WO2014104335A1 - 発電システム - Google Patents

発電システム Download PDF

Info

Publication number
WO2014104335A1
WO2014104335A1 PCT/JP2013/085200 JP2013085200W WO2014104335A1 WO 2014104335 A1 WO2014104335 A1 WO 2014104335A1 JP 2013085200 W JP2013085200 W JP 2013085200W WO 2014104335 A1 WO2014104335 A1 WO 2014104335A1
Authority
WO
WIPO (PCT)
Prior art keywords
power generation
medium
power
relay
working medium
Prior art date
Application number
PCT/JP2013/085200
Other languages
English (en)
French (fr)
Inventor
裕孝 久保田
平尾 豊隆
貴夫 桜井
小林 直樹
Original Assignee
三菱重工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱重工業株式会社 filed Critical 三菱重工業株式会社
Priority to EP13869379.1A priority Critical patent/EP2940252B1/en
Priority to CN201380064487.3A priority patent/CN104854313B/zh
Priority to US14/653,465 priority patent/US9810089B2/en
Publication of WO2014104335A1 publication Critical patent/WO2014104335A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D15/00Adaptations of machines or engines for special use; Combinations of engines with devices driven thereby
    • F01D15/10Adaptations for driving, or combinations with, electric generators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K13/00General layout or general methods of operation of complete plants
    • F01K13/02Controlling, e.g. stopping or starting
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D21/00Shutting-down of machines or engines, e.g. in emergency; Regulating, controlling, or safety means not otherwise provided for
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K23/00Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
    • F01K23/02Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02CGAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
    • F02C7/00Features, components parts, details or accessories, not provided for in, or of interest apart form groups F02C1/00 - F02C6/00; Air intakes for jet-propulsion plants
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02CGAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
    • F02C9/00Controlling gas-turbine plants; Controlling fuel supply in air- breathing jet-propulsion plants
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D21/00Shutting-down of machines or engines, e.g. in emergency; Regulating, controlling, or safety means not otherwise provided for
    • F01D21/04Shutting-down of machines or engines, e.g. in emergency; Regulating, controlling, or safety means not otherwise provided for responsive to undesired position of rotor relative to stator or to breaking-off of a part of the rotor, e.g. indicating such position
    • F01D21/06Shutting-down

