WO2015007133A1 - Temporary supporting and permanent supporting parallel operation excavating technology for crawler-type hydraulic combination bracket and equipment using same - Google Patents

Temporary supporting and permanent supporting parallel operation excavating technology for crawler-type hydraulic combination bracket and equipment using same Download PDF

Info

Publication number
WO2015007133A1
WO2015007133A1 PCT/CN2014/080333 CN2014080333W WO2015007133A1 WO 2015007133 A1 WO2015007133 A1 WO 2015007133A1 CN 2014080333 W CN2014080333 W CN 2014080333W WO 2015007133 A1 WO2015007133 A1 WO 2015007133A1
Authority
WO
WIPO (PCT)
Prior art keywords
support
temporary
temporary support
hydraulic
area
Prior art date
Application number
PCT/CN2014/080333
Other languages
French (fr)
Chinese (zh)
Inventor
翟明华
Original Assignee
郑东风
周斌
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 郑东风, 周斌 filed Critical 郑东风
Priority to AU2014292699A priority Critical patent/AU2014292699A1/en
Publication of WO2015007133A1 publication Critical patent/WO2015007133A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor

Definitions

  • Temporary support is to prevent the surrounding rock from falling and collapsing after the tunnel is excavated. In order to ensure the safety of the permanent support workers, the mining depth is shallow and the surrounding rock strength is high, and the self-supporting after excavation is stable and reliable. Simple construction and other suitable conditions, can be used for temporary support without temporary support. Under normal circumstances, after roadway excavation, temporary support should be carried out near the heading of the roadway, and the roadway should be implemented under the protection of temporary support. Permanent support.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Earth Drilling (AREA)

Abstract

A temporary supporting and permanent supporting parallel operation excavating technology for a crawler-type hydraulic combination bracket and the equipment using same. The technology divides an excavating working face into a temporary supporting area (4) and a permanent supporting area (5); excavator operating area is the temporary supporting area and the permanent supporting area is arranged behind the temporary supporting area; the temporary supporting area is temporarily supported by front supporting and back returning technology for the crawler-type hydraulic combined bracket; the operation of permanent supporting and the operation of excavator (1) cutting are performed simultaneously. The technological equipment comprises two parts: a crawler-type front supporting and back returning temporary supporting hydraulic combination bracket and a moving device (2).

