WO2013039208A1 - 電力情報管理システム、電力情報管理装置、及びプログラム - Google Patents

電力情報管理システム、電力情報管理装置、及びプログラム Download PDF

Info

Publication number
WO2013039208A1
WO2013039208A1 PCT/JP2012/073642 JP2012073642W WO2013039208A1 WO 2013039208 A1 WO2013039208 A1 WO 2013039208A1 JP 2012073642 W JP2012073642 W JP 2012073642W WO 2013039208 A1 WO2013039208 A1 WO 2013039208A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
information
attribute
received
unit
Prior art date
Application number
PCT/JP2012/073642
Other languages
English (en)
French (fr)
Inventor
秀和 大野
石井 伸也
伸行 尾張
哲也 安達
Original Assignee
三菱重工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱重工業株式会社 filed Critical 三菱重工業株式会社
Priority to SG2014013239A priority Critical patent/SG2014013239A/en
Priority to EP12832486.0A priority patent/EP2752809A4/en
Publication of WO2013039208A1 publication Critical patent/WO2013039208A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/008Circuit arrangements for AC mains or AC distribution networks involving trading of energy or energy transmission rights
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S50/00Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
    • Y04S50/10Energy trading, including energy flowing from end-user application to grid

Definitions

  • the present invention relates to a power information management system that manages power information, a power information management device that manages power information received by a consumer, and a program for the power information management device.
  • the word “smart” is used frequently, including smart grids, smart meters, and smart communities.
  • the power network which is a social infrastructure system in the real world, it currently has a star structure from large power plants to factories, offices, homes, but wind power generation, solar cells, fuel cells, With the advancement and development of storage batteries, and the policies to prevent global warming that will support it, it is anticipated that decentralization, interaction and personalization will rapidly progress.
  • Non-Patent Document 1 proposes the idea of energy informatization with the aim of constructing a new super-distributed energy social infrastructure by integrating electric power networks and information networks. More specifically, in the research and development described in Non-Patent Document 1, when a plurality of power sources are installed in the home, the power from each power source is distinguished, and not only quantitative energy saving but also carbon dioxide It is advocated to perform energy management in consideration of the reduction of generation amount.
  • Patent Literature 1 since information on the power source is supplied in association with the power from each power source, various information depending on the difference in the power source can be obtained by referring to the information. It is thought that the energy management can be realized.
  • Patent Document 1 does not propose a mechanism for cumulatively managing information on power received by consumers.
  • the power information management system of the present invention includes a power information management device that manages information on power received by a consumer, the power information management device includes a power attribute evaluation unit that evaluates attributes of power received by the consumer, Each time the power attribute evaluation unit evaluates the power attribute, the power attribute evaluation unit includes a cumulative attribute information storage unit in which the evaluated power attribute information is cumulatively stored.
  • the power information management system of the present invention further includes a power information aggregating apparatus that aggregates information on power received by a plurality of consumers, and the power information aggregating apparatus is attribute information for aggregating attribute information on power received by the consumers.
  • You may have a statistics calculation part which calculates the statistics of the attribute of the electric power which the some consumer in the predetermined area received based on the attribute information which the aggregation part and the attribute information aggregation part aggregated.
  • the power information aggregating apparatus may further include an incentive calculating unit that calculates incentives to be given to consumers based on attribute information aggregated by the attribute information aggregating unit.
  • the power information aggregating apparatus may further include a penalty calculating unit that calculates a penalty to be given to the consumer based on the attribute information aggregated by the attribute information aggregating unit.
  • a power information management device is a power information management device that manages information on power received by a consumer, and includes a power attribute evaluation unit that evaluates an attribute of power received by the consumer, and a power attribute evaluation unit.
  • a cumulative attribute information storage unit in which the evaluated power attribute information is cumulatively stored each time the power attribute is evaluated.
  • the program of the present invention is a program for a power information management device that manages information on power received by a consumer, and the power information management device includes a power attribute evaluation unit that evaluates attributes of power received by the consumer; Each time the power attribute evaluation unit evaluates the power attribute, the power attribute evaluation unit functions as a cumulative attribute information storage unit that stores the evaluated power attribute information cumulatively.
  • the present invention can cumulatively manage information on the power received by the customer.
  • FIG. 1 is a diagram illustrating an example of a usage environment of a power information management system 100.
  • FIG. It is a figure which shows an example of the block configuration of the electric power information management apparatus 110a. It is a figure which shows an example of the information stored in the accumulation attribute information storage part 115 in a table format. It is a figure which shows an example of the block configuration of the electric power information management apparatus 130a. It is a figure which shows an example of the information stored in the accumulation attribute information storage part 135 in a table format. It is a figure which shows an example of the block configuration of the electric power information management apparatus 150a. It is a figure which shows an example of the information stored in the accumulation attribute information storage part 155 in a table format.
  • FIG. 1 It is a figure which shows an example of the information stored in the incentive information storage part 180 in a table format. It is a figure which shows an example of the information stored in the penalty information storage part 181 in a table format. It is a figure which shows an example of the operation
  • FIG. 1 It is a figure which shows an example of the operation
  • FIG. 1 shows an example of a usage environment of the power information management system 100.
  • the power information management system 100 is a system that manages power information. More specifically, in the power information management system 100, the electric power generated by various power generation methods in the electric power company P includes a plurality of charging infrastructures Sa, b, c,. ) And a plurality of houses Ra, b, c,... (Hereinafter collectively referred to as house R).
  • the power information management system 100 assumes a power system in which electric power generated in-house is supplied in the charging infrastructure S and the house R. Further, the power information management system 100 assumes a power system in which the electric vehicle E is charged with the power received by the charging infrastructure S and the house R. Further, the electric vehicle E, the charging infrastructure S, and the house R may be an example of “customers” in the present invention.
  • the power generation method may be an example of “attribute” in the present invention.
  • the power information management system 100 includes a plurality of power information management devices 110a, b, c,... (Hereinafter collectively referred to as the power information management device 110), a plurality of power information management devices 130a, b, c,. (Hereinafter collectively referred to as power information management device 130), a plurality of power information management devices 150a, b, c,... (Hereinafter collectively referred to as power information management device 150), and power information aggregation device 170. Is provided.
  • the power information management device 110 is a device that manages information on the power received by the electric vehicle E. More specifically, the power information management device 110 is provided in the electric vehicle E. The power information management device 110 is electrically connected to a watt hour meter that measures the amount of power received by the electric vehicle E. In addition, the power information management device 110 is connected to the power information management device 130 and the power information management device 150 through near field communication. Further, the power information management device 110 is communicatively connected to the power information aggregation device 170 via the communication line N.
  • the communication line N includes a computer network such as the Internet, a core network of a communication carrier, and various local networks.
  • the power information management device 130 is a device that manages information on the power received by the charging infrastructure S. More specifically, the power information management device 130 is provided in the charging station S. Then, the power information management device 130 is electrically connected to a smart meter that detects what kind of power the charging infrastructure S is receiving and measures the amount of power received. Further, the power information management device 130 is electrically connected to an input device for inputting attribute data indicating attribute information of power supplied to the electric vehicle E by the charging infrastructure S. In addition, the power information management device 130 is connected to the power information management device 110 through near field communication. Further, the power information management device 130 is communicatively connected to the power information aggregation device 170 via the communication line N.
  • the power information management device 150 is a device that manages information on the power received by the house R. More specifically, the power information management device 150 is provided in the house R. Then, the power information management device 150 is electrically connected to a smart meter that detects what kind of power the house R is receiving and measures the amount of power received. Further, the power information management device 150 is electrically connected to an input device for inputting attribute data indicating attribute information of power supplied to the electric vehicle E in the house R. In addition, the power information management device 150 is connected to the power information management device 110 through near field communication. Further, the power information management device 150 is communicatively connected to the power information aggregation device 170 via the communication line N.
  • the power information aggregating apparatus 170 is an apparatus that aggregates information on the power received by the electric vehicle E, the charging infrastructure S, and the house R. More specifically, the power information aggregation device 170 is communicatively connected to the power information management device 110, the power information management device 130, and the power information management device 150 via the communication line N.
  • the power information management system 100 may include a plurality of power information aggregation devices 170.
  • FIG. 2 shows an example of a block configuration of the power information management apparatus 110a.
  • the power information management apparatus 110a includes an attribute data receiving unit 111a, a received power amount data input receiving unit 112a, a power attribute evaluating unit 113a, a cumulative attribute data transmitting unit 114a, and a cumulative attribute information storage unit 115a.
  • the power information management device 110 other than the power information management device 110a also has the same components as the components of the power information management device 110a.
  • the same subscript (as in the power information management device 110 having each component) a), b, c,...) are added to the end of each component to distinguish them.
  • the attribute data receiving unit 111a, the attribute data receiving unit 111b, and the attribute data receiving unit 111c indicate components of the power information management device 110a, the power information management device 110b, and the power information management device 110c, respectively.
  • the function and operation of a component that is not given a subscript indicates the function and operation of any component that is assigned the same reference numeral.
  • the functions and operations described in the attribute data receiving unit 111 indicate the functions and operations of the attribute data receiving unit 111a, the attribute data receiving unit 111b, the attribute data receiving unit 111c,.
  • the attribute data receiving unit 111 receives attribute data indicating attribute information of power received by the electric vehicle E from the charging infrastructure S from the power information management device 130 of the charging infrastructure S that is the power supply source. Similarly, the attribute data receiving unit 111 receives attribute data indicating the attribute information of the power received by the electric vehicle E in the house R from the power information management device 150 of the house R as a power supply source.
  • the received power amount data input receiving unit 112 receives input of received power amount data indicating the received power amount of the electric vehicle E from the watt-hour meter of the electric vehicle E.
  • the power attribute evaluation unit 113 evaluates the attribute of the power received by the electric vehicle E.
  • the cumulative attribute data transmission unit 114 transmits cumulative attribute data indicating the power attribute information stored in the cumulative attribute information storage unit 115 to the power information aggregation device 170.
  • FIG. 3 shows an example of information stored in the cumulative attribute information storage unit 115 in a table format.
  • the accumulated attribute information storage unit 115 stores attribute information of a power generation source, a power generation method, a power supply source, and a power reception amount (kWh) in association with each other.
  • the power generation source is attribute information indicating the power generation source of the electric power received by the electric vehicle E.
  • the power generation method is attribute information indicating a power generation method of power received by the electric vehicle E.
  • the power supply source is attribute information indicating a power supply source of power received by the electric vehicle E.
  • the amount of power received (kWh) is generated by the power generation method indicated by the “power generation method” attribute information in the power generation source indicated by the “power generation source” attribute information, and is indicated by the “power supply source” attribute information. This is attribute information indicating the cumulative value of the amount of power fed from.
  • FIG. 4 shows an example of a block configuration of the power information management device 130a.
  • the power information management device 130a includes a received power amount data input reception unit 132a, a power attribute evaluation unit 133a, a cumulative attribute data transmission unit 134a, a cumulative attribute information storage unit 135a, an attribute data input reception unit 136a, and an attribute data transmission unit 137a.
  • a received power amount data input reception unit 132a includes a received power amount data input reception unit 132a, a power attribute evaluation unit 133a, a cumulative attribute data transmission unit 134a, a cumulative attribute information storage unit 135a, an attribute data input reception unit 136a, and an attribute data transmission unit 137a.
  • the power information management devices 130b, c,... Other than the power information management device 130a also have the same components as those of the power information management device 130a.
  • the same subscript (as in the power information management device 130 having each component) a), b, c,...) are added to the end of each component to distinguish them.
  • the received power amount data input receiving unit 132a, the received power amount data input receiving unit 132b, and the received power amount data input receiving unit 132c are components of the power information management device 130a, the power information management device 130b, and the power information management device 130c, respectively.
  • the function and operation of a component that is not given a subscript indicates the function and operation of any component that is assigned the same reference numeral.
  • the functions and operations described in the received power amount data input receiving unit 132 include the functions and operations of the received power amount data input receiving unit 132a, the received power amount data input receiving unit 132b, the received power amount data input receiving unit 132c,. Show.
  • the received power amount data input receiving unit 132 receives input of received power amount data indicating the received power amount of the charging infrastructure S from the smart meter of the charging infrastructure S.
  • the power attribute evaluation unit 133 evaluates the attribute of the power received by the charging infrastructure S.
  • the cumulative attribute data transmission unit 134 transmits cumulative attribute data indicating the power attribute information stored in the cumulative attribute information storage unit 135 to the power information aggregating apparatus 170.
  • the attribute data input receiving unit 136 receives input of attribute data indicating attribute information of power received by the charging infrastructure S from the smart meter of the charging infrastructure S.
  • the attribute data transmission unit 137 transmits attribute data indicating attribute information of power supplied to the electric vehicle E by the charging infrastructure S to the power information management device 110 of the electric vehicle E that is the power supply destination.
  • FIG. 5 shows an example of information stored in the cumulative attribute information storage unit 135 in a table format.
  • the accumulated attribute information storage unit 135 stores each attribute information of a power generation source, a power generation method, and a power reception amount (kWh) in association with each other.
  • the power generation source is attribute information indicating the power generation source of the power received by the charging infrastructure S.
  • the power generation method is attribute information indicating a power generation method of power received by the charging infrastructure S.
  • the amount of power received (kWh) is attribute information indicating the cumulative value of the amount of power received by the power generation method indicated by the attribute information of “power generation method” at the power generation source indicated by the attribute information of “power generation source”. .
  • FIG. 6 shows an example of a block configuration of the power information management device 150a.
  • the power information management device 150a includes a received power amount data input reception unit 152a, a power attribute evaluation unit 153a, a cumulative attribute data transmission unit 154a, a cumulative attribute information storage unit 155a, an attribute data input reception unit 156a, and an attribute data transmission unit 157a.
  • a received power amount data input reception unit 152a includes a received power amount data input reception unit 152a, a power attribute evaluation unit 153a, a cumulative attribute data transmission unit 154a, a cumulative attribute information storage unit 155a, an attribute data input reception unit 156a, and an attribute data transmission unit 157a.
  • the power information management device 150 other than the power information management device 150a also has the same components as the components of the power information management device 150a.
  • the same subscript (as in the power information management device 150 having each component) a), b, c,...) are added to the end of each component to distinguish them.
  • the received power amount data input receiving unit 152a, the received power amount data input receiving unit 152b, and the received power amount data input receiving unit 152c are components of the power information management device 150a, the power information management device 150b, and the power information management device 150c, respectively.
  • the function and operation of a component that is not given a subscript indicates the function and operation of any component that is assigned the same reference numeral.