Definitions

  • the present invention relates to a power generation system including a plurality of power generation units in parallel.
  • Rankine cycle power generation systems have been developed as systems that generate power using exhaust heat from ships, factories, gas turbines, etc., geothermal heat, solar heat, and ocean temperature differences from the viewpoint of effective energy use and environmental protection.
  • a medium having a boiling point lower than that of water for example, an organic fluid such as a fluorocarbon medium is used as the medium.
  • a medium is circulated by a circulation pump 6 in a cycle circuit 5 having a preheater 1, an evaporator 2, a turbine 3, and a condenser 4.
  • fever from the above heat sources is sent to the evaporator 2, heat-exchanges with a medium, a medium is evaporated, and it gasifies. Further, the heat medium that has passed through the evaporator 2 preheats the medium in the preheater 1 provided in the previous stage of the evaporator 2. The gasified medium expands in the turbine 3 to rotationally drive the drive shaft 3 a and drive the generator 7. The medium expanded by the turbine 3 is condensed by the condenser 4 and circulated to the circulation pump 6.
  • the alternating current (AC) output when the generator 7 is driven is converted into direct current (DC) by the rectifier 9 and further converted back to alternating current by the grid interconnection inverter 10 to generate externally generated power. Is output.
  • Patent Documents 1 to 3 disclose a method for dealing with large output energy fluctuations on the heat source side by providing a plurality of power generation units including the turbine 3 and the generator 7 and changing the number of operating units. Yes.
  • the power generation unit requiring maintenance is stopped to perform maintenance of the turbine 3, and the turbine 3 and the generator 7 of the other power generation units are It is preferable to operate.
  • the present invention provides a power generation system capable of shutting off power supply to a power generation unit that performs maintenance when performing maintenance of the power generation unit in a state in which the other power generation units are operated in a configuration including a plurality of power generation units. I will provide a.
  • a power generation system is a power generation system provided with a plurality of power generation units in parallel with an external power system, each of the power generation units being an expander that is rotated by a working medium.
  • a generator that generates electric power by rotating the expander; a rectifier that rectifies the electric power generated by the generator and outputs the rectified power to the external power system; and a medium distribution system that sends the working medium to the expander;
  • a relay that cuts off power between the generator and the external power system, an operating part that is activated when maintenance of the power generation unit is started, and when the operating part is actuated, the generator and the And a relay drive unit that cuts off electric power with the external power system.
  • the relay drive unit switches the relay according to the operation of the operation unit that is always operated at the start of the maintenance, and between the generator and the external power system. Power off with.
  • the relay may be provided between the rectifier and the external power system, or may be provided between the generator and the rectifier.
  • the power generation system may have any configuration as long as power is generated by driving a generator with an expander.
  • the medium circulation system is a medium circulation circuit that circulates the working medium.
  • the medium circulation circuit pressurizes the working medium and circulates the medium in the medium circulation circuit.
  • An evaporator that heats and evaporates the working medium by an external heat source, the expander that rotates by the working medium evaporated by the evaporator, and a condenser that condenses the working medium discharged from the expander
  • the flow of the working medium in the medium circulation circuit with respect to a maintenance target device including at least one of the circulation pump, the evaporator, the expander, and the condenser.
  • a first on-off valve provided upstream in the direction and capable of interrupting the flow of the working medium; and a first on-off valve provided downstream in the flow direction of the working medium in the medium circulation circuit and capable of interrupting the flow of the working medium. It is preferable that at least one of the first on-off valve and the second on-off valve is the operating portion.
  • the first on-off valve and the second on-off valve are closed, and then the medium between the first on-off valve and the second on-off valve is recovered. To do. Therefore, since the first on-off valve or the second on-off valve is closed to collect the working medium during maintenance, the power can be interrupted by the relay by using at least one of these as the operating portion.
  • a maintenance object apparatus is maintained.
  • the first on-off valve and the second on-off valve are evacuated, and the medium is filled between the first on-off valve and the second on-off valve.
  • evacuation performed when the medium is filled after maintenance may be performed only between the first on-off valve and the second on-off valve.
  • the maintenance target device in the power generation unit only needs to include at least one of a circulation pump, an evaporator, an expander, and a condenser, and may include two or more of these. Moreover, you may provide a 1st on-off valve and a 2nd on-off valve with respect to two or more maintenance object apparatuses.
  • At least one of the circulation pump or a pump that supplies a heat medium from the external heat source to the evaporator may be used as the operation unit.
  • a circulation pump for circulating the working fluid and a pump for supplying a heat medium for evaporating the working fluid to the evaporator Stop In maintenance of the power generation system, in order to stop the expansion of the working fluid in the expander, a circulation pump for circulating the working fluid and a pump for supplying a heat medium for evaporating the working fluid to the evaporator Stop.
  • a circulation pump for circulating the working fluid and a pump for supplying a heat medium for evaporating the working fluid to the evaporator Stop In maintenance of the power generation system, in order to stop the expansion of the working fluid in the expander, a circulation pump for circulating the working fluid and a pump for supplying a heat medium for evaporating the working fluid to the evaporator Stop.
  • a power generation system includes a cooling fan that cools the condenser, a fan drive source that drives the cooling fan, power between the fan drive source and the power source of the fan drive source.
  • a second relay that shuts off the power supply, and the relay drive unit is configured to switch between the fan drive source and the power source of the fan drive source at the second relay when the operating unit is activated. The power may be cut off.
  • the power generation system 20A includes a plurality of sets of power generation units 50A, 50B, 50C,.
  • Each of the power generation units 50A, 50B, 50C,... Has a heat medium circuit 21 into which a heat medium is sent from a heat source such as exhaust heat from a ship, factory, gas turbine, etc., geothermal heat, solar heat, ocean temperature difference, and the like.
  • a medium circulation circuit (medium distribution system) 22 that circulates a medium (working medium) that obtains heat energy by exchanging heat with the heat medium of the circuit 21.
  • a chlorofluorocarbon medium such as HFC-134a, HFC-245fa, HFO-1234yf, and HFO-1234ze can be used as the medium of the medium circulation circuit 22.
  • the heat medium circuit 21 supplies a heat medium such as steam and water (hot water) obtained by recovering heat from a heat source.
  • a heat medium such as steam and water (hot water) obtained by recovering heat from a heat source.
  • the medium circulation circuit 22 includes a circulation pump 23, a preheater 24, an evaporator 25, a turbine (expander) 26, and a condenser 27.
  • the circulation pump 23 circulates the medium in the medium circulation circuit 22 so that the medium passes through the preheater 24, the evaporator 25, the turbine 26, and the condenser 27 in order by compressing and feeding the medium.
  • the preheater 24 and the evaporator 25 exchange heat between the heat medium of the heat medium circuit 21 and the medium of the medium circulation circuit 22, and the evaporator 25 uses the pressurized medium as a heat medium (external heat source).
  • the preheater 24 preheats the medium by the residual heat of the heat medium that has passed through the evaporator 25.
  • the medium introduced into the turbine 26 expands in the turbine chamber, so that the drive shaft 26a is rotationally driven around the axis.
  • a rotor (not shown) of the generator 28 is connected to the drive shaft 26a, and the rotor (not shown) is rotationally driven to face a stator (not shown) of the generator 28.
  • the generator 28 outputs an alternating current.
  • the alternating current output from the generator 28 is rectified by the rectifier 29 and converted into direct current.
  • the direct current output from each set of rectifiers 29 is converted back to alternating current by the grid interconnection inverter 30 and output to the external power transmission network as generated power.
  • the medium circulation circuit 22 includes an on-off valve (first on-off valve) 40A on the upstream side and downstream side of the equipment to be maintained, for example, the turbine 26.
  • An on-off valve (second on-off valve) 40B is provided in the medium circulation circuit 22 .
  • a port pipe 41 is provided between the on-off valves 40 ⁇ / b> A and 40 ⁇ / b> B, and the tip of the port pipe 41 can communicate with the medium circulation circuit 22.
  • a service port 42 to which a device for taking in and out can be connected is used.
  • the port pipe 41 is formed with an on-off valve 43.
  • a relay that interrupts power between the rectifier 29 and the grid interconnection inverter 30 between the rectifier 29 and the grid interconnection inverter 30. 70 is provided.
  • the relay 70 is configured so that the relay circuit (relay driver unit) 71 switches the electrical circuit in conjunction with the on-off valves 40A and 40B that are activated when maintenance starts.
  • At least one of the on-off valves 40A and 40B is provided with a sensor 72 that detects whether the valve is in an open state or a closed state.
  • the relay drive circuit 71 When the relay drive circuit 71 receives the detection signal of the sensor 72 and the signal transitions from the closed state to the open state, the relay drive circuit 71 opens the relay 70 and cuts off the power between the rectifier 29 and the grid interconnection inverter 30. Further, when the detection signal from the sensor 72 transitions from the open state to the closed state, the relay 70 is closed, and power is connected between the rectifier 29 and the grid interconnection inverter 30.
  • the power generation system 20A includes a control unit 35.
  • the control unit 35 controls the operation of the heating medium supply of the heating medium circuit 21, the circulation pump 23 of the medium circulation circuit 22, and the on-off valves 40A, 40B, and 43, and the operating state of each device constituting the power generation system 20A. To monitor.
  • Such a power generation system 20A has a plurality of power generation units according to the input heat energy amount of the heat medium sent from the heat medium circuit 21 and the required power amount (output amount) on the output side under the control of the control unit 35.
  • the number of units to be operated that is, the number of operating turbines 26
  • the power generation amount can be changed stepwise.
  • the power generation system 20A in order to maintain the turbine 26 of one unit among the plurality of power generation units 50A, 50B, 50C,..., First, in the unit (for example, the power generation unit 50A), The supply of the heat medium is stopped by a pump 21 (not shown) and an on-off valve (not shown), and the circulation pump 23 of the medium circulation circuit 22 is stopped. At this time, among the plurality of power generation units 50A, 50B, 50C, ..., the power generation units 50B, 50C, ... other than the power generation unit 50A to be maintained can continue to operate.
  • the on-off valves 40A and 40B are closed.
  • the medium circulation circuit 22 is blocked on the upstream side and the downstream side of the turbine 26.
  • the sensor 72 detects the state change.
  • the relay 70 is opened by the relay drive circuit 71, and the power is cut off between the rectifier 29 and the grid-connected inverter 30.
  • the on-off valve 43 is opened. Thereby, in the medium circulation circuit 22, the medium between the on-off valves 40A and 40B is collected.
  • the maintenance includes, for example, replacement of the seal member, inspection of whether or not the blade is damaged, repair of the damaged portion, inspection and replacement of various sensors, and the like.
  • the maintenance content of the turbine 26 is not limited at all.
  • a vacuum pump is connected to the service port 42 and the vacuum pump 110 is operated to evacuate the inside of the medium circulation circuit 22 between the on-off valves 40A and 40B.
  • the vacuum valve 110 is evacuated to a predetermined degree of vacuum, and then the on-off valve 43 is closed.
