WO2015136747A1 - 内燃機関の冷却装置及び冷却装置の制御方法 - Google Patents

内燃機関の冷却装置及び冷却装置の制御方法 Download PDF

Info

Publication number
WO2015136747A1
WO2015136747A1 PCT/JP2014/074704 JP2014074704W WO2015136747A1 WO 2015136747 A1 WO2015136747 A1 WO 2015136747A1 JP 2014074704 W JP2014074704 W JP 2014074704W WO 2015136747 A1 WO2015136747 A1 WO 2015136747A1
Authority
WO
WIPO (PCT)
Prior art keywords
coolant
temperature
internal combustion
combustion engine
control valve
Prior art date
Application number
PCT/JP2014/074704
Other languages
English (en)
French (fr)
Inventor
村井 淳
智之 村上
坂口 重幸
裕一 外山
渡辺 正彦
英昭 中村
Original Assignee
日立オートモティブシステムズ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日立オートモティブシステムズ株式会社 filed Critical 日立オートモティブシステムズ株式会社
Priority to US15/125,336 priority Critical patent/US9726068B2/en
Priority to DE112014006448.3T priority patent/DE112014006448B4/de
Priority to CN201480077024.5A priority patent/CN106103931B/zh
Publication of WO2015136747A1 publication Critical patent/WO2015136747A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01PCOOLING OF MACHINES OR ENGINES IN GENERAL; COOLING OF INTERNAL-COMBUSTION ENGINES
    • F01P7/00Controlling of coolant flow
    • F01P7/14Controlling of coolant flow the coolant being liquid
    • F01P7/16Controlling of coolant flow the coolant being liquid by thermostatic control
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01PCOOLING OF MACHINES OR ENGINES IN GENERAL; COOLING OF INTERNAL-COMBUSTION ENGINES
    • F01P3/00Liquid cooling
    • F01P3/02Arrangements for cooling cylinders or cylinder heads
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01PCOOLING OF MACHINES OR ENGINES IN GENERAL; COOLING OF INTERNAL-COMBUSTION ENGINES
    • F01P5/00Pumping cooling-air or liquid coolants
    • F01P5/10Pumping liquid coolant; Arrangements of coolant pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01PCOOLING OF MACHINES OR ENGINES IN GENERAL; COOLING OF INTERNAL-COMBUSTION ENGINES
    • F01P7/00Controlling of coolant flow
    • F01P7/14Controlling of coolant flow the coolant being liquid
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01PCOOLING OF MACHINES OR ENGINES IN GENERAL; COOLING OF INTERNAL-COMBUSTION ENGINES
    • F01P3/00Liquid cooling
    • F01P3/02Arrangements for cooling cylinders or cylinder heads
    • F01P2003/024Cooling cylinder heads
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01PCOOLING OF MACHINES OR ENGINES IN GENERAL; COOLING OF INTERNAL-COMBUSTION ENGINES
    • F01P3/00Liquid cooling
    • F01P3/02Arrangements for cooling cylinders or cylinder heads
    • F01P2003/027Cooling cylinders and cylinder heads in parallel
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01PCOOLING OF MACHINES OR ENGINES IN GENERAL; COOLING OF INTERNAL-COMBUSTION ENGINES
    • F01P7/00Controlling of coolant flow
    • F01P7/14Controlling of coolant flow the coolant being liquid
    • F01P2007/146Controlling of coolant flow the coolant being liquid using valves

