WO2013165099A1 - Procédé d'établissement d'échéancier et appareil associé - Google Patents

Procédé d'établissement d'échéancier et appareil associé Download PDF

Info

Publication number
WO2013165099A1
WO2013165099A1 PCT/KR2013/002820 KR2013002820W WO2013165099A1 WO 2013165099 A1 WO2013165099 A1 WO 2013165099A1 KR 2013002820 W KR2013002820 W KR 2013002820W WO 2013165099 A1 WO2013165099 A1 WO 2013165099A1
Authority
WO
WIPO (PCT)
Prior art keywords
project
schedule
activity
communication terminal
user
Prior art date
Application number
PCT/KR2013/002820
Other languages
English (en)
Korean (ko)
Inventor
윤영식
Original Assignee
Youn Young Sik
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Youn Young Sik filed Critical Youn Young Sik
Publication of WO2013165099A1 publication Critical patent/WO2013165099A1/fr

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/40Business processes related to the transportation industry

Definitions

  • a user downloads a project or grouping activities related to each other through a service operator or a community (an event in which a specific date or a specific time is determined at a specific time) and adjusts them according to their schedule.
  • the present invention relates to a schedule management method and apparatus that can be downloaded and used after adjusting the schedule of a project or each activity according to its own schedule through a service operator or a community.
  • schedule management tools and methods are provided in this way, there are not many people who continuously manage their schedules using one schedule management tool and method. Even if you don't have a schedule management tool at the time you need to record it, or if you're not comfortable using the existing schedule management tool, or you're bothered to enter it every time a schedule is created, or how you want to manage your schedule, They may not use schedule management tools because they do not know whether they should be established.
  • the schedule management tool exists in various forms, in recent years, the schedule management tool in the form of a smartphone application has attracted attention in that it must be available when needed. Paper-based schedule management tools, such as Franklin Planner, which have been used in the past, are still used, but they are not always easy to carry, but bulky and inconvenient in terms of convenience functions such as search functions.
  • the schedule management tool in the form of a personal computer program also has limitations that cannot be used if it is not in front of the computer, and the service provided on the Internet can be used on a smartphone, but the process of connecting to the service is cumbersome.
  • the schedule management tool has limitations that are difficult to use by adding various functions in addition to those provided at the time of release.
  • schedule management tools manage all schedules separately, except schedules that repeat on the same day every week or on the same day every month or every year. Although not repeated weekly, monthly, or daily, there may be a set of events that repeat on a particular interval date from that event if there is a particular event.
  • a car salesman sells a car
  • each customer calls a thank you phone a few days after the sale date, a few days later to check the car's condition, and a few months later to provide guidance on car maintenance. I can make a phone call.
  • each customer has to enter each schedule one by one.
  • a communication terminal user downloads a project grouping activities related to each other through a service operator or a community
  • the communication terminal user readjusts and utilizes an existing schedule of activities of the project according to a user's own schedule.
  • the present invention is a project that a communication terminal user has downloaded from his or her communication terminal in order to allow the communication terminal user to download a project grouping activities related to each other through a service operator or a community and recycle them according to their own schedule. If you select, the earliest or latest date among the activities of the activities included in the project is displayed or the earliest and latest date are displayed together. If you change the schedule to and save it, the schedule management method calculates the interval between all the activities included in the project and the schedule before the user changes the schedule, and automatically reschedules it to be the same interval based on the changed schedule. And provide that device do.
  • the present invention is a project that a communication terminal user has downloaded from his or her communication terminal in order to allow the communication terminal user to download a project grouping activities related to each other through a service operator or a community and recycle them according to their own schedule.
  • a schedule management method and an apparatus which can be readjusted to maintain the same interval.
  • the schedule of each activity included in the project is based on the D-day.
  • Set a schedule for example, D-Day, D-Day days before or D-Day days
  • the communication terminal user selects the downloaded project the user inputs his schedule to be used for the D-Day.
  • the present invention provides a communication terminal user in a service operator or community in order to enable the communication terminal user to download and use after re-scheduling a project grouping activities related to each other through a service operator or community according to their own schedule
  • the schedule shows the earliest or latest date of the activities included in the project, or the earliest and latest date together, and the user of the telecommunications terminal can select one of the earliest or latest date. If you change to your own schedule, it calculates the interval between the schedules of all activities in the project and the schedule before the user changes, and automatically reschedules them to the same interval based on the changed schedule and downloads them.
  • Method and It provides an apparatus.
  • the present invention provides a communication terminal user in a service operator or community in order to enable the communication terminal user to download and use after re-scheduling a project grouping activities related to each other through a service operator or community according to their own schedule After you select a project, enter your own schedule to start the project, that is, the date on which the activities included in the project will run, which will be the fastest.
  • the present invention provides a schedule management method and apparatus for re-scheduling and downloading all activities included in a project based on a date selected by a user.
  • a schedule of each activity included in a project can be downloaded so that a communication terminal user can download and utilize a project grouping activities related to each other through a service operator or a community according to his or her schedule.
  • Set the schedule based on for example, D-Day, D-Day before or D-Day
  • a schedule management method and apparatus for calculating a schedule of activities in a group, generating a project, and utilizing the generated project according to a schedule are provided.
  • the present invention provides a schedule management method and apparatus for allowing a communication terminal user to newly determine a D-day of a project previously created and used according to his / her schedule, and to reschedule and use activities in the project according to the newly-determined D-day. to provide.
  • the present invention is set to check whether the activities in the project in order to check whether the implementation of the planned schedule is well carried out, and then the schedule management method to calculate and display the performance ratio of each activity visually and its Provide the device.
  • the present invention integrates a to-do program that manages when and when to start a date, a schedule program that manages what to do at a particular time of day, and a memo program that manages tasks not yet scheduled into one program. To provide a schedule management method and the device to manage.
  • the present invention provides a schedule management method that enables a user of a communication terminal to directly add a new activity to a project grouping related activities downloaded through a service operator or a community, or to delete or change an existing activity. And its apparatus.
