WO2016031374A1 - 現金装填自動計画装置および方法 - Google Patents

現金装填自動計画装置および方法 Download PDF

Info

Publication number
WO2016031374A1
WO2016031374A1 PCT/JP2015/068266 JP2015068266W WO2016031374A1 WO 2016031374 A1 WO2016031374 A1 WO 2016031374A1 JP 2015068266 W JP2015068266 W JP 2015068266W WO 2016031374 A1 WO2016031374 A1 WO 2016031374A1
Authority
WO
WIPO (PCT)
Prior art keywords
automatic transaction
delivery
automatic
cash
plan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2015/068266
Other languages
English (en)
French (fr)
Inventor
正樹 土谷
康夫 後藤
崇司 松尾
英史 濱田
雅之 手塚
麗莉 郭
継紅 張
汝洋 呂
慧 程
超 戴
可 姜
然 李
園萍 王
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Financial Equipment System Shen Zhen Co Ltd
Hitachi Channel Solutions Corp
Original Assignee
Hitachi Financial Equipment System Shen Zhen Co Ltd
Hitachi Omron Terminal Solutions Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Financial Equipment System Shen Zhen Co Ltd, Hitachi Omron Terminal Solutions Corp filed Critical Hitachi Financial Equipment System Shen Zhen Co Ltd
Priority to JP2016545021A priority Critical patent/JPWO2016031374A1/ja
Publication of WO2016031374A1 publication Critical patent/WO2016031374A1/ja
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/02Banking, e.g. interest calculation or account maintenance

Definitions

  • the present invention relates to a method for determining a delivery cash amount and a delivery plan when delivering cash to a plurality of automatic transaction devices scattered within a predetermined area, and a plan for delivering cash to each automatic transaction device using the method. Relates to a device for creating
  • the delivery plan is to group delivery destinations based on the installation location of the automatic transaction equipment, perform delivery for each group, and assign delivery dates in this way, each delivery date based on general forecast data It was just to set the amount of cash delivery.
  • the delivery plan in the conventional technology, it is often difficult to manage funds efficiently due to surplus or lack of funds. Further, according to the method for creating a delivery plan as described above, the delivery plan is easily patterned, so there is a problem in terms of security.
  • Patent Document 1 predicts future deposit / withdrawal status according to the past deposit / withdrawal status for each automatic transaction device installed in the same store. A technique for determining the replenishment time and amount of cash is disclosed.
  • a host computer of a cash transport organization manages a prepayment from a financial institution and replenishes / collects cash, thereby storing a predetermined amount of cash in a plurality of ATMs.
  • a technology is disclosed in which a host computer is connected to each ATM via a communication line and receives stored cash data transmitted from the ATM.
  • Both the host computer of the cash transport organization and the host computer of the financial institution are connected via a communication line to constitute a communication network for ATM cash storage management.
  • the host computer of the cash transport facility has a plan determining means for determining a cash replenishment / collection plan for each ATM based on the ATM storage amount data.
  • the automatic scrutiny means which scrutinizes the cash stored in the cash storage unit is installed in the ATM.
  • Patent Document 3 discloses a value medium collection and delivery system, a cassette used in the system, a counter, a scrutiny machine, and a preparation value medium loading machine.
  • a data recording unit is installed in the cassette, and the counter counts the value of the value medium, stores the value medium in the cassette, and records data in the data recording unit of the cassette.
  • the scrutinizer takes out the value medium from the cassette and counts it, and reads the data from the data recording part of the cassette.
  • the value medium loading machine loads the prepared value medium into a cassette and records data in the data recording unit of the cassette.
  • the host computer communicates with an ATM installed outside a general store to read data indicating the deposit / withdrawal status of each device, and uses this data as a past transaction data on a floppy disk ( A technique for storing a floppy in a registered trademark is disclosed.
  • delivery conditions such as the installation location and delivery capacity of each ATM are set in advance, and the past transaction data is used to estimate the deposit / withdrawal status of each ATM within a predetermined period in the future. From this, a cash delivery plan to each ATM is created based on the estimation result and delivery conditions.
  • the present invention has been made to solve the above-described technical problems in the prior art, and makes a plan that can efficiently deliver cash to each automatic transaction apparatus in both aspects of delivery work and fund management. For the purpose.
  • the present invention provides an automatic cash loading planning device that determines a plan for delivering cash to a plurality of automatic transaction devices respectively installed at a plurality of points.
  • the apparatus includes a distribution route generation unit that generates route information to be delivered to each automatic transaction apparatus and a delivery cash amount, and an automatic transaction apparatus based on a predicted balance value of each automatic transaction apparatus, current balance information, and delivery conditions.
  • a plan optimization unit that changes a delivery presence / absence condition for deciding whether or not to deliver a product and thereby determines a loading plan for each automatic transaction apparatus based on a condition that minimizes the total cost. It is characterized by that.
  • the cash loading automatic planning device In the cash loading automatic planning device, the cash loading automatic planning device generates a model for predicting a future transaction volume based on past transaction data and past external environment data of each automatic transaction device, and the generated model Further includes a prediction model generation unit that predicts a balance prediction value that is the balance of each automatic transaction apparatus at a predetermined time in the future, and the delivery route generation unit includes the automatic transaction apparatus generated by the prediction model generation unit. Route information to be delivered to each automatic transaction apparatus and delivery cash amount may be generated on the basis of the estimated balance value, current stock information and delivery conditions.
  • the prediction model generation unit In the cash loading automatic planning device, the prediction model generation unit generates condition data based on past transaction data and past external environment data of each automatic transaction device, and based on the condition data, each of the automatic transaction devices A device individual model for predicting the future transaction volume is generated, and each automatic transaction at a predetermined time in the future is generated by the device individual model based on the stock information of each automatic transaction device obtained from the latest external environment data.
  • the cash demand of the transaction device may be predicted, and thereby the predicted balance value of each automatic transaction device at a predetermined future time may be predicted.
  • the delivery route generation unit calculates a single round-trip time required for delivering each of the automatic transaction apparatuses independently, and independently for each of the two automatic transaction apparatuses. Calculate the saving time to save when moving from one automatic transaction device to another automatic transaction device for delivery, and within the range of the length of the saving time, the range not exceeding the delivery capacity
  • the automatic transaction apparatus may be sequentially selected from a plurality of automatic transaction apparatuses and added to the route, thereby generating route information to be delivered to each automatic transaction apparatus.
  • the delivery route generation unit selects an automatic transaction apparatus having the longest single round trip time from a plurality of automatic transaction apparatuses, and selects an automatic transaction apparatus from the automatic transaction apparatus having the longest single round trip time to another automatic transaction apparatus.
  • Calculate the delivery time for delivery to a certain automatic transaction device select the other automatic transaction device in the route with the shortest delivery time and add it to the route, thereby not exceeding the delivery capacity within the range, the automatic transaction apparatus may be sequentially selected from other automatic transaction apparatuses and added to the route, thereby generating route information to be delivered to each automatic transaction apparatus.
  • the plan optimization unit includes a cash preparation cost and a delivery cost based on the route information and the delivery cash amount of a plurality of automatic transaction devices generated by the delivery route generation unit.
  • the delivery route generation unit By calculating the total cost and changing the delivery presence / absence condition for determining whether or not to deliver to the automatic transaction apparatus, the delivery route generation unit repeatedly generates the route information and the delivery cash amount.
  • the loading plan for each automatic transaction apparatus may be determined based on the condition with the smallest total cost.
  • the plan optimization unit calculates a total value of the total cost within the calculation specified period as a specified period total cost, and sets the total cost for the specified period to the automatic transaction apparatus so that the specified total cost is minimized.
  • a delivery presence / absence condition for determining whether or not to perform delivery may be changed, thereby determining a loading plan for each automatic transaction apparatus.
  • the plan optimization unit calculates the total value of the total cost within the calculation specified period for the automatic transaction apparatus that does not necessarily have to be delivered, and sets the total cost for the specified period, A delivery presence / absence condition for deciding whether or not to deliver to the automatic transaction apparatus that does not necessarily have to be delivered is changed so that the total cost for the specified period is minimized, thereby loading each automatic transaction apparatus A plan may be determined.
  • the automatic cash loading planning device may further include a display unit that displays the loading plan determined by the plan optimization unit and / or route information corresponding to the loading plan.
  • the present invention further provides an automatic cash loading planning method for determining a plan for delivering cash to a plurality of automatic transaction apparatuses respectively installed at a plurality of points by a computer system, and the method includes a balance of each automatic transaction apparatus. Based on the predicted value, current stock information, and delivery conditions, the route information to be delivered to each automatic transaction device and the delivery route generation step for generating the delivery cash amount, and whether to deliver to the automatic transaction device A plan optimizing step for changing a delivery presence / absence condition for determining a loading plan for each automatic transaction apparatus based on a condition that minimizes the total cost.
  • the cash loading automatic planning method generates a model for predicting a future transaction volume based on past transaction data and past external environment data of each automatic transaction apparatus, and the generated model Further includes a prediction model generation step of predicting a balance prediction value that is the balance of each automatic transaction apparatus at a predetermined time in the future, and the delivery route generation step includes a step of generating each of the automatic transaction apparatuses generated by the prediction model generation step.
  • Route information to be delivered to each automatic transaction apparatus and delivery cash amount may be generated on the basis of the estimated balance value, current stock information and delivery conditions.
  • the cash loading automatic planning method may further include a display step of displaying the loading plan determined by the plan optimization step and / or route information corresponding to the loading plan.
  • the present invention further provides a cash demand prediction method for predicting the cash demand of a plurality of automatic transaction apparatuses by a computer system, and the method is based on past transaction data and past external environment data of each automatic transaction apparatus.
  • a step of generating data a step of generating a device individual model for predicting the future transaction volume of each automatic transaction device based on the condition data, and the existence of each automatic transaction device obtained from the latest external environment data. Predicting the cash demand of each automatic transaction apparatus at a predetermined future time by the apparatus individual model based on high information.
  • the present invention further provides a delivery route generation method for generating a route to be delivered to a plurality of automatic transaction apparatuses respectively installed at a plurality of points, and the method performs delivery to each automatic transaction apparatus independently.
  • a delivery route generation method for generating a route to be delivered to a plurality of automatic transaction apparatuses respectively installed at a plurality of points, and the method performs delivery to each automatic transaction apparatus independently.
  • the present invention further provides a delivery plan optimizing method for optimizing a plan for delivering cash to a plurality of automatic transaction apparatuses respectively installed at a plurality of points, and the method is installed at each of a plurality of points.
  • Calculating the total cost including the cash preparation cost and the delivery cost based on the route information and the delivery cash amount delivered to a plurality of automatic transaction devices, and calculating the total value of the total cost within the calculation designated period The route information and delivery so that the designated period total cost is minimized by changing the specified period total cost and changing the delivery presence / absence condition for determining whether to deliver to the automatic transaction apparatus.
  • the delivery plan optimization method may further include a display step of displaying the determined loading plan and / or route information corresponding to the loading plan.
  • FIG. 1 is a schematic diagram of an automatic cash loading planning system according to a first embodiment. It is the schematic of the automatic transaction apparatus in the cash loading automatic planning system concerning Embodiment 1.
  • FIG. It is the schematic of the modification of the cash loading automatic planning system concerning Embodiment 1.
  • FIG. It is a hardware block diagram of the cash loading automatic planning device concerning Embodiment 1. It is a module block diagram of the cash loading automatic planning device concerning Embodiment 1.
  • FIG. It is a flowchart of the cash loading automatic planning method concerning Embodiment 1. It is a flowchart explaining the specific example of the prediction model production
  • FIG. 1 It is a flowchart explaining the specific example of the delivery route production
  • FIG. 2nd part It is a flowchart explaining the specific example (2nd part) of the plan optimization step of the cash loading automatic planning method concerning Embodiment 1.
  • FIG. 1 is a schematic diagram showing a configuration example of an automatic cash loading planning system according to a first embodiment to which the present invention is applied.
  • the automatic cash loading planning system includes an automatic transaction apparatus 1 (1-1 to 1-4), a bank host computer 2, and an automatic cash loading planning apparatus 3.
  • the automatic transaction apparatus 1 (1-1 to 1-4)
  • a bank host computer 2 1-1 to 1-4
  • an automatic cash loading planning apparatus 3 3
  • each device in the cash loading automatic planning system will be described in detail.
  • FIG. 2 is an external view of an automatic transaction apparatus in the automatic cash loading planning system according to the first embodiment to which the present invention is applied.
  • the installation position and shape of each component are shown schematically and do not limit the present invention. In practice, various installation positions and shapes can be employed depending on the situation.
  • the automatic transaction apparatus 1 is an automatic transaction apparatus that is used for transactions such as payment at a bank or the like.
  • the automatic transaction apparatus 1 includes an operation panel (for example, a touch panel display), operation keys, and a password input unit, and a user operates them to perform a transaction.
  • the automatic transaction apparatus for example, a card entrance, a deposit / withdrawal port, a statement slip discharge port, and the like are installed on the front surface.
  • the automatic transaction apparatus accommodates a bill processing mechanism 9, a control unit, and a receiving unit and a transmitting unit that communicate with the host computer 2 of the bank via a network.
  • a staff operation panel for example, a touch panel display
  • the bill processing mechanism 9 is provided with a cassette for storing cash. The cash required for the transaction is replenished to the automatic transaction apparatus 1 by delivering and loading the cassette with cash.
  • the bank host computer 2 is connected to a plurality of automatic transaction apparatuses 1 installed inside and outside the general store via a line, and manages transaction processing of each automatic transaction apparatus 1.
  • Each automatic transaction apparatus 1 is managed by, for example, a management company.
  • the management company is in charge of loading the cash of the automatic transaction apparatus 1 in a predetermined area divided by boundaries such as cities and prefectures.
  • the bank replenishment plan creation department must communicate the cash plan required for recharging the next day to the management company via communication.
  • a plan is created by the cash loading automatic planning device 3 and transmitted to the management company.
  • the automatic cash loading planning device 3 may be realized by, for example, a general-purpose computer, or may be realized by a dedicated device or an integrated circuit.
  • the automatic cash loading plan device 3 accepts past transaction data created by the host computer 2 and delivery conditions set by the bank, and automatically creates a cash delivery plan in the area.
  • the past transaction data may be acquired via the recording medium without being connected to the automatic cash loading planning device 3 and the host computer 2 via a line.
  • the recording medium only needs to store data such as past transaction data and can be read by the automatic cash loading planning device 3, for example, a storage device such as a memory or a hard disk, or a laser disk such as a CD, DVD, or BD. And so on.
  • FIG. 3 is a diagram illustrating a modified example of the automatic cash loading planning system according to the first embodiment.
  • each automatic planning device 1 is directly connected to the automatic cash loading planning device 3 via a line, and past transaction data is transferred to each automatic transaction device 1. Send it.
  • FIG. 4 is a hardware configuration diagram of the automatic cash loading planning apparatus according to the first embodiment.
  • the automatic cash loading planning device 3 is composed of a CPU, a ROM, a RAM, and other memories as a control body, a hard disk, an input unit, an output unit, and the like. To do.
  • the input unit includes, for example, a keyboard, a mouse, and a corresponding interface.
  • the output unit includes, for example, a display, a printer, and a corresponding interface. Among these, when the cash loading automatic planning apparatus 3 and another computer are connected by an Internet line, the Internet line and the transmission / reception line are also included in the input unit and the output unit.
  • the hard disk stores a prediction model generation program, a delivery route generation program, a plan optimization program, and the like that predict the transaction volume of each automatic transaction apparatus 1.
  • an external environment database a condition database, a transaction database, a condition-specific model database, and the like are stored. Each database is empty at the initial stage.
  • These programs and database are installed in the hard disk from the recording medium by an installation operation.
  • the program and the database may be stored using a storage device such as a memory.
  • the prediction model generation program includes an inference rule for calculating a future deposit / withdrawal amount of each automatic transaction apparatus 1 based on past transaction data.
  • the inference rule may be, for example, a BP neural network function.
  • the CPU Based on the program and the inference rules, the CPU generates a model that predicts the future deposit / withdrawal amount of each automatic transaction apparatus 1 every business day and every hour, and stores the prediction model result in the condition-specific model database.
  • the automatic cash loading planning apparatus 3 reads past transaction data of each automatic transaction apparatus 1 through communication with the host computer 2 or each automatic transaction apparatus 1, and the past transaction data and A model for predicting the transaction amount of each automatic transaction apparatus 1 within a predetermined future period is generated using the past external environment data as learning condition data. It is to be noted that the current cash amount information of each automatic transaction apparatus 1 is read by communication with the host computer 2 or each automatic transaction apparatus 1, and it is determined whether or not the delivery is made to each automatic transaction apparatus 1, and the delivery is determined. If so, the amount of cash loaded is also determined.
  • Past transaction data is the contents of deposit / withdrawal transactions within a predetermined period in the past. For example, it is data in which a deposit amount and a withdrawal amount within a period are accumulated for each day, or a difference value between a sunrise amount and a deposit amount (hereinafter referred to as “consumption amount”).
  • the past transaction data may include current data.
  • the past transaction data is data obtained by collecting the amount of money in and out of the automatic transaction device in the past predetermined period or the amount of consumption for each device, business day, time or transaction.
  • Transport volume of each automatic transaction apparatus within a predetermined future period “Transaction volume of each automatic transaction apparatus within a predetermined period in the future” predicts the transaction volume of each automatic transaction apparatus using the past transaction data. This is data obtained by model generation. For example, the predicted value of the deposit / withdrawal amount or consumption amount of each automatic transaction apparatus in a predetermined future period is calculated in units of one business day or one hour.
  • “External environment data” “External environment data” is used to generate a forecast model for each automatic transaction device or when forecasting cash demand in transactions within a predetermined period for each automatic transaction device using the prediction model. For each automatic transaction apparatus, learning of a prediction model and setting of conditions at the time of prediction are required. “External environment data” is a past transaction data group for the learning and condition setting. This system generates a model that predicts a prediction result in units of one business day or one hour as a transaction amount for each automatic transaction apparatus by the learning, and is used for calculation of cash demand prediction. Further, the latest external environment data may include current stock information of each automatic transaction apparatus.
  • “Current balance information” “Current balance information” is information on the amount of cash in each automatic transaction apparatus at the time of communication, and may be included in external environment data.
  • Delivery condition includes information regarding the installation location of each automatic transaction apparatus, information regarding delivery capability, information regarding delivery cost, operating state of each automatic transaction apparatus installation location (such as a closed day of a retail store)
  • the maximum scrutiny cycle such as the scrutiny period determined by bank rules.
  • the delivery conditions are preferably set by combining a plurality of pieces of information.
  • the “Installation position of each automatic transaction apparatus” is determined based on the map coordinate information corresponding to the installation location of each automatic transaction apparatus or the average transit time of each road on the map. Can be displayed.
  • the “installation position of each automatic transaction apparatus” is not limited to this, and any data that can derive the geographical relationship of each automatic transaction apparatus such as the distance between the automatic transaction apparatuses may be used.
  • “Information on delivery capability” includes, for example, delivery capability within a predetermined period.
  • the delivery capacity is, for example, the number of delivery vehicles, the amount of cash that can be loaded into the delivery vehicle, the various working hours of the delivery unit, the upper limit value or the lower limit value of the loading amount when loading the automatic transaction apparatus, or almost It is indicated by the reference loading amount calculated for loading the same amount into the automatic transaction apparatus.
  • the various work hours for a delivery unit are, for example, standard work time for actually loading in one cassette in addition to the travel time for delivery when delivering from one delivery point to another. , The preparation time for loading the cassette, the post-process work time after loading the cassette, and the like.
  • the delivery capacity is generally determined by the number of business days, the number of workers, the number of delivery vehicles, etc. of the department in charge of delivery or the management company entrusted with the delivery.
  • the number of business days there may be a delivery count determined by the contract with the bank.
  • “Loaded cash amount” is represented by, for example, the amount of cash loaded in each automatic transaction apparatus or the face value and number of coins loaded.
  • the face value includes each denomination, each face value of the same denomination, and a combination thereof.
  • Delivery route which automatic transaction apparatus, which delivery vehicle, which delivery order, via which road, by what time, etc.
  • delivery route which automatic transaction apparatus, which delivery vehicle, which delivery order, via which road, by what time, etc.
  • “Scrutinize” is a comparison between the total amount of money in the bank account based on the records of the bank's host computer and the total value of money in the bank account calculated and recorded by the automatic transaction equipment. This process is also referred to as reconsideration scrutiny or reconsideration bill replenishment scrutiny.
  • FIG. 5 is a module configuration diagram of the automatic cash loading planning apparatus according to the first embodiment.
  • the automatic cash loading planning apparatus 3 according to the present embodiment includes, for example, a prediction model generation unit 31, a delivery route generation unit 32, and a plan optimization unit 33 as functional modules.
  • the prediction model generation unit 31 generates a model for predicting the future transaction volume based on the past transaction data and past external environment data of each automatic transaction apparatus 1, and each automatic transaction at a predetermined future time is generated by the generated model.
  • the balance prediction value that is the balance of the transaction apparatus 1 is predicted.
  • the delivery route generation unit 32 generates route information and delivery cash amount to be delivered to each automatic transaction apparatus 1 based on the predicted balance value of each automatic transaction apparatus 1, current stock information and delivery conditions.
  • the plan optimizing unit 33 changes the delivery presence / absence condition for determining whether or not to deliver to the automatic transaction apparatus 1, so that the total cost is reduced to each automatic transaction apparatus 1 based on the condition that the total cost is minimized. Determine the loading plan.
  • each of the functional modules of the automatic cash loading planning device 3 is realized, for example, by the CPU executing a corresponding program.
  • these functional modules are realized by, for example, independent electric circuit modules.
  • FIG. 6 is a flowchart of the cash loading automatic planning method according to the first embodiment.
  • the prediction model generation unit 31 in the prediction model generation step S ⁇ b> 1, the prediction model generation unit 31 generates a model for predicting a future transaction volume based on past transaction data and past external environment data of each automatic transaction apparatus 1. And the balance prediction value which is the amount of money of each automatic transaction apparatus 1 in the future predetermined time with the generated model is predicted.
  • the delivery route generation step S2 delivers the route information and the delivery cash amount to be delivered to each automatic transaction apparatus 1 based on the estimated balance of each automatic transaction apparatus 1, the current stock information and the delivery conditions. Is generated.
  • the plan optimization unit 33 changes the delivery presence / absence condition for determining whether or not to deliver to the automatic transaction apparatus 1, and thereby based on the condition that the total cost is minimized.
  • a loading plan for each automatic transaction apparatus 1 is determined.
  • FIG. 7 is a flowchart for explaining a specific example of the prediction model generation step of the automatic cash loading planning method according to the first embodiment.
  • the prediction model generation unit 31 of the cash loading automatic planning device 3 can calculate the prediction model result as follows.
  • the prediction model generation unit 31 generates condition data based on past transaction data and past external environment data.
  • condition data for example, the past deposit amount within a specified period such as holiday, day of the week, date, time, weather, every other day or every hour, within a specified period such as every other day or every hour The amount of withdrawal in the past.
  • the prediction model generation unit 31 generates a plurality of individual models for each automatic transaction device 1 for each business day based on the above condition data, and determines the future of each automatic transaction device 1 in the future.
  • a model for predicting deposits and withdrawals that is, a model by condition
  • the prediction model generation unit 31 uses the plurality of device individual models, and the stock information of each automatic transaction device at that time acquired according to the latest external environment data when creating the cash loading plan. Based on the date, device ID, etc., the cash demand at a certain future time such as the next day is predicted. Examples of cash demand forecast results include hourly demand forecast results and daily demand forecast results. The prediction result is a result obtained by predicting how much cash demand will be in each unit time in the future.
  • the prediction model generation unit 31 subtracts the cash demand prediction result from the latest cash transaction amount of each automatic transaction apparatus 1 to obtain the cash balance at the future time. Can be predicted.
  • the prediction model generation unit 31 can calculate the stocks at a plurality of future points in time from the next day, and the balance calculation result group at these points can be used as the balance prediction value.
  • the plurality of time points may be, for example, times after the maximum number of scrutiny cycles have elapsed.
  • the prediction model generation unit 31 predicts these balance prediction values separately by the generated plurality of device individual models, and adopts the balance prediction value evaluated as being closest to the latest external environment data.
  • FIG. 8 is a flowchart for explaining a specific example of the delivery route generation step of the automatic cash loading planning method according to the first embodiment.
  • the delivery route generation unit 32 of the cash loading automatic planning device 3 is based on the estimated balance value generated by the prediction model generation unit 31, the current amount information, the cassette capacity of each automatic transaction device 1, and the like. Based on the delivery conditions such as the minimum / maximum capacity limitation of the entire automatic transaction apparatus, the automatic transaction apparatus 1 to be delivered, the cash amount to be delivered to the automatic transaction apparatus 1, and the delivery route between each automatic transaction apparatus 1 are determined. To do.
  • the delivery route generation unit 32 selects the automatic transaction apparatus 1 that requires delivery on the next day based on the loading plan condition data.
  • the loading plan condition data for example, the condition that the dispatch to the automatic transaction apparatus 1 is indispensable, such as the above balance prediction value, current stock information, last scrutinization date, basic scrutiny cycle, maximum scrutiny cycle, paper medium replacement scheduled date Is included.
  • the delivery route generation unit 32 compares each automatic transaction apparatus 1 with the maximum scrutiny cycle and the previous scrutiny date, selects the following automatic transaction apparatus 1 as an automatic transaction apparatus that must be delivered the next day, and scrutinizes it. Set the flag to "Required".
  • the automatic transaction apparatus selected to be delivered the next day is the automatic transaction apparatus that has the maximum scrutiny cycle the next day, and the automatic that must be dispatched because the next day is the scheduled date for paper media replacement. Includes transaction equipment.
  • automatic transaction devices that do not reach the maximum scrutiny cycle on the next day there are also automatic transaction devices within the limit value range in which the estimated balance of the day after tomorrow does not satisfy the minimum / maximum capacity restrictions (that is, the balance cannot be maintained until the day after tomorrow). Selected as an automated transaction device that must be delivered the next day.
  • the delivery route generation unit 32 compares the basic scrutiny cycle with the previous scrutiny date for the automatic transaction apparatus within the limit value range in which the balance prediction value of the day after tomorrow does not satisfy the minimum / maximum capacity limit. On the next day, the scrutinization flag is set to “scrutinization date” for the automatic transaction apparatus 1 having a basic scrutiny cycle, and the scrutiny flags of other automatic transaction apparatuses 1 are selected as “hold”.
  • the delivery route generation unit 32 determines that the scrutiny flag is “required” and “scrutiny date” from the next day to the next scrutiny date after the basic scrutiny cycle.
  • the required loading amount of each automatic transaction apparatus 1 is determined so that the estimated balance of the automatic transaction apparatus 1 satisfies the minimum / maximum capacity limit.
  • the delivery route generation unit 32 creates a list of the required loading amount and the corresponding automatic transaction apparatus 1 and sets the next day loading plan.
  • the delivery route generation unit 32 generates a route plan.
  • the delivery route generation unit 32 is based on delivery condition information such as preparation time, work time, road information, position information of the automatic transaction device, work start time, work end time, etc. for the automatic transaction device 1 to be loaded. To determine the delivery route.
  • the delivery route generation unit 32 calculates a round-trip route when dispatching and returning to each automatic transaction apparatus 1 based on the work start point and the work end point.
  • a cash center etc. are mentioned as a work start point and a work end point.
  • the work start point and the work end point are the same, but of course, they may differ depending on the actual situation.
  • the delivery route generation unit 32 calculates the travel time of the route of each automatic transaction apparatus 1 based on the road information and the like, and adds it to the preparation time and work time to deliver the delivery time of each automatic transaction apparatus 1 (hereinafter, (Referred to as single round trip time).
  • the single round trip time of an arbitrary automatic transaction apparatus N is represented by T0, n + Tn, 0.
  • T0, n represents the time required to dispatch from the work start point to the installation point of the automatic transaction apparatus N
  • Tn, 0 represents the time required to return from the installation point of the automatic transaction apparatus N to the work end point. Represents.
  • the total of the calculated single round trip time of each automatic transaction apparatus is ⁇ (T 0, n + T n, 0 ), of which ⁇ is a code for calculating the sum.
  • the sum of the single round trip times of the automatic transaction apparatuses A and B is T 0, a + T a, 0 + T 0, b + T b, 0 .
  • the time required is T 0, a + T a, b + T b, 0 . .
  • the movement to another automatic transaction apparatus B is T a, 0 + T 0, b ⁇ T a compared to the single reciprocation to the automatic transaction apparatuses A and B. , B time can be saved.
  • the delivery route generation unit 32 follows the order of the saving time T a, 0 + T 0, b ⁇ T a, b until the delivery time of the newly generated route exceeds the time limit. Select in turn and add automatic transaction equipment to the route. Thereafter, the route generated before the delivery time exceeds the time limit is put on hold. If there is still an unjoined automatic transaction apparatus 1 in the route, a new route is generated, and the above process is continuously executed until all automatic transaction apparatuses 1 are added to the route.
  • the delivery route generation unit 32 generates a route plan by the above method.
  • the following specific method can be employed.
  • the automatic transaction apparatus 1 having the longest delivery time that is, the single round trip time
  • it moves from the work start point to the other automatic transaction apparatus 1 through the position of the automatic transaction apparatus 1 having the longest delivery time, and the work ends.
  • the travel time of each route is calculated and added to the preparation time and work time to calculate the delivery time.
  • a plurality of the delivery times can be calculated because there are a plurality of the routes.
  • the delivery route generation unit 32 compares delivery times passing through a plurality of routes of the two automatic transaction apparatuses (the automatic transaction apparatus having the longest delivery time and another automatic transaction apparatus), and has the shortest delivery time. Select a route. Subsequently, after sequentially passing through the two automatic transaction apparatuses from the work start point, the apparatus moves to another automatic transaction apparatus, and calculates a route to move to the work end point. Based on the road information and the like, the travel time of each route is calculated, and the delivery time is calculated by adding to the preparation time and the work time.
  • the delivery route generation unit 32 sequentially selects the automatic transaction devices to be delivered in accordance with the above-described method for each automatic transaction device 1 to be delivered, and sequentially connects the points of the automatic transaction devices to be delivered. And the generated delivery route.
  • the route to the automatic transaction apparatus before the generated delivery route exceeds the delivery capability is generated as the first delivery route.
  • the automatic transaction apparatus having the longest delivery time is selected from the work start point, and the second delivery route is calculated by the same method.
  • the delivery route generation unit 32 calculates delivery routes for all the automatic transaction apparatuses 1 subject to the loading plan, and uses all the calculated delivery routes as route information.
  • FIG. 9 is a flowchart for explaining a specific example (first part) of the plan optimization step of the automatic cash loading planning method according to the first embodiment.
  • FIG. 10 is a flowchart for explaining a specific example (second part) of the plan optimization step of the automatic cash loading planning method according to the first embodiment.
  • the plan optimization unit 33 of the cash loading automatic planning device 3 changes the delivery presence / absence condition for determining whether or not to deliver to the automatic transaction device 1, thereby minimizing the total cost. Based on the conditions, the loading plan for each automatic transaction apparatus 1 is determined.
  • the plan optimization unit 33 calculates the operation cost for the total required loading amount based on the cash preparation expense information such as the interest rate and the management cost for the total required loading amount of each automatic transaction apparatus 1.
  • the cash reserve cost is the amount of the cash preparation expense information.
  • the plan optimization unit 33 calculates a delivery cost based on the delivery cost information such as the work preparation unit price or the delivery unit price based on the route information.
  • the total cost is calculated by adding the cash preparation cost and the delivery cost.
  • the plan optimization unit 33 calculates the specified period information based on a preset maximum scrutiny period, etc., calculates the specified period not only for the next day, but also for the day after tomorrow, the day after tomorrow, and the like. The cost is calculated, and the total value of the total cost in the period is set as the specified period total cost. If the total cost for the specified period cannot be obtained, the process returns to the prediction model generation step S1, and the prediction model generation unit 31 performs the stock amount prediction based on another condition, and continues to execute according to the above process. Get the total cost for a specified period.
  • the automatic transaction apparatus 1 whose scrutiny flag is “scrutiny date” if it is determined that there is no problem in the amount of money based on the predicted balance value, compulsory delivery will be performed before the maximum scrutiny cycle It may be set so that it is unnecessary, that is, it is not intentionally dispatched for delivery.
  • the automatic transaction apparatus 1 whose scrutiny flag is “pending” there is an automatic transaction apparatus in which delivery is indispensable nearby even if it is determined that there is no problem in the balance based on the predicted balance value. Delivery may be more efficient as a result.
  • the plan optimization unit 33 performs the above-mentioned designated period total for each automatic transaction apparatus 1 whose scrutiny flags are “scrutinization date” and “hold”, that is, the automatic transaction apparatus 1 that does not necessarily have to be delivered the next day.
  • Select the delivery presence / absence condition for determining whether or not to deliver, that is, the lowest cost, that is, the optimum condition for whether or not to deliver, and the final loading plan and delivery based on the optimum condition for whether or not to deliver Determine the route.
  • the Taguchi-method can be used to suppress the amount of calculation and estimate the optimum value. Good. This will be specifically described below.
  • the plan optimization unit 33 sets the total designated period total cost as the initial designated period total cost.
  • the plan optimization unit 33 assigns a combination of conditions for the case where the target number is delivered to each automatic transaction apparatus 1 with respect to the La orthogonal table, and generates a prediction model based on each condition.
  • the prediction model generation unit 31 predicts the stock amount based on other conditions, and subsequently executes according to the above process, and calculates the total cost for the specified period under each condition.
  • the plan optimization unit 33 calculates the signal-to-noise characteristic SN ratio, and calculates a combination of delivery presence / absence conditions as to whether or not delivery with the minimum specified period total cost is the smallest. Based on the combination, the process returns to the prediction model generation step S1, the stock amount is predicted based on other conditions by the prediction model generation unit 31, and subsequently executed according to the above process, and the designated period total cost in the combination is recalculated. The estimated minimum total cost.
  • the plan optimization unit 33 determines the final loading plan and delivery route based on the condition of the predicted minimum total cost. If the predicted minimum total cost is not smaller than the initial designated period total cost, the plan optimization unit 33 determines the final loading plan and the delivery route based on the condition where the calculated designated period total cost is the smallest. (Other embodiments)
  • the automatic cash loading planning device 3 includes the prediction model generation unit 31 .
  • the automatic cash loading planning device 3 does not include the prediction model generation unit, and each automatic transaction device is configured by other devices.
  • the cash loading automatic planning device 3 may acquire the result via a recording medium or communication.
  • the automatic cash loading planning device 3 may include only the delivery route generation unit 32 and the plan optimization unit 33.
  • the cash loading automatic planning method executed by the cash loading automatic planning apparatus 3 may include only the delivery route generation step S2 and the plan optimization step S3.
  • the cash loading automatic planning device 3 may display the loading plan for each automatic transaction device determined by the plan optimization unit 33 by using an output unit such as a display as a display unit.
  • the display unit may display route information corresponding to the loading plan.
  • the display unit may be displayed by various methods such as a table and a node diagram, and is not limited here.
  • the automatic transaction apparatus 1 is described as an example of an automatic transaction apparatus that is used for transactions such as depositing in a bank or the like.
  • the automatic transaction apparatus 1 is not limited to this and is used for various automatic transaction operations. It may be a device.
  • the automatic transaction apparatus 1 processes a banknote, an automatic transaction apparatus is not limited to this, You may process moneys, such as a coin.
  • the overall operation cost including the cash amount in each automatic transaction apparatus is minimized while comprehensively considering various conditions such as the installation location and delivery capability of each automatic transaction apparatus. It is possible to determine a delivery schedule for replenishing cash according to conditions, thereby improving operational efficiency such as delivery efficiency and practicality of delivery.

Landscapes

  • Business, Economics & Management (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Engineering & Computer Science (AREA)
  • Development Economics (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Strategic Management (AREA)
  • Technology Law (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

 本発明は各自動取引装置に対して配送業務、資金運用の両方において効率よく現金を配送可能な計画を作成する現金装填自動計画装置および方法を提供する。 複数の地点にそれぞれ設置されている複数台の自動取引装置へ現金を配送する計画を決定する現金装填自動計画装置は、各自動取引装置の残高予測値、現在の在高情報および配送条件に基づいて、各自動取引装置へ配送するルート情報と配送現金量を生成する配送ルート生成ユニットと、自動取引装置に対して配送を行なうかどうかを決定するための配送有無条件を変更し、これにより総コストが最小となる条件に基づいて各自動取引装置への装填計画を決定する計画最適化ユニットと、を備える。

Description

現金装填自動計画装置および方法
 本発明は所定範囲の地域内に点在する複数の自動取引装置へ現金を配送する際に配送現金量と配送計画を決定する方法および当該方法を用いて各自動取引装置へ現金を配送する計画を作成する装置に関する。
 近年、銀行は顧客の利便性を図るために、都会における無人店舗(出張所)等の無人自動取引銀行、デパート、スーパー、コンビニエンスストアなどに自動取引装置を設置するようになった。
 これら通常銀行店舗外に設置されている自動取引装置に現金を補充するときは、銀行から委託された管理会社によって行われるのが一般的である。銀行側は自動取引装置の設置場所などに応じて適切な現金の配送計画を設定し、計画に対応する配送業務が行われるように管理会社に委託する。
 従来の技術において、配送計画は自動取引装置の設置場所に基づいて配送先をグループ分けし、グループごとに配送を行い、そしてこの方法で配送日を割り当て、一般の予測データに基づいて各配送日の現金の配送量を設定することに過ぎなかった。
 そのため、従来の技術における上述の配送計画ではしばしば剰余金が生じたり、資金不足が生じたりして、効率よく資金を運用することが難しかった。また、上述のような配送計画の作成方法によると、配送計画が簡単にパターン化されるため、セキュリティ面においても問題があった。
 これらについては、特許文献1に、資金を効率よく運用するために、同一店舗内に設置された自動取引装置に対して、装置ごとに過去の入出金状況に応じて今後の入出金状況を予測して現金の補充時間と補充量を決定する技術が開示されている。
 また、特許文献2に、現金輸送機関のホストコンピュータが金融機関からの前払い金を管理し、現金を補充/回収し、これにより複数のATMにそれぞれ所定の金額の現金を収納し、金融機関のホストコンピュータは通信回線を介して各ATMと接続し、ATMから送信される収納在高データを受信する技術が開示されている。現金輸送機関のホストコンピュータと金融機関のホストコンピュータの双方は通信回線を介して接続し、ATM現金収納管理の通信ネットワークを構成する。現金輸送機関のホストコンピュータは、ATMの収納在高データに基づいて各ATMの現金補充/回収の計画を決定する計画決定手段を有する。また、ATMに現金収納部の収納現金を精査する自動精査手段が設置されている。
 そして、特許文献3に、価値媒体の集配システム、当該システムに使用されるカセット、計数機、精査機および準備価値媒体装填機が開示されている。そのうち、カセットにはデータ記録部が設置され、計数機では価値媒体の価値を計数して当該価値媒体をカセットに収納するとともに、当該カセットのデータ記録部にデータを記録する。配送する際に、カセットのデータ記録部からデータを読み取り、価値媒体の取り出しを許可する。精査機はカセットから価値媒体を取り出すとともに計数を行い、カセットのデータ記録部からデータを読み取る。価値媒体装填機は準備した価値媒体をカセットに装填するとともに、当該カセットのデータ記録部にデータを記録する。
 しかし、広い地域内に点在する複数の自動取引装置を対象とした場合、資金の運用効率が求められるとともに、配送業務の効率向上も求められる。
 例えば、同じ日に近隣に設置された自動取引装置に配送したり、配送対象の装置の台数が管理会社の処理能力を超えないように日程を調整したり、地理条件や管理会社側の能力を総合的に考えた上で計画を立てなければならない。さらに、デパートやスーパーなどに設置された自動取引装置については、設置場所の休日など通常型の自動取引装置には発生しない条件も考慮した上で配送日などを決定しなければならない。
 これに対しては、特許文献4に、ホストコンピュータが一般店舗外に設置されたATMと通信することによって、各装置の入出金状況を示すデータを読み取り、これを過去の取引データとしてフロッピーディスク(フロッピーは登録商標)に記憶する技術が開示されている。現金配送計画作成装置には各ATMの設置位置や配送能力などの配送条件が予め設定されており、上記過去の取引データを用いて将来の所定期間内における各ATMの入出金状況を推測してから、当該推測結果と配送条件に基づいて、各ATMへの現金配送計画を作成する。
特開平8-315217号公報 特開2002-92316号公報 特開2000-82183号公報 特開2002-32569号公報
 しかし、このように設置場所に応じて自動取引装置をグループ分けし、所定期間内の各グループへの配送条件を適用すると、以下のような問題点がある。すなわち、管理会社側の能力が過剰となる場合に、配送作業が前倒しで計画されることによって配送現金量が増え易くなる。一方、管理会社側の能力が不足した場合に、急に発生する入出金取引の変動などに対応し難くなる。従って、配送現金量と配送コストのいずれもが適切である配送計画を立てることができない。
 本発明は従来の技術における上述の技術課題を解決するためになされたものであり、各自動取引装置に対して配送業務、資金運用のいずれの面においても効率よく現金を配送可能な計画を立てることを目的とする。
 上記課題を解決し、目的を達成するために、本発明は複数の地点にそれぞれ設置されている複数台の自動取引装置へ現金を配送する計画を決定する現金装填自動計画装置を提供し、当該装置は、各自動取引装置の残高予測値、現在の在高情報および配送条件に基づいて、各自動取引装置へ配送するルート情報と配送現金量を生成する配送ルート生成ユニットと、自動取引装置に対して配送を行なうかどうかを決定するための配送有無条件を変更し、これにより総コストが最小となる条件に基づいて各自動取引装置への装填計画を決定する計画最適化ユニットと、を備えることを特徴とする。
 上記現金装填自動計画装置において、前記現金装填自動計画装置は、各自動取引装置の過去の取引データと過去の外部環境データに基づいて将来の取引量を予測するモデルを生成し、生成されたモデルによって将来の所定時刻における各自動取引装置の在高である残高予測値を予測する予測モデル生成ユニットをさらに備え、前記配送ルート生成ユニットは、前記予測モデル生成ユニットによって生成された各自動取引装置の残高予測値、現在の在高情報および配送条件に基づいて、各自動取引装置へ配送するルート情報と配送現金量を生成してもよい。
 上記現金装填自動計画装置において、前記予測モデル生成ユニットは、各自動取引装置の過去の取引データと過去の外部環境データに基づいて条件データを生成し、前記条件データに基づいて各自動取引装置の将来の取引量をそれぞれ予測するための装置個別モデルを生成し、最新の外部環境データから得られた各自動取引装置の在高情報に基づいて、前記装置個別モデルによって将来の所定時刻における各自動取引装置の現金需要を予測し、これにより将来の所定時刻における各自動取引装置の残高予測値を予測してもよい。
 上記現金装填自動計画装置において、前記配送ルート生成ユニットは、各自動取引装置に対して単独に配送を行なうのに必要な単独往復時間を算出するとともに、二つの自動取引装置に対してそれぞれ単独に配送を行なう場合に対して一方の自動取引装置から他方の自動取引装置へ移動して配送を行なう場合に節約する節約時間を算出し、当該節約時間の長さの順に、配送能力を超えない範囲内で複数の自動取引装置から順次自動取引装置を選択してルートに加え、これにより各自動取引装置へ配送するルート情報を生成してもよい。
 上記現金装填自動計画装置において、前記配送ルート生成ユニットは、複数の自動取引装置から単独往復時間が最も長い自動取引装置を選択し、当該単独往復時間が最も長い自動取引装置からその他の自動取引装置のうちある自動取引装置へ移動して配送を行なう場合の配送時間を算出し、当該配送時間が最も短いルートにおけるその他の自動取引装置を選択してルートに加え、これによって、配送能力を超えない範囲内でその他の自動取引装置から順次自動取引装置を選択してルートに加え、これにより各自動取引装置へ配送するルート情報を生成してもよい。
 上記現金装填自動計画装置において、前記計画最適化ユニットは、前記配送ルート生成ユニットによって生成された複数台の自動取引装置の前記ルート情報と配送現金量に基づいて、現金準備コストと配送コストを含む総コストを算出し、自動取引装置に対して配送を行なうかどうかを決定するための配送有無条件を変更することにより、前記配送ルート生成ユニットに前記ルート情報と配送現金量を繰り返し生成させ、これにより総コストが最も小さい条件に基づいて各自動取引装置への装填計画を決定してもよい。
 上記現金装填自動計画装置において、前記計画最適化ユニットは、算出指定期間内の総コストの合計値を算出して指定期間総コストとし、前記指定期間総コストが最も小さくなるように自動取引装置に対して配送を行なうかどうかを決定するための配送有無条件を変更し、これにより各自動取引装置への装填計画を決定してもよい。
 上記現金装填自動計画装置において、前記計画最適化ユニットは、必ずしも配送しなくてもよい自動取引装置に対して、算出指定期間内の総コストの合計値を算出して指定期間総コストとし、前記指定期間総コストが最も小さくなるように前記必ずしも配送しなくてもよい自動取引装置に対して配送を行なうかどうかを決定するための配送有無条件を変更し、これにより各自動取引装置への装填計画を決定してもよい。
 上記現金装填自動計画装置において、前記現金装填自動計画装置は、前記計画最適化ユニットによって決定された装填計画および/または当該装填計画に対応するルート情報を表示する表示ユニットをさらに備えてもよい。
 本発明はさらにコンピュータシステムによって複数の地点にそれぞれ設置されている複数台の自動取引装置へ現金を配送する計画を決定する現金装填自動計画方法を提供し、当該方法は、各自動取引装置の残高予測値、現在の在高情報および配送条件に基づいて、各自動取引装置へ配送するルート情報と配送現金量を生成する配送ルート生成ステップと、自動取引装置に対して配送を行なうかどうかを決定するための配送有無条件を変更し、これにより総コストが最小となる条件に基づいて各自動取引装置への装填計画を決定する計画最適化ステップと、を含む。
 上記現金装填自動計画方法において、前記現金装填自動計画方法は、各自動取引装置の過去の取引データと過去の外部環境データに基づいて将来の取引量を予測するモデルを生成し、生成されたモデルによって将来の所定時刻における各自動取引装置の在高である残高予測値を予測する予測モデル生成ステップをさらに含み、前記配送ルート生成ステップは、前記予測モデル生成ステップによって生成された各自動取引装置の残高予測値、現在の在高情報および配送条件に基づいて、各自動取引装置へ配送するルート情報と配送現金量を生成してもよい。
 上記現金装填自動計画方法において、前記現金装填自動計画方法は、前記計画最適化ステップによって決定された装填計画および/または当該装填計画に対応するルート情報を表示する表示ステップをさらに含んでもよい。
 本発明はさらにコンピュータシステムによって複数台の自動取引装置の現金需要を予測する現金需要予測方法を提供し、当該方法は、各自動取引装置の過去の取引データと過去の外部環境データに基づいて条件データを生成するステップと、前記条件データによって各自動取引装置の将来の取引量をそれぞれ予測するための装置個別モデルを生成するステップと、最新の外部環境データから得られた各自動取引装置の在高情報に基づいて、前記装置個別モデルによって将来の所定時刻における各自動取引装置の現金需要を予測するステップと、を含むことを特徴とする。
 本発明はさらに複数の地点にそれぞれ設置されている複数台の自動取引装置へ配送するルートを生成する配送ルート生成方法を提供し、当該方法は、各自動取引装置に対して単独に配送を行なうのに必要な単独往復時間を算出するステップと、複数の自動取引装置から単独往復時間が最も長い自動取引装置を選択するステップと、当該単独往復時間が最も長い自動取引装置からその他の自動取引装置のうちある自動取引装置へ移動して配送を行なう場合の配送時間を算出し、当該配送時間が最も短いルートにおけるその他の自動取引装置を選択してルートに加えるステップと、配送能力を超えない範囲内でその他の自動取引装置から順次自動取引装置を選択してルートに加え、これにより各自動取引装置へ配送するルートを生成するステップと、含むことを特徴とする。
 本発明はさらに複数の地点にそれぞれ設置されている複数台の自動取引装置へ現金を配送する計画を最適化させる配送計画最適化方法を提供し、当該方法は、複数の地点にそれぞれ設置されている複数台の自動取引装置へ配送するルート情報と配送現金量に基づいて、現金準備コストと配送コストを含む総コストを算出するステップと、算出指定期間内の総コストの合計値を算出して指定期間総コストとするステップと、自動取引装置に対して配送を行なうかどうかを決定するための配送有無条件を変更することにより、前記指定期間総コストが最も小さくなるように前記ルート情報と配送現金量を繰り返し生成し、これにより各自動取引装置への装填計画を決定するステップと、を含むことを特徴とする。
 上記配送計画最適化方法において、前記配送計画最適化方法は、決定された装填計画および/または当該装填計画に対応するルート情報を表示する表示ステップをさらに含んでもよい。
 本発明によれば、各自動取引装置に対して配送業務、資金運用のいずれの面においても効率よく現金を配送可能な計画を立てることができる。
実施形態1にかかる現金装填自動計画システムの略図である。 実施形態1にかかる現金装填自動計画システムにおける自動取引装置の略図である。 実施形態1にかかる現金装填自動計画システムの変形例の略図である。 実施形態1にかかる現金装填自動計画装置のハードウェア構成図である。 実施形態1にかかる現金装填自動計画装置のモジュール構成図である。 実施形態1にかかる現金装填自動計画方法のフローチャートである。 実施形態1にかかる現金装填自動計画方法の予測モデル生成ステップの具体例を説明するフローチャートである。 実施形態1にかかる現金装填自動計画方法の配送ルート生成ステップの具体例を説明するフローチャートである。 実施形態1にかかる現金装填自動計画方法の計画最適化ステップの具体例(第一部分)を説明するフローチャートである。 実施形態1にかかる現金装填自動計画方法の計画最適化ステップの具体例(第二部分)を説明するフローチャートである。
 以下、図面および実施例に基づいて本発明にかかる現金装填自動計画装置および方法の一形態ついてさらに詳しく説明する。なお、図面において同一もしくは対応する箇所については同一の符号を付与し、説明を省略する。
 図1は本発明を適用した実施形態1にかかる現金装填自動計画システムの構成例を示す図略図である。図1に示すように、現金装填自動計画システムは、自動取引装置1(1-1~1-4)、銀行のホストコンピュータ2および現金装填自動計画装置3を含む。以下、現金装填自動計画システムにおける各装置についてそれぞれ詳しく説明する。
 図1に示すように、複数の自動取引装置1(1-1~1-4)はそれぞれ複数の個所に設置されている。図2は本発明を適用した実施形態1にかかる現金装填自動計画システムにおける自動取引装置の外観図である。図2において、各構成の設置位置および形状は概略を示したものであり、本発明を限定するものではない。実際においては状況に応じて様々な設置位置および形状を採用することができる。図2に示すように、自動取引装置1は、例えば、銀行などで入金などの取引に使用される自動取引装置である。当該自動取引装置1は操作パネル(例えばタッチパネルディスプレイ)、操作キーおよび暗証番号入力部を備え、ユーザがそれらを操作して取引を行う。自動取引装置1には、例えば、前面にカード出入口、入出金口および明細票排出口などが設置されている。自動取引装置の内部には紙幣処理機構9、制御部およびネットワークを介して銀行のホストコンピュータ2と通信を行う受信部と送信部が収納されている。また、自動取引装置1には、例えば、後面に係員操作用の係員操作パネル(例えば、タッチパネルディスプレイ)が設置されている。そのうち、紙幣処理機構9には現金を収納ためのカセットが設置されている。配送してカセットに現金を装填することにより、取引に必要な現金を自動取引装置1に補充する。
 銀行のホストコンピュータ2は回線を介して一般店舗内外に設置された複数の自動取引装置1に接続され、各自動取引装置1の取引処理を管理する。各自動取引装置1は、例えば、管理会社に任せて管理されている。管理会社は、例えば、市、県などの境界線により区画された所定範囲の地域に対して、当該地域内の自動取引装置1の現金の装填を担当する。
 銀行の装填計画作成部門は、翌日に装填必要な現金の計画を通信などによって管理会社に伝えなければならない。本実施形態では、現金装填自動計画装置3によって計画を作成し、管理会社に伝える。本実施形態にかかる現金装填自動計画装置3は、例えば、汎用のコンピュータによって実現するか、または専用装置や集積回路などによって実現してもよい。現金装填自動計画装置3はホストコンピュータ2によって作成された過去の取引データと銀行によって設定された配送条件を受け付けて、当該地域内の現金配送計画を自動的に作成する。
 また、図1の構成の代わりに以下の構成を採用してもよい。すなわち、現金装填自動計画装置3とホストコンピュータ2は回線を介して接続されずに、記録媒体を介して上記過去の取引データを取得してもよい。ここで、記録媒体は過去の取引データなどのデータを記憶し現金装填自動計画装置3によって読み取り可能であればよく、例えば、メモリ、ハードディスクなどの記憶装置、またはCD、DVD、BDなどのレーザディスクなどであってよい。
 また、図3に示す構成を採用してもよい。図3は実施形態1にかかる現金装填自動計画システムの変形例を示す図である。図3に示すように、現金装填自動計画システムの変形例においては、各自動計画装置1が回線を介して直接現金装填自動計画装置3に接続され、各自動取引装置1に過去の取引データを送信させる。
 以下、本実施形態にかかる現金装填自動計画装置3について具体的に説明する。まず、現金装填自動計画装置3として汎用コンピュータによって実現する場合のハードウェア構成について説明する。図4は実施形態1にかかる現金装填自動計画装置のハードウェア構成図である。現金装填自動計画装置3は、制御本体であるCPU、ROM、RAMなどの各メモリ、ハードディスク、入力部、出力部などから構成され、上記各構成の間は、例えばバスによって接続されてデータの伝送を行なう。
 入力部は、例えば、キーボード、マウスおよびそれに対応するインターフェースを含む。出力部は、例えば、ディスプレー、プリンタおよびそれに対応するインターフェースを含む。そのうち、現金装填自動計画装置3と別のコンピュータがインターネット回線によって接続される場合、当該インターネット回線と送受信回線も入力部および出力部に含まれる。
 ハードディスク内には、各自動取引装置1の取引量を予測する予測モデル生成プログラム、配送ルート生成プログラム、計画最適化プログラムなどが記憶されている。このほかに、外部環境データベース、条件データベース、取引データベース、条件別モデルデータベースなどが記憶されている。各データベースは初期段階において空の状態である。これらのプログラムとデータベースは記録媒体からインストール操作によりハードディスク内にインストールされる。ここで、ハードディスクの代わりに、メモリなどの記憶装置を用いて上記プログラムとデータベースを記憶してもよい。予測モデル生成プログラムには過去の取引データに基づいて各自動取引装置1の将来の入出金額を算出するための推論ルールが含まれている。上記推論ルールは、例えば、BPニューラルネットワーク関数などであってよい。CPUは当該プログラムと推論ルールに基づいて、各営業日毎、時間毎に各自動取引装置1の将来の入出金額を予測するモデルを生成し、当該予測モデル結果を条件別モデルデータベースに記憶する。
 本実施形態にかかる現金装填自動計画装置3は上記構成に基づいて、ホストコンピュータ2または各自動取引装置1との通信によって各自動取引装置1の過去の取引データを読み取り、当該過去の取引データと過去の外部環境データとをともに学習用の条件データとして、将来の所定期間内における各自動取引装置1の取引量を予測するためのモデルを生成する。なお、ホストコンピュータ2または各自動取引装置1との通信によって各自動取引装置1の現在の在高情報を読み取り、各自動取引装置1に対して配送を行なうどうかを決定し、配送を行なうと決定した場合は装填現金量も決定する。合計装填現金量を算出した後、予め決定された各自動取引装置1の設置位置、最大精査周期および配送能力などの配送条件に基づいて、運用リソースが最も少ない各自動取引装置1への現金配送ルートを求める。また、前記配送を行なうかどうかの配送有無条件を変更することにより、合計装填現金量と現金配送ルートを繰り返し算出し、総コストが最も少ない条件に基づいて計画を作成する。
 現金装填自動計画装置3の機能について具体的に説明する前に、まず本出願の明細書に使用される幾つかの用語について説明する。
 「過去の取引データ」:「過去の取引データ」は過去の所定期間内の入出金取引の内容である。例えば、期間内の入金額と出金額を日毎に蓄積したデータ、または毎日の出金額と入金額との差分値(以下「消費額」と称する)である。また、過去の取引データには現時点のデータが含まれてもよい。例えば、過去の取引データは装置、営業日、時間または取引等を単位に各自動取引装置の過去所定期間内の入出金額または消費額をとりまとめて得られたデータである。
 「将来の所定期間内における各自動取引装置の取引量」:「将来の所定期間内における各自動取引装置の取引量」は前記過去の取引データを用いた各自動取引装置の取引量を予測するモデル生成により得られるデータであり、例えば、将来の所定期間における各自動取引装置の入出金額または消費額の予測値を1営業日単位または1時間単位で算出する。
 「外部環境データ」:「外部環境データ」は各自動取引装置別の予測モデルを生成する前や、当該予測モデルを用いて各自動取引装置別に所定期間内の取引における現金需要予測を行う際に、自動取引装置ごとに予測モデルの学習や予測時の条件設定が必要となる。「外部環境データ」は当該学習と条件設定のための過去の取引データ群である。本システムは、上記学習によって自動取引装置別に、例えば、1営業日単位または1時間単位の予測結果を取引量として予測するモデルを生成し、現金需要予測の算出に用いられる。また、最新外部環境データには各自動取引装置の現在の在高情報を含んでよい。
 「現在の在高情報」:「現在の在高情報」は上記通信時点での各自動取引装置内にある現金量の情報であり、外部環境データ内に含まれている場合もある。
 「配送条件」:「配送条件」としては、各自動取引装置の設置場所に関する情報、配送能力に関する情報、配送コストに関する情報、各自動取引装置の設置場所の稼働状態(小売店の休業日など)、銀行内ルールによって決定された精査期間などの最大精査周期などが挙げられる。また、配送条件はこれらの情報のうち複数の情報を組み合わせて設定することが好ましい。
 「各自動取引装置の設置位置」:例えば、各自動取引装置の設置場所に対応する地図座標情報または地図上の各道路の平均的な通過時間などにより、「各自動取引装置の設置位置」を表示することができる。もちろん、「各自動取引装置の設置位置」はこれに限定されず、各自動取引装置間の距離など各自動取引装置の地理関係が導き出せるデータであればよい。
 「配送能力に関する情報」:「配送能力に関する情報」としては、例えば、所定期間内の配送能力を挙げることができる。配送能力は具体的に、例えば、配送車両の数、配送車両に積み込み可能な現金の額、配送単位の各種作業時間、自動取引装置への装填時の装填金額の上限値または下限値、またはほぼ同額を自動取引装置に装填するために割り出した基準の装填額などによって示される。そのうち、配送単位の各種作業時間とは、例えば、ある配送地点から別の配送地点に配送する際に、配送のための移動時間のほかに、実際に一つのカセットに装填するための標準作業時間、カセットを装填するための準備時間、カセットを装填した後の後工程作業時間等によって示される。上記配送能力は一般に、配送を担当する部門または委託を受けた管理会社の営業日数、作業者人数、配送車両の数などによって決定される。また、営業日数に代えて、銀行との間で交わされる契約内容によって定められた配送回数があてられる場合もある
 「装填現金量」:「装填現金量」は、例えば、各自動取引装置内に装填される現金の金額、または装填される貨幣の額面金額と枚数などによって表される。ここで、額面金額は各金種と、同じ金種の各額面金額およびその組み合わせと、を含む。
 「配送ルート」:どの自動取引装置へ、どの配送車両で、どの配送順で、どの道路を経由して、何時までに配送するかなどを示す。もちろん、実際の状況に応じて、上述のすべての要素を含んでもよく、そのうちの一部のみを含んでもよい。
 「精査」:「精査」とは、銀行のホストコンピュータの記録に基づく銀行帳務における在高合計値と自動取引装置によって計算し記録された銀行帳務における貨幣の在高合計値とを比較して照合する処理のことであり、洗い替え精査または洗い替え紙幣装填精査とも称する。
 以下、本実施形態にかかる現金装填自動計画装置3の機能構成について具体的に説明する。図5は実施形態1にかかる現金装填自動計画装置のモジュール構成図である。本実施形態にかかる現金装填自動計画装置3は、例えば、機能モジュールとして予測モデル生成ユニット31、配送ルート生成ユニット32および計画最適化ユニット33を含む。予測モデル生成ユニット31は、各自動取引装置1の過去の取引データと過去の外部環境データに基づいて将来の取引量を予測するモデルを生成し、生成されたモデルによって将来の所定時刻における各自動取引装置1の在高である残高予測値を予測する。配送ルート生成ユニット32は、各自動取引装置1の残高予測値、現在の在高情報および配送条件に基づいて、各自動取引装置1へ配送するルート情報と配送現金量を生成する。計画最適化ユニット33は、自動取引装置1に対して配送を行なうかどうかを決定するための配送有無条件を変更し、これにより総コストが最小となる条件に基づいて各自動取引装置1への装填計画を決定する。
 図4に示すように、汎用コンピュータによって現金装填自動計画装置3を実現する場合、現金装填自動計画装置3の上記各機能モジュールは、例えば、CPUが対応するプログラムを実行することによって実現される。また、専用コンピュータまたは集積回路によって現金装填自動計画装置3を実現する場合、これらの機能モジュールは、例えば、独立した電気回路モジュールによって実現される。
 続いて、本実施形態にかかる現金装填自動計画装置3によって実行される現金装填自動計画方法について具体的に説明する。図6は実施形態1にかかる現金装填自動計画方法のフローチャートである。図6に示すように、予測モデル生成ステップS1において、予測モデル生成ユニット31は、各自動取引装置1の過去の取引データと過去の外部環境データに基づいて将来の取引量を予測するモデルを生成し、生成されたモデルによって将来の所定時刻における各自動取引装置1の在高である残高予測値を予測する。配送ルート生成ステップS2において、配送ルート生成ユニット32は、各自動取引装置1の残高予測値、現在の在高情報および配送条件に基づいて、各自動取引装置1へ配送するルート情報と配送現金量を生成する。計画最適化ステップS3において、計画最適化ユニット33は、自動取引装置1に対して配送を行なうかどうかを決定するための配送有無条件を変更し、これにより総コストが最小となる条件に基づいて各自動取引装置1への装填計画を決定する。
(具体例)
 以下、図面に基づいて本実施形態にかかる現金装填自動計画装置3によって実行される現金装填自動計画方法の一つの具体例について説明する。本具体例はただ本実施形態にかかる現金装填自動計画方法の理解に便宜を図るために挙げた一例であり、本発明を限定するものではなく、本分野の技術者はこれに対して様々な変形を行なうことができる。
 図7は実施形態1にかかる現金装填自動計画方法の予測モデル生成ステップの具体例を説明するフローチャートである。予測モデル生成ステップS1において、現金装填自動計画装置3の予測モデル生成ユニット31は、以下のように予測モデル結果を算出することができる。
 まず、予測モデル生成ユニット31は、過去の取引データと過去の外部環境データに基づいて、条件データを生成する。ここで、条件データとしては、例えば、休日、曜日、日付、時刻、天気、1日おきまたは1時間おきなどの指定期間内の過去の入金量、1日おきまたは1時間おきなどの指定期間内の過去の出金量などが挙げられる。
 続いて、予測モデル生成ユニット31は、上記条件データに基づいて、各自動取引装置1に対して、営業日ごと時間ごとに複数の装置個別モデルを生成して、各自動取引装置1の将来の入出金額を予測するモデルすなわち条件別モデルとする。
 続いて、予測モデル生成ユニット31は、上記複数の装置個別モデルを用いて、現金装填計画を作成するときの最新の外部環境データに応じて取得したその時点での各自動取引装置の在高情報、および日付、装置IDなどに基づいて、例えば翌日など将来のある時刻における現金需要を予測する。現金需要の予測結果としては、時間別需要予測結果と日別需要予測結果が挙げられる。当該予測結果は将来における単位時間ごとにどのぐらいの現金需要があるかを予測して得られる結果である。
 例えば、入金を正とし、出金を負とした場合、予測モデル生成ユニット31は最新の各自動取引装置1の在高から現金需要予測結果を減算することにより、当該将来の時刻における在高を予測することができる。
 これにより、予測モデル生成ユニット31は、翌日からの将来の複数の時点における在高を算出し、これらの時点における在高算出結果群を残高予測値とすることができる。上記複数の時点は、例えば、最大精査周期の日数を経過した後の時刻などであってよい。
 予測モデル生成ユニット31は、これらの残高予測値について、上記生成された複数の装置個別モデルによって別々に予測し、最新の外部環境データに最も近いと評価された残高予測値を採用する。
 図8は実施形態1にかかる現金装填自動計画方法の配送ルート生成ステップの具体例を説明するフローチャートである。配送ルート生成ステップS2において、現金装填自動計画装置3の配送ルート生成ユニット32は予測モデル生成ユニット31によって生成された残高予測値、現在の在高情報、各自動取引装置1のカセット容量などに基づく自動取引装置全体の最小/最大容量制限などの配送条件に基づいて、配送すべき自動取引装置1および当該自動取引装置1へ配送すべき現金量、および各自動取引装置1間の配送ルートを決定する。
 まず、配送ルート生成ユニット32は、装填計画条件データに基づいて、翌日の配送が必須となる自動取引装置1を選択する。装填計画条件データには、例えば、上記残高予測値、現在の在高情報、前回精査日、基本精査周期、最大精査周期、紙媒体交換予定日など自動取引装置1への出動が必須である条件が含まれる。
 配送ルート生成ユニット32は、各自動取引装置1に対して、最大精査周期と前回精査日とを比較し、以下の自動取引装置1を翌日に配送しなければならない自動取引装置として選択し、精査フラグを「必須」に設定する。ここで、翌日に配送しなければならないと選択された自動取引装置は、翌日に最大精査周期となる自動取引装置、および翌日が紙媒体交換予定日であるなどの原因で出動しなければならない自動取引装置を含む。また、翌日に最大精査周期とならない自動取引装置のうち、明後日の残高予測値が上記最小/最大容量制限を満たさない制限値範囲(すなわち、在高が明後日まで維持できない)内の自動取引装置も翌日に配送しなければならない自動取引装置として選択される。
 また、配送ルート生成ユニット32は、明後日の残高予測値が最小/最大容量制限を満たさない制限値範囲内の自動取引装置に対して、基本精査周期と前回精査日とを比較する。翌日に基本精査周期となる自動取引装置1に対して、精査フラグを「精査日」に設定し、その他の自動取引装置1の精査フラグは「保留」として選別する。
 配送ルート生成ユニット32は、精査フラグが「必須」と「精査日」である自動取引装置1に対して、基本精査周期に基づいて、翌日から基本精査周期経過後の次回精査日までに、当該自動取引装置1の残高予測値が最小/最大容量制限を満たすように各自動取引装置1の必要装填額を決定する。
 配送ルート生成ユニット32は、上記必要装填額および対応する自動取引装置1のリストを作成して翌日の装填計画とする。
 続いて、配送ルート生成ユニット32はルート計画を生成する。
 配送ルート生成ユニット32は、前記装填計画対象の自動取引装置1に対して、準備時間、作業時間、道路情報、自動取引装置の位置情報、作業開始時間、作業終了時間などの配送条件情報に基づいて、配送ルートを決定する。
 まず、配送ルート生成ユニット32は、作業開始地点および作業終了地点に基づいて、各自動取引装置1へ出動し戻るときの往復ルートを算出する。ここで、作業開始地点および作業終了地点として、現金センターなどが挙げられる。以下の説明において、作業開始地点および作業終了地点は同じであるが、当然ながら実際の状況に応じて異なってもよい。
 その後、配送ルート生成ユニット32は、道路情報などに基づいて、各自動取引装置1のルートの移動時間を算出し、準備時間や作業時間に加算して各自動取引装置1の配送時間(以下、単独往復時間と称する)を算出する。このとき、任意の自動取引装置Nの単独往復時間をT0,n+Tn,0で表す。そのうち、T0,nは作業開始地点から自動取引装置Nの設置地点まで出動するのに必要な時間を表し、Tn,0は自動取引装置Nの設置地点から作業終了地点まで戻るのに必要な時間を表す。
 従って、算出された各自動取引装置の単独往復時間の合計はΣ(T0,n+Tn,0)であり、そのうち、Σは和を求める符号である。例えば、自動取引装置A、Bの単独往復時間の合計はT0,a+Ta,0+T0,b+Tb,0である。ここで、作業開始地点からある自動取引装置Aに出動した後に別の自動取引装置Bへ移動し、作業終了地点に戻る場合、かかる時間はT0,a+Ta,b+Tb,0である。従って、上述のような自動取引装置Aに出動した後に別の自動取引装置Bへの移動は、自動取引装置A、Bへの単独往復に比べて、Ta,0+T0,b-Ta,b時間節約することができる。
 以下、配送ルート生成ユニット32は、上記節約時間Ta,0+T0,b-Ta,bの大きさ順に従い、新たに生成したルートの配送時間が制限時間を超えるまで自動取引装置1を順次選択して自動取引装置をルートに加える。その後、配送時間が制限時間を超える前に生成されたルートを保留する。ルートに未加入の自動取引装置1がまだ残っている場合、新たなルートを生成し、すべての自動取引装置1がルートに加えるまでに、上記プロセスを継続して実行する。
 配送ルート生成ユニット32は、上記方法によってルート計画を生成する。具体例として、例えば、以下の具体的な方法を採用することができる。
 配送時間すなわち単独往復時間が最も長い自動取引装置1に対して、作業開始地点から上記配送時間が最も長い自動取引装置1の位置を経由して、ある別の自動取引装置へ移動し、作業終了地点へ移動するルートを算出する。道路情報などに基づいて、各上記ルートの移動時間を算出し、準備時間や作業時間に加算して配送時間を算出する。
 複数の上記別の自動取引装置が存在する場合、複数の上記ルートが存在するため、複数の上記配送時間を算出することができる。配送ルート生成ユニット32は、上記二か所の自動取引装置(配送時間が最も長い自動取引装置およびある別の自動取引装置)の複数のルートを経由する配送時間を比較し、配送時間が最も短いルートを選択する。続いて、作業開始地点から順次当該二か所の自動取引装置を経由した後に別の自動取引装置へ移動し、作業終了地点へ移動するルートを算出する。道路情報などに基づいて、各ルートの移動時間を算出し、準備時間と作業時間とに加算して配送時間を算出する。
 そして、配送ルート生成ユニット32は、配送対象となる各自動取引装置1に対して、上記方法に従って配送すべき自動取引装置を順次選択し、配送すべき自動取引装置の地点を順番に繋いだルートを算出し、生成された配送ルートとする。
 このとき、作業開始時間と作業終了時間などの配送能力による制限を超える場合、生成された配送ルートが配送能力を超える前の自動取引装置までのルートを、第一の配送ルートとして生成する。配送ルートに加えられていないその他の自動取引装置に対して、作業開始地点から配送時間が最も長い自動取引装置を選択し、同じような方法で第二の配送ルートを算出する。
 このように、配送ルート生成ユニット32は、すべての装填計画対象の自動取引装置1に対して配送ルートを算出し、算出されたすべての配送ルートをルート情報とする。
 図9は、実施形態1にかかる現金装填自動計画方法の計画最適化ステップの具体例(第一部分)を説明するフローチャートである。図10は実施形態1にかかる現金装填自動計画方法の計画最適化ステップの具体例(第二部分)を説明するフローチャートである。計画最適化ステップS3において、現金装填自動計画装置3の計画最適化ユニット33は自動取引装置1に対して配送を行なうかどうかを決定するための配送有無条件を変更し、これにより総コストが最小となる条件に基づいて各自動取引装置1への装填計画を決定する。
 まず、計画最適化ユニット33は、各自動取引装置1の必要装填額の合計に対して、利率と管理コストなどの現金準備経費情報に基づいて、必要装填額の合計に対する運用経費を算出して現金準備コストとする。
 その後、計画最適化ユニット33は、上記ルート情報に基づいて、作業準備単価または配送単価などの配送コスト情報に基づいて配送コストを算出する。上記現金準備コストと配送コストを合計して総コストを算出する。
 計画最適化ユニット33は、予め設定された最大精査周期などに基づいて指定期間情報を算出し、翌日だけでなく、明後日、明々後日などに対しても指定期間を算出し、上述と同様に総コストを算出し、当該期間における総コストの合計値を指定期間総コストとする。また、指定期間総コストを得られない場合、予測モデル生成ステップS1に戻り、予測モデル生成ユニット31により別の条件に基づいて在高予測を行ない、引き続き上記プロセスに従って実行し、別の条件での指定期間総コストを取得する。
 また、精査フラグが「精査日」である自動取引装置1に対しては、残高予測値に基づいて在高に問題がないと判断された場合、最大精査周期になる前に強制的な配送は不要、すなわち、わざと配送に出動しないように設定してもよい。精査フラグが「保留」である自動取引装置1に対しては、残高予測値に基づいて在高に問題がないと判断されても、近くに配送が必須である自動取引装置があり、前倒しで配送したほうが結果的に効率的な場合がある。
 従って、計画最適化ユニット33は、精査フラグが「精査日」と「保留」である各自動取引装置1、すなわち翌日に必ずしも配送しなくてもよい自動取引装置1に対して、上記指定期間総コストが最小となる、配送するかどうかを決定するための配送有無条件、すなわち配送するかどうかの最適条件を選択し、当該配送するかどうかの最適条件に基づいて、最終的な装填計画および配送ルートを決定する。
 また、精査フラグが「精査日」と「保留」である各自動取引装置1に対して、配送するかどうかのすべての組み合わせに応じて算出することを考えてよい。しかし、自動取引装置1の台数が多くて計算量が増えた場合、計算量を減らすために、例えば、タグチメソッド(Taguchi-method)などを用いて計算量を抑えて最適値を推定してもよい。以下、具体的に説明する。
 まず、計画最適化ユニット33は、上記指定期間総コストを初期指定期間総コストとする。
 続いて、計画最適化ユニット33は、精査フラグが「精査日」と「保留」である各自動取引装置1の台数を対象台数とする。対象台数に基づいて、「対象台数<2」を満たす最小のnを算出し、a=2とした場合のaを求める。上記aに対応するLa直交表を使用する。例えば、対象台数が7台である場合、a=8で、L8直交表を使用する。
 計画最適化ユニット33は、対象台数が各自動取引装置1に対して、配送する場合と配送しない場合の条件の組み合わせを上記La直交表について割り付けし、それぞれの条件に基づいて、予測モデル生成ステップS1に戻り、予測モデル生成ユニット31によりその他の条件に基づいて在高を予測し、引き続き上記プロセスに従って実行し、それぞれの条件での指定期間総コストを算出する。
 続いて、計画最適化ユニット33は、望小特性のSN比を算出し、指定期間総コストが最も小さくなる配送するかどうかの配送有無条件の組み合わせを算出する。当該組み合わせに基づいて、予測モデル生成ステップS1に戻り、予測モデル生成ユニット31によりその他の条件に基づいて在高を予測し、引き続き上記プロセスに従って実行し、当該組合せにおける指定期間総コストを再算出して予測最小総コストとする。
 予測最小総コストが初期指定期間総コストより小さい場合、計画最適化ユニット33は、予測最小総コストの条件に基づいて最終装填計画および配送ルートを決定する。予測最小総コストが初期指定期間総コストより小さくない場合、計画最適化ユニット33は、上記算出された指定期間総コストが最も小さい条件に基づいて最終装填計画および配送ルートを決定する。
(その他の実施形態)
 上述の実施形態では、現金装填自動計画装置3が予測モデル生成ユニット31を備える例について説明したが、現金装填自動計画装置3は予測モデル生成ユニットを備えずに、その他の装置によって各自動取引装置の取引量を予測するためのモデルを生成した後に、現金装填自動計画装置3により記録媒体または通信などを介してその結果を取得してもよい。この場合、現金装填自動計画装置3は配送ルート生成ユニット32と計画最適化ユニット33のみを備えてよい。また、現金装填自動計画装置3により実行される現金装填自動計画方法は配送ルート生成ステップS2と計画最適化ステップS3のみを含めてよい。
 上述の実施形態では、現金装填自動計画装置3はディスプレーなどの出力部を表示ユニットとし、計画最適化ユニット33により決定された各自動取引装置への装填計画を表示してもよい。また、表示ユニットは装填計画に対応するルート情報を表示してもよい。そのうち、表示ユニットは表、ノード図などの多様な方法によって表示してよく、ここでは限定しない。
 上述の実施形態では、自動取引装置1として銀行などで入金などの取引に用いられる自動取引装置について例を挙げて説明したが、自動取引装置1はこれに限定されず、様々な自動取引業務用の装置であってよい。また、上述の実施形態では、自動取引装置1は紙幣を処理するが、自動取引装置はこれに限定されず、硬貨などの貨幣を処理してもよい。
 上述の実施形態によれば、各自動取引装置の設置場所、配送能力などの諸条件を総合的に考慮しつつ、各自動取引装置内の現金量を含む全体の運用コストを最小化するような条件で現金を補充する配送スケジュールを決定することが可能となり、これにより配送効率および配送の実用性等の運用効率を向上させることができる。
 以上、図面に基づき本発明を適用した実施例について説明したが、以上説明した実施例は本発明を理解するための具体例であり、本発明の範囲を限定するものではない。本分野の技術者は各実施例について様々な変形、組合せおよび要素の合理的な省略を行うことができるが、これにより得られた形態も本発明の範囲に含まれる。
 1(1-1~1-4)…自動取引装置、2…ホストコンピュータ、3…現金装填自動計画装置、9…紙幣処理機構、31…予測モデル生成ユニット、32…配送ルート生成ユニット、33…計画最適化ユニット。

Claims (16)

  1.  複数の地点にそれぞれ設置されている複数台の自動取引装置へ現金を配送する計画を決定する現金装填自動計画装置であって、
    各自動取引装置の残高予測値、現在の在高情報および配送条件に基づいて、各自動取引装置へ配送するルート情報と配送現金量を生成する配送ルート生成ユニットと、
    自動取引装置に対して配送を行なうかどうかを決定するための配送有無条件を変更し、これにより総コストが最小となる条件に基づいて各自動取引装置への装填計画を決定する計画最適化ユニットと、
    を備えることを特徴とする現金装填自動計画装置。
  2.  各自動取引装置の過去の取引データと過去の外部環境データに基づいて将来の取引量を予測するモデルを生成し、生成されたモデルによって将来の所定時刻における各自動取引装置の在高である残高予測値を予測する予測モデル生成ユニットをさらに備え、
    前記配送ルート生成ユニットは、前記予測モデル生成ユニットによって生成された各自動取引装置の残高予測値、現在の在高情報および配送条件に基づいて、各自動取引装置へ配送するルート情報と配送現金量を生成することを特徴とする請求項1に記載の現金装填自動計画装置。
  3.  前記予測モデル生成ユニットは、各自動取引装置の過去の取引データと過去の外部環境データに基づいて条件データを生成し、前記条件データに基づいて各自動取引装置の将来の取引量をそれぞれ予測するための装置個別モデルを生成し、最新の外部環境データから得られた各自動取引装置の在高情報に基づいて、前記装置個別モデルによって将来の所定時刻における各自動取引装置の現金需要を予測し、これにより将来の所定時刻における各自動取引装置の残高予測値を予測することを特徴とする請求項2に記載の現金装填自動計画装置。
  4.  前記配送ルート生成ユニットは、各自動取引装置に対して単独に配送を行なうのに必要な単独往復時間を算出するとともに、二つの自動取引装置に対してそれぞれ単独に配送を行なう場合に対して一方の自動取引装置から他方の自動取引装置へ移動して配送を行なう場合に節約する節約時間を算出し、当該節約時間の長さの順に、配送能力を超えない範囲内で複数の自動取引装置から順次自動取引装置を選択してルートに加え、これにより各自動取引装置へ配送するルート情報を生成することを特徴とする請求項1に記載の現金装填自動計画装置。
  5.  前記配送ルート生成ユニットは、複数の自動取引装置から単独往復時間が最も長い自動取引装置を選択し、当該単独往復時間が最も長い自動取引装置からその他の自動取引装置のうちある自動取引装置へ移動して配送を行なう場合の配送時間を算出し、当該配送時間が最も短いルートにおけるその他の自動取引装置を選択してルートに加え、これによって、配送能力を超えない範囲内でその他の自動取引装置から順次自動取引装置を選択してルートに加え、これにより各自動取引装置へ配送するルート情報を生成することを特徴とする請求項4に記載の現金装填自動計画装置。
  6.  前記計画最適化ユニットは、前記配送ルート生成ユニットによって生成された複数台の自動取引装置の前記ルート情報と配送現金量に基づいて、現金準備コストと配送コストを含む総コストを算出し、自動取引装置に対して配送を行なうかどうかを決定するための配送有無条件を変更することにより、前記配送ルート生成ユニットに前記ルート情報と配送現金量を繰り返し生成させ、これにより総コストが最も小さい条件に基づいて各自動取引装置への装填計画を決定することを特徴とする請求項1に記載の現金装填自動計画装置。
  7.  前記計画最適化ユニットは、算出指定期間内の総コストの合計値を算出して指定期間総コストとし、前記指定期間総コストが最も小さくなるように自動取引装置に対して配送を行なうかどうかを決定するための配送有無条件を変更し、これにより各自動取引装置への装填計画を決定することを特徴とする請求項6に記載の現金装填自動計画装置。
  8.  前記計画最適化ユニットは、必ずしも配送しなくてもよい自動取引装置に対して、算出指定期間内の総コストの合計値を算出して指定期間総コストとし、前記指定期間総コストが最も小さくなるように前記必ずしも配送しなくてもよい自動取引装置に対して配送を行なうかどうかを決定するための配送有無条件を変更し、これにより各自動取引装置への装填計画を決定することを特徴とする請求項7に記載の現金装填自動計画装置。
  9.  前記計画最適化ユニットによって決定された装填計画および/または当該装填計画に対応するルート情報を表示する表示ユニットをさらに備えることを特徴とする請求項1~8のいずれかに記載の現金装填自動計画装置。
  10.  コンピュータシステムによって複数の地点にそれぞれ設置されている複数台の自動取引装置へ現金を配送する計画を決定する現金装填自動計画方法であって、
    各自動取引装置の残高予測値、現在の在高情報および配送条件に基づいて、各自動取引装置へ配送するルート情報と配送現金量を生成する配送ルート生成ステップと、
    自動取引装置に対して配送を行なうかどうかを決定するための配送有無条件を変更し、これにより総コストが最小となる条件に基づいて各自動取引装置への装填計画を決定する計画最適化ステップと、
    を含むことを特徴とする現金装填自動計画方法。
  11.  各自動取引装置の過去の取引データと過去の外部環境データに基づいて将来の取引量を予測するモデルを生成し、生成されたモデルによって将来の所定時刻における各自動取引装置の在高である残高予測値を予測する予測モデル生成ステップをさらに含み、
    前記配送ルート生成ステップは、前記予測モデル生成ステップによって生成された各自動取引装置の残高予測値、現在の在高情報および配送条件に基づいて、各自動取引装置へ配送するルート情報と配送現金量を生成することを特徴とする請求項10に記載の現金装填自動計画方法。
  12.  前記計画最適化ステップによって決定された装填計画および/または当該装填計画に対応するルート情報を表示する表示ステップをさらに含むことを特徴とする請求項10または11に記載の現金装填自動計画方法。
  13.  コンピュータシステムによって複数台の自動取引装置の現金需要を予測する現金需要予測方法であって、
    各自動取引装置の過去の取引データと過去の外部環境データに基づいて条件データを生成するステップと、
    前記条件データによって各自動取引装置の将来の取引量をそれぞれ予測するための装置個別モデルを生成するステップと、
    最新の外部環境データから得られた各自動取引装置の在高情報に基づいて、前記装置個別モデルによって将来の所定時刻における各自動取引装置の現金需要を予測するステップと、
    を含むことを特徴とする現金需要予測方法。
  14.  複数の地点にそれぞれ設置されている複数台の自動取引装置へ配送するルートを生成する配送ルート生成方法であって、
    各自動取引装置に対して単独に配送を行なうのに必要な単独往復時間を算出するステップと、
    複数の自動取引装置から単独往復時間が最も長い自動取引装置を選択するステップと、
    当該単独往復時間が最も長い自動取引装置からその他の自動取引装置のうちある自動取引装置へ移動して配送を行なう場合の配送時間を算出し、当該配送時間が最も短いルートにおけるその他の自動取引装置を選択してルートに加えるステップと、
    配送能力を超えない範囲内でその他の自動取引装置から順次自動取引装置を選択してルートに加え、これにより各自動取引装置へ配送するルートを生成するステップと、
    を含むことを特徴とする配送ルート生成方法。
  15.  複数の地点にそれぞれ設置されている複数台の自動取引装置へ現金を配送する計画を最適化させる配送計画最適化方法であって、
    複数の地点にそれぞれ設置されている複数台の自動取引装置へ配送するルート情報と配送現金量に基づいて、現金準備コストと配送コストを含む総コストを算出するステップと、
    算出指定期間内の総コストの合計値を算出して指定期間総コストとするステップと、
    自動取引装置に対して配送を行なうかどうかを決定するための配送有無条件を変更することにより、前記指定期間総コストが最も小さくなるように前記ルート情報と配送現金量を繰り返し生成し、これにより各自動取引装置への装填計画を決定するステップと、を含むことを特徴とする配送計画最適化方法。
  16.  決定された装填計画および/または当該装填計画に対応するルート情報を表示する表示ステップをさらに含むことを特徴とする請求項15に記載の配送計画最適化方法。 
PCT/JP2015/068266 2014-08-27 2015-06-24 現金装填自動計画装置および方法 Ceased WO2016031374A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016545021A JPWO2016031374A1 (ja) 2014-08-27 2015-06-24 現金装填自動計画装置および方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201410429151.9A CN105447995B (zh) 2014-08-27 2014-08-27 装填现金自动计划装置及方法
CN201410429151.9 2014-08-27

Publications (1)

Publication Number Publication Date
WO2016031374A1 true WO2016031374A1 (ja) 2016-03-03

Family

ID=55399278

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2015/068266 Ceased WO2016031374A1 (ja) 2014-08-27 2015-06-24 現金装填自動計画装置および方法

Country Status (3)

Country Link
JP (1) JPWO2016031374A1 (ja)
CN (1) CN105447995B (ja)
WO (1) WO2016031374A1 (ja)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019012393A (ja) * 2017-06-30 2019-01-24 沖電気工業株式会社 情報処理装置、プログラム
JP2021077275A (ja) * 2019-11-13 2021-05-20 ローレルバンクマシン株式会社 在高管理装置、在高管理方法およびプログラム
WO2021161361A1 (ja) * 2020-02-10 2021-08-19 日本電気株式会社 釣銭管理システム、釣銭管理方法及びコンピュータ可読媒体
CN113593147A (zh) * 2021-08-03 2021-11-02 中国银行股份有限公司 自动取款机atm余额显示方法、装置、服务器、介质及产品
JP7648974B1 (ja) 2024-09-27 2025-03-19 弥生株式会社 データ処理装置、データ処理方法、及びプログラム

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108122326B (zh) * 2016-11-30 2020-07-07 日立欧姆龙金融系统有限公司 一种数据处理方法、装置及系统
CN106803309B (zh) * 2017-01-19 2019-10-11 深圳怡化电脑股份有限公司 一种金融自助设备加钞预测的方法和装置
CN110634061A (zh) * 2018-06-22 2019-12-31 马上消费金融股份有限公司 一种资金需求预测方法、装置及终端设备
CN109146148B (zh) * 2018-07-27 2022-05-10 创新先进技术有限公司 一种余额预测偏差原因的确定方法及装置
CN109034493A (zh) * 2018-08-22 2018-12-18 阿里巴巴集团控股有限公司 一种账户余额预测方法及装置
CN113496567A (zh) * 2020-03-18 2021-10-12 光荣株式会社 现金准备方法和现金准备系统
CN111967691A (zh) * 2020-09-07 2020-11-20 中国银行股份有限公司 一种外币配送方法及系统
CN113256123B (zh) * 2021-05-27 2024-10-15 中国农业银行股份有限公司 基于网点分组的自助设备的补给方法和电子设备
CN115049422A (zh) * 2022-05-07 2022-09-13 中国工商银行股份有限公司 自动取款设备信息处理方法、装置及系统

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09311900A (ja) * 1996-05-23 1997-12-02 Hitachi Ltd 現金自動取引装置の現金補充スケジュール決定支援方法
JP2004206261A (ja) * 2002-12-24 2004-07-22 Fujitsu Ltd 出動作業計画立案システム,出動作業計画立案プログラムおよび同プログラムを記録したコンピュータ読取可能な記録媒体

Family Cites Families (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02259896A (ja) * 1989-03-31 1990-10-22 Hitachi Ltd 自動現金取引装置
JPH1196438A (ja) * 1997-09-22 1999-04-09 Toshiba Corp 自動取引装置の資金量予測方法および資金量予測装置
JP2004021961A (ja) * 2002-06-14 2004-01-22 Masayuki Kuzuu 現金宅配システム
JP2005255333A (ja) * 2004-03-11 2005-09-22 Oki Electric Ind Co Ltd 現金配送計画システム
KR100650348B1 (ko) * 2004-06-21 2006-11-29 노틸러스효성 주식회사 자동화 기기의 현송 금액 최적화 방법
JP4521004B2 (ja) * 2007-02-13 2010-08-11 Smbcデリバリーサービス株式会社 配車計画作成装置、配車計画作成方法及び配車計画作成用プログラム
JP5016115B2 (ja) * 2008-09-29 2012-09-05 日本たばこ産業株式会社 配送コース数算出システムおよび配送コース数算出方法
WO2010035498A1 (ja) * 2008-09-29 2010-04-01 日本たばこ産業株式会社 配送方式決定支援システム、コース作成システム、配送方式決定支援方法、およびコース作成方法
JP2011113432A (ja) * 2009-11-30 2011-06-09 Takumi Giken:Kk 現金補充計画支援システムおよび現金補充計画支援方法
CN102096965B (zh) * 2011-01-28 2012-08-08 迈普通信技术股份有限公司 Atm管理系统以及自动配钞方法
CN102800159B (zh) * 2011-05-26 2015-03-04 日立(中国)研究开发有限公司 自动交易装置和用于预测现金需求量的方法
CN102231216B (zh) * 2011-06-27 2013-05-22 中国建设银行股份有限公司 一种用于自助设备的现金管理方法和系统
CN102521724A (zh) * 2011-12-07 2012-06-27 清华大学 基于车辆路径规划装置及规划方法
CN203149648U (zh) * 2013-02-21 2013-08-21 高邮市诚信物流有限公司 车载物流配送系统
CN103226762B (zh) * 2013-04-17 2017-09-12 深圳东原电子有限公司 一种基于云计算平台的物流配送方法
CN103383756A (zh) * 2013-07-22 2013-11-06 浙江省烟草公司绍兴市公司 一种烟草物流配送路径规划方法
CN103854072B (zh) * 2014-03-17 2017-12-12 湖南工学院 用于路径选择的处理方法及系统

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09311900A (ja) * 1996-05-23 1997-12-02 Hitachi Ltd 現金自動取引装置の現金補充スケジュール決定支援方法
JP2004206261A (ja) * 2002-12-24 2004-07-22 Fujitsu Ltd 出動作業計画立案システム,出動作業計画立案プログラムおよび同プログラムを記録したコンピュータ読取可能な記録媒体

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019012393A (ja) * 2017-06-30 2019-01-24 沖電気工業株式会社 情報処理装置、プログラム
JP2021077275A (ja) * 2019-11-13 2021-05-20 ローレルバンクマシン株式会社 在高管理装置、在高管理方法およびプログラム
JP2023129679A (ja) * 2019-11-13 2023-09-14 ローレルバンクマシン株式会社 在高管理装置、在高管理方法およびプログラム
JP7560075B2 (ja) 2019-11-13 2024-10-02 ローレルバンクマシン株式会社 在高管理装置、在高管理方法およびプログラム
WO2021161361A1 (ja) * 2020-02-10 2021-08-19 日本電気株式会社 釣銭管理システム、釣銭管理方法及びコンピュータ可読媒体
JPWO2021161361A1 (ja) * 2020-02-10 2021-08-19
JP7513037B2 (ja) 2020-02-10 2024-07-09 日本電気株式会社 釣銭管理システム、釣銭管理方法及びプログラム
CN113593147A (zh) * 2021-08-03 2021-11-02 中国银行股份有限公司 自动取款机atm余额显示方法、装置、服务器、介质及产品
JP7648974B1 (ja) 2024-09-27 2025-03-19 弥生株式会社 データ処理装置、データ処理方法、及びプログラム
JP2026060073A (ja) * 2024-09-27 2026-04-08 弥生株式会社 データ処理装置、データ処理方法、及びプログラム

Also Published As

Publication number Publication date
CN105447995A (zh) 2016-03-30
CN105447995B (zh) 2018-05-15
JPWO2016031374A1 (ja) 2017-09-07

Similar Documents

Publication Publication Date Title
WO2016031374A1 (ja) 現金装填自動計画装置および方法
WO2004015604A2 (en) Currency management
Batı et al. Joint optimization of cash management and routing for new-generation automated teller machine networks
JP2011113432A (ja) 現金補充計画支援システムおよび現金補充計画支援方法
Seo et al. Rebalancing docked bicycle sharing system with approximate dynamic programming and reinforcement learning
JP5469196B2 (ja) 店舗内外現金在庫管理システム
CN102306366A (zh) 自动柜员机配钞数据的确定方法
Genevois et al. ATM location problem and cash management in automated teller machines
RU2724798C1 (ru) Способ и система оптимизации инкассаторского обслуживания объектов наличного денежного обращения
JP6329093B2 (ja) 自動現金預払機運用計画システム及び方法
CN107316378A (zh) 自助设备的现金管理系统及现金管理方法
JP7184040B2 (ja) 現金需要予測システム、現金需要予測方法および現金需要予測プログラム
JP7513037B2 (ja) 釣銭管理システム、釣銭管理方法及びプログラム
AU2024264623A1 (en) Systems and methods for till management
CN111583046A (zh) 金融资源的处理方法、装置、设备以及系统
JP6945509B2 (ja) 現金管理装置、現金管理方法、及び現金管理プログラム
CN118780542A (zh) 储氢瓶的补给方法、系统、电子设备、存储介质及计算机程序产品
CN108122326B (zh) 一种数据处理方法、装置及系统
WO2017122388A1 (ja) 情報処理装置、情報処理方法、および、現金自動預け払い機、ならびにプログラム
CN106251218A (zh) 投资组合方式的生成方法和装置
CN110633967A (zh) 一种支付方案智能调整系统及方法
JP2018026010A (ja) 貨幣残量管理システム
JP2007241825A (ja) Atm現金ユニットの交換計画生成システム及びプログラム
JP2000207480A (ja) 現金自動取引装置への資金装填計画方法及び資金装填計画装置並びに記憶媒体
Scholtz et al. Multi-objective optimisation with stochastic discrete-event simulation in retail banking: A case study

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15835005

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2016545021

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 15835005

Country of ref document: EP

Kind code of ref document: A1