Description

一种 "履带式"液压组合支架临时支护与永久支护平行作业掘进工艺及设备 技术领域  Parallel operation and equipment for parallel operation and temporary support of "crawler type" hydraulic combined bracket
本发明涉及一种地下工程安全高效快速施工的巷道支护工艺及配套设备。  The invention relates to a roadway supporting technology and ancillary equipment for safe, efficient and rapid construction of underground engineering.
背景技术 Background technique
地下工程综合机械化掘进施工工艺, 因其安全可靠、 单进效率远高于传统的炮掘工艺, 目前已被广泛推广应用。 综合机械化掘进施工工艺一个循环的主要耗时在于掘进机截割和巷 道支护。 如何实现掘进机截割与巷道支护平行作业, 自上个世纪五十年代至今, 国内外采矿 界进行了大量的探索, 并产生了很多技术与装备。 其中主要的技术点涉及两个方面, 即快速 实施安全可靠的临时支护和掘进机截割与永久支护的平行作业。  The comprehensive mechanized excavation construction technology of underground engineering has been widely promoted and applied because of its safety and reliability, and the single-entry efficiency is much higher than the traditional artillery excavation process. The main time-consuming time for a comprehensive mechanized tunneling construction process is the roadheader cutting and roadway support. How to realize the parallel operation of roadheader cutting and roadway support. Since the 1950s, the mining industry at home and abroad has carried out a lot of exploration and produced a lot of technology and equipment. The main technical points involve two aspects, namely the rapid implementation of safe and reliable temporary support and the parallel operation of the cutting machine cutting and permanent support.
临时支护是为防止巷道开掘后围岩冒落坍塌伤人, 为保证永久支护作业人员的安全而设 的, 对于开采深度较浅且围岩强度高、 开挖后自支撑稳定可靠、 地质构造简单等适合条件, 可以不作临时支护, 直接进行永久支护, 一般情况下的巷道施工在巷道开挖后要先在掘进迎 头附近实施临时支护, 在临时支护的保护下实施巷道的永久支护。  Temporary support is to prevent the surrounding rock from falling and collapsing after the tunnel is excavated. In order to ensure the safety of the permanent support workers, the mining depth is shallow and the surrounding rock strength is high, and the self-supporting after excavation is stable and reliable. Simple construction and other suitable conditions, can be used for temporary support without temporary support. Under normal circumstances, after roadway excavation, temporary support should be carried out near the heading of the roadway, and the roadway should be implemented under the protection of temporary support. Permanent support.
现有掘进巷道临时支护方式主要有 6种类型:  There are six main types of temporary support methods for excavation roadways:
1、 传统的临时支护方式有吊环加钢管 (或轨道、 型钢) 等, 通过前窜钢管 (或轨道、 型 钢) 等再加护顶材料临时支护顶板。  1. The traditional temporary support method includes a lifting ring and a steel pipe (or rail, steel), etc., and the top plate is temporarily supported by a front-end steel pipe (or rail, steel).
2、 掘进机机架式托梁护顶方式。  2. The boring machine rack-type joist top protection method.
3、 掘锚一体化掘进机。  3. Digging and anchoring integrated roadheader.
4、 前后推拉式或成对交替迈步式液压自移支架。  4. Push-pull or pair-wise alternating step-by-step hydraulic self-moving brackets.
5、 德国研制的单轨吊架棚机。  5. The monorail hanger room machine developed by Germany.
6、 TBS遂道施工掘进机临时支护形式。  6, TBS ramp construction roadheader temporary support form.
现有临时支护存在的主要问题:  The main problems with existing temporary support:
1、 传统的临时支护前窜时需人工铺网、 上接顶材料, 劳动强度大, 空顶下作业不安全, 对顶板支护力几乎没有,只能对作业人员起到有限的保护作用,常出现现场作业人员图省事、 怕麻烦、 不使用现象。  1. In the case of traditional temporary support, manual laying and topping materials are required. The labor intensity is high, the operation under the empty roof is unsafe, and there is almost no support for the roof. It can only provide limited protection for the workers. It is often the case that the on-site operators have troubles, are afraid of trouble, and are not using the phenomenon.
2、 掘进机机架托梁式临时支护, 铺网作业仍在空顶下, 支护面积达不到全断面, 机架强 度及与掘进机连接强度受限, 支护力很小, 实施临时支护及永久支护时掘进机就无法平行作 业。  2. The temporary support of the boring machine frame joist type, the laying operation is still under the empty roof, the supporting area can not reach the full section, the strength of the frame and the connection strength with the roadheader are limited, the supporting force is small, and the implementation When the temporary support and permanent support are used, the roadheader cannot work in parallel.
3、 掘锚一体化掘进机。 从六十年代第一代掘锚机诞生至今已进行过两次变革, 第三代掘 锚一体化, 虽然实现了掘锚平行作业, 但锚杆空顶距大, 一般在 1.2-1.5米以上, 支护不能紧 跟迎头, 所以, 仅适用于釆深不大、矿压小、 围岩条件较好的大断面矩形或梯形巷道, 因此, 一直没有得到广泛的推广应用。 像我国绝大部分矿区及德国、 波兰等国家开釆深度较深, 矿 压大, 围岩松软破碎等条件, 锚杆密集, 甚至还需要掛网、 锚索支护, 支护工作量大, 不仅 空顶距离满足不了要求, 支护时间远大于截割时间, 也很难与截割同步。 3. Digging and anchoring integrated roadheader. Since the birth of the first generation of the anchoring machine in the 1960s, two changes have been made. The third generation of integrated anchoring and anchoring, although the parallel operation of the anchoring and anchoring is realized, the anchoring of the anchor is large, generally above 1.2-1.5 meters. The support can't keep up with the head. Therefore, it is only suitable for large-section rectangular or trapezoidal roadways with small depth, small mine pressure and good surrounding rock conditions. Therefore, Has not been widely promoted and applied. For example, most of China's mining areas and Germany, Poland and other countries have deeper depths, large mine pressures, soft and broken surrounding rocks, and dense anchors. Not only can the empty top distance not meet the requirements, but the support time is much longer than the cutting time, and it is difficult to synchronize with the cutting.