  • the medium supply device 120 is connected to the service port 42, and the on-off valve 43 is opened to fill the medium circulation circuit 22 with the medium.
  • the on-off valve 43 After filling the medium, the on-off valve 43 is closed, and then the on-off valves 40A, 40B are opened.
  • the detection signal from the sensor 72 transits from the open state to the closed state, so that the relay 70 is closed by the relay drive circuit 71, and power is connected between the rectifier 29 and the grid interconnection inverter 30.
  • the power generation unit 50A is energized.
  • the power generation unit 50A can be restarted, so that the pump (not shown) of the heat medium circuit 21 and the circulation pump 23 of the medium circulation circuit 22 are operated, and the power generation unit 50A is restarted in a predetermined procedure. .
  • a power generation system 20A including a plurality of power generation units 50A, 50B, 50C,...
  • the power generation system 20A is activated during maintenance.
  • the energization to the turbine 26 the generator 28 and the rectifier 29 is interrupted using this as a trigger.
  • the on-off valves 40A and 40B are always operated during the maintenance of the turbine 26, and energization is automatically cut off by the operation. Therefore, there is no room for forgetting work, work mistakes, etc., and safe work. The environment can be secured.
  • on-off valves 40A and 40B are provided on the upstream side and the downstream side of the turbine 26 to be maintained, and a service port 42 is provided between the on-off valves 40A and 40B.
  • the on-off valves 40A and 40B may be closed, and the medium circulating circuit 22 may take in and out the medium only in a partial section including the turbine 26 between the on-off valves 40A and 40B. Therefore, it is possible to shorten the time required for extracting, evacuating, and filling the medium, shorten the maintenance period, and increase the operating rate of the power generation system. Further, since the amount of medium required for maintenance can be reduced, the maintenance cost can be reduced.
  • the operation of the on-off valves 40A and 40B is used as a trigger for shutting off the energization to the rectifier 29 during the maintenance of the turbine 26.
  • the present invention is not limited to this.
  • the operation unit that can be used as such a trigger include a door of a turbine chamber in which the turbine 26 is accommodated, a door and cover of a control panel in which the control unit 35 is accommodated, a cover of the rectifier 29, and the like.
  • opening / closing states may be detected.
  • a locking part that locks these doors, covers and the like may be used as an operating part to detect locking and unlocking of the locking part.
  • the operation unit there are a switch for stopping the operation of the circulation pump 23, a pump for stopping the supply of the heat medium from the heat medium circuit 21, and a switch for an on-off valve (both not shown). These ON / OFF may be detected by the sensor 72, and the energization to the rectifier 29 may be cut off. A combination of multiple triggers can also be used.
  • the circulation pump 23 or the heat medium circuit 21 is used as a trigger, even if a switch for stopping these is operated, the delivery of the medium from the circulation pump 23 and the heat supply from the heat medium circuit 21 are immediately stopped.
  • the medium expands and the generator 28 generates power. Therefore, the rotation of the turbine 26 and the generator 28 may be detected, and the energization to the rectifier 29 may be interrupted when the rotation stops.
  • the rotation of the turbine 26 and the generator 28 may be stopped when the supply of heat energy from the heat source side is stopped even during normal operation other than during maintenance. Therefore, it is necessary to combine the interruption of energization to the rectifier 29 when the rotation of the turbine 26 or the generator 28 is stopped with the detection of a change in the state of the turbine 26 that is always operated during the maintenance. .
  • a relay 75 may be provided between the generator 28 and the rectifier 29, and the relay 70 and the relay 75 may operate in conjunction with each other. Further, the function of this relay 75 may be realized by a switching element mounted on the substrate of the rectifier 29.
  • the building containing the turbine 26 and the control panel containing the rectifier 29 cannot be opened unless the energization to the rectifier 29 is cut off as described above. It can also be interlocked with these door locks.
  • the relay 70 is intermittently connected by the relay drive circuit 71 when the on-off valves 40A and 40B are opened and closed by an electrical determination circuit.
  • the control unit 35 it is also possible to control the interruption of the relay 70 by software according to the open / close signal of the sensor 72.
  • the control unit 35 monitors the intermittent state of the relay 70, and when the intermittent state of the relay 70 is changed by the relay drive circuit 71, whether or not the relay 70 is actually operated and the intermittent state is changed. It can also be monitored. When the intermittent state does not transition correctly, the control unit 35 may output an alarm signal, stop the power generation system 20A, or the like.
  • the rectifiers 29 of the plurality of power generation units 50A, 50B, 50C,... are connected to one grid-connected inverter 30, but the present invention is not limited to this.
  • the present invention is not limited to this.
  • the turbine 26 is exemplified as the device to be maintained.
  • the present invention is not limited to this, and any device other than the turbine 26 may be the maintenance target as long as the device constitutes the power generation system 20A. .
  • the power generation system 20B includes a plurality of sets of power generation units 60A, 60B, 60C,.
  • one medium circulation circuit 22, a circulation pump 23, a preheater 24, an evaporator 25, and a condenser 27 are provided for one heat medium circuit 21, and the evaporator 25 and the condenser 27 are connected to each other.
  • the heat medium circuit 21 is branched into a plurality of branch pipes 21a, 21b, 21c,.
  • the power generation unit 60A, 60B, 60C, ... is formed by providing the turbine 26, the generator 28, and the rectifier 29 in each of the branch pipes 21a, 21b, 21c, ....
  • each rectifier 29 of a plurality of sets of power generation units 60A, 60B, 60C,... Is connected to one grid interconnection inverter 30.
  • the medium sent out by the circulation pump 23 passes through the preheater 24 and the evaporator 25 in the medium circulation circuit 22, and then the power generation units 60A, 60B, 60C,. Branches into branch pipes 21a, 21b, 21c,.
  • the medium drives the turbine 26 to generate power with the generator 28, and then returns to the circulation pump 23 through the condenser 27 in order.
  • the direct current output from the rectifiers 29 of the plurality of power generation units 60A, 60B, 60C,... Is reconverted into alternating current, and is output to the external power transmission network as generated power.
  • the amount of heat energy of the heat medium sent from the heat medium circuit 21 and the required power amount on the output side are controlled by the control unit 35 as in the first embodiment. Accordingly, by changing the number of units to be operated among the plurality of power generation units 60A, 60B, 60C,.
  • each of the power generation units 60A, 60B, 60C,... Is provided with an on-off valve 40A, an upstream side and a downstream side of a device to be maintained, for example, the turbine 26, as in the first embodiment.
  • 40B is provided in the medium circulation circuit 22 .
  • a port pipe 41 including a service port 42 and an on / off valve 43 is provided between the on / off valves 40 ⁇ / b> A and 40 ⁇ / b> B.
  • a relay 70 is provided between the rectifier 29 and the grid interconnection inverter 30 to interrupt power between the rectifier 29 and the grid interconnection inverter 30. Yes.
  • the relay drive circuit 71 detects the transition of the detection signal of the sensor 72 provided in at least one of the on / off valves 40A and 40B, thereby switching the power on and off in conjunction with the on / off valves 40A and 40B. It is done.
  • each of the power generation units 60A, 60B, 60C,... In order to maintain the turbine 26, as shown in the first embodiment, among the plurality of power generation units 60A, 60B, 60C,.
  • the on-off valves 40A and 40B are closed.
  • the sensor 72 detects the transition of the on-off valves 40A and 40B.
  • the relay 70 is opened by the relay drive circuit 71, and the power is cut off between the rectifier 29 and the grid-connected inverter 30.
  • the on-off valve 43 is opened. Thereby, the medium between the on-off valves 40A and 40B is collected.
  • the turbine 26 is subjected to necessary maintenance. Then, after the maintenance of the turbine 26 is completed, the vacuum pump 110 is connected to the service port 42 to evacuate the inside of the medium circulation circuit 22 between the on-off valves 40A and 40B. The valve 43 is closed. Then, the medium supply device 120 is connected to the service port 42 and the on-off valve 43 is opened to fill the medium circulation circuit 22 with the medium.
  • the on-off valve 43 After filling the medium, the on-off valve 43 is closed, and then the on-off valves 40A, 40B are opened. Accordingly, since the detection signal from the sensor 72 transitions from the open state to the closed state, the relay 70 is closed by the relay drive circuit 71, and the power is connected between the rectifier 29 and the grid interconnection inverter 30, and the rectifier 29 is energized. From this state, the power generation unit 60A is restarted.
  • a part including the turbine 26 between the on-off valves 40A, 40B is closed in the medium circulation circuit 22 when the turbine 26 is maintained. What is necessary is just to put in and out the medium only for a section. Therefore, it is possible to shorten the time required for extracting, evacuating, and filling the medium, shorten the maintenance period, and increase the operating rate of the power generation system. Further, since the amount of medium required for maintenance can be reduced, the maintenance cost can be reduced.
  • the third embodiment described below has, for example, a system configuration based on the configuration shown in the first embodiment, and the configuration common to the first embodiment is described below. The same reference numerals are given in the figure and the description thereof is omitted. Further, in FIG. 3 used for the following description, only one power generation unit 50A is shown, but the power generation system 20C has the same configuration as that of the power generation unit 50A as in the first embodiment shown in FIG. Are provided with a plurality of power generation units 50B, 50C,. As shown in FIG.
  • the power generation system 20 ⁇ / b> C includes a fan 80 that cools the condenser 27 in order to increase the condensation efficiency in the condenser 27.
  • the fan 80 is rotationally driven by a fan driving machine 81 including a motor that uses a direct current obtained from the downstream side of the rectifier 29 as a power source. By applying the wind generated by the rotation of the fan 80 to the condenser 27, the efficiency of the condenser 27 is increased.
  • a (second relay) 77 is provided. In the same manner as shown in the first embodiment, the relay 77 is connected to the fan drive 81 by the sensor 72 and the relay drive circuit 71 in accordance with the closing operation of the on-off valves 40A and 40B during the maintenance of the turbine 26. And the grid-connected inverter 30.
  • the fan 80 for cooling the condenser 27 can be stopped to ensure work safety.
  • the control unit 35 monitors the medium temperature before and after the turbine 26. If the temperature is high, the relay 77 is not immediately released even if the on-off valves 40A and 40B are closed, and the medium temperature Until the temperature becomes equal to or lower than a predetermined temperature, the cooling of the condenser 27 may be continued by operating the fan 80. In that case, the control unit 35 outputs an alarm display and an alarm sound indicating that the fan 80 is operating until the medium temperature falls below the specified temperature and the relay 77 is opened. Also good.
  • the operations of the fan 80, the fan driving device 81, the relay 77, and the relay 77 that cool the condenser 27 as described above can be similarly applied to the configuration shown in the second embodiment.
  • the power generation system of the present invention is not limited to the above-described embodiments described with reference to the drawings, and various modifications are conceivable within the technical scope.
  • exhaust heat from ships, factories, gas turbines, etc., geothermal heat, solar heat, ocean temperature difference, etc. are used as power sources for power generation. Is not a question at all.
  • the turbine 26 was illustrated as an expander, it can replace with the turbine 26 and a scroll type expander etc. can also be employ
  • the procedure for maintenance is within the scope of the gist of the present invention, the above-described procedure can be appropriately changed.
  • any configuration of power generation is possible as long as the generator 28 is driven by supplying a working medium to the turbine 26 (expander). It can also be applied to a system.
  • the configurations described in the above embodiments can be selected or changed to other configurations as appropriate.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)
  • Control Of Turbines (AREA)
  • Control Of Eletrric Generators (AREA)

Abstract

この発電システムは、複数の発電ユニット(50A,50B,50C,…)を並列に備えた発電システム(20A)において、発電ユニット(50A,50B,50C,…)のそれぞれが、作動媒体により回転する膨張器(26)と、膨張器(26)の回転によって電力を生成する発電機(28)と、整流器(29)と、膨張器(26)に作動媒体を送り込む媒体流通系統(22)と、発電機(28)と外部電力系統(30)との間で電力を遮断する継電器(70)と、メンテナンス開始時に作動させる作動部(40A,40B)と、作動部(40A,40B)が作動したときに、継電器(70)にて発電機(28)と外部電力系統(30)との間で電力を遮断させる継電器駆動部(71)と、を備える。

Description

発電システム
 本発明は、複数の発電ユニットを並列に備えた発電システムに関する。
 本願は、2012年12月28日に、日本に出願された特願2012-288962号に基づき優先権を主張し、その内容をここに援用する。
 近年、エネルギの有効利用、環境保全等の観点から、船舶,工場,ガスタービン等からの排熱、地熱、太陽熱、海洋温度差等を熱源として発電を行うシステムとして、ランキンサイクル式の発電システムが検討されている(例えば、特許文献1~3参照)。この際、上記のような熱源を利用する場合には、媒体として、水よりも沸点の低い媒体、例えばフロン系媒体などの有機流体が用いられる。このような発電システムにおいては、図4に示すように、予熱器1、蒸発器2、タービン3、凝縮器4を有したサイクル回路5内を、循環ポンプ6によって媒体を循環させる。そして、上記したような熱源から熱を回収した熱媒を、蒸発器2に送り込み、媒体と熱交換させ、媒体を蒸発させてガス化する。また、蒸発器2を経た熱媒は、蒸発器2の前段に設けられた予熱器1において、媒体を予熱する。
 ガス化された媒体は、タービン3において膨張することによって駆動軸3aを回転駆動し、発電機7を駆動する。タービン3で膨張した媒体は、凝縮器4で凝縮され、循環ポンプ6に循環される。
 発電機7が駆動されることによって出力される交流電流(AC)は、整流器9で直流電流(DC)に変換され、さらに、系統連系インバータ10で交流電流に再変換され、発電電力として外部に出力される。
 有機ランキンサイクル式の発電システムにおいては、熱源から出力される熱エネルギの変動量が大きい。これに対応するには、発電機7の回転数を変動させれば良いが、タービン3を発電機7の駆動源としている構成においては、タービン3の効率を考慮する必要がある。タービン3は、仕事効率の高い回転領域で作動させるのが好ましく、このため、熱源側の出力エネルギ変動に応じてタービン3および発電機7の回転数を変動させようとすると、その変動幅が制限を受ける。
 そこで、タービン3および発電機7を備えた発電ユニットを複数台備えて、その稼働台数を変動させることによって、熱源側の大きな出力エネルギ変動に対応する手法が特許文献1~3にも開示されている。
特開2006-299996号公報 特開2006-313048号公報 特開2006-313049号公報
 上記したような発電システムにおいては、例えばタービン3の駆動軸3aの軸受等の消耗部品の点検や交換等、メンテナンスを行う必要がある。
 このとき、発電システムの稼働率を高めるため、複数台の発電ユニットのうち、メンテナンスの必要な発電ユニットを停止させてタービン3のメンテナンスを行い、それ以外の発電ユニットのタービン3および発電機7は稼働させるのが好ましい。
 しかし、その場合、発電システム全体をシャットダウンしないことになるので、停止させた発電ユニットにおいても、タービン3および発電機7の整流器9等に外部から通電していることがあり、作業者はこれに配慮して作業を行う必要がある。そこで、停止させた発電ユニットのタービン3および発電機7においては、スイッチやリレー等によって、電力供給を遮断することが考えられる。しかし、スイッチやリレーの操作が必要であり、作業忘れ、作業ミス等の発生の可能性がある。また、例えば媒体として水よりも沸点の低い媒体を使う場合では、機器の温度が比較的低く保たれることから高温に対する注意不足が生じるため、作業者が不用意に機器に触れてしまう可能性があり、より上記のような作業忘れや作業ミスが発生する可能性が高くなる。そこで本発明は、複数の発電ユニットを備えた構成において、他の発電ユニットを稼働させた状態で発電ユニットのメンテナンスを行う際に、メンテナンスを行う発電ユニットに対する電力供給を遮断することのできる発電システムを提供する。
 本発明の第一の態様に係る発電システムは、複数の発電ユニットを、外部電力系統に対して並列に備えた発電システムであって、それぞれの前記発電ユニットは、作動媒体により回転する膨張器と、前記膨張器の回転によって電力を生成する発電機と、前記発電機で生成した電力を整流し、前記外部電力系統に出力する整流器と、前記膨張器に前記作動媒体を送り込む媒体流通系統と、前記発電機と前記外部電力系統との間で電力を遮断する継電器と、前記発電ユニットのメンテナンス開始時に作動させる作動部と、前記作動部が作動したときに、前記継電器にて前記発電機と前記外部電力系統との間で電力を遮断させる継電器駆動部と、を備える。
 このような発電システムにおいては、それぞれの発電ユニットにおいて、メンテナンスを行うに際し、メンテナンス開始時に必ず作動させる作動部の作動に応じ、継電器駆動部が継電器を切り替えて、発電機と外部電力系統との間で電力を遮断させる。これにより、メンテナンスの際に、他の発電ユニットは稼働させたまま、メンテナンスを行う発電ユニットへの電力供給を遮断できる。
 ここで、継電器は、整流器と外部電力系統との間に設けてもよいし、発電機と整流器との間に設けてもよい。
 本発明の第二の態様に係る発電システムは、膨張器で発電機を駆動して発電を行うのであれば、いかなる構成のものであってもよい。
 例えば、前記媒体流通系統は、前記作動媒体を循環させる媒体循環回路であり、前記媒体循環回路に、前記作動媒体を加圧して前記媒体循環回路内で循環させる循環ポンプと、加圧された前記作動媒体を外部の熱源により加熱して蒸発させる蒸発器と、前記蒸発器で蒸発された前記作動媒体により回転する前記膨張器と、前記膨張器から排出された前記作動媒体を凝縮する凝縮器と、を備えている構成の発電システムであってもよい。
 本発明の第三の態様に係る発電システムにおいて、前記循環ポンプ、前記蒸発器、前記膨張器、前記凝縮器の少なくとも一つを含むメンテナンス対象機器に対し、前記媒体循環回路において前記作動媒体の流れ方向上流側に設けられ、前記作動媒体の流通を遮断可能な第一の開閉弁と、前記媒体循環回路において前記作動媒体の流れ方向下流側に設けられ、前記作動媒体の流通を遮断可能な第二の開閉弁と、を備え、前記第一の開閉弁および前記第二の開閉弁の少なくとも一方が前記作動部であるのが好ましい。
 この発電システムによれば、メンテナンス対象機器をメンテナンスするに際しては、第一の開閉弁と第二の開閉弁を閉じた後、第一の開閉弁と前記第二の開閉弁の間の媒体を回収する。
 したがって、メンテナンスに際して作動媒体を回収するために第一の開閉弁または第二の開閉弁を閉じるので、この少なくとも一方を作動部とすることによって、継電器で電力遮断を行える。
 また、上記発電システムによれば、第一の開閉弁と前記第二の開閉弁の間の媒体を回収した後に、メンテナンス対象機器のメンテナンスを行う。メンテナンスの完了後、第一の開閉弁と第二の開閉弁との間を真空引きし、第一の開閉弁と第二の開閉弁との間に媒体を充填する。
 このようにして、メンテナンス対象機器をメンテナンスするに際して、媒体循環回路全体の媒体を抜く必要がなく、第一の開閉弁と第二の開閉弁との間の媒体のみを抜けばよい。また、メンテナンス後に媒体を充填する際に行う真空引きも、第一の開閉弁と第二の開閉弁との間のみ行えばよい。
 ここで、発電ユニットにおけるメンテナンス対象機器は、循環ポンプ、蒸発器、膨張器、凝縮器の少なくとも一つを含んでいればよく、これらの中の二つ以上を含んでいてもよい。また、二つ以上のメンテナンス対象機器に対し、第一の開閉弁、第二の開閉弁を備えてもよい。
 本発明の第四の態様によれば、前記循環ポンプ、または前記外部の熱源から前記蒸発器に熱媒を送給するポンプの少なくとも一方を前記作動部としてもよい。
 発電システムのメンテナンスに際しては、膨張器での作動流体の膨張を停止させるため、作動流体を循環させるための循環ポンプと、作動流体を蒸発させるための熱媒を蒸発器に送給するポンプとを停止させる。そこで、その少なくとも一方を作動部とすることによって、継電器で電力遮断を行える。
 本発明の第五の態様に係る発電システムは、前記凝縮器を冷却する冷却ファンと、前記冷却ファンを駆動するファン駆動源と、前記ファン駆動源と該ファン駆動源の電源との間で電力を遮断する第二の継電器と、をさらに備え、前記継電器駆動部は、前記作動部が作動したときに、前記第二の継電器にて前記ファン駆動源と該ファン駆動源の電源との間で電力を遮断させるようにしてもよい。
 これにより、凝縮器を冷却する冷却ファンを備える場合に、発電ユニットのメンテナンスに際し、冷却ファンの作動も停止できる。
 上記発電システムによれば、機器のメンテナンスを行う際に、発電ユニットへの電力供給を遮断することができ、メンテナンス作業を安全に行うことができる。
本発明の第1の実施形態に係る発電システムの構成を示す図である。 本発明の第2の実施形態に係る発電システムの構成を示す図である。 本発明の第3の実施形態に係る発電システムの構成を示す図である。 従来の発電システムの構成を示す図である。
 以下、添付図面を参照して、本発明による発電システムを実施するための形態を説明する。しかし、本発明はこれらの実施形態のみに限定されるものではない。
(第1の実施形態)
 図1に示すように、発電システム20Aは、複数組の発電ユニット50A,50B,50C,…を備える。
 発電ユニット50A,50B,50C,…のそれぞれは、船舶,工場,ガスタービン等からの排熱、地熱、太陽熱、海洋温度差等の熱源から熱媒が送り込まれる熱媒回路21と、この熱媒回路21の熱媒と熱交換することによって熱エネルギを得る媒体(作動媒体)を循環させる媒体循環回路(媒体流通系統)22と、を備える。
 ここで、媒体循環回路22の媒体としては、例えば、HFC-134a,HFC-245fa,HFO-1234yf,HFO-1234zeといったフロン系媒体等を用いることができる。
 熱媒回路21は、熱源から熱を回収することによって得た蒸気、水(湯)等の熱媒を供給する。
 媒体循環回路22には、循環ポンプ23、予熱器24、蒸発器25、タービン(膨張器)26、凝縮器27が備えられている。
 循環ポンプ23は、媒体を圧縮して送り出すことで、媒体が予熱器24、蒸発器25、タービン26、凝縮器27を順に経るよう、媒体を媒体循環回路22内で循環させる。
 予熱器24および蒸発器25は、熱媒回路21の熱媒と媒体循環回路22の媒体とを熱交換するもので、蒸発器25は、加圧された媒体を熱媒(外部の熱源)との熱交換によって加熱して蒸発させ、予熱器24は、蒸発器25を経た熱媒の余熱によって媒体を予熱する。
 タービン26は、内部に導入された媒体がタービン室内で膨張することによって、駆動軸26aをその軸線周りに回転駆動させる。この駆動軸26aには、発電機28の回転子(図示無し)が連結されており、この回転子(図示無し)が発電機28の固定子(図示無し)に対向して回転駆動される。これによって、発電機28では交流電流を出力する。
 発電機28から出力された交流電流は、整流器29で整流され、直流電流に変換される。
 上記したような複数組の発電ユニット50A,50B,50C,…のそれぞれの整流器29は、外部電力系統に接続された一つの系統連系インバータ30に対して並列に接続されている。各組の整流器29から出力された直流電流は、系統連系インバータ30で交流電流に再変換されて、発電電力として外部の送電網に出力される。
 複数組の発電ユニット50A,50B,50C,…のそれぞれにおいて、媒体循環回路22には、メンテナンス対象となる機器、例えばタービン26の上流側と下流側に、開閉弁(第一の開閉弁)40A,開閉弁(第二の開閉弁)40Bが設けられている。
 また、媒体循環回路22において、開閉弁40A,40Bの間には、ポート管41が設けられ、このポート管41の先端は、媒体循環回路22に連通可能で、媒体循環回路22内に媒体を出し入れするための機器が接続可能なサービスポート42とされている。また、ポート管41には、開閉弁43が形成されている。
 また、各組の発電ユニット50A,50B,50C,…のそれぞれにおいて、整流器29と、系統連系インバータ30との間には、整流器29と系統連系インバータ30との間で電力を断続する継電器70が設けられている。
 この継電器70は、リレー駆動回路(継電器駆動部)71によって、メンテナンス開始時に作動する開閉弁40A,40Bに連動して電路の断続が切り替えられるようになっている。開閉弁40A,40Bの少なくとも一方には、弁が開状態にあるか、閉状態にあるかを検出するセンサ72が設けられている。
 リレー駆動回路71は、センサ72の検出信号を受け、信号が閉状態から開状態に遷移したら、継電器70を開放し、整流器29と系統連系インバータ30との間で電力を遮断する。また、センサ72からの検出信号が、開状態から閉状態に遷移したら、継電器70を閉じ、整流器29と系統連系インバータ30との間で電力を接続させる。
 上記発電システム20Aにおいては、制御部35が備えられている。この制御部35では、熱媒回路21の熱媒供給、媒体循環回路22の循環ポンプ23、開閉弁40A,40B,43の作動を制御するとともに、発電システム20Aを構成する各機器の作動状態等をモニタリングする。
 このような発電システム20Aは、制御部35の制御により、熱媒回路21から送られてくる熱媒の入力熱エネルギ量や、出力側における要求電力量(出力量)に応じて、複数の発電ユニット50A,50B,50C,…を選択的に稼働させることによって、稼働させるユニット数(すなわちタービン26の稼働台数)を変化させ、発電量を段階的に変えることができる。
 上記したような発電システム20Aにおいて、複数の発電ユニット50A,50B,50C,…のうち、一つのユニットのタービン26をメンテナンスするには、まず、そのユニット(例えば発電ユニット50A)において、熱媒回路21のポンプ(図示無し)や開閉弁(図示無し)によって熱媒の供給を停止するとともに、媒体循環回路22の循環ポンプ23を停止させる。このとき、複数の発電ユニット50A,50B,50C,…のうち、メンテナンス対象の発電ユニット50A以外の他の発電ユニット50B,50C,…は稼働を継続することができる。
 次いで、開閉弁40A,40Bを閉じる。これにより、タービン26の上流側と下流側で、媒体循環回路22が遮断される。
 このとき、開閉弁40A,40Bが開状態から閉状態に移行するに伴い、センサ72では、その状態変化を検出する。すると、リレー駆動回路71によって継電器70が開放され、整流器29と系統連系インバータ30との間で電力を遮断する。これによって、この後は、この発電ユニット50Aのタービン26、発電機28、整流器29に作業者が触れても、安全に作業を行うことができる。
 そして、ポート管41のサービスポート42に、媒体を回収するための媒体回収機器100を接続した後、開閉弁43を開く。これにより、媒体循環回路22において、開閉弁40A,40B間の媒体が回収される。
 この後、タービン26に対して、所要のメンテナンスを施す。メンテナンスとしては、例えばシール部材の交換、ブレードの破損の有無の点検や破損部分の修復、各種センサの点検及び交換等が挙げられる。なお、ここでは、タービン26のメンテナンス内容についてはなんら限定するものではない。
 タービン26のメンテナンス終了後、サービスポート42に真空ポンプを接続し、この真空ポンプ110を作動させることによって、開閉弁40A,40Bの間の媒体循環回路22内を真空引きする。真空ポンプ110において、予め定めた規定の真空度まで真空引きされた後、開閉弁43を閉じる。
 そして、サービスポート42に媒体供給機器120を接続し、開閉弁43を開いて媒体循環回路22内に媒体を充填する。
 媒体の充填後、開閉弁43を閉じ、その後、開閉弁40A,40Bを開く。これに伴い、センサ72からの検出信号が、開状態から閉状態に遷移するので、リレー駆動回路71によって継電器70を閉じ、整流器29と系統連系インバータ30との間で電力が接続され、この発電ユニット50Aに対して通電する。
 これにより、発電ユニット50Aが再起動可能な状態となるので、熱媒回路21のポンプ(図示無し)および媒体循環回路22の循環ポンプ23を作動させ、所定の手順で発電ユニット50Aを再起動させる。
 上述したような構成によれば、複数の発電ユニット50A,50B,50C,…を備える発電システム20Aにおいて、他の発電ユニットを稼働させながら、一つの発電ユニットをメンテナンスする場合に、メンテナンス時に作動させる作動部として対応する開閉弁40A,40Bを閉じることによって、これをトリガーとしてタービン26、発電機28、整流器29への通電が遮断される。開閉弁40A,40Bの操作は、タービン26のメンテナンスの際に必ず行うものであり、その操作によって自動的に通電が遮断されるので、作業忘れ、作業ミス等が生じる余地はなく、安全な作業環境を確保することができる。
 また、媒体循環回路22においてメンテナンス対象となるタービン26の上流側と下流側に開閉弁40A,40Bが設けられ、さらに、開閉弁40A,40Bの間にサービスポート42が設けられている。これにより、タービン26のメンテナンス時には、開閉弁40A,40Bを閉じ、媒体循環回路22において、開閉弁40A,40Bの間の、タービン26を含んだ一部区間のみの媒体を出し入れすればよい。したがって、媒体の抜き取り・真空引き・媒体の充填に掛かる時間を短縮することができ、メンテナンス期間を短縮化して、発電システムの稼働率を高めることができる。また、メンテナンスの際に必要な媒体量も少なくて済むので、メンテナンスコストを抑えることができる。
(第1の実施形態の変形例)
 なお、上記実施形態において、タービン26のメンテナンスの際に整流器29への通電を遮断するトリガーとして、開閉弁40A,40Bの操作を用いたが、これに限るものではない。タービン26のメンテナンスの際に必ず、メンテナンス前に作動する作動部であれば、その作動状況をセンサ72によって検出してこれをトリガーとし、整流器29への通電を遮断してもよい。
 このようなトリガーとして用いることのできる作動部としては、例えば、タービン26が収容されているタービン室の扉、制御部35が収容されている制御盤の扉やカバー、整流器29のカバー等が挙げられ、これらの開閉状況を検出してもよい。または、これらの扉、カバー等の施錠する施錠部を作動部とし、施錠部の施錠、開錠を検出してもよい。
 また、作動部として他には、循環ポンプ23の動作を停止するためのスイッチ、熱媒回路21からの熱媒供給を停止するためのポンプや開閉弁(いずれも図示なし)のスイッチ等があり、これらのON/OFFをセンサ72で検出し、整流器29への通電を遮断してもよい。
 複数のトリガーを組み合わせて用いることもできる。
 また、循環ポンプ23や熱媒回路21をトリガーとする場合、これらを停止するためのスイッチを操作しても、ただちに循環ポンプ23からの媒体の送出、熱媒回路21からの熱供給が停止されるわけではなく、タービン26においては媒体が膨張して発電機28で発電が行われる。そこで、タービン26や発電機28の回転を検出し、その回転が停止した時点で整流器29への通電を遮断してもよい。ただしこの場合、メンテナンス時以外の通常運転時においても、熱源側からの熱エネルギ供給が止まった場合等に、タービン26や発電機28の回転が止まることはあり得る。したがって、タービン26や発電機28の回転が止まったときにおける整流器29への通電遮断は、上記したようなタービン26のメンテナンスの際に必ず作動されるものの状態変化を検出することと組み合わせる必要がある。
 また、上記したように、継電器70により整流器29と系統連系インバータ30との間で電力を遮断しても、タービン26が完全に停止せずに発電機28において発電が継続されていると、整流器29に発電機28から通電がなされ、整流器29自体が損傷してしまう可能性がある。
 そこで、継電器70に加え、発電機28と整流器29との間にも継電器75を備え、継電器70と継電器75とが連動して作動してもよい。また、この継電器75の機能を、整流器29の基板上に実装されたスイッチング素子によって実現してもよい。
 さらには、タービン26のメンテナンス時、上記したような整流器29への通電が遮断された状態とならない限り、タービン26が収容された建屋や、整流器29が収容された制御盤を開けることができないよう、これらの扉の錠と連動させることもできる。
 なお、上記実施形態で示した構成においては、開閉弁40A,40Bの開閉に伴うリレー駆動回路71による継電器70の断続は、電気的な判定回路によって実現することを想定しているが、これに代えて、制御部35において、センサ72の開閉信号に応じて継電器70の断続をソフトウェア的に制御することも可能である。
 また、制御部35においては、継電器70の断続状態をモニタリングし、リレー駆動回路71によって継電器70の断続状態が変わったときに、実際に継電器70が動作して断続状態が遷移したか否かを監視することもできる。そして、断続状態が正しく遷移しなかった時には、制御部35においてアラーム信号を出力したり、発電システム20Aを停止させる等してもよい。
