WO2015072408A1 - ワイヤハーネス生産システム及びワイヤハーネス生産方法 - Google Patents

ワイヤハーネス生産システム及びワイヤハーネス生産方法 Download PDF

Info

Publication number
WO2015072408A1
WO2015072408A1 PCT/JP2014/079570 JP2014079570W WO2015072408A1 WO 2015072408 A1 WO2015072408 A1 WO 2015072408A1 JP 2014079570 W JP2014079570 W JP 2014079570W WO 2015072408 A1 WO2015072408 A1 WO 2015072408A1
Authority
WO
WIPO (PCT)
Prior art keywords
terminal
electric wire
wire
production
electric
Prior art date
Application number
PCT/JP2014/079570
Other languages
English (en)
French (fr)
Inventor
明行 平田
中原 光一
Original Assignee
矢崎総業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 矢崎総業株式会社 filed Critical 矢崎総業株式会社
Priority to DE112014005159.4T priority Critical patent/DE112014005159T5/de
Priority to CN201480058618.1A priority patent/CN105684104B/zh
Publication of WO2015072408A1 publication Critical patent/WO2015072408A1/ja
Priority to US15/134,522 priority patent/US10148055B2/en

Links

Images

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01RELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
    • H01R43/00Apparatus or processes specially adapted for manufacturing, assembling, maintaining, or repairing of line connectors or current collectors or for joining electric conductors
    • H01R43/28Apparatus or processes specially adapted for manufacturing, assembling, maintaining, or repairing of line connectors or current collectors or for joining electric conductors for wire processing before connecting to contact members, not provided for in groups H01R43/02 - H01R43/26
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01RELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
    • H01R43/00Apparatus or processes specially adapted for manufacturing, assembling, maintaining, or repairing of line connectors or current collectors or for joining electric conductors
    • H01R43/04Apparatus or processes specially adapted for manufacturing, assembling, maintaining, or repairing of line connectors or current collectors or for joining electric conductors for forming connections by deformation, e.g. crimping tool
    • H01R43/048Crimping apparatus or processes
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/49002Electrical device making
    • Y10T29/49117Conductor or circuit manufacturing
    • Y10T29/49174Assembling terminal to elongated conductor