4、 前后推拉式或成对交替迈步式液压自移支架, 每一个循环对顶板反复支撑一次, 易破 坏顶板, 不利于对顶板的支护, 顶板条件不好时, 必须停机支护, 不能实现掘进机截割与永 久支护平行作业。  4. Push-pull type or front-to-back alternating step-type hydraulic self-moving brackets. Each cycle repeatedly supports the top plate once, which is easy to damage the top plate. It is not conducive to the support of the top plate. When the roof condition is not good, it must be stopped and supported. The roadheader cuts in parallel with the permanent support.
5、 德国研制的单轨吊架棚机。 可以实现永久支护的机械化操作, 避免人员进入无支护区 作业, 但该设备结构太复杂, 外形尺寸大, 只能适用于大断面巷道施工, 支护与掘进截割在 同一区域, 相互干挠, 影响平行作业效率。  5. The monorail hanger room machine developed by Germany. The mechanized operation of permanent support can be realized to prevent personnel from entering the unsupported area. However, the structure of the equipment is too complicated and the external dimensions are large. It can only be applied to the construction of large-section roadways. The support and excavation are cut in the same area, and they are mutually dry. Scratching, affecting the efficiency of parallel operations.
6、 TBM岩石掘进机有敝开式、 双护盾、 单护盾等, 遂道施工临时支护形式是与全断面 截割掘进机一体化的支护方式。 该支护方式掘进迎头对顶帮的支护是通过护盾全长对围岩的 整体支撑、 收缩、 前移、再支撑, 反复支撑易破坏围岩, 仅适用于拐弯曲率半径大、 大断面、 围岩条件较好的遂道施工, 遇断层、 破碎带易被卡住。  6. The TBM rock boring machine has split type, double shield, single shield, etc. The temporary support form of the tunnel construction is the support method integrated with the full section cutting and boring machine. The support method is used to support the head support. The overall support, contraction, forward movement and re-support of the surrounding rock through the full length of the shield, and repeated support for the damage of the surrounding rock, only applicable to the large bending radius and large section. The construction of the ramp with better surrounding rock conditions is easy to get stuck in the fault and the broken belt.
针对上述问题, 本发明公布了一种 "履带式" 临时支护与永久支护平行作业掘进工艺及 设备。  In view of the above problems, the present invention discloses a "crawler type" temporary support and permanent support parallel operation excavation process and equipment.
发明内容 Summary of the invention
一种 "履带式"液压组合支架临时支护与永久支护平行作业掘进工艺先将掘进工作面分 为临时支护区和永久支护区; 掘进机作业区为临时支护区, 其后为永久支护区; 临时支护区 釆用"履带式 "液压组合支架前支后回工艺进行临时支护;永久支护与掘进机截割同时作业。 "履带式"液压组合支架, 由若干个液压支架组成, 每一个液压支架主要包括顶梁、 角梁、 可伸缩侧支撑、 超静定平衡油缸。  A "crawler type" hydraulic combination bracket temporary support and permanent support parallel operation excavation process first divides the excavation work surface into a temporary support area and a permanent support area; the roadheader operation area is a temporary support area, followed by The permanent support area; the temporary support area uses the "crawler type" hydraulic combination bracket front support and back process for temporary support; the permanent support and the roadheader cut at the same time. The "crawler" hydraulic combination bracket consists of several hydraulic supports, each of which mainly includes a top beam, a corner beam, a retractable side support, and an ultra-static balance cylinder.
所述前支后回工艺是,若干个液压支架沿掘进巷道轴线方向并排布置以支撑临时支护区, 随着掘进机的推移和永久支护的跟进, 临时支护区尾部的临时支架撤回, 运输到临时支护区 的前方, 重新支撑, 如此循环。  The front support and back process is that a plurality of hydraulic supports are arranged side by side along the axis direction of the roadway to support the temporary support area. With the advancement of the roadheader and the follow-up of the permanent support, the temporary support of the tail of the temporary support area is withdrawn. , transported to the front of the temporary support area, re-supported, and so on.
实现该工艺的设备主要包括 "履带式"前支后回临时支护液压组合支架及移架设备两部 分组成。  The equipment for realizing this process mainly consists of two parts: the "crawler type" front support and the back support hydraulic support bracket and the transfer equipment.
每一排永久支护排用一个液压支架, 液压支架个数根据临时支护区长度确定; 临时支护 支架随掘进机截割及时架设, 如同履带的带板相对静止于地面一样, 一直保持其对围岩的支 护至组合架架尾, 对于临时支护区无反复支撑破坏围岩问题。  Each row of permanent support is equipped with a hydraulic support. The number of hydraulic supports is determined according to the length of the temporary support area. The temporary support bracket is erected with the boring machine, as if the track plate is relatively stationary on the ground. Supporting the surrounding rock to the tail of the combined frame, there is no problem of repeated support to damage the surrounding rock in the temporary support area.
用于临时支护的液压支架是可收缩或折叠的; 临时支护液压支架是与移架设备配合, 避 开巷道内掘进机及通风防尘等设备设施, 整体运移至组合架前再支护的。 根据巷道断面形状临时支护的支架为矩形、 或梯形、 或拱形、 或拱梯形、 或斜梯形。 移架设备至少要包括三个系统: 随着巷道掘进自前移系统; 运移临时支架系统, 即能够 将临时支架避开掘进机和通风防尘等设施, 从临时支护区尾部运至前部; 辅助临时支架升降 系统。 The hydraulic support for temporary support is collapsible or foldable; the temporary support hydraulic support is matched with the transfer equipment, avoiding the roadway boring machine, ventilation and dustproof equipment, etc., and the whole transportation to the combination frame before the support Protected. The bracket temporarily supported according to the shape of the section of the roadway is rectangular, or trapezoidal, or arched, or arched, or trapezoidal. The transfer equipment must include at least three systems: As the roadway excavates from the forward movement system; the temporary support system can move the temporary support away from the roadheader, ventilation and dustproof facilities, from the tail of the temporary support area to the front Department; auxiliary temporary bracket lifting system.
移架设备有掘进机机架托载式、 移动绗架托载式、 轨上龙门托载式、 临时支架配套导轨 自移式四种形式。  The moving equipment has four types: the boring machine frame supporting type, the moving truss supporting type, the gantry supporting type on the rail, and the temporary supporting rail.
如机架托载式, 机架位于掘进机之上, 即可随着掘进机前移而前移; 掘进机位于机架内 侧, 通风防尘等设施也固定于机架内侧, 机架上设有载架移动系统, 可以将临时支架从机架 的外侧前移; 机架上设有临时支架升降的辅助系统, 以辅助临时支架的升降。  For example, the rack supports the rack, and the rack is located above the roadheader, so that it can move forward as the roadheader moves forward; the roadheader is located inside the rack, and the ventilation and dustproof facilities are also fixed on the inside of the rack. The carrier movement system can move the temporary bracket forward from the outside of the rack; the rack is provided with an auxiliary system for temporary bracket lifting to assist the lifting of the temporary bracket.
一种 "履带式"液压组合支架临时支护与永久支护平行作业掘进方法, 其步骤为: 步骤一: 掘进机截割完成一个步距;  A "crawler type" hydraulic combined bracket temporary support and permanent support parallel operation method, the steps are as follows: Step 1: The roadheader completes a step;
步骤二: 将临时支护区尾端回撤下来的一个临时支架, 利用移架设备移动至前方待支护 空间;  Step 2: Move a temporary bracket that has been pulled back from the end of the temporary support area to the space to be supported by the moving equipment;
步骤三: 升临时支架即完成临时支护;  Step 3: Temporarily support the temporary support;
步骤四: 掘进机进行截割;  Step 4: The roadheader performs cutting;
步骤五: 在掘进机进行截割的同时, 降临时支护区尾端的临时支架并前移临时支架; 步骤六: 临时支护区的液压支架前移后, 立即进行永久支护;  Step 5: While the roadheader is cutting, lower the temporary bracket at the end of the temporary support area and move the temporary bracket forward; Step 6: Immediately after the hydraulic support of the temporary support area moves forward, perform permanent support;
步骤七: 重复上述步骤进行下一个循环。  Step 7: Repeat the above steps for the next cycle.
本发明所述一种地下综掘巷道临时支护的循环快速技术与实施装置系统,具有以下特点: The cycle rapid technology and implementation device system for temporary support of underground comprehensive roadway excavation has the following characteristics:
1. 将掘进工作面分为临时支护区 (一般为掘进机工作区, 下略) 和永久支护区; 实现了 临时支护与永久支护、 永久支护与掘进机截割的同时作业。 1. Divide the working face into temporary support area (generally the roadhead working area, below) and permanent support area; realize the simultaneous operation of temporary support and permanent support, permanent support and roadheader cutting .
2. 对临时支护区釆用 "履带式 "前支后回临时支护液压组合支架支护, 有效解决了反复 支撑对围岩的破坏问题。  2. For the temporary support area, the "crawler type" front support and the temporary support hydraulic combination bracket support are used to effectively solve the problem of repeated support to the surrounding rock.
3.临时支架能够根据围岩特性给定初撑力,既可以足够的初撑力限制围岩变形,也可以适 当的初撑力和工作阻力释放围岩应力, 可以适应于各种适合综合掘进机工艺的围岩条件以及 巷道断面形状。  3. The temporary support can give the initial support force according to the characteristics of the surrounding rock. It can not only reduce the surrounding rock deformation with sufficient initial support force, but also release the surrounding rock stress with proper initial support force and working resistance. It can be adapted to various suitable comprehensive excavation. Surrounding rock conditions of the machine process and the shape of the roadway section.
4. 永久支护在永久支护区, 有利于锚杆、 锚索安装平行作业, 有利于提高工程质量。 4. Permanent support in the permanent support area is conducive to parallel installation of anchors and anchor cables, which is conducive to improving the quality of the project.
5.可以大幅度提高巷道掘进速度。 5. Can greatly improve the tunneling speed.
6.职工作业环境安全可靠, 自动化程度高, 劳动强度低、 效率高。  6. The working environment of employees is safe and reliable, with high degree of automation, low labor intensity and high efficiency.
附图说明 DRAWINGS
图 1-3 本发明的示意图 1-掘进机; 2-移架设备; 3-液压支架; 4-临时支护区; 5-永久支护区 Figure 1-3 Schematic diagram of the present invention 1-heading machine; 2-shifting equipment; 3-hydraulic bracket; 4-temporary support area; 5-permanent support area
具体实施方式 detailed description