  • a schedule management method includes: (1) a communication terminal performing a communication connection to a server computer managing a project grouping individual activities or related activities to be used for scheduling through a network communication network; Performing a check and retrieval of a list of activities or projects created or registered by the server operator or registered by other users; and (2) the server computer performs a check and retrieval of a list of activities or projects through step (1). Confirming the download selection of a specific activity or project of a user, and downloading the selected activity or project to be used for scheduling to the corresponding communication terminal, and (3) the communication terminal confirms the user's operation to the server.
  • step (4) The use of a specific project downloaded from a computer (4) If the use of the project is selected as a result of the determination in step (4) and (3), the communication terminal checks the schedule that the user changes and inputs, and based on the newly determined schedule, the communication terminal checks in the project downloaded from the server computer. (B) automatically rescheduling each activity, and (5) the communication terminal stores the activities of the rescheduled project in the step (4) through the schedule management tool on the corresponding date to perform the schedule management. It may include.
  • the schedule management method (6) the server computer, re-scheduling and download selection of the specific project of the user who performed the check and search of the activity or project list through step (1) If reschedule and download is selected, rescheduling the existing schedule of the project generated by the server operator or created by other users in the community according to their schedule, and downloading the rescheduled project to the corresponding communication terminal, (7)
  • the communication terminal may further perform a step of performing schedule management by rescheduling the schedule from the server computer in step (6) through the schedule management tool and storing each downloaded activity in the project on the corresponding date. .
  • the schedule management method after the step (5), (8) the communication terminal, if the specific project is selected to confirm whether or not the practice of the planned schedule is set to enable the operation check function, Checking the user's operation through the schedule management tool to check the activity of each activity in the project, calculating the performance ratio of each activity based on the result of the activity check, and displaying the result of the performance ratio on the screen. You can do more.
  • step (3) If the determination result of step (3) is not utilizing the specific project downloaded from the server computer, the communication terminal is associated with each other among the activities downloaded from the server computer Judging whether it is selected to create a project by grouping existing activities, and (10) (9), when selecting to generate a project by grouping activities related to each other, the communication terminal performs a user's operation. After checking and grouping activities related to each other among the activities downloaded from the server computer, if the base date of the grouped activities is determined, the step of calculating the schedule of each activity in the group may be further performed. .
  • a method for managing a schedule may include: (a) determining, by a communication terminal, a user's operation to determine which one of the projects previously used by the user is selected; b) If the determination result shows that the utilization of any one of the previously used projects is selected, the communication terminal checks the schedule inputted by the user and automatically reschedules each activity in the project based on the newly determined schedule. And, (c) the communication terminal, through the schedule management tool may include the step of performing the schedule management by storing each activity in the project rescheduled in step (b) on the corresponding date.
  • the schedule management apparatus to connect the unspecified multiple communication lines to each other to perform data communication related to schedule management, and the schedule schedule and the server computer connected through the network communication network Check and search the list of activities or projects to be used for management, and download specific activities or projects from the server computer according to the user's download selection, and then download them from the server computer based on the newly determined schedule entered by the user of the downloaded project. Automatically reschedule each activity in a received project, or related activities registered by a server administrator or other users, depending on the download selection after rescheduling a specific project registered in the community of the user's server computer.
  • the rescheduled project After rescheduling the existing schedule of the projects that grouped the activities to their own schedule, the rescheduled project is downloaded from the server computer, and each activity in the rescheduled project is saved on the date using the calendar tool, or After rescheduling, each downloaded activity in the downloaded project is saved on the relevant date, and the communication terminal performs the scheduling, and the individual activities or related activities that are created by the server computer operator or used by other users for scheduling.
  • It stores the project grouping the existing activities, and handles the download of the project grouping the individual activities or related activities at the request of the communication terminal connected through the network network, or the server operator or Other users can create a remediation an existing schedule of activities within each specific project registered according to the user's own schedule, and then include the server computer to download the event is re-project into the communication terminal.
  • the schedule management tool is performing the schedule management Check the activity check of each activity in the project, calculate the execution rate of each activity based on the check result of the action, and convert the calculated execution rate result into text or picture to perform the function of displaying on the screen. can do.
  • the communication terminal of the schedule management apparatus is selected to group a related activity among each of the activities downloaded from the server computer according to a user's operation, and generate a project
  • the communication terminal downloads from the server computer.
  • the project is created by calculating the schedule of each activity in the group, and the schedule management tool displays the activities in the project. It can be configured to perform more functions to save schedules.
  • the schedule management apparatus if the utilization of any one of the project previously used by the user according to the user's operation is selected, after the user checks the schedule to change and input newly determined Based on the schedule, each activity in the project is automatically rescheduled, and the schedule management tool can be configured to save each activity in the rescheduled project on the date and perform the schedule management.
  • the schedule management method and apparatus of the present invention according to a new schedule or a special purpose of a project grouping the activities that are created by the user of the communication terminal directly, or downloaded through the service operator or community After the communication terminal user downloads various activities through the service operator or community, the related activities can be grouped together to create a project and use it for scheduling. Through this, users can easily adjust and manage the schedule because the existing schedule of the project grouping related activities can be readjusted and downloaded and used according to their own schedule.
  • FIG. 1 is a block diagram schematically showing the configuration of a schedule management apparatus according to an embodiment of the present invention