Definitions

  • the present invention produces a wire harness production system [wire harness production system] and wire harness production in which a terminal-fitted electric wire is produced and a terminal metal fitting [metal terminal] is inserted into a connector housing. Concerning the method [wire harness production method].
  • a large number of electric wires are used in automobiles (moving bodies). These many electric wires constitute a wire harness. Cars are equipped with various electronic devices that enable basic performance (that is, performance of running, turning, and stopping), safety, convenience, and comfort. These various electronic devices are operated by power from the battery and control signals, and the power and signals are transmitted by the wire harness. Various types of wires (length, thickness, insulator material) are required for the wire harness depending on the type of device, current value, wiring position, and the like.
  • the conventional wire harness production system consists of a sub-harness production line for producing intermediate products such as sub-harnesses, and wiring harnesses from sub-harnesses and exterior components [outer components].
  • Wire harness assembly line [wire ⁇ ⁇ ⁇ harness assembly line].
  • the electric wire reel 101 includes a reel and an electric wire wound around the reel.
  • an electric wire of 0.5 sq (or 0.3 sq or 0.8 sq) may be wound.
  • One electric wire drawn out from the electric wire reel 101 is supplied to the coloring unit 102 (the electric wire reel 101 is configured to be able to supply electric wires).
  • the coating of the electric wire supplied from the electric wire reel 101 is colored in a coloring unit [coloring unit] 102.
  • the colored wires are supplied to a cutting / crimping unit 103.
  • the cutting / crimping unit 103 includes a measuring / cutting device [measuring and cutting device] 104, an A-end crimping device [A-end crimping device] 105, a B-end crimping device [B-end crimping device] 106, Consists of.
  • the measuring / cutting device 104 measures the length of the electric wire and cuts the electric wire to a predetermined length based on the measured value.
  • the cut electric wire is called a scale cut electric wire.
  • the production line 111 includes a process using automated machines.
  • terminal fitting of the electric wire with terminal 109 is inserted into the cavity of the connector housing (terminal insertion step 110).
  • the terminal fittings of the number of electric wires with terminals 109 required for the sub-harness are inserted into the cavities. That is, the terminal-attached electric wires 109 are sequentially supplied from the previous process, and the terminal fittings are sequentially inserted. Inserted manually by terminal fitting. When the insertion of the required number of terminal fittings is completed, one sub-harness is completed.
  • This production line 112 is a manual process by an operator.
  • the sub-harness produced in the above-described sub-harness production line is assembled on a wiring board [wiring board], bundled with tape [bundled], and external parts are attached.
  • an object of the present invention is to provide a wire harness production system and a wire harness production method capable of eliminating a difference in production capacity on a production line and smoothly performing continuous production.
  • a first feature of the present invention is a wire harness production system in which post-processing using the produced terminal-attached electric wires is performed after sequentially producing electric wires with terminals necessary for the production of wire harnesses.
  • Wire sequential production for sequentially producing the electric wires with terminals, and a temporary management unit for temporarily storing the electric wires with terminals produced by the electric wire sequential production unit before being supplied to the post-processing.
  • the electric wire sequential production section cuts the electric wire or the terminal-attached electric wire with a coloring unit with a colorant, and cuts the electric wire by a predetermined length, and at the end of the cut electric wire.
  • the continuous production can be smoothly performed by absorbing the difference in production capacity between the electric wire sequential production section and the post-processing by the temporary management section.
  • provision of a temporary management unit can prevent a worker from waiting and a reduction in system operation rate.
  • the post-processing is performed at a terminal insertion portion that inserts the terminal fitting of the terminal-attached electric wire into the connector housing.
  • the temporary storage management section effectively absorbs the difference between the production capacity of the electric wire sequential production section that is generally performed by an automatic machine and the production capacity of the terminal insertion section that is generally performed manually. Can do.
  • the temporary placement management unit includes at least the temporary placement units equal to or more than the number of the electric wires with terminals necessary for one sub-harness.
  • a second feature of the present invention is a wire harness production method in which after the electric wires with terminals necessary for the production of the wire harness are sequentially produced, the post-treatment using the produced electric wires with the terminals is performed.
  • a wire sequential production step for sequentially producing the terminal-attached wire; and a temporary storage management step for temporarily storing the wire with the terminal produced by the wire sequential production unit before supplying it to the post-processing.
  • the wire sequential production step includes a step of coloring a coating of the wire or the terminal-attached wire with a colorant; the wire is cut at a predetermined length; and the terminal is attached to an end of the cut wire.
  • the continuous production can be smoothly performed by absorbing the difference in production capacity between the electric wire sequential production process and the post-processing process by the temporary control process.
  • the temporary control process it is possible to prevent an operator from waiting and a reduction in system operation rate.
  • the post-processing is a terminal insertion step of inserting the terminal fitting of the electric wire with terminal into the connector housing.
  • the temporary management unit effectively absorbs the difference between the production capacity in the wire sequential production process generally performed by an automatic machine and the production capacity in the terminal insertion process generally performed manually. Can do.
  • FIG. 1 It is a block diagram (process drawing) of the subharness production line in embodiment of a wire harness production system (wire harness production method).
  • A) is a perspective view which shows an example of a temporary placement management part
  • (b) is a perspective view which shows an example of the operation
  • FIG. 1 It is a block diagram (process drawing) of the subharness production line of a prior art example.
  • the wire harness production system of the present embodiment is a sub-harness production line 1 for producing an intermediate product such as a sub-harness, and a wire harness is assembled from a sub-harness or an exterior part. Wire harness assembly line.
  • the sub-harness production line 1 since the sub-harness production line 1 is characterized, the configuration and processes of the sub-harness production line 1 will be described in detail below.
  • the sub-harness production line 1 includes an electric wire sequential production section (process) [electric wire sequential production portion (process)] 2, a terminal insertion portion (process) [terminal insertion portion (process)] 3, and these electric wire sequential production department 2 And a temporary management unit (process) [temporarily-storing handling portion (process)] 4 installed between the terminal insertion portions 3.
  • process electric wire sequential production section
  • process terminal insertion portion
  • process temporary management unit
  • process temporary management unit
  • the electric wire sequential production section 2 a process of automatically and sequentially producing the electric wires with terminals 5 necessary for the production of the wire harness (electric wire sequential production process) is performed.
  • the temporary placement management step 4 a step of temporarily placing the terminal-attached electric wire 5 (temporary placement management step) is performed.
  • the process which inserts the terminal metal fittings 6 and 7 which comprise the electric wire 5 with a terminal into the connector housing 8 (refer FIG. 2) is performed.
  • the terminal insertion process performed in the terminal insertion part 3 is a post-process [post
  • the electric wire sequential production section (process) 2 is controlled by a computer (not shown) and operated by a control mechanism (not shown).
  • the control part by a computer is comprised so that the whole electric wire sequential production part 2 can be collectively controlled (it may be controlled for every structure).
  • the control unit includes a known CPU, RAM, ROM, and the like.
  • the electric wire sequential production unit 2 includes an electric wire reel 9, a coloring unit 10, and a cutting / crimping unit 11. Although the three units 9 to 11 will be described here, the number of units in the electric wire sequential production process 2 is not limited as long as it is configured by a continuous automatic machine.
  • the electric wire reel 9 has a cylindrical reel body and a pair of flanges at both ends of the reel body.
  • An electric wire of 0.5 sq (may be 0.3 sq or 0.8 sq) is wound around the reel body.
  • the electric wire is composed of a conductor [conductor] and a sheath [sheath] (insulator).
