WO2012171147A1 - 结合风力发电的纯电动汽车有序充放电协调控制系统 - Google Patents
结合风力发电的纯电动汽车有序充放电协调控制系统 Download PDFInfo
- Publication number
- WO2012171147A1 WO2012171147A1 PCT/CN2011/001470 CN2011001470W WO2012171147A1 WO 2012171147 A1 WO2012171147 A1 WO 2012171147A1 CN 2011001470 W CN2011001470 W CN 2011001470W WO 2012171147 A1 WO2012171147 A1 WO 2012171147A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- power
- charging
- wind
- prediction
- wind power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/28—Arrangements for balancing of the load in networks by storage of energy
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L53/00—Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
- B60L53/50—Charging stations characterised by energy-storage or power-generation means
- B60L53/52—Wind-driven generators
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L53/00—Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
- B60L53/60—Monitoring or controlling charging stations
- B60L53/63—Monitoring or controlling charging stations in response to network capacity
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for feeding a single network from two or more generators or sources in parallel; Arrangements for feeding already energised networks from additional generators or sources in parallel
- H02J3/381—Dispersed generators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2101/00—Supply or distribution of decentralised, dispersed or local electric power generation
- H02J2101/20—Dispersed power generation using renewable energy sources
- H02J2101/28—Wind energy
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/76—Power conversion electric or electronic aspects
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E70/00—Other energy conversion or management systems reducing GHG emissions
- Y02E70/30—Systems combining energy storage with energy generation of non-fossil origin
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/60—Other road transportation technologies with climate change mitigation effect
- Y02T10/70—Energy storage systems for electromobility, e.g. batteries
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/60—Other road transportation technologies with climate change mitigation effect
- Y02T10/7072—Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02T90/10—Technologies relating to charging of electric vehicles
- Y02T90/12—Electric charging stations
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02T90/10—Technologies relating to charging of electric vehicles
- Y02T90/16—Information or communication technologies improving the operation of electric vehicles
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/12—Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
- Y04S10/126—Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving electric vehicles [EV] or hybrid vehicles [HEV], i.e. power aggregation of EV or HEV, vehicle to grid arrangements [V2G]
Definitions
- the invention relates to the technical field of wind power generation, in particular to a coordinated charging and discharging control system for a pure electric vehicle combined with wind power generation, which is a coordinated control system for orderly charging and discharging management of a pure electric vehicle.
- the present invention is directed to the above-mentioned problems in the prior art, and provides an integrated charge and discharge coordinated control system for a pure electric vehicle in combination with wind power generation.
- the purpose is to overcome the randomness, intermittentness, uncontrollability and anti-peak characteristics of wind power generation, and the disorderly charging of pure electric vehicles will affect the normal operation of the power grid.
- the invention not only can overcome the shortcomings of wind power generation, but also can reduce the impact of the disorderly charging of the pure electric vehicle on the normal operation of the power grid, improve the utilization efficiency of the wind power, and improve the stability level of the power grid.
- the grid dispatching center judges the current state of the power system, generates a corresponding charging control mode, and transmits the information to the charging station centralized coordination monitoring system for information interaction; the power grid dispatching center will adjust the peak by the communication network of the charging station centralized coordinated control system
- the command is sent to each power battery, that is, the power battery pack; the power battery pack receives the command and is monitored and recorded, and feeds the information back to the charging station to coordinate and control the control system through the communication network; the power battery realizes organized and planned according to the received command. Peak shaving, while returning the remaining electricity to the grid;
- the centralized coordination and monitoring system of the charging station receives and monitors the information collected by the charger and its connected power battery pack, the inverter, and the power distribution equipment, the smoke sensing device and the battery charging and discharging metering module;
- the coordinated monitoring system sends the remotely received information to the grid dispatching center for information interaction and accepts the instructions of the grid dispatching center.
- the wind power prediction module includes three prediction methods: a physical method, a statistical method, and a learning method; the physical method is to accurately estimate weather information at a wind turbine hub height; first, using a numerical weather prediction (NWP) system The predicted results are weather data such as wind speed, wind direction, air pressure, temperature, etc., and then the wind speed and wind direction of the wind turbine hub height are obtained according to the physical information around the wind turbine. Finally, the actual output power of the wind turbine is calculated by using the power curve of the wind turbine;
- NWP numerical weather prediction
- the statistical method is to establish a mapping relationship between the input of the system, that is, NWP, historical statistical data, measured data, and wind power, usually a linear relationship; the linear relationship can be expressed in the form of a function, including regression analysis,
- NWP historical statistical data
- measured data measured data
- wind power usually a linear relationship
- the exponential smoothing method, the time series method, the Kalman filter method, the gray prediction method, and the like are all based on a linear model
- the pure electric motor combined with wind power generation according to claim 1.
- Automobile orderly charge and discharge coordinated control system which is characterized by:
- the learning method is to extract the relationship between input and output by artificial intelligence.
- the model built is a nonlinear model, including neural network method, wavelet analysis method, support vector machine method, particle swarm optimization algorithm and so on.
- the short-term load forecasting module of the power system uses the historical load data of yesterday and before to complete the short-term load forecasting today; in the conventional load forecasting mode, generally only considering the influence of load-related factors such as meteorological factors, reference history Load data samples, using a variety of short-term load forecasting algorithms, such as: neural network algorithm, linear extrapolation algorithm, exponential smoothing algorithm, etc., respectively, complete the 96-point load value prediction for the day.