  • FIG. 2 is a block diagram showing the configuration of the communication terminal of FIG. 1 in more detail;
  • FIG. 3 is a block diagram showing in detail the configuration of the server computer of FIG.
  • 5 to 8 are flowcharts showing in more detail the operation of each subroutine of FIG.
  • FIG. 9 is a flowchart showing in detail the operation of the schedule management method according to another embodiment of the present invention.
  • FIG. 1 is a block diagram schematically showing the configuration of a schedule management apparatus according to an embodiment of the present invention.
  • the schedule management apparatus of the present invention includes a network communication network 100, a communication terminal 200, a server computer 300, and the like.
  • the network communication network 100 is a communication network such as a wired / wireless internet, and connects a communication line between the communication terminal 200 and the server computer 300 so that data communication related to schedule management is performed.
  • the communication terminal 200 is a terminal capable of using a wired / wireless internet such as a mobile phone, a smartphone, a laptop, a netbook, a tablet PC, and the like, and communicates with the server computer 300 through the network communication network 100 according to a user's operation. Proceed with (for example, access to the application installed on the smartphone, web access, etc.), and checks and searches the list of activities or projects to be used for schedule management and server computer 300 is connected to the communication. After downloading a specific activity or project to be used for scheduling from the server computer 300 according to the user's download selection, each project in the project downloaded from the server computer 300 based on a newly determined schedule input by the user of the downloaded project.
  • a wired / wireless internet such as a mobile phone, a smartphone, a laptop, a netbook, a tablet PC, and the like.
  • the communication terminal 200 checks whether or not the activities of each activity in the project are being executed through the schedule management tool. Check the performance, calculate the performance rate of each activity, and convert the calculated performance rate result to a character (for example, a number, a symbol, etc.) or a picture (for example, a table, a figure, etc.) You can further perform the function to display on the screen.
  • a character for example, a number, a symbol, etc.
  • a picture for example, a table, a figure, etc.
  • the communication terminal 200 selects to generate a project by grouping related activities among the activities downloaded from the server computer 300 according to a user's operation, the activities downloaded from the server computer 300.
  • the project is created by calculating the schedule of each activity in the group, and each activity in the project is saved on the corresponding date by the schedule management tool. Can perform the function to perform the schedule management.
  • the server computer 300 stores an individual activity or a project grouping activities related to each other, which are directly generated by the server operator or used for a schedule created and registered by other users (for example, in a bulletin board format).
  • a specific activity or a download of a project grouping activities related to each other is processed, or a server operator or another user creates and registers a specific project.
  • the rescheduled project is downloaded to the corresponding communication terminal 200.
  • the activity registered in the server computer 300 is event information that determines what to perform on a specific date or a specific time of a certain date, and the project is a grouping of activities related to each other.
  • the server computer 300 may further perform a function of configuring a community for each project generated by the server operator or registered by other users.
  • users of each communication terminal 200 may exchange additional schedules or information with each other through the community for each project, and the server computer 300 may download the project from the communication terminal 200 to the community of the corresponding project.
  • the server computer 300 configures an SNS (Social Network Service) through a schedule management tool, and makes the act of joining a community to download a project in order to easily form a community for each person who shares the same project.
  • SNS Social Network Service
  • communication The terminal 200 may perform a schedule management by using any one project among the projects previously used by the user.
  • the communication terminal 200 checks the schedule inputted by the user, and automatically reschedules each activity in the project based on the newly determined schedule, and schedules each activity in the rescheduled project through the schedule management tool. The schedule will be saved by saving on the date.
  • FIG. 2 is a block diagram illustrating in detail the configuration of the communication terminal 200 of FIG. 1.
  • the communication terminal 200 includes a data communication unit 210, a project management unit 220, an activity management unit 230, a schedule management unit 240, a storage unit 250, a schedule performance checking unit 260, and a control unit. 270 and the like.
  • the data communication unit 210 checks and retrieves a list of activities or projects to be used for scheduling and server server 300 connected through the network communication network 100, specific activities registered by a server operator or other users, or related activities. Downloading and grouping of projects, the server computer 300 processes data transmission and reception associated with the download of a specific project that the user has rescheduled.
  • the project manager 220 determines whether the utilization of the specific project downloaded from the server computer 300 is selected according to the user's operation, and the corresponding project management unit 220 selects the utilization of the specific project downloaded from the server computer 300. When a new schedule of the project is determined, the schedule of each activity in the project downloaded from the server computer 300 is automatically rescheduled based on the newly determined schedule.
  • the project management unit 220 confirms the user's operation and if the reschedule of the project downloaded from the server computer 300 is selected, the earliest date and / or latest date of the schedule of each activity in the project is displayed on the screen. If you change to your own schedule after one of the earliest or latest dates is selected, the schedule is calculated based on the schedule of each activity in the project and the schedule of the user before the change. The interval can be adjusted automatically.
  • the project management unit 220 confirms the user's operation and if the rescheduling of the project downloaded from the server computer 300 is selected, which one of the activities in the project downloaded from the server computer 300 is selected.
  • the project management unit 220 checks whether the schedule of the specific activity selected by the user is changed to his own schedule, and then based on the changed schedule of all the activities after the changed activity to the user's own schedule. It can also be readjusted to be equally spaced.
  • the project management unit 220 checks the user's operation and if the rescheduling of the project downloaded from the server computer 300 is selected, it is determined whether the own schedule to be used as the D-day of the project downloaded from the server computer 300 is input. If the user's schedule to be used as a D-day is input, the schedule of each activity in the project can be changed to a schedule based on the D-day input by the user.
  • the project manager 220 may directly change the specific schedule readjusted for each activity.
  • the project management unit 220 adds new activities to the project downloaded from the server computer 300 according to the user's operation, before rescheduling each activity in the project downloaded from the server computer 300.
  • an activity is deleted or changed, you can further perform the functions of adding new activities to the project, deleting or changing existing activities.
  • the project management unit 220 in addition to the method of adjusting and utilizing the schedule of the specific project downloaded from the server computer 300 as described above, the user can download after rescheduling the schedule directly from the community of the server computer 300 Method may be used (the detailed operation thereof will be described with reference to FIG. 3). That is, after re-adjusting the existing schedule of the project grouping related activities registered by the server operator or other users according to the user's schedule according to the user's operation connected to the server computer 300, the server is rescheduled. Download from computer 300.
  • the activity management unit 230 determines whether to generate a project by grouping individual activities downloaded from the server computer 300 into related activities according to a user's operation, and selecting whether to generate a project through grouping activities. If the user's operation grouped the activities related to each other among the activities, and if the base date of the activities grouped by the user is determined and inputted, the schedule of each activity in the group is calculated according to the date. Create a project based on each calculated activity.
  • the scheduler 240 stores the activities in the rescheduled project in the project manager 220 on the corresponding date to perform the schedule management or downloads after rescheduling a specific project registered in the community of the server computer 300.
  • Schedule activities by storing each activity in a specific project on that date.
  • each activity in the project generated by the activity management unit 230 may be stored in a corresponding date to perform a schedule management.
  • a check function may be set to operate.
  • the storage unit 250 stores individual activities and projects downloaded from the server computer 300, and stores a specific project downloaded after the user directly reschedules the schedule in the server computer 300, and the project manager 220 In step), the rescheduled project and the project grouping related activities generated by the activity management unit 230 are stored.
  • the schedule execution checker 260 checks whether the practice is checked from the users who perform the schedule of each activity in the project for the project in which the practice check function is set to operate under the control of the schedule manager 240, Based on the result of the user's check of performance, the performance rate is calculated to know whether each activity has been performed normally, and the means by which the user can visually recognize the calculated performance rate result (for example, a character including a number or a symbol, The image is converted into a table including figures and figures) and displayed on the screen.
  • the control unit 270 checks and retrieves a list of activities or projects to be used for schedule management with the server computer 300 connected through the network communication network 100, downloading a project grouping specific activities or related activities, and the server computer.
  • the user controls the download of a specific project that has been rescheduled. Based on the user's selection, utilization of a specific project downloaded from the server computer 300 or rescheduling and downloading of a specific project through the community of the server computer 300 and generating a project grouping activities downloaded from the server computer 300. To control.
  • the activity management unit 230 generated Controls the schedule management in the scheduler 240 for each activity in the project grouping activities related to each other.
  • FIG. 3 is a block diagram illustrating the configuration of the server computer 300 of FIG. 1 described above in more detail.
  • the server computer 300 includes a communication unit 310, a community management unit 320, a project readjustment unit 330, a download processing unit 340, a database 350, a control unit 360, and the like.
  • the communication unit 310 checks and retrieves a list of activities or projects to be used for scheduling and communication with the communication terminal 200 connected through the network 100, grouping specific activities registered by a server operator or other users or related activities. Downloading of a project, the server computer 300 processes data transmission and reception related to the download of a specific project that the user has rescheduled. The server computer 300 processes communication connection and data upload of other communication terminal users for registering an activity or a project used for scheduling.
  • the community manager 320 processes the registration of a project in which an individual group or activities related to each other are generated by an operator under the control of the controller 360 or used for a schedule management provided from each communication terminal 200. In response to a request of the communication terminal 200 connected through the communication unit 310, a process of checking and searching a list of registered activities or projects is processed.
  • the project rebalancing unit 330 may determine the rescheduling of a specific project of the communication terminal 200 which is generated by the server operator through the community manager 320 or by other users, and confirms the project. Reschedule the existing schedule according to the schedule you enter.
  • the schedule rescheduling unit 330 is selected to reschedule a specific project registered in the community from the communication terminal 200, the earliest date and / or the latest date of the schedule of each activity in the project communication terminal 200 If one of the earliest date or the latest date is selected from the communication terminal 200 and then changed to the user's own schedule, the schedule is changed after calculating the interval between the schedule of each activity in the project and the schedule before the user changes. Automatically readjusted to be the same interval based on the user's own schedule, so that it can be downloaded to the communication terminal 200 through the download processor 340.
  • the project rescheduling unit 330 is a user who will perform the fastest activity among the activities in the project from the communication terminal 200, if the schedule rescheduling of the specific project registered in the community from the communication terminal 200 is selected Receives his schedule, but after presenting the date of the input point so that the user can change, re-schedule each activity in the project based on the date received from the communication terminal 200, the download processing unit 340 It can be downloaded to the communication terminal 200 through.
  • the project rescheduling unit 330 is selected to reschedule a specific project registered in the community from the communication terminal 200, and determines whether the schedule of their own to be used as the D-day of the project from the communication terminal 200.
  • the schedule of the user to be used as the D-day is input from the communication terminal 200
  • the schedule of each activity in the project is changed to the schedule based on the D-day input from the communication terminal 200, and the corresponding communication terminal is downloaded through the download processor 340. To be downloaded to 200.
  • the download processor 340 downloads a specific activity or project to be used for schedule management to the corresponding communication terminal 200 in response to a request of the communication terminal 200 that has performed a list check and search through the community manager 320, and reconstructs a project.
  • the government 330 downloads the rescheduled project according to the schedule input by the user to the corresponding communication terminal 200.
  • the database 350 is a member activity and download information of each communication terminal 200 using the schedule management, an individual activity that is directly generated by the operator through the community management unit 320 or used for schedule management registered from each communication terminal 200. Or save a project that groups activities related to each other.
  • the control unit 360 registers and projects 350 a project in which individual activities or related activities are grouped together, which are directly generated by an operator through the community management unit 320 or used for scheduling provided from each communication terminal 200.
