JP6616556B1 - 電力情報管理システム、管理方法、プログラム、電力情報管理サーバ、通信端末、及び、電力システム - Google Patents
電力情報管理システム、管理方法、プログラム、電力情報管理サーバ、通信端末、及び、電力システム Download PDFInfo
- Publication number
- JP6616556B1 JP6616556B1 JP2019542741A JP2019542741A JP6616556B1 JP 6616556 B1 JP6616556 B1 JP 6616556B1 JP 2019542741 A JP2019542741 A JP 2019542741A JP 2019542741 A JP2019542741 A JP 2019542741A JP 6616556 B1 JP6616556 B1 JP 6616556B1
- Authority
- JP
- Japan
- Prior art keywords
- power
- amount
- supply
- demand
- facility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000007726 management method Methods 0.000 title claims description 320
- 238000004891 communication Methods 0.000 title claims description 74
- 238000010248 power generation Methods 0.000 claims abstract description 36
- 230000005540 biological transmission Effects 0.000 claims description 133
- 238000012937 correction Methods 0.000 claims description 52
- 230000002596 correlated effect Effects 0.000 claims description 17
- 230000000875 corresponding effect Effects 0.000 claims description 11
- 230000005611 electricity Effects 0.000 description 29
- 238000000034 method Methods 0.000 description 29
- 238000006243 chemical reaction Methods 0.000 description 28
- 230000010365 information processing Effects 0.000 description 28
- 238000012545 processing Methods 0.000 description 28
- 230000004308 accommodation Effects 0.000 description 20
- 230000014759 maintenance of location Effects 0.000 description 18
- 238000012544 monitoring process Methods 0.000 description 17
- 230000008569 process Effects 0.000 description 12
- 238000013480 data collection Methods 0.000 description 11
- 238000004364 calculation method Methods 0.000 description 10
- 239000000470 constituent Substances 0.000 description 9
- 230000001276 controlling effect Effects 0.000 description 9
- 230000006870 function Effects 0.000 description 8
- 230000000717 retained effect Effects 0.000 description 7
- 238000009825 accumulation Methods 0.000 description 5
- 230000007423 decrease Effects 0.000 description 5
- 230000015556 catabolic process Effects 0.000 description 4
- 238000007599 discharging Methods 0.000 description 4
- 230000009466 transformation Effects 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 230000006835 compression Effects 0.000 description 2
- 238000007906 compression Methods 0.000 description 2
- 230000003247 decreasing effect Effects 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 2
- 230000004044 response Effects 0.000 description 2
- 238000004804 winding Methods 0.000 description 2
- 230000003213 activating effect Effects 0.000 description 1
- 239000004020 conductor Substances 0.000 description 1