- the automatic power generation control module refers to a computer power monitoring system of a hydropower plant or a command output by a thermal power plant DCS according to the calculation result of the AGC software of the dispatching center, and automatically adjusts the output of the unit to maintain the grid frequency and the net exchange power of the tie line in a closed loop of the planned value. Adjustment process
- the centralized coordination and monitoring system of the charging station is equipped with a central computer system for collecting and processing necessary information from each power battery; and centrally coordinating charging method for charging the power battery at the same charging station, through a computer Intelligent judgment, coordinate the start of charging time, current size, charging time of each power battery, achieve the purpose of not overloading the total current demand, and ensure that the charging load curve is a flat curve.
- the battery charge and discharge metering module measures the charge and discharge amount of the power battery; the power battery is charged when the wind power is generated and the grid load is low; the power battery releases the remaining power to the grid when the grid load peaks, and the battery is charged and discharged.
- the metering module calculates the actual purchase cost of the user.
- the wind power prediction module may also adopt the following prediction method:
- the power grid dispatching center is realized by the following communication network structure:
- the power grid dispatching center sends power demand commands to the charging stations through the Ethernet, including charging the battery and transmitting the battery to the power grid, and sending the charging to the charging
- the station centrally coordinates the monitoring system;
- the centralized coordination and monitoring system of the charging station performs the calculation after receiving the instruction, and decomposes the target power into the actual control amount for each battery, and delivers the task through the CAN communication bus;
- the charging station centralized coordination monitoring system collects the information of the battery charging and discharging metering module, the charging machine, the power battery pack, the power distribution equipment and the smoke sensing device through the CAN communication bus, and packs the information in the station, and sends it to the power grid dispatching center through the Ethernet. .
- the beneficial effects of the invention are: realizing and coordinating the complementary relationship between wind power generation, electric vehicle charging and discharging, and grid stability. It has improved the acceptance of wind power, minimized the harmonic pollution caused by disorderly charging of pure electric vehicles and adversely affected the power grid, and reduced the peak-to-valley difference of the power grid by cutting peaks and valleys, thus improving the stability level of the power grid.
- the invention can overcome the randomness, intermittentness, uncontrollability and anti-peaking characteristics of wind power generation, and the disorderly charging of pure electric vehicles will affect the normal operation of the power grid. It can not only overcome the shortcomings of wind power generation, but also reduce the impact of disorderly charging of pure electric vehicles on the normal operation of the power grid, improve the utilization efficiency of wind power, and improve the stability level of the power grid.
- Figure 1 is a block diagram of the system of the present invention.
- FIG. 2 is a structural diagram of a communication network of the present invention.
- the invention relates to an orderly charge and discharge coordinated control system for a pure electric vehicle combined with wind power generation.
- the utility model utilizes a power battery to charge energy from the power grid when the load is low, and to reversely transmit power to the power grid when the load is peak.
- harmonic management is concentrated in each power battery charging station to improve power quality.
- the invention transmits the information of each charging station to the power grid dispatching command center, and the power grid dispatching command center determines the current power system state according to wind power prediction, load forecasting and grid state monitoring, and generates a corresponding charging control mode, which is adopted.
- Power grids, wind power and power batteries are all favorable control strategies.
- the power battery sends the remaining power of the battery to the power grid.
- the power grid charges the power battery. The time and condition of charging the battery, due to fluctuations in load and uncertainty of wind power, the daily charge and discharge time is not fixed, but is calculated by the program.
- a central computer system is installed in the power battery charging station to collect and process the necessary information from each power battery, such as battery capacity, state of charge (S0C), rated current, rated voltage, and expected charging time.
- S0C state of charge
- the centralized charging method is adopted when charging the power battery at the same charging station, and the intelligent charging of the computer is used to coordinate the charging time, the current level and the charging time of each power battery.
- the charging load curve is a flat curve.
- Fig. 1 is a system configuration diagram of the present invention.
- the invention relates to a coordinated charging and discharging control system for pure electric vehicles combined with wind power generation, which is realized by the following three steps:
- the first step the wind power prediction module of each charging station, the short-term load forecasting module of the power system, The information collected by the automatic power generation control module is transmitted to the power grid dispatching center;
- the second step the grid dispatching center judges the current state of the power system, generates a corresponding charging control mode, and then transmits the information to the charging station centralized coordination monitoring system for information interaction; the power grid dispatching center centrally coordinates the control system communication through the charging station
- the network sends the peaking command to each power battery, that is, the power battery pack; the power battery pack receives the command and is monitored and recorded, and simultaneously feeds the information back to the charging station centralized coordination control system through the communication network; the power battery is organized according to the received command. , planned peaking, and reversed the remaining electricity to the grid;
- the third step the charging station centrally coordinates the monitoring system to receive and monitor the information collected by the charger and its connected power battery pack, the inverter, and the station's power distribution equipment, the smoke sensor, and the battery pack charge and discharge metering module;
- the centralized coordination and monitoring system of the charging station sends the remotely received information to the power grid dispatching center for information interaction, and accepts the instructions of the power grid dispatching center.
- the wind power prediction module of the present invention is a thermometer
- the goal of the physical method is to estimate the meteorological information at the hub height of the wind turbine as accurately as possible. Firstly, using the prediction results of the numerical weather prediction (WP) system, the weather data such as wind speed, wind direction, air pressure and temperature are obtained, and then the wind speed and wind direction of the wind turbine hub height are obtained according to the physical information around the wind turbine, and finally the power curve of the wind turbine is utilized. Calculate the actual output power of the fan.
- WP numerical weather prediction
- the essence of the statistical method is to establish a mapping relationship between the input of the system (NWP, historical statistics, measured data) and wind power, usually a linear relationship.
- This relationship can be expressed in the form of functions such as regression analysis, exponential smoothing, time series, Kalman filtering, grey prediction, etc., all based on linear models.
