WO2014012227A1 - 一种数据连接管理的方法、装置及系统 - Google Patents

一种数据连接管理的方法、装置及系统 Download PDF

Info

Publication number
WO2014012227A1
WO2014012227A1 PCT/CN2012/078810 CN2012078810W WO2014012227A1 WO 2014012227 A1 WO2014012227 A1 WO 2014012227A1 CN 2012078810 W CN2012078810 W CN 2012078810W WO 2014012227 A1 WO2014012227 A1 WO 2014012227A1
Authority
WO
WIPO (PCT)
Prior art keywords
bearer
indication information
policy
data packet
data
Prior art date
Application number
PCT/CN2012/078810
Other languages
English (en)
French (fr)
Inventor
于益俊
于游洋
Original Assignee
华为技术有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to PCT/CN2012/078810 priority Critical patent/WO2014012227A1/zh
Priority to JP2015521930A priority patent/JP5974393B2/ja
Priority to CN201710740601.XA priority patent/CN107453917B/zh
Priority to EP12881209.6A priority patent/EP2876965B1/en
Priority to CN201710740604.3A priority patent/CN107613571B/zh
Priority to CN201280001319.5A priority patent/CN103875302B/zh
Application filed by 华为技术有限公司 filed Critical 华为技术有限公司
Priority to CN201710740485.1A priority patent/CN107659908B/zh
Publication of WO2014012227A1 publication Critical patent/WO2014012227A1/zh
Priority to US14/594,575 priority patent/US9674889B2/en
Priority to US15/495,747 priority patent/US10219316B2/en
Priority to US16/241,357 priority patent/US10743365B2/en
Priority to US16/933,707 priority patent/US11570842B2/en

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/20Manipulation of established connections
    • H04W76/28Discontinuous transmission [DTX]; Discontinuous reception [DRX]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/08Configuration management of networks or network elements
    • H04L41/0893Assignment of logical groups to network elements
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/02Details
    • H04L12/14Charging, metering or billing arrangements for data wireline or wireless communications
    • H04L12/1403Architecture for metering, charging or billing
    • H04L12/1407Policy-and-charging control [PCC] architecture
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04MTELEPHONIC COMMUNICATION
    • H04M15/00Arrangements for metering, time-control or time indication ; Metering, charging or billing arrangements for voice wireline or wireless communications, e.g. VoIP
    • H04M15/66Policy and charging system
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/24Accounting or billing
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/10Connection setup
    • H04W76/11Allocation or use of connection identifiers
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/10Connection setup
    • H04W76/12Setup of transport tunnels
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/30Connection release
    • H04W76/34Selective release of ongoing connections
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/08Configuration management of networks or network elements
    • H04L41/0894Policy-based network configuration management
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04MTELEPHONIC COMMUNICATION
    • H04M15/00Arrangements for metering, time-control or time indication ; Metering, charging or billing arrangements for voice wireline or wireless communications, e.g. VoIP
    • H04M15/82Criteria or parameters used for performing billing operations
    • H04M15/8214Data or packet based
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04MTELEPHONIC COMMUNICATION
    • H04M15/00Arrangements for metering, time-control or time indication ; Metering, charging or billing arrangements for voice wireline or wireless communications, e.g. VoIP
    • H04M15/82Criteria or parameters used for performing billing operations
    • H04M15/8228Session based
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/20Manipulation of established connections
    • H04W76/22Manipulation of transport tunnels