- 230000001186 cumulative effect Effects 0.000 description 1
- 239000006185 dispersion Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 239000007789 gas Substances 0.000 description 1
- 239000001257 hydrogen Substances 0.000 description 1
- 229910052739 hydrogen Inorganic materials 0.000 description 1
- 125000004435 hydrogen atom Chemical class [H]* 0.000 description 1
- 238000010295 mobile communication Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L53/00—Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
- B60L53/60—Monitoring or controlling charging stations
- B60L53/65—Monitoring or controlling charging stations involving identification of vehicles or their battery types
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/007—Regulation of charging or discharging current or voltage
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00002—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by monitoring
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/003—Load forecast, e.g. methods or systems for forecasting future load demand
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
- H02J3/144—Demand-response operation of the power transmission or distribution network
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
- H02J3/32—Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/10—Power transmission or distribution systems management focussing at grid-level, e.g. load flow analysis, node profile computation, meshed network optimisation, active network management or spinning reserve management
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
- H02J3/32—Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
- H02J3/322—Arrangements for balancing of the load in a network by storage of energy using batteries with converting means the battery being on-board an electric or hybrid vehicle, e.g. vehicle to grid arrangements [V2G], power aggregation, use of the battery for network load balancing, coordinated or cooperative battery charging
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/60—Other road transportation technologies with climate change mitigation effect
- Y02T10/70—Energy storage systems for electromobility, e.g. batteries
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/60—Other road transportation technologies with climate change mitigation effect
- Y02T10/7072—Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02T90/10—Technologies relating to charging of electric vehicles
- Y02T90/12—Electric charging stations
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02T90/10—Technologies relating to charging of electric vehicles
- Y02T90/16—Information or communication technologies improving the operation of electric vehicles
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02T90/10—Technologies relating to charging of electric vehicles
- Y02T90/16—Information or communication technologies improving the operation of electric vehicles
- Y02T90/167—Systems integrating technologies related to power network operation and communication or information technologies for supporting the interoperability of electric or hybrid vehicles, i.e. smartgrids as interface for battery charging of electric vehicles [EV] or hybrid vehicles [HEV]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/12—Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
- Y04S10/126—Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving electric vehicles [EV] or hybrid vehicles [HEV], i.e. power aggregation of EV or HEV, vehicle to grid arrangements [V2G]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S30/00—Systems supporting specific end-user applications in the sector of transportation
- Y04S30/10—Systems supporting the interoperability of electric or hybrid vehicles
- Y04S30/14—Details associated with the interoperability, e.g. vehicle recognition, authentication, identification or billing
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- Primary Health Care (AREA)
- General Business, Economics & Management (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Public Health (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Water Supply & Treatment (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Transportation (AREA)
- Mechanical Engineering (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
[先行技術文献]
[特許文献]
[特許文献1] 特開2014−057495号公報
図1は、エネルギ管理システム100のシステム構成の一例を概略的に示す。本実施形態において、エネルギ管理システム100は、共同体102を構成する複数の機器(単に、共同体102と称される場合がある。)と、共同体104を構成する複数の機器(単に、共同体104と称される場合がある。)と、共同体106を構成する複数の機器(単に、共同体106と称される場合がある。)とを備える。エネルギ管理システム100は、広域管理サーバ180を備えてもよい。
エネルギ管理システム100の各部は、ハードウェアにより実現されてもよく、ソフトウエアにより実現されてもよく、ハードウェア及びソフトウエアにより実現されてもよい。エネルギ管理システム100の各部は、その少なくとも一部が、単一のサーバによって実現されてもよく、複数のサーバによって実現されてもよい。エネルギ管理システム100の各部は、その少なくとも一部が、仮想マシン上又はクラウドシステム上で実現されてもよい。エネルギ管理システム100の各部は、その少なくとも一部が、パーソナルコンピュータ又は携帯端末によって実現されてもよい。携帯端末としては、携帯電話、スマートフォン、PDA、タブレット、ノートブック・コンピュータ又はラップトップ・コンピュータ、ウエアラブル・コンピュータなどが例示される。エネルギ管理システム100の各部は、ブロックチェーンなどの分散型台帳技術又は分散型ネットワークを利用して、情報を格納してもよい。
図2は、需給家施設112の内部構成の一例を概略的に示す。本実施形態において、需給家施設112は、1以上の電力負荷210と、電源設備220とを備える。需給家施設112は、配分電設備230と、コントローラ240と、1以上の需給家端末250とを備えてもよい。本実施形態において、電源設備220は、1以上の発電装置222と、1以上の蓄電装置224とを備える。なお、需給家施設112は、上記の構成要素の少なくとも1つを備えなくてもよい。一実施形態において、需給家施設112は、電源設備220を備えなくてよい。他の実施形態において、需給家施設112は、発電装置222及び蓄電装置224の一方を備えなくてもよい。他の実施形態において、需給家施設112は、需給家端末250を備えなくてもよい。なお、需給家施設114は、需給家施設112と同様の構成を有してよい。