  • the functions and operations described in the received power amount data input receiving unit 152 include the functions and operations of the received power amount data input receiving unit 152a, the received power amount data input receiving unit 152b, the received power amount data input receiving unit 152c,. Show.
  • the received power amount data input receiving unit 152 receives input of received power amount data indicating the received power amount of the house R from the smart meter of the house R.
  • the power attribute evaluation unit 153 evaluates the attribute of the power received by the house R.
  • the cumulative attribute data transmission unit 154 transmits cumulative attribute data indicating the power attribute information stored in the cumulative attribute information storage unit 155 to the power information aggregation device 170.
  • the attribute data input receiving unit 156 receives input of attribute data indicating attribute information of power received by the house R from the smart meter of the house R.
  • the attribute data transmission unit 157 transmits attribute data indicating attribute information of power supplied to the electric vehicle E in the house R to the power information management device 110 of the electric vehicle E as a power supply destination.
  • FIG. 7 shows an example of information stored in the cumulative attribute information storage unit 155 in a table format.
  • the accumulated attribute information storage unit 155 stores each attribute information of the power generation source, the power generation method, and the amount of power received (kWh) in association with each other.
  • the power generation source is attribute information indicating the power generation source of the electric power received by the house R.
  • the power generation method is attribute information indicating a power generation method of power received by the house R.
  • the amount of power received (kWh) is attribute information indicating the cumulative value of the amount of power received by the power generation method indicated by the attribute information of “power generation method” at the power generation source indicated by the attribute information of “power generation source”. .
  • FIG. 8 shows an example of a block configuration of the power information aggregating apparatus 170.
  • the power information aggregation device 170 includes an attribute information aggregation unit 171, a statistical calculation unit 172, an incentive calculation unit 173, a penalty calculation unit 174, a data output request reception unit 175, a data output unit 176, a customer information storage unit 177, aggregated attribute information.
  • a storage unit 178, a statistical information storage unit 179, an incentive information storage unit 180, and a penalty information storage unit 181 are included.
  • the function and operation of each component will be described.
  • the attribute information aggregating unit 171 collects attribute information of electric power received by the electric vehicle E, the charging infrastructure S, and the house R.
  • the statistical calculation unit 172 Based on the attribute information aggregated by the attribute information aggregating unit 171, the statistical calculation unit 172 receives the power received by the users of the plurality of electric vehicles E, the charging infrastructure S operators, and the residents of the house R in the predetermined area. Calculate attribute statistics.
  • the incentive calculating unit 173 calculates an incentive to be given to the user of the electric vehicle E, the business of the charging infrastructure S, and the resident of the house R based on the attribute information aggregated by the attribute information aggregating unit 171.
  • the penalty calculation unit 174 calculates a penalty to be given to the user of the electric vehicle E, the operator of the charging infrastructure S, and the resident of the house R based on the attribute information aggregated by the attribute information aggregation unit 171.
  • the data output request receiving unit 175 is a request for outputting data indicating statistics of the attributes of power received by users of a plurality of electric vehicles E in a predetermined area, operators of the charging infrastructure S, and residents of the house R Is received from the input device.
  • the data output request accepting unit 175 accepts a request for outputting data indicating incentives to be given to the user of the electric vehicle E, the business of the charging infrastructure S, and the resident of the house R from the input device. Further, the data output request receiving unit 175 receives from the input device a request for outputting data indicating a penalty given to the user of the electric vehicle E, the business of the charging infrastructure S, and the resident of the house R.
  • the data output unit 176 outputs, to the output device, data indicating statistics of power attributes received by users of a plurality of electric vehicles E in a predetermined area, operators of the charging infrastructure S, and residents of the house R. Further, the data output unit 176 outputs data indicating incentives to be given to the user of the electric vehicle E, the operator of the charging infrastructure S, and the resident of the house R to the output device. In addition, the data output unit 176 outputs data indicating a penalty to be given to the user of the electric vehicle E, the operator of the charging infrastructure S, and the resident of the house R to the output device.
  • FIG. 9 shows an example of information stored in the customer information storage unit 177 in a table format.
  • information on each region and customer is stored in association with each other.
  • the region is information indicating a certain range of region.
  • the consumer is information indicating the electric vehicle E, the charging infrastructure S, and the house R in the region indicated by the “region” information.
  • FIG. 10 shows an example of information stored in the aggregate attribute information storage unit 178 in a table format.
  • the information in this example is an example of information collected from the power information management device 110 of the electric vehicle E.
  • each attribute information of a power generation source, a power generation method, a power supply source, a power reception amount (kWh), a power reception ratio (%), an ecology index, and a carbon intensity is stored in association with each other. The These pieces of information are individually stored for each electric vehicle E.
  • the power generation source is attribute information indicating the power generation source of the electric power received by the electric vehicle E.
  • the power generation method is attribute information indicating a power generation method of power received by the electric vehicle E.
  • the power supply source is attribute information indicating a power supply source of power received by the electric vehicle E.
  • the amount of power received (kWh) is generated by the power generation method indicated by the “power generation method” attribute information in the power generation source indicated by the “power generation source” attribute information, and is indicated by the “power supply source” attribute information. This is attribute information indicating the cumulative value of the amount of power fed from.
  • the power reception ratio (%) is attribute information indicating the ratio of the amount of power indicated by the attribute information “power reception amount (kWh)” of the amount of power received by the electric vehicle E.
  • the carbon intensity is attribute information indicating the carbon emission amount when the electric power having the power amount indicated by the attribute information “power received (kWh)” is generated by the power generation method indicated by the attribute information “power generation method”.
  • the ecology index is attribute information indicating the degree of contribution to ecology when the amount of power indicated by the attribute information of “amount of power received (kWh)” is generated by the power generation method indicated by the attribute information of “power generation method” It is.
  • FIG. 11 shows another example of information stored in the aggregate attribute information storage unit 178 in a table format.
  • the information in this example is an example of information collected from the power information management device 130 of the charging infrastructure S.
  • attribute information of a power generation source, a power generation method, a power reception amount (kWh), a power reception ratio (%), an ecology index, and a carbon intensity are stored in association with each other. These pieces of information are stored individually for each charging infrastructure S.
  • the power generation source is attribute information indicating the power generation source of the power received by the charging infrastructure S.
  • the power generation method is attribute information indicating a power generation method of power received by the charging infrastructure S.
  • the amount of power received (kWh) is attribute information indicating the cumulative value of the amount of power received by the power generation method indicated by the attribute information of “power generation method” at the power generation source indicated by the attribute information of “power generation source”.
  • the power reception ratio (%) is attribute information indicating the ratio of the amount of power indicated by the attribute information “power reception amount (kWh)” of the amount of power received by the charging infrastructure S.
  • the carbon intensity is attribute information indicating the carbon emission amount when the electric power having the electric energy indicated by the attribute information “received power (kWh)” is generated by the power generation method indicated by the attribute information “power generation method”.
  • the ecology index is attribute information indicating the degree of contribution to ecology when the amount of power indicated by the attribute information “received power (kWh)” is generated by the power generation method indicated by the attribute information of “power generation method”. It is.
  • FIG. 12 shows still another example of information stored in the aggregate attribute information storage unit 178 in a table format.
  • the information in this example is an example of information aggregated from the power information management device 150 of the house R.
  • attribute information of a power generation source, a power generation method, a power reception amount (kWh), a power reception ratio (%), an ecology index, and a carbon intensity are stored in association with each other. These pieces of information are stored individually for each house R.
  • the power generation source is attribute information indicating the power generation source of the electric power received by the house R.
  • the power generation method is attribute information indicating a power generation method of power received by the house R.
  • the amount of power received (kWh) is attribute information indicating the cumulative value of the amount of power received by the power generation method indicated by the attribute information of “power generation method” at the power generation source indicated by the attribute information of “power generation source”.
  • the power reception ratio (%) is attribute information indicating the ratio of the amount of power indicated by the attribute information of “power reception (kWh)” out of the amount of power received by the house R.
  • the carbon intensity is attribute information indicating the carbon emission amount when the electric power having the power amount indicated by the attribute information “power received (kWh)” is generated by the power generation method indicated by the attribute information “power generation method”.
  • the ecology index is attribute information indicating the degree of contribution to ecology when the amount of power indicated by the attribute information of “amount of power received (kWh)” is generated by the power generation method indicated by the attribute information of “power generation method” It is.
  • FIG. 13 shows an example of information stored in the statistical information storage unit 179 in a table format.
  • information on regions and ecology contribution rates is stored in association with each other.
  • the region is information indicating a certain range of region.
  • the ecology contribution rate is information indicating the degree of contribution to ecology within the region indicated by “region”.
  • FIG. 14 shows an example of information stored in the incentive information storage unit 180 in a table format.
  • the incentive information storage unit 180 information on consumers and points is stored in association with each other.
  • the customer is information indicating the electric vehicle E, the charging infrastructure S, and the house R.
  • the point (point) is the number of points of the point service given to the consumer indicated by “customer”.
  • the point service point may be an example of the “incentive” in the present invention.
  • FIG. 15 shows an example of information stored in the penalty information storage unit 181 in a table format.
  • the penalty information storage unit 181 stores information on customers and taxes (yen) in association with each other.
  • the customer is information indicating the electric vehicle E, the charging infrastructure S, and the house R.
  • the tax (yen) is the amount of tax imposed on the consumer indicated by “customer”.
  • the tax may be an example of a “penalty” in the present invention.
  • FIG. 16 shows an example of an operation sequence of the power information management device 130 and the power information aggregation device 170.
  • This operation sequence shows an operation when the charging infrastructure S receives power.
  • FIGS. 1 to 15 For description of this operation sequence, refer to FIGS. 1 to 15 together.
  • the charging infrastructure S receives the power supplied from the power company P or the power generated by the solar power generation system of the charging infrastructure S.
  • the charging infrastructure S individually receives, as power supplied from the power company P, power generated by nuclear power generation, power generated by solar power generation, and power generated by thermal power generation.
  • the smart meter of the charging infrastructure S detects what attribute power is being received. Then, the smart meter outputs attribute data indicating the attribute information of the received power to the power information management apparatus 130.
  • the smart meter uses the power generation source “power company P” and the power generation method “nuclear power” as attribute information of the power received. Is output to the power information management apparatus 130.
  • the attribute data input receiving unit 136 of the power information management apparatus 130 receives the attribute data input from the smart meter (S101), the attribute data input receiving unit 136 sends the attribute data to the power attribute evaluation unit 133.
  • the smart meter of the charging infrastructure S measures the amount of power received by the charging infrastructure S. Then, the smart meter outputs received power amount data indicating a measured value of the received power amount to the power information management device 130.
  • the received power amount data input receiving unit 132 of the power information management apparatus 130 receives the received power amount data output from the smart meter (S102), the received power amount data is sent to the power attribute evaluating unit 133.
  • the charging infrastructure S The attribute of the received power is evaluated (S103), and the attribute information stored in the cumulative attribute information storage unit 135 is updated (S104). For example, it is assumed that each attribute information of the power generation source “electric power company P”, the power generation method “nuclear power”, and the amount of received power “1990 (kWh)” is stored in the accumulated attribute information storage unit 135 in association with each other. Further, it is assumed that the attribute data indicates attribute information of the power generation source “electric power company P” and the power generation method “nuclear power”.
  • the cumulative attribute data transmission unit 134 of the power information management device 130 displays the cumulative attribute indicating the attribute information stored in the cumulative attribute information storage unit 135. Data is transmitted to the power information aggregating apparatus 170 (S105).
  • the attribute information aggregating unit 171 of the power information aggregating apparatus 170 When the attribute information aggregating unit 171 of the power information aggregating apparatus 170 receives the accumulated attribute data transmitted from the power information managing apparatus 130, the attribute information aggregating unit 171 stores the attribute information indicated by the accumulated attribute data in the aggregated attribute information storage unit 178. Update (S106). For example, when storing the attribute information in the aggregated attribute information storage unit 178, the attribute information aggregating unit 171 receives a power reception ratio (%), ecology for each combination of attribute information of a power generation source, a power generation method, and a power reception amount (kWh). The index and carbon intensity are calculated and stored together. In this way, attribute information as shown in FIG. 11 is stored in the aggregate attribute information storage unit 178 of the power information aggregating apparatus 170.
  • Update (S106) For example, when storing the attribute information in the aggregated attribute information storage unit 178, the attribute information aggregating unit 171 receives a power reception ratio (%), ecology for each combination
  • the statistical calculation unit 172 of the power information aggregating apparatus 170 is updated within the predetermined area based on the attribute information aggregated in the aggregated attribute information storage unit 178.
  • the statistics of the attribute of the electric power received by the users of the plurality of electric vehicles E, the provider of the charging infrastructure S, and the residents of the house R are calculated (S107).
  • the statistical calculation unit 172 refers to the information stored in the customer information storage unit 177 and selects a plurality of consumers in a predetermined area from the attribute information stored in the aggregate attribute information storage unit 178. Reads the attribute information of the received power.
  • the statistics calculation unit 172 calculates the ecology contribution rate in the area as statistics. Then, the statistical calculation unit 172 stores the calculated statistical information of the ecology contribution rate in the statistical information storage unit 179 (S108). In this way, information as shown in FIG. 13 is stored in the statistical information storage unit 179 of the power information aggregating apparatus 170.
  • the incentive calculation unit 173 of the power information aggregation device 170 performs charging based on the attribute information aggregated in the aggregate attribute information storage unit 178.
  • An incentive to be given to the provider of the infrastructure S is calculated (S109).
  • the incentive calculation unit 173 calculates the point number of the point service as an incentive to be given to the charging infrastructure company.
  • the incentive calculation unit 173 stores the calculated incentive information in the incentive information storage unit 180 (S110). In this way, information as shown in FIG. 14 is stored in the incentive information storage unit 180 of the power information aggregating apparatus 170.
  • the penalty calculation unit 174 of the power information aggregating apparatus 170 performs charging based on the attribute information aggregated in the aggregate attribute information storage unit 178.
  • a penalty to be given to the provider of the infrastructure S is calculated (S111).
  • the penalty calculation unit 174 calculates a tax as a penalty to be given to the business of the charging infrastructure S.
  • the penalty calculation unit 174 stores the calculated penalty information in the penalty information storage unit 181 (S112). In this way, information as shown in FIG. 15 is stored in the penalty information storage unit 181 of the power information aggregating apparatus 170.
  • FIG. 17 shows an example of an operation sequence of the power information management device 150 and the power information aggregation device 170. This operation sequence shows an operation when the house R receives power. Note that this operation sequence will be described with reference to FIGS.
  • the house R receives power supplied from the electric power company P or power generated by the solar power generation system of the house R.
  • the house R individually receives, as power supplied from the power company P, power generated by nuclear power generation, power generated by solar power generation, and power generated by thermal power generation.
  • the smart meter of the house R detects which attribute of electric power is being received. Then, the smart meter outputs attribute data indicating the attribute information of the received power to the power information management device 150.
  • the smart meter uses the power generation source “power company P” and the power generation method “nuclear power” as attribute information of the power received. ”Is output to the power information management apparatus 150.
  • the attribute data input accepting unit 156 of the power information management apparatus 150 accepts input of attribute data output from the smart meter (S101)
  • the attribute data input accepting unit 156 sends the attribute data to the power attribute evaluating unit 153.
  • the smart meter of the house R measures the amount of power received by the house R. Then, the smart meter outputs received power amount data indicating a measured value of the received power amount to the power information management device 150.
  • the received power amount data input receiving unit 152 of the power information management device 150 sends the received power amount data to the power attribute evaluating unit 153.
  • the house R receives the power.
  • the attribute of the generated power is evaluated (S203), and the attribute information stored in the cumulative attribute information storage unit 155 is updated (S204). For example, it is assumed that each attribute information of the power generation source “electric power company P”, the power generation method “nuclear power”, and the power reception amount “290 (kWh)” is stored in the accumulated attribute information storage unit 155 in association with each other. Further, it is assumed that the attribute data indicates attribute information of the power generation source “electric power company P” and the power generation method “nuclear power”.
  • the electric energy data indicates that 10 (kWh) electric power generated by nuclear power generation is received from the electric power company P.
  • the cumulative attribute data transmission unit 154 of the power information management device 150 displays the cumulative attribute indicating the attribute information stored in the cumulative attribute information storage unit 155. Data is transmitted to the power information aggregating apparatus 170 (S205).
  • the attribute information aggregating unit 171 of the power information aggregating apparatus 170 receives the accumulated attribute data transmitted from the power information managing apparatus 150, the attribute information indicated by the accumulated attribute data is stored in the aggregated attribute information storage unit 178.
  • Update (S206) For example, when storing the attribute information in the aggregated attribute information storage unit 178, the attribute information aggregating unit 171 receives a power reception ratio (%), ecology for each combination of attribute information of a power generation source, a power generation method, and a power reception amount (kWh). The index and carbon intensity are calculated and stored together. In this way, attribute information as shown in FIG. 12 is stored in the aggregate attribute information storage unit 178 of the power information aggregating apparatus 170.
  • the statistical calculation unit 172 of the power information aggregating apparatus 170 is updated within the predetermined area based on the attribute information aggregated in the aggregated attribute information storage unit 178.
  • the statistics of the attribute of the electric power received by the users of the plurality of electric vehicles E, the provider of the charging infrastructure S, and the residents of the house R are calculated (S207).
  • the statistical calculation unit 172 refers to the information stored in the customer information storage unit 177 and selects a plurality of consumers in a predetermined area from the attribute information stored in the aggregate attribute information storage unit 178. Reads the attribute information of the received power.
  • the statistics calculation unit 172 calculates the ecology contribution rate in the area as statistics. Then, the statistical calculation unit 172 stores the calculated statistical information of the ecology contribution rate in the statistical information storage unit 179 (S208). In this way, information as shown in FIG. 13 is stored in the statistical information storage unit 179 of the power information aggregating apparatus 170.
  • the incentive calculation unit 173 of the power information aggregating apparatus 170 performs the housing based on the attribute information aggregated in the aggregated attribute information storage unit 178.
  • the incentive given to the resident of R is calculated (S209).
  • the incentive calculation unit 173 calculates the number of points for the point service as an incentive to be given to the resident of the house R.
  • the incentive calculation unit 173 stores the calculated incentive information in the incentive information storage unit 180 (S210). In this way, information as shown in FIG. 14 is stored in the incentive information storage unit 180 of the power information aggregating apparatus 170.
  • the penalty calculation unit 174 of the power information aggregating apparatus 170 is based on the attribute information aggregated in the aggregated attribute information storage unit 178.
  • the penalty given to the resident of R is calculated (S211).
  • the penalty calculation unit 174 calculates a tax as a penalty to be given to a resident of the house R.
  • the penalty calculation unit 174 stores the calculated penalty information in the penalty information storage unit 181 (S212). In this way, information as shown in FIG. 15 is stored in the penalty information storage unit 181 of the power information aggregating apparatus 170.
  • FIGS. 18 and 19 show an example of an operation sequence of the power information management device 110, the power information management device 130, and the power information aggregation device 170.
  • This operation sequence shows an operation when the electric vehicle E is charged in the charging infrastructure S. Note that this operation flow will be described with reference to FIGS.
  • the power generated by the nuclear power generation at the power company P When the user of the electric vehicle E charges with the charging infrastructure S, the power generated by the nuclear power generation at the power company P, the power generated by the solar power generation at the power company P, the power company P It is selected which of the electric power generated by the thermal power generation and the electric power of which attribute is charged from the electric power generated by the solar power generation in the charging infrastructure S.
  • the charging infrastructure S electric power selected by the user of the electric vehicle E is received, and the electric power is supplied to the electric vehicle E through the charger.
  • the smart meter of the charging infrastructure S detects what attribute power is being received. Then, the smart meter outputs attribute data indicating the attribute information of the received power to the power information management apparatus 130. For example, when receiving power generated by nuclear power supplied from the power company P, the smart meter uses the power generation source “power company P” and the power generation method “nuclear power” as attribute information of the power received. Is output to the power information management apparatus 130.
  • the attribute data input reception unit 136 of the power information management device 130 When the attribute data input reception unit 136 of the power information management device 130 receives the input of the attribute data output from the smart meter (S301), the attribute data input reception unit 136 transmits the attribute data to the power attribute evaluation unit 133.
  • the power information management device 130 When the electric vehicle E is charged, the power information management device 130 establishes a communication link with the power information management device 110 of the electric vehicle E. In that case, the attribute data input receiving unit 136 also sends the attribute data to the attribute data transmitting unit 137.
  • the power information management apparatus 130 performs the same processing as the processing in steps S103 to S105 described above in the operation sequence shown in FIG.
  • the power information aggregating apparatus 170 performs the same processing as the processing in steps S106 to S112 described above in the operation sequence shown in FIG. These processes are not shown in the operation sequences of FIGS.
  • the attribute data transmission unit 137 of the power information management device 130 When the attribute data transmission unit 137 of the power information management device 130 receives the attribute data transmitted from the attribute data input reception unit 136, the attribute data transmission unit 137 transmits the attribute data to the power information management device 110 with which the communication link is established ( S302).
  • the attribute data receiving unit 111 of the power information management device 110 receives the attribute data transmitted from the power information management device 130, the attribute data reception unit 111 sends the attribute data to the power attribute evaluation unit 113.
  • the amount of power received by the electric vehicle E is measured by the watt-hour meter of the electric vehicle E. Then, the watt hour meter outputs received power amount data indicating a measured value of the received power amount.
  • the received power amount data input receiving unit 112 of the power information management apparatus 110 receives the received power amount data output from the watt hour meter (S303), the received power amount data is sent to the power attribute evaluating unit 113.
  • the power attribute evaluation unit 113 of the power information management apparatus 110 When the power attribute evaluation unit 113 of the power information management apparatus 110 receives the received power amount data transmitted from the received power amount data input receiving unit 112, the power attribute evaluation unit 113 evaluates the attribute of the power received by the electric vehicle E (S304), and the accumulated attribute The attribute information stored in the information storage unit 115 is updated (S305).
  • the accumulated attribute information storage unit 115 is associated with each attribute information of the power generation source “electric power company P”, the power generation method “nuclear power”, the power supply source “charging infrastructure Sa”, and the amount of power received “90 (kWh)”. And stored. Further, it is assumed that the power amount data indicates that 10 (kWh) of power generated by nuclear power generation at the power company P is received from the charging infrastructure Sa.
  • the method is stored and updated in association with the attribute information of the method “Nuclear Power” and the power supply source “Charging Infrastructure Sa”.
  • the attribute information as shown in FIG. 3 is stored in the cumulative attribute information storage unit 115.
  • the cumulative attribute data transmission unit 114 of the power information management apparatus 110 displays the cumulative attribute indicating the attribute information stored in the cumulative attribute information storage unit 115. Data is transmitted to the power information aggregating apparatus 170 (S306).
  • the attribute information aggregating unit 171 of the power information aggregating apparatus 170 When the attribute information aggregating unit 171 of the power information aggregating apparatus 170 receives the accumulated attribute data transmitted from the power information management apparatus 110, the attribute information aggregating unit 171 stores the attribute information indicated by the accumulated attribute data in the aggregated attribute information storage unit 178. Update (S307). For example, when storing the attribute information in the aggregated attribute information storage unit 178, the attribute information aggregating unit 171 receives a power reception ratio (%) for each combination of attribute information of a power generation source, a power generation method, a power supply source, and a power reception amount (kWh). ), Calculate ecology index and carbon intensity and store them together. In this way, attribute information as shown in FIG. 10 is stored in the aggregate attribute information storage unit 178 of the power information aggregating apparatus 170.
  • Update (S307) For example, when storing the attribute information in the aggregated attribute information storage unit 178, the attribute information aggregating unit 171 receives a power reception
  • the statistical calculation unit 172 of the power information aggregating apparatus 170 is updated within the predetermined area based on the attribute information aggregated in the aggregated attribute information storage unit 178.
  • the statistics of the attribute of the electric power received by the users of the plurality of electric vehicles E, the provider of the charging infrastructure S, and the residents of the house R are calculated (S308).
  • the statistical calculation unit 172 refers to the information stored in the customer information storage unit 177 and selects a plurality of consumers in a predetermined area from the attribute information stored in the aggregate attribute information storage unit 178. Reads the attribute information of the received power.
  • the statistics calculation unit 172 calculates the ecology contribution rate in the area as statistics. Then, the statistical calculation unit 172 stores the calculated statistical information of the ecology contribution rate in the statistical information storage unit 179 (S309). In this way, information as shown in FIG. 13 is stored in the statistical information storage unit 179 of the power information aggregating apparatus 170.
  • the incentive calculation unit 173 of the power information aggregating apparatus 170 performs the electrical information based on the attribute information aggregated in the aggregate attribute information storage unit 178.
  • An incentive given to the user of the car E is calculated (S310).
  • the incentive calculation unit 173 calculates the number of points for the point service as an incentive to be given to the user of the electric vehicle E.
  • the incentive calculation unit 173 stores the calculated incentive information in the incentive information storage unit 180 (S311). In this way, information as shown in FIG. 14 is stored in the incentive information storage unit 180 of the power information aggregating apparatus 170.
  • the penalty calculation unit 174 of the power information aggregating apparatus 170 determines the electrical information based on the attribute information aggregated in the aggregated attribute information storage unit 178.
  • a penalty to be given to the user of the car E is calculated (S312).
  • the penalty calculation unit 174 calculates a tax as a penalty to be given to the user of the electric vehicle E.
  • the penalty calculation unit 174 stores the calculated penalty information in the penalty information storage unit 181 (S313). In this way, information as shown in FIG. 15 is stored in the penalty information storage unit 181 of the power information aggregating apparatus 170.
  • FIGS. 20 and 21 show an example of an operation sequence of the power information management apparatus 110, the power information management apparatus 150, and the power information aggregation apparatus 170.
  • This operation sequence shows an operation when the electric vehicle E is charged in the house R. Note that this operation flow will be described with reference to FIGS.
  • the electric power generated by the electric power company P by nuclear power generation, the electric power generated by the electric power company P by solar power generation, and the thermal power generated by the electric power company P It is selected which attribute of power is to be received from the power generated by power generation and the power generated by solar power generation in the house R.
  • the electric power selected by the user of the electric vehicle E is received, and the electric power is supplied to the electric vehicle E through the charger.
  • the smart meter of the house R detects which attribute of electric power is being received. Then, the smart meter outputs attribute data indicating the attribute information of the received power to the power information management device 150.
  • the smart meter when receiving power generated by nuclear power supplied from the power company P, uses the power generation source “power company P” and the power generation method “nuclear power” as attribute information of the power received. ”Is output to the power information management apparatus 150.
  • the attribute data input receiving unit 156 of the power information management apparatus 150 receives input of attribute data output from the smart meter (S401), the attribute data is converted into power attribute evaluation. To part 153.
  • the power information management device 150 establishes a communication link with the power information management device 110 of the electric vehicle E. In that case, the attribute data input receiving unit 156 also sends the attribute data to the attribute data transmitting unit 157.
  • the power information management apparatus 150 performs the same processing as the processing in steps S203 to S205 described above in the operation sequence shown in FIG. Then, the power information aggregating apparatus 170 performs the same processing as the processing in steps S206 to S212 described above in the operation sequence shown in FIG. These processes are not shown in the operation sequences of FIGS.
  • the attribute data transmission unit 157 of the power information management device 150 When the attribute data transmission unit 157 of the power information management device 150 receives the attribute data transmitted from the attribute data input reception unit 156, the attribute data transmission unit 157 transmits the attribute data to the power information management device 110 with which the communication link is established ( S402).
  • the attribute data receiving unit 111 of the power information management apparatus 110 receives the attribute data transmitted from the power information management apparatus 150, the attribute data reception unit 111 transmits the attribute data to the power attribute evaluation unit 113.
  • step S403 to step S413 is the same as the processing from step S303 to step S313 of the operation sequence described above with reference to FIGS.
  • information as shown in FIG. 13 is stored in the statistical information storage unit 179 of the power information aggregating apparatus 170.
  • information as shown in FIG. 14 is stored in the incentive information storage unit 180 of the power information aggregating apparatus 170.
  • information as shown in FIG. 15 is stored in the penalty information storage unit 181 of the power information aggregating apparatus 170.
  • FIG. 22 shows an example of the operation flow of the power information aggregating apparatus 170.
  • This operation flow shows an operation of outputting data indicating ecological contribution rate statistical information for each region, incentive information to be given to consumers, and penalty information to be given to consumers. The description of this operation flow will be made with reference to FIGS.
  • a service provider of the power information management system 100 checks statistical information on the ecology contribution rate for each region, information on incentives to be given to consumers, and information on penalties to be given to consumers, an input device is used. To request output of data indicating desired information.
  • the data output request accepting unit 175 of the power information aggregating apparatus 170 accepts an output request for data indicating desired information (S501). Then, the data output request reception unit 175 sends data indicating which information output request has been received to the data output unit 176.
  • the data output unit 176 of the power information aggregating apparatus 170 receives the data sent from the data output request receiving unit 175, the data output unit 176 receives the information corresponding to the output request indicated by the data, the statistical information storage unit 179, the incentive information storage unit 180, read from the penalty information storage unit 181.
  • the data output unit 176 reads information stored in the statistical information storage unit 179.
  • the data output unit 176 reads information stored in the incentive information storage unit 180.
  • the data output unit 176 reads information stored in the penalty information storage unit 181.
  • the data output unit 176 outputs the data indicating the read information to an output device that outputs the data in a form that can be recognized by humans (S704).
  • the power information management system 100 it is possible to grasp statistical information on the ecology contribution rate for each region, information on incentives to be given to consumers, and information on penalties to be given to consumers.
  • the power information management system 100 can cumulatively manage power information received by the consumer.
  • the present invention relates to a power information management system including a power information management device that manages information on power received by a consumer.
  • the power information management device includes: a power attribute evaluation unit that evaluates an attribute of power received by a consumer; and each time the power attribute evaluation unit evaluates an attribute of power, the attribute information of the evaluated power is cumulative. And a cumulative attribute information storage unit. ADVANTAGE OF THE INVENTION According to this invention, the information of the electric power which the consumer received can be managed cumulatively.