Definitions

  • the present invention relates to the field of communications technologies, and in particular, to a data connection management method, apparatus, and system. Background technique
  • EPS Evolved Packet System
  • 3G UMTS Universal Mobile Telecommunications System
  • 3GPP The 3rd Generation Partnership Project
  • SAE System Architecture Evolution
  • the EPS network provides a data channel for the mobile network, so that the UE (User Equipment) can access the Internet through the EPS network to implement data transmission in the Internet.
  • the EPS network in order to improve the user experience, the EPS network establishes a data channel, that is, a default bearer (UE), in the process of attaching the network to the UE, so that the UE can initiate data immediately after the attachment is completed.
  • UE default bearer
  • EPS network support forever online function is another major feature compared to 3G technology.
  • a method of data connection management including:
  • the user equipment UE acquires the first indication information, where the first indication information is used to indicate that the data connection is closed or opened; the UE transmits the first indication information to the packet data network gateway P-GW, so that the P-GW is configured according to the P-GW.
  • the first indication information stops or initiates data transmission of at least one bearer of the UE.
  • a method of data connection management including:
  • the packet data network gateway P-GW receives the first indication information transmitted by the user equipment UE, where the first indication information is used to indicate that the data connection is closed or opened;
  • a user equipment UE including:
  • An acquiring module configured to obtain first indication information, where the first indication information is used to indicate that the data connection is closed or opened, and the transmission module is configured to transmit the first indication information to the packet data network gateway P-GW, so that the The P-GW stops or starts data transmission of at least one bearer of the UE according to the first indication information.
  • a packet data network gateway P-GW including:
  • a receiving module configured to receive first indication information that is transmitted by the user equipment UE, where the first indication information is used to indicate that the data connection is closed or opened;
  • a control module configured to stop or start data transmission of the at least one bearer of the UE according to the first indication information.
  • the technical solution provided by the embodiment of the present invention is: when the UE performs the closing or opening of the data connection, the UE acquires first indication information used to indicate that the data connection is closed or opened; the UE transmits the first indication Transmitting the information to the P-GW on the network side, so that the P-GW stops or starts data transmission of at least one bearer of the UE according to the first indication information, so that the UE does not have to be "always on", that is, when When the UE is not in the use state, the UE performs a data connection shutdown, and the corresponding network side P-GW also stops data transmission of at least one bearer of the UE, so as to avoid the background caused by the "always on” of the UE.
  • the consumption of data traffic enables the terminal's traffic to be effectively controlled, thereby reducing the user's extra cost.
  • FIG. 1 is a flowchart of an embodiment of a method for data connection management according to an embodiment of the present invention
  • 2 is a flowchart of another embodiment of a data connection management method according to an embodiment of the present invention
  • FIG. 3 is a flowchart of still another embodiment of a data connection management method according to an embodiment of the present invention
  • FIG. 4 is a flowchart of another embodiment of a method for data connection management according to an embodiment of the present invention.
  • FIG. 5 is a flowchart of still another embodiment of a method for data connection management according to an embodiment of the present invention.
  • FIG. 6 is a flowchart of still another embodiment of a method for data connection management according to an embodiment of the present invention.
  • FIG. 7 is a flowchart of still another embodiment of a method for data connection management according to an embodiment of the present invention.
  • FIG. 8 is a flowchart of still another embodiment of a method for data connection management according to an embodiment of the present invention.
  • FIG. 9 is a first schematic structural diagram of an embodiment of a user equipment UE according to an embodiment of the present disclosure.
  • FIG. 10 is a schematic diagram of a second structure of an embodiment of a user equipment UE according to an embodiment of the present disclosure.
  • FIG. 11 is a schematic diagram of a third structure of an embodiment of a user equipment UE according to an embodiment of the present disclosure.
  • FIG. 12 is a fourth schematic structural diagram of an embodiment of a user equipment UE according to an embodiment of the present disclosure.
  • FIG. 13 is a fifth schematic structural diagram of an embodiment of a user equipment UE according to an embodiment of the present disclosure.
  • FIG. 14 is a sixth structural diagram of an embodiment of a user equipment UE according to an embodiment of the present disclosure.
  • FIG. 15 is a first schematic structural diagram of an embodiment of a packet data network gateway P-GW according to an embodiment of the present invention
  • FIG. 16 is a second structure of an embodiment of a packet data network gateway P-GW according to an embodiment of the present invention
  • FIG. 17 is a third schematic structural diagram of a packet data network gateway P-GW according to an embodiment of the present invention
  • FIG. 18 is a schematic diagram of a packet data network gateway P-GW according to an embodiment of the present invention.
  • FIG. 19 is a fifth schematic structural diagram of an embodiment of a packet data network gateway P-GW according to an embodiment of the present invention
  • FIG. 20 is a schematic diagram of a packet data network gateway P-GW according to an embodiment of the present invention
  • FIG. 21 is a seventh structural diagram of an embodiment of a packet data network gateway P-GW according to an embodiment of the present invention
  • FIG. 22 is a system embodiment of data connection management according to an embodiment of the present invention; Schematic diagram of the structure. detailed description
  • FIG. 1 is a flowchart of an embodiment of a data connection management method according to an embodiment of the present invention
  • S101 The UE acquires first indication information, where the first indication information is used to indicate that the data connection is closed or opened.
  • PDN GW Packet Data Network Gateway
  • PDN GW Packet Data Network Gateway
  • a packet data network gateway a packet data network gateway
  • FIG. 2 is a flowchart of another embodiment of a data connection management method according to an embodiment of the present invention.
  • the P-GW receives the first indication information that is transmitted by the UE, where the first indication information is used to indicate that the data connection is closed or opened.
  • S202 The P-GW stops or starts data transmission of at least one bearer of the UE according to the first indication information.
  • the P-GW when the UE performs the closing or opening of the data connection, the P-GW receives the first indication information that is sent by the UE to indicate that the data connection is closed or opened; the P-GW stops according to the first indication information or Transmitting data transmission of at least one bearer of the UE, so that the UE may decide to close or start the data connection according to service requirements or user needs.
  • the data connection is closed, the data packet cannot be transmitted through the mobile network, thus avoiding The background data traffic generates additional charging when consumed by the user.
  • the service is processed by starting the closed data connection.
  • FIG. 3 is a flowchart of another embodiment of a method for data connection management according to an embodiment of the present invention.
  • the UE when the UE closes or opens a data connection, the UE notifies the network by using signaling.
  • the P-GW of the side performs the closing or opening of the data connection.
  • the data connection update request sent by the UE includes the first indication information, where the first indication information is used to indicate that the data connection is closed or opened.
  • the data connection management method includes:
  • the UE acquires first indication information, where the first indication information is used to indicate that the data connection is closed or opened.
  • the UE attached to the EPS network remains attached, and when the UE performs the data connection closed or opened, During processing, the UE acquires first indication information, where the first indication information is used to indicate that the data connection is closed or opened.
  • the UE may be triggered by the user to perform a process of closing or opening the data connection.
  • the user implements a process of the UE performing the closing or opening of the data connection by running or operating an application on the UE, where the application may be the UE self.
  • the application may also be an application that is additionally installed on the UE; the UE acquires the first indication information, and may also be closed by the UE according to the configured policy. Or open the processing of the data connection, for example, when the configured policy is to turn off the data connection when the UE is in standby (such as the screen is closed), and when the data connection is turned on during the non-standby (such as the screen is turned on), the UE performs the closing or opening of the data connection according to the policy. deal with.
  • the UE may further set a first policy to the at least one bearer of the UE according to the first indication information, where the first policy is used to stop or start at least one of the at least one bearer.
  • the first policy is used to stop or start at least one of the at least one bearer.
  • S302 The UE sends a data connection update request to the MME (Mobility Management Entity Mobile Management Entity), where the data connection update request includes the first indication information.
  • MME Mobility Management Entity Mobile Management Entity
  • the UE sends a data connection update request to the MME via an eNB (evolved Node B evolved base station), where the data connection update request may specifically be a service request (Service Request) message or a tracking area update request (TAU ( Tracking area update, tracking area update) Request) Messages, etc.
  • eNB evolved Node B evolved base station
  • TAU Tracking area update, tracking area update
  • the first indication information may be in the form of a data connection update request type in the data connection update request.
  • the data connection update request type may be to close the data connection or enable the data connection.
  • the MME obtains the first indication information from the data connection update request, and sends a modify bearer request to the P-GW by using a S-GW (Serving Gateway, the serving gateway), where the modified bearer request includes the An indication message.
  • S-GW Serving Gateway, the serving gateway
  • the MME receives the data connection update request, obtains the first indication information from the data connection update request, and sends a modify bearer request including the first indication information to the S-GW;
  • the GW forwards the modified bearer request to the P-GW.
  • the modify bearer request may be specifically a Modify Bearer Request message or a Modify Bearer Command message.
  • the modify bearer request may specifically be a Suspend Notification message. Wait.
  • the modify bearer request may specifically be a Resume Notification message or the like.
  • the P-GW obtains the first indication information from the modify bearer request, according to the first indication information. Stop or initiate data transmission of at least one bearer of the UE.
  • the P-GW determines whether to use the PCRF (Policy and Charging Rules Function) according to the preset policy currently adopted by the P-GW.
  • the rule function entity performs a policy update process. Specifically, if the P-GW currently adopts a policy and charging control policy (Policy and Charging Control) policy, the P-GW needs to execute a policy with the PCRF.
  • the update process the P-GW stops or starts the data transmission of the at least one bearer of the UE according to the updated policy; if the P-GW does not currently adopt the dynamic PCC, but adopts the static PCC or does not need according to the operator's policy.
  • the P-GW interacts with the PCC, the P-GW does not need to perform a policy update process with the PCRF, and directly stops or starts data transmission of at least one bearer of the UE according to the first indication information.
  • the performing the policy update process by the P-GW and the PCRF specifically includes:
  • the P-GW sends an IP-CAN (Internet Protocol-Connectivity Access Network) session modification indication (Indication of IP-CAN Session Modification) message to the PCRF, where the IP-CAN session is modified.
  • the indication message includes the first indication information;
  • the PCRF obtains the first indication information from the IP-CAN session modification indication message, performs a corresponding policy update according to the first indication information, and sends an IP-CAN session modification confirmation (Acknowledge of IP-CAN Session Modification) a message to the P-GW; wherein the IP-CAN session modification confirmation message includes the admission control policy after the policy update process. details as follows:
  • the PCRF When the first indication information is used to indicate that the data connection is closed, the PCRF performs an admission control process according to the first indication information, to obtain a first admission control policy, where the first admission control policy is used. Instructing the P-GW to stop data transmission of at least one bearer of the UE; the PCRF sends a first IP-CAN session modification acknowledgement message to the P-GW, where the first IP-CAN session modification acknowledgement
  • the first admission control policy is included in the message.
  • the first admission control policy may specifically be to turn off the traffic flow indication (for example, Gating Control is set to off), or to stop the packet transmission indication.
  • the PCRF When the first indication information is used to indicate that the data connection is initiated, the PCRF performs an admission control process according to the first indication information to obtain a second admission control policy, where the second admission control policy is used. Instructing the P-GW to initiate data transmission of at least one bearer of the UE; the PCRF sends a second IP-CAN session modification acknowledgement message to the P-GW, where the second IP-CAN session modification confirmation
  • the second admission control policy is included in the message.
  • the second admission control policy may specifically be to enable a traffic flow indication (for example, Gating Control is set to on), or to initiate a packet transmission indication.
  • the P-GW After the P-GW and the PCRF perform the policy update process, the P-GW receives the IP-CAN session modification confirmation message, according to the policy update process included in the IP-CAN session modification confirmation message.
  • Post-entry control The policy stops or initiates data transmission of at least one bearer of the UE.
  • the data transmission of the P-GW to stop or start the at least one bearer of the UE according to the first indication information in the step includes:
  • the P-GW stops or starts data transmission of at least one bearer of the UE according to the first indication information
  • the P-GW stops or starts data transmission of at least one bearer of the UE according to the first admission control policy or the second admission control policy;
  • the P-GW stops data transmission of the at least one bearer of the UE according to the first indication information and the first admission control policy; or, the P-GW is configured according to the first indication information and the second
  • the admission control policy initiates data transmission of at least one bearer of the UE.
  • the stopping, by the P-GW, the data transmission of the at least one bearer of the UE further includes:
  • the P-GW stops data transmission on all bearers of the UE
  • the P-GW stops data transmission on a specific bearer of the UE.
  • the P-GW may also perform bearer deletion processing, deleting other bearers of the UE except the default bearer in the at least one bearer, or deleting the default in the at least one bearer. And deleting at least one designated bearer other than the bearer; stopping data transmission of the bearer that is not deleted in the at least one bearer of the UE according to the first indication information. In this way, after the P-GW stops the data transmission of the bearer that is not deleted in the at least one bearer of the UE, if the P-GW subsequently receives the new downlink data packet of the UE, the P-GW may directly discard the data packet.
  • the downlink data packet does not perform the bearer update process or the bearer setup process.
  • the P-GW stops the data transmission of the bearer that is not deleted in the at least one bearer according to the first indication information, and includes: the P-GW is not deleted according to the first indication information.
  • the bearer sets a second policy, where the second policy is used to stop data transmission of at least one of the unremoved bearers; and the P-GW stops the at least one data according to the second policy.
  • Stream data transfer
  • the performing the bearer deletion process by the P-GW includes:
  • the P-GW sends a Delete Bearer Request message to the MME via the S-GW; the MME sends a Deactivate EPS Bearer Context Request message to the UE; Sending a Deactivate EPS Bearer Context Accept message to the MME; the MME sends a Delete Bearer Response (Delete Bearer Response) message to the P-GW via the S-GW to complete the bearer deletion process.
  • a Delete Bearer Response Delete Bearer Response
  • the UE may further receive a delete bearer request initiated by the P-GW, and delete the at least one a part of the bearer in the bearer; the UE sets a second policy to the bearer that is not deleted in the at least one bearer according to the first indication information, where the second policy is used to stop the bearer that is not deleted. Data transmission of at least one service flow; the UE stops data transmission of the at least one service flow according to the second policy.
  • the data transmission that the P-GW initiates the at least one bearer of the UE specifically includes:
  • the P-GW allows data transmission of at least one bearer of the UE. Subsequently, the P-GW may initiate a bearer setup procedure or a bearer update procedure according to the received downlink data packet to complete data transmission of at least one bearer in the downlink. The P-GW forwards when receiving the uplink data packet, and allows a new bearer to be established for the UE.
  • the P-GW starts data transmission of the at least one bearer of the UE according to the first indication information, including:
  • the P-GW sets a third policy to the at least one bearer according to the first indication information, where the third policy is used to start data transmission of at least one service flow in the untagged bearer;
  • the P-GW starts data transmission of the at least one data stream according to the third policy.
  • the P-GW sends a modify bearer response to the MME via the S-GW.
  • the P-GW instructs to stop or start at least one of the UE according to one or both of the first indication information, the first admission control policy, and the second admission control policy.
  • the modified bearer response is sent to the MME via the S-GW to notify the S-GW and the MME, and the P-GW has stopped or started data of at least one bearer of the UE. transmission.
  • the modify bearer response may specifically be a Modify Bearer Response message, an Update Bearer Request message, a Suspend Acknowledge message, or a Resume Acknowledge.
  • S306 The MME sends a data connection update response to the UE.
  • the data connection update response may specifically be a tracking area update receiving (TAU Accept) message
  • the MME sends a data connection update response to the UE by using a tracking area update receiving (TAU Accept) message, and notifies the UE.
  • the P-GW has completed processing of stopping or starting to transmit a data packet of the UE.
  • the MME sends a data connection update response to the eNB by using an initial context setup request message to notify the eNB; the eNB sends a data connection update response by using a radio bearer setup request (Radio Bearer Request) message. And to the UE, notifying the UE that the P-GW has completed processing of stopping or starting to transmit a data packet of the UE.
  • Radio Bearer Request Radio Bearer Request
  • the UE when the UE performs the process of closing the data connection, the UE may stop sending the uplink data packet at any time between the foregoing S302-S306, or may stop the uplink before S302 or after S306. The sending of the packet.
  • the UE performs the process of enabling the data connection, if there is currently an uplink data packet to be sent, Then, the UE needs to send the uplink data packet after S306.
  • the first indication information includes second indication information, where the second indication information is used to indicate that the data connection of the specific service flow is turned off or turned on, that is, the second indication information.
  • the P-GW is configured to perform one or two of the second indication information, the first admission control policy, and the second admission control policy. Instructing to stop or initiate at least one bearer's data transmission for a particular traffic flow of the UE.
  • the first indication information includes the second indication information, that is, the specific information includes the data connection update request type, and the specific The second indication information of the related information of the service flow.
  • the data connection update request type is to close the data connection, or to open the data connection;
  • the related information of the specific service flow indicated by the second indication information includes: the identification information of the specific service flow, the specific service flow Any one or more of the information of the corresponding application.
  • the identification information of the specific service flow includes: one or more of a source IP (Internet Protocol) address, a destination IP address, a source port number, a destination port number, and a protocol type of a specific service flow.
  • the information of the application corresponding to the specific service flow includes any one or more of an application identifier (Application ID), an application name, and an application number.
  • the related information of the specific service flow correspondingly includes a combination of related information of the multiple service flows.
  • the first indication information includes the second indication information, indicating that the data connection of the specific service flow is closed
  • the specific service flow uses a dedicated bearer (Dedicated Bearer) to transmit the data packet
  • the P- The stopping, by the GW, the data transmission of the at least one bearer of the specific service flow of the UE according to the second indication information includes:
  • the P-GW may perform bearer deletion processing to delete the dedicated bearer corresponding to the specific service flow; and the P-GW deletes the UE according to the first indication information and/or the first admission control policy
  • the remaining bearer setting definition policy wherein the defining policy is used to prohibit data transmission of at least one bearer of the specific service flow; wherein "/" in the embodiment of the present invention indicates "or".
  • the bearer remaining after the deletion of the UE includes: a bearer that does not have a TFT (Traffic Flow Template), such as a default bearer, and a dedicated bearer that transmits unclosed service flow data.
  • TFT Traffic Flow Template
  • the defined policy may be a packet filter containing relevant information for the particular traffic flow.
  • the P-GW stops data transmission of at least one bearer of the closed specific service flow indicated by the second indication information on the remaining bearers of the UE according to the setting defining policy.
  • the P-GW may be configured according to the other service flows.
  • Downstream data packet initiation bearer establishment The process or the bearer update process completes the data transmission of at least one bearer of the downlink of the other unclosed service flows.
  • the P-GW sets a defined policy on the bearer remaining after the deletion of the UE, for example, the packet filter including the related information of the specific service flow is set, when the UE performs a specific service start
  • the P-GW updates the qualification policy to cancel related information including the specific service flow to be started, and starts the specific service flow.
  • At least one bearer of data transmission If the UE performs data connection processing for enabling all service flows, the P-GW cancels the qualification policy and initiates data transmission of at least one bearer of all service flows.
  • the above-mentioned update or cancellation of the defined policy may specifically be that the P-GW updates or cancels the qualified policy on the bearer that has set the defined policy, including the default bearer and the dedicated bearer.
  • the UE when the UE performs the closing or opening of the data connection, the UE acquires first indication information for instructing to close or open the data connection; the UE transmits the first indication information to the P-GW on the network side.
  • the P-GW stops data transmission of at least one bearer of the UE according to the first indication information and/or the first admission control policy, or the P-GW according to the first indication information and/or the second
  • the admission control policy initiates data transmission of at least one bearer of the UE, such that the UE does not have to be "always on", that is, when the UE is not in use, the UE performs a close data connection, and the corresponding network
  • the side P-GW also stops data transmission of at least one bearer of the UE, so that the consumption of background data traffic caused by the "always on" of the UE can be avoided, so that the traffic of the terminal can be effectively controlled, thereby saving data traffic.
  • FIG. 4 is a flowchart of another embodiment of a data connection management method according to an embodiment of the present invention.
  • the UE when the UE closes or opens a data connection, the UE notifies the network by using signaling.
  • the P-GW of the side performs the closing or the opening of the data connection.
  • the requesting bearer resource modification message sent by the UE includes the first indication information, where the first indication information is used to indicate that the data connection is closed or opened.
  • the data connection management method includes:
  • S401 The UE acquires the first indication information, where the first indication information is used to indicate that the data connection is closed or opened.
  • the S401 is similar to the S301 in the foregoing embodiment, and is not described here. For details, refer to the related description of S301.
  • S402 The UE sends a request bearer resource modification message to the MME, where the request bearer resource modification message includes the first indication information.
  • the UE sends a request bearer resource modification message to the MME via the eNB, where the request bearer resource modification message includes the first indication information.
  • S403 The MME obtains the first indication information from the request bearer resource modification message, and sends a bearer resource command (Bearer Resource Command) message to the P-GW, where the bearer resource command message includes the First indication information.
  • S404 The P-GW obtains the first indication information from the bearer resource command message, and performs a policy update process according to the first indication information and the PCRF.
  • the P-GW determines whether to use the PCRF (Policy and Charging Rules Function) according to the preset policy currently adopted by the P-GW.
  • the fee rule function entity performs a policy update process. Specifically, if the P-GW currently adopts a dynamic PCC (Policy and Charging Control) policy, the P-GW needs to be executed with the PCRF.
  • the P-GW stops or starts the data transmission of the at least one bearer of the UE according to the updated policy; if the P-GW does not currently adopt the dynamic PCC, but adopts the static PCC or according to the operator's policy, When a policy such as a PCC interaction is required, the P-GW does not need to perform a policy update process with the PCRF, and directly stops or starts data transmission of at least one bearer of the UE according to the first indication information.
  • the process of performing the policy update process by the P-GW and the PCRF is similar to the policy update process in S304 in the foregoing embodiment, and details are not described herein. For details, refer to the related description of S304.
  • S405 The P-GW stops or starts data transmission of at least one bearer of the UE according to the first indication information and/or the admission control policy after the policy update processing received by the P-GW.
  • the P-GW receives an IP-CAN session modification confirmation message sent by the PCRF, according to the
  • the admission control policy after the policy update processing included in the IP-CAN session modification acknowledgement message stops or initiates data transmission of at least one bearer of the UE.
  • the P-GW may stop or start data transmission on all bearers of the UE according to the admission control policy; or the P-GW according to the first indication information and/or the An admission control policy is used to stop data transmission of at least one bearer of the UE; or the P-GW starts data of at least one bearer of the UE according to the first indication information and/or the second admission control policy transmission.
  • the stopping, by the P-GW, the data transmission of the at least one bearer of the UE further includes:
  • the P-GW stops data transmission on all bearers of the UE
  • the P-GW stops data transmission on a specific bearer of the UE.
  • the P-GW may also perform bearer deletion processing, deleting other bearers of the UE except the default bearer in the at least one bearer, or deleting the default in the at least one bearer. And deleting at least one designated bearer other than the bearer; stopping data transmission of the bearer that is not deleted in the at least one bearer of the UE according to the first indication information.
  • the process of performing the bearer deletion process in the P-GW is similar to the process of the bearer deletion process in the method embodiment corresponding to FIG. 3, and details are not described herein. For details, refer to the related description of the foregoing embodiment.
  • the P-GW performs bearer deletion processing, and the UE is deficient in the at least one bearer.
  • the P-GW may also perform a bearer update process, and send the updated settings.
  • the P-GW sends an Update Bearer Request (Update Bearer Request) message to the MME via the S-GW; the MME receives the Update Bearer Request message, and sends an Evolved Packet System (Evolved Packet System) bearer context.
  • Update Bearer Request Update Bearer Request
  • the MME receives the Update Bearer Request message, and sends an Evolved Packet System (Evolved Packet System) bearer context.
  • Evolved Packet System Evolved Packet System
  • the process of the P-GW initiating the data packet transmission of the UE is similar to the processing procedure of the P-GW in the method embodiment corresponding to the method in the embodiment of the present invention, and is not described here. See the related description of the above embodiment.
  • the first indication information includes second indication information, where the second indication information is used to indicate that the data connection of the specific service flow is turned off or turned on, that is, the second indication information.
  • the P-GW is configured to stop or enable the data transmission of the at least one bearer of the specific service flow of the UE according to the first indication information that includes the second indication information.
  • the related description of the second indication information is similar to the second indication information in the method embodiment corresponding to FIG. 3, and details are not described herein. For details, refer to the related description of the foregoing embodiment.
  • the UE when the UE performs the closing or opening of the data connection, the UE acquires first indication information for instructing to close or open the data connection; the UE transmits the first indication information to the P-GW on the network side.
  • the P-GW stops data transmission of at least one bearer of the UE according to the first indication information and/or the first admission control policy, or the P-GW according to the first indication information and/or the second
  • the admission control policy initiates data transmission of at least one bearer of the UE, such that the UE does not have to be "always on", that is, when the UE is not in use, the UE performs a close data connection, and the corresponding network
  • the side P-GW also stops data transmission of at least one bearer of the UE, so that the consumption of background data traffic caused by the "always on" of the UE can be avoided, so that the traffic of the terminal can be effectively controlled, thereby saving data traffic.
  • FIG. 5 is a flowchart of another embodiment of a data connection management method according to an embodiment of the present invention.
  • the UE uses a data packet through a preset channel. Notifying the P-GW on the network side to perform the closing or opening of the data connection; wherein the first designated data packet sent by the UE includes the first finger
  • the first indication information is used to indicate that the data connection is closed or opened.
  • the data connection management method includes:
  • S501 The UE acquires first indication information, where the first indication information is used to indicate that the data connection is closed or opened.
  • S501 is similar to S301 in the foregoing embodiment, and is not described here. For details, refer to the related description of S301.
  • S502 The UE sends the first specified data packet to the P-GW by using a preset channel, where the first designated data packet includes the first indication information.
  • the UE passes a preset channel for performing data connection between the UE and the P-GW, such as a GTP (General Packet Radio Service Tunnel Protocol) channel. (Specifically referred to as a PDP (Packet Data Protocol) channel, or a Bearer), sending a first designated data packet to the P-GW, where the first designated data packet includes the The first indication information is used to indicate that the data connection is closed or opened.
  • a GTP General Packet Radio Service Tunnel Protocol
  • PDP Packet Data Protocol
  • Bearer a PDP (Packet Data Protocol) channel, or a Bearer
  • the P-GW acquires the first indication information from the first designated data packet, and stops or starts data transmission of at least one bearer of the UE according to the first indication information.
  • the P-GW receives the first designated data packet, and obtains the first indication information from the first designated data packet; then the P-GW stops according to the first indication information or And activating the data transmission of the at least one bearer of the UE, where the optional P-GW stops or starts at least one bearer of the UE according to the first indication information.
  • the process of data transmission is similar to that of S304 in the foregoing embodiment, and details are not described herein. For details, refer to the related description of S304.
  • the P-GW may also perform a bearer deletion process and a bearer update process.
  • a bearer deletion process may also perform a bearer update process.
  • the first indication information includes second indication information, where the second indication information is used to indicate that the data connection of the specific service flow is turned off or turned on, that is, the second indication information.
  • the P-GW is configured to stop or enable the data transmission of the at least one bearer of the specific service flow of the UE according to the first indication information that includes the second indication information.
  • the related description of the second indication information is similar to the second indication information in the method embodiment corresponding to FIG. 3, and details are not described herein. For details, refer to the related description of the foregoing embodiment.
  • the UE when the UE performs the data connection to be closed or enabled, the UE acquires first indication information for instructing to close or open the data connection; the UE transmits the first indication information to the network side by using a preset channel.
  • a P-GW the P-GW stops data transmission of at least one bearer of the UE according to the first indication information and/or the first admission control policy, or the P-GW according to the first indication information and / or a second admission control policy initiates data transmission of at least one bearer of the UE, such that the UE does not have to be "always on", that is to say when the UE is not in use
  • the UE performs the data connection shutdown, and the corresponding network-side P-GW also stops the data transmission of the at least one bearer of the UE, so as to avoid the consumption of the background data traffic caused by the "always on" of the UE, so that the terminal
  • the traffic can be effectively controlled, which in turn saves data traffic and user extra costs, and also enhances the user
  • FIG. 6 is a flowchart of another embodiment of a data connection management method according to an embodiment of the present invention.
  • the UE when a UE closes or opens a data connection, the UE adopts a data packet through a preset channel. The way to notify the P-GW on the network side to perform the closing or opening of the data connection.
  • the second designated data packet sent by the UE is specifically the first indication information, where the second designated data packet is used to indicate that the data connection is closed or opened; when the destination address of the second designated data packet is the first preset When the value, and/or the destination port number is the second preset value, the second designated data packet is specifically used to indicate that the data connection is closed; when the destination address of the second designated data packet is the third preset value, and The second designated data packet is specifically used to enable the data connection when the destination port number is the fourth preset value.
  • the data connection management method includes:
  • S601 The UE acquires a second designated data packet, where the second designated data packet is used to indicate that the data connection is closed or opened.
  • the second designated data packet is specifically the first indication information, where the first indication information, that is, the second designated data packet is used to indicate that the data connection is closed or opened.
  • the UE attached to the EPS network remains in the attached state.
  • the UE performs the process of turning off or enabling the data connection
  • the UE acquires the second designated data packet, where the destination address of the second designated data packet is the first.
  • the second designated data packet is specifically used to indicate that the data connection is closed; when the destination address of the second designated data packet is the third preset value
  • the second designated data packet is specifically used to enable the data connection.
  • the UE may be triggered by the user to perform a process of closing or opening the data connection.
  • the user implements a process of the UE performing the closing or opening of the data connection by running or operating an application on the UE, where the application may be the UE self.