  • the schedule management tool of the communication terminal 200 to perform the function of performing the schedule management of each activity whose specific execution date is determined, and to manage when to start and when to end by date Integrate and manage a day program, a schedule program that manages what to do at a certain time (from what time to what time), and a memo program that manages tasks that have not been scheduled yet. You can do more.
  • the present invention has created memos, tasks and schedules in the same database structure for integration thereof. For example, when you type, you don't have to decide when to do it, but when you save it, it's saved as a note, then you select the note in the note list, enter edit, and schedule it to switch directly to the activity. In the case of activities, you can set the start and end of when to do it. When you start and end, you distinguish between what you set by date and what you set by start and end time.
  • the schedules defined by the start time and the end time are displayed in the time zone in the daily schedule or weekly schedule where the time is displayed, and the ones defined as the period without the start time and end time are displayed under the time space. When viewed in the form, the list of dates is displayed with the activities specified by the start time and end time.
  • a memo needs a separate field so that memos can be divided and managed by categories.
  • This field includes an activity. If you change the note to activity, that is, select a date or date and time, this field is displayed as the activity. If you delete the date or the date and time you need to do in the activity, the note becomes a note, in which case you will be prompted to select a category for the note. Notes have no information about when to run them, while the date the note was created or last modified is maintained. When you change a memo to an activity, it displays information about when it will run, rather than the date of creation or last modification. When you change an activity to a note, you manage that change as the last modified date.
  • FIGS. 4 to 8 are flowcharts showing in detail the operation process of the schedule management method according to an embodiment of the present invention
  • Figure 9 is a flow chart showing in detail the operation process of the schedule management method according to another embodiment of the present invention. .
  • the communication terminal 200 performs a communication connection through the network communication network 100 to the server computer 300 that manages a grouping of individual activities or related activities to be used for schedule management, and based on the user's operation.
  • the server operator checks or searches a list of activities or projects to be used for schedule management generated or registered by other users (S100).
  • a project generated by the server operator managed by the server computer 300 through the step S100 or created and registered by other users may configure a community for each project. That is, the server computer 300 may send and receive additional schedules or information between each communication terminal 200 through the community for each project, and automatically join the community of the corresponding project when downloading the project from the communication terminal 200. If you do not indicate the objection when downloading the project to the communication terminal 200 that has received the consent for the automatic subscription, the consent to the automatic subscription is to be joined to the community of the project. Accordingly, SNS can be configured through a schedule management tool, and a community can be easily configured for each person who shares the same project.
  • the server computer 300 performing the communication connection of the communication terminal 200 confirms the download selection of the specific activity or project of the user who has performed the check and search of the activity or the project list through step S100, and if the download is selected, Download a specific activity or project to be used for scheduling to the communication terminal 200 (S200).
  • the activity is event information that determines what to do at a specific date or at a specific time of day
  • the project is a grouping of related activities.
  • the communication terminal 200 determines whether the user selects to utilize the specific project downloaded from the server computer 300 (S300).
  • step S300 when the utilization of the project is selected, the communication terminal 200 confirms the schedule inputted by the user, and automatically schedules the schedule of each activity in the project downloaded from the server computer 300 based on the newly determined schedule. To readjust (S400).
  • the communication terminal 200 checks the user's operation to determine whether a rescheduling of activities in the project downloaded from the server computer 300 is selected (S410). If the reschedule is selected, the earliest date and / or latest date of the schedule of each activity in the project is displayed on the screen (S420), and the user's operation is confirmed to determine the earliest date or latest of the schedule of each activity in the project. It is determined whether one of the dates is selected and then changed to the user's own schedule (S430).
  • the communication terminal 200 calculates the interval between the schedule of each activity in the project and the schedule before the user changes the changed user. Automatically readjusted to be the same interval based on their schedule (S440).
  • the communication terminal 200 determines whether any one of the activities in the project downloaded from the server computer 300 is selected (S450).
  • the communication terminal 200 determines whether the schedule of the specific activity selected by the user is changed to his schedule (S460), and the schedule of the specific activity is set to his schedule. If the change is made, the schedules of all activities after the activity changed to the user's own schedule through the step S460 among the activities included in the same project are readjusted to be the same interval as the schedule before the change based on the changed schedule (S470).
  • the communication terminal 200 checks the user's operation to determine whether the own schedule to be used as the D-day of the project downloaded from the server computer 300 is input ( In step S480, when the user's schedule to be used as a D-day is input, the schedule of each activity in the project is changed to a schedule based on the D-day input by the user (S490).
  • the specific execution date of each activity in the project that is changed to a schedule based on the D-day input by the user in step S490 may be arbitrarily changed according to the user's operation.
  • step S410 the communication terminal 200 according to the user's operation to the new activity downloaded to the project downloaded from the server computer 300 If you add, delete, or change an existing activity, you can add new activities to the project, delete or change existing activities.
  • the communication terminal 200 performs schedule management by storing each activity in the project whose schedule is rescheduled at step S400 through a schedule management tool on a corresponding date (S500).
  • the schedule management may be performed by storing each activity in the corresponding project on the corresponding date.
  • the schedule management tool of the communication terminal 200 that performs the schedule management of each activity whose specific execution date is determined in step S500, a to-do program for managing when to start and when to end with a date, and what day at a specific time of day
  • a schedule program that manages whether to manage and a memo program that manages tasks not yet scheduled may be integrated into one function.
  • the server computer 300 performing the communication connection of the communication terminal 200 confirms the rescheduling and downloading selection of the specific project of the user who has performed the check or search of the activity or the project list through step S100, and reschedules the schedule. And download is selected by the server operator or readjust the existing schedule of the project created by other users and registered in the community according to their own schedule, and downloads the rescheduled project to the corresponding communication terminal 200 (S600). .
  • the server computer 300 determines whether to reschedule a specific project registered in the community from the communication terminal 200 (S610).
  • step S610 if the schedule reschedule is selected, the server computer 300 provides the communication terminal 200 with the earliest date and / or the latest date of the schedule of each activity in the project, so that the user may change the schedule. To confirm this (S620).
  • the server computer 300 selects one of the earliest date or the latest date from the communication terminal 200 confirming the earliest date and / or the latest date of each activity in the project, and then changes to the user's own schedule. Determine (S630).
  • step S630 if one of the earliest date or the latest date is selected from the communication terminal 200 and then changed to the user's own schedule, the server computer 300 schedules each activity in the project and the schedule before the user changes. After calculating the interval between and automatically adjusts to the same interval based on the changed user's schedule (S640).
  • the server computer 300 downloads the rescheduled project to the corresponding communication terminal 200 through step S640 (S650).
  • the server computer 300 from the communication terminal 200 of the user himself or herself to perform the fastest activity among the activities in the project Although the schedule is input, the user can change the present time after presenting the input time (S660).
  • the server computer 300 readjusts the schedule of each activity in the project based on the date input from the communication terminal 200 through step S660 (S670), and downloads the rescheduled project to the corresponding communication terminal 200. Be sure to
  • the server computer 300 determines whether or not its schedule to be used as the D-day of the project is input from the communication terminal 200 (S680).
  • the schedule of each activity in the project is changed to a schedule based on the D-day input from the communication terminal 200 (S690), and the schedule is rescheduled. To be downloaded to the communication terminal 200.
  • each activity in the downloaded project is stored in the corresponding date to perform a schedule management (S700).
  • the communication terminal 200 selects a specific project to confirm the implementation of the planned schedule, and then set to check whether the action is activated, the user through the schedule management tool After confirming the operation, checks whether each activity in the project is checked for execution, calculates the execution rate of each activity based on the result of checking whether the result is displayed, and displays the result of the execution rate on the screen (S800).
  • the communication terminal 200 confirms the user's specific project selection for checking the implementation of the planned schedule, and set to operate the operation check function for the corresponding project (S810). .
  • the communication terminal 200 checks the user's operation and checks whether or not each activity in the project in which the specific execution date is determined is performed (S820).
  • step S820 whether or not each activity in the project is executed in step S820 is checked based on a click operation for checking whether each activity of a user who performs a schedule through the calendar tool or inputting start and end time for each activity. Is common.
  • the communication terminal 200 calculates an actual performance ratio based on a result of whether each activity is checked in step S820 (S830).
  • the calculated performance ratio result of each activity is converted into a means that can be visually recognized by the user (S840), and converted into a visually recognizable means, and the performance ratio result of each created activity is displayed on the screen. (S850). That is, the communication terminal 200 displays whether or not the user performs the schedule by displaying the user's schedule in practice in the form of daily, weekly, monthly calendar or activity list of the project as a letter including a number or a symbol, a figure including a table and a figure. It is easy to check.
  • step S300 if the specific project downloaded from the server computer 300 is not utilized, the communication terminal 200 groups the activities related to each other among the activities downloaded from the server computer 300 to project them. It is determined whether generating is selected (S900).
  • step S900 if a group of activities related to each other is selected to generate a project, the communication terminal 200 groups the activities related to each other among the activities downloaded from the server computer 300, and then the grouped activities
  • a project is generated by calculating a schedule of activities in the group (S1000). That is, the communication terminal 200 checks a user's operation to group activities related to each other among the activities downloaded from the server computer 300, and when a date serving as a reference for the grouped activities is determined, schedules of each activity in the group.
  • the project is created by calculation, and the schedule management tool saves each activity in the project on the corresponding date so that it can perform the function of scheduling.
  • the communication terminal 200 determines whether the user selects activities related to each other among the activities downloaded from the server computer 300 (S1010).
  • the communication terminal 200 groups the corresponding activities (S1020), and sets the date on which the user becomes the reference of the grouped activities. Determine and determine whether to enter (S1030).
  • the communication terminal 200 calculates a specific execution date for each grouped activity on the basis of the date that is determined by the corresponding user (S1040).
  • the communication terminal 200 After calculating the specific execution date for each grouped activity, the communication terminal 200 generates and stores a project including the activities for which the specific execution date is calculated (S1050).
  • the communication terminal 200 downloads and utilizes an activity or project to be used for schedule management from the server computer 300, and reschedules a project registered in the community of the server computer 300.
  • schedule management may be performed by using any one project that the user has previously created and used directly without downloading an activity or a project from the server computer 300.
  • FIG. 9 is a diagram for describing an exemplary embodiment. Since detailed operations of steps S1200 and S1400 are the same as those of FIGS. 5 and 7 described above, detailed descriptions thereof will be omitted.
  • the communication terminal 200 determines whether the user selects the utilization of one of the projects previously created and used (S1100).
  • the communication terminal 200 checks the schedule that the user changes and inputs, and automatically schedules the schedule of each activity in the project based on the newly determined schedule. It readjusts (S1200).
  • the communication terminal 200 starts the schedule management by storing each activity in the project whose schedule is rescheduled at step S1200 through a schedule management tool on a corresponding date (S1300).
  • the communication terminal 200 selects a specific project for checking the implementation of the planned schedule, and then set the check whether the implementation of the operation, check the user's operation through the schedule management tool After checking the activity check of each activity in the project and calculating the execution rate of each activity based on the check result of the action, the result of the execution rate is displayed on the screen (S1400).
  • a project grouped by a user of a communication terminal or a group of related activities downloaded through a service operator or a community can be rearranged and utilized according to a new schedule or a special purpose, and the user of the communication terminal can use the service.
  • the related activities can be grouped to create a project and used for scheduling.
  • the user of the communication terminal group the related activities through the service operator or the community. After rescheduling your schedule, you can download and use it.

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

La présente invention porte sur un procédé d'établissement d'échéancier et un appareil associé. Un terminal de communication qui télécharge à partir d'un ordinateur serveur une activité spécifique ou un projet destiné à être utilisé dans un établissement d'échéancier détermine nouvellement l'échéancier pour le projet téléchargé depuis l'ordinateur serveur lorsque le projet à utiliser est sélectionné par l'utilisateur, réajuste automatiquement l'échéancier de chaque activité dans le projet et conserve en mémoire chacune des activités du projet dont l'échéancier a été réajusté pour des dates correspondantes, et un établissement d'échéancier est ainsi réalisé. Lorsque le téléchargement est sélectionné par l'utilisateur du terminal de communication après le réajustement de l'échéancier du projet spécifique enregistré pour la communauté de l'ordinateur serveur, l'ordinateur serveur réajuste l'échéancier existant d'un projet dans lequel des activités enregistrées par un opérateur de serveur ou d'autres utilisateurs et mises en corrélation les unes avec les autres sont regroupées en fonction de données entrées par l'intermédiaire du terminal de communication, permettant ainsi au projet disposant d'un échéancier réajusté d'être téléchargé vers le terminal de communication correspondant, et conserve en mémoire chaque activité à l'intérieur du projet téléchargé pour une date correspondante, et un établissement d'échéancier est ainsi réalisé. De cette manière, un échéancier est facilement ajusté et géré, l'ajustement étant effectué au moyen d'un projet téléchargé par l'intermédiaire d'un opérateur de service ou d'une communauté selon un nouvel échéancier, ou le téléchargement est réalisé au moyen de l'échéancier existant d'un projet dans lequel des activités enregistrées par un opérateur de serveur ou d'autres utilisateurs et mises en corrélation les unes avec les autres sont regroupées après réajustement de l'échéancier existant selon l'échéancier de l'utilisateur.
PCT/KR2013/002820 2012-05-02 2013-04-04 Procédé d'établissement d'échéancier et appareil associé WO2013165099A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR10-2012-0046436 2012-05-02
KR1020120046436A KR101230462B1 (ko) 2012-05-02 2012-05-02 일정관리방법 및 그 장치

Publications (1)

Publication Number Publication Date
WO2013165099A1 true WO2013165099A1 (fr) 2013-11-07

Family

ID=47899012

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2013/002820 WO2013165099A1 (fr) 2012-05-02 2013-04-04 Procédé d'établissement d'échéancier et appareil associé

Country Status (2)

Country Link
KR (1) KR101230462B1 (fr)
WO (1) WO2013165099A1 (fr)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9794387B1 (en) 2016-12-13 2017-10-17 Sorenson Ip Holdings, Llc Automatically establishing a communication session associated with an event
US11494744B2 (en) * 2019-11-28 2022-11-08 Ricoh Company, Ltd. Information processing apparatus, information processing system, and information processing method
WO2024029975A1 (fr) * 2022-08-05 2024-02-08 (주)시지태테크놀러지 Procédé de réutilisation d'informations de planification

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20150110330A (ko) * 2014-03-21 2015-10-02 삼성전자주식회사 멀티미디어 정보 수집 방법 및 그 디바이스
KR20160142537A (ko) 2015-06-03 2016-12-13 주식회사 에스이든 프로젝트 통제 및 전환 관리 시스템
KR101615730B1 (ko) * 2015-08-28 2016-04-27 주식회사 코노랩스 일정 관리를 지원하기 위한 방법, 시스템 및 비일시성의 컴퓨터 판독 가능한 기록 매체

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070023286A (ko) * 2005-08-24 2007-02-28 주식회사 팬택 일정 관리 장치 및 방법
KR20070070374A (ko) * 2005-12-29 2007-07-04 엘지전자 주식회사 연계된 일정관리 방법 및 그 장치
KR20090062417A (ko) * 2007-12-13 2009-06-17 대림산업 주식회사 공정 공사비 통합관리기법을 이용한 전사적 프로젝트통합관리시스템
KR100968708B1 (ko) * 2010-04-08 2010-07-06 지에스건설 주식회사 공사 프로젝트의 스케줄 생성 시스템 및 그 방법

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070023286A (ko) * 2005-08-24 2007-02-28 주식회사 팬택 일정 관리 장치 및 방법
KR20070070374A (ko) * 2005-12-29 2007-07-04 엘지전자 주식회사 연계된 일정관리 방법 및 그 장치
KR20090062417A (ko) * 2007-12-13 2009-06-17 대림산업 주식회사 공정 공사비 통합관리기법을 이용한 전사적 프로젝트통합관리시스템
KR100968708B1 (ko) * 2010-04-08 2010-07-06 지에스건설 주식회사 공사 프로젝트의 스케줄 생성 시스템 및 그 방법

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9794387B1 (en) 2016-12-13 2017-10-17 Sorenson Ip Holdings, Llc Automatically establishing a communication session associated with an event
US11494744B2 (en) * 2019-11-28 2022-11-08 Ricoh Company, Ltd. Information processing apparatus, information processing system, and information processing method
WO2024029975A1 (fr) * 2022-08-05 2024-02-08 (주)시지태테크놀러지 Procédé de réutilisation d'informations de planification

Also Published As

Publication number Publication date
KR101230462B1 (ko) 2013-02-06

Similar Documents

Publication Publication Date Title
WO2013165099A1 (fr) Procédé d'établissement d'échéancier et appareil associé
US20090248480A1 (en) Controlled synchronization between a group calendar and individual work calendars
US20030076353A1 (en) Graphical user interface for collaboration
JP6263668B1 (ja) チャット型タスク管理システム
JPH0628361A (ja) データ処理装置および方法
US20170337501A1 (en) System and method for coordinating and controlling production processes and inter-related decision making processes
JPH09200350A (ja) 電子会議システム
WO2018194218A1 (fr) Dispositif et procédé de fourniture d'informations de recrutement
KR20210010256A (ko) 개인별 일정 관리를 통한 그룹 정보 수집 시스템 및 그 장치
JP2005085190A (ja) 作業支援システム
WO2024029975A1 (fr) Procédé de réutilisation d'informations de planification
JP2010160556A (ja) 教育スケジュール生成装置、方法及びプログラム
JP6955724B1 (ja) 会計業務支援システム
JP2004206363A (ja) 在宅勤務システム、在宅勤務方法、及び在宅勤務システム用プログラム
WO2023243964A1 (fr) Système de gestion d'événements utilisant des badges intelligents
WO2022250435A1 (fr) Système de service de messagerie personnalisée et procédé de service de messagerie personnalisée
JP4412016B2 (ja) 共同作業支援のためのプログラム、装置及び方法
JP6939820B2 (ja) 情報処理装置、スケジュール管理方法及びプログラム
CN107230038A (zh) 任务管理装置以及任务管理方法
WO2018021621A1 (fr) Dispositif de gestion d'émission
WO2024029928A1 (fr) Procédé de gestion de calendrier de réunion
JP2005222333A (ja) 求人求職仲介システムおよび求人求職仲介方法ならびにプログラム
JP2005165856A (ja) 資料呼出装置
JP2008250969A (ja) 人材派遣支援ソフト
JP7015496B1 (ja) 会計業務支援システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13785104

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13785104

Country of ref document: EP

Kind code of ref document: A1