WO2015071979A1 - 集中コントローラー - Google Patents

集中コントローラー Download PDF

Info

Publication number
WO2015071979A1
WO2015071979A1 PCT/JP2013/080689 JP2013080689W WO2015071979A1 WO 2015071979 A1 WO2015071979 A1 WO 2015071979A1 JP 2013080689 W JP2013080689 W JP 2013080689W WO 2015071979 A1 WO2015071979 A1 WO 2015071979A1
Authority
WO
WIPO (PCT)
Prior art keywords
data
power consumption
unit
power
centralized controller
Prior art date
Application number
PCT/JP2013/080689
Other languages
English (en)
French (fr)
Inventor
維哉 川村
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to PCT/JP2013/080689 priority Critical patent/WO2015071979A1/ja
Publication of WO2015071979A1 publication Critical patent/WO2015071979A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00004Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the power network being locally controlled
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00028Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment involving the use of Internet protocols
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • F24F11/46Improving electric energy efficiency or saving
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/10The network having a local or delimited stationary reach
    • H02J2310/12The local stationary network supplying a household or a building
    • H02J2310/14The load or loads being home appliances
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances

Definitions

  • the present invention relates to a centralized controller.
  • Patent Document 1 did not consider the power consumption of each unit in determining the priority order of the demand control target. Therefore, even if the prior art described in Patent Document 1 performs demand control on a demand control target with high priority, there is a case where power consumption that can be reduced is small. In this case, the prior art described in Patent Document 1 cannot reduce the overall power consumption to the target demand value even if the demand control is executed.
  • Patent Document 1 has a problem that when the demand control is executed, the overall power consumption may not be reduced to the target demand value. .
  • the present invention has been made to solve the above-described problems, and an object of the present invention is to provide a centralized controller that can reduce the overall power consumption to a target demand value when demand control is executed. It is what.
  • the centralized controller is a centralized controller for demand-controlling air conditioning equipment composed of a plurality of units, and each of the plurality of units is based on the power consumption of each of the plurality of units.
  • a priority determining unit that determines priority of demand control, an entire property data comparing unit that compares power consumption of the air conditioning equipment with preset power consumption, and the power consumption of the air conditioning equipment is the set power
  • a demand control unit that executes demand control based on the priority order.
  • the present invention determines the priority order of the demand control target based on the power consumption. Therefore, the present invention has an effect that the overall power consumption can be reduced to the target demand value when the demand control is executed.
  • step of describing the program for performing the operation of the embodiment of the present invention is a process performed in time series in the order described, but it is not always necessary to process in time series.
  • the processing executed may be included.
  • each block diagram described in this embodiment may be considered as a hardware block diagram or a software functional block diagram.
  • each block diagram may be realized by hardware such as a circuit device, or may be realized by software executed on an arithmetic device such as a processor (not shown).
  • each block in the block diagram described in the present embodiment only needs to perform its function, and the configuration may not be separated by each block.
  • items that are not particularly described are the same as those in the first and second embodiments, and the same functions and configurations are described using the same reference numerals.
  • each of Embodiments 1 and 2 may be implemented independently or in combination. In either case, the advantageous effects described later can be obtained.
  • various specific setting examples described in this embodiment are merely examples, and are not particularly limited thereto.
  • the system represents the entire apparatus composed of a plurality of apparatuses.
  • a network refers to a mechanism in which at least two devices are connected and information can be transmitted from one device to another.
  • Devices that communicate via a network may be independent devices, or may be internal blocks that constitute one device.
  • the communication may be communication in which wireless communication and wired communication are mixed as well as wireless communication and wired communication. For example, wireless communication may be performed in a certain section, and wired communication may be performed in another space. Further, communication from one device to another device may be performed by wired communication, and communication from another device to one device may be performed by wireless communication.
  • FIG. 1 is a diagram illustrating an example of a schematic configuration of an air-conditioning system 1 according to Embodiment 1 of the present invention.
  • the air conditioning system 1 includes an air conditioner 5_1 to an air conditioner 5_N, a general equipment controller 17_1 to a general equipment controller 17_N, a general equipment group 18_1 to a general equipment group 18_N, a centralized controller 19, and an external device. And a device group 21.
  • Each of the air conditioning equipment 5_1 to the air conditioning equipment 5_N, the general equipment controller 17_1 to the general equipment controller 17_N, and the centralized controller 19 are connected via, for example, a management dedicated transmission line 33.
  • Each of the general-purpose device controller 17_1 to the general-purpose device controller 17_N and the general-purpose device group 18_1 to the general-purpose device group 18_N is connected through a general-purpose transmission line 31, for example.
  • the centralized controller 19 and the external device group 21 are connected, for example, via a LAN (Local Area Network) 37.
  • the air conditioning equipment 5_1 includes, for example, an outdoor unit 11_1 to an outdoor unit 11_N, an indoor unit 13_11 to an indoor unit 13_NN, and a remote controller 15_1 to a remote controller 15_N.
  • Each of the outdoor unit 11_1 to the outdoor unit 11_N, the indoor unit 13_11 to the indoor unit 13_NN, and the remote controller 15_1 to the remote controller 15_N are connected via, for example, an indoor / outdoor dedicated transmission line 35.
  • each of the air conditioning equipment 5_2 to 5_N includes equipment similar to the various equipment described in the air conditioning equipment 5_1. Therefore, the description of each of the air conditioning equipment 5_2 to 5_N is omitted.
  • the number of devices and the types of the various devices configuring the air conditioning facility 5_1 and the various devices configuring each of the air conditioning facilities 5_2 to 5_N are not necessarily the same.
  • Each of the general-purpose device controller 17_1 to the general-purpose device controller 17_N controls the general-purpose device group 18_1 to the general-purpose device group 18_N via the general-purpose transmission line 31.
  • Each of the general-purpose device group 18_1 to the general-purpose device group 18_N includes, for example, a humidifier, a heater, a ventilation fan, a temperature sensor for general-purpose devices, a humidity sensor for general-purpose devices, and the like (all not shown).
  • the centralized controller 19 manages the general-purpose device controller 17_1 to the general-purpose device controller 17_N, the air-conditioning equipment 5_1 to the air-conditioning equipment 5_N, the external device group 21, and the like. For example, the centralized controller 19 manages the operation states of the general-purpose device controller 17_1 to the general-purpose device controller 17_N. For example, the centralized controller 19 manages the operating states and power consumption of the air conditioning facilities 5_1 to 5_N, and performs demand control of the air conditioning facilities 5_1 to 5_N. The centralized controller 19 manages various devices included in the external device group 21, for example. Details of the centralized controller 19 will be described later with reference to FIG.
  • the external device group 21 includes, for example, an energy management device, a WEB browser, a wireless transmission device, a tablet terminal, and the like (all not shown). Therefore, the centralized controller 19 manages various devices such as an energy management device, a WEB browser, a wireless transmission device, and a tablet terminal.
  • the general-purpose transmission line 31 is a communication medium in which communication is generally performed in accordance with a communication protocol disclosed to the outside. For example, the general-purpose transmission line 31 transmits various signals between each of the general-purpose device controller 17_1 to the general-purpose device controller 17_N and each of the general-purpose device group 18_1 to the general-purpose device group 18_N.
  • the management dedicated transmission line 33 is a communication medium in which communication conforming to a communication protocol that is not disclosed to the outside is performed. For example, the management-dedicated transmission line 33 transmits various signals between the air conditioning equipment 5_1 to the air conditioning equipment 5_N, the general equipment controller 17_1 to the general equipment controller 17_N, and the centralized controller 19.
  • the indoor / outdoor dedicated transmission line 35 is a communication medium in which communication conforming to a communication protocol that is not disclosed to the outside is performed.
  • the indoor / outdoor dedicated transmission line 35 transmits various signals between, for example, each of the outdoor units 11_1 to 11_N, each of the indoor units 13_11 to 13_NN, and each of the remote controllers 15_1 to 15_N. .
  • wired media such as the general-purpose transmission line 31, the management dedicated transmission line 33, and the LAN 37 are examples of communication media, and are not particularly limited thereto.
  • the communication medium may be a wireless medium.
  • the air conditioning equipment 5_1 to the air conditioning equipment 5_N are referred to as the air conditioning equipment 5 unless otherwise distinguished.
  • the outdoor units 11_1 to the outdoor units 11_N are referred to as outdoor units 11 unless particularly distinguished from each other.
  • the indoor units 13_11 to 13_NN are referred to as indoor units 13 unless otherwise distinguished.
  • the remote controllers 15_1 to 15_N will be referred to as remote controllers 15 unless otherwise distinguished.
  • the general-purpose device controller 17_1 to the general-purpose device controller 17_N are referred to as a general-purpose device controller 17 unless particularly distinguished from each other.
  • the general-purpose device group 18_1 to the general-purpose device group 18_N will be referred to as a general-purpose device group 18 unless particularly distinguished from each other.
  • each of the indoor unit 13 and the outdoor unit 11 corresponds to a unit in the present invention.
  • the plurality of indoor units 13 correspond to the plurality of units in the present invention.
  • the indoor unit 13 and the outdoor unit 11 correspond to a plurality of units in the present invention.
  • the plurality of indoor units 13 and the outdoor unit 11 correspond to a plurality of units in the present invention.
  • the plurality of indoor units 13 and the plurality of outdoor units 11 correspond to the plurality of units in the present invention.
  • the indoor unit 13 and the plurality of outdoor units 11 correspond to a plurality of units in the present invention.
  • the number of each of the outdoor unit 11 and the indoor unit 13 which comprise an air conditioner, and a refrigerant circuit structure are not specifically limited to the description content mentioned later.
  • the outdoor unit 11 and the indoor unit 13 are collectively referred to as an air conditioner regardless of the number of installed outdoor units 11 and indoor units 13.
  • the air conditioning equipment 5 including the outdoor unit 11 and the indoor unit 13 is not particularly limited in the content described later.
  • FIG. 2 is a diagram showing an example of the internal configuration of the outdoor unit 11 according to Embodiment 1 of the present invention.
  • the outdoor unit 11 includes a compressor 61, a four-way switching valve 62, a heat exchanger 63, an expansion valve 64, an accumulator 65, a fan 66, a control board 51, and the like.
  • a refrigerant pipe 39 is connected to the outdoor unit 11.
  • the refrigerant pipe 39 is connected to a part of the refrigerant circuit of the air conditioner configured in the outdoor unit 11 and is connected to a part of the refrigerant circuit of the air conditioner configured in the indoor unit 13.
  • the refrigerant is circulated between the outdoor unit 11 and the indoor unit 13.
  • Compressor 61 compresses the sucked refrigerant, and discharges it by applying an arbitrary pressure according to the operating frequency.
  • the compressor 61 changes the amount of refrigerant delivered per unit time in accordance with, for example, a change in operating frequency supplied from an inverter circuit (not shown).
  • the four-way switching valve 62 switches the path of the refrigerant circuit according to, for example, a cooling operation or a heating operation.
  • the heat exchanger 63 exchanges heat between the refrigerant circulating inside and the air existing outside.
  • the expansion valve 64 controls the flow rate of the refrigerant by adjusting the opening degree of the valve based on the control command supplied from the control board 51.
  • the accumulator 65 stores the refrigerant liquid, and causes the compressor 61 to suck the gas-phase refrigerant.
  • the fan 66 sends air to the heat exchanger 63.
  • a transmission module 91 and a control module 95 are configured on the control board 51.
  • the control board 51 transmits and receives various signals between the outdoor unit 11 and the indoor unit 13.
  • the control board 51 controls driving of the compressor 61, the four-way switching valve 62, the expansion valve 64, and the fan 66, for example.
  • the transmission module 91 transmits and receives various signals to and from the indoor unit 13 via the indoor / outdoor dedicated transmission line 35.
  • the detection result of the temperature sensor 71 is supplied to the control module 95.
  • the temperature sensor 71 detects the temperature around the outdoor unit 11.
  • the control module 95 drives each of the compressor 61, the four-way switching valve 62, the expansion valve 64, and the fan 66 based on various signals supplied from the transmission module 91 and the detection result of the temperature sensor 71. To control. Since the control module 95 communicates with the indoor unit 13 via the transmission module 91, the control module 95 can acquire indoor temperature data of the air-conditioning target space held by the indoor unit 13.
  • FIG. 3 is a diagram showing an example of the internal configuration of the indoor unit 13 according to Embodiment 1 of the present invention.
  • the indoor unit 13 includes an expansion valve 67, a heat exchanger 68, a fan 69, a control board 53, and the like.
  • a refrigerant pipe 39 is connected to the indoor unit 13.
  • the refrigerant pipe 39 is connected to a part of the refrigerant circuit of the air conditioner configured in the indoor unit 13, and is connected to the refrigerant circuit of the air conditioner configured in the outdoor unit 11. By being connected to a part, the refrigerant is circulated between the indoor unit 13 and the outdoor unit 11.
  • the expansion valve 67 adjusts the opening degree of the valve based on the control command of the control board 53, and controls the flow rate of the refrigerant.
  • the fan 69 sends air to the heat exchanger 68.
  • a transmission module 92 and a control module 96 are configured on the control board 53.
  • the control board 53 transmits and receives various signals between the indoor unit 13 and the outdoor unit 11.
  • the control board 53 controls driving of the expansion valve 67 and the fan 69.
  • the transmission module 92 transmits and receives various signals to and from the outdoor unit 11 via the indoor / outdoor dedicated transmission line 35.
  • the detection result of the temperature sensor 75 and the detection result of the humidity sensor 73 are supplied to the control module 96.
  • the temperature sensor 75 detects the temperature around the indoor unit 13 and supplies the indoor temperature data of the air-conditioning target space to the control module 96.
  • the humidity sensor 73 detects the humidity around the indoor unit 13 and supplies the indoor humidity data of the air-conditioning target space to the control module 96.
  • control module 96 controls the driving of the expansion valve 67 and the fan 69 based on various signals supplied from the transmission module 92, the detection result of the temperature sensor 75, and the detection result of the humidity sensor 73. To do. Since the control module 96 communicates with the outdoor unit 11 via the transmission module 92, various data held by the outdoor unit 11 can be acquired.
  • FIG. 4 is a diagram showing an example of the internal configuration of the centralized controller 19 according to Embodiment 1 of the present invention.
  • the centralized controller 19 includes an interface configuration unit 101 and a processing configuration unit 103.
  • the interface configuration unit 101 relays transmission / reception of various signals between the air conditioning equipment 5 and the general-purpose device controller 17 and the processing configuration unit 103, and appropriately converts various signals in accordance with a communication protocol.
  • the processing configuration unit 103 includes a first communication module 111, a second communication module 113, a storage module 115, and a control module 117, and monitors, controls, and sets the general equipment controller 17, the air conditioning equipment 5, and the general equipment group 18. Etc.
  • the first communication module 111 relays communication between the interface configuration unit 101 and the control module 117.
  • the second communication module 113 relays communication between the control module 117 and the external device group 21.
  • the storage module 115 stores various data related to monitoring, control, setting, and the like of the general-purpose device controller 17, the air conditioning equipment 5, and the general-purpose device group 18.
  • the control module 117 performs integrated management of the processing configuration unit 103.
  • the processing configuration unit 103 executes the functions described above as a schematic software configuration.
  • the processing configuration unit 103 has a schematic hardware configuration in which, for example, a ROM (Read Only Memory), a RAM (Random Access Memory), and a CPU (Central Processing Unit) are connected via a bus.
  • the storage device, the input device, the output device, the communication device, and the drive may be connected via an input / output interface (none of which is shown).
  • FIG. 5 is a diagram showing a detailed example of the functional configuration of each of the control module 117 and the storage module 115 including the power consumption database generation processing in Embodiment 1 of the present invention. As illustrated in FIG. 5, a power consumption database generation processing module 121 is configured across both the control module 117 and the storage module 115.
  • a data regular acquisition unit 201, an operation schedule start data acquisition unit 203, an operation schedule control unit 205, an operation schedule start data acquisition unit 207, and a data calculation Unit 209 is configured.
  • a power consumption database 221 and an operation schedule database 223 are configured on the storage module 115 side.
  • the storage module 115 includes a unit number assignment table 220 separately from the power consumption database generation processing module 121.
  • the data regular acquisition unit 201 acquires the operation data of the operating unit, the power consumption of the entire property, and the power consumption of each unit every time a preset data acquisition cycle arrives.
  • the operation data includes, for example, the operating state of the operating unit, the set temperature set for the operating unit, the internal temperature of the air-conditioning target space of the operating unit, the schedule setting content of the operating unit, and the like.
  • the operating state of the operating unit is, for example, whether there is an abnormality in the device, whether the load is cut off, whether there is a margin for the target power, whether there is a caution alarm, and whether there is a cut-off alarm. It is not limited to.
  • the temperature in the air-conditioning target space of the operating unit varies depending on the air-conditioning target space, for example, the inside corresponding to each of the fruit processing room, the meat processing room, the fresh fish processing room, the arrival room, etc. Temperature.
  • the schedule setting content of the operating unit is the operation content in which normal operation or demand control or the like is set for each time zone, such as a daily schedule or a weekly schedule.
  • the centralized controller 19 determines that the demand control described later has a higher priority than the scheduled demand control.
  • the power consumption of the entire property is the power consumption of the equipment within the range managed by the centralized controller 19.
  • the centralized controller 19 manages the air conditioning equipment 5_1, the general-purpose equipment controller 17_2, and the general-purpose equipment group 18_2
  • the power consumption of the entire property is the air conditioning equipment 5_1, the general-purpose equipment controller 17_2, and the general-purpose equipment group 18_2.
  • the power consumption of each unit is the power consumption of each unit within the range managed by the centralized controller 19.
  • the centralized controller 19 manages the air conditioning equipment 5_1, and the air conditioning equipment 5_1 is composed of the outdoor unit 11_1 to the outdoor unit 11_3 and the indoor unit 13_11 to the indoor unit 13_33.
  • the power consumption of each unit is the power consumption of each of the outdoor unit 11_1 to the outdoor unit 11_3 and the indoor unit 13_11 to the indoor unit 13_33.
  • the data regular acquisition unit 201 stores various types of data acquired at each data acquisition cycle as comparison data, for example, accumulates operation data of the units in operation, power consumption of the entire property data, the first unit, etc.
  • the power consumption of the operating unit is accumulated, and the operation data of the operating unit such as the first unit is associated with the power consumption of the operating unit such as the first unit for each unit. deep.
  • the first unit described above is assumed to mean any one of the outdoor unit 11 and the indoor unit 13.
  • operation data of the operating unit corresponds to the third operation data in the present invention.
  • the operation schedule start time data acquisition unit 203 acquires operation data at the start of the operation schedule. Specifically, the operation schedule start time data acquisition unit 203 acquires operation data of a unit that starts the operation schedule. Specifically, as described above, the operation schedule start time data acquisition unit 203 uses the operation status of the operation schedule target unit, the set temperature of the operation schedule target unit, and the operation schedule target unit as the operation data. Acquires the internal temperature of the air conditioning target space and the schedule setting contents of the operation schedule target unit.
  • the operation schedule control unit 205 acquires schedule setting contents corresponding to each of the first unit to the fifth unit.
  • the operation schedule control unit 205 accumulates data by associating a target unit with power consumption that is power data for each unit that is a target of the operation schedule. For example, the operation schedule control unit 205 accumulates the power consumption of the target unit until the power acquisition cycle comes.
  • the power acquisition cycle is, for example, 5 minutes, but is not particularly limited to this.
  • the operation schedule start data acquisition unit 207 acquires the maximum power consumption among the plurality of power data accumulated by the operation schedule control unit 205, that is, the plurality of power consumptions.
  • the data acquisition unit 207 after the start of the operation schedule associates the target unit with the maximum power consumption.
  • the data calculation unit 209 is based on the operation data acquired by the operation schedule start time data acquisition unit 203 and the set data of the target unit and the maximum power consumption acquired by the data acquisition unit 207 after the start of the operation schedule. Create data after running schedule.
  • the data calculation unit 209 creates operation schedule and post-execution data by associating operation data and maximum power consumption and associating operation data and maximum power consumption corresponding to the target unit.
  • the data calculation unit 209 compares the comparison data acquired by the data periodic acquisition unit 201 with the data after execution of the operation schedule.