- the essence of the learning method is to use the artificial intelligence method to extract the relationship between input and output, instead of The form of the analytic method is described.
- the model built in this way is usually a nonlinear model, such as neural network method, wavelet analysis method, support vector machine method, etc., which cannot be directly represented by a mathematical expression.
- the algorithm research will be based on statistical methods and physical methods.
- the ensemble prediction is the main research direction, and the short-term wind power prediction algorithm suitable for various working conditions of wind farms is studied.
- the 0-4 hour ultra-short-term forecast wind power prediction algorithm is studied. After calculation and simulation, the most effective algorithm is selected to realize the dynamic correction of power prediction, which provides an effective basis for the dispatching department to dispatch and ensure the safe and reliable operation of the grid.
- the algorithm research will fully explore various real-time data of wind farms, and select the most suitable ultra-short-term wind power prediction algorithm through case analysis.
- AGC Automatic Generation Control
- AGC Automatic power generation control
- the charging station has a two-way communication function, which can remotely receive commands and transmit power information, and the peaking command is dispatched by the power grid through the centralized coordination control system of the charging station.
- the network is sent to each power battery, and the response of the power battery is monitored, recorded, and fed back to the charging station to coordinate the control system through the communication network.
- the main monitoring object of this module is the charger and its connected power battery pack, as well as the station's power distribution equipment, smoke detector and battery pack charge and discharge metering module. At the same time, the module also interacts with the upper-level centralized monitoring system, that is, the power grid dispatching center.
- a central computer system is installed in the centralized coordination monitoring system of the charging station to collect and process the necessary information from each power battery, such as battery capacity, state of charge (S0C), rated current, rated voltage and expected charging time. Wait.
- the power grid dispatching center will send the power demand command of each charging station to each charging station to centrally coordinate the monitoring system; the charging station centralized coordination monitoring system receives the instruction and performs calculation, and decomposes the target power into actual batteries. Control the amount, and coordinate when each power battery starts charging The charging, the current, the charging time, and the total current demand are not overloaded, and the battery is charged by the charger.
- the main function of this module is to measure the charge and discharge of the power battery.
- the power battery is charged when the wind power is large and the grid load is low.
- the electricity price is cheap at this time; the power battery releases the remaining power to the grid when the grid load peaks (about 9:00 in the evening), and the electricity price is high at this time.
- the metering module can be used to calculate the actual purchase cost of the user.
- the communication network structure of the system of the present invention is as follows:
- Fig. 2 is a structural diagram of a communication network of the present invention.