Definitions

  • the present invention relates to a cooling device for circulating a coolant to an internal combustion engine by a water pump and a control method thereof.
  • a radiator cooling water circuit through which a cooling water flows, a radiator bypass circuit bypassing the radiator, and a radiator bypass circuit, which are provided between the cooling water and the hydraulic oil of the automatic transmission of the engine A heat exchanger that exchanges heat, the radiator downstream side passage connecting the upstream side of the heat exchanger and the downstream portion of the radiator of the radiator cooling water circuit, and allowing the coolant passing through the radiator to flow into the heat exchanger;
  • Flow control means for adjusting the inflow ratio of the cooling water from the radiator bypass circuit and the cooling water from the radiator downstream side passage, which is provided at the connecting portion of the bypass circuit and the radiator downstream side passage and flows into the heat exchanger A cooling circuit is disclosed.
  • the temperature of the cylinder head in other words, the combustion temperature
  • the combustibility is improved, and the fuel consumption performance, exhaust characteristics and the like can be improved.
  • raising the temperature of the cylinder block reduces the friction and improves the fuel efficiency. it can.
  • the present invention aims to provide a cooling device for an internal combustion engine and a control method therefor that can improve the controllability of the temperature of the cylinder head and the temperature of the cylinder block and improve the fuel consumption performance of the internal combustion engine. .
  • the cooling device includes the water pump for circulating the coolant to the internal combustion engine, the first coolant line passing through the cylinder head and the radiator of the internal combustion engine, and the cylinder block of the internal combustion engine.
  • a motor-driven flow control valve in which a second coolant line bypassing a radiator, the first coolant line and the second coolant line are connected to the inflow side, and the outflow side is connected to the suction side of the water pump And a bypass line branched from the first coolant line between the cylinder head and the radiator and bypassing the radiator and joining the outlet side of the flow control valve.
  • a water pump for circulating a coolant to an internal combustion engine for circulating a coolant to an internal combustion engine, a first cooling fluid line passing through a cylinder head and a radiator of the internal combustion engine, and a cylinder block of the internal combustion engine
  • a second cooling fluid line bypassing the radiator via the first cooling fluid line, the first cooling fluid line and the second cooling fluid line are connected to the inflow side, and the outflow side is connected to the suction side of the water pump.
  • a cooling device comprising: a flow control valve; and a bypass line branched from the first coolant line between the cylinder head and the radiator and bypassing the radiator and joining the outflow side of the flow control valve.
  • a control method comprising: detecting a temperature of a coolant at an outlet of the cylinder head; and a temperature of the coolant at an outlet of the cylinder block The and detecting and controlling the flow rate control valve based on the temperature of the coolant at the outlet temperature and the cylinder block coolant at the outlet of the cylinder head.
  • the controllability of the temperature of the cylinder head and the temperature of the cylinder block can be enhanced, and the fuel consumption performance of the internal combustion engine can be improved.
  • FIG. 1 is a block diagram showing an example of a cooling device according to the present invention.
  • An internal combustion engine 10 for a vehicle has a cylinder head 11 and a cylinder block 12.
  • a transmission 20 as an example of a power transmission device is connected to an output shaft of the internal combustion engine 10, and the output of the transmission 20 is transmitted to driving wheels (not shown).
  • the cooling device of the internal combustion engine 10 is a water cooling type cooling device that circulates cooling water (cooling fluid).
  • the cooling system includes a flow control valve 30 operated by an electric actuator, an electric water pump 40 driven by a motor, a radiator 50, a cooling water passage 60 provided in the internal combustion engine 10, and a pipe 70 connecting these. Ru.
  • the cylinder head 11 of the internal combustion engine 10 is connected to a cooling water inlet 13 provided at one end of the cylinder head 11 in the cylinder arrangement direction and a cooling water outlet 14 provided at the other end of the cylinder head 11 in the cylinder arrangement direction.
  • a cooling water passage 61 extending in the cylinder head 11 is provided.
  • the cylinder block 12 of the internal combustion engine 60 is branched from the cooling water passage 61 to reach the cylinder block 12, extends inside the cylinder block 12, and is connected to the cooling water outlet 15 provided in the cylinder block 12
  • a cooling water passage 62 is provided.
  • the coolant outlet 15 of the cylinder block 12 is provided at the end in the same cylinder arrangement direction as the side where the coolant outlet 14 is provided.
  • the cooling water is supplied to the cylinder block 12 via the cylinder head 11, and the cooling water that has passed only the cylinder head 11 is discharged from the cooling water outlet 14. After flowing into the cylinder head 11, the cooling water that has passed through the cylinder block 12 is discharged from the cooling water outlet 15.
  • One end of a first cooling water pipe 71 is connected to the cooling water outlet 14 of the cylinder head 11, and the other end of the first cooling water pipe 71 is connected to the cooling water inlet 51 of the radiator 50.
  • One end of a second cooling water pipe 72 is connected to the cooling water outlet 15 of the cylinder block 12, and the other end of the second cooling water pipe 72 is connected to four inlet ports (inflow holes) 31-34 of the flow control valve 30. Are connected to the first inlet port 31 of the An oil cooler 16 for cooling the lubricating oil of the internal combustion engine 10 is provided in the middle of the second cooling water pipe 72. The oil cooler 16 exchanges heat between the cooling water flowing in the second cooling water pipe 72 and the lubricating oil of the internal combustion engine 10.
  • one end of the third cooling water pipe 73 is connected to the first cooling water pipe 71, and the other end is connected to the second inlet port 32 of the flow control valve 30.
  • an oil warmer 21 for heating the hydraulic oil of the transmission 20 is provided in the middle of the third cooling water pipe 73.
  • the oil warmer 21 performs heat exchange between the cooling water flowing in the third cooling water pipe 73 and the hydraulic oil of the transmission 20. That is, the cooling water having passed through the cylinder head 11 is diverted to be led to the oil warmer 21, and the hydraulic oil is heated in the oil warmer 21.
  • the fourth cooling water pipe 74 is connected to the first cooling water pipe 71, and the other end is connected to the third inlet port 33 of the flow control valve 30.
  • the fourth cooling water pipe 74 is provided with various heat exchange devices.
  • a heater core 91 for heating the vehicle a water-cooled EGR cooler 92 constituting an exhaust gas recirculation system for the internal combustion engine 10, and an exhaust gas for adjusting the exhaust gas recirculation amount in the exhaust gas recirculation system
  • a return control valve 93 and a throttle valve 94 for adjusting the intake air amount of the internal combustion engine 10 are provided.
  • the heater core 91 is a device that performs heat exchange between the cooling water in the fourth cooling water pipe 74 and the conditioned air to warm the conditioned air.
  • the EGR cooler 92 performs heat exchange between the exhaust gas recirculated to the intake system of the internal combustion engine 10 by the exhaust gas recirculation apparatus and the cooling water in the fourth cooling water pipe 74 to reduce the temperature of the exhaust gas recirculated. It is a device.
  • the exhaust gas recirculation control valve 93 and the throttle valve 94 are configured to be warmed by performing heat exchange with the cooling water in the fourth cooling water pipe 74, and are thereby included in the exhaust and the intake. Moisture is prevented from freezing around the exhaust gas recirculation control valve 93 and the throttle valve 94.
  • the cooling water that has passed through the cylinder head 11 is diverted and led to the heater core 91, the EGR cooler 92, the exhaust gas recirculation control valve 93, and the throttle valve 94 to perform heat exchange with these. Further, one end of the fifth cooling water pipe 75 is connected to the cooling water outlet 52 of the radiator 50, and the other end is connected to the fourth inlet port 34 of the flow control valve 30.
  • the flow control valve 30 has one outlet port (outlet hole) 35, and one end of a sixth cooling water pipe 76 is connected to the outlet port 35.
  • the other end of the sixth cooling water pipe 76 is connected to the suction port 41 of the water pump 40.
  • one end of a seventh cooling water pipe 77 is connected to the discharge port 42 of the water pump 40, and the other end of the seventh cooling water pipe 77 is connected to the cooling water inlet 13 of the cylinder head 11.
  • the eighth cooling water pipe 78 has one end connected downstream of the portion to which the third cooling water pipe 73 and the fourth cooling water pipe 74 of the first cooling water pipe 71 are connected, and the other end is the sixth It is connected to the cooling water pipe 76.
  • the flow control valve 30 includes four inlet ports (inflow holes) 31-34 and one outlet port (outflow hole) 35, and the inlet ports 31-34 have cooling water pipes 72, 73, 74 and 75 are respectively connected, and the sixth cooling water pipe 76 is connected to the outlet port 35.
  • the flow control valve 30 is, for example, a rotary flow passage switching valve, and a stator provided with a plurality of ports 31 to 35 is fitted with a rotor provided with a flow passage, and the rotor is an electric actuator such as an electric motor
  • the respective openings of the stator are connected by rotating the rotor and changing the angular position of the rotor.
  • the opening area ratio of the four inlet ports 31 to 34 changes according to the rotor angle, and the rotor flow is controlled so that the desired opening area ratio can be controlled by selecting the rotor angle. Road etc. are adapted.
  • the cooling water passage 61 and the first cooling water pipe 71 constitute a first cooling fluid line passing through the cylinder head 11 and the radiator 50.
  • the cooling water passage 62 and the second cooling water pipe 72 constitute a second cooling fluid line that bypasses the radiator 50 via the cylinder block 12.
  • the cooling water passage 61 and the fourth cooling water pipe 74 constitute a third cooling liquid line that bypasses the radiator 50 via the cylinder head 11 and the heater core 91.
  • the cooling water passage 61 and the third cooling water pipe 73 constitute a fourth cooling fluid line that bypasses the radiator 50 via the cylinder head 11 and the oil warmer 21 of the transmission 20.
  • a bypass line is branched from the first coolant line between the cylinder head 11 and the radiator 50 by the eighth coolant pipe 78, and bypasses the radiator 50 to join the outlet side of the flow control valve 30.
  • Ru that is, in the flow control valve 30, the first coolant line, the second coolant line, the third coolant line, and the fourth coolant line described above are respectively connected to the inflow side, and the outflow side is the suction side of the water pump 40. Control the amount of cooling water supplied to the first coolant line, the second coolant line, the third coolant line, and the fourth coolant line by connecting and adjusting the opening area of the outlet of each coolant line It is a switching mechanism of a flow path.
  • the flow control valve 30 has, for example, a plurality of switching patterns (switching positions) as illustrated in FIG. 5, and is configured to switch to any of these switching patterns by changing the rotor angle with an electric actuator. . That is, the flow control valve 30 closes all the inlet ports 31-34 within a predetermined angular range from the reference angular position where the rotor angle is regulated by the stopper.
  • the position where all the inlet ports 31 to 34 of the flow control valve 30 close is referred to as a first pattern or a first position.
  • the state in which the minimum opening area is larger than zero in other words, leakage flow occurs. It shall include the state.
  • the third inlet port 33 to which the outlet of the heater core coolant line is connected opens to a constant opening degree, and then the rotor angle The constant flow rate is maintained for an increase in
  • the position where the third inlet port 33 opens is referred to as a second pattern or a second position.
  • the first inlet port 31 to which the outlet of the block coolant line is connected opens and the opening area of the first inlet port 31 becomes , Gradually increases as the rotor angle increases.
  • the position where the first inlet port 31 is opened is referred to as a third pattern or a third position.
  • the second inlet port 32 to which the outlet of the power transmission system coolant fluid line is connected opens at a constant opening at an angular position larger than the angle at which the first inlet port 31 opens, and then, for the increase of the rotor angle. Thus, the constant opening degree is maintained.
  • the position where the second inlet port 32 is opened is referred to as a fourth pattern or a fourth position.
  • the fourth inlet port 34 to which the outlet of the radiator coolant line is connected opens at an angular position larger than the angle at which the second inlet port 32 opens to a constant opening degree, and the opening area of the fourth inlet port 34 is It gradually increases as the rotor angle increases.
  • the position where the fourth inlet port 34 is opened is referred to as a fifth pattern or a fifth position.
  • a second temperature sensor 82 for detecting the temperature of the cooling water in the water pipe 71, that is, the temperature of the cooling water near the outlet of the cylinder block 12 is provided.
  • a water temperature detection signal TW1 of the first temperature sensor 81 and a water temperature detection signal TW2 of the second temperature sensor 82 are input to an electronic control unit (controller, control unit) 100 including a microcomputer. Then, the electronic control unit 100 outputs an operation signal to the water pump 40 and the flow control valve 30, and controls the discharge amount of the water pump 40 and the position (switching pattern) of the flow control valve 30.
  • the electronic control unit 100 has a function of controlling the fuel injection device 17 and the ignition device 18 of the internal combustion engine 10, and also has a function of temporarily stopping the internal combustion engine 10 when waiting for a signal from the vehicle. It has a reduction function).
  • An electronic control unit having a control function of the internal combustion engine 10 is provided separately from the electronic control unit 100, and an electronic control unit for engine control and an electronic control unit for a cooling system for controlling the water pump 40 and the flow control valve 30. Intercommunication can be configured to take place with 100.
  • the electronic control unit 100 sequentially switches the rotor angle (switching pattern) of the flow control valve 30 and changes the discharge amount of the water pump 40 as the warm-up of the internal combustion engine 10 progresses. It has a function of causing the temperature of the cylinder head 11 to approach the target value, and a function of causing the temperature of the cylinder block 12 to approach the target value.
  • the flowchart of FIG. 2 shows an example of control of the water pump 40 and the flow control valve 30 by the electronic control unit 100.
