電力量計114の記憶部111aから114aは、それぞれ固有の識別情報を記憶する。各電力量計に固有の識別情報を、電力量計IDともいう。
 電力系統監視装置115は、記憶部115a、制御部115b、及び通信部115cを備える。電力系統監視装置115は、制御部115bを用いて電力網110の状態を監視する。電力系統監視装置115は、電力網110の状態に関する情報を通信部115cを用いて送配電サーバ140に送信する。電力系統監視装置115が送配電サーバ140に送信する電力網110の状態に関する情報は、電力網110の電力品質を維持するための情報である。電力品質を維持するための情報を、アンシラリー情報ともいう。電力品質は、例えば周波数又は電圧等を含んでよい。
 第1発電所120及び第2発電所130は、それぞれ第1電力会社及び第2電力会社が保有する発電所であり、発電した電力を電力網110に供給する。
 送配電サーバ140は、記憶部140a、制御部140b、及び通信部140cを備える。送配電サーバ140は、第1電力量計111、第2電力量計112、施設内電力量計113、及び施設外電力量計114と、通信部140cを用いて通信可能に接続される。送配電サーバ140は、電力系統監視装置115から通信部140cを用いて取得するアンシラリー情報を記憶部140aに記憶する。送配電サーバ140は、このアンシラリー情報に基づいて、制御部140bを用いて電力網110の状態を監視する。送配電サーバ140は、電力網110の安定化のために、必要に応じて、電力の供給側や需要側に命令を送信する。送配電サーバ140と各構成部との接続には、有線による通信又は無線による通信が用いられてよい。送配電サーバ140は、サーバ装置ともいう。
 第1電力会社内サーバ150は、記憶部150a、制御部150b、及び通信部150cを備える。第2電力会社内サーバ160は、記憶部160a、制御部160b、及び通信部160cを備える。第1電力会社内サーバ150及び第2電力会社内サーバ160は、それぞれ電力の販売事業を行う第1電力会社及び第2電力会社が保有するサーバである。第1電力会社内サーバ150及び第2電力会社内サーバ160は、各電力会社の契約需要家に対する電力受給を制御部150b、160bを用いて制御する。電力管理システム100は、更に他の電力会社が保有するサーバを備えてよい。
 需要家施設170は、第1電力会社と電力受給契約を結んだ需要家の施設である。需要家施設170は、契約に基づいて第1電力会社から電力供給を受けてよい。需要家施設170は、発電した電力を第1電力会社に供給してよい。需要家施設170は電力管理システム100が備える需要家施設の一例である。電力管理システム100は、第2電力会社と契約した需要家を含む他の需要家の需要家施設も備えてよい。需要家施設170は、第1機器171と、第2機器172と、電力管理装置173とを備える。
 第1機器171及び第2機器172は、需要家施設170が備える電力受給を行う機器の一例である。第1機器171は、記憶部171a、制御部171b、及び通信部171cを備える。第2機器172は、記憶部172a、制御部172b、及び通信部172cを備える。第1機器171及び第2機器172はそれぞれ、需要家の識別情報を記憶部171a及び172aに記憶してよい。需要家の識別情報を、需要家IDともいう。第1機器171及び第2機器172は、電子機器や蓄電池等の機器であってよい。第2機器172は、需要家施設170の外部に持ち出して使用されてよい。第2機器172は、需要家施設170外において、電力受給装置180を介して電力網110からの電力の受給が可能である。第2機器172は、通信部172cを用いて通信網220を介した通信を実行可能である。
 電力管理装置173は、記憶部173a、制御部173b、及び通信部173cを備える。電力管理装置173は、例えばエネルギー管理システムの機能を有してよい。エネルギー管理システムは、EMS(Energy Management System)ともいう。EMSの機能は、アグリゲータサーバ210の指示を受けて需要家施設170内の電力の需給調整を行う機能であってよい。電力管理装置173は、需要家施設170で管理する機器を登録した管理機器リストと、電力の需給調整に使用可能な機器を登録した需給調整機器リストとを記憶部173aに記憶する。電力管理装置173は、通信部173cを用いて、施設内における通信である施設内通信を実行可能である。電力管理装置173は、通信部173cを用いて、通信網220を介した外部通信を実行可能である。
 電力受給装置180は、記憶部180a、制御部180b、及び通信部180cを備える。電力受給装置180は、受給装置管理サーバ192により管理される。電力受給装置180は、需要家施設170の外部に設置される。電力受給装置180は、電力網110と系統連系する。電力受給装置180は、接続された第2機器172等の外部機器に電力を供給可能であってよい。電力受給装置180は、逆潮流により電力網110に電力を供給可能であってよい。電力受給装置180は、複数設置されてよい。
 幹事サーバ191は、記憶部191a、制御部191b、及び通信部191cを備える。幹事サーバ191は、バランシンググループである幹事事業者が運用するサーバである。幹事サーバ191は、受給装置管理サーバ192、第1電力会社内サーバ150、及び第2電力会社内サーバ160と協働して、電力供給予測、電力供給、及び電気料金の精算等を行う。幹事サーバ191は、電力網110に電力を供給する第1電力会社又は第2電力会社等の電力会社の電力受給計画の情報を、記憶部191aに記憶する。
 受給装置管理サーバ192は、記憶部192a、制御部192b、及び通信部192cを備える。受給装置管理サーバ192は、受給装置管理事業者によって運用される。受給装置管理サーバ192は、電力受給装置180を管理し、電力受給装置180を介して電力サービスを提供する。受給装置管理サーバ192は、通信部192cを用いて認証記憶部200を参照することができる。認証記憶部200は、需要家識別情報である需要家IDと、契約している電力会社との対応情報、及び第1電力量計111、第2電力量計112、施設内電力量計113及び施設外電力量計114それぞれの識別情報を記憶するデータベースである。認証記憶部200の記憶内容は、受給装置管理サーバ192の記憶部192aに記憶されてよい。