一种 "履带式"液压组合支架临时支护与永久支护平行作业掘进工艺先将掘进工作面分 为临时支护区 (4)和永久支护区 (5) ; 掘进机作业区为临时支护区 (4) , 其后为永久支护 区 (5 ) ; 临时支护区 (4) 釆用 "履带式"液压组合支架前支后回工艺进行临时支护; 永久 支护与掘进机截割同时作业。 "履带式"液压组合支架, 由若干个液压支架 (3) 组成。  A "crawler type" hydraulic combination bracket temporary support and permanent support parallel operation excavation process first divides the excavation working face into a temporary support area (4) and a permanent support area (5); the roadheader operation area is a temporary support The protection zone (4), followed by the permanent support zone (5); the temporary support zone (4) 临时 the temporary support of the "crawler type" hydraulic combination bracket front and back process; permanent support and roadheader Cut at the same time. The "crawler" hydraulic combination bracket consists of several hydraulic supports (3).
所述前支后回工艺是, 若干个液压支架(3)沿掘进巷道轴线方向并排布置以支撑临时支 护区 (4) , 随着掘进机(1)的推移和永久支护的跟进, 临时支护区尾部的临时支架撤回, 运 输到临时支护区的前方, 重新支撑, 如此循环。  The front support and back process is that a plurality of hydraulic supports (3) are arranged side by side along the axis direction of the roadway to support the temporary support area (4). With the advancement of the roadheader (1) and the follow-up of the permanent support, The temporary support at the end of the temporary support area is withdrawn, transported to the front of the temporary support area, re-supported, and so circulated.
实现该工艺的设备主要包括 "履带式"前支后回临时支护液压组合支架及移架设备 (2 ) 两部分。  The equipment to realize the process mainly includes two parts: "crawler type" front support and back support hydraulic support bracket and transfer equipment (2).
每一排永久支护排用一架液压支架(3) , 液压支架架数根据临时支护区长度确定; 临时 支护支架随掘进机截割及时架设, 如同履带的带板相对静止于地面一样, 一直保持其对围岩 的支护至组合架架尾, 对于临时支护区无反复支撑破坏围岩问题。  Each row of permanent support is equipped with a hydraulic support (3). The number of hydraulic supports is determined according to the length of the temporary support area; the temporary support bracket is erected with the boring machine, as if the track plate is relatively stationary on the ground. , has always maintained its support for the surrounding rock to the end of the combined frame, for the temporary support area without repeated support to destroy the surrounding rock problem.
用于临时支护的液压支架是可收缩或折叠的; 临时支护液压支架(3)是与移架设备(2) 配合, 避开巷道内掘进机 (1 ) 及通风防尘等设施, 整体运移至组合架前再支护的。  The hydraulic support for temporary support is collapsible or foldable; the temporary support hydraulic support (3) is matched with the transfer equipment (2), avoiding the roadway boring machine (1), ventilation and dustproof facilities, etc. Re-supported before moving to the combination frame.
移架设备至少要包括三个系统。 随着巷道掘进自前移系统; 运移临时支架系统, 即能够 将临时支架避开掘进机和通风防尘等设施, 从临时支护区尾部运至前部; 辅助临时支架升降 系统。  The racking equipment must include at least three systems. As the roadway excavates from the forward movement system; the temporary support system can move the temporary support away from the roadheader, ventilation and dustproof facilities, from the tail of the temporary support area to the front; and assist the temporary support lifting system.
移架设备有掘进机机架托载式、 移动绗架托载式、 轨上龙门托载式、 临时支架配套导轨 自移式四种形式。  The moving equipment has four types: the boring machine frame supporting type, the moving truss supporting type, the gantry supporting type on the rail, and the temporary supporting rail.
如机架托载式, 机架位于掘进机之上, 即可随着掘进机前移而前移; 掘进机位于机架内 侧, 通风防尘除尘等设施也固定于机架内侧, 机架上设有载架移动系统, 可以将临时支架从 机架的外侧前移; 机架上设有临时支架升降的辅助系统, 以辅助临时支架的升降。  For example, the rack support type, the rack is located above the roadheader, and can be moved forward as the roadheader moves forward; the roadheader is located inside the rack, and the ventilation, dustproof and dust removal facilities are also fixed on the inside of the rack, on the rack A carrier movement system is provided to move the temporary bracket forward from the outside of the rack; the rack is provided with an auxiliary system for temporary bracket lifting to assist in the lifting of the temporary bracket.
一种 "履带式"液压组合支架临时支护与永久支护平行作业掘进方法, 其步骤为: 步骤一: 掘进机截割完成一个步距;  A "crawler type" hydraulic combined bracket temporary support and permanent support parallel operation method, the steps are as follows: Step 1: The roadheader completes a step;
步骤二: 将临时支护区尾端回撤下来的一架临时支护液压支架, 利用移架设备移动至前 方待支护空间;  Step 2: Move a temporary support hydraulic support that has been pulled back from the end of the temporary support area to the front to be supported by the transfer equipment;
步骤三: 升临时支护液压支架即完成临时支护;  Step 3: Lifting the temporary support hydraulic support to complete the temporary support;
步骤四: 掘进机进行截割;  Step 4: The roadheader performs cutting;
步骤五: 在掘进机进行截割的同时, 降临时支护区尾端的临时支护液压支架并前移临时 支护液压支架; Step 5: While the roadheader is cutting, lower the temporary support hydraulic support at the end of the temporary support area and move forward temporarily. Support hydraulic support;
步骤六: 临时支护区的液压支架前移后, 立即进行永久支护; 步骤七: 重复上述步骤进行下一个循环。  Step 6: Immediately after the hydraulic support of the temporary support area is moved forward, perform permanent support; Step 7: Repeat the above steps for the next cycle.

Claims

1、 一种 "履带式"液压组合支架临时支护与永久支护平行作业掘进工艺, 将掘进工作面 分为临时支护区 (4)和永久支护区 (5) , 掘进机作业区为临时支护区 (4) , 其后为永久支 护区 (5) ; 临时支护区 (4) 釆用 "履带式"液压组合支架前支后回工艺进行临时支护; 永 久支护与掘进机截割同时作业。 1. A "crawler type" hydraulic combined support temporary support and permanent support parallel operation excavation technology. The excavation working surface is divided into a temporary support area (4) and a permanent support area (5). The tunnel boring machine operating area is Temporary support area (4), followed by permanent support area (5); Temporary support area (4) adopts "crawler type" hydraulic combined support front support and back return technology for temporary support; permanent support and excavation Machine cutting and working at the same time.
2、 一种如权利要求 1所述的掘进工艺, 其特征是: 所述前支后回工艺是, 若干个液压支 架 (3)沿掘进巷道轴线方向并排布置以支撑临时支护区 (4) , 随着掘进机(1)的推移和永久 支护的跟进, 临时支护区尾部的临时支架撤回, 运输到临时支护区的前方, 重新支撑, 如此 循环。 2. An excavation process as claimed in claim 1, characterized in that: the front support and back return process is that several hydraulic supports (3) are arranged side by side along the axis of the excavation tunnel to support the temporary support area (4) , As the boring machine (1) moves forward and the permanent support follows up, the temporary support at the rear of the temporary support area is withdrawn, transported to the front of the temporary support area, and re-supported, and so on.
3、 一种如权利要求 2所述的掘进工艺, 其特征是: 实现该工艺的设备包括 "履带式 "前 支后回液压组合支架及移架设备 (2) 两部分。 3. An excavation process as claimed in claim 2, characterized in that: the equipment for realizing the process includes two parts: a "crawler type" front and rear hydraulic combination bracket and a rack-moving device (2).
4、 一种如权利要求 3所述的掘进工艺, 其特征是: 所述 "履带式"液压组合支架由若干 个液压支架 (3) 组成。 4. An excavation process as claimed in claim 3, characterized in that: the "crawler type" hydraulic combination bracket is composed of several hydraulic brackets (3).
5、一种如权利要求 4所述的掘进工艺,其特征是:每一排永久支护排用一架液压支架(3), 液压支架架数根据临时支护区长度确定, 临时支护支架随掘进机截割及时架设, 如同履带的 带板相对静止于地面一样, 一直保持其对围岩的支护至组合架架尾, 对于临时支护区无反复 支撑破坏围岩问题。 5. An excavation process as claimed in claim 4, characterized in that: each row of permanent support rows uses a hydraulic support (3), the number of hydraulic supports is determined according to the length of the temporary support area, and the temporary support support It is erected in time as the tunnel boring machine cuts, just as the belt plate of the crawler track is relatively stationary on the ground, and its support for the surrounding rock is maintained until the end of the combined frame. There is no problem of repeated support to damage the surrounding rock in the temporary support area.
6、 一种如权利要求 4所述的掘进工艺, 其特征是: 用于临时支护的液压支架是可收缩或 折叠的; 临时支护液压支架 (3) 是与移架设备 (2)配合, 避开巷道内掘进机 (1 )及通风防 尘等设备设施, 整体运移至组合架前再支护的。 6. An excavation process as claimed in claim 4, characterized by: the hydraulic support used for temporary support is retractable or foldable; the temporary support hydraulic support (3) cooperates with the rack moving equipment (2) , avoiding the boring machine (1) and ventilation and dustproof equipment and facilities in the tunnel, and moving the whole to the front of the combined frame for support.
7、 一种如权利要求 3所述的掘进工艺, 其特征是: 移架设备至少要包括三个系统: 随着 巷道掘进自前移系统; 运移临时支架系统, 即能够将临时支架避开掘进机和通风防尘设施, 从临时支护区尾部运至前部; 辅助临时支架升降系统。 7. An excavation process as claimed in claim 3, characterized in that: the frame moving equipment must include at least three systems: a self-moving forward system as the tunnel is excavated; a temporary support system for moving, that is, the temporary support can be avoided The tunnel boring machine and ventilation and dustproof facilities are transported from the rear to the front of the temporary support area; auxiliary temporary support lifting system.
8、 一种如权利要求 3或 7所述的掘进工艺, 其特征是: 移架设备有掘进机机架托载式、 移动绗架托载式、 轨上龙门托载式、 临时支架配套导轨自移式四种形式。 8. An excavation process as claimed in claim 3 or 7, characterized by: The frame shifting equipment includes a boring machine frame carrier type, a mobile quilting frame carrier type, a rail-mounted gantry carrier type, and a temporary support supporting guide rail. Four forms of self-moving.
9、一种"履带式 "液压组合支架临时支护与永久支护平行作业掘进设备,包括掘进机(1 )、 移架设备 (2) 和液压支架 (3) ; 若干个液压支架组合成支护临时支护区的 "履带式"液压 组合支架, 以前支后回工艺进行临时支护; 所述液压支架是可伸缩或可折叠的; 所述移架设 备至少要包括随着巷道掘进自前移系统、 运移临时支架系统和辅助临时支架升降系统。 9. A "crawler type" hydraulic combined support excavation equipment for parallel operations of temporary support and permanent support, including a tunnel boring machine (1), a moving frame equipment (2) and a hydraulic support (3); several hydraulic supports are combined into a support The "crawler-type" hydraulic combination support is used to protect the temporary support area, and the front support and back-turning process are used for temporary support; the hydraulic support is retractable or foldable; the moving equipment must at least include moving from the front along with the tunnel excavation. transfer system, transfer temporary support system and auxiliary temporary support lifting system.
10、 一种 "履带式"液压组合支架临时支护与永久支护平行作业掘进方法, 其步骤为: 步骤一: 掘进机截割完成一个步距; 10. A "crawler type" hydraulic combined support temporary support and permanent support parallel operation excavation method, the steps are: Step 1: The tunnel boring machine completes one step;
步骤二: 将临时支护区尾端回撤下来的一个临时支护液压支架, 利用移架设备移动至前 方待支护空间; Step 2: Pull back a temporary support hydraulic support from the rear end of the temporary support area, and use the moving equipment to move it to the front. Space to be supported;
步骤三: 升临时液压支架即完成临时支护; Step 3: Raise the temporary hydraulic support to complete the temporary support;
步骤四: 掘进机进行截割; Step 4: The tunnel boring machine cuts;
步骤五:在掘进机进行截割的同时,降临时支护区尾端的临时液压支架并前移临时支架; 步骤六: 临时支护区的液压支架前移后, 立即进行永久支护; Step five: While the tunnel boring machine is cutting, lower the temporary hydraulic support at the end of the temporary support area and move the temporary support forward; Step six: After the hydraulic support in the temporary support area moves forward, perform permanent support immediately;
步骤七: 重复上述步骤进行下一个循环。 Step 7: Repeat the above steps for the next cycle.
PCT/CN2014/080333 2013-07-15 2014-06-19 Temporary supporting and permanent supporting parallel operation excavating technology for crawler-type hydraulic combination bracket and equipment using same WO2015007133A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU2014292699A AU2014292699A1 (en) 2013-07-15 2014-06-19 Temporary supporting and permanent supporting parallel operation excavating technology for crawler-type hydraulic combination bracket and equipment using same