  • the electronic control unit 100 implements the routine shown in the flowchart of FIG. 2 by interrupt processing every predetermined time.
  • the electronic control unit 100 determines whether the internal combustion engine 10 is started in a cold state or is in a restart state immediately after the operation is stopped and the internal combustion engine 10 is in a high start state.
  • the water temperature TW1 detected by the temperature sensor 81 that is, the water temperature TW1 at the outlet of the cylinder head 11, and the first threshold TH1 are compared and determined. Then, when the internal combustion engine 10 is started in a cold state where the water temperature TW1 falls below the first threshold TH1, the electronic control unit 100 proceeds to step S502.
  • the electronic control unit 100 bypasses steps S502 to S507 and proceeds to step S508. In the cold start state and proceeding to step S502, the electronic control unit 100 sets the rotor target angle of the flow control valve 30 according to the first pattern.
  • the electronic control unit 100 sets the angular position at which all of the first inlet port 31, the second inlet port 32, the third inlet port 33, and the fourth inlet port 34 are closed to the target angle of the rotor of the flow control valve 30. .
  • the circulation of the cooling water through the first inlet port 31, the second inlet port 32, the third inlet port 33 and the fourth inlet port 34 is stopped.
  • the cooling water discharged from the water pump 40 is again drawn into the water pump 40 via the seventh cooling water pipe 77, the cooling water passage 61, the first cooling water pipe 71, and the eighth cooling water pipe 78. Cycle through the
  • the supply of cooling water to the first cooling liquid line, the second cooling liquid line, the third cooling liquid line and the fourth cooling liquid line is stopped, and the cooling water is supplied only to the bypass line. Be done.
  • the coolant passing through the cylinder head 11 bypasses the radiator 50 and is circulated again to the cylinder head 11, and the cylinder block 12, the oil cooler 16, the oil warmer 21, the heater core 91, the EGR cooler 92, the exhaust gas recirculation control valve 93, the throttle valve 94 is in a state where the cooling water is not circulated.
  • the electronic control unit 100 sets the target value of the discharge flow rate of the water pump 40 as the target value for raising the temperature of the cylinder head 11 in the cold start state.
  • the target value for raising the temperature of the cylinder head 11 is a flow rate as small as possible within a range where the temperature change of the cylinder head 11 can be detected by the first temperature sensor 81 and the occurrence of the temperature variation of the cylinder head 11 can be suppressed. For example, it is set to about 3 liters / second to 10 liters / second. That is, in the cold start state, the electronic control unit 100 selects the first pattern, and further suppresses the discharge flow rate of the water pump 40 to promote the temperature rise of the cylinder head 11, thereby improving the combustibility early. The goal is to improve fuel efficiency by
  • the cooling capacity of the cylinder head 11 is lowered and the temperature rise of the cylinder head 11 can be promoted, but the cooling water stagnates in the cooling water passage 61 As a result, the detection accuracy of the temperature of the cylinder head 11 by the first temperature sensor 81 may be lowered, and temperature variations may occur to cause thermal distortion. Therefore, the cooling water is circulated at a minimum flow rate such that the temperature change of the cylinder head 11 can be detected by the first temperature sensor 81 and the occurrence of thermal distortion can be suppressed. Furthermore, by suppressing the heat radiation from the cooling water circulated in the cooling water passage 61 of the cylinder head 11, the temperature rise of the cylinder head 11 can be promoted.
  • the electronic control unit 100 includes a third cooling fluid, which is a route in which the heater core 91 or the like is interposed, so that the cooling water passage 61 does not include a device for taking heat from the cooling water.
  • Line, second coolant line which is a path through which the oil cooler 16 is interposed, first coolant line which is a path through which the radiator 50 is intervened, fourth coolant which is a path through which the oil warmer 21 is interposed Cut off the line.
  • the electronic control unit 100 can detect the temperature change of the cylinder head 11 with the first temperature sensor 81 and can suppress the occurrence of thermal distortion with the minimum flow rate of cooling water without passing through the radiator 50, the heater core 91, etc.
  • the temperature increase of the cylinder head 11 is promoted by circulating the coolant to the cooling water passage 61.
  • FIG. 4 shows changes in the coolant temperature of the heater core 91, the coolant temperature of the cylinder head 11, and the coolant temperature of the cylinder block 12 in a state in which the flow control valve 30 is controlled in the first pattern described above. .
  • the cooling water is circulated to the cylinder head 11 without passing through the radiator 50, the heater core 91, etc., the temperature of the cylinder head 11 is as fast as possible while suppressing the occurrence of thermal distortion. It can be raised at a speed.
  • the cooling water temperature of the cylinder block 12 also gradually rises due to the influence of convection from the cylinder head 11 and frictional heat.
  • FIG. 5 exemplifies switching of the flow control valve 30 in the cold start state.
  • the flow control valve 30 is held in the first pattern, and the discharge amount of the water pump 40 is thermally distorted.
  • the temperature rise of the cylinder head 11 is to be awaited by suppressing the generation to a small amount within the range that can be suppressed.
  • the electronic control unit 100 proceeds to step S503, and compares the water temperature TW1, that is, the water temperature TW1 at the outlet of the cylinder head 11 with the second threshold TH2. Do.
  • the second threshold TH2 is a temperature higher than the first threshold TH1, and the temperature of the cylinder head 11 has risen to such an extent that sufficient combustibility can be obtained, in other words, the warm-up of the cylinder head 11 is completed.
  • the second threshold TH2 is, for example, a temperature within the range of 80 ° C. to 100 ° C. Then, if the water temperature TW1 has not reached the second threshold value TH2, the electronic control unit 100 returns to step S502 and continues control of the flow rate control valve 30 according to the first pattern.
  • the electronic control unit 100 continues the control in the first pattern for promoting the temperature rise of the cylinder head 11. Then, when the water temperature TW1 reaches the second threshold TH2, the electronic control unit 100 proceeds to step S504.
  • step S504 the electronic control unit 100 sets the target angle of the rotor of the flow control valve 30 according to the second pattern. That is, the electronic control unit 100 holds the first inlet port 31, the second inlet port 32, and the fourth inlet port 34 in the closed state, and sets the opening angle position of the third inlet port 33 to the target angle of the rotor. Do.
  • the flow control valve 30 closes all of the first inlet port 31, the second inlet port 32, the third inlet port 33 and the fourth inlet port 34 at one end of the variable range of the rotor angle, and from the angular position
  • the opening area of the third inlet port 33 is gradually increased while keeping the first inlet port 31, the second inlet port 32, and the fourth inlet port 34 in the closed state. ing. Therefore, the electronic control unit 100 directly switches from the first pattern to the second pattern by changing the angle of the flow control valve 30.
  • the circulation of the cooling water through the first inlet port 31, the second inlet port 32 and the fourth inlet port 34 is kept stopped.
  • circulation of cooling water via the third inlet port 33 is started.
  • the cooling water discharged from the water pump 40 passes through the seventh cooling water pipe 77, the cooling water passage 61, the fourth cooling water pipe 74, the flow rate control valve 30, and the sixth cooling water pipe 76, and the water pump
  • the path drawn again to 40 is circulated again, and a part of the cooling water discharged from the cooling water passage 61 is circulated through the first cooling water pipe 71 and the eighth cooling water pipe 78.
  • the supply of the cooling water to the first cooling liquid line, the second cooling liquid line and the fourth cooling liquid line is kept stopped, and the cooling water is supplied to the third cooling liquid line and the bypass line Is supplied.
  • the cooling water having passed through the cylinder head 11 is diverted to the fourth cooling water pipe 74, whereby the heater core 91 disposed in the fourth cooling water pipe 74, the EGR cooler 92, the exhaust gas recirculation control valve 93, Heat exchange between the throttle valve 94 and the cooling water takes place.
  • the cooling water circulates by bypassing the radiator 50, and the cooling water is not circulated through the second cooling water pipe 72 to the cylinder block 12 which has not sufficiently risen in temperature. Furthermore, the cooling water is not circulated to the oil oil warmer 21 disposed in the third cooling water pipe 73, and the temperature of the cooling water can be maintained high. Therefore, the cooling water having a sufficiently high temperature can be supplied to the fourth cooling water pipe 74 in which the heater core 91 and the like are arranged, and the rising response of heating due to heat exchange in the heater core 91 can be enhanced.
  • the electronic control unit 100 keeps the rotor angle of the flow control valve 30 along with the progress of warm-up to maintain the water temperature TW1 at the outlet of the cylinder head 11 near the second threshold TH2.
  • the target of is gradually increased to increase the opening area of the third inlet port 33, and the discharge flow rate of the water pump 40 is gradually increased from the time of the first pattern.
  • the electronic control unit 100 sets the discharge flow rate of the water pump 40 to about 3 liters / second to about 10 liters / second in the first pattern and to about 10 liters / second to about 60 liters / second in the second pattern. increase.
  • the electronic control unit 100 increases the rotor angle of the flow control valve 30 with an angle at which the flow control valve switches to the third pattern, that is, before the rotor angle at which the first inlet port 31 starts to open.
  • the opening area of the third inlet port 33 is increased.
  • FIG. 7 shows changes in the coolant temperature of the heater core 91, the coolant temperature of the cylinder head 11, and the coolant temperature of the cylinder block 12 in a state in which the flow control valve 30 is controlled in the second pattern described above. .
  • the coolant temperature of the cylinder head 11 reaches around the second threshold TH2
  • switching from the first pattern to the second pattern is performed.
  • the cooling water having passed through the cylinder head 11 is supplied to the fourth cooling water pipe 74, whereby the temperature of the cooling water of the heater core 91 becomes high.
  • the air can be heated to high temperatures.
  • FIG. 5 shows the switching timing from the first pattern to the second pattern and the change in flow rate of the cooling water in the second pattern.
  • the electronic control unit 100 controls the flow rate control valve 30 in the second pattern, in order to suppress the temperature of the cylinder head 11 from becoming higher than the second threshold TH2, the third inlet port 33 A process of increasing the opening area of the water pump 40 and increasing the discharge amount of the water pump 40 is performed.
  • the electronic control unit 100 proceeds to step S505 in a state where the coolant is circulated through the heater core 91, and the water temperature detection signal TW2 of the second temperature sensor 82, that is, the water temperature TW2 at the outlet of the cylinder block 12, and the third threshold Compare with TH3.
  • the third threshold TH3 is set to a temperature that is the same as the second threshold TH2, or shifted to a side higher or lower by a predetermined temperature. Then, the electronic control unit 100 compares the third threshold value TH3 with the water temperature TW2 at the outlet of the cylinder block 12 so that the temperature of the cylinder block 12 becomes the temperature at which the supply of cooling water to the cylinder block 12 is started. It is detected whether or not the cylinder block 12 has been warmed up.
  • step S504 While the water temperature TW2 at the outlet of the cylinder block 12 falls below the third threshold TH3, that is, while the cylinder block 12 is being warmed up, the electronic control unit 100 returns to step S504 and follows the second pattern Control of the flow control valve 30 and control of the water pump 40 are continued. On the other hand, when the water temperature TW2 at the outlet of the cylinder block 12 becomes equal to or higher than the third threshold TH3, the electronic control unit 100 proceeds to step S506.
  • step S506 the electronic control unit 100 sets the target angle of the rotor of the flow control valve 30 according to the third pattern. That is, the electronic control unit 100 keeps the second inlet port 32 and the fourth inlet port 34 of the flow control valve 30 closed, and keeps the opening area of the third inlet port 34 of the flow control valve 30 at the upper limit value.
  • the angular position at which the first inlet port 31 of the flow control valve 30 opens is set to the target angle of the rotor.
  • the electronic control unit 100 directly switches from the second pattern to the third pattern by changing the angle of the flow control valve 30.
  • the circulation of the cooling water through the second inlet port 32 and the fourth inlet port 34 is kept stopped, and the third inlet port While the circulation of the cooling water via 33 is continued, the circulation of the cooling water via the first inlet port 31 is started.
  • part of the cooling water discharged from the water pump 40 is again drawn to the water pump 40 via the cooling water passage 62, the second cooling water pipe 72, the flow control valve 30, and the sixth cooling water pipe 76. Will be cycled through.
  • the supply of cooling water to the first cooling fluid line and the fourth cooling fluid line is kept stopped, and the cooling water is supplied to the second cooling fluid line, the third cooling fluid line, and the bypass line. Is supplied.
  • part of the cooling water discharged by the water pump 40 is supplied to the cylinder block 12 so that the temperature of the cylinder block 12 is controlled.
  • the electronic control unit 100 gradually increases the target of the rotor angle of the flow control valve 30 in response to the rise of the water temperature TW2 at the outlet of the cylinder block 12 and the first inlet port 31 And the discharge flow rate of the water pump 40 is gradually increased from the time of the second pattern.
  • the electronic control unit 100 increases the rotor angle of the flow control valve 30 to the angle position at which the fourth pattern is switched, in other words, before the rotor angle at which the second inlet port 32 starts to open.
  • the opening area of the first inlet port 31 is increased with the opening area at the limit value of the rotor angle in the third pattern as the upper limit value.
  • the electronic control unit 100 controls the flow control valve 30 and the water pump 40 according to the third pattern to control the supply of the cooling water to the cylinder block 12 to gradually increase the temperature of the cylinder block 12 toward the target value, The temperature of the cylinder block 12 is prevented from overshooting beyond the target value.
  • FIG. 9 shows changes in the coolant temperature of the cylinder head 11 and the coolant temperature of the cylinder block 12 in a state in which the flow control valve 30 is controlled in the third pattern described above.
  • the coolant temperature of the cylinder block 12 reaches around the third threshold TH3