  • the data calculation unit 209 determines whether the data other than the power data is the same data as a result of the comparison. That is, if the operation data included in the comparison data that is the data before the start of the operation schedule and the operation data included in the data after the operation schedule that is the data after the start of the operation schedule are the same, the data calculation unit 209 The power consumption database 221 is updated, and if it is not the same, various data associated with the operation schedule execution are added.
  • a correspondence relationship is established in which a unit number of the first unit or the like is associated with each unit under the control of the centralized controller 19. For example, the correspondence between the unit number and the address set for each unit may be set.
  • the power consumption database 221 includes, for example, unit unit data, operating unit data, and entire property data.
  • the unit unit data has, for example, a data structure in which operation data and power data are linked.
  • the operation data includes the operation state, the set temperature, the internal temperature, and the schedule setting content.
  • the power data is power consumption as described above. That is, the unit unit data has a data structure in which operation data and power data are associated with each unit.
  • the operation data included in the power consumption database 221 corresponds to the first operation data in the present invention.
  • the power data included in the power consumption database 221 corresponds to the first power consumption data in the present invention.
  • the operating unit data for example, whether each unit is operating is set.
  • the operating unit data is set such that the first unit is operating and the second unit is stopped.
  • the operating state of a unit under the control of the centralized controller 19 may be set.
  • the entire property data includes, for example, power data of the entire property. That is, the entire property data may store the result of obtaining the power consumption of the entire property.
  • the power consumption database 221 stores, for each unit, the operation state and setting for each unit in order to record how much power consumption has increased by executing what operation schedule during what operation (setting).
  • the temperature, internal temperature, schedule setting content, and power consumption are stored as one record.
  • the power consumption included in one record is the maximum power consumption.
  • the power consumption database generation processing module 121 described above may be developed in the logical space of the storage device every time it is executed, and it is preliminarily stored in the logical space or physical space regardless of whether or not it is executed. It may be configured.
  • the data structure of the power consumption database 221 and the data structure of the operation schedule database 223 described above are examples, and are not particularly limited thereto.
  • FIG. 6 is a diagram showing a detailed example of the functional configurations of the control module 117 and the storage module 115 including the priority-ordered demand control process according to the first embodiment of the present invention.
  • FIG. 7 is a diagram illustrating an example of ranking of the power that can be reduced determined based on the power consumption database 221 and the power reduction database 225 according to Embodiment 1 of the present invention.
  • a demand control processing module 123 with priority is configured across both the control module 117 and the storage module 115.
  • a unit 309 and a demand result calculation unit 311 are configured.
  • a reduced power database 225 is configured on the storage module 115 side in the priority-ordered demand control processing module 123.
  • the storage module 115 includes the unit number allocation table 220 separately from the power consumption database generation processing module 121 and the priority-ordered demand control processing module 123.
  • the priority order determination data periodic acquisition unit 301 acquires unit unit data included in the power consumption database 221 for each priority order determination data acquisition cycle. That is, the priority determination data regular acquisition unit 301 acquires the operation data and the power consumption corresponding to the operation data, that is, the power consumption of each unit, for each priority determination data acquisition cycle.
  • the unit unit data comparison unit 303 acquires unit unit set power for each priority order determination data acquisition cycle.
  • the unit unit set power is set power assigned to each unit in the entire property set power. That is, in the unit-unit set power, usable power consumption is associated with each unit out of the entire property set power that is contract power. Note that the logical space in which the unit unit set power is held before being acquired by the unit unit data comparison unit 303 is not particularly limited.
  • the unit unit data comparison unit 303 acquires the power consumption for each unit among the unit unit data acquired by the priority order determination data periodic acquisition unit 301.
  • the unit unit data comparison unit 303 compares the unit unit set power and the unit power consumption for each unit.
  • the unit unit data comparison unit 303 shifts to priority determination processing.
  • the priority order determination unit 305 includes, for example, a lowerable power ranking determination unit 401 and a priority order queue 403.
  • the reducible power ranking determining unit 401 ranks the reducible power based on the power consumption database 221 and the reduced power database 225 after referring to the schedule setting content and the demand control content.
  • the reducible power ranking determination unit 401 determines, for each unit, power data when power consumption occurs with reference to schedule setting contents and power data when power consumption occurs with reference to demand control contents. Is given priority from the unit whose power to be reduced is large.
  • the priority queue 403 is, for example, a buffer of FIFO (First In First Out) logical configuration, and stores the execution order of demand control in units based on the result of ranking the power that can be reduced. Details of the operation of the priority order determination unit 305 will be described later with reference to FIG.
  • FIFO First In First Out
  • the entire property data comparison unit 307 acquires the power consumption obtained as the power data of the entire property data included in the power consumption database 221, that is, the entire property power consumption, for each priority determination data acquisition cycle.
  • the entire property data comparison unit 307 acquires the entire property setting power, that is, contract power.
  • the logical space in which the entire property set power is held before being acquired by the entire property data comparison unit 307 is not particularly limited.
  • the entire property data comparison unit 307 compares the entire property power consumption with the entire property power setting, and when the entire property power consumption exceeds the entire property power setting, shifts to the demand control process.
  • the demand control unit 309 selects the priority target unit by referring to the priority queue 403, and acquires the demand control content from the operation data included in the unit unit data.
  • the demand control unit 309 performs demand control based on the acquired demand control content.
  • the demand control unit 309 acquires operation data at the start of demand control and supplies it to the demand result calculation unit 311.
  • the demand control unit 309 supplies data related to the target unit to be demand controlled to the demand result calculation unit 311.
  • the demand control unit 309 accumulates power data, that is, power consumption at the time of demand control until the power acquisition cycle comes. When the power acquisition cycle arrives, the demand control unit 309 acquires the minimum power consumption from the accumulated power data and supplies the minimum power consumption to the demand result calculation unit 311.
  • the operation data at the start of demand control and the operation data corresponding to the unit in operation according to the demand control are the same data. Therefore, the operation data at the start of demand control corresponds to the fourth operation data in the present invention.
  • the demand result calculation unit 311 acquires unit unit data.
  • the demand result calculation unit 311 associates the target unit, the operation data, and the minimum power consumption, and forms post-demand execution data. For example, the demand result calculation unit 311 associates the target unit with the minimum power consumption.
  • the demand result calculation unit 311 associates the operation data with the minimum power consumption.
  • the demand result calculation unit 311 associates the target unit with the operation data.
  • the demand result calculation unit 311 compares the unit unit data with the post-demand execution data, so that when the data other than the power data is the same data, that is, when the same unit is the same operation data, the reduced power If the database 225 is updated and the data other than the power data is not the same data, the post-demand execution data is added to the reduced power database 225.
  • the reduced power database 225 is configured by unit unit data, for example.
  • the unit unit data has, for example, a data structure in which operation data and power data are linked.
  • the operation data includes the operation state, the set temperature, the internal temperature, and the demand control content.
  • the power data is power consumption as described above. That is, the unit unit data has a data structure in which operation data and power data are associated with each unit.
  • the operation data included in the reduced power database 225 corresponds to the second operation data in the present invention.
  • the power data included in the reduced power database 225 corresponds to the second power consumption in the present invention.
  • the reduced power database 225 records, for each unit, the operating state, for each unit, in order to record how much power consumption has been reduced by executing what demand control during what operation (setting).
  • the set temperature, internal temperature, demand control contents, and power consumption are stored as one record.
  • the power consumption included in one record is the minimum power consumption.
  • the power consumption database generation processing module 121 described above may be developed in the logical space of the storage device every time it is executed, and it is preliminarily stored in the logical space or physical space regardless of whether or not it is executed. It may be configured.
  • the data structure of the power consumption database 221 and the data structure of the operation schedule database 223 described above are examples, and are not particularly limited thereto.
  • the priority-ordered demand control processing module 123 and the power consumption database generation processing module 121 exist over both the control module 117 and the storage module 115.
  • the power consumption database generation processing is performed. Only module 121 exists across both control module 117 and storage module 115. This is because the demand control processing module with priority 123 uses the calculation result of the power consumption database generation processing module 121, but the power consumption database generation processing module 121 performs various calculations independently. If there is sufficient margin in the logical space, both the priority-ordered demand control processing module 123 and the power consumption database generation processing module 121 may exist in any process.
  • the centralized controller 19, for example, the priority order determination unit 305 acquires the maximum power consumption from the power consumption database 221 and acquires the minimum power consumption from the reduced power database 225 for each unit, and determines the maximum power consumption and the minimum power consumption. Compare the differences. For example, the priority determining unit 305 obtains the difference between the maximum power consumption and the minimum power consumption corresponding to the first unit as the first difference, and determines the difference between the maximum power consumption and the minimum power consumption corresponding to the second unit. Then, the difference corresponding to each unit is similarly obtained, and for example, the difference between the maximum power consumption and the minimum power consumption corresponding to the Nth unit is obtained as the Nth difference. The priority order determination unit 305 determines the priority order in which demand control is executed in order from the largest unit among the first to Nth differences. For example, the priority order determination unit 305 stores the determined priority order in the priority order queue 403.
  • the priority-ordered demand control processing module 123 described above may be developed in a logical space of a storage device (not shown) each time it is executed. It may be configured in advance in the space. Further, the data structure of the reduced power database 225 described above is an example, and the present invention is not particularly limited to this.
  • the functional configurations of the power consumption database generation processing module 121 and the priority-ordered demand control processing module 123 described above are merely examples, and are not particularly limited thereto. In short, what is necessary is just to implement each function demonstrated above.
  • FIG. 8 is a flowchart for explaining an overall processing example of the centralized controller 19 according to Embodiment 1 of the present invention.
  • Step S11 The centralized controller 19 executes a power consumption database generation process, and shifts to a priority-ordered demand control process.
  • the power consumption database generation processing module 121 described above executes the power consumption database generation processing.
  • Step S12 The centralized controller 19 executes the demand control process with priority and ends the process.
  • the demand control with priority order is executed by the demand control process module 123 with priority order described above, for example.
  • FIG. 9 is a flowchart for explaining the power consumption database generation processing according to Embodiment 1 of the present invention.
  • the processes in steps S21 to S24 correspond to the data regular acquisition process.
  • the processing from step S25 to step S27 corresponds to the operation schedule start processing.
  • the processing from step S28 to step S31 corresponds to the execution data acquisition processing.
  • the processing from step S32 to step S33 corresponds to the database update confirmation processing.
  • the processes in steps S34 to S37 correspond to the database update process.
  • the process in step S38 corresponds to the database addition process.
  • Step S21 The centralized controller 19 determines whether or not a data acquisition cycle has arrived. When the data acquisition cycle has arrived, the centralized controller 19 proceeds to step S22. On the other hand, when the data acquisition cycle has not arrived, the centralized controller 19 returns to step S21.
  • Step S22 The centralized controller 19 acquires operation data of the operating unit.
  • Step S23 The centralized controller 19 acquires the power consumption of the entire property.
  • Step S24 The centralized controller 19 acquires the power consumption of each unit.
  • Step S25 The centralized controller 19 refers to the set time of the operation schedule of each unit.
  • Step S26 The centralized controller 19 determines whether or not there is an operation schedule that has reached the set time. If there is an operation schedule for which the set time has arrived, the centralized controller 19 proceeds to step S27. On the other hand, the centralized controller 19 returns to step S25, when there is no driving schedule which the set time has come.
  • Step S27 The centralized controller 19 operates the corresponding unit.
  • Step S28 The centralized controller 19 acquires operation data at the start of the operation schedule.
  • Step S29 The centralized controller 19 accumulates power data.
  • Step S30 The centralized controller 19 determines whether or not the power acquisition cycle has arrived. When the power acquisition cycle has arrived, the centralized controller 19 proceeds to step S31. On the other hand, when the power acquisition cycle does not arrive, the centralized controller 19 returns to step S29.
  • Step S31 The centralized controller 19 acquires the maximum power consumption from the power data.
  • Step S32 The centralized controller 19 compares various data associated with the operation schedule execution with various data corresponding to the operating unit.
  • the various data is data including operation data and power data.
  • Step S33 The centralized controller 19 determines whether data other than power data is the same data. If the data other than the power data is the same data, the centralized controller 19 proceeds to step S34. On the other hand, if the data other than the power data is not the same data, the centralized controller 19 proceeds to step S38.
  • Step S34 The centralized controller 19 extracts a corresponding unit.
  • Step S35 The centralized controller 19 calculates the average of the power consumption of the corresponding unit and the acquired maximum power consumption.
  • Step S36 The centralized controller 19 updates the power consumption database 221 of the corresponding unit based on the calculation result.
  • Step S37 The centralized controller 19 determines whether or not data related to all operating units has been confirmed. When the centralized controller 19 confirms the data regarding all operating units, the centralized controller 19 proceeds to step S39. On the other hand, the centralized controller 19 returns to step S32, when the data regarding all the units in operation are not confirmed.
  • Step S38 The centralized controller 19 adds various data associated with the operation schedule execution. As described above, the database addition process corresponds to the process in step S38.
  • Step S39 The centralized controller 19 determines whether or not there is an end command.
  • the centralized controller 19 ends the process when there is an end command.
  • the centralized controller 19 returns to step S21 when there is no termination command.
  • FIG. 10 is a flowchart for explaining the demand control with priority in the first embodiment of the present invention.
  • the processing from step S51 to step S55 corresponds to priority order determination data periodic acquisition processing.
  • the process of step S56 corresponds to the unit unit comparison process.
  • the processing from step S57 to step S58 corresponds to priority order determination processing.
  • the processing from step S59 to step S61 corresponds to the property unit comparison processing.
  • the process of step S62 corresponds to the demand control process.
  • the processes in steps S63 to S66 correspond to the execution data acquisition process.
  • the processing from step S67 to step S68 corresponds to the database update confirmation processing.
  • the processing from step S69 to step S72 corresponds to the database update processing.
  • the process of step S73 corresponds to the database addition process.
  • Step S51 The centralized controller 19 determines whether or not the priority order determination data acquisition cycle has arrived. When the priority determination data acquisition cycle has arrived, the centralized controller 19 proceeds to step S52. On the other hand, the centralized controller 19 returns to step S51 when the priority order determination data acquisition cycle has not arrived.
  • Step S52 The centralized controller 19 acquires operation data.
  • Step S53 The centralized controller 19 acquires the power consumption of the entire property.
  • Step S54 The centralized controller 19 acquires the power consumption of each unit.
  • Step S55 The centralized controller 19 acquires unit unit set power.
  • Step S56 The centralized controller 19 determines whether there is a unit with power consumption exceeding the unit-unit set power. When there is a unit with power consumption exceeding the unit unit set power, the centralized controller 19 proceeds to step S57. On the other hand, when there is no unit of power consumption exceeding the unit unit set power, the centralized controller 19 proceeds to step S74.
  • Step S57 The centralized controller 19 ranks the power that can be reduced for each unit based on the power consumption database 221 and the reduced power database 225.
  • Step S58 The centralized controller 19 determines the priority order of units that execute demand control based on the ranking of the power that can be reduced.
  • Step S59 The centralized controller 19 acquires the entire property setting power.
  • Step S60 The centralized controller 19 obtains the entire property power consumption.
  • Step S61 The centralized controller 19 determines whether the entire property power consumption exceeds the entire property set power. When the overall property power consumption exceeds the overall property set power, the centralized controller 19 proceeds to step S62. On the other hand, when the overall property power consumption does not exceed the overall property set power, the centralized controller 19 proceeds to step S74.
  • Step S62 The centralized controller 19 executes demand control based on the priority order.
  • Step S63 The centralized controller 19 acquires operation data at the start of demand control.
  • Step S64 The centralized controller 19 accumulates power data.
  • Step S65 The centralized controller 19 determines whether or not the power acquisition cycle has arrived. When the power acquisition cycle has arrived, the centralized controller 19 proceeds to step S66. On the other hand, when the power acquisition cycle does not arrive, the centralized controller 19 returns to step S64.
  • Step S66 The centralized controller 19 acquires the minimum power consumption from the power data.
  • Step S67 The centralized controller 19 compares various data accompanying execution of demand control with various data in the reduced power database 225.
  • the various data is data including operation data and power data.
  • Step S68 The centralized controller 19 determines whether data other than power data is the same data. If the data other than the power data is the same data, the centralized controller 19 proceeds to step S69. On the other hand, if the data other than the power data is not the same data, the centralized controller 19 proceeds to step S73.
  • Step S69 The centralized controller 19 extracts a corresponding unit.
  • Step S70 The centralized controller 19 calculates the average of the power consumption of the corresponding unit and the acquired minimum power consumption.
  • Step S71 The centralized controller 19 updates the reduced power database 225 of the corresponding unit based on the calculation result.
  • Step S72 The centralized controller 19 determines whether data relating to all units has been confirmed. When the centralized controller 19 confirms the data regarding all the units, the centralized controller 19 proceeds to step S74. On the other hand, the centralized controller 19 returns to step S67, when the data regarding all the units are not confirmed.
  • Step S73 The centralized controller 19 adds various data accompanying demand control execution. Note that the processing in step S73 corresponds to database addition processing.
  • Step S74 The centralized controller 19 determines whether or not there is an end command.
  • the centralized controller 19 ends the process when there is an end command.
  • the centralized controller 19 returns to step S51 when there is no termination command.
  • the centralized controller 19 uses the power consumption database 221 and the reduced power database 225 when ranking the power that can be reduced.
  • the present invention is not particularly limited to this.
  • the centralized controller 19 may rank the power that can be reduced in the reduced power database 225 based on the power data.
  • the centralized controller 19 may determine whether or not there is an increase in power consumption that exceeds a preset value from the stored schedule setting contents of each unit. Next, when there is an increase in power consumption that exceeds a preset value as a result of the determination, the centralized controller 19 reduces power consumption based on the current operating state of each unit and the reduced power database 225.
  • the priority for executing the demand control may be determined from a unit having a large value.
  • dummy data may be set as a default value before demand control is performed. Such dummy data may be set based on past operation data, or may be set based on a simulation result calculated from a calculation model.
  • each function of the centralized controller 19 is mounted in one housing, but the present invention is not particularly limited to this.
  • the functional configuration of the power consumption database generation processing module 121 and the functional configuration of the priority-ordered demand control processing module 123 are implemented at different locations, and various calculation results are transmitted / received via an IP-connected network. Also good. That is, each function of the centralized controller 19 may be realized by cloud computing that does not specify an execution place, and thus the implementation form of each function of the centralized controller 19 is not particularly limited.
  • the centralized controller 19 uses the maximum value of power consumption in a preset time interval for creating the power consumption database 221, it creates a database when the power consumption is highest during system operation. . Therefore, the centralized controller 19 can determine the priority order of demand control so as not to exceed the contract power by using the power consumption database 221.