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201310311586.9 2013-07-15
CN201310311586.9A CN103382844B (en) 2013-07-15 2013-07-15 A kind of tracked hydraulic sectional shelf-unit temporary lining and permanent support parallel operations piercing technique and equipment

Publications (1)

Publication Number Publication Date
WO2015007133A1 true WO2015007133A1 (en) 2015-01-22

Family

ID=49490748

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2014/080333 WO2015007133A1 (en) 2013-07-15 2014-06-19 Temporary supporting and permanent supporting parallel operation excavating technology for crawler-type hydraulic combination bracket and equipment using same

Country Status (3)

Country Link
CN (1) CN103382844B (en)
AU (1) AU2014292699A1 (en)
WO (1) WO2015007133A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112943285A (en) * 2021-03-16 2021-06-11 中铁四院集团西南勘察设计有限公司 Rectangular pipe jacking machine and shovel blade for excavating dead zone thereof

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103382844B (en) * 2013-07-15 2015-09-30 郑东风 A kind of tracked hydraulic sectional shelf-unit temporary lining and permanent support parallel operations piercing technique and equipment
CN103670425B (en) * 2013-12-23 2015-12-02 郑东风 Formula lifting migration rack mechanical hand is carried in an a kind of pick integral method and development machine holder
CN103742176B (en) * 2014-01-21 2015-10-28 蒲长晏 A kind of pick anchor one unit
CN103758522B (en) * 2014-01-23 2015-12-30 郑东风 A kind of temporary support for drivage face method and equipment thereof
CN104179517B (en) * 2014-09-03 2017-03-15 兖矿集团有限公司 A kind of driving support system and laneway support method
CN104500116B (en) * 2014-12-15 2017-11-10 郑东风 A kind of machine-carried type auxiliary stand lift transport device
CN104675422B (en) * 2014-12-26 2016-08-24 安徽理工大学 The hydraulic means of coal mine roadway temporary support for drivage face
CN108691545B (en) * 2018-03-30 2019-06-28 张卫东 A kind of continuous tunneling construction method of bolting with wire mesh adapting to Complex Roof shape
CN108894794B (en) * 2018-07-20 2024-02-27 陈成军 Tunneling assembly line and tunneling operation method thereof
CN112593961A (en) * 2020-12-04 2021-04-02 煤炭科学研究总院 Roadway driving method
CN114658432A (en) * 2022-03-24 2022-06-24 国家能源集团宁夏煤业有限责任公司 Construction method of fully mechanized coal mining face retraction channel

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3871707A (en) * 1972-09-06 1975-03-18 Consolidation Coal Co Method for mining and supporting the mine roof
US4710064A (en) * 1985-04-15 1987-12-01 Stafford Frank K Movable roof support and bolter system
CN2189645Y (en) * 1993-12-02 1995-02-15 中国矿业大学 Special hydraulic supporting rack for temporary supporting of digging head
CN102678151A (en) * 2012-04-17 2012-09-19 太原理工大学 Fully-mechanized excavating self-moving type temporary support system and technological method thereof
CN103382844A (en) * 2013-07-15 2013-11-06 郑东风 Temporary support and permanent support parallel operation excavating technology and equipment for tracked hydraulic combined support
CN103643979A (en) * 2013-07-15 2014-03-19 郑东风 Hydraulic support used for roadway temporary support and erecting and use method of hydraulic support
CN203769795U (en) * 2013-07-15 2014-08-13 郑东风 Tracked hydraulic combined bracket temporary support and permanent support parallel operation tunneling equipment

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102410017B (en) * 2011-12-13 2014-06-25 单淑花 Supporting type integrated tunneling-anchoring machine
CN202645555U (en) * 2012-04-06 2013-01-02 中铁隧道装备制造有限公司 Fully-sealed coal roadway heading-anchoring synchronizer
CN202768027U (en) * 2012-09-20 2013-03-06 石家庄煤矿机械有限责任公司 Quick heading temporary shoring system matched and used with heading machine

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3871707A (en) * 1972-09-06 1975-03-18 Consolidation Coal Co Method for mining and supporting the mine roof
US4710064A (en) * 1985-04-15 1987-12-01 Stafford Frank K Movable roof support and bolter system
CN2189645Y (en) * 1993-12-02 1995-02-15 中国矿业大学 Special hydraulic supporting rack for temporary supporting of digging head
CN102678151A (en) * 2012-04-17 2012-09-19 太原理工大学 Fully-mechanized excavating self-moving type temporary support system and technological method thereof
CN103382844A (en) * 2013-07-15 2013-11-06 郑东风 Temporary support and permanent support parallel operation excavating technology and equipment for tracked hydraulic combined support
CN103643979A (en) * 2013-07-15 2014-03-19 郑东风 Hydraulic support used for roadway temporary support and erecting and use method of hydraulic support
CN203769795U (en) * 2013-07-15 2014-08-13 郑东风 Tracked hydraulic combined bracket temporary support and permanent support parallel operation tunneling equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112943285A (en) * 2021-03-16 2021-06-11 中铁四院集团西南勘察设计有限公司 Rectangular pipe jacking machine and shovel blade for excavating dead zone thereof

Also Published As

Publication number Publication date
CN103382844A (en) 2013-11-06
AU2014292699A1 (en) 2016-01-28
CN103382844B (en) 2015-09-30

Similar Documents

Publication Publication Date Title
WO2015007133A1 (en) Temporary supporting and permanent supporting parallel operation excavating technology for crawler-type hydraulic combination bracket and equipment using same
US11008860B2 (en) Equipment system for no-roadway no-coal-pillar retained roadway mining method
CN103643979B (en) Hydraulic support used for roadway temporary support and erecting and use method of hydraulic support
CN102155219B (en) Comprehensive dredging machine
CN107288648B (en) Supporting system and supporting method for open type full face rock tunneling machine
US10036252B2 (en) Method for removing hydraulic support for solid filling coal mining
CN104234749B (en) A kind of fully-mechanized mining working big cross section return channel surrounding rock control method
CN202023559U (en) Comprehensive dig-anchor machine
CN202500562U (en) Excavating, supporting and anchoring parallel operating system
CN104747201A (en) Rapid drivage-anchoring integrated equipment for coal road under instable surrounding rock condition
CN104632236A (en) Construction method of TBM-EPB double-mode shield in composite stratum
CN104373147B (en) Folding extension type roadway hydraulic bracket
CN204113319U (en) A kind of folding telescopic alley hydraulic support
CN110985083B (en) Stoping roadway stack type support supporting system and method
CN105065048A (en) Temporary support for driving working face under coal mine
US4687375A (en) Circular heading machine
CN109356193B (en) Prefabricated piping lane propelling movement construction equipment
CN204941586U (en) Underground coal mine Provisional support for tunnelling face
CN208441848U (en) Freezing Method for Cross-passage Construction class rectangle push-bench
CN108691553B (en) Rectangular-like pipe jacking machine for construction of connecting channel
CN105201536B (en) A kind of warkitself tunneling boring advance support equipment
CN104863599A (en) Fully-mechanized mining face synchronous slope expansion and installation method and supporting system
CN109882189B (en) Horseshoe-shaped half-section shield machine suitable for fault fracture zone and construction method
CN203769795U (en) Tracked hydraulic combined bracket temporary support and permanent support parallel operation tunneling equipment
CN211598712U (en) Track self-moving type advance support

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14826668

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2014292699

Country of ref document: AU

Date of ref document: 20140619

Kind code of ref document: A

122 Ep: pct application non-entry in european phase

Ref document number: 14826668

Country of ref document: EP

Kind code of ref document: A1