 上記第1の実施形態においては、複数の発電ユニット50A,50B,50C,…の整流器29を、一つの系統連系インバータ30に接続する構成としたが、これに限るものではない。例えば、複数の発電ユニット50A,50B,50C,…のそれぞれにおいて、整流器29にそれぞれ系統連系インバータ30を備えてもよい。
 上記実施形態においては、メンテナンス対象となる機器としてタービン26を例示したが、これに限るものではなく、発電システム20Aを構成する機器であれば、タービン26以外のものをメンテナンス対象とすることもできる。
(第2の実施形態)
 次に、本発明にかかる発電システムの第2の実施形態について説明する。なお、以下に説明する第2の実施形態においては、上記第1の実施形態と共通する構成については図中に同符号を付してその説明を省略する。
 図2に示すように、本実施形態に係る発電システム20Bは、複数組の発電ユニット60A,60B,60C,…を備える。
 発電システム20Bにおいては、一つの熱媒回路21に対し、一つの媒体循環回路22、循環ポンプ23、予熱器24、蒸発器25、凝縮器27が設けられ、蒸発器25と凝縮器27との間で、熱媒回路21が複数の分岐管21a,21b,21c,…に分岐している。そして、分岐管21a,21b,21c,…のそれぞれに、タービン26、発電機28、整流器29が設けられることで、発電ユニット60A,60B,60C,…が形成されている。
 そして、複数組の発電ユニット60A,60B,60C,…のそれぞれの整流器29が、一つの系統連系インバータ30に接続されている。
 このような構成の発電システム20Bにおいては、循環ポンプ23によって送りだされた媒体は、媒体循環回路22内で、予熱器24、蒸発器25を経た後、発電ユニット60A,60B,60C,…の分岐管21a,21b,21c,…に分岐する。この媒体は、発電ユニット60A,60B,60C,…のそれぞれにおいて、タービン26を駆動させて発電機28で発電した後、凝縮器27を順に経て循環ポンプ23に戻る。
 そして、系統連系インバータ30では、複数の発電ユニット60A,60B,60C,…の整流器29から出力された直流電流を、交流電流に再変換し、発電電力として外部の送電網に出力する。
 このような発電システム20Bにおいても、上記第1の実施形態と同様にして、制御部35の制御により、熱媒回路21から送られてくる熱媒の熱エネルギ量や出力側における要求電力量に応じて、複数の発電ユニット60A,60B,60C,…のうち、稼働させるユニット数を変化させることによって、発電量を段階的に変えることができる。
 上記発電システム20Bにおいて、発電ユニット60A,60B,60C,…のそれぞれは、上記第1の実施形態と同様、メンテナンス対象となる機器、例えばタービン26の上流側と下流側には、開閉弁40A,40Bが設けられている。また、媒体循環回路22において、開閉弁40A,40Bの間には、サービスポート42および開閉弁43を備えたポート管41が設けられている。
 発電ユニット60A,60B,60C,…のそれぞれにおいて、整流器29と、系統連系インバータ30との間には、整流器29と系統連系インバータ30との間で電力を断続する継電器70が設けられている。
 この継電器70は、リレー駆動回路71で、開閉弁40A,40Bの少なくとも一方に設けられたセンサ72の検出信号の遷移を検出することによって、開閉弁40A,40Bに連動して電力の断続が切り替えられる。
 発電ユニット60A,60B,60C,…のそれぞれにおいては、上記第1実施形態で示したように、タービン26をメンテナンスするには、複数の発電ユニット60A,60B,60C,…のうち、メンテナンス対象のタービン26を備えたユニット(例えば発電ユニット60A)において、開閉弁40A,40Bを閉じる。このとき、開閉弁40A,40Bが開状態から閉状態に移行するに伴い、センサ72では、開閉弁40A、40Bの状態の移行を検出する。すると、リレー駆動回路71によって継電器70が開放され、整流器29と系統連系インバータ30との間で電力を遮断する。これによって、この後は、発電ユニット60Aのタービン26、発電機28、整流器29に作業者が触れても、安全に作業を行うことができる。
 そして、ポート管41のサービスポート42に、媒体を回収するための媒体回収機器100を接続した後、開閉弁43を開く。これにより、開閉弁40A,40B間の媒体が回収される。
 この後、タービン26に対して、所要のメンテナンスを施す。そして、タービン26のメンテナンス終了後、サービスポート42に真空ポンプ110を接続して開閉弁40A,40Bの間の媒体循環回路22内を真空引きし、規定の真空度まで真空引きされた後、開閉弁43を閉じる。そして、サービスポート42に媒体供給機器120を接続し、開閉弁43を開いて媒体循環回路22内に媒体を充填する。
 媒体の充填後、開閉弁43を閉じ、その後、開閉弁40A,40Bを開く。これに伴い、センサ72からの検出信号が、開状態から閉状態に遷移するので、リレー駆動回路71によって継電器70を閉じ、整流器29と系統連系インバータ30との間で電力が接続され、整流器29が通電される。この状態から、発電ユニット60Aを再起動させる。
 上述したような構成においても、上記第1の実施形態と同様、例えば発電ユニット60B,60C,…を稼働させたまま、発電ユニット60Aのタービン26をメンテナンスする際に、発電ユニット60Aの開閉弁40A,40Bを閉じることによって、これをトリガーとして発電ユニット60Aのへの通電が遮断される。開閉弁40A,40Bの操作は、タービン26のメンテナンスの際に必ず行うものであり、その操作によって自動的に発電ユニット60Aのへの通電が遮断されるので、作業忘れ、作業ミス等が生じず、安全な作業環境を確保することができる。
 また、発電ユニット60A,60B,60C,…のそれぞれにおいて、タービン26のメンテナンス時に、開閉弁40A,40Bを閉じ、媒体循環回路22において、開閉弁40A,40Bの間のタービン26を含んだ一部区間のみの媒体を出し入れすればよい。したがって、媒体の抜き取り・真空引き・媒体の充填に掛かる時間を短縮することができ、メンテナンス期間を短縮化して、発電システムの稼働率を高めることができる。また、メンテナンスの際に必要な媒体量も少なくて済むので、メンテナンスコストを抑えることができる。
 なお、本実施形態における発電システム20Bにおいても、上記第1の実施形態の変形例と同様の変形例が適用可能である。
(第3の実施形態)
 次に、本発明にかかる発電システムの第3の実施形態について説明する。なお、以下に説明する第3の実施形態においては、例えば、上記第1の実施形態に示した構成をベースとしたシステム構成を有しており、上記第1の実施形態と共通する構成については図中に同符号を付してその説明を省略する。また、以下の説明に用いる図3においては、一つの発電ユニット50Aのみを示しているが、発電システム20Cには、図1に示した上記第1の実施形態と同様に、発電ユニット50Aと同様の複数の発電ユニット50B,50C,…を備えている。
 図3に示すように、本実施形態に係る発電システム20Cは、凝縮器27における凝縮効率を高めるために、凝縮器27を冷却するファン80を備えている。
 このファン80は、整流器29の後流側から得た直流電流を電源とするモータからなるファン駆動機81によって回転駆動される。ファン80の回転によって生じる風を凝縮器27に当てることによって、凝縮器27の効率を高める。
 各組の発電ユニット50A,50B,50C,…において、ファン駆動機81と、系統連系インバータ30との間には、ファン駆動機81と系統連系インバータ30との間で電力を断続する継電器(第二の継電器)77が設けられている。
 この継電器77は、上記第1の実施形態に示したのと同様にして、タービン26のメンテナンスに際しての開閉弁40A,40Bの閉動作に伴い、センサ72およびリレー駆動回路71によって、ファン駆動機81と系統連系インバータ30との間で電力を遮断する。
 このようにして、タービン26のメンテナンスに際しては、凝縮器27を冷却するファン80を停止させ、作業安全性を確保することもできる。
 なお、このような構成において、制御部35において、タービン26の前後における媒体温度を監視し、温度が高い場合には、開閉弁40A,40Bを閉じても直ちに継電器77を解放せず、媒体温度が予め定めた規定温度以下となるまで、ファン80を作動させて凝縮器27の冷却を継続してもよい。その場合、媒体温度が規定温度以下に下がり、継電器77を開放するまでの間、作業者に対して、ファン80が作動していることを示すアラーム表示やアラーム音を制御部35で出力してもよい。
 また、上記したような凝縮器27を冷却するファン80、ファン駆動機81、継電器77および継電器77の動作は、上記第2の実施形態で示した構成にも同様に適用することができる。
(その他の実施形態)
 なお、本発明の発電システムは、図面を参照して説明した上述の各実施形態に限定されるものではなく、その技術的範囲において様々な変形例が考えられる。
 例えば、上記各実施形態の発電システム20A,20Bにおいては、船舶,工場,ガスタービン等からの排熱、地熱、太陽熱、海洋温度差等を熱源として発電に用いるようにしたが、その熱源の種類はなんら問うものではない。
 また、上記各実施形態では、膨張器としてタービン26を例示したが、タービン26に代えてスクロール式の膨張器等を採用することもできる。
 さらに、メンテナンスに際しての手順は、本発明の主旨の範囲内であれば、上記した手順を適宜変更することができる。
 また、本発明は、熱媒回路21、媒体循環回路22を備えない構成においても、タービン26(膨張器)に作動媒体を供給することによって発電機28を駆動するのであれば、いかなる構成の発電システムにも適用することが可能である。
 これ以外にも、本発明の主旨を逸脱しない限り、上記各実施の形態で挙げた構成を取捨選択したり、他の構成に適宜変更することが可能である。
 上述した発電システムによれば、機器のメンテナンスを行う際に、確実に発電ユニットへの電力供給を遮断することができ、メンテナンス作業を安全に行うことができる。
20A,20B  発電システム
21  熱媒回路
21a,21b,21c  分岐管
22  媒体循環回路(媒体流通系統)
23  循環ポンプ
24  予熱器
25  蒸発器
26  タービン(膨張器)
26a  駆動軸
27 凝縮器
28  発電機
29  整流器
30  系統連系インバータ
35  制御部
40A  開閉弁(第一の開閉弁)
40B  開閉弁(第二の開閉弁)
41  ポート管
42  サービスポート(ポート)
43  開閉弁(第三の開閉弁)
50A,50B,50C  発電ユニット
60A,60B,60C  発電ユニット
70  継電器
71  リレー駆動回路(継電器駆動部)
72  センサ
75  継電器
77  継電器(第二の継電器)
80  ファン
81  ファン駆動機
100  媒体回収機器
110  真空ポンプ
120  媒体供給機器