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Data Mining & Analysis (AREA)
  • Public Health (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Power Engineering (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

 この電力情報管理システムは、需要家が受電した電力の情報を管理する電力情報管理装置を備え、前記電力情報管理装置は、需要家が受電した電力の属性を評価する電力属性評価部と、電力属性評価部が電力の属性を評価する度に、前記評価された電力の属性情報が累積的に格納される累積属性情報格納部とを有する。

Description

電力情報管理システム、電力情報管理装置、及びプログラム
 本発明は、電力の情報を管理する電力情報管理システム、需要家が受電した電力の情報を管理する電力情報管理装置、並びに前記電力情報管理装置用のプログラムに関する。
 本願は、2011年9月16日に日本に出願された特願2011-203017号に対して優先権を主張し、その内容をここに援用する。
 最近、スマートグリッドをはじめとして、スマートメーターやスマートコミュニティ等、スマートという言葉が多用されている。実世界における社会基盤システムである電力ネットワークの今後を展望してみると、現在は大型発電所から工場、オフィス、家庭へといったスター型構造をしているが、風力発電、太陽電池、燃料電池、蓄電池の進歩、発展、それを後押しする地球温暖化防止に向けた政策によって、急速に分散化、双方向化、個人化が進むことが予想される。
 非特許文献1に記載の研究開発は、電力ネットワークと情報ネットワークの統合による新たな超分散型エネルギー社会基盤の構築を目指してエネルギーの情報化というアイデアを提唱している。より具体的に説明すると、非特許文献1に記載の研究開発は、家庭内に複数の動力源が設置された場合、各電源からの電力を区別し、量的な省エネだけでなく、二酸化炭素発生量の低減を考慮したエネルギー・マネージメントを行うことを提唱している。
松山 隆司「<大学の研究・動向>エネルギーの情報化:電力ネットワークと情報ネットワークの統合」、Cue:京都大学電気関係教室技術情報誌、京都大学電気関係教室・洛友会、平成22年3月、第23号、p.3-8
 特許文献1に記載の研究開発によれば、各電力源からの電力には、その電力源に関する情報が紐付けられて供給されるため、その情報を参照することによって、電力源の違いによる様々なエネルギー・マネージメントを実現することができるものと考えられる。
 しかしながら、特許文献1に記載の研究開発は、需要家が受電した電力の情報を累積的に管理するような仕組みまでは提唱していない。
 本発明の電力情報管理システムは、需要家が受電した電力の情報を管理する電力情報管理装置を備え、電力情報管理装置は、需要家が受電した電力の属性を評価する電力属性評価部と、電力属性評価部が電力の属性を評価する度に、前記評価された電力の属性情報が累積的に格納される累積属性情報格納部とを有する。
 本発明の電力情報管理システムは、複数の需要家が受電した電力の情報を集約する電力情報集約装置を更に備え、電力情報集約装置は、需要家が受電した電力の属性情報を集約する属性情報集約部と、属性情報集約部が集約した属性情報に基づいて、所定地域内の複数の需要家が受電した電力の属性の統計を算出する統計算出部を有してよい。
 電力情報集約装置は、属性情報集約部が集約した属性情報に基づいて、需要家に付与するインセンティブを算出するインセンティブ算出部を更に有してよい。
 電力情報集約装置は、属性情報集約部が集約した属性情報に基づいて、需要家に付与するペナルティを算出するペナルティ算出部を更に有してよい。
 本発明の電力情報管理装置は、需要家が受電した電力の情報を管理する電力情報管理装置であって、需要家が受電した電力の属性を評価する電力属性評価部と、電力属性評価部が電力の属性を評価する度に、前記評価された電力の属性情報が累積的に格納される累積属性情報格納部とを備える。
 本発明のプログラムは、需要家が受電した電力の情報を管理する電力情報管理装置用のプログラムであって、電力情報管理装置を、需要家が受電した電力の属性を評価する電力属性評価部と、電力属性評価部が電力の属性を評価する度に前記評価された電力の属性情報が累積的に格納される累積属性情報格納部として機能させる。
 上記の発明の概要は、本発明の必要な特徴の全てを列挙したものではなく、これらの特徴群のサブコンビネーションもまた、発明となり得る。
 以上の説明から明らかなように、この発明は、需要家が受電した電力の情報を累積的に管理することができる。
電力情報管理システム100の利用環境の一例を示す図である。 電力情報管理装置110aのブロック構成の一例を示す図である。 累積属性情報格納部115に格納される情報の一例をテーブル形式で示す図である。 電力情報管理装置130aのブロック構成の一例を示す図である。 累積属性情報格納部135に格納される情報の一例をテーブル形式で示す図である。 電力情報管理装置150aのブロック構成の一例を示す図である。 累積属性情報格納部155に格納される情報の一例をテーブル形式で示す図である。 電力情報集約装置170のブロック構成の一例を示す図である。 需要家情報格納部177に格納されている情報の一例をテーブル形式で示す図である。 集約属性情報格納部178に格納される情報の一例をテーブル形式で示す図である。 集約属性情報格納部178に格納される情報の他の例をテーブル形式で示す図である。 集約属性情報格納部178に格納される情報の更に他の例をテーブル形式で示す図である。 統計情報格納部179に格納される情報の一例をテーブル形式で示す図である。 インセンティブ情報格納部180に格納される情報の一例をテーブル形式で示す図である。 ペナルティ情報格納部181に格納される情報の一例をテーブル形式で示す図である。 電力情報管理装置130、及び電力情報集約装置170の動作シーケンスの一例を示す図である。 電力情報管理装置150、及び電力情報集約装置170の動作シーケンスの一例を示す図である。 電力情報管理装置110、電力情報管理装置130、及び電力情報集約装置170の動作シーケンスの一例を示す図である。 電力情報管理装置110、電力情報管理装置130、及び電力情報集約装置170の動作シーケンスの一例を示す図である。 電力情報管理装置110、電力情報管理装置150、及び電力情報集約装置170の動作シーケンスの一例を示す図である。 電力情報管理装置110、電力情報管理装置150、及び電力情報集約装置170の動作シーケンスの一例を示す図である。 電力情報集約装置170の動作フローの一例を示す図である。
 以下、発明の実施の形態を通じて本発明を説明するが、以下の実施形態は特許請求の範囲にかかる発明を限定するものではなく、また、実施形態の中で説明されている特徴の組み合わせの全てが発明の解決手段に必須であるとは限らない。
 図1は、電力情報管理システム100の利用環境の一例を示す。電力情報管理システム100は、電力の情報を管理するシステムである。より具体的に説明すると、電力情報管理システム100は、電力会社Pにおいて様々な発電方式により発電された電力が、複数の充電インフラSa、b、c、・・・(以下、充電インフラSと総称する。)や、複数の住宅Ra、b、c、・・・(以下、住宅Rと総称する。)に給電されるような電力系統を想定している。また、電力情報管理システム100は、充電インフラSや住宅Rにおいて、自家発電された電力も給電されるような電力系統を想定している。また、電力情報管理システム100は、充電インフラSや住宅Rが受電した電力を、電気自動車Eに充電させるような電力系統を想定している。また、電気自動車E、充電インフラS、及び住宅Rは、この発明における「需要家」の一例であってよい。また、発電方式は、この発明における「属性」の一例であってよい。
 電力情報管理システム100は、複数の電力情報管理装置110a、b、c、・・・(以下、電力情報管理装置110と総称する。)、複数の電力情報管理装置130a、b、c、・・・(以下、電力情報管理装置130と総称する。)、複数の電力情報管理装置150a、b、c、・・・(以下、電力情報管理装置150と総称する。)、及び電力情報集約装置170を備える。
 電力情報管理装置110は、電気自動車Eが受電した電力の情報を管理する装置である。より具体的に説明すると、電力情報管理装置110は、電気自動車Eに設けられている。そして、電力情報管理装置110は、電気自動車Eの受電量を計量する電力量計と電気的に接続されている。また、電力情報管理装置110は、電力情報管理装置130や電力情報管理装置150と近距離無線通信により通信接続される。また、電力情報管理装置110は、電力情報集約装置170と通信回線Nを介して通信接続される。ここで、通信回線Nは、インターネット等のコンピュータネットワーク、通信事業者のコアネットワーク、及び種々のローカルネットワークを含む。
 電力情報管理装置130は、充電インフラSが受電した電力の情報を管理する装置である。より具体的に説明すると、電力情報管理装置130は、充電スタンドSに設けられている。そして、電力情報管理装置130は、充電インフラSが如何なる属性の電力を受電しているかを検知すると共に、その受電量を計量するスマートメーターと電気的に接続されている。また、電力情報管理装置130は、充電インフラSにて電気自動車Eに給電される電力の属性情報を示す属性データを入力するための入力装置と電気的に接続されている。また、電力情報管理装置130は、電力情報管理装置110と近距離無線通信により通信接続される。また、電力情報管理装置130は、電力情報集約装置170と通信回線Nを介して通信接続される。
 電力情報管理装置150は、住宅Rが受電した電力の情報を管理する装置である。より具体的に説明すると、電力情報管理装置150は、住宅Rに設けられている。そして、電力情報管理装置150は、住宅Rが如何なる属性の電力を受電しているかを検知すると共に、その受電量を計量するスマートメーターと電気的に接続されている。また、電力情報管理装置150は、住宅Rにて電気自動車Eに給電される電力の属性情報を示す属性データを入力するための入力装置と電気的に接続されている。また、電力情報管理装置150は、電力情報管理装置110と近距離無線通信により通信接続される。また、電力情報管理装置150は、電力情報集約装置170と通信回線Nを介して通信接続される。
 電力情報集約装置170は、電気自動車E、充電インフラS、及び住宅Rが受電した電力の情報を集約する装置である。より具体的に説明すると、電力情報集約装置170は、電力情報管理装置110、電力情報管理装置130、及び電力情報管理装置150と通信回線Nを介して通信接続される。
 本実施形態においては、説明が煩雑になることを防ぐことを目的として、電力情報管理システム100が一の電力情報集約装置170を備える構成について説明する。しかしながら、電力情報管理システム100は、複数の電力情報集約装置170を備えてよい。
 図2は、電力情報管理装置110aのブロック構成の一例を示す。電力情報管理装置110aは、属性データ受信部111a、受電量データ入力受付部112a、電力属性評価部113a、累積属性データ送信部114a、及び累積属性情報格納部115aを有する。以下、各構成要素の機能及び動作を説明する。
 電力情報管理装置110a以外の電力情報管理装置110も、電力情報管理装置110aが有する構成要素と同じ構成要素を有する。以後の説明では、電力情報管理装置110が有する構成要素がいずれの電力情報管理装置110の構成要素であるかを区別する場合には、各構成要素を有する電力情報管理装置110と同じ添え字(a、b、c、・・・)を各構成要素の末尾に付して区別する。例えば、属性データ受信部111a、属性データ受信部111b、及び属性データ受信部111cは、それぞれ電力情報管理装置110a、電力情報管理装置110b、及び電力情報管理装置110cの構成要素であることを示す。
 また、以後の説明において、添え字が付されていない構成要素の機能及び動作は、同じ符号が付されたいずれの構成要素の機能及び動作を示す。例えば、属性データ受信部111で説明された機能及び動作は、属性データ受信部111a、属性データ受信部111b、属性データ受信部111c、・・・の機能及び動作を示す。
 属性データ受信部111は、充電インフラSにて電気自動車Eが受電する電力の属性情報を示す属性データを、給電元の充電インフラSの電力情報管理装置130から受信する。同様に、属性データ受信部111は、住宅Rにて電気自動車Eが受電する電力の属性情報を示す属性データを、給電元の住宅Rの電力情報管理装置150から受信する。
 受電量データ入力受付部112は、電気自動車Eの受電量を示す受電量データの入力を、電気自動車Eの電力量計から受け付ける。
 電力属性評価部113は、電気自動車Eが受電した電力の属性を評価する。
 累積属性データ送信部114は、累積属性情報格納部115に格納されている電力の属性情報を示す累積属性データを、電力情報集約装置170へ送信する。
 図3は、累積属性情報格納部115に格納される情報の一例をテーブル形式で示す。累積属性情報格納部115には、発電元、発電方法、給電元、及び受電量(kWh)の各属性情報が対応付けられて格納される。
 発電元は、電気自動車Eが受電した電力の発電元を示す属性情報である。発電方法は、電気自動車Eが受電した電力の発電方法を示す属性情報である。給電元は、電気自動車Eが受電した電力の給電元を示す属性情報である。受電量(kWh)は、「発電元」の属性情報によって示される発電元において、「発電方法」の属性情報によって示される発電方法により発電されて、「給電元」の属性情報によって示される給電元から給電された電力量の累積値を示す属性情報である。
 図4は、電力情報管理装置130aのブロック構成の一例を示す。電力情報管理装置130aは、受電量データ入力受付部132a、電力属性評価部133a、累積属性データ送信部134a、累積属性情報格納部135a、属性データ入力受付部136a、及び属性データ送信部137aを有する。以下、各構成要素の機能及び動作を説明する。
 電力情報管理装置130a以外の電力情報管理装置130b、c、・・・も、電力情報管理装置130aが有する構成要素と同じ構成要素を有する。以後の説明では、電力情報管理装置130が有する構成要素がいずれの電力情報管理装置130の構成要素であるかを区別する場合には、各構成要素を有する電力情報管理装置130と同じ添え字(a、b、c、・・・)を各構成要素の末尾に付して区別する。例えば、受電量データ入力受付部132a、受電量データ入力受付部132b、及び受電量データ入力受付部132cは、それぞれ電力情報管理装置130a、電力情報管理装置130b、及び電力情報管理装置130cの構成要素であることを示す。
 また、以後の説明において、添え字が付されていない構成要素の機能及び動作は、同じ符号が付されたいずれの構成要素の機能及び動作を示す。例えば、受電量データ入力受付部132で説明された機能及び動作は、受電量データ入力受付部132a、受電量データ入力受付部132b、受電量データ入力受付部132c、・・・の機能及び動作を示す。
 受電量データ入力受付部132は、充電インフラSの受電量を示す受電量データの入力を、充電インフラSのスマートメーターから受け付ける。
 電力属性評価部133は、充電インフラSが受電した電力の属性を評価する。
 累積属性データ送信部134は、累積属性情報格納部135に格納されている電力の属性情報を示す累積属性データを、電力情報集約装置170へ送信する。
 属性データ入力受付部136は、充電インフラSが受電した電力の属性情報を示す属性データの入力を、充電インフラSのスマートメーターから受け付ける。
 属性データ送信部137は、充電インフラSにて電気自動車Eに給電される電力の属性情報を示す属性データを、給電先の電気自動車Eの電力情報管理装置110へ送信する。
 図5は、累積属性情報格納部135に格納される情報の一例をテーブル形式で示す。累積属性情報格納部135には、発電元、発電方法、及び受電量(kWh)の各属性情報が対応付けられて格納される。
 発電元は、充電インフラSが受電した電力の発電元を示す属性情報である。発電方法は、充電インフラSが受電した電力の発電方法を示す属性情報である。受電量(kWh)は、「発電元」の属性情報によって示される発電元において、「発電方法」の属性情報によって示される発電方法により発電された電力の受電量の累積値を示す属性情報である。
 図6は、電力情報管理装置150aのブロック構成の一例を示す。電力情報管理装置150aは、受電量データ入力受付部152a、電力属性評価部153a、累積属性データ送信部154a、累積属性情報格納部155a、属性データ入力受付部156a、及び属性データ送信部157aを有する。以下、各構成要素の機能及び動作を説明する。
 電力情報管理装置150a以外の電力情報管理装置150も、電力情報管理装置150aが有する構成要素と同じ構成要素を有する。以後の説明では、電力情報管理装置150が有する構成要素がいずれの電力情報管理装置150の構成要素であるかを区別する場合には、各構成要素を有する電力情報管理装置150と同じ添え字(a、b、c、・・・)を各構成要素の末尾に付して区別する。例えば、受電量データ入力受付部152a、受電量データ入力受付部152b、及び受電量データ入力受付部152cは、それぞれ電力情報管理装置150a、電力情報管理装置150b、及び電力情報管理装置150cの構成要素であることを示す。
 また、以後の説明において、添え字が付されていない構成要素の機能及び動作は、同じ符号が付されたいずれの構成要素の機能及び動作を示す。例えば、受電量データ入力受付部152で説明された機能及び動作は、受電量データ入力受付部152a、受電量データ入力受付部152b、受電量データ入力受付部152c、・・・の機能及び動作を示す。
 受電量データ入力受付部152は、住宅Rの受電量を示す受電量データの入力を、住宅Rのスマートメーターから受け付ける。
 電力属性評価部153は、住宅Rが受電した電力の属性を評価する。
 累積属性データ送信部154は、累積属性情報格納部155に格納されている電力の属性情報を示す累積属性データを、電力情報集約装置170へ送信する。
 属性データ入力受付部156は、住宅Rが受電した電力の属性情報を示す属性データの入力を、住宅Rのスマートメーターから受け付ける。
 属性データ送信部157は、住宅Rにて電気自動車Eに給電される電力の属性情報を示す属性データを、給電先の電気自動車Eの電力情報管理装置110へ送信する。
 図7は、累積属性情報格納部155に格納される情報の一例をテーブル形式で示す。累積属性情報格納部155には、発電元、発電方法、及び受電量(kWh)の各属性情報が対応付けられて格納される。
 発電元は、住宅Rが受電した電力の発電元を示す属性情報である。発電方法は、住宅Rが受電した電力の発電方法を示す属性情報である。受電量(kWh)は、「発電元」の属性情報によって示される発電元において、「発電方法」の属性情報によって示される発電方法により発電された電力の受電量の累積値を示す属性情報である。
 図8は、電力情報集約装置170のブロック構成の一例を示す。電力情報集約装置170は、属性情報集約部171、統計算出部172、インセンティブ算出部173、ペナルティ算出部174、データ出力要求受付部175、データ出力部176、需要家情報格納部177、集約属性情報格納部178、統計情報格納部179、インセンティブ情報格納部180、及びペナルティ情報格納部181を有する。以下、各構成要素の機能及び動作を説明する。
 属性情報集約部171は、電気自動車Eや、充電インフラSや、住宅Rが受電した電力の属性情報を集約する。
 統計算出部172は、属性情報集約部171が集約した属性情報に基づいて、所定地域内の複数の電気自動車Eの利用者、充電インフラSの事業者、住宅Rの居住者が受電した電力の属性の統計を算出する。
 インセンティブ算出部173は、属性情報集約部171が集約した属性情報に基づいて、電気自動車Eの利用者、充電インフラSの事業者、住宅Rの居住者に付与するインセンティブを算出する。
 ペナルティ算出部174は、属性情報集約部171が集約した属性情報に基づいて、電気自動車Eの利用者、充電インフラSの事業者、住宅Rの居住者に付与するペナルティを算出する。
 データ出力要求受付部175は、所定地域内の複数の電気自動車Eの利用者、充電インフラSの事業者、住宅Rの居住者が受電した電力の属性の統計を示すデータを出力する旨の要求を、入力装置から受け付ける。また、データ出力要求受付部175は、電気自動車Eの利用者、充電インフラSの事業者、住宅Rの居住者に付与するインセンティブを示すデータを出力する旨の要求を、入力装置から受け付ける。また、データ出力要求受付部175は、電気自動車Eの利用者、充電インフラSの事業者、住宅Rの居住者に付与するペナルティを示すデータを出力する旨の要求を、入力装置から受け付ける。
 データ出力部176は、所定地域内の複数の電気自動車Eの利用者、充電インフラSの事業者、住宅Rの居住者が受電した電力の属性の統計を示すデータを、出力装置へ出力する。また、データ出力部176は、電気自動車Eの利用者、充電インフラSの事業者、住宅Rの居住者に付与するインセンティブを示すデータを、出力装置へ出力する。また、データ出力部176は、電気自動車Eの利用者、充電インフラSの事業者、住宅Rの居住者に付与するペナルティを示すデータを、出力装置へ出力する。
 図9は、需要家情報格納部177に格納されている情報の一例をテーブル形式で示す。
需要家情報格納部177には、地域、及び需要家の各情報が対応付けられて格納されている。
 地域は、一定の範囲の地域を示す情報である。需要家は、「地域」の情報によって示される地域内の電気自動車E、充電インフラS、住宅Rを示す情報である。
 図10は、集約属性情報格納部178に格納される情報の一例をテーブル形式で示す。
この例の情報は、電気自動車Eの電力情報管理装置110から集約された情報の一例である。この例の集約属性情報格納部178には、発電元、発電方法、給電元、受電量(kWh)、受電割合(%)、エコロジー指数、及び炭素強度の各属性情報が対応付けられて格納される。これら情報は、電気自動車E毎にそれぞれ個別に格納される。
 発電元は、電気自動車Eが受電した電力の発電元を示す属性情報である。発電方法は、電気自動車Eが受電した電力の発電方法を示す属性情報である。給電元は、電気自動車Eが受電した電力の給電元を示す属性情報である。受電量(kWh)は、「発電元」の属性情報によって示される発電元において、「発電方法」の属性情報によって示される発電方法により発電されて、「給電元」の属性情報によって示される給電元から給電された電力量の累積値を示す属性情報である。受電割合(%)は、電気自動車Eが受電した電力量のうち、「受電量(kWh)」の属性情報によって示される電力量の割合を示す属性情報である。炭素強度は、「受電量(kWh)」の属性情報によって示される電力量の電力を、「発電方法」の属性情報によって示される発電方法により発電した場合の炭素排出量を示す属性情報である。エコロジー指数は、「受電量(kWh)」の属性情報によって示される電力量の電力を、「発電方法」の属性情報によって示される発電方法により発電した場合のエコロジーへの貢献の度合いを示す属性情報である。
 図11は、集約属性情報格納部178に格納される情報の他の例をテーブル形式で示す。この例の情報は、充電インフラSの電力情報管理装置130から集約された情報の一例である。この例の集約属性情報格納部178には、発電元、発電方法、受電量(kWh)、受電割合(%)、エコロジー指数、及び炭素強度の各属性情報がそれぞれ対応付けられて格納される。これら情報は、充電インフラS毎にそれぞれ個別に格納される。
 発電元は、充電インフラSが受電した電力の発電もとを示す属性情報である。発電方法は、充電インフラSが受電した電力の発電方法を示す属性情報である。受電量(kWh)は、「発電元」の属性情報によって示される発電元において、「発電方法」の属性情報によって示される発電方法により発電された電力の受電量の累積値を示す属性情報である。
受電割合(%)は、充電インフラSが受電した電力量のうち、「受電量(kWh)」の属性情報によって示される電力量の割合を示す属性情報である。炭素強度は、「受電量(kWh)」の属性情報によって示される電力量の電力を、「発電方法」の属性情報によって示される発電方法により発電した場合の炭素排出量を示す属性情報である。エコロジー指数は、「受電量(kWh)」の属性情報によって示される電力量の電力を、「発電方法」の属性情報によって示される発電方法により発電した場合のエコロジーへの貢献の度合いを示す属性情報である。
 図12は、集約属性情報格納部178に格納される情報の更に他の例をテーブル形式で示す。この例の情報は、住宅Rの電力情報管理装置150から集約された情報の一例である。この例の集約属性情報格納部178には、発電元、発電方法、受電量(kWh)、受電割合(%)、エコロジー指数、及び炭素強度の各属性情報がそれぞれ対応付けられて格納される。これら情報は、住宅R毎にそれぞれ個別に格納される。
 発電元は、住宅Rが受電した電力の発電元を示す属性情報である。発電方法は、住宅Rが受電した電力の発電方法を示す属性情報である。受電量(kWh)は、「発電元」の属性情報によって示される発電元において、「発電方法」の属性情報によって示される発電方法により発電された電力の受電量の累積値を示す属性情報である。受電割合(%)は、住宅Rが受電した電力量のうち、「受電量(kWh)」の属性情報によって示される電力量の割合を示す属性情報である。炭素強度は、「受電量(kWh)」の属性情報によって示される電力量の電力を、「発電方法」の属性情報によって示される発電方法により発電した場合の炭素排出量を示す属性情報である。エコロジー指数は、「受電量(kWh)」の属性情報によって示される電力量の電力を、「発電方法」の属性情報によって示される発電方法により発電した場合のエコロジーへの貢献の度合いを示す属性情報である。
 図13は、統計情報格納部179に格納される情報の一例をテーブル形式で示す。統計情報格納部179には、地域、及びエコロジー貢献率の各情報がそれぞれ対応付けられて格納される。
 地域は、一定の範囲の地域を示す情報である。エコロジー貢献率は、「地域」によって示される地域内におけるエコロジーへの貢献の度合いを示す情報である。
 図14は、インセンティブ情報格納部180に格納される情報の一例をテーブル形式で示す。インセンティブ情報格納部180には、需要家、及びポイント(点)の各情報がそれぞれ対応付けられて格納される。
 需要家は、電気自動車E、充電インフラS、住宅Rを示す情報である。ポイント(点)は、「需要家」によって示される需要家に対して与えられるポイントサービスのポイント数である。なお、ポイントサービスのポイントは、この発明における「インセンティブ」の一例であってよい。
 図15は、ペナルティ情報格納部181に格納される情報の一例をテーブル形式で示す。ペナルティ情報格納部181には、需要家、及び税金(円)の各情報がそれぞれ対応付けられて格納される。
 需要家は、電気自動車E、充電インフラS、住宅Rを示す情報である。税金(円)は、「需要家」によって示される需要家に対して課せられる税金の金額である。なお、税金は、この発明における「ペナルティ」の一例であってよい。
 図16は、電力情報管理装置130、及び電力情報集約装置170の動作シーケンスの一例を示す。この動作シーケンスは、充電インフラSが電力を受電した場合の動作を示すものである。この動作シーケンスの説明は、図1から図15を共に参照する。
 充電インフラSは、電力会社Pから供給される電力、又は充電インフラSの太陽光発電システムにより発電された電力を受電する。例えば、充電インフラSは、電力会社Pから供給される電力として、原子力発電により発電された電力、太陽光発電により発電された電力、火力発電により発電された電力を個別に受電する。充電インフラSに電力が受電され始めると、充電インフラSのスマートメーターは、如何なる属性の電力を受電しているかを検知する。そして、スマートメーターは、受電している電力の属性情報を示す属性データを、電力情報管理装置130へ出力する。例えば、電力会社Pから供給される原子力発電により発電された電力を受電している場合、スマートメーターは、受電している電力の属性情報として、発電元「電力会社P」、及び発電方法「原子力」を示す属性データを、電力情報管理装置130へ出力する。
 電力情報管理装置130の属性データ入力受付部136は、スマートメーターから出力された属性データの入力を受け付けると(S101)、その属性データを、電力属性評価部133へ送る。
 一方、充電インフラSのスマートメーターは、充電インフラSの受電量を計量する。そして、スマートメーターは、受電量の計量値を示す受電量データを、電力情報管理装置130へ出力する。
 電力情報管理装置130の受電量データ入力受付部132は、スマートメーターから出力された受電量データの入力を受け付けると(S102)、その受電量データを、電力属性評価部133へ送る。
 電力情報管理装置130の電力属性評価部133は、属性データ入力受付部136から送られた属性データを受け取り、受電量データ入力受付部132から送られた受電量データを受け取ると、充電インフラSが受電した電力の属性を評価して(S103)、累積属性情報格納部135に格納されている属性情報を更新する(S104)。例えば、累積属性情報格納部135には、発電元「電力会社P」、発電方法「原子力」、及び受電量「1990(kWh)」の各属性情報が対応付けられて格納されていたとする。また、属性データは、発電元「電力会社P」、発電方法「原子力」の属性情報を示していたとする。また、受電量データは、10(kWh)の電力を受電したことを示していたとする。このような場合、電力属性評価部133は、受電後の受電量(kWh)の累積属性情報を、1990(kWh)+10(kWh)=2000(kWh)として、発電元「電力会社P」、発電方法「原子力」の属性情報と対応付けて格納して更新する。このようにして、累積属性情報格納部135には、図5に示すような属性情報が格納されることになる。
 累積属性情報格納部135に格納されている属性情報が更新されると、電力情報管理装置130の累積属性データ送信部134は、累積属性情報格納部135に格納されている属性情報を示す累積属性データを、電力情報集約装置170へ送信する(S105)。
 電力情報集約装置170の属性情報集約部171は、電力情報管理装置130から送信された累積属性データを受信すると、その累積属性データによって示される属性情報を、集約属性情報格納部178に格納して更新する(S106)。例えば、属性情報集約部171は、属性情報を集約属性情報格納部178に格納するにあたり、発電元、発電方法、受電量(kWh)の各属性情報の組み合わせ毎に、受電割合(%)、エコロジー指数、及び炭素強度を算出して、共に格納する。このようにして、電力情報集約装置170の集約属性情報格納部178には、図11に示すような属性情報が格納されることになる。
 集約属性情報格納部178に格納されている属性情報が更新されると、電力情報集約装置170の統計算出部172は、集約属性情報格納部178に集約された属性情報に基づいて、所定地域内の複数の電気自動車Eの利用者、充電インフラSの事業者、住宅Rの居住者が受電した電力の属性の統計を算出する(S107)。例えば、統計算出部172は、需要家情報格納部177に格納されている情報を参照して、集約属性情報格納部178に格納されている属性情報の中から、所定地域内の複数の需要家が受電した電力の属性情報をそれぞれ読み出す。そして、統計算出部172は、読み出した属性情報に基づいて、その地域におけるエコロジー貢献率を、統計として算出する。そして、統計算出部172は、算出したエコロジー貢献率の統計情報を、統計情報格納部179に格納する(S108)。このようにして、電力情報集約装置170の統計情報格納部179には、図13に示すような情報が格納されることになる。
 一方、集約属性情報格納部178に格納されている属性情報が更新されると、電力情報集約装置170のインセンティブ算出部173は、集約属性情報格納部178に集約された属性情報に基づいて、充電インフラSの事業者に付与するインセンティブを算出する(S109)。例えば、インセンティブ算出部173は、充電インフラSの事業者に付与するインセンティブとして、ポイントサービスのポイント数を算出する。そして、インセンティブ算出部173は、算出したインセンティブの情報を、インセンティブ情報格納部180に格納する(S110)。このようにして、電力情報集約装置170のインセンティブ情報格納部180には、図14に示すような情報が格納されることになる。
 一方、集約属性情報格納部178に格納されている属性情報が更新されると、電力情報集約装置170のペナルティ算出部174は、集約属性情報格納部178に集約された属性情報に基づいて、充電インフラSの事業者に付与するペナルティを算出する(S111)。例えば、ペナルティ算出部174は、充電インフラSの事業者に付与するペナルティとして、税金を算出する。そして、ペナルティ算出部174は、算出したペナルティの情報を、ペナルティ情報格納部181に格納する(S112)。このようにして、電力情報集約装置170のペナルティ情報格納部181には、図15に示すような情報が格納されることになる。
 図17は、電力情報管理装置150、及び電力情報集約装置170の動作シーケンスの一例を示す。この動作シーケンスは、住宅Rが電力を受電した場合の動作を示すものである。なお、この動作シーケンスの説明は、図1から図16を共に参照する。
 住宅Rは、電力会社Pから供給される電力、又は住宅Rの太陽光発電システムにより発電された電力を受電する。例えば、住宅Rは、電力会社Pから供給される電力として、原子力発電により発電された電力、太陽光発電により発電された電力、火力発電により発電された電力を個別に受電する。住宅Rに電力が受電され始めると、住宅Rのスマートメーターは、如何なる属性の電力を受電しているかを検知する。そして、スマートメーターは、受電している電力の属性情報を示す属性データを、電力情報管理装置150へ出力する。例えば、電力会社Pから供給される原子力発電により発電された電力を受電している場合、スマートメーターは、受電している電力の属性情報として、発電元「電力会社P」、及び発電方法「原子力」を示す属性データを、電力情報管理装置150へ出力する。
 電力情報管理装置150の属性データ入力受付部156は、スマートメーターから出力された属性データの入力を受け付けると(S101)、その属性データを、電力属性評価部153へ送る。
 一方、住宅Rのスマートメーターは、住宅Rの受電量を計量する。そして、スマートメーターは、受電量の計量値を示す受電量データを、電力情報管理装置150へ出力する。
 電力情報管理装置150の受電量データ入力受付部152は、スマートメーターから出力された受電量データの入力を受け付けると(S202)、その受電量データを、電力属性評価部153へ送る。
 電力情報管理装置150の電力属性評価部153は、属性データ入力受付部156から送られた属性データを受け取り、受電量データ入力受付部152から送られた受電量データを受け取ると、住宅Rが受電した電力の属性を評価して(S203)、累積属性情報格納部155に格納されている属性情報を更新する(S204)。例えば、累積属性情報格納部155には、発電元「電力会社P」、発電方法「原子力」、及び受電量「290(kWh)」の各属性情報が対応付けられて格納されていたとする。また、属性データは、発電元「電力会社P」、発電方法「原子力」の属性情報を示していたとする。また、電力量データは、原子力発電により発電された10(kWh)の電力を電力会社Pから受電したことを示していたとする。このような場合、電力属性評価部153は、受電後の受電量(kWh)の累積属性情報を、290(kWh)+10(kWh)=300(kWh)として、発電元「電力会社P」、発電方法「原子力」の属性情報と対応付けて格納して更新する。このようにして、累積属性情報格納部155には、図7に示すような属性情報が格納されることになる。
 累積属性情報格納部155に格納されている属性情報が更新されると、電力情報管理装置150の累積属性データ送信部154は、累積属性情報格納部155に格納されている属性情報を示す累積属性データを、電力情報集約装置170へ送信する(S205)。
 電力情報集約装置170の属性情報集約部171は、電力情報管理装置150から送信された累積属性データを受信すると、その累積属性データによって示される属性情報を、集約属性情報格納部178に格納して更新する(S206)。例えば、属性情報集約部171は、属性情報を集約属性情報格納部178に格納するにあたり、発電元、発電方法、受電量(kWh)の各属性情報の組み合わせ毎に、受電割合(%)、エコロジー指数、及び炭素強度を算出して、共に格納する。このようにして、電力情報集約装置170の集約属性情報格納部178には、図12に示すような属性情報が格納されることになる。
 集約属性情報格納部178に格納されている属性情報が更新されると、電力情報集約装置170の統計算出部172は、集約属性情報格納部178に集約された属性情報に基づいて、所定地域内の複数の電気自動車Eの利用者、充電インフラSの事業者、住宅Rの居住者が受電した電力の属性の統計を算出する(S207)。例えば、統計算出部172は、需要家情報格納部177に格納されている情報を参照して、集約属性情報格納部178に格納されている属性情報の中から、所定地域内の複数の需要家が受電した電力の属性情報をそれぞれ読み出す。そして、統計算出部172は、読み出した属性情報に基づいて、その地域におけるエコロジー貢献率を、統計として算出する。そして、統計算出部172は、算出したエコロジー貢献率の統計情報を、統計情報格納部179に格納する(S208)。このようにして、電力情報集約装置170の統計情報格納部179には、図13に示すような情報が格納されることになる。
 一方、集約属性情報格納部178に格納されている属性情報が更新されると、電力情報集約装置170のインセンティブ算出部173は、集約属性情報格納部178に集約された属性情報に基づいて、住宅Rの居住者に付与するインセンティブを算出する(S209)。例えば、インセンティブ算出部173は、住宅Rの居住者に付与するインセンティブとして、ポイントサービスのポイント数を算出する。そして、インセンティブ算出部173は、算出したインセンティブの情報を、インセンティブ情報格納部180に格納する(S210)。このようにして、電力情報集約装置170のインセンティブ情報格納部180には、図14に示すような情報が格納されることになる。
 一方、集約属性情報格納部178に格納されている属性情報が更新されると、電力情報集約装置170のペナルティ算出部174は、集約属性情報格納部178に集約された属性情報に基づいて、住宅Rの居住者に付与するペナルティを算出する(S211)。例えば、ペナルティ算出部174は、住宅Rの居住者に付与するペナルティとして、税金を算出する。そして、ペナルティ算出部174は、算出したペナルティの情報を、ペナルティ情報格納部181に格納する(S212)。このようにして、電力情報集約装置170のペナルティ情報格納部181には、図15に示すような情報が格納されることになる。
 図18、19は、電力情報管理装置110、電力情報管理装置130、及び電力情報集約装置170の動作シーケンスの一例を示す。この動作シーケンスは、充電インフラSにて電気自動車Eが充電を行った場合の動作を示すものである。なお、この動作フローの説明は、図1から図17を共に参照する。
 電気自動車Eの利用者は、充電インフラSにて充電を行う場合、電力会社Pにて原子力発電により発電された電力、電力会社Pにて太陽光発電により発電された電力、電力会社Pにて火力発電により発電された電力、充電インフラSにて太陽光発電により発電された電力のうち何れの属性の電力を充電するか選択する。充電インフラSにおいては、電気自動車Eの利用者により選択された電力が受電されて、その電力が充電器を介して電気自動車Eに給電される。充電インフラSに電力が受電され始めると、充電インフラSのスマートメーターは、如何なる属性の電力を受電しているかを検知する。そして、スマートメーターは、受電している電力の属性情報を示す属性データを、電力情報管理装置130へ出力する。例えば、電力会社Pから供給される原子力発電により発電された電力を受電している場合、スマートメーターは、受電している電力の属性情報として、発電元「電力会社P」、及び発電方法「原子力」を示す属性データを、電力情報管理装置130へ出力する。
 電力情報管理装置130の属性データ入力受付部136は、スマートメーターから出力された属性データの入力を受け付けると(S301)、その属性データを、電力属性評価部133へ送る。ここで、電気自動車Eが充電される際、電力情報管理装置130は、電気自動車Eの電力情報管理装置110と通信リンクが確立している。その場合、属性データ入力受付部136は、属性データを、属性データ送信部137にも送る。
 ここで、電力情報管理装置130は、図16に示す動作シーケンスにおける上述したステップS103~S105の処理と同様の処理を行う。そして、電力情報集約装置170は、図16に示す動作シーケンスにおける上述したステップS106~S112の処理と同様の処理を行う。これらの処理は、図18、19の動作シーケンスには示していない。
 電力情報管理装置130の属性データ送信部137は、属性データ入力受付部136から送られた属性データを受け取ると、その属性データを、通信リンクが確立している電力情報管理装置110へ送信する(S302)。電力情報管理装置110の属性データ受信部111は、電力情報管理装置130から送信された属性データを受信すると、その属性データを、電力属性評価部113へ送る。
 一方、電気自動車Eの受電量は、電気自動車Eの電力量計によって計量される。そして、電力量計は、受電量の計量値を示す受電量データを出力する。
 電力情報管理装置110の受電量データ入力受付部112は、電力量計から出力された受電量データの入力を受け付けると(S303)、その受電量データを、電力属性評価部113へ送る。
 電力情報管理装置110の電力属性評価部113は、受電量データ入力受付部112から送られた受電量データを受け取ると、電気自動車Eが受電した電力の属性を評価して(S304)、累積属性情報格納部115に格納されている属性情報を更新する(S305)。例えば、累積属性情報格納部115には、発電元「電力会社P」、発電方法「原子力」、給電元「充電インフラSa」、及び受電量「90(kWh)」の各属性情報が対応付けられて格納されていたとする。また、電力量データは、電力会社Pにて原子力発電により発電された10(kWh)の電力を充電インフラSaから受電したことを示していたとする。このような場合、電力属性評価部113は、受電後の受電量(kWh)の累積属性情報を、90(kWh)+10(kWh)=100(kWh)として、発電元「電力会社P」、発電方法「原子力」、給電元「充電インフラSa」の属性情報と対応付けて格納して更新する。このようにして、累積属性情報格納部115には、図3に示すような属性情報が格納されることになる。
 累積属性情報格納部115に格納されている属性情報が更新されると、電力情報管理装置110の累積属性データ送信部114は、累積属性情報格納部115に格納されている属性情報を示す累積属性データを、電力情報集約装置170へ送信する(S306)。
 電力情報集約装置170の属性情報集約部171は、電力情報管理装置110から送信された累積属性データを受信すると、その累積属性データによって示される属性情報を、集約属性情報格納部178に格納して更新する(S307)。例えば、属性情報集約部171は、属性情報を集約属性情報格納部178に格納するにあたり、発電元、発電方法、給電元、受電量(kWh)の各属性情報の組み合わせ毎に、受電割合(%)、エコロジー指数、及び炭素強度を算出して、共に格納する。このようにして、電力情報集約装置170の集約属性情報格納部178には、図10に示すような属性情報が格納されることになる。
 集約属性情報格納部178に格納されている属性情報が更新されると、電力情報集約装置170の統計算出部172は、集約属性情報格納部178に集約された属性情報に基づいて、所定地域内の複数の電気自動車Eの利用者、充電インフラSの事業者、住宅Rの居住者が受電した電力の属性の統計を算出する(S308)。例えば、統計算出部172は、需要家情報格納部177に格納されている情報を参照して、集約属性情報格納部178に格納されている属性情報の中から、所定地域内の複数の需要家が受電した電力の属性情報をそれぞれ読み出す。そして、統計算出部172は、読み出した属性情報に基づいて、その地域におけるエコロジー貢献率を、統計として算出する。そして、統計算出部172は、算出したエコロジー貢献率の統計情報を、統計情報格納部179に格納する(S309)。このようにして、電力情報集約装置170の統計情報格納部179には、図13に示すような情報が格納されることになる。
 一方、集約属性情報格納部178に格納されている属性情報が更新されると、電力情報集約装置170のインセンティブ算出部173は、集約属性情報格納部178に集約された属性情報に基づいて、電気自動車Eの利用者に付与するインセンティブを算出する(S310)。例えば、インセンティブ算出部173は、電気自動車Eの利用者に付与するインセンティブとして、ポイントサービスのポイント数を算出する。そして、インセンティブ算出部173は、算出したインセンティブの情報を、インセンティブ情報格納部180に格納する(S311)。このようにして、電力情報集約装置170のインセンティブ情報格納部180には、図14に示すような情報が格納されることになる。
 一方、集約属性情報格納部178に格納されている属性情報が更新されると、電力情報集約装置170のペナルティ算出部174は、集約属性情報格納部178に集約された属性情報に基づいて、電気自動車Eの利用者に付与するペナルティを算出する(S312)。例えば、ペナルティ算出部174は、電気自動車Eの利用者に付与するペナルティとして、税金を算出する。そして、ペナルティ算出部174は、算出したペナルティの情報を、ペナルティ情報格納部181に格納する(S313)。このようにして、電力情報集約装置170のペナルティ情報格納部181には、図15に示すような情報が格納されることになる。
 図20、21は、電力情報管理装置110、電力情報管理装置150、及び電力情報集約装置170の動作シーケンスの一例を示す。この動作シーケンスは、住宅Rにて電気自動車Eが充電を行った場合の動作を示すものである。なお、この動作フローの説明は、図1から図19を共に参照する。
 電気自動車Eの利用者は、住宅Rにて充電を行う場合、電力会社Pにて原子力発電により発電された電力、電力会社Pにて太陽光発電により発電された電力、電力会社Pにて火力発電により発電された電力、住宅Rにて太陽光発電により発電された電力のうち何れの属性の電力を受電するか選択する。住宅Rにおいては、電気自動車Eの利用者により選択された電力が受電されて、その電力が充電器を介して電気自動車Eに給電される。住宅Rに電力が受電され始めると、住宅Rのスマートメーターは、如何なる属性の電力を受電しているかを検知する。そして、スマートメーターは、受電している電力の属性情報を示す属性データを、電力情報管理装置150へ出力する。例えば、電力会社Pから供給される原子力発電により発電された電力を受電している場合、スマートメーターは、受電している電力の属性情報として、発電元「電力会社P」、及び発電方法「原子力」を示す属性データを、電力情報管理装置150へ出力する。
 そのような入力操作が成されると、電力情報管理装置150の属性データ入力受付部156は、スマートメーターから出力された属性データの入力を受け付けると(S401)、その属性データを、電力属性評価部153へ送る。ここで、電気自動車Eが充電される際、電力情報管理装置150は、電気自動車Eの電力情報管理装置110と通信リンクが確立している。その場合、属性データ入力受付部156は、属性データを、属性データ送信部157にも送る。
 ここで、電力情報管理装置150は、図17に示す動作シーケンスにおける上述したステップS203~S205の処理と同様の処理を行う。そして、電力情報集約装置170は、図17に示す動作シーケンスにおける上述したステップS206~S212の処理と同様の処理を行う。これらの処理は、図20、21の動作シーケンスには示していない。
 電力情報管理装置150の属性データ送信部157は、属性データ入力受付部156から送られた属性データを受け取ると、その属性データを、通信リンクが確立している電力情報管理装置110へ送信する(S402)。電力情報管理装置110の属性データ受信部111は、電力情報管理装置150から送信された属性データを受信すると、その属性データを、電力属性評価部113へ送る。
 以降のステップS403からステップS413の処理は、図18、19を参照して上述した動作シーケンスのステップS303からステップS313の処理とそれぞれ同じ処理であるから、その詳細な説明を省略する。その結果、電力情報集約装置170の統計情報格納部179には、図13に示すような情報が格納されることになる。また、電力情報集約装置170のインセンティブ情報格納部180には、図14に示すような情報が格納されることになる。また、電力情報集約装置170のペナルティ情報格納部181には、図15に示すような情報が格納されることになる。
 図22は、電力情報集約装置170の動作フローの一例を示す。この動作フローは、地域毎のエコロジー貢献率の統計情報や、需要家に付与すべきインセンティブの情報や、需要家に付与すべきペナルティの情報を示すデータを出力する動作を示すものである。なお、この動作フローの説明は、図1から図21を共に参照する。
 電力情報管理システム100のサービス事業者は、地域毎のエコロジー貢献率の統計情報や、需要家に付与すべきインセンティブの情報や、需要家に付与すべきペナルティの情報を確認する場合、入力装置を用いて、所望の情報を示すデータの出力要求を行う。
 そのような入力操作が成されると、電力情報集約装置170のデータ出力要求受付部175は、所望の情報を示すデータの出力要求を受け付ける(S501)。そして、データ出力要求受付部175は、何れの情報の出力要求を受け付けたのかを示すデータを、データ出力部176へ送る。
 電力情報集約装置170のデータ出力部176は、データ出力要求受付部175から送られたデータを受け取ると、そのデータによって示される出力要求に対応する情報を、統計情報格納部179、インセンティブ情報格納部180、ペナルティ情報格納部181から読み出す。例えば、地域毎のエコロジー貢献率の統計情報の出力要求の場合、データ出力部176は、統計情報格納部179に格納されている情報を読み出す。また、需要家に付与すべきインセンティブの情報の出力要求の場合、データ出力部176は、インセンティブ情報格納部180に格納されている情報を読み出す。また、需要家に付与すべきペナルティの情報の出力要求の場合、データ出力部176は、ペナルティ情報格納部181に格納されている情報を読み出す。そして、データ出力部176は、読み出した情報を示すデータを、人間に認識できる形で出力する出力装置へ出力する(S704)。かくして、電力情報管理システム100によっては、地域毎のエコロジー貢献率の統計情報や、需要家に付与すべきインセンティブの情報や、需要家に付与するペナルティの情報を把握することができる。
 以上説明したように、電力情報管理システム100は、需要家が受電した電力の情報を累積的に管理することができる。
 以上、本発明を実施の形態を用いて説明したが、本発明の技術的範囲は、上記実施の形態に記載の範囲には限定されない。上記実施の形態に、多様な変更又は改良を加えることが可能であることが当業者に明らかである。そのような変更又は改良を加えた形態も本発明の技術的範囲に含まれ得ることが、特許請求の範囲の記載から明らかである。
 本発明は、需要家が受電した電力の情報を管理する電力情報管理装置を備える電力情報管理システムに関する。前記電力情報管理装置は、需要家が受電した電力の属性を評価する電力属性評価部と、前記電力属性評価部が電力の属性を評価する度に、前記評価された電力の属性情報が累積的に格納される累積属性情報格納部とを有する。
 本発明によれば、需要家が受電した電力の情報を累積的に管理することができる。
100 電力情報管理システム
110 電力情報管理装置
111 属性データ受信部
112 受電量データ入力受付部
113 電力属性評価部
114 属性データ送信部
115 属性情報格納部
130 電力情報管理装置
132 受電量データ入力受付部
133 電力属性評価部
134 累積属性データ送信部
135 累積属性情報格納部
136 属性データ入力受付部
137 属性データ送信部
150 電力情報管理装置
152 受電量データ入力受付部
153 電力属性評価部
154 累積属性データ送信部
155 累積属性情報格納部
156 属性データ入力受付部
157 属性データ送信部
170 電力情報集約装置
171 属性情報集約部
172 統計算出部
173 インセンティブ算出部
174 ペナルティ算出部
175 データ出力要求受付部
176 データ出力部
177 需要家情報格納部
178 集約属性情報格納部
179 統計情報格納部
180 インセンティブ情報格納部
181 ペナルティ情報格納部
E 電気自動車
N 通信回線
P 電力会社
R 住宅
S 充電インフラ