図4は、エネルギ管理設備140の内部構成の一例を概略的に示す。本実施形態において、エネルギ管理設備140は、電源設備220と、配分電設備230と、共同体管理サーバ440とを備える。共同体管理サーバ440は、電力情報管理システム、電力情報管理サーバ、及び、電力システムの一例であってよい。
本実施形態において、共同体管理サーバ440は、共同体102で利用されるエネルギを管理する。例えば、共同体管理サーバ440は、共同体102で利用される電力を管理する。共同体管理サーバ440は、共同体102の電力需給を管理する。共同体管理サーバ440は、共同体102の内部における電力融通を管理してよい。共同体管理サーバ440は、共同体102と、他の共同体との間における電力融通を管理してよい。
共同体管理サーバ440は、ハードウェアにより実現されてもよく、ソフトウエアにより実現されてもよく、ハードウェア及びソフトウエアにより実現されてもよい。共同体管理サーバ440を構成する構成要素の少なくとも一部がソフトウエアにより実現される場合、当該ソフトウエアにより実現される構成要素は、一般的な構成の情報処理装置において、当該構成要素に関する動作を規定したプログラムを起動することにより実現されてよい。
図6は、需給管理部540の内部構成の一例を概略的に示す。本実施形態において、需給管理部540は、要求処理部620と、システム制御部630と、請求管理部640と、ポイント管理部650とを備える。本実施形態において、ポイント管理部650は、電力量取得部652と、ポイント換算部654と、保有量管理部656とを有する。
本実施形態において、調整量決定部740は、ポイントの保有期間に関する情報に基づいて、調整量を決定する。上述のとおり、ポイントの保有期間に関する情報としては、ポイントの保有期間を示す情報、ポイントの保有期間における電力需給に関する情報などが例示される。
本実施形態において、調整量決定部740は、特定の時点における、共同体102の電力需給の状況に基づいて、調整量を決定する。例えば、調整量決定部740は、特定の時点における共同体102の電力需給が逼迫しているほど、調整量が大きくなるように、調整量を決定する。調整量決定部740は、特定の時点における共同体102の電力需給が逼迫しているほど、調整量が小さくなるように、調整量を決定してもよい。
本実施形態において、調整量決定部740は、電力が送配電網122に供給された時点における、共同体102の電力需給の状況に基づいて、調整量を決定する。例えば、調整量決定部740は、電力が送配電網122に供給された時点における共同体102の電力需給が逼迫しているほど、調整量が大きくなるように、調整量を決定する。調整量決定部740は、電力が送配電網122に供給された時点における共同体102の電力需給が逼迫しているほど、調整量が小さくなるように、調整量を決定してもよい。
Claims (18)
- 発電設備及び蓄電設備の少なくとも一方を備えた電力需給家が外部に供給した電力量である外部供給電力量と相関する供給電力相関量を取得する供給情報取得部と、
前記電力需給家が外部から受領した電力量である外部受領電力量と相関する受領電力相関量を取得する受領情報取得部と、
前記電力需給家が使用、収益又は処分することのできる電力量と相関し、前記電力需給家が利用することのできる利用可能電力相関量を決定する利用可能量決定部と、
を備え、
前記利用可能量決定部は、(A)前記供給電力相関量と、(B)前記受領電力相関量と、(C)(i)前記電力需給家が電力を外部に供給した時点から、又は、(ii)前記供給電力相関量と前記受領電力相関量との差が予め定められた第1条件を満足した時点から、特定の時点までの期間である経過期間に関する情報と、に基づいて、前記特定の時点における前記利用可能電力相関量を決定する、
電力情報管理システム。 - 前記外部供給電力量は、前記電力需給家が外部に供給する電力量であって、前記電力需給家の外部に配された蓄電設備が受領する電力量に相当する電力量であり、
前記外部受領電力量は、前記電力需給家が外部から受領する電力量であって、前記電力需給家の外部に配された蓄電設備から供給される電力量に相当する電力量である、
請求項1に記載の電力情報管理システム。 - 前記電力需給家が外部から電力を受領することの許否を決定する受領許可部をさらに備え、
前記受領許可部は、前記利用可能電力相関量の範囲内で、外部からの電力の受領を許可する、
請求項1又は請求項2に記載の電力情報管理システム。 - 前記利用可能量決定部は、(D)前記供給電力相関量から、前記受領電力相関量を減算して得られた量と、(E)前記経過期間に関する情報に基づいて決定される補正量と、に基づいて、前記利用可能電力相関量を決定する、
請求項1から請求項3までの何れか一項に記載の電力情報管理システム。 - 前記利用可能量決定部は、前記補正量を決定する補正量決定部を有し、
前記補正量決定部は、前記経過期間の長さが長いほど、補正後の前記利用可能電力相関量が小さくなるように、前記補正量を決定する、
請求項4に記載の電力情報管理システム。 - 前記利用可能量決定部は、
前記補正量を決定する補正量決定部と、
電力需給の状況に関する情報を取得する需給状況取得部と、
を有し、
前記補正量決定部は、前記経過期間において前記需給状況取得部が取得した電力需給の状況に関する前記情報に基づいて、前記補正量を決定する、
請求項4に記載の電力情報管理システム。 - 前記需給状況取得部は、前記電力需給家が所属する共同体の電力需給の状況に関する情報を取得し、
前記利用可能量決定部は、前記経過期間における前記共同体の電力需給の逼迫具合に基づいて、前記補正量を決定する、
請求項6に記載の電力情報管理システム。 - 発電設備及び蓄電設備の少なくとも一方を備えた電力需給家が外部に供給した電力量である外部供給電力量と相関する供給電力相関量を取得する供給情報取得部と、
前記電力需給家が外部から受領した電力量である外部受領電力量と相関する受領電力相関量を取得する受領情報取得部と、
電力需給の状況に関する情報を取得する需給状況取得部と、
前記電力需給家が使用、収益又は処分することのできる電力量と相関し、前記電力需給家が利用することのできる利用可能電力相関量を決定する利用可能量決定部と
を備え、