  • the centralized controller 19 uses the minimum value of power consumption at a preset time interval for creating the reduced power database 225, the centralized controller 19 creates a database when the power consumption is not reduced most during the execution of demand control. . Therefore, the centralized controller 19 can safely perform demand control by using the reduced power database 225.
  • the centralized controller 19 determines the priority order of the units that perform the demand control in descending order of the power to be reduced based on the schedule setting contents, the demand control contents, the power consumption database 221 and the reduced power database 225. To do. Therefore, the centralized controller 19 can reduce the overall power consumption to a target demand value that is assumed, and thus does not exceed the contract power for the entire property.
  • the centralized controller 19 determines the priority order of the demand control target based on the power consumption. Therefore, the centralized controller 19 can reduce the overall power consumption to the target demand value when the demand control is executed. Therefore, the centralized controller 19 can operate the air conditioning equipment 5 stably without exceeding the contract power.
  • the centralized controller 19 which carries out demand control of the air-conditioning equipment 5 comprised by several units, Comprising: Each of several units is based on each power consumption of several units.
  • the priority order determination unit 305 for determining the priority order of demand control, the property entire data comparison unit 307 for comparing the power consumption of the air conditioning equipment 5 with the preset power consumption, and the power consumption of the air conditioning equipment 5
  • a centralized controller 19 including a demand control unit 309 that executes demand control based on the priority order is configured.
  • the centralized controller 19 determines the priority order of the demand control target based on the power consumption. Therefore, the centralized controller 19 can reduce the overall power consumption to the target demand value when the demand control is executed. Therefore, the centralized controller 19 can operate the air conditioning equipment 5 stably without exceeding the contract power.
  • the power consumption database 225 further includes a reduced power database 225 corresponding to demand control, and a demand result calculation unit 311 that changes the reduced power database 225.
  • the power consumption database 221 includes a plurality of units. The first operation data related to each operation schedule and the first power consumption data corresponding to the first operation data are held, and the reduced power database 225 is related to the demand control of each of the plurality of units.
  • the second operation data and the second operation data is stored, and the data calculation unit 209 includes, among the plurality of units, the third operation data corresponding to the unit in operation according to the operation schedule, and the first operation data.
  • the power consumption database 221 is changed, and the demand result calculation unit 311 includes fourth operation data and second operation data corresponding to a unit that is operating according to demand control among a plurality of units.
  • the reduced power database 225 is changed.
  • the centralized controller 19 can change the power consumption database 221 according to the operation schedule execution result, and can change the reduced power database 225 according to the demand control execution result.
  • the data calculation unit 209 updates the first power consumption data in the power consumption database 221, and
  • varied with execution of an operation schedule are added to the power consumption database 221, and the demand result calculating part 311 is 4th operation data, 2nd
  • the operation data is the same
  • the second power consumption data is updated in the reduced power database 225, and when the fourth operation data and the second operation data are not the same, it fluctuates with the execution of demand control.
  • the various data thus added are added to the reduced power database 225.
  • the centralized controller 19 can appropriately update and add the power consumption database 221 and update and add the reduced power database 225 based on the operation data.
  • the data calculation unit 209 calculates the average value obtained from the maximum power consumption data and the first power consumption data in a preset time interval in the execution period of the operation schedule.
  • the first power consumption data is updated, and the demand result calculation unit 311 calculates the average value obtained from the minimum power consumption data and the second power consumption data in a preset time interval during the demand control execution period. 2 Update power consumption data.
  • the centralized controller 19 updates each of the power consumption database 221 and the reduced power database 225, the centralized controller 19 updates the average value of the previous value and the current value.
  • the amount can be included.
  • the priority order determination unit 305 also includes the first power consumption data included in the power consumption database 221 and the second power consumption data included in the reduced power database 225 for each of a plurality of units.
  • the priority order for performing demand control is determined in order from the largest difference among the plurality of units.
  • the centralized controller 19 can determine the priority order of demand control in consideration of power consumption.
  • the centralized controller 19 can operate the air conditioning equipment 5 stably without exceeding the contract power.
  • Embodiment 2 The difference from the first embodiment is that not only the maximum value of power but also the value in the vicinity thereof is taken into consideration in the creation of the power consumption database 221, and the vicinity thereof in addition to the minimum value of power in the creation of the reduced power database 225. Is also a point to consider. In other words, the difference from the first embodiment is that a transition of power in a preset time interval is taken into account by considering not only one feature amount but also a plurality of values at a preset time interval. The point is to operate the system.
  • FIG. 11 is a diagram showing a detailed example of the functional configuration of each of the control module 117 and the storage module 115 including the power consumption database generation processing in Embodiment 2 of the present invention.
  • the differences from the first embodiment are the functional configurations of the data acquisition unit 207 and the data calculation unit 209 after starting the operation schedule. However, since other configurations are the same as those of the first embodiment, description thereof will be omitted.
  • the data acquisition unit 207 after starting the operation schedule acquires a plurality of power data accumulated by the operation schedule control unit 205, that is, a plurality of power consumptions near the maximum value before and after the maximum value among the plurality of power consumptions.
  • the data acquisition unit 207 after the start of the operation schedule associates the target unit with a plurality of power consumptions.
  • the data calculation unit 209 is based on the operation data acquired by the operation schedule start time data acquisition unit 203 and the target unit and the plurality of power consumption combination data acquired by the data acquisition unit 207 after the operation schedule is started. Create post-execution data. For example, the data calculation unit 209 creates driving schedule post-execution data by associating operation data with a plurality of power consumptions and associating operation data corresponding to the target unit and a plurality of power consumptions. Next, the data calculation unit 209 compares the comparison data acquired by the data periodic acquisition unit 201 with the data after execution of the operation schedule. Note that the data calculation unit 209 is the same as that in the first embodiment regarding the process of transition as a result of the above comparison, and a description thereof will be omitted.
  • FIG. 12 is a diagram showing a detailed example of the functional configuration of each of the control module 117 and the storage module 115 including the demand control with priority in the second embodiment of the present invention.
  • the difference from the first embodiment is the functional configuration of the demand result calculation unit 311.
  • description thereof will be omitted.
  • the demand result calculation unit 311 acquires unit unit data.
  • the demand result calculation unit 311 associates the target unit, operation data, and a plurality of power consumptions, and configures data after demand execution. For example, the demand result calculation unit 311 associates the target unit with a plurality of power consumptions.
  • the demand result calculation unit 311 associates the operation data with a plurality of power consumptions.
  • the demand result calculation unit 311 associates the target unit with the operation data.
  • the demand result calculation unit 311 compares the unit unit data with the post-demand execution data, so that when the data other than the power data is the same data, that is, when the same unit is the same operation data, the reduced power If the database 225 is updated and the data other than the power data is not the same data, the post-demand execution data is added to the reduced power database 225.
  • FIG. 13 is a diagram illustrating an example of ranking of reducible power determined based on the power consumption database 221 and the reduced power database 225 according to Embodiment 2 of the present invention.
  • the centralized controller 19 selects a unit that consumes power by referring to the schedule setting content and the demand control content for each unit.
  • the centralized controller 19, for example, the priority order determination unit 305 acquires, for each unit, the maximum value vicinity average value that is the average value of the plurality of power consumptions from the power consumption database 221, and the plurality of power consumptions from the reduced power database 225.
  • the minimum value vicinity average value which is an average value is acquired, and the difference between the maximum value vicinity average value and the minimum value vicinity average value is compared.
  • the priority order determination unit 305 obtains the difference between the maximum value vicinity average value and the minimum value vicinity average value of the first unit as the first difference, and determines the maximum value vicinity average value and the minimum value vicinity average value of the second unit.
  • the difference between the maximum value vicinity average value and the minimum value vicinity average value of the Nth unit is determined as the Nth difference, for example.
  • the priority order determination unit 305 determines the priority order in which demand control is executed in order from the largest unit among the first to Nth differences. For example, the priority order determination unit 305 stores the determined priority order in the priority order queue 403.
  • the priority-ordered demand control processing module 123 described above may be expanded in the logical space of the storage device every time it is executed, and in the logical space or the physical space regardless of whether or not it is executed. It may be configured in advance. Further, the data structure of the reduced power database 225 described above is an example, and the present invention is not particularly limited to this.
  • the functional configurations of the power consumption database generation processing module 121 and the priority-ordered demand control processing module 123 described above are merely examples, and are not particularly limited thereto. In short, what is necessary is just to implement each function demonstrated above.
  • the power consumption database 221 acquires the average value near the maximum value, that is, a plurality of power consumption including before and after the maximum value, and the acquired average value of the plurality of power consumptions is the data. Part of.
  • the reduced power database 225 obtains a minimum value vicinity average value, that is, a plurality of power consumptions including before and after the minimum value, and the acquired average values of the plurality of power consumptions constitute a part of the data.
  • the method of obtaining the average value assumes an arithmetic average, but is not particularly limited to this.
  • the average value may be obtained by any one of geometric average, moving average, weighted average, and the like.
  • the centralized controller 19 may execute a calculation in which each feature amount of the plurality of power consumptions is included in the obtained one feature amount.
  • FIG. 14 is a flowchart for explaining the power consumption database generation processing in the second embodiment of the present invention.
  • FIG. 14 is a flowchart for explaining the power consumption database generation processing according to Embodiment 2 of the present invention.
  • the processing from step S91 to step S94 corresponds to the data regular acquisition processing.
  • the processing from step S95 to step S97 corresponds to the operation schedule start processing.
  • the processing from step S98 to step S101 corresponds to the execution data acquisition processing.
  • the processing from step S102 to step S103 corresponds to the database update confirmation processing.
  • the processing from step S104 to step S107 corresponds to the database update processing.
  • the processing in step S108 corresponds to the database addition processing.
  • Step S91 The centralized controller 19 determines whether or not a data acquisition cycle has arrived. When the data acquisition cycle has arrived, the centralized controller 19 proceeds to step S92. On the other hand, when the data acquisition cycle has not arrived, the centralized controller 19 returns to step S91.
  • Step S92 The centralized controller 19 acquires operation data of the operating unit.
  • Step S93 The centralized controller 19 acquires the power consumption of the entire property.
  • Step S94 The centralized controller 19 acquires the power consumption of each unit.
  • Step S95 The centralized controller 19 refers to the set time of the operation schedule of each unit.
  • Step S96 The centralized controller 19 determines whether or not there is an operation schedule that has reached the set time. If there is an operation schedule for which the set time has arrived, the centralized controller 19 proceeds to step S97. On the other hand, the centralized controller 19 returns to step S95, when there is no driving schedule which the set time has come.
  • Step S97 The centralized controller 19 operates the corresponding unit.
  • Step S98 The centralized controller 19 acquires operation data at the start of the operation schedule.
  • Step S99 The centralized controller 19 accumulates power data.
  • Step S100 The centralized controller 19 determines whether or not the power acquisition cycle has arrived. When the power acquisition cycle has arrived, the centralized controller 19 proceeds to step S101. On the other hand, when the power acquisition cycle has not arrived, the centralized controller 19 returns to step S99.
  • Step S101 The centralized controller 19 acquires a plurality of power consumptions from the power data.
  • the plurality of power consumptions are power consumptions in the vicinity of the maximum value and mean power consumptions including before and after the maximum value.
  • Step S102 The centralized controller 19 compares various data associated with the operation schedule execution with various data corresponding to the operating unit.
  • the various data is data including operation data and power data.
  • Step S103 The centralized controller 19 determines whether data other than power data is the same data. If the data other than the power data is the same data, the centralized controller 19 proceeds to step S104. On the other hand, when the data other than the power data is not the same data, the centralized controller 19 proceeds to step S108.
  • Step S104 The centralized controller 19 extracts a corresponding unit.
  • Step S105 The centralized controller 19 calculates the average of the power consumption of the corresponding unit and the acquired plurality of power consumptions.
  • Step S106 The centralized controller 19 updates the power consumption database 221 of the corresponding unit based on the calculation result.
  • Step S107 The centralized controller 19 determines whether or not data related to all operating units has been confirmed. When the centralized controller 19 confirms the data regarding all the operating units, the centralized controller 19 proceeds to step S109. On the other hand, the centralized controller 19 returns to step S102, when the data regarding all the units in operation are not confirmed.
  • Step S108 The centralized controller 19 adds various data associated with the operation schedule execution. As described above, the database addition process corresponds to the process in step S108.
  • Step S109 The centralized controller 19 determines whether or not there is an end command.
  • the centralized controller 19 ends the process when there is an end command. On the other hand, when there is no termination command, the centralized controller 19 returns to step S91.
  • FIG. 15 is a flowchart for explaining the demand control with priority in the second embodiment of the present invention.
  • the processing from step S121 to step S125 corresponds to priority order determination data periodic acquisition processing.
  • the process of step S126 corresponds to the unit unit comparison process.
  • the processing from step S127 to step S128 corresponds to the priority order determination processing.
  • the processing from step S129 to step S131 corresponds to the property unit comparison processing.
  • the process of step S132 corresponds to the demand control process.
  • the processing from step S33 to step S136 corresponds to the execution data acquisition processing.
  • the processing from step S137 to step S138 corresponds to the database update confirmation processing.
  • the processing from step S139 to step S142 corresponds to the database update processing.
  • the process of step S143 corresponds to the database addition process.
  • Step S121 The centralized controller 19 determines whether or not the priority order determination data acquisition cycle has arrived. When the priority determination data acquisition cycle has arrived, the centralized controller 19 proceeds to step S122. On the other hand, the centralized controller 19 returns to step S121, when the priority determination data acquisition period does not arrive.
  • Step S122 The centralized controller 19 acquires operation data.
  • Step S123 The centralized controller 19 acquires the power consumption of the entire property.
  • Step S124 The centralized controller 19 acquires the power consumption of each unit.
  • Step S125 The centralized controller 19 acquires unit unit set power.
  • Step S126 The centralized controller 19 determines whether there is a unit with power consumption exceeding the unit-unit set power. When there is a unit with power consumption exceeding the unit unit set power, the centralized controller 19 proceeds to step S127. On the other hand, when there is no unit with power consumption exceeding the unit unit set power, the centralized controller 19 proceeds to step S144.
  • Step S127 The centralized controller 19 ranks the power that can be reduced for each unit based on the power consumption database 221 and the reduced power database 225.
  • Step S128) The centralized controller 19 determines the priority order of units that execute demand control based on the ranking of the power that can be reduced.
  • Step S129 The centralized controller 19 acquires the entire property setting power.
  • Step S130 The centralized controller 19 obtains the entire property power consumption.
  • Step S131 The centralized controller 19 determines whether the entire property power consumption exceeds the entire property set power. When the entire property power consumption exceeds the entire property set power, the centralized controller 19 proceeds to step S132. On the other hand, when the overall property power consumption does not exceed the overall property set power, the centralized controller 19 proceeds to step S144.
  • Step S132 The centralized controller 19 executes demand control based on the priority order.
  • Step S133 The centralized controller 19 acquires operation data at the start of demand control.
  • Step S134 The centralized controller 19 accumulates power data.
  • Step S135) The centralized controller 19 determines whether or not the power acquisition cycle has arrived. When the power acquisition cycle has arrived, the centralized controller 19 proceeds to step S136. On the other hand, when the power acquisition cycle has not arrived, the centralized controller 19 returns to step S134.
  • Step S136 The centralized controller 19 acquires a plurality of power consumptions from the power data.
  • the plurality of power consumptions are average values in the vicinity of the minimum value, and a plurality of power consumptions including before and after the minimum value are assumed.
  • Step S137 The centralized controller 19 compares various data accompanying execution of demand control with various data in the reduced power database 225.
  • the various data is data including operation data and power data.
  • Step S138 The centralized controller 19 determines whether data other than power data is the same data. When the data other than the power data is the same data, the centralized controller 19 proceeds to step S139. On the other hand, when the data other than the power data is not the same data, the centralized controller 19 proceeds to step S143.
  • Step S139 The centralized controller 19 extracts a corresponding unit.
  • Step S140 The centralized controller 19 calculates the average of the power consumption of the corresponding unit and the acquired plurality of power consumptions.
  • Step S141 The centralized controller 19 updates the reduced power database 225 of the corresponding unit based on the calculation result.
  • Step S142 The centralized controller 19 determines whether data relating to all units has been confirmed. When the centralized controller 19 confirms the data regarding all the units, the centralized controller 19 proceeds to step S144. On the other hand, the centralized controller 19 returns to step S137, when the data regarding all the units are not confirmed.
  • Step S143 The centralized controller 19 adds various data accompanying demand control execution. Note that the processing in step S143 corresponds to database addition processing.
  • Step S144 The centralized controller 19 determines whether or not there is an end command.
  • the centralized controller 19 ends the process when there is an end command. On the other hand, when there is no termination command, the centralized controller 19 returns to step S121.
  • the data calculation unit 209 is an average value obtained from the plurality of power consumption data and the first power consumption data in a preset time interval in the execution period of the operation schedule.
  • the first power consumption data is updated, and the demand result calculation unit 311 calculates the average value obtained from the plurality of power consumption data and the second power consumption data in a preset time interval during the demand control execution period. To update the second power consumption data.
  • the centralized controller 19 determines the priority order of the demand control target based on a plurality of power consumptions. Therefore, the centralized controller 19 operates the system in consideration of the transition of power in the preset time interval by considering not only one feature amount but also a plurality of values at the preset time interval. Can do. Therefore, the centralized controller 19 can reduce the overall power consumption to the target demand value when the demand control is executed more accurately. Thus, the centralized controller 19 can reliably operate the air conditioning equipment 5 without exceeding the contract power.
  • the data calculation unit 209 calculates an average value using any one of arithmetic average, geometric average, moving average, and weighted average
  • the demand result calculation unit 311 calculates arithmetic average and geometric average.
  • the average value is obtained by any one of moving average and weighted average.
  • the centralized controller 19 can perform demand control utilizing a plurality of power consumption feature quantities.
  • Air conditioning system 5, 5_1 to 5_N Air conditioning equipment, 11, 11_1 to 11_N Outdoor unit, 13, 13_11 to 13_NN Indoor unit, 15, 15_1 to 15_N Remote controller, 17, 17_1 to 17_N General equipment controller, 18, 18_1 to 18_N general-purpose equipment group, 19 centralized controller, 21 external device group, 31 general-purpose transmission line, 33 management dedicated transmission line, 35 indoor / outdoor dedicated transmission line, 37 LAN, 39 refrigerant piping, 51, 53 control board, 61 compressor, 62 Four-way switching valve, 63, 68 heat exchanger, 64, 67 expansion valve, 65 accumulator, 66, 69 fan, 71, 75 temperature sensor, 73 humidity sensor, 91 transmission module, 95 control module, 101 interface Configuration unit, 103 processing configuration unit, 111 first communication module, 113 second communication module, 115 storage module, 117 control module, 121 power consumption database generation processing module, 123 priority demand control processing module, 201 data periodic acquisition unit , 203 Operation schedule start data acquisition unit

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

 複数台のユニットで構成される空調設備5をデマンド制御する集中コントローラー19であって、複数台のユニットのそれぞれの消費電力に基づいて、複数台のユニットのそれぞれのデマンド制御の優先順位を決定する優先順位決定部305と、空調設備5の消費電力と、予め設定された設定電力と、を比較する物件全体データ比較部307と、空調設備5の消費電力が設定電力を超える場合、優先順位に基づいて、デマンド制御を実行するデマンド制御部309と、を備えた。

Description

集中コントローラー
 本発明は、集中コントローラーに関する。
 従来、デマンド制御対象となっている各ユニットの運転状態と、庫内温度と設定温度との差異と、に基づいて、デマンド制御対象の優先順位を決定してデマンド制御を行う集中コントローラーがあった(例えば、特許文献1参照)。
特許第4346584号公報(段落[0104])
 特許文献1に記載の従来技術は、デマンド制御対象の優先順位の決定に、各ユニットの消費電力量を考慮していなかった。よって、特許文献1に記載の従来技術は、優先順位の高いデマンド制御対象をデマンド制御したとしても、低下させることのできる消費電力が少ない場合があった。この場合、特許文献1に記載の従来技術は、デマンド制御を実行したとしても、全体的な消費電力を目標デマンド値に低下させることができなかった。
 上記の説明から、特許文献1に記載されているような従来技術は、デマンド制御を実行した場合、全体的な消費電力を目標デマンド値に低下させることができない恐れがあるという問題点があった。
 本発明は、上記のような問題点を解決するためになされたもので、デマンド制御を実行した場合、全体的な消費電力を目標デマンド値に低下させることができる集中コントローラーを提供することを目的とするものである。
 本発明に係る集中コントローラーは、複数台のユニットで構成される空調設備をデマンド制御する集中コントローラーであって、前記複数台のユニットのそれぞれの消費電力に基づいて、該複数台のユニットのそれぞれのデマンド制御の優先順位を決定する優先順位決定部と、前記空調設備の消費電力と、予め設定された設定電力と、を比較する物件全体データ比較部と、前記空調設備の消費電力が前記設定電力を超える場合、前記優先順位に基づいて、デマンド制御を実行するデマンド制御部と、を備えたものである。
 本発明は、消費電力に基づいてデマンド制御対象の優先順位を決定する。よって、本発明は、デマンド制御を実行した場合、全体的な消費電力を目標デマンド値に低下させることができるという効果を有する。
本発明の実施の形態1における空気調和システム1の概略構成の一例を示す図である。 本発明の実施の形態1における室外ユニット11の内部構成の一例を示す図である。 本発明の実施の形態1における室内ユニット13の内部構成の一例を示す図である。 本発明の実施の形態1における集中コントローラー19の内部構成の一例を示す図である。 本発明の実施の形態1における消費電力データベース生成処理を含む制御モジュール117及び記憶モジュール115のそれぞれの機能構成の詳細例を示す図である。 本発明の実施の形態1における優先順位付きデマンド制御処理を含む制御モジュール117及び記憶モジュール115のそれぞれの機能構成の詳細例を示す図である。 本発明の実施の形態1における消費電力データベース221及び低下電力データベース225に基づいて決定される低下可能電力の順位付けの一例を示す図である。 本発明の実施の形態1における集中コントローラー19の全体的な処理例をを説明するフローチャートである。 本発明の実施の形態1における消費電力データベース生成処理を説明するフローチャートである。 本発明の実施の形態1における優先順位付きデマンド制御処理を説明するフローチャートである。 本発明の実施の形態2における消費電力データベース生成処理を含む制御モジュール117及び記憶モジュール115のそれぞれの機能構成の詳細例を示す図である。 本発明の実施の形態2における優先順位付きデマンド制御処理を含む制御モジュール117及び記憶モジュール115のそれぞれの機能構成の詳細例を示す図である。 本発明の実施の形態2における消費電力データベース221及び低下電力データベース225に基づいて決定される低下可能電力の順位付けの一例を示す図である。 本発明の実施の形態2における消費電力データベース生成処理を説明するフローチャートである。 本発明の実施の形態2における優先順位付きデマンド制御処理を説明するフローチャートである。
 以下、本発明の実施の形態について、図面を用いて詳細に説明する。なお、本発明の実施の形態の動作を行うプログラムを記述するステップは、記載された順序に沿って時系列に行われる処理であるが、必ずしも時系列に処理されなくても、並列的又は個別に実行される処理をも含んでもよい。
 また、本実施の形態で説明される各機能をハードウェアで実現するか、ソフトウェアで実現するかは問わない。つまり、本実施の形態で説明される各ブロック図は、ハードウェアのブロック図と考えても、ソフトウェアの機能ブロック図と考えてもよい。例えば、各ブロック図は、回路デバイス等のハードウェアで実現されてもよく、図示しないプロセッサ等の演算装置上で実行されるソフトウェアで実現されてもよい。
 また、本実施の形態で説明されるブロック図の各ブロックは、その機能が実施されればよく、それらの各ブロックで構成が分離されなくてもよい。なお、本実施の形態1~2のそれぞれにおいて、特に記述しない項目については実施の形態1~2と同様とし、同一の機能及び構成については同一の符号を用いて述べることとする。また、本実施の形態1~2のそれぞれは、単独で実施されてもよく、組み合わされて実施されてもよい。いずれの場合においても、後述する有利な効果を奏することとなる。また、本実施の形態で説明する各種具体的な設定例は一例を示すだけであり、特にこれらに限定されない。
 また、本実施の形態において、システムとは、複数の装置で構成される装置全体を表すものである。また、本実施の形態において、ネットワークとは、少なくとも2つの装置が接続され、ある装置から他の装置へ情報の伝達ができるようにした仕組みをいう。ネットワークを介して通信する装置は、独立した装置同士であってもよく、1つの装置を構成している内部ブロック同士であってもよい。また、本実施の形態において、通信とは、無線通信及び有線通信は勿論、無線通信と有線通信とが混在した通信であってもよい。例えば、ある区間では無線通信が行われ、他の空間では有線通信が行われるようなものであってもよい。また、ある装置から他の装置への通信が有線通信で行われ、他の装置からある装置への通信が無線通信で行われるようなものであってもよい。
実施の形態1.
(実施の形態1の構成)
 図1は、本発明の実施の形態1における空気調和システム1の概略構成の一例を示す図である。図1に示すように、空気調和システム1は、空調設備5_1~空調設備5_Nと、汎用機器コントローラー17_1~汎用機器コントローラー17_Nと、汎用機器群18_1~汎用機器群18_Nと、集中コントローラー19と、外部装置群21と、を備えている。空調設備5_1~空調設備5_N、汎用機器コントローラー17_1~汎用機器コントローラー17_N、及び集中コントローラー19のそれぞれは、例えば、管理専用伝送線33を介して接続されている。汎用機器コントローラー17_1~汎用機器コントローラー17_N及び汎用機器群18_1~汎用機器群18_Nのそれぞれは、例えば、汎用伝送線31を介して接続されている。集中コントローラー19及び外部装置群21は、例えば、LAN(Local Area Network)37を介して接続されている。
 空調設備5_1は、例えば、室外ユニット11_1~室外ユニット11_N、室内ユニット13_11~室内ユニット13_NN、及びリモートコントローラー15_1~リモートコントローラー15_N等で構成される。室外ユニット11_1~室外ユニット11_N、室内ユニット13_11~室内ユニット13_NN、及びリモートコントローラー15_1~リモートコントローラー15_Nのそれぞれは、例えば、室内外専用伝送線35を介して接続されている。
 なお、空調設備5_2~空調設備5_Nのそれぞれは、空調設備5_1で説明した各種機器と同様な機器を含んでいると想定する。よって、空調設備5_2~空調設備5_Nのそれぞれの説明を省略する。ただし、空調設備5_1を構成する各種機器と、空調設備5_2~空調設備5_Nのそれぞれを構成する各種機器とは、台数及び種類等が同じである必要はない。
 汎用機器コントローラー17_1~汎用機器コントローラー17_Nのそれぞれは、汎用伝送線31を介して、汎用機器群18_1~汎用機器群18_Nのそれぞれを制御する。汎用機器群18_1~汎用機器群18_Nのそれぞれは、例えば、加湿器、ヒーター、換気扇、汎用機器用温度センサー、及び汎用機器用湿度センサー等(いずれも図示せず)を含む。
 集中コントローラー19は、汎用機器コントローラー17_1~汎用機器コントローラー17_N、空調設備5_1~空調設備5_N、及び外部装置群21等を管理する。集中コントローラー19は、例えば、汎用機器コントローラー17_1~汎用機器コントローラー17_Nのそれぞれの運転状態を管理する。集中コントローラー19は、例えば、空調設備5_1~空調設備5_Nのそれぞれの運転状態及び消費電力量等を管理し、空調設備5_1~空調設備5_Nのそれぞれのデマンド制御を行う。集中コントローラー19は、例えば、外部装置群21に含まれる各種機器を管理する。なお、集中コントローラー19の詳細については、図4を用いて後述する。
 外部装置群21は、例えば、エネルギー管理装置、WEBブラウザ、無線送信機器、及びタブレット端末等(いずれも図示せず)を含む。よって、集中コントローラー19は、エネルギー管理装置、WEBブラウザ、無線送信機器、及びタブレット端末等のような各種機器を管理する。
 汎用伝送線31は、一般的に外部に公開された通信プロトコルに準拠した通信が行われる通信媒体である。例えば、汎用伝送線31は、汎用機器コントローラー17_1~汎用機器コントローラー17_Nのそれぞれと、汎用機器群18_1~汎用機器群18_Nのそれぞれとの間で各種信号を伝達させる。管理専用伝送線33は、外部に非公開である通信プロトコルに準拠した通信が行われる通信媒体である。例えば、管理専用伝送線33は、空調設備5_1~空調設備5_Nのそれぞれと、汎用機器コントローラー17_1~汎用機器コントローラー17_Nのそれぞれと、集中コントローラー19との間で各種信号を伝達させる。
 室内外専用伝送線35は、外部に非公開である通信プロトコルに準拠した通信が行われる通信媒体である。室内外専用伝送線35は、例えば、室外ユニット11_1~室外ユニット11_Nのそれぞれと、室内ユニット13_11~室内ユニット13_NNのそれぞれと、リモートコントローラー15_1~リモートコントローラー15_Nのそれぞれとの間で各種信号を伝達させる。
 なお、汎用伝送線31、管理専用伝送線33、及びLAN37等のような有線媒体は、通信媒体の一例であって、特にこれらに限定されない。例えば、通信媒体は、無線媒体であってもよい。
 なお、空調設備5_1~空調設備5_Nのそれぞれを特に区別しない場合、空調設備5と称する。また、室外ユニット11_1~室外ユニット11_Nのそれぞれを特に区別しない場合、室外ユニット11と称する。また、室内ユニット13_11~室内ユニット13_NNのそれぞれを特に区別しない場合、室内ユニット13と称する。また、リモートコントローラー15_1~リモートコントローラー15_Nのそれぞれを特に区別しない場合、リモートコントローラー15と称する。また、汎用機器コントローラー17_1~汎用機器コントローラー17_Nのそれぞれを特に区別しない場合、汎用機器コントローラー17と称する。また、汎用機器群18_1~汎用機器群18_Nのそれぞれを特に区別しない場合、汎用機器群18と称する。
 なお、室内ユニット13及び室外ユニット11のそれぞれは、本発明におけるユニットに相当する。例えば、複数台の室内ユニット13は、本発明のおける複数台のユニットに相当する。また、例えば、室内ユニット13及び室外ユニット11は、本発明における複数台のユニットに相当する。また、例えば、複数台の室内ユニット13及び室外ユニット11は、本発明における複数台のユニットに相当する。また、複数台の室内ユニット13及び複数台の室外ユニット11は、本発明における複数台のユニットに相当する。また、室内ユニット13及び複数台の室外ユニット11は、本発明における複数台のユニットに相当する。
 次に、空調設備5に含まれる室外ユニット11及び室内ユニット13で構成される空気調和機の冷媒回路構成例について図2及び図3を用いて説明する。なお、空気調和機を構成する室外ユニット11及び室内ユニット13のそれぞれの台数及び冷媒回路構成は後述する記載内容に特に限定されない。また、室外ユニット11及び室内ユニット13のそれぞれの設置台数にかかわらず、室外ユニット11及び室内ユニット13を総称する場合、空気調和機と称する。また、室外ユニット11及び室内ユニット13を含む空調設備5は、後述する記載内容で特に限定されない。
 図2は、本発明の実施の形態1における室外ユニット11の内部構成の一例を示す図である。図2に示すように、室外ユニット11は、圧縮機61、四方切換弁62、熱交換器63、膨張弁64、アキュムレーター65、ファン66、及び制御基板51等を備えている。室外ユニット11には、冷媒配管39が接続されている。冷媒配管39は、室外ユニット11内に構成されている空気調和機の冷媒回路の一部と接続され、室内ユニット13内に構成されている空気調和機の冷媒回路の一部と接続されることで、室外ユニット11と、室内ユニット13との間で冷媒を循環させる。
 圧縮機61は、吸入した冷媒を圧縮し、運転周波数に応じて任意の圧力を加えて吐出する。圧縮機61は、例えば、図示しないインバータ回路から供給される運転周波数の変化に応じて、単位時間当たりの冷媒の送出量を変化させる。四方切換弁62は、例えば、冷房運転又は暖房運転に応じて、冷媒回路の経路を切り換える。熱交換器63は、内部を流通する冷媒と、外部に存在する空気とを熱交換する。膨張弁64は、制御基板51から供給される制御指令に基づいて、弁の開度が調整されることで、冷媒の流量を制御する。アキュムレーター65は、冷媒液を貯留することで、気相の冷媒を圧縮機61に吸入させる。ファン66は、熱交換器63に空気を送る。
 制御基板51には、伝送モジュール91及び制御モジュール95が構成されている。制御基板51は、例えば、室外ユニット11と、室内ユニット13との間の各種信号を送受信する。制御基板51は、例えば、圧縮機61、四方切換弁62、膨張弁64、及びファン66の駆動を制御する。具体的には、伝送モジュール91が、室内外専用伝送線35を介して、室内ユニット13と各種信号を送受信する。また、制御モジュール95には、温度センサー71の検知結果が供給される。温度センサー71は、室外ユニット11周囲の温度を検知する。
 よって、制御モジュール95は、伝送モジュール91から供給される各種信号と、温度センサー71の検知結果と、に基づいて、圧縮機61、四方切換弁62、膨張弁64、及びファン66のそれぞれの駆動を制御する。制御モジュール95は、伝送モジュール91を介して、室内ユニット13と通信が行われるため、室内ユニット13が保持する空調対象空間の室内温度データを取得することができる。
 図3は、本発明の実施の形態1における室内ユニット13の内部構成の一例を示す図である。図3に示すように、室内ユニット13は、膨張弁67、熱交換器68、ファン69、及び制御基板53等を備えている。室内ユニット13には、冷媒配管39が接続されている。冷媒配管39は、上記で説明したように、室内ユニット13内に構成されている空気調和機の冷媒回路の一部と接続され、室外ユニット11内に構成されている空気調和機の冷媒回路の一部と接続されることで、室内ユニット13と、室外ユニット11との間で冷媒を循環させる。
 膨張弁67は、制御基板53の制御指令に基づいて、弁の開度が調整され、冷媒の流量を制御する。ファン69は、熱交換器68に空気を送る。
 制御基板53には、伝送モジュール92及び制御モジュール96が構成されている。制御基板53は、例えば、室内ユニット13と、室外ユニット11との間の各種信号を送受信する。制御基板53は、例えば、膨張弁67及びファン69のそれぞれの駆動を制御する。具体的には、伝送モジュール92は、室内外専用伝送線35を介して、室外ユニット11と各種信号を送受信する。制御モジュール96には、温度センサー75の検知結果及び湿度センサー73の検知結果が供給される。温度センサー75は、室内ユニット13周囲の温度を検知することで、空調対象空間の室内温度データを制御モジュール96に供給する。湿度センサー73は、室内ユニット13周囲の湿度を検知することで、空調対象空間の室内湿度データを制御モジュール96に供給する。
 よって、制御モジュール96は、伝送モジュール92から供給される各種信号と、温度センサー75の検知結果と、湿度センサー73の検知結果と、に基づいて、膨張弁67及びファン69のそれぞれの駆動を制御する。制御モジュール96は、伝送モジュール92を介して、室外ユニット11と通信が行われるため、室外ユニット11が保持する各種データを取得することができる。
 図4は、本発明の実施の形態1における集中コントローラー19の内部構成の一例を示す図である。図4に示すように、集中コントローラー19は、インターフェース構成部101及び処理構成部103を備えている。インターフェース構成部101は、空調設備5及び汎用機器コントローラー17と、処理構成部103との間で、各種信号の送受信を中継し、適宜、通信プロトコルに準拠した各種信号の変換を行う。
 処理構成部103は、第1通信モジュール111、第2通信モジュール113、記憶モジュール115、及び制御モジュール117を備え、汎用機器コントローラー17、空調設備5、及び汎用機器群18の監視、制御、及び設定等を行う。第1通信モジュール111は、インターフェース構成部101と、制御モジュール117との間の通信を中継する。第2通信モジュール113は、制御モジュール117と、外部装置群21との間の通信を中継する。記憶モジュール115は、汎用機器コントローラー17、空調設備5、及び汎用機器群18の監視、制御、及び設定等に関する各種データを記憶する。制御モジュール117は、処理構成部103を統合管理する。
 処理構成部103は、概略的なソフトウェア構成としては上記で説明したような機能が実行される。一方、処理構成部103は、概略的なハードウェア構成としては、例えば、ROM(Read Only Memory)、RAM(Random Access Memory)、及びCPU(Central Processing Unit)がバスを介して接続され、バスと、記憶装置と、入力装置と、出力装置と、通信装置と、ドライブとが入出力インターフェースを介して接続されていればよい(いずれも図示せず)。次に、処理構成部103のうち、制御モジュール117及び記憶モジュール115の詳細構成例について図5及び図6を用いて説明する。
 図5は、本発明の実施の形態1における消費電力データベース生成処理を含む制御モジュール117及び記憶モジュール115のそれぞれの機能構成の詳細例を示す図である。図5に示すように、制御モジュール117及び記憶モジュール115の両方にわたって、消費電力データベース生成処理モジュール121が構成される。
 消費電力データベース生成処理モジュール121のうち、制御モジュール117側には、データ定期取得部201、運転スケジュール開始時データ取得部203、運転スケジュール制御部205、運転スケジュール開始後データ取得部207、及びデータ演算部209が構成される。消費電力データベース生成処理モジュール121のうち、記憶モジュール115側には、消費電力データベース221及び運転スケジュールデータベース223が構成される。なお、記憶モジュール115には、消費電力データベース生成処理モジュール121とは別に、ユニット番号割当テーブル220が構成されている。
 データ定期取得部201は、予め設定されたデータ取得周期が到来するたびに、稼働中ユニットの運転データと、物件全体の消費電力と、各ユニットの消費電力とを取得する。運転データは、例えば、稼働中ユニットの運転状態、稼働中ユニットに設定された設定温度、稼働中ユニットの空調対象空間の庫内温度、及び稼働中ユニットのスケジュール設定内容等である。運転データのうち、稼働中ユニットの運転状態は、例えば、装置の異常有無、負荷の遮断有無、目標電力に対する余裕の有無、注意警報の有無、及び遮断警報の有無等であるが、特にれらに限定されない。運転データのうち、稼働中ユニットの空調対象空間の庫内温度は、空調対象空間ごとに異なり、例えば、青果加工室、精肉加工室、鮮魚加工室、及び入荷室等のそれぞれに対応する庫内温度である。
 運転データのうち、稼働中ユニットのスケジュール設定内容は、例えば、デイリースケジュール又はウィークリースケジュール等のように時間帯ごとに通常運転又はデマンド制御等が設定された運転内容である。つまり、集中コントローラー19は、スケジュール設定されているデマンド制御と比べ、後述するデマンド制御の方が優先順位が高いと判断する。
 物件全体の消費電力は、集中コントローラー19が管理する範囲の機器の消費電力である。例えば、集中コントローラー19が、空調設備5_1、汎用機器コントローラー17_2、及び汎用機器群18_2を管理している場合、物件全体の消費電力は、空調設備5_1、汎用機器コントローラー17_2、及び汎用機器群18_2を合計した消費電力である。各ユニットの消費電力は、集中コントローラー19が管理する範囲のユニットごとの消費電力である。例えば、集中コントローラー19が、空調設備5_1を管理し、空調設備5_1は、室外ユニット11_1~室外ユニット11_3及び室内ユニット13_11~室内ユニット13_33で構成されていると想定する。この場合、各ユニットの消費電力は、室外ユニット11_1~室外ユニット11_3及び室内ユニット13_11~室内ユニット13_33のそれぞれの消費電力である。
 データ定期取得部201は、データ取得周期ごとに取得した各種データを比較データとして、例えば、稼働中ユニットの運転データを蓄積していき、物件全体データの消費電力と、第1ユニット等のような稼働中ユニットの消費電力とを蓄積していき、第1ユニット等のような稼働中ユニットの運転データと、第1ユニット等のような稼働中ユニットの消費電力とをユニットごとに紐付けさせておく。なお、上記で説明した第1ユニットは、室外ユニット11及び室内ユニット13の何れか1台を意味すると想定する。
 なお、稼働中ユニットの運転データは、本発明における第3運転データに相当する。
 次に、運転スケジュール開始時データ取得部203は、運転スケジュール開始時の運転データを取得する。具体的には、運転スケジュール開始時データ取得部203は、運転スケジュールを開始させるユニットの運転データを取得する。具体的には、運転スケジュール開始時データ取得部203は、上記で説明したように、運転データとして、運転スケジュール対象のユニットの運転状態、運転スケジュール対象のユニットの設定温度、運転スケジュール対象のユニットの空調対象空間の庫内温度、及び運転スケジュール対象のユニットのスケジュール設定内容を取得する。
 次に、運転スケジュール制御部205は、集中コントローラー19の管理下にあるユニット台数が、例えば、5台と想定した場合、第1ユニット~第5ユニットのそれぞれに対応するスケジュール設定内容を取得する。運転スケジュール制御部205は、運転スケジュール対象のユニットごとに、対象ユニットと、電力データである消費電力とを紐付けしてデータを蓄積していく。例えば、運転スケジュール制御部205は、電力取得周期が到来するまで、対象ユニットの消費電力を蓄積していく。なお、電力取得周期は、例えば、5分間であるが、特にこれに限定されない。
 次に、運転スケジュール開始後データ取得部207は、運転スケジュール制御部205が蓄積した複数の電力データ、すなわち、複数の消費電力のうち、最大消費電力を取得する。運転スケジュール開始後データ取得部207は、対象ユニットと、最大消費電力とを紐付けしておく。次に、データ演算部209は、運転スケジュール開始時データ取得部203が取得した運転データと、運転スケジュール開始後データ取得部207が取得した対象ユニット及び最大消費電力の組データと、に基づいて、運転スケジュール実行後データを作成する。例えば、データ演算部209は、運転データと、最大消費電力とを紐付けさせ、対象ユニットに対応する運転データ及び最大消費電力を紐付けさせることで、運転スケジュール実行後データを作成する。次に、データ演算部209は、データ定期取得部201で取得した比較データと、運転スケジュール実行後データとを比較する。
 次に、データ演算部209は、上記の比較の結果、電力データ以外が同一のデータであるか否かを判定する。つまり、データ演算部209は、運転スケジュール開始前のデータである比較データに含まれる運転データと、運転スケジュール開始後のデータである運転スケジュール実行後データに含まれる運転データと、が同一であれば、消費電力データベース221を更新させ、同一でなければ、運転スケジュール実行に伴う各種データを追加する。
 ユニット番号割当テーブル220は、第1ユニット等のユニット番号と、集中コントローラー19の管理下にある各ユニットとを紐付ける対応関係が設定されている。例えば、ユニット番号と、各ユニットに設定されているアドレスとの対応関係が設定されていればよい。
 消費電力データベース221は、例えば、ユニット単位データと、稼働中ユニットデータと、物件全体データとで構成される。ユニット単位データは、例えば、運転データと、電力データとが紐付けされたデータ構造である。運転データは、上記で説明したように、運転状態、設定温度、庫内温度、及びスケジュール設定内容で構成される。電力データは、上記で説明したように、消費電力である。つまり、ユニット単位データは、ユニットごとに、運転データと、電力データとが紐付けされたデータ構造で構成される。
 なお、消費電力データベース221に含まれる運転データは、本発明における第1運転データに相当する。また、消費電力データベース221に含まれる電力データは、本発明における第1消費電力データに相当する。
 稼働中ユニットデータは、例えば、各ユニットが稼働中であるか否かが設定される。例えば、稼働中ユニットデータは、第1ユニットが稼働中であり、第2ユニットが停止中である等が設定される。なお、上記の説明では、第2ユニットまでの一例を説明したが、特にこれに限定されない。稼働中ユニットデータは、例えば、集中コントローラー19の管理下にあるユニットの稼働状態が設定されればよい。物件全体データは、例えば、物件全体の電力データで構成される。つまり、物件全体データは、物件全体の消費電力を求めた結果が格納されればよい。
 要するに、消費電力データベース221は、ユニットごとに、何の運転(設定)中にどんな運転スケジュールを実行することでどれだけ消費電力が増加したかを記録させるために、ユニットごとに、運転状態、設定温度、庫内温度、スケジュール設定内容、及び消費電力を1レコードとして格納していく。ここで、1レコードに含まれる消費電力は最大消費電力である。
 なお、上記で説明した消費電力データベース生成処理モジュール121は、実行されるたびに記憶装置の論理空間に展開されるものであってもよく、実行の有無にかかわらず、論理空間又は物理空間に予め構成されているものであってもよい。また、上記で説明した消費電力データベース221のデータ構造及び運転スケジュールデータベース223のデータ構造は一例であって、特にこれらに限定されない。
 図6は、本発明の実施の形態1における優先順位付きデマンド制御処理を含む制御モジュール117及び記憶モジュール115のそれぞれの機能構成の詳細例を示す図である。図7は、本発明の実施の形態1における消費電力データベース221及び低下電力データベース225に基づいて決定される低下可能電力の順位付けの一例を示す図である。図6に示すように、制御モジュール117及び記憶モジュール115の両方にわたって、優先順位付きデマンド制御処理モジュール123が構成される。
 優先順位付きデマンド制御処理モジュール123のうち、制御モジュール117側には、優先順位決定用データ定期取得部301、ユニット単位データ比較部303、優先順位決定部305、物件全体データ比較部307、デマンド制御部309、及びデマンド結果演算部311が構成される。優先順位付きデマンド制御処理モジュール123のうち、記憶モジュール115側には、低下電力データベース225が構成される。なお、上記で説明したように、記憶モジュール115には、消費電力データベース生成処理モジュール121及び優先順位付きデマンド制御処理モジュール123とは別に、ユニット番号割当テーブル220が構成されている。
 優先順位決定用データ定期取得部301は、優先順位決定用データ取得周期ごとに、消費電力データベース221に含まれるユニット単位データを取得する。つまり、優先順位決定用データ定期取得部301は、優先順位決定用データ取得周期ごとに、運転データと、運転データに対応する消費電力、すなわち、各ユニットの消費電力とを取得する。
 ユニット単位データ比較部303は、優先順位決定用データ取得周期ごとに、ユニット単位設定電力を取得する。ここで、ユニット単位設定電力は、物件全体設定電力のうち、ユニットごとに割り当てられている設定電力である。つまり、ユニット単位設定電力は、契約電力である物件全体設定電力のうち、使用可能な消費電力がユニットごとに紐付けされている。なお、ユニット単位データ比較部303に取得される前にユニット単位設定電力が保持されている論理空間は、特に限定されない。
 次に、ユニット単位データ比較部303は、優先順位決定用データ定期取得部301が取得したユニット単位データのうち、ユニットごとに消費電力を取得する。次に、ユニット単位データ比較部303は、ユニット単位設定電力と、ユニットの消費電力とを、ユニットごとに比較していく。次に、ユニット単位データ比較部303は、ユニット単位設定電力を超える消費電力のユニットがある場合、優先決定処理に移行させる。
 優先順位決定部305は、例えば、低下可能電力順位付け決定部401と、優先順位キュー403とで構成される。低下可能電力順位付け決定部401は、スケジュール設定内容及びデマンド制御内容を参照後、消費電力データベース221と、低下電力データベース225と、に基づいて、低下可能電力の順位付けを行う。例えば、低下可能電力順位付け決定部401は、ユニットごとに、スケジュール設定内容を参照して電力消費が発生する場合の電力データと、デマンド制御内容を参照して電力消費が発生する場合の電力データとを比較することで、低下させられる電力が大きいユニットから優先順位を付与していく。優先順位キュー403は、例えば、FIFO(First In First Out)の論理構成のバッファであって、低下可能電力の順位付けの結果に基づいて、デマンド制御の実行順序がユニット単位で格納される。なお、優先順位決定部305の動作の詳細については図7を用いて後述する。
 物件全体データ比較部307は、優先順位決定用データ取得周期ごとに、消費電力データベース221に含まれる物件全体データの電力データとして求められた消費電力、すなわち、物件全体消費電力を取得する。物件全体データ比較部307は、物件全体設定電力、すなわち、契約電力を取得する。なお、物件全体データ比較部307に取得される前に物件全体設定電力が保持されている論理空間は、特に限定されない。物件全体データ比較部307は、物件全体消費電力と、物件全体設定電力とを比較し、物件全体消費電力が物件全体設定電力を超える場合、デマンド制御処理に移行させる。
 デマンド制御部309は、優先順位キュー403を参照することで、優先順位対象ユニットを選択し、ユニット単位データに含まれる運転データからデマンド制御内容を取得する。デマンド制御部309は、取得したデマンド制御内容に基づいて、デマンド制御を行う。デマンド制御部309は、デマンド制御開始時の運転データを取得し、デマンド結果演算部311に供給する。デマンド制御部309は、デマンド制御対象の対象ユニットに関するデータをデマンド結果演算部311に供給する。デマンド制御部309は、電力取得周期が到来するまでの間、電力データ、すなわち、デマンド制御時の消費電力を蓄積する。デマンド制御部309は、電力取得周期が到来した場合、蓄積した電力データのうち、最小消費電力を取得し、デマンド結果演算部311に供給する。
 なお、同一のデマンド制御内容であれば、デマンド制御開始時の運転データと、デマンド制御に応じて稼働中のユニットに対応する運転データとは、同じデータとなる。よって、デマンド制御開始時の運転データは、本発明における第4運転データに相当する。
 デマンド結果演算部311は、ユニット単位データを取得する。デマンド結果演算部311は、対象ユニット、運転データ、及び最小消費電力を紐付けし、デマンド実行後データを構成する。例えば、デマンド結果演算部311は、対象ユニットと、最小消費電力とを紐付けする。デマンド結果演算部311は、運転データと、最小消費電力とを紐付けする。デマンド結果演算部311は、対象ユニットと、運転データとを紐付けする。デマンド結果演算部311は、ユニット単位データと、デマンド実行後データとを比較することで、電力データ以外が同一のデータである場合、つまり、同一のユニットで同一の運転データである場合、低下電力データベース225を更新し、電力データ以外が同一のデータでない場合、デマンド実行後データを低下電力データベース225に追加する。
 低下電力データベース225は、例えば、ユニット単位データで構成される。ユニット単位データは、例えば、運転データと、電力データとが紐付けされたデータ構造である。運転データは、上記で説明したように、運転状態、設定温度、庫内温度、及びデマンド制御内容で構成される。電力データは、上記で説明したように、消費電力である。つまり、ユニット単位データは、ユニットごとに、運転データと、電力データとが紐付けされたデータ構造で構成される。
 なお、低下電力データベース225に含まれる運転データは、本発明における第2運転データに相当する。また、低下電力データベース225に含まれる電力データは、本発明における第2消費電力に相当する。
 要するに、低下電力データベース225は、ユニットごとに、何の運転(設定)中にどんなデマンド制御を実行することでどれだけ消費電力を低下させられたかを記録させるために、ユニットごとに、運転状態、設定温度、庫内温度、デマンド制御内容、及び消費電力を1レコードとして格納していく。ここで、1レコードに含まれる消費電力は最小消費電力である。
 なお、上記で説明した消費電力データベース生成処理モジュール121は、実行されるたびに記憶装置の論理空間に展開されるものであってもよく、実行の有無にかかわらず、論理空間又は物理空間に予め構成されているものであってもよい。また、上記で説明した消費電力データベース221のデータ構造及び運転スケジュールデータベース223のデータ構造は一例であって、特にこれらに限定されない。
 なお、図6においては、優先順位付きデマンド制御処理モジュール123と、消費電力データベース生成処理モジュール121とが、制御モジュール117及び記憶モジュール115の両方にわたって存在し、図5においては、消費電力データベース生成処理モジュール121のみが制御モジュール117及び記憶モジュール115の両方にわたって存在している。これは、優先順位付きデマンド制御処理モジュール123は、消費電力データベース生成処理モジュール121の演算結果を利用するものの、消費電力データベース生成処理モジュール121は、単独で各種演算が実施されるためである。なお、論理空間に余裕が十分にあれば、何れの処理の場合においても、優先順位付きデマンド制御処理モジュール123と、消費電力データベース生成処理モジュール121とを両方存在させておいてもよい。
 次に、図7を参照し、消費電力データベース221と、低下電力データベース225とを用いることで、各ユニットの優先順位を決定する動作例について説明する。なお、図7においては、集中コントローラー19は、ユニットごとに、スケジュール設定内容と、デマンド制御内容とを参照し、電力消費が生じるユニットを選択していると想定する。
 集中コントローラー19、例えば、優先順位決定部305は、ユニットごとに、消費電力データベース221から最大消費電力を取得し、低下電力データベース225から最小消費電力を取得し、最大消費電力と、最小消費電力との差分を比較する。例えば、優先順位決定部305は、第1ユニットに対応する最大消費電力と最小消費電力との差分を第1差分とし求め、第2ユニットに対応する最大消費電力と最小消費電力との差分を第2差分として求め、以後ユニットごとに同様に対応する差分を求め、例えば、第Nユニットに対応する最大消費電力と最小消費電力との差分を第N差分として求める。優先順位決定部305は、第1差分~第N差分のうち、最も大きいユニットから順にデマンド制御を実行させる優先順位を決定する。例えば、優先順位決定部305は、決定した優先順位を優先順位キュー403に格納する。
 なお、上記で説明した優先順位付きデマンド制御処理モジュール123は、実行されるたびに図示しない記憶装置の論理空間に展開されるものであってもよく、実行の有無にかかわらず、論理空間又は物理空間に予め構成されているものであってもよい。また、上記で説明した低下電力データベース225のデータ構造は一例であって、特にこれに限定されない。
