WO2016003208A1 - 강관 버팀보를 이용한 가설 흙막이 구조 및 그 시공방법 - Google Patents

강관 버팀보를 이용한 가설 흙막이 구조 및 그 시공방법 Download PDF

Info

Publication number
WO2016003208A1
WO2016003208A1 PCT/KR2015/006793 KR2015006793W WO2016003208A1 WO 2016003208 A1 WO2016003208 A1 WO 2016003208A1 KR 2015006793 W KR2015006793 W KR 2015006793W WO 2016003208 A1 WO2016003208 A1 WO 2016003208A1
Authority
WO
WIPO (PCT)
Prior art keywords
steel pipe
brace
temporary
braces
length
Prior art date
Application number
PCT/KR2015/006793
Other languages
English (en)
French (fr)
Inventor
김동준
Original Assignee
(주)피에스테크
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from KR1020150093205A external-priority patent/KR20160005310A/ko
Application filed by (주)피에스테크 filed Critical (주)피에스테크
Publication of WO2016003208A1 publication Critical patent/WO2016003208A1/ko

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations

Definitions

  • the present invention relates to a temporary soil structure and its construction method, and more specifically, to use the standardized closed steel pipe braces by assembling only without on-site fabrication, and to solve the separation part generated at the end with a prefabricated length adjustment block
  • the present invention relates to a temporary soil structure and a construction method using steel pipe braces that reduce losses and reduce processes such as on-site fabrication.
  • the construction includes a supporting method for supporting the earth pressure acting on the back of the excavation.
  • the supporting method is a support method or an anchor method.
  • the reinforcement method is a method of supporting the earth pressure acting on the earth wall by installing a belt length in the transverse direction with respect to the earth wall, and installing a plurality of bracing beams between the band bands facing each other. As the brace, H-beam or steel pipe brace is applied.
  • temporary braces are made on-site, cut to the required length in the field, and then plated, etc., to connect with other braces by welding, bolting, etc. Install the jack at the end of the brace to adjust the fine length of the brace.
  • waste steel is inevitable because the end portion of the brace is cut and manufactured in the form of a block for connection.
  • reinforcing the length of the brace by cutting a portion of the brace in the field takes a lot of time.
  • Patent Document 1 Republic of Korea Patent Publication No. 10-0733719 (July 4, 2007)
  • An object of the present invention is to devise to solve the conventional problems as described above, and can easily and freely adjust the length of the brace according to the site conditions, and the steel pipe brace can reuse the brace after the dismantling of the temporary soil structure
  • the present invention provides a temporary soil block structure and a construction method thereof.
  • Temporary soil structure using a steel pipe brace according to a preferred embodiment of the present invention for achieving the technical problem is a steel pipe brace between the temporary soil wall is installed; And a prefabricated length adjustment block that is selectively connected to the end of the steel pipe support according to the site conditions to adjust the length of the support while performing the function of the support.
  • the temporary soil block structure for connecting a plurality of the steel pipe braces with each other; And an end connection part for connecting both ends of the brace configured to include only the steel pipe brace or both ends of the brace configured to include the steel pipe brace and the length adjusting block, respectively, to the strip and the jack.
  • the temporary soil structure, the steel pipe brace, the length adjustment block and the computer bolt for connecting the end connection parts may further include.
  • the length adjustment block the block body shorter than the steel pipe brace; And And And a connecting diaphragm which is joined to at least one of both ends of the block body and through which the threaded bolt passes without screwing.
  • the fixing nut can be fixed to the connecting diaphragm of the steel pipe brace through the threaded coupling.
  • the central connection part the upper cover for covering the upper end of the connecting end of the steel pipe prop; And a lower cover covering a lower portion of the connection end of the steel pipe brace and coupled to the upper cover.
  • openings are formed in the upper cover and the lower cover, respectively, and connecting diaphragms which are in surface contact with each other are provided at connection ends of the plurality of steel pipe braces, and a part of edges of the connecting diaphragm are outside the ends of the steel pipe braces. Protruded to be formed, the protruding edge portion may be inserted into the opening to be exposed.
  • At least one bolt hole is formed at the protruding edge of the connecting plate, and the connecting plate of the steel pipe brace can be coupled by a bolt and a nut fastened through the bolt hole.
  • the length of the brace can be adjusted by selectively connecting to the site conditions.
  • the length adjustment block is pre-fabricated in a variety of standards and can be constructed by selecting the length adjustment block of the standard that meets the requirements in the field.
  • the steel pipe braces are connected to each other using a central connecting part, and both ends of the braces are connected to both bands, respectively, or both ends of the band through the end connecting parts, Can be connected to at least one jack installed.
  • Temporary soil structure and construction method using the steel pipe brace according to the present invention has the following effects.
  • the present invention is used to connect the standardized closed steel pipe brace by assembly only without on-site fabrication, and to solve the separation part generated at the end with a prefabricated length adjustment block, to reduce the loss of steel materials and field production, etc. Can reduce the process.
  • the length control block is pre-manufactured in a variety of specifications in the factory, and in the field by selecting a standard that fits the conditions can be assembled with a fastening member, the length control block can be reused after dismantling the construction of the temporary mud structure.
  • the connecting diaphragm when the connecting diaphragm is installed in the connection end of the steel pipe brace when the plurality of steel pipe brace is connected to each other, even if the axial force acts through the steel pipe brace, the axial force is transmitted evenly throughout the cross section of the connecting diaphragm compression and Buckling performance can be improved.
  • the present invention is inserted into the opening formed in the connection portion of the center of the steel pipe brace is exposed to protrude in the vertical direction by inserting into the opening, the connection plate after connecting the plurality of steel pipe braces because the connection plate is not caught in the opening, so the steel pipe brace
  • the connection state of can be kept stable.
  • the present invention bolts the first connecting diaphragm of the steel pipe braces exposed through the opening of the central connection parts after connecting the steel pipe braces primarily through the central connection part consisting of upper and lower cover when connecting a plurality of steel pipe braces By secondarily coupling, the buckling performance and connection strength of the steel pipe brace can be further increased.
  • FIG. 1 is a side view of a temporary construction constructed by a temporary construction method using a steel pipe support according to an embodiment of the present invention.
  • Figure 2 is a plan view of a temporary facility constructed by a temporary earthquake construction method using a steel pipe support according to an embodiment of the present invention.
  • Figure 3 is an exploded perspective view showing the disassembled steel pipe brace, the central connection part, the length adjustment block, the end connection part according to an embodiment of the present invention.
  • Figure 4 is a perspective view showing a state in which the steel pipe braces are connected to each other through the central connecting part shown in FIG.
  • FIG. 5 is a cross-sectional view taken along the line A-A of FIG.
  • FIG. 6 is a perspective view showing a state in which a steel pipe brace, a length adjusting block and an end connection part are connected.
  • FIG. 7 is a cross-sectional view taken along the line B-B of FIG.
  • FIG. 8 is a perspective view of a fixing nut fixed to the steel pipe brace.
  • FIG. 9 is an exploded perspective view showing the disassembled steel pipe brace, the center connection part, the length adjustment block, the end connection part according to another preferred embodiment of the present invention.
  • FIG. 10 is a perspective view illustrating a state in which steel pipe braces are connected to each other through a central connecting part shown in FIG. 9.
  • FIG. 11 is a cross-sectional view taken along the line A-A of FIG.
  • Figure 1 is a side view of a temporary construction constructed by a temporary construction method using a steel pipe brace according to an embodiment of the present invention
  • Figure 2 is a construction by a temporary construction method using a steel pipe brace according to an embodiment of the present invention
  • Floor plan of a built temporary facility
  • the earthenware wall 10 is erected vertically, and fixed to the earthenware wall 10 in the transverse direction, the banding 20 between, facing the banding 20 Work is done in the form of installing across the steel pipe brace 30.
  • Steel pipe brace 30 is installed alone or a plurality are connected to each other according to the interval between the facing strip 20.
  • Belt length 20 is fixed to the front of the retaining wall (10) through the hanger (40), the steel pipe braces 30 are connected to each other through the central connection part 50 to form a brace, braces One end of the belt is connected to one of the belt 20 through the end connection part 60, the other end of the brace is opposite the length of the other side through the length adjustment block 70, the end connection part 60, the jack 80 (20) Is connected to.
  • the length adjustment block 70 is connected to the other end of the brace to function as a brace and to extend the length of the brace. Since the length adjustment block 70 does not function as a sole prop alone but extends the insufficient length of the prop so that the length is shorter than that of the steel pipe prop 30, it is pre-fabricated to various specifications in the factory and according to needs in the field. Optionally applied. In addition, a plurality of length adjusting blocks 70 may be applied to fit the site conditions.
  • FIG. 3 is an exploded perspective view showing the disassembled steel pipe brace, the central connection part, the length adjustment block, the end connection part according to an embodiment of the present invention
  • Figure 4 is a steel pipe through the central connection part shown in FIG. 5 is a perspective view showing a state in which braces are connected to each other
  • FIG. 5 is a cross-sectional view taken along line AA of FIG. 4.
  • the two steel pipe braces 30 are connected to each other via a central connecting part 50.
  • the length control block 70 is prefabricated through the computer bolt 90 to the end of the steel pipe brace 30 to perform the function of the brace, thereby extending the length of the brace.
  • the end connection part 60 is connected to the length adjusting block 70 through a computer bolt 90 to connect one end of the brace including the length adjusting block 70 to the jack 80.
  • the central connection part 50 is for connecting two steel pipe braces 30 long, and includes upper and lower covers 51 and 52, a bending reinforcing member 53, and a reinforcing plate 54.
  • the first connecting diaphragm 100 for coupling with the central connecting part 50 is joined to both ends of the steel pipe brace 30 by welding.
  • the first connecting diaphragm 100 is joined to the connection end of the steel pipe brace 30 by welding, respectively, and is formed in a rectangular plate shape and is in surface contact with each other when the two steel pipe braces 30 are connected. Since the first connection diaphragm 100 is in surface contact with each other when the steel pipe brace 30 is connected, even though the axial force acts through the steel pipe brace 30, the axial force is evenly transmitted to the entire cross section of the first connection diaphragm 30, so that the steel pipe brace 30 ) Compression and buckling performance is improved.
  • the upper and lower ends of the first connecting diaphragm 100 protrude upward and downward than the upper and lower ends of the steel pipe brace 30.
  • the through hole 101 is formed in the center of the first connecting diaphragm 100.
  • the upper cover 51 is combined with the upper outer surface of the steel pipe brace 30 to surround the upper portion of the steel pipe brace 30, the lower cover 52 is combined with the lower outer surface of the steel pipe brace 30 of the steel pipe brace 30 Wrap the lower part
  • the upper and lower covers 51 and 52 are provided with coupling portions 51a and 52a that are coupled to each other by bolts and nuts in a state where they are opposed to each other.
  • the upper and lower ends of the first connection diaphragm 100 are inserted into the horizontal portions 51b and 52b which respectively cover the upper and lower surfaces of the steel pipe prop 30 among the portions constituting the upper and lower covers 51 and 52.
  • the openings 51c and 52c that are exposed are formed long left and right, respectively.
  • the bending reinforcing member 53 is joined by welding in the form of wrapping the bent portion of the upper and lower cover 51, 52 to reinforce the strength of the bending portion that is weak.
  • the reinforcement plate 54 is joined to the portions adjacent to both edges of the openings 51c and 52c by welding, respectively, to reinforce the strength of the weak part formed by the openings 51c and 52c.
  • FIG. 6 is a perspective view showing a state in which the steel pipe brace, the length adjustment block and the end connection part is connected
  • Figure 7 is a cross-sectional view taken along the line B-B of Figure 6
  • Figure 8 is a perspective view of a fixing nut fixed to the steel pipe brace.
  • the first connecting diaphragm 100 is joined to the other end of the steel pipe brace 30 is connected to the length adjustment block 70 is formed in the center hole will be described later in the vicinity of the hole A plurality of fixing nut fixing holes into which the first fixing nut 120 is inserted and fixed are formed.
  • the length control block 70 is a square steel pipe having the same cross-sectional area as the steel pipe brace 30, and the second connecting diaphragm 110 is joined to both ends by welding.
  • a through hole is formed in the center of the second connection diaphragm 110, and a plurality of computed bolt through holes are formed in the periphery of the through hole.
  • the length control block 70 is to reinforce the length of the steel pipe brace 30 if the length is shorter, the length is shorter than the steel pipe brace 30, and pre-manufactured in various specifications in the factory to selectively use according to the site conditions do.
  • the end connecting part 60 includes two connecting plates 61 and 62, a connecting pipe 63 and a stiffener 64.
  • the connecting plates 61 and 62 are formed in different areas, and the first connecting plate 61 having a large area is connected to the length adjusting block 70, and the second connecting plate 62 having a small area is connected to the jack 80. ). Both ends of the connecting pipe 63 are joined to the two connecting plates 61 and 62 by welding to connect the two connecting plates 61 and 62 integrally.
  • the stiffener 64 is welded to the outer side of the connecting tube 63 and the two connecting plates 61 and 62 to increase the structural rigidity of the connecting tube 63 and the connecting plates 61 and 62.
  • the first connecting plate 61 is formed with a plurality of computer bolt through-holes through which the threaded bolt 90 for connection with the length adjusting block 70 is not screwed together, and the jack is provided in the second connecting plate 62.
  • a plurality of bolt through holes are formed through which the bolts for engagement with the 80 are not screwed together.
  • the threaded bolt 90 is connected to the first connecting diaphragm 100 of the steel pipe brace 30, the second connecting diaphragm 110 of the length adjusting block 70, and the first connecting plate 61 of the end connecting part 60. Penetrates.
  • One end of the threaded bolt 90 is screwed to the first fixing nut 120 fixed to the first connecting diaphragm 100 of the steel pipe brace 30, and the other end is connected to the first and second ends of the end connecting part 60.
  • the first fixing nut 120 fixed to the first connecting diaphragm 100 of the steel pipe brace 30 is formed in a different form from the second fixing nut 130 which is a general nut. That is, since it is difficult to work by hand into the steel pipe brace 30, the first fixing nut 120 is fixed in advance in the fixing nut fixing hole formed in the first connecting plate 100 of the steel pipe brace 30.
  • the first fixing nut 120 includes a fitting portion 121 forcibly fitted into the fixing nut fixing hole in the inner side of the steel pipe brace 30, and a locking portion 122 formed at an end of the fitting portion 121. do. Spline projections are formed on the outer circumferential surface of the fitting portion 121, and the fitting portion 121 is prevented from rotating when tightening the computer bolt 90 by being inserted into the fixing nut fixing hole.
  • FIG. 9 is an exploded perspective view showing the disassembled steel pipe brace, the central connection part, the length adjustment block, the end connection part according to another embodiment of the present invention
  • Figure 10 is a steel pipe through the central connection part shown in FIG.
  • FIG. 11 is a perspective view illustrating the prop beams connected to each other
  • FIG. 11 is a cross-sectional view taken along line AA of FIG. 10.
  • the present embodiment is the same as the above-described embodiment except for the structure of bolting the connection ends of the two steel pipe brace 30 and connecting through the central connection part 50 Do. Therefore, the same reference numerals are used to designate components that perform the same functions as the above-described embodiments, and detailed description thereof will be omitted, and only different configurations will be described below.
  • the central connection part 50 is for connecting two steel pipe braces 30 for a long time, the upper cover 51 which is joined to the upper outer surface of the steel pipe brace 30 and wraps the upper end of the connection end of the steel pipe brace 30,
  • the lower cover 52 may be combined with the lower outer surface of the steel pipe brace 30 to surround the lower end of the connecting end of the steel pipe brace 30 and may be coupled to the upper cover 51.
  • horizontal portions 51b and 52b respectively surrounding the top and bottom surfaces of the steel pipe brace 30 are formed at ends of two steel pipe braces 30 to be described later.
  • the upper and lower ends of the first connecting diaphragm 100 are inserted to form openings 51c and 52c that are exposed to the outside, respectively.
  • the two steel pipe braces 30 are connected to each other via a central connecting part 50.
  • the first connecting diaphragm 100 is installed at both ends to which two steel pipe braces 30 are connected.
  • the first connecting diaphragm 100 is joined to the connection end of the steel pipe brace 30 by welding, respectively, and is formed in a square plate shape, and is in contact with each other when the two steel pipe braces 30 are connected to each other.
  • the first connection diaphragm 30 is connected to each other when the steel pipe brace 30 is in contact with each other, even if the axial force acts through the steel pipe brace 30 is transferred evenly throughout the cross section of the first connection diaphragm (100)
  • the compression and buckling performance of the steel pipe brace 30 is improved.
  • first connecting diaphragm 100 protrudes outward from the end of the steel pipe brace 30.
  • the upper and lower ends of the first connecting diaphragm 100 protrude upward and downward than the upper and lower ends of the steel pipe brace 30.
  • the upper and lower ends of the protruding first connecting diaphragm 100 are inserted and exposed to the openings 51c and 52c of the central connecting member 50 to be described later.
  • the upper and lower ends of the first connecting diaphragm 100 protrude longer and longer in the up and down direction than the upper and lower ends of the first connecting diaphragm 100 described above, so that the upper and lower ends of the first connecting diaphragm 100 are the openings 51c.
  • Longer exposure is made in the vertical direction through 52c. Therefore, since the two first connecting diaphragms 100 are inserted into the openings 51c and 52c and exposed to protrude in the vertical direction, the first connecting diaphragms 30 are connected to the openings after connecting the two steel pipe supports 30. 51c) (52c) because it is not caught, the connection state of the two steel pipe brace 30 can be maintained stably.
  • bolt holes 100a are formed in upper and lower protrusions of the first connecting diaphragm 100 exposed through the openings 51c and 52c.
  • two first connecting diaphragms 100 are inserted into the openings 51c and 52c to protrude upward and downward to expose the bolt holes ( After passing through the bolt 111 through 100a) to the washer 115 and the nut 113 to the bolt 111 to combine the two first connecting diaphragm (100).
  • the excavation of the brace will be installed sequentially from the top.
  • the length adjustment block 70 may be installed in two bands 20 facing horizontally across the excavated space with only one steel pipe brace 30, otherwise the length adjustment block 70 is connected to the end of the steel pipe brace 30 or Another steel pipe brace 30 will be connected. In some cases, the length adjusting block 70 may be further connected in a state in which a plurality of steel pipe braces 30 are connected.
  • the length control block 70 is made of a square steel pipe having the same cross-section as the steel pipe brace 30, and when connected to the steel pipe brace 30 performs a function of the brace with the steel pipe brace 30, steel pipe brace 30 It is shorter than) and manufactured in various specifications in advance in the factory, so it can be selected according to the site situation.
  • connection between the steel pipe brace 30 is made through the central connection part (50).
  • the brace is composed of the brace or steel pipe brace 30 and the length adjustment block 70 is a mixture consisting of only the steel pipe brace 30, one end of the brace is connected to one strip 20 through the end connection part 60 The other end of the brace is connected to the jack 80 connected to the opposite belt 20 through the end connection part 60.
  • both ends of the brace are first connected to each of the two bands 20 located opposite to each other, the jack 80 is manipulated so that both ends of the braces are firmly adhered to the two bands 20 and then the installation of the braces is completed. do.
  • the installation of the temporary facility is completed.
  • the jack 80 is operated to release the contact state of the brace that was in close contact with the strip 20, and then dismantle the brace.
  • a fine length adjusting plate may be further provided for adjusting the fine length of the brace, and may be positioned between the steel pipe brace and the length adjusting block, or between the length adjusting block and the end connection part.
  • Computed bolt through hole is formed in the fine length control plate through which the bolt is not screwed.
  • the application number of the fine length control panel can be changed to suit the site conditions.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

본 발명은 가설 흙막이 구조에 관한 것으로, 더욱 상세하게는 규격화되어 있는 폐강관 버팀보를 현장 제작 없이 조립만으로 연결하여 사용하며, 단부에 발생하는 이격 부분을 조립식 길이 조절 블럭으로 해결하여 강재 손실을 줄이고, 현장 제작 등의 공정을 줄여주는 강관 버팀보를 이용한 가설 흙막이 구조에 관한 것이다. 본 발명 강관 버팀보를 이용한 가설 흙막이 구조는, 강관 버팀보; 및 현장 여건에 맞게 강관 버팀보의 단부에 선택적으로 연결되어 버팀보의 기능을 수행하면서 버팀보의 길이를 조절해주는 조립식 길이 조절 블럭;을 포함한다.

Description

강관 버팀보를 이용한 가설 흙막이 구조 및 그 시공방법
본 발명은 가설 흙막이 구조 및 그 시공방법에 관한 것으로, 더욱 상세하게는 규격화되어 있는 폐강관 버팀보를 현장 제작 없이 조립만으로 연결하여 사용하며, 단부에 발생하는 이격 부분을 조립식 길이 조절 블럭으로 해결하여 강재 손실을 줄이고, 현장 제작 등의 공정을 줄여주는 강관 버팀보를 이용한 가설 흙막이 구조 및 그 시공방법에 관한 것이다.
건설현장(토목/건축현장)에서는 구조물을 축조하기 위한 지반 굴착시 굴착 배면의 토사 붕괴방지 및 변위억제를 위해 가설 흙막이 공사를 시행한다. 이 공사에는 굴착 배면에 작용하는 토압을 지지하기 위한 지지공법이 포함되는데, 지지공법으로는 버팀보 공법이나 앵커 공법 등이 적용된다.
버팀보 공법은 토류벽에 대하여 횡방향으로 띠장을 설치하고, 서로 마주보는 띠장 사이에 다수의 버팀보를 설치하여 토류벽에 작용하는 토압을 지지하도록 하는 공법이다. 버팀보로는 H형강이나 강관 버팀보가 적용된다.
일반적으로 가시설 버팀보는 현장 제작으로 현장에서 필요한 길이만큼 절단한 후 플레이트 등을 덧대어 용접, 볼트 체결 등을 통해 다른 버팀보와 연결하게 된다. 버팀보의 단부에 잭을 설치하여 버팀보의 미세한 길이를 조절한다. 기 제작된 버팀보를 사용할 경우에는 길이 조정을 위해 버팀보 중 일부의 단부를 절단하여 블럭형태로 제작한 후 연결하여 사용하기 때문에 폐강재의 발생이 불가피하다. 또한, 현장에서 버팀보 중 일부를 절단하여 버팀보의 길이를 보강하는 작업은 많은 시간이 소요된다.
선행기술문헌
(특허문헌 1) 대한민국 등록특허공보 제10-0733719호(2007.07.04.공고)
본 발명의 목적은 전술한 바와 같은 종래의 문제점을 해소하기 위하여 안출된 것으로, 현장 여건에 맞게 버팀보의 길이를 간편하고 자유롭게 조절할 수 있으며, 가설 흙막이 구조의 해체 후 버팀보를 재사용할 수 있는 강관 버팀보를 이용한 가설 흙막이 구조 및 그 시공방법을 제공하는데 있다.
상기 기술적 과제를 달성하기 위한 본 발명의 바람직한 실시예에 따른 강관 버팀보를 이용한 가설 흙막이 구조는 가설 흙막이 벽체 사이에 설치되는 강관 버팀보; 및 현장 여건에 맞게 상기 강관 버팀보의 단부에 선택적으로 연결되어 버팀보의 기능을 수행하면서 버팀보의 길이를 조절하는 조립식 길이 조절 블럭;을 포함할 수 있다.
또한, 상기 가설 흙막이 구조는, 복수 개의 상기 강관 버팀보를 서로 연결하는 중앙 연결 부속; 및 상기 강관 버팀보만으로 구성되는 버팀보 또는 상기 강관 버팀보와 상기 길이 조절 블럭을 포함하여 구성되는 버팀보의 양단을 띠장과 잭에 각각 연결해주는 단부 연결 부속;을 더 포함할 수 있다.
또한, 상기 가설 흙막이 구조는, 상기 강관 버팀보, 상기 길이 조절 블럭 및 상기 단부 연결 부속을 연결하는 전산볼트;를 더 포함할 수 있다.
또한, 상기 길이 조절 블럭은, 상기 강관 버팀보에 비해 길이가 짧은 블럭 몸체; 및 상기 블럭 몸체의 양단 중 적어도 하나 이상에 접합되며, 상기 전산볼트가 나사 결합 없이 관통되는 연결 격판;을 포함할 수 있다.
또한, 상기 강관 버팀보의 단부에는 상기 길이 조절 블럭의 연결 격판에 맞대어 접촉되는 연결 격판이 접합되며, 상기 강관 버팀보의 연결 격판에는 상기 전산볼트가 나사 결합되면서 관통되는 고정너트가 고정될 수 있다.
또한, 상기 중앙 연결 부속은, 상기 강관 버팀보의 연결단 상부를 덮는 상부 덮개; 및 상기 강관 버팀보의 연결단 하부를 덮고 상기 상부 덮개와 결합되는 하부 덮개;를 포함할 수 있다.
또한, 상기 상부 덮개 및 상기 하부 덮개에 개구부가 각각 형성되며, 복수 개의 상기 강관 버팀보의 연결단에 서로 면접촉되는 연결 격판이 각각 설치되고, 상기 연결 격판의 가장자리 중 일부는 상기 강관 버팀보의 단부 외측으로 돌출 형성되며, 돌출된 가장자리부는 상기 개구부에 삽입되어 노출될 수 있다.
또한, 상기 연결 격판의 돌출된 가장자리부에 볼트구멍이 적어도 하나 이상 형성되며, 상기 볼트구멍을 통해 체결되는 볼트 및 너트에 의해 상기 강관 버팀보의 연결 격판이 결합될 수 있다.
상기 기술적 과제를 달성하기 위한 본 발명의 바람직한 실시예에 따른 강관 버팀보를 이용한 가설 흙막이 구조 시공방법은 버팀보로서 강관 버팀보를 사용하고, 상기 강관 버팀보의 단부에 버팀보로서의 기능을 수행하는 조립식 길이 조절 블럭을 현장 여건에 맞게 선택적으로 연결하여 버팀보의 길이를 조절할 수 있다.
또한, 상기 길이 조절 블럭은 다양한 규격으로 사전 제작되며 현장에서 여건에 맞는 규격의 길이 조절 블럭을 선택하여 시공할 수 있다.
또한, 복수 개의 상기 강관 버팀보를 버팀보로 사용하는 경우 중앙 연결 부속을 이용해 상기 강관 버팀보들을 서로 연결하며, 버팀보의 양단을 양쪽 띠장에 각각 연결하거나 단부 연결 부속을 통해 양쪽 띠장에 각각 연결하거나 양쪽 띠장 중 적어도 하나에 설치된 잭에 연결할 수 있다.
본 발명에 따른 강관 버팀보를 이용한 가설 흙막이 구조 및 그 시공방법은 다음과 같은 효과가 있다.
첫째, 본 발명은 규격화되어 있는 폐강관 버팀보를 현장 제작 없이 조립만으로 연결하여 사용하며, 단부에 발생하는 이격 부분을 조립식의 길이 조절 블럭으로 해결하도록 이루어짐으로써, 강재의 손실을 줄일 수 있고 현장 제작 등의 공정을 줄일 수 있다. 특히, 길이 조절 블럭이 공장에서 다양한 규격으로 사전 제작되며 현장에서는 여건에 맞는 규격의 것을 선택하여 체결부재로 조립하면 되기 때문에 가설 흙막이 구조 해체 후 길이 조절 블럭을 재사용할 수 있다.
둘째, 본 발명은 복수 개의 강관 버팀보 연결 시 강관 버팀보의 연결단에 설치된 연결 격판이 서로 면접촉됨으로써, 강관 버팀보를 통한 축력이 작용하더라도 축력이 연결 격판의 단면 전체에 고르게 전달되므로 강관 버팀보의 압축 및 좌굴 성능이 향상될 수 있다.
셋째, 본 발명은 강관 버팀보의 연결단에 설치된 연결 격판이 중앙 연결 부속에 형성된 개구부에 삽입되어 상하방향으로 돌출되게 노출됨으로써, 복수 개의 강관 버팀보 연결 후 연결 격판이 개구부에 걸려 벌어지지 않기 때문에 강관 버팀보의 연결상태가 안정적으로 유지될 수 있다.
넷째, 본 발명은 복수 개의 강관 버팀보를 연결 시 상,하부 덮개로 구성된 중앙 연결 부속을 통해 강관 버팀보를 1차로 연결한 후 중앙 연결 부속의 개구부를 통해 노출되는 강관 버팀보의 제1 연결 격판을 볼트 체결하여 2차로 결합함으로써, 강관 버팀보의 좌굴성능 및 연결강도를 더욱 증대시킬 수 있다.
도 1은 본 발명의 바람직한 일 실시예에 따른 강관 버팀보를 이용한 가설 흙막이 공법에 의해 시공된 가시설의 측면도.
도 2는 본 발명의 바람직한 일 실시예에 따른 강관 버팀보를 이용한 가설 흙막이 공법에 의해 시공된 가시설의 평면도.
도 3은 본 발명의 바람직한 일 실시예에 따른 강관 버팀보, 중앙 연결 부속, 길이 조절 블럭, 단부 연결 부속이 분해된 모습을 나타낸 분해사시도.
도 4는 도 3에 도시된 중앙 연결 부속을 통해 강관 버팀보가 서로 연결된 모습을 나타낸 사시도.
도 5는 도 4의 A-A 선에 따른 단면도.
도 6은 강관 버팀보, 길이 조절 블럭 및 단부 연결 부속이 연결된 모습을 나타낸 사시도.
도 7은 도 6의 B-B 선에 따른 단면도.
도 8은 강관 버팀보에 고정되는 고정너트의 사시도.
도 9는 본 발명의 바람직한 다른 실시예에 따른 강관 버팀보, 중앙 연결 부속, 길이 조절 블럭, 단부 연결 부속이 분해된 모습을 나타낸 분해사시도.
도 10은 도 9에 도시된 중앙 연결 부속을 통해 강관 버팀보가 서로 연결된 모습을 나타낸 사시도.
도 11은 도 10의 A-A 선에 따른 단면도.
이하에서는, 본 발명의 바람직한 실시예에 따른 강관 버팀보를 이용한 가설 흙막이 구조 및 그 시공방법을 첨부된 도면들을 참조하여 상세히 설명하기로 한다. 참고로, 본 발명을 설명함에 있어서 관련된 공지 기능 혹은 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우 그 상세한 설명은 생략한다.
도 1은 본 발명의 바람직한 일 실시예에 따른 강관 버팀보를 이용한 가설 흙막이 공법에 의해 시공된 가시설의 측면도이고, 도 2는 본 발명의 바람직한 일 실시예에 따른 강관 버팀보를 이용한 가설 흙막이 공법에 의해 시공된 가시설의 평면도이다.
도 1 및 도 2에 도시된 바와 같이, 가설 흙막이 공사시에는 흙막이 벽체(10)를 수직으로 세우고, 흙막이 벽체(10)에 횡방향으로 띠장(20)을 고정하며, 마주하는 띠장(20) 사이에 강관 버팀보(30)를 가로질러 설치하는 형태로 작업이 이루어진다. 마주하는 띠장(20) 사이의 간격에 따라 강관 버팀보(30)는 하나만 단독으로 설치되거나 복수 개가 서로 연결되어 설치된다.
띠장(20)은 보걸이(40)를 통해 흙막이 벽체(10)의 앞쪽에 고정되며, 강관 버팀보(30)는 중앙 연결 부속(50)을 통해 두 개가 서로 연결되어 하나의 버팀보를 형성하고, 버팀보의 일단은 단부 연결 부속(60)을 통해 한쪽 띠장(20)에 연결되고, 버팀보의 타단은 길이 조절 블럭(70), 단부 연결 부속(60), 잭(80)을 통해 맞은편 띠장(20)에 연결된다.
길이 조절 블럭(70)은 버팀보의 타단에 연결되어 버팀보로서의 기능을 수행하며 버팀보의 길이를 연장시키는 기능을 한다. 이러한 길이 조절 블럭(70)은 단독으로 버팀보로서의 기능을 수행하는 것이 아니라 버팀보의 부족한 길이를 연장하는 것이므로 강관 버팀보(30)에 비해 길이가 짧으며 공장에서 다양한 규격으로 사전 제작되어 현장에서 필요에 따라 선택적으로 적용된다. 또한, 현장 여건에 맞게 길이 조절 블럭(70)을 복수 개 적용할 수도 있다.
강관 버팀보(30)만으로 이루어지거나 강관 버팀보(30)와 길이 조절 블럭(70)이 혼합된 형태의 버팀보는 흙막이 벽체(10) 및 띠장(20)에 작용하는 토압을 효과적으로 지지하여 굴착된 흙벽의 토사가 유실되거나 붕괴되는 것을 방지해준다. 이웃하는 흙막이 벽체(10) 사이에 상,하로 적층되는 토류판에는 상당한 압력의 토압이 작용하기 때문에 토압으로부터 안정된 지지가 가능하게 하기 위해서는 버팀보가 대략 2~3m정도의 상하층 간격으로 설치된다(벽체의 강성 및 토압의 크기에 따라 간격이 달라질 수 있다).
도 3은 본 발명의 바람직한 일 실시예에 따른 강관 버팀보, 중앙 연결 부속, 길이 조절 블럭, 단부 연결 부속이 분해된 모습을 나타낸 분해사시도이고, 도 4는 도 3에 도시된 중앙 연결 부속을 통해 강관 버팀보가 서로 연결된 모습을 나타낸 사시도이며, 도 5는 도 4의 A-A 선에 따른 단면도이다.
도 3 내지 도 5에 도시된 바와 같이, 두 개의 강관 버팀보(30)는 중앙 연결 부속(50)을 통해 서로 연결된다.
길이 조절 블럭(70)은 강관 버팀보(30)의 단부에 전산볼트(90)를 통해 조립식으로 연결되어 버팀보의 기능을 수행함으로써, 버팀보의 길이를 연장해준다.
단부 연결 부속(60)은 길이 조절 블럭(70)에 전산볼트(90)를 통해 연결되어, 길이 조절 블럭(70)을 포함한 버팀보의 일단을 잭(80)에 연결시켜 준다.
중앙 연결 부속(50)은 두 개의 강관 버팀보(30)를 길게 연결하기 위한 것으로, 상,하부 덮개(51)(52), 절곡보강부재(53) 및 보강판(54)을 포함한다. 또한, 강관 버팀보(30)의 양단에는 중앙 연결 부속(50)과의 결합을 위한 제1 연결 격판(100)이 용접에 의해 접합된다.
제1 연결 격판(100)은 강관 버팀보(30)의 연결단에 각각 용접에 의해 접합되는 것으로, 사각의 판 형태로 형성되며 두 강관 버팀보(30) 연결시 서로 면접촉된다. 강관 버팀보(30) 연결시 제1 연결 격판(100)이 서로 면접촉됨으로써 강관 버팀보(30)를 통한 축력이 작용하더라도 축력이 제1 연결 격판(100)의 단면 전체에 고르게 전달되므로 강관 버팀보(30)의 압축 및 좌굴성능이 향상된다. 제1 연결 격판(100)의 상하단은 강관 버팀보(30)의 상하단보다 상하방으로 돌출된다. 제1 연결 격판(100)의 중심부에는 통공(101)이 형성된다.
상부 덮개(51)는 강관 버팀보(30)의 상부 외면과 형합되어 강관 버팀보(30)의 상부를 감싸며, 하부 덮개(52)는 강관 버팀보(30)의 하부 외면과 형합되어 강관 버팀보(30)의 하부를 감싼다. 상,하부 덮개(51)(52)에는 서로 맞대어진 상태에서 볼트와 너트로 결합되는 결합부(51a)(52a)가 각각 구비된다. 상,하부 덮개(51)(52)를 구성하는 부분 중 강관 버팀보(30)의 상면 및 저면을 각각 감싸는 수평부(51b)(52b)에는 제1 연결 격판(100)의 상하단이 삽입되어 외부로 노출되는 개구부(51c)(52c)가 각각 좌우로 길게 형성된다. 개구부(51c)(52c)를 통해 두 제1 연결 격판(100)이 벌어지는 것을 육안으로 확인할 수 있을 뿐만 아니라, 개구부(51c)(52c)에 두 제1 연결 격판(100)이 삽입된 상태이므로 두 강관 버팀보(30) 연결 후 제1 연결 격판(100)이 개구부(51c)(52c)에 걸려 벌어지지 않기 때문에 두 강관 버팀보(30)의 연결상태가 안정적으로 유지될 수 있다.
절곡보강부재(53)는 상,하부 덮개(51)(52)의 절곡된 부위를 감싸는 형태로 용접에 의해 접합되어 취약부인 절곡부위의 강도를 보강해준다.
보강판(54)은 개구부(51c)(52c)의 양쪽 가장자리에 인접된 부위에 각각 용접에 의해 접합되어 개구부(51c)(52c)로 인해 형성되는 취약부분의 강도를 보강해준다.
도 6은 강관 버팀보, 길이 조절 블럭 및 단부 연결 부속이 연결된 모습을 나타낸 사시도이고, 도 7은 도 6의 B-B 선에 따른 단면도이며, 도 8은 강관 버팀보에 고정되는 고정너트의 사시도이다.
도 6 내지 도 8에 도시된 바와 같이, 길이 조절 블럭(70)이 연결되는 강관 버팀보(30)의 타단에 접합된 제1 연결 격판(100)은 중심에 통공이 형성되며 통공의 주변에 후술할 제1 고정너트(120)가 삽입 고정되는 복수 개의 고정너트 고정홀이 형성된다.
길이 조절 블럭(70)은 강관 버팀보(30)와 동일 단면적을 갖는 사각강관으로서 양단에 제2 연결 격판(110)이 용접에 의해 접합된다. 제2 연결 격판(110)의 중심에는 통공이 형성되며 통공의 주변에는 전산볼트(90)가 나사 결합되지 않고 단순히 관통되기만 하는 복수 개의 전산볼트 관통홀이 각각 형성된다. 길이 조절 블럭(70)은 강관 버팀보(30)의 길이가 짧은 경우 그 길이를 보강하기 위한 것으로, 강관 버팀보(30) 보다 길이가 짧으며 공장에서 여러 규격으로 사전 제작되어 현장 여건에 맞게 선택적으로 사용된다.
단부 연결 부속(60)은, 두 개의 연결판(61)(62), 연결관(63) 및 스티프너(64)를 포함한다.
연결판(61)(62)은 서로 다른 면적으로 형성되며, 면적이 큰 제1 연결판(61)은 길이 조절 블럭(70)과 연결되고 면적이 작은 제2 연결판(62)은 잭(80)과 연결된다. 연결관(63)은 양단이 두 연결판(61)(62)에 용접에 의해 각각 접합되어 두 연결판(61)(62)을 일체로 연결해준다. 스티프너(64)는 연결관(63)의 외측 및 두 연결판(61)(62)에 용접에 의해 접합되어 연결관(63) 및 연결판(61)(62)의 구조적 강성을 증대시켜준다.
제1 연결판(61)에는 길이 조절 블럭(70)과의 연결을 위한 전산볼트(90)가 나사 결합되지 않고 관통되는 복수 개의 전산볼트 관통홀이 형성되며, 제2 연결판(62)에는 잭(80)과의 결합을 위한 볼트가 나사 결합되지 않고 관통되는 복수 개의 볼트 관통홀이 형성된다.
전산볼트(90)는 강관 버팀보(30)의 제1 연결 격판(100), 길이 조절 블럭(70)의 제2 연결 격판(110) 및 단부 연결 부속(60)의 제1 연결판(61)을 관통한다. 전산볼트(90)의 일단부는 강관 버팀보(30)의 제1 연결 격판(100)에 고정되는 제1 고정너트(120)에 나사 결합되고 타단부는 단부 연결 부속(60)의 제1,2 연결판(61)(62) 사이에서 제2 고정너트(130)에 나사 결합됨으로써, 강관 버팀보(30), 길이 조절 블럭(70) 및 단부 연결 부속(60)을 일체로 연결시킨다.
강관 버팀보(30)의 제1 연결 격판(100)에 고정되는 제1 고정너트(120)의 경우 일반적인 너트인 제2 고정너트(130)와는 다른 형태로 형성된다. 즉, 강관 버팀보(30) 내로는 손으로 넣어 작업하기가 어렵기 때문에 강관 버팀보(30)의 제1 연결 격판(100)에 형성된 고정너트 고정홀에 제1 고정너트(120)가 미리 고정된다. 이를 위해 제1 고정너트(120)는 강관 버팀보(30)의 내측에서 고정너트 고정홀에 억지 끼움되는 끼움부(121)와, 끼움부(121)의 단부에 형성되는 걸림부(122)를 포함한다. 끼움부(121)의 외주면에는 스프라인돌기가 형성되며 끼움부(121)는 고정너트 고정홀에 억지 끼움됨으로써 전산볼트(90)를 조일 때 회전이 방지된다.
도 9는 본 발명의 바람직한 다른 실시예에 따른 강관 버팀보, 중앙 연결 부속, 길이 조절 블럭, 단부 연결 부속이 분해된 모습을 나타낸 분해사시도이고, 도 10은 도 9에 도시된 중앙 연결 부속을 통해 강관 버팀보가 서로 연결된 모습을 나타낸 사시도이며, 도 11은 도 10의 A-A 선에 따른 단면도이다.
도 9 내지 도 11에 도시된 바와 같이, 본 실시예는 두 개의 강관 버팀보(30)의 연결단을 볼트 체결하고 중앙 연결 부속(50)을 통해 연결하는 구조를 제외하고는 전술한 실시예와 동일하다. 따라서, 전술할 실시예와 동일한 기능을 수행하는 구성에 대해서는 동일한 참조부호를 기재하고 이에 대한 상세한 설명은 생략하며, 이하에서는 상이한 구성에 대해서만 구체적으로 설명한다.
중앙 연결 부속(50)은 두 개의 강관 버팀보(30)를 길게 연결하기 위한 것으로, 강관 버팀보(30)의 상부 외면과 형합되어 강관 버팀보(30)의 연결단 상부를 감싸는 상부 덮개(51)와, 강관 버팀보(30)의 하부 외면과 형합되어 강관 버팀보(30)의 연결단 하부를 감싸고 상부 덮개(51)와 결합되는 하부 덮개(52)를 포함할 수 있다. 상,하부 덮개(51)(52)를 구성하는 부분 중 강관 버팀보(30)의 상면 및 저면을 각각 감싸는 수평부(51b)(52b)에는 두 개의 강관 버팀보(30)의 단부에 형성된 후술할 제1 연결 격판(100)의 상하단이 삽입되어 외부로 노출되는 개구부(51c)(52c)가 각각 좌우로 길게 형성된다.
두 개의 강관 버팀보(30)는 중앙 연결 부속(50)을 통해 서로 연결된다. 또한, 두 개의 강관 버팀보(30)가 연결되는 양단에는 제1 연결 격판(100)이 각각 설치된다.
제1 연결 격판(100)은 강관 버팀보(30)의 연결단에 각각 용접에 의해 접합되고, 사각의 판 형태로 형성되며, 두 강관 버팀보(30) 연결 시 서로 맞대어 면접촉된다. 이렇게 강관 버팀보(30) 연결 시 두 개의 제1 연결 격판(100)이 서로 면접촉됨으로써, 강관 버팀보(30)를 통한 축력이 작용하더라도 축력이 제1 연결 격판(100)의 단면 전체에 고르게 전달되므로 강관 버팀보(30)의 압축 및 좌굴 성능이 향상된다.
또한, 제1 연결 격판(100)의 가장자리 중 일부는 강관 버팀보(30)의 단부 외측으로 돌출 형성된다. 예를 들어, 제1 연결 격판(100)의 상하단은 강관 버팀보(30)의 상하단보다 상하방향으로 돌출 형성된다. 돌출된 제1 연결 격판(100)의 상하단은 후술할 중앙 연결 부속(50)의 개구부(51c)(52c)에 삽입되어 노출된다. 특히, 본 실시예에서는 제1 연결 격판(100)의 상하단이 전술할 제1 연결 격판(100)의 상하단 보다 상하방향으로 더 길게 돌출 형성되어 제1 연결 격판(100)의 상하단은 개구부(51c)(52c)를 통해 상하방향으로 더 길게 노출된다. 따라서, 두 개의 제1 연결 격판(100)이 개구부(51c)(52c)에 삽입되어 상하방향으로 돌출되게 노출된 상태이므로 두 개의 강관 버팀보(30) 연결 후 제1 연결 격판(100)이 개구부(51c)(52c)에 걸려 벌어지지 않기 때문에 두 강관 버팀보(30)의 연결상태가 안정적으로 유지될 수 있다.
또한, 개구부(51c)(52c)를 통해 노출되는 제1 연결 격판(100)의 상하단 돌출부에는 볼트구멍(100a)이 형성된다. 중앙 연결 부속(50)을 통해 두 개의 강관 버팀보(30)를 연결 시 두 개의 제1 연결 격판(100)이 개구부(51c)(52c)에 삽입되어 상하방향으로 돌출되게 노출된 상태에서 볼트구멍(100a)에 볼트(111)를 관통시킨 후 볼트(111)에 와셔(115)와 너트(113)를 체결하여 두 개의 제1 연결 격판(100)을 결합한다.
따라서, 복수 개의 강관 버팀보(30)를 연결 시 상,하부 덮개(51)(52)로 구성된 중앙 연결 부속(50)을 통해 강관 버팀보(30)를 1차로 연결한 후 중앙 연결 부속(50)의 개구부(51c)(52c)를 통해 노출되는 강관 버팀보(30)의 제1 연결 격판(100)을 볼트(11) 체결하여 2차로 결합함으로써, 강관 버팀보(30)의 좌굴성능 및 연결강도를 더욱 증대시킬 수 있다.
이하에서는 상기와 같은 구성을 갖는 본 발명 가설 흙막이용 가시설을 시공하는 과정을 살펴본다.
먼저, 굴착하고자 하는 지반 주변에 일정간격으로 흙막이 벽체(10)를 수직으로 시공하고, 그 내부공간을 굴착하며 마주하고 있는 수직의 흙막이 벽체(10)를 서로 연결 지지하는 다수의 띠장(20)과 버팀보를 굴착과 동시에 상측으로부터 순차적으로 설치하게 된다.
하나의 강관 버팀보(30)만으로 굴착된 공간을 수평으로 가로질러 마주하는 두 띠장(20)에 설치될 수도 있으나, 그렇지 않은 경우에는 강관 버팀보(30)의 단부에 길이 조절 블럭(70)을 연결하거나 또 다른 강관 버팀보(30)를 연결하게 된다. 경우에 따라 복수 개의 강관 버팀보(30)를 연결한 상태에서 길이 조절 블럭(70)을 추가로 연결할 수도 있다.
길이 조절 블럭(70)은 강관 버팀보(30)와 동일 단면을 갖는 사각 강관으로 제작되기 때문에 강관 버팀보(30)에 연결될 때 강관 버팀보(30)와 함께 버팀보의 기능을 수행하게 되며, 강관 버팀보(30) 보다 길이가 짧으며 공장에서 사전에 다양한 규격으로 제작되기 때문에 현장 상황에 맞게 선택하여 사용할 수 있다.
강관 버팀보(30)끼리의 연결은 중앙 연결 부속(50)을 통해 이루어진다.
강관 버팀보(30)만으로 이루어진 버팀보 또는 강관 버팀보(30)와 길이 조절 블럭(70)이 혼합된 형태의 버팀보가 준비되면, 버팀보의 일단은 단부 연결 부속(60)을 통해 한쪽 띠장(20)에 연결되고, 버팀보의 타단은 맞은편 띠장(20)에 연결된 잭(80)에 단부 연결 부속(60)을 통해 연결된다.
버팀보의 양단이 맞은편에 위치되는 두 띠장(20)에 각각 1차 연결되면, 잭(80)을 조작하여 버팀보의 양단을 두 띠장(20)에 견고하게 밀착시킨 후 체결하면 버팀보의 설치가 완료된다.
위와 같은 버팀보의 설치과정이 반복되면서 가시설의 설치가 모두 완료된다. 가시설의 해체시에는 잭(80)을 조작하여 띠장(20)에 밀착되었던 버팀보의 밀착상태를 해제한 후 버팀보의 해체가 이루어진다.
이상에서 설명한 바와 같이, 본 발명의 강관 버팀보를 이용한 가설 흙막이 구조 및 그 시공방법을 바람직한 실시예를 기초로 상세히 설명하였으나, 본 발명은 특정 실시예에 한정되는 것은 아니며, 해당분야 통상의 지식을 가진 자가 특허청구범위에 기재된 범주 내에서 다양하게 변형 실시할 수 있다.
예컨대, 본 발명의 실시예들에는 포함하지 않았으나, 버팀보의 미세 길이 조절을 위해 미세 길이 조절판을 더 구비하여 강관 버팀보와 길이 조절 블럭 사이, 또는 길이 조절 블럭과 단부 연결 부속 사이에 위치시킬 수도 있다. 미세 길이 조절판에는 전산볼트가 나사 결합되지 않고 관통되는 전산볼트 관통홀이 형성된다. 미세 길이 조절판의 적용 숫자는 현장 여건에 맞게 변경될 수 있다.

Claims (11)

  1. 가설 흙막이 벽체 사이에 설치되는 강관 버팀보; 및
    현장 여건에 맞게 상기 강관 버팀보의 단부에 선택적으로 연결되어 버팀보의 기능을 수행하면서 버팀보의 길이를 조절하는 조립식 길이 조절 블럭;을 포함하는 강관 버팀보를 이용한 가설 흙막이 구조.
  2. 제 1 항에 있어서,
    상기 가설 흙막이 구조는,
    복수 개의 상기 강관 버팀보를 서로 연결하는 중앙 연결 부속; 및
    상기 강관 버팀보만으로 구성되는 버팀보 또는 상기 강관 버팀보와 상기 길이 조절 블럭을 포함하여 구성되는 버팀보의 양단을 띠장과 잭에 각각 연결해주는 단부 연결 부속;을 더 포함하는 강관 버팀보를 이용한 가설 흙막이 구조.
  3. 제 2 항에 있어서,
    상기 가설 흙막이 구조는,
    상기 강관 버팀보, 상기 길이 조절 블럭 및 상기 단부 연결 부속을 연결하는 전산볼트;를 더 포함하는 강관 버팀보를 이용한 가설 흙막이 구조.
  4. 제 3 항에 있어서,
    상기 길이 조절 블럭은,
    상기 강관 버팀보에 비해 길이가 짧은 블럭 몸체; 및
    상기 블럭 몸체의 양단 중 적어도 하나 이상에 접합되며, 상기 전산볼트가 나사 결합 없이 관통되는 연결 격판;을 포함하는 강관 버팀보를 이용한 가설 흙막이 구조.
  5. 제 4 항에 있어서,
    상기 강관 버팀보의 단부에는 상기 길이 조절 블럭의 연결 격판에 맞대어 접촉되는 연결 격판이 접합되며, 상기 강관 버팀보의 연결 격판에는 상기 전산볼트가 나사 결합되면서 관통되는 고정너트가 고정되는 것을 특징으로 하는 강관 버팀보를 이용한 가설 흙막이 구조.
  6. 제 2 항에 있어서,
    상기 중앙 연결 부속은,
    상기 강관 버팀보의 연결단 상부를 덮는 상부 덮개; 및
    상기 강관 버팀보의 연결단 하부를 덮고 상기 상부 덮개와 결합되는 하부 덮개;를 포함하는 강관 버팀보를 이용한 가설 흙막이 구조.
  7. 제 6 항에 있어서,
    상기 상부 덮개 및 상기 하부 덮개에 개구부가 각각 형성되며,
    복수 개의 상기 강관 버팀보의 연결단에 서로 면접촉되는 연결 격판이 각각 설치되고, 상기 연결 격판의 가장자리 중 일부는 상기 강관 버팀보의 단부 외측으로 돌출 형성되며, 돌출된 가장자리부는 상기 개구부에 삽입되어 노출되는 것을 특징으로 하는 강관 버팀보를 이용한 가설 흙막이 구조.
  8. 제 7 항에 있어서,
    상기 연결 격판의 돌출된 가장자리부에 볼트구멍이 적어도 하나 이상 형성되며, 상기 볼트구멍을 통해 체결되는 볼트 및 너트에 의해 상기 강관 버팀보의 연결 격판이 결합되는 것을 특징으로 하는 강관 버팀보를 이용한 가설 흙막이 구조.
  9. 버팀보로서 강관 버팀보를 사용하고, 상기 강관 버팀보의 단부에 버팀보로서의 기능을 수행하는 조립식 길이 조절 블럭을 현장 여건에 맞게 선택적으로 연결하여 버팀보의 길이를 조절하는 것을 특징으로 하는 강관 버팀보를 이용한 가설 흙막이 구조 시공방법.
  10. 제 9 항에 있어서,
    상기 길이 조절 블럭은 다양한 규격으로 사전 제작되며 현장에서 여건에 맞는 규격의 길이 조절 블럭을 선택하여 시공하는 것을 특징으로 하는 강관 버팀보를 이용한 가설 흙막이 구조 시공방법.
  11. 제 10 항에 있어서,
    복수 개의 상기 강관 버팀보를 버팀보로 사용하는 경우 중앙 연결 부속을 이용해 상기 강관 버팀보들을 서로 연결하며, 버팀보의 양단을 양쪽 띠장에 각각 연결하거나 단부 연결 부속을 통해 양쪽 띠장에 각각 연결하거나 양쪽 띠장 중 적어도 하나에 설치된 잭에 연결하는 것을 특징으로 하는 강관 버팀보를 이용한 가설 흙막이 구조 시공방법.
PCT/KR2015/006793 2014-07-04 2015-07-02 강관 버팀보를 이용한 가설 흙막이 구조 및 그 시공방법 WO2016003208A1 (ko)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
KR10-2014-0083807 2014-07-04
KR20140083807 2014-07-04
KR1020150093205A KR20160005310A (ko) 2014-07-04 2015-06-30 강관 버팀보를 이용한 가설 흙막이 구조 및 그 시공방법
KR10-2015-0093205 2015-06-30

Publications (1)

Publication Number Publication Date
WO2016003208A1 true WO2016003208A1 (ko) 2016-01-07

Family

ID=55019652

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2015/006793 WO2016003208A1 (ko) 2014-07-04 2015-07-02 강관 버팀보를 이용한 가설 흙막이 구조 및 그 시공방법

Country Status (1)

Country Link
WO (1) WO2016003208A1 (ko)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107675711A (zh) * 2017-09-01 2018-02-09 广州宏途设备工程有限公司 一种免拆撑的钢管支撑结构
CN108193704A (zh) * 2018-02-22 2018-06-22 广西大学 一种可重复使用的装配式可调节导向墙内支撑架及应用施工方法
CN111485558A (zh) * 2020-04-20 2020-08-04 中国一冶集团有限公司 深基坑支护钢支撑安装装置及其安装方法
US11255065B2 (en) * 2018-03-07 2022-02-22 Gyeong Sik SEO Cover band of steel pipe strut connector, steel pipe strut connector having same, and steel pipe strut assembly
CN114991170A (zh) * 2022-06-23 2022-09-02 中国水利水电第七工程局有限公司 中空夹层钢管混凝土支撑系统及其施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001214543A (ja) * 2000-02-02 2001-08-10 East Japan Railway Co 継材用仕口
KR200344123Y1 (ko) * 2003-12-02 2004-03-09 주식회사 스마텍엔지니어링 버팀보 지지용 잭 장치 및 이를 이용한 버팀보 지지구조
KR200414056Y1 (ko) * 2005-12-29 2006-04-14 (주)핸스건설 강관 버팀보 연결구조
KR100733719B1 (ko) * 2006-02-15 2007-07-04 (주)핸스건설 길이조정형 강관 버팀보
KR20110018581A (ko) * 2009-08-18 2011-02-24 (주)피에스테크 가설 흙막이 공법용 사각강관 버팀보의 연결 및 접합 시공구조 및 그 시공구조를 위한 연결보강부재와 접합보강부재

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001214543A (ja) * 2000-02-02 2001-08-10 East Japan Railway Co 継材用仕口
KR200344123Y1 (ko) * 2003-12-02 2004-03-09 주식회사 스마텍엔지니어링 버팀보 지지용 잭 장치 및 이를 이용한 버팀보 지지구조
KR200414056Y1 (ko) * 2005-12-29 2006-04-14 (주)핸스건설 강관 버팀보 연결구조
KR100733719B1 (ko) * 2006-02-15 2007-07-04 (주)핸스건설 길이조정형 강관 버팀보
KR20110018581A (ko) * 2009-08-18 2011-02-24 (주)피에스테크 가설 흙막이 공법용 사각강관 버팀보의 연결 및 접합 시공구조 및 그 시공구조를 위한 연결보강부재와 접합보강부재

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107675711A (zh) * 2017-09-01 2018-02-09 广州宏途设备工程有限公司 一种免拆撑的钢管支撑结构
CN108193704A (zh) * 2018-02-22 2018-06-22 广西大学 一种可重复使用的装配式可调节导向墙内支撑架及应用施工方法
US11255065B2 (en) * 2018-03-07 2022-02-22 Gyeong Sik SEO Cover band of steel pipe strut connector, steel pipe strut connector having same, and steel pipe strut assembly
CN111485558A (zh) * 2020-04-20 2020-08-04 中国一冶集团有限公司 深基坑支护钢支撑安装装置及其安装方法
CN114991170A (zh) * 2022-06-23 2022-09-02 中国水利水电第七工程局有限公司 中空夹层钢管混凝土支撑系统及其施工方法
CN114991170B (zh) * 2022-06-23 2023-06-13 中国水利水电第七工程局有限公司 中空夹层钢管混凝土支撑系统及其施工方法

Similar Documents

Publication Publication Date Title
WO2016003208A1 (ko) 강관 버팀보를 이용한 가설 흙막이 구조 및 그 시공방법
WO2016129826A1 (ko) 안전성이 강화된 피씨 트러스 벽체 구조물 및 이를 이용한 지하구조물 시공방법
FI112969B (fi) Rakennuksen runko
WO2016085187A1 (ko) 트러스거더 고정용 스페이서 및 이를 이용한 데크플레이트와 트러스거더 간의 결합구조
WO2009142416A2 (ko) 철근콘크리트 빔 단부연결용 보강재 및 이를 이용한 구조물 시공방법
KR102223854B1 (ko) 후시공 pc 발코니
KR20160005310A (ko) 강관 버팀보를 이용한 가설 흙막이 구조 및 그 시공방법
WO2009096725A2 (ko) 프리캐스트 가시설 구조체 및 그 시공방법
WO2015137577A1 (ko) 콘크리트 주택의 단위체 구조물 적층 시공방법
WO2012108703A2 (ko) 원형 브레이스 및 이의 시공방법
WO2015178584A1 (ko) 철근망의 선조립 공법
WO2017034354A1 (ko) 데크거푸집 고정 구조
WO2018174375A1 (ko) 웨브 연결형 강합성콘크리트 기둥-보 접합 구조
CA2989842C (en) Fastening devices for prefabricated reusable concrete pedestal
WO2022050499A1 (ko) 토류판, 토류판 설치 지그 및 토류판 시공 방법
KR101415321B1 (ko) 건축물 외벽용 커튼월 유닛
SK161099A3 (en) Building framework
KR20110004717A (ko) 발코니용 안전 울
KR101908943B1 (ko) Rc 벽체 역타 구조
WO2021015442A1 (ko) 건축기초시스템에 있어 임플란트식 파일 설치구 및 이를 이용한 임플란트식 파일공법
KR20060117158A (ko) 카본-유리섬유 복합 거푸집 및 이를 이용한 건축물 시공방법
WO2013022194A1 (ko) 지중 벽체 시공방법
WO2017047834A1 (ko) 철근 선조립 기둥
JP6736830B2 (ja) 地下躯体を有するコンクリート構築物の建替工法
JP3273775B1 (ja) プレキャストコンクリート製地下室ユニットの連結方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15814257

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 15814257

Country of ref document: EP

Kind code of ref document: A1