- the communication network of the system includes a communication network within the charging station and a communication network between the charging station and the dispatching center.
- the communication network of the monitoring system in the charging station uses the controller area network CAN bus. It includes a front-end data acquisition system based on the CAN bus, a personal computer with a CAN interface card, a PC, and other hardware modules with a CAN controller. Compared with the traditional monitoring system based on RS-485 total money, it has obvious advantages in communication capability, reliability, real-time performance, flexibility, ease of use, and transmission distance.
- the communication network of the charging station and the dispatching center adopts Ethernet, adopts a unified network communication protocol--TCP/IP protocol, avoids the trouble of communication between different protocols, and can directly interconnect with the computer of the local area network without additional hardware equipment. It facilitates the sharing of data over the LAN. It adopts a unified network cable, which reduces the wiring cost and difficulty, and avoids the coexistence of multiple buses.
- the power grid dispatching center will send power demand commands to the charging stations through the Ethernet, including the instructions for charging the battery and requiring the battery to be reversely sent to the power grid, and sending it to the charging station to centrally coordinate the monitoring system; the charging station centralized coordination monitoring system receives the After the command is calculated, the target power is decomposed into the actual control amount for each battery, and the task is sent down through the CAN communication bus.
- the charging station centralized coordination monitoring system collects the battery pack charging and discharging metering module and charging through the CAN communication bus. Information on the motor, power battery pack, power distribution equipment, and smoke sensor, and package the information in the station and send it to the grid dispatch center via Ethernet.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Transportation (AREA)
- Mechanical Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201110163112.5 | 2011-06-17 | ||
| CN2011101631125A CN102324752B (zh) | 2011-06-17 | 2011-06-17 | 结合风力发电的纯电动汽车有序充放电协调控制系统 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2012171147A1 true WO2012171147A1 (zh) | 2012-12-20 |
Family
ID=45452439
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/CN2011/001470 Ceased WO2012171147A1 (zh) | 2011-06-17 | 2011-08-31 | 结合风力发电的纯电动汽车有序充放电协调控制系统 |
Country Status (2)
| Country | Link |
|---|---|
| CN (1) | CN102324752B (zh) |
| WO (1) | WO2012171147A1 (zh) |
Cited By (51)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103489041A (zh) * | 2013-09-17 | 2014-01-01 | 国家电网公司 | 一种短期风电功率预测方法 |
| CN105429240A (zh) * | 2015-12-29 | 2016-03-23 | 北京国网普瑞特高压输电技术有限公司 | 车网融合模式下的电动汽车智能充放电互动协调控制系统 |
| CN106300349A (zh) * | 2016-11-05 | 2017-01-04 | 北京普锐电子有限公司 | 一种区域用电智能管理系统 |
| CN109272656A (zh) * | 2017-07-17 | 2019-01-25 | 周锡卫 | 一种基于多能互补微电网的储能蓄电移动充电桩系统及运行方法 |
| CN109460620A (zh) * | 2018-11-14 | 2019-03-12 | 国网湖北省电力有限公司电力科学研究院 | 一种电动汽车充电站典型充电负荷特性获取方法 |
| CN109849718A (zh) * | 2018-12-06 | 2019-06-07 | 海南电网有限责任公司 | 一种电动汽车充电设施及配电网主动式协同规划的方法 |
| CN109918798A (zh) * | 2019-03-11 | 2019-06-21 | 三峡大学 | 基于充电功率等级的电动汽车充电方式优化方法 |
| CN110048412A (zh) * | 2019-04-23 | 2019-07-23 | 哈密豫新能源产业研究院有限责任公司 | 一种基于粒子群的煤矿高压电网自适应并行拓扑分析方法 |
| CN110061565A (zh) * | 2019-04-01 | 2019-07-26 | 国网新源张家口风光储示范电站有限公司 | 一种基于风力发电机的储能充放电容量控制系统及方法 |
| CN111162551A (zh) * | 2020-01-15 | 2020-05-15 | 国网内蒙古东部电力有限公司 | 一种基于风电功率超短期预测的蓄电池充放电控制方法 |
| CN112085363A (zh) * | 2020-08-31 | 2020-12-15 | 浙江大学 | 一种储能和电动汽车集群协同调度的需求响应方法 |
| CN112736894A (zh) * | 2020-11-30 | 2021-04-30 | 国网陕西省电力公司电力科学研究院 | 一种计及风电与电动汽车随机性的两阶段机组组合建模方法 |
| CN112848946A (zh) * | 2021-02-20 | 2021-05-28 | 国网上海市电力公司 | 一种基于优化配电网分布的电动汽车充电桩充电改进方法 |
| CN113067370A (zh) * | 2021-03-15 | 2021-07-02 | 远景智能国际私人投资有限公司 | V2g充电站的充电控制方法、装置、服务器及存储介质 |
| CN113162089A (zh) * | 2021-04-29 | 2021-07-23 | 华北电力大学 | 一种电动汽车参与风电消纳的调度方法 |
| CN113285479A (zh) * | 2021-01-20 | 2021-08-20 | 天宏阳光新能源股份有限公司 | 一种超大容量的区域微电网系统及运行方法 |
| CN113779815A (zh) * | 2021-10-20 | 2021-12-10 | 上海尼拜环保科技发展有限公司 | 一种绿色低碳的一体化能源回收再利用系统 |
| CN113771675A (zh) * | 2021-10-09 | 2021-12-10 | 南方电网数字电网研究院有限公司 | 有序充电方法和系统 |
| CN113815473A (zh) * | 2021-07-12 | 2021-12-21 | 中国华能集团清洁能源技术研究院有限公司 | 一种具备储能功能的换电站 |
| CN113991687A (zh) * | 2021-11-03 | 2022-01-28 | 国网湖南省电力有限公司 | 基于风机状态及超短期功率预测的电压支撑方法及系统 |
| CN114091263A (zh) * | 2021-11-23 | 2022-02-25 | 中国电力科学研究院有限公司 | 双联络线电网送受电能力仿真分析方法、系统及存储介质 |
| CN114169575A (zh) * | 2021-11-12 | 2022-03-11 | 国网湖北省电力有限公司电力科学研究院 | 一种充电状态汽车电池温度的大数据预测系统 |
| CN114475331A (zh) * | 2021-08-31 | 2022-05-13 | 武汉大学 | 一种考虑负荷反弹的电动汽车聚合优化调度方法 |
| CN114707761A (zh) * | 2022-04-29 | 2022-07-05 | 深圳供电局有限公司 | 一种电力智能调度管理系统 |
| CN114906001A (zh) * | 2022-06-06 | 2022-08-16 | 国网江苏省电力有限公司连云港市赣榆区供电分公司 | 一种电网和蓄电池混合输入的电动汽车充电系统 |
| CN115663921A (zh) * | 2022-12-12 | 2023-01-31 | 中国华能集团清洁能源技术研究院有限公司 | 一种风光储充微电网调控计划确定方法及系统 |
| CN115659595A (zh) * | 2022-09-26 | 2023-01-31 | 中国华能集团清洁能源技术研究院有限公司 | 基于人工智能的新能源场站的储能控制方法及装置 |
| CN115902472A (zh) * | 2022-11-18 | 2023-04-04 | 深圳市赛特新能科技有限公司 | 一种电动汽车对电网放电的测试方法 |
| CN115946563A (zh) * | 2023-03-13 | 2023-04-11 | 山东理工大学 | 充电堆功率动态分配策略优化方法、系统、终端及介质 |
| CN116031870A (zh) * | 2022-12-06 | 2023-04-28 | 国网河北省电力有限公司电力科学研究院 | 电力台区重过载治理方法与装置 |
| CN116039576A (zh) * | 2023-03-22 | 2023-05-02 | 杭州禾美汽车科技有限公司 | 新能源汽车电池智能更换系统 |
| CN116198368A (zh) * | 2023-01-16 | 2023-06-02 | 奇瑞新能源汽车股份有限公司 | 一种新型太阳能储能充电系统及其控制方法 |
| CN116231661A (zh) * | 2023-03-24 | 2023-06-06 | 阳光慧碳科技有限公司 | 一种电力调控方法、系统、电子设备及存储介质 |
| CN116316634A (zh) * | 2023-03-10 | 2023-06-23 | 国网湖北省电力有限公司电力科学研究院 | 一种面向电动汽车充电站群的站网互动控制方法 |
| CN117335439A (zh) * | 2023-11-30 | 2024-01-02 | 国网浙江省电力有限公司 | 一种多元负荷资源联合调度方法及系统 |
| CN117595231A (zh) * | 2023-10-20 | 2024-02-23 | 国网安徽省电力有限公司六安供电公司 | 一种智能电网配网管理系统及其方法 |
| CN117791647A (zh) * | 2023-12-29 | 2024-03-29 | 华北电力大学 | 一种用于风功率平抑的soec系统功率控制方法和系统 |
| CN117937550A (zh) * | 2024-03-25 | 2024-04-26 | 宁波市电力设计院有限公司 | 一种综合能源储能系统优化调度方法和系统 |
| CN117955110A (zh) * | 2024-03-26 | 2024-04-30 | 国网甘肃省电力公司武威供电公司 | 一种创新电力系统负荷调控的辅助优化方法 |
| CN118381067A (zh) * | 2024-04-16 | 2024-07-23 | 内蒙古电力(集团)有限责任公司阿拉善供电分公司 | 一种终端配电网余电不上网模式下的自调峰控制方法 |
| CN118472941A (zh) * | 2024-07-09 | 2024-08-09 | 宁德时代新能源科技股份有限公司 | 储充一体机站点的控制方法、装置、设备、介质和产品 |
| CN118572715A (zh) * | 2024-08-02 | 2024-08-30 | 山东大学 | 一种基于贪婪修复遗传算法的大规模电动汽车集群有序充电优化方法 |
| CN118646012A (zh) * | 2024-08-12 | 2024-09-13 | 国网安徽省电力有限公司电力科学研究院 | 一种区域电网调度优化系统、方法及存储介质 |
| CN118674243A (zh) * | 2024-08-23 | 2024-09-20 | 厦门闽投科技服务有限公司 | 一种微电网关键节点生产管理方法及系统 |
| CN118801480A (zh) * | 2024-09-11 | 2024-10-18 | 华能兰州热电有限责任公司 | 一种火电机组调频调峰控制方法及系统 |
| CN119674932A (zh) * | 2024-11-29 | 2025-03-21 | 国网内蒙古东部电力有限公司赤峰供电公司 | 一种新能源储能消纳能力指数预测方法 |
| CN120508014A (zh) * | 2025-05-19 | 2025-08-19 | 湖北省电力装备有限公司 | 基于高安全性能多源数据采集传输的储能电池舱控制方法 |
| CN120524153A (zh) * | 2025-07-23 | 2025-08-22 | 陕西建一建设有限公司 | 一种水位流量智能定线分析系统 |
| CN121356057A (zh) * | 2025-12-16 | 2026-01-16 | 四川华电木里河水电开发有限公司 | 水电站多目标调度决策方法及系统 |
| CN121440849A (zh) * | 2025-12-31 | 2026-01-30 | 深圳即刻换电数字信息有限公司 | 一种基于自主决策与精准定位的充电机控制方法及系统 |
| CN121749154A (zh) * | 2026-02-26 | 2026-03-27 | 青岛美锦新能源汽车制造有限公司 | 一种新能源车的供电负荷预测方法及系统 |
Families Citing this family (16)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102593901B (zh) * | 2012-02-22 | 2014-04-30 | 华北电力大学 | 电动汽车充电设施负荷预测系统及预测方法 |
| CN103136598B (zh) * | 2013-02-26 | 2016-08-24 | 福建省电力有限公司 | 基于小波分析的月度电力负荷计算机预测方法 |
| CN103246942B (zh) * | 2013-05-21 | 2016-08-10 | 长沙理工大学 | 风电-电动汽车-火电联合运行模型的多目标调度方法 |
| CN103490445B (zh) * | 2013-09-05 | 2016-01-20 | 国家电网公司 | 一种风电机组中长期有功协调控制的仿真模型和方法 |
| CN104124709B (zh) * | 2014-08-11 | 2016-06-22 | 新疆伊能众诚高科有限公司 | 一种基于功率预测的风电并网运行系统 |
| CN107231001B (zh) * | 2017-07-26 | 2019-12-24 | 武汉大学 | 一种基于改进灰色预测的楼宇微网在线能量管理方法 |
| CN108599267B (zh) * | 2018-04-17 | 2020-09-01 | 上海电力学院 | 一种考虑电动汽车出行相关性的机组组合调度方法 |
| CN109274100A (zh) * | 2018-11-28 | 2019-01-25 | 清华四川能源互联网研究院 | 一种电能调度方法及系统 |
| CN109523087B (zh) * | 2018-11-28 | 2020-09-25 | 国网山东省电力公司德州供电公司 | 基于深度学习的电动汽车快充站储能监测系统及其方法 |
| CN109709910A (zh) * | 2018-11-30 | 2019-05-03 | 中国科学院广州能源研究所 | 一种家庭能源优化调度管理系统及方法 |
| CN110348592A (zh) * | 2019-05-21 | 2019-10-18 | 华电电力科学研究院有限公司 | 一种基于人工神经网络的负荷模型预测方法及预测系统 |
| CN110245904B (zh) * | 2019-06-25 | 2022-02-15 | 南方电网科学研究院有限责任公司 | 一种综合能源市场的物资处理方法及相关装置 |
| CN113131530B (zh) * | 2021-04-25 | 2023-05-30 | 西安热工研究院有限公司 | 一种电动汽车参与分散式风电场出力的控制方法及系统 |
| CN117674369B (zh) * | 2024-02-01 | 2024-05-03 | 河南工学院 | 一种新能源储能电池组充放电安全管理系统 |
| CN118011135B (zh) * | 2024-04-09 | 2024-06-14 | 江苏联能电力科学研究院有限公司 | 一种多通道电能质量分析与数据处理方法 |
| CN119428301B (zh) * | 2024-11-13 | 2025-09-16 | 深圳市布雷科检测技术有限公司 | 一种新能源充电桩充电控制方法及系统 |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20090229900A1 (en) * | 2008-03-13 | 2009-09-17 | International Business Machines Corporation | Plugin hybrid electric vehicle with v2g optimization system |
| JP4445040B1 (ja) * | 2008-10-24 | 2010-04-07 | 株式会社MERSTech | 電力供給システム |
| US20110015799A1 (en) * | 2009-07-17 | 2011-01-20 | Gridpoint, Inc. | Smart charging value and guarantee application |
| CN102055217A (zh) * | 2010-10-27 | 2011-05-11 | 国家电网公司 | 电动汽车有序充电控制方法及系统 |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101901945B (zh) * | 2010-07-12 | 2012-07-25 | 河海大学 | 一种插电式混合动力车的集中智能调度充电方法 |
-
2011
- 2011-06-17 CN CN2011101631125A patent/CN102324752B/zh active Active
- 2011-08-31 WO PCT/CN2011/001470 patent/WO2012171147A1/zh not_active Ceased
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20090229900A1 (en) * | 2008-03-13 | 2009-09-17 | International Business Machines Corporation | Plugin hybrid electric vehicle with v2g optimization system |
| JP4445040B1 (ja) * | 2008-10-24 | 2010-04-07 | 株式会社MERSTech | 電力供給システム |
| US20110015799A1 (en) * | 2009-07-17 | 2011-01-20 | Gridpoint, Inc. | Smart charging value and guarantee application |
| CN102055217A (zh) * | 2010-10-27 | 2011-05-11 | 国家电网公司 | 电动汽车有序充电控制方法及系统 |
Cited By (70)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103489041A (zh) * | 2013-09-17 | 2014-01-01 | 国家电网公司 | 一种短期风电功率预测方法 |
| CN105429240A (zh) * | 2015-12-29 | 2016-03-23 | 北京国网普瑞特高压输电技术有限公司 | 车网融合模式下的电动汽车智能充放电互动协调控制系统 |
| CN105429240B (zh) * | 2015-12-29 | 2024-02-06 | 北京国网普瑞特高压输电技术有限公司 | 车网融合模式下的电动汽车智能充放电互动协调控制系统 |
| CN106300349A (zh) * | 2016-11-05 | 2017-01-04 | 北京普锐电子有限公司 | 一种区域用电智能管理系统 |
| CN109272656A (zh) * | 2017-07-17 | 2019-01-25 | 周锡卫 | 一种基于多能互补微电网的储能蓄电移动充电桩系统及运行方法 |
| CN109272656B (zh) * | 2017-07-17 | 2023-08-29 | 周锡卫 | 一种基于多能互补微电网的储能蓄电移动充电桩系统的运行方法 |
| CN109460620A (zh) * | 2018-11-14 | 2019-03-12 | 国网湖北省电力有限公司电力科学研究院 | 一种电动汽车充电站典型充电负荷特性获取方法 |
| CN109849718A (zh) * | 2018-12-06 | 2019-06-07 | 海南电网有限责任公司 | 一种电动汽车充电设施及配电网主动式协同规划的方法 |
| CN109918798B (zh) * | 2019-03-11 | 2023-06-02 | 三峡大学 | 基于充电功率等级的电动汽车充电方式优化方法 |
| CN109918798A (zh) * | 2019-03-11 | 2019-06-21 | 三峡大学 | 基于充电功率等级的电动汽车充电方式优化方法 |
| CN110061565A (zh) * | 2019-04-01 | 2019-07-26 | 国网新源张家口风光储示范电站有限公司 | 一种基于风力发电机的储能充放电容量控制系统及方法 |
| CN110048412A (zh) * | 2019-04-23 | 2019-07-23 | 哈密豫新能源产业研究院有限责任公司 | 一种基于粒子群的煤矿高压电网自适应并行拓扑分析方法 |
| CN111162551B (zh) * | 2020-01-15 | 2023-03-21 | 国网内蒙古东部电力有限公司 | 一种基于风电功率超短期预测的蓄电池充放电控制方法 |
| CN111162551A (zh) * | 2020-01-15 | 2020-05-15 | 国网内蒙古东部电力有限公司 | 一种基于风电功率超短期预测的蓄电池充放电控制方法 |
| CN112085363A (zh) * | 2020-08-31 | 2020-12-15 | 浙江大学 | 一种储能和电动汽车集群协同调度的需求响应方法 |
| CN112085363B (zh) * | 2020-08-31 | 2024-04-12 | 浙江大学 | 一种储能和电动汽车集群协同调度的需求响应方法 |
| CN112736894A (zh) * | 2020-11-30 | 2021-04-30 | 国网陕西省电力公司电力科学研究院 | 一种计及风电与电动汽车随机性的两阶段机组组合建模方法 |
| CN113285479A (zh) * | 2021-01-20 | 2021-08-20 | 天宏阳光新能源股份有限公司 | 一种超大容量的区域微电网系统及运行方法 |
| CN112848946A (zh) * | 2021-02-20 | 2021-05-28 | 国网上海市电力公司 | 一种基于优化配电网分布的电动汽车充电桩充电改进方法 |
| CN112848946B (zh) * | 2021-02-20 | 2022-10-04 | 国网上海市电力公司 | 一种基于优化配电网分布的电动汽车充电桩充电改进方法 |
| CN113067370B (zh) * | 2021-03-15 | 2023-07-18 | 远景智能国际私人投资有限公司 | V2g充电站的充电控制方法、装置、服务器及存储介质 |
| CN113067370A (zh) * | 2021-03-15 | 2021-07-02 | 远景智能国际私人投资有限公司 | V2g充电站的充电控制方法、装置、服务器及存储介质 |
| CN113162089A (zh) * | 2021-04-29 | 2021-07-23 | 华北电力大学 | 一种电动汽车参与风电消纳的调度方法 |
| CN113815473A (zh) * | 2021-07-12 | 2021-12-21 | 中国华能集团清洁能源技术研究院有限公司 | 一种具备储能功能的换电站 |
| CN114475331B (zh) * | 2021-08-31 | 2024-04-02 | 武汉大学 | 一种考虑负荷反弹的电动汽车聚合优化调度方法 |
| CN114475331A (zh) * | 2021-08-31 | 2022-05-13 | 武汉大学 | 一种考虑负荷反弹的电动汽车聚合优化调度方法 |
| CN113771675A (zh) * | 2021-10-09 | 2021-12-10 | 南方电网数字电网研究院有限公司 | 有序充电方法和系统 |
| CN113779815A (zh) * | 2021-10-20 | 2021-12-10 | 上海尼拜环保科技发展有限公司 | 一种绿色低碳的一体化能源回收再利用系统 |
| CN113991687A (zh) * | 2021-11-03 | 2022-01-28 | 国网湖南省电力有限公司 | 基于风机状态及超短期功率预测的电压支撑方法及系统 |
| CN113991687B (zh) * | 2021-11-03 | 2023-12-19 | 国网湖南省电力有限公司 | 基于风机状态及超短期功率预测的电压支撑方法及系统 |
| CN114169575A (zh) * | 2021-11-12 | 2022-03-11 | 国网湖北省电力有限公司电力科学研究院 | 一种充电状态汽车电池温度的大数据预测系统 |
| CN114091263A (zh) * | 2021-11-23 | 2022-02-25 | 中国电力科学研究院有限公司 | 双联络线电网送受电能力仿真分析方法、系统及存储介质 |
| CN114091263B (zh) * | 2021-11-23 | 2024-03-01 | 中国电力科学研究院有限公司 | 双联络线电网送受电能力仿真分析方法、系统及存储介质 |
| CN114707761A (zh) * | 2022-04-29 | 2022-07-05 | 深圳供电局有限公司 | 一种电力智能调度管理系统 |
| CN114906001A (zh) * | 2022-06-06 | 2022-08-16 | 国网江苏省电力有限公司连云港市赣榆区供电分公司 | 一种电网和蓄电池混合输入的电动汽车充电系统 |
| CN115659595A (zh) * | 2022-09-26 | 2023-01-31 | 中国华能集团清洁能源技术研究院有限公司 | 基于人工智能的新能源场站的储能控制方法及装置 |
| CN115659595B (zh) * | 2022-09-26 | 2024-02-06 | 中国华能集团清洁能源技术研究院有限公司 | 基于人工智能的新能源场站的储能控制方法及装置 |
| CN115902472A (zh) * | 2022-11-18 | 2023-04-04 | 深圳市赛特新能科技有限公司 | 一种电动汽车对电网放电的测试方法 |
| CN115902472B (zh) * | 2022-11-18 | 2023-11-14 | 深圳市赛特新能科技有限公司 | 一种电动汽车对电网放电的测试方法 |
| CN116031870A (zh) * | 2022-12-06 | 2023-04-28 | 国网河北省电力有限公司电力科学研究院 | 电力台区重过载治理方法与装置 |
| CN115663921A (zh) * | 2022-12-12 | 2023-01-31 | 中国华能集团清洁能源技术研究院有限公司 | 一种风光储充微电网调控计划确定方法及系统 |
| CN116198368A (zh) * | 2023-01-16 | 2023-06-02 | 奇瑞新能源汽车股份有限公司 | 一种新型太阳能储能充电系统及其控制方法 |
| CN116316634A (zh) * | 2023-03-10 | 2023-06-23 | 国网湖北省电力有限公司电力科学研究院 | 一种面向电动汽车充电站群的站网互动控制方法 |
| CN115946563B (zh) * | 2023-03-13 | 2023-05-16 | 山东理工大学 | 充电堆功率动态分配策略优化方法、系统、终端及介质 |
| CN115946563A (zh) * | 2023-03-13 | 2023-04-11 | 山东理工大学 | 充电堆功率动态分配策略优化方法、系统、终端及介质 |
| CN116039576B (zh) * | 2023-03-22 | 2023-08-08 | 宁波禾旭汽车科技有限公司 | 新能源汽车电池智能更换系统 |
| CN116039576A (zh) * | 2023-03-22 | 2023-05-02 | 杭州禾美汽车科技有限公司 | 新能源汽车电池智能更换系统 |
| CN116231661A (zh) * | 2023-03-24 | 2023-06-06 | 阳光慧碳科技有限公司 | 一种电力调控方法、系统、电子设备及存储介质 |
| CN117595231B (zh) * | 2023-10-20 | 2024-05-31 | 国网安徽省电力有限公司六安供电公司 | 一种智能电网配网管理系统及其方法 |
| CN117595231A (zh) * | 2023-10-20 | 2024-02-23 | 国网安徽省电力有限公司六安供电公司 | 一种智能电网配网管理系统及其方法 |
| CN117335439B (zh) * | 2023-11-30 | 2024-02-27 | 国网浙江省电力有限公司 | 一种多元负荷资源联合调度方法及系统 |
| CN117335439A (zh) * | 2023-11-30 | 2024-01-02 | 国网浙江省电力有限公司 | 一种多元负荷资源联合调度方法及系统 |
| CN117791647A (zh) * | 2023-12-29 | 2024-03-29 | 华北电力大学 | 一种用于风功率平抑的soec系统功率控制方法和系统 |
| CN117937550A (zh) * | 2024-03-25 | 2024-04-26 | 宁波市电力设计院有限公司 | 一种综合能源储能系统优化调度方法和系统 |
| CN117937550B (zh) * | 2024-03-25 | 2024-08-02 | 宁波市电力设计院有限公司 | 一种综合能源储能系统优化调度方法和系统 |
| CN117955110A (zh) * | 2024-03-26 | 2024-04-30 | 国网甘肃省电力公司武威供电公司 | 一种创新电力系统负荷调控的辅助优化方法 |
| CN117955110B (zh) * | 2024-03-26 | 2024-05-31 | 国网甘肃省电力公司武威供电公司 | 一种创新电力系统负荷调控的辅助优化方法 |
| CN118381067A (zh) * | 2024-04-16 | 2024-07-23 | 内蒙古电力(集团)有限责任公司阿拉善供电分公司 | 一种终端配电网余电不上网模式下的自调峰控制方法 |
| CN118472941A (zh) * | 2024-07-09 | 2024-08-09 | 宁德时代新能源科技股份有限公司 | 储充一体机站点的控制方法、装置、设备、介质和产品 |
| CN118572715A (zh) * | 2024-08-02 | 2024-08-30 | 山东大学 | 一种基于贪婪修复遗传算法的大规模电动汽车集群有序充电优化方法 |
| CN118646012A (zh) * | 2024-08-12 | 2024-09-13 | 国网安徽省电力有限公司电力科学研究院 | 一种区域电网调度优化系统、方法及存储介质 |
| CN118674243A (zh) * | 2024-08-23 | 2024-09-20 | 厦门闽投科技服务有限公司 | 一种微电网关键节点生产管理方法及系统 |
| CN118801480A (zh) * | 2024-09-11 | 2024-10-18 | 华能兰州热电有限责任公司 | 一种火电机组调频调峰控制方法及系统 |
| CN119674932A (zh) * | 2024-11-29 | 2025-03-21 | 国网内蒙古东部电力有限公司赤峰供电公司 | 一种新能源储能消纳能力指数预测方法 |
| CN120508014A (zh) * | 2025-05-19 | 2025-08-19 | 湖北省电力装备有限公司 | 基于高安全性能多源数据采集传输的储能电池舱控制方法 |
| CN120524153A (zh) * | 2025-07-23 | 2025-08-22 | 陕西建一建设有限公司 | 一种水位流量智能定线分析系统 |
| CN121356057A (zh) * | 2025-12-16 | 2026-01-16 | 四川华电木里河水电开发有限公司 | 水电站多目标调度决策方法及系统 |
| CN121440849A (zh) * | 2025-12-31 | 2026-01-30 | 深圳即刻换电数字信息有限公司 | 一种基于自主决策与精准定位的充电机控制方法及系统 |
| CN121440849B (zh) * | 2025-12-31 | 2026-03-17 | 深圳即刻换电数字信息有限公司 | 一种基于自主决策与精准定位的充电机控制方法及系统 |
| CN121749154A (zh) * | 2026-02-26 | 2026-03-27 | 青岛美锦新能源汽车制造有限公司 | 一种新能源车的供电负荷预测方法及系统 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN102324752B (zh) | 2013-11-13 |
| CN102324752A (zh) | 2012-01-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102324752B (zh) | 结合风力发电的纯电动汽车有序充放电协调控制系统 | |
| CN103812219B (zh) | 一种多储能电站联合远程监控系统 | |
| CN107947231B (zh) | 一种面向配电网优化运行的混合储能系统控制方法 | |
| CN103559567B (zh) | 电网对电动汽车充电站的管理系统的管理方法 | |
| CN105471109B (zh) | 面向户用风光互补电站的智能用电管理系统及其管理方法 | |
| CN106849109B (zh) | 一种用于规模化充电桩接入的城市配网负荷调控方法 | |
| WO2018129829A1 (zh) | 一种新型微网系统以及基于该系统的组网调度方法 | |
| CN114336694B (zh) | 一种混合储能电站能量优化控制方法 | |
| CN111864748A (zh) | 适用于分布式光伏并网的监控调度一体化系统及方法 | |
| CN105117805A (zh) | 一种利用电动汽车的虚拟发电厂优化调度方法及系统 | |
| CN109462258A (zh) | 一种基于机会约束规划的家庭能量优化调度方法 | |
| CN104348189A (zh) | 一种分布式电源系统 | |
| CN112799352A (zh) | 一种园区智慧能源物联网络拓扑结构 | |
| CN112186785A (zh) | 一种基于台区智能终端的源网荷储平衡系统 | |
| CN103560533B (zh) | 基于变化率控制储能电站平滑风光发电波动的方法及系统 | |
| CN117411048A (zh) | 一种用于光伏储能的容量配置系统 | |
| CN118842101A (zh) | 一种以可聚合资源为主体的配电网调度优化方法 | |
| CN109004641A (zh) | 一种基于能源优化调度的微网源网荷协调控制方法 | |
| CN120146448A (zh) | 一种含多能源耦合的优化调度方法 | |
| CN120566583B (zh) | 一种光伏储能系统及其储能方法 | |
| CN113595235A (zh) | 一种基于泛在电力物联网的储能管理系统 | |
| CN120820870A (zh) | 一种新能源电池综合测试能源管理系统及方法 | |
| CN120749832A (zh) | 一种基于车网互动的社区微电网系统及其控制方法 | |
| CN209516641U (zh) | 一种面向分布式储能需求的储能集聚系统 | |
| CN118739427A (zh) | 一种基于微电网的分布式光伏发电与车辆到微电网v2g协同控制系统 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 11867907 Country of ref document: EP Kind code of ref document: A1 |
|
| ENP | Entry into the national phase |
Ref document number: 2011370924 Country of ref document: AU Date of ref document: 20110831 Kind code of ref document: A |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 11867907 Country of ref document: EP Kind code of ref document: A1 |