 なお、上記で説明した消費電力データベース生成処理モジュール121及び優先順位付きデマンド制御処理モジュール123のそれぞれの機能構成は一例であって、特にこれらに限定されない。要するに、上記で説明した各機能が実施されるものであればよい。
(実施の形態1の動作)
 図8は、本発明の実施の形態1における集中コントローラー19の全体的な処理例をを説明するフローチャートである。
(ステップS11)
 集中コントローラー19は、消費電力データベース生成処理を実行し、優先順位付きデマンド制御処理に移行する。消費電力データベース生成処理は、例えば、上記で説明した消費電力データベース生成処理モジュール121が実行する。
(ステップS12)
 集中コントローラー19は、優先順位付きデマンド制御処理を実行し、処理を終了する。優先順位付きデマンド制御処理は、例えば、上記で説明した優先順位付きデマンド制御処理モジュール123が実行する。
 図9は、本発明の実施の形態1における消費電力データベース生成処理を説明するフローチャートである。なお、ステップS21~ステップS24の処理がデータ定期取得処理に対応する。また、ステップS25~ステップS27の処理が運転スケジュール開始処理に対応する。また、ステップS28~ステップS31の処理が実行データ取得処理に対応する。また、ステップS32~ステップS33の処理がデータベース更新確認処理に対応する。また、ステップS34~ステップS37の処理がデータベース更新処理に対応する。また、ステップS38の処理がデータベース追加処理に対応する。
(データ定期取得処理)
(ステップS21)
 集中コントローラー19は、データ取得周期が到来したか否かを判定する。集中コントローラー19は、データ取得周期が到来した場合、ステップS22に進む。一方、集中コントローラー19は、データ取得周期が到来しない場合、ステップS21に戻る。
(ステップS22)
 集中コントローラー19は、稼働中ユニットの運転データを取得する。
(ステップS23)
 集中コントローラー19は、物件全体の消費電力を取得する。
(ステップS24)
 集中コントローラー19は、各ユニットの消費電力を取得する。
(運転スケジュール開始処理)
(ステップS25)
 集中コントローラー19は、各ユニットの運転スケジュールの設定時刻を参照する。
(ステップS26)
 集中コントローラー19は、設定時刻が到来した運転スケジュールがあるか否かを判定する。集中コントローラー19は、設定時刻が到来した運転スケジュールがある場合、ステップS27に進む。一方、集中コントローラー19は、設定時刻が到来した運転スケジュールがない場合、ステップS25に戻る。
(ステップS27)
 集中コントローラー19は、該当ユニットを運転させる。
(実行データ取得処理)
(ステップS28)
 集中コントローラー19は、運転スケジュール開始時の運転データを取得する。
(ステップS29)
 集中コントローラー19は、電力データを蓄積する。
(ステップS30)
 集中コントローラー19は、電力取得周期が到来したか否かを判定する。集中コントローラー19は、電力取得周期が到来した場合、ステップS31に進む。一方、集中コントローラー19は、電力取得周期が到来しない場合、ステップS29に戻る。
(ステップS31)
 集中コントローラー19は、電力データのうち最大消費電力を取得する。
(データベース更新確認処理)
(ステップS32)
 集中コントローラー19は、運転スケジュール実行に伴う各種データと稼働中ユニットに対応する各種データとを比較する。ここで、各種データとは、運転データと、電力データとを含んだデータであると想定する。
(ステップS33)
 集中コントローラー19は、電力データ以外が同一のデータであるか否かを判定する。集中コントローラー19は、電力データ以外が同一のデータである場合、ステップS34に進む。一方、集中コントローラー19は、電力データ以外が同一のデータでない場合、ステップS38に進む。
(データベース更新処理)
(ステップS34)
 集中コントローラー19は、該当するユニットを抽出する。
(ステップS35)
 集中コントローラー19は、該当するユニットの消費電力と取得した最大消費電力との平均を算出する。
(ステップS36)
 集中コントローラー19は、算出結果に基づいて該当するユニットの消費電力データベース221を更新する。
(ステップS37)
 集中コントローラー19は、全部の稼働中ユニットに関するデータを確認したか否かを判定する。集中コントローラー19は、全部の稼働中ユニットに関するデータを確認した場合、ステップS39に進む。一方、集中コントローラー19は、全部の稼働中ユニットに関するデータを確認していない場合、ステップS32に戻る。
(データベース追加処理)
(ステップS38)
 集中コントローラー19は、運転スケジュール実行に伴う各種データを追加する。なお、上記で説明したように、データベース追加処理は、ステップS38の処理が対応する。
(ステップS39)
 集中コントローラー19は、終了指令が有るか否かを判定する。集中コントローラー19は、終了指令が有る場合、処理を終了する。一方、集中コントローラー19は、終了指令が無い場合、ステップS21に戻る。
 図10は、本発明の実施の形態1における優先順位付きデマンド制御処理を説明するフローチャートである。なお、ステップS51~ステップS55の処理が優先順位決定用データ定期取得処理に対応する。また、ステップS56の処理がユニット単位比較処理に対応する。また、ステップS57~ステップS58の処理が優先順位決定処理に対応する。また、ステップS59~ステップS61の処理が物件単位比較処理に対応する。また、ステップS62の処理がデマンド制御処理に対応する。また、ステップS63~ステップS66の処理が実行データ取得処理に対応する。また、ステップS67~ステップS68の処理がデータベース更新確認処理に対応する。また、ステップS69~ステップS72の処理がデータベース更新処理に対応する。また、ステップS73の処理がデータベース追加処理に対応する。
(優先順位決定用データ定期取得処理)
(ステップS51)
 集中コントローラー19は、優先順位決定用データ取得周期が到来したか否かを判定する。集中コントローラー19は、優先順位決定用データ取得周期が到来した場合、ステップS52に進む。一方、集中コントローラー19は、優先順位決定用データ取得周期が到来しない場合、ステップS51に戻る。
(ステップS52)
 集中コントローラー19は、運転データを取得する。
(ステップS53)
 集中コントローラー19は、物件全体の消費電力を取得する。
(ステップS54)
 集中コントローラー19は、各ユニットの消費電力を取得する。
(ステップS55)
 集中コントローラー19は、ユニット単位設定電力を取得する。
(ユニット単位比較処理)
(ステップS56)
 集中コントローラー19は、ユニット単位設定電力を超える消費電力のユニットがあるか否かを判定する。集中コントローラー19は、ユニット単位設定電力を超える消費電力のユニットがある場合、ステップS57に進む。一方、集中コントローラー19は、ユニット単位設定電力を超える消費電力のユニットがない場合、ステップS74に進む。
(優先順位決定処理)
(ステップS57)
 集中コントローラー19は、消費電力データベース221と低下電力データベース225とに基づいて低下可能電力の順位付けをユニットごとに行う。
(ステップS58)
 集中コントローラー19は、低下可能電力の順位付けに基づいてデマンド制御を実行するユニットの優先順位を決定する。
(物件単位比較処理)
(ステップS59)
 集中コントローラー19は、物件全体設定電力を取得する。
(ステップS60)
 集中コントローラー19は、物件全体消費電力を求める。
(ステップS61)
 集中コントローラー19は、物件全体消費電力が物件全体設定電力を超えるか否かを判定する。集中コントローラー19は、物件全体消費電力が物件全体設定電力を超える場合、ステップS62に進む。一方、集中コントローラー19は、物件全体消費電力が物件全体設定電力を超えない場合、ステップS74に進む。
(デマンド制御処理)
(ステップS62)
 集中コントローラー19は、優先順位に基づいてデマンド制御を実行する。
(実行データ取得処理)
(ステップS63)
 集中コントローラー19は、デマンド制御開始時の運転データを取得する。
(ステップS64)
 集中コントローラー19は、電力データを蓄積する。
(ステップS65)
 集中コントローラー19は、電力取得周期が到来したか否かを判定する。集中コントローラー19は、電力取得周期が到来した場合、ステップS66に進む。一方、集中コントローラー19は、電力取得周期が到来しない場合、ステップS64に戻る。
(ステップS66)
 集中コントローラー19は、電力データのうち最小消費電力を取得する。
(データベース更新確認処理)
(ステップS67)
 集中コントローラー19は、デマンド制御実行に伴う各種データと低下電力データベース225にある各種データとを比較する。ここで、各種データは、運転データと、電力データとを含むデータであると想定する。
(ステップS68)
 集中コントローラー19は、電力データ以外が同一のデータであるか否かを判定する。集中コントローラー19は、電力データ以外が同一のデータである場合、ステップS69に進む。一方、集中コントローラー19は、電力データ以外が同一のデータでない場合、ステップS73に進む。
(データベース更新処理)
(ステップS69)
 集中コントローラー19は、該当するユニットを抽出する。
(ステップS70)
 集中コントローラー19は、該当するユニットの消費電力と取得した最小消費電力との平均を算出する。
(ステップS71)
 集中コントローラー19は、算出結果に基づいて該当するユニットの低下電力データベース225を更新する。
(ステップS72)
 集中コントローラー19は、全部のユニットに関するデータを確認したか否かを判定する。集中コントローラー19は、全部のユニットに関するデータを確認した場合、ステップS74に進む。一方、集中コントローラー19は、全部のユニットに関するデータを価確認していない場合、ステップS67に戻る。
(データベース追加処理)
(ステップS73)
 集中コントローラー19は、デマンド制御実行に伴う各種データを追加する。なお、ステップS73の処理が、データベース追加処理に対応する。
(ステップS74)
 集中コントローラー19は、終了指令が有るか否かを判定する。集中コントローラー19は、終了指令が有る場合、処理を終了する。一方、集中コントローラー19は、終了指令が無い場合、ステップS51に戻る。
 なお、上記では、集中コントローラー19は、低下可能電力の順位付けをする際、消費電力データベース221と、低下電力データベース225とを利用する一例を説明したが、特にこれに限定されない。例えば、集中コントローラー19は、低下電力データベース225に電力データに基づいて、低下可能電力の順位付けをしてもよい。
 具体的には、集中コントローラー19は、消費電力データベース221に基づいて、保存されている各ユニットのスケジュール設定内容から予め設定された設定値を超える消費電力の増加の有無を判断してもよい。次いで、集中コントローラー19は、判断の結果、予め設定された設定値を超える消費電力の増加が有る場合、現在の各ユニットの運転状態と、低下電力データベース225とに基づいて、低下させられる消費電力の大きいユニットからデマンド制御を実行する優先順位を決定してもよい。
 また、低下電力データベース225は、デマンド制御が行われる前においては、デフォルト値としてダミーデータが設定されていてもよい。このようなダミーデータは、過去の運用データに基づいて設定されてもよく、計算モデルから算出したシミュレーション結果に基づいて設定されてもよい。
 なお、上記の説明では、集中コントローラー19の各機能が1つの筐体内に実装されていることを想定したが、特にこれに限定されない。例えば、消費電力データベース生成処理モジュール121の機能構成と、優先順位付きデマンド制御処理モジュール123の機能構成とが、別々の場所で実装され、IP接続のネットワークを介して、各種演算結果が送受信されてもよい。つまり、集中コントローラー19の各機能は、実行場所を特定しないクラウドコンピューティングで実現されてもよいため、集中コントローラー19の各機能の実装形態は特に限定されない。
(実施の形態1の効果)
 以上の説明から、集中コントローラー19は、消費電力データベース221の作成に予め設定された時間間隔における消費電力の最大値を用いるため、システムの運用中、最も消費電力が高かった場合のデータベースを作成する。よって、集中コントローラー19は、消費電力データベース221を利用すれば、確実に契約電力を超えないようにデマンド制御の優先順位を決定することができる。
 また、集中コントローラー19は、低下電力データベース225の作成に予め設定された時間間隔における消費電力の最小値を用いるため、デマンド制御の実行中、最も消費電力が低下しなかった場合のデータベースを作成する。よって、集中コントローラー19は、低下電力データベース225を利用すれば、安全にデマンド制御を行うことができる。
 さらに、集中コントローラー19は、スケジュール設定内容と、デマンド制御内容と、消費電力データベース221と、低下電力データベース225とに基づいて、低下させられる電力が大きい順にデマンド制御を実施するユニットの優先順位を決定する。よって、集中コントローラー19は、全体的な消費電力を想定される目標デマンド値に低下させることができるため、物件全体で契約電力を超えることがない。
 要するに、集中コントローラー19は、消費電力に基づいてデマンド制御対象の優先順位を決定する。よって、集中コントローラー19は、デマンド制御を実行した場合、全体的な消費電力を目標デマンド値に低下させることができる。よって、集中コントローラー19は、契約電力を超えることなく安定して空調設備5を運用させることができる。
 以上、本実施の形態1において、複数台のユニットで構成される空調設備5をデマンド制御する集中コントローラー19であって、複数台のユニットのそれぞれの消費電力に基づいて、複数台のユニットのそれぞれのデマンド制御の優先順位を決定する優先順位決定部305と、空調設備5の消費電力と、予め設定された設定電力と、を比較する物件全体データ比較部307と、空調設備5の消費電力が設定電力を超える場合、優先順位に基づいて、デマンド制御を実行するデマンド制御部309と、を備えた集中コントローラー19が構成される。
 上記構成で、集中コントローラー19は、消費電力に基づいてデマンド制御対象の優先順位を決定する。よって、集中コントローラー19は、デマンド制御を実行した場合、全体的な消費電力を目標デマンド値に低下させることができる。したがって、集中コントローラー19は、契約電力を超えることなく安定して空調設備5を運用させることができる。
 また、本実施の形態1において、複数台のユニットのそれぞれの消費電力に関するデータのうち、運転スケジュールに対応する消費電力データベース221と、消費電力データベース221を変更するデータ演算部209と、複数台のユニットのそれぞれの消費電力に関するデータのうち、デマンド制御に対応する低下電力データベース225と、低下電力データベース225を変更するデマンド結果演算部311と、をさらに備え、消費電力データベース221は、複数台のユニットのそれぞれの運転スケジュールに関連する第1運転データと、第1運転データに対応する第1消費電力データと、を保持し、低下電力データベース225は、複数台のユニットのそれぞれのデマンド制御に関連する第2運転データと、第2運転データに対応する第2消費電力データと、を保持し、データ演算部209は、複数台のユニットのうち、運転スケジュールに応じて稼働中のユニットに対応する第3運転データと、第1運転データと、の比較結果に基づいて、消費電力データベース221を変更し、デマンド結果演算部311は、複数台のユニットのうち、デマンド制御に応じて稼働中のユニットに対応する第4運転データと、第2運転データと、の比較結果に基づいて、低下電力データベース225を変更する。
 上記構成で、集中コントローラー19は、運転スケジュールの実施結果に応じて消費電力データベース221を変更することができると共に、デマンド制御の実施結果に応じて低下電力データベース225を変更することができる。
 また、本実施の形態1において、データ演算部209は、第3運転データと、第1運転データと、が同一である場合、消費電力データベース221のうち、第1消費電力データを更新し、第3運転データと、第1運転データと、が同一でない場合、運転スケジュールの実行に伴い変動した各種データを消費電力データベース221に追加し、デマンド結果演算部311は、第4運転データと、第2運転データと、が同一である場合、低下電力データベース225のうち、第2消費電力データを更新し、第4運転データと、第2運転データと、が同一でない場合、デマンド制御の実行に伴い変動した各種データを低下電力データベース225に追加する。
 上記構成で、集中コントローラー19は、運転データに基づいて、消費電力データベース221の更新及び追加と、低下電力データベース225の更新及び追加とを適切に行うことができる。
 また、本実施の形態1において、データ演算部209は、運転スケジュールの実行期間のうち、予め設定された時間間隔における最大消費電力データと、第1消費電力データと、から求めた平均値で第1消費電力データを更新し、デマンド結果演算部311は、デマンド制御の実行期間のうち、予め設定された時間間隔における最小消費電力データと、第2消費電力データと、から求めた平均値で第2消費電力データを更新する。
 上記構成で、集中コントローラー19は、消費電力データベース221及び低下電力データベース225のそれぞれを更新する際、前回の値と、今回の値との平均値で更新するため、更新結果に過去のデータの特徴量を含ませることができる。
 また、本実施の形態1において、優先順位決定部305は、複数台のユニットのそれぞれについて、消費電力データベース221に含まれる第1消費電力データと、低下電力データベース225に含まれる第2消費電力データと、の差分を求め、複数台のユニットのうち、差分が大きいものから順にデマンド制御を行う優先順位を決定する。
 上記構成で、集中コントローラー19は、消費電力を考慮してデマンド制御の優先順位を決定することができる。
 以上の説明から、集中コントローラー19は、契約電力を超えることなく安定して空調設備5を運用させることができる。
実施の形態2.
 実施の形態1との相違点は、消費電力データベース221の作成に電力の最大値だけでなくその近傍の値も考慮する点と、低下電力データベース225の作成に電力の最小値だけでなくその近傍の値も考慮する点とにある。つまり、実施の形態1との相違点は、予め設定された時間間隔で、1つの特徴量だけでなく複数の値が考慮されることで、予め設定された時間間隔の電力の推移を考慮したシステムの運用をする点にある。
 図11は、本発明の実施の形態2における消費電力データベース生成処理を含む制御モジュール117及び記憶モジュール115のそれぞれの機能構成の詳細例を示す図である。実施の形態1との相違点は、運転スケジュール開始後データ取得部207及びデータ演算部209のそれぞれの機能構成である。ただし、その他の構成は実施の形態1と同様であるため、それらの説明については省略する。
 運転スケジュール開始後データ取得部207は、運転スケジュール制御部205が蓄積した複数の電力データ、すなわち、複数の消費電力のうち、最大値の前後で最大値近傍の複数の消費電力を取得する。運転スケジュール開始後データ取得部207は、対象ユニットと、複数の消費電力とを紐付けしておく。
 データ演算部209は、運転スケジュール開始時データ取得部203が取得した運転データと、運転スケジュール開始後データ取得部207が取得した対象ユニット及び複数の消費電力の組データと、に基づいて、運転スケジュール実行後データを作成する。例えば、データ演算部209は、運転データと、複数の消費電力とを紐付けさせ、対象ユニットに対応する運転データ及び複数の消費電力を紐付けさせることで、運転スケジュール実行後データを作成する。次に、データ演算部209は、データ定期取得部201で取得した比較データと、運転スケジュール実行後データとを比較する。なお、データ演算部209は、上記の比較の結果移行の処理については実施の形態1と同様であるため、その説明については省略する。
 図12は、本発明の実施の形態2における優先順位付きデマンド制御処理を含む制御モジュール117及び記憶モジュール115のそれぞれの機能構成の詳細例を示す図である。実施の形態1との相違点は、デマンド結果演算部311の機能構成である。ただし、その他の構成は実施の形態1と同様であるため、それらの説明については省略する。
 デマンド結果演算部311は、ユニット単位データを取得する。デマンド結果演算部311は、対象ユニット、運転データ、及び複数の消費電力を紐付けし、デマンド実行後データを構成する。例えば、デマンド結果演算部311は、対象ユニットと、複数の消費電力とを紐付けする。デマンド結果演算部311は、運転データと、複数の消費電力とを紐付けする。デマンド結果演算部311は、対象ユニットと、運転データとを紐付けする。デマンド結果演算部311は、ユニット単位データと、デマンド実行後データとを比較することで、電力データ以外が同一のデータである場合、つまり、同一のユニットで同一の運転データである場合、低下電力データベース225を更新し、電力データ以外が同一のデータでない場合、デマンド実行後データを低下電力データベース225に追加する。
 図13は、本発明の実施の形態2における消費電力データベース221及び低下電力データベース225に基づいて決定される低下可能電力の順位付けの一例を示す図である。なお、図13においては、集中コントローラー19は、ユニットごとに、スケジュール設定内容と、デマンド制御内容とを参照し、電力消費が生じるユニットを選択していると想定する。
 集中コントローラー19、例えば、優先順位決定部305は、ユニットごとに、消費電力データベース221から複数の消費電力の平均値である最大値近傍平均値を取得し、低下電力データベース225から複数の消費電力の平均値である最小値近傍平均値を取得し、最大値近傍平均値と、最小値近傍平均値との差分を比較する。例えば、優先順位決定部305は、第1ユニットの最大値近傍平均値と最小値近傍平均値との差分を第1差分とし求め、第2ユニットの最大値近傍平均値と最小値近傍平均値との差分を第2差分として求め、以後ユニットごとに同様に差分を求め、例えば、第Nユニットの最大値近傍平均値と最小値近傍平均値との差分を第N差分として求める。優先順位決定部305は、第1差分~第N差分のうち、最も大きいユニットから順にデマンド制御を実行させる優先順位を決定する。例えば、優先順位決定部305は、決定した優先順位を優先順位キュー403に格納する。
 なお、上記で説明した優先順位付きデマンド制御処理モジュール123は、実行されるたびに記憶装置の論理空間に展開されるものであってもよく、実行の有無にかかわらず、論理空間又は物理空間に予め構成されているものであってもよい。また、上記で説明した低下電力データベース225のデータ構造は一例であって、特にこれに限定されない。
 なお、上記で説明した消費電力データベース生成処理モジュール121及び優先順位付きデマンド制御処理モジュール123のそれぞれの機能構成は一例であって、特にこれらに限定されない。要するに、上記で説明した各機能が実施されるものであればよい。
 なお、上記で説明したように、消費電力データベース221は、最大値近傍平均値、すなわち、最大値の前後を含めた複数の消費電力が取得され、取得された複数の消費電力の平均値がデータの一部を構成している。同様に、低下電力データベース225は、最小値近傍平均値、すなわち、最小値の前後を含めた複数の消費電力が取得され、取得された複数の消費電力の平均値がデータの一部を構成している。ここで、平均値の求め方は、相加平均を想定しているが、特にこれに限定されない。例えば、平均値の求め方は、相乗平均、移動平均、及び加重平均等の何れであってもよい。
 要するに、集中コントローラー19は、複数の消費電力を利用して1つの特徴量を求める場合、求めた1つの特徴量に複数の消費電力のそれぞれの特徴量が含まれる演算を実行すればよい。
 図14は、本発明の実施の形態2における消費電力データベース生成処理を説明するフローチャートである。図14は、本発明の実施の形態2における消費電力データベース生成処理を説明するフローチャートである。なお、ステップS91~ステップS94の処理がデータ定期取得処理に対応する。また、ステップS95~ステップS97の処理が運転スケジュール開始処理に対応する。また、ステップS98~ステップS101の処理が実行データ取得処理に対応する。また、ステップS102~ステップS103の処理がデータベース更新確認処理に対応する。また、ステップS104~ステップS107の処理がデータベース更新処理に対応する。また、ステップS108の処理がデータベース追加処理に対応する。
(データ定期取得処理)
(ステップS91)
 集中コントローラー19は、データ取得周期が到来したか否かを判定する。集中コントローラー19は、データ取得周期が到来した場合、ステップS92に進む。一方、集中コントローラー19は、データ取得周期が到来しない場合、ステップS91に戻る。
(ステップS92)
 集中コントローラー19は、稼働中ユニットの運転データを取得する。
(ステップS93)
 集中コントローラー19は、物件全体の消費電力を取得する。
(ステップS94)
 集中コントローラー19は、各ユニットの消費電力を取得する。
(運転スケジュール開始処理)
(ステップS95)
 集中コントローラー19は、各ユニットの運転スケジュールの設定時刻を参照する。
(ステップS96)
 集中コントローラー19は、設定時刻が到来した運転スケジュールがあるか否かを判定する。集中コントローラー19は、設定時刻が到来した運転スケジュールがある場合、ステップS97に進む。一方、集中コントローラー19は、設定時刻が到来した運転スケジュールがない場合、ステップS95に戻る。
(ステップS97)
 集中コントローラー19は、該当ユニットを運転させる。
(実行データ取得処理)
(ステップS98)
 集中コントローラー19は、運転スケジュール開始時の運転データを取得する。
(ステップS99)
 集中コントローラー19は、電力データを蓄積する。
(ステップS100)
 集中コントローラー19は、電力取得周期が到来したか否かを判定する。集中コントローラー19は、電力取得周期が到来した場合、ステップS101に進む。一方、集中コントローラー19は、電力取得周期が到来しない場合、ステップS99に戻る。
(ステップS101)
 集中コントローラー19は、電力データのうち複数の消費電力を取得する。複数の消費電力は、上記で説明したように、最大値近傍の消費電力であって、最大値の前後を含めた複数の消費電力を意味する。
(データベース更新確認処理)
(ステップS102)
 集中コントローラー19は、運転スケジュール実行に伴う各種データと稼働中ユニットに対応する各種データとを比較する。ここで、各種データとは、運転データと、電力データとを含んだデータであると想定する。
(ステップS103)
 集中コントローラー19は、電力データ以外が同一のデータであるか否かを判定する。集中コントローラー19は、電力データ以外が同一のデータである場合、ステップS104に進む。一方、集中コントローラー19は、電力データ以外が同一のデータでない場合、ステップS108に進む。
(データベース更新処理)
(ステップS104)
 集中コントローラー19は、該当するユニットを抽出する。
(ステップS105)
 集中コントローラー19は、該当するユニットの消費電力と取得した複数の消費電力との平均を算出する。
(ステップS106)
 集中コントローラー19は、算出結果に基づいて該当するユニットの消費電力データベース221を更新する。
(ステップS107)
 集中コントローラー19は、全部の稼働中ユニットに関するデータを確認したか否かを判定する。集中コントローラー19は、全部の稼働中ユニットに関するデータを確認した場合、ステップS109に進む。一方、集中コントローラー19は、全部の稼働中ユニットに関するデータを確認していない場合、ステップS102に戻る。
(データベース追加処理)
(ステップS108)
 集中コントローラー19は、運転スケジュール実行に伴う各種データを追加する。なお、上記で説明したように、データベース追加処理は、ステップS108の処理が対応する。
(ステップS109)
 集中コントローラー19は、終了指令が有るか否かを判定する。集中コントローラー19は、終了指令が有る場合、処理を終了する。一方、集中コントローラー19は、終了指令が無い場合、ステップS91に戻る。
 図15は、本発明の実施の形態2における優先順位付きデマンド制御処理を説明するフローチャートである。なお、ステップS121~ステップS125の処理が優先順位決定用データ定期取得処理に対応する。また、ステップS126の処理がユニット単位比較処理に対応する。また、ステップS127~ステップS128の処理が優先順位決定処理に対応する。また、ステップS129~ステップS131の処理が物件単位比較処理に対応する。また、ステップS132の処理がデマンド制御処理に対応する。また、ステップS33~ステップS136の処理が実行データ取得処理に対応する。また、ステップS137~ステップS138の処理がデータベース更新確認処理に対応する。また、ステップS139~ステップS142の処理がデータベース更新処理に対応する。また、ステップS143の処理がデータベース追加処理に対応する。
(優先順位決定用データ定期取得処理)
(ステップS121)
 集中コントローラー19は、優先順位決定用データ取得周期が到来したか否かを判定する。集中コントローラー19は、優先順位決定用データ取得周期が到来した場合、ステップS122に進む。一方、集中コントローラー19は、優先順位決定用データ取得周期が到来しない場合、ステップS121に戻る。
(ステップS122)
 集中コントローラー19は、運転データを取得する。
(ステップS123)
 集中コントローラー19は、物件全体の消費電力を取得する。
(ステップS124)
 集中コントローラー19は、各ユニットの消費電力を取得する。
(ステップS125)
 集中コントローラー19は、ユニット単位設定電力を取得する。
(ユニット単位比較処理)
(ステップS126)
 集中コントローラー19は、ユニット単位設定電力を超える消費電力のユニットがあるか否かを判定する。集中コントローラー19は、ユニット単位設定電力を超える消費電力のユニットがある場合、ステップS127に進む。一方、集中コントローラー19は、ユニット単位設定電力を超える消費電力のユニットがない場合、ステップS144に進む。
(優先順位決定処理)
(ステップS127)
 集中コントローラー19は、消費電力データベース221と低下電力データベース225とに基づいて低下可能電力の順位付けをユニットごとに行う。
(ステップS128)
 集中コントローラー19は、低下可能電力の順位付けに基づいてデマンド制御を実行するユニットの優先順位を決定する。
(物件単位比較処理)
(ステップS129)
 集中コントローラー19は、物件全体設定電力を取得する。
(ステップS130)
 集中コントローラー19は、物件全体消費電力を求める。
(ステップS131)
 集中コントローラー19は、物件全体消費電力が物件全体設定電力を超えるか否かを判定する。集中コントローラー19は、物件全体消費電力が物件全体設定電力を超える場合、ステップS132に進む。一方、集中コントローラー19は、物件全体消費電力が物件全体設定電力を超えない場合、ステップS144に進む。
(デマンド制御処理)
(ステップS132)
 集中コントローラー19は、優先順位に基づいてデマンド制御を実行する。
(実行データ取得処理)
(ステップS133)
 集中コントローラー19は、デマンド制御開始時の運転データを取得する。
(ステップS134)
 集中コントローラー19は、電力データを蓄積する。
(ステップS135)
 集中コントローラー19は、電力取得周期が到来したか否かを判定する。集中コントローラー19は、電力取得周期が到来した場合、ステップS136に進む。一方、集中コントローラー19は、電力取得周期が到来しない場合、ステップS134に戻る。
(ステップS136)
 集中コントローラー19は、電力データのうち複数の消費電力を取得する。ここで、複数の消費電力は、最小値近傍平均値であって、最小値の前後を含んだ複数の消費電力が想定される。
(データベース更新確認処理)
(ステップS137)
 集中コントローラー19は、デマンド制御実行に伴う各種データと低下電力データベース225にある各種データとを比較する。ここで、各種データは、運転データと、電力データとを含むデータであると想定する。
(ステップS138)
 集中コントローラー19は、電力データ以外が同一のデータであるか否かを判定する。集中コントローラー19は、電力データ以外が同一のデータである場合、ステップS139に進む。一方、集中コントローラー19は、電力データ以外が同一のデータでない場合、ステップS143に進む。
(データベース更新処理)
(ステップS139)
 集中コントローラー19は、該当するユニットを抽出する。
(ステップS140)
 集中コントローラー19は、該当するユニットの消費電力と取得した複数の消費電力との平均を算出する。
(ステップS141)
 集中コントローラー19は、算出結果に基づいて該当するユニットの低下電力データベース225を更新する。
(ステップS142)
 集中コントローラー19は、全部のユニットに関するデータを確認したか否かを判定する。集中コントローラー19は、全部のユニットに関するデータを確認した場合、ステップS144に進む。一方、集中コントローラー19は、全部のユニットに関するデータを価確認していない場合、ステップS137に戻る。
(データベース追加処理)
(ステップS143)
 集中コントローラー19は、デマンド制御実行に伴う各種データを追加する。なお、ステップS143の処理が、データベース追加処理に対応する。
(ステップS144)
 集中コントローラー19は、終了指令が有るか否かを判定する。集中コントローラー19は、終了指令が有る場合、処理を終了する。一方、集中コントローラー19は、終了指令が無い場合、ステップS121に戻る。
 以上、本実施の形態2において、データ演算部209は、運転スケジュールの実行期間のうち、予め設定された時間間隔における複数の消費電力データと、第1消費電力データと、から求めた平均値で第1消費電力データを更新し、デマンド結果演算部311は、デマンド制御の実行期間のうち、予め設定された時間間隔における複数の消費電力データと、第2消費電力データと、から求めた平均値で第2消費電力データを更新する。
 上記構成で、集中コントローラー19は、複数の消費電力に基づいてデマンド制御対象の優先順位を決定する。よって、集中コントローラー19は、予め設定された時間間隔で、1つの特徴量だけでなく複数の値を考慮することで、予め設定された時間間隔の電力の推移を考慮したシステムの運用をすることができる。よって、集中コントローラー19は、さらに正確に、デマンド制御を実行した場合、全体的な消費電力を目標デマンド値に低下させることができる。よって、集中コントローラー19は、確実に、契約電力を超えることなく安定して空調設備5を運用させることができる。
 また、本実施の形態2において、データ演算部209は、相加平均、相乗平均、移動平均、及び加重平均の何れかで平均値を求め、デマンド結果演算部311は、相加平均、相乗平均、移動平均、及び加重平均の何れかで平均値を求める。
 上記構成で、集中コントローラー19は、複数の消費電力の特徴量を活かしたデマンド制御を実施することができる。
 1 空気調和システム、5、5_1~5_N 空調設備、11、11_1~11_N 室外ユニット、13、13_11~13_NN 室内ユニット、15、15_1~15_N リモートコントローラー、17、17_1~17_N 汎用機器コントローラー、18、18_1~18_N 汎用機器群、19 集中コントローラー、21 外部装置群、31 汎用伝送線、33 管理専用伝送線、35 室内外専用伝送線、37 LAN、39 冷媒配管、51、53 制御基板、61 圧縮機、62 四方切換弁、63、68 熱交換器、64、67 膨張弁、65 アキュムレーター、66、69 ファン、71、75 温度センサー、73 湿度センサー、91 伝送モジュール、95 制御モジュール、101 インターフェース構成部、103 処理構成部、111 第1通信モジュール、113 第2通信モジュール、115 記憶モジュール、117 制御モジュール、121 消費電力データベース生成処理モジュール、123 優先順位付きデマンド制御処理モジュール、201 データ定期取得部、203 運転スケジュール開始時データ取得部、205 運転スケジュール制御部、207 運転スケジュール開始後データ取得部、209 データ演算部、220 ユニット番号割当テーブル、221 消費電力データベース、223 運転スケジュールデータベース、225 低下電力データベース、301 優先順位決定用データ定期取得部、303 ユニット単位データ比較部、305 優先順位決定部、307 物件全体データ比較部、309 デマンド制御部、311 デマンド結果演算部、401 低下可能電力順位付け決定部、403 優先順位キュー。

Claims (7)

  1.  複数台のユニットで構成される空調設備をデマンド制御する集中コントローラーであって、
     前記複数台のユニットのそれぞれの消費電力に基づいて、該複数台のユニットのそれぞれのデマンド制御の優先順位を決定する優先順位決定部と、
     前記空調設備の消費電力と、予め設定された設定電力と、を比較する物件全体データ比較部と、
     前記空調設備の消費電力が前記設定電力を超える場合、前記優先順位に基づいて、デマンド制御を実行するデマンド制御部と、
    を備えたことを特徴とする集中コントローラー。
  2.  前記複数台のユニットのそれぞれの消費電力に関するデータのうち、運転スケジュールに対応する消費電力データベースと、
     前記消費電力データベースを変更するデータ演算部と、
     前記複数台のユニットのそれぞれの消費電力に関するデータのうち、デマンド制御に対応する低下電力データベースと、
     前記低下電力データベースを変更するデマンド結果演算部と、
    をさらに備え、
     前記消費電力データベースは、
     前記複数台のユニットのそれぞれの前記運転スケジュールに関連する第1運転データと、該第1運転データに対応する第1消費電力データと、を保持し、
     前記低下電力データベースは、
     前記複数台のユニットのそれぞれの前記デマンド制御に関連する第2運転データと、該第2運転データに対応する第2消費電力データと、を保持し、
     前記データ演算部は、
     前記複数台のユニットのうち、前記運転スケジュールに応じて稼働中のユニットに対応する第3運転データと、前記第1運転データと、の比較結果に基づいて、前記消費電力データベースを変更し、
     前記デマンド結果演算部は、
     前記複数台のユニットのうち、前記デマンド制御に応じて稼働中のユニットに対応する第4運転データと、前記第2運転データと、の比較結果に基づいて、前記低下電力データベースを変更する
    ことを特徴とする請求項1に記載の集中コントローラー。
  3.  前記データ演算部は、
     前記第3運転データと、前記第1運転データと、が同一である場合、前記消費電力データベースのうち、前記第1消費電力データを更新し、
     前記第3運転データと、前記第1運転データと、が同一でない場合、前記運転スケジュールの実行に伴い変動した各種データを前記消費電力データベースに追加し、
     前記デマンド結果演算部は、
     前記第4運転データと、前記第2運転データと、が同一である場合、前記低下電力データベースのうち、前記第2消費電力データを更新し、
     前記第4運転データと、前記第2運転データと、が同一でない場合、前記デマンド制御の実行に伴い変動した各種データを前記低下電力データベースに追加する
    ことを特徴とする請求項2に記載の集中コントローラー。
  4.  前記データ演算部は、
     前記運転スケジュールの実行期間のうち、予め設定された時間間隔における最大消費電力データと、前記第1消費電力データと、から求めた平均値で前記第1消費電力データを更新し、
     前記デマンド結果演算部は、
     前記デマンド制御の実行期間のうち、予め設定された時間間隔における最小消費電力データと、前記第2消費電力データと、から求めた平均値で前記第2消費電力データを更新する
    ことを特徴とする請求項2又は3に記載の集中コントローラー。
  5.  前記データ演算部は、
     前記運転スケジュールの実行期間のうち、予め設定された時間間隔における複数の消費電力データと、前記第1消費電力データと、から求めた平均値で前記第1消費電力データを更新し、
     前記デマンド結果演算部は、
     前記デマンド制御の実行期間のうち、予め設定された時間間隔における複数の消費電力データと、前記第2消費電力データと、から求めた平均値で前記第2消費電力データを更新する
    ことを特徴とする請求項2又は3に記載の集中コントローラー。
  6.  前記優先順位決定部は、
     前記複数台のユニットのそれぞれについて、前記消費電力データベースに含まれる前記第1消費電力データと、前記低下電力データベースに含まれる前記第2消費電力データと、の差分を求め、
     前記複数台のユニットのうち、前記差分が大きいものから順に前記デマンド制御を行う前記優先順位を決定する
    ことを特徴とする請求項4又は5に記載の集中コントローラー。
  7.  前記データ演算部は、
     相加平均、相乗平均、移動平均、及び加重平均の何れかで前記平均値を求め、
     前記デマンド結果演算部は、
     相加平均、相乗平均、移動平均、及び加重平均の何れかで前記平均値を求める
    ことを特徴とする請求項6に記載の集中コントローラー。
PCT/JP2013/080689 2013-11-13 2013-11-13 集中コントローラー WO2015071979A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/JP2013/080689 WO2015071979A1 (ja) 2013-11-13 2013-11-13 集中コントローラー

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2013/080689 WO2015071979A1 (ja) 2013-11-13 2013-11-13 集中コントローラー

Publications (1)

Publication Number Publication Date
WO2015071979A1 true WO2015071979A1 (ja) 2015-05-21

Family

ID=53056948

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/080689 WO2015071979A1 (ja) 2013-11-13 2013-11-13 集中コントローラー

Country Status (1)

Country Link
WO (1) WO2015071979A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3421897A4 (en) * 2016-02-25 2019-03-06 Mitsubishi Electric Corporation CLIMATE CONTROL SYSTEM

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06335164A (ja) * 1993-05-20 1994-12-02 Mitsubishi Electric Corp デマンド制御装置
JP2003097841A (ja) * 2001-09-21 2003-04-03 Sanyo Electric Industries Co Ltd 空調機の台数制御方法
JP2005312112A (ja) * 2004-04-19 2005-11-04 Toko Electric Corp 電力線搬送制御システム
JP2008157533A (ja) * 2006-12-22 2008-07-10 Daikin Ind Ltd 空調管理装置
JP2011002191A (ja) * 2009-06-19 2011-01-06 Nihon Techno Co Ltd 省エネシステム
JP2011239528A (ja) * 2010-05-07 2011-11-24 Shimizu Corp 需要電力制御装置および需要電力制御方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06335164A (ja) * 1993-05-20 1994-12-02 Mitsubishi Electric Corp デマンド制御装置
JP2003097841A (ja) * 2001-09-21 2003-04-03 Sanyo Electric Industries Co Ltd 空調機の台数制御方法
JP2005312112A (ja) * 2004-04-19 2005-11-04 Toko Electric Corp 電力線搬送制御システム
JP2008157533A (ja) * 2006-12-22 2008-07-10 Daikin Ind Ltd 空調管理装置
JP2011002191A (ja) * 2009-06-19 2011-01-06 Nihon Techno Co Ltd 省エネシステム
JP2011239528A (ja) * 2010-05-07 2011-11-24 Shimizu Corp 需要電力制御装置および需要電力制御方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3421897A4 (en) * 2016-02-25 2019-03-06 Mitsubishi Electric Corporation CLIMATE CONTROL SYSTEM

Similar Documents

Publication Publication Date Title
US20200119982A1 (en) Devices and methods for network integration of an hvac device
CN104236018B (zh) 空调器的控制方法和空调器的控制装置
CN106765985B (zh) 数据中心机房空调末端的节能控制方法和装置
US10955157B2 (en) Building management system with distributed data storage and processing
US8634962B2 (en) Method and apparatus for efficiently coordinating data center cooling units
CN105180349B (zh) 空调器及其控制方法和控制装置
CN110726217B (zh) 空调器的控制方法及装置
CN109974237A (zh) 空调器、空调器运行策略的调整方法及装置
CN109373538A (zh) 一种室外风机控制方法、装置及空调器
CA3041319C (en) Operating an hvac system to reach target temperature efficiently
CN108917117B (zh) 空调及其控制方法、装置
JP2013200115A (ja) 蒸気圧縮システムを動作させるための方法、蒸気圧縮システムの動作を制御するための方法、および蒸気圧縮システムの性能を最適化するための最適化コントローラ
CN110736249A (zh) 压缩机的运行频率控制方法及装置、存储介质和处理器
CN112283890A (zh) 适应建筑暖通设备监控系统的冷热量控制方法及装置
US9719690B2 (en) Zone based heating, ventilation and air-conditioning (HVAC) control using extensive temperature monitoring
CN105066336A (zh) 一种室内空调调温系统及调温方法
CN108131792A (zh) 空调器及其控制方法、装置
CN105352119B (zh) 空调中冷冻水系统的控制方法和装置
CN103528168A (zh) 空调系统运行控制方法、装置、系统主机及空调系统
CN107631424A (zh) 自动调温空调器控制方法及空调器
JP2008306870A (ja) 電力削減方法及び電力削減装置
CN110081560B (zh) 风机运行频率的调整方法及装置
WO2015071979A1 (ja) 集中コントローラー
CN108131806A (zh) 温度控制方法和线控器
CN108826605A (zh) 一种空调控制方法、装置、存储介质及空调

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13897486

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

NENP Non-entry into the national phase

Ref country code: JP

122 Ep: pct application non-entry in european phase

Ref document number: 13897486

Country of ref document: EP

Kind code of ref document: A1