WO2014101301A1 - A movable brick building - Google Patents

A movable brick building Download PDF

Info

Publication number
WO2014101301A1
WO2014101301A1 PCT/CN2013/001671 CN2013001671W WO2014101301A1 WO 2014101301 A1 WO2014101301 A1 WO 2014101301A1 CN 2013001671 W CN2013001671 W CN 2013001671W WO 2014101301 A1 WO2014101301 A1 WO 2014101301A1
Authority
WO
WIPO (PCT)
Prior art keywords
brick
design
bricks
connecting pieces
steel
Prior art date
Application number
PCT/CN2013/001671
Other languages
French (fr)
Chinese (zh)
Original Assignee
胡钢
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 胡钢 filed Critical 胡钢
Priority to CN201380067921.3A priority Critical patent/CN105264151A/en
Publication of WO2014101301A1 publication Critical patent/WO2014101301A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • E04B2/14Walls having cavities in, but not between, the elements, i.e. each cavity being enclosed by at least four sides forming part of one single element
    • E04B2/16Walls having cavities in, but not between, the elements, i.e. each cavity being enclosed by at least four sides forming part of one single element using elements having specially-designed means for stabilising the position
    • E04B2/18Walls having cavities in, but not between, the elements, i.e. each cavity being enclosed by at least four sides forming part of one single element using elements having specially-designed means for stabilising the position by interlocking of projections or inserts with indentations, e.g. of tongues, grooves, dovetails
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C3/08Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal with apertured web, e.g. with a web consisting of bar-like components; Honeycomb girders
    • E04C3/09Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal with apertured web, e.g. with a web consisting of bar-like components; Honeycomb girders at least partly of bent or otherwise deformed strip- or sheet-like material

Definitions

  • the content of the invention dry assembly activity brick room, the load-bearing wall uses special concrete hollow bricks and special metal connectors and steel components.
  • the brick is made of magnesia cement steel fiber fine stone concrete, with high compressive strength, excellent performance such as crack resistance, tensile, bending, anti-shear, anti-freeze, anti-seismic and long-lasting. It can be used according to the height of the wall. And other factors to determine the cement type label, sand and stone ratio, steel fiber ratio and reinforcement.
  • the single brick volume is simple in form and can be constructed without skilled workers and large machinery.
  • the metal connector and the steel structure are few types, and the installation and disassembly are simple and quick, which can greatly reduce the construction cost and shorten the construction period. It can be constructed as usual during the winter rainy season. It does not pollute the environment. X does not generate noise. It can also save construction materials and control the quality of the project. It can be used for temporary housing in disaster areas, construction site, warehouse barracks, flood control and disaster prevention facilities, various markets. Shops, temporary walls, scenic settlements, tourist attractions, villas, etc.
  • FIG. 1 is a three-view and plan view of a movable brick standard brick
  • FIG. 2 is a three-view and plan view of a movable brick half-brick
  • FIG. 3 is a three-part three-view and plan view of the movable brick
  • Figure 3 is a three-view and plan view of the movable brick for the gable
  • Figure 6 is a three-view and plan view of the movable brick for the apex
  • Figure 7 is a three-view and plan view of the movable brick at the doorway of the window sill
  • Figure 3 is a three-view and plan view of the movable brick for the door and window lining
  • Figure 10 is a schematic view of the assembly of the dingyu joint
  • Figure 11 is a three-view and plan view of the air and the sill
  • Figure 12 is a horizontal connector
  • Figure 3 is a three-view and plan view of the vertical joint
  • Figure 14 is a three-view and plan view of the
  • the basic part uses the basic special hollow brick (Fig. 9), the brick height is the step height, and each step is filled into the middle by two hundred and fifty millimeters by changing the direction of the brick and the number of rows, upper and lower layers
  • the staggered arrangement changes cyclically, the brick holes are oriented toward the adjacent bricks or walls, and the highest step is all made by the slab method (striped method).
  • Lap the 1/2 brick length and fill the hollow insert into the hollow of the brick Figure 11).
  • the horizontal joint Fig. 12
  • the vertical joint Fig. 13
  • the quasi-vertical connector can be lowered.
  • the hollow block (Fig. 9)
  • the horizontal connecting piece ⁇ bolt can be connected to the light steel structure beam, cut wall, door and window frame, interior and exterior wall decoration insulation materials, water and electric pipe fittings, air conditioner water heater, window guardrail eaves staircase balcony, etc.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Residential Or Office Buildings (AREA)

Abstract

A movable brick building comprises air bricks, connecting pieces, beam frames and foot holds. The air bricks comprise round hollowness and hollow insertion pieces, and diamond structures protrude from the intermediate regions on both undersurface and top surface. The connecting pieces comprise vertical connecting pieces and horizontal connecting pieces. The vertical connecting pieces and horizontal connecting pieces connect to each other by tenon-and-mortise works. The horizontal connecting pieces can lock the above and below bricks, lock bricks vertically, and connect other structures horizontally. Paired or single triangular connecting piece connects to walls and steel frameworks. The steel frameworks of the beam frames are formed by deformed channel steel and unequal angle iron standard units, and equipped with foot holds. The movable brick building changes the situation of one time use of movable buildings, and reduces builders rubbish.

Description

活动砖房  Activity brick house
[0001]—, 技术领域: 活动房屋 [0002] 二, 背景技术: 现在的活动房屋多数是活动板房, 它以轻钢为骨架, 以夹心板为围护材料, 以 标准模数系列进行空间组合, 构件采用螺栓连接 。 优点是成本低, 拆装方便快捷。 缺点是使 用寿命短, 外观与普通房尾差异大, 墙体承重有限, 保温隔热隔音, 防火防水防腐防盗性能差, 不宜在房屋内设置厨房卫生间柜橱和楼梯等。  [0001]—, Technical Field: Mobile Home [0002] Second, background technology: Most of the current mobile homes are movable board houses, which use light steel as the skeleton and sandwich panels as the enclosing material, and space is carried out in standard modular series. In combination, the components are bolted. The advantage is low cost, convenient and quick to disassemble. The shortcoming is that the service life is short, the appearance is different from the common room tail, the wall has limited bearing capacity, thermal insulation and sound insulation, fireproof, waterproof and anti-corrosion anti-theft performance, it is not suitable to set up kitchen bathroom cabinets and stairs in the house.
[0003]三, 发明内容: 干式组装活动砖体房, 承重墙使用特制的混凝土空心砖和专用的金属连 接件及钢制构件。 砖块用镁水泥钢纤维细石混凝土成型, 抗压强度高, 具有阻裂抗拉抗弯抗剪 抗冻抗渗耐久等优良的性能, 可根据墙体承受荷载的大小作用高度长度及使用要求等因素统筹 确定水泥种类标号, 沙石配比, 钢纤维比例及配筋等。 单块砖体量轻组砌形式简单, 不用熟练 工人和大型机械即可施工。 金属连接件和钢构散件种类少安装拆解简单快捷, 可大幅度降低施 工成本, 缩短工期。 冬季雨季均可照常施工, 既不污染环境, X不产生噪音, 还可节省建筑辅 料, 便于掌控工程质量, 可用于灾区临时住宅, 建筑工地用房, 仓库营房, 防洪防灾设施, 各 类市场店铺, 临时围墙, 牧区定居点, 旅游景点别墅等。  [0003] Third, the content of the invention: dry assembly activity brick room, the load-bearing wall uses special concrete hollow bricks and special metal connectors and steel components. The brick is made of magnesia cement steel fiber fine stone concrete, with high compressive strength, excellent performance such as crack resistance, tensile, bending, anti-shear, anti-freeze, anti-seismic and long-lasting. It can be used according to the height of the wall. And other factors to determine the cement type label, sand and stone ratio, steel fiber ratio and reinforcement. The single brick volume is simple in form and can be constructed without skilled workers and large machinery. The metal connector and the steel structure are few types, and the installation and disassembly are simple and quick, which can greatly reduce the construction cost and shorten the construction period. It can be constructed as usual during the winter rainy season. It does not pollute the environment. X does not generate noise. It can also save construction materials and control the quality of the project. It can be used for temporary housing in disaster areas, construction site, warehouse barracks, flood control and disaster prevention facilities, various markets. Shops, temporary walls, pastoral settlements, tourist attractions, villas, etc.
[0004]四, 附图说明: 图 1 为活动砖标准砖三视图及平面图 ; 图 2 为活动砖半砖三视图及平 面图; 图 3 为活动砖七分头三视图及平面图; 图 4 为活动砖三分头三视图及平面图; 图 5 为 山墙用活动砖三视图及乎面图; 图 6为山尖用活动砖三视图及平面图; 图 7为窗台门口用活 动砖三视图及平面图 ; 图 8 为门窗过梁用活动砖三视图及平面图; 图 9为基础用活动砖三视 图及平面图; 图 10为丁宇接头组装示意图; 图 11 为空 、揷件三视图及平面图; 图 12为横向 连接件三视图及平面图; 图 13为竖向连接件三视图及平面图; 图 14为钢构横梁上槽钢三视图及 平面图; 图 15为钢构横梁下槽钢三视图及平面图; 图 16为连梁长槽钢三视图及平面图; 图 17 为连梁短槽钢三视图及平面图; 图 18为横梁角钢三视图及平面图; 图 19为三角形连接件三 视图及平面图; 图 20为横梁组装平面图; 图 21为方踏板三视图及平面图; 图 22为长方踏板 三视图及平面图; 图 23为钢构件组装效果三视图; 图 24为墙角接头组装示意图; 图 25为山 墙山顶组装示意图; 图 26为地基组装平面图。  BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a three-view and plan view of a movable brick standard brick; FIG. 2 is a three-view and plan view of a movable brick half-brick; FIG. 3 is a three-part three-view and plan view of the movable brick; Figure 3 is a three-view and plan view of the movable brick for the gable; Figure 6 is a three-view and plan view of the movable brick for the apex; Figure 7 is a three-view and plan view of the movable brick at the doorway of the window sill; Figure 3 is a three-view and plan view of the movable brick for the door and window lining; Figure 10 is a schematic view of the assembly of the dingyu joint; Figure 11 is a three-view and plan view of the air and the sill; Figure 12 is a horizontal connector Figure 3 is a three-view and plan view of the vertical joint; Figure 14 is a three-view and plan view of the channel on the steel beam; Figure 15 is a three-view and plan view of the channel under the steel beam; Figure 16 is the beam Three views and plan view of long channel steel; Figure 17 is three views and plan view of short beam steel of joint beam; Figure 18 is three views and plan view of beam angle steel; Figure 19 is three views and plane of triangle joint Figure 20 is a plan view of the beam assembly; Figure 21 is a three-view and plan view of the square pedal; Figure 22 is a three-view and plan view of the rectangular pedal; Figure 23 is a three-view view of the assembly of the steel member; Figure 24 is a schematic view of the assembly of the corner joint; Schematic diagram of the assembly of the gable top; Figure 26 is a plan view of the foundation assembly.
[0005]五, 具体实施方式, 基础部分使用基础专用空心砖(图 9) , 砖高就是台阶高, 通过 改变排砖方向和排数使每级台阶向中间收进二百五十毫米, 上下层错缝排列循环变化, 砖 孔朝向相邻的砖块或墙内方向, 最高层台阶上全部采用顺砌法 (条砌法) 错缝排铺基础墙 砖 (图 1 ) , 两皮间竖缝搭接 1/2砖长, 砖块空心里全部填入空心插件 (图 11 ) 。 组装地上 墙体时使用横向连接件 (图 12 ) 和竖向连接件 (图 13 ) , 砖面竖孔中插入两节竖向连接件 后套上横向连接伴, 上皮砖面朝下砖孔对准竖向连接件放下即可。 墙角处丁字交接处十字 交接处和门窗口处的砖块空心中填入空心插件 (图 11 ) 和横向竖向连接件 (图 12图 13 ) 丁 字接头处使用七分头活动砖和空心插件 (图 10) , 横向连接件嫘栓伸出墙体时可以连接轻 钢结构梁架, 割断墙, 门窗框, 内外墙装饰保温材料, 水电气管件, 空调器热水器, 窗户 护栏屋檐楼梯阳台等。 钢构安装时先在墙体上固定一对三角形连接件 (图 19) , 然后安装 上下槽钢 (图 14图 15 ) , 用两组螺栓螺母分别从槽钢两侧固定横粱角钢 (图 18) 安装连梁 槽钢 (图 16) 时只需松开横梁的螺母待放好后拧紧即可(图 23) , 最后扣上方踏板(图 21 ) 和长方踏板 (图 22 ) , 踏板上面铺 1Μ*2Μ胶合板, 外墙用合成材料勾缝做防水处理。  [0005] Fifth, the specific embodiment, the basic part uses the basic special hollow brick (Fig. 9), the brick height is the step height, and each step is filled into the middle by two hundred and fifty millimeters by changing the direction of the brick and the number of rows, upper and lower layers The staggered arrangement changes cyclically, the brick holes are oriented toward the adjacent bricks or walls, and the highest step is all made by the slab method (striped method). Lap the 1/2 brick length and fill the hollow insert into the hollow of the brick (Figure 11). When assembling the above ground wall, use the horizontal joint (Fig. 12) and the vertical joint (Fig. 13). Insert two vertical joints in the brick vertical hole and insert the horizontal joint with the upper brick facing down. The quasi-vertical connector can be lowered. The hollow block (Fig. 11) and the horizontal vertical joint (Fig. 12, Fig. 13) are filled into the hollow of the brick at the intersection of the T-junction at the corner and the door window. The seven-part movable brick and the hollow insert are used at the T-joint. 10), the horizontal connecting piece 嫘 bolt can be connected to the light steel structure beam, cut wall, door and window frame, interior and exterior wall decoration insulation materials, water and electric pipe fittings, air conditioner water heater, window guardrail eaves staircase balcony, etc. When installing the steel structure, first fix a pair of triangular connecting pieces on the wall (Fig. 19), then install the upper and lower channels (Fig. 14 and Fig. 15), and fix the horizontal angle steel from both sides of the channel by using two sets of bolts and nuts respectively (Figure 18). When installing the coupling beam (Fig. 16), simply loosen the nut of the beam and put it on and tighten it (Fig. 23). Finally, buckle the upper pedal (Fig. 21) and the rectangular pedal (Fig. 22). 1Μ*2Μ plywood, the outer wall is made of synthetic material to make waterproof treatment.

Claims

活动砖房 Activity brick house
一, 活动砖型设计: 空心式砖块(图 1 )设计不仅使砖块体量轻适合人力搬抬, 还与一般空 心砖方形空心不同, 设计出圆形空心和空心插件(图 11 ) , 并通过在混凝土中掺入适 量的钢纤维或其它合成纤维和配筋, 使用细石和镁水泥等提高砖块的抗压抗拉强度和 墙体整体的抗剪性能。 砖块中间上下凸出的菱角设计填补了因倒角形成的横向三角缺 口, 阻挡砖块上下错位。 倒角设计不仅为美观和护角, 还便于外墙沟缝和搬运及拉出 螺栓。 半圆形凹槽设计不仅可使横向连接件随意伸缩, 还能起到防止上下两皮间砖块 相互错位的作用。基础用活动砖块(图 9)的上下圆形凹凸面和长宽比例设计, 不用任 何连接件就让单一规格的砖块满足整体基础构筑及基础与基础墙接合的需要。 半截砖 (图 2)设计用于门窗两侧等位置, 七分头砖块(图 3)主要用于丁字十字接头和门窗 过梁两边及山墙挑檐等处。 First, the movable brick design: The hollow brick (Fig. 1) design not only makes the brick volume lighter for human lifting, but also different from the general hollow brick square hollow, designing a circular hollow and hollow insert (Fig. 11), and By adding appropriate steel fiber or other synthetic fibers and reinforcements to the concrete, fine stone and magnesium cement are used to improve the compressive tensile strength of the brick and the overall shear resistance of the wall. The angled design of the upper and lower bulges in the middle of the brick fills the lateral triangular gap formed by the chamfer and blocks the bricks from being displaced up and down. The chamfer design not only looks good and protects the corners, but also facilitates the sulking and handling of the outer wall and the pulling out of the bolts. The semi-circular groove design not only allows the lateral joints to be freely stretched, but also prevents the bricks from being displaced from each other between the upper and lower skins. The upper and lower circular concave-convex surfaces and the aspect ratio design of the movable bricks (Fig. 9) allow a single-size brick to meet the needs of the overall foundation construction and foundation and foundation wall without any joints. The half-brick (Fig. 2) is designed for use on both sides of the door and window. The seven-point brick (Fig. 3) is mainly used for the T-shaped cross joints and the doors and windows on both sides of the beam and the gables.
二, 连接构件设计: 连接构件采用传统的榫卯结构设计使竖向连接件(图 13)之间的连接 和与横向连接件(图 12)的连接简单可靠, 只有两个部件, 无需使用任何工具, 在砖 孔和凹槽处摆放好连接件后将砖面朝下砖孔对准竖向连接件放下即可(图 10) , 横向 连接件縮进墙体时便能锁定上下砖块, 伸出墙体时既可竖向锁定砖块又能横向连接其 它构件。 三角形连接件(图 19)连接墙体和钢构, 即可配对用也可单独用 (图 23)。 三, 梁架踏板设计: 钢构设计由定制的高强度异型槽钢和不等边角钢(图 14-图 18)标准件 组装而成, 单件体量轻种类少, 拆装方便快捷。 不同跨度的梁架(砖长的整倍数)选用不 同长度的槽钢和角钢, 上槽钢(图 14图 16图 17)的开口朝上组装形成的网格状沟槽便于踏 板砖(图 21图 22) 的铺装, 下槽钢(图 15)的开口朝下便于安装天花板。 踏板设计简单拆 装方便快捷。 Second, the connection member design: The connection member adopts the traditional 榫卯 structure design to make the connection between the vertical connection members (Fig. 13) and the connection with the lateral connection member (Fig. 12) simple and reliable, only two parts, no need to use any Tool, after placing the connector in the brick hole and groove, put the brick face down the brick hole and align it with the vertical connector (Fig. 10). When the horizontal connector is retracted into the wall, the upper and lower bricks can be locked. When the wall is extended, the bricks can be locked vertically and the other members can be connected laterally. The triangular joints (Fig. 19) connect the wall to the steel structure and can be paired or used separately (Fig. 23). Third, the beam pedal design: The steel structure design is assembled from the customized high-strength shaped channel steel and the unequal angle steel (Fig. 14-Fig. 18) standard parts. The single piece is light and light in type, and the disassembly and assembly is convenient and quick. Beams of different spans (integral multiples of brick length) are made of channel steel and angle steel of different lengths, and the grid-shaped grooves formed by the upward opening of the upper channel steel (Fig. 14 Fig. 16 and Fig. 17) are convenient for the pedal bricks (Fig. 21). In the paving of Figure 22), the opening of the lower channel (Figure 15) is facing down to facilitate the installation of the ceiling. The pedal design is simple and easy to disassemble.
PCT/CN2013/001671 2012-12-31 2013-12-31 A movable brick building WO2014101301A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201380067921.3A CN105264151A (en) 2012-12-31 2013-12-31 A movable brick building

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201210596692.1A CN103912062A (en) 2012-12-31 2012-12-31 Movable brick house
CN201210596692.1 2012-12-31

Publications (1)

Publication Number Publication Date
WO2014101301A1 true WO2014101301A1 (en) 2014-07-03

Family

ID=51019835

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2013/001671 WO2014101301A1 (en) 2012-12-31 2013-12-31 A movable brick building

Country Status (2)

Country Link
CN (2) CN103912062A (en)
WO (1) WO2014101301A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306685B (en) * 2019-04-12 2024-06-07 深圳全景空间工业有限公司 Brick wall
CN110284622B (en) * 2019-04-12 2024-05-31 深圳全景空间工业有限公司 Brick wall

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1079139A (en) * 1965-04-07 1967-08-16 Truestone Ltd Improvements in or relating to building blocks
CN87102225A (en) * 1986-03-20 1987-09-30 降下伞有限公司 Assembly block formed from polyolefin foam
CN2313002Y (en) * 1997-02-25 1999-04-07 都兴林 Steel-tube trestle for building
CN1515763A (en) * 2003-01-09 2004-07-28 上海锦江科技工程公司 Shaped channel steel upright column tension link connected type mobile house

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110225909A1 (en) * 2000-03-10 2011-09-22 Alberto Rodriguez Carassus Self-locking block and complementary blocks for the construction of pillars, free-standing walls, rooms, and buildings
FR2871487B1 (en) * 2004-06-15 2006-09-08 Dev Construction Ecologique Sa METHOD FOR PRODUCING A WALL FROM HEMP AND LIME, BLOCKS FOR ITS USE AND DEVICE FOR MOLDING SAID BLOCKS
CN101899880A (en) * 2009-05-25 2010-12-01 吉岷 Dislocation preventing perforated brick neck brick

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1079139A (en) * 1965-04-07 1967-08-16 Truestone Ltd Improvements in or relating to building blocks
CN87102225A (en) * 1986-03-20 1987-09-30 降下伞有限公司 Assembly block formed from polyolefin foam
CN2313002Y (en) * 1997-02-25 1999-04-07 都兴林 Steel-tube trestle for building
CN1515763A (en) * 2003-01-09 2004-07-28 上海锦江科技工程公司 Shaped channel steel upright column tension link connected type mobile house

Also Published As

Publication number Publication date
CN103912062A (en) 2014-07-09
CN105264151A (en) 2016-01-20

Similar Documents

Publication Publication Date Title
WO2017197853A1 (en) Insulation precast wall and prefabricated building
CN103216115B (en) Modular integrally-movable house
US20100024323A1 (en) Energy Saving House
CN101368428B (en) Prefabricated component house and its construction method
US20100218446A1 (en) Structure system of concrete building for self-heat insulation
WO2017036185A1 (en) Aluminum alloy house
US20140338283A1 (en) House constructed from finished product components and constructing method thereof
CN106522359B (en) Fully-assembled village and town dwelling type composite wall structure system and construction method thereof
CN105822009A (en) Concrete heat preservation composite component plate, outer wall building envelope and assembling method
WO2017041517A1 (en) Movable aluminum alloy house
CN1147652C (en) Technology for building house with slab-type structure
WO2000077314A1 (en) Structure formed of foaming cement and lightweight steel, and a structure system and method of forming the structure system
CN103821229A (en) Rapid assembly type integrated house and installation method
CN104912230A (en) Modular assembly type composite wall and connecting mode thereof
CN206418663U (en) A kind of prefabricated combined wall board of novel fabricated H types
CN2931627Y (en) Frame and wall plate combined building
CN1888344A (en) Composite thermal insulation concrete load-bearing wall
CN101545287A (en) Multifunctional thermal insulation board
WO2014101301A1 (en) A movable brick building
CN110593397A (en) Multilayer assembled plate type building
CN211200692U (en) Multilayer assembled plate type building
CN205637316U (en) Concrete heat preservation composite member board and outer wall envelope who constitutes thereof
CN210976300U (en) Prefabricated heat preservation wallboard of assembly type structure
CN108625482B (en) Detachable and assembled energy-saving modularized steel structure and decoration integrated house system
CN204151985U (en) Sandwich wall Self-thermal-insulation System

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201380067921.3

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13868217

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13868217

Country of ref document: EP

Kind code of ref document: A1