前記利用可能量決定部は、(A)前記供給電力相関量と、(B)前記受領電力相関量と、(F)前記需給状況取得部が取得した、特定の時点における電力需給の状況に関する前記情報とに基づいて、前記特定の時点における前記利用可能電力相関量を決定する、
電力情報管理システム。 - 前記利用可能量決定部は、
前記特定の時点における電力需給の状況に関する前記情報に基づいて、前記利用可能電力相関量の補正量を決定する補正量決定部と、
前記供給電力相関量から、前記受領電力相関量を減算して得られた量と、前記補正量とに基づいて、前記利用可能電力相関量を決定する補正部と、
を有する、
請求項8に記載の電力情報管理システム。 - 発電設備及び蓄電設備の少なくとも一方を備えた電力需給家が外部に供給した電力量である外部供給電力量と相関する供給電力相関量を取得する供給情報取得部と、
前記電力需給家が外部から受領した電力量である外部受領電力量と相関する受領電力相関量を取得する受領情報取得部と、
電力需給の状況に関する情報を取得する需給状況取得部と、
前記電力需給家が使用、収益又は処分することのできる電力量と相関し、前記電力需給家が利用することのできる利用可能電力相関量を決定する利用可能量決定部と
を備え、
前記利用可能量決定部は、(A)前記供給電力相関量と、(B)前記受領電力相関量と、(G)前記需給状況取得部が取得した、前記電力需給家が電力を外部に供給した時点における電力需給の状況に関する前記情報とに基づいて、前記利用可能電力相関量を決定する、
電力情報管理システム。 - 前記利用可能量決定部は、
前記電力需給家が電力を外部に供給した前記時点における前記電力需給の状況に関する前記情報に基づいて、前記利用可能電力相関量の補正量を決定する補正量決定部と、
前記供給電力相関量から、前記受領電力相関量を減算して得られた量と、前記補正量とに基づいて、前記利用可能電力相関量を決定する補正部と、
を有する、
請求項10に記載の電力情報管理システム。 - 前記補正部は、前記供給電力相関量から、前記受領電力相関量を減算して得られた量と、前記補正量とを合計して、前記電力需給家が利用可能な電力相関量を決定し、
前記補正量決定部は、前記電力需給が逼迫するほど、補正後の前記利用可能電力相関量が小さくなるように、前記補正量を決定する、
請求項9又は請求項11に記載の電力情報管理システム。 - 発電設備及び蓄電設備の少なくとも一方を備えた電力需給家が外部に供給した電力量である外部供給電力量と相関する供給電力相関量を取得する供給情報取得段階と、
前記電力需給家が外部から受領した電力量である外部受領電力量と相関する受領電力相関量を取得する受領情報取得段階と、
前記電力需給家が使用、収益又は処分することのできる電力量と相関し、前記電力需給家が利用することのできる利用可能電力相関量を決定する利用可能量決定段階と、
を有し、
前記利用可能量決定段階は、(A)前記供給電力相関量と、(B)前記受領電力相関量と、(C)(i)前記電力需給家が電力を外部に供給した時点から、又は、(ii)前記供給電力相関量と前前記受領電力相関量との差が予め定められた第1条件を満足した時点から、特定の時点までの期間である経過期間に関する情報と、に基づいて、前記特定の時点における前記利用可能電力相関量を決定する段階を含む、
電力情報の管理方法。 - コンピュータに、請求項13に記載された電力情報の管理方法を実行させるためのプログラム。
- 発電設備及び蓄電設備の少なくとも一方を備えた電力需給家が外部に供給した電力量である外部供給電力量と相関する供給電力相関量を取得する供給情報取得部と、
前記電力需給家が外部から受領した電力量である外部受領電力量と相関する受領電力相関量を取得する受領情報取得部と、
前記電力需給家が使用、収益又は処分することのできる電力量と相関し、前記電力需給家が利用することのできる利用可能電力相関量を決定する利用可能量決定部と、
を備え、
前記利用可能量決定部は、(A)前記供給電力相関量と、(B)前記受領電力相関量と、(C)(i)前記電力需給家が電力を外部に供給した時点から、又は、(ii)前記供給電力相関量と前前記受領電力相関量との差が予め定められた第1条件を満足した時点から、特定の時点までの期間である経過期間に関する情報と、に基づいて、前記特定の時点における前記利用可能電力相関量を決定する、
電力情報管理サーバ。 - 発電設備及び蓄電設備の少なくとも一方を備えた電力需給家において利用される通信端末であって、
前記電力需給家が外部に供給した電力量である外部供給電力量と相関する供給電力相関量を取得する供給情報取得部と、
前記電力需給家が外部から受領した電力量である外部受領電力量と相関する受領電力相関量を取得する受領情報取得部と、
前記電力需給家が使用、収益又は処分することのできる電力量と相関し、前記電力需給家が利用することのできる利用可能電力相関量を決定する利用可能量決定部と、
を備え、
前記利用可能量決定部は、(A)前記供給電力相関量と、(B)前記受領電力相関量と、(C)(i)前記電力需給家が電力を外部に供給した時点から、又は、(ii)前記供給電力相関量と前記受領電力相関量との差が予め定められた第1条件を満足した時点から、特定の時点までの期間である経過期間に関する情報と、に基づいて、前記特定の時点における前記利用可能電力相関量を決定する、
通信端末。 - 請求項1から請求項12までの何れか一項に記載の電力情報管理システムと、
複数の電力需給家のそれぞれに配された複数の前記発電設備及び複数の前記蓄電設備のうちの少なくとも2つが、電気的に接続されて構成された電源システムと、
を備え、
前記電力情報管理システムの前記供給情報取得部は、前記複数の電力需給家のそれぞれについて、各電力需給家が前記電源システムに供給した電力量と相関する供給電力相関量を取得し、
前記電力情報管理システムの前記受領情報取得部は、前記複数の電力需給家のそれぞれについて、各電力需給家が前記電源システムから受領した電力量と相関する受領電力相関量を取得し、
前記電力情報管理システムの前記利用可能量決定部は、前記複数の電力需給家のそれぞれについて、各電力需給家の前記供給電力相関量及び前記受領電力相関量に基づいて、各電力需給家の利用可能電力相関量を決定する、
電力システム。 - 前記複数の電力需給家の1つが前記電源システムからの電力の受領を希望していることを示す情報を取得する要求取得部と、
前記電源システムと、前記複数の電力需給家のそれぞれとの間の電力の送受を制御する送受電制御部と、
を備え、
前記送受電制御部は、前記複数の電力需給家の前記1つの利用可能電力相関量と相関する電力量の範囲内で、前記電源システムから前記複数の電力需給家の前記1つへの送電を許可する、
請求項17に記載の電力システム。
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2018052844 | 2018-03-20 | ||
JP2018052844 | 2018-03-20 | ||
PCT/JP2019/011716 WO2019182016A1 (ja) | 2018-03-20 | 2019-03-20 | 電力情報管理システム、管理方法、プログラム、電力情報管理サーバ、通信端末、及び、電力システム |
Publications (2)
Publication Number | Publication Date |
---|---|
JP6616556B1 true JP6616556B1 (ja) | 2019-12-04 |
JPWO2019182016A1 JPWO2019182016A1 (ja) | 2020-04-30 |
Family
ID=67987273
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2019542741A Active JP6616556B1 (ja) | 2018-03-20 | 2019-03-20 | 電力情報管理システム、管理方法、プログラム、電力情報管理サーバ、通信端末、及び、電力システム |
Country Status (5)
Country | Link |
---|---|
US (1) | US10778028B2 (ja) |
EP (1) | EP3771060B1 (ja) |
JP (1) | JP6616556B1 (ja) |
CN (1) | CN111903027A (ja) |
WO (1) | WO2019182016A1 (ja) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019182016A1 (ja) * | 2018-03-20 | 2019-09-26 | 本田技研工業株式会社 | 電力情報管理システム、管理方法、プログラム、電力情報管理サーバ、通信端末、及び、電力システム |
JP6618659B1 (ja) * | 2018-12-10 | 2019-12-11 | 三菱電機株式会社 | 電力変換システム及びその管理装置、並びに、分散電源装置 |
CN112776649B (zh) * | 2020-12-30 | 2023-04-07 | 爱驰汽车有限公司 | 电动车辆的充电方法、充电桩、电池管理系统及介质 |
CN113612280B (zh) * | 2021-08-04 | 2023-08-04 | 南方电网电动汽车服务有限公司 | 功率控制方法、能量路由器、功率控制系统及存储介质 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012210073A (ja) * | 2011-03-30 | 2012-10-25 | Sony Corp | 充放電制御装置、電力管理装置、電力管理方法および電力管理システム |
JP2014057495A (ja) * | 2012-09-14 | 2014-03-27 | Lifenet Co Ltd | 電力管理システムおよび電力管理方法 |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2008117392A1 (ja) * | 2007-03-26 | 2008-10-02 | Vpec, Inc. | 電力システム |
US9114721B2 (en) * | 2010-05-25 | 2015-08-25 | Mitsubishi Electric Corporation | Electric power information management apparatus, electric power information management system, and electric power information management method |
JP5487125B2 (ja) * | 2011-01-11 | 2014-05-07 | 株式会社東芝 | 電力需給調整予備力取引システムおよび電力需給調整予備力取引方法 |
JP5857646B2 (ja) * | 2011-11-10 | 2016-02-10 | ソニー株式会社 | 電力管理装置、電力管理方法およびデマンド通知装置 |
JP7008503B2 (ja) * | 2015-08-31 | 2022-01-25 | シャープ株式会社 | 電力情報管理装置、電力情報管理システム、および、電力情報管理方法 |
JP2017153274A (ja) * | 2016-02-25 | 2017-08-31 | オムロン株式会社 | 電力取引マッチングシステム、電力取引マッチング方法および電力取引マッチングプログラム |
JP6172345B1 (ja) * | 2016-06-17 | 2017-08-02 | 積水ハウス株式会社 | エネルギーマネジメントシステム |
WO2019182016A1 (ja) * | 2018-03-20 | 2019-09-26 | 本田技研工業株式会社 | 電力情報管理システム、管理方法、プログラム、電力情報管理サーバ、通信端末、及び、電力システム |
-
2019
- 2019-03-20 WO PCT/JP2019/011716 patent/WO2019182016A1/ja unknown
- 2019-03-20 JP JP2019542741A patent/JP6616556B1/ja active Active
- 2019-03-20 CN CN201980019582.9A patent/CN111903027A/zh active Pending
- 2019-03-20 EP EP19772307.5A patent/EP3771060B1/en active Active
-
2020
- 2020-01-13 US US16/741,710 patent/US10778028B2/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012210073A (ja) * | 2011-03-30 | 2012-10-25 | Sony Corp | 充放電制御装置、電力管理装置、電力管理方法および電力管理システム |
JP2014057495A (ja) * | 2012-09-14 | 2014-03-27 | Lifenet Co Ltd | 電力管理システムおよび電力管理方法 |
Also Published As
Publication number | Publication date |
---|---|
CN111903027A (zh) | 2020-11-06 |
WO2019182016A1 (ja) | 2019-09-26 |
US20200153254A1 (en) | 2020-05-14 |
US10778028B2 (en) | 2020-09-15 |
JPWO2019182016A1 (ja) | 2020-04-30 |
EP3771060B1 (en) | 2023-02-22 |
EP3771060A1 (en) | 2021-01-27 |
EP3771060A4 (en) | 2021-12-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6616556B1 (ja) | 電力情報管理システム、管理方法、プログラム、電力情報管理サーバ、通信端末、及び、電力システム | |
US11993171B2 (en) | Method and apparatus for charging a battery using local power grid topology information | |
Patil et al. | Grid integration of electric vehicles for economic benefits: A review | |
US20230356605A1 (en) | Method and apparatus for charging a battery from an isolatable electric power grid | |
US10727784B2 (en) | Aggregation system, control method thereof, and control apparatus | |
JP6740505B2 (ja) | エネルギシステム、エネルギ管理サーバ、エネルギ管理方法、及び、プログラム | |
Jin et al. | Optimizing electric vehicle charging with energy storage in the electricity market | |
Falvo et al. | Electric vehicles integration in demand response programs | |
JP5355147B2 (ja) | 排出係数算定器および排出係数算定方法 | |
JP5616385B2 (ja) | 電力系統制御装置及び電力系統制御方法 | |
JP6945723B2 (ja) | 電力融通装置、プログラム及び電力融通方法 | |
JP7053795B2 (ja) | 条件決定装置、プログラム及び条件決定方法 | |
JP6920748B2 (ja) | 仮想電力システム、プログラム、管理サーバ及び情報端末 | |
JP7102182B2 (ja) | 電力システム、制御装置、電力管理方法、プログラム、及び、電力管理サーバ | |
JP2018098951A (ja) | 電力制御システム、電力制御方法および管理制御センター装置 | |
Liu et al. | A dynamic energy trading and management algorithm for the elastic end-user in smart grids | |
JP7162819B2 (ja) | 電力制御装置、電力制御システム及び電力制御方法 | |
Papadopoulos et al. | Analysis of an electric vehicle agent based management model |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20190807 |
|
A871 | Explanation of circumstances concerning accelerated examination |
Free format text: JAPANESE INTERMEDIATE CODE: A871 Effective date: 20190807 |
|
A975 | Report on accelerated examination |
Free format text: JAPANESE INTERMEDIATE CODE: A971005 Effective date: 20190930 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20191008 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20191107 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6616556 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |