WO2016031169A1 - 厚鋼板の製造方法 - Google Patents

厚鋼板の製造方法 Download PDF

Info

Publication number
WO2016031169A1
WO2016031169A1 PCT/JP2015/004056 JP2015004056W WO2016031169A1 WO 2016031169 A1 WO2016031169 A1 WO 2016031169A1 JP 2015004056 W JP2015004056 W JP 2015004056W WO 2016031169 A1 WO2016031169 A1 WO 2016031169A1
Authority
WO
WIPO (PCT)
Prior art keywords
descaling
steel plate
thick steel
cooling
water
Prior art date
Application number
PCT/JP2015/004056
Other languages
English (en)
French (fr)
Japanese (ja)
Inventor
雄太 田村
安達 健二
Original Assignee
Jfeスチール株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jfeスチール株式会社 filed Critical Jfeスチール株式会社
Priority to EP15836450.5A priority Critical patent/EP3187275B1/en
Priority to KR1020177005018A priority patent/KR101940429B1/ko
Priority to CN201580045918.0A priority patent/CN106604785B/zh
Priority to JP2016544933A priority patent/JP6108041B2/ja
Priority to BR112017004022-0A priority patent/BR112017004022B1/pt
Publication of WO2016031169A1 publication Critical patent/WO2016031169A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • B21B37/74Temperature control, e.g. by cooling or heating the rolls or the product
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B45/00Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B45/04Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for de-scaling, e.g. by brushing
    • B21B45/08Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for de-scaling, e.g. by brushing hydraulically
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B1/00Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
    • B21B1/38Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling sheets of limited length, e.g. folded sheets, superimposed sheets, pack rolling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B45/00Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B45/02Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for lubricating, cooling, or cleaning
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B45/00Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B45/04Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for de-scaling, e.g. by brushing
    • B21B45/06Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for de-scaling, e.g. by brushing of strip material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B2261/00Product parameters
    • B21B2261/20Temperature

Definitions

  • the present invention relates to a method for manufacturing a thick steel plate.
  • the application of controlled cooling is expanding.
  • the thick steel plate (not shown) is reheated in the heating furnace 1
  • the thick steel plate is descaled in the descaling device 2.
  • the thick steel plate is rolled by the rolling mill 3 and then corrected by the shape correcting device 4, and then controlled cooling by water cooling or air cooling is performed in the accelerated cooling device 5.
  • the arrow in a figure is the advancing direction of a thick steel plate.
  • the cooling stop temperature when the place where scale thickness is 40 micrometers and 20 micrometers coexists in the thickness direction of a thick steel plate, the cooling stop temperature when cooling a thick steel plate with a thickness of 25 mm from 800 ° C. to a target temperature of 500 ° C. is 40 ⁇ m. It becomes 460 degreeC in a location, and 500 degreeC in a location of 20 micrometers. At the 40 ⁇ m portion, the cooling stop temperature falls below 40 ° C. from the target temperature, and as a result, a uniform material cannot be obtained.
  • Patent Document 1 discloses a method for achieving uniform cooling stop temperature by controlling the scale thickness to equalize the cooling rate.
  • Patent Document 1 using a descaling device provided before and after the rolling mill during rolling, when the cooling stop temperature of the tail end of the thick steel plate is lower than that of the tip, the descaling injection on the tail end side is performed. The amount of water is controlled to be larger than the amount of water jetted on the tip side. In this way, by controlling the scale removal rate and the remaining thickness in the longitudinal direction of the thick steel plate, the heat transfer coefficient of the steel plate surface during controlled cooling is changed, and the cooling stop temperature in the longitudinal direction of the thick steel plate is made uniform. .
  • the cooling stop temperature has been made uniform by adjusting the amount of cooling water and the conveyance speed.
  • the cooling rate varies due to the variation in scale thickness, it is difficult not only to make the cooling rate uniform, but also to make the cooling stop temperature uniform.
  • An object of the present invention is to provide a method of manufacturing a thick steel plate that can solve the above-described problems and can secure a high-quality thick steel plate with less material variation.
  • the present invention has been made to solve the above-mentioned conventional problems, and the gist thereof is as follows. [1] In a method of manufacturing a thick steel plate in the order of a hot rolling step, a hot straightening step, and an accelerated cooling step, descaled water is injected twice between the hot straightening step and the accelerated cooling step.
  • a scaling step, and in the descaling step, the energy density of descaling water sprayed on the surface of the thick steel plate is 0.07 J / mm 2 or more in total of the two sprays, and the first descaling water is Production of a thick steel plate, characterized in that the second descaling water is jetted 0.5 s or more after the jetting, and the steel sheet surface temperature immediately before the second descaling water jet is set to the Ar 3 transformation point or less.
  • Method. [2] In the method of manufacturing a thick steel plate in the order of the hot rolling step, the hot straightening step, and the accelerated cooling step, the descaling water is injected twice or more between the hot straightening step and the accelerated cooling step.
  • a descaling step wherein in the descaling step, the energy density of descaling water sprayed on the surface of the thick steel plate is 0.07 J / mm 2 or more in total of two or more sprays,
  • a thick steel plate characterized in that the final descaling water is jetted 0.5 s or more after the scaling water is jetted, and the steel sheet surface temperature immediately before the final descaling water jet is set to the Ar 3 transformation point or less.
  • the cooling rate and the cooling stop temperature can be made uniform. As a result, it is possible to manufacture a high-quality thick steel plate with little material variation.
  • FIG. 1 is a schematic view showing a conventional equipment for producing thick steel plates.
  • FIG. 2 is a diagram showing the relationship among scale thickness, cooling time, and thick steel plate surface temperature during accelerated cooling.
  • FIG. 3 is a diagram showing the relationship between the position in the width direction of the thick steel plate and the cooling stop temperature after accelerated cooling.
  • FIG. 4 is a schematic view showing a thick steel plate manufacturing facility according to an embodiment of the present invention.
  • FIG. 5 is a schematic diagram showing the arrangement relationship of the spray nozzles of the descaling device, (a) is a schematic diagram showing the positional relationship of the spray nozzles, and (b) is a schematic diagram showing a spray pattern.
  • FIG. 6 is a diagram illustrating the relationship between the energy density of descaling water and the scale peeling rate.
  • FIG. 7 is a diagram showing the temperature history of the thick steel plate at each time of the descaling process.
  • FIG. 8 is a transformation diagram of the thick steel plate from the first descaling to the second descaling.
  • FIG. 9 is a side view of the accelerated cooling apparatus according to the embodiment of the present invention.
  • FIG. 10 is a side view of another accelerated cooling apparatus according to an embodiment of the present invention.
  • FIG. 11 is a diagram for explaining an example of the nozzle arrangement of the partition wall according to the embodiment of the present invention.
  • FIG. 12 is a diagram for explaining the flow of the cooling drainage on the partition wall.
  • FIG. 13 is a diagram for explaining another flow of the cooling drainage on the partition wall.
  • FIG. 14 is a diagram for explaining a temperature distribution in the width direction of a thick steel plate of a conventional example.
  • FIG. 15 is a diagram illustrating the flow of cooling water in the acceleration cooling device.
  • FIG. 16 is a diagram for explaining non-interference with cooling water on the partition wall in the accelerated cooling device.
  • FIG. 4 is a schematic view showing a thick steel plate manufacturing facility according to an embodiment of the present invention.
  • an arrow is a conveyance direction of a thick steel plate.
  • the heating furnace 1, the descaling device 2, the rolling mill 3, the shape correcting device 4, the descaling device 6, the descaling device 7, and the accelerated cooling device 5 are arranged in this order.
  • the thick steel plate (not shown) is reheated in the heating furnace 1, the thick steel plate is descaled in the descaling device 2 to remove the primary scale.
  • the thick steel plate is hot-rolled by the rolling mill 3 and corrected by the shape correcting device 4, and then descaling is performed to completely remove the scale in the descaling device 6 and the descaling device 7. Then, controlled cooling by water cooling or air cooling is performed in the acceleration cooling device 5.
  • two descaling devices that is, a descaling device 6 and a descaling device 7 are arranged between the shape correction device 4 and the acceleration cooling device 5.
  • the descaling device shown in FIG. 4 has only two columns. In addition, you may comprise in 3 or more rows. As shown in FIG. 4, when the descaling device has two rows, the energy density of descaling water sprayed from the descaling device 6 and the descaling device 7 onto the surface of the steel plate is the sum of the two rows of spray nozzles.
  • the steel sheet surface temperature is not more than the Ar 3 transformation point.
  • the total of the spray nozzles of all the descaling device rows to be configured is 0.07 J / mm 2 or more, and after the descaling water jet from the last descaling device immediately before After 0.5 s or more, the final descaling water is injected, and the surface temperature of the steel plate immediately before the final descaling water injection is set to the Ar 3 transformation point or less. By doing so, the scale can be completely removed and uniform cooling can be realized.
  • two rows of deske headers 6-1 of the descaling device 6 and deske headers 7-1 of the descaling device 7 are arranged in the longitudinal direction of the thick steel plate. .
  • Descaling water is sprayed onto the thick steel plate 1 from a plurality of spray nozzles 6-2 and 7-2 provided on the desk header, and a spray pattern 22 as shown in FIG. 6B is formed.
  • the arrangement of the injection nozzles 6-2 and 7-2 is arranged.
  • the distance is 500 mm or more in the longitudinal direction of the thick steel plate, that is, the conveying direction of the steel plate.
  • the ejection pattern in the width direction is a staggered arrangement in which the ejection nozzle 6-2 and the ejection nozzle 7-2 are shifted in the width direction.
  • the nozzle rows are spaced apart by 500 mm or more in the longitudinal direction to form a staggered arrangement, as in the case of two descaling devices.
  • the upper limit is preferably 3 rows.
  • the scale surface is cooled by the descaling water, so that thermal stress is generated on the scale and the impact force by the descaling water acts. As a result, the scale is removed by peeling or breaking.
  • the effect of the thermal stress generated at the time of descaling is obtained twice or more by performing descaling twice or more between the hot shape correction process and the accelerated cooling process. Can do.
  • the relationship between the energy density and the scale peeling rate (the ratio of the area where the scale peels and the steel sheet area) is specifically as “no transformation” in FIG.
  • the energy density of descaling water sprayed on the surface of the thick steel plate is set to 0.07 J / mm 2 or more in total of two sprays, and the descaling device 6 After the descaling water is injected on the surface of the thick steel plate, the descaling water is injected from the descaling device 7 onto the surface of the thick steel plate after 0.5 s or more, and the steel plate surface temperature at the start of the descaling water injection from the descaling device is By setting the Ar 3 transformation point or less, the scale can be removed more efficiently.
  • the effect that the scale can be removed more efficiently by setting the steel sheet surface temperature at the start of descaling water injection below the Ar 3 transformation point is confirmed even when the descaling water injection number is 3 times or more. It was done.
  • the total energy density of the two times of descaling can be calculated by summing up the energy density of each time of descaling calculated by the formula described later.
  • the Ar 3 transformation point can be calculated by the following formula (*).
  • Ar 3 (° C.) 910-310C-80Mn-20Cu-15Cr-55Ni-80Mo (*)
  • the element symbol indicates the content (mass%) of each element in steel, and 0 if not contained.
  • the energy density of descaling water sprayed on the surface of a thick steel plate was set to 0.07 J / mm 2 or more in total of two or more sprays, and immediately before the final descaling water spray
  • the steel plate surface temperature can be lowered below the Ar 3 transformation point, and the steel plate surface can be transformed. Due to the transformation of the base iron, a deviation occurs at the interface between the scale and the base iron, reducing the scale adhesion. Descaling by scaling becomes easy, and descaling is possible with descaling water with a smaller energy density.
  • the temperature history of the descaling devices 6 and 7 during the descaling water injection is as shown in FIG. Since the outermost layer part of the iron base is supercooled and the transformation is promoted, even if the holding time below the Ar 3 transformation point is a very short time of 1 s or less, only several tens of ⁇ m of the outermost surface layer of the iron iron undergoes ferrite transformation. Occur. In addition, when the present inventors investigated whether or not the ferrite transformation of the outermost layer portion of the ground iron was changed by variously changing the time of the descaling water injection of the first descaling and the second descaling, as shown in FIG. I understood it.
  • the steel plate surface temperature at the start of the descaling water injection in the second descaling is below the Ar 3 transformation point, and the time from the first descaling to the second descaling being 0.5 s or more
  • the ferrite transformation occurs in the outermost layer of the steel. Since the transformation occurs only in the tens of ⁇ m of the outermost surface layer of the ground iron, the scale can be easily peeled off by scaling without affecting the material such as strength.
  • the time from the first descaling water injection to the second descaling water injection is 0.5 s or more, and the steel sheet surface temperature immediately before the descaling water injection in the second descaling is below the Ar 3 transformation point. If it exists, the scale peeling effect in the second descaling is improved, and the energy of the descaling water at the time of descaling necessary for the scale peeling is reduced.
  • the time from the last descaling water injection immediately before the final time to the final descaling water injection time is 0.5 s or more. If the steel sheet surface temperature is below the Ar 3 transformation point, the scale peeling effect in final descaling is improved, and the energy of descaling water at the time of descaling necessary for scale peeling is reduced.
  • the inventors also examined the energy density of the first descaling by the descaling device 6 and the energy density of the second descaling by the descaling device 7. As described above, in the case where the iron surface layer undergoes ferrite transformation before the second descaling water is jetted by the first descaling, the scale peeling effect by the second descaling is improved. Therefore, the scale can be peeled off more efficiently by supplying the energy necessary for the transformation of the surface layer of the ground metal at the first time and descaling at a larger energy density at the second time. Specifically, it is preferable to set the energy density of the first descaling to 0.02 J / mm 2 or more.
  • the energy density of the last descaling is 0.02 J / mm 2 or more, as in the case of 2 times of descaling.
  • the total energy density of descaling water in the total number of times is preferably 0.7 J / mm 2 or less.
  • the energy density E (J / mm 2 ) of descaling water sprayed on the thick steel plate is an index of the ability to remove the scale by descaling and is defined as the following equation (1).
  • E Q ⁇ v 2 t ⁇ ( 2 dW) (1)
  • Q Descaling water injection flow rate [m 3 / s]
  • d Flat nozzle spray injection thickness [mm]
  • W Flat nozzle spray injection width [mm]
  • the present inventors adopted water density ⁇ injection pressure ⁇ collision time as a simple definition of the energy density E (J / mm 2 ) of descaling water injected into the thick steel plate. I found out that I should do.
  • the water density (m 3 / (mm 2 ⁇ min)) is a value calculated by “descaled water injection flow rate ⁇ descaling water collision area”.
  • the collision time (s) is a value calculated by “descaled water collision thickness ⁇ thick steel plate conveyance speed”.
  • the relationship between the energy density of the high pressure water of this invention calculated by this simple definition and a scale peeling rate is the same as that of FIG.
  • the following formula (3) can be derived based on the above formula (2). That is, when the time t [s] from the end of descaling of the thick steel plate by the descaling devices 6 and 7 to the start of cooling the thick steel plate by the accelerated cooling device 5 satisfies the following equation (3): Cooling by the acceleration cooling device 5 is stabilized. t ⁇ 5 ⁇ 10 ⁇ 9 ⁇ exp (25000 / T) (3) However, T: Thick steel plate temperature [K] before cooling.
  • the following formula (4) can be derived based on the above formula (2). That is, when the time t [s] from the end of removal of the scale of the thick steel plate by the descaling devices 6 and 7 to the start of cooling of the thick steel plate by the accelerated cooling device 5 satisfies the following equation (4): The cooling by the acceleration cooling device 5 is more stable. t ⁇ 2.2 ⁇ 10 ⁇ 9 ⁇ exp (25000 / T) (4) Furthermore, when the scale thickness is 5 ⁇ m or less, the following formula (5) can be derived based on the above formula (2).
  • the upper surface cooling facility of the accelerated cooling device 5 of the present invention includes an upper header 11 that supplies cooling water to the upper surface of the thick steel plate 10, and cooling that jets rod-shaped cooling water suspended from the upper header 11.
  • the water injection nozzle 13 and the partition 15 installed between the thick steel plate 10 and the upper header 11 are provided.
  • the partition wall 15 is provided with a plurality of water supply ports 16 for inserting the lower end portion of the cooling water injection nozzle 13 and drain ports 17 for draining the cooling water supplied to the upper surface of the thick steel plate 10 onto the partition wall 15.
  • it is.
  • the upper surface cooling facility includes an upper header 11 for supplying cooling water to the upper surface of the thick steel plate 10, a cooling water injection nozzle 13 suspended from the upper header 11, and the upper header 11 and the thick steel plate 10. And a partition wall 15 having a large number of through-holes (water supply port 16 and drain port 17) installed horizontally in the width direction of the thick steel plate.
  • the cooling water injection nozzle 13 is a circular pipe nozzle that injects rod-shaped cooling water, and its tip is inserted into a through-hole (water supply port 16) provided in the partition wall 15 and above the lower end portion of the partition wall 15. It is installed to become.
  • the cooling water injection nozzle 13 may be inserted into the upper header 11 so that the upper end of the cooling water injection nozzle 13 protrudes into the upper header 11 in order to prevent the foreign matter at the bottom in the upper header 11 from being sucked and clogged. preferable.
  • the rod-shaped cooling water in the present invention is cooling water injected in a state of being pressurized to some extent from a circular (including elliptical or polygonal) nozzle outlet, and is cooled from the nozzle outlet.
  • the water injection speed is 6 m / s or more, preferably 8 m / s or more, and the water flow jetted from the nozzle outlet has a continuous circular shape, and the water flow has a continuous and straight flow.
  • it is different from a free fall flow from a circular tube laminar nozzle or a liquid ejected in a droplet state such as a spray.
  • the reason why the tip of the cooling water spray nozzle 13 is inserted into the through hole and is located above the lower end of the partition wall 15 is that the partition wall 15 is inserted even when a thick steel plate whose tip is warped upward enters. This is to prevent the cooling water injection nozzle 13 from being damaged. As a result, the cooling water injection nozzle 13 can be cooled for a long period of time in a good state, so that it is possible to prevent the occurrence of temperature unevenness in the thick steel plate without repairing the equipment.
  • the tip of the circular tube nozzle 13 is inserted into the through hole, as shown in FIG. 16, there is no interference with the flow in the width direction of the drained water indicated by the dotted arrow flowing through the upper surface of the partition wall 15. Therefore, the cooling water jetted from the cooling water jet nozzle 13 can reach the upper surface of the thick steel plate equally regardless of the position in the width direction, and uniform cooling in the width direction can be performed.
  • a large number of through-holes having a diameter of 10 mm are opened in a grid pattern at a pitch of 80 mm in the thick steel plate width direction and 80 mm in the transport direction.
  • a cooling water injection nozzle 13 having an outer diameter of 8 mm, an inner diameter of 3 mm, and a length of 140 mm is inserted into the water supply port 16.
  • the cooling water injection nozzles 13 are arranged in a staggered pattern, and the through holes through which the cooling water injection nozzles 13 do not pass serve as cooling water drains 17.
  • the large number of through holes provided in the partition wall 15 of the accelerated cooling device of the present invention are composed of the substantially same number of water supply ports 16 and drain ports 17, and each share a role and function.
  • the total cross-sectional area of the drain port 17 is sufficiently larger than the total cross-sectional area of the inner diameter of the circular pipe nozzle 13 of the cooling water injection nozzle 13, and about 11 times the total cross-sectional area of the inner diameter of the circular pipe nozzle 13 is ensured.
  • the cooling water supplied to the upper surface of the thick steel plate is filled between the thick steel plate surface and the partition wall 15, led to the upper side of the partition wall 15 through the drain port 17, and quickly discharged.
  • the FIG. 12 is a front view for explaining the flow of cooling drainage near the end in the width direction of the thick steel plate on the partition wall.
  • the drainage direction of the drainage port 17 is upward opposite to the cooling water injection direction, and the cooling drainage drained upward from the partition wall 15 changes the direction outward in the thick steel plate width direction, between the upper header 11 and the partition wall 15. It drains through the drainage channel.
  • the drain port 17 is inclined in the thick steel plate width direction, and the slant direction is directed outward in the width direction so that the drain direction is directed outward in the thick steel plate width direction.
  • the cooling water does not easily escape above the partition wall 15 after colliding with the steel plate, and the steel plate 10. And the partition wall 15 flow toward the end in the width direction of the thick steel plate. Then, since the flow rate of the cooling drainage between the thick steel plate 10 and the partition wall 15 increases as it approaches the end in the plate width direction, the force that the jet cooling water 18 penetrates the staying water film and reaches the thick steel plate is the plate width. The direction end portion is inhibited.
  • the influence is limited because the plate width is about 2 m at most. However, the influence cannot be ignored especially in the case of a thick steel plate having a plate width of 3 m or more. Accordingly, the cooling at the end in the width direction of the thick steel plate is weakened, and the temperature distribution in the width direction of the thick steel plate in this case becomes a non-uniform temperature distribution.
  • the water supply port 16 and the water discharge port 17 are provided separately and share the roles of water supply and water discharge. 15 flows smoothly through the drainage port 17 and above the partition wall 15. Accordingly, since the drainage after cooling is quickly removed from the upper surface of the thick steel plate, the cooling water supplied subsequently can easily penetrate the staying water film, and a sufficient cooling capacity can be obtained.
  • the temperature distribution in the width direction of the thick steel plate is a uniform temperature distribution, and a uniform temperature distribution in the width direction can be obtained.
  • the cooling water is discharged quickly. This can be realized, for example, by making holes larger than the outer diameter of the circular tube nozzle 13 in the partition wall 15 and making the number of drain ports equal to or greater than the number of water supply ports.
  • the ratio of the total cross-sectional area of the drain outlet and the total cross-sectional area of the inner diameter of the circular tube nozzle 13 is preferably in the range of 1.5 to 20.
  • the gap between the outer peripheral surface of the circular tube nozzle 13 inserted in the water supply port 16 of the partition wall 15 and the inner surface of the water supply port 16 be 3 mm or less. If this gap is large, the cooling drainage discharged to the upper surface of the partition wall 15 is drawn into the gap between the outer peripheral surface of the circular pipe nozzle 13 of the water supply port 16 due to the influence of the accompanying flow of the cooling water injected from the circular pipe nozzle 13. As a result, the steel sheet is again supplied onto the thick steel plate, resulting in poor cooling efficiency. In order to prevent this, it is more preferable that the outer diameter of the circular tube nozzle 13 is substantially the same as the size of the water supply port 16. However, in consideration of machining accuracy and mounting errors, a gap of up to 3 mm that has substantially little influence is allowed. More preferably, it is 2 mm or less.
  • the nozzle inner diameter is preferably 3 to 8 mm. If it is smaller than 3 mm, the bundle of water sprayed from the nozzle becomes thin and the momentum becomes weak. On the other hand, when the nozzle diameter exceeds 8 mm, the flow rate becomes slow, and the force penetrating the staying water film becomes weak.
  • the length of the circular tube nozzle 13 is preferably 120 to 240 mm.
  • the length of the circular tube nozzle 13 here means the length from the inlet at the upper end of the nozzle that penetrates into the header to some extent to the lower end of the nozzle inserted into the water supply port of the partition wall.
  • the distance between the lower surface of the header and the upper surface of the partition wall becomes too short (for example, the header thickness is 20 mm, the protrusion amount of the nozzle upper end into the header is 20 mm, and the insertion amount of the nozzle lower end into the partition wall is 10 mm. Therefore, the drainage space above the partition wall becomes small, and the cooling drainage cannot be discharged smoothly.
  • the pressure loss of the circular tube nozzle 13 becomes large, and the force penetrating the staying water film becomes weak.
  • the jet speed of cooling water from the nozzle is required to be 6 m / s or more, preferably 8 m / s or more. This is because if it is less than 6 m / s, the force of the cooling water penetrating through the staying water film becomes extremely weak. If it is 8 m / s or more, a larger cooling capacity can be secured, which is preferable.
  • the distance from the lower end of the cooling water spray nozzle 13 for upper surface cooling to the surface of the thick steel plate 10 is preferably 30 to 120 mm. If it is less than 30 mm, the frequency with which the thick steel plate 10 collides with the partition wall 15 becomes extremely high, and equipment maintenance becomes difficult. If it exceeds 120 mm, the force through which the cooling water penetrates the staying water film becomes extremely weak.
  • draining rolls 20 When cooling the upper surface of the thick steel plate, it is preferable to install draining rolls 20 before and after the upper header 11 so that the cooling water does not spread in the longitudinal direction of the thick steel plate. Thereby, the cooling zone length becomes constant and the temperature control becomes easy.
  • the cooling drainage since the flow of the cooling water in the direction of transporting the thick steel plate is blocked by the draining roll 20, the cooling drainage flows outward in the width direction of the thick steel plate. However, the cooling water tends to stay in the vicinity of the draining roll 20.
  • the cooling water jet nozzle in the uppermost stream side row in the thick steel plate transport direction is 15 to upstream in the thick steel plate transport direction. It is preferable that the cooling water jet nozzles at the most downstream side in the thick steel plate conveyance direction are inclined 15 to 60 degrees in the downstream direction in the thick steel plate conveyance direction.
  • the distance between the lower surface of the upper header 11 and the upper surface of the partition wall 15 is such that the cross-sectional area in the width direction of the thick steel plate in the space surrounded by the lower surface of the header and the upper surface of the partition wall is 1.5 times the total cross-sectional area of the cooling water spray nozzle inner diameter. It is preferable to be provided, for example, about 100 mm or more is preferable.
  • the cross-sectional area of the thick steel plate in the width direction is not 1.5 times or more than the total cross-sectional area of the cooling water jet nozzle inner diameter, the cooling drainage discharged from the drain port 17 provided on the partition wall to the top surface of the partition wall 15 is smoothly thick. There is a possibility that it cannot be discharged in the width direction of the steel sheet.
  • the range of the water density that exhibits the most effect is 1.5 m 3 / (m 2 ⁇ min) or more.
  • the water density is lower than this, the accumulated water film does not become so thick, and even if a known technique for cooling the thick steel plate by dropping the rod-shaped cooling water freely is applied, the temperature unevenness in the width direction does not become so large. In some cases.
  • the water density is higher than 4.0 m 3 / (m 2 ⁇ min)
  • it is effective to use the technique of the present invention but there are problems in practical use such as an increase in equipment cost. Therefore, 1.5 to 4.0 m 3 / (m 2 ⁇ min) is the most practical water density.
  • the application of the cooling technique of the present invention is particularly effective when a draining roll is arranged before and after the cooling header.
  • the header is relatively long in the longitudinal direction (when it is about 2 to 4 m), and it is applied to cooling equipment that sprays water spray for purging before and after the header to prevent water leakage to the non-water cooling zone. Is also possible.
  • the cooling device on the lower surface side of the thick steel plate is not particularly limited.
  • FIGS. 9 and 10 an example of the cooled header 12 including the circular tube nozzle 14 similar to the cooling device on the upper surface side is shown.
  • the injected cooling water naturally falls after colliding with the thick steel plate, so that there is no need for the partition wall 15 for discharging cooling drainage as in the upper surface side cooling in the thick steel plate width direction.
  • heating furnace 1 and the descaling device 2 of the present invention are not particularly limited, and conventional devices can be used.
  • the descaling device 2 need not have the same configuration as the descaling devices 6 and 7 of the present invention.
  • the steel plate temperature is the temperature of the steel plate surface.
  • the thick steel plate of the present invention was manufactured using a thick steel plate manufacturing facility as shown in FIG. After the slab was reheated in the heating furnace 1, the primary scale was removed in the descaling device 2, hot rolled by the rolling mill 3, and the shape was corrected by the shape correcting device 4. After shape correction, descaling was performed. In the case of descaling after hot straightening, in the case of two times, two descaling devices of a descaling device 6 and a descaling device 7 were arranged, and descaling was performed twice on the surface of the thick steel plate.
  • the descaling devices are arranged in three or more rows, and the nozzle rows are spaced apart by 500 mm or more in the longitudinal direction to form a staggered arrangement.
  • controlled cooling of the thick steel plate was performed using the accelerated cooling device 5.
  • the spray distance (the surface distance between the spray nozzle of the descaling device and the thick steel plate) was 130 mm, the nozzle spray angle was 66 °, and the angle of attack was 15 °.
  • the nozzles of the descaling device 6 and the descaling device 7 are arranged in the width direction so that the ejection regions of adjacent nozzles overlap to some extent.
  • the distance between the descaling device 6 and the descaling 7 was arranged at a distance of 1.1 m in the longitudinal direction.
  • the nozzle was a flat spray nozzle.
  • the spray pressure of the descaling nozzle after hot rolling and the spray flow rate per nozzle were the same for both the descaling device 6 and the descaling device 7 and were performed under the conditions shown in Table 1. Further, the Ar 3 transformation point of the used steel sheet was 780 ° C. The sheet thickness after rolling in the rolling mill 3 was 30 mm, and the steel plate temperature was 830 ° C. or 840 ° C.
  • the cooling conditions calculated from the above-described equations (3), (4), and (5) are as follows. After removing the scale of the thick steel plate by the descaling device, the cooling of the thick steel plate is started by the acceleration cooling device. The time t until it is 42 s or less, preferably 19 s or less, more preferably 5 s or less.
  • T is the thick steel plate temperature (K) before cooling.
  • the energy density was 0.07 J / mm 2 .
  • the steel plate surface temperature at the second descaling was 785 ° C. Since the second descaling was performed in a state where the thick steel plate surface was not transformed from austenite to ferrite, the scale remained in a part of the steel plate, and the temperature unevenness became 40 ° C.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Metal Rolling (AREA)
  • Heat Treatments In General, Especially Conveying And Cooling (AREA)
  • Heat Treatment Of Strip Materials And Filament Materials (AREA)
PCT/JP2015/004056 2014-08-26 2015-08-14 厚鋼板の製造方法 WO2016031169A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
EP15836450.5A EP3187275B1 (en) 2014-08-26 2015-08-14 Thick steel plate manufacturing method
KR1020177005018A KR101940429B1 (ko) 2014-08-26 2015-08-14 후강판의 제조 방법
CN201580045918.0A CN106604785B (zh) 2014-08-26 2015-08-14 厚钢板的制造方法
JP2016544933A JP6108041B2 (ja) 2014-08-26 2015-08-14 厚鋼板の製造方法
BR112017004022-0A BR112017004022B1 (pt) 2014-08-26 2015-08-14 Método de fabricação de placa de aço

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2014171046 2014-08-26
JP2014-171046 2014-08-26

Publications (1)

Publication Number Publication Date
WO2016031169A1 true WO2016031169A1 (ja) 2016-03-03

Family

ID=55399087

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2015/004056 WO2016031169A1 (ja) 2014-08-26 2015-08-14 厚鋼板の製造方法

Country Status (6)

Country Link
EP (1) EP3187275B1 (pt)
JP (1) JP6108041B2 (pt)
KR (1) KR101940429B1 (pt)
CN (1) CN106604785B (pt)
BR (1) BR112017004022B1 (pt)
WO (1) WO2016031169A1 (pt)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7513046B2 (ja) 2021-06-16 2024-07-09 Jfeスチール株式会社 表層硬度予測モデル及びこれを用いた鋼板の表層硬度を予測制御する方法、制御指令装置、鋼板製造ライン、並びに鋼板製造方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010110473A1 (ja) * 2009-03-25 2010-09-30 Jfeスチール株式会社 厚鋼板の製造設備及び製造方法
JP2012077325A (ja) * 2010-09-30 2012-04-19 Jfe Steel Corp ラインパイプ用高強度鋼板及びその製造方法並びにラインパイプ用高強度鋼板を用いた高強度鋼管
JP2012152761A (ja) * 2011-01-24 2012-08-16 Jfe Steel Corp 厚鋼板のデスケーリング設備およびデスケーリング方法

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06330155A (ja) 1993-05-26 1994-11-29 Kawasaki Steel Corp 厚鋼板の冷却方法
JP3796133B2 (ja) * 2000-04-18 2006-07-12 新日本製鐵株式会社 厚鋼板冷却方法およびその装置
JP2003181522A (ja) * 2001-12-14 2003-07-02 Nippon Steel Corp 表面性状の優れた鋼板の製造方法及びその装置
CN101215624B (zh) * 2008-01-08 2011-07-06 济南钢铁股份有限公司 一种高强韧厚钢板的在线淬火生产工艺方法
CN102811824B (zh) * 2010-03-15 2013-11-06 新日铁住金株式会社 厚钢板制造装置
CN102899557B (zh) * 2012-11-02 2014-12-03 湖南华菱湘潭钢铁有限公司 一种低合金中厚钢板的生产方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010110473A1 (ja) * 2009-03-25 2010-09-30 Jfeスチール株式会社 厚鋼板の製造設備及び製造方法
JP2012077325A (ja) * 2010-09-30 2012-04-19 Jfe Steel Corp ラインパイプ用高強度鋼板及びその製造方法並びにラインパイプ用高強度鋼板を用いた高強度鋼管
JP2012152761A (ja) * 2011-01-24 2012-08-16 Jfe Steel Corp 厚鋼板のデスケーリング設備およびデスケーリング方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3187275A4 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7513046B2 (ja) 2021-06-16 2024-07-09 Jfeスチール株式会社 表層硬度予測モデル及びこれを用いた鋼板の表層硬度を予測制御する方法、制御指令装置、鋼板製造ライン、並びに鋼板製造方法

Also Published As

Publication number Publication date
JPWO2016031169A1 (ja) 2017-04-27
EP3187275A4 (en) 2017-09-06
JP6108041B2 (ja) 2017-04-05
KR20170033423A (ko) 2017-03-24
CN106604785A (zh) 2017-04-26
CN106604785B (zh) 2019-01-11
BR112017004022B1 (pt) 2022-08-02
EP3187275A1 (en) 2017-07-05
EP3187275B1 (en) 2019-12-18
BR112017004022A2 (pt) 2017-12-05
KR101940429B1 (ko) 2019-01-18

Similar Documents

Publication Publication Date Title
JP5614040B2 (ja) 厚鋼板の製造設備及び製造方法
JP4586791B2 (ja) 熱延鋼帯の冷却方法
JP5720714B2 (ja) 厚鋼板の製造方法および製造設備
JP4774887B2 (ja) 鋼板の冷却設備および製造方法
JP5515483B2 (ja) 厚鋼板の冷却設備および冷却方法
JP5962849B2 (ja) 厚鋼板の製造設備および製造方法
JP2010247227A (ja) 厚鋼板の製造設備及び製造方法
JP6108041B2 (ja) 厚鋼板の製造方法
JP6264464B2 (ja) 厚鋼板の製造設備および製造方法
JP5387093B2 (ja) 熱鋼板の冷却設備
JP4888124B2 (ja) 鋼材の冷却装置および冷却方法
JP5246075B2 (ja) 熱鋼板の冷却設備および冷却方法
JP5228720B2 (ja) 厚鋼板の冷却設備
JP5347781B2 (ja) 熱鋼板の冷却設備および冷却方法
JP2010284680A (ja) 厚鋼板の冷却設備およびその冷却方法
JP4962349B2 (ja) 熱延鋼帯の下面冷却方法および下面冷却装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15836450

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2016544933

Country of ref document: JP

Kind code of ref document: A

REEP Request for entry into the european phase

Ref document number: 2015836450

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2015836450

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 20177005018

Country of ref document: KR

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112017004022

Country of ref document: BR

ENP Entry into the national phase

Ref document number: 112017004022

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20170224