WO2016046996A1 - 電力系統監視制御システムおよび電力系統監視制御プログラム - Google Patents

電力系統監視制御システムおよび電力系統監視制御プログラム Download PDF

Info

Publication number
WO2016046996A1
WO2016046996A1 PCT/JP2014/079795 JP2014079795W WO2016046996A1 WO 2016046996 A1 WO2016046996 A1 WO 2016046996A1 JP 2014079795 W JP2014079795 W JP 2014079795W WO 2016046996 A1 WO2016046996 A1 WO 2016046996A1
Authority
WO
WIPO (PCT)
Prior art keywords
power system
database
monitoring control
equipment
facility
Prior art date
Application number
PCT/JP2014/079795
Other languages
English (en)
French (fr)
Inventor
雄二 福田
仁 和佐田
和哉 大瀧
博隆 岩橋
眞稔 島田
秀徳 山下
Original Assignee
株式会社 東芝
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社 東芝 filed Critical 株式会社 東芝
Publication of WO2016046996A1 publication Critical patent/WO2016046996A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/30State monitoring, e.g. fault, temperature monitoring, insulator monitoring, corona discharge

Definitions

  • Embodiments of the present invention relate to a power system monitoring control system and a power system monitoring control program for monitoring a power system from a remote location.
  • monitoring control of power system facilities is performed based on a facility database, which is a database related to power system facilities.
  • a facility database which is a database related to power system facilities.
  • the current equipment database is updated, and the changed equipment database is stored in a storage area different from the current equipment database.
  • the operation check using the monitoring control function simulated in the test part is performed. If it is confirmed by the operation check that the equipment database has been correctly changed, the equipment database after the change is operated in the power system monitoring system.
  • monitoring and control of the power system by the monitoring control means based on the current equipment database is terminated. And the equipment database after a change is read, and monitoring and control of the electric power system by the monitoring control means based on the equipment database after a change are restarted.
  • operation bases managed by each monitoring control server are set in advance. Since the maintenance server manages the power system equipment of each operation base in association with the monitoring control server that has jurisdiction over the power system equipment, the monitoring control server could not monitor and control the operation base outside the jurisdiction .
  • the embodiment of the present invention has been proposed in order to solve the problems of the prior art as described above. Its purpose is to provide a power system monitoring control system and a power system monitoring control program that prevent the monitoring control function of the power system from being impaired and also enable the monitoring control server to monitor and control operation bases outside the jurisdiction. It is to be.
  • a power system monitoring and control system is based on a facility database that is information related to a plurality of power system facilities at a plurality of operation bases.
  • the maintenance control server that updates the equipment database, the plurality of operation bases, the plurality of monitoring control servers, and the maintenance server are connected via a network,
  • the maintenance server includes a change data extraction unit that extracts change data for the facility database, an operation start date extraction unit that extracts information about an operation start date included in the change data extracted by the change data extraction unit, and the operation start Based on the information about the operation start date extracted by the date extraction unit, the change data is time-sequentially Having a integration unit that integrates the serial equipment database.
  • each said form can also be grasped
  • FIG. 1 is a configuration diagram illustrating an example of a power system monitoring control system according to the present embodiment.
  • a maintenance server M a plurality of monitoring control servers 1A to 1E, and a plurality of operation bases 2A to 2E are connected via a power monitoring control network N.
  • the maintenance server M is a processing unit that updates the current equipment database, which is a database related to the current power system equipment.
  • the facility database of the present embodiment is a time series integrated facility database of the operation bases 2A to 2E.
  • the monitoring control servers 1A to 1E are processing units that perform monitoring control of the power system equipment based on the equipment database output from the maintenance server M.
  • the operation bases 2A to 2E have a plurality of power system facilities, and output the control information output by the monitoring control servers 1A to 1E to the power system, and monitor the status of the power system facilities and measured data from the monitoring control servers 1A to 1E. 1E is included.
  • the equipment database includes information such as operation start date, power system equipment, jurisdiction operation base, monitoring control operation base, and monitoring control information as shown in the example of FIG.
  • the operation start date is information on the date and time when the power system facility is changed. For example, the date when the generator is added / deleted is also the operation start date.
  • the power system equipment indicates elements constituting the power system such as a generator, a power feeder, a bus, a line, a transformer, a switch, and a circuit breaker.
  • the jurisdiction operation base is information on the operation base having jurisdiction over the power system facility.
  • the monitoring control operation base is information on the operation base that monitors and controls the power system equipment. When there are a plurality of monitoring control operation bases, it indicates that the power system equipment is shared by the plurality of operation bases.
  • the monitoring control information includes information relating to control such as ON / OFF of the power system facility and information relating to monitoring such as the rated current / voltage of the facility.
  • the equipment database may be expressed as equipment DB.
  • the network N includes a monitoring control console C (see FIG. 4) and a maintenance console D (see FIG. 4) which are arranged at a control station or the like having jurisdiction over the power system facilities of each of the operation bases 2A to 2E. Multiple connected.
  • the operator inputs data to the maintenance server M and the monitoring control servers 1A to 1E and displays a screen transmitted from the server side by using the input / output devices of the monitoring control console C and the maintenance console D.
  • each configuration will be described in more detail.
  • the monitoring control servers 1A to 1E are processing units that perform monitoring control of the power system equipment at the operation bases 2A to 2E based on the equipment database. Basically, the operation bases 2A to 2E managed by the respective monitoring control servers 1A to 1E are set in advance.
  • the supervisory control servers 1A to 1E share the supervisory control of a plurality of power system facilities by targeting only the power system facilities of the operation bases 2A to 2E under their jurisdiction. However, a plurality of operation bases may share one power system facility. In this case, one jurisdiction operation base for the power system equipment is determined, but the operation base sharing the power system equipment also performs monitoring control.
  • the monitoring control servers 1A to 1E include a monitoring control unit 11, a monitoring control information storage unit 12, an equipment DB switching unit 13, an active equipment DB storage unit 14, and an integrated equipment DB storage unit 15.
  • the test facility DB storage unit 16 and the test unit 17 are provided.
  • the monitoring control unit 11 is a processing unit that performs monitoring control on the power system facility based on the facility database.
  • the monitoring control unit 11 has a function of monitoring a state change of the power system facility within the jurisdiction range and performing a remote operation and control including stop and restart of the operation of the power system facility by a control command.
  • the monitoring control unit 11 obtains information related to the power system from the remote monitoring control means of the operation bases 2A to 2E, and outputs a control command to the remote monitoring control means.
  • the monitoring control information storage unit 12 is a storage unit that stores information related to the power system obtained by the monitoring control unit 11 from the remote monitoring control means of the operation bases 2A to 2E.
  • the information related to the power system includes information indicating the device status related to the power system facility under the jurisdiction.
  • the facility DB switching unit 13 stores the modified facility data in the integrated facility DB storage unit 15 when the facility database is changed in the maintenance server M, and integrates the monitoring control unit 11 from the current facility DB storage unit 14. It is a processing unit that outputs a command to switch the facility database to be referenced to the facility DB storage unit 15.
  • the facility DB switching unit 13 is also a processing unit that stores the changed test facility data in the test facility DB storage unit 16 when the test facility database is changed in the maintenance server M.
  • the working facility DB storage unit 14 is a storage unit that stores a working facility database related to the current power system facility.
  • the monitoring control unit 11 of the monitoring control servers 1A to 1e performs monitoring control of the power system equipment based on the working equipment database stored in the working equipment DB storage section 14.
  • the integrated facility DB storage unit 15 is a storage unit that stores a facility database integrated by the maintenance server M.
  • the test facility DB storage unit 16 is a storage unit that stores a test database that is a modified facility database created by the maintenance unit 20.
  • the test unit 17 is a processing unit that tests the test database stored in the test facility DB storage unit 16.
  • the test unit 17 reads the test facility database stored in the test facility DB storage unit 16 in response to an input from the monitoring control console C.
  • the test unit 17 has a function of simulating a power system based on the changed test facility database and performing monitoring control. By the simulated monitoring control, the operator confirms whether the equipment database is correctly changed.
  • Each of the operation bases 2A to 2E includes a plurality of power system facilities.
  • the operation bases 2A to 2E have remote monitoring control means (not shown).
  • the remote monitoring control means has a function of outputting the control command output by the monitoring control unit 11 of the monitoring servers 1A to 1E to the power system.
  • the remote monitoring control unit has a function of transmitting data obtained by monitoring or measuring information about the power system to the monitoring control unit 11.
  • the operation bases 2A to 2E may be configured to share some power system facilities.
  • the power system facility E is a shared facility that can be monitored and controlled by the operation bases 2A and 2C.
  • the power system equipment E is monitored and controlled by the workers at the control centers of both the operation bases 2A and 2C. That is, there is a case where an input such as a change of the power system equipment E is performed to the maintenance server M from the maintenance console D of both the operation bases 2A and 2C.
  • the maintenance server M is a processing unit that performs the following processing when there is a change such as addition of a power system facility.
  • A Create a new equipment database based on the current equipment database.
  • B The created equipment database is transmitted to the test unit 14 of the designated monitoring control servers 1A to 1E.
  • C Integrate the equipment database after the test.
  • the maintenance server M includes a maintenance unit 20, a transmission unit 30, and a database integration unit 40.
  • the maintenance unit 20 is a processing unit that creates a new equipment database based on the current equipment database.
  • the maintenance unit 20 includes an active facility DB storage unit 21, an facility DB change unit 22, a change data extraction unit 23, and a test facility DB storage unit 24.
  • the working facility DB storage unit 21 is a storage unit that stores a working facility database related to the current power system facility.
  • the facility DB changing unit 22 is a processing unit that updates the current facility database when the power system facility is changed.
  • the facility DB changing unit 22 reads the current facility database stored in the current facility DB storage unit 21 and displays it on the maintenance table D, for example.
  • the operator makes changes to the working equipment database via the maintenance console D.
  • the equipment DB changing unit 22 updates the equipment database according to the change from the maintenance console D, outputs it to the changed data extracting unit 23, and stores it in the test equipment DB storage unit 24.
  • the change data extraction unit 23 is a processing unit that extracts change data from the working facility database changed by the facility DB changing unit 22.
  • the change data extraction unit 23 compares the current facility database stored in the current facility DB storage unit 21 with the facility database input from the facility DB change unit 22, and extracts change data that is the difference between the two databases. To do. For example, when the generator is added on January 1 at the operation base 2A, “January 1, generator A, operation base 2A jurisdiction, operation base 2A monitoring, addition, rating, etc.
  • the data may include data including “equipment information”.
  • the facility information such as the rating is stored in a storage unit (not shown), and when the change of the power system facility is input from the maintenance console D, the facility DB changing unit 22 reads from the storage unit. be able to.
  • the test facility DB storage unit is a storage unit that stores the changed facility database.
  • the coefficient of the generator is displayed on the screen of the monitoring control console C, or whether the monitoring control of the generator is correctly performed.
  • (B) Transmission unit The transmission unit 30 monitors the changed facility database stored in the test facility DB storage unit 24 and the integrated facility database stored in the integrated facility DB storage unit 43.
  • a processing unit that transmits to the equipment DB switching unit 13 of 1E.
  • the transmission unit 30 outputs the changed equipment database or the integrated equipment database to the equipment DB switching unit 13 based on a command from the monitoring control console C.
  • the database integration unit 40 is a processing unit that integrates the equipment database after the test.
  • the database integration unit 40 includes an operation start date extraction unit 41, an integration unit 42, and an integrated facility DB storage unit 43.
  • the operation start extraction unit 41 is a processing unit that extracts an operation start date included in the change data input from the change data extraction unit 22. For example, if the change data includes information such as “January 1, generator A, operation base 2A jurisdiction, operation base 2A monitoring, facility information such as addition, rating, etc.”, January 1 is extracted.
  • the integration unit 42 is a processing unit that integrates the current equipment database and the change data in time series. For example, if the current equipment database includes an equipment database whose operation start date is up to December 31, the change data including the operation start date on January 1 is integrated so that it comes next to the equipment data on December 31. Is done.
  • the integrated facility DB storage unit 43 is a storage unit that stores an integrated facility database.
  • FIG. 6 schematically shows the processing performed by the maintenance unit 20.
  • the facility DB change unit 22 updates the working facility database.
  • the input change is shown as change data for convenience of explanation.
  • the changed equipment database is set as the generation 1 equipment database.
  • the generation 1 equipment database is updated with the change data 2 and the generation 2 equipment database is created.
  • the facility database of each generation may be stored in the test facility DB storage unit 24 and read and updated by the facility DB change unit 23. Moreover, it is good also as a structure which preserve
  • the changed equipment database is transmitted by the transmitting unit 30 to the equipment DB switching unit 13 of the monitoring control servers 1A to 1E.
  • the facility DB switching unit 13 causes the test facility DB storage unit 16 to store the modified facility database.
  • the test unit 17 reads the modified facility database stored in the test facility DB storage unit 16 and performs monitoring control by simulating the power system (step S03).
  • the operator confirms the test contents and determines that there is a defect in the changed equipment database (step S04, NO)
  • the process returns to step S01, the current equipment database is changed again, and steps S02 to S04 are repeated.
  • the change data extraction unit 23 compares the current equipment database with the changed equipment database, and extracts change data that is a difference between the two databases (step S05). The extracted change data is input to the database integration unit 40.
  • the operation start date extraction unit 41 extracts the operation start date included in the input change data (step S06).
  • the integration unit 42 integrates the working facility database and the change data in time series (step S07).
  • the integrated equipment database is stored in the integrated equipment DB storage unit 43.
  • FIG. 7 schematically shows the processing performed by the database integration unit 40.
  • the working equipment database is obtained by integrating the equipment databases of the operation bases 2A to 2E in time series.
  • the equipment database changed in each operation base is tested at any time by the test unit 17 of the monitoring control servers 1A to 1E.
  • the change data is extracted from the changed equipment database.
  • the operation start date is extracted from the changed data.
  • the operation start date of the information related to the power system equipment included in the working equipment database which is the initial value, is December 31, 2014.
  • the change data 1 is added after the data whose operation start date is December 31, 2014.
  • the operation start date of the change data 2 of the operation base 2B is January 1, 2015
  • the operation start date is next to the data of December 31, 2014
  • the change data 1 of the operation base 2A Before, the change data 2 of the operation base 2B is added. That is, when the information regarding the operation start date of the change data integrated later is earlier than the change data integrated earlier, the change data integrated later becomes the change data integrated earlier. As such, they are rearranged and integrated in time series.
  • FIG. 8 An example of the equipment database integrated as described above is shown in FIG. As shown in FIG. 8, in the integrated equipment database, information on the power system equipment of each operation base is integrated in time series in order of the operation start date.
  • the monitoring control servers 1A to 1E perform monitoring control of power system facilities using the integrated facility database.
  • the integrated facility database shown in FIG. 8 is stored in the integrated facility DB storage unit 15 of the monitoring control servers 1A to 1E and the integrated facility DB storage unit 43 of the maintenance server M, respectively.
  • the monitoring control unit 11 of the monitoring control servers 1A to 1E ends the monitoring control based on the current facility database.
  • the monitoring control unit 11 reads the modified facility database from the integrated facility DB storage unit 15, and resumes the monitoring control based on the integrated facility database.
  • the monitoring control unit 11 manages the integrated facility DB storage unit 15 as the working facility DB storage unit.
  • the active facility DB storage unit 14 is managed as an integrated facility DB storage unit. That is, when there is a further change in the equipment database after switching, the equipment database integrated in the working equipment DB storage unit 14 is stored. Thus, the role of the working facility DB storage unit 14 and the integrated facility DB storage unit 15 is switched every time the facility database is changed.
  • the maintenance equipment M stores the integrated equipment stored in the integrated equipment DB storage unit 43.
  • the database is stored in the working facility DB storage unit 21. If there is a further change in the equipment database after switching, the equipment DB changing unit 22 reads the integrated equipment database stored in the active equipment DB storage unit 21 and makes a change.
  • the workers at the operation bases 2A to 2E read the integrated equipment database stored in the working equipment DB storage unit 21 as the generation 5 equipment database, respectively, and the equipment DB changing unit 22 generates the generations. 5
  • the equipment database is changed and stored in the test equipment DB storage unit 24.
  • the test is performed at each of the operation bases 2A to 2E, and the operator inputs that the operations are to be integrated at each operation base.
  • the operation start date of the change data 6 to 10 extracted by the change data extraction unit 23 is extracted, and the integration unit 42 chronologically stores the data included in the generation 5 facility database and the change data 6 to 10 in time series. Rearrange and integrate.
  • the integration unit 42 integrates the change data into the equipment database in time series based on the information about the operation start date extracted by the operation start date extraction unit 41. Accordingly, it is possible to obtain facility data in which information on power system facilities at a plurality of operation bases is integrated. Therefore, the facility database can be switched at a time at all operation bases. Compared to the conventional power system monitoring control system that switches the facility data by stopping the monitoring control function at all operation bases whenever there is a change in the equipment database, it is possible to suppress the damage to the power system monitoring control function. .
  • the database integration unit 40 integrates change data based on input from an input device connected to the network.
  • the change data is integrated based on the input from the maintenance console D, so that the operator changes the operation start date itself when a malfunction occurs. Is possible.
  • the configuration of the power system monitoring and control system of the second embodiment is basically the same as that of the first embodiment.
  • the facility DB changing unit 22 includes an operation base extracting unit 22a.
  • the operation site extraction unit 22a is a processing unit that searches and extracts the facility database of the operation site designated by the operator from the facility database read from the active facility DB storage unit 21 or the integrated facility DB storage unit 43. .
  • the extracted equipment database is output to the maintenance table D.
  • the facility database of the present embodiment is a database in which data related to power system facilities at a plurality of operation bases 2A to 2E is integrated. For this reason, the worker changes the equipment database based on the equipment database including all data related to the power system equipment of the plurality of operation bases 2A to 2E.
  • the operation base extraction unit 22a since the operation base extraction unit 22a is provided, the operator can search and display an equipment database of a desired operation base. Therefore, the facility database change operation is simplified.
  • the operation base 2A can extract the equipment database of the operation base 2B which is another operation base. Therefore, for example, even when an abnormality occurs in the monitoring control console of the operation base 2B, the equipment database can be changed, tested, and integrated using the monitoring control console C and the maintenance console D of the operation base 2A. Become.
  • the configuration of the power system monitoring and control system of the third embodiment is basically the same as that of the first embodiment.
  • the facility DB changing unit 22 includes an operation base changing unit 22b.
  • the operation base changing unit 22b is a processing unit that changes the operation base that monitors and controls the power system facility based on the input from the maintenance console D.
  • the operation base changing unit 22b reads the integrated equipment data stored in the integrated equipment DB storage unit 43, and selects the monitoring control operation base from the information about the equipment A from the operation base 2A. Change to 2B.
  • the monitoring control server at another operating base can perform monitoring control of the operating base where the monitoring control server has failed.
  • the power system monitoring control system can be realized by controlling a computer including a CPU or the like with a predetermined program.
  • the program in this case realizes the processing of each unit as described above by physically utilizing computer hardware.
  • a method, a program, and a recording medium storing the program for executing the processing of each unit described above are also one aspect of the embodiment.
  • how to set the range processed by hardware and the range processed by software including a program is not limited to a specific mode.
  • any one of the above-described units can be configured as a circuit that realizes each process.
  • each processing unit, storage unit, and the like described above may be realized in a common computer.
  • the equipment database includes information such as the operation start date, power system equipment, jurisdiction operation base, monitoring control operation base, and monitoring control information.
  • the equipment database may be configured to include information on the operation base where the equipment database is changed. In the above embodiment, it becomes possible for a plurality of operation bases to change the equipment database. Therefore, by including information on the operation base where the change was made, it is possible to check the changes of other operation bases. good.
  • the change data extraction part 23 was set as the structure which compares the equipment database input from the working equipment database and the equipment DB change part 22, and extracts change data.
  • the configuration may be such that the current equipment database and the equipment database stored in the test equipment DB storage unit 24 are compared to extract change data.
  • the operation start date extraction unit 41 extracts the operation start date of the change data, and the integration unit 42 integrates the change data in time series.
  • the operation start date extraction unit 41 may be configured to extract information related to the operation start time.
  • the integration unit 42 is configured to integrate the change data in time series including up to hours, minutes, and seconds.
  • the operation base extraction unit 22a and the operation base change unit 22b are provided to extract and change the operation base.
  • an extraction part and a change part can be suitably provided also with respect to the other information contained in an equipment database.
  • the facility DB changing unit 22 reads the current facility database in the current facility DB storage unit 21 that is the initial condition and adds the change. However, after the monitoring control operation is started, the facility DB changing unit 22 may read and change the integrated facility database from the integrated facility DB storage unit 43.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Testing And Monitoring For Control Systems (AREA)
  • Selective Calling Equipment (AREA)

Abstract

 電力系統の監視制御機能が損なわれることを抑制するとともに、監視制御サーバが管轄外の運用拠点を監視制御することを可能とする電力系統監視制御システムおよび電力系統監視制御プログラムを提供する。複数の運用拠点2A~2Eと、複数の監視制御サーバ1A~1Eと、メンテナンスサーバMと、はネットワークNを介して接続され、メンテナンスサーバMは、設備データベースに対する変更データを抽出する変更データ抽出部23と、変更データ抽出部23が抽出した変更データに含まれる運用開始日に関する情報を抽出する運用開始日抽出部41と、運用開始日抽出部41が抽出した運用開始日に関する情報に基づいて、変更データを時系列で前記設備データベースに統合する統合部42と、を有する。

Description

電力系統監視制御システムおよび電力系統監視制御プログラム
 本発明の実施形態は、電力系統を遠隔地から監視する電力系統監視制御システム及び電力系統監視制御プログラムに関する。
 電力系統監視制御システムでは、電力系統の設備に関するデータベースである、設備データベースに基づいて電力系統設備の監視制御が行われている。電力系統設備に変更があった場合、現用の設備データベースを更新され、現用の設備データベースと異なる格納エリアに、変更後の設備データベースが格納される。変更後の設備データベースについては、試験部において模擬された監視制御機能を用いた動作確認が行われる。動作確認により、正しく設備データベースが変更されていることが確認されると、電力系統監視システムにおいて変更後の設備データベースが運用される。
 変更後の設備データベースに基づいた運用を行う場合、まず、現用の設備データベースに基づいた、監視制御手段による電力系統の監視および制御が終了される。そして、変更後の設備データベースが読み出され、変更後の設備データベースに基づいた、監視制御手段による電力系統の監視および制御が再開される。
 従って、変更後の設備データベースに基づいた電力系統の監視制御を開始するまでには時間を要し、また、電力系統の監視制御に一時的な空白が生じてしまうおそれがあった。そこで、従来では、複数の監視制御手段を切り換えて、変更後の設備データベースに基づいた電力系統の監視制御を開始してから、現用の設備データベースに基づいた電力系統の監視制御を終了することで、監視制御を連続して稼働させていた。
特開2011-004495号公報
 近年、複数の運用拠点と、複数の監視制御サーバと、メンテナンスサーバと、をネットワークを介して接続し、各監視制御サーバがそれぞれ管轄運用拠点を分担して広域における監視制御を行う、電力系統監視制御システムが採用されている。このような構成の場合、一部の運用拠点において電力系統の設備に変更があり、変更後の設備データベースに基づく監視制御を行う場合には、全ての運用拠点において監視制御を一時的に終了する必要があった。そのため、各運用拠点において設備の変更がある度に、全ての運用拠点において電力系統の監視制御機能が一時的に損なわれていた。しかし、全ての運用拠点において、監視制御サーバを切り換え可能に設けるとすると、監視制御システムの構成が複雑化する。
 また、電力系統監視システムでは、各監視制御サーバが管轄する運用拠点は予め設定されている。メンテナンスサーバは、各運用拠点の電力系統設備と、その電力系統設備を管轄する監視制御サーバを関連付けて管理しているため、監視制御サーバは管轄外の運用拠点を監視制御することはできなかった。
 一方、地震等の災害により、ある運用拠点の監視制御サーバが故障した場合に、他の監視制御サーバが、故障した監視制御サーバに代わって運用拠点を監視制御することが望まれていた。しかし、設備データベースの変更は各運用拠点において適宜行われており、全ての運用拠点における変更後の設備データベースを、各監視制御サーバが随時把握する構成とするのは、構成が煩雑となる上、経済的な観点からも現実的ではなかった。
 本発明の実施形態は、上記のような従来技術の問題点を解決するために提案されたものである。その目的は、電力系統の監視制御機能が損なわれることを抑制するとともに、監視制御サーバが管轄外の運用拠点を監視制御することを可能とする電力系統監視制御システムおよび電力系統監視制御プログラムを提供することである。
 上記のような目的を達成するための実施形態の電力系統監視制御システムは、複数の運用拠点が有する複数の電力系統設備に関する情報である設備データベースに基づき、前記電力系統設備の監視制御を行う複数の監視制御サーバと、前記設備データベースの更新を行うメンテナンスサーバと、を有し、前記複数の運用拠点と、前記複数の監視制御サーバと、前記メンテナンスサーバと、はネットワークを介して接続され、前記メンテナンスサーバは、前記設備データベースに対する変更データを抽出する変更データ抽出部と、前記変更データ抽出部が抽出した変更データに含まれる運用開始日に関する情報を抽出する運用開始日抽出部と、前記運用開始日抽出部が抽出した運用開始日に関する情報に基づいて、前記変更データを時系列で前記設備データベースに統合する統合部と、を有する。
 なお、上記の各形態は、各部の処理をコンピュータに実行させる電力系統監視制御御プログラムの発明としても捉えることができる。
第一の実施形態の電力系統監視制御システムの一例を示す構成図である。 設備データベースの一例を示す説明図である。 複数の運用拠点の一例を示す説明図である。 メンテナンスサーバの構成の一例を示すブロック図である。 電力系統監視制御システムの設備データベースの更新、試験、および統合のフローの一例を示すフローチャートである。 メンテナンスサーバにおける設備データベースの更新に関する処理を説明する模式図である。 メンテナンスサーバにおける設備データベースの統合に関する処理を説明する模式図である。 統合された設備データベースの一例を示す説明図である。 メンテナンスサーバにおける統合設備データベースの更新に関する処理を説明する模式図である。 第二の実施形態の電力系統監視制御システムの一例を示す構成図である。 第三の実施形態の電力系統監視制御システムの一例を示す構成図である。 設備データベースの監視制御運用拠点の変更例を示す説明図である。
[第一の実施形態]
[1.構成]
(1)概略構成
 以下、本発明の第一の実施形態について、図面を参照して説明する。図1は、本実施形態の電力系統監視制御システムの一例を示す構成図である。電力系統監視制御システムは、メンテナンスサーバM、複数の監視制御サーバ1A~1E、複数の運用拠点2A~2Eが、電力監視制御ネットワークNを介して接続されている。
 メンテナンスサーバMは、現在の電力系統設備に関するデータベースである、現用設備データベースの更新を行う処理部である。後ほど詳しく説明するが、本実施形態の設備データベースは、運用拠点2A~2Eの設備データベースが、時系列で統合されたものである。
 監視制御サーバ1A~1Eは、メンテナンスサーバMが出力した設備データベースに基づき、電力系統設備の監視制御を行う処理部である。運用拠点2A~2Eは、複数の電力系統設備を有し、監視制御サーバ1A~1Eが出力した制御情報を電力系統に出力したり、電力系統設備の状態や計測したデータを監視制御サーバ1A~1Eに出力する構成部を含む。
 設備データベースは、図2の例に示す通り、運用開始日、電力系統設備、管轄運用拠点、監視制御運用拠点、監視制御情報等の情報を含む。運用開始日は、電力系統設備を変更する日時の情報である。例えば、発電機を追加・削除する日時も運用開始日となる。電力系統設備は、発電機、給電器、母線、回線、変圧器、開閉器、遮断器等の電力系統を構成する要素を示す。管轄運用拠点は、電力系統設備を管轄する運用拠点の情報である。
 監視制御運用拠点は、電力系統設備を監視・制御する運用拠点の情報である。監視制御運用拠点が複数ある場合には、その電力系統設備は複数の運用拠点により共有されていることを示す。監視制御情報は、電力系統設備のON・OFFなど制御に関する情報や、設備の定格電流・電圧など監視に関する情報を含む。なお、設備データベースを設備DBと表現する場合もある。
 また、ネットワークNには、各運用拠点2A~2Eの電力系統設備を管轄する制御所等に配置され、クライアントとして稼働する監視制御卓C(図4参照)とメンテナンス卓D(図4参照)が複数接続されている。作業者は、監視制御卓Cおよびメンテナンス卓Dの入出力装置により、メンテナンスサーバMおよび監視制御サーバ1A~1Eにデータを入力したり、サーバ側から送信された画面を表示したりする。以下、各構成についてより詳細に説明する。
(2)監視制御サーバ
 監視制御サーバ1A~1Eは、設備データベースに基づき、運用拠点2A~2Eの電力系統設備の監視制御を行う処理部である。基本的には、それぞれの監視制御サーバ1A~1Eが管轄する運用拠点2A~2Eは予め設定されている。監視制御サーバ1A~1Eは、管轄する運用拠点2A~2Eの電力系統設備のみを監視制御の対象とすることで、複数の電力系統設備の監視制御を分担している。ただし、複数の運用拠点が1つの電力系統設備を共有する場合もある。その場合には、その電力系統設備に対する管轄運用拠点が1つ決定されるが、電力系統設備を共有する運用拠点も監視制御を行う。
 図1に示す通り、監視制御サーバ1A~1Eは、監視制御部11と、監視制御情報記憶部12と、設備DB切替部13と、現用設備DB記憶部14と、統合設備DB記憶部15と、試験設備DB記憶部16と、試験部17をそれぞれ有する。監視制御部11は、設備データベースに基づいて、電力系統設備に対する監視制御を行う処理部である。監視制御部11は、管轄範囲内の電力系統設備の状態変化を監視したり、制御指令により電力系統設備の運転の停止や再開などを含む遠隔操作や制御を行う機能を有する。監視制御部11は、運用拠点2A~2Eが有する遠方監視制御手段から電力系統に関する情報を得たり、遠方監視制御手段に制御指令を出力したりする。
 監視制御情報記憶部12は、監視制御部11が運用拠点2A~2Eの遠方監視制御手段から得た電力系統に関する情報を記憶する記憶部である。電力系統に関する情報には、管轄する電力系統設備に関する機器状態を示す情報などが含まれる。設備DB切替部13は、メンテナンスサーバMにおいて設備データベースが変更された場合に、統合設備DB記憶部15に変更された設備データを記憶させ、監視制御部11に現用設備DB記憶部14から、統合設備DB記憶部15へと参照する設備データベースを切り替えるように指令を出力する処理部である。また、設備DB切替部13は、メンテナンスサーバMにおいて試験設備データベースが変更された場合に、試験設備DB記憶部16に変更された試験設備データを記憶させる処理部でもある。
 現用設備DB記憶部14は、現在の電力系統設備に関する現用設備データベースを記憶する記憶部である。電力系統監視制御システムの運転開始時には、監視制御サーバ1A~1eの監視制御部11は、現用設備DB記憶部14に記憶されている現用設備データベースに基づいて、電力系統設備の監視制御を行う。統合設備DB記憶部15は、メンテナンスサーバMにて統合された設備データベースを記憶する記憶部である。
 試験設備DB記憶部16は、メンテナンス部20が作成した変更後の設備データベースである試験データベースを記憶する記憶部である。試験部17は、試験設備DB記憶部16に記憶された試験データベースを試験する処理部である。試験部17は、監視制御卓Cからの入力により、試験設備DB記憶部16に記憶されている試験設備データベースを読み出す。試験部17は、変更後の試験設備データベースに基づいて電力系統を模擬して監視制御を行う機能を有する。模擬された監視制御により、設備データベースの変更が正しく行われているかが作業者により確認される。
(3)運用拠点
 運用拠点2A~2Eのそれぞれには、複数の電力系統設備が含まれる。運用拠点2A~2Eは、不図示の遠方監視制御手段をそれぞれ有する。遠方監視制御手段は、監視サーバ1A~1Eの監視制御部11が出力した制御指令を電力系統に出力する機能を有する。また、遠方監視制御手段は、電力系統に関する情報を監視または計測して得たデータを、監視制御部11に送信する機能を有する。
 運用拠点2A~2Eは、図3の模式図に示す通り、一部の電力系統設備を共有する構成であっても良い。例えば、電力系統設備Eは、運用拠点2Aおよび2Cが監視制御可能な共有設備である。電力系統設備Eは、例えば管轄運用拠点が2Aであったとしても、運用拠点2Aおよび2C両方の制御所の作業員により、監視制御が行われる。すなわち、運用拠点2Aおよび2C両方のメンテナンス卓Dから、メンテナンスサーバMに電力系統設備Eの変更等の入力が行われる場合がある。
(4)メンテナンスサーバ
 メンテナンスサーバMは、電力系統設備が追加されるなど変更があった場合に、以下の処理を行う処理部である。
(a)現用設備データベースを基に新たな設備データベースを作成する。
(b)作成した設備データベースを指定した監視制御サーバ1A~1Eの試験部14に送信する。
(c)試験後の設備データベースを統合する。
 図4に示す通り、メンテナンスサーバMは、メンテナンス部20と、送信部30と、データベース統合部40と、を有する。
(a)メンテナンス部
 メンテナンス部20は、現用設備データベースを基に、新たな設備データベースを作成する処理部である。メンテナンス部20は、現用設備DB記憶部21と、設備DB変更部22と、変更データ抽出部23と、試験設備DB記憶部24と、を有する。現用設備DB記憶部21は、現在の電力系統設備に関する現用設備データベースを記憶する記憶部である。
 設備DB変更部22は、電力系統設備に変更があった場合に、現用の設備データベースを更新する処理部である。メンテナンス卓Dからの指令により、設備DB変更部22は、現用設備DB記憶部21に記憶されている現用設備データベースを読み出し、例えばメンテナンス卓Dに表示する。作業者は、メンテナンス卓Dを介して、現用設備データベースに対する変更を行う。設備DB変更部22は、メンテナンス卓Dからの変更により設備データベースを更新し、変更データ抽出部23に出力するとともに、試験設備DB記憶部24に記憶する。
 変更データ抽出部23は、設備DB変更部22が変更した現用設備データベースから、変更データを抽出する処理部である。変更データ抽出部23は、現用設備DB記憶部21に記憶されている現用設備データベースと、設備DB変更部22から入力された設備データベースとを比較し、2つのデータベースの差分である変更データを抽出する。変更データは、例えば、運用拠点2Aにおいて発電機が1月1日に追加される場合には、「1月1日、発電機A、運用拠点2A管轄、運用拠点2A監視、追加、定格等の設備情報」という情報を含むデータとすることができる。
 なお、定格等の設備情報は、不図示の記憶部に保存されており、メンテナンス卓Dから電力系統設備の変更の入力があった場合に、設備DB変更部22が記憶部から読み出す構成とすることができる。試験設備DB記憶部は、変更後の設備データベースを記憶する記憶部である。
 具体的には、例えば発電機が追加されたことや発電機の係数が監視制御卓Cの画面に表示されるか、発電機の監視制御が正しく行われているか等が確認される。変更後の設備データベースの試験が完了し、作業者がメンテナンス卓Dにおいて変更後の設備データベースを統合する旨の入力をした場合、変更データ抽出部22が抽出した変更データは、データベース統合部40に出力される。
(b)送信部
 送信部30は、試験設備DB記憶部24に記憶されている変更後の設備データベースと、統合設備DB記憶部43に記憶されている統合された設備データベースを、監視制御サーバ1A~1Eの設備DB切替部13に送信する処理部である。送信部30は、監視制御卓Cからの指令に基づき、変更後の設備データベースまたは統合された設備データベースを、設備DB切替部13に出力する。
(c)データベース統合部
 データベース統合部40は、試験後の設備データベースを統合する処理部である。データベース統合部40は、運用開始日抽出部41と、統合部42と、統合設備DB記憶部43と、を有する。運用開始抽出部41は、変更データ抽出部22から入力された変更データに含まれる運用開始日を抽出する処理部である。例えば、変更データが「1月1日、発電機A、運用拠点2A管轄、運用拠点2A監視、追加、定格等の設備情報」という情報を含む場合、1月1日が抽出される。
 統合部42は、現用設備データベースと、変更データを時系列で統合する処理部である。例えば、現用設備データベースが運用開始日が12月31日までの設備データベースを含む場合、1月1日の運用開始日を含む変更データは、12月31日の設備データの次に来るように統合される。統合設備DB記憶部43は、統合された設備データベースを記憶する記憶部である。
[2.作用]
(1)データベースの更新・試験・統合
 以上のような本実施形態における、電力系統監視制御システムにおける、設備データベースの更新、試験、および統合に関するフローを、図5を参照して説明する。電力系統設備に変更があった場合、作業者は、現用設備DB記憶部21に記憶されている設備データベースを参照し、メンテナンス卓Dを介して現用設備データベースに対する変更を入力する(ステップS01)。設備DB変更部22は、変更された設備データベースを作成し、試験設備DB記憶部24に記憶する(ステップS02)。
 図6にメンテナンス部20が行う処理を模式的に表した図を示す。メンテナンス部20は、メンテナンス卓Dから電力系統設備の変更が入力される度に、設備DB変更部22が現用設備データベースを更新する。図6では、説明の便宜上、入力された変更を変更データとして示す。現用設備データベースが、変更データ1で更新された場合、変更後の設備データベースを世代1設備データベースとする。
 世代1設備データベースの作成後に、変更データ2が入力された場合には、世代1設備データベースを変更データ2により更新し、世代2設備データベースが作成される。各世代の設備データベースは、試験設備DB記憶部24に記憶され、設備DB変更部23により読み出されて更新される構成としてもよい。また、各世代の設備データベースをRAM等の一時的な記憶部に保存しておく構成としてもよい。
 変更後の設備データベースは、送信部30により、監視制御サーバ1A~1Eの設備DB切替部13に送信される。図1に示す通り、設備DB切替部13は、試験設備DB記憶部16に、変更後の設備データベースを記憶させる。
 試験部17は、試験設備DB記憶部16に記憶されている変更後の設備データベースを読み出し、電力系統を模擬して監視制御を行う(ステップS03)。作業者が試験内容を確認し、変更後の設備データベースに不具合があると判断した場合(ステップS04、NO)、ステップS01に戻り、再度現用設備データベースの変更を行い、ステップS02~S04を繰り返す。
 一方、作業者が試験内容を確認し、変更後の設備データベースが正しく変更されていると判断した場合、メンテナンス卓Dを介して変更データを統合する旨の入力を行う(ステップS04、YES)。すると、変更データ抽出部23は、現用設備データベースと、変更された設備データベースとを比較し、2つのデータベースの差分である変更データを抽出する(ステップS05)。抽出された変更データは、データベース統合部40に入力される。
 運用開始日抽出部41は、入力された変更データに含まれる運用開始日を抽出する(ステップS06)。統合部42は、現用設備データベースと、変更データを時系列で統合する(ステップS07)。統合された設備データベースは、統合設備DB記憶部43に記憶される。
 図7にデータベース統合部40が行う処理を模式的に表した図を示す。まず、初期条件として、現用設備データベースは、運用拠点2A~2Eの設備データベースが、時系列で統合されたものである。各運用拠点の変更された設備データベースは、監視制御サーバ1A~1Eの試験部17により随時試験がおこなわれる。試験が終了した設備データベースについて、作業者が統合する旨の入力を行うと、変更された設備データベースから変更データが抽出される。
 データベース統合部40において、変更データから運用開始日が抽出される。例えば、初期値である現用設備データベースに含まれる電力系統設備に関する情報の運用開始日が、平成26年12月31日とする。この場合、例えば運用拠点2Aの変更データ1の運用開始日が平成27年1月2日であれば、運用開始日が平成26年12月31日のデータの次に、変更データ1が追加される。
 また、運用拠点2Bの変更データ2の運用開始日が平成27年1月1日であれば、運用開始日が平成26年12月31日のデータの次かつ、運用拠点2Aの変更データ1の前に、運用拠点2Bの変更データ2が追加される。すなわち、先に統合された変更データより、後に統合された変更データの運用開始日に関する情報の方が早い場合には、後に統合された変更データが、先に統合された変更データの前となるように、時系列で並べ替えて統合される。
 以上のようにして統合された設備データベースの一例を図8に示す。図8に示す通り、統合された設備データベースは、各運用拠点の電力系統設備に関する情報が、運用開始日順に時系列で統合されている。監視制御サーバ1A~1Eは、この統合された設備データベースを用いて、電力系統設備の監視制御を行う。なお、図8に示す統合された設備データベースは、監視制御サーバ1A~1Eの統合設備DB記憶部15と、メンテナンスサーバMの統合設備DB記憶部43にそれぞれ記憶されるものである。
(2)設備データベースの切替
 監視制御に用いる設備データベースを変更する場合、監視制御サーバ1A~1Eの監視制御部11は、現用の設備データベースに基づいた監視制御を終了する。設備DB切替部13の切替指令を受け取ると、監視制御部11は変更された設備データベースを、統合設備DB記憶部15より読み出し、統合された設備データベースに基づいた監視制御を再開する。
 現用設備データベースから、統合された設備データベースに切り換えられた後、監視制御部11は、統合設備DB記憶部15を現用設備DB記憶部として管理する。また、現用設備DB記憶部14は統合設備DB記憶部として管理される。すなわち、切り替え後にさらに設備データベースに変更があった場合には、現用設備DB記憶部14に統合された設備データベースが記憶されることとなる。このように現用設備DB記憶部14と統合設備DB記憶部15は、設備データベースが変更される度にその役割が入れ替わる。
(3)統合設備データベースの変更
 監視制御サーバ1A~1Eにおいて、統合された設備データベースに基づく監視制御が再開さると、メンテナンスサーバMでは、統合設備DB記憶部43に記憶されている統合された設備データベースが、現用設備DB記憶部21に記憶される。切り替え後にさらに設備データベースに変更がある場合には、設備DB変更部22は、現用設備DB記憶部21に記憶された統合された設備データベースを読み出し変更を加える。
 すなわち、図9模式図に示す通り、運用拠点2A~2Eの作業者は、現用設備DB記憶部21に記憶されている統合設備データベースを世代5設備データベースとしてそれぞれ読み出し、設備DB変更部22が世代5設備データベースを変更し試験設備DB記憶部24に記憶する。そして、運用拠点2A~2Eそれぞれにおいて試験を行い、作業者が各運用拠点において統合する旨の入力を行ったとする。その場合には、変更データ抽出部23により抽出された変更データ6~10の運用開始日が抽出され、統合部42が世代5設備データベースに含まれるデータと、変更データ6~10を時系列で並べ変えて統合する。
 [3.効果]
 以上のような本実施形態の作用効果を以下に説明する。
(1)本実施形態の電力系統監視制御システムでは、運用開始日抽出部41が抽出した運用開始日に関する情報により、統合部42が変更データを時系列で設備データベースに統合する。従って、複数の運用拠点の電力系統設備に関する情報が統合された設備データを得ることができる。従って、あるタイミングにおいて全ての運用拠点において一斉に設備データベースを切り替えることができる。設備データベースに変更がある度に全ての運用拠点において監視制御機能を停止して設備データを切り替える従来の電力系統監視制御システムに比べ、電力系統の監視制御機能が損なわれることを抑制することができる。
 電力系統監視制御システムでは、作業員は将来の運用開始日を目指して、例えば数ヶ月前から設備データベースの変更や試験を行い、変更データを統合する。例えば、1月1日の運用開始日を有する変更データの統合が、12月31日となる場合もあれば8月中に統合される場合もある。以上から、変更データの統合について締め切りを設けることが出来ないため、統合された設備データベースを作ることは困難であった。しかし、本実施形態では、変更データは時系列で統合されるため、統合の日時によらず設備データベースを時系列で並べ替えるため、設備データベースを統合することを可能にし、上記の通り、設備データベースを一斉に切り替えることが可能となった。
(2)データベース統合部40は、ネットワークに接続された入力装置の入力に基づいて、変更データの統合を行う。設備データベースの変更・試験においては、運用開始日までに試験が間に合わない場合や変更に不具合が生じる可能性がある。設備データベースの試験を行いつつ変更データを統合するのではなく、メンテナンス卓Dからの入力に基づいて変更データを統合することにより、作業者は不具合が生じた際に運用開始日自体を変更することが可能になる。
(3)従来、例えば運用拠点2Aおよび2Bに共有されている電力系統設備を変更する場合には、運用拠点2Aおよび2Bの両者が、それぞれの設備データベースを変更し、試験する必要があった。しかし、本実施形態のように設備データベースが統合されている場合には、何方か一方が設備データベースの変更、試験を行えば良いため、運用拠点で共有されている設備データベースの変更作業の負荷が低減される。
[第二の実施形態]
 第二の実施形態の電力系統監視制御システムの構成は、基本的には第一の実施形態と同じである。ただし、図10に示す通り、設備DB変更部22は、運用拠点抽出部22aを有する。運用拠点抽出部22aは、現用設備DB記憶部21または統合設備DB記憶部43から読み出された設備データベースから、作業者から指定された運用拠点の設備データベースを検索して抽出する処理部である。抽出された設備データベースは、メンテナンス卓Dに出力される。
 以上のような構成を有する本実施形態では、上記実施形態に加えて以下の作用効果を得ることができる。本実施形態の設備データベースは、複数の運用拠点2A~2Eの電力系統設備に関するデータが統合されたデータベースである。そのため、複数の運用拠点2A~2Eの電力系統設備に関する全てのデータが含まれた設備データベースに基づいて、作業者は設備データベースの変更を行うことになる。本実施形態では、運用拠点抽出部22aが設けられているため、作業者は所望の運用拠点の設備データベースを検索・表示することが可能となる。よって、設備データベースの変更作業が簡易化される。
 また、本実施形態では、例えば、運用拠点2Aが他の運用拠点である運用拠点2Bの設備データベースを抽出することも可能である。従って、例えば運用拠点2Bの監視制御卓に異常が生じた場合であっても、運用拠点2Aの監視制御卓Cおよびメンテナンス卓Dを用いて設備データベースの変更、試験、統合を行うことが可能となる。
[第三の実施形態]
 第三の実施形態の電力系統監視制御システムの構成は、基本的には第一の実施形態と同じである。ただし、図11に示す通り、設備DB変更部22は、運用拠点変更部22bを有する。運用拠点変更部22bは、メンテナンス卓Dからの入力に基づき、電力系統設備を監視制御する運用拠点を変更する処理部である。
 以上のような構成を有する本実施形態では、上記実施形態に加えて以下の作用効果を得ることができる。例えば、図12に示す通り、運用拠点変更部22bは、統合設備DB記憶部43に記憶されている統合された設備データを読み出し、設備Aに関する情報のうち監視制御運用拠点を、運用拠点2Aから2Bに変更する。このような本実施形態では、ある運用拠点の監視制御サーバが故障した場合に、他の運用拠点の監視制御サーバに、監視制御サーバが故障した運用拠点の監視制御を行わせることができる。
[他の実施形態]
(1)電力系統監視制御システムは、CPU等を含むコンピュータを所定のプログラムで制御することによって実現できる。この場合のプログラムは、コンピュータのハードウェアを物理的に活用することで、上記のような各部の処理を実現するものである。
 上記の各部の処理を実行する方法、プログラム及びプログラムを記録した記録媒体も、実施形態の一態様である。また、ハードウェアで処理する範囲、プログラムを含むソフトウェアで処理する範囲をどのように設定するかは、特定の態様には限定されない。たとえば、上記の各部のいずれかを、それぞれの処理を実現する回路として構成することも可能である。また、上記の各処理部、記憶部等は、共通のコンピュータにおいて実現してもよい。
(2)上記の実施形態では、設備データベースは、運用開始日、電力系統設備、管轄運用拠点、監視制御運用拠点、監視制御情報等の情報を含むこととした。他にも、設備データベースは、設備データベースに変更を加えた運用拠点に関する情報を含む構成としてもよい。上記の実施形態では、複数の運用拠点が設備データベースを変更することが可能となるため、変更を加えた運用拠点に関する情報を含めることで、他の運用拠点の変更内容を確認することができて良い。
(3)上記の実施形態では、変更データ抽出部23は、現用設備データベースと、設備DB変更部22から入力された設備データベースを比較し、変更データを抽出する構成とした。ただし、現用設備データベースと、試験設備DB記憶部24に記憶されている設備データベースを比較し、変更データを抽出する構成としてもよい。
(4)上記の実施形態では、運用開始日抽出部41が変更データの運用開始日を抽出し、統合部42が時系列で変更データを統合する構成とした。ただし、運用開始日抽出部41は、運用開始時間に関する情報を抽出する構成としても良い。その場合、統合部42は、時分秒までを含めて時系列で変更データを統合するように構成する。
(5)上記の実施形態では、運用拠点抽出部22aおよび運用拠点変更部22bを設け、運用拠点を抽出および変更する構成とした。ただし、抽出部および変更部は、設備データベースに含まれる他の情報に対しても適宜設けることができる。
(6)上記の実施形態では、設備DB変更部22は、初期条件である現用設備DB記憶部21の現用設備データベースを読み出し、変更を加える構成とした。ただし、監視制御の運用が開始された以降は、設備DB変更部22は、統合設備DB記憶部43から統合された設備データベースを読み出し、変更する構成としてもよい。
(7)上記実施形態は、適宜組み合わせることが可能である。すなわち、第一~第三の実施形態の全てを組み合わせることにより、その全ての作用効果を得ることができる。
(8)本発明のいくつかの実施形態を説明したが、これらの実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。これら実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。これら実施形態やその変形は、発明の範囲や要旨に含まれると同様に、請求の範囲に記載された発明とその均等の範囲に含まれるものである。
1A~1E…監視制御サーバ
2A~2E…運用拠点
M…メンテナンスサーバ
N…電力監視制御ネットワーク
E…電力系統設備
C…監視制御卓
D…メンテナンス卓
11…監視制御部
12…監視制御情報記憶部
13…設備DB切替部
14…現用設備DB記憶部
15…統合設備DB記憶部
16…試験設備DB記憶部
17…試験部
20…メンテナンス部
21…現用設備DB記憶部
22…設備DB変更部
22a…運用拠点抽出部
22b…運用拠点変更部
23…変更データ抽出部
24…試験設備DB記憶部
30…送信部
40…データベース統合部
41…運用開始日抽出部
42…統合部
43…統合設備DB記憶部

Claims (6)

  1.  複数の運用拠点が有する複数の電力系統設備に関する情報である設備データベースに基づき、前記電力系統設備の監視制御を行う複数の監視制御サーバと、
     前記設備データベースの更新を行うメンテナンスサーバと、を有し、
     前記複数の運用拠点と、前記複数の監視制御サーバと、前記メンテナンスサーバと、はネットワークを介して接続され、
     前記メンテナンスサーバは、
     前記設備データベースに対する変更データを抽出する変更データ抽出部と、
     前記変更データ抽出部が抽出した変更データに含まれる運用開始日に関する情報を抽出する運用開始日抽出部と、
     前記運用開始日抽出部が抽出した運用開始日に関する情報に基づいて、前記変更データを時系列で前記設備データベースに統合する統合部と、を有することを特徴とする電力系統監視制御システム。
  2.  前記統合部は、先に統合された変更データより、後に統合された変更データの運用開始日に関する情報の方が早い場合には、当該後に統合された変更データが、先に統合された変更データの前となるように、時系列で並べ替えて統合することを特徴とする請求項1記載の電力系統監視制御システム。
  3.  前記統合部は、前記ネットワークに接続された入力装置の入力に基づいて、前記変更データの統合を行うことを特徴とする請求項1又は2記載の電力系統監視制御システム。
  4.  前記設備データベースには、電力系統設備を管轄する運用拠点の情報が含まれ、
     前記メンテナンスサーバは、前記管轄する運用拠点の情報により設備データベースを抽出する運用拠点抽出部をさらに有することを特徴とする請求項1~3いずれか一項記載の電力系統監視制御システム。
  5.  前記設備データベースには、電力系統設備を監視制御する運用拠点の情報が含まれ、
     前記メンテナンスサーバは、前記監視制御する運用拠点を変更する運用拠点変更部をさらに有することを特徴とする請求項1~4いずれか一項記載の電力系統監視制御システム。
  6.  複数の運用拠点と、複数の運用拠点が有する複数の電力系統設備に関する情報である設備データベースに基づき、前記電力系統設備の監視制御を行う複数の監視制御サーバと、にネットワークを介して接続されたコンピュータに、前記設備データベースの更新を行わせるプログラムであって、
     コンピュータに、
     前記設備データベースに対する変更を抽出する変更データ抽出処理と、
     抽出した変更データに含まれる運用開始日に関する情報を抽出する運用開始日抽出処理と、
     抽出した運用開始日に関する情報により、前記変更データを時系列で前記設備データベースに統合する統合処理と、を実行させることを特徴とする電力系統監視制御プログラム。
     
     
     
PCT/JP2014/079795 2014-09-24 2014-11-11 電力系統監視制御システムおよび電力系統監視制御プログラム WO2016046996A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2014194387A JP2016066228A (ja) 2014-09-24 2014-09-24 電力系統監視制御システムおよび電力系統監視制御プログラム
JP2014-194387 2014-09-24

Publications (1)

Publication Number Publication Date
WO2016046996A1 true WO2016046996A1 (ja) 2016-03-31

Family

ID=55580553

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2014/079795 WO2016046996A1 (ja) 2014-09-24 2014-11-11 電力系統監視制御システムおよび電力系統監視制御プログラム

Country Status (2)

Country Link
JP (1) JP2016066228A (ja)
WO (1) WO2016046996A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10489019B2 (en) 2017-06-16 2019-11-26 Florida Power & Light Company Identifying and presenting related electrical power distribution system events
US10837995B2 (en) 2017-06-16 2020-11-17 Florida Power & Light Company Composite fault mapping
US10852341B2 (en) 2017-06-16 2020-12-01 Florida Power & Light Company Composite fault mapping

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6828418B2 (ja) * 2016-12-22 2021-02-10 東京電力ホールディングス株式会社 集中監視制御システム
JP6828416B2 (ja) * 2016-12-22 2021-02-10 東京電力ホールディングス株式会社 集中監視制御システム
JP6828417B2 (ja) * 2016-12-22 2021-02-10 東京電力ホールディングス株式会社 集中監視制御システム
KR101998295B1 (ko) * 2017-12-28 2019-07-10 주식회사 제니스텍 고속 직렬 버스를 갖는 다중 저장 메모리 공유 방식의 전력 제어 시스템

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09312931A (ja) * 1996-05-23 1997-12-02 Mitsubishi Electric Corp 電力系統設備データメンテナンス方法
JP2002354668A (ja) * 2001-05-23 2002-12-06 Toshiba Corp 電力系統監視制御装置
JP2003032916A (ja) * 2001-07-13 2003-01-31 Mitsubishi Electric Corp 電力系統監視・制御システム
JP2003061246A (ja) * 2001-08-10 2003-02-28 Mitsubishi Electric Corp 将来系統展開装置
JP2004364421A (ja) * 2003-06-05 2004-12-24 Tm T & D Kk 電力系統監視制御装置および電力系統監視制御装置用プログラム
JP2010011561A (ja) * 2008-06-24 2010-01-14 Chugoku Electric Power Co Inc:The 分散型監視制御システム及び同システムのデータの更新方法
JP2011041416A (ja) * 2009-08-17 2011-02-24 Hitachi Ltd 電力系統の設備データ管理方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09312931A (ja) * 1996-05-23 1997-12-02 Mitsubishi Electric Corp 電力系統設備データメンテナンス方法
JP2002354668A (ja) * 2001-05-23 2002-12-06 Toshiba Corp 電力系統監視制御装置
JP2003032916A (ja) * 2001-07-13 2003-01-31 Mitsubishi Electric Corp 電力系統監視・制御システム
JP2003061246A (ja) * 2001-08-10 2003-02-28 Mitsubishi Electric Corp 将来系統展開装置
JP2004364421A (ja) * 2003-06-05 2004-12-24 Tm T & D Kk 電力系統監視制御装置および電力系統監視制御装置用プログラム
JP2010011561A (ja) * 2008-06-24 2010-01-14 Chugoku Electric Power Co Inc:The 分散型監視制御システム及び同システムのデータの更新方法
JP2011041416A (ja) * 2009-08-17 2011-02-24 Hitachi Ltd 電力系統の設備データ管理方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10489019B2 (en) 2017-06-16 2019-11-26 Florida Power & Light Company Identifying and presenting related electrical power distribution system events
US10809885B2 (en) 2017-06-16 2020-10-20 Florida Power & Light Company Identifying and presenting related electrical power distribution system events
US10837995B2 (en) 2017-06-16 2020-11-17 Florida Power & Light Company Composite fault mapping
US10852341B2 (en) 2017-06-16 2020-12-01 Florida Power & Light Company Composite fault mapping

Also Published As

Publication number Publication date
JP2016066228A (ja) 2016-04-28

Similar Documents

Publication Publication Date Title
WO2016046996A1 (ja) 電力系統監視制御システムおよび電力系統監視制御プログラム
CN106685676B (zh) 一种节点切换方法及装置
KR101418229B1 (ko) 서보 제어 장치의 이상 진단 장치 및 이상 진단 시스템
JPWO2017195261A1 (ja) エレベーター遠隔保守支援システム、およびエレベーター遠隔保守支援方法
CN103795572B (zh) 主从服务器的切换方法及监控服务器
CN103500475A (zh) 一种办公楼宇门禁系统的调试方法、系统
US10855102B2 (en) Method for monitoring a source changeover switch and source changeover switch implementing such a method
JP6038418B1 (ja) プログラマブル表示器及び制御システム
WO2013132529A1 (ja) 監視制御システム
KR101426525B1 (ko) 변전 설비 감시 시스템
CN104049578B (zh) 用于基础设施监测控制的方法和系统
DE102023115224A1 (de) Einrichtungen und verfahren für nicht-störendes ersetzen von simplex-e/a-komponenten
JP6377537B2 (ja) 電力系統監視装置、電力系統監視方法及び電力系統監視プログラム
JP2012165613A (ja) 監視制御システム
JP5814753B2 (ja) 電力系統監視制御システム
CN114978923B (zh) 故障演练方法、装置和系统
JP2009095197A (ja) 遠方監視制御装置用模擬装置及び電力系統監視制御システム
JP2013168038A (ja) プラント用装置の更新試験装置、更新試験方法及び更新試験プログラム
KR101960324B1 (ko) 시설물 통합 원격 장비 관리 시스템
JP2016200942A (ja) インストール装置およびインストール方法
JP2014003838A (ja) データメンテナンス用クライアント端末
JP6702540B2 (ja) 監視制御システム、監視制御方法及び監視制御装置
WO2014033943A1 (ja) バックアップ装置、バックアップシステム及びバックアップ方法
JP2016091393A (ja) オンライン試験方法
JP2012221282A (ja) プラント制御システムおよびプラント制御方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14902702

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14902702

Country of ref document: EP

Kind code of ref document: A1