  • Conductor conductive
  • the coating has an insulating property.
  • the coating is formed by extruding molten resin on the outer surface of the conductor.
  • a white colorant is mixed in the coating resin, and the coating is white.
  • the coating is natural without the colorant being mixed. In this embodiment, the color of the coating is white, but it may be natural or other colors.
  • the wire reel 9 includes a reel support portion [reel support portion] that rotatably supports the reel body, and an electric wire guide portion [electric wire guide portion] for guiding the wire drawn from the wire reel 9 to the coloring unit 10. And a drawing mechanism [drawing mechanism] (a driving mechanism [drive mechanism]) for pulling out the electric wire from the electric wire reel 9.
  • a drawing mechanism (a driving mechanism [drive mechanism]) for pulling out the electric wire from the electric wire reel 9.
  • One electric wire drawn out from the electric wire reel 9 is supplied to the coloring unit 10 through the electric wire guide.
  • the drawing mechanism may be provided in the coloring unit 10 or may be provided on a later process side than the coloring unit 10.
  • the coloring unit 10 is configured to give a predetermined coloring to the coating of the electric wire supplied from the electric wire reel 9.
  • colored dots or colored marks may be added (marked).
  • the coloring unit 10 adds a color band (see a colored portion [26] described later) in the circumferential direction of the coating.
  • Coloring means coloring the outer surface of the coating with a colorant.
  • the colorant is a liquid material in which a coloring material [industrial organic material] is dissolved or dispersed in water or other solvent.
  • organic substances include dyes and pigments (mostly organic substances and synthetic substances), and sometimes dyes are used as pigments or pigments are used as dyes. More specifically, the colorant is a coloring liquid or paint.
  • the coloring liquid is made by dissolving or dispersing a dye in a solvent.
  • the paint is made by dispersing a pigment in a dispersion. Therefore, when the outer surface of the coating is colored with the coloring liquid, the dye soaks into the coating. When the outer surface of the coating is colored with paint, the pigment adheres to the outer surface without penetrating into the coating. That is, “coloring” here means dyeing the outer surface of the coating with a dye and applying a pigment to the outer surface of the coating.
  • the dye penetrates reliably into the coating and the pigment adheres securely to the outer surface of the coating.
  • the cutting / crimping unit 11 includes a plurality of devices, specifically, a measuring / cutting device 12, an A-end side crimping device 13, and a B-end side crimping device 14.
  • the measuring / cutting device 12 measures the length of the electric wire colored by the coloring unit 10 and cuts the electric wire by a predetermined length based on the measured value. Specifically, a measuring portion for measuring the length of the electric wire and a wire cutting portion for cutting the electric wire by a predetermined length based on the measurement of the measuring portion. An electric wire cut at a predetermined length based on the measurement of the measuring portion is referred to as a measured-and-cut electric wire 15.
  • the A end side crimping device 13 crimps the terminal fitting 6 to the A end (tip in the moving direction) of the electric wire before or after cutting the electric wire with the predetermined length described above (not limited to the crimping, for example, terminal)
  • the metal fitting 6 may be pressure welded or welded. In these cases, “crimping” is read as “pressure welding” or “welding”).
  • the A-end side crimping device 13 includes a sheath removing portion that removes the sheath at the A end of the electric wire to expose the conductor, and a terminal attachment portion that attaches the terminal fitting 6 to the conductor exposed by the sheath removing portion. Become.
  • the terminal fitting 6 is supplied from a terminal reel 16.
  • the B end side crimping device 14 crimps the terminal fitting 7 to the B end (opposite side of the A end: rear end in the moving direction) after cutting and separating the measuring wire 15 (not limited to crimping). Specifically, the B-end side crimping device 14, similarly to the A-end side crimping device 13, removes the coating of the B end of the electric wire and exposes the conductor portion, and the conductor exposed by the coating removal portion. It consists of the terminal attachment part which attaches the terminal metal fitting 7. FIG. The terminal fitting 7 is supplied from a terminal reel 17.
  • the electric wire 5 with a terminal consists of a scale cut electric wire 15 and terminal fittings 6 and 7 attached to both ends thereof. Colored portions 26 colored by the coloring unit 10 are formed at both ends of the electric wire 5 with a terminal.
  • the coloring part 26 is a color band formed in the circumferential direction.
  • the temporary placement management unit 4 includes a temporary placement unit 18.
  • the terminal-attached electric wire 5 produced by the electric wire sequential production unit 2 is temporarily stored before being supplied to the terminal insertion step 3.
  • the temporary placement unit 18 stores the terminal-attached wires 5 in the order of production by the wire sequential production unit 2.
  • the temporary placement management part 4 is provided with the temporary placement part 18 of the number of the electric wires 5 with a terminal required for production of one subharness.
  • the temporary placement management part 4 may be provided with the temporary placement parts 18 of the number of the electric wires 5 with a terminal required for the production of a plurality of sub-harnesses. If the electric wire 5 with a terminal is stored in the temporary placement part 18 in the production order of the sub harness, the electric wire 5 with a terminal can be easily managed.
  • the temporary placement portion 18 shown in FIG. 2A is configured by a known electric wire holding rod 19.
  • the wire holding rod 19 includes a number of wire clips 20 arranged in the longitudinal direction and a clip base 21 that holds the wire clips 20.
  • Each electric wire clip 20 is composed of a pair of pinching elements [pinching ⁇ elements], and an electric wire holding part [electric wire storing portion] for holding the measuring wire 15 of the electric wire 5 with a terminal is formed between the pair of pinching elements.
  • a taper portion for guiding the electric wire is formed at the tip of each sandwiching element. The taper part is inclined toward the electric wire holding part. All the electric wire clips 20 have the same size and the same shape.
  • Several tens of the electric wire clips 20 are provided on one electric wire holding rod 19.
  • the numbers (1) to (4) in FIGS. 1 and 2 indicate the production order in the electric wire sequential production section 2.
  • FIG. 3 shows another example of the temporary placement section.
  • the temporary placement unit 22 shown in FIG. 3 is formed as five gutters.
  • FIG. 4 shows still another example of the temporary placement unit.
  • the temporary placement section 24 shown in FIG. 4 is provided on the conveyor 23.
  • the numbers (1) to (5) in FIGS. 3 and 4 indicate the production order in the electric wire sequential production section 2.
  • the terminal insertion portion 3 includes a supply portion of the connector housing 8 and a work table.
  • the connector housing 8 is held by hand, but the connector housing 8 may be held by a dedicated jig.
  • the insertion of the terminal fitting 6 (7) is performed on the number of the electric wires 5 with a terminal necessary for the production of the sub-harness. That is, the terminal-attached electric wires 5 are picked up sequentially from the temporary placement portion 18, and the terminal fittings 6 (7) are sequentially inserted into the cavities 25 of the connector housing 8. The terminal fitting 6 (7) is manually inserted. When the necessary number of terminal fittings 6 (7) have been inserted, one sub-harness is completed.
  • the sub-harness refers to a state in which the required number of terminal fittings 6 (7) of the electric wires with terminals 5 are all inserted into the connector housing 8 or in a jointed state. In other words, the sub-harness does not have the terminal fitting 6 (7) left exposed.
  • the terminal insertion process is not affected by the production status in the wire sequential production process. This is because a temporary management process is provided as the immediately preceding process. Specifically, the terminal-attached electric wire 5 required in the terminal insertion process 3 is temporarily stored in the temporary placement unit 18 of the temporary placement management process 4.
  • the sub harness is continuously produced by the sub harness production line 1 related to the wire harness production system (method).
  • the sub-harness production line 1 includes the temporary placement management unit (process) 4, between the electric wire sequential production unit (process) 2 by the automatic machine and the manual terminal insertion unit (process) 3.
  • the difference in production capacity can be absorbed. Therefore, continuous production is performed smoothly.
  • a temporary placement management unit (process) 4 is provided between the electric wire sequential production unit (process) 2 and the terminal insertion unit (process) 3, it prevents the occurrence of waiting for workers and a decrease in the operating rate of the system. You can also
  • the terminal-attached wires 5 necessary for the plurality of sub-harnesses are stored in the temporary placement unit 18 in advance, so that the operator can wait at the terminal insertion unit (process) 3. Can be prevented.

Abstract

 ワイヤハーネス生産システムでは、ワイヤハーネスの生産に必要な端子付き電線が順次生産された後、生産された前記端子付き電線を用いた後処理が行われる。前記システムは、電線から前記端子付き電線を順次生産する電線順次生産と、前記電線順次生産部によって生産された前記端子付き電線を、前記後処理に供給される前に一時的に保管する仮置管理部とを備えている。前記電線順次生産部が、前記電線又は前記端子付き電線の被覆を着色をする着色ユニットと、前記電線を所定長さで切断してその端部に前記端子金具を取り付けて前記端子付き電線を生産する切断・圧着ユニットとを含む。前記仮置管理部が、前記端子付き電線を前記端子挿入部へ流す前に、生産された順番で一時的に保管する複数の仮置部を含む。上記システムによれば、生産ライン上での生産能力の差を解消して円滑に連続生産を行える。

Description

ワイヤハーネス生産システム及びワイヤハーネス生産方法
 本発明は、端子付き電線[terminal-fitted electric wire]を生産すると共に、端子付き電線の端子金具[metal terminal]をコネクタハウジングに挿入する、ワイヤハーネス生産システム[wire harness production system]及びワイヤハーネス生産方法[wire harness production method]に関する。
 自動車(移動体)では、多数の電線が使用される。この多数の電線は、ワイヤハーネスを構成する。自動車には、基本性能(即ち、走る・曲がる・止まる性能)や、安全性、利便性、快適性を可能にする様々な電子機器が搭載される。これら様々な電子機器は、バッテリーからの電力と制御信号によって動作し、電力と信号は、ワイヤハーネスによって伝送される。ワイヤハーネスには、機器の種類、電流値、配索位置などに応じて、様々な種類(長さ、太さ、絶縁体材料)の電線が必要になる。
 様々な種類の電線で構成されるワイヤハーネスの製造は、全ての電線の外観が同じであるときわめて困難になる。また、機器同士の接続時には、誤接続が生じてしまう。さらには、メンテナンスに支障をきたす。そこで、様々な種類の電線を識別するために、一般に、被覆[sheath]に着色やマーキングが施される(下記特許文献1参照)。
 従来のワイヤハーネス生産システムは、サブハーネスなどの中間生産品[intermediate product]を生産するためのサブハーネス生産ライン[sub-harness production line]と、サブハーネスや外装部品[outer components]などからワイヤハーネスを組み立てるためのワイヤハーネス組み立てライン[wire harness assembly line]とを備えている。以下、図5を参照しつつサブハーネスの生産ラインの構成や生産方法について説明する。
 図5に示されるように、電線リール101は、リールとリールに巻かれた電線とからなる。例えば、0.5sq(0.3sqや0.8sq等でもよい)の電線が巻かれている。電線リール101から引き出された一本の電線は、着色ユニット102へと供給される(電線リール101は、電線を供給できるように構成されている)。電線リール101から供給された電線は、着色ユニット[coloring unit]102において被覆が着色される。被覆が着色された電線は、切断・圧着ユニット[cutting and crimping unit]103へと供給される。
 切断・圧着ユニット103は、検尺・切断装置[measuring and cutting device]104と、A端側圧着装置[A-end crimping device]105と、B端側圧着装置[B-end crimping device]106とからなる。検尺・切断装置104では、電線の長さが測定され、かつ、測定値に基づいて電線が所定長さに切断される。切断された電線は、検尺切断電線と呼ばれる。
 A端側圧着装置105では、電線のA端(移動方向の先端[leading end])に端子金具が取り付けられる(圧着される)。次に、B端側圧着装置106でも同様に、電線のB端(A端の反対側:移動方向の後端[trailing end])に端子金具が取り付けられる。端子金具は、端子リール107及び108から供給される。A端及びB端のそれぞれに端子金具が取り付けられると、端子付き電線109が完成する。なお、この生産ライン111は、自動機[automated machines]による工程からなる。
 端子付き電線109の端子金具が、コネクタハウジングのキャビティに挿入される(端子挿入工程110)。端子挿入工程110では、サブハーネスに必要な数の端子付き電線109の端子金具がキャビティに挿入される。即ち、端子付き電線109が前工程から順次供給され、端子金具の挿入が順次行われる。端子金具の手作業で挿入される。必要な数の端子金具の挿入が完了すると、一つのサブハーネスが完成する。この生産ライン112は、作業者による手動の工程である。
 ワイヤハーネス組み立てラインでは、上述したサブハーネス生産ラインで生産されたサブハーネスが布線板[wiring board]上で組み立てられてテープで束ねられ[bundled]、外装部品が取り付けられる。
日本国特公平7-1645号公報
 上述したサブハーネスの生産では、自動機による生産ライン111と、手動によるライン112との間で処理速度(生産能力)に差が生じ、同期した連続生産が困難となる。例えば、端子金具の圧着まで工程の段取り替え[set-up change]などに自動機による生産ライン111によって遅れが生じると、端子挿入工程110での作業者の待機が必要になってしまう。また、端子金具の挿入工程が遅い場合は圧着までの工程の速度を落とす必要があるが、自動機の稼働率が低下する。
 従って、本発明の目的は、生産ライン上での生産能力の差を解消して円滑に連続生産を行えるワイヤハーネス生産システム及びワイヤハーネス生産方法を提供することにある。
 本発明の第1の特徴は、ワイヤハーネスの生産に必要な端子付き電線を順次生産した後、生産された前記端子付き電線を用いた後処理が行われるワイヤハーネス生産システムであって、電線から前記端子付き電線を順次生産する電線順次生産と、前記電線順次生産部によって生産された前記端子付き電線を、前記後処理に供給される前に一時的に保管する仮置管理部とを備えており、前記電線順次生産部が、前記電線又は前記端子付き電線の被覆を着色剤で着色をする着色ユニットと、前記電線を所定長さで切断し、かつ、切断された前記電線の端部に前記端子金具を取り付けて前記端子付き電線を生産する切断・圧着ユニットとを含み、前記仮置管理部が、前記電線順次生産部によって生産された前記端子付き電線を前記端子挿入部へ流す前に、生産された順番で一時的に保管する複数の仮置部を含む、ワイヤハーネス生産システムを提供する。
 上記第1の特徴によれば、電線順次生産部と後処理との間の生産能力の差を仮置管理部によって吸収して円滑に連続生産を行える。また、仮置管理部を設けることで、作業者の待機やシステムの稼働率の低下も防止できる。
 ここで、前記後処理が、前記端子付き電線の端子金具をコネクタハウジングに挿入する端子挿入部で行われる、ことが好ましい。
 このようにすれば、一般に自動機によって行われる電線順次生産部での生産能力と一般に手作業で行われる端子挿入部での生産能力との差を、仮置管理部によって効果的に吸収することができる。
 さらに、前記仮置管理部が、少なくとも、一つのサブハーネスに必要な前記端子付き電線の数以上の前記仮置部を有している、ことが好ましい。
 このようにすれば、仮置管理部に、一つのサブハーネスに必要な数の端子付き電線を一時的に保管することができる。電線付き端子は、生産された順番で一時的に保管されるが、少なくとも一つのサブハーネスに必要な数が一時的に保管されるので、その後の端子挿入を生産順に行わないことも可能になる。即ち、コネクタハウジングに応じて端子金具の挿入順を変更することも可能であり、作業自由度を向上できる。
 本発明の第2の特徴は、ワイヤハーネスの生産に必要な端子付き電線を順次生産した後、生産された前記端子付き電線を用いた後処理が行われるワイヤハーネス生産方法であって、電線から前記端子付き電線を順次生産する電線順次生産工程と、前記電線順次生産部によって生産された前記端子付き電線を、前記後処理に供給する前に一時的に保管する仮置管理工程とを備えており、前記電線順次生産工程が、前記電線又は前記端子付き電線の被覆を着色剤で着色する工程と、前記電線を所定長さで切断し、かつ、切断された前記電線の端部に前記端子金具を取り付けて前記端子付き電線を生産する工程とを含み、前記仮置管理工程が、前記電線順次生産工程で生産された前記端子付き電線を前記端子挿入工程へ流す前に、生産された順番で複数の仮置部に一時的に保管する工程を含む、ワイヤハーネス生産方法を提供する。
 上記第2の特徴によれば、電線順次生産工程と後処理の工程との間の生産能力の差を仮置管理工程によって吸収して円滑に連続生産を行える。また、仮置管理工程を設けることで、作業者の待機やシステムの稼働率の低下も防止できる。
 ここで、前記後処理が、前記端子付き電線の端子金具をコネクタハウジングに挿入する端子挿入工程である、ことが好ましい。
 このようにすれば、一般に自動機によって行われる電線順次生産工程での生産能力と一般に手作業で行われる端子挿入工程での生産能力との差を、仮置管理部によって効果的に吸収することができる。
ワイヤハーネス生産システム(ワイヤハーネス生産方法)の実施形態におけるサブハーネス生産ラインの構成図(工程図)である。 (a)は仮置管理部の一例を示す斜視図であり、(b)は端子挿入部での作業の一例を示す斜視図である。 仮置管理部の他の例を示す斜視図である。 仮置管理部の更に他の例を示す斜視図である。 従来例のサブハーネス生産ラインの構成図(工程図)である。
 ワイヤハーネス生産システム(ワイヤハーネス生産方法)の実施形態について、図面を参照しつつ説明する。
 図1に示されるように、本実施形態のワイヤハーネス生産システムは、サブハーネスなどの中間生産品を生産するためのサブハーネス生産ライン1と、サブハーネスや外装部品などからワイヤハーネスを組み立てるためのワイヤハーネス組み立てラインとを備えている。本実施形態では、サブハーネス生産ライン1に特徴があるので、サブハーネス生産ライン1の構成や工程について、以下に詳細に説明をする。
 サブハーネス生産ライン1は、電線順次生産部(工程)[electric wire sequential production portion (process)]2と、端子挿入部(工程)[terminal insertion portion (process)]3と、これら電線順次生産部2及び端子挿入部3の間に設置される仮置管理部(工程)[temporarily-storing and handling portion (process)]4と、を含んで構成される。
 電線順次生産部2では、ワイヤハーネスの生産に必要な端子付き電線5を自動で順次生産する工程(電線順次生産工程)が行われる。仮置管理工程4では、端子付き電線5を一時的に仮置きする工程(仮置管理工程)が行われる。端子挿入部3では、端子付き電線5を構成する端子金具6及び7をコネクタハウジング8(図2参照)に挿入する工程(端子挿入工程)が行われる。なお、端子挿入部3で行われる端子挿入工程は、電線順次生産部(工程)2によって生産された端子付き電線5を用いて行われる後処理[post process]である。
 電線順次生産部(工程)2は、コンピュータ(図示せず)によって制御され、制御機構(図示せず)によって作動される。コンピュータによる制御部は、電線順次生産部2の全体を一括制御可能に構成される(各構成ごとに制御されてもよい)。制御部は、公知のCPUやRAM、ROM等を有して構成される。
 電線順次生産部2は、電線リール9と、着色ユニット10と、切断・圧着ユニット11とを備えている。なお、ここでは三つのユニット9~11を説明するが、連続する自動機によって構成されていれば、電線順次生産工程2のユニット数は限定されない。
 電線リール9は、円筒状のリール本体と、リール本体の両端の一対のフランジとを有している。リール本体には、0.5sq(0.3sqや0.8sq等でもよい)の電線が巻かれている。
 電線は、導体[conductor]と被覆[sheath](絶縁体[insulator])とで構成されている。導体、導電性を有する。一方、被覆は、絶縁性を有する。被覆は、導体の外表面に溶融樹脂が押し出されて形成されている。被覆の樹脂には白色の着色剤が混入されており、被覆は白色である。あるいは、着色剤が混入されずに、被覆はナチュラルとされる。なお、本実施形態では、被覆の色は白色とするが、ナチュラルやその他の色でもよい。
 電線リール9は、リール本体を回転自在に支持するリール支持部[reel support portion]と、電線リール9から引き出された電線を着色ユニット10へと案内するための電線案内部[electric wire guide portion]と、電線リール9から電線を引き出すための引出機構[drawing mechanism](駆動機構[drive mechanism])とを有する。電線リール9から引き出された一本の電線は、電線案内部を介して着色ユニット10へと供給される。なお、引出機構は、着色ユニット10に設けられたり、着色ユニット10よりも後工程側に設けられてもよい。
 着色ユニット10は、電線リール9から供給された電線の被覆に所定の着色を施すように構成されている。被覆の周方向に色帯を付す他、色付ドットや色付マークを付し(マーキングし)てもよい。また、被覆の全体を着色してもよい。即ち、着色ユニット10は、「着色・マーキングユニット」と呼んでもよい。なお、本実施形態では、着色ユニット10によって被覆の周方向に色帯(後述する着色部[colored portions]26参照)を付す例を説明する。
 ここで「着色」について説明をする。「着色」とは、被覆の外表面に着色剤[colorant]で色を付けることである。着色剤とは、色剤[coloring material](工業用有機物質)が水又はその他の溶媒に溶解又は分散された液状物質である。有機物質としては、染料や顔料(大部分は有機物であり、合成物)があり、時には、染料が顔料として用いられたり、顔料が染料として用いられる。より具体的には、着色剤とは、着色液または塗料である。
 着色液は、溶媒に染料を溶かすか、分散させることで作られている。塗料は、分散液中に顔料を分散させることで作られている。従って、着色液で被覆の外表面を着色すると、染料が被覆内に染み込む。塗料で被覆の外表面を着色すると、顔料は被覆内に染み込むことなく外表面に付着する。即ち、ここでの「着色」とは、被覆の外表面を染料で染めること、及び、被覆の外表面に顔料を塗ることである。
 上述した溶媒や分散液としては、被覆を形成する樹脂と親和性のあるものが望ましい。この場合、染料は被覆内に確実に染み込み、顔料は被覆の外表面に確実に付着する。
 切断・圧着ユニット11は、複数の装置からなり、具体的には、検尺・切断装置12と、A端側圧着装置13と、B端側圧着装置14とからなる。
 検尺・切断装置12は、着色ユニット10によって着色された電線の長さを測定し、かつ、測定値に基づいて電線を所定長さで切断する。具体的には、電線の長さを測定する検尺部と、検尺部の測定に基づいて電線を所定長さで切断する電線切断部とを備えている。検尺部の測定に基づいて所定長さで切断された電線を検尺切断電線[measured-and-cut electric wire]15と呼ぶ。
 A端側圧着装置13は、上述した所定長さでの電線の切断前や後に、電線のA端(移動方向の先端)に端子金具6を圧着する(なお、圧着に限らない。例えば、端子金具6は、圧接や溶着されてもよく、これらの場合は、「圧着」を「圧接」や「溶接」と読み替える)。具体的には、A端側圧着装置13は、電線のA端の被覆を取り除いて導体を露出させる被覆除去部と、被覆除去部によって露出された導体に端子金具6を取り付ける端子取付部とからなる。端子金具6は、端子リール16から供給される。
 B端側圧着装置14は、検尺切断電線15の切断分離後に、そのB端(A端の反対側:移動方向の後端)に端子金具7を圧着する(なお、圧着に限らない)。具体的には、B端側圧着装置14は、A端側圧着装置13と同様に、電線のB端の被覆を取り除いて導体部を露出させる被覆除去部と、被覆除去部によって露出した導体に端子金具7を取り付ける端子取付部とからなる。端子金具7は、端子リール17から供給される。
 A端及びB端のそれぞれに端子金具6及び7が取り付けられると、一本の端子付き電線5の生産が完了する。端子付き電線5は、電線順次生産部2によって自動で順次生産される。
 端子付き電線5は、検尺切断電線15と、その両端に取り付けられる端子金具6及び7とからなる。端子付き電線5の両端には、着色ユニット10によって着色された着色部26が形成されている。着色部26は、周方向に形成された色帯である。
 仮置管理部4は、仮置部18を備えている。仮置部18には、電線順次生産部2によって生産された端子付き電線5が、端子挿入工程3に供給される前に一時的に保管される。
 仮置部18には、電線順次生産部2で生産された順番で、端子付き電線5が保管される。図1に示される仮置管理部4には、四つの端子付き電線5が保管される。なお、ここでの保管数に限定されず、仮置管理部4には、一本のサブハーネスの生産に必要な端子付き電線5の数の仮置部18が設けられる。あるいは、仮置管理部4は、複数本のサブハーネスの生産に必要な端子付き電線5の数の仮置部18が設けられてもよい。サブハーネスの生産順に端子付き電線5が仮置部18に保管されれば、端子付き電線5を管理し易くなる。
 図2(a)に示される仮置部18は、公知の電線保持竿[electric wire storing rod]19で構成されている。電線保持竿19は、長手方向に並べられた多数の電線クリップ20と、電線クリップ20を保持するクリップベース21からなる。各電線クリップ20は、一対の挟持子[pinching elements]で構成され、一対の挟持子の間に、端子付き電線5の検尺切断電線15を挟持する電線保持部[electric wire storing portion]が形成されている。各挟持子の先端には、電線を案内するテーパ部が形成されている。テーパ部は、電線保持部に向けて傾斜されている。全ての電線クリップ20は、同一の大きさ及び同一形状を有している。電線クリップ20は、一つの電線保持竿19に数十個設けられている。なお、図1及び図2中の数字(1)~(4)は、電線順次生産部2での生産順を示している。
 図3に仮置部の他の例を示す。図3に示される仮置部22は、五つの樋[gutters]として形成されている。また、図4に仮置部のさらに他の例を示す。図4に示される仮置部24は、コンベア23上に設けられている。なお、図3及び図4中の数字(1)~(5)は、電線順次生産部2での生産順を示している。
 図1及び図2(b)に示されるように、端子挿入部3では、端子付き電線5の端子金具6又は7がコネクタハウジング8のキャビティ25に挿入される。具体的には、端子挿入部3は、コネクタハウジング8の供給部や作業台などからなる。なお、図2(b)に示される例では、コネクタハウジング8が手で保持されているが、専用の治具でコネクタハウジング8が保持されてもよい。
 端子金具6(7)の挿入は、サブハーネスの生産に必要な数の端子付き電線5に対して行われる。即ち、端子付き電線5が仮置部18から順次取り上げられて、端子金具6(7)がコネクタハウジング8のキャビティ25に順次挿入される。端子金具6(7)は手動で挿入される。必要な数の端子金具6(7)の挿入が完了すると、一つのサブハーネスが完成する。
 なお、サブハーネスとは、必要な数の端子付き電線5の端子金具6(7)が、全てコネクタハウジング8に挿入された状態や、ジョイントされた状態にあるものを指す。言い換えれば、サブハーネスには、露出されたままの端子金具6(7)はない。
 端子挿入工程は、電線順次生産工程での生産状況の影響を受けない。何故なら、直前の工程として、仮置管理工程が設けられているからである。具体的には、端子挿入工程3で必要な端子付き電線5は、仮置管理工程4の仮置部18に一時的に保管されているからである。
 このように、ワイヤハーネス生産システム(方法)に係るサブハーネス生産ライン1によって、サブハーネスが連続生産される。この連続生産において、サブハーネス生産ライン1が仮置管理部(工程)4を含んでいるので、自動機による電線順次生産部(工程)2と、手動による端子挿入部(工程)3との間の生産能力の差を吸収することができる。従って、円滑に連続生産が行われる。
 また、電線順次生産部(工程)2と端子挿入部(工程)3との間に仮置管理部(工程)4が設けられるので、作業者の待機の発生やシステムの稼働率の低下を防止することもできる。
 手動(手作業)で行なわれる端子挿入が遅くなる場合には、端子挿入部(工程)3を複数設けて調整することができる。端子付き電線5は生産順に仮置部18に置かれるので、複数の端子挿入部(工程)3が設けられても容易に対応できる。
 また、段取り替えが頻繁に発生する場合は、複数のサブハーネスに必要な端子付き電線5を予め仮置部18に保管しておくことで、端子挿入部(工程)3での作業者の待機を防止できる。
 日本国特許出願第2013-233610号(2013年11月12日出願)の全ての内容は、ここに参照されることで本明細書に援用される。本発明の実施形態を参照することで上述のように本発明が説明されたが、本発明は上述した実施形態に限定されるものではない。本発明の範囲は、請求の範囲に照らして決定される。

Claims (5)

  1.  ワイヤハーネスの生産に必要な端子付き電線を順次生産した後、生産された前記端子付き電線を用いた後処理が行われるワイヤハーネス生産システムであって、
     電線から前記端子付き電線を順次生産する電線順次生産と、
     前記電線順次生産部によって生産された前記端子付き電線を、前記後処理に供給される前に一時的に保管する仮置管理部とを備えており、
     前記電線順次生産部が、前記電線又は前記端子付き電線の被覆を着色剤で着色をする着色ユニットと、前記電線を所定長さで切断し、かつ、切断された前記電線の端部に前記端子金具を取り付けて前記端子付き電線を生産する切断・圧着ユニットとを含み、
     前記仮置管理部が、前記電線順次生産部によって生産された前記端子付き電線を前記端子挿入部へ流す前に、生産された順番で一時的に保管する複数の仮置部を含む、ワイヤハーネス生産システム。
  2.  請求項1に記載のワイヤハーネス生産システムであって、
     前記後処理が、前記端子付き電線の端子金具をコネクタハウジングに挿入する端子挿入部で行われる、ワイヤハーネス生産システム。
  3.  請求項2に記載のワイヤハーネス生産システムであって、
     前記仮置管理部が、少なくとも、一つのサブハーネスに必要な前記端子付き電線の数以上の前記仮置部を有している、ワイヤハーネス生産システム。
  4.  ワイヤハーネスの生産に必要な端子付き電線を順次生産した後、生産された前記端子付き電線を用いた後処理が行われるワイヤハーネス生産方法であって、
     電線から前記端子付き電線を順次生産する電線順次生産工程と、
     前記電線順次生産部によって生産された前記端子付き電線を、前記後処理に供給する前に一時的に保管する仮置管理工程とを備えており、
     前記電線順次生産工程が、前記電線又は前記端子付き電線の被覆を着色剤で着色する工程と、前記電線を所定長さで切断し、かつ、切断された前記電線の端部に前記端子金具を取り付けて前記端子付き電線を生産する工程とを含み、
     前記仮置管理工程が、前記電線順次生産工程で生産された前記端子付き電線を前記端子挿入工程へ流す前に、生産された順番で複数の仮置部に一時的に保管する工程を含む、ワイヤハーネス生産方法。
  5.  請求項4に記載のワイヤハーネス生産方法であって、
     前記後処理が、前記端子付き電線の端子金具をコネクタハウジングに挿入する端子挿入工程である、ワイヤハーネス生産方法。
PCT/JP2014/079570 2013-11-12 2014-11-07 ワイヤハーネス生産システム及びワイヤハーネス生産方法 WO2015072408A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
DE112014005159.4T DE112014005159T5 (de) 2013-11-12 2014-11-07 Kabelbaum-Produktionssystem und Kabelbaum-Produktionsverfahren
CN201480058618.1A CN105684104B (zh) 2013-11-12 2014-11-07 线束生产系统和线束生产方法
US15/134,522 US10148055B2 (en) 2013-11-12 2016-04-21 Wire harness production method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2013-233610 2013-11-12
JP2013233610A JP6212777B2 (ja) 2013-11-12 2013-11-12 ワイヤハーネス生産システム及びワイヤハーネス生産方法

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US15/134,522 Continuation US10148055B2 (en) 2013-11-12 2016-04-21 Wire harness production method

Publications (1)

Publication Number Publication Date
WO2015072408A1 true WO2015072408A1 (ja) 2015-05-21

Family

ID=53057342

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2014/079570 WO2015072408A1 (ja) 2013-11-12 2014-11-07 ワイヤハーネス生産システム及びワイヤハーネス生産方法

Country Status (5)

Country Link
US (1) US10148055B2 (ja)
JP (1) JP6212777B2 (ja)
CN (1) CN105684104B (ja)
DE (1) DE112014005159T5 (ja)
WO (1) WO2015072408A1 (ja)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3330720B1 (en) 2016-11-30 2019-06-26 Yuyang DNU Co., Ltd System for charge-discharge cycler
CN108539556A (zh) * 2018-02-08 2018-09-14 北京帝格线束有限责任公司 一种前舱线束总成的生产工艺
CN114488986B (zh) * 2022-01-29 2023-07-25 广州亿隆电子科技有限公司 端子压着的产能监控方法、系统、设备及存储介质
EP4350903A1 (de) 2022-10-04 2024-04-10 komax Holding AG Maschinenverbund und verfahren zum anordnen von kabeln gemäss einer vorgegebenen kabelsequenz

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH071645B2 (ja) * 1985-04-23 1995-01-11 矢崎総業株式会社 ワイヤハ−ネスの製造方法
JP2001332144A (ja) * 2000-05-23 2001-11-30 Sumitomo Wiring Syst Ltd 電線接続体ホルダおよびストック台車

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2053010C (en) * 1990-10-17 2001-05-01 Claude Ricard Processes and devices for the automatic connection of conductor wire or optical fiber section ends to adapted component receptacles
SE509662C2 (sv) * 1993-04-29 1999-02-22 Tetra Laval Holdings & Finance Förpackningslaminat belagt med en vattenolöslig chitosanförening samt sätt att tillverka förpackningslaminatet
AU2002344605A1 (en) * 2001-11-27 2003-06-10 Yazaki Corporation Method for order receipt production of wire harness and its order receipt production system
AU2003254821A1 (en) * 2002-08-09 2004-02-25 Yazaki Corporation Method and device for marking wire
JP2004356022A (ja) 2003-05-30 2004-12-16 Yazaki Corp ワイヤハーネスの組立方法とワイヤハーネス

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH071645B2 (ja) * 1985-04-23 1995-01-11 矢崎総業株式会社 ワイヤハ−ネスの製造方法
JP2001332144A (ja) * 2000-05-23 2001-11-30 Sumitomo Wiring Syst Ltd 電線接続体ホルダおよびストック台車

Also Published As

Publication number Publication date
US20160233638A1 (en) 2016-08-11
US10148055B2 (en) 2018-12-04
CN105684104A (zh) 2016-06-15
JP6212777B2 (ja) 2017-10-18
JP2015095341A (ja) 2015-05-18
DE112014005159T5 (de) 2016-09-01
CN105684104B (zh) 2017-08-25

Similar Documents

Publication Publication Date Title
WO2015072408A1 (ja) ワイヤハーネス生産システム及びワイヤハーネス生産方法
JP6322377B2 (ja) ワイヤハーネス生産システム及びワイヤハーネス生産方法
EP3593420B1 (de) Anlage sowie verfahren zum automatisierten herstellen eines kabelsatzes
JPH0215516A (ja) 電気ハーネスの製造装置
US4347651A (en) System for manufacturing connection wires
DE2440264B2 (de) Verfahren zum Anspritzen eines Steckers an eine elektrische Leitung
JP4842691B2 (ja) 電線着色装置及び電線着色方法
DE102015119754B4 (de) Verfahren zur herstellung eines kabelbaums und vorrichtung zur durchführung dieses verfahrens
JP4295621B2 (ja) ワイヤハーネスの受注生産方法及びその受注生産システム
DE102015110755B4 (de) Vorrichtung und Verfahren zum Zwischenlagern von Leitungen
WO2015050027A1 (ja) ワイヤハーネス生産システム及びワイヤハーネス生産方法
JP6206663B2 (ja) ワイヤハーネス生産システム及びワイヤハーネス生産方法
EP4238192A1 (de) Vorrichtung und verfahren zur montage eines steckverbinders
JP6537093B2 (ja) ワイヤハーネス生産システム及びワイヤハーネス生産方法
DE102019119660A1 (de) Verfahren, Vorrichtung und System zur Konfektionierung eines elektrischen Kabels
DE19847958C2 (de) Verfahren zur Herstellung von verdrillten Kabeln
EP3323680B1 (de) Verfahren zum bereitstellen von vorkonfektionierten leitungen für die automatische konfektion eines teilleitungssatzes zum montieren eines leitungssatzes
JP3326066B2 (ja) 組電線用素線の印字方法及び測長・印字装置
EP1084912B1 (de) Elektrischer Leiterkreis
DE102022120059A1 (de) Vorrichtung zur Herstellung eines Kabelbaums
DE102014200874B4 (de) Verfahren und Anlage zur Herstellung eines konfektionierten Kabels vorbestimmter Länge
CN116913616A (zh) 飞机线束自动化制造系统
DE4038040A1 (de) Verfahren zum erfassen und markieren von isolationsfehlern waehrend der herstellung eines elektrischen kabels
JPH0213749B2 (ja)
ITMI20000751A1 (it) Apparecchiatura e metodo per la lavorazione di cavi rivestiti

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14862064

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 112014005159

Country of ref document: DE

Ref document number: 1120140051594

Country of ref document: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14862064

Country of ref document: EP

Kind code of ref document: A1