Claims (5)

  1.  複数の発電ユニットを、外部電力系統に対して並列に備えた発電システムであって、
     それぞれの前記発電ユニットは、
     作動媒体により回転する膨張器と、
     前記膨張器の回転によって電力を生成する発電機と、
     前記発電機で生成した電力を整流し、前記外部電力系統に出力する整流器と、
     前記膨張器に前記作動媒体を送り込む媒体流通系統と、
     前記発電機と前記外部電力系統との間で電力を遮断する継電器と、
     前記発電ユニットのメンテナンス開始時に作動させる作動部と、
     前記作動部が作動したときに、前記継電器にて前記発電機と前記外部電力系統との間で電力を遮断させる継電器駆動部と、を備える、発電システム。
  2.  前記媒体流通系統は、前記作動媒体を循環させる媒体循環回路であり、
     前記媒体循環回路に、
     前記作動媒体を加圧して前記媒体循環回路内で循環させる循環ポンプと、
     加圧された前記作動媒体を外部の熱源により加熱して蒸発させる蒸発器と、
     前記蒸発器で蒸発された前記作動媒体により回転する前記膨張器と、
     前記膨張器から排出された前記作動媒体を凝縮する凝縮器と、を備える、請求項1に記載の発電システム。
  3.  前記循環ポンプ、前記蒸発器、前記膨張器、前記凝縮器の少なくとも一つを含むメンテナンス対象機器に対し、
     前記媒体循環回路において前記作動媒体の流れ方向上流側に設けられ、前記作動媒体の流通を遮断可能な第一の開閉弁と、
     前記媒体循環回路において前記作動媒体の流れ方向下流側に設けられ、前記作動媒体の流通を遮断可能な第二の開閉弁と、
     を備え、
     前記第一の開閉弁および前記第二の開閉弁の少なくとも一方が前記作動部である、請求項2に記載の発電システム。
  4.  前記循環ポンプ、または前記外部の熱源から前記蒸発器に熱媒を送給するポンプの少なくとも一方が前記作動部である、請求項2または3に記載の発電システム。
  5.  前記凝縮器を冷却する冷却ファンと、
     前記冷却ファンを駆動するファン駆動源と、
     前記ファン駆動源と該ファン駆動源の電源との間で電力を遮断する第二の継電器と、をさらに備え、
     前記継電器駆動部は、前記作動部が作動したときに、前記第二の継電器にて前記ファン駆動源と該ファン駆動源の電源との間で電力を遮断させる、請求項2から4のいずれか一項に記載の発電システム。
PCT/JP2013/085200 2012-12-28 2013-12-27 発電システム WO2014104335A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
EP13869379.1A EP2940252B1 (en) 2012-12-28 2013-12-27 Power generation system
CN201380064487.3A CN104854313B (zh) 2012-12-28 2013-12-27 发电系统
US14/653,465 US9810089B2 (en) 2012-12-28 2013-12-27 Power generation system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2012288962A JP5964229B2 (ja) 2012-12-28 2012-12-28 発電システム
JP2012-288962 2012-12-28

Publications (1)

Publication Number Publication Date
WO2014104335A1 true WO2014104335A1 (ja) 2014-07-03

Family

ID=51021399

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/085200 WO2014104335A1 (ja) 2012-12-28 2013-12-27 発電システム

Country Status (5)

Country Link
US (1) US9810089B2 (ja)
EP (1) EP2940252B1 (ja)
JP (1) JP5964229B2 (ja)
CN (1) CN104854313B (ja)
WO (1) WO2014104335A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3112622A1 (en) * 2015-06-30 2017-01-04 Anest Iwata Corporation Binary power generation system and binary power generation method

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6021637B2 (ja) * 2012-12-28 2016-11-09 三菱重工業株式会社 発電システム、発電方法
JP6640524B2 (ja) * 2015-10-16 2020-02-05 パナソニック株式会社 ランキンサイクル発電装置
JP6425310B2 (ja) * 2016-01-20 2018-11-21 東芝三菱電機産業システム株式会社 熱回収システムおよび制御装置
JP2018160998A (ja) * 2017-03-23 2018-10-11 株式会社神戸製鋼所 発電システム
JP6604355B2 (ja) * 2017-04-28 2019-11-13 トヨタ自動車株式会社 廃熱回収装置
PL3447256T3 (pl) * 2017-08-25 2024-03-25 Orcan Energy Ag Układ do chłodzenia płynu procesowego urządzenia wytwarzającego ciepło
CN110067603B (zh) * 2019-04-04 2021-11-12 中海石油(中国)有限公司湛江分公司 余热汽轮发电机在海上电网并网运行的控制及安稳方法
JP2020183732A (ja) * 2019-05-08 2020-11-12 いすゞ自動車株式会社 ランキンサイクルシステム

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61177133A (ja) * 1985-01-30 1986-08-08 ヤンマーディーゼル株式会社 発電装置の集中監視システム
JP2001197789A (ja) * 1999-11-08 2001-07-19 Toshiba Corp コンバインドサイクル発電プラントの制御装置
JP2006299996A (ja) 2005-04-22 2006-11-02 Ebara Corp 排熱利用システム及び運転方法
JP2006313049A (ja) 2005-05-09 2006-11-16 Ebara Corp 排熱利用システム、及びその運転方法
JP2006313048A (ja) 2005-05-09 2006-11-16 Ebara Corp 排熱利用システム及びその運転方法
JP2008175108A (ja) * 2007-01-17 2008-07-31 Yanmar Co Ltd ランキンサイクル動力回収装置

Family Cites Families (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4455614A (en) * 1973-09-21 1984-06-19 Westinghouse Electric Corp. Gas turbine and steam turbine combined cycle electric power generating plant having a coordinated and hybridized control system and an improved factory based method for making and testing combined cycle and other power plants and control systems therefor
US4445180A (en) * 1973-11-06 1984-04-24 Westinghouse Electric Corp. Plant unit master control for fossil fired boiler implemented with a digital computer
US5860279A (en) * 1994-02-14 1999-01-19 Bronicki; Lucien Y. Method and apparatus for cooling hot fluids
DE19839636A1 (de) * 1998-08-31 2000-03-02 Asea Brown Boveri Kraftwerk mit einem von einer Turbine angetriebenen Generator sowie Verfahren zum Betrieb eines solchen Kraftwerkes
AU2002307462A1 (en) * 2001-04-23 2002-11-05 John M. Turchetta Gas energy conversion apparatus and method
US8448437B2 (en) * 2003-07-25 2013-05-28 Baker Hughes Incorporated System and method of cooling turbines
DE202004003772U1 (de) * 2004-03-09 2004-06-03 Enginion Ag Anordnung zur Drehzahlstabilisierung von Gleichstromgeneratoren
DE102004016450A1 (de) * 2004-03-31 2005-10-20 Alstom Technology Ltd Baden Generatorbeschaltung und Verfahren zur Erzeugung einer regelbaren Bremsleistung in einer Turbinenanlage
US7274111B2 (en) 2005-12-09 2007-09-25 General Electric Company Methods and apparatus for electric power grid frequency stabilization
US7608938B2 (en) 2006-10-12 2009-10-27 General Electric Company Methods and apparatus for electric power grid frequency stabilization
WO2009038562A2 (en) * 2007-09-19 2009-03-26 Utc Power Corporation Preventing overspeeding of a turbine driven generator
US7635923B2 (en) * 2008-01-25 2009-12-22 Deangeles Steven J Momentum-conserving wind-driven electrical generator
EP2295733A1 (de) 2009-08-12 2011-03-16 Siemens Aktiengesellschaft Kraftwerksanlage und Verfahren zum Betreiben einer Kraftwerksanlage
EP2466077A1 (en) * 2010-12-17 2012-06-20 Alstom Technology Ltd Steam turbine overspeed protection
JP5597597B2 (ja) * 2011-06-09 2014-10-01 株式会社神戸製鋼所 発電装置
US8742604B2 (en) * 2012-06-06 2014-06-03 Energy Recovery, Inc. Systems and methods for combined flow control and electricity generation
JP2014171350A (ja) * 2013-03-05 2014-09-18 Kobe Steel Ltd 発電装置及び発電方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61177133A (ja) * 1985-01-30 1986-08-08 ヤンマーディーゼル株式会社 発電装置の集中監視システム
JP2001197789A (ja) * 1999-11-08 2001-07-19 Toshiba Corp コンバインドサイクル発電プラントの制御装置
JP2006299996A (ja) 2005-04-22 2006-11-02 Ebara Corp 排熱利用システム及び運転方法
JP2006313049A (ja) 2005-05-09 2006-11-16 Ebara Corp 排熱利用システム、及びその運転方法
JP2006313048A (ja) 2005-05-09 2006-11-16 Ebara Corp 排熱利用システム及びその運転方法
JP2008175108A (ja) * 2007-01-17 2008-07-31 Yanmar Co Ltd ランキンサイクル動力回収装置

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3112622A1 (en) * 2015-06-30 2017-01-04 Anest Iwata Corporation Binary power generation system and binary power generation method

Also Published As

Publication number Publication date
JP5964229B2 (ja) 2016-08-03
EP2940252B1 (en) 2021-04-14
CN104854313A (zh) 2015-08-19
EP2940252A4 (en) 2016-11-23
EP2940252A1 (en) 2015-11-04
CN104854313B (zh) 2016-09-07
JP2014129798A (ja) 2014-07-10
US9810089B2 (en) 2017-11-07
US20150345340A1 (en) 2015-12-03

Similar Documents

Publication Publication Date Title
JP5964229B2 (ja) 発電システム
WO2014104297A1 (ja) 発電システム、発電システムのメンテナンス方法
US8739538B2 (en) Generating energy from fluid expansion
US8400005B2 (en) Generating energy from fluid expansion
JP6086726B2 (ja) 発電システム、発電方法
JP4889956B2 (ja) 発電装置
US10767513B2 (en) Thermal electric power generator
US9784138B2 (en) Waste heat power generation device
JP6021637B2 (ja) 発電システム、発電方法
US20140110939A1 (en) Waste heat power generator
CN103384806B (zh) 冶金设备气体清洁系统和清洁废气的方法
JP6490217B2 (ja) 非常運転手段が備えられるタービン発電システムおよびその非常運転方法
JP5592305B2 (ja) 発電装置
KR101612227B1 (ko) 폐압/폐열을 이용한 발전 시스템 및 그 방법
JP2007332807A (ja) 排熱発電装置
WO2015020273A1 (ko) 압축기 시스템
JP6392131B2 (ja) Vpc発電制御装置
JP2007309141A (ja) 発電装置及び発電方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13869379

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 14653465

Country of ref document: US

Ref document number: 2013869379

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE