WO2014057614A1 - エネルギー管理装置、管理装置、遠隔管理装置 - Google Patents

エネルギー管理装置、管理装置、遠隔管理装置 Download PDF

Info

Publication number
WO2014057614A1
WO2014057614A1 PCT/JP2013/005543 JP2013005543W WO2014057614A1 WO 2014057614 A1 WO2014057614 A1 WO 2014057614A1 JP 2013005543 W JP2013005543 W JP 2013005543W WO 2014057614 A1 WO2014057614 A1 WO 2014057614A1
Authority
WO
WIPO (PCT)
Prior art keywords
information
facility
unit
management device
energy
Prior art date
Application number
PCT/JP2013/005543
Other languages
English (en)
French (fr)
Inventor
昌史 村上
浩基 數野
剛 椙山
知也 十河
敏章 中尾
仲野 章生
Original Assignee
パナソニック株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from JP2012227251A external-priority patent/JP5945826B2/ja
Priority claimed from JP2012227254A external-priority patent/JP5967541B2/ja
Application filed by パナソニック株式会社 filed Critical パナソニック株式会社
Publication of WO2014057614A1 publication Critical patent/WO2014057614A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • H02J3/144Demand-response operation of the power transmission or distribution network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00028Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment involving the use of Internet protocols
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/52The controlling of the operation of the load not being the total disconnection of the load, i.e. entering a degraded mode or in current limitation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Definitions

  • the present invention relates to an energy management device that manages operating states of a plurality of load devices arranged in a facility and suppresses energy consumed by the load devices, a management device that constitutes the energy management device, and a remote management device. .
  • Japanese Patent Application Publication No. 2009-240032 discloses a technique for controlling the performance of a lighting device so that a demand value of power consumption (integrated value) does not exceed a preset contract power.
  • the demand value is the integrated value of power consumption in the demand period in units of 30 minutes, and the unit price of the electricity rate for one year from the next month is determined by the peak value of the power consumption (integrated value) for each demand period in the month. It is done.
  • the consumer in addition to the demand control performed on the consumer side as described above, recently, the consumer must limit the operation of the load device in various situations. For example, even in the case of social demands for continuous energy conservation to control global warming and temporary power savings requested by electric utilities to prevent power outages due to insufficient power supply, It is required to limit energy consumption in load equipment.
  • an energy management device that manages the operation of a load device according to a schedule set to manage energy consumption is provided (see, for example, Japanese Patent Application Publication No. 2012-133553).
  • This type of energy management apparatus is assumed to be used by a user such as a facility manager, and supports energy saving by managing the operation of the load device.
  • the energy management apparatus as described above is used by individual consumers, in a range including a plurality of consumers such as regions and cities, the energy management apparatus is monitored while monitoring the power demand of the consumers. It is not used for the purpose of managing consumption. However, in situations where the supply capacity is not sufficient for the energy demand, the customer not only manages the operation of the load device individually, but also manages the operation of the load device over the entire range including multiple consumers. It is required to do.
  • control data for operating load devices according to the power saving rate and environmental conditions has been set by the know-how of experts and experts who have knowledge about the field. Therefore, it is difficult for a user who is not an expert or an expert to appropriately set control data for various situations.
  • An object of the present invention is to provide an energy management device capable of easily generating information necessary for controlling operations of a plurality of load devices, and further, a management device constituting the energy management device, And to provide a remote management device.
  • An object of the present invention is to provide an energy management apparatus capable of performing an energy simulation using knowledge of an expert or an expert only by inputting a small number of information that can be easily obtained by a user. Furthermore, it aims at providing the management apparatus which comprises an energy management apparatus, and a remote management apparatus.
  • An object of the present invention is to provide an energy management apparatus capable of appropriately and easily setting control data for various situations, and further provides a management apparatus and a remote management apparatus constituting the energy management apparatus The purpose is to do.
  • An energy management device communicates with a management device that controls operation of the plurality of load devices in accordance with a target power saving rate in a facility where the plurality of load devices are arranged, and the plurality of the plurality of load devices.
  • a remote management device that provides the management device with control data for controlling the operation of the load device, and the remote management device is realized by the facility information relating to the characteristics of the facility and the operation of the plurality of load devices
  • An information storage unit that stores a plurality of records that are associated with setting information that is environment information of the facility, and the plurality of records that are stored in the information storage unit, It generates information necessary for controlling the operation of the load equipment.
  • the remote management apparatus inputs an energy calculation unit that calculates recommended power, which is the lowest power that does not cause a failure in the operation of the facility, by an energy simulation, and a necessary condition included in the facility information
  • a parameter used in the energy calculation unit is generated by extracting from the information storage unit an information input unit that is input as information and a record that includes the facility information similar to the requirement input from the information input unit. It is preferable to further include a parameter estimation unit.
  • the energy calculation unit when all information included in the facility information is input as the input information from the information input unit, without using the parameters generated by the parameter estimation unit, Preferably, the recommended power is calculated using the input information as the parameter.
  • a plurality of the management apparatuses are provided in one-to-one correspondence with a plurality of facilities, the plurality of load devices are arranged in each of the plurality of facilities, and the information storage unit includes the plurality of information storage units For each of the facilities, the plurality of records in which the facility information and the setting information are associated with each other are stored, and the energy calculation unit calculates the recommended power for the facility of interest among the plurality of facilities by the energy simulation.
  • the information input unit calculates the necessary condition regarding the facility of interest as the input information, and the energy calculation unit from the information input unit of the plurality of records regarding the facility of interest. By extracting the record including the facility information similar to the input requirement from the information storage unit It is preferred to generate the parameters used in serial energy calculation unit.
  • the remote management device includes an information input unit to which the facility information of the facility in which the plurality of load devices managed by the management device are arranged, and the plurality of records.
  • a comparison unit that extracts the setting information from a record that is determined that the facility information input from the information input unit and the facility information stored in the information storage unit are similar, and the comparison unit is the information storage unit It is preferable to further include a data generation unit that generates the control data to be given to the management device using the setting information extracted from the management information.
  • the information storage unit stores the setting information together with the facility information when the control data used by the management device is not changed beyond a predetermined duration. .
  • the information storage unit stores, for each of the plurality of records, the actual number of times of use when the comparison unit adopts the record for extraction of the setting information, and the comparison unit
  • a weighted average value weighted by the actual number of times is obtained for the setting information extracted from each of the two or more records.
  • the weighted average value is preferably given as the setting information to the data generation unit.
  • the information input unit receives the facility information and the setting information from a user apparatus attached to the management apparatus and operated by a user.
  • the information input unit has a function of inputting the facility information and the setting information to the information storage unit.
  • a plurality of the management apparatuses are provided in one-to-one correspondence with a plurality of facilities, the plurality of load devices are arranged in each of the plurality of facilities, and the information storage unit includes the plurality of information storage units With respect to each of the facilities, the plurality of records in which the facility information and the setting information are associated with each other are stored, and the information input unit is configured to input the facility information regarding the facility to which attention is paid among the plurality of facilities,
  • the comparison unit with respect to the facility of interest, from the records determined to be similar to the facility information input from the information input unit and the facility information stored in the information storage unit among the plurality of records
  • the setting information is extracted, and the data generation unit uses the setting information extracted from the information storage unit by the comparison unit with respect to the facility of interest. It is preferable to generate the control data to be supplied to.
  • the remote management apparatus communicates with the management apparatus through a communication network.
  • the management device according to the present invention is used for the energy management device.
  • the remote management device according to the present invention is used for the energy management device.
  • the configuration of the present invention it is possible to perform an energy simulation using the knowledge of an expert or an expert only by inputting a small number of necessary conditions that can be easily obtained by the user.
  • users who do not have knowledge of energy simulation have the advantage that it is possible to obtain appropriate management objectives by energy simulation at individual facilities using the knowledge of experts and experts .
  • the setting data to be set in the management apparatus is generated using the information stored in the information storage unit of the remote management apparatus, so that the control data for various situations can be set appropriately and easily. Has the advantage that it becomes possible.
  • the energy management device includes a management device 10 as shown in FIG.
  • the management device 10 manages the power consumption consumed by the plurality of load devices 30.
  • the plurality of load devices 30 are arranged in each area 40 in a facility divided into a plurality of areas 40.
  • the power consumption per unit time in each of the plurality of load devices 31, 32,... Is measured by the measuring device 50.
  • the measuring device 50 performs measurement in units of the entire facility, for example, measurement in units of areas 41, 42,..., Measurement in units of types of load devices 31, 32,. It is desirable to have a configuration for performing measurement in units of 31, 32,.
  • the load devices 31, 32,... are described as the load device 30, and when it is not necessary to distinguish the areas 41, 42,.
  • the load devices 31, 32,... are assumed to be electric loads. However, the load devices 31, 32,.
  • Facilities may be supermarkets, convenience stores, department stores, store buildings, office buildings, hotels, hospitals, and other buildings such as parks and theme parks. These are examples of facilities, and the facility may have any form as long as a plurality of load devices are arranged and the power consumption of the arranged load devices is collectively managed by the consumer. .
  • the supermarket assumed in the present embodiment includes a plurality of areas 40 such as a sales floor, a cash register, a backyard, and an office.
  • a load device 30 such as a sales floor, a cash register, a backyard, and an office.
  • an illumination device 301 such as an LED lamp, a thermometer, and a thermometer.
  • a lighting device 301 and an air conditioning device 302 are arranged as load devices 30 in the cash register and the office.
  • the refrigeration equipment 303 means a refrigerator or a freezer that stores and displays food.
  • various types of showcases such as a flat type, a multistage type, and a reach-in type are arranged as the refrigeration equipment 303, and a large-capacity refrigerator is arranged as the refrigeration equipment 303 in the backyard.
  • the management device 10 includes a connection unit (not shown) that enables connection with other devices in order to exchange information with other devices and to monitor and control operations of the other devices.
  • the connection unit includes a device that enables electrical connection with other devices, such as a terminal and a connector, and a device for exchanging signals or a device for opening and closing an electric circuit.
  • the management apparatus 10 includes a computer that realizes functions described below as a main hardware element by executing a program. This computer means a combination of a processor and a memory, which are individual devices, and a microcomputer in which the processor and the memory are configured on a single chip.
  • the remote management device 20, the load device 30, the measurement device 50, and the user device 60 are illustrated as other devices connected to the connection unit of the management device 10, but the management device 10 is not limited to these devices. It is also possible to connect other devices.
  • the remote management device 20 is a computer server including one or more computers, and executes a program for realizing the functions described below. Therefore, the connection unit of the management device 10 includes an interface unit (not shown) (hereinafter referred to as “I / F unit”) for communicating with the remote management device 20 through the communication network NT1.
  • the remote management device 20 may include a plurality of computers associated with each other so as to be able to communicate with each other.
  • the communication network NT1 uses a VPN (Virtual Private Network) constructed using a public network such as the Internet.
  • the load device 30 used in the present embodiment has a function of communicating with the management apparatus 10, a function of controlling the operation state according to an instruction from the management apparatus 10, and a function of notifying the management apparatus 10 of the operation state. Therefore, the connection unit of the management apparatus 10 includes an I / F unit (not shown) for communicating with the load device 30.
  • the load device 30 may be configured to accept only on / off control by a communication signal from the management device 10. It is also possible to use a load device 30 that does not have a function of communicating with the management apparatus 10. In this case, the management apparatus 10 needs to include a switch element such as a relay for turning on and off the electric circuit that supplies power to the load device 30.
  • the measuring device 50 transmits information on the measured power to the management device 10.
  • the connection unit of the management device 10 includes an I / F unit (not shown) for communicating with the measurement device 50.
  • the transmission path used for communication between the management apparatus 10 and the measurement apparatus 50 may be either a wired communication path or a wireless communication path.
  • the above-described I / F unit acquires power information from the measurement device 50 every unit time.
  • the unit time is selected from, for example, 1 minute, 5 minutes, and the like.
  • the user device 60 includes a display unit and an operation unit as a user interface, a function for displaying and visualizing information acquired by the management device 10 on the display unit, and an operation unit by a user such as a facility manager. A function of reflecting the operation content in the operation of the management apparatus 10. It is desirable that the display unit and the operation unit include an operation display having a configuration in which a touch panel is superimposed on a flat panel display screen.
  • the user device 60 can use a computer, a smartphone, a tablet terminal, etc. in addition to a dedicated device.
  • the connection unit of the management apparatus 10 includes an I / F unit (not shown) configured to be able to use such a user device 60. When this computer uses a computer, a smartphone, a tablet terminal, or the like as the user device 60, specifications of a wireless LAN (Local Area Network) or Bluetooth (registered trademark) are adopted.
  • a wireless LAN Local Area Network
  • Bluetooth registered trademark
  • the management device 10 includes a target setting unit 11 in which a target value of power consumption is set, an evaluation unit 12 that compares the power acquired from the measurement device 50 with a target value set in the target setting unit 11, And an instruction unit 13 for instructing the operation of the load device 30 according to the evaluation result.
  • target power the target value of power consumption
  • the target setting unit 11 obtains the target power by multiplying the preset reference power by the power saving rate.
  • the reference power is defined by contract power determined by a contract with an electric power company or the like, or is obtained from the actual power consumption in the facility.
  • the target power set in the target setting unit 11 is set so as to reduce the power consumption of the facility.
  • the constant target power is determined according to the utility of the person existing in the area 40 so as not to impair the convenience that the person existing in the area 40 enjoys by driving the load device 30.
  • the target power in an emergency such as when a power saving rate is instructed by an electric power company is determined so as to match the instructed power saving rate.
  • the target power Since the target power differs for each facility, it can be obtained from the past power consumption record and the power saving rate in the required power saving period.
  • the power saving period is selected from a time zone of one day, a period specified by a date and time, a period of a plurality of days, a day of the week, a year, and the like. For example, if the power saving period is the time when the demand for power peaks during the day, or the period when the demand for power peaks during the year, the peak of power consumption will be suppressed. It becomes possible to suppress the peak of electric power.
  • the target power may be set so as to reduce the annual power consumption in the facility.
  • the target value of the target setting unit 11 is set by the remote management device 20 in principle, but may be set by the user using the user device 60. A technique for setting the target power by the remote management device 20 will be described later.
  • the target power can be set for the entire facility, and can be set individually for each load device 30 or area 40.
  • the target setting unit 11 stores a first target power set using the user device 60 and a second setting power stored using the first target power 111 set by the remote management device 20.
  • the setting unit 112 is provided.
  • the first setting unit 111 and the second setting unit 112 also store a power saving period in which the target power should be achieved.
  • the first setting unit 111 and the second setting unit 112 are configured by a storage device such as a semiconductor memory or a hard disk.
  • the target setting unit 11 may include a power storage unit 113 that stores a change in power consumption of the facility during a predetermined period. Although it is desirable that the power storage unit 113 stores a transition of actual power consumption in the facility, there is no record of storing the power storage unit 113 immediately after the use of the management apparatus 10 is started. Therefore, it is also possible to use the power storage unit 113 by storing the transition of power consumption obtained at a facility of the same scale as the facility where the management apparatus 10 is installed. Information on such other facilities can be acquired from the remote management device 20.
  • the target setting unit 11 extracts the power consumption in the period corresponding to the power saving period from the power storage unit 113, and uses the specified power saving rate to set the first target power and A second target power is calculated.
  • the first target power set from the remote management device 20 may be set according to a request from an electric power company such as an electric power company, for example, and the power saving period for executing the process is urgent as the current day or the next day. May have sex.
  • the second target power set by the user device 60 often has a relatively long power saving period for executing processing. Therefore, the first target power has a power saving period individually set, the second target power has a relatively long application period, and the daily time zone in the application period is adopted as the power saving period.
  • the power saving period of the first setting unit 111 is individually set, and the power saving period of the second setting unit 112 is specified by a combination of the application period and the time zone.
  • the target setting unit 11 includes a target selection unit 114 in order to determine which of the first target power and the second target power is selected.
  • the target selection unit 114 selects one of the first target power and the second target power according to an instruction from either the remote management device 20 or the user device 60.
  • the management device 10 can select a plurality of types of operation modes, and the target selection unit 114 selects one of the first target power and the second target power according to the selected operation mode.
  • the operation mode includes a normal mode, a remote priority mode, a user priority mode, and the like.
  • the operation mode selection request is made by the remote management device 20 or the user device 60.
  • the user priority mode prohibits the use of the first target power from the remote management device 20 in case a serious problem occurs in the facility when the first target power set by the remote management device 20 is used.
  • This is the operating mode that enables. That is, even if the remote management device 20 sets the first target power (or power saving rate) without considering the actual environmental state of the facility, the management device 10 prohibits the use of the first target power. It becomes possible to operate the load device 30 in accordance with the environmental conditions at the site.
  • an example in which a serious problem occurs in operating a food supermarket is when the temperature of the refrigeration apparatus 303 is set to a high state for a long time. Therefore, if the management apparatus 10 is configured to permit the user priority mode when the temperature of the refrigeration apparatus 303 is higher than a predetermined value, the temperature increase of the refrigeration apparatus 303 is prevented while preventing the abuse of the user priority mode. It becomes possible to prevent the deterioration of the food due to.
  • the target selection unit 114 selects the higher one of the first target power and the second target power with the power saving rate. Therefore, when the normal mode is selected, the power consumption satisfies both the first target power and the second target power.
  • the evaluation unit 12 calculates power consumption by integrating power information acquired from the measuring device 50 every unit time, and in a required determination period, the ratio of power consumption (integrated value) to the target power and the start of the determination period The transition of power consumption (integrated value) is predicted using the elapsed time from. Then, when it is predicted that the power consumption exceeds the target power at the end of the determination period, the evaluation unit 12 instructs the load device 30 to perform an operation for suppressing the power consumption of the load device 30.
  • the degree to which power consumption is suppressed (hereinafter referred to as “control level”) varies depending on the ratio between power consumption and target power. Therefore, the evaluation unit 12 notifies the instruction unit 13 of a control level corresponding to the relationship between the power consumption and the target power.
  • the control level can be selected from a plurality of levels (4 levels in the following description).
  • the determination period is selected from, for example, 30 minutes, 1 day, 1 month, 1 year, and the like. For example, in a case where a charge system is adopted in which the unit price of the electricity charge is determined at the maximum monthly power consumption every 30 minutes, 30 minutes is selected as the determination period.
  • the determination period is one month or one year. The power consumption is integrated from the start of the determination period and reset to 0 when the determination period ends.
  • the instructing unit 13 selects the load device 30 that reduces the power consumption so that the power consumption of the facility is reduced to match the control level, and the selected load device. 30 operations are determined.
  • the control level is associated with the type and operation of the load device 30, and the type and operation of the load device 30 can be changed over time.
  • the relationship between the control level and the type and operation of the load device 30 is stored in the control table 14.
  • the control table 14 may store a control procedure for the load device 30 so that at least one of the type and operation of the load device 30 to be controlled is changed with time.
  • the instruction unit 13 refers to the content of the control table 14 and reads the type and operation of the load device 30 associated with the control level from the control table 14. Then, the instruction unit 13 gives an instruction to the load device 30 according to the type and operation of the load device 30 read from the control table 14.
  • the content of the control table 14 may be associated with the control level in the order of limiting the power for the type and operation of the load device 30.
  • the content of the control table 14 is an operation for reducing the power consumption for the lighting device 301 and the air conditioning device 302 in the office for a control level with a low ratio of reducing the power consumption.
  • the type and operation of the load device 30 are associated with the control level in order from the least influential when power consumption is reduced.
  • the contents of the control table 14 can be rewritten, and information including the contents of the control table 14 is transmitted from the remote management device 20.
  • Information including the contents of the control table 14 transmitted from the remote management device 20 is received by the update unit 15 provided in the management device 10, and the update unit 15 receives the contents of the control table 14 according to the information transmitted from the remote management device 20. Update.
  • the contents of the control table 14 can also be set using the user device 60.
  • the target power (or power saving rate) may become too strict when operating the target facility.
  • the first target power is unilaterally determined from the remote management device 20 without considering the on-site environmental condition, and this type of problem is likely to occur.
  • the second target power set using the user device 60 may be set too low, causing a problem in the operation of the facility.
  • the management apparatus 10 includes the target evaluation unit 16 that evaluates the target power set in the target setting unit 11 so that the target power is not set to be too small (the power saving rate is too high).
  • the target evaluation unit 16 uses recommended power (recommended value), which is the minimum power consumption necessary for operating the facility without problems, and compares the target power set in the target setting unit 11 with the recommended power.
  • the target evaluation unit 16 alerts the user through the user device 60.
  • the recommended power is given from the remote management device 20 in principle, but may be input from the user device 60.
  • the remote management device 20 includes a function for estimating an environmental state for operating a facility without problems and a function for performing simulation of power consumption.
  • the technology for alerting the user through the user device 60 includes a technology for displaying a comment sentence on the display device of the user device 60, a technology for changing the background color of the display device to red, and a beep sound. Selected from technology.
  • the management apparatus 10 includes a presentation control unit 17 for displaying information on the display unit of the user device 60 and a presentation content storage unit 18 that stores display content to be displayed on the display unit.
  • the presentation content storage unit 18 indicates to the user device 60 such as an evaluation result by the target evaluation unit 16.
  • the presentation control unit 17 has a function of presenting information stored in the presentation content storage unit 18 to the user device 60.
  • the presentation control unit 17 also displays on the user device 60 the content instructed by the instruction unit 13 to the load device 30.
  • the instruction unit 13 compares the control level with the control table 14 and extracts the type and operation of the load device 30 according to the control level. .
  • the instruction unit 13 determines that further power saving is impossible in operating the facility. Then, the determination result is presented to the user device 60 through the presentation control unit 17.
  • the management apparatus 10 may change the operation mode to the user priority mode using the determination result of the instruction unit 13. In the user priority mode, it is possible to prohibit power saving or increase the power consumption of the load device 30 by operating the user device 60. That is, the user can increase the power consumption according to the actual environmental state of the equipment space (facility) while accepting the first target power (or power saving rate) instructed from the remote management device 20. Therefore, you will be convinced to save power.
  • the remote management device 20 can communicate with a plurality of management devices 10, and a target instruction unit 21 in which a target power saving rate is set in order to notify each management device 10 of the same first power saving rate. And a communication interface (not shown) that communicates with the management apparatus 10 through the communication network NT1.
  • the power saving period and the first power saving rate on the current day or the next day determined by an electric power company or the like are input from the information input unit 24 to the target instruction unit 21 and notified to the management device 10 at an appropriate timing.
  • the first power saving rate set in the management device 10 of each store is set as the first power saving rate of the headquarters managing the stores. Transmission from the remote management device 20 is possible. Further, even when an electric power company or the like requests power saving at a specific date (time zone) on the current day or the next day, the requested first power saving rate is transferred from the remote management device 20 of the headquarters to the management device 10 of each store. Can be sent to.
  • the management device 10 in order for the management device 10 to operate the load device 30 so as to satisfy the first power saving rate, it is necessary to determine the operation of the load device 30 according to the environmental conditions of the facility where the management device 10 is disposed. There is. In other words, the relationship between the control level registered in the control table 14 and the type and operation of the load device 30 must be set appropriately.
  • the remote management device 20 can communicate with a plurality of management devices 10, it is possible to collect power consumption history for each management device 10.
  • a history of power consumption for each management device 10 is collected from the other remote management devices 20.
  • the collected data relating to the power consumption history is associated with the facility information related to the characteristics of the facility, and is stored in the information storage unit 22 provided in the remote management device 20. That is, the remote management device 20 stores a large amount of data related to the power consumption history for each facility in association with the characteristics of the facility.
  • the information stored in the information storage unit 22 receives facility information and setting information related to the characteristics of the facility from the user device 60 through the management device 10.
  • the facility information and setting information stored in the information storage unit 22 can also be input from an information input unit 24 provided in the remote management device 20.
  • the remote management device 20 acquires facility information from the management device 10 together with the power consumption history for each facility.
  • the facility information includes environmental information and setting information, and the environmental information includes facility information, scene information, and external environment information.
  • the facility information includes information regarding the area where the facility exists and the usage of the facility, information regarding the size of the facility, and information regarding the type and power capacity of the load device 30 installed in the facility.
  • the information regarding the use includes a division such as a store, an office building, and a hotel, and a division of an area 40 such as a sales floor and an office. Further, the size information is represented by the floor area of the area 40.
  • the information regarding the type of the load device 30 represents the illumination device 301, the air conditioning device 302, and the refrigeration device 303.
  • Information on the power capacity is stored in the information storage unit 22 as a power load density (capacity basic unit) that is a power capacity per unit area obtained by dividing the power capacity of the load device 30 by the floor area of the area 40. .
  • the floor area of the area 40 can be replaced with a volume, the following description will be made using the floor area.
  • the power load density is information indicating the grade (superior or inferiority) of the facility and the capacity for energy saving.
  • the area 40 where the power load density of the lighting device 301 is large shows a tendency that the illuminance is high, and it can be said that there is a large energy saving energy compared to the area 40 where the illuminance is low.
  • the air conditioning equipment 302 and the refrigeration equipment 303 If supermarkets, the power load density of the air conditioning equipment 302 is generally are often designed at about 110W / m 2, if the power load density is 200 W / m 2 of a, a large margin for energy saving I can say that.
  • the facility grade mainly represents the heat insulation performance of the area 40.
  • Scene information represents information on the environment that affects the operation of the load device 30 such as busy hours, spread times, non-business hours, and power saving hours. That is, it represents the difference in the environment mainly due to the number and attributes of the people present in the facility (different of employees and visitors).
  • External environment information represents information related to outside air temperature, humidity, and solar radiation.
  • the setting information is information on the environment realized by the operation of the load device 30, and here represents the set illuminance of the lighting device 301, the set temperature of the air conditioning device 302, and the set temperature of the refrigeration device 303.
  • the remote management device 20 generates the contents of the control table 14 provided in the management device 10 using the data stored in the information storage unit 22. Therefore, a comparison unit 23 that compares the facility information of the facility where the management apparatus 10 is arranged with the facility information stored in the information storage unit 22 and evaluates the similarity according to a predetermined evaluation rule is provided. The characteristics of the facility where the load device 30 managed by the management apparatus 10 is arranged are given from the information input unit 24 to the comparison unit 23.
  • the information input unit 24 includes a configuration for receiving facility characteristics input from a user device 60 provided in the management apparatus 10 in addition to a configuration for inputting facility characteristics using an operation unit such as a keyboard and a mouse. It may be. The function of the information input unit 24 will be described later.
  • the comparison unit 23 extracts setting information using the environment information of the facility characteristics given from the information input unit 24 as a key.
  • the environment information used for the key is represented by characters, a record including information that matches the key is extracted.
  • the environmental information used for the key is expressed by a numerical value such as an electric power load density or an outside air temperature, the similarity is evaluated by a predetermined evaluation rule for each type of the load device 30 and similar for each type of the load device 30 High setting information is selected. This process will be described later. It is desirable that the environmental information used for the key includes at least the facility classification, the area 40 classification, the power load density, the scene information, and the outside temperature.
  • the comparison unit 23 When there are a plurality of setting information extracted by the comparison unit 23 from the data stored in the information storage unit 22, the comparison unit 23 transmits the extracted plurality of setting information to the management device 10 and sends it to the user device 60. By presenting the setting information, the user may select the setting information.
  • the comparison unit 23 notifies the management device 10 and prompts user intervention through the user device 60. At this time, it is desirable that the user device 60 indicates the key from which the data is extracted, and allows the user to exclude some keys.
  • the setting information can be extracted from the data stored in the information storage unit 22, the setting information set by the expert or expert can be used for the facility having similar environmental information. Therefore, by simply communicating between the management device 10 and the remote management device 20, even a user who does not have special knowledge can easily set appropriate setting information. That is, it becomes possible to determine the contents of the control table 14 in a short time using setting information suitable for the facility where the load device 30 managed by the management apparatus 10 is arranged.
  • the remote management device 20 includes a data generation unit 25 that generates control data that is the content of the control table 14 based on the data extracted by the comparison unit 23. As described above, the contents of the control table 14 are associated with the operation of the load device 30 for each control level.
  • the collected information includes information that is not the setting information set by the expert or expert. There is a possibility. Moreover, although it is not the setting information set by the skilled person or the expert, there is a possibility that setting information obtained with a desired result in the facility may be included. Therefore, when the control data selected by the management device 10 is not changed beyond a predetermined duration (for example, 1 hour), the information storage unit 22 is in a state where this operation of the load device 30 is desirable for the user. It may be judged and recorded. That is, the information storage unit 22 stores the setting information of the load device 30 when the user determines that the operation is desirable together with the facility information. Since the information stored in the information storage unit 22 in this way becomes a successful example, the possibility of being reused in other facilities becomes high.
  • a predetermined duration for example, 1 hour
  • the remote management device 20 has a function of notifying the management device 10 of the first power saving rate notified from the above-mentioned electric power company and the like, and a function of defining the contents of the control table 14 provided in the management device 10. A function for calculating the reference power is provided. That is, the remote management device 20 includes an energy calculation unit 26 that determines the reference power and the recommended power to be given to the target evaluation unit 16 of the management device 10.
  • the energy calculation unit 26 estimates the power consumption of the facility by computer simulation using information similar to the above-described facility characteristics. That is, the energy calculation unit 26 is realized by executing an application program for performing an energy simulation on a computer.
  • Known application programs for energy simulation include TRNSYS and EnergyPlus.
  • the information regarding the facility given to the energy calculation unit 26 includes the heat insulation performance, the window area, the floor area, etc. of the facility or the area 40.
  • this type of information includes the power capacity of the load device 30, efficiency information indicating the energy efficiency of the load device 30, the set illuminance of the lighting device 301, the set temperature of the air conditioning device 302, the set temperature of the refrigeration device 303, and the load device. 30 operating hours are also included.
  • weather information such as the outside temperature, humidity, and amount of solar radiation in the area where the management device 10 is arranged.
  • the remote management device 20 includes a parameter estimation unit 27 that automatically generates 200 to 300 types of information to be given to the energy calculation unit 26 by only inputting about 10 types of information.
  • the parameter estimation unit 27 uses the information input by the user by the remote management device 20 communicating with the management device 10 and the information (parameters) given to the energy calculation unit 26 using the information stored in the information storage unit 22. ).
  • Information input to the user device 60 attached to the management device 10 is stored in a holding unit provided in the information input unit 24.
  • the information stored in the holding unit includes information on the facility such as floor area, building age, facility use (store, office, etc.), region, business hours (usage time zone), type of load device 30, and the necessary conditions. Information.
  • Information given to the parameter estimation unit 27 is not only input from the user device 60 to the information input unit 24 but may be directly input to the information input unit 24 by the user.
  • the information extracted and used by the parameter estimation unit 27 from the information storage unit 22 includes the power load density of the load device 30 arranged for each area 40, the grade of the facility, the energy efficiency of the load device 30, and the area where the facility exists. , Including outside air temperature, humidity, and solar radiation.
  • the parameter estimation unit 27 has a function of estimating the operation time of the load device 30 from business hours. In order to estimate the operation time from the business hours, a data table or an arithmetic expression is used.
  • the remote management device 20 when information related to the facility is given from the management device 10 to the information input unit 24, the remote management device 20 causes the comparison unit 23 to send information corresponding to the information given to the information input unit 24 to the information storage unit. 22 is extracted.
  • the data generation unit 25 generates the contents of the control table 14 using the information extracted from the information storage unit 22 by the comparison unit 23 and transmits the contents of the control table 14 to the update unit 15 of the management apparatus 10.
  • the update unit 15 writes the content received from the data generation unit 25 in the control table 14.
  • the information given from the management apparatus 10 to the information input unit 24 is facility information, scene information, and external environment information, and data that matches or is similar to these is extracted from the information storage unit 22. Therefore, setting information is extracted with the contents of these information as conditions. Since the extracted setting information is setting information set by an expert or expert, the data generation unit 25 generates the contents of the control table 14 relatively easily and appropriately by using the extracted setting information. To do.
  • the data generation unit 25 automatically generates the contents of the control table 14 by using the past setting information.
  • the contents of the control table 14 can be corrected by the user by operating the user device 60.
  • FIG. 2 shows an example of information stored in the information storage unit 22.
  • the illustrated example assumes a food supermarket, and the refrigeration equipment 303 represents a refrigerated showcase.
  • a set of 10 items (No, area, scene, outside air temperature, basic unit of air conditioning capacity, basic unit of lighting capacity, basic unit of case capacity, set temperature (air conditioning), set illuminance, set temperature (case)).
  • Area, air conditioning capacity basic unit, lighting capacity basic unit, case capacity basic unit) is equipment information
  • (scene) is scene information
  • (outside temperature) is external environment information
  • set temperature (air conditioning), set illuminance, set temperature (Case) corresponds to setting information.
  • (No) is a number for distinguishing records.
  • the capacity unit of the load device 30 is represented by the power load density, and the unit is W / m 2 .
  • the unit of the set temperature is ° C., and the unit of the set illuminance is lx.
  • “case” means a refrigerated showcase.
  • Experts and experts determine the operation of the load device 30 by estimating the margin of power saving for each area 40 by considering the power load density. However, it is difficult for a general user to determine the operation of the load device 30 in consideration of the power load density.
  • the expert or expert since the expert or expert stores the setting information adopted for the condition combining the facility information, the scene information, and the external environment information in the information storage unit 22, by using this information, The setting information can be set easily and appropriately.
  • the area 40 is a sales floor, the scene is busy, the outside temperature is 29 ° C., the air conditioning capacity basic unit is 140 W / m 2 , the lighting capacity basic unit is 26 W / m 2 , and the case capacity basic unit is Assume that information of 200 W / m 2 is input. That is, it is assumed that the air conditioner 302 performs a cooling operation.
  • the comparison unit 23 attempts to extract a record from the information storage unit 22 using this information (sales floor, busy, 29, 140, 26, 200) as a key. As described above, the comparison unit 23 matches the conditions represented by characters (area, scene) and is represented by numerical values (outside temperature, air conditioning capacity basic unit, lighting capacity basic unit, case capacity basic unit). Data with similar conditions for each type of load device 30 is generated.
  • the comparison unit 23 narrows down the records to be extracted to these two records. .
  • the degree of similarity is evaluated using the capacity unit and the outside air temperature, and setting information corresponding to a condition with a high degree of similarity is selected, thereby setting information To decide.
  • the set illuminance of the lighting device 301 is not affected by the outside air temperature, and the set temperatures of the air conditioner 302 and the refrigeration device 303 are affected by the outside air temperature. Including and evaluating.
  • the capacity per unit of the lighting apparatus 301 is a 25W / m 2 and 20W / m 2 DOO
  • similarity between 26W / m 2 is set illuminance instructed from the information input unit 24 the since more of 25W / m 2 than 20W / m 2 is large
  • a set illuminance records "1" 750lx is employed as a set illuminance.
  • the set temperature of the air conditioner 302 is 26 ° C., which is the set temperature of the record “3”
  • the set temperature of the refrigerating machine 303 is 5 ° C., which is the set temperature of the record “1”.
  • a value corresponding to “1” is selected as the set illuminance of the lighting device 301
  • a value corresponding to “3” is selected as the set temperature of the air conditioner 302
  • the set temperature of the refrigeration device 303 is “ The value corresponding to “1” is selected.
  • the outside air temperature is 28 ° C. for the “1” record and 30 ° C. for the “3” record, but 30 ° C., which is the worse condition, is adopted. Accordingly, the information (sales floor, busy, 30, 150, 25, 200, 26, 750, 5) is delivered to the data generation unit 25.
  • the comparison unit 23 evaluates the similarity, when a plurality of setting information with substantially no difference is extracted, the average value of each setting information is adopted.
  • the number of times the extracted record has been used may be stored in the information storage unit 22, and the comparison unit 23 may employ a weighted average value weighted by the number of times the record has been used as setting information. . That is, when the comparison unit 23 extracts a plurality of records from the information storage unit 22, the comparison unit 23 uses a weighting coefficient that becomes a larger value as the actual number of times increases based on the actual number of times for each setting information extracted from these records. The weighted average value of the setting information is calculated. The weighted average value thus calculated is set as setting information to be given to the data generation unit 25. Further, when considering the utility of the user, if the user name is included in the record stored in the information storage unit 22, it is possible to narrow down the records to be selected using the user name as a key.
  • the information input unit 24 has a function of determining the contents of the key in advance and treating the given information as invalid when deviating from the appropriate information range. It is desirable to evaluate whether or not the information stored in the information storage unit 22 is within the appropriate information range, and to treat the information as invalid if it is in an inappropriate range.
  • numerical information included in the environmental information are used as explanatory variables.
  • a regression equation using the setting information as an objective variable may be created for each type of load device 30.
  • the information is treated as invalid when the deviation between the setting information estimated by the regression equation with respect to the environment information and the setting information extracted by the comparison unit 23 deviates from the allowable range. You can do it.
  • the information determined by the comparison unit 23 is transferred to the data generation unit 25, and the data generation unit 25 generates the contents of the control table 14 based on the information transferred from the comparison unit 23. Therefore, a new control table 14 is generated on the basis of proven information created by experts and experts in the past, and a control table 14 comparable to the control table created by experts and experts is obtained. .
  • the control table 14 associates operation information for each control level with respect to the lighting device 301, the air conditioning device 302, and the refrigeration device 303.
  • the control level can be selected from four levels “0” to “3”.
  • the control level “0” is a control state in which no energy-saving measures are taken
  • the control level “1” is a normal energy-saving control state
  • the control level “2” is the most severe control state that can be routinely put up
  • the control level “3” "Is a particularly strict control condition that is implemented extraordinarily.
  • control level means a control state in which the convenience of using the load device 30 decreases as the numerical value increases.
  • control level “0” is set to be close to normal operation and is selected during busy hours.
  • the control level “1” is a setting for energy saving operation, and is selected during a quiet time period.
  • the control level “2” is selected for power saving, and the control level “3” is a so-called demand response, which is selected in response to a second power saving rate required by an electric power company or the like. That is, the control level corresponds to the setting condition for each scene.
  • the management device 10 whose contents of the control table 14 are determined measures and monitors the power consumption of the facility.
  • the evaluation unit 12 provided in the management device 10 compares the power consumption measured by the measurement device 50 with the target power set in the target setting unit 11, and based on the ratio of the power consumption to the target power, the determination period It is predicted whether the power consumption is equal to or lower than the target power at the end of the step.
  • the evaluation unit 12 instructs the instruction unit to increase the control level so that the power consumption in the load device 30 is reduced. 13
  • the evaluation unit 12 uses the load device 30 when the power consumption at the end of the determination period is less than the target power and the difference between the target power and the power consumption is predicted to be a predetermined value or more.
  • the instruction unit 13 is instructed to lower the control level so as to improve the convenience.
  • the instructing unit 13 instructs the load device 30 to operate according to the control level by checking the control level against the control table 14.
  • the evaluation unit 12 selects the control level “3”
  • the content that prompts the user device 60 to stop some of the load devices 30 is displayed.
  • the content to be presented to the user device 60 is read from the presentation content storage unit 18 and output to the user device 60 through the presentation control unit 17.
  • the output to the user device 60 employs a format that displays a warning message on the screen of the user device 60 as “the demand will be exceeded as it is, so please stop the operation of the surrounding load devices”.
  • a plurality of characters (icons) may be switched and displayed on the screen of the user device 60 so that the urgency level can be intuitively understood according to the control level employed.
  • Operaation example 2 The operation example 1 has been described focusing on the process of generating the contents of the control table 14 based on the environment information input by the user from the user device 60.
  • the content of the control table 14 is generated based on the information extracted from the information storage unit 22 using the evaluation rule in the comparison unit 23, but the generated content is not verified.
  • the remote management device 20 inputs the control data (contents of the control table 14) generated by the data generation unit 25 to the energy calculation unit 26 together with the facility environment information.
  • the environment information input to the energy calculation unit 26 includes information necessary for energy simulation such as facility use classification, area 40 classification, external environment information, scene information, power load density, and energy efficiency of the load device 30. Including.
  • the energy calculator 26 calculates recommended power, which is the lowest power that does not cause a failure in the operation of the facility, by energy simulation.
  • the target evaluation unit 16 of the management apparatus 10 compares the recommended power, which is the minimum power for realizing the environmental state for operating the facility without any problem, with the target power determined by the reference power and the power saving rate. When the target power is smaller than the recommended power, the target evaluation unit 16 determines that the requested power saving rate is difficult to realize and alerts the user through the user device 60.
  • the background screen of the user device 60 is changed from blue to red, a notification sound is output from the user device 60, or displayed on the user device 60. What is necessary is just to change the form of the icon to perform.
  • the feasible recommended power is determined by using a regression equation that obtains the maximum power per day using the power load density and the maximum daily temperature of the outside temperature as explanatory variables.
  • This regression equation is obtained by extracting information on a facility having a similar use and configuration of the load device 30 managed by the management device 10 from the information storage unit 22 and using the extracted information. Determined.
  • the maximum value of the power load density is predicted by fitting the expected maximum temperature on the corresponding day to the above regression equation in the facility where the management device 10 is installed. Multiply the area of the facility by the maximum power load density. Since the result of this calculation is considered to be the maximum power for the corresponding day at the corresponding facility, this value is used as the recommended recommended power.
  • the energy calculation unit 26 predicts and obtains recommended power that does not hinder the operation of the facility by energy simulation.
  • the target evaluation unit 16 compares the target power corresponding to the power saving rate set using the user device 60 with the recommended power, and evaluates the feasibility of the target power. As described above, if the target power is difficult to realize, the presentation control unit 17 alerts the user through the user device 60, so that the user can set an appropriate power saving rate.
  • the screen display is changed according to the ratio of the current power consumption to the target power. It is desirable.
  • an icon 61 representing the face is displayed on the screen of the user device 60, and the expression of the icon 61 is changed according to the current power consumption with respect to the target power.
  • the icon 61 represents a smile if the power consumption (integrated value) has a margin with respect to the target power (for example, 80% or less), and the power consumption with respect to the target power is a predetermined threshold ( For example, if it exceeds 90%), a crying face may be represented.
  • the target evaluation unit 16 determines the ratio of the current power consumption to the target power.
  • a straight line whose slope is determined by the target power and the judgment period is set, and when the power consumption (integrated value) is below the straight line in the judgment period, it indicates that the target is approaching the target consumption. If the power is above the straight line, it may indicate that the target is far from being achieved. That is, two regions for determining the transition of power consumption (integrated value) by the straight line are set as the determination period, and the icon 61 is displayed depending on whether the power consumption (integrated value) is an upper region or a lower region of the straight line. The display may be switched.
  • the icon 61 may be associated with a form for each area divided by three straight lines. Further, it is not essential that the icon 61 is a facial expression, and an appropriate character may be used. The concept of the form of the icon 61 includes not only the shape but also the size and color.
  • the target is reached at the end of the determination period. Since there is a possibility of exceeding the power, the user is notified to limit the operation of the appropriate load device 30. This notification is performed by displaying a message on the screen of the user device 60 or outputting a notification sound.
  • the display part 62 which shows a power saving rate is provided in the lower part of the screen of the user apparatus 60 shown in FIG.
  • the display unit 62 represents the lower limit value of the power saving rate ("recommended value" in FIG. 4) by a broken-line square, and the realized power saving rate is represented by a solid-line square.
  • the power saving rate adopted in the management device 10 needs to consider the power saving rate instructed from the remote management device 20. Therefore, in the example shown in FIG. 4, information indicating whether the current power saving rate is set to the management device 10 or the remote management device 20 is displayed on the screen of the user device 60 (FIG. 4). 4 “server” indicates the power saving rate from the remote management device 20).
  • the management device 10 In order to adjust the power saving rate instructed from the remote management device 20 while allowing the facility manager to set the power saving rate using the user device 60, the management device 10 The operating state of the load device 30 to be managed is fed back. Further, the relationship between the target power and the power consumption is determined so that the power saving rate set by the user such as the facility manager from the user device 60 does not interfere with the operation of the facility. Such an operation is performed by the target evaluation unit 16. In other words, the target evaluation unit 16 adjusts the power saving rate so that the power saving rate set by the user and the power saving rate set by the remote management device 20 are balanced, and both the power saving and the operation in the facility are compatible. .
  • the target setting unit 11 of the management device 10 uses the first target power corresponding to the power saving rate instructed from the remote management device 20 and the facility manager through the user device 60.
  • the second target power corresponding to the power saving rate set by the user is set. Therefore, it can be considered that the first target power and the second target power compete with each other.
  • the target setting unit 11 includes a target selection unit 114 that selects one of the first target power and the second target power. Below, the procedure for selecting the target power when the first target power and the second target power compete with each other will be described.
  • the remote management device 20 has an event of power saving on the current day or the next day due to a request from an electric power company or the like.
  • a power saving period (date and time) for power saving and a power saving rate (first power saving rate) are instructed from the remote management device 20 to the required management device 10.
  • the management device 10 Upon receiving the first power saving rate from the remote management device 20, the management device 10 calculates the first target power based on the first power saving rate, and the first target power is combined with the power saving period to the first power saving period. Save in the setting unit 111.
  • the second target power is calculated from the second power saving rate.
  • the calculated second target power is stored in the second setting unit 112 together with the power saving period.
  • the target setting unit 11 refers to the current date and time measured by a clock unit (not shown) built in the management apparatus 10, and operates the load device 30 without power saving if the referenced date and time is not a power saving period. Let Moreover, the target setting part 11 will operate the load apparatus 30 so that it may correspond to the 1st or 2nd target electric power according to the applicable power saving period, if the referred date and time is a power saving period.
  • the target selecting unit 114 sets the first target power and the second power saving period.
  • the smaller one of the first target power and the second target power is adopted as the target power so as to satisfy both target powers.
  • the target selection unit 114 employs the larger power saving rate of the first power saving rate and the second power saving rate.
  • the second power saving rate set using the user device 60 is considered to be smaller than the first power saving rate requested from the remote management device 20, and depending on the type of the load device 30 used in the facility If the first power saving rate is adopted, an operational obstacle may occur. For example, in a food supermarket, if the power consumption of the refrigeration equipment 303 that stores food that needs to be refrigerated or frozen is not maintained, the food will deteriorate and hinder the operation.
  • the target selection unit 114 determines that there is an operational failure, and the second power saving rate input from the user device 60 is preferentially used. For example, when power saving is requested from the remote management device 20, the second power saving rate set by the user device 60 is 15% before the start of the power saving period, whereas it is 5 after the start of the power saving period. If it is reduced to%, the power saving rate adopted will be 5%. Even when the second power saving rate set by the user device 60 is 0% from before the start of the power saving period, the target selecting unit 114 determines that power saving causes an operational obstacle. Do not save power.
  • the second power saving rate set by the user device 60 is always used preferentially, the second power saving rate is abused and the first power saving rate set from the remote management device 20 is not used. there is a possibility. Therefore, it is desirable to attach permission conditions for using the second power saving rate set from the user device 60 in preference to the first power saving rate set from the remote management device 20.
  • the permission condition is, for example, that the integrated value of power consumption within the determination period (usually 30 minutes) for determining the unit price of the electricity bill reaches 90% or more of the upper limit value set for the determination period.
  • This permission condition permits the use of the second power saving rate as a countermeasure when the demand power (demand) at the facility approaches a peak (upper limit value).
  • the permission condition may be that the internal temperature of any of the refrigeration devices 303 is higher than a predetermined reference temperature.
  • This permission condition allows the second power saving rate to be used as a countermeasure when preventing deterioration of food due to an increase in the temperature inside the refrigerator 303. Thus, only when the permission condition is satisfied, the second power saving rate is prevented from being abused by allowing the second power saving rate to be used in preference to the first power saving rate.
  • the power saving rate can be reduced.
  • the restriction by the permission condition is added, when the first power saving rate is set from the remote management device 20 by a social request, the second set by the user if the permission condition is not satisfied. The abuse of the second power saving rate can be suppressed by not using the power saving rate.
  • the remote management device 20 includes an energy calculation unit 26 that performs energy simulation by computer simulation. Depending on the scale of the facility, 200 to 300 types of information are required for the energy calculator 26 to accurately perform the energy simulation. It is difficult for general users such as facility managers to set such a large number of pieces of information correctly according to the facility, and it is difficult to perform energy simulations unless they are skilled workers or experts. .
  • the energy management apparatus generates a large number of pieces of information necessary for calculation by the energy calculation unit 26 from a small number of pieces of input information by the parameter estimation unit 27 provided in the remote management apparatus 20. Is possible. That is, it is possible to perform an energy simulation even by a user who is not an expert or an expert only by giving about 10 pieces of input information to the parameter estimation unit 27.
  • the input information given to the parameter estimation unit 27 is information that can be easily known by the user among the environmental information.
  • the input information includes the floor area of the facility, the age of the facility, the use classification of the facility, the geographical area where the facility exists, the business hours of the facility, and the type of the load device 30 arranged in the facility.
  • the listed input information is the minimum necessary information and can be easily obtained by a user.
  • the parameter estimation unit 27 collects information necessary for calculation by the energy calculation unit 26 from the information storage unit 22 by referring to various information stored in the information storage unit 22.
  • the information stored in the information storage unit 22 includes the power load density (or power capacity) of the load device 30 arranged for each area 40, the heat insulation performance and floor area of the area 40, and the load device 30. Energy efficiency, facility grade, load device 30 energy efficiency, area where the facility is located, outside temperature, humidity, solar radiation, and the like. Furthermore, the parameter estimation unit 27 has a function of estimating the operation time of the load device 30 from business hours. In order to estimate the operation time from the business hours, a data table or an arithmetic expression stored in the information storage unit 22 is used.
  • the information storage unit 22 can use the size (scale unit) for the refrigeration equipment 303 instead of the power capacity.
  • the refrigeration equipment 303 is often expressed in units of scale in industry customs, and since the power capacity of the refrigeration equipment 303 and the floor area of the area 40 are not directly related, the power load density is used rather than the power load density. The accuracy of estimating the power capacity is higher when the scale unit is used.
  • the user may roughly estimate the number of scales in which the refrigeration equipment 303 is arranged from the layout of the area 40.
  • the parameter estimation unit 27 collates the input information with various information stored in the information storage unit 22 and evaluates the similarity with the input information, thereby calculating the energy calculation unit 26. Estimate the information given to. In other words, the parameter estimation unit 27 collates a small number of pieces of information with a large number of pieces of information stored in the information storage unit 22, thereby obtaining a small number of pieces of information necessary for energy simulation in the energy calculation unit 26. Expand into information.
  • the information storage unit 22 stores standard information on the ceiling height, window area ratio, and the like, and standard information on the insulation performance of walls and windows for each geographical area. is doing. Therefore, given as input information to the parameter estimation unit 27, the floor area of the facility, the age of the facility, the classification of the usage of the facility, and the geographical area where the facility exists, the ceiling height of the facility necessary for the energy simulation Information such as window area and heat insulation performance can be obtained.
  • the information storage unit 22 stores external environment information such as outside air temperature, humidity, and amount of solar radiation classified for each region, and the parameter estimation unit 27 is given the region where the facility exists as input information. And output external environment information.
  • the information storage unit 22 stores setting information regarding the load device 30 in addition to the facility information, the scene information, and the external environment information. Therefore, the setting information of the load device 30 corresponding to the facility can be extracted by searching the facility information, the scene information, and the external environment information using the input information of the parameter estimation unit 27 as a key.
  • the parameter estimation unit 27 narrows down the information by majority vote if it is non-numeric information, and average value if it is numeric information Etc. are used.
  • the operating time of the load device 30 is extracted from the information storage unit 22 based on the business hours of the facility.
  • the information storage unit 22 stores a reference value for the operation time of the load device 30 and a correction value corresponding to the business hours.
  • the operation time of the load device 30 corresponding to the business hours is calculated for each area 40.
  • 1-2 hours before the start of business hours is preparation time before opening
  • 1-2 hours after the end of business hours is the time to clean up after closing become.
  • the preparation time if the lighting device 301 is turned on so as to secure an illuminance of a workable level and the air conditioning device 302 is stopped, the operation time of the air conditioning device 302 matches the business hours.
  • the device 301 must be in an operating state necessary for work for one to two hours outside business hours.
  • the refrigeration equipment 303 needs to continue operation regardless of business hours except for the interior lighting during the period in which the goods are stored in the interior.
  • the parameter estimation unit 27 sets the operation time of the load device 30 to the business hours of the facility. Can be estimated accordingly.
  • the information storage unit 22 stores energy efficiency (equipment efficiency) for each type of load device 30.
  • the energy efficiency is represented by the relationship between the outside air temperature and the device efficiency (COP: Coefficient Of Performance).
  • the parameter estimation unit 27 estimates the equipment efficiency using the outside air temperature included in the external environment information.
  • the parameter estimation unit 27 estimates information necessary for the energy simulation in the energy calculation unit 26 from the input information. Therefore, if the information amount of the input information increases, the estimation accuracy of information given to the energy calculation unit 26 increases. . Therefore, it is conceivable that a user such as a skilled person or an expert who has knowledge of energy simulation intends to directly input a large number of pieces of information to the energy calculation unit 26 in order to improve the accuracy of the energy simulation. . Therefore, the energy calculation unit 26 allows a large number of pieces of information to be directly input by an expert or expert. That is, when all the input information included in the facility information is input from the information input unit 24, the energy calculation unit 26 calculates the recommended power without using the parameter generated by the parameter estimation unit 27. The energy calculation unit 26 may calculate the reference power together with the recommended power.
  • the contents of the information storage unit 22 can be updated.
  • the power capacity is directly input as 150 kW for the air conditioner 302 arranged in the sales floor having a floor area of 1000 m 2 to the energy calculation unit 26
  • the air conditioning capacity basic unit is 150 W / m 2 . .
  • the value obtained in this way is stored in the information storage unit 22. That is, information directly input to the energy calculation unit 26 by a skilled person or an expert is stored in the information storage unit 22 and used for subsequent estimation by the parameter estimation unit 27. Therefore, new information is added to the information stored in the information storage unit 22 as needed.
  • old information of a predetermined period before the added information is deleted from the information storage unit 22, the information stored in the information storage unit 22 is prevented from being obsolete.
  • the energy calculation unit 26 When the parameter estimation unit 27 generates information used for the energy simulation based on the input information, the energy calculation unit 26 performs the energy simulation using the purpose and effect of energy saving as a constraint condition. Through this simulation, the energy calculation unit 26 calculates the target power for the facility indicated by the input information.
  • the energy management device includes a management device 10 and a remote management device 20.
  • the management apparatus 10 controls the operation of the plurality of load devices 30 according to a target power saving rate in a facility where the plurality of load devices 30 are arranged.
  • the remote management device 20 communicates with the management device 10 and provides the management device 10 with control data for controlling the operation of the plurality of load devices 30.
  • the remote management device 20 includes an information storage unit 22.
  • the information storage unit 22 stores a plurality of records in which facility information and setting information are associated with each other.
  • Facility information is information relating to the characteristics of the facility.
  • the setting information is information on the environment of the facility realized by the operation of the plurality of load devices 30.
  • the remote management device 20 uses the plurality of records stored in the information storage unit 22 to generate information necessary for controlling the operations of the plurality of load devices 30.
  • the remote management device 20 preferably further includes an energy calculation unit 26, an information input unit 24, and a parameter estimation unit 27.
  • the energy calculation unit 26 calculates recommended power, which is the lowest power that does not cause a failure in the operation of the facility, by energy simulation.
  • the necessary conditions included in the facility information are input as input information.
  • the parameter estimation unit 27 generates a parameter used by the energy calculation unit 26 by extracting from the information storage unit 22 a record including facility information similar to the necessary condition input from the information input unit 24.
  • the energy calculation unit 26 preferably performs the following operation.
  • the energy calculation unit 26 recommends using the input information as parameters without using the parameters generated by the parameter estimation unit 27. Calculate power.
  • a plurality of management apparatuses 10 are provided in one-to-one correspondence with a plurality of facilities, and a plurality of load devices 30 are arranged in each of the plurality of facilities.
  • the information storage unit 22 stores a plurality of records in which facility information and setting information are associated with each of a plurality of facilities.
  • the energy calculation unit 26 calculates recommended power for the facility of interest among a plurality of facilities by energy simulation.
  • the information input unit 24 inputs necessary conditions as input information for the facility of interest.
  • the energy calculation unit 26 extracts a record including facility information similar to the necessary condition input from the information input unit 24 from the information storage unit 22 among the plurality of records regarding the facility of interest by the energy calculation unit 26. Generate the parameters to use.
  • the remote management device 20 preferably further includes an information input unit 24, a comparison unit 23, and a data generation unit 25.
  • the information input unit 24 receives facility information of a facility where a plurality of load devices 30 managed by the management apparatus 10 are arranged.
  • the comparison unit 23 extracts setting information from a record that is determined that the facility information input from the information input unit 24 is similar to the facility information stored in the information storage unit 22 among the plurality of records.
  • the data generation unit 25 generates control data to be given to the management apparatus 10 using the setting information extracted from the information storage unit 22 by the comparison unit 23.
  • the information storage unit 22 stores setting information together with facility information when the control data used by the management device 10 is not changed beyond a predetermined duration. It is preferable.
  • the information storage unit 22 and the comparison unit 23 preferably perform the following operations.
  • the information storage unit 22 stores, for each of a plurality of records, the actual number of times of use when the comparison unit 23 employs the record for extracting setting information.
  • the comparison unit 23 extracts two or more records from the plurality of records from the information storage unit 22, the comparison unit 23 calculates a weighted average value that weights the actual number of times for the setting information extracted from each of the two or more records. The weighted average value is obtained and given to the data generation unit 25 as setting information.
  • the information input unit 24 preferably receives facility information and setting information from the user device 60 attached to the management device 10 and operated by the user.
  • the information input unit 24 preferably has a function of inputting facility information and setting information to the information storage unit 22.
  • the information storage unit 22 stores a plurality of records in which facility information and setting information are associated with each of a plurality of facilities.
  • the information input unit 24 inputs facility information regarding a facility of interest among a plurality of facilities.
  • the comparison unit 23 extracts setting information from the records that are determined that the facility information input from the information input unit 24 and the facility information stored in the information storage unit 22 are similar among the plurality of records regarding the facility of interest. To do.
  • the data generation unit 25 generates control data to be given to the management apparatus 10 using the setting information extracted from the information storage unit 22 by the comparison unit 23 for the facility of interest.
  • the remote management device 20 preferably communicates with the management device 10 through the communication network NT1.
  • the management apparatus 10 according to the present embodiment is used for the energy management apparatus according to the present embodiment.
  • the remote management device 20 according to the present embodiment is used for the energy management device according to the present embodiment.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Public Health (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Power Engineering (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

 エネルギー管理装置は、複数の負荷機器が配置された施設において目標とする節電率に応じて負荷機器の動作を制御する管理装置と、管理装置と通信し、負荷機器の動作を制御する制御データを管理装置に提供する遠隔管理装置とを備える。遠隔管理装置は、施設情報と設定情報とを対応付けて記憶している情報記憶部と、着目する施設の推奨電力をエネルギーシミュレーションによって算出するエネルギー計算部と、着目する施設に関して施設情報に含まれる所要条件が入力される情報入力部と、所要条件を用いて情報記憶部から情報を抽出し、エネルギー計算部で用いるパラメータを生成するパラメータ推定部とを備える。

Description

エネルギー管理装置、管理装置、遠隔管理装置
 本発明は、施設に配置した複数の負荷機器の動作状態を管理し、負荷機器で消費されるエネルギーを抑制するエネルギー管理装置、およびエネルギー管理装置を構成する管理装置、遠隔管理装置に関するものである。
 従来から、多数の負荷機器を備える施設において、負荷機器で消費されるエネルギーを抑制する技術が種々提案されている。たとえば、食品を扱うスーパーマーケットのような施設では、照明機器、空調機器、冷蔵機器(冷蔵庫または冷凍庫)のような負荷機器が多数配置され、これらの負荷機器で消費されるエネルギーを抑制するために、様々な条件に応じて負荷機器の動作を制御するエネルギー管理装置が設けられている。
 たとえば、日本国特許出願公開番号2009-240032号には、消費電力(積算値)のデマンド値があらかじめ設定された契約電力を超えないように、照明機器の能力を制御する技術が開示されている。デマンド値は、30分を単位とするデマンド期間における消費電力の積算値であり、月間におけるデマンド期間ごとの消費電力(積算値)のピーク値によって、次月から1年間の電気料金の単価が定められる。
 ところで、上述のような需要家側で行うデマンド制御のほか、昨今では、需要家は様々な状況において負荷機器の動作を制限しなければならない。たとえば、地球温暖化を抑制するための継続的な省エネルギーに関する社会的要請、供給電力の不足に伴う停電を防止するために電気事業者から要請される一時的な節電の場合にも、需要家は、負荷機器でのエネルギーの消費量を制限することが要求される。
 一方、エネルギーの消費量を管理するように設定したスケジュールに従って負荷機器の動作を管理するエネルギー管理装置が提供されている(たとえば、日本国特許出願公開番号2012-133553号参照)。この種のエネルギー管理装置は、施設管理者のような利用者による使用が想定されており、負荷機器の動作を管理することによって省エネルギーを支援する。
 ところで、上述のようなエネルギー管理装置は、個々の需要家が使用しているから、地域や都市のように、複数の需要家が含まれる範囲において、需要家の電力需要を監視しながらエネルギーの消費量を管理する目的では用いられない。しかしながら、エネルギーの需要量に対して供給能力が十分ではない状況では、需要家が個々に負荷機器の動作を管理するだけではなく、複数の需要家が含まれる範囲全体において負荷機器の動作を管理することが要求される。
 そのため、着目する範囲内の需要家へのエネルギーの供給能力と、個々の需要家におけるエネルギーの需要量との時間変化を予測し、かつ供給能力に限りのあるエネルギーを需要家に対して適切に配分する必要がある。このような処理を行うには、需要家ごとに負荷機器に供給するエネルギーを制御する個別装置と、複数の個別装置を統括してエネルギーの配分を決める統括装置とが必要である。さらに、統括装置は、様々な情報を用いてエネルギーシミュレーションを行って、エネルギーの需給予測を行うことが求められる。
 しかしながら、エネルギーシミュレーションは、200~300種類の情報を入力する必要があり、高度な知識を必要とするから、熟練者や専門家でなければ、エネルギーの需要予測を行うことは困難である。また、仮にエネルギーシミュレーションに関する知識があったとしても、情報の種類が多いために入力工数が多いから、エネルギーの需給予測には手間がかかる。
 さらに、着目する範囲に含まれる需要家の数が多くなると、需要家に関する情報を測定ないし調査するだけでも、多大な時間および費用を要するから、この種の情報を収集する時間間隔は最短でも数年程度になり、情報が陳腐化するという問題もある。しかも、熟練者や専門家が作成した、高精度のエネルギーシミュレーションの結果は、1回だけ使用され、二度と活用されないことが多い。
 また、上述のように、多数の負荷機器が配置されている施設で負荷機器でのエネルギーの消費量を制限するには、施設の運営のために必要な負荷機器については所要の動作が行えるだけのエネルギーを確保しながらも、エネルギーの消費量を抑制しなければならない。すなわち、施設管理者のような利用者は、節電率や環境条件に応じて、どの負荷機器をどのように動作させるかを決めて、負荷機器を運転することが要求される。
 これまで、節電率や環境条件に応じて負荷機器を運転するための制御データは、現場に関する知識を保有している熟練者や専門家のノウハウによって設定されていた。したがって、熟練者や専門家ではない利用者にとって、様々な状況に対する制御データを適切に設定することは困難である。
 本発明は、複数の負荷機器の動作を制御するために必要な情報を容易に生成することを可能にしたエネルギー管理装置を提供することを目的とし、さらに、エネルギー管理装置を構成する管理装置、および遠隔管理装置を提供することを目的とする。
 本発明は、利用者が容易に入手できる少数の情報を入力するだけで、熟練者や専門家の知識を利用したエネルギーシミュレーションを行うことを可能にしたエネルギー管理装置を提供することを目的とし、さらに、エネルギー管理装置を構成する管理装置、および遠隔管理装置を提供することを目的とする。
 本発明は、様々な状況に対する制御データを適切かつ容易に設定することを可能にしたエネルギー管理装置を提供することを目的とし、さらに、エネルギー管理装置を構成する管理装置、および遠隔管理装置を提供することを目的とする。
 本発明に係るエネルギー管理装置は、複数の負荷機器が配置された施設において目標とする節電率に応じて前記複数の負荷機器の動作を制御する管理装置と、前記管理装置と通信し、前記複数の負荷機器の動作を制御する制御データを前記管理装置に提供する遠隔管理装置とを備え、前記遠隔管理装置は、前記施設の特性に関する施設情報と、前記複数の負荷機器が動作することにより実現される前記施設の環境の情報である設定情報とを対応付けた複数のレコードを記憶している情報記憶部を備え、前記情報記憶部に記憶されている前記複数のレコードを用いて、前記複数の負荷機器の動作を制御するために必要な情報を生成することを特徴とする。
 このエネルギー管理装置において、前記遠隔管理装置は、前記施設の運営上で障害が生じない最低の電力である推奨電力をエネルギーシミュレーションによって算出するエネルギー計算部と、前記施設情報に含まれる所要条件が入力情報として入力される情報入力部と、前記情報入力部から入力された前記所要条件に類似する前記施設情報を含むレコードを前記情報記憶部から抽出することにより前記エネルギー計算部で用いるパラメータを生成するパラメータ推定部とをさらに備えることが好ましい。
 このエネルギー管理装置において、前記エネルギー計算部は、前記情報入力部から前記施設情報に含まれるすべての情報が前記入力情報として入力されると、前記パラメータ推定部で生成されるパラメータを用いることなく、前記入力情報を前記パラメータに用いて前記推奨電力を算出することが好ましい。
 このエネルギー管理装置において、前記管理装置は、複数の施設と一対一に対応して複数設けられ、前記複数の施設の各々に前記複数の負荷機器が配置され、前記情報記憶部は、前記複数の施設の各々に関して、前記施設情報と前記設定情報とを対応付けた前記複数のレコードを記憶し、前記エネルギー計算部は、前記複数の施設のうち着目する施設に関して、前記推奨電力を前記エネルギーシミュレーションによって算出し、前記情報入力部は、前記着目する施設に関して、前記所要条件が前記入力情報として入力され、前記エネルギー計算部は、前記着目する施設に関して、前記複数のレコードのうち、前記情報入力部から入力された前記所要条件に類似する前記施設情報を含む前記レコードを前記情報記憶部から抽出することにより前記エネルギー計算部で用いる前記パラメータを生成することが好ましい。
 このエネルギー管理装置において、前記遠隔管理装置は、前記管理装置により管理される前記複数の負荷機器が配置された前記施設の前記施設情報が入力される情報入力部と、前記複数のレコードのうち、前記情報入力部から入力された前記施設情報と前記情報記憶部が記憶している前記施設情報とが類似すると判断したレコードから前記設定情報を抽出する比較部と、前記比較部が前記情報記憶部から抽出した前記設定情報を用いて前記管理装置に与える前記制御データを生成するデータ生成部とをさらに備えることが好ましい。
 このエネルギー管理装置において、前記情報記憶部は、前記管理装置が用いている前記制御データが所定の継続時間を超えて変更されなかった場合に、前記施設情報とともに前記設定情報を格納することが好ましい。
 このエネルギー管理装置において、前記情報記憶部は、前記複数のレコードの各々に関して、レコードを前記比較部が前記設定情報の抽出に採用したときの利用の実績回数を記憶し、前記比較部は、前記情報記憶部から前記複数のレコードのうちの2以上のレコードを抽出した場合に、前記2以上のレコードの各々から抽出される前記設定情報について前記実績回数を重みとする重み付き平均値を求め、この重み付き平均値を前記データ生成部に前記設定情報として与えることが好ましい。
 このエネルギー管理装置において、前記情報入力部は、前記施設情報および前記設定情報を、前記管理装置に付設され利用者が操作する利用者装置から受け取ることが好ましい。
 このエネルギー管理装置において、前記情報入力部は、前記施設情報と前記設定情報とを前記情報記憶部に入力する機能を有していることが好ましい。
 このエネルギー管理装置において、前記管理装置は、複数の施設と一対一に対応して複数設けられ、前記複数の施設の各々に前記複数の負荷機器が配置され、前記情報記憶部は、前記複数の施設の各々に関して、前記施設情報と前記設定情報とを対応付けた前記複数のレコードを記憶し、前記情報入力部は、前記複数の施設のうち着目する施設に関して、前記施設情報が入力され、前記比較部は、前記着目する施設に関して、前記複数のレコードのうち、前記情報入力部から入力された前記施設情報と前記情報記憶部が記憶している前記施設情報とが類似すると判断した前記レコードから前記設定情報を抽出し、前記データ生成部は、前記着目する施設に関して、前記比較部が前記情報記憶部から抽出した前記設定情報を用いて前記管理装置に与える前記制御データを生成することが好ましい。
 このエネルギー管理装置において、前記遠隔管理装置は、前記管理装置と通信ネットワークを通して通信することが好ましい。
 本発明に係る管理装置は、前記エネルギー管理装置に用いることを特徴とする。
 本発明に係る遠隔管理装置は、前記エネルギー管理装置に用いることを特徴とする。
 本発明の構成によれば、利用者が容易に入手できる少数の所要条件を入力するだけで、熟練者や専門家の知識を利用したエネルギーシミュレーションを行うことが可能になる。その結果、エネルギーシミュレーションの知識がない利用者であっても、熟練者や専門家の知識を利用して、個々の施設において適切な管理目標をエネルギーシミュレーションによって求めることが可能になるという利点を有する。
 本発明の構成によれば、遠隔管理装置の情報記憶部に記憶されている情報を用いて、管理装置に設定する設定データを生成するから、様々な状況に対する制御データを適切かつ容易に設定することが可能になるという利点を有する。
 本発明の好ましい実施形態をより詳細に記述する。本発明の他の特徴および利点は、以下の詳細な記述および添付図面に関連して一層よく理解される。
実施形態に係るエネルギー管理装置を示すブロック図である。 実施形態に用いる情報記憶部の例を示す図である。 実施形態に用いる制御テーブルの例を示す図である。 実施形態に用いる利用者装置の画面例を示す図である。
 (全体構成)
 以下に説明する実施形態に係るエネルギー管理装置は、図1に示すように、管理装置10を備える。管理装置10は、複数の負荷機器30が消費する消費電力を管理する。複数の負荷機器30は、複数のエリア40に区分されている施設において、それぞれのエリア40に配置されている。複数の負荷機器31,32,…の各々における単位時間の消費電力は計測装置50で計測される。計測装置50は、施設の全体を単位とする計測を行うほか、たとえば、エリア41,42,…を単位とする計測、負荷機器31,32,…の種類を単位とする計測、個々の負荷機器31,32,…を単位とする計測などを行う構成を備えていることが望ましい。以下では、負荷機器31,32,…を区別する必要がない場合は負荷機器30として記載し、エリア41,42,…を区別する必要がない場合はエリア40として記載する。なお、以下の実施形態において、負荷機器31,32,…は、電気負荷を想定しているが、ガス機器や水道を利用する機器を負荷機器31,32,…に含めることが可能である。
 施設は、食品を扱うスーパーマーケット、コンビニエンスストア、百貨店、店舗ビル、オフィスビル、ホテル、病院のような建物空間のほか、公園、テーマパークなどでもよい。これらは施設の一例であって、施設は、複数の負荷機器が配置され、かつ配置された負荷機器での消費電力が需用者に一括して管理されている空間であれば形態は問わない。
 以下に説明する実施形態は、施設が食品を扱うスーパーマーケットである場合を例として説明する。限定する趣旨ではないが、本実施形態で想定しているスーパーマーケットには、売場、レジ、バックヤード、事務室などの複数のエリア40が存在する。売場とバックヤードとには、負荷機器30として、照明機器301、空調機器302、冷蔵機器303が配置される。また、レジと事務室とには、負荷機器30として、照明機器301、空調機器302が配置される。冷蔵機器303は、食品の保存と陳列とを行う冷蔵庫または冷凍庫を意味する。売場には、冷蔵機器303として平型、多段型、リーチイン型などの各種形式のショーケースが配置され、バックヤードには、冷蔵機器303として大容量の冷蔵庫が配置される。
 (管理装置)
 管理装置10は、他装置との間で情報を授受したり、他装置の動作の監視や制御を行うために、他装置との接続を可能にする接続部(図示せず)を備える。接続部は、端子やコネクタのように他装置との電気的接続を可能にする装置と、信号の授受のための装置あるいは電路の開閉を行うための装置とを備える。管理装置10は、プログラムを実行することにより以下に説明する機能を実現するコンピュータを主なハードウェア要素として備える。このコンピュータは、個別のデバイスであるプロセッサとメモリとの組合せ、プロセッサとメモリとをワンチップで構成したマイコンなどを意味する。
 管理装置10の接続部に接続される他装置として、本実施形態では、遠隔管理装置20と負荷機器30と計測装置50と利用者装置60とを例示するが、管理装置10は、これら以外の他装置を接続することも可能である。
 遠隔管理装置20は、1台以上のコンピュータを備えるコンピュータサーバであり、以下に説明する機能を実現するためのプログラムを実行する。そのため、管理装置10の上記接続部は、通信ネットワークNT1を通して遠隔管理装置20と通信するための図示しないインターフェイス部(以下、「I/F部」という)を備える。遠隔管理装置20は、通信可能に関連付けられた複数台のコンピュータを備えていてもよい。また、通信ネットワークNT1は、インターネットのような公衆網を用いて構築されるVPN(Virtual Private Network)が用いられる。
 本実施形態で用いる負荷機器30は、管理装置10と通信する機能と、管理装置10からの指示に従って動作状態が制御される機能と、動作状態を管理装置10に通知する機能とを備える。そのため、管理装置10の上記接続部は、負荷機器30と通信するためのI/F部(図示せず)を備える。ただし、負荷機器30は、管理装置10からの通信信号によりオンオフの制御のみを受け付ける構成であってもよい。また、管理装置10と通信する機能を備えていない負荷機器30を用いることも可能である。この場合、管理装置10は、負荷機器30に給電する電路のオンオフを行うためのリレーのようなスイッチ要素を備える必要がある。
 計測装置50は、計測した電力の情報を管理装置10に伝送する。管理装置10の上記接続部は、計測装置50と通信するためのI/F部(図示せず)を備える。管理装置10と計測装置50との間の通信に用いる伝送路は、有線通信路と無線通信路とのどちらでもよい。ただし、管理装置10が分電盤の近くに配置される場合は管理装置10と計測装置50との間の距離が短いから有線通信路を採用し、管理装置10が分電盤から離れて配置される場合は無線通信路を採用することが望ましい。上述したI/F部(図示せず)は、計測装置50から単位時間ごとに電力の情報を取得する。ここに、単位時間は、たとえば、1分、5分などから選択される。
 利用者装置60は、ユーザインターフェイスとしての表示部と操作部とを備え、管理装置10が取得した情報を表示部に表示して可視化する機能と、施設責任者のような利用者による操作部の操作内容を管理装置10の動作に反映させる機能とを有する。表示部と操作部とは、フラットパネルディスプレイの画面にタッチパネルを重ね合わせた構成の操作表示器を備えていることが望ましい。利用者装置60は、専用装置のほか、コンピュータ、スマートフォン、タブレット端末などを流用可能である。管理装置10の上記接続部は、このような利用者装置60を利用可能とする構成のI/F部(図示せず)を備える。このI/F部は、コンピュータ、スマートフォン、タブレット端末などを利用者装置60として流用する場合、無線LAN(Local Area Network)やBluetooth(登録商標)の仕様が採用される。
 管理装置10は、消費電力の目標値が設定される目標設定部11と、計測装置50から取得した電力を目標設定部11に設定された目標値と比較する評価部12と、評価部12の評価結果に応じて負荷機器30の動作を指示する指示部13とを備える。以下では、消費電力の目標値を「目標電力」という。目標設定部11は、節電率が与えられると、あらかじめ設定された基準電力に節電率を乗じて目標電力を求める。基準電力は、電気事業者などとの契約により定められる契約電力で規定される場合と、施設における消費電力の実績から求められる場合とがある。
 目標設定部11に設定される目標電力は、施設の消費電力の低減を図るように設定される。ここに、常時の目標電力は、エリア40に存在する人が負荷機器30の運転により享受する利便性を損なわないように、エリア40に存在する人の効用に応じて定められる。また、電気事業者から節電率が指示される場合などの非常時の目標電力は、指示された節電率に見合うように定められる。
 目標電力は、施設ごとに異なるから、過去の消費電力の実績と、所要の節電期間における節電率とから求められる。節電期間は、1日の時間帯、日時で指定される期間、複数日にわたる期間、曜日、年などから選択される。たとえば、1日において電力の需要がピークになる時間帯、年間において電力の需要がピークになる期間などを節電期間とすれば、消費電力のピークが抑制され、結果的に、電気事業者は供給する電力のピークを抑制することが可能になる。また、施設における年間の消費電力を低減させるように目標電力が設定される場合もある。
 目標設定部11の目標値は、原則として、遠隔管理装置20から設定されるが、利用者装置60を用いて利用者が設定する場合もある。遠隔管理装置20が目標電力を設定する技術については後述する。利用者装置60を用いる場合、目標電力は、施設の全体について設定するほか、負荷機器30あるいはエリア40を単位として個別に設定することが可能である。
 目標設定部11は、遠隔管理装置20から設定される第1の目標電力を記憶する第1の設定部111と、利用者装置60を用いて設定される第2の目標電力を記憶する第2の設定部112とを備える。第1の設定部111および第2の設定部112は、目標電力を達成すべき節電期間も併せて記憶する。第1の設定部111および第2の設定部112は、半導体メモリやハードディスクのような記憶装置で構成される。
 目標設定部11は、所定期間における施設の消費電力の変化を記憶する電力記憶部113を備えていてもよい。電力記憶部113は、施設における実際の消費電力の推移を記憶していることが望ましいが、管理装置10の使用開始直後などには、電力記憶部113に記憶させる実績がない。したがって、管理装置10が設置される施設と同程度の規模の施設で得られた消費電力の推移を電力記憶部113に記憶させて用いることも可能である。このような他の施設の情報は、遠隔管理装置20から取得することが可能である。
 電力記憶部113が設けられている場合、目標設定部11は、節電期間に相当する期間の消費電力を電力記憶部113から抽出し、指定された節電率を用いて、第1の目標電力および第2の目標電力を算出する。
 遠隔管理装置20から設定される第1の目標電力は、たとえば、電力会社のような電気事業者からの要望によって設定される場合があり、処理を実行する節電期間が当日や翌日のように緊急性を有していることがある。一方、利用者装置60から設定される第2の目標電力は、処理を実行する節電期間が比較的長期にわたっていることが多い。そのため、第1の目標電力は節電期間が個別に設定され、第2の目標電力は比較的長期にわたる適用期間が設定され、適用期間における日々の時間帯が節電期間として採用される。言い換えると、第1の設定部111の節電期間は個別に設定され、第2の設定部112の節電期間は適用期間と時間帯との組合せで指定される。このように、利用者装置60で設定される節電期間が適用期間と時間帯との組合せとすれば、利用者装置60を頻繁に操作する煩わしさが解消される。
 目標設定部11は、第1の目標電力と第2の目標電力とのどちらを選択するかを決めるために、目標選択部114を備える。目標選択部114は、遠隔管理装置20と利用者装置60とのいずれかからの指示により、第1の目標電力と第2の目標電力との一方を選択する。
 ところで、管理装置10は、複数種類の動作モードが選択可能であり、目標選択部114は、選択された動作モードに応じて第1の目標電力と第2の目標電力との一方を選択する。動作モードには、通常モード、遠隔優先モード、利用者優先モードなどがあり、動作モードの選択要求は、遠隔管理装置20あるいは利用者装置60により行われる。
 利用者優先モードは、遠隔管理装置20で設定された第1の目標電力を用いると施設において重大な問題が生じる場合などに備えて、遠隔管理装置20からの第1の目標電力の使用を禁止可能にする動作モードである。すなわち、遠隔管理装置20が施設の実際の環境状態を考慮せずに第1の目標電力(あるいは節電率)を設定したとしても、管理装置10が第1の目標電力の使用を禁止することにより、現場の環境状態に応じた負荷機器30の運転を行うことが可能になる。
 たとえば、食品スーパーマーケットを運営する上で重大な問題が生じる例としては、冷蔵機器303の温度が長時間にわたって高い状態に設定される場合などがある。そこで、冷蔵機器303の温度が所定値よりも高くなると、利用者優先モードを許可するように管理装置10を構成すれば、利用者優先モードの乱用を防止しながらも、冷蔵機器303の温度上昇による食品の劣化を防止することが可能になる。
 目標選択部114は、通常モードでは、第1の目標電力と第2の目標電力とのうち節電率の大きいほうを選択する。したがって、通常モードが選択されていると、消費電力は第1の目標電力と第2の目標電力との両方を満足することになる。
 評価部12は、計測装置50から単位時間ごとに取得した電力の情報を積算することにより消費電力を求め、所要の判定期間において、目標電力に対する消費電力(積算値)の割合と判定期間の開始からの経過時間とを用いて消費電力(積算値)の推移を予測する。そして、評価部12は、判定期間の終了時に消費電力が目標電力を超えることが予測される場合、指示部13が負荷機器30の消費電力を抑制する動作を負荷機器30に指示する。消費電力を抑制させる程度(以下、「制御レベル」という)は、消費電力と目標電力との割合によって異なる。したがって、評価部12は、消費電力と目標電力との関係に応じた制御レベルを指示部13に通知する。制御レベルは、複数段階(以下の説明では4段階)から選択可能になっている。
 なお、判定期間は、たとえば30分、1日、1ヶ月、1年などから選択される。たとえば、30分ごとの消費電力について月間の最大値で電気料金の単価が定まる料金体系が採用されている場合には、判定期間として30分が選択される。また、月間あるいは年間の消費電力の節電率を目標値として設定している場合には、判定期間は1ヶ月あるいは1年になる。消費電力は、判定期間の開始から積算され、判定期間の終了をもって0にリセットされる。
 指示部13は、評価部12から制御レベルが通知されると、施設の消費電力が制御レベルに見合うだけ低減されるように、消費電力を低減させる負荷機器30を選択し、かつ選択した負荷機器30の動作を決定する。制御レベルは、負荷機器30の種類および動作に対応付けられ、負荷機器30の種類および動作は時間経過に伴って変化させることも可能である。
 制御レベルと負荷機器30の種類および動作との関係は、制御テーブル14に格納されている。制御テーブル14は、制御対象である負荷機器30の種類と動作との少なくとも一方を時間経過に伴って変化させるように、負荷機器30の制御手順が格納されていてもよい。指示部13は、評価部12から制御レベルが通知されると、制御テーブル14の内容を参照し、上記制御レベルに対応付けられている負荷機器30の種類および動作を制御テーブル14から読み出す。そして、指示部13は、制御テーブル14から読み出した負荷機器30の種類および動作に従って負荷機器30に指示を与える。
 また、制御テーブル14の内容は、負荷機器30の種類および動作について電力を制限する順番を制御レベルに対応付けてあってもよい。たとえば、食品を扱うスーパーマーケットであれば、事務室の照明機器301および空調機器302の消費電力は低減させても店舗の運営に対する影響が少ないが、冷蔵機器303の消費電力を低減させることは難しい。したがって、制御テーブル14の内容は、消費電力を低減させる割合が少ない制御レベルに対しては、事務所の照明機器301および空調機器302を対象として消費電力を低減させる動作になる。言い換えると、制御テーブルの内容は、消費電力を低減させた場合の影響が少ないほうから順に、負荷機器30の種類および動作が制御レベルに対応付けられる。
 制御テーブル14の内容は書換可能であり、制御テーブル14の内容を含む情報は、遠隔管理装置20から伝送される。遠隔管理装置20から伝送された制御テーブル14の内容を含む情報は、管理装置10に設けられた更新部15が受け取り、更新部15は遠隔管理装置20から伝送された情報に従って制御テーブル14の内容を更新する。なお、制御テーブル14の内容は、利用者装置60を用いて設定することも可能である。
 ところで、目標電力(あるいは節電率)は、対象となる施設を運営する上で厳しくなりすぎる場合がある。とくに、第1の目標電力は、上述したように、現場の環境状態を考慮せずに遠隔管理装置20から一方的に定められるから、この種の問題が生じやすくなる。また、利用者装置60を用いて設定される第2の目標電力についても、過小に設定されて施設の運営に問題が生じる可能性がある。
 上述のことから、目標電力が過小(節電率が過大)に設定されないように、管理装置10は、目標設定部11に設定された目標電力を評価する目標評価部16を備える。目標評価部16は、施設を問題なく運営するのに最低限必要な消費電力である推奨電力(推奨値)を用い、目標設定部11に設定された目標電力を推奨電力と比較する。目標設定部11に設定された目標電力が推奨電力よりも小さい場合、目標評価部16は、利用者装置60を通して利用者の注意を喚起する。推奨電力は、原則として遠隔管理装置20から与えられるが、利用者装置60から入力してもよい。
 推奨電力は、施設における消費電力の過去の実績やシミュレーションの結果を用いて、施設ごとに推定される。施設を問題なく運営するための環境状態を推定する機能、および消費電力のシミュレーションを行う機能は、後述するように、遠隔管理装置20が備える。
 また、利用者装置60を通して利用者の注意を喚起する技術は、利用者装置60の表示器にコメント文を表示する技術、表示器の背景色を赤色などに変更する技術、ビープ音を発生させる技術などから選択される。管理装置10は、利用者装置60の表示器に情報を表示するために提示制御部17と、表示器に表示する表示内容を格納した提示内容記憶部18とを備える。提示内容記憶部18は、計測装置50から取得した電力と目標設定部11に設定された目標値とを評価部12が比較した結果、目標評価部16による評価の結果など、利用者装置60に表示すべき情報を記憶する。また、提示制御部17は、提示内容記憶部18に記憶された情報を利用者装置60に提示する機能を備える。提示制御部17は、指示部13が負荷機器30に指示した内容も利用者装置60に表示する。
 上述したように、評価部12から指示部13に制御レベルが通知されると、指示部13は制御レベルを制御テーブル14に照合し、制御レベルに応じた負荷機器30の種類および動作を抽出する。ここで、指示部13は、制御レベルが高くなり負荷機器30による消費電力が低減されても目標電力を上回っている場合、施設を運営する上では、それ以上の節電が不可能であると判断し、提示制御部17を通して判断結果を利用者装置60に提示する。また、管理装置10は、指示部13の判断結果を用いて、動作モードを利用者優先モードに変更してもよい。利用者優先モードでは、利用者装置60の操作によって、節電の禁止、あるいは負荷機器30の消費電力の増加が可能になる。すなわち、利用者は、遠隔管理装置20から指示された第1の目標電力(あるいは節電率)を受け入れながらも、設備空間(施設)の実際の環境状態に応じて消費電力を増加させることが可能であるから、納得して節電を行うことになる。
 (遠隔管理装置)
 遠隔管理装置20は、複数台の管理装置10と通信可能であって、それぞれの管理装置10に同じ第1の節電率を通知するために、目標とする節電率が設定される目標指示部21と、管理装置10との間で通信ネットワークNT1を通して通信する通信インターフェイス(図示せず)とを備える。電気事業者などが定めた当日や翌日の節電期間と第1の節電率とは、情報入力部24から目標指示部21に入力され、適宜のタイミングで管理装置10に通知される。
 この構成により、コンビニエンスストアや食品スーパーマーケットのように本部が多数の店舗を管理しているような業態の場合、各店舗の管理装置10に設定する第1の節電率を、店舗を管理する本部の遠隔管理装置20から送信することが可能になる。また、電気事業者などから当日や翌日の特定の日時(時間帯)に節電が要求される場合にも、要求された第1の節電率を本部の遠隔管理装置20から各店舗の管理装置10に送信することができる。
 ところで、管理装置10において第1の節電率を満足するように負荷機器30を動作させるには、管理装置10が配置されている施設の環境条件に応じて、負荷機器30の動作を決定する必要がある。言い換えると、制御テーブル14に登録される制御レベルと負荷機器30の種類および動作との関係を適切に設定しなければならない。
 一方、遠隔管理装置20は、複数台の管理装置10と通信可能であるから、管理装置10ごとの消費電力の履歴を収集することが可能である。また、通信対象である管理装置10が異なる遠隔管理装置20が他に存在している場合には、他の遠隔管理装置20から管理装置10ごとの消費電力の履歴を収集する。
 収集された消費電力の履歴に関するデータは、施設の特性に関する施設情報と関連付けられ、遠隔管理装置20に設けられた情報記憶部22に保存される。すなわち、遠隔管理装置20は、施設ごとの消費電力の履歴に関する大量のデータを、施設の特性に関連付けて保存している。情報記憶部22に保存される情報は、施設の特性に関する施設情報および設定情報を、利用者装置60から管理装置10を通して受け取る。また、情報記憶部22に保存される施設情報および設定情報は、遠隔管理装置20に設けられた情報入力部24から入力することも可能になっている。
 遠隔管理装置20は、施設情報を、施設ごとの消費電力の履歴と併せて管理装置10から取得する。施設情報は、環境情報と設定情報とを含み、環境情報は、設備情報とシーン情報と外部環境情報とを含む。
 設備情報は、施設が存在する地域および施設の用途に関する情報と、施設のサイズに関する情報と、施設に設置されている負荷機器30の種類および電力容量に関する情報とを含む。用途に関する情報は、店舗、オフィスビル、ホテルなどの区分と、売場、事務所などのエリア40の区分とを含む。また、サイズに関する情報は、エリア40の床面積で表される。負荷機器30の種類に関する情報は、照明機器301、空調機器302、冷蔵機器303の別を表す。電力容量に関する情報は、負荷機器30の電力容量がエリア40の床面積で除算されて得られた単位面積当たりの電力容量である電力負荷密度(容量原単位)として情報記憶部22に格納される。なお、エリア40の床面積は容積に代えることが可能であるが、以下では床面積を用いて説明する。
 電力負荷密度は、施設のグレード(優劣)や省エネルギーのための余力を示す情報になる。たとえば、照明機器301の電力負荷密度が大きいエリア40は、照度が高い傾向を表し、照度の低いエリア40に比べると、省エネルギーのための余力が大きいと言える。空調機器302や冷蔵機器303も同様である。食品スーパーマーケットであれば、空調機器302の電力負荷密度は、一般に約110W/mで設計されることが多いが、電力負荷密度が200W/mのであれば、省エネルギーのための余力が大きいと言える。なお、施設のグレードは、主として、エリア40の断熱性能を表す。
 シーン情報は、繁忙時間帯、開散時間帯、営業外時間帯、節電時間帯のように、負荷機器30の動作に影響する環境の情報を表す。すなわち、主として施設に存在する人の数や属性(従業員と来訪者の別)などによる環境の相違を表す。
 外部環境情報は、外気温、湿度、日射量などに関する情報を表す。
 一方、設定情報は、負荷機器30の動作により実現される環境の情報であり、ここでは、照明機器301の設定照度、空調機器302の設定温度、冷蔵機器303の設定温度を表す。
 遠隔管理装置20は、情報記憶部22が記憶しているデータを用いて、管理装置10に設けられた制御テーブル14の内容を生成する。そのため、管理装置10が配置されている施設の施設情報と、情報記憶部22が記憶している施設情報とを比較して所定の評価ルールで類似度を評価する比較部23を備える。管理装置10により管理される負荷機器30が配置された施設の特性は、情報入力部24から比較部23に与えられる。情報入力部24は、キーボードやマウスのような操作部を用いて施設の特性を入力する構成のほか、管理装置10に設けられた利用者装置60から入力された施設の特性を受け付ける構成を備えていてもよい。情報入力部24の機能は後述する。
 比較部23は、情報入力部24から与えられた施設の特性のうちの環境情報をキーに用いて設定情報を抽出する。キーに用いる環境情報が文字で表される場合、キーと一致する情報を含むレコードが抽出される。また、キーに用いる環境情報が電力負荷密度や外気温のように数値で表される場合、負荷機器30の種類ごとに所定の評価ルールによって類似度が評価され、負荷機器30の種類ごとに類似度の高い設定情報が選択される。この処理については後述する。キーに用いる環境情報には、少なくとも、施設の区分、エリア40の区分、電力負荷密度、シーン情報、外気温が含まれていることが望ましい。
 情報記憶部22に記憶されたデータから比較部23が抽出した設定情報が複数存在する場合は、比較部23は、抽出された複数の設定情報を管理装置10に伝送し、利用者装置60に提示することによって、設定情報を利用者に選択させてもよい。
 比較部23は、情報入力部24から与えられたキーに合致するデータが情報記憶部22から抽出できない場合は、管理装置10に通知し、利用者装置60を通して利用者の介入を促す。このとき、利用者装置60には、データを抽出したキーを示し、利用者に一部のキーを除外させることが望ましい。
 情報記憶部22が記憶しているデータから設定情報が抽出できる場合は、類似した環境情報を持つ施設について、熟練者や専門家が設定した設定情報を利用できる。そのため、管理装置10と遠隔管理装置20との間で通信するだけで、特別な知識を持たない利用者であっても、適正な設定情報を簡便に設定することができる。つまり、管理装置10に管理される負荷機器30が配置された施設に適した設定情報を用いて、制御テーブル14の内容を短時間で定めることが可能になる。遠隔管理装置20は、比較部23が抽出したデータに基づいて制御テーブル14の内容である制御データを生成するデータ生成部25を備える。制御テーブル14の内容は、上述したように、制御レベルごとに負荷機器30の動作が対応付けられている。
 ところで、施設ごとの設定内容として管理装置10から収集されるすべての情報を情報記憶部22に保存しても、収集した情報には、熟練者や専門家が設定した設定情報ではない情報も含まれる可能性がある。また、熟練者や専門家が設定した設定情報ではないにもかかわらず、施設において望ましい結果が得られた設定情報が含まれる可能性もある。そこで、情報記憶部22は、管理装置10で選択されている制御データが所定の継続時間(たとえば、1時間)を超えて変更されなかった場合、負荷機器30のこの動作を利用者にとって望ましい状態と判断して記録するようにしてもよい。つまり、情報記憶部22は、利用者が望ましい動作と判断したときの負荷機器30の設定情報を、施設情報とともに格納する。このようにして情報記憶部22に格納された情報は、成功事例となるから、他の施設において再利用される可能性が高くなる。
 遠隔管理装置20は、上述した電気事業者などから通知される第1の節電率を管理装置10に通知する機能、および管理装置10に設けられた制御テーブル14の内容を定める機能のほかに、基準電力を算出する機能を備えている。すなわち、遠隔管理装置20は、管理装置10の目標評価部16に与える基準電力と推奨電力とを定めるエネルギー計算部26を備える。
 エネルギー計算部26は、上述した施設の特性と同様の情報を用いて施設の消費電力をコンピュータシミュレーションにより推定する。すなわち、エネルギー計算部26は、エネルギーシミュレーションを行うアプリケーションプログラムをコンピュータで実行することにより実現される。エネルギーシミュレーションのためのアプリケーションプログラムとしては、TRNSYSやEnergyPlusなどが知られている。
 これらのアプリケーションプログラムを用いるために、エネルギー計算部26に与える施設に関する情報には、施設あるいはエリア40の断熱性能、窓面積、床面積などが含まれる。また、この種の情報には、負荷機器30の電力容量、負荷機器30のエネルギー効率を表す効率情報、照明機器301の設定照度、空調機器302の設定温度、冷蔵機器303の設定温度、負荷機器30の運転時間なども含まれる。さらに、エネルギー計算部26には、管理装置10が配置された地域の外気温、湿度、日射量などの気象情報も与えることが必要である。
 ところで、エネルギー計算部26は、エネルギーシミュレーションのためのアプリケーションプログラムを用いるから、エネルギー計算部26に入力すべき情報(パラメータ)は、200~300種類程度になる。このように多数の情報は、熟練者あるいは専門家でなければ、エネルギー計算部26に与えることが困難である。そのため、遠隔管理装置20は、10種類程度の情報を入力するだけで、エネルギー計算部26に与える200~300種類の情報を自動的に生成するパラメータ推定部27を備える。
 パラメータ推定部27は、遠隔管理装置20が管理装置10と通信することにより利用者が入力した情報と、情報記憶部22に格納された情報とを用いて、エネルギー計算部26に与える情報(パラメータ)を推定する。管理装置10に付設された利用者装置60に入力された情報は、情報入力部24に設けられた保持部に記憶される。保持部が記憶する情報は、床面積、築年数、施設の用途(店舗、オフィスの別など)、地域、営業時間(利用時間帯)、負荷機器30の種類などの施設に関する情報すなわち所要条件となる情報である。なお、パラメータ推定部27に与える情報は、利用者装置60から情報入力部24に入力されるだけではなく、利用者によって情報入力部24に直接入力してもよい。
 一方、パラメータ推定部27が情報記憶部22から抽出して用いる情報は、エリア40ごとに配置された負荷機器30の電力負荷密度、施設のグレード、負荷機器30のエネルギー効率、施設が存在する地域、外気温、湿度、日射量などを含む。さらに、パラメータ推定部27は、営業時間から負荷機器30の運転時間を推定する機能を備える。営業時間から運転時間を推定するには、データテーブルあるいは演算式を用いる。
 上述した管理装置10および遠隔管理装置20と利用者装置60とを用いて施設における消費電力を低減させる動作例を以下に説明する。
 (動作例1)
 以下では、遠隔管理装置20が制御テーブル14の内容を生成する動作と、第1の節電率を達成するために、制御テーブル14を用いて負荷機器30を制御する動作とについて説明する。
 上述したように、遠隔管理装置20は、施設に関する情報が管理装置10から情報入力部24に与えられると、比較部23において、情報入力部24に与えられた情報に対応する情報を情報記憶部22から抽出する。データ生成部25は、比較部23が情報記憶部22から抽出した情報を用いて制御テーブル14の内容を生成し、制御テーブル14の内容を管理装置10の更新部15に伝送する。更新部15は、データ生成部25から受け取った内容を制御テーブル14に書き込む。
 管理装置10から情報入力部24に与えられる情報は、上述したように、設備情報、シーン情報、外部環境情報であって、これらと一致または類似するデータが情報記憶部22から抽出される。したがって、これらの情報の内容を条件とした設定情報が抽出される。抽出された設定情報は、熟練者あるいは専門家が設定した設定情報であるから、データ生成部25は、抽出された設定情報を用いることにより、制御テーブル14の内容を比較的簡単かつ適正に生成する。
 このように、データ生成部25は、過去の設定情報を用いることにより、制御テーブル14の内容を自動的に生成する。なお、制御テーブル14の内容は、利用者装置60を操作すれば利用者が修正することもできる。
 図2に情報記憶部22に格納された情報の一例を示す。図示例は食品スーパーマーケットを想定しており、冷蔵機器303は冷蔵ショーケースを表している。図示例では、(No、エリア、シーン、外気温、空調容量原単位、照明容量原単位、ケース容量原単位、設定温度(空調)、設定照度、設定温度(ケース))の10項目で一組のレコードを構成している。(エリア、空調容量原単位、照明容量原単位、ケース容量原単位)は設備情報、(シーン)はシーン情報、(外気温)は外部環境情報、(設定温度(空調)、設定照度、設定温度(ケース))は設定情報に相当する。(No)はレコードを区別するための番号である。負荷機器30の容量原単位は電力負荷密度で表され、単位はW/mである。また、設定温度の単位は℃であり、設定照度の単位はlxである。なお、図示例において、「ケース」は冷蔵ショーケースの意味である。
 熟練者や専門家は、電力負荷密度を勘案することによりエリア40ごとに節電が可能な余裕の程度を見積もって、負荷機器30の動作を決定している。しかし、一般の利用者にとって、電力負荷密度を勘案して負荷機器30の動作を決定する作業は困難である。本実施形態では、熟練者あるいは専門家が、設備情報、シーン情報、外部環境情報を組合せた条件に対して採用した設定情報を情報記憶部22に格納しているから、この情報を用いることにより、設定情報を簡単かつ適正に設定することができる。
 いま、情報入力部24に、エリア40が売場、シーンが繁忙時間帯、外気温が29℃、空調容量原単位が140W/m、照明容量原単位が26W/m、ケース容量原単位が200W/mという情報が入力されたとする。すなわち、空調機器302は冷房運転を行う場合を想定する。比較部23は、この情報(売場、繁忙、29、140、26、200)をキーとして、情報記憶部22からレコードの抽出を試みる。上述したように、比較部23は、文字(エリア、シーン)で表される条件が一致し、かつ、数値(外気温、空調容量原単位、照明容量原単位、ケース容量原単位)で表される条件が負荷機器30の種類ごとに類似するデータを生成する。
 すなわち、図示例では、「No」が「1」と「3」とのレコードは、売場かつ繁忙時間帯を表しているから、比較部23は、抽出するレコードをこれらの2個のレコードに絞り込む。次に、抽出されたレコードを用いて負荷機器30ごとに、容量原単位と外気温とを用いて類似度を評価し、類似度が高い条件に対応する設定情報を選択することにより、設定情報を決定する。ここに、照明機器301の設定照度については外気温の影響はなく、空調機器302および冷蔵機器303の設定温度については外気温の影響があるから、設定温度を決めるための類似度は外気温を含めて評価する。
 上述した2個のレコードでは、照明機器301の容量原単位は、25W/mと20W/mとであり、情報入力部24から指示された設定照度である26W/mとの類似度は20W/mよりも25W/mのほうが大きいから、「1」のレコードの設定照度である750lxが設定照度として採用される。また、空調機器302の設定温度は「3」のレコードの設定温度である26℃が選択され、冷蔵機器303の設定温度は「1」のレコードの設定温度である5℃が選択される。すなわち、この例では、照明機器301の設定照度は「1」に対応する値が選択され、空調機器302の設定温度は「3」に対応する値が選択され、冷蔵機器303の設定温度は「1」に対応する値が選択される。外気温は「1」のレコードでは28℃であり、「3」のレコードでは30℃であるが、条件が悪いほうの30℃が採用される。したがって、データ生成部25には、(売場、繁忙、30、150、25、200、26、750、5)という情報が引き渡される。
 比較部23が類似度を評価したとき、類似度に実質的に差のない複数の設定情報が抽出された場合には、それぞれの設定情報の平均値が採用される。また、抽出されたレコードが利用された実績回数を情報記憶部22に記憶しておき、比較部23において、利用された実績回数を重みとする重み付き平均値を設定情報として採用してもよい。つまり、比較部23は、情報記憶部22から複数のレコードを抽出した場合、これらのレコードから抽出される設定情報ごとの実績回数に基づき、実績回数が多いほど大きい値になる重み係数を用いて、設定情報の重み付き平均値を算出する。このようにして算出された重み付き平均値を、データ生成部25に与える設定情報とする。また、利用者の効用を考慮する場合、情報記憶部22に記憶させるレコードに利用者名を含めておけば、利用者名をキーに用いて選択するレコードを絞り込むことが可能である。
 ところで、情報入力部24で指定したキーを用いて情報記憶部22からレコードを抽出する際に、入力ミスなどによりキーに不適切な情報が含まれる可能性がある。このような不適切な情報によって情報記憶部22から情報を抽出しようとしても、適切な設定情報を得ることはできない。そのため、情報入力部24は、キーの内容を事前に判定し、適切な情報の範囲から逸脱する場合に、与えられた情報を無効として扱う機能を備えていることが望ましい。情報記憶部22に記憶される情報についても適切な情報の範囲内か否かを評価し、不適切な範囲であれば情報を無効として扱うことが望ましい。
 なお、キーの内容あるいは情報記憶部22に記憶する情報が適切か否かを判断するために、環境情報に含まれる数値の情報(図示例では、外気温および容量原単位)を説明変数とし、設定情報を目的変数とした回帰式を、負荷機器30の種類ごとに作成してもよい。回帰式を用いる場合、環境情報に対して回帰式で推定される設定情報と、比較部23が抽出した設定情報との乖離度が許容範囲を逸脱しているときに、情報を無効として扱うようにすればよい。
 比較部23が定めた情報は、データ生成部25に引き渡され、データ生成部25は、比較部23から引き渡された情報を基準として、制御テーブル14の内容を生成する。したがって、熟練者や専門家が過去に作成した実績のある情報に基づいて新たな制御テーブル14が生成され、熟練者や専門家が作成した制御テーブルに匹敵する制御テーブル14が得られることになる。
 制御テーブル14は、図3に示すように、照明機器301と空調機器302と冷蔵機器303とについて、制御レベルごとに動作の情報が対応付けられている。本実施形態では、制御レベルは「0」~「3」の4段階から選択可能になっている。制御レベル「0」は省エネルギーの対策を行わない制御状態、制御レベル「1」は通常の省エネルギーの制御状態、制御レベル「2」は常習的に我慢できる範囲ではもっとも厳しい制御状態、制御レベル「3」は非日常的に実施される特別に厳しい制御状態である。
 言い換えると、制御レベルは、数値が大きくなるほど、負荷機器30の使用による利便性が低下する制御状態であることを意味する。食品スーパーマーケットでは、制御レベル「0」は、通常運転に近い設定であり、繁忙時間帯に選択される。また、制御レベル「1」は、省エネルギー運転の設定であり、閑散時間帯に選択される。制御レベル「2」は節電のために選択され、制御レベル「3」は、いわゆるデマンドレスポンスであって、電気事業者などから要求される第2の節電率)に応える場合に選択される。つまり、制御レベルはシーン別の設定条件に相当する。
 上述したように、制御テーブル14の内容が決定された管理装置10は、施設の消費電力を計測して監視する。管理装置10に設けられた評価部12は、計測装置50が計測した消費電力と、目標設定部11に設定された目標電力とを比較し、目標電力に対する消費電力の割合に基づいて、判定期間の終了時点で消費電力が目標電力以下であるか否かを予測する。
 評価部12は、判定期間の終了時点での消費電力が目標電力を超えることが予測される場合は、負荷機器30での消費電力が低減されるように、制御レベルを高くする指示を指示部13に与える。一方、評価部12は、判定期間の終了時点での消費電力が目標電力を下回り、かつ目標電力と消費電力との差が所定値以上になることが予測される場合は、負荷機器30の使用による利便性を向上させるように制御レベルを低くする指示を指示部13に与える。
 指示部13は、制御テーブル14に制御レベルを照合することによって、制御レベルに応じた動作状態を負荷機器30に指示する。ここで、評価部12が制御レベル「3」を選択しても、依然として消費電力が目標電力を超えることが予測される場合、利用者装置60を通して一部の負荷機器30の停止を促す内容を利用者に提示する。利用者装置60に提示する内容は提示内容記憶部18から読み出され、提示制御部17を通して利用者装置60に出力される。利用者装置60への出力は、たとえば、「このままではデマンドを超過するので、周囲の負荷機器の運転を停止させてください」という内容の警告を利用者装置60の画面に表示する形式を採用する。また、採用されている制御レベルに応じて緊急度が直観的に理解できるように、複数のキャラクタ(アイコン)を切り替えて利用者装置60の画面に表示してもよい。
 (動作例2)
 動作例1は、利用者装置60から利用者が入力した環境情報に基づいて制御テーブル14の内容を生成する処理を中心として説明した。この動作では、情報記憶部22から比較部23における評価ルールを用いて抽出した情報に基づいて制御テーブル14の内容を生成しているが、生成された内容は検証されていない。
 以下では、データ生成部25が生成した制御テーブル14の内容をエネルギー計算部26に与えてエネルギーシミュレーションを行う動作について説明する。すなわち、遠隔管理装置20は、データ生成部25で生成された制御データ(制御テーブル14の内容)を、施設の環境情報と併せてエネルギー計算部26に入力する。エネルギー計算部26に入力される環境情報は、施設の用途の区分、エリア40の区分、外部環境情報、シーン情報、電力負荷密度、負荷機器30のエネルギー効率のようなエネルギーシミュレーションに必要な情報を含む。エネルギー計算部26は、エネルギーシミュレーションにより、施設の運営上で障害が生じない最低の電力である推奨電力を算出する。
 管理装置10の目標評価部16は、施設を問題なく運営するための環境状態を実現するための最小限の電力である推奨電力を、基準電力と節電率とにより決まる目標電力と比較する。目標評価部16は、目標電力が推奨電力よりも小さい場合には、要求された節電率を実現困難と判断し、利用者装置60を通して利用者の注意を喚起する。利用者装置60により注意を喚起するには、たとえば、利用者装置60の背景画面を青色系から赤色系に変更するか、利用者装置60から報知音を出力するか、利用者装置60に表示するアイコンの形態を変更すればよい。
 実行可能な推奨電力は、電力負荷密度と外気温の1日の最高温度とを説明変数として1日の最大電力を求める回帰式を用いて決定する。この回帰式は、管理装置10により管理される負荷機器30が配置された施設と用途および負荷機器30の構成が類似した施設の情報を情報記憶部22から抽出し、抽出した情報を用いることにより定められる。実際に推奨電力を求めるには、管理装置10が設置された施設において、該当する日の予想最高気温を上述した回帰式に当て嵌めることにより、電力負荷密度の最大値が予測されるから、求められた電力負荷密度の最大値を施設の面積に乗じる。この計算の結果は、該当する施設において該当する日の最大電力と考えられるから、この値が実行可能な推奨電力として用いられる。
 上述のように、エネルギー計算部26は、施設の運営上で支障が生じない推奨電力をエネルギーシミュレーションにより予測して求める。目標評価部16は、利用者装置60を用いて設定した節電率に対応した目標電力と推奨電力とを比較し、目標電力の実現可能性を評価する。上述したように、目標電力が実現困難であれば、提示制御部17が、利用者装置60を通して利用者に注意を喚起するから、利用者は適切な節電率の設定が可能になる。
 また、利用者装置60には、利用者に対して直観的でわかりやすい情報を提供するために、図4に示すように、目標電力に対する現在の消費電力の割合に応じて画面の表示を変更することが望ましい。たとえば、利用者装置60の画面に顔を表すアイコン61を表示しておき、目標電力に対する現在の消費電力に応じてアイコン61の表情を変更する。この例では、アイコン61は、目標電力に対して消費電力(積算値)に余裕があれば(たとえば、80%以下であれば)笑顔を表し、目標電力に対して消費電力が所定の閾値(たとえば、90%)を超えると泣き顔を表すようにすればよい。目標電力に対する現在の消費電力の割合は、目標評価部16が判定する。
 また、目標電力と判定期間とによって傾きが決まる直線を設定し、判定期間の中で、消費電力(積算値)が当該直線の下側である場合に目標達成に近付いていることを示し、消費電力が当該直線の上側である場合に目標達成から遠ざかっていることを示してもよい。つまり、上記直線によって消費電力(積算値)の推移を判定する2領域を判定期間に設定し、消費電力(積算値)が上記直線の上側の領域か下側の領域かに応じてアイコン61の表示を切り替えるようにしてもよい。
 判定期間に設定する直線は複数本であってもよい。上述のように、1本の直線を設定すれば2状態を判断することができる。これに対して、たとえば、目標電力を100%として、目標電力の120%に達する直線と、目標電力の80%に達する直線と、目標電力の100%に達する直線との3本の直線を設定すれば、4状態を判断することができる。アイコン61は、3本の直線で分割された領域ごとに形態を対応付ければよい。また、アイコン61が顔の表情であることは必須ではなく適宜のキャラクタを用いてもよい。なお、アイコン61の形態の概念には、形状だけではなく、サイズや色も含まれる。
 また、上述した判定期間の開始から所定時間が経過した時点(ただし判定期間の終了前)で、目標電力に対する消費電力(積算値)の割合が上記閾値を超えると、判定期間の終了時点で目標電力を超過する可能性があるから、利用者に対して適宜の負荷機器30の動作を制限するように通知する。この通知は、利用者装置60の画面へのメッセージの表示や報知音の出力により行われる。
 以上説明したように、アイコン61の形態を変化させることによって目標電力に対する消費電力の余裕の程度を通知すれば、利用者に直観的にわかりやすい通知が可能になる。なお、図4に示す利用者装置60の画面の下部には、節電率を示す表示部62が設けられている。表示部62は、節電率の下限値(図4の「推奨値」)を破線の四角で表しており、実現されている節電率を実線の四角で表している。
 管理装置10において採用する節電率は、遠隔管理装置20から指示された節電率も考慮する必要がある。そこで、図4に示す例では、利用者装置60の画面に、現在の節電率が管理装置10と遠隔管理装置20とのどちらに設定された節電率かを示す情報が表示されている(図4の「サーバ」は、遠隔管理装置20からの節電率であることを示している)。
 動作例2では、施設責任者が利用者装置60を用いて節電率を設定することを可能にしながらも、遠隔管理装置20から指示された節電率との調節を図るために、管理装置10が管理する負荷機器30の動作状態をフィードバックしている。また、施設責任者のような利用者が利用者装置60から設定した節電率が、施設の運営に支障を与えないように目標電力と消費電力との関係を判断している。このような動作は目標評価部16により行われる。すなわち、目標評価部16は、利用者が設定する節電率と遠隔管理装置20から設定される節電率とのバランスがとれ、施設における節電と運営とが両立されるように、節電率を調節する。
 (動作例3)
 管理装置10の構成として説明したように、管理装置10の目標設定部11は、遠隔管理装置20から指示された節電率に応じた第1の目標電力と、利用者装置60を通して施設責任者のような利用者が設定した節電率に応じた第2の目標電力とが設定される。したがって、第1の目標電力と第2の目標電力とが互いに競合することが考えられる。競合を回避するために、目標設定部11は、第1の目標電力と第2の目標電力との一方を選択する目標選択部114を備えている。以下では、第1の目標電力と第2の目標電力とが競合する場合に目標電力を選択する手順について説明する。
 いま、遠隔管理装置20において電気事業者などからの要請によって、当日や翌日の節電を行う事象が生じたとする。この場合、節電を行う節電期間(日時)と節電率(第1の節電率)とが遠隔管理装置20から所要の管理装置10に指示される。管理装置10は、遠隔管理装置20から第1の節電率を受け取ると、第1の節電率に基づいて第1の目標電力を算出し、第1の目標電力を節電期間と併せて第1の設定部111に保存する。
 一方、施設管理者のような利用者が利用者装置60を用いて節電期間と節電率(第2の節電率)とを入力していると、第2の節電率から第2の目標電力が算出され、第2の目標電力は節電期間と併せて第2の設定部112に保存される。
 目標設定部11は、管理装置10に内蔵された時計部(図示せず)が計時している現在日時を参照し、参照した日時が節電期間でなければ、節電することなく負荷機器30を動作させる。また、目標設定部11は、参照した日時が節電期間であれば、該当する節電期間に応じた第1または第2の目標電力に見合うように負荷機器30を動作させる。
 ここで、第1の設定部111に設定された節電期間と第2の設定部112に設定された節電期間とが重複していると、目標選択部114は、第1の目標電力および第2の目標電力の両方を満足するように、第1の目標電力と第2の目標電力とのうち小さいほうを目標電力として採用する。言い換えると、目標選択部114は、第1の節電率および第2の節電率のうちより大きいほうの節電率を採用する。
 一般に、利用者装置60を用いて設定した第2の節電率は、遠隔管理装置20から要請される第1の節電率よりも小さいと考えられ、施設で用いている負荷機器30の種類によっては、第1の節電率を採用すると運営上の障害が生じることがある。たとえば、食品スーパーマーケットでは、冷蔵あるいは冷凍を要する食品を保存している冷蔵機器303の消費電力を維持しなければ、食品が劣化し、運営に支障をきたすことになる。
 そのため、遠隔管理装置20から要請された第1の節電率が実施される節電期間に、利用者装置60を用いて意図的に小さい第2の節電率が入力された場合、目標選択部114は、運営上の障害があったと判断し、利用者装置60から入力された第2の節電率を優先的に用いる。たとえば、遠隔管理装置20から節電が要請された場合において、利用者装置60により設定された第2の節電率が節電期間の開始前に15%であったのに対して節電期間の開始後に5%に引き下げられた場合、採用される節電率は5%になる。なお、利用者装置60により設定された第2の節電率が節電期間の開始前から0%である場合も、目標選択部114は、節電することが運営上の障害を生じる場合と判断して節電を行わない。
 ただし、利用者装置60により設定される第2の節電率を、つねに優先的に使用させると、第2の節電率が乱用され、遠隔管理装置20から設定する第1の節電率が使用されなくなる可能性がある。そこで、利用者装置60から設定される第2の節電率を遠隔管理装置20から設定される第1の節電率に優先して用いるための許可条件を付しておくことが望ましい。
 許可条件は、たとえば、電気料金の単価を決める判定期間(通常、30分)内での消費電力の積算値が、判定期間について設定された上限値の90%以上に達したこととする。この許可条件は、施設での需要電力(デマンド)がピーク(上限値)に近くなった場合の対応として第2の節電率を用いることを許容する。また、許可条件は、いずれかの冷蔵機器303の庫内温度が所定の基準温度よりも高いことであってもよい。この許可条件は、冷蔵機器303の庫内温度の上昇による食品の劣化を防止する場合の対応として第2の節電率を用いることを許容する。このように許可条件が成立したときにのみ、第1の節電率に優先して第2の節電率を用いることを許容することにより、第2の節電率の乱用が防止される。
 以上説明した動作により、現場運営を任されている施設責任者のような利用者が、施設の運営上、遠隔管理装置20から指示された第1の節電率での節電が難しいと判断した場合には、節電率を引き下げることができる。しかも、許可条件による制約を付加していることにより、社会的要請によって遠隔管理装置20から第1の節電率が設定されているときには、許可条件が成立しなければ利用者が設定した第2の節電率が採用されないようにして、第2の節電率の乱用を抑制することができる。
 (動作例4)
 遠隔管理装置20は、コンピュータシミュレーションによってエネルギーシミュレーションを行うエネルギー計算部26を備えている。施設の規模にもよるが、エネルギー計算部26においてエネルギーシミュレーションを精度よく行うには、200~300種類の情報が必要である。このような多数個の情報を施設に合わせて正しく設定することは、施設管理者のような一般の利用者には困難であって、熟練者や専門家でなければエネルギーシミュレーションを行うことは難しい。
 これに対して本実施形態のエネルギー管理装置は、遠隔管理装置20に設けられたパラメータ推定部27によって少数個の入力情報からエネルギー計算部26での計算に必要な多数個の情報を生成することを可能にしている。つまり、パラメータ推定部27に10個程度の入力情報を与えるだけで、熟練者や専門家ではない利用者でもエネルギーシミュレーションを行うことが可能になっている。
 パラメータ推定部27に与える入力情報は、環境情報のうち利用者が容易に知ることのできる情報である。入力情報は、施設の床面積、施設の築年数、施設の用途の区分、施設が存在する地理上の地域、施設の営業時間、施設に配置された負荷機器30の種類を含む。列挙した入力情報は、必要最小限の情報であり、利用者であれば容易に入手可能である。
 パラメータ推定部27は、入力情報が与えられると、情報記憶部22に格納された種々の情報を参照することにより、エネルギー計算部26での計算に必要な情報を情報記憶部22から収集する。
 情報記憶部22に格納されている情報は、上述したように、エリア40ごとに配置された負荷機器30の電力負荷密度(あるいは電力容量)、エリア40の断熱性能や床面積、負荷機器30ごとのエネルギー効率、施設のグレード、負荷機器30のエネルギー効率、施設が存在する地域、外気温、湿度、日射量などを含む。さらに、パラメータ推定部27は、営業時間から負荷機器30の運転時間を推定する機能を備える。営業時間から運転時間を推定するには、情報記憶部22に格納されたデータテーブルあるいは演算式を用いる。
 情報記憶部22は、冷蔵機器303については、電力容量に代えてサイズ(尺数単位)を用いることが可能である。冷蔵機器303は、業界習慣では尺数単位で表現されることが多く、また、冷蔵機器303の電力容量とエリア40の床面積とは直接的な関係がないから、電力負荷密度を用いるよりも尺数単位を用いるほうが、電力容量の推定精度が高くなる。利用者は、冷蔵機器303について尺度単位を用いる場合、エリア40の間取りから冷蔵機器303の配置される尺数を大まかに推定すればよい。
 すなわち、パラメータ推定部27は、上述した入力情報が与えられると、入力情報を情報記憶部22に格納された各種情報と照合し、入力情報との類似度を評価することによって、エネルギー計算部26に与える情報を推定する。言い換えると、パラメータ推定部27は、少数の入力情報を情報記憶部22に格納された多数の情報と照合することにより、少数個の情報をエネルギー計算部26でのエネルギーシミュレーションに必要な多数個の情報に展開する。
 情報記憶部22は、設備情報として、上述した情報のほかに、天井高さや窓面積率などについて標準的な情報、地理上の地域ごとの壁や窓の断熱性能について標準的な情報などを格納している。したがって、パラメータ推定部27に入力情報として、施設の床面積、施設の築年数、施設の用途の区分、施設が存在する地理上の地域が与えられると、エネルギーシミュレーションに必要な施設の天井高さ、窓面積、断熱性能などの情報を求めることができる。
 また、情報記憶部22は、外気温、湿度、日射量のような外部環境情報を地域ごとに分類して格納しており、パラメータ推定部27は、施設が存在する地域が入力情報として与えられると、外部環境情報を出力する。
 さらに、情報記憶部22には、設備情報、シーン情報、外部環境情報のほかに、負荷機器30に関する設定情報が格納されている。したがって、パラメータ推定部27の入力情報をキーに用いて、設備情報、シーン情報、外部環境情報の検索を行うことによって、施設に相当する負荷機器30の設定情報を抽出することができる。
 なお、パラメータ推定部27は、入力情報に対して情報記憶部22から複数の情報が抽出された場合には、非数値の情報であれば多数決によって情報を絞り込み、数値の情報であれば平均値などを用いる。負荷機器30の運転時間は、施設の営業時間に基づいて情報記憶部22から抽出される。情報記憶部22には、負荷機器30の運転時間について基準値と、営業時間に応じた補正値とが格納されており、パラメータ推定部27は、施設の営業時間が入力情報として与えられると、エリア40ごとに営業時間に応じた負荷機器30の運転時間を算出する。
 たとえば、営業時間が午前8時から午後10時である店舗では、営業時間の開始前1~2時間は開店前の準備時間であり、営業時間の終了後1~2時間は閉店後の後片付け時間になる。ここで、準備時間において、照明機器301は作業可能な程度の照度を確保するように点灯させ、空調機器302は停止させるとすれば、空調機器302の運転時間は営業時間と一致するが、照明機器301は営業時間外の1~2時間は作業に必要な動作状態としなければならない。また、冷蔵機器303は、商品が庫内に収納されている期間には、庫内照明を除いて営業時間とは無関係に運転を継続する必要がある。
 一方、24時間営業の店舗では、営業時間と関係なく来客の少ない夜間(午前0時から午前5時)において、来客が増加する時間帯に向けて商品補充や清掃のような準備を行っている。そのため、照明機器301および空調機器302についても停止させることなく運転を継続すればよい。
 このことから、24時間営業ではない店舗について、営業時間に応じた補正値が情報記憶部22に保存されていれば、パラメータ推定部27は、負荷機器30の運転時間を、施設の営業時間に応じて推定することができる。
 情報記憶部22は、負荷機器30の種類別にエネルギー効率(機器効率)を格納している。エネルギー効率は、たとえば、空調機器302であれば、外気温と機器効率(COP:Coefficient Of Performance)の関係で表されている。したがって、パラメータ推定部27は、施設の地域から外部環境情報を推定すると、外部環境情報に含まれる外気温を用いて機器効率を推定する。
 ところで、パラメータ推定部27は、入力情報からエネルギー計算部26でのエネルギーシミュレーションに必要な情報を推定するから、入力情報の情報量が増加すれば、エネルギー計算部26に与える情報の推定精度が高まる。そのため、エネルギーシミュレーションの知識を有する熟練者や専門家のような利用者であれば、エネルギーシミュレーションの精度を高めるために、多数個の情報をエネルギー計算部26に直接入力しようとすることが考えられる。そこで、エネルギー計算部26は、熟練者や専門家などによって多数個の情報が直接入力されることを許容している。つまり、エネルギー計算部26は、情報入力部24から施設情報に含まれるすべての入力情報が入力されると、パラメータ推定部27で生成されるパラメータを用いることなく、推奨電力を算出する。また、エネルギー計算部26は、推奨電力と併せて基準電力を算出してもよい。
 また、熟練者や専門家により多数個の情報がエネルギー計算部26に直接入力された場合には、情報記憶部22の内容を更新することを可能にしている。たとえば、エネルギー計算部26に対して、床面積が1000mである売場に配置された空調機器302について電力容量が150kWとして直接入力された場合、この空調容量原単位は、150W/mにある。このようにして求められた値は情報記憶部22に格納される。つまり、熟練者や専門家がエネルギー計算部26に直接入力した情報は、情報記憶部22に格納され、パラメータ推定部27による以後の推定に採用される。したがって、情報記憶部22に格納された情報に新たな情報が随時追加される。ここで、追加された情報に対して所定期間前の古い情報を情報記憶部22から削除すれば、情報記憶部22に格納されている情報の陳腐化が防止される。
 パラメータ推定部27が入力情報に基づいてエネルギーシミュレーションに用いる情報を生成すると、エネルギー計算部26は、省エネルギーの目的や効果を制約条件として、エネルギーシミュレーションを行う。このシミュレーションにより、エネルギー計算部26は、入力情報で示された施設に対する目標電力を算出する。
 以上説明した本実施形態に係るエネルギー管理装置は、管理装置10と、遠隔管理装置20とを備える。管理装置10は、複数の負荷機器30が配置された施設において目標とする節電率に応じて複数の負荷機器30の動作を制御する。遠隔管理装置20は、管理装置10と通信し、複数の負荷機器30の動作を制御する制御データを管理装置10に提供する。遠隔管理装置20は、情報記憶部22を備える。情報記憶部22は、施設情報と設定情報とを対応付けた複数のレコードを記憶している。施設情報は、施設の特性に関する情報である。設定情報は、複数の負荷機器30が動作することにより実現される施設の環境の情報である。遠隔管理装置20は、情報記憶部22に記憶されている複数のレコードを用いて、複数の負荷機器30の動作を制御するために必要な情報を生成する。
 本実施形態に係るエネルギー管理装置のように、遠隔管理装置20は、エネルギー計算部26と、情報入力部24と、パラメータ推定部27とをさらに備えることが好ましい。エネルギー計算部26は、施設の運営上で障害が生じない最低の電力である推奨電力をエネルギーシミュレーションによって算出する。情報入力部24は、施設情報に含まれる所要条件が入力情報として入力される。パラメータ推定部27は、情報入力部24から入力された所要条件に類似する施設情報を含むレコードを情報記憶部22から抽出することによりエネルギー計算部26で用いるパラメータを生成する。
 本実施形態に係るエネルギー管理装置のように、エネルギー計算部26は、以下の動作を行うことが好ましい。エネルギー計算部26は、情報入力部24から施設情報に含まれるすべての情報が入力情報として入力されると、パラメータ推定部27で生成されるパラメータを用いることなく、入力情報をパラメータに用いて推奨電力を算出する。
 本実施形態に係るエネルギー管理装置のように、管理装置10は、複数の施設と一対一に対応して複数設けられ、複数の施設の各々に複数の負荷機器30が配置されることが好ましい。この場合、情報記憶部22は、複数の施設の各々に関して、施設情報と設定情報とを対応付けた複数のレコードを記憶する。エネルギー計算部26は、複数の施設のうち着目する施設に関して、推奨電力をエネルギーシミュレーションによって算出する。情報入力部24は、着目する施設に関して、所要条件が入力情報として入力される。エネルギー計算部26は、着目する施設に関して、複数のレコードのうち、情報入力部24から入力された所要条件に類似する施設情報を含むレコードを情報記憶部22から抽出することによりエネルギー計算部26で用いるパラメータを生成する。
 本実施形態に係るエネルギー管理装置のように、遠隔管理装置20は、情報入力部24と、比較部23と、データ生成部25とをさらに備えることが好ましい。情報入力部24は、管理装置10により管理される複数の負荷機器30が配置された施設の施設情報が入力される。比較部23は、複数のレコードのうち、情報入力部24から入力された施設情報と情報記憶部22が記憶している施設情報とが類似すると判断したレコードから設定情報を抽出する。データ生成部25は、比較部23が情報記憶部22から抽出した設定情報を用いて、管理装置10に与える制御データを生成する。
 本実施形態に係るエネルギー管理装置のように、情報記憶部22は、管理装置10が用いている制御データが所定の継続時間を超えて変更されなかった場合に、施設情報とともに設定情報を格納することが好ましい。
 本実施形態に係るエネルギー管理装置のように、情報記憶部22および比較部23は以下の動作を行うことが好ましい。情報記憶部22は、複数のレコードの各々に関して、レコードを比較部23が設定情報の抽出に採用したときの利用の実績回数を記憶する。比較部23は、情報記憶部22から複数のレコードのうちの2以上のレコードを抽出した場合に、2以上のレコードの各々から抽出される設定情報について実績回数を重みとする重み付き平均値を求め、この重み付き平均値をデータ生成部25に設定情報として与える。
 本実施形態に係るエネルギー管理装置のように、情報入力部24は、施設情報および設定情報を、管理装置10に付設され利用者が操作する利用者装置60から受け取ることが好ましい。
 本実施形態に係るエネルギー管理装置のように、情報入力部24は、施設情報と設定情報とを情報記憶部22に入力する機能を有していることが好ましい。
 本実施形態に係るエネルギー管理装置のように、管理装置10は、複数の施設と一対一に対応して複数設けられ、複数の施設の各々に複数の負荷機器30が配置されることが好ましい。この場合、情報記憶部22は、複数の施設の各々に関して、施設情報と設定情報とを対応付けた複数のレコードを記憶している。情報入力部24は、複数の施設のうち着目する施設に関して、施設情報が入力される。比較部23は、着目する施設に関して、複数のレコードのうち、情報入力部24から入力された施設情報と情報記憶部22が記憶している施設情報とが類似すると判断したレコードから設定情報を抽出する。データ生成部25は、着目する施設に関して、比較部23が情報記憶部22から抽出した設定情報を用いて管理装置10に与える制御データを生成する。
 本実施形態に係るエネルギー管理装置のように、遠隔管理装置20は、管理装置10と通信ネットワークNT1を通して通信することが好ましい。
 本実施形態に係る管理装置10は、本実施形態に係るエネルギー管理装置に用いる。
 本実施形態に係る遠隔管理装置20は、本実施形態に係るエネルギー管理装置に用いる。
 本発明を好ましい実施形態によって記述したが、本発明の本来の精神および範囲、すなわち請求の範囲を逸脱することなく、当業者によって様々な修正および変形が可能である。

Claims (13)

  1.  複数の負荷機器が配置された施設において目標とする節電率に応じて前記複数の負荷機器の動作を制御する管理装置と、
     前記管理装置と通信し、前記複数の負荷機器の動作を制御する制御データを前記管理装置に提供する遠隔管理装置とを備え、
     前記遠隔管理装置は、
     前記施設の特性に関する施設情報と、前記複数の負荷機器が動作することにより実現される前記施設の環境の情報である設定情報とを対応付けた複数のレコードを記憶している情報記憶部を備え、
     前記情報記憶部に記憶されている前記複数のレコードを用いて、前記複数の負荷機器の動作を制御するために必要な情報を生成する
     ことを特徴とするエネルギー管理装置。
  2.  前記遠隔管理装置は、
     前記施設の運営上で障害が生じない最低の電力である推奨電力をエネルギーシミュレーションによって算出するエネルギー計算部と、
     前記施設情報に含まれる所要条件が入力情報として入力される情報入力部と、
     前記情報入力部から入力された前記所要条件に類似する前記施設情報を含むレコードを前記情報記憶部から抽出することにより前記エネルギー計算部で用いるパラメータを生成するパラメータ推定部とをさらに備える
     ことを特徴とする請求項1記載のエネルギー管理装置。
  3.  前記エネルギー計算部は、前記情報入力部から前記施設情報に含まれるすべての情報が前記入力情報として入力されると、前記パラメータ推定部で生成されるパラメータを用いることなく、前記入力情報を前記パラメータに用いて前記推奨電力を算出することを特徴とする請求項2記載のエネルギー管理装置。
  4.  前記管理装置は、複数の施設と一対一に対応して複数設けられ、前記複数の施設の各々に前記複数の負荷機器が配置され、
     前記情報記憶部は、前記複数の施設の各々に関して、前記施設情報と前記設定情報とを対応付けた前記複数のレコードを記憶し、
     前記エネルギー計算部は、前記複数の施設のうち着目する施設に関して、前記推奨電力を前記エネルギーシミュレーションによって算出し、
     前記情報入力部は、前記着目する施設に関して、前記所要条件が前記入力情報として入力され、
     前記エネルギー計算部は、前記着目する施設に関して、前記複数のレコードのうち、前記情報入力部から入力された前記所要条件に類似する前記施設情報を含む前記レコードを前記情報記憶部から抽出することにより前記エネルギー計算部で用いる前記パラメータを生成する
     ことを特徴とする請求項2又は3記載のエネルギー管理装置。
  5.  前記遠隔管理装置は、
     前記管理装置により管理される前記複数の負荷機器が配置された前記施設の前記施設情報が入力される情報入力部と、
     前記複数のレコードのうち、前記情報入力部から入力された前記施設情報と前記情報記憶部が記憶している前記施設情報とが類似すると判断したレコードから前記設定情報を抽出する比較部と、
     前記比較部が前記情報記憶部から抽出した前記設定情報を用いて、前記管理装置に与える前記制御データを生成するデータ生成部とをさらに備える
     ことを特徴とする請求項1記載のエネルギー管理装置。
  6.  前記情報記憶部は、前記管理装置が用いている前記制御データが所定の継続時間を超えて変更されなかった場合に、前記施設情報とともに前記設定情報を格納することを特徴とする請求項5記載のエネルギー管理装置。
  7.  前記情報記憶部は、前記複数のレコードの各々に関して、レコードを前記比較部が前記設定情報の抽出に採用したときの利用の実績回数を記憶し、
     前記比較部は、前記情報記憶部から前記複数のレコードのうちの2以上のレコードを抽出した場合に、前記2以上のレコードの各々から抽出される前記設定情報について前記実績回数を重みとする重み付き平均値を求め、この重み付き平均値を前記データ生成部に前記設定情報として与える
     ことを特徴とする請求項5又は6記載のエネルギー管理装置。
  8.  前記情報入力部は、前記施設情報および前記設定情報を、前記管理装置に付設され利用者が操作する利用者装置から受け取ることを特徴とする請求項5~7のいずれか1項に記載のエネルギー管理装置。
  9.  前記情報入力部は、前記施設情報と前記設定情報とを前記情報記憶部に入力する機能を有していることを特徴とする請求項5~8のいずれか1項に記載のエネルギー管理装置。
  10.  前記管理装置は、複数の施設と一対一に対応して複数設けられ、前記複数の施設の各々に前記複数の負荷機器が配置され、
     前記情報記憶部は、前記複数の施設の各々に関して、前記施設情報と前記設定情報とを対応付けた前記複数のレコードを記憶し、
     前記情報入力部は、前記複数の施設のうち着目する施設に関して、前記施設情報が入力され、
     前記比較部は、前記着目する施設に関して、前記複数のレコードのうち、前記情報入力部から入力された前記施設情報と前記情報記憶部が記憶している前記施設情報とが類似すると判断した前記レコードから前記設定情報を抽出し、
     前記データ生成部は、前記着目する施設に関して、前記比較部が前記情報記憶部から抽出した前記設定情報を用いて前記管理装置に与える前記制御データを生成する
     ことを特徴とする請求項5~9のいずれか1項に記載のエネルギー管理装置。
  11.  前記遠隔管理装置は、前記管理装置と通信ネットワークを通して通信することを特徴とする請求項1~10のいずれか1項に記載のエネルギー管理装置。
  12.  請求項1~11のいずれか1項に記載のエネルギー管理装置に用いることを特徴とする管理装置。
  13.  請求項1~11のいずれか1項に記載のエネルギー管理装置に用いることを特徴とする遠隔管理装置。
PCT/JP2013/005543 2012-10-12 2013-09-20 エネルギー管理装置、管理装置、遠隔管理装置 WO2014057614A1 (ja)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP2012227251A JP5945826B2 (ja) 2012-10-12 2012-10-12 エネルギー管理装置、遠隔管理装置
JP2012227254A JP5967541B2 (ja) 2012-10-12 2012-10-12 エネルギー管理装置、管理装置、遠隔管理装置、エネルギー管理方法、プログラム
JP2012-227254 2012-10-12
JP2012-227251 2012-10-12

Publications (1)

Publication Number Publication Date
WO2014057614A1 true WO2014057614A1 (ja) 2014-04-17

Family

ID=50477098

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/005543 WO2014057614A1 (ja) 2012-10-12 2013-09-20 エネルギー管理装置、管理装置、遠隔管理装置

Country Status (1)

Country Link
WO (1) WO2014057614A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020235394A1 (ja) * 2019-05-21 2020-11-26 パナソニックIpマネジメント株式会社 エネルギー管理システムおよびエネルギー管理方法
CN117937522A (zh) * 2024-03-25 2024-04-26 湖北世纪森源电气集团有限公司 电力控制柜的电力节能控制方法、控制柜及存储介质

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005158020A (ja) * 2003-10-30 2005-06-16 Hitachi Ltd エネルギー管理方法,装置及びプログラム
JP2005221163A (ja) * 2004-02-06 2005-08-18 Sanyo Electric Co Ltd シミュレーション装置、シミュレーション方法、データベース装置およびシミュレーションシステム

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005158020A (ja) * 2003-10-30 2005-06-16 Hitachi Ltd エネルギー管理方法,装置及びプログラム
JP2005221163A (ja) * 2004-02-06 2005-08-18 Sanyo Electric Co Ltd シミュレーション装置、シミュレーション方法、データベース装置およびシミュレーションシステム

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020235394A1 (ja) * 2019-05-21 2020-11-26 パナソニックIpマネジメント株式会社 エネルギー管理システムおよびエネルギー管理方法
JPWO2020235394A1 (ja) * 2019-05-21 2020-11-26
JP7270233B2 (ja) 2019-05-21 2023-05-10 パナソニックIpマネジメント株式会社 エネルギー管理システムおよびエネルギー管理方法
CN117937522A (zh) * 2024-03-25 2024-04-26 湖北世纪森源电气集团有限公司 电力控制柜的电力节能控制方法、控制柜及存储介质

Similar Documents

Publication Publication Date Title
JP5979546B2 (ja) エネルギー管理装置、管理装置、プログラム
JP5914860B2 (ja) 管理装置
JP5967541B2 (ja) エネルギー管理装置、管理装置、遠隔管理装置、エネルギー管理方法、プログラム
JP5834252B2 (ja) エネルギー管理装置、プログラム
US20190261067A1 (en) Home intelligence system
US8571717B2 (en) Group management apparatus and group management system
JP5914891B2 (ja) 省エネ評価装置、省エネ評価方法、サーバ装置、プログラム
US20120130924A1 (en) System and method for analyzing energy use
US10319052B2 (en) Information terminal control method and energy conservation support system
JP2011122908A (ja) 分析装置及び計測管理システム
JP2011248568A (ja) エネルギー管理システム
KR20130120865A (ko) 빌딩 에너지 관리 시스템에서의 냉동기 대수 제어 장치 및 방법
WO2014057614A1 (ja) エネルギー管理装置、管理装置、遠隔管理装置
JP5945826B2 (ja) エネルギー管理装置、遠隔管理装置
JP2011106698A (ja) 設備機器制御装置
JP2010108339A (ja) 資源表示システム
JP5360090B2 (ja) 多店舗型施設の設備運用システムとその処理方法とプログラム
KR20150096833A (ko) 양방향 조율 및 순차보상 기반 최대수요전력관리 방법 및 시스템
JP6757915B2 (ja) 情報端末の制御方法および情報システム
JP2021108079A (ja) 資源管理システム、資源管理方法及びプログラム
KR102572325B1 (ko) 다중제어 시나리오에 기반한 건물 에너지 관리정보를 표시하는 방법 및 시스템
JP6919995B2 (ja) デマンドレスポンスにおける電力管理方法および電力管理装置
JP6093292B2 (ja) 行動予測システム、機器制御方法、行動支援方法およびプログラム
Rasmussen et al. Modeling and Performance Simulation of a Retail Store as a Smart Grid Ready Building Muhyiddine Jradi, Henrik Engelbrecht Foldager, Rasmus Camillus Jeppesen, Jakob Hviid

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13845850

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13845850

Country of ref document: EP

Kind code of ref document: A1