 アグリゲータサーバ210は、記憶部210a、制御部210b、及び通信部210cを備える。アグリゲータサーバ210は、需要家施設170を含む各需要家施設の電力需給を監視する。アグリゲータサーバ210は、第1電力会社内サーバ150の要請を受けて需要家施設170を含む各需要家施設に通信網220経由で需給調整要請を送信する。アグリゲータサーバ210は、需要家施設170を含む各需要家施設が所有する機器、発電装置、又は蓄電池等の情報を記憶部210aに記憶する。アグリゲータサーバ210は、どの程度電力需給調整が可能かという電力需給調整範囲情報を記憶部210aに記憶する。アグリゲータサーバ210と同様のアグリゲータサーバが、通信網220を介して第2電力会社内サーバ160と接続されてよい。
 需要家が第2機器172を需要家施設170から外部に持ち出した場合に、第2機器172が移動先である電力受給装置180から電気供給を受けるための方法について説明する。図11に示されるように、本実施形態に係る電力管理システム100において、電力受給装置180から第2機器172への電力供給が開始されてよい。
 第2機器172と受給装置管理サーバ192との間での情報伝達は、通信網220を介した通信を用いて行われてよい。受給装置管理サーバ192と施設外電力量計114との間での情報伝達は、送配電サーバ140を介した通信を用いて行われてよい。第2機器172と電力受給装置180又は施設外電力量計114との情報伝達は、有線又は無線による通信を用いて行われてよい。
 需要家によって第2機器172が移動された場合、第2機器172は、移動先で受給装置管理サーバ192の管理する電力受給装置180からの電力供給を要求する(ステップS111)。具体的には、例えば、第2機器172は、電力受給装置180と接続され、需要家によって入力される電力供給を受けるための所定の操作を受け付ける。
 第2機器172は、要求に応じて、施設外電力量計114の識別情報を取得する(ステップS112)。具体的には、第2機器172は、施設外電力量計114に対する施設外電力量計114の識別情報の送信要求を、通信部172cを用いて送信する。施設外電力量計114は、識別情報の送信要求を受信した場合、第2機器172に対して、施設外電力量計114の識別情報である電力量計IDを、通信部114cを用いて送信する。
 第2機器172は、電力量計IDを受信した場合、受電開始の申請と、記憶部172aに記憶された需要家ID及び取得した電力量計IDとを共に、通信部172cを用いて受給装置管理サーバ192に送信する(ステップS113)。需要家IDは、需要家識別番号を含んでよい。
 受給装置管理サーバ192は、受信した需要家IDと電力量計IDとを認証記憶部200を用いて認証する。受給装置管理サーバ192は、認証が成功した場合、申請が承認された旨の通知を、通信部192cを用いて送配電サーバ140に送信する(ステップS114)。具体的には、受給装置管理サーバ192は、需要家IDが認証記憶部200に記憶された電力会社の契約者識別情報と一致する場合、需要家IDが条件を満たすと判定する。受給装置管理サーバ192は、電力量計IDが認証記憶部200に記憶された受給装置管理サーバ192の管理する電力量計の識別情報と一致する場合、電力量計IDが条件を満たすと判定する。受給装置管理サーバ192は、需要家ID及び電力量計IDが共に条件を満たすと判定した場合、認証が成功したと判定する。受給装置管理サーバ192は、需要家ID及び電力量計IDの少なくとも一方が条件を満たさないと判定した場合、認証が失敗したと判定する。受給装置管理サーバ192は、認証が失敗したと判定した場合、申請が却下された旨の通知を、通信部192cを用いて第2機器172に送信し、処理を終了する。
 送配電サーバ140は、電力系統監視装置115から取得するアンシラリー情報に基づいて、第2機器172に対する電力供給を承認するか否かを判定する。送配電サーバ140は、電力供給を承認すると判定した場合、申請が承認された旨の通知を第2機器172に送信する(ステップS115)。送配電サーバ140は、電力供給を承認しないと判定した場合、申請が却下された旨の通知を、通信部140cを用いて第2機器172に送信し、処理を終了する。
 受電開始の申請が承認された場合、受給装置管理サーバ192は、第2機器172への電力供給の開始手続きに入る。受給装置管理サーバ192は、施設外電力量計114の現在の状態を確認する(ステップS116)。具体的には、受給装置管理サーバ192は、施設外電力量計114に対して現在の状態の問い合わせを、通信部192cを用いて送信する。施設外電力量計114は、問い合わせの受信に応じて通信部114cを用いて受給装置管理サーバ192に現在の状態を送信する。本実施形態において、施設外電力量計114の現在の状態は、施設外電力量計114の供給電力量の計測値、及びブレーカーの開閉状態を含んでよい。施設外電力量計114の現在の状態は、ブレーカーが開状態である場合、電力量計ID及び電力供給先の機器の需要家IDを含んでよい。ブレーカーの開状態とは、施設外電力量計114内のブレーカーが電路を導通させて開通している状態を意味する。ブレーカーの閉状態とは、施設外電力量計114内のブレーカーが電路を遮断し閉鎖している状態を意味する。
 受給装置管理サーバ192は、施設外電力量計114の現在の状態に基づき、電力供給の可否を判断する。受給装置管理サーバ192は、電力供給が可であると判断した場合、第2機器172に電力供給を行う為の開通指示を、通信部192cを用いて施設外電力量計114に送信する(ステップS117)。具体的には、受給装置管理サーバ192は、施設外電力量計114の現在の状態として、ブレーカーが閉状態である場合、電力供給が可であると判断して、開通指示を施設外電力量計114に送信する。一方、受給装置管理サーバ192は、施設外電力量計114の現在の状態として、ブレーカーが開状態である場合、ステップS116で受信した需要家IDと電力量計IDとを確認する。ステップS113で受信した需要家IDと電力量計IDとがこの組み合わせの申請である場合、受給装置管理サーバ192は、既に電力供給がされていると判断して、開通指示を送信しない。受信した需要家IDと電力量計IDとの組み合わせが異なる場合、受給装置管理サーバ192は、施設外電力量計114に閉鎖指示を送信した後、改めて開通指示を送信する。
 施設外電力量計114は、開通指示を受信した場合、ブレーカーを開状態に変更する。施設外電力量計114は、第2機器172への電力供給及び供給電力量の計測を開始する。施設外電力量計114は、開通が完了した旨の報告を、通信部114cを用いて受給装置管理サーバ192に送信する(ステップS118)。
 第2機器172への電力供給を終了するための方法について、図12及び図13を用いて説明する。
 上述の電力供給開始方法による電力供給の開始後、図12に示されるように、第2機器172は、例えば需要家等の使用者の操作により、受電終了指示を受け付ける(ステップS121)。第2機器172は、受電終了指示を受け付けた場合、受電終了の申請を、需要家ID及び電力量計IDと共に、通信部172cを用いて受給装置管理サーバ192に送信する(ステップS122)。
 受給装置管理サーバ192は、受信した需要家IDと電力量計IDとを認証記憶部200を用いて認証する。受給装置管理サーバ192は、認証が成功した場合、申請が承認された旨の通知を、通信部192cを用いて第2機器172に送信する(ステップS123)。具体的には、受給装置管理サーバ192は、図11に示される電力供給開始方法におけるステップS114と同様に判定する。受給装置管理サーバ192は、需要家IDが認証記憶部200に記憶された電力会社の契約者識別情報と一致する場合、需要家IDが条件を満たしたと判定する。受給装置管理サーバ192は、電力量計IDが認証記憶部200に記憶された受給装置管理サーバ192の管理する電力量計の識別情報と一致する場合、電力量計IDが条件を満たしたと判定する。受給装置管理サーバ192は、需要家ID及び電力量計IDが条件を満たしたと判定した場合、認証が成功したと判定する。受給装置管理サーバ192は、需要家ID及び電力量計IDの少なくとも一方が条件を満たさないと判定した場合、認証が失敗したと判定する。
 認証が成功した場合、受給装置管理サーバ192は、第2機器172への電力供給の終了手続きに入る。受給装置管理サーバ192は、施設外電力量計114の現在の供給電力量の計測値を確認する(ステップS124)。具体的には、受給装置管理サーバ192は、通信部192cを用いて施設外電力量計114に現在の供給電力量の計測値の問い合わせを送信する。施設外電力量計114は、問い合わせの受信に応じて受給装置管理サーバ192に通信部114cを用いて現在の供給電力量の計測値を送信する。
 受給装置管理サーバ192は、受信した現在の供給電力量の計測値と、電力供給開始時における供給電力量の計測値とに基づいて、需要家が第2機器172を用いて電力受給装置180から供給を受けた電力量を需要家IDと関連付ける(ステップS125)。需要家が第2機器172を用いて電力受給装置180から供給を受けた電力量を、施設外電力量ともいう。受給装置管理サーバ192は、需要家IDと関連付けた施設外電力量を、施設外使用情報として記憶部192aに記憶する。電力供給開始時における供給電力量の計測値は、電力供給開始方法におけるステップS114において取得したものである。受給装置管理サーバ192は、ブレーカーの閉鎖指示を、通信部192cを用いて施設外電力量計114に送信する(ステップS126)。
 施設外電力量計114は、閉鎖指示を受信した場合、ブレーカーを閉状態に変更し、第2機器172への電力供給を終了する。施設外電力量計114は、閉鎖が完了した旨の報告を、通信部114cを用いて受給装置管理サーバ192に送信する(ステップS127)。
 図13に示されるように、電力管理システム100は、所定時間の経過によるタイムアウトに基づいて、電力受給装置180から第2機器172への電力供給を終了させてよい。
 上述の電力供給開始方法による電力供給の開始後、図13に示されるように、受給装置管理サーバ192は、一定頻度で施設外電力量計114の現在の供給電力量の計測値を確認する(ステップS131)。具体的には、受給装置管理サーバ192は、一定頻度で施設外電力量計114に通信部192cを用いて現在の供給電力量の計測値の問い合わせを送信する。施設外電力量計114は、問い合わせの受信の度に受給装置管理サーバ192に通信部114cを用いて現在の供給電力量の計測値を送信する。
 第2機器172が電力受給装置180から取り外される、又は第2機器172の充電が完了する等の事象が発生した場合、電力受給装置180からの電力供給が停止する(ステップS132)。電力受給装置180からの電力供給は、上述の事象に限られず、他の事象が発生した場合に停止してよい。
 受給装置管理サーバ192は、施設外電力量計114の供給電力量の計測値が一定期間変化しないことを確認した場合(ステップS133、S134)、タイムアウトしたと判断する(ステップS135)。受給装置管理サーバ192は、タイムアウトしたと判断した場合、第2機器172の電力使用が終了したとみなす。受給装置管理サーバ192は、受信した現在の供給電力量の計測値と、電力供給開始時における供給電力量の計測値とに基づいて、施設外電力量を需要家IDと関連付ける(ステップS136)。受給装置管理サーバ192は、需要家IDと関連付けた施設外電力量を、施設外使用情報として記憶部192aに記憶する。電力供給開始時における供給電力量の計測値は、電力供給開始方法におけるステップS114において取得したものである。受給装置管理サーバ192は、ブレーカーの閉鎖指示を施設外電力量計114に通信部192cを用いて送信する(ステップS136)。
 施設外電力量計114は、閉鎖指示を受信した場合、ブレーカーを閉状態に変更し、第2機器172への電力供給を終了する。施設外電力量計114は、閉鎖が完了した旨の報告を受給装置管理サーバ192に通信部114cを用いて送信する(ステップS137)。
 以上、図11から図13を用いて、電力受給の開始方法及び終了方法を説明したが、同様の手順で第2機器172から電力網110に電力を供給する給電が実行されてよい。
 各会社、事業者間における電力料金は、図14に示されるように精算されてよい。
 送配電サーバ140は、所定の周期で、送配電網を流れた電力の請求情報を作成し、通信部140cを用いて幹事サーバ191に送信する(ステップS141)。所定の周期は、例えば1ヶ月に1回の頻度であってよいし、1日(24時間)に1回の頻度であってもよい。具体的には、送配電サーバ140は、第1電力会社内サーバ150、第2電力会社内サーバ160及び受給装置管理サーバ192それぞれに対する料金支払いの請求情報を作成し、まとめて幹事サーバ191に送信する。第1電力会社内サーバ150及び第2電力会社内サーバ160に対する請求情報は、第1電力会社及び第2電力会社それぞれの契約需要家が需要家施設170で受電又は給電した電力量の情報に基づいて作成されてよい。需要家施設170で受電又は給電した電力量の情報のことを施設内使用情報ともいう。受給装置管理サーバ192に対する請求情報は、第1電力会社及び第2電力会社それぞれの契約需要家が電力受給装置180等の需要家施設外の需給装置で受電または給電した電力量の情報に基づいて作成されてよい。
 幹事サーバ191は、請求情報を受信した場合、受給装置管理サーバ192に対して請求情報通知を、通信部191cを用いて送信する(ステップS142)。ステップS142の処理は、第1電力会社及び第2電力会社それぞれの契約需要家が需要家施設外で使用した電力量に基づく請求情報を作成する為に実行される。幹事サーバ191は、受信した各サーバに対する請求情報の精算額の支払いを、まとめて送配電サーバ140に対して行う(ステップS143)。
 受給装置管理サーバ192は、請求情報通知を受信した場合、施設外使用情報を、需要家識別情報に対応する電力会社毎に分類する。受給装置管理サーバ192は、各電力会社の契約需要家に対する需要家施設170の外部での電力使用についての請求情報を生成する(ステップS144)。需要家施設170の外部での電力使用についての請求情報のことを、施設外請求情報ともいう。受給装置管理サーバ192は、各電力会社内サーバに対する施設外請求情報を、通信部192cを用いて幹事サーバ191に送信する(ステップS145)。
 幹事サーバ191は、各電力会社内サーバに対する請求情報と、各電力会社の契約需要家に対する施設外請求情報とに基づいて、各電力会社に対する請求情報の請求額を合算した合算請求額の情報を生成する。各電力会社内サーバに対する請求情報は、送配電サーバ140から受信したものである。各電力会社の契約需要家に対する施設外請求情報は、受給装置管理サーバ192から受信したものである。幹事サーバ191は、合算請求額を、記憶部191aに記憶された各電力会社の電力受給計画に基づく想定請求額と比較する。幹事サーバ191は、電力網110に接続される電力会社内サーバに対する請求額間の調整を行い、調整後請求額の情報を生成する(ステップS146)。幹事サーバ191は、具体的には、合算請求額を想定請求額に近づけた調整後請求額を生成する。例えば、幹事サーバ191は、第1電力会社内サーバ150に対する合算請求額が想定請求額を上回り、第2電力会社に対する合算請求額が想定請求額を下回る場合、第1電力会社の超過分を第2電力会社が補填しているとみなす。幹事サーバ191は、この場合、第1電力会社への合算請求額の超過分を第2電力会社内の合算請求額から減額し、請求額の総額を変えないようにして調整を行う。
 幹事サーバ191は、調整後請求額を請求情報として、通信部191cを用いて、第1電力会社内サーバ150、第2電力会社内サーバ160及び受給装置管理サーバ192に送信する(ステップS147)。
 本実施形態に係る電気料金精算方法において、需要家施設170外での電力供給に特化した電力受給装置180が用いられる。本実施形態に係る電気料金精算方法によれば、需要家施設170外での電力需給設備を持たない電力会社が、需要家と契約した電力需給サービスを場所の制約を受けずに、あたかも自社サービスのように提供可能になる。各電力会社の電力需給の実績と電力受給計画との間に差異が生じた場合であっても、電力会社内サーバに対する請求額間の調整が行われることによって、実績が電力受給計画に近づけられうる。
 図15及び図16に示されるように、本実施形態に係る電力管理システム100は、電力需給を調整することができる。図15及び図16の例において、第2機器172は、需要家施設170から外部に持ちだされ、電力受給装置180から電気供給を受けていると仮定する。図15及び図16における電力需給調整の要請は、実施形態1におけるDR要請であってよい。
 送配電サーバ140は、電力系統監視装置115を用いて電力網110の運転状況を監視する(ステップS151)。送配電サーバ140は、電力網110の需給調整が必要と判断した場合、通信部140cを用いて需給調整要請を第1電力会社内サーバ150に送信する。第1電力会社内サーバ150は、需給調整要請を受信した場合、通信部150cを用いてアグリゲータサーバ210に調整要請を送信する(ステップS152)。需給調整が必要と判断される場合は、例えば、電力の需要と供給との間に著しく差異が発生した場合であってよい。需給調整が必要と判断される場合は、電力の需要と供給との間に著しい差異が発生すると予測される場合であってよい。需給調整が必要と判断される場合は、電力品質を示す電圧又は周波数等のアンシラリー情報が既定の範囲を超えた場合であってよい。需給調整が必要と判断される場合は、電力品質を示す電圧又は周波数等のアンシラリー情報が既定の範囲を超えることが予測される場合であってよい。
 アグリゲータサーバ210は、第1電力会社内サーバ150から需給調整指示を受けた場合、電力需給調整範囲情報に基づき、どの需要家にどの程度の需給調整を依頼するかの全体調整計画を策定する(ステップS153)。アグリゲータサーバ210は、需要家施設170に設置された電力管理装置173に、通信部210cを用いて全体調整計画に基づく需給調整要請を送信する(ステップS154)。
 電力管理装置173は、第1機器171及び第2機器172の過去の稼働状況に基づき個別調整計画を策定する。電力管理装置173は、個別調整計画が規定する調整時刻になった場合、調整を開始する(ステップS155)。
 電力管理装置173は、第1機器171及び/又は第2機器172に、通信部173cを用いて需給調整の指示を送信する。第1機器171及び第2機器172は、調整指示を受信した旨の通知をそれぞれ通信部171c及び通信部172cを用いて電力管理装置173に返信する(ステップS156)。具体的には、例えば、電力管理装置173は、需給調整対象リストに登録された機器に対して施設内通信によって調整指示を送信する。電力管理装置173は、施設内通信によって調整指示を送信できない機器がある場合には、外部通信によって調整指示を送信する。電力管理装置173は、例えば、個別調整計画の策定後、調整時刻になる前に、機器が施設内通信によって通信可能である間に調整指示を予め送信する。例えば、需要家施設170から外部に持ちだされている第2機器172は、調整指示を受信した場合、要請された調整指示による調整を全て実施する旨の応答をしてよいし、施設外利用で必要となる容量を残す旨を応答してよい。需給調整は、節電動作、発電動作又は蓄電池の充放電動作等によって行われてよい。
 第2機器172は、電力供給を受ける電力受給装置180又は施設外電力量計114と通信して、調整を開始する前の現在の電力、周波数、及び電圧の各測定値を取得する。第2機器172は、取得した各測定値を需要家施設170内に設置された電力管理装置173に通信部172cを用いて送信する(ステップS157)。第1機器171及び第2機器172は、需給調整を実行する(ステップS158)。
 指定された調整時刻が終了した場合(図16のステップS159)、電力管理装置173は、第1機器171及び第2機器172に対し、通信部173cを用いて需給調整の終了指示を送信する(ステップS160)。第2機器172は、電力受給装置180又は施設外電力量計114と通信し、調整終了時の現在の電力、周波数、及び電圧の測定値を取得する(ステップS161)。
 電力管理装置173は、第2機器172の調整結果を確認する(ステップS162)。電力管理装置173は、需要家施設170内の第1機器171等の調整結果と合算することで集計する(ステップS163)。電力管理装置173は、需要家施設170の各機器の調整結果を、通信部173cを用いてアグリゲータサーバ210に送信する(ステップS164)。
 アグリゲータサーバ210は、各需要家施設からの調整結果を集計する(ステップS165)。アグリゲータサーバ210は、集計した調整結果を、通信部210cを用いて第1電力会社内サーバ150に送信する(ステップS166)。第1電力会社内サーバ150は、その結果を、通信部150cを用いて送配電サーバ140に送信する(ステップS167)。
 本実施形態に係る電力需給調整方法によれば、需要家施設170外に持ち出された第2機器172が電力受給装置180を利用しながら需給調整を行うことができる。本実施形態に係る電力需給調整方法によれば、需要家施設170内の機器だけでなく、需要家施設170外に持ち出された第2機器172も、需要家施設170に対して要請された電力需給調整に寄与しうる。このようにすることで、需要家が電力網110の電力品質の維持に協力し、電力系統6の安定化に寄与しやすくされうる。
 本実施形態に係る電力管理装置173は、図17に示されるように、需給調整機器リストを更新できる。
 電力管理装置173は、管理機器リストを読み出し、管理機器リストに登録された機器である第1機器171及び第2機器172の所在を確認する(ステップS201)。具体的には、電力管理装置173は、それぞれの機器に応じて、手動操作により又は自動で確認してよいし、有線通信又は無線通信の接続状況で確認してよい。ステップS201の確認処理は、需要家施設170内及び需要家施設170外それぞれに所在する機器に対して別々の方法で同時に行われてよい。
 電力管理装置173は、管理機器リストに登録された第1機器171又は第2機器172の中に除外対象機器があるか判定する(ステップS202)。除外対象機器は、所在が確認できない機器、又は需給調整に使えない機器等であってよい。管理機器リストの中に除外対象機器がある場合(ステップS202のYes)、電力管理装置173は、除外対象機器を除いた需給調整機器リストを生成・更新する(ステップS203)。一方、電力管理装置173は、除外対象機器が無い場合(ステップS202のNo)、処理を終了する。
 電力管理装置173は、一定周期毎にこの確認を行うことによって、常に第1機器171及び第2機器172の所在を把握することができる。
 図15から図17を参照して、需要家施設170外で受給装置管理サーバ192が提供する電力受給装置180を使っているときに電力系統6の安定化に用いられる需給調整技術の動作方法について説明してきた。この調整技術が動作している間、受給装置管理サーバ192は何も行わなくてよい。即ち、第1電力会社が需給調整サービスを提供し、且つ、第2電力会社が需給調整サービスを提供しない場合であっても、受給装置管理サーバ192が構築する電力接続サービスは、影響を受けない。
 本実施形態に係る電力管理システム100は、需要家の施設外に設けた電力受給装置180を管理する受給装置管理サーバ192を備える。本実施形態に係る電力管理システム100は、電力網110の電力品質を維持するためのアンシラリー情報を取得する送配電サーバ140を備える。本実施形態に係る電力管理システム100は、電力受給装置180を経由した受電又は給電の開始を申請する需要家の第2機器172を備える。送配電サーバ140は、第2機器172による受電又は開始の申請を、アンシラリー情報に基づいて承認又は却下する。従って、電力網110の電力品質を維持することができる。
(実施形態3)
 図18に示されるように、実施形態3に係る電力管理システム100’は、電力網110と、第1電力量計111と、第2電力量計112と、施設内電力量計113と、施設外電力量計114と、電力系統監視装置115とを備える。電力管理システム100’は、第1発電所120と、第2発電所130と、送配電サーバ140と、第1電力会社内サーバ150と、第2電力会社内サーバ160と、需要家施設170と、電力受給装置180とを備える。電力管理システム100’は、アグリゲータサーバ210と、インターネット等の通信網220とを備える。需要家施設170は、第1機器171と、第2機器172と、電力管理装置173とを備える。
 第1電力会社内サーバ150及び第2電力会社内サーバ160は、実施形態2に係る電力管理システム100が備える認証記憶部200と同様の記憶部を備える。第1電力会社内サーバ150及び第2電力会社内サーバ160以外の構成部については、実施形態2における各構成部と同一であるので、説明を省略する。
 本実施形態に係る電力管理システム100’において、電力受給装置180から第2機器172への電力供給開始方法及び電力供給終了方法が実施されてよい。本実施形態に係る電力供給開始方法及び電力供給終了方法は、第1電力会社内サーバ150が、図11から図13における受給装置管理サーバ192に係る処理も実行することで、実施されてよい。
 本実施形態に係る電力管理システム100’において、電力需給調整方法及び需給調整機器リスト更新方法が実施されてよい。本実施形態に係る電力需給調整方法及び需給調整機器リスト更新方法は、図15から図17の各ステップの処理を実行することで、実施されてよい。
 本実施形態に係る電力管理システム100’は、電力網110の電力品質を維持するためのアンシラリー情報を取得する送配電サーバ140を備える。本実施形態に係る電力管理システム100’は、電力受給装置180を経由した受電又は給電の開始を申請する需要家の第2機器172を備える。送配電サーバ140は、第2機器172による受電又は開始の申請を、アンシラリー情報に基づいて承認又は却下する。従って、電力網110の電力品質を維持することができる。
 本開示に係る構成を諸図面や実施形態に基づき説明してきたが、当業者であれば本開示に基づき種々の変形や修正を行うことが容易であることに注意されたい。従って、これらの変形や修正は本開示の範囲に含まれることに留意されたい。例えば、各構成部、各ステップなどに含まれる機能などは論理的に矛盾しないように再配置可能であり、複数の構成部やステップなどを1つに組み合わせたり、或いは分割したりすることが可能である。
 送配電サーバ140、第1電力会社内サーバ150、第2電力会社内サーバ160、幹事サーバ191、受給装置管理サーバ192、及びアグリゲータサーバ210は、これらの機能の一部又は全てが統合されたサーバ装置とされてよい。送配電サーバ140、第1電力会社内サーバ150、第2電力会社内サーバ160、幹事サーバ191、受給装置管理サーバ192、及びアグリゲータサーバ210は、更に細分化されたサーバ装置とされてよい。これらサーバ装置は、クラウドコンピューティングサービスの形態で提供されてよい。
 本開示に係る構成として装置を中心に説明してきたが、本開示に係る構成は装置の各構成部が実行するステップを含む方法としても実現し得るものである。本開示に係る構成は装置が備えるプロセッサにより実行される方法、プログラム、又はプログラムを記録した記憶媒体としても実現し得るものであり、本開示の範囲にはこれらも包含されるものと理解されたい。
 本開示内容の制御は、プログラム命令を実行可能なコンピュータシステムその他のハードウェアによって実行される、一連の動作として示される。コンピュータシステムその他のハードウェアには、例えば、汎用コンピュータ、PC(Personal Computer)、専用コンピュータ、ワークステーション、またはその他のプログラム可能なデータ処理装置が含まれてよい。各実施形態では、種々の動作は、プログラム命令で実装された専用回路、1つ以上のプロセッサによって実行される論理ブロック、またはプログラムモジュール等によって実行されることに留意されたい。プログラム命令は、ソフトウェアであってよい。専用回路は、例えば、特定機能を実行するために相互接続された個別の論理ゲートであってよい。論理ブロックやプログラムモジュール等を実行する一以上のプロセッサには、例えば、一以上のマイクロプロセッサ、CPU(Central Processing Unit)、ASIC(Application Specific Integrated Circuit)、DSP(Digital Signal Processor)、PLD(Programmable Logic Device)、FPGA(Field Programmable Gate Array)、コントローラ、マイクロコントローラ、電子機器、ここに記載する機能を実行可能に設計されたその他の装置、及び/又は、これらいずれかの組合せが含まれる。ここに示す実施形態は、たとえば、ハードウェア、ソフトウェア、ファームウェア、ミドルウェア、マイクロコードまたはこれらいずれかの組合せによって実装されてよい。
 ここで用いられるネットワークには、他に特段の断りがない限りは、インターネット、アドホックネットワーク、LAN(Local Area Network)、セルラーネットワーク、もしくは他のネットワークまたはこれらいずれかの組合せが含まれてよい。
 1 電力管理システム
 2 第1サーバ(DR要請サーバ)
 21 第1制御部(DR要請処理部)
 22 第1通信部
 3 第2サーバ(需要予測サーバ)
 31 第2制御部(需要予測部)
 32 第2通信部
 4 記憶装置
 5 入力装置
 6 電力系統
 7 電力事業者群
 71 電力事業者サーバ
 8 需要家施設群
 81 需要家施設
 100,100’ 電力管理システム
 110 電力網
 111 第1電力量計
 112 第2電力量計
 113 施設内電力量計
 114 施設外電力量計
 115 電力系統監視装置
 120 第1発電所
 130 第2発電所
 140 送配電サーバ(サーバ装置)
 150 第1電力会社内サーバ
 160 第2電力会社内サーバ
 170 需要家施設
 171 第1機器
 172 第2機器
 173 電力管理装置
 180 電力受給装置
 190 管理サーバ
 191 幹事サーバ
 192 受給装置管理サーバ
 200 認証記憶部
 210 アグリゲータサーバ
 220 通信網

Claims (15)

  1.  複数の需要家施設に対して電力需要の削減を要請する制御部と、
     前記電力需要の削減が要請される要請日と該要請日に要請される電力需要の削減量を示す要請量とを含む要請情報を取得する通信部と
    を備え、
     前記制御部は、
     前記電力需要の相関がある日の分類を示すクラスの中から、前記要請日が属する要請日クラスを決定し、
     所定日数の間の前記要請日クラスに属する日において、前記制御部が前記複数の需要家施設のそれぞれに対して前記電力需要の削減を要請した回数を示す要請回数、及び、前記複数の需要家施設が前記電力需要の削減に参加した回数を示す参加回数の少なくとも一方を前記複数の需要家施設について算出し、
     前記要請回数、及び、前記参加回数の少なくとも一方と、前記要請量とに基づいて、前記複数の需要家施設の中から前記電力需要の削減を要請する対象とする要請先需要家施設を決定する、サーバ。
  2.  前記通信部は、前記複数の需要家施設における電力需要実績データに基づいて生成された前記要請情報を取得する、請求項1に記載のサーバ。
  3.  前記制御部は、前記要請回数、及び、前記参加回数の少なくとも一方に基づいて、前記複数の需要家施設に順位を設定し、該順位に基づいて前記要請先需要家施設を選択する、請求項1又は2に記載のサーバ。
  4.  前記制御部は、前記要請回数、及び、前記参加回数の少なくとも一方が所定回数以下である需要家施設を前記要請先需要家施設として選択する、請求項1乃至3いずれか一項に記載のサーバ。
  5.  前記制御部は、
     電力網の電力品質を維持するためのアンシラリー情報を取得し、
     前記要請先需要家施設の外部に設けられた電力受給装置を経由して行う、前記要請先需要家施設の機器に対する受電又は給電の開始の申請を、前記アンシラリー情報に基づいて承認又は却下する、請求項1乃至4いずれか一項に記載のサーバ。
  6.  複数の需要家施設に対して電力需要の削減を要請する第1サーバと、
     前記電力需要の削減が要請される要請日と該要請日に要請される電力需要の削減量を示す要請量とを含む要請情報を生成する第2サーバと
    を備え、
     前記第1サーバは、第1制御部と、前記第2サーバから前記要請情報を取得する第1通信部と、を備え、
     前記第1制御部は、
     前記電力需要の相関がある日の分類を示すクラスの中から、前記要請日が属する要請日クラスを決定し、
     所定日数の間の前記要請日クラスに属する日において、前記第1サーバが前記複数の需要家施設のそれぞれに対して前記電力需要の削減を要請した回数を示す要請回数、及び、前記複数の需要家施設が前記電力需要の削減に参加した回数を示す参加回数の少なくとも一方を前記複数の需要家施設について算出し、
     前記要請回数、及び、前記参加回数の少なくとも一方と、前記要請量とに基づいて、前記複数の需要家施設の中から前記電力需要の削減を要請する対象とする要請先需要家施設を決定し、
     前記第2サーバは、
     前記複数の需要家施設から電力需要実績データを取得する第2通信部と、
     前記電力需要実績データに基づいて前記要請情報を生成する第2制御部と
    を備える、電力管理システム。
  7.  前記第1通信部は、前記複数の需要家施設における電力需要実績データに基づいて生成された前記要請情報を取得する、請求項6に記載の電力管理システム。
  8.  前記第1制御部は、前記要請回数、及び、前記参加回数の少なくとも一方に基づいて、前記複数の需要家施設に順位を設定し、該順位に基づいて前記要請先需要家施設を選択する、請求項6又は7に記載の電力管理システム。
  9.  前記第1制御部は、前記要請回数、及び、前記参加回数の少なくとも一方が所定回数以下である需要家施設を前記要請先需要家施設として選択する、請求項6乃至8いずれか一項に記載の電力管理システム。
  10.  前記第1制御部は、
     電力網の電力品質を維持するためのアンシラリー情報を取得し、
     前記要請先需要家施設の外部に設けられた電力受給装置を経由して行う、前記要請先需要家施設の機器に対する受電又は給電の開始の申請を、前記アンシラリー情報に基づいて承認又は却下する、請求項6乃至9いずれか一項に記載の電力管理システム。
  11.  複数の需要家施設に対して電力需要の削減を要請するサーバが実行する電力管理方法であって、
     前記電力需要の削減が要請される要請日と該要請日に要請される電力需要の削減量を示す要請量とを含む要請情報を取得する取得ステップと、
     前記電力需要の相関がある日の分類を示すクラスの中から、前記要請日が属する要請日クラスを決定するクラス決定ステップと、
     所定日数の間の前記要請日クラスに属する日において、前記サーバが前記複数の需要家施設のそれぞれに対して前記電力需要の削減を要請した回数を示す要請回数、及び、前記複数の需要家施設が前記電力需要の削減に参加した回数を示す参加回数の少なくとも一方を前記複数の需要家施設について算出する算出ステップと、
     前記要請回数、及び、前記参加回数の少なくとも一方と、前記要請量とに基づいて、前記複数の需要家施設の中から前記電力需要の削減を要請する対象とする要請先需要家施設を選択する選択ステップと
    を含む電力管理方法。
  12.  前記取得ステップにおいて、
     前記複数の需要家施設における電力需要実績データに基づいて生成された前記要請情報を取得する、請求項11に記載の電力管理方法。
  13.  前記選択ステップにおいて、
     前記要請回数、及び、前記参加回数の少なくとも一方に基づいて、前記複数の需要家施設に順位を設定し、該順位に基づいて前記要請先需要家施設を選択する、請求項11又は12に記載の電力管理方法。
  14.  前記選択ステップにおいて、
     前記要請回数、及び、前記参加回数の少なくとも一方が所定回数以下である需要家施設を前記要請先需要家施設として選択する、請求項11乃至13いずれか一項に記載の電力管理方法。
  15.  電力網の電力品質を維持するためのアンシラリー情報を取得するステップと、
     前記要請先需要家施設の外部に設けられた電力受給装置を経由して行う、前記要請先需要家施設の機器に対する受電又は給電の開始の申請を、前記アンシラリー情報に基づいて承認又は却下するステップと
    をさらに含む、請求項11乃至14いずれか一項に記載の電力管理方法。
PCT/JP2016/003074 2015-06-26 2016-06-24 サーバ、電力管理システム、及び電力管理方法 WO2016208206A1 (ja)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP2015129181A JP6664156B2 (ja) 2015-06-26 2015-06-26 電力管理方法、電力管理システム及びサーバ装置
JP2015-129181 2015-06-26
JP2015-146830 2015-07-24
JP2015146830A JP2017027448A (ja) 2015-07-24 2015-07-24 デマンドレスポンス要請方法、デマンドレスポンス要請サーバ、及びデマンドレスポンス要請システム

Publications (1)

Publication Number Publication Date
WO2016208206A1 true WO2016208206A1 (ja) 2016-12-29

Family

ID=57584771

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/003074 WO2016208206A1 (ja) 2015-06-26 2016-06-24 サーバ、電力管理システム、及び電力管理方法

Country Status (1)

Country Link
WO (1) WO2016208206A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111260354A (zh) * 2020-01-23 2020-06-09 广东电力信息科技有限公司 一种多时序多品种电力市场下的电费结算方法和相关装置

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012120623A1 (ja) * 2011-03-07 2012-09-13 株式会社日立製作所 エネルギー消費管理のためのシステム、方法及びコンピュータプログラム
WO2013084268A1 (ja) * 2011-12-09 2013-06-13 株式会社日立製作所 異主体間連携による資源融通方式
WO2014002199A1 (ja) * 2012-06-27 2014-01-03 株式会社日立製作所 分散型資源配分における資源配分交渉方法、交渉規則検査方法
JP5727063B1 (ja) * 2014-02-27 2015-06-03 株式会社東芝 エネルギー管理装置、エネルギー管理システム、エネルギー管理方法およびプログラム

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012120623A1 (ja) * 2011-03-07 2012-09-13 株式会社日立製作所 エネルギー消費管理のためのシステム、方法及びコンピュータプログラム
WO2013084268A1 (ja) * 2011-12-09 2013-06-13 株式会社日立製作所 異主体間連携による資源融通方式
WO2014002199A1 (ja) * 2012-06-27 2014-01-03 株式会社日立製作所 分散型資源配分における資源配分交渉方法、交渉規則検査方法
JP5727063B1 (ja) * 2014-02-27 2015-06-03 株式会社東芝 エネルギー管理装置、エネルギー管理システム、エネルギー管理方法およびプログラム

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111260354A (zh) * 2020-01-23 2020-06-09 广东电力信息科技有限公司 一种多时序多品种电力市场下的电费结算方法和相关装置
CN111260354B (zh) * 2020-01-23 2023-05-02 广东电力信息科技有限公司 一种多时序多品种电力市场下的电费结算方法和相关装置

Similar Documents

Publication Publication Date Title
CN109002957B (zh) 具有经济负载需求响应(eldr)优化的建筑物能量优化系统
Sun et al. Optimal charging operation of battery swapping and charging stations with QoS guarantee
Xi et al. Using price-based signals to control plug-in electric vehicle fleet charging
EP4287441A2 (en) Systems for machine learning, optimising and managing local multi-asset flexibility of distributed energy storage resources
KR20200100626A (ko) 에너지 저장 시스템의 최적의 제어를 위한 시스템 및 방법
JP6028102B2 (ja) 電力系統制御装置、電力系統システムおよび電力系統制御方法
US10916945B2 (en) Demand and supply adjustment system, control apparatus, control method, and program
WO2018200861A1 (en) Building energy system with stochastic model predictive control
JP6257538B2 (ja) 電力需給調整要請量決定装置及びその方法
EP3245704A1 (en) Energy storage controller with battery life model
US11949269B2 (en) Management server, management system, and management method
JP6899807B2 (ja) 各蓄電池の充放電電力量を制御するアグリゲータ装置、プログラム及び需給調整方法
US10103575B2 (en) Power interchange management system and power interchange management method for maintaining a balance between power supply and demand
AU2017263912B2 (en) Charge/discharge planning system, planning method, and program
CN111066055A (zh) 用于能量需求响应的整合分配
JP6616556B1 (ja) 電力情報管理システム、管理方法、プログラム、電力情報管理サーバ、通信端末、及び、電力システム
JP2017027448A (ja) デマンドレスポンス要請方法、デマンドレスポンス要請サーバ、及びデマンドレスポンス要請システム
JP6129768B2 (ja) 需要家機器運用管理システムおよび方法
CN109768560B (zh) 提供多服务的蓄电池的充放电控制装置及方法
JP2023504564A (ja) 分散型エネルギーリソースをアグリゲーションするシステム及び装置
Kong et al. Joint rate control and demand balancing for electric vehicle charging
Liu et al. Dynamic energy trading and load scheduling algorithm for the end-user in smart grid
Huang et al. Optimal smart grid tariffs
WO2016208206A1 (ja) サーバ、電力管理システム、及び電力管理方法
JP6942295B1 (ja) 充放電計画作成装置、指令装置、電力系統管理システム、端末装置、蓄電システム、充放電システム、蓄電池、電気自動車、充放電計画作成方法および充放電計画作成プログラム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16813977

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16813977

Country of ref document: EP

Kind code of ref document: A1