Claims (6)

  1.  需要家が受電した電力の情報を管理する電力情報管理装置を備え、
     前記電力情報管理装置は、
     需要家が受電した電力の属性を評価する電力属性評価部と、
     前記電力属性評価部が電力の属性を評価する度に、前記評価された電力の属性情報が累積的に格納される累積属性情報格納部と
    を有する電力情報管理システム。
  2.  複数の需要家が受電した電力の情報を集約する電力情報集約装置を更に備え、
     前記電力情報集約装置は、
     需要家が受電した電力の属性情報を集約する属性情報集約部と、
     前記属性情報集約部が集約した属性情報に基づいて、所定地域内の複数の需要家が受電した電力の属性の統計を算出する統計算出部と
    を有する請求項1に記載の電力情報管理システム。
  3.  前記電力情報集約装置は、
     前記属性情報集約部が集約した属性情報に基づいて、需要家に付与するインセンティブを算出するインセンティブ算出部を更に有する請求項2に記載の電力情報管理システム。
  4.  前記電力情報集約装置は、
     前記属性情報集約部が集約した属性情報に基づいて、需要家に付与するペナルティを算出するペナルティ算出部を更に有する請求項2又は3に記載の電力情報管理システム。
  5.  需要家が受電した電力の情報を管理する電力情報管理装置であって、
     需要家が受電した電力の属性を評価する電力属性評価部と、
     前記電力属性評価部が電力の属性を評価する度に、前記評価された電力の属性情報が累積的に格納される累積属性情報格納部とを備える電力情報管理装置。
  6.  需要家が受電した電力の情報を管理する電力情報管理装置用のプログラムであって、前記電力情報管理装置を、
     需要家が受電した電力の属性を評価する電力属性評価部と、
     前記電力属性評価部が電力の属性を評価する度に、前記評価された電力の属性情報が累積的に格納される累積属性情報格納部
    として機能させるプログラム。
PCT/JP2012/073642 2011-09-16 2012-09-14 電力情報管理システム、電力情報管理装置、及びプログラム WO2013039208A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
SG2014013239A SG2014013239A (en) 2011-09-16 2012-09-14 Power information management system, power information management device, and program
EP12832486.0A EP2752809A4 (en) 2011-09-16 2012-09-14 ENERGY INFORMATION MANAGEMENT SYSTEM, ENERGY INFORMATION MANAGEMENT DEVICE, AND PROGRAM

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2011203017A JP6097476B2 (ja) 2011-09-16 2011-09-16 電力情報管理システム、電力情報管理装置、プログラム、電気自動車、充電インフラ、住宅及び電気自動車向けシステムモジュール
JP2011-203017 2011-09-16

Publications (1)

Publication Number Publication Date
WO2013039208A1 true WO2013039208A1 (ja) 2013-03-21

Family

ID=47883424

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2012/073642 WO2013039208A1 (ja) 2011-09-16 2012-09-14 電力情報管理システム、電力情報管理装置、及びプログラム

Country Status (4)

Country Link
EP (1) EP2752809A4 (ja)
JP (1) JP6097476B2 (ja)
SG (1) SG2014013239A (ja)
WO (1) WO2013039208A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103617561A (zh) * 2013-12-02 2014-03-05 深圳供电局有限公司 一种电网智能变电站二次设备状态评估系统和方法
CN113424035A (zh) * 2019-02-14 2021-09-21 梅吉特股份有限公司 用于确定交通工具的物理特性的传感器组件

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPWO2022045040A1 (ja) * 2020-08-25 2022-03-03

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001184406A (ja) * 1999-12-24 2001-07-06 Sumitomo Corp 電力供給システム及びそれに関連するシステム、電力供給運用方法及びそれに関連する方法、並びに、それら方法を実行することができるプログラムを記録したコンピュータ読み取り可能な記録媒体
WO2010039239A2 (en) * 2008-10-01 2010-04-08 Silver Spring Networks, Inc. Method and system of applying environmental incentives
JP2011164700A (ja) * 2010-02-04 2011-08-25 Omron Corp 電力需給システム、電力供給制御装置、電力受領制御装置、グリーン電力供給制御装置、グリーン電力受領制御装置、グリーン電力需給証明装置、電力配合制御装置、グリーン電力需給精算装置、移動体、建造物、グリーン電力需給システム、グリーン電力送受電方法、グリーン電力需給証明方法、電力配合方法、精算方法、および、電力配合プログラム

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3780838B2 (ja) * 2000-09-26 2006-05-31 株式会社日立製作所 グリーン電力供給システム及びグリーン電力供給方法
JP5457857B2 (ja) * 2010-01-27 2014-04-02 株式会社Verifirm 電力システムおよび電力伝送方法、並びに電力受電装置

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001184406A (ja) * 1999-12-24 2001-07-06 Sumitomo Corp 電力供給システム及びそれに関連するシステム、電力供給運用方法及びそれに関連する方法、並びに、それら方法を実行することができるプログラムを記録したコンピュータ読み取り可能な記録媒体
WO2010039239A2 (en) * 2008-10-01 2010-04-08 Silver Spring Networks, Inc. Method and system of applying environmental incentives
JP2011164700A (ja) * 2010-02-04 2011-08-25 Omron Corp 電力需給システム、電力供給制御装置、電力受領制御装置、グリーン電力供給制御装置、グリーン電力受領制御装置、グリーン電力需給証明装置、電力配合制御装置、グリーン電力需給精算装置、移動体、建造物、グリーン電力需給システム、グリーン電力送受電方法、グリーン電力需給証明方法、電力配合方法、精算方法、および、電力配合プログラム

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
"Green Denryoku eno Tenkan de Shakai wa Kawaru!", WORLD WIDE FUND FOR NATURE, July 2002 (2002-07-01), XP055151016, Retrieved from the Internet <URL:https://www.wwf.or.jp/activities/lib/pdf_climate/green-energy/wwfswitch_ge.pdf> [retrieved on 20121127] *
See also references of EP2752809A4 *
TAKASHI MATSUYAMA: "<Research and Trend of University> Informationization of Energy: Unification of Power Network and Information Network", CUE: ELECTRICITY-RELATED CLASSROOM TECHNOLOGY AND INFORMATION JOURNAL OF KYOTO UNIVERSITY, ELECTRICITY-RELATED CLASSROOM AND RAKUYUKAI OF KYOTO UNIVERSITY, March 2010 (2010-03-01), pages 3 - 8

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103617561A (zh) * 2013-12-02 2014-03-05 深圳供电局有限公司 一种电网智能变电站二次设备状态评估系统和方法
CN113424035A (zh) * 2019-02-14 2021-09-21 梅吉特股份有限公司 用于确定交通工具的物理特性的传感器组件

Also Published As

Publication number Publication date
JP6097476B2 (ja) 2017-03-15
EP2752809A4 (en) 2015-03-18
JP2013065169A (ja) 2013-04-11
EP2752809A1 (en) 2014-07-09
SG2014013239A (en) 2014-07-30

Similar Documents

Publication Publication Date Title
Kong et al. Charging schemes for plug-in hybrid electric vehicles in smart grid: A survey
JP6740505B2 (ja) エネルギシステム、エネルギ管理サーバ、エネルギ管理方法、及び、プログラム
CN102484503A (zh) 电力线通信网络上的智能电网
JP2016025792A (ja) エネルギーマネジメントシステムおよび電力需給計画最適化方法
WO2021171850A1 (ja) 推奨行動出力システム、推奨行動出力方法、及び、プログラム
WO2013039208A1 (ja) 電力情報管理システム、電力情報管理装置、及びプログラム
Yousuf et al. An in-depth exploration of electric vehicle charging station infrastructure: a comprehensive review of challenges, mitigation approaches, and optimization strategies
Cao et al. A holistic review on E-mobility service optimization: Challenges, recent progress and future directions
Shams et al. Exact approach for charging of PEVs with V2G capability to improve micro‐grid reliability
Mahmutoğulları et al. Robust alternative fuel refueling station location problem with routing under decision-dependent flow uncertainty
Liu et al. Optimal configuration for batteries and chargers in battery switch station considering extra waiting time of electric vehicles
JP5936320B2 (ja) 電力授受システム、蓄電情報管理装置、制御方法、及びプログラム
Sirisumrannukul Charging Management of Electric Vehicles on Loading Capability of Distribution System Equipment, Voltage Quality, and Energy Loss by Monte Carlo Simulation and Linear Programming
Su Smart grid operations integrated with plug-in electric vehicles and renewable energy resources
JP6738380B2 (ja) 充電インフラ
JP6109971B2 (ja) 電力授受システム、蓄電情報管理装置、制御方法、プログラム及び電気自動車
Daulatabad et al. Smart grid and the importance of electric vehicles
JP2014096867A (ja) スマートコミュニティシステム
JP6109471B2 (ja) 充電インフラ情報提供システム、充電インフラ情報提供装置、制御方法及びプログラム
JP2011223740A (ja) 仮想エネルギートレードシステム
Bai et al. Multi-objective planning for electric vehicle charging stations considering TOU price
Aoun et al. Dynamic charging optimization algorithm for electric vehicles to mitigate grid power peaks
JP2024033263A (ja) 通知方法、車両管理システム
Gan et al. A two-stage model for capacity planning of centralized charging station and ordered discharging
CN110870162B (zh) 电力信息管理装置及电力信息管理系统

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12832486

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: P167/2014

Country of ref document: AE

NENP Non-entry into the national phase

Ref country code: DE