  • switching from the second pattern to the third pattern is performed.
  • a part of the cooling water supplied to the cooling water passage 61 is divided into the cooling water passage 62 and circulated through the cooling water passage 62, the oil cooler 16, and the flow control valve 30.
  • the coolant temperature of the cylinder block 12 rises.
  • FIG. 5 shows the switching timing from the second pattern to the third pattern, and the flow rate change of the cooling water in the third pattern.
  • the electronic control unit 100 increases the opening area of the first inlet port 31 in order to suppress the temperature of the cylinder head 11 from becoming higher than the second threshold TH2, and the water pump 40
  • the temperature of the cylinder block 12 is gradually increased by performing a process of increasing the discharge amount of the cylinder block 12.
  • the electronic control unit 100 controls the flow control valve 30 according to the third pattern to circulate the cooling water to the cylinder block 12 and proceeds to step S507, and the water temperature TW2 at the outlet of the cylinder block 12 and the fourth threshold Compare with TH4.
  • the target of the temperature of the cylinder block 12 which is higher than the second threshold TH2 which is the target temperature of the cylinder head 11 and which is higher than the third threshold TH3 which starts the cooling water supply to the cylinder block 12 It is a value, for example, set to a value of about 100.degree. C. to 110.degree. That is, while the target temperature of the cylinder head 11 is set for the purpose of suppression of preignition and knocking, the target temperature of the cylinder block 12 is set for the purpose of friction suppression and By increasing the target temperature of block 12, the reduction of friction is promoted.
  • step S506 If the water temperature TW2 at the outlet of the cylinder block 12 falls below the fourth threshold TH4, the electronic control unit 100 returns to step S506 and continues control of the flow control valve 30 and the water pump 40 according to the third pattern. On the other hand, when the water temperature TW2 at the outlet of the cylinder block 12 reaches the fourth threshold TH4, that is, the target temperature of the cylinder block 12, the electronic control unit 100 proceeds to step S508.
  • step S508 the electronic control unit 100 sets the rotor target angle of the flow control valve 30 according to the fourth pattern. That is, the electronic control unit 100 holds the fourth inlet port 34 in the closed state, holds the opening area of the third inlet port 34 at the upper limit value, and continues the opening area of the first inlet port 31 to the third pattern.
  • the angular position at which the opening area of the second inlet port 32 increases to the upper limit value is set as the target angle of the rotor.
  • the fourth inlet port 34 is closed, and the opening area of the third inlet port 34 is kept at the upper limit.
  • the opening area of the second inlet port 32 is opened up to the upper limit value, and the opening area of the first inlet port 31 is set to increase continuously to the third pattern. Therefore, the electronic control unit 100 directly switches from the third pattern to the fourth pattern by changing the angle of the flow control valve 30.
  • the circulation of the cooling water via the radiator 50 is not continued to the first pattern, the second pattern and the third pattern, but the transmission 20 and the oil warmer 21 As a result of the start of the supply of the cooling water to the cylinder block 12, the heater core 91, the oil warmer 21 and the bypass line are supplied with the cooling water.
  • the cooling water having passed through the cylinder head 11 is branched and flows into the fourth cooling water pipe 74, reaches the flow control valve 30 via the oil warmer 21, and is again the water pump Cooling water circulates in the path drawn to the 40.
  • heat exchange is performed between the hydraulic oil of the transmission 20 and the cooling water in the oil warmer 21, and the warm-up of the transmission 20 is promoted.
  • the electronic control unit 100 performs a process of opening the second inlet port 32 and a process of increasing the discharge amount of the water pump 40 more than in the case of the third pattern, and the first cooling water pipe 71 and the second cooling water pipe 72 A sufficient amount of cooling water is supplied to the third cooling water pipe 73 and the fourth cooling water pipe 74, respectively.
  • FIG. 11 shows changes in the temperature of the coolant in the oil warmer 21, the temperature of the coolant in the cylinder head 11, and the temperature of the coolant in the cylinder block 12 when the flow control valve 30 is controlled in the fourth pattern described above.
  • the flow control valve 30 is controlled in the fourth pattern described above.
  • FIG. 11 shows when the coolant temperature of the cylinder block 12 reaches around the fourth threshold TH4, the switching from the third pattern to the fourth pattern is performed. Then, in the fourth pattern, a portion of the cooling water supplied to the cooling water passage 61 is diverted to the third cooling water pipe 73 and flows to be circulated to the oil warmer 21. Cooling water temperature increases.
  • FIG. 5 shows the switching timing from the third pattern to the fourth pattern and the change in flow rate of the cooling water in the fourth pattern.
  • the electronic control unit 100 switches from the third pattern to the fourth pattern, opens the second inlet port 32 to a predetermined opening degree, and moves to the oil warmer 21.
  • the opening area of the first inlet port 31 is started in order to start the circulation of cooling water and keep the temperature of the cylinder head 11 near the second threshold TH2 and keep the temperature of the cylinder block 12 near the fourth threshold TH4. And control the discharge amount of the water pump 40.
  • step S509 After starting control of the flow control valve 30 according to the fourth pattern in step S508, the electronic control unit 100 proceeds to step S509, and the deviation ⁇ TC between the water temperature TW2 at the outlet of the cylinder block 12 and the fourth threshold TH4. Further, a deviation ⁇ TB between the water temperature TW1 at the outlet of the cylinder head 11 and the second threshold TH2 is calculated.
  • step S510 the electronic control unit 100 proceeds to step S510, and performs switching control of the control pattern of the flow control valve 30 based on the temperature deviations ⁇ TC and ⁇ TB obtained in step S509.
  • the rotor target angle of the control valve 30 is set in accordance with the fifth pattern, and when the load decreases, control is performed to return to the fourth pattern.
  • the electronic control unit 100 holds the opening area of the second inlet port 32 and the third inlet port 33 at the upper limit value, and the opening area of the first inlet port 31 continuously increases from the fourth pattern, The angular position at which the fourth inlet port 34 opens from fully closed is set to the target angle of the rotor.
  • the electronic control unit 100 directly switches from the fourth pattern to the fifth pattern by changing the angle of the flow control valve 30.
  • the electronic control unit 100 increases the discharge amount of the water pump 40 in accordance with the increase in the opening area of the fourth inlet port 31.
  • the electronic control unit 10 controls to keep both the water temperature TW2 at the outlet of the cylinder block 12 and the water temperature TW1 at the outlet of the cylinder head 11 near the target temperature. Even when the temperature rise of the cylinder head 11 is prioritized and the temperature of the cylinder block 12 falls below the target value, if the temperature of the cylinder head 11 exceeds the target value, the fourth inlet port The increase of the opening area of 34 and the increase of the discharge rate of the water pump 40 are carried out. Thus, the temperature rise of the cylinder head 11 can be sufficiently suppressed in the high load range of the internal combustion engine 10, and the preignition and knocking can be suppressed. Therefore, the retardation correction amount of the ignition timing for suppressing the preignition and knocking can be reduced. The reduction in output performance of the internal combustion engine 10 can be suppressed.
  • FIG. 5 shows the switching timing from the fourth pattern to the fifth pattern and the flow rate change of the cooling water in the fifth pattern.
  • the electronic control unit 10 switches from the fourth pattern to the fifth pattern to start circulation of the cooling water via the radiator 50, and the opening area of the fourth inlet port 34 is set to the temperature of the cylinder head 11 or the cylinder block 12
  • the discharge amount of the water pump 40 is increased at the same time as the increase can be suppressed.
  • time t5 is a switching timing to a pattern that gives priority to suppression of the temperature rise of the cylinder head 11 over temperature holding of the cylinder block 12, and the electronic control device 10 operates the internal combustion engine 10 under high load. Then, the opening area of the fourth inlet port 34 is further increased, and the discharge amount of the water pump 40 is increased to suppress the temperature rise of the cylinder head 11. At this time, the temperature of the cylinder block 12 may fall below the target value by increasing the amount of cooling water flowing to the cylinder head 11 and increasing the amount of cooling water flowing to the cylinder block 12 as well. The process of reducing the opening area of the fourth inlet port 34 and the discharge amount of the water pump 40 is not performed even if priority is given to suppressing the temperature rise of the cylinder head 11 and the temperature of the cylinder block 12 is lower than the target temperature.
  • routine shown in the flowchart of FIG. 13 exemplifies control in idle reduction as an example of control of the flow control valve 30 performed by the electronic control unit 100.
  • the routine shown in the flowchart of FIG. 13 is interrupt-processed by the electronic control unit 100 based on an idle reduction command signal.
  • step S601 the electronic control unit 100 performs idle reduction control, specifically, control of stopping the fuel supply to the internal combustion engine 10 and stopping the ignition operation by the spark plug.
  • step S602 the electronic control unit 100 controls the rotor angle of the flow control valve 30 according to the fifth pattern described above, thereby opening each input port 31-34 of the flow control valve 30, and thus part of the cooling water. Is controlled to be circulated through the radiator 50.
  • the electronic control unit 100 increases the discharge amount of the water pump 40 to a target value in the idle reduction state, which is larger than the discharge amount in the fifth pattern described above.
  • the electronic control unit 100 proceeds to step S603 to detect whether the water temperature TW1 at the outlet of the cylinder head 11 has fallen to the fifth threshold TH5 or less.
  • the fifth threshold TH5 may be, for example, a temperature that is equal to or lower than the second threshold TH2.
  • the electronic control unit 100 When the water temperature TW1 at the outlet of the cylinder head 11 exceeds the fifth threshold TH5, the electronic control unit 100 returns the process to step S602 and circulates the cooling water by controlling the flow control valve 30 according to the fifth pattern. The temperature of the head 11 is lowered. Then, when the water temperature TW1 at the outlet of the cylinder head 11 becomes equal to or less than the fifth threshold TH5, the electronic control unit 100 proceeds from step S603 to step S604 and stops the water pump 40 or has the same degree as the first pattern. To the discharge flow rate of
  • the electronic control unit 100 controls the flow control valve 30 so that the cooling water is circulated via the radiator 50 in a predetermined period immediately after the internal combustion engine 10 is stopped by the idle reduction and the water pump 40 Can be suppressed to prevent the temperature of the cylinder head 11 from rising during idle reduction. Therefore, in the restart state of the internal combustion engine 10 from the idle reduction, the occurrence of pre-ignition and knocking can be suppressed, and good startability can be maintained.
  • FIG. 14 shows changes in the discharge amount of the water pump 40 and the temperature of the cylinder head 11 when the idle reduction is performed.
  • the electronic control unit 100 when idle reduction is started at time t6 and the operation of the internal combustion engine 10 is stopped, the electronic control unit 100 causes the flow control valve 30 to circulate cooling water according to the fifth pattern. And increase the discharge amount of the water pump 40. Then, at time t7, when the outlet water temperature TW1 of the cylinder head 11 becomes equal to or less than the fifth threshold TH5 and the temperature of the cylinder head 11 does not rise and change thereafter, the electronic control unit 100 generates the water pump 40. Reduce the amount of discharge.
  • the cooling water can be circulated only to the cylinder head 11 by the control of the flow control valve 30, and the cooling supplied to the cylinder head 11 by the control of the electric water pump 40. Since the flow rate of water can be controlled to an arbitrary flow rate, it is possible to obtain the improvement effect of the fuel efficiency by the early warm-up of the cylinder head 11.
  • the flow rate ratio of the cooling water supplied to the cylinder head 11 and the cylinder block 12 can be controlled by the control of the flow control valve 30, and the electric water pump 40 can reduce the rotational speed of the internal combustion engine 10, A high flow rate of cooling water can be circulated. Therefore, the temperatures of the cylinder head 11 and the cylinder block 12 can be controlled to different target temperatures, and the temperature of the cylinder block 12 can be positively controlled while suppressing the temperature of the cylinder head 11 to a temperature that can suppress preignition and knocking. To reduce the friction.
  • the cooling water can be circulated to the cylinder head 11 even when the internal combustion engine 10 is stopped by the electric water pump 40, the temperature rise of the cylinder head 11 during idle reduction is suppressed, and the preignition in the restart state is performed. The occurrence of knocking can be suppressed.
  • the heater can be operated early. Further, even while the internal combustion engine 10 is stopped, the electric water pump 40 can be driven to supply the cooling water having passed through the cylinder head 11 to the heater core 91 or the like to operate the heater.
  • the flow control valve 30 is not limited to the rotor type, and for example, a switching valve configured to linearly move the valve body by an electric actuator can be used.
  • the heater core 91 can be disposed in the fourth cooling water pipe 74. Further, in addition to the heater core 91, the fourth cooler water pipe 74, the EGR cooler 92, the exhaust gas recirculation control valve 93, the throttle valve One or two out of 94 can be arranged.
  • the inlet of the cooling water passage 62 is formed in the cylinder block 12
  • the cooling water pipe 77 can be branched into two on the way, and one can be connected to the cooling water passage 61 and the other can be connected to the cooling water passage 62.
  • the water pump 40 can be driven by the internal combustion engine 10.
  • the flow control valve 30 can distribute the flow rate, whereby the early stage of the cylinder head 11 is obtained. Besides enabling warm-up and early operation of the heater, it is possible to control the cylinder head 11 and the cylinder block 12 to different temperatures.
  • the oil cooler 16 may not be disposed in the second coolant line.
  • an auxiliary electric water pump can be disposed in the bypass line.
  • an engine drive type water pump driven by the internal combustion engine 10 can be provided in parallel with the electric water pump 40.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Combined Controls Of Internal Combustion Engines (AREA)
  • Electrical Control Of Air Or Fuel Supplied To Internal-Combustion Engine (AREA)
  • Multiple-Way Valves (AREA)

Abstract

本願発明は、冷却装置及びその制御方法に関する。冷却装置は、シリンダヘッド(11)及びラジエータ(50)を経由する第1冷却液ライン(71)と、シリンダブロック(12)を経由しラジエータ(50)を迂回する第2冷却液ライン(72)と、第1冷却液ライン(71)及び第2冷却液ライン(72)が流入側に接続され、流出側が電動式ウォータポンプ(40)の吸引側に接続される流量制御弁(30)と、シリンダヘッド(11)とラジエータ(50)との間の第1冷却液ライン(71)から分岐し、ラジエータ(50)を迂回して流量制御弁(30)の流出側に合流するバイパスライン(78)と、を備える。そして、制御ユニット(100)は、シリンダヘッド(11)の温度及びシリンダブロック(12)の温度に応じて流量制御弁を制御する。

Description

内燃機関の冷却装置及び冷却装置の制御方法
 本発明は、ウォータポンプによって冷却液を内燃機関に循環させる冷却装置及びその制御方法に関する。
 特許文献1には、ラジエータを通過して冷却水が流れるラジエータ冷却水回路と、ラジエータをバイパスするラジエータバイパス回路と、ラジエータバイパス回路に設けられ、冷却水およびエンジンの自動変速機の作動油の間で熱交換する熱交換器と、熱交換器の上流側およびラジエータ冷却水回路のラジエータの下流側部位を接続し、ラジエータを通過した冷却水を熱交換器に流入させるラジエータ下流側通路と、ラジエータバイパス回路およびラジエータ下流側通路の接続部に設けられ、熱交換器に流入する、ラジエータバイパス回路からの冷却水およびラジエータ下流側通路からの冷却水の流入割合を調整する流量調整手段と、を備えた冷却回路が開示されている。
特許第4196802号公報
 内燃機関の始動後の暖機運転中においては、シリンダヘッドの温度、換言すれば燃焼温度を早期に上昇させることで燃焼性が改善され、燃費性能や排気性状などを向上させることができる。
 また、内燃機関の暖機後においては、シリンダヘッドの温度上昇を抑制することでノッキングの発生を抑制できる一方で、シリンダブロックの温度を高めることでフリクションが低減され、燃費性能を向上させることができる。
 そこで、本発明は、シリンダヘッドの温度及びシリンダブロックの温度の制御性を高め、内燃機関の燃費性能などの向上に寄与できる、内燃機関の冷却装置及びその制御方法を提供することを目的とする。
 そのため、本願発明に係る冷却装置は、内燃機関に冷却液を循環させるウォータポンプと、前記内燃機関のシリンダヘッド及びラジエータを経由する第1冷却液ラインと、前記内燃機関のシリンダブロックを経由し前記ラジエータを迂回する第2冷却液ラインと、前記第1冷却液ライン及び前記第2冷却液ラインがそれぞれ流入側に接続され、流出側が前記ウォータポンプの吸引側に接続される電動式の流量制御弁と、前記シリンダヘッドと前記ラジエータとの間の前記第1冷却液ラインから分岐し、前記ラジエータを迂回して前記流量制御弁の流出側に合流するバイパスラインと、を含む。
 また、本願発明に係る冷却装置の制御方法は、内燃機関に冷却液を循環させるウォータポンプと、前記内燃機関のシリンダヘッド及びラジエータを経由する第1冷却液ラインと、前記内燃機関のシリンダブロックを経由し前記ラジエータを迂回する第2冷却液ラインと、前記第1冷却液ライン及び前記第2冷却液ラインがそれぞれ流入側に接続され、流出側が前記ウォータポンプの吸引側に接続される電動式の流量制御弁と、前記シリンダヘッドと前記ラジエータとの間の前記第1冷却液ラインから分岐し、前記ラジエータを迂回して前記流量制御弁の流出側に合流するバイパスラインと、を含む冷却装置の制御方法であって、前記シリンダヘッドの出口での冷却液の温度を検出するステップと、前記シリンダブロックの出口での冷却液の温度を検出するステップと、前記シリンダヘッドの出口での冷却液の温度及び前記シリンダブロックの出口での冷却液の温度に基づいて前記流量制御弁を制御するステップと、を含む。
 上記発明によると、シリンダヘッドの温度及びシリンダブロックの温度の制御性が高くなり、内燃機関の燃費性能を向上させることができる。
本発明の一実施形態における内燃機関の冷却装置の概略図である。 本発明の一実施形態における流量制御弁の制御を示すフローチャートである。 本発明の一実施形態における冷却水の循環経路の第1パターンを示す状態図である。 本発明の一実施形態における循環経路の第1パターンでの温度変化を例示するタイムチャートである。 本発明の一実施形態における流量制御弁の切り替え制御を例示するタイムチャートである。 本発明の一実施形態における冷却水の循環経路の第2パターンを示す状態図である。 本発明の一実施形態における循環経路の第2パターンでの温度変化を例示するタイムチャートである。 本発明の一実施形態における冷却水の循環経路の第3パターンを示す状態図である。 本発明の一実施形態における循環経路の第3パターンにおける温度変化を例示するタイムチャートである。 本発明の一実施形態における冷却水の循環経路の第4パターンを示す状態図である。 本発明の一実施形態における循環経路の第4パターンにおける温度変化を例示するタイムチャートである。 本発明の実施形態における冷却水の循環経路の第5パターンを示す状態図である。 本発明の実施形態におけるアイドルストップ状態での流量制御弁の制御を示すフローチャートである。 本発明の実施形態におけるアイドルストップ状態での冷却水の温度変化及びポンプの吐出流量の変化を示すタイムチャートである。
 以下に本発明の実施の形態を説明する。
 図1は、本発明に係る冷却装置の一例を示す構成図である。
 車両用の内燃機関10は、シリンダヘッド11及びシリンダブロック12を有する。内燃機関10の出力軸には、動力伝達装置の一例としての変速機20が接続され、変速機20の出力が図示省略した駆動輪に伝達される。
 内燃機関10の冷却装置は、冷却水(冷却液)を循環させる水冷式冷却装置である。冷却装置は、電気式アクチュエータによって動作する流量制御弁30、モータで駆動される電動式のウォータポンプ40、ラジエータ50、内燃機関10に設けた冷却水通路60、これらを接続する配管70で構成される。
 内燃機関10のシリンダヘッド11には、シリンダヘッド11の気筒配列方向の一方端に設けた冷却水入口13と、シリンダヘッド11の気筒配列方向の他方端に設けた冷却水出口14とを接続し、シリンダヘッド11内に延設される冷却水通路61を設けてある。
 また、内燃機関60のシリンダブロック12には、冷却水通路61から分岐してシリンダブロック12に至り、シリンダブロック12内に延設されて、シリンダブロック12に設けた冷却水出口15に接続される冷却水通路62を設けてある。シリンダブロック12の冷却水出口15は、冷却水出口14が設けられる側と同じ気筒配列方向の端部に設けられる。
 このように、図1に例示した冷却装置において、シリンダブロック12には、シリンダヘッド11を経由して冷却水が供給され、シリンダヘッド11のみを通過した冷却水は冷却水出口14から排出され、シリンダヘッド11に流入した後シリンダブロック12内を通過した冷却水は冷却水出口15から排出される。
 シリンダヘッド11の冷却水出口14には、第1冷却水配管71の一端が接続され、第1冷却水配管71の他端は、ラジエータ50の冷却水入口51に接続される。
 シリンダブロック12の冷却水出口15には、第2冷却水配管72の一端が接続され、第2冷却水配管72の他端は、流量制御弁30の4つの入口ポート(流入孔)31-34のうちの第1入口ポート31に接続される。
 第2冷却水配管72の途中には、内燃機関10の潤滑油を冷却するためのオイルクーラー16を設けてある。オイルクーラー16は、第2冷却水配管72内を流れる冷却水と内燃機関10の潤滑油との間で熱交換を行う。
 また、第3冷却水配管73は、一端が第1冷却水配管71に接続され、他端が流量制御弁30の第2入口ポート32に接続される。第3冷却水配管73は途中には、変速機20の作動油を加熱するためのオイルウォーマー21が設けられる。
 オイルウォーマー21は、第3冷却水配管73内を流れる冷却水と変速機20の作動油との間で熱交換を行う。つまり、シリンダヘッド11を通過した冷却水を分流させてオイルウォーマー21に導き、オイルウォーマー21において作動油を加熱させる。
 更に、第4冷却水配管74は、一端が第1冷却水配管71に接続され、他端が流量制御弁30の第3入口ポート33に接続される。
 第4冷却水配管74には、各種の熱交換デバイスが設けられている。
 上記の熱交換デバイスとして、上流側から順に、車両暖房用のヒータコア91、内燃機関10の排気還流装置を構成する水冷式のEGRクーラ92、同じく排気還流装置において排気還流量を調整するための排気還流制御弁93、内燃機関10の吸入空気量を調整するスロットルバルブ94が設けられている。
 ヒータコア91は、第4冷却水配管74内の冷却水と空調空気との間で熱交換を行わせ、空調空気を暖めるデバイスである。
 EGRクーラ92は、排気還流装置によって内燃機関10の吸気系に還流される排気と第4冷却水配管74内の冷却水との間で熱交換を行わせ、還流される排気の温度を低下させるデバイスである。
 また、排気還流制御弁93及びスロットルバルブ94は、第4冷却水配管74内の冷却水との間で熱交換を行うことで暖められるように構成され、これにより排気中や吸気中に含まれる水分が、排気還流制御弁93、スロットルバルブ94の周辺で凍結することを抑制する。
 このように、シリンダヘッド11を通過した冷却水を分流させて、ヒータコア91、EGRクーラ92、排気還流制御弁93、スロットルバルブ94に導き、これらとの間での熱交換を行わせる。
 また、第5冷却水配管75は、一端がラジエータ50の冷却水出口52に接続され、他端が流量制御弁30の第4入口ポート34に接続される。
 流量制御弁30は、1つの出口ポート(流出孔)35を有し、この出口ポート35には、第6冷却水配管76の一端が接続される。第6冷却水配管76の他端は、ウォータポンプ40の吸込口41に接続される。
 そして、ウォータポンプ40の吐出口42には第7冷却水配管77の一端が接続され、第7冷却水配管77の他端は、シリンダヘッド11の冷却水入口13に接続される。
 また、第8冷却水配管78は、第1冷却水配管71の第3冷却水配管73、第4冷却水配管74が接続される部分よりも下流側に一端が接続され、他端が第6冷却水配管76に接続される。
 流量制御弁30は、前述したように、4つの入口ポート(流入孔)31-34と1つの出口ポート(流出孔)35とを備え、入口ポート31-34には冷却水配管72,73,74,75がそれぞれ接続され、出口ポート35に第6冷却水配管76が接続される。
 流量制御弁30は、例えば回転式の流路切換バルブであり、複数のポート31-35が形成されたステータに、流路が設けられたロータを嵌装し、ロータを電動モータなどの電動アクチュエータで回転駆動してロータの角度位置を変更することで、ステータの各開口を接続する構成である。
 そして、係る回転式の流量制御弁30では、ロータ角度に応じて4つの入口ポート31-34の開口面積割合が変化し、ロータ角度の選定によって所望の開口面積割合に制御できるようにロータの流路などが適合される。
 上記構成において、冷却水通路61と第1冷却水配管71とによって、シリンダヘッド11及びラジエータ50を経由する第1冷却液ラインが構成される。
 また、冷却水通路62と第2冷却水配管72とによって、シリンダブロック12を経由しラジエータ50を迂回する第2冷却液ラインが構成される。
 また、冷却水通路61と第4冷却水配管74とによって、シリンダヘッド11及びヒータコア91を経由しラジエータ50を迂回する第3冷却液ラインが構成される。
 また、冷却水通路61と第3冷却水配管73とによって、シリンダヘッド11及び変速機20のオイルウォーマー21を経由しラジエータ50を迂回する第4冷却液ラインが構成される。
 更に、第8冷却水配管78によって、シリンダヘッド11とラジエータ50との間の第1冷却液ラインから分岐し、ラジエータ50を迂回して流量制御弁30の流出側に合流するバイパスラインが構成される。
 つまり、流量制御弁30は、上述した第1冷却液ライン、第2冷却液ライン、第3冷却液ライン及び第4冷却液ラインがそれぞれ流入側に接続され、流出側がウォータポンプ40の吸引側に接続され、各冷却液ラインの出口の開口面積を調整することで、第1冷却液ライン、第2冷却液ライン、第3冷却液ライン及び第4冷却液ラインへの冷却水の供給量を制御する、流路の切り替え機構である。
 流量制御弁30は、例えば、図5に例示したような複数の切替えパターン(切替え位置)を有し、電動アクチュエータでロータ角度を変更することで、これらの切替えパターンのいずれかに切り替わる構成である。
 即ち、流量制御弁30は、ロータ角度がストッパで規制される基準角度位置から所定角度範囲内では、入口ポート31-34を全て閉じる。流量制御弁30の入口ポート31-34が全て閉じる位置を、第1パターン若しくは第1位置と称する。
 なお、入口ポート31-34を全て閉じる状態は、各入口ポート31-34の開口面積を零とする状態の他、零よりも大きい最小開口面積とする状態、換言すれば、漏れ流量が発生する状態を含むものとする。
 上記入口ポート31-34を全て閉じられる角度よりもロータ角度を増加させると、ヒータコア冷却液ラインの出口が接続される第3入口ポート33が一定開度にまで開くようになり、その後、ロータ角度の増大に対して前記一定の流量を保持する。
 上記の第3入口ポート33が開く位置を、第2パターン若しくは第2位置と称する。
 第3入口ポート33が一定開度にまで開く角度から更にロータ角度を増大させると、ブロック冷却液ラインの出口が接続される第1入口ポート31が開き出し、第1入口ポート31の開口面積は、ロータ角度の増大に応じて漸増する。
 上記の第1入口ポート31が開く位置を、第3パターン若しくは第3位置と称する。
 第1入口ポート31が開き出する角度よりもより大きな角度位置で、動力伝達系冷却液ラインの出口が接続される第2入口ポート32が一定開度まで開き、その後、ロータ角度の増大に対して前記一定開度を保持する。
 上記の第2入口ポート32が開く位置を、第4パターン若しくは第4位置と称する。
 更に、第2入口ポート32が一定開度まで開く角度よりも大きな角度位置で、ラジエータ冷却液ラインの出口が接続される第4入口ポート34が開き出し、第4入口ポート34の開口面積は、ロータ角度の増大に応じて漸増する。
 上記の第4入口ポート34が開く位置を、第5パターン若しくは第5位置と称する。
 冷却水出口14近傍の第1冷却水配管71内の冷却水温度、つまり、シリンダヘッド11の出口付近の冷却水の温度を検出する第1温度センサ81と、冷却水出口15近傍の第2冷却水配管71内の冷却水温度、つまり、シリンダブロック12の出口付近で冷却水の温度を検出する第2温度センサ82とを設けてある。
 第1温度センサ81の水温検出信号TW1及び第2温度センサ82の水温検出信号TW2は、マイクロコンピュータを備える電子制御装置(コントローラ、制御ユニット)100に入力される。そして、電子制御装置100は、ウォータポンプ40及び流量制御弁30に操作信号を出力して、ウォータポンプ40の吐出量、流量制御弁30の位置(切替えパターン)を制御する。
 また、電子制御装置100は、内燃機関10の燃料噴射装置17、点火装置18を制御する機能を有し、また、車両の信号待ちの場合などに内燃機関10を一時的に停止させる機能(アイドルリダクション機能)を有している。
 なお、内燃機関10の制御機能を有する電子制御装置を、電子制御装置100とは別に設け、機関制御用の電子制御装置と、ウォータポンプ40及び流量制御弁30を制御する冷却系の電子制御装置100との間で相互通信が行われるよう構成することができる。
 次に、電子制御装置100によるウォータポンプ40及び流量制御弁30の制御について説明する。
 電子制御装置100は、以下で詳細に説明するように、内燃機関10の暖機の進行に伴って、流量制御弁30のロータ角度(切替えパターン)を順次切替えると共にウォータポンプ40の吐出量を変化させる機能を有し、また、シリンダヘッド11の温度を目標値に近づける機能、シリンダブロック12の温度を目標値に近づける機能を有している。
 図2のフローチャートは、電子制御装置100によるウォータポンプ40及び流量制御弁30の制御の一例を示す。電子制御装置100は、図2のフローチャートに示すルーチンを所定時間毎の割り込み処理によって実施する。
 まず、ステップS501で、電子制御装置100は、内燃機関10が冷機状態で始動されたか、又は、運転停止直後の再始動状態であって内燃機関10の温度が高い始動状態であるかを、第1温度センサ81が検出した水温TW1、つまり、シリンダヘッド11の出口での水温TW1と、第1閾値TH1とを比較して判別する。
 そして、水温TW1が第1閾値TH1を下回る冷機状態で内燃機関10が始動された場合、電子制御装置100は、ステップS502へ進む。
 一方、水温TW1が第1閾値TH1以上であり、暖機完了態で内燃機関10が始動された場合、電子制御装置100は、ステップS502-ステップS507を迂回してステップS508へ進む。
 冷始動状態であってステップS502へ進むと、電子制御装置100は、流量制御弁30のロータ目標角度を第1パターンに従って設定する。
 つまり、電子制御装置100は、第1入口ポート31、第2入口ポート32、第3入口ポート33及び第4入口ポート34を全て閉じる角度位置を、流量制御弁30のロータの目標角度に設定する。
 係る目標角度の設定によって、図3に示すように、第1入口ポート31、第2入口ポート32、第3入口ポート33及び第4入口ポート34を介した冷却水の循環が停止される。この場合、ウォータポンプ40から吐出された冷却水は、第7冷却水配管77、冷却水通路61、第1冷却水配管71、第8冷却水配管78を経由し、ウォータポンプ40に再度吸引される経路を循環することになる。
 換言すれば、第1パターンでは、第1冷却液ライン、第2冷却液ライン、第3冷却液ライン及び第4冷却液ラインへの冷却水の供給は停止され、バイパスラインにのみ冷却水が供給される。
 これにより、シリンダヘッド11を通過した冷却水は、ラジエータ50を迂回して再度シリンダヘッド11に循環され、シリンダブロック12、オイルクーラー16、オイルウォーマー21、ヒータコア91、EGRクーラ92、排気還流制御弁93、スロットルバルブ94には、冷却水が循環されない状態となる。
 また、第1パターンにおいて、電子制御装置100は、ウォータポンプ40の吐出流量の目標値を、冷始動状態でシリンダヘッド11の温度を上昇させるための目標値とする。このシリンダヘッド11の温度を上昇させるための目標値は、シリンダヘッド11の温度変化を第1温度センサ81で検知でき、かつ、シリンダヘッド11の温度ばらつきの発生を抑制できる範囲内でなるべく少ない流量に設定され、例えば、3リットル/秒から10リットル/秒程度に設定される。
 つまり、電子制御装置100は、冷始動状態において、第1パターンを選択し、更に、ウォータポンプ40の吐出流量を低く抑えることで、シリンダヘッド11の温度上昇を促進させ、燃焼性を早期に向上させることで、燃費改善を図ることを目的とする。
 冷却水通路61への冷却水の供給を停止させれば、シリンダヘッド11の冷却能力が低下し、シリンダヘッド11の温度上昇を促進させることができるが、冷却水通路61内で冷却水が滞ると、第1温度センサ81によるシリンダヘッド11の温度の検出精度が低下し、また、温度ばらつきが発生して熱歪みが発生する可能性がある。そこで、シリンダヘッド11の温度変化を第1温度センサ81で検知でき、かつ、熱歪みの発生を抑制できる程度の最低流量の冷却水を循環させる。
 更に、シリンダヘッド11の冷却水通路61に循環させる冷却水からの放熱を抑えることで、シリンダヘッド11の温度上昇を促進できる。
 そこで、冷却水通路61に冷却水を循環させる経路に、冷却水から熱を奪うデバイスが含まれないように、電子制御装置100は、ヒータコア91などが介装される経路である第3冷却液ライン、オイルクーラー16が介装される経路である第2冷却液ライン、ラジエータ50が介装される経路である第1冷却液ライン、オイルウォーマー21が介装される経路である第4冷却液ラインを遮断する。
 これにより、シリンダヘッド11の冷却水通路61から排出された冷却水は、ラジエータ50やヒータコア91などを介さずにそのままウォータポンプ40に戻され、冷却水通路61に循環させる。
 上記のように、電子制御装置100は、シリンダヘッド11の温度変化を第1温度センサ81で検出できかつ熱歪みの発生を抑制できる最小流量の冷却水を、ラジエータ50やヒータコア91などを介さずに冷却水通路61に循環させることで、シリンダヘッド11の温度上昇を促進させる。
 図4は、上記の第1パターンで流量制御弁30を制御している状態でのヒータコア91の冷却水温度、シリンダヘッド11の冷却水温度、及び、シリンダブロック12の冷却水温度の変化を示す。
 第1パターンでは、冷却水を、ラジエータ50やヒータコア91などを経由させずに、シリンダヘッド11に循環させることから、シリンダヘッド11の温度を、熱歪みの発生を抑制しつつ可及的に速い速度で上昇させることができる。
 なお、第1パターンでは、シリンダヘッド11からの対流の影響や摩擦熱などによって、シリンダブロック12の冷却水温度も徐々に上昇することになる。
 図5は、冷始動状態における流量制御弁30の切り替えを例示するものであり、冷始動状態では、まず、流量制御弁30を第1パターンに保持させると共に、ウォータポンプ40の吐出量を熱歪みの発生を抑制できる範囲内の少ない量に抑え、シリンダヘッド11の温度上昇を待つことになる。
 上記の第1パターンに従って流量制御弁30を制御している状態で、電子制御装置100はステップS503へ進み、水温TW1、つまり、シリンダヘッド11の出口での水温TW1と第2閾値TH2とを比較する。
 ここで、第2閾値TH2は、第1閾値TH1よりも高い温度であり、シリンダヘッド11の温度が十分な燃焼性を得られる程度に上がったこと、換言すれば、シリンダヘッド11の暖機完了を判定できるように適合される。なお、第2閾値TH2は、例えば、80℃から100℃までの範囲内の温度である。
 そして、水温TW1が第2閾値TH2に達していない場合、電子制御装置100はステップS502に戻り、第1パターンに従った流量制御弁30の制御を継続する。
 すなわち、TW1<TH2が成立する状態は、十分な燃焼性が得られる温度にまでシリンダヘッド11の温度が高くなっていない状態である。このため、電子制御装置100は、シリンダヘッド11の昇温を促進させるための第1パターンでの制御を継続する。
 そして、水温TW1が第2閾値TH2に達すると、電子制御装置100は、ステップS504へ進む。
 ステップS504で、電子制御装置100は、流量制御弁30のロータの目標角度を第2パターンに従って設定する。
 つまり、電子制御装置100は、第1入口ポート31、第2入口ポート32及び第4入口ポート34を閉じた状態に保持し、第3入口ポート33の開く角度位置を、ロータの目標角度に設定する。
 流量制御弁30は、ロータ角度の可変範囲の一方端側で、第1入口ポート31、第2入口ポート32、第3入口ポート33及び第4入口ポート34を全て閉じる状態となり、係る角度位置からロータ角度を変化させることで、第1入口ポート31、第2入口ポート32及び第4入口ポート34を閉じた状態に保持したまま、第3入口ポート33の開口面積を徐々に増大させる設定となっている。
 従って、電子制御装置100が、流量制御弁30の角度を変化させることで、第1パターンから第2パターンに直接切り替わる。
 第2パターンに従った目標角度の設定によって、図6に示すように、第1入口ポート31、第2入口ポート32及び第4入口ポート34を介した冷却水の循環は停止状態に保持される一方、第3入口ポート33を介した冷却水の循環が開始される。
 これにより、ウォータポンプ40から吐出された冷却水は、第7冷却水配管77、冷却水通路61、第4冷却水配管74、流量制御弁30、第6冷却水配管76を経由し、ウォータポンプ40に再度吸引される経路を循環するようになり、また、冷却水通路61から排出された冷却水の一部は、第1冷却水配管71、第8冷却水配管78を介して循環される。
 換言すれば、第2パターンでは、第1冷却液ライン、第2冷却液ライン及び第4冷却液ラインへの冷却水の供給は停止状態に保持され、第3冷却液ライン及びバイパスラインに冷却水が供給される。
 第2パターンでは、シリンダヘッド11を通過した冷却水が第4冷却水配管74に分流されることで、第4冷却水配管74に配置されるヒータコア91、EGRクーラ92、排気還流制御弁93、スロットルバルブ94と冷却水との間の熱交換が行われるようになる。
 また、第2パターンでは、冷却水がラジエータ50を迂回して循環し、また、十分に温度上昇していないシリンダブロック12に第2冷却水配管72を介して冷却水が循環されることがなく、更に、第3冷却水配管73に配置されるオイルオイルウォーマー21に冷却水が循環されず、冷却水温度を高く維持できる。
 従って、ヒータコア91などが配置される第4冷却水配管74に十分に高い温度の冷却水を供給でき、ヒータコア91での熱交換による暖房の立ち上がり応答を高めることができる。
 係る第2パターンの設定状態で、電子制御装置100は、シリンダヘッド11の出口での水温TW1を第2閾値TH2付近に維持するために、暖機の進行に伴い、流量制御弁30のロータ角度の目標を徐々に増大させて第3入口ポート33の開口面積を増やすと共に、ウォータポンプ40の吐出流量を第1パターンのときから徐々に増大させる。
 例えば、電子制御装置100は、ウォータポンプ40の吐出流量を、第1パターンのときには3リットル/秒から10リットル/秒程度とし、第2パターンのときには10リットル/秒から60リットル/秒程度にまで増やす。
 また、電子制御装置100は、第2パターンにおいて、流量制御弁30のロータ角度を、第3パターンに切り替わる角度位置、つまり、第1入口ポート31が開き始めるロータ角度の手前を限度として増大させ、第3入口ポート33の開口面積を増大させる。
 図7は、上記の第2パターンで流量制御弁30を制御している状態でのヒータコア91の冷却水温度、シリンダヘッド11の冷却水温度、及び、シリンダブロック12の冷却水温度の変化を示す。
 この図7に示すように、シリンダヘッド11の冷却水温度が第2閾値TH2付近に達すると、第1パターンから第2パターンへの切り替えが行われる。そして、第2パターンでは、シリンダヘッド11を通過した冷却水が第4冷却水配管74に供給されるようになることで、ヒータコア91の冷却水温度が高くなり、ヒータコア91での熱交換による空調空気を高い温度に加熱できる。
 なお、流量制御弁30が第2パターンで制御されている状態でも、シリンダヘッド11からの対流の影響や摩擦熱などによって、シリンダブロック12の冷却水温度も徐々に上昇することになる。
 図5には、第1パターンから第2パターンへの切り替えタイミングと、第2パターンでの冷却水の流量変化とを示してある。
 時刻t0で内燃機関10が始動されてから、時刻t1でシリンダヘッド11の温度が第2閾値TH2付近に達するまでの間は第1パターンに保持され、時刻t1で第1パターンから第2パターンへの切り替えが行われる。
 そして、電子制御装置100は、第2パターンで流量制御弁30を制御しているときに、シリンダヘッド11の温度が第2閾値TH2よりも高くなることを抑制するために、第3入口ポート33の開口面積を増やし、また、ウォータポンプ40の吐出量を増やす処理を実施する。
 電子制御装置100は、ヒータコア91に冷却水を循環させている状態でステップS505へ進み、第2温度センサ82の水温検出信号TW2、つまり、シリンダブロック12の出口での水温TW2と、第3閾値TH3とを比較する。
 第3閾値TH3は、第2閾値TH2と同じか若しくは所定温度だけ高い側若しくは低い側にずれた温度に設定される。
 そして、電子制御装置100は、第3閾値TH3とシリンダブロック12の出口での水温TW2とを比較することで、シリンダブロック12の温度が、シリンダブロック12への冷却水の供給を開始する温度に達したか否か、換言すれば、シリンダブロック12の暖機が完了したか否かを検出する。
 電子制御装置100は、シリンダブロック12の出口での水温TW2が第3閾値TH3を下回る間、つまり、シリンダブロック12の暖機中である場合には、ステップS504に戻り、第2パターンに従った流量制御弁30の制御、及び、ウォータポンプ40の制御を継続させる。
 一方、シリンダブロック12の出口での水温TW2が第3閾値TH3以上になると、電子制御装置100は、ステップS506へ進む。
 ステップS506で、電子制御装置100は、流量制御弁30のロータの目標角度を第3パターンに従って設定する。
 つまり、電子制御装置100は、流量制御弁30の第2入口ポート32及び第4入口ポート34を閉じた状態に保持し、流量制御弁30の第3入口ポート34の開口面積を上限値に保持し、流量制御弁30の第1入口ポート31が開く角度位置を、ロータの目標角度に設定する。
 流量制御弁30のロータ角度が第2パターンでの上限角度よりも増大すると、第2入口ポート32及び第4入口ポート34を閉じた状態に保持し、また、第3入口ポート34の開口面積を上限値に保持した状態のまま、第1入口ポート31の開口面積が徐々に増大するようになっている。従って、電子制御装置100が、流量制御弁30の角度を変化させることで、第2パターンから第3パターンに直接切り替わる。
 第3パターンに従った目標角度の設定によって、図8に示すように、第2入口ポート32及び第4入口ポート34を介した冷却水の循環は停止状態に保持され、かつ、第3入口ポート33を介した冷却水の循環が継続される一方で、第1入口ポート31を介した冷却水の循環が開始される。
 これにより、ウォータポンプ40から吐出された冷却水の一部は、冷却水通路62、第2冷却水配管72、流量制御弁30、第6冷却水配管76を経由し、ウォータポンプ40に再度吸引される経路を循環するようになる。
 換言すれば、第3パターンでは、第1冷却液ライン及び第4冷却液ラインへの冷却水の供給は停止状態に保持され、第2冷却液ライン、第3冷却液ライン及びバイパスラインに冷却水が供給される。
 これにより、第3パターンでは、ウォータポンプ40が吐出した冷却水の一部がシリンダブロック12に供給され、シリンダブロック12の温度が制御されるようになる。
 係る第3パターンの設定状態で、電子制御装置100は、シリンダブロック12の出口での水温TW2の上昇に応じて、流量制御弁30のロータ角度の目標を徐々に増大させて第1入口ポート31の開口面積を増やすと共にウォータポンプ40の吐出流量を第2パターンのときから徐々に増大させる。
 なお、第3パターンにおいて、電子制御装置100は、流量制御弁30のロータ角度を、第4パターンに切り替わる角度位置、換言すれば、第2入口ポート32が開き始めるロータ角度の手前を限度として増大させ、第1入口ポート31の開口面積を、第3パターンでのロータ角度の限界値での開口面積を上限値として増大させる。
 電子制御装置100は、第3パターンによる流量制御弁30及びウォータポンプ40の制御によってシリンダブロック12への冷却水の供給を制御することで、シリンダブロック12の温度を目標値に向けて漸増させ、シリンダブロック12の温度が目標値を超えてオーバーシュートすることを抑制する。
 図9は、上記の第3パターンで流量制御弁30を制御している状態でのシリンダヘッド11の冷却水温度、及び、シリンダブロック12の冷却水温度の変化を示す。
 この図9に示すように、シリンダブロック12の冷却水温度が第3閾値TH3付近に達すると、第2パターンから第3パターンへの切り替えが行われる。そして、第3パターンでは、冷却水通路61に供給された冷却水の一部が、冷却水通路62に分流され、冷却水通路62、オイルクーラー16、流量制御弁30を介して循環されるようになり、シリンダブロック12の冷却水温度が上昇する。
 図5には、第2パターンから第3パターンへの切り替えタイミングと、第3パターンでの冷却水の流量変化とを示してある。
 時刻t2でシリンダブロック12の温度が第3閾値TH3付近に達すると、第2パターンから第3パターンへの切り替えが行われる。
 そして、第3パターンでは、シリンダヘッド11の温度が第2閾値TH2よりも高くなることを抑制するために、電子制御装置100は、第1入口ポート31の開口面積を増やし、また、ウォータポンプ40の吐出量を増やす処理を実施して、シリンダブロック12の温度を漸増させるようにする。
 電子制御装置100は、第3パターンに従って流量制御弁30を制御してシリンダブロック12に冷却水を循環させている状態でステップS507へ進み、シリンダブロック12の出口での水温TW2と、第4閾値TH4とを比較する。
 第4閾値TH4は、シリンダヘッド11の目標温度である第2閾値TH2よりも高く、かつ、シリンダブロック12への冷却水供給を開始させる第3閾値TH3よりも高い、シリンダブロック12の温度の目標値であり、例えば、100℃から110℃程度の値に設定される。
 つまり、シリンダヘッド11の目標温度は、プレイグニッションやノッキングの抑制を目的として設定されるのに対し、シリンダブロック12の目標温度はフリクション抑制を目的として設定され、シリンダヘッド11の目標温度よりもシリンダブロック12の目標温度を高くすることでフリクションの低減を促進させる。
 シリンダブロック12の出口での水温TW2が第4閾値TH4を下回る場合、電子制御装置100は、ステップS506に戻り、第3パターンに従った流量制御弁30及びウォータポンプ40の制御を継続させる。
 一方、シリンダブロック12の出口での水温TW2が、第4閾値TH4、つまり、シリンダブロック12の目標温度に達すると、電子制御装置100はステップS508へ進む。
 ステップS508で、電子制御装置100は、流量制御弁30のロータ目標角度を第4パターンに従って設定する。
 つまり、電子制御装置100は、第4入口ポート34を閉じた状態に保持し、第3入口ポート34の開口面積を上限値に保持し、第1入口ポート31の開口面積が第3パターンに引き続き増大し、また、第2入口ポート32の開口面積が上限値にまで開く角度位置を、ロータの目標角度に設定する。
 流量制御弁30のロータ角度を、第3パターンでの上限ロータ角度より増大させると、第4入口ポート34を閉じた状態に、また、第3入口ポート34の開口面積を上限値に保持した状態のまま、第2入口ポート32の開口面積が上限値にまで開き、第1入口ポート31の開口面積が第3パターンに引き続き増大する設定となっている。従って、電子制御装置100が、流量制御弁30の角度を変化させることで、第3パターンから第4パターンに直接切り替わる。
 係る第4パターンでは、図10に示すように、ラジエータ50を経由しての冷却水の循環は第1パターン、第2パターン及び第3パターンに引き続き行われないものの、変速機20、オイルウォーマー21への冷却水の供給が開始される結果、シリンダブロック12、ヒータコア91、オイルウォーマー21及びバイパスラインに冷却水が供給されることになる。
 そして、第2入口ポート32を開くことで、シリンダヘッド11を通過した冷却水が分流して第4冷却水配管74に流れ込み、オイルウォーマー21を経由して流量制御弁30に至り、再度ウォータポンプ40に吸引される経路を冷却水が循環するようになる。これにより、オイルウォーマー21において変速機20の作動油と冷却水との間での熱交換が行われ、変速機20の暖機が促進される。
 また、電子制御装置100は、第2入口ポート32を開く処理と共に、ウォータポンプ40の吐出量を第3パターンの場合よりも増やす処理を行い、第1冷却水配管71、第2冷却水配管72、第3冷却水配管73、第4冷却水配管74それぞれに十分な量の冷却水が供給されるようにする。
 図11は、上記の第4パターンで流量制御弁30を制御している状態でのオイルウォーマー21での冷却水温度、シリンダヘッド11の冷却水温度、及び、シリンダブロック12の冷却水温度の変化を示す。
 この図11に示すように、シリンダブロック12の冷却水温度が第4閾値TH4付近に達すると、第3パターンから第4パターンへの切り替えが行われる。そして、第4パターンでは、冷却水通路61に供給された冷却水の一部が、第3冷却水配管73に分流して流れ、オイルウォーマー21に循環されるようになるため、オイルウォーマー21での冷却水温度が増加する。
 図5には、第3パターンから第4パターンへの切り替えタイミングと、第4パターンでの冷却水の流量変化とを示してある。
 時刻t3でシリンダブロック12の温度が第4閾値TH4付近に達すると、電子制御装置100は、第3パターンから第4パターンに切り替え、第2入口ポート32を所定開度に開いてオイルウォーマー21への冷却水循環を開始させると共に、シリンダヘッド11の温度を第2閾値TH2付近に保持し、また、シリンダブロック12の温度を第4閾値TH4付近に保持するために、第1入口ポート31の開口面積を変化させ、また、ウォータポンプ40の吐出量を制御する。
 電子制御装置100は、ステップS508で第4パターンに従った流量制御弁30の制御を開始した後、ステップS509へ進み、シリンダブロック12の出口での水温TW2と第4閾値TH4との偏差ΔTC、及び、シリンダヘッド11の出口での水温TW1と第2閾値TH2との偏差ΔTBを演算する。
 次いで、電子制御装置100は、ステップS510へ進み、ステップS509で求めた温度偏差ΔTC、ΔTBに基づき、流量制御弁30の制御パターンの切り替え制御を実施する。
 つまり、電子制御装置100は、内燃機関10の負荷の増大によって、シリンダブロック12の出口での水温TW2及び/又はシリンダヘッド11の出口での水温TW1が目標値よりも所定以上に高くなると、流量制御弁30のロータ目標角度を第5パターンに従って設定し、負荷が小さくなると、第4パターンに戻す制御を行う。
 電子制御装置100は、第5パターンにおいて、第2入口ポート32及び第3入口ポート33の開口面積を上限値に保持し、第1入口ポート31の開口面積が第4パターンから引き続いて増大し、第4入口ポート34が全閉から開く角度位置を、ロータの目標角度に設定する。
 つまり、流量制御弁30のロータ角度を、第4パターンでの上限ロータ角度より増大させると、第2入口ポート32及び第3入口ポート33の開口面積を上限値に保持した状態のまま、第1入口ポート31の開口面積が第4パターンでの上限ロータ角度での面積から更に増大し、また、並行して第4入口ポート31が開いて徐々に開口面積を増大するとなっている。従って、電子制御装置100が、流量制御弁30の角度を変化させることで、第4パターンから第5パターンに直接切り替わる。
 第5パターンに従った目標角度の設定によって、図12に示すように、ラジエータ50を迂回して冷却水を循環させていた状態から、冷却水の一部がラジエータ50を介して循環されるようになり、ラジエータ50を通過する際に冷却水が放熱することで、内燃機関10を冷却する能力が上がり、内燃機関10が過熱することが抑制される。
 また、電子制御装置100は、第4入口ポート31の開口面積の増大に合わせて、ウォータポンプ40の吐出量を増大させる。
 なお、電子制御装置10は、第5パターンにおいて、シリンダブロック12の出口での水温TW2及びシリンダヘッド11の出口での水温TW1を共に目標温度付近に保持するように制御するが、高負荷状態では、シリンダヘッド11の温度上昇の抑制を優先させ、シリンダブロック12の温度が目標値を下回ることになる場合でも、シリンダヘッド11の温度が目標値を所定以上に上回る場合には、第4入口ポート34の開口面積の増大及びウォータポンプ40の吐出量の増大を実施する。
 これにより、内燃機関10の高負荷域でシリンダヘッド11の温度上昇を十分に抑え、プレイグニッションやノッキングを抑制できるから、プレイグニッションやノッキングを抑制するための点火時期の遅角補正量を低減でき、内燃機関10の出力性能の低下を抑制できる。
 図5には、第4パターンから第5パターンへの切り替えタイミングと、第5パターンでの冷却水の流量変化とを示してある。
 例えば、時刻t4にて、温度偏差ΔTC、ΔTBが所定値を超えるようになった場合、つまり、ラジエータ50を迂回した冷却水の循環では、シリンダヘッド11やシリンダブロック12の温度上昇を抑制できなくなると、電子制御装置10は、第4パターンから第5パターンに切り替え、ラジエータ50を経由した冷却水の循環を開始させ、第4入口ポート34の開口面積を、シリンダヘッド11やシリンダブロック12の温度上昇を抑制できる程度にまで増大させ、並行してウォータポンプ40の吐出量を増加させる。
 また、時刻t5は、シリンダブロック12の温度保持よりも、シリンダヘッド11の温度上昇の抑制を優先させるパターンへの切り替わりタイミングであり、電子制御装置10は、内燃機関10が高負荷運転されるようになると、第4入口ポート34の開口面積を更に増やし、かつ、ウォータポンプ40の吐出量を増加させて、シリンダヘッド11の温度上昇を抑制する。
 このとき、シリンダヘッド11に流れる冷却水が増大すると共に、シリンダブロック12に流れる冷却水も増大することで、シリンダブロック12の温度が目標値よりも低下する場合があるが、電子制御装置100は、シリンダヘッド11の温度上昇の抑制を優先させ、シリンダブロック12の温度が目標温度よりも下回っても、第4入口ポート34の開口面積やウォータポンプ40の吐出量を減らす処理は行わない。
 また、図13のフローチャートに示すルーチンは、電子制御装置100が実施する流量制御弁30の制御の一例として、アイドルリダクションにおける制御を例示する。
 図13のフローチャートに示すルーチンは、アイドルリダクションの指令信号に基づき、電子制御装置100により割り込み処理される。
 まず、電子制御装置100は、ステップS601で、アイドルリダクション制御、具体的には、内燃機関10への燃料供給を停止し、また、点火プラグによる点火動作を停止させる制御を行う。
 次いで、ステップS602で、電子制御装置100は、前述した第5パターンに従って流量制御弁30のロータ角度を制御することで、流量制御弁30の各入力ポート31-34を開き、冷却水の一部がラジエータ50を介して循環される状態に制御する。更に、電子制御装置100は、ウォータポンプ40の吐出量を、前述した第5パターンでの吐出量よりも多い、アイドルリダクション状態での目標値にまで増やす。
 次いで、電子制御装置100は、ステップS603に進み、シリンダヘッド11の出口での水温TW1が第5閾値TH5以下に低下したか否かを検出する。
 ここで、第5閾値TH5は、例えば、第2閾値TH2と同じか、第2閾値TH2を下回る温度とすることができる。
 シリンダヘッド11の出口での水温TW1が第5閾値TH5を上回る状態では、電子制御装置100は、ステップS602に戻って第5パターンに従って流量制御弁30を制御することで冷却水を循環させ、シリンダヘッド11の温度低下を図る。
 そして、シリンダヘッド11の出口での水温TW1が第5閾値TH5以下になると、電子制御装置100は、ステップS603からステップS604に進み、ウォータポンプ40を停止させるか、若しくは、第1パターンと同程度の吐出流量にまで低下させる。
 アイドルリダクションに伴って冷却水の循環を停止させると、シリンダヘッド11の温度が上昇し、内燃機関10を再始動させるときに、プレイグニッションやノッキングが発生し易くなる。
 これに対し、アイドルリダクションによって内燃機関10が停止した直後の所定期間において、電子制御装置100が、ラジエータ50を経由した冷却水の循環が行われるように流量制御弁30を制御しかつウォータポンプ40を駆動すれば、アイドルリダクション中にシリンダヘッド11の温度が上昇することを抑制できる。従って、アイドルリダクションからの内燃機関10の再始動状態で、プレイグニッションやノッキングが発生することを抑制し、良好な始動性を維持できる。
 図14は、アイドルリダクションを行うときのウォータポンプ40の吐出量、及び、シリンダヘッド11の温度の変化を示す。
 図14に示すように、時刻t6にてアイドルリダクションが開始され、内燃機関10の運転が停止すると、電子制御装置100は、第5パターンに従ってラジエータ50に冷却水を循環させる状態に流量制御弁30を制御し、かつ、ウォータポンプ40の吐出量を増大させる。
 そして、時刻t7にてシリンダヘッド11の出口水温TW1が第5閾値TH5以下になり、その後にシリンダヘッド11の温度が上昇変化することがない状態になれば、電子制御装置100は、ウォータポンプ40の吐出量を減らす。
 以上のように、本発明に係る冷却装置では、流量制御弁30の制御によってシリンダヘッド11にのみ冷却水を循環させることができ、かつ、電動ウォータポンプ40の制御によってシリンダヘッド11に供給する冷却水の流量を任意の流量に制御することができるため、シリンダヘッド11の早期暖機による燃費の改善効果を得ることができる。
 また、流量制御弁30の制御によって、シリンダヘッド11とシリンダブロック12とに供給される冷却水の流量割合を制御でき、また、電動ウォータポンプ40によって内燃機関10の低回転状態であっても、高い流量の冷却水を循環させることができる。
 従って、シリンダヘッド11及びシリンダブロック12の温度をそれぞれに異なる目標温度に制御することができ、シリンダヘッド11の温度をプレイグニッションやノッキングを抑制できる温度に抑えつつ、シリンダブロック12の温度を積極的に高くしてフリクションの低減を図ることができる。
 また、電動ウォータポンプ40により、内燃機関10の停止中でもシリンダヘッド11に冷却水を循環させることができるため、アイドルリダクション中におけるシリンダヘッド11の温度上昇を抑制して、再始動状態でのプレイグニッションやノッキングの発生を抑制できる。
 また、早期暖機させたシリンダヘッド11の通過した冷却水をヒータコア91などに供給できたため、ヒータを早期に稼働させることができる。
 また、内燃機関10の停止中でも電動ウォータポンプ40を駆動させて、シリンダヘッド11の通過した冷却水をヒータコア91などに供給し、ヒータを稼働させることが可能である。
 以上、好ましい実施形態を参照して本発明の内容を具体的に説明したが、本発明の基本的技術思想及び教示に基づいて、当業者であれば種々の変形態様を採り得ることは自明である。
 例えば、流量制御弁30は、ロータ式に限定されるものではなく、例えば、電気式アクチュエータによって弁体を直線運動させる構造の切替え弁を用いることができる。
 また、第4冷却水配管74に、ヒータコア91のみを配置する構成とすることができ、また、第4冷却水配管74に、ヒータコア91の他、EGRクーラ92、排気還流制御弁93、スロットルバルブ94のうちの1つ乃至2つを配置する構成とすることができる。
 また、シリンダブロック12の冷却水通路62とシリンダヘッド11の冷却水通路61とを内燃機関10内で接続する通路を設けずに、冷却水通路62の入口をシリンダブロック12に形成し、第7冷却水配管77を途中で2つに分岐させ、一方を冷却水通路61に接続させ、他方を冷却水通路62に接続させる配管構造とすることができる。
 また、ウォータポンプ40を内燃機関10で駆動される形式のものとすることができる。
 機関駆動式のウォータポンプ40を用いる場合、ウォータポンプ40の吐出量は、内燃機関10の回転速度に依存することになるものの、流量制御弁30によって流量分配を行えることで、シリンダヘッド11の早期暖機、ヒータの早期稼働を実現できる他、シリンダヘッド11及びシリンダブロック12をそれぞれに異なる温度に制御することが可能である。
 また、第1冷却液ライン-第4冷却液ラインのうちの第3冷却液ラインと第4冷却液ラインとのいずれか一方若しくは双方を省略した冷却装置とすることができる。
 また、第2冷却液ラインにオイルクーラー16が配置されない構造とすることができる。
 また、バイパスラインに補助の電動式ウォータポンプを配置した構成とすることができる。また、内燃機関10で駆動される機関駆動式のウォータポンプを電動式のウォータポンプ40と並列に備える構成とすることができる。
 10…内燃機関、11…シリンダヘッド、12…シリンダブロック、16…オイルクーラー、20…変速機(動力伝達装置)、21…オイルウォーマー、30…流量制御弁、31-34…入口ポート、35…出口ポート、40…ウォータポンプ、50…ラジエータ、61…ヘッド側冷却水通路、62…ブロック側冷却水通路、71…第1冷却水配管、72…第2冷却水配管、73…第3冷却水配管、74…第4冷却水配管、75…第5冷却水配管、76…第6冷却水配管、77…第7冷却水配管、78…第8冷却水配管、81…第1温度センサ、82…第2温度センサ、91…ヒータコア、92…EGRクーラ、93…排気還流制御弁、94…スロットルバルブ、100…電子制御装置

Claims (17)

  1.  内燃機関に冷却液を循環させるウォータポンプと、
     前記内燃機関のシリンダヘッド及びラジエータを経由する第1冷却液ラインと、
     前記内燃機関のシリンダブロックを経由し前記ラジエータを迂回する第2冷却液ラインと、
     前記第1冷却液ライン及び前記第2冷却液ラインがそれぞれ流入側に接続され、流出側が前記ウォータポンプの吸引側に接続される電動式の流量制御弁と、
     前記シリンダヘッドと前記ラジエータとの間の前記第1冷却液ラインから分岐し、前記ラジエータを迂回して前記流量制御弁の流出側に合流するバイパスラインと、
     を含む、内燃機関の冷却装置。
  2.  前記シリンダヘッド及びヒータコアを経由し前記ラジエータを迂回する第3冷却液ラインを更に含み、
     前記流量制御弁の流入側に、前記第1冷却液ライン、前記第2冷却液ライン及び前記第3冷却液ラインが接続される、
     請求項1記載の内燃機関の冷却装置。
  3.  前記シリンダヘッド及び前記内燃機関の動力伝達装置を経由し前記ラジエータを迂回する第4冷却液ラインを更に含み、
     前記流量制御弁の流入側に、前記第1冷却液ライン、前記第2冷却液ライン、前記第3冷却液ライン及び前記第4冷却液ラインが接続される、
     請求項2記載の内燃機関の冷却装置。
  4.  前記流量制御弁は、流入側に接続される複数の冷却液ラインの全てを閉じる位置と、前記第2冷却液ラインを開いて他の冷却液ラインを閉じる位置と、流入側に接続される複数の冷却液ラインの全てを開く位置とを有する、請求項1記載の内燃機関の冷却装置。
  5.  前記流量制御弁は、流入側に接続される複数の冷却液ラインの全てを閉じる位置と、前記第3冷却液ラインを開いて他の冷却液ラインを閉じる位置と、前記第3冷却液ライン及び前記第2冷却液ラインを開いて他の冷却液ラインを閉じる位置と、流入側に接続される複数の冷却液ラインの全てを開く位置とを有する、請求項2記載の内燃機関の冷却装置。
  6.  前記流量制御弁は、前記第1冷却液ライン-第4冷却液ラインの全てを閉じる第1位置と、前記第3冷却液ラインを開いて前記第1冷却液ライン、前記第2冷却液ライン及び前記第4冷却液ラインを閉じる第2位置と、前記第2冷却液ライン及び前記第3冷却液ラインを開いて前記第1冷却液ライン及び前記第4冷却液ラインを閉じる第3位置と、前記第2冷却液ライン、前記第3冷却液ライン及び前記第4冷却液ラインを開いて前記第1冷却液ラインを閉じる第4位置と、前記第1冷却液ライン-前記第4冷却液ラインの全てを開く第5位置とを有する、請求項3記載の内燃機関の冷却装置。
  7.  前記流量制御弁を制御する制御ユニットを更に含み、
     前記制御ユニットは、前記流量制御弁の位置を、前記内燃機関の暖機の進行に伴って前記第1位置、前記第2位置、前記第3位置、前記第4位置の順に変更する、
     請求項6記載の内燃機関の冷却装置。
  8.  前記シリンダヘッドの出口での冷却液の温度を検出する第1温度センサと、
     前記シリンダブロックの出口での冷却液の温度を検出する第2温度センサと、
     を更に含む、請求項1記載の内燃機関の冷却装置。
  9.  前記シリンダヘッドに設けた第1冷却水通路と、前記第1冷却水通路から分岐して前記シリンダブロック内に延設される第2冷却水通路とを更に含む、請求項1記載の内燃機関の冷却装置。
  10.  前記ウォータポンプは電動ウォータポンプである、請求項1記載の内燃機関の冷却装置。
  11.  前記流量制御弁を制御する制御ユニットを更に含み、
     前記制御ユニットは、前記シリンダヘッドの出口での冷却液の温度が所定温度を下回るときに、前記流量制御弁の流入側に接続する全ラインを閉じる位置に前記流量制御弁を制御する、請求項1記載の内燃機関の冷却装置。
  12.  前記流量制御弁を制御する制御ユニットを更に含み、
     前記制御ユニットは、前記シリンダヘッドの出口での冷却液の温度が所定温度に達した後に、前記流量制御弁を制御して前記第3冷却液ラインに冷却液を供給する、
     請求項2記載の内燃機関の冷却装置。
  13.  前記流量制御弁を制御する制御ユニットを更に含み、
     前記制御ユニットは、前記シリンダブロックの出口での冷却液の温度が所定温度に達した後に、前記流量制御弁を制御して前記第2冷却液ラインに冷却液を供給する、
     請求項1記載の内燃機関の冷却装置。
  14.  前記流量制御弁を制御する制御ユニットを更に含み、
     前記制御ユニットは、前記シリンダヘッドの出口での冷却液の温度が第1温度になり、前記シリンダブロックの出口での冷却液の温度が前記第1温度よりも高い第2温度になるように前記流量制御弁を制御する、
     請求項1記載の内燃機関の冷却装置。
  15.  前記ウォータポンプは電動ウォータポンプであり、
     前記電動ウォータポンプを制御する制御ユニットを更に含み、
     前記制御ユニットは、前記シリンダヘッドの出口での冷却液の温度の上昇に応じて前記電動ウォータポンプの吐出流量を増大させる、
     請求項1記載の内燃機関の冷却装置。
  16.  前記ウォータポンプは電動ウォータポンプであり、
     前記電動ウォータポンプ及び前記流量制御弁を制御する制御ユニットを更に含み、
     前記制御ユニットは、前記内燃機関が一時的に停止したときに、前記第1冷却液ラインに冷却液が供給されるように前記流量制御弁を制御し、前記電動ウォータポンプの吐出流量を増大させる、請求項1記載の内燃機関の冷却装置。
  17.  内燃機関に冷却液を循環させるウォータポンプと、
     前記内燃機関のシリンダヘッド及びラジエータを経由する第1冷却液ラインと、
     前記内燃機関のシリンダブロックを経由し前記ラジエータを迂回する第2冷却液ラインと、
     前記第1冷却液ライン及び前記第2冷却液ラインがそれぞれ流入側に接続され、流出側が前記ウォータポンプの吸引側に接続される電動式の流量制御弁と、
     前記シリンダヘッドと前記ラジエータとの間の前記第1冷却液ラインから分岐し、前記ラジエータを迂回して前記流量制御弁の流出側に合流するバイパスラインと、
     を含む冷却装置の制御方法であって、
     前記シリンダヘッドの出口での冷却液の温度を検出するステップと、
     前記シリンダブロックの出口での冷却液の温度を検出するステップと、
     前記シリンダヘッドの出口での冷却液の温度及び前記シリンダブロックの出口での冷却液の温度に基づいて前記流量制御弁を制御するステップと、
     を含む、内燃機関の冷却装置の制御方法。
PCT/JP2014/074704 2014-03-12 2014-09-18 内燃機関の冷却装置及び冷却装置の制御方法 WO2015136747A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US15/125,336 US9726068B2 (en) 2014-03-12 2014-09-18 Cooling device for internal combustion engine and control method for cooling device
DE112014006448.3T DE112014006448B4 (de) 2014-03-12 2014-09-18 Kühlvorrichtung für einen Verbrennungsmotor mit getrennter Temperatursteuerung des Zylinderkopfs und des Zylinderblocks
CN201480077024.5A CN106103931B (zh) 2014-03-12 2014-09-18 内燃机的冷却装置以及冷却装置的控制方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2014-048707 2014-03-12
JP2014048707A JP6272094B2 (ja) 2014-03-12 2014-03-12 内燃機関の冷却装置

Publications (1)

Publication Number Publication Date
WO2015136747A1 true WO2015136747A1 (ja) 2015-09-17

Family

ID=54071215

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2014/074704 WO2015136747A1 (ja) 2014-03-12 2014-09-18 内燃機関の冷却装置及び冷却装置の制御方法

Country Status (5)

Country Link
US (1) US9726068B2 (ja)
JP (1) JP6272094B2 (ja)
CN (1) CN106103931B (ja)
DE (1) DE112014006448B4 (ja)
WO (1) WO2015136747A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108138641A (zh) * 2016-01-06 2018-06-08 日立汽车系统株式会社 车辆用内燃机的冷却装置以及控制方法

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2535159A (en) * 2015-02-09 2016-08-17 Gm Global Tech Operations Llc Method of controlling a cooling circuit of an internal combustion engine
JP6417315B2 (ja) 2015-12-17 2018-11-07 日立オートモティブシステムズ株式会社 車両用内燃機関の冷却装置
KR101807046B1 (ko) * 2016-04-01 2017-12-08 현대자동차 주식회사 냉각수온 센서를 구비한 엔진 냉각시스템
US10161501B2 (en) * 2016-04-25 2018-12-25 GM Global Technology Operations LLC System and method for adjusting coolant flow through a cooling system of a vehicle to increase a warming rate of a transmission
JP6473105B2 (ja) * 2016-06-16 2019-02-20 日立オートモティブシステムズ株式会社 車両用内燃機関の冷却装置及び冷却装置の制御方法
JP6544376B2 (ja) * 2017-03-28 2019-07-17 トヨタ自動車株式会社 内燃機関の冷却装置
JP6583333B2 (ja) * 2017-03-28 2019-10-02 トヨタ自動車株式会社 内燃機関の冷却装置
US20190032539A1 (en) * 2017-07-25 2019-01-31 GM Global Technology Operations LLC Controlling the flow of a coolant fluid through a cooling system of an internal combustion engine
US10508587B2 (en) * 2017-07-28 2019-12-17 GM Global Technology Operations LLC Controlling coolant fluid in a vehicle cooling system using a secondary coolant pump
KR102359946B1 (ko) * 2017-09-08 2022-02-07 현대자동차 주식회사 냉각수 제어밸브 유닛의 제어방법
KR102398887B1 (ko) * 2017-10-25 2022-05-18 현대자동차주식회사 차량용 냉각시스템의 제어방법
KR102487183B1 (ko) * 2017-12-20 2023-01-10 현대자동차 주식회사 차량용 냉각 시스템
JP7100483B2 (ja) 2018-04-19 2022-07-13 日立Astemo株式会社 内燃機関の燃料噴射制御装置及び燃料噴射制御方法
US11078825B2 (en) * 2019-10-01 2021-08-03 GM Global Technology Operations LLC Method and apparatus for control of propulsion system warmup based on engine wall temperature

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003293767A (ja) * 2002-04-02 2003-10-15 Yamaha Motor Co Ltd エンジンの冷却装置
JP2009068363A (ja) * 2007-09-11 2009-04-02 Nissan Motor Co Ltd 火花点火式内燃機関
JP2012184693A (ja) * 2011-03-04 2012-09-27 Toyota Motor Corp 内燃機関の冷却装置
JP2013238189A (ja) * 2012-05-16 2013-11-28 Aisin Seiki Co Ltd エンジン冷却装置
JP2014145326A (ja) * 2013-01-30 2014-08-14 Daihatsu Motor Co Ltd 内燃機関
WO2014129145A1 (ja) * 2013-02-21 2014-08-28 マツダ株式会社 多気筒エンジンの冷却装置

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3134371A (en) * 1962-10-29 1964-05-26 Cooper Bessemer Corp Cooling system for internal combustion engines
US4317439A (en) * 1979-08-24 1982-03-02 The Garrett Corporation Cooling system
JP4196802B2 (ja) 2003-10-07 2008-12-17 株式会社デンソー 冷却水回路
US7128025B1 (en) * 2003-10-24 2006-10-31 Brp Us Inc. Dual temperature closed loop cooling system
JP2006161745A (ja) * 2004-12-09 2006-06-22 Toyota Motor Corp 車両の制御装置
CN101055137A (zh) * 2006-04-11 2007-10-17 何君 一种以内燃机废气能量驱动为主的混合制冷空调系统
US7717069B2 (en) * 2007-11-15 2010-05-18 Caterpillar Inc. Engine cooling system having two cooling circuits
JP5505331B2 (ja) 2011-02-23 2014-05-28 株式会社デンソー 内燃機関冷却システム
JP5694021B2 (ja) * 2011-03-18 2015-04-01 日立オートモティブシステムズ株式会社 内燃機関の冷却制御装置
JP5919031B2 (ja) * 2012-02-28 2016-05-18 株式会社ミクニ 冷却水制御バルブ装置
JP6051989B2 (ja) * 2013-03-21 2016-12-27 マツダ株式会社 エンジンの冷却装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003293767A (ja) * 2002-04-02 2003-10-15 Yamaha Motor Co Ltd エンジンの冷却装置
JP2009068363A (ja) * 2007-09-11 2009-04-02 Nissan Motor Co Ltd 火花点火式内燃機関
JP2012184693A (ja) * 2011-03-04 2012-09-27 Toyota Motor Corp 内燃機関の冷却装置
JP2013238189A (ja) * 2012-05-16 2013-11-28 Aisin Seiki Co Ltd エンジン冷却装置
JP2014145326A (ja) * 2013-01-30 2014-08-14 Daihatsu Motor Co Ltd 内燃機関
WO2014129145A1 (ja) * 2013-02-21 2014-08-28 マツダ株式会社 多気筒エンジンの冷却装置

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108138641A (zh) * 2016-01-06 2018-06-08 日立汽车系统株式会社 车辆用内燃机的冷却装置以及控制方法
CN108138641B (zh) * 2016-01-06 2020-08-25 日立汽车系统株式会社 车辆用内燃机的冷却装置、其所使用的控制装置及流量控制阀、控制方法

Also Published As

Publication number Publication date
DE112014006448B4 (de) 2017-11-16
JP2015172355A (ja) 2015-10-01
DE112014006448T5 (de) 2016-12-01
CN106103931A (zh) 2016-11-09
JP6272094B2 (ja) 2018-01-31
US20170107891A1 (en) 2017-04-20
CN106103931B (zh) 2018-08-03
US9726068B2 (en) 2017-08-08

Similar Documents

Publication Publication Date Title
WO2015136747A1 (ja) 内燃機関の冷却装置及び冷却装置の制御方法
JP6266393B2 (ja) 内燃機関の冷却装置
JP6378055B2 (ja) 内燃機関の冷却制御装置
JP6417315B2 (ja) 車両用内燃機関の冷却装置
RU2628682C2 (ru) Система двигателя для транспортного средства
JP6473105B2 (ja) 車両用内燃機関の冷却装置及び冷却装置の制御方法
JP5993759B2 (ja) エンジンの吸気冷却装置
JP6306529B2 (ja) 車両用内燃機関の冷却装置及び制御方法
JP6265171B2 (ja) 車両の熱交換装置
JP6096492B2 (ja) エンジンの冷却装置
JP2015110919A (ja) エンジンの冷却装置及び冷却方法
JP2014009617A (ja) 内燃機関の冷却装置
WO2016043229A1 (ja) 冷却システムの制御装置及び冷却システムの制御方法
JP2005016364A (ja) エンジンの冷却装置
JP6518757B2 (ja) 内燃機関の冷却装置
JP2012184754A (ja) 冷却装置
JP2016056760A (ja) エンジン冷却装置
JP2013124546A (ja) 車両の冷却装置
JP2020090903A (ja) 内燃機関の制御装置
JP2017122397A (ja) 車両用内燃機関の冷却装置及び自動変速機の作動液の温度制御方法
JP2015101960A (ja) 内燃機関の冷却装置
JP2013007274A (ja) エンジン冷却システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14885388

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 15125336

Country of ref document: US

Ref document number: 112014006448

Country of ref document: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14885388

Country of ref document: EP

Kind code of ref document: A1