  • the application (for example, the UE operating system comes with software or function) may also be an application that is additionally installed on the UE; the UE acquires the first indication information, and may also be closed by the UE according to the configured policy.
  • the UE performs the closing or opening of the data connection according to the policy. deal with.
  • the UE may further set a first policy to the at least one bearer of the UE according to the first indication information, where the first policy is used to stop or start at least one of the at least one bearer.
  • the first policy is used to stop or start at least one of the at least one bearer.
  • the UE sends the second designated data packet to the P-GW by using a preset channel.
  • the UE sends a second designated data packet to the P-GW through a preset channel for performing data connection between the UE and the P-GW, such as a GTP channel.
  • the second designated data packet implements an indication of closing or opening the data connection according to a corresponding value of its destination address and/or destination port number.
  • the P-GW acquires the data connection information according to the destination address and/or the destination port number of the second designated data packet, and stops or starts the UE according to the closing or starting the data connection information. At least one bearer of data transmission.
  • the second designated data packet corresponds to closing the data connection
  • the P-GW acquires the closed data connection information according to the destination address and/or the destination port number of the second designated data packet, where the P-GW stops the data of the at least one bearer of the UE according to the closed data connection information. transmission.
  • the second designated data packet corresponds to the open data connection
  • the P- The GW acquires the start data connection information according to the destination address and/or the destination port number of the second designated data packet, and the P-GW starts data transmission of the at least one bearer of the UE according to the start data connection information.
  • the data transmission process of the at least one bearer of the UE is similar.
  • the function and function of the data connection information for shutting down or starting the data are the same as the first indication information in the method embodiment corresponding to FIG. The effect is similar to the function.
  • the P-GW may further perform a bearer deletion process and a bearer update process.
  • a bearer deletion process may further perform a bearer deletion process and a bearer update process.
  • the second designated data packet includes second indication information, where the second indication information is used to indicate that the data connection of the specific service flow is closed or enabled; correspondingly, the P The GW stops or starts at least one bearer data transmission of the specific service flow of the UE according to the second designated data packet.
  • the related description of the second indication information is similar to the second indication information in the method embodiment corresponding to FIG. 3, and details are not described herein. For details, refer to the related description of the foregoing embodiment.
  • the UE when the UE performs the closing or opening of the data connection, the UE acquires a second specified data packet for instructing to close or open the data connection, where the second designated data packet may specifically be the first indication information; Transmitting, by the preset channel, the second designated data packet to the P-GW of the network side, where the P-GW stops or starts data transmission of at least one bearer of the UE according to the second designated data packet, where The UE does not have to be "always on", that is, when the UE is not in use, the UE performs a close data connection, and the corresponding network side P-GW also stops the The data transmission of at least one bearer of the UE can avoid the consumption of background data traffic caused by the "always on" of the UE, so that the traffic of the terminal can be effectively controlled, thereby saving data traffic and additional cost for the user, and also improving The user experience.
  • FIG. 7 is a flowchart of another embodiment of a data connection management method according to an embodiment of the present invention.
  • the UE when a UE closes or opens a data connection, the UE adopts a data packet through a preset channel.
  • the data connection management method includes:
  • the UE acquires the first indication information, where the first indication information is used to indicate that the data connection is closed or opened.
  • the S701 is similar to the S301 in the foregoing embodiment, and is not described here. For details, refer to the related description of S301.
  • S702 The UE sends the first designated data packet to the AS/AF by using a preset channel, where the first specified data packet includes the first indication information.
  • the UE sends the first designated data packet to the P-GW through a preset channel, such as a GTP channel, between the UE and the P-GW that is used for data connection, and then The P-GW forwards the first designated data packet to the AS/AF; wherein the first designated data packet includes the first indication information, where the first indication information is used to indicate that the data connection is closed or opened.
  • a preset channel such as a GTP channel
  • the AS/AF obtains the first indication information from the first designated data packet, and performs an application service information update process according to the first indication information and the PCRF.
  • the AS/AF receives the first designated data packet, and obtains the first indication information from the first designated data packet, where the first indication information is used to indicate that the data connection is closed or opened.
  • the AS/AF performs an application service information update process according to the first indication information and the PCRF. Specifically, the AS/AF updates the service information in the service session according to the first indication information, if the first indication The information indicates that the data connection is closed, and the AS/AF updates the service information to not include any service information or invalidate all service information; if the first indication information indicates that the data connection is enabled, the AS/ The AF updates the service information to include the UE and the AS/AF related service information or to make the existing service information valid.
  • the AS/AF sends a modified session information request message including the updated service information to the PCRF, so that the PCRF performs a policy update process according to the updated service information, so that the P-GW performs a process of closing or opening the data connection.
  • the PCRF sends a policy and charging rule update message to the office after executing the application service information update process.
  • the P-GW wherein the policy and charging rule update message includes an admission control policy for closing or opening a data connection.
  • the update completion response may be sent to the above, and after the PCRF executes the application service information update process, the policy and charging rules are updated (Policy and Charging Rules).
  • Policy and Charging Rules a provisioning message to the P-GW, where the policy and charging rule update message includes an admission control policy for closing or opening the data connection, and the specific processing may be implemented by referring to the method corresponding to FIG. 3 and FIG. The related description of the example will not be described here.
  • S705 The P-GW stops or starts at least one carried data transmission of the UE according to the policy and charging rule update message.
  • the P-GW shuts down or starts data transmission of at least one bearer of the UE according to the corresponding admission control policy in the policy and charging rule update message.
  • FIG. 3 and FIG. 4 related descriptions of method embodiments, which are not described herein again.
  • the P-GW may also perform a bearer deletion process and/or a bearer update process.
  • a bearer deletion process and/or a bearer update process.
  • the P-GW may further send a Policy and Charging Rules Ack message to the PCRF to notify the PCRF.
  • the P-GW has received the policy and charging rule update message.
  • the first indication information includes second indication information, where the second indication information is used to indicate that the data connection of the specific service flow is turned off or turned on, that is, the second indication information.
  • the AS/AF updates the service information according to the specific service flow information in the second indication information, specifically, when the second indication information is used to indicate that the specific information is turned off.
  • the AS/AF updates the service information to not include the service information of the specific service flow or invalidate the service information of the specific service flow; if the second indication information Instructing to open a data connection of a specific service flow, the AS/AF updates the service information to include service information of the specific service flow or validate service information of the specific service flow.
  • the AS/AF sends a modified session information request message including the updated service information to the PCRF, so that the PCRF performs a policy update process according to the updated service information, to obtain a first admission control policy or a second admission control policy.
  • the P-GW In order for the P-GW to perform the process of turning off or turning on the data connection.
  • the P-GW stops data transmission of at least one bearer of the specific service flow of the UE according to the first indication information and/or the first admission control policy, or the P-GW according to the first indication information
  • a second admission control policy initiates data transmission of at least one bearer for a particular traffic flow of the UE.
  • the UE when the UE performs the data connection to be closed or enabled, the UE acquires first indication information for instructing to close or open the data connection; the UE transmits the first indication information to the network side by using a preset channel.
  • AS/AF causing the AS/AF to perform corresponding processing of turning off or turning on the data connection, thereby causing the P-GW on the network side to stop or start data transmission of at least one bearer of the UE, so that the UE does not have to be " "Only online", that is to say, when the UE is not in the use state, the UE performs a close data connection, and the corresponding network side P-GW also stops data transmission of at least one bearer of the UE, so that the UE can be avoided.
  • FIG. 8 is a flowchart of another embodiment of a method for data connection management according to an embodiment of the present invention.
  • the UE uses a data packet through a preset channel.
  • the second designated data packet sent by the UE is specifically the first indication information, where the second designated data packet is used to indicate that the data connection is closed or opened; when the destination address of the second designated data packet is the first preset When the value, and/or the destination port number is the second preset value, the second designated data packet is specifically used to indicate that the data connection is closed; when the destination address of the second designated data packet is the third preset value, and The second designated data packet is specifically used to enable the data connection when the destination port number is the fourth preset value.
  • the data connection management method includes:
  • S801 The UE acquires a second designated data packet, where the second designated data packet is used to indicate that the data connection is closed or opened.
  • S801 is similar to the S601 in the foregoing embodiment, and is not described here. For details, refer to the related description of S601.
  • S802 The UE sends the second designated data packet to the AS/AF through a preset channel.
  • the UE sends a second designated data packet to the P-GW through a preset channel between the UE and the P-GW for performing data connection, such as a GTP channel, and then And the P-GW forwards the first designated data packet to the AS/AF, where the second designated data packet implements an indication of closing or opening the data connection according to a corresponding value of the destination address and/or the destination port number.
  • the AS/AF acquires the closed or opened data connection information according to the destination address and/or the destination port number of the second designated data packet, and performs an application service information update process according to the closing or opening the data connection information and the PCRF.
  • the second designated data packet corresponds to closing the data connection
  • the AS/AF is according to the second specified number Obtaining the closed data connection information according to the destination address and/or the destination port number of the packet;
  • the second designated data packet corresponds to the open data connection, and the AS/ The AF obtains the startup data connection information according to the destination address and/or the destination port number of the second specified data packet;
  • the process of the AS/AF performing the application service information update process according to the closing or starting the data connection information and the PCRF is similar to the process of performing the application service information update process according to the first indication information and the PCRF according to the S703 in the foregoing embodiment.
  • the functions and functions of the data connection information for shutting down or starting the data are similar to the functions and functions of the first indication information in the method embodiment corresponding to FIG. 7.
  • the PCRF generates a policy and charging rule update message after performing the application service information update process, and sends the policy and charging rule update message to the P-GW.
  • S804 is similar to S704 of the foregoing embodiment, and is not described here. For details, refer to the related description of S704.
  • S805 The P-GW stops or starts at least one carried data transmission of the UE according to the policy and charging rule update message.
  • the S805 is similar to the S705 in the foregoing embodiment, and is not described here. For details, refer to the related description of S705.
  • the P-GW may also perform a bearer deletion process and/or a bearer update process.
  • a bearer deletion process and/or a bearer update process.
  • the second designated data packet includes second indication information, where the second indication information is used to indicate that the data connection of the specific service flow is closed or enabled; correspondingly, the P - stopping, by the GW, the data transmission of the at least one bearer of the specific service flow of the UE according to the second designated data packet and/or the first admission control policy, or the P-GW according to the second designated data packet and/or the The second admission control policy initiates data transmission of at least one bearer of the specific service flow of the UE.
  • the related description of the second indication information is similar to the second indication information of the method embodiment corresponding to FIG. 3, and details are not described herein. For details, refer to the related description of the foregoing embodiment.
  • the UE may select to send only the second designated data packet to the specific AS/AF, or may separately send the second designated data packet to the multiple AS/AF, and receive the second designated data packet.
  • the AS/AF of the package performs subsequent processing.
  • the UE may send the second indication information only to the AS/AF corresponding to the specific service flow.
  • the UE when the UE performs the closing or opening of the data connection, the UE acquires a second specified data packet for instructing to close or open the data connection, where the second designated data packet may specifically be the first indication information;
  • the UE transmits the second designated data packet to the AS/AF on the network side through the preset channel, so that the AS/AF performs the corresponding processing of turning off or turning on the data connection, thereby stopping or starting the P-GW on the network side.
  • FIG. 9 is a first schematic structural diagram of an embodiment of a user equipment UE according to an embodiment of the present invention.
  • the obtaining module 901 is configured to obtain first indication information, where the first indication information is used to indicate that the data connection is closed or opened.
  • the transmitting module 902 is configured to transmit the first indication information to the packet data network gateway P-GW, so that the P-GW stops or starts data transmission of at least one bearer of the UE according to the first indication information.
  • the obtaining module 901 can be specifically referred to the related descriptions of S101 and S301.
  • the functions of the obtaining module 901 and the transmitting module 902 may be specifically implemented by the first processor.
  • the UE may further include: on the basis of the acquiring module 901 and the transmission module 902,
  • a setting module configured to set a first policy to the at least one bearer according to the first indication information, where the first policy is used to stop or start data transmission of at least one service flow in the at least one bearer.
  • a transmission control module configured to stop or start data transmission of the at least one service flow according to the first policy.
  • the UE may further include: on the basis of the acquiring module 901 and the transmission module 902,
  • a deleting module configured to receive a delete bearer request initiated by the P-GW, and delete a partial bearer in the at least one bearer.
  • a policy setting module configured to set, according to the first indication information, a second policy for a bearer that is not deleted in the at least one bearer, where the second policy is used to stop at least the unremoved bearer Data transfer of a business flow.
  • And stopping the transmission module configured to stop data transmission of the at least one service flow according to the second policy.
  • the deleting module For details about the functions of the deleting module, the policy setting module, and the stopping transmission module, refer to the related description of S304.
  • the functions of the setting module, the transmission control module, the deletion module, the policy setting module, and the stop transmission module may all be implemented by a second processor in the processor.
  • the transmission module 902 includes: a first sending unit 9021, as shown in FIG. 10 is a schematic diagram of a second structure of an embodiment of a user equipment UE according to an embodiment of the present invention
  • the first sending unit 9021 is configured to send a service request message, a tracking area update request message, or request a bearer resource modification message to the mobility management entity MME, and enable the MME to trace the area update request message or the request from the service request message. Acquiring the first indication information in the bearer resource modification message and transmitting the first indication information to the P-GW via the serving gateway S-GW.
  • the function of the first sending unit 9021 can be specifically implemented by using a first transmitter.
  • the transmission module 902 includes: a second sending unit 9022, as shown in FIG. 11, FIG. 11 is a schematic diagram of a third structure of an embodiment of a user equipment UE according to an embodiment of the present invention
  • the second sending unit 9022 is configured to send the first specified data packet to the P-GW by using a preset channel, where the first designated data packet includes the first indication information.
  • the function of the second sending unit 9022 can be specifically implemented by using a second transmitter.
  • the transmission module 902 includes: a third sending unit 9023, as shown in FIG. 12, FIG. 12 is a fourth structural diagram of an embodiment of a user equipment UE according to an embodiment of the present invention.
  • the third sending unit 9023 is configured to send the first designated data packet to the P-GW by using a preset channel, and trigger the P-GW to forward the first designated data packet to the application server AS/application function entity AF. And causing the AS/AF to acquire the first indication information from the first designated data packet, and execute an application service information update process according to the first indication information and a policy and charging rule function entity PCRF, where the PCRF After the application service information update process is executed, the policy and charging rule update message is sent to the P-GW, so that the P-GW stops or starts data transmission of at least one bearer of the UE according to the policy and charging rule update message.
  • the policy and charging rule update message includes an admission control policy for closing or opening the data connection.
  • the function of the third sending unit 9023 can be specifically implemented by using a third transmitter.
  • the transmission module 902 includes: a fourth sending unit 9024 or a fifth sending unit 9025.
  • FIG. 13 is a fifth embodiment of a user equipment UE according to an embodiment of the present invention.
  • the fourth sending unit 9024 is configured to send the second designated data packet to the P-GW by using a preset channel, so that the P-GW is configured according to a destination address of the second designated data packet.
  • the destination port number is used to obtain the data connection information, and the data transmission of the at least one bearer of the UE is stopped according to the data connection information, wherein the destination address of the second designated data packet is a first preset value, and / or the destination port number is the second preset value;
  • the fifth sending unit 9025 is configured to send the second designated data packet to the P-GW by using a preset channel, And causing the P-GW to acquire start data connection information according to the destination address and/or the destination port number of the second designated data packet, and start data transmission of at least one bearer of the UE according to the start data connection information, where
  • the destination address of the second designated data packet is a third preset value, and/or the destination port number is a fourth preset value.
  • the function of the fourth sending unit 9024 may be specifically implemented by using a fourth transmitter, and the function of the fifth sending unit 9025 may be specifically implemented by using a fifth transmitter.
  • the transmission module 902 includes: a sixth sending unit 9026 or a seventh sending unit 9027.
  • FIG. 14 is a sixth embodiment of a user equipment UE according to an embodiment of the present invention.
  • the sixth sending unit 9026 is configured to send a second designated data packet to the P-GW by using a preset channel, and trigger the P-GW to forward the second designated data packet to the AS/AF, so that And the AS/AF acquires the closed data connection information according to the destination address and/or the destination port number of the second designated data packet, and performs an application service information update process according to the closed data connection information and the PCRF, where the PCRF executes the application.
  • the policy and charging rule update message is sent to the P-GW, so that the P-GW stops data transmission of at least one bearer of the UE according to the policy and charging rule update message;
  • the charging rule update message includes an admission control policy for closing the data connection; wherein the destination address of the second designated data packet is a first preset value, and/or a destination port The number is the second preset value;
  • the seventh sending unit 9027 is configured to send a second designated data packet to the P-GW by using a preset channel, and trigger the P-GW to forward the second designated data packet to the AS/AF, so that the AS And the AF obtains the startup data connection information according to the destination address and/or the destination port number of the second designated data packet, and executes an application service information update process according to the startup data connection information and the PCRF, where the PCRF performs the application service information update.
  • the P-GW sends a policy and charging rule update message to the P-GW after the process, so that the P-GW starts data transmission of at least one bearer of the UE according to the policy and charging rule update message; wherein the policy and charging The rule update message includes an admission control policy for starting a data connection; wherein the destination address of the second designated data packet is a third preset value, and/or the destination port number is a fourth preset value.
  • the function of the sixth sending unit 90264 may be specifically implemented by a sixth transmitter, and the function of the seventh sending unit 9027 may be specifically implemented by using a seventh transmitter.
  • the UE when the UE performs the closing or opening of the data connection, the UE acquires first indication information for instructing to close or open the data connection; the UE transmits the first indication information to the P-GW on the network side. , making the P-GW Stopping or starting data transmission of at least one bearer of the UE according to the first indication information, so that the UE does not have to be "always on", that is, when the UE is not in the use state, the UE performs shutdown data.
  • the network-side P-GW also stops the data transmission of the at least one bearer of the UE, so as to avoid the consumption of background data traffic caused by the "always on" of the UE, so that the traffic of the terminal can be effectively controlled.
  • FIG. 15 is a first schematic structural diagram of an embodiment of a packet data network gateway P-GW according to an embodiment of the present invention.
  • the P-GW includes:
  • the receiving module 101 is configured to receive first indication information that is transmitted by the user equipment UE, where the first indication information is used to indicate that the data connection is closed or opened.
  • the control module 102 is configured to stop or start data transmission of at least one bearer of the UE according to the first indication information.
  • the functions of the receiving module 101 and the control module 102 can refer to the related descriptions of S201 and S202, respectively.
  • the functions of the receiving module 101 and the control module 102 may be specifically implemented by a third processor.
  • the receiving module 101 includes: a first receiving unit 1011, as shown in FIG.
  • FIG. 16 is a schematic diagram of a second structure of a packet data network gateway P-GW according to an embodiment of the present invention.
  • the first receiving unit 1011 is configured to receive first indication information that is sent by the mobility management entity MME via the serving gateway S-GW, where the first indication information is sent by the UE through a service request message, a tracking area update request message, or a request
  • the bearer resource modification message is sent to the MME, and the first indication information is obtained by the MME from the service request message, the tracking area update request message, or the request bearer resource modification message.
  • the function of the first receiving unit 1011 can be specifically referred to the related descriptions of S304 and S404.
  • the function of the first receiving unit 1011 can be specifically implemented by using a first receiver.
  • the P-GW includes a receiving module 101 and a control module 102, and further includes: a response sending module 103, as shown in FIG. 17, FIG. 17 is a schematic diagram of an embodiment of the present invention.
  • FIG. 17 is a schematic diagram of an embodiment of the present invention.
  • the response sending module 103 is configured to: when the first indication information is sent by the UE to the MME by using a service request message or a tracking area update request message, the P-GW stops or starts according to the first indication information. After the data transmission of the at least one bearer of the UE, sending a modify bearer response to the MME via the S-GW, causing the MME to send a data connection update response to the UE according to the modified bearer response, to notify the UE of the P- The GW has stopped or initiated data transmission of at least one bearer of the UE.
  • the function of the response sending module 103 can be specifically referred to the related description of S305-S306.
  • the function of the response sending module 103 can be specifically implemented by using a fourth processor.
  • the receiving module 101 includes: a second receiving unit 1012, as shown in FIG. 18, FIG. 18 is a fourth structural diagram of an embodiment of a packet data network gateway P-GW according to an embodiment of the present invention. ;
  • the second receiving unit 1012 is configured to receive a first specified data packet that is transmitted by the UE by using a preset channel, where the first designated data packet includes first indication information.
  • the function of the second receiving unit 1012 can be specifically implemented by using a second receiver.
  • control module 102 includes:
  • a first control unit configured to perform a policy update process according to the first indication information and the policy and charging rule function entity PCRF, and receive the admission control policy after the policy update process sent by the PCRF, according to the An indication information and/or the admission control policy stops or initiates data transmission of at least one bearer of the UE.
  • the function of the first control unit may be specifically implemented by using a fifth processor.
  • the receiving module 101 includes: a third receiving unit 1013.
  • the control module 102 includes a first forwarding unit 1021 and a second control unit 1022, as shown in FIG.
  • FIG. 1 A fifth structural diagram of an embodiment of a packet data network gateway P-GW provided by an embodiment of the invention.
  • the third receiving unit 1013 is configured to receive a first designated data packet that is transmitted by the UE by using a preset channel, where the first designated data packet includes first indication information.
  • the first forwarding unit 1021 is configured to forward the first designated data packet to the application server AS/application function entity AF, so that the AS/AF obtains the first indication information from the first designated data packet. And performing an application service information update process according to the first indication information and the PCRF.
  • the second control unit 1022 is configured to receive a policy and charging rule update message generated by the PCRF after the application service information update process, and stop or start the UE according to the policy and charging rule update message. At least one bearer data transmission; wherein the policy and charging rule update message includes an admission control policy for closing or opening the data connection.
  • the function of the third receiving unit 1013 may be specifically implemented by using a third receiver.
  • the functions of the first forwarding unit 1021 and the second control unit 1022 may be specifically implemented by using a sixth processor.
  • the receiving module 101 includes: a fourth receiving unit 1014.
  • the control module 102 includes an information acquiring unit 1023 and a third control unit 1024.
  • FIG. 20 is the present invention.
  • Example A sixth schematic structural diagram of a packet data network gateway P-GW embodiment is provided;
  • the fourth receiving unit 1014 is configured to receive a second specified data packet that is transmitted by the UE through a preset channel.
  • the information obtaining unit 1023 is configured to acquire, according to the destination address and/or the destination port number of the second designated data packet, the data connection information is closed or opened, where the destination address of the second designated data packet is the first pre- If the value, and/or the destination port number is the second preset value, the second designated data packet corresponds to closing the data connection; if the destination address of the second designated data packet is the third preset value, and Or the destination port number is the fourth preset value, and the second designated data packet corresponds to the open data connection.
  • the third control unit 1024 is configured to stop or start data transmission of at least one bearer of the UE according to the closing or opening of the data connection information; or execute a policy according to the closing or opening the data connection information and the PCRF. And an update process, receiving an admission control policy sent by the PCRF, stopping or starting data transmission of at least one bearer of the UE according to the admission control policy.
  • the function of the fourth receiving unit 1014 may be specifically implemented by using a fourth receiver, and the functions of the information acquiring unit 1023 and the third control unit 1024 may be specifically implemented by using a seventh processor.
  • the receiving module 101 includes: a fifth receiving unit 1015.
  • the control module 102 includes a second forwarding unit 1025 and a fourth control unit 1026.
  • FIG. 21 is A seventh structural diagram of an embodiment of a packet data network gateway P-GW according to an embodiment of the present invention.
  • the fifth receiving unit 1015 is configured to receive a second designated data packet that is transmitted by the UE by using a preset channel, where the second forwarding unit 1025 is configured to forward the second designated data packet to the AS/AF, so that the And acquiring, by the AS/AF, the data connection information according to the destination address and/or the destination port number of the second designated data packet, and performing the application service information update process according to the closing or opening the data connection information and the PCRF, where If the destination address of the second designated data packet is the first preset value, and/or the destination port number is the second preset value, the second designated data packet corresponds to closing the data connection; if the second designated data packet The destination address is the third preset value, and/or the destination port number is the fourth preset value, and the second designated data packet corresponds to the open data connection;
  • the fourth control unit 1026 is configured to receive a policy and charging rule update message generated by the PCRF after the application service information update process, and stop or start the UE according to the policy and charging rule update message. At least one bearer data transmission; wherein the policy and charging rule update message includes an admission control policy for closing or opening the data connection.
  • the functions of the fifth receiving unit 1015, the second forwarding unit 1025, and the fourth control unit 1026 refer to the related description of S803-S805.
  • the function of the fifth receiving unit 1015 may be specifically implemented by using a fifth receiver, and the functions of the second forwarding unit 1025 and the fourth control unit 1026 may be specifically implemented by using an eighth processor.
  • control module 102 includes:
  • a bearer deleting unit configured to perform a bearer deletion process, deleting other bearers except the default bearer in the at least one bearer, or deleting at least one specified bearer other than the default bearer in the at least one bearer
  • the fifth control unit is configured to stop data transmission of the bearer that is not deleted in the at least one bearer according to the first indication information.
  • the fifth control unit includes:
  • a setting unit configured to set a second policy to the unremoved bearer according to the first indication information, where the second policy is used to stop at least one service flow of the untagged bearer data transmission.
  • the P-GW further includes:
  • a bearer update module configured to perform bearer deletion processing on the P-GW, and perform a bearer update process after deleting other bearers except the default bearer in the at least one bearer.
  • control module 102 can include:
  • a setting unit configured to set a third policy to the at least one bearer according to the first indication information, where the third policy is used to start data transmission of at least one service flow in the untagged bearer;
  • a starting unit configured to start data transmission of the at least one data stream according to the third policy.
  • the functions of the functions of the bearer deletion unit, the fifth control unit, the setting subunit, the stop subunit, the bearer update module, the setting unit, and the activation unit may be specifically referred to the related descriptions of S304 and S405.
  • the functions of the bearer deleting unit, the fifth control unit, the setting subunit, the stopping subunit, the bearer updating module, the setting unit, and the starting unit may be specifically implemented by the ninth processor.
  • the P-GW when the UE performs the closing or opening of the data connection, receives the first indication information that is sent by the UE to indicate that the data connection is closed or opened; the P-GW stops according to the first indication information or Starting the data transmission of the at least one bearer of the UE, so that the UE does not have to be "always on", that is to say, when the UE is not in the use state, the UE performs a close data connection, and the corresponding network side P-GW The data transmission of the at least one bearer of the UE is also stopped according to the corresponding indication, so that the consumption of the background data traffic caused by the "always on" of the UE can be avoided, so that the traffic of the terminal can be effectively controlled, thereby reducing the user's Extra cost.
  • FIG. 22 is a schematic structural diagram of a system for managing data connection according to an embodiment of the present invention.
  • the system for data connection management includes: a user equipment UE90 and a packet data network gateway P-GW10, where use
  • the function of the user equipment UE is similar to the function of the UE in the device embodiment corresponding to FIG. 9 , and details are not described herein again.
  • the packet data network gateway P-GW The function is similar to the function of the P-GW in the device embodiment corresponding to FIG. 10, and details are not described herein.
  • the data connection management system may further include: an eNB, a ⁇ 5, on the basis of the UE90 and the P-GW10.
  • the functions of the S-GW and the PCRF may be specifically referred to the related descriptions of all the foregoing embodiments, and details are not described herein again.
  • system of the data connection management may further include an AS/AF, and the functions of the AS/AF may be specifically described in the method embodiments corresponding to FIG. 7 and FIG. 8 , and details are not described herein again.
  • the UE when the UE performs the closing or opening of the data connection, the UE acquires first indication information for instructing to close or open the data connection; the UE transmits the first indication information to the P-GW on the network side.
  • the P-GW stops or starts data transmission of at least one bearer of the UE according to the first indication information, so that the UE does not have to be "always on", that is, when the UE is not in use,
  • the UE performs the data connection shutdown, and the corresponding network-side P-GW also stops the data transmission of the at least one bearer of the UE, so as to avoid the consumption of the background data traffic caused by the "always on" of the UE, and the traffic of the terminal Effective control can be achieved, which in turn saves data traffic and user extra costs, and enhances the user experience.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Business, Economics & Management (AREA)
  • Accounting & Taxation (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

本发明实施例提供了一种数据连接管理的方法、装置及系统。一种数据连接管理的方法包括:用户设备UE获取第一指示信息,所述第一指示信息用于指示关闭或开启数据连接;所述UE传输所述第一指示信息至分组数据网络网关P-GW,使所述P-GW根据所述第一指示信息停止或启动所述UE的至少一个承载的数据传输。本实施例有效控制终端的流量,减少了用户的额外费用。

Description

一种数据连接管理的方法、 装置及系统 技术领域
本发明涉及通信技术领域, 特别涉及一种数据连接管理的方法、 装置及系统。 背景技术
为了适应业务带宽、 服务质量以及网络覆盖等多方面需求, 3G Ord-Generation, 第三 代移动通信技术) 标准推出了新的演进技术。 EPS (Evolved Packet System, 演进分组系统) 是 3GPP(The 3rd Generation Partnership Project,第三代合作伙伴项目)组织制定的 3G UMTS (Universal Mobile Telecommunications System, 通用移动通信系统)最新演进标准, 一般也 称之为 4G或 SAE ( System Architecture Evolution, 系统架构演进)。 EPS相比较 3G技术的 一个特点是在核心网只保留了分组域 (PS, Packet System Domain), 而放弃了电路交换域 (CS, Circuit Switch Domain )。
EPS网络提供了移动网络的数据通道, 从而支持 UE (User Equipment, 用户设备) 通 过该 EPS网络接入到互联网中, 实现互联网中数据业务的传输。 在 EPS网络中, 为了更好 地提高用户体验, 在 UE附着网络的过程中, EPS网络即为 UE建立数据通道, 即缺省承载 (Default Bearer),从而保证 UE在附着完成后立即可以发起数据业务,即所谓的" Always-on, 永远在线"功能, EPS网络支持永远在线功能是相比较 3G技术的另一个主要特点。
但是智能终端的普及带来了大量背景数据流量,例如 OS ( Operation System,操作系统) 心跳、 软件自动升级检测、 后台程序联网更新等数据流量的消耗, 这些额外的数据流量的 消耗一般发生在 UE没有进行数据业务的时候,因此 UE的"永远在线"使得 UE在附着到 EPS 网络的同时即可以连接到互联网, 在为用户提供更好的用户体验的同时, 也为上述大量背 景数据流量的消耗提供了条件,这种背景流量的消耗不能被用户感知,且 UE保持永远在线, 因此无法得到有效的控制, 进而增加了用户的额外费用, 影响了用户体验。 发明内容
为了有效控制用户设备的流量, 本发明实施例提供了一种数据连接管理的方法、 装置 及系统。 所述技术方案如下: 一方面, 提供了一种数据连接管理的方法, 包括:
用户设备 UE获取第一指示信息, 所述第一指示信息用于指示关闭或开启数据连接; 所述 UE传输所述第一指示信息至分组数据网络网关 P-GW,使所述 P-GW根据所述第 一指示信息停止或启动所述 UE的至少一个承载的数据传输。
另一方面, 提供了一种数据连接管理的方法, 包括:
分组数据网络网关 P-GW接收用户设备 UE传输的第一指示信息,其中所述第一指示信 息用于指示关闭或开启数据连接;
所述 P-GW根据所述第一指示信息停止或启动所述 UE的至少一个承载的数据传输。 另一方面, 提供了一种用户设备 UE, 包括:
获取模块, 用于获取第一指示信息, 所述第一指示信息用于指示关闭或开启数据连接; 传输模块,用于传输所述第一指示信息至分组数据网络网关 P-GW,使所述 P-GW根据 所述第一指示信息停止或启动所述 UE的至少一个承载的数据传输。
另一方面, 提供了一种分组数据网络网关 P-GW, 包括:
接收模块, 用于接收用户设备 UE传输的第一指示信息, 其中所述第一指示信息用于指 示关闭或开启数据连接;
控制模块, 用于根据所述第一指示信息停止或启动所述 UE 的至少一个承载的数据传 输。
本发明实施例提供的技术方案的有益效果是: 当 UE执行关闭或开启数据连接时, 所述 UE获取用于指示关闭或开启数据连接的第一指示信息; 所述 UE传输所述第一指示信息至 网络侧的 P-GW,使所述 P-GW根据所述第一指示信息停止或启动所述 UE的至少一个承载 的数据传输, 这样所述 UE不必"永远在线", 也就是说当所述 UE不处于使用状态时, 所述 UE执行关闭数据连接, 相应的网络侧 P-GW也停止所述 UE的至少一个承载的数据传输, 这样可以避免 UE的"永远在线"而造成的背景数据流量的消耗,使得终端的流量能够得到有 效的控制, 进而可以减小用户的额外费用。 附图说明
为了更清楚地说明本发明实施例中的技术方案, 下面将对实施例描述中所需要使用的 附图作简单地介绍, 显而易见地, 下面描述中的附图仅仅是本发明的一些实施例, 对于本 领域普通技术人员来讲, 在不付出创造性劳动的前提下, 还可以根据这些附图获得其它的 附图。
图 1是本发明实施例提供的一种数据连接管理的方法实施例的流程图; 图 2是本发明实施例提供的另一种数据连接管理的方法实施例的流程图; 图 3是本发明实施例提供的再一种数据连接管理的方法实施例的流程图;
图 4是本发明实施例提供的再一种数据连接管理的方法实施例的流程图;
图 5是本发明实施例提供的再一种数据连接管理的方法实施例的流程图;
图 6是本发明实施例提供的再一种数据连接管理的方法实施例的流程图;
图 7是本发明实施例提供的再一种数据连接管理的方法实施例的流程图;
图 8是本发明实施例提供的再一种数据连接管理的方法实施例的流程图;
图 9是本发明实施例提供的一种用户设备 UE实施例的第一结构示意图;
图 10为本发明实施例提供的一种用户设备 UE实施例的第二结构示意图;
图 11为本发明实施例提供的一种用户设备 UE实施例的第三结构示意图;
图 12是本发明实施例提供的一种用户设备 UE实施例的第四结构示意图;
图 13是本发明实施例提供的一种用户设备 UE实施例的第五结构示意图;
图 14是本发明实施例提供的一种用户设备 UE实施例的第六结构示意图;
图 15是本发明实施例提供的一种分组数据网络网关 P-GW实施例的第一结构示意图; 图 16是本发明实施例提供的一种分组数据网络网关 P-GW实施例的第二结构示意图; 图 17是本发明实施例提供的一种分组数据网络网关 P-GW实施例的第三结构示意图; 图 18是本发明实施例提供的一种分组数据网络网关 P-GW实施例的第四结构示意图; 图 19是本发明实施例提供的一种分组数据网络网关 P-GW实施例的第五结构示意图; 图 20是本发明实施例提供的一种分组数据网络网关 P-GW实施例的第六结构示意图; 图 21是本发明实施例提供的一种分组数据网络网关 P-GW实施例的第七结构示意图; 图 22为本发明实施例提供的一种数据连接管理的系统实施例的结构示意图。 具体实施方式
为使本发明的目的、 技术方案和优点更加清楚, 下面将结合附图对本发明实施方式作 进一步地详细描述。
参考图 1, 图 1是本发明实施例提供的一种数据连接管理的方法实施例的流程图; 所述 数据连接管理的方法包括:
S101 : UE获取第一指示信息, 所述第一指示信息用于指示关闭或开启数据连接。 S102: 所述 UE传输所述第一指示信息至 P-GW (Packet Data Network Gateway, PDN GW, 分组数据网络网关), 使所述 P-GW根据所述第一指示信息停止或启动所述 UE的至 少一个承载的数据传输。 本实施例中, 当 UE执行关闭或开启数据连接时, 所述 UE获取用于指示关闭或开启数 据连接的第一指示信息; 所述 UE传输所述第一指示信息至网络侧的 P-GW, 使所述 P-GW 根据所述第一指示信息停止或启动所述 UE的至少一个承载的数据传输,这样所述 UE可以 根据业务要求或者用户需要, 决定关闭或者启动数据连接, 当数据连接关闭的时候, 数据 包无法通过移动网络进行传输, 因此避免了背景数据流量在用户不感知的情况下的消耗而 产生额外计费; 当用户需要进行业务的时候, 通过启动已经关闭的数据连接, 进行业务处 理。 这样可以避免 UE的"永远在线"而造成的背景数据流量的消耗, 使得 UE的流量能够得 到有效的控制, 进而可以减小用户的额外费用, 提高用户体验。 参考图 2, 图 2是本发明实施例提供的另一种数据连接管理的方法实施例的流程图; 所 述数据连接管理的方法包括:
S201 : P-GW接收 UE传输的第一指示信息, 其中所述第一指示信息用于指示关闭或开 启数据连接。
S202:所述 P-GW根据所述第一指示信息停止或启动所述 UE的至少一个承载的数据传 输。
本实施例中, 当 UE执行关闭或开启数据连接时, P-GW接收 UE传输的用于指示关闭 或开启数据连接的第一指示信息; 所述 P-GW根据所述第一指示信息停止或启动所述 UE 的至少一个承载的数据传输, 这样所述 UE可以根据业务要求或者用户需要, 决定关闭或者 启动数据连接, 当数据连接关闭的时候, 数据包无法通过移动网络进行传输, 因此避免了 背景数据流量在用户不感知的情况下的消耗而产生额外计费; 当用户需要进行业务的时候, 通过启动已经关闭的数据连接, 进行业务处理。 这样可以避免 UE的"永远在线"而造成的背 景数据流量的消耗, 使得 UE的流量能够得到有效的控制, 进而可以减小用户的额外费用, 提高用户体验。 参考图 3, 图 3是本发明实施例提供的再一种数据连接管理的方法实施例的流程图; 本 实施例中当 UE关闭或开启数据连接时,所述 UE采用信令的方式通知网络侧的 P-GW执行 数据连接的关闭或开启; 其中所述 UE发送的数据连接更新请求中包含所述第一指示信息, 所述第一指示信息用于指示关闭或开启数据连接。
所述数据连接管理的方法包括:
S301 : UE获取第一指示信息, 其中所述第一指示信息用于指示关闭或开启数据连接。 本实施例中, 附着在 EPS网络的 UE保持附着状态, 当 UE执行关闭或开启数据连接的 处理时,所述 UE获取第一指示信息,其中所述第一指示信息用于指示关闭或开启数据连接。 具体地, 可以由用户触发 UE执行关闭或开启数据连接的处理, 例如, 用户通过运行或 操作 UE上的应用程序来实现 UE执行关闭或开启数据连接的处理,其中所述应用程序可以 是 UE自带的应用程序 (例如 UE操作系统自带软件或功能), 也可以是在 UE上额外安装 的应用程序; 所述 UE获取所述第一指示信息, 也可以由 UE根据配置的策略来执行关闭或 开启数据连接的处理, 例如, 当配置的策略为 UE待机时(如屏幕关闭)关闭数据连接, 非 待机时 (如屏幕开启) 开启数据连接时, UE根据该策略执行关闭或开启数据连接的处理。
本实施例中,所述 UE还可以根据所述第一指示信息对所述 UE的至少一个承载设定第 一策略, 其中所述第一策略用于停止或启动所述至少一个承载中至少一个业务流的数据传 输; 所述 UE根据所述第一策略停止或启动所述至少一个业务流的数据传输。
S302: 所述 UE发送数据连接更新请求至 MME (Mobility Management Entity移动管理 实体), 其中所述数据连接更新请求中包含所述第一指示信息。
此步骤中,所述 UE经 eNB(evolved Node B 演进基站)发送数据连接更新请求至 MME, 其中所述数据连接更新请求具体可以是服务请求 (Service Request) 消息, 或跟踪区更新请 求 (TAU (tracking area update, 跟踪区更新) Request) 消息等。
所述第一指示信息在所述数据连接更新请求中可以以数据连接更新请求类型的形式存 在, 具体地, 所述数据连接更新请求类型可以为关闭数据连接, 或开启数据连接。
S303:所述 MME从所述数据连接更新请求中获取第一指示信息,发送修改承载请求经 S-GW (Serving Gateway, 服务网关) 至 P-GW, 其中所述修改承载请求中包含所述第一指 示信息。
此步骤中,所述 MME接收所述数据连接更新请求,从所述数据连接更新请求中获取第 一指示信息,发送包含所述第一指示信息的修改承载请求至 S-GW; 所述 S-GW转发所述修 改承载请求至 P-GW。
所述修改承载请求可以具体为修改承载请求 (Modify Bearer Request) 消息, 或修改承 载命令 (Modify Bearer Command) 消息。
具体地, 当所述数据连接更新请求类型为关闭数据连接时, 即所述第一指示信息具体 用于指示关闭数据连接时,所述修改承载请求具体也可以为挂起通知(Suspend Notification) 消息等。 当所述数据连接更新请求类型为开启数据连接时, 即所述第一指示信息具体用于 指示开启数据连接时, 所述修改承载请求具体也可以为恢复通知 (Resume Notification) 消 息等。
S304: 所述 P-GW从所述修改承载请求中获取第一指示信息, 根据所述第一指示信息 停止或启动所述 UE的至少一个承载的数据传输。
此步骤中, 所述 P-GW从所述修改承载请求中获取第一指示信息后, 根据所述 P-GW 当前采用的预设策略决定是否与 PCRF (Policy and Charging Rules Function, 策略与计费规 则功能实体)执行策略更新处理,具体地,如果所述 P-GW当前采用了动态 PCC (Policy and Charging Control, 策略和计费控制) 策略, 则所述 P-GW需要与所述 PCRF执行策略更新 处理, P-GW根据更新的策略停止或启动所述 UE 的至少一个承载的数据传输; 如果所述 P-GW当前没有采用动态 PCC,而是采用了静态 PCC或根据运营商的策略不需要和 PCC交 互等策略时, 则所述 P-GW不需要与所述 PCRF执行策略更新处理, 直接根据所述第一指 示信息停止或启动所述 UE的至少一个承载的数据传输。
所述 P-GW与所述 PCRF执行策略更新处理具体包括:
所述 P-GW发送 IP-CAN (Internet Protocol-Connectivity Access Network, 网络互联协议 连接访问网络)会话修改指示(Indication of IP-CAN Session Modification)消息至所述 PCRF, 其中所述 IP-CAN会话修改指示消息中包括第一指示信息;
所述 PCRF从所述 IP-CAN会话修改指示消息中获取所述第一指示信息,根据所述第一 指示信息执行相应的策略更新,发送 IP-CAN会话修改确认( Acknowledge of IP-CAN Session Modification)消息至所述 P-GW; 其中所述 IP-CAN会话修改确认消息中包含所述策略更新 处理后的准入控制策略。 具体如下:
当所述第一指示信息用于指示关闭数据连接时,所述 PCRF根据所述第一指示信息,执 行准入控制处理, 得到第一准入控制策略, 其中所述第一准入控制策略用于指示所述 P-GW 停止所述 UE的至少一个承载的数据传输; 所述 PCRF发送第一 IP-CAN会话修改确认消息 至所述 P-GW, 其中所述第一 IP-CAN会话修改确认消息中包含所述第一准入控制策略。 所 述第一准入控制策略具体可以是关闭业务流指示 (例如 Gating Control设置为关闭), 或者 停止数据包传输指示。
当所述第一指示信息用于指示开启数据连接时,所述 PCRF根据所述第一指示信息,执 行准入控制处理, 得到第二准入控制策略, 其中所述第二准入控制策略用于指示所述 P-GW 启动所述 UE的至少一个承载的数据传输; 所述 PCRF发送第二 IP-CAN会话修改确认消息 至所述 P-GW, 其中所述第二 IP-CAN会话修改确认消息中包含所述第二准入控制策略。 所 述第二准入控制策略具体可以是开启业务流指示 (例如 Gating Control设置为开启), 或者 启动数据包传输指示。
所述 P-GW与所述 PCRF执行完策略更新处理之后,所述 P-GW接收所述 IP-CAN会话 修改确认消息,根据所述 IP-CAN会话修改确认消息中包含的所述策略更新处理后的准入控 制策略停止或启动所述 UE的至少一个承载的数据传输。
本步骤中所述 P-GW根据所述第一指示信息停止或启动所述 UE的至少一个承载的数据 传输包括:
所述 P-GW根据所述第一指示信息停止或启动所述 UE的至少一个承载的数据传输; 或者,
所述 P-GW根据所述第一准入控制策略或所述第二准入控制策略停止或启动所述 UE 的至少一个承载的数据传输; 或者,
所述 P-GW根据所述第一指示信息和所述第一准入控制策略停止所述 UE的至少一个承 载的数据传输; 或者, 所述 P-GW根据所述第一指示信息和第二准入控制策略启动所述 UE 的至少一个承载的数据传输。
所述 P-GW停止所述 UE的至少一个承载的数据传输具体还包括:
所述 P-GW停止所述 UE的所有承载上的数据传输;
或者,
所述 P-GW停止所述 UE的特定承载上的数据传输。优选的,所述 P-GW也可以执行承 载删除处理, 将所述 UE的除所述至少一个承载中的缺省承载之外的其他承载删除, 或将除 所述至少一个承载中的缺省承载之外的至少一个指定承载删除; 根据所述第一指示信息停 止所述 UE的所述至少一个承载中未被删除的承载的数据传输。这样,所述 P-GW停止所述 UE的所述至少一个承载中未被删除的承载的数据传输后, 如果所述 P-GW后续接收到所述 UE的新的下行数据包, 可以直接丢弃该下行数据包, 不会执行承载更新流程或者承载建立 流程。 其中, 所述 P-GW根据所述第一指示信息停止所述至少一个承载中未被删除的承载 的数据传输, 包括: 所述 P-GW根据所述第一指示信息对所述未被删除的承载设定第二策 略, 其中所述第二策略用于停止所述未被删除的承载中至少一个业务流的数据传输; 所述 P-GW根据所述第二策略停止所述至少一个数据流的数据传输。
其中, 所述 P-GW执行承载删除处理包括:
所述 P-GW发送删除承载请求(Delete Bearer Request)消息经所述 S-GW至 MME; 所 述 MME发送去激活 EPS承载上下文请求 (Deactivate EPS Bearer Context Request) 消息至 所述 UE; 所述 UE发送去激活 EPS承载上下文接受(Deactivate EPS Bearer Context Accept) 消息至 MME; 所述 MME发送删除承载响应 (Delete Bearer Response) 消息经所述 S-GW 至所述 P-GW, 完成承载删除处理。
本实施例中,所述 UE还可以接收所述 P-GW发起的删除承载请求,删除所述至少一个 承载中的部分承载;所述 UE根据所述第一指示信息对所述至少一个承载中未被删除的承载 设定第二策略, 其中所述第二策略用于停止所述未被删除的承载中至少一个业务流的数据 传输; 所述 UE根据所述第二策略停止所述至少一个业务流的数据传输。
所述 P-GW启动所述 UE的至少一个承载的数据传输具体包括:
所述 P-GW允许所述 UE的至少一个承载的数据传输,后续,所述 P-GW可以根据接收 到的下行数据包发起承载建立流程或承载更新流程, 以完成下行至少一个承载的数据传输; 所述 P-GW在收到上行数据包时进行转发, 允许为所述 UE建立新的承载。
本实施例中,所述 P-GW根据所述第一指示信息启动所述 UE的至少一个承载的数据传 输包括:
所述 P-GW根据所述第一指示信息对所述至少一个承载设定第三策略, 其中所述第三 策略用于启动所述未被删除的承载中至少一个业务流的数据传输;
所述 P-GW根据所述第三策略启动所述至少一个数据流的数据传输。
S305: 所述 P-GW发送修改承载响应经 S-GW至所述 MME。
此步骤中, 所述 P-GW根据所述第一指示信息、 所述第一准入控制策略、 所述第二准 入控制策略中的一种或两种指示停止或启动所述 UE的至少一个承载的数据传输后,发送所 述修改承载响应经 S-GW至所述 MME, 以通知所述 S-GW和 MME, 所述 P-GW已经停止 或启动所述 UE的至少一个承载的数据传输。
其中所述修改承载响应可以具体是修改承载响应 (Modify Bearer Response) 消息、 更 新承载请求 (Update Bearer Request) 消息、 挂起确认 (Suspend Acknowledge) 消息或恢复 确认 ( Resume Acknowledge ) 等。
S306: 所述 MME发送数据连接更新响应至所述 UE。
此步骤中, 所述数据连接更新响应具体可以是跟踪区更新接收 (TAU Accept) 消息, 所述 MME通过跟踪区更新接收 (TAU Accept) 消息发送数据连接更新响应至所述 UE, 通 知所述 UE, 所述 P-GW已经完成停止或启动传输所述 UE的数据包的处理。
或者, 所述 MME通过初始上下文建立请求(Initial Context Setup Request)消息发送数 据连接更新响应至 eNB, 通知所述 eNB; 所述 eNB再通过无线承载建立请求(Radio Bearer Request) 消息发送数据连接更新响应至所述 UE, 通知所述 UE, 所述 P-GW已经完成停止 或启动传输所述 UE的数据包的处理。
本实施例中, 当所述 UE执行关闭数据连接的处理时, 所述 UE可以在上述 S302-S306 之间的任何时刻停止上行数据包的发送, 或者, 也可以在 S302之前或 S306之后停止上行 数据包的发送。 当所述 UE执行开启数据连接的处理时, 如果当前有上行数据包需要发送, 则所述 UE需要在 S306之后再发送所述上行数据包。
在本实施例的一种实施方式中, 所述第一指示信息包括第二指示信息, 其中所述第二 指示信息用于指示关闭或开启特定业务流的数据连接, 也就是说第二指示信息用于指示关 闭或开启部分数据连接; 相应的, 所述 P-GW根据所述第二指示信息、 所述第一准入控制 策略、所述第二准入控制策略中的一种或两种指示停止或启动所述 UE的特定业务流至少一 个承载的数据传输。
当 UE关闭或开启特定业务流的数据连接时,所述第一指示信息包括第二指示信息, 即 在所述第一指示信息包括所述数据连接更新请求类型的基础上, 还包括所述特定业务流的 相关信息的所述第二指示信息。 其中所述数据连接更新请求类型为关闭数据连接, 或开启 数据连接; 所述所述第二指示信息指示的特定业务流的相关信息包括: 所述特定业务流的 识别信息、 所述特定业务流对应的应用程序的信息中的任一种或多种。
其中所述特定业务流的识别信息包括: 特定业务流的源 IP (Internet Protocol, 网络互连 协议) 地址、 目的 IP地址、 源端口号、 目的端口号和协议类型中的任一种或多种; 所述特 定业务流对应的应用程序的信息包括应用程序标识 (Application ID )、 应用程序名称、 应用 程序编号中的任一种或多种。
当所述特定业务流为多种业务流时, 所述特定业务流的相关信息相应的包含所述多种 业务流的相关信息的组合。
本实施例中, 当所述第一指示信息包括第二指示信息, 指示关闭特定业务流的数据连 接时, 如果所述特定业务流采用专用承载(Dedicated Bearer)传输数据包时, 所述 P-GW根 据所述第二指示信息停止所述 UE的特定业务流至少一个承载的数据传输包括:
所述 P-GW可以执行承载删除处理, 将所述特定业务流对应的专用承载删除; 所述 P-GW根据所述第一指示信息和 /或第一准入控制策略对所述 UE的删除后剩余的 承载设定限定策略, 其中所述限定策略用于禁止所述特定业务流的至少一个承载的数据传 输; 其中, 本发明实施例中的 "/"表示 "或"。
其中所述 UE的删除后剩余的承载包括: 没有配置 TFT (Traffic Flow Template, 业务流 模板) 的承载, 如缺省承载 (Default Bearer); 传输未关闭的业务流数据的专用承载等。 所 述限定策略可以为包含所述特定业务流的相关信息的数据包过滤器。
所述 P-GW根据所述设定限定策略停止所述 UE的删除后剩余的承载上的所述第二指示 信息指示的关闭的特定业务流的至少一个承载的数据传输。
这种情况下,如果所述 P-GW后续接收到所述 UE的除所述关闭的特定业务流之外的其 他业务流的下行数据包时, 所述 P-GW可以根据该其他业务流的下行数据包发起承载建立 流程或承载更新流程, 完成其他未关闭的业务流的下行至少一个承载的数据传输。
如果 P-GW对所述 UE的删除后剩余的承载上设定了限定策略,例如设定了所述包含所 述特定业务流的相关信息的数据包过滤器, 当所述 UE执行开启特定业务流的数据连接时, 即所述第二指示信息指示开启特定业务流, 所述 P-GW更新限定策略, 使之取消包含所述 要开启的特定业务流的相关信息, 启动所述特定业务流的至少一个承载的数据传输。 如果 所述 UE执行开启所有业务流的数据连接处理时,所述 P-GW取消所述限定策略,启动所有 业务流的至少一个承载的数据传输。 上述更新或取消所述限定策略, 具体可以是 P-GW更 新或取消已经设定了所述限定策略的承载上的限定策略, 包括缺省承载和专用承载。
本实施例中, 当 UE执行关闭或开启数据连接时, 所述 UE获取用于指示关闭或开启数 据连接的第一指示信息; 所述 UE传输所述第一指示信息至网络侧的 P-GW, 所述 P-GW根 据所述第一指示信息和 /或第一准入控制策略停止所述 UE的至少一个承载的数据传输, 或 者所述 P-GW根据第一指示信息和 /或第二准入控制策略启动所述 UE的至少一个承载的数 据传输, 这样所述 UE不必"永远在线", 也就是说当所述 UE不处于使用状态时, 所述 UE 执行关闭数据连接,相应的网络侧 P-GW也停止所述 UE的至少一个承载的数据传输,这样 可以避免 UE的"永远在线"而造成的背景数据流量的消耗,使得终端的流量能够得到有效的 控制, 进而可以节省数据流量和用户的额外费用, 也提升了用户体验。 参考图 4, 图 4是本发明实施例提供的再一种数据连接管理的方法实施例的流程图; 本 实施例中当 UE关闭或开启数据连接时,所述 UE采用信令的方式通知网络侧的 P-GW执行 数据连接的关闭或开启; 其中所述 UE发送的请求承载资源修改消息中包含第一指示信息, 所述第一指示信息用于指示关闭或开启数据连接。
所述数据连接管理的方法包括:
S401 : UE获取第一指示信息, 其中所述第一指示信息用于指示关闭或开启数据连接。 S401与上述实施例中的 S301类似, 在此不再赘述, 具体可参见 S301的相关描述。 S402: 所述 UE发送请求承载资源修改消息至 MME, 其中所述请求承载资源修改消息 中包含所述第一指示信息。
此步骤中, 所述 UE经 eNB发送请求承载资源修改消息至 MME, 其中所述请求承载资 源修改消息中包含所述第一指示信息。
S403:所述 MME从所述请求承载资源修改消息中获取第一指示信息,发送承载资源命 令(Bearer Resource Command)消息经 S-GW至 P-GW, 其中所述承载资源命令消息中包含 所述第一指示信息。 S404: 所述 P-GW从所述承载资源命令消息中获取第一指示信息, 根据所述第一指示 信息与 PCRF执行策略更新处理。
此步骤中, 所述 P-GW 从所述承载资源命令消息中获取第一指示信息后, 根据所述 P-GW当前采用的预设策略决定是否与 PCRF (Policy and Charging Rules Function, 策略与 计费规则功能实体)执行策略更新处理,具体地,如果所述 P-GW当前采用了动态 PCC(Policy and Charging Control, 策略和计费控制)策略, 则所述 P-GW需要与所述 PCRF执行策略更 新处理, P-GW根据更新的策略停止或启动所述 UE的至少一个承载的数据传输; 如果所述 P-GW当前没有采用动态 PCC,而是采用了静态 PCC或根据运营商的策略不需要和 PCC交 互等策略时, 则所述 P-GW不需要与所述 PCRF执行策略更新处理, 直接根据所述第一指 示信息停止或启动所述 UE的至少一个承载的数据传输。
所述 P-GW与所述 PCRF执行策略更新处理的过程与上述实施例中的 S304中的策略更 新处理过程类似, 在此不再赘述, 具体可参见 S304的相关描述。
S405: 所述 P-GW根据所述的第一指示信息和 /或所述 P-GW接收的所述策略更新处理 后的准入控制策略停止或启动所述 UE的至少一个承载的数据传输。
此步骤中, 所述 P-GW接收所述 PCRF发送的 IP-CAN会话修改确认消息, 根据所述
IP-CAN 会话修改确认消息中包含的所述策略更新处理后的准入控制策略停止或启动所述 UE的至少一个承载的数据传输。
具体地,所述 P-GW可以根据所述准入控制策略停止或启动所述 UE的所有承载上的数 据传输;或者,所述 P-GW根据所述第一指示信息和 /或所述第一准入控制策略停止所述 UE 的至少一个承载的数据传输; 或者, 所述 P-GW根据所述第一指示信息和 /或第二准入控制 策略启动所述 UE的至少一个承载的数据传输。
所述 P-GW停止所述 UE的至少一个承载的数据传输具体还包括:
所述 P-GW停止所述 UE的所有承载上的数据传输;
或者,
所述 P-GW停止所述 UE的特定承载上的数据传输。优选的,所述 P-GW也可以执行承 载删除处理, 将所述 UE的除所述至少一个承载中的缺省承载之外的其他承载删除, 或将除 所述至少一个承载中的缺省承载之外的至少一个指定承载删除; 根据所述第一指示信息停 止所述 UE的所述至少一个承载中未被删除的承载的数据传输。其中所述 P-GW执行承载删 除处理的过程与图 3 对应的方法实施例中所述承载删除处理的过程类似, 在此不再赘述, 具体可参见上述实施例的相关描述。
本实施例中,所述 P-GW执行承载删除处理,将所述 UE的除所述至少一个承载中的缺 省承载之外的其他承载删除, 或将除所述至少一个承载中的缺省承载之外的至少一个指定 承载删除之后, 所述 P-GW还可以执行承载更新流程, 将更新后的设置发送给所述 UE。 具 体地, 所述 P-GW发送更新承载请求 (Update Bearer Request) 消息经 S-GW至 MME; 所 述 MME接收所述更新承载请求消息, 发送修改 EPS (Evolved Packet System, 演进分组系 统)承载上下文请求 (Modify EPS Bearer Context Request)消息, 或下行 NAS (Non Access Stratum, 非接入层) 传输 (Downlink NAS Transport) 消息至 UE; 所述 UE接收所述修改 EPS承载上下文请求消息或下行 NAS传输消息,发送修改 EPS承载上下文接受 (Modify EPS Bearer Context Accept)消息, 或上行 NAS传输 (Uplink NAS Transport)消息至所述 MME; 所述 MME接收所述修改 EPS承载上下文接受消息或上行 NAS传输消息, 发送更新承载响 应 (Update Bearer Response) 消息经所述 S-GW至所述 P-GW, 完成承载更新流程。
所述 P-GW启动所述 UE的数据包传输的过程与图 3对应的方法实施例中所述 P-GW启 动所述 UE的数据包传输的处理过程类似,在此不再赘述, 具体可参见上述实施例的相关描 述。
在本实施例的一种实施方式中, 所述第一指示信息包括第二指示信息, 其中所述第二 指示信息用于指示关闭或开启特定业务流的数据连接, 也就是说第二指示信息用于指示关 闭或开启部分数据连接; 相应的, 所述 P-GW根据包括所述第二指示信息的所述第一指示 信息停止或启动所述 UE的特定业务流至少一个承载的数据传输。关于所述第二指示信息的 相关描述与图 3 对应的方法实施例中的所述第二指示信息相似, 在此不再赘述, 具体可参 见上述实施例的相关描述。
本实施例中, 当 UE执行关闭或开启数据连接时, 所述 UE获取用于指示关闭或开启数 据连接的第一指示信息; 所述 UE传输所述第一指示信息至网络侧的 P-GW, 所述 P-GW根 据所述第一指示信息和 /或第一准入控制策略停止所述 UE的至少一个承载的数据传输, 或 者所述 P-GW根据第一指示信息和 /或第二准入控制策略启动所述 UE的至少一个承载的数 据传输, 这样所述 UE不必"永远在线", 也就是说当所述 UE不处于使用状态时, 所述 UE 执行关闭数据连接,相应的网络侧 P-GW也停止所述 UE的至少一个承载的数据传输,这样 可以避免 UE的"永远在线"而造成的背景数据流量的消耗,使得终端的流量能够得到有效的 控制, 进而可以节省数据流量和用户的额外费用, 也提升了用户体验。 参考图 5, 图 5是本发明实施例提供的再一种数据连接管理的方法实施例的流程图; 本 实施例中当 UE关闭或开启数据连接时,所述 UE通过预设通道采用数据包的方式通知网络 侧的 P-GW执行数据连接的关闭或开启;其中所述 UE发送的第一指定数据包中包含第一指 示信息, 所述第一指示信息用于指示关闭或开启数据连接。
所述数据连接管理的方法包括:
S501 : UE获取第一指示信息, 其中所述第一指示信息用于指示关闭或开启数据连接。 S501与上述实施例中的 S301类似, 在此不再赘述, 具体可参见 S301的相关描述。 S502: 所述 UE通过预设通道发送第一指定数据包至 P-GW, 其中所述第一指定数据包 中包含所述第一指示信息。
此步骤中,所述 UE通过已经建立的所述 UE和所述 P-GW之间用于进行数据连接的预 设通道, 如 GTP (General packet radio service Tunnel Protocol, 通用分组无线业务隧道协议) 通道(具体可以称之为 PDP (Packet Data Protocol,分组数据协议)通道,或者承载(Bearer)), 发送第一指定数据包至所述 P-GW, 其中所述第一指定数据包中包含所述第一指示信息, 所 述第一指示信息用于指示关闭或开启数据连接。
S503: 所述 P-GW从所述第一指定数据包中获取所述第一指示信息, 根据所述第一指 示信息停止或启动所述 UE的至少一个承载的数据传输。
此步骤中, 所述 P-GW接收所述第一指定数据包, 从所述第一指定数据包中获取所述 第一指示信息;然后所述 P-GW根据所述第一指示信息停止或启动所述 UE的至少一个承载 的数据传输, 其中包括可选的与 PCRF执行的策略更新处理, 具体地所述 P-GW根据所述 第一指示信息停止或启动所述 UE 的至少一个承载的数据传输的过程与上述实施例中的 S304类似, 在此不再赘述, 具体可参见 S304的相关描述。
可选的, 所述 P-GW还可以执行承载删除处理和承载更新处理, 具体可参照图 3和图 4 所对应的方法实施例中的相关描述, 在此不再赘述。
在本实施例的一种实施方式中, 所述第一指示信息包括第二指示信息, 其中所述第二 指示信息用于指示关闭或开启特定业务流的数据连接, 也就是说第二指示信息用于指示关 闭或开启部分数据连接; 相应的, 所述 P-GW根据所述包括第二指示信息的第一指示信息 停止或启动所述 UE的特定业务流至少一个承载的数据传输。关于所述第二指示信息的相关 描述与图 3 所对应的方法实施例中的所述第二指示信息相似, 在此不再赘述, 具体可参见 上述实施例的相关描述。
本实施例中, 当 UE执行关闭或开启数据连接时, 所述 UE获取用于指示关闭或开启数 据连接的第一指示信息; 所述 UE通过预设通道传输所述第一指示信息至网络侧的 P-GW, 所述 P-GW根据所述第一指示信息和 /或第一准入控制策略停止所述 UE的至少一个承载的 数据传输, 或者所述 P-GW根据第一指示信息和 /或第二准入控制策略启动所述 UE的至少 一个承载的数据传输, 这样所述 UE不必"永远在线", 也就是说当所述 UE不处于使用状态 时, 所述 UE执行关闭数据连接, 相应的网络侧 P-GW也停止所述 UE的至少一个承载的数 据传输, 这样可以避免 UE的"永远在线"而造成的背景数据流量的消耗, 使得终端的流量能 够得到有效的控制, 进而可以节省数据流量和用户的额外费用, 也提升了用户体验。 参考图 6, 图 6是本发明实施例提供的再一种数据连接管理的方法实施例的流程图; 本 实施例中当 UE关闭或开启数据连接时,所述 UE通过预设通道采用数据包的方式通知网络 侧的 P-GW执行数据连接的关闭或开启。其中所述 UE发送的第二指定数据包具体为第一指 示信息, 所述第二指定数据包用于指示关闭或开启数据连接; 当所述第二指定数据包的目 的地址为第一预设值, 和 /或目的端口号为第二预设值时, 所述第二指定数据包具体用于指 示关闭数据连接; 当所述第二指定数据包的目的地址为第三预设值, 和 /或目的端口号为第 四预设值时, 所述第二指定数据包具体用于开启数据连接。
所述数据连接管理的方法包括:
S601 : UE获取第二指定数据包, 其中所述第二指定数据包用于指示关闭或开启数据连 接。
此步骤中, 所述第二指定数据包具体为第一指示信息, 其中所述第一指示信息, 即所 述第二指定数据包用于指示关闭或开启数据连接。
实际应用中, 附着在 EPS网络的 UE保持附着状态, 当 UE执行关闭或开启数据连接的 处理时, 所述 UE获取第二指定数据包, 当所述第二指定数据包的目的地址为第一预设值, 和 /或目的端口号为第二预设值时, 所述第二指定数据包具体用于指示关闭数据连接; 当所 述第二指定数据包的目的地址为第三预设值, 和 /或目的端口号为第四预设值时, 所述第二 指定数据包具体用于开启数据连接。
具体地, 可以由用户触发 UE执行关闭或开启数据连接的处理, 例如, 用户通过运行或 操作 UE上的应用程序来实现 UE执行关闭或开启数据连接的处理,其中所述应用程序可以 是 UE自带的应用程序 (例如 UE操作系统自带软件或功能), 也可以是在 UE上额外安装 的应用程序; 所述 UE获取所述第一指示信息, 也可以由 UE根据配置的策略来执行关闭或 开启数据连接的处理, 例如, 当配置的策略为 UE待机时(如屏幕关闭)关闭数据连接, 非 待机时 (如屏幕开启) 开启数据连接时, UE根据该策略执行关闭或开启数据连接的处理。
本实施例中,所述 UE还可以根据所述第一指示信息对所述 UE的至少一个承载设定第 一策略, 其中所述第一策略用于停止或启动所述至少一个承载中至少一个业务流的数据传 输; 所述 UE根据所述第一策略停止或启动所述至少一个业务流的数据传输。
S602: 所述 UE通过预设通道发送所述第二指定数据包至 P-GW。 此步骤中,所述 UE通过已经建立的所述 UE和所述 P-GW之间用于进行数据连接的预 设通道, 如 GTP通道发送第二指定数据包至所述 P-GW, 其中所述第二指定数据包根据其 目的地址和 /或目的端口号的相应取值来实现关闭或开启数据连接的指示。
S603: 所述 P-GW根据所述第二指定数据包的目的地址和 /或目的端口号获取关闭或启 动数据连接信息,并根据所述关闭或启动数据连接信息相应的停止或启动所述 UE的至少一 个承载的数据传输。
此步骤中, 当所述第二指定数据包的目的地址为第一预设值, 和 /或目的端口号为第二 预设值时, 所述第二指定数据包对应于关闭数据连接, 则所述 P-GW根据所述第二指定数 据包的目的地址和 /或目的端口号获取关闭数据连接信息, 所述 P-GW根据所述关闭数据连 接信息停止所述 UE的至少一个承载的数据传输。
当所述第二指定数据包的目的地址为第三预设值, 和 /或目的端口号为第四预设值时, 所述第二指定数据包对应于开启数据连接, 则所述 P-GW根据所述第二指定数据包的目的 地址和 /或目的端口号获取启动数据连接信息, 所述 P-GW根据所述启动数据连接信息启动 所述 UE的至少一个承载的数据传输。
其中所述 P-GW根据所述关闭或启动数据连接信息相应的停止或启动所述 UE的至少一 个承载的数据传输过程与上述实施例中 S304中根据所述第一指示信息停止或启动所述 UE 的至少一个承载的数据传输过程类似, 具体可参见 S304的相关描述; 其中所述关闭或启动 数据连接信息的作用与功能与图 3 所对应的方法实施例中的所述第一指示信息的作用与功 能类似。
可选的, 所述 P-GW还可以执行承载删除处理和承载更新处理, 具体可参照图 3和图 4 所对应的方法实施例的相关描述, 在此不再赘述。
在本实施例的一种实施方式中, 所述第二指定数据包包括第二指示信息, 其中所述第 二指示信息用于指示关闭或开启特定业务流的数据连接; 相应的, 所述 P-GW根据所述第 二指定数据包停止或启动所述 UE的特定业务流至少一个承载的数据传输。关于所述第二指 示信息的相关描述与图 3所对应的方法实施例中的所述第二指示信息相似, 在此不再赘述, 具体可参见上述实施例的相关描述。
本实施例中, 当 UE执行关闭或开启数据连接时, 所述 UE获取用于指示关闭或开启数 据连接的第二指定数据包, 其中所述第二指定数据包具体可以为第一指示信息; 所述 UE通 过预设通道传输第二指定数据包至网络侧的 P-GW,所述 P-GW根据所述第二指定数据包停 止或启动所述 UE的至少一个承载的数据传输, 这样所述 UE不必"永远在线", 也就是说当 所述 UE不处于使用状态时, 所述 UE执行关闭数据连接, 相应的网络侧 P-GW也停止所述 UE的至少一个承载的数据传输, 这样可以避免 UE的"永远在线"而造成的背景数据流量的 消耗, 使得终端的流量能够得到有效的控制, 进而可以节省数据流量和用户的额外费用, 也提升了用户体验。 参考图 7, 图 7是本发明实施例提供的再一种数据连接管理的方法实施例的流程图; 本 实施例中当 UE关闭或开启数据连接时,所述 UE通过预设通道采用数据包的方式通知网络 侧的 AS (Application Server, 应用服务器) /AF (Application Function, 应用功能实体) 执 行数据连接的关闭或开启的相应处理,进而使网络侧的 P-GW停止或启动所述 UE的至少一 个承载的数据传输; 其中所述 UE发送的第一指定数据包中包含第一指示信息, 所述第一指 示信息用于指示关闭或开启数据连接。
所述数据连接管理的方法包括:
S701 : UE获取第一指示信息, 其中所述第一指示信息用于指示关闭或开启数据连接。
S701与上述实施例中的 S301类似, 在此不再赘述, 具体可参见 S301的相关描述。
S702: 所述 UE通过预设通道发送第一指定数据包至 AS/AF, 其中所述第一指定数据 包中包含所述第一指示信息。
此步骤中,所述 UE通过已经建立的所述 UE和所述 P-GW之间用于进行数据连接的预 设通道, 如 GTP通道发送第一指定数据包至所述 P-GW, 再由所述 P-GW转发所述第一指 定数据包至 AS/AF; 其中所述第一指定数据包中包含所述第一指示信息, 所述第一指示信 息用于指示关闭或开启数据连接。
S703: 所述 AS/AF从所述第一指定数据包中获取所述第一指示信息, 根据所述第一指 示信息与 PCRF执行应用服务信息更新处理。
此步骤中, 所述 AS/AF接收所述第一指定数据包, 从所述第一指定数据包中获取所述 第一指示信息, 所述第一指示信息用于指示关闭或开启数据连接。
所述 AS/AF根据所述第一指示信息与 PCRF执行应用服务信息更新处理, 具体地, 所 述 AS/AF根据所述第一指示信息更新业务会话中的业务信息, 如果所述第一指示信息指示 关闭数据连接, 则所述 AS/AF更新所述业务信息使之不包括任何业务信息或将所有业务信 息置为无效; 如果所述第一指示信息指示开启数据连接, 则所述 AS/AF更新所述业务信息 使之包括所述 UE与所述 AS/AF相关业务信息或者将已有业务信息置为有效。 所述 AS/AF 向 PCRF发送包括更新的业务信息的修改会话信息请求消息,以使所述 PCRF根据更新的业 务信息执行策略更新处理, 以使 P-GW执行关闭或开启数据连接的处理。
S704: 所述 PCRF执行完应用服务信息更新流程后发送策略与计费规则更新消息至所 述 P-GW,其中所述策略与计费规则更新消息中包含用于关闭或开启数据连接的准入控制策 略。
此步骤中,所述 PCRF执行完应用服务信息更新流程后,可以发送更新完成响应至所述 此外, 所述 PCRF执行完应用服务信息更新流程后, 发送策略与计费规则更新 (Policy and Charging Rules Provision)消息至所述 P-GW, 其中所述策略与计费规则更新消息中包含 用于关闭或开启数据连接的准入控制策略, 具体处理过程可参考图 3和图 4所对应的方法 实施例的相关描述, 此处不再赘述。
S705:所述 P-GW根据所述策略与计费规则更新消息停止或启动所述 UE的至少一个承 载的数据传输。
此步骤中, 所述 P-GW根据所述策略与计费规则更新消息中的相应的准入控制策略关 闭或启动所述 UE的至少一个承载的数据传输,具体处理过程可参考图 3和图 4所对应的方 法实施例的相关描述, 此处不再赘述。
所述 P-GW还可以执行承载删除处理和 /或承载更新处理, 具体可参照图 3和图 4所对 应的方法实施例的相关描述, 在此不再赘述。
本实施例中, 所述 P-GW接收所述策略与计费规则更新消息后, 还可以发送策略与计 费规则确认(Policy and Charging Rules Ack)消息至所述 PCRF,通知所述 PCRF,所述 P-GW 已经接收到所述策略与计费规则更新消息。
在本实施例的一种实施方式中, 所述第一指示信息包括第二指示信息, 其中所述第二 指示信息用于指示关闭或开启特定业务流的数据连接, 也就是说第二指示信息用于指示关 闭或开启部分数据连接; 此时, 步骤 703中, 所述 AS/AF根据第二指示信息中的特定业务 流信息更新业务信息, 具体的, 当第二指示信息用于指示关闭特定业务流的数据连接时, 所述 AS/AF更新所述业务信息使之不包括所述特定业务流的业务信息或将所述特定业务流 的业务信息置为无效; 如果所述第二指示信息指示开启特定业务流的数据连接, 则所述 AS/AF 更新所述业务信息使之包括所述特定业务流的业务信息或者将所述特定业务流的业 务信息置为有效。所述 AS/AF向 PCRF发送包括更新的业务信息的修改会话信息请求消息, 以使所述 PCRF根据更新的业务信息执行策略更新处理,得到第一准入控制策略或第二准入 控制策略, 以使 P-GW执行关闭或开启数据连接的处理。 相应的, 所述 P-GW根据所述第 一指示信息和 /或第一准入控制策略停止所述 UE的特定业务流至少一个承载的数据传输, 或者所述 P-GW根据第一指示信息和 /或第二准入控制策略启动所述 UE的特定业务流至少 一个承载的数据传输。 关于所述第二指示信息的相关描述与图 3 所对应的方法实施例的所 述第二指示信息相似, 在此不再赘述, 具体可参见上述实施例的相关描述。
本实施例中, 当 UE执行关闭或开启数据连接时, 所述 UE获取用于指示关闭或开启数 据连接的第一指示信息; 所述 UE通过预设通道传输所述第一指示信息至网络侧的 AS/AF, 使所述 AS/AF执行数据连接的关闭或开启的相应处理, 进而使网络侧的 P-GW停止或启动 所述 UE的至少一个承载的数据传输, 这样所述 UE不必"永远在线", 也就是说当所述 UE 不处于使用状态时, 所述 UE执行关闭数据连接, 相应的网络侧 P-GW也停止所述 UE的至 少一个承载的数据传输, 这样可以避免 UE的"永远在线"而造成的背景数据流量的消耗, 使 得终端的流量能够得到有效的控制, 进而可以节省数据流量和用户的额外费用, 也提升了 用户体验。 参考图 8, 图 8是本发明实施例提供的再一种数据连接管理的方法实施例的流程图; 本 实施例中当 UE关闭或开启数据连接时,所述 UE通过预设通道采用数据包的方式通知网络 侧的 AS/AF执行数据连接的关闭或开启, 进而使网络侧的 P-GW停止或启动所述 UE的至 少一个承载的数据传输。其中所述 UE发送的第二指定数据包具体为第一指示信息, 所述第 二指定数据包用于指示关闭或开启数据连接; 当所述第二指定数据包的目的地址为第一预 设值, 和 /或目的端口号为第二预设值时, 所述第二指定数据包具体用于指示关闭数据连接; 当所述第二指定数据包的目的地址为第三预设值, 和 /或目的端口号为第四预设值时, 所述 第二指定数据包具体用于开启数据连接。
所述数据连接管理的方法包括:
S801 : UE获取第二指定数据包, 其中所述第二指定数据包用于指示关闭或开启数据连 接。
S801与上述实施例中的 S601类似, 在此不再赘述, 具体可参见 S601的相关描述。 S802: 所述 UE通过预设通道发送所述第二指定数据包至 AS/AF。
此步骤中,所述 UE通过已经建立的所述 UE和所述 P-GW之间用于进行数据连接的预 设通道, 如 GTP通道发送第二指定数据包至所述 P-GW, 再由所述 P-GW转发所述第一指 定数据包至 AS/AF, 其中所述第二指定数据包根据其目的地址和 /或目的端口号的相应取值 来实现关闭或开启数据连接的指示。
S803:所述 AS/AF根据所述第二指定数据包的目的地址和 /或目的端口号获取关闭或开 启数据连接信息并根据所述关闭或开启数据连接信息与 PCRF执行应用服务信息更新处理。
此步骤中, 当所述第二指定数据包的目的地址为第一预设值, 和 /或目的端口号为第二 预设值时, 所述第二指定数据包对应于关闭数据连接, 则所述 AS/AF根据所述第二指定数 据包的目的地址和 /或目的端口号获取关闭数据连接信息;
当所述第二指定数据包的目的地址为第三预设值, 和 /或目的端口号为第四预设值时, 所述第二指定数据包对应于开启数据连接, 则所述 AS/AF根据所述第二指定数据包的目的 地址和 /或目的端口号获取启动数据连接信息;
所述 AS/AF根据所述关闭或启动数据连接信息与 PCRF执行应用服务信息更新处理的 过程与上述实施例中 S703所述根据所述第一指示信息与 PCRF执行应用服务信息更新处理 过程类似, 具体可参见 S703的相关描述; 其中所述关闭或启动数据连接信息的作用与功能 与图 7所对应的方法实施例中的所述第一指示信息的作用与功能类似。
S804: 所述 PCRF执行完所述应用服务信息更新处理后生成策略与计费规则更新消息, 发送所述策略与计费规则更新消息至 P-GW。
S804与上述实施例的 S704类似, 在此不再赘述, 具体可参见 S704的相关描述。
S805:所述 P-GW根据所述策略与计费规则更新消息停止或启动所述 UE的至少一个承 载的数据传输。
S805与上述实施例的 S705类似, 在此不再赘述, 具体可参见 S705的相关描述。
所述 P-GW还可以执行承载删除处理和 /或承载更新处理, 具体可参照图 3和图 4所对 应的方法实施例的相关描述, 在此不再赘述。
在本实施例的一种实施方式中, 所述第二指定数据包包括第二指示信息, 其中所述第 二指示信息用于指示关闭或开启特定业务流的数据连接; 相应的, 所述 P-GW根据所述第 二指定数据包和 /或第一准入控制策略停止所述 UE的特定业务流至少一个承载的数据传输, 或者所述 P-GW根据第二指定数据包和 /或第二准入控制策略启动所述 UE的特定业务流至 少一个承载的数据传输。 关于所述第二指示信息的相关描述与图 3 所对应的方法实施例的 所述第二指示信息相似, 在此不再赘述, 具体可参见上述实施例的相关描述。
本实施例中, 在 S802中所述 UE可以选择只向特定的 AS/AF发送第二指定数据包, 也 可以向多个 AS/AF分别发送第二指定数据包,接收所述第二指定数据包的 AS/AF执行后续 的处理。 当所述第二指定数据包包括第二指示信息时,所述 UE可以仅向所述特定业务流对 应的 AS/AF发送所述第二指示信息。
本实施例中, 当 UE执行关闭或开启数据连接时, 所述 UE获取用于指示关闭或开启数 据连接的第二指定数据包, 其中所述第二指定数据包具体可以为第一指示信息; 所述 UE通 过预设通道传输第二指定数据包至网络侧的 AS/AF, 使所述 AS/AF执行数据连接的关闭或 开启的相应处理, 进而使网络侧的 P-GW停止或启动所述 UE的至少一个承载的数据传输, 这样所述 UE不必"永远在线", 也就是说当所述 UE不处于使用状态时, 所述 UE执行关闭 数据连接,相应的网络侧 P-GW也停止所述 UE的至少一个承载的数据传输,这样可以避免 UE的"永远在线"而造成的背景数据流量的消耗, 使得终端的流量能够得到有效的控制, 进 而可以节省数据流量和用户的额外费用, 也提升了用户体验。 参考图 9, 图 9是本发明实施例提供的一种用户设备 UE实施例的第一结构示意图; 所 述 UE包括:
获取模块 901, 用于获取第一指示信息, 所述第一指示信息用于指示关闭或开启数据连 接。
传输模块 902, 用于传输所述第一指示信息至分组数据网络网关 P-GW, 使所述 P-GW 根据所述第一指示信息停止或启动所述 UE的至少一个承载的数据传输。
其中, 所述获取模块 901具体可参照 S101和 S301的相关描述; 所述传输模块 902的 功能具体可参照 S102的相关描述。 其中所述获取模块 901和所述传输模块 902的功能具体 可以由第一处理器来实现。
在一种实施方式中, 所述 UE在包括所述获取模块 901和所述传输模块 902的基础上, 还可以包括:
设定模块, 用于根据所述第一指示信息对所述至少一个承载设定第一策略, 其中所述 第一策略用于停止或启动所述至少一个承载中至少一个业务流的数据传输。
传输控制模块, 用于根据所述第一策略停止或启动所述至少一个业务流的数据传输。 所述设定模块和所述传输控制模块的功能具体可参照 S301的相关描述。
在另一中实施方式中,所述 UE在包括所述获取模块 901和所述传输模块 902的基础上, 还可以包括:
删除模块, 用于接收所述 P-GW发起的删除承载请求, 删除所述至少一个承载中的部 分承载。
策略设定模块, 用于根据所述第一指示信息对所述至少一个承载中未被删除的承载设 定第二策略, 其中所述第二策略用于停止所述未被删除的承载中至少一个业务流的数据传 输。
停止传输模块, 用于根据所述第二策略停止所述至少一个业务流的数据传输。
其中所述删除模块、策略设定模块和停止传输模块的功能具体可参照 S304的相关描述。 其中所述设定模块、 传输控制模块、 删除模块、 策略设定模块和停止传输模块的功能 均可以由所述处理器中的第二处理器来实现。
再一种实施方式中, 所述传输模块 902包括: 第一发送单元 9021, 如图 10所示, 图 10为本发明实施例提供的一种用户设备 UE实施例的第二结构示意图;
所述第一发送单元 9021, 用于发送服务请求消息, 跟踪区更新请求消息, 或请求承载 资源修改消息至移动管理实体 MME,使 MME从所述服务请求消息,跟踪区更新请求消息, 或请求承载资源修改消息中获取第一指示信息并将所述第一指示信息经服务网关 S-GW传 输至所述 P-GW。
其中, 所述第一发送单元 9021的功能具体可参见 S302-S303和 S402-403的相关描述。 其中, 所述第一发送单元 9021的功能具体可以通过第一发送器来实现。
再一实施方式中, 所述传输模块 902包括: 第二发送单元 9022, 如图 11所示, 图 11 为本发明实施例提供的一种用户设备 UE实施例的第三结构示意图;
所述第二发送单元 9022, 用于通过预设通道发送第一指定数据包至所述 P-GW, 其中 所述第一指定数据包中包含所述第一指示信息。
其中, 所述第二发送单元 9022的功能具体可参见 S502的相关描述。
其中, 所述第二发送单元 9022的功能具体可以通过第二发送器来实现。
再一实施方式中, 所述传输模块 902包括: 第三发送单元 9023, 如图 12所示, 图 12 是本发明实施例提供的一种用户设备 UE实施例的第四结构示意图;
所述第三发送单元 9023, 用于通过预设通道发送第一指定数据包至所述 P-GW, 触发 所述 P-GW转发所述第一指定数据包至应用服务器 AS/应用功能实体 AF,使所述 AS/AF从 所述第一指定数据包中获取所述第一指示信息并根据所述第一指示信息与策略和计费规则 功能实体 PCRF执行应用服务信息更新流程,所述 PCRF执行完应用服务信息更新流程后发 送策略与计费规则更新消息至所述 P-GW,使所述 P-GW根据策略与计费规则更新消息停止 或启动所述 UE的至少一个承载的数据传输;其中所述策略与计费规则更新消息中包含用于 关闭或开启数据连接的准入控制策略。
其中, 所述第三发送单元 9023的功能具体可参见 S702的相关描述。
其中, 所述第三发送单元 9023的功能具体可以通过第三发送器来实现。
再一实施方式中, 所述传输模块 902包括: 第四发送单元 9024或第五发送单元 9025, 如图 13所示, 图 13是本发明实施例提供的一种用户设备 UE实施例的第五结构示意图; 所述第四发送单元 9024, 用于通过预设通道发送所述第二指定数据包至所述 P-GW, 使所述 P-GW根据所述第二指定数据包的目的地址和 /或目的端口号获取关闭数据连接信 息, 并根据所述关闭数据连接信息停止所述 UE的至少一个承载的数据传输, 其中所述第二 指定数据包的目的地址为第一预设值, 和 /或目的端口号为第二预设值;
所述第五发送单元 9025, 用于通过预设通道发送所述第二指定数据包至所述 P-GW, 使所述 P-GW根据所述第二指定数据包的目的地址和 /或目的端口号获取启动数据连接信 息, 并根据所述启动数据连接信息启动所述 UE的至少一个承载的数据传输, 其中所述第二 指定数据包的目的地址为第三预设值, 和 /或目的端口号为第四预设值。
其中, 所述第四发送单元 9024和所述第五发送单元 9025的功能具体可参见 S602的相 关描述。
其中, 所述第四发送单元 9024的功能具体可以通过第四发送器来实现, 所述第五发送 单元 9025的功能具体可以通过第五发送器来实现。
再一实施方式中, 所述传输模块 902包括: 第六发送单元 9026或第七发送单元 9027, 如图 14所示, 图 14是本发明实施例提供的一种用户设备 UE实施例的第六结构示意图; 所述第六发送单元 9026, 用于通过预设通道发送第二指定数据包至所述 P-GW, 触发 所述 P-GW转发所述第二指定数据包至 AS/AF, 使所述 AS/AF根据所述第二指定数据包的 目的地址和 /或目的端口号获取关闭数据连接信息并根据所述关闭数据连接信息与 PCRF执 行应用服务信息更新流程,所述 PCRF执行完应用服务信息更新流程后发送策略与计费规则 更新消息至所述 P-GW,使所述 P-GW根据策略与计费规则更新消息停止所述 UE的至少一 个承载的数据传输; 其中所述策略与计费规则更新消息中包含用于关闭数据连接的准入控 制策略; 其中所述第二指定数据包的目的地址为第一预设值, 和 /或目的端口号为第二预设 值;
所述第七发送单元 9027, 用于通过预设通道发送第二指定数据包至所述 P-GW, 触发 所述 P-GW转发所述第二指定数据包至 AS/AF, 使所述 AS/AF根据所述第二指定数据包的 目的地址和 /或目的端口号获取启动数据连接信息并根据所述启动数据连接信息与 PCRF执 行应用服务信息更新流程,所述 PCRF执行完应用服务信息更新流程后发送策略与计费规则 更新消息至所述 P-GW,使所述 P-GW根据策略与计费规则更新消息启动所述 UE的至少一 个承载的数据传输; 其中所述策略与计费规则更新消息中包含用于启动数据连接的准入控 制策略; 其中所述第二指定数据包的目的地址为第三预设值, 和 /或目的端口号为第四预设 值。
其中, 所述第六发送单元 9026和所述第七发送单元 9027的功能具体可参见 S802的相 关描述。
其中, 所述第六发送单元 90264 的功能具体可以通过第六发送器来实现, 所述第七发 送单元 9027的功能具体可以通过第七发送器来实现。
本实施例中, 当 UE执行关闭或开启数据连接时, 所述 UE获取用于指示关闭或开启数 据连接的第一指示信息; 所述 UE传输所述第一指示信息至网络侧的 P-GW, 使所述 P-GW 根据所述第一指示信息停止或启动所述 UE的至少一个承载的数据传输,这样所述 UE不必 "永远在线", 也就是说当所述 UE不处于使用状态时, 所述 UE执行关闭数据连接, 相应的 网络侧 P-GW也停止所述 UE的至少一个承载的数据传输, 这样可以避免 UE的"永远在线" 而造成的背景数据流量的消耗, 使得终端的流量能够得到有效的控制, 进而可以节省数据 流量和用户的额外费用, 也提升了用户体验。 参考图 15,图 15是本发明实施例提供的一种分组数据网络网关 P-GW实施例的第一结 构示意图; 所述 P-GW包括:
接收模块 101, 用于接收用户设备 UE传输的第一指示信息, 其中所述第一指示信息用 于指示关闭或开启数据连接。
控制模块 102, 用于根据所述第一指示信息停止或启动所述 UE的至少一个承载的数据 传输。
其中, 所述接收模块 101和所述控制模块 102的功能分别可参照 S201和 S202的相关 描述。 其中所述接收模块 101和所述控制模块 102的功能具体可以由第三处理器来实现。
在一种实施方式中, 所述接收模块 101包括: 第一接收单元 1011, 如图 16所示, 图
16是本发明实施例提供的一种分组数据网络网关 P-GW实施例的第二结构示意图;
所述第一接收单元 1011, 用于接收移动管理实体 MME经服务网关 S-GW传输的第一 指示信息, 其中所述第一指示信息由 UE通过服务请求消息, 跟踪区更新请求消息, 或请求 承载资源修改消息发送至所述 MME,所述第一指示信息由所述 MME从所述服务请求消息, 跟踪区更新请求消息, 或请求承载资源修改消息中获取。
其中, 所述第一接收单元 1011的功能具体可参见 S304和 S404的相关描述。
其中, 所述第一接收单元 1011的功能具体可以通过第一接收器来实现。
另一种实施方式中, 所述 P-GW在包括接收模块 101和控制模块 102的基础上, 还包 括: 响应发送模块 103, 如图 17所示, 图 17是本发明实施例提供的一种分组数据网络网关 P-GW实施例的第三结构示意图;
所述响应发送模块 103, 用于当所述第一指示信息由 UE通过服务请求消息或跟踪区更 新请求消息发送至所述 MME时,所述 P-GW根据所述第一指示信息停止或启动所述 UE的 至少一个承载的数据传输之后, 发送修改承载响应经 S-GW至 MME, 使所述 MME根据所 述修改承载响应发送数据连接更新响应至 UE, 以通知所述 UE所述 P-GW已停止或启动所 述 UE的至少一个承载的数据传输。
其中, 所述响应发送模块 103的功能具体可参见 S305-S306的相关描述。 其中, 所述响应发送模块 103的功能具体可以通过第四处理器来实现。
再一实施方式中, 所述接收模块 101包括: 第二接收单元 1012, 如图 18所示, 图 18 是本发明实施例提供的一种分组数据网络网关 P-GW实施例的第四结构示意图;
所述第二接收单元 1012, 用于接收 UE通过预设通道传输的第一指定数据包, 其中所 述第一指定数据包中包含第一指示信息。
其中, 所述第二接收单元 1012的功能具体可参见 S503的相关描述。
其中, 所述第二接收单元 1012的功能具体可以通过第二接收器来实现。
在上述实施方式的基础上, 所述控制模块 102包括:
第一控制单元,用于根据所述第一指示信息与策略和计费规则功能实体 PCRF执行策略 更新处理,接收所述 PCRF发送的所述策略更新处理后的准入控制策略,根据所述第一指示 信息和 /或所述准入控制策略停止或启动所述 UE的至少一个承载的数据传输。
其中, 所述第一控制单元的功能具体可参见 S304、 S405和 S503的相关描述。
其中, 所述第一控制单元的功能具体可以通过第五处理器来实现。
再一实施方式中, 所述接收模块 101包括: 第三接收单元 1013, 相应的, 所述控制模 块 102包括第一转发单元 1021和第二控制单元 1022, 如图 19所示, 图 19是本发明实施例 提供的一种分组数据网络网关 P-GW实施例的第五结构示意图;
所述第三接收单元 1013, 用于接收 UE通过预设通道传输的第一指定数据包, 其中所 述第一指定数据包中包含第一指示信息。
所述第一转发单元 1021, 用于转发所述第一指定数据包至应用服务器 AS/应用功能实 体 AF,使所述 AS/AF从所述第一指定数据包中获取所述第一指示信息并根据所述第一指示 信息与 PCRF执行应用服务信息更新处理。
所述第二控制单元 1022, 用于接收所述 PCRF在所述应用服务信息更新处理后生成的 策略与计费规则更新消息,根据所述策略与计费规则更新消息停止或启动所述 UE的至少一 个承载的数据传输; 其中所述策略与计费规则更新消息中包含用于关闭或开启数据连接的 准入控制策略。
其中, 所述第三接收单元 1013、 第一转发单元 1021和第二控制单元 1022的功能具体 可参见 S703的相关描述。
其中, 所述第三接收单元 1013的功能具体可以通过第三接收器来实现; 所述第一转发 单元 1021和第二控制单元 1022的功能具体可以通过第六处理器来实现。
再一实施方式中, 所述接收模块 101包括: 第四接收单元 1014, 相应的, 所述控制模 块 102包括信息获取单元 1023和第三控制单元 1024, 如图 20所示, 图 20是本发明实施例 提供的一种分组数据网络网关 P-GW实施例的第六结构示意图;
所述第四接收单元 1014, 用于接收 UE通过预设通道传输的第二指定数据包。
所述信息获取单元 1023, 用于根据所述第二指定数据包的目的地址和 /或目的端口号获 取关闭或开启数据连接信息, 其中如果所述第二指定数据包的目的地址为第一预设值, 和 / 或目的端口号为第二预设值, 则所述第二指定数据包对应于关闭数据连接; 如果所述第二 指定数据包的目的地址为第三预设值, 和 /或目的端口号为第四预设值, 则所述第二指定数 据包对应于开启数据连接。
所述第三控制单元 1024, 用于根据所述关闭或开启数据连接信息相应的停止或启动所 述 UE的至少一个承载的数据传输; 或者, 根据所述关闭或开启数据连接信息与 PCRF执行 策略更新处理,接收所述 PCRF发送的准入控制策略,根据所述准入控制策略停止或启动所 述 UE的至少一个承载的数据传输。
其中, 所述第四接收单元 1014、 信息获取单元 1023和第三控制单元 1024的功能具体 可参见 S603的相关描述。
其中, 所述第四接收单元 1014的功能具体可以通过第四接收器来实现, 所述信息获取 单元 1023和第三控制单元 1024的功能具体可以通过第七处理器来实现。
再一实施方式中, 所述接收模块 101包括: 第五接收单元 1015, 相应的, 所述控制模 块 102包括第二转发单元 1025和第四控制单元 1026, 如图 21所示, 图 21是本发明实施例 提供的一种分组数据网络网关 P-GW实施例的第七结构示意图;
所述第五接收单元 1015, 用于接收 UE通过预设通道传输的第二指定数据包; 所述第二转发单元 1025, 用于转发所述第二指定数据包至 AS/AF, 使所述 AS/AF根据 所述第二指定数据包的目的地址和 /或目的端口号获取关闭或开启数据连接信息并根据所述 关闭或开启数据连接信息与 PCRF执行应用服务信息更新处理,其中如果所述第二指定数据 包的目的地址为第一预设值, 和 /或目的端口号为第二预设值, 则所述第二指定数据包对应 于关闭数据连接; 如果所述第二指定数据包的目的地址为第三预设值, 和 /或目的端口号为 第四预设值, 则所述第二指定数据包对应于开启数据连接;
所述第四控制单元 1026, 用于接收所述 PCRF在所述应用服务信息更新处理后生成的 策略与计费规则更新消息,根据所述策略与计费规则更新消息停止或启动所述 UE的至少一 个承载的数据传输; 其中所述策略与计费规则更新消息中包含用于关闭或开启数据连接的 准入控制策略。
其中, 所述第五接收单元 1015、 所述第二转发单元 1025和第四控制单元 1026的功能 具体可参见 S803-S805的相关描述。 其中, 所述第五接收单元 1015的功能具体可以通过第五接收器来实现, 所述第二转发 单元 1025和第四控制单元 1026的功能具体可以通过第八处理器来实现。
再一实施方式中, 所述控制模块 102包括:
承载删除单元, 用于执行承载删除流程, 将除所述至少一个承载中的缺省承载之外的 其他承载删除, 或将除所述至少一个承载中的缺省承载之外的至少一个指定承载删除; 第五控制单元, 用于根据所述第一指示信息停止所述至少一个承载中未被删除的承载 的数据传输。
其中, 第五控制单元包括:
设定子单元, 用于根据所述第一指示信息对所述未被删除的承载设定第二策略, 其中 所述第二策略用于停止所述未被删除的承载中至少一个业务流的数据传输。
停止子单元, 用于根据所述第二策略停止所述至少一个数据流的数据传输。
再一实施方式中, 所述 P-GW还包括:
承载更新模块, 用于所述 P-GW执行承载删除处理, 将除所述至少一个承载中的缺省 承载之外的其他承载删除之后, 执行承载更新流程。
再一实施方式中, 所述控制模块 102可以包括:
设定单元, 根据所述第一指示信息对所述至少一个承载设定第三策略, 其中所述第三 策略用于启动所述未被删除的承载中至少一个业务流的数据传输;
启动单元, 用于根据所述第三策略启动所述至少一个数据流的数据传输。
其中, 所述承载删除单元、 第五控制单元、 设定子单元、 停止子单元、 承载更新模块、 设定单元和启动单元的功能的功能具体可参照 S304和 S405的相关描述。
其中, 所述承载删除单元、 第五控制单元、 设定子单元、 停止子单元、 承载更新模块、 设定单元和启动单元的功能具体可以通过第九处理器来实现。
本实施例中, 当 UE执行关闭或开启数据连接时, P-GW接收 UE传输的用于指示关闭 或开启数据连接的第一指示信息; 所述 P-GW根据所述第一指示信息停止或启动所述 UE 的至少一个承载的数据传输, 这样所述 UE不必"永远在线", 也就是说当所述 UE不处于使 用状态时, 所述 UE执行关闭数据连接, 相应的网络侧 P-GW也根据相应指示停止所述 UE 的至少一个承载的数据传输, 这样可以避免 UE 的"永远在线"而造成的背景数据流量的消 耗, 使得终端的流量能够得到有效的控制, 进而可以减小用户的额外费用。 参考图 22,图 22为本发明实施例提供的一种数据连接管理的系统实施例的结构示意图, 所述数据连接管理的系统包括: 用户设备 UE90和分组数据网络网关 P-GW10, 其中所述用 户设备 UE的功能与图 9所对应的装置实施例中的所述的 UE的功能类似, 在此不再赘述, 具体可参见上述实施例的相关描述; 所述分组数据网络网关 P-GW的功能与图 10所对应的 装置实施例中的所述的 P-GW 的功能类似, 在此不再赘述, 具体可参见上述实施例的相关 描述。
所述数据连接管理的系统在包括所述 UE90和 P-GW10的基础上,还可以包括: eNB、匪5、
S-GW和 PCRF, 所述 eNB、 匪5、 S_GW和 PCRF的功能可以具体参考上述所有实施例的相关描 述, 在此不再赘述。
此外, 所述数据连接管理的系统还可以包括 AS/AF, 所述 AS/AF的功能具体可参见图 7 和图 8所对应的方法实施例中的相关描述, 在此不再赘述。
本实施例中, 当 UE执行关闭或开启数据连接时, 所述 UE获取用于指示关闭或开启数 据连接的第一指示信息; 所述 UE传输所述第一指示信息至网络侧的 P-GW, 所述 P-GW根 据所述第一指示信息停止或启动所述 UE的至少一个承载的数据传输,这样所述 UE不必"永 远在线", 也就是说当所述 UE不处于使用状态时, 所述 UE执行关闭数据连接, 相应的网 络侧 P-GW也停止所述 UE的至少一个承载的数据传输, 这样可以避免 UE的"永远在线"而 造成的背景数据流量的消耗, 使得终端的流量能够得到有效的控制, 进而可以节省数据流 量和用户的额外费用, 也提升了用户体验。 需要说明的是, 本说明书中的各个实施例均采用递进的方式描述, 每个实施例重点说 明的都是与其它实施例的不同之处, 各个实施例之间相同相似的部分互相参见即可。 对于 装置类实施例而言, 由于其与方法实施例基本相似, 所以描述的比较简单, 相关之处参见 方法实施例的部分说明即可。
需要说明的是, 在本文中, 诸如第一和第二等之类的关系术语仅仅用来将一个实体或 者操作与另一个实体或操作区分开来, 而不一定要求或者暗示这些实体或操作之间存在任 何这种实际的关系或者顺序。 而且, 术语"包括"、 "包含"或者其任何其它变体意在涵盖非排 它性的包含, 从而使得包括一系列要素的过程、 方法、 物品或者设备不仅包括那些要素, 而且还包括没有明确列出的其它要素, 或者是还包括为这种过程、 方法、 物品或者设备所 固有的要素。在没有更多限制的情况下, 由语句 "包括一个 ...... "限定的要素, 并不排除在包 括所述要素的过程、 方法、 物品或者设备中还存在另外的相同要素。
本领域普通技术人员可以理解实现上述实施例的全部或部分步骤可以通过硬件来完 成, 也可以通过程序来指令相关的硬件完成, 所述的程序可以存储于一种计算机可读存储 介质中, 上述提到的存储介质可以是只读存储器, 磁盘或光盘等。 以上所述仅为本发明的较佳实施例, 并不用以限制本发明, 凡在本发明的原则之内, 所作的任何修改、 等同替换、 改进等, 均应包含在本发明的保护范围之内。

Claims

权 利 要 求 书
1、 一种数据连接管理的方法, 其特征在于, 包括:
用户设备 UE获取第一指示信息, 所述第一指示信息用于指示关闭或开启数据连接; 所述 UE传输所述第一指示信息至分组数据网络网关 P-GW, 使所述 P-GW根据所述第 一指示信息停止或启动所述 UE的至少一个承载的数据传输。
2、 根据权利要求 1所述的方法, 其特征在于, 进一步包括:
所述 UE根据所述第一指示信息对所述至少一个承载设定第一策略, 其中所述第一策略 用于停止或启动所述至少一个承载中至少一个业务流的数据传输;
所述 UE根据所述第一策略停止或启动所述至少一个业务流的数据传输。
3、 根据权利要求 1所述的方法, 其特征在于, 进一步包括:
所述 UE接收所述 P-GW发起的删除承载请求, 删除所述至少一个承载中的部分承载; 所述 UE根据所述第一指示信息对所述至少一个承载中未被删除的承载设定第二策略, 其中所述第二策略用于停止所述未被删除的承载中至少一个业务流的数据传输;
所述 UE根据所述第二策略停止所述至少一个业务流的数据传输。
4、根据权利要求 1或 2所述的方法,其特征在于,所述 UE传输所述第一指示信息至 P-GW 包括:
所述 UE发送服务请求消息, 跟踪区更新请求消息, 或请求承载资源修改消息至移动管 理实体 MME,使所述 MME从所述服务请求消息、跟踪区更新请求消息或请求承载资源修改 消息中获取所述第一指示信息并将所述第一指示信息经服务网关 S-GW传输至 P-GW。
5、根据权利要求 1或 2所述的方法,其特征在于,所述 UE传输所述第一指示信息至 P-GW 包括:
UE通过预设通道发送第一指定数据包至 P-GW,其中所述第一指定数据包中包含所述第 一指示信息。
6、 根据权利要求 1或 2所述的方法, 其特征在于, 所述 UE传输所述第一指示信息至 P-GW,使所述 P-GW根据所述第一指示信息停止或启动所述 UE的至少一个承载的数据传输 包括:
所述 UE通过预设通道发送第一指定数据包至 P-GW, 触发所述 P-GW转发所述第一指 定数据包至应用服务器 AS或应用功能实体 AF, 使所述 AS或 AF从所述第一指定数据包中 获取所述第一指示信息并根据所述第一指示信息与策略和计费规则功能实体 PCRF执行应用 服务信息更新流程, 所述 PCRF发送策略与计费规则更新消息至所述 P-GW, 使所述 P-GW 根据所述策略与计费规则更新消息停止或启动所述 UE的至少一个承载的数据传输; 其中所 述策略与计费规则更新消息中包含用于关闭或开启数据连接的准入控制策略。
7、 根据权利要求 1-6任一项所述的方法, 其特征在于, 所述第一指示信息包括第二指示 信息, 其中所述第二指示信息用于指示关闭或开启特定业务流的数据连接;
所述第二指示信息包括: 所述特定业务流的识别信息和所述特定业务流对应的应用程序 的信息中的任一种或多种; 其中所述特定业务流的识别信息包括特定业务流的源网络互联协 议 IP地址、 目的 IP地址、 源端口号、 目的端口号和协议类型中的任一种或多种; 所述特定 业务流对应的应用程序的信息包括应用程序标识、 应用程序名称、 应用程序编号中的任一种 或多种。
8、 根据权利要求 1或 2所述的方法, 其特征在于, 所述 UE传输所述第一指示信息至 P-GW,使所述 P-GW根据所述第一指示信息停止或启动所述 UE的至少一个承载的数据传输 包括:
所述 UE通过预设通道发送第二指定数据包至 P-GW, 使所述 P-GW根据所述第二指定 数据包的目的地址和 /或目的端口号获取关闭数据连接信息并根据所述关闭数据连接信息停 止所述 UE的至少一个承载的数据传输, 其中所述第二指定数据包的目的地址为第一预设值, 和 /或目的端口号为第二预设值;
或者,
所述 UE通过预设通道发送所述第二指定数据包至 P-GW, 使所述 P-GW根据所述第二 指定数据包的目的地址和 /或目的端口号获取启动数据连接信息并根据所述启动数据连接信 息启动所述 UE的至少一个承载的数据传输, 其中所述第二指定数据包的目的地址为第三预 设值, 和 /或目的端口号为第四预设值。
9、 根据权利要求 1或 2所述的方法, 其特征在于, 所述 UE传输所述第一指示信息至 P-GW,使所述 P-GW根据所述第一指示信息停止或启动所述 UE的至少一个承载的数据传输 包括:
所述 UE通过预设通道发送第二指定数据包至 P-GW, 触发所述 P-GW转发所述第二指 定数据包至 AS或 AF, 使所述 AS或 AF根据所述第二指定数据包的目的地址和 /或目的端口 号获取关闭数据连接信息并根据所述关闭数据连接信息与 PCRF 执行应用服务信息更新流 程, 所述 PCRF发送策略与计费规则更新消息至所述 P-GW, 使所述 P-GW根据策略与计费 规则更新消息停止所述 UE的至少一个承载的数据传输; 其中所述策略与计费规则更新消息 中包含用于关闭数据连接的准入控制策略; 其中所述第二指定数据包的目的地址为第一预设 值, 和 /或目的端口号为第二预设值;
或者,
所述 UE通过预设通道发送第二指定数据包至 P-GW, 触发所述 P-GW转发所述第二指 定数据包至 AS或 AF, 使所述 AS或 AF根据所述第二指定数据包的目的地址和 /或目的端口 号获取启动数据连接信息并根据所述启动数据连接信息与 PCRF 执行应用服务信息更新流 程, 所述 PCRF发送策略与计费规则更新消息至所述 P-GW, 使所述 P-GW根据策略与计费 规则更新消息启动所述 UE的至少一个承载的数据传输; 其中所述策略与计费规则更新消息 中包含用于启动数据连接的准入控制策略; 其中所述第二指定数据包的目的地址为第三预设 值, 和 /或目的端口号为第四预设值。
10、 根据权利要求 8或 9所述的方法, 其特征在于, 所述第二指定数据包包括第二指示 信息, 其中所述第二指示信息用于指示关闭或开启特定业务流的数据连接;
所述第二指示信息包括: 所述特定业务流的识别信息和所述特定业务流对应的应用程序 的信息中的任一种或多种; 其中所述特定业务流的识别信息包括特定业务流的源 IP地址、 目 的 IP地址、 源端口号、 目的端口号和协议类型中的任一种或多种; 所述特定业务流对应的应 用程序的信息包括应用程序标识、 应用程序名称、 应用程序编号中的任一种或多种。
11、 一种数据连接管理的方法, 其特征在于, 包括:
分组数据网络网关 P-GW接收用户设备 UE传输的第一指示信息, 其中所述第一指示信 息用于指示关闭或开启数据连接;
所述 P-GW根据所述第一指示信息停止或启动所述 UE的至少一个承载的数据传输。
12、 根据权利要求 11所述的方法, 其特征在于, 所述 P-GW接收 UE传输的第一指示信 息包括:
P-GW接收移动管理实体 MME经服务网关 S-GW传输的第一指示信息, 其中所述第一 指示信息由 UE通过服务请求消息, 跟踪区更新请求消息, 或请求承载资源修改消息发送至 所述 MME, 所述第一指示信息由所述 MME从所述服务请求消息, 跟踪区更新请求消息, 或 请求承载资源修改消息中获取。
13、 根据权利要求 12所述的方法, 其特征在于, 当所述第一指示信息由 UE通过服务请 求消息或跟踪区更新请求消息发送至所述 MME时, 所述 P-GW根据所述第一指示信息停止 或启动所述 UE的至少一个承载的数据传输之后, 进一步包括:
所述 P-GW发送修改承载响应经所述 S-GW至所述 MME,使所述 MME根据所述修改承 载响应发送数据连接更新响应至所述 UE, 以通知所述 UE, 所述 P-GW 已停止或启动所述 UE的至少一个承载的数据传输。
14、 根据权利要求 11所述的方法, 其特征在于, 所述 P-GW接收 UE传输的第一指示信 息包括:
P-GW接收 UE通过预设通道传输的第一指定数据包,其中所述第一指定数据包中包含第 一指示信息。
15、 根据权利要求 11-14任一项所述的方法, 其特征在于, 所述 P-GW根据所述第一指 示信息停止或启动所述 UE的至少一个承载的数据传输包括:
所述 P-GW根据所述第一指示信息与策略和计费规则功能实体 PCRF执行策略更新处理, 接收所述 PCRF发送的所述策略更新处理后的准入控制策略, 根据所述准入控制策略停止或 启动所述 UE的至少一个承载的数据传输。
16、 根据权利要求 11所述的方法, 其特征在于, 所述 P-GW接收 UE传输的第一指示信 息包括:
P-GW接收 UE通过预设通道传输的第一指定数据包,其中所述第一指定数据包中包括第 一指示信息; 所述 P-GW根据所述第一指示信息停止或启动所述 UE的至少一个承载的数据传输包括: 所述 P-GW转发所述第一指定数据包至应用服务器 AS或应用功能实体 AF, 使所述 AS 或 AF从所述第一指定数据包中获取所述第一指示信息并根据所述第一指示信息与 PCRF执 行应用服务信息更新处理;
所述 P-GW接收所述 PCRF在所述应用服务信息更新处理后生成的策略与计费规则更新 消息, 根据所述策略与计费规则更新消息停止或启动所述 UE的至少一个承载的数据传输; 其中所述策略与计费规则更新消息中包含用于关闭或开启数据连接的准入控制策略。
17、 根据权利要求 11-16任一项所述的方法, 其特征在于, 所述第一指示信息包括第二 指示信息, 其中所述第二指示信息用于指示关闭或开启特定业务流的数据连接;
所述第二指示信息包括: 所述特定业务流的识别信息和所述特定业务流对应的应用程序 的信息中的任一种或多种; 其中所述特定业务流的识别信息包括特定业务流的源网络互联协 议 IP地址、 目的 IP地址、 源端口号、 目的端口号和协议类型中的任一种或多种; 所述特定 业务流对应的应用程序的信息包括应用程序标识、 应用程序名称、 应用程序编号中的任一种 或多种。
18、 根据权利要求 11所述的方法, 其特征在于, 所述 P-GW接收 UE传输的第一指示信 息包括:
P-GW接收 UE通过预设通道传输的第二指定数据包;
所述 P-GW根据所述第一指示信息停止或启动所述 UE的至少一个承载的数据传输包括: 所述 P-GW根据所述第二指定数据包的目的地址和 /或目的端口号获取关闭或开启数据连 接信息, 其中如果所述第二指定数据包的目的地址为第一预设值, 和 /或目的端口号为第二预 设值, 则所述第二指定数据包对应于关闭数据连接; 或者, 如果所述第二指定数据包的目的 地址为第三预设值, 和 /或目的端口号为第四预设值, 则所述第二指定数据包对应于开启数据 连接;
所述 P-GW根据所述关闭或开启数据连接信息停止或启动所述 UE的至少一个承载的数 据传输; 或者, 所述 P-GW根据所述关闭或开启数据连接信息与 PCRF执行策略更新处理, 接收所述 PCRF发送的准入控制策略, 根据所述准入控制策略停止或启动所述 UE的至少一 个承载的数据传输。
19、 根据权利要求 11所述的方法, 其特征在于, 所述 P-GW接收 UE传输的第一指示信 息包括:
P-GW接收 UE通过预设通道传输的第二指定数据包;
所述 P-GW根据所述第一指示信息停止所述 UE的至少一个承载的数据传输包括: 所述 P-GW转发所述第二指定数据包至 AS或 AF, 使所述 AS或 AF根据所述第二指定 数据包的目的地址和 /或目的端口号获取关闭或开启数据连接信息并根据所述关闭或开启数 据连接信息与 PCRF执行应用服务信息更新处理, 其中如果所述第二指定数据包的目的地址 为第一预设值,和 /或目的端口号为第二预设值,则所述第二指定数据包对应于关闭数据连接; 或者, 如果所述第二指定数据包的目的地址为第三预设值, 和 /或目的端口号为第四预设值, 则所述第二指定数据包对应于开启数据连接;
所述 P-GW接收所述 PCRF在所述应用服务信息更新处理后生成的策略与计费规则更新 消息, 根据所述策略与计费规则更新消息停止或启动所述 UE的至少一个承载的数据传输; 其中所述策略与计费规则更新消息中包含用于关闭或开启数据连接的准入控制策略。
20、 根据权利要求 18或 19所述的方法, 其特征在于, 所述第二指定数据包包括第二指 示信息, 其中所述第二指示信息用于指示关闭或开启特定业务流的数据连接;
所述第二指示信息包括: 所述特定业务流的识别信息和所述特定业务流对应的应用程序 的信息中的任一种或多种; 其中所述特定业务流的识别信息包括特定业务流的源 IP地址、 目 的 IP地址、 源端口号、 目的端口号和协议类型中的任一种或多种; 所述特定业务流对应的应 用程序的信息包括应用程序标识、 应用程序名称、 应用程序编号中的任一种或多种。
21、根据权利要求 11所述的方法, 其特征在于, 所述 P-GW根据所述第一指示信息停止 所述 UE的至少一个承载的数据传输包括:
所述 P-GW执行承载删除流程, 将除所述至少一个承载中的缺省承载之外的其他承载删 除, 或将除所述至少一个承载中的缺省承载之外的至少一个指定承载删除;
所述 P-GW根据所述第一指示信息停止所述至少一个承载中未被删除的承载的数据传 输。
22、根据权利要求 21所述的方法, 其特征在于, 所述 P-GW根据所述第一指示信息停止 所述至少一个承载中未被删除的承载的数据传输, 包括: 所述 P-GW根据所述第一指示信息对所述未被删除的承载设定第二策略, 其中所述第二 策略用于停止所述未被删除的承载中至少一个业务流的数据传输;
所述 P-GW根据所述第二策略停止所述至少一个数据流的数据传输。
23、 根据权利要求 21或 22所述的方法, 其特征在于, 所述 P-GW执行承载删除处理, 将除所述至少一个承载中的缺省承载之外的其他承载删除之后, 进一步包括:
所述 P-GW执行承载更新流程。
24、根据权利要求 11所述的方法, 其特征在于, 所述 P-GW根据所述第一指示信息启动 所述 UE的至少一个承载的数据传输包括:
所述 P-GW根据所述第一指示信息对所述至少一个承载设定第三策略, 其中所述第三策 略用于启动所述未被删除的承载中至少一个业务流的数据传输;
所述 P-GW根据所述第三策略启动所述至少一个数据流的数据传输。
25、 一种用户设备 UE, 其特征在于, 包括:
获取模块, 用于获取第一指示信息, 所述第一指示信息用于指示关闭或开启数据连接; 传输模块, 用于传输所述第一指示信息至分组数据网络网关 P-GW, 使所述 P-GW根据 所述第一指示信息停止或启动所述 UE的至少一个承载的数据传输。
26、 根据权利要求 25所述的 UE, 其特征在于, 进一步包括:
设定模块, 用于根据所述第一指示信息对所述至少一个承载设定第一策略, 其中所述第 一策略用于停止或启动所述至少一个承载中至少一个业务流的数据传输;
传输控制模块, 用于根据所述第一策略停止或启动所述至少一个业务流的数据传输。
27、 根据权利要求 25所述的 UE, 其特征在于, 进一步包括:
删除模块, 用于接收所述 P-GW发起的删除承载请求, 删除所述至少一个承载中的部分 承载;
策略设定模块, 用于根据所述第一指示信息对所述至少一个承载中未被删除的承载设定 第二策略, 其中所述第二策略用于停止所述未被删除的承载中至少一个业务流的数据传输; 停止传输模块, 用于根据所述第二策略停止所述至少一个业务流的数据传输。
28、 根据权利要求 25或 26所述的 UE, 其特征在于, 所述传输模块包括: 第一发送单元, 用于发送服务请求消息, 跟踪区更新请求消息, 或请求承载资源修改消 息至移动管理实体 MME,使所述 MME从所述服务请求消息、跟踪区更新请求消息或请求承 载资源修改消息中获取所述第一指示信息并将所述第一指示信息经服务网关 S-GW传输至
29、 根据权利要求 25或 26所述的 UE, 其特征在于, 所述传输模块包括:
第二发送单元, 用于通过预设通道发送第一指定数据包至 P-GW, 其中所述第一指定数 据包中包含所述第一指示信息。
30、 根据权利要求 25或 26所述的 UE, 其特征在于, 所述传输模块包括:
第三发送单元, 用于通过预设通道发送第一指定数据包至 P-GW, 触发所述 P-GW转发 所述第一指定数据包至应用服务器 AS或应用功能实体 AF, 使所述 AS或 AF从所述第一指 定数据包中获取所述第一指示信息并根据所述第一指示信息与策略和计费规则功能实体 PCRF执行应用服务信息更新流程, 所述 PCRF发送策略与计费规则更新消息至所述 P-GW, 使所述 P-GW根据策略与计费规则更新消息停止或启动所述 UE的至少一个承载的数据传输; 其中所述策略与计费规则更新消息中包含用于关闭或开启数据连接的准入控制策略。
31、 根据权利要求 25或 26所述的 UE, 其特征在于, 所述传输模块包括:
第四发送单元, 用于通过预设通道发送所述第二指定数据包至 P-GW, 使所述 P-GW根 据所述第二指定数据包的目的地址和 /或目的端口号获取关闭数据连接信息, 并根据所述关闭 数据连接信息停止所述 UE的至少一个承载的数据传输, 其中所述第二指定数据包的目的地 址为第一预设值, 和 /或目的端口号为第二预设值;
或者,
第五发送单元, 用于通过预设通道发送所述第二指定数据包至 P-GW, 使所述 P-GW根 据所述第二指定数据包的目的地址和 /或目的端口号获取启动数据连接信息, 并根据所述启动 数据连接信息启动所述 UE的至少一个承载的数据传输, 其中所述第二指定数据包的目的地 址为第三预设值, 和 /或目的端口号为第四预设值。
32、 根据权利要求 25或 26所述的 UE, 其特征在于, 所述传输模块包括: 第六发送单元, 用于通过预设通道发送第二指定数据包至 P-GW, 触发所述 P-GW转发 所述第二指定数据包至 AS或 AF, 使所述 AS或 AF根据所述第二指定数据包的目的地址和 / 或目的端口号获取关闭数据连接信息并根据所述关闭数据连接信息与 PCRF执行应用服务信 息更新流程, 所述 PCRF发送策略与计费规则更新消息至所述 P-GW, 使所述 P-GW根据策 略与计费规则更新消息停止所述 UE的至少一个承载的数据传输; 其中所述策略与计费规则 更新消息中包含用于关闭数据连接的准入控制策略; 其中所述第二指定数据包的目的地址为 第一预设值, 和 /或目的端口号为第二预设值;
或者,
第七发送单元, 用于通过预设通道发送第二指定数据包至 P-GW, 触发所述 P-GW转发 所述第二指定数据包至 AS或 AF, 使所述 AS或 AF根据所述第二指定数据包的目的地址和 / 或目的端口号获取启动数据连接信息并根据所述启动数据连接信息与 PCRF执行应用服务信 息更新流程, 所述 PCRF发送策略与计费规则更新消息至所述 P-GW, 使所述 P-GW根据策 略与计费规则更新消息启动所述 UE的至少一个承载的数据传输; 其中所述策略与计费规则 更新消息中包含用于启动数据连接的准入控制策略; 其中所述第二指定数据包的目的地址为 第三预设值, 和 /或目的端口号为第四预设值。
33、 一种分组数据网络网关 P-GW, 其特征在于, 包括:
接收模块, 用于接收用户设备 UE传输的第一指示信息, 其中所述第一指示信息用于指 示关闭或开启数据连接;
控制模块, 用于根据所述第一指示信息停止或启动所述 UE的至少一个承载的数据传输。
34、 根据权利要求 33所述的 P-GW, 其特征在于, 所述接收模块包括:
第一接收单元, 用于接收移动管理实体 MME经服务网关 S-GW传输的第一指示信息, 其中所述第一指示信息由 UE通过服务请求消息, 跟踪区更新请求消息, 或请求承载资源修 改消息发送至所述 MME,所述第一指示信息由所述 MME从所述服务请求消息, 跟踪区更新 请求消息, 或请求承载资源修改消息中获取。
35、 根据权利要求 33所述的 P-GW, 其特征在于, 进一步包括:
响应发送模块, 用于当所述第一指示信息由 UE通过服务请求消息或跟踪区更新请求消 息发送至所述 MME时, 所述 P-GW根据所述第一指示信息停止或启动所述 UE的至少一个 承载的数据传输之后,发送修改承载响应经 S-GW至 MME,使所述 MME根据所述修改承载 响应发送数据连接更新响应至 UE, 以通知所述 UE所述 P-GW已停止或启动所述 UE的至少 一个承载的数据传输。
36、 根据权利要求 33所述的 P-GW, 其特征在于, 所述接收模块包括:
第二接收单元, 用于接收 UE通过预设通道传输的第一指定数据包, 其中所述第一指定 数据包中包含第一指示信息。
37、 根据权利要求 33-36任一项所述的 P-GW, 其特征在于, 所述控制模块包括: 第一控制单元, 用于根据所述第一指示信息与策略和计费规则功能实体 PCRF执行策略 更新处理, 接收所述 PCRF发送的所述策略更新处理后的准入控制策略, 根据所述准入控制 策略停止或启动所述 UE的至少一个承载的数据传输。
38、 根据权利要求 33所述的 P-GW, 其特征在于, 所述接收模块包括:
第三接收单元, 用于接收 UE通过预设通道传输的第一指定数据包, 其中所述第一指定 数据包中包含第一指示信息;
所述控制模块包括:
第一转发单元, 用于转发所述第一指定数据包至应用服务器 AS或应用功能实体 AF, 使 所述 AS或 AF从所述第一指定数据包中获取所述第一指示信息并根据所述第一指示信息与 PCRF执行应用服务信息更新处理;
第二控制单元, 用于接收所述 PCRF在所述应用服务信息更新处理后生成的策略与计费 规则更新消息, 根据所述策略与计费规则更新消息停止或启动所述 UE的至少一个承载的数 据传输;其中所述策略与计费规则更新消息中包含用于关闭或开启数据连接的准入控制策略。
39、 根据权利要求 33所述的 P-GW, 其特征在于, 所述接收模块包括:
第四接收单元, 用于接收 UE通过预设通道传输的第二指定数据包;
所述控制模块包括:
信息获取单元, 用于根据所述第二指定数据包的目的地址和 /或目的端口号获取关闭或开 启数据连接信息, 其中如果所述第二指定数据包的目的地址为第一预设值, 和 /或目的端口号 为第二预设值, 则所述第二指定数据包对应于关闭数据连接; 或者, 如果所述第二指定数据 包的目的地址为第三预设值, 和 /或目的端口号为第四预设值, 则所述第二指定数据包对应于 开启数据连接;
第三控制单元, 用于根据所述关闭或开启数据连接信息相应的停止或启动所述 UE的至 少一个承载的数据传输; 或者, 根据所述关闭或开启数据连接信息与 PCRF执行策略更新处 理, 接收所述 PCRF发送的准入控制策略, 根据所述准入控制策略停止或启动所述 UE的至 少一个承载的数据传输。
40、 根据权利要求 33所述的 P-GW, 其特征在于, 所述接收模块包括:
第五接收单元, 用于接收 UE通过预设通道传输的第二指定数据包;
所述控制模块包括:
第二转发单元, 用于转发所述第二指定数据包至 AS或 AF, 使所述 AS或 AF根据所述 第二指定数据包的目的地址和 /或目的端口号获取关闭或开启数据连接信息并根据所述关闭 或开启数据连接信息与 PCRF执行应用服务信息更新处理, 其中如果所述第二指定数据包的 目的地址为第一预设值, 和 /或目的端口号为第二预设值, 则所述第二指定数据包对应于关闭 数据连接; 或者, 如果所述第二指定数据包的目的地址为第三预设值, 和 /或目的端口号为第 四预设值, 则所述第二指定数据包对应于开启数据连接;
第四控制单元, 用于接收所述 PCRF在所述应用服务信息更新处理后生成的策略与计费 规则更新消息, 根据所述策略与计费规则更新消息停止或启动所述 UE的至少一个承载的数 据传输;其中所述策略与计费规则更新消息中包含用于关闭或开启数据连接的准入控制策略。
41、 根据权利要求 33所述的 P-GW, 其特征在于, 所述控制模块包括:
承载删除单元, 用于执行承载删除流程, 将除所述至少一个承载中的缺省承载之外的其 他承载删除, 或将除所述至少一个承载中的缺省承载之外的至少一个指定承载删除;
第五控制单元, 用于根据所述第一指示信息停止所述至少一个承载中未被删除的承载的 数据传输。
42、 根据权利要求 41所述的 P-GW, 其特征在于, 所述第五控制单元包括:
设定子单元, 用于根据所述第一指示信息对所述未被删除的承载设定第二策略, 其中所 述第二策略用于停止所述未被删除的承载中至少一个业务流的数据传输; 停止子单元, 用于根据所述第二策略停止所述至少一个数据流的数据传输。
43、 根据权利要求 41或 42所述的 P-GW, 其特征在于, 进一步包括:
承载更新模块, 用于所述 P-GW执行承载删除处理, 将除所述至少一个承载中的缺省承 载之外的其他承载删除之后, 执行承载更新流程。
44、 根据权利要求 33所述的 P-GW, 其特征在于, 所述控制模块包括:
设定单元, 根据所述第一指示信息对所述至少一个承载设定第三策略, 其中所述第三策 略用于启动所述未被删除的承载中至少一个业务流的数据传输;
启动单元, 用于根据所述第三策略启动所述至少一个数据流的数据传输。
45、 一种数据连接管理的系统, 其特征在于, 包括如权利要求 25-32任一项所述的用户 设备 UE和如权利要求 33-44任一项所述的分组数据网络网关 P-GW。
PCT/CN2012/078810 2012-07-18 2012-07-18 一种数据连接管理的方法、装置及系统 WO2014012227A1 (zh)

Priority Applications (11)

Application Number Priority Date Filing Date Title
JP2015521930A JP5974393B2 (ja) 2012-07-18 2012-07-18 データ接続管理の方法、装置およびシステム
CN201710740601.XA CN107453917B (zh) 2012-07-18 2012-07-18 一种数据连接管理的方法、装置及系统
EP12881209.6A EP2876965B1 (en) 2012-07-18 2012-07-18 Data connection management method, device and system
CN201710740604.3A CN107613571B (zh) 2012-07-18 2012-07-18 一种数据连接管理的方法、装置及系统
CN201280001319.5A CN103875302B (zh) 2012-07-18 2012-07-18 一种数据连接管理的方法、装置及系统
PCT/CN2012/078810 WO2014012227A1 (zh) 2012-07-18 2012-07-18 一种数据连接管理的方法、装置及系统
CN201710740485.1A CN107659908B (zh) 2012-07-18 2012-07-18 一种数据连接管理的方法、装置及系统
US14/594,575 US9674889B2 (en) 2012-07-18 2015-01-12 Method, apparatus and system for data connection management
US15/495,747 US10219316B2 (en) 2012-07-18 2017-04-24 Method, apparatus and system for data connection management
US16/241,357 US10743365B2 (en) 2012-07-18 2019-01-07 Method, apparatus and system for data connection management
US16/933,707 US11570842B2 (en) 2012-07-18 2020-07-20 Method, apparatus and system for data connection management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2012/078810 WO2014012227A1 (zh) 2012-07-18 2012-07-18 一种数据连接管理的方法、装置及系统

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US14/594,575 Continuation US9674889B2 (en) 2012-07-18 2015-01-12 Method, apparatus and system for data connection management

Publications (1)

Publication Number Publication Date
WO2014012227A1 true WO2014012227A1 (zh) 2014-01-23

Family

ID=49948169

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2012/078810 WO2014012227A1 (zh) 2012-07-18 2012-07-18 一种数据连接管理的方法、装置及系统

Country Status (5)

Country Link
US (4) US9674889B2 (zh)
EP (1) EP2876965B1 (zh)
JP (1) JP5974393B2 (zh)
CN (4) CN107659908B (zh)
WO (1) WO2014012227A1 (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105025589A (zh) * 2014-04-15 2015-11-04 中国移动通信集团公司 终端设备数据传输管理方法、装置、系统及相关设备
KR20160147994A (ko) * 2014-05-05 2016-12-23 코나겐 인크. 무칼로리 감미제
JP2017526277A (ja) * 2014-08-11 2017-09-07 華為技術有限公司Huawei Technologies Co.,Ltd. データ・サービスを実装するためのデバイス及び方法
WO2018006252A1 (zh) * 2016-07-04 2018-01-11 华为技术有限公司 一种关闭分组业务数据的方法、网络设备以及用户设备
CN107979475A (zh) * 2016-10-21 2018-05-01 中国电信股份有限公司 上报和处理数据开关状态的方法、终端、pgw及系统
CN108810872A (zh) * 2017-05-03 2018-11-13 阿里巴巴集团控股有限公司 控制数据传输的方法、装置和系统

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10341239B2 (en) 2015-05-21 2019-07-02 Qualcomm Incorporated Efficient policy enforcement for downlink traffic using network access tokens—control-plane approach
CN109076320B (zh) 2016-05-25 2020-12-22 华为技术有限公司 数据业务控制方法及相关设备
WO2018049681A1 (zh) * 2016-09-19 2018-03-22 华为技术有限公司 数据业务处理方法、装置、终端及网络设备
CN109996306B (zh) 2017-12-29 2022-02-25 华为技术有限公司 通信方法和通信设备
US10673953B2 (en) * 2018-01-02 2020-06-02 Sap Se Transport channel via web socket for OData
CN110048861B (zh) * 2018-01-17 2021-01-29 华为技术有限公司 一种业务数据流处理方法及其相关设备
TWI727269B (zh) 2019-02-27 2021-05-11 瑞昱半導體股份有限公司 通用序列匯流排裝置及其資料傳輸方法
CN113678490A (zh) * 2019-04-02 2021-11-19 上海诺基亚贝尔股份有限公司 用于在上行链路中发送后台数据的机制
WO2022041116A1 (en) * 2020-08-28 2022-03-03 Telefonaktiebolaget Lm Ericsson (Publ) Management for background da ta transfer (bdt) based on dynamic tariff da ta
CN112512103B (zh) * 2020-11-02 2023-08-18 鹏城实验室 一种省电精确移动端网络测量方法
CN115955714A (zh) * 2021-10-09 2023-04-11 中国移动通信集团河南有限公司 节约网络资源的方法及系统

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020163938A1 (en) * 1999-12-02 2002-11-07 Nokia Corp. Data transmission method and apparatus
CN101286909A (zh) * 2008-06-10 2008-10-15 华中科技大学 一种自动构建无线分布式系统的方法
CN101321382A (zh) * 2007-06-05 2008-12-10 中兴通讯股份有限公司 高速分组数据会话释放方法
WO2012012788A1 (en) * 2010-07-22 2012-01-26 Qualcomm Incorporated Coordinating transmission hold and resume in td-scdma

Family Cites Families (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE60106706T2 (de) * 2000-02-17 2005-03-10 Samsung Electronics Co., Ltd., Suwon Verfahren und vorrichtung zur zuweisung eines gemeinsames paketkanals in einem cdma-nachrichtensystem
US6621793B2 (en) * 2000-05-22 2003-09-16 Telefonaktiebolaget Lm Ericsson (Publ) Application influenced policy
US7006481B2 (en) * 2002-10-10 2006-02-28 Interdigital Technology Corporation System and method for integrating WLAN and 3G
US8488462B2 (en) * 2002-12-31 2013-07-16 Nokia Corporation Handling traffic flows in a mobile communications network
US8130718B2 (en) 2004-12-09 2012-03-06 Interdigital Technology Corporation Method and system for interworking of cellular networks and wireless local area networks
CN1956451B (zh) * 2005-10-28 2010-05-12 华为技术有限公司 一种实现多媒体广播/组播业务中会话开始的方法
KR20070081050A (ko) * 2006-02-09 2007-08-14 삼성전자주식회사 무선 통신 시스템에서 트랙킹 영역 설정 방법 및 그 시스템
KR100957348B1 (ko) 2006-10-16 2010-05-12 삼성전자주식회사 이동 통신 시스템에서 불연속 수신 모드에서 동작하는 단말이 핸드 오버를 수행하는 방법 및 장치
CN101466083B (zh) * 2007-12-18 2010-12-08 华为技术有限公司 一种紧急呼叫方法和装置
CN101494848B (zh) * 2008-01-25 2013-08-07 华为技术有限公司 业务挂起的方法、业务恢复的方法、系统及设备
CN101472256B (zh) 2008-04-03 2011-04-20 华为技术有限公司 承载挂起的方法、承载恢复的方法、网关代理及通信系统
CN101286915B (zh) * 2008-06-11 2012-05-09 中兴通讯股份有限公司 分组数据网络的接入控制方法和系统、pcrf实体
CN101610201A (zh) * 2008-06-20 2009-12-23 大唐移动通信设备有限公司 实现pdn连接释放的方法、装置和系统
JPWO2010016241A1 (ja) * 2008-08-06 2012-01-19 パナソニック株式会社 プレフィックス割り当て管理システム及び移動端末並びにプレフィックス割り当て管理装置
CN101742453B (zh) * 2008-11-06 2013-01-09 华为技术有限公司 接入控制的方法、系统及接入控制网元
CN101742452B (zh) * 2008-11-10 2012-08-29 华为技术有限公司 承载管理方法、相关设备及网络系统
US20100124223A1 (en) * 2008-11-18 2010-05-20 Andrew Gibbs Selective paging in wireless networks
US8289848B2 (en) * 2009-02-02 2012-10-16 Telefonaktiebolaget Lm Ericsson (Publ) Controlling a packet flow from a user equipment
CN101931928B (zh) * 2009-06-19 2014-08-13 中兴通讯股份有限公司 漫游场景下单apn多pdn连接的策略计费控制的方法及系统
US9107032B2 (en) * 2009-08-21 2015-08-11 Alcatel Lucent Method of collecting per-user performance data
EP2478658B1 (en) * 2009-09-18 2022-12-07 BlackBerry Limited Method and system for hybrid automatic repeat request operation for uplink coordinated multi-point signaling
US8406192B2 (en) * 2009-10-02 2013-03-26 Research In Motion Limited Handover mechanisms with synchronous PDCP protocol under various relay architectures
JP5527814B2 (ja) * 2010-04-28 2014-06-25 Necカシオモバイルコミュニケーションズ株式会社 通信端末装置、通信システム、通信制御方法、ならびに、プログラム
US9749880B2 (en) * 2010-06-30 2017-08-29 Verizon Patent And Licensing Inc. Base station failover using neighboring base stations as relays
US9723528B2 (en) * 2010-09-20 2017-08-01 Blackberry Limited Methods and apparatus to provide packet switched service continuity during circuit switched fallback operation
WO2012093433A1 (ja) 2011-01-06 2012-07-12 日本電気株式会社 ポリシ決定システム、ポリシ決定方法、及び非一時的なコンピュータ可読媒体
CN103299702B (zh) 2011-01-06 2017-07-07 日本电气株式会社 移动通信系统、控制设备、策略供应系统、状态转变控制方法和策略供应方法
JP5021821B2 (ja) * 2011-01-07 2012-09-12 株式会社エヌ・ティ・ティ・ドコモ 移動通信方法、移動管理ノード及びサービングゲートウェイ装置
GB2493508B (en) * 2011-07-27 2014-06-18 Samsung Electronics Co Ltd Controlling data transmission between a user equipment and a acket data network
CN102291295B (zh) 2011-07-29 2014-11-05 电信科学技术研究院 一种pdn连接的管理方法和设备
US9913163B2 (en) * 2011-11-16 2018-03-06 Telefonaktiebolaget Lm Ericsson (Publ) UE control of downlink data
CN103179085B (zh) * 2011-12-20 2017-04-12 华为技术有限公司 网际协议头置换映射关系的获取方法及网络节点
WO2013118978A1 (ko) * 2012-02-06 2013-08-15 삼성전자 주식회사 무선 통신 시스템에서 small data를 효율적으로 전송하는 방법 및 장치
CN104349400B (zh) * 2013-07-23 2019-04-05 华为技术有限公司 无线通信的方法、有线传输检测的方法及相关设备
KR102458117B1 (ko) * 2015-03-20 2022-10-21 닛본 덴끼 가부시끼가이샤 통신 시스템, 관리 장치, 통신 단말, 통신 제어 방법, 센서 정보 송신 방법, 및 컴퓨터 판독가능 매체

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020163938A1 (en) * 1999-12-02 2002-11-07 Nokia Corp. Data transmission method and apparatus
CN101321382A (zh) * 2007-06-05 2008-12-10 中兴通讯股份有限公司 高速分组数据会话释放方法
CN101286909A (zh) * 2008-06-10 2008-10-15 华中科技大学 一种自动构建无线分布式系统的方法
WO2012012788A1 (en) * 2010-07-22 2012-01-26 Qualcomm Incorporated Coordinating transmission hold and resume in td-scdma

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105025589A (zh) * 2014-04-15 2015-11-04 中国移动通信集团公司 终端设备数据传输管理方法、装置、系统及相关设备
KR20160147994A (ko) * 2014-05-05 2016-12-23 코나겐 인크. 무칼로리 감미제
KR102378988B1 (ko) 2014-05-05 2022-03-28 코나겐 인크. 무칼로리 감미제
JP2017526277A (ja) * 2014-08-11 2017-09-07 華為技術有限公司Huawei Technologies Co.,Ltd. データ・サービスを実装するためのデバイス及び方法
US10225412B2 (en) 2014-08-11 2019-03-05 Huawei Technologies Co., Ltd. Device and method for implementing data service
US10798251B2 (en) 2014-08-11 2020-10-06 Huawei Technologies Co., Ltd. Device and method for implementing data service
WO2018006252A1 (zh) * 2016-07-04 2018-01-11 华为技术有限公司 一种关闭分组业务数据的方法、网络设备以及用户设备
CN107979475A (zh) * 2016-10-21 2018-05-01 中国电信股份有限公司 上报和处理数据开关状态的方法、终端、pgw及系统
CN108810872A (zh) * 2017-05-03 2018-11-13 阿里巴巴集团控股有限公司 控制数据传输的方法、装置和系统

Also Published As

Publication number Publication date
JP5974393B2 (ja) 2016-08-23
US9674889B2 (en) 2017-06-06
CN107659908A (zh) 2018-02-02
EP2876965B1 (en) 2023-09-06
EP2876965A4 (en) 2015-10-07
US20150124763A1 (en) 2015-05-07
US10743365B2 (en) 2020-08-11
CN107453917B (zh) 2020-07-14
CN103875302A (zh) 2014-06-18
US20170230512A1 (en) 2017-08-10
CN103875302B (zh) 2017-10-27
JP2015523819A (ja) 2015-08-13
CN107453917A (zh) 2017-12-08
US11570842B2 (en) 2023-01-31
CN107659908B (zh) 2021-06-22
US20200351978A1 (en) 2020-11-05
US20190141780A1 (en) 2019-05-09
CN107613571A (zh) 2018-01-19
EP2876965A1 (en) 2015-05-27
US10219316B2 (en) 2019-02-26
CN107613571B (zh) 2021-05-18

Similar Documents

Publication Publication Date Title
WO2014012227A1 (zh) 一种数据连接管理的方法、装置及系统
TWI754140B (zh) 處理qos 流的方法及使用者設備
EP2469930A1 (en) Method, system and transmission distribution network element for indicating data-distribution
WO2009043209A1 (fr) Procédé permettant d'établir une porteuse vers un terminal utilisateur en mode repos
KR20170132249A (ko) 사용자 플레인 베어러 확립을 제어하는 방법 및 장치
WO2009089790A1 (fr) Procédé pour l'acquisition du type d'un service support et pour la commutation entre réseaux supports pour des terminaux
EP3379872B1 (en) Methods and apparatuses for transmitting downlink data notification message
WO2013053133A1 (zh) 业务数据传输处理方法、设备以及通信系统
WO2009132582A1 (zh) 一种删除承载的方法与装置
WO2020034802A1 (zh) 一种激活pdu会话的方法及设备
WO2009076814A1 (zh) 一种pcc规则更新方法和设备
KR102284953B1 (ko) 소프트웨어 정의 네트워크 기반 이동통신 시스템에서 제어 메시지 전송 방법 및 장치
JP2017538334A (ja) データ処理方法、装置、端末、モビリティ管理エンティティ、およびシステム
WO2011050663A1 (zh) 支持本地ip访问的通信系统中隧道更新方法与系统
WO2013170437A1 (zh) 缺省承载上策略计费控制规则移除方法和装置
WO2011085623A1 (zh) 本地接入网关获取终端的寻呼信息的方法和系统
WO2011035719A1 (zh) 一种释放本地连接的方法及系统
WO2011032522A1 (zh) 一种实现本地接入的系统及方法
WO2010040268A1 (zh) 一种网络侧与空闲状态终端分离的方法
WO2018228309A1 (zh) 缓存控制方法、网元及控制器
WO2012139478A1 (zh) 一种多接入技术的传输方法及装置
WO2018137216A1 (zh) 一种信息传输方法、设备及系统
WO2011063692A1 (zh) 一种数据缓存单元区分网络链接类型的方法及系统
WO2011097988A1 (zh) 对本地ip数据进行管理的方法及移动通信系统
WO2019223477A1 (zh) 会话处理方法及装置、网元及存储介质

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12881209

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2012881209

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2015521930

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE