WO2012057423A1 - 가공지선 겸용 중성선 설치 멀티캡 - Google Patents

가공지선 겸용 중성선 설치 멀티캡 Download PDF

Info

Publication number
WO2012057423A1
WO2012057423A1 PCT/KR2011/004027 KR2011004027W WO2012057423A1 WO 2012057423 A1 WO2012057423 A1 WO 2012057423A1 KR 2011004027 W KR2011004027 W KR 2011004027W WO 2012057423 A1 WO2012057423 A1 WO 2012057423A1
Authority
WO
WIPO (PCT)
Prior art keywords
pole
neutral wire
uneven
combined
arm
Prior art date
Application number
PCT/KR2011/004027
Other languages
English (en)
French (fr)
Inventor
권세원
Original Assignee
대원전기 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 대원전기 주식회사 filed Critical 대원전기 주식회사
Publication of WO2012057423A1 publication Critical patent/WO2012057423A1/ko

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/20Spatial arrangements or dispositions of lines or cables on poles, posts or towers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/22Arrangements of earthing wires suspended between mastheads

Definitions

  • the present invention relates to a neutral wire installation multicap for installing a neutral wire to the pole pole to install the neutral wire at the top of the pole without the need to install a separate overhead wire to perform the role of the overhead line at the same time, more specifically It is coupled to the upper end of the pole, and the upper part provides a multi-cap having a screw hole in the center and a plurality of fastening holes at its periphery.
  • the present invention relates to a multi-cap combined neutral cable installation process that enables the installation of a bird nest and significantly reduces construction convenience and construction cost when providing a bird nest installation space and installing a neutral wire.
  • the first is that the reality of having to fight the war with magpies and the fact that most of the accidents are unknown are estimated to be foreign-contact accidents caused by birds. It is in a situation where structural and structural weaknesses are exposed to natural disasters such as typhoons and floods due to unstable construction due to eccentric loads of support and electric wires, or construction beyond the protection angle of lightning shielding.
  • KEPCO enacted the distribution line tolerant standards for improvement of power quality, and processed the mines as well as direct lightning strikes to protect the distribution lines from lightning strikes to prevent lightning strikes on the distribution lines. It was implemented by changing the installation of the ground wire to the basic, but in order to construct additional overhead wire on the existing distribution line, it was unavoidable to relay the wires around the circumference (extended by tying the poles and the complete wire) to install the overhead wires. Small steel plates) are developed and used continuously to connect the poles. If the finished steel sheets or steel sheets lack the basic safety factor, they should be reinforced so that the safety factor can be maintained by branch lines, etc. There is a vulnerability to collapse.
  • the retrograde method and the construction method of the distribution line are also expanding the hazardous facilities due to indiscriminate construction without sufficient scientific review.
  • the processing ground wire and neutral wire are connected to each other every week, and the investments are duplicated with the same function. Not only does it increase the load on the support, but it is also vulnerable to natural disasters due to unstable power facilities due to the relaying method, and there is a problem in securing the ground height of the support.
  • the poles can be used as a single power line without the risk of overvoltage and heavy current caused by the direct brain
  • the overhead line can be used as a neutral wire to reduce construction costs and simplify the line. It reduces the load and eliminates the ground fault of the neutral wire, and creates an eco-friendly bird nest space on the neutral wire, and installs the bird nest induction pin on the lower power line to guide the bird nest to the safest place away from the power line to prevent power failure.
  • it can protect algae, recycle suspended suspension insulators, save resources, prevent environmental pollution, prevent lightning accidents, protect against lightning strikes, and prevent typhoons and floods. Robust power distribution facilities and external contact It could prevent the outage of unknown origin.
  • the electric pole having the processed ground wire combined neutral wire as described above has various installation structures for installing the neutral wire according to the type of pole.
  • the rack is fixed to the upper part of the pole by a separate band so that the neutral wire is supported on the rack.
  • the top of the pole is installed by the support rod or fastening band to be uneven to one side, and the end and the pole are fixed by the arm tie and the arm tie band, and the insulator is installed on the top surface of the finish and the neutral wire
  • the work of installing neutral pole support in different ways according to the types of poles is very cumbersome in the works and the increase of construction cost is caused.
  • each support means for supporting the neutral wire has a structure that is installed in the upper circumference of the pole, such as a band, there was a problem that the bearing capacity, such as the deflection of the support caused by the load of the support decreases.
  • the present invention has been made to solve the above problems, by providing a multi-cap screw hole and a plurality of fastening holes are formed on the top to install a neutral wire combined with a processing branch line, the installation of the track by the multi-cap It can be easily and easily applied to various poles, such as to facilitate the installation of the support to be installed according to the type, which can bring down the construction cost, and prevent the sagging of the support even if a load occurs on the installed support. It is an object of the present invention to provide a processing branch wire combined neutral wire installation multicap providing an environment-friendly bird nest installation space.
  • the neutral pole is installed on the top of the processing branch wire combined
  • a space portion having an open bottom portion is fitted to the top of the pole, and cut portions are formed on both sides of the lower portion, and each of the cut end portions has a circular tubular coupling portion having a fastening bracket facing each other; It is formed on the upper end of the coupling portion, a screw hole is formed in the center, including a circular plate having a larger diameter than the coupling portion for securing a bird nest installation space formed a plurality of fastening holes radially around the screw hole around the periphery It can be achieved by constructing.
  • the present invention by the installation multi-cap installed on the top of the pole, it is possible to easily install and solid support of the neutral wire in all the poles, such as built-in, pin length, uneven pole, and thereby reduce the construction cost In addition, it is possible to obtain the effect of providing eco-friendly green technology by providing a bird nest installation space.
  • Figure 1 is a perspective view of the present invention overhead wire combined neutral wire installation multicap.
  • Figure 2 is a cross-sectional view of the present invention processing ground wire combined neutral wire installation multicap installed on the pole.
  • Figure 3 is an embodiment of the state applied to the built-in column of the present invention overhead wire combined neutral wire installation multicap.
  • Figure 4 is an embodiment of the state applied to the pin length column of the present invention overhead wire combined neutral wire installation multicap.
  • Figure 5 is an embodiment of the state applied to the uneven length of the present invention overhead wire combined neutral wire installation multicap.
  • Figure 6 is another embodiment of the present invention applied to the biasing pole of the present invention overhead wire combined neutral wire installation multicap.
  • Figure 7 is a state in which the bird nest is formed in the present invention processing ground wire combined neutral wire installation multicap.
  • pole 20 neutral wire
  • FIG. 1 is a perspective view of the present invention overhead wire combined neutral wire installation multicap
  • Figure 2 is a cross-sectional view of the present invention overhead wire combined neutral wire installation multicap is installed on the pole.
  • the complete 40 is provided with a plurality of insulators 50 to which the power line 30 is connected, the processing on the top In the electric pole 10 where the branch wire combined neutral wire 20 is installed, the coupling portion 100 forming the lower structure of the installation multicap 1 and the circular plate 200 forming the upper structure of the multicap 1. It is composed.
  • the coupling part 100 is composed of a circular tubular shape formed with a space 110, the lower portion of which is open to be fitted to the top of the pole 10, the incision portion cut in a predetermined height from the lower end on both sides of the lower ( 120 is formed, and a pair of fastening brackets 130 facing each other are formed at the ends of the cutouts 120, and the fastening brackets 130 are coupled to the top of the electric pole 10 by the space part 110. ) Is tightened by tightening bolt and nut.
  • the circular plate 200 is composed of a circular plate having a predetermined thickness formed on the upper end of the coupling portion 100, the screw hole 210 is formed in the middle portion thereof, the screw hole (around the periphery) A plurality of fastening holes 220 and 220 ′ are formed radially around the 210.
  • the fastening holes 220, 220 ' can be used in various numbers as applicable depending on the angle of the track is installed, in the embodiment of the present invention designates eight fastening holes 220, 220'. Will be explained.
  • the circular plate 200 is configured to have a larger outer diameter than the outer diameter of the coupling portion 100,
  • the fastening holes 220 and 220 ′ formed in the circular plate 200 are formed outside the outer diameter of the coupling part 100 so as not to interfere with the coupling part 100, and at the same time, the bird nests are formed on the circular plate 200. It is desirable to configure to secure the installation space.
  • the insulator 320 is formed inside the rack 310 that is bent in a "c" shape, and is configured to be connected to the bottom protruding fastening bolt 330 to the bottom of the rack 310.
  • fastening bolt 330 which is configured to enable the installation of the neutral wire (20) when applied to the pin long column (straight column) .
  • Figure 5 is configured to include a loose end 410 having a predetermined length, and the upper end is coupled to the outer end 410, the arm tie 420 is coupled to the arm tie band 430 But
  • the disengagement wan 410 is bolted to the fastening holes 220, 220 'to be ejected to one side of the electric pole 10 to the fastening holes 220, 220' on the upper surface of the circular plate 200,
  • the arm tie 420 supporting the loosening 410 may be fixed on the pole 10 by the arm tie band 430 to be configured to support the loosening 410. When applied to the installation of the neutral wire 20 is possible.
  • FIG. 6 it is configured to include a loose slack 410 having a constant length, and the arm tie 420a for supporting the loose slack 410,
  • the uneven arm 410 is bolted to the fastening holes 220 and 220 'to be uneven to the one side of the electric pole 10 in the upper surface of the circular plate 200, the arm tie for supporting the uneven arm 410 420a can be configured such that the upper end thereof is coupled to the slipper 410 at the rear of the slipper 410, and the lower end is coupled to the fastening bracket 130 to support the slipper 410. In this case, it is also configured to enable the installation of the neutral wire 20 when applied to the uneven pole.
  • reference numeral 80 is a bird nest.
  • Neutral wire installation multi-cap combined use of the present invention is to enable the installation of the neutral wire, easy and robust as well as to reduce the construction cost through this,
  • the present invention installation multicap (1) the installation of the neutral wire 20 on the upper end of the pole 10 and to install the bird nest as necessary, the lower coupling portion 100 What is necessary is to fit the upper end of the pole 10 to install the neutral wire 20 by the space 110.
  • the installation multicap 1 is that the flow can occur at the top of the pole 10, in order to prevent this, each pair of fastening brackets 130 formed on the lower portion of the coupling portion 100 bolt and nut fastening method
  • the coupling part may be coupled to the lower part of the coupling part 100 by the cutout part 120 and the fixing part is tightened and fixed by the electric pole 10.
  • Neutral wire 20 is installed in the installation multi-cap (1) installed as described above, the neutral wire 20 is installed according to the track of the electric pole 10, human race, built-in (angle), pinjangju ( Straight line), and elongate column.
  • Figure 3 is a perspective view showing the application of the present invention installed multi-cap (1) to the neutral line 20 is installed in the built-in column (angle column), the neutral wire 20 of the two sides of the suspension insulator 60 is coupled What is necessary is to fasten the neutral wire 20 of either side to the any one fastening hole 220 of the circular plate 200 by the suspension insulator 60.
  • the neutral wire 20 on the other side may be fastened to another fastening hole 220 'of the circular plate 200 by the suspension insulator 60, and the neutral wire 20 installed is a jump line 70. Is connected by.
  • the neutral wire 20 installed by the suspension insulator 60 may be selectively installed in a plurality of fastening holes 220 and 220 'according to the angle of the track, and fastening holes 220 and 220.
  • Suspension insulators installed in ') can be selectively installed using various types of jangju materials, including the rings normally used for installation.
  • Figure 4 is an embodiment showing the application of the present invention the multi-cap (1) to the neutral wire 20 is installed in the pin length column (straight column), a screw hole 210 formed in the center of the circular plate 200 There is a rack 310 is screwed by the fastening bolt 330 of the lower.
  • the neutral wire 20 is interposed between the rack 310 installed on the circular plate 200 and the insulator 320.
  • Figure 5 is an embodiment showing the application of the present invention when the multi-cap (1) is installed on the neutral wire 20 is installed in the gwonjangju, the top plate of the circular plate 200 is provided with a blister wan 410 is installed
  • the unscrewing 410 is installed to be uneven to one side of the electric pole 10, it is to be fastened with a bolt or the like by the fastening holes 220, 220 '.
  • the uneven arm 410 is fixed by the arm tie 420 to prevent sag due to the eccentric load
  • the arm tie 420 is fixed on the uneven arm 410, the upper end, The lower end is installed inclined on the pole 10 by the arm tie band 430, the installed arm tie 420 is supported by the eccentric load 410 from the lower side by the eccentric load It can prevent sag.
  • Figure 6 is another embodiment showing the application of the present invention when the multi-cap (1) is installed on the neutral wire 20 is installed on the uneven column, the uneven block 410 is installed on the upper surface of the circular plate 200 As it is, the unevenness 410 is installed to be uneven to one side of the electric pole 10, it is to be fastened with a bolt or the like by the fastening hole 220 (220 ').
  • the slip stiffening 41 is supported and fixed by the arm tie 420a in order to prevent sag due to the eccentric load, and the arm tie 420a has an upper end at the rear of the slack of the slipper 410. It is fixed, the lower end is fixed to the fastening bracket 130 of the coupling portion 100, the installed arm tie (420a) is held by the eccentric load of the loosening loosening (410) by holding the rear of the loosening loosening (410) It can be prevented.
  • the uneven column is a straight column and an angular column can be applied according to the direction of the track, when applied to the straight column first, as shown in FIG.
  • the neutral wire 20 can be installed, and when applied to the angular column, the neutral pole 20 may be connected to both sides of the uneven arm 410 by the suspension insulator in the same way as the above-described built-in column.
  • Figure 7 is a diagram showing that the bird nest is formed in the multi-cap installed in the pole, the upper surface of the circular plate 200 of the multi-cap to grasp the behavior of the bird in a form that is easy to form a bird nest 80 As a result, it creates bird nests in Jeonju, but creates bird nests where there is no danger of power lines or other line accidents. It is a green technology that makes environmentally friendly facilities symbiotic with electric power facilities, rather than removing them by instantaneous removal.
  • the present invention combined multi-wire neutral cable installation multicap can be applied in various ways by a single multicap without the need to install a separate installation means for connecting the neutral wire to each pole according to the type of the line as a simple structure Simple and robust construction can be made, as well as material costs and construction costs can be reduced.

Landscapes

  • Catching Or Destruction (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

본 발명은 별도의 가공지선을 설치하지 않고, 중성선을 전주의 최상단에 설치하기 위한 중성선 설치 멀티캡에 관한 것으로, 상단에 가공지선 겸용 중성선이 설치되는 전주에 있어서, 하부가 개방된 공간부가 형성되어 전주의 상단에 끼움 결합 되며, 하부 양측에 절개부가 형성되고, 상기 각각의 절개부 단부에는 마주보는 체결브라켓이 형성된 원형관상의 결합부와; 상기 결합부의 상단에 형성되며, 중앙에 나사공이 형성되고, 그 주연부 둘레에 나사공을 중심으로 방사상으로 다수의 체결공이 형성된 조류둥지설치 공간확보를 위해 결합부보다 큰 직경을 갖는 원형플레이트를 포함하여 구성된 것으로, 전주의 상단에 설치되는 설치멀티캡에 의해 내장주, 핀장주, 편출장주 등 모든 장주에 중성선의 간편한 설치 및 견고한 지지가 가능하게 하고, 나아가 조류둥지설치 공간 제공으로 친환경적이며, 하중에 의해 지지물 및 중성선의 처짐 발생을 막아주는 효과가 있다.

Description

가공지선 겸용 중성선 설치 멀티캡
본 발명은 별도의 가공지선을 설치하지 않고, 중성선을 전주의 최상단에 설치하여 가공지선의 역할을 동시에 수행할 수 있도록 하는 중성선을 전주에 설치하기 위한 중성선 설치 멀티캡에 관한 것으로, 더욱 상세하게는 전주의 상단에 결합되며, 상부에는 중앙에 나사공 및 그 주연부로 다수의 체결공을 갖는 멀티캡을 제공함으로, 선로의 종류 즉, 내장주, 핀장주, 편출장주 등 모든 장주에 용이하게 중성선의 설치가 가능하게 하고, 조류둥지 설치공간의 제공과 중성선의 설치시 공사의 편리성 및 공사원가를 현저히 절감할 수 있게한 가공지선 겸용 중성선 설치 멀티캡에 관한 것이다.
전기는 우리의 생활에 필수 수단으로서 문명의 발전과 더불어 현대사회는 시대적으로 고품질의 전력을 요구하고 있어 작업정전은 물론이고 순간적인 불시정전도 국민생활에 큰 불편과 기업생산 활동에도 막대한 지장을 초래하고 있어 정전을
방지하고자 국가적인 차원의 노력을 하고 있는 실정이다.
이러한 정전사고 방지노력의 일환으로 전국의 호당 평균정전시간이 년간 100분대에서 19분대로 매우 크게 감소하여 현재에 이르고 있으나, 첫째로 가장 큰 비중을 차지하던 작업정전은 무정전공법의 개발과 적용으로 해결되었고,
둘째로 기자재 불량으로 인한 정전은 고품질의 자재개발 및 보급으로 크게 감소되었으며,
셋째는 외물 접촉으로 인한 정전인데 이는 선로의 절연화 및 단순 조류고장 회피형 장주[점퍼선 하향장주 및 L.H.C 시공법 등]과 구제(驅除: 까치를 총으로 쏘아 없애는 방법)로 다소나마 해소되었으나, 아직도 순간정전의 원인으로 추정되며, 또한 총기 사용으로 인한 안전사고 위험 및 환경보호단체의 민원도 무시할 수 없는 현실이며,
넷째는 낙뢰로 인한 정전사고로서 이는 1990. 2. 7 한국전력공사의 설계기준[3800] 배전선내뢰기준을 제정운영 하여 배전선로의 낙뢰방지를 위한 배전선로의 내뢰대책은 유도뢰뿐만 아니라 직격뢰도 보호대상으로 하여 가공지선 설치를 기본으로 하고, 공급신뢰도를 높이기 위해서 피뢰기 등의 설치를 병행함으로서 크게 해결되었다.
다섯째는 기타 정전사고가 태풍, 수해등의 자연재해와 고객설비 불량, 일반인과실, 작업자과실, 원인불명 등이 차지하고 현실이다.
상기에서 열거한 바와 같이 아직도 정전사고 방지를 위하여 해결해야 할 산적한 문제점들이 아주 많다는 사실을 알 수 있다.
그 중에서, 첫째는 아직도 "까치와의 전쟁"을 치러야 하는 현실과 원인 불명이라고 치부하는 사고의 대부분이 조류로 인한 외물접촉사고로 추정되고 있는 현실이며, 단순 조류고장 회피형 장주설치로 인하여 구조역학적으로 지지물과 전선의 설치하중이 편심되어 불안정하게 시공하거나 낙뢰차폐 보호각을 벗어나는 시공으로 인하여 태풍과 수해등의 자연재해에 구조역학적 취약성을 드러낸 상황에 처한 것이다.
둘째는 한국전력공사에서 전력품질향상을 위하여 1990. 2. 7. 배전선내뢰기준을 제정하고, 배전선로의 낙뢰사고 방지를 위한 배전선로의 내뢰대책을 유도뢰 뿐만 아니라 직격뢰까지도 보호대상으로 하여 가공지선 설치를 기본으로 변경하여 시행였으나 기존의 배전선로에 가공지선을 추가로 시공하기 위하여 부득이 전주위에 완금으로 계주(전주와 완금을 묶어서 연장함)하여 가공지선을 설치하게 되었고, 또한 가공지선지지대(소형 강판주)를 개발하여 전주를 잇는 공법을 계속하여 사용함으로서 이어 올린 완금이나 강판주가 기초 안전율이 부족한 경우에는 지선등에 의하여 안전율을 보지할 수 있도록 보강하여야 하나 이에 미흡하여, 태풍과 같은 재해에 쉽게 붕괴되는 취약성이 있다.
이는, 과거 자금이 부족한 경제개발시대의 어려운 환경에서 필요한 지상고를 얻기 어려운 경우에 할 수 없이 사용하던 단 계주나 인형주의 구시대적인 시공법을 경제력이 있는 현재에도 누더기처럼 사용하는 상황일 뿐만 아니라 편출용 가공지지
대까지 개발하여 전선로에 적용하고 있으나 완전편출장주에는 낙뢰보호 차폐각을 확보하지 못하는 한계가 있는 등 이들 문제점을 모두 해결할 더욱 견고하고 완벽한 공법을 필요로 하게 되었다.
또한 정전사고 중 까치의 산란기에 발생하는 외물접촉사고와 원인불명사고가 전체고장의 약 43%를 차지하고 있으나, 사고방지 노력에도 불구하고 사고는 줄지 않고 있으며 방지대책 또한 엽사를 동원하여 까치를 구제하는 환경생태계 보호에
역행하는 방법과, 배전선로의 시공방법(일명 L.H.C. 공법, 하향점퍼시공) 또한 충분한 과학적 검토 없이 무분별한 시공으로 인하여 오히려 위해설비를 확대하고 있는 실정이며, 새로운 기자재의 개발과 더불어 재활용이 가능한 철거자재를 무조
건 폐기함으로서 자원의 낭비는 물론이고 환경오염을 부채질하고 있고, 22.9KV 다중접지 방식에서 가공지선과 중성선은 매 전주마다 서로 연결되어 있어 위치만 다를 뿐 같은 기능으로 중복 투자되고 있어 불필요한 가공지선 설비로 지지물에 하중을 증가시킬 뿐만 아니라, 계주방식의 시공으로 불안정한 전력시설물로 자연재해에 취약하며 지지물의 지상고 확보에도 문제점이 있다
한편, 상기와 같은 문제점을 해결하기 위해 본 발명 출원인은, 특허등록 제10-0725382호와 같이 가공지선 겸용 중성선을 갖는 전주 및 이를 이용한 배전공법을 출원한바 있으며,
이를 통해, 가공지선과 중성선을 직격뇌에 의한 과전압, 대전류 상승 등의 위험성 없이 하나의 전력선으로 사용할 수 있는 전주를 구성하므로서, 중성선으로 가공지선 역할을 겸용하여 공사비 원가절감 및 선로의 단순화로 지지물의 하중을 경감시키고 중성선의 지상고 미달등을 해소함은 물론,중성선에 조류둥지 공간부를 친환경적으로 형성하고 하단 전력선에는 조류둥지 유도핀을 설치하여 조류둥지를 전력선으로부터 가장 멀고 안전한 곳으로 유도하여 정전사고를 방지하면서도 조류를 보호할수 있고, 폐기물처리되는 현수애자를 재활용하여 자원을 절약하고 환경오염을 방지할 수 있으며, 보다 안전하고 편리한 낙뢰보호 차폐각의 확보로 낙뢰에 의한 사고를 방지하고, 태풍이나 수해 등의 자연 재해에 대비한 견고한 배전시설과 외물접촉으로 인한 원인불명의 정전사고를 방지할 수 있었다.
그러나 상기와 같은 가공지선 겸용 중성선을 갖는 전주는, 전주의 종류에 따라 중성선을 설치하기 위해 다양한 방법의 설치구조를 가지고 있는 것으로, 이를 살펴보면,
먼저, 내장주의 경우 별도의 지지봉이나 체결밴드를 이용하여 전주의 상부 양측에 완금을 지지하고, 상기 완금에 중성선이 연결된 현수애자를 고정 지지 및 점퍼선에 의해 연결 하였으며,
핀장주의 경우 전주의 상부에 랙크를 별도의 밴드로 고정하여 상기 랙크에 중성선이 지지되게 하였으며,
편출장주의 경우 전주의 상부에 완금을 지지봉이나 체결밴드에 의해 일측으로 편출되게 설치하고, 완금과 전주를 암타이 및 암타이밴드로 고정 지지하며, 상기 완금의 상부면에 애자를 설치 및 중성선의 지지가 가능하게 하는 등 전주의 종류에 따라 각각 다른 방식의 중성선 지지방식을 전주에 설치하여야 하는 작업상 매우 번거로운 문제점과 이로 인해 공사 원가의 증가를 가져오는 문제점이 있었다.
또한, 중성선을 지지하기 위한 각각의 지지수단을 전주의 상부 둘레에 밴드 등으로 설치하는 구조를 가지고 있어, 지지물의 하중에 의해 지지물의 처짐 발생 등 지지력이 저하되는 문제점이 있었다.
본 발명은 상기와 같은 문제점을 해결하기 위해 안출된 것으로, 가공지선 겸용 중성선을 설치하기 위해 상부에 나사공 및 둘레에 다수의 체결공이 형성된 설치멀티캡을 구비함으로, 상기 설치멀티캡에 의해 선로의 종류에 따라 설치되는 지지물의 설치가 용이하게 하는 등 다양한 전주에 간편하면서도 용이하게 적용할 수 있어 공사원가의 절감을 가져올 수 있으며, 설치된 지지물에 하중이 발생하더라도 그 지지물의 처짐이 발생하지 않게 하고, 친환경적인 조류둥지설치 공간을 제공하는 가공지선 겸용 중성선 설치 멀티캡을 제공함에 본 발명의 목적이 있는 것이다.
상기 목적을 달성하기 위한 구체적인 수단으로는, 전력선이 연결되는 다수의 애자가 구비된 완금이 설치되며, 상단에 가공지선 겸용 중성선이 설치되는 전주에 있어서,
하부가 개방된 공간부가 형성되어 전주의 상단에 끼움 결합 되며, 하부 양측에 절개부가 형성되고, 상기 각각의 절개부 단부에는 마주보는 체결브라켓이 형성된 원형관상의 결합부와; 상기 결합부의 상단에 형성되며, 중앙에 나사공이 형성되고, 그 주연부 둘레에 나사공을 중심으로 방사상으로 다수의 체결공이 형성된 조류둥지설치 공간확보를 위해 결합부보다 큰 직경을 갖는 원형플레이트를 포함하여 구성함으로 달성할 수 있는 것이다.
이상과 같이 본 발명은, 전주의 상단에 설치되는 설치멀티캡에 의해 내장주, 핀장주, 편출장주 등 모든 장주에 중성선의 간편한 설치 및 견고한 지지가 가능하게 하고, 이로 인한 공사원가의 절감을 가져오며, 나아가 조류둥지설치 공간 제공으로 친환경적인 녹색기술이 제공되는 효과를 얻을 수 있는 것이다.
또한, 하중에 의해 지지물 및 중성선의 처짐 발생을 막아줄 수 있는 효과를 얻을 수 있는 것이다.
도 1은 본 발명 가공지선 겸용 중성선 설치 멀티캡의 사시도.
도 2는 본 발명 가공지선 겸용 중성선 설치 멀티캡이 전주에 설치된 상태의 단면도.
도 3은 본 발명 가공지선 겸용 중성선 설치 멀티캡의 내장주에 적용 상태의 실시예도.
도 4는 본 발명 가공지선 겸용 중성선 설치 멀티캡의 핀장주에 적용 상태의 실시예도.
도 5는 본 발명 가공지선 겸용 중성선 설치 멀티캡의 편출장주에 적용 상태의 실시예도.
도 6은 본 발명 가공지선 겸용 중성선 설치 멀티캡의 편충장주에 적용 상태의 다른 실시예도.
도 7은 본 발명 가공지선 겸용 중성선 설치 멀티캡에 조류둥지가 조성된 상태의 도.
부호의 설명
10 : 전주 20 : 중성선
30 : 전력선 40 : 완금
50 : 애자 100 : 결합부
110 : 공간부 120 : 절개부
130 : 체결브라켓 200 : 원형플레이트
210 : 나사공 220,220' : 체결공
310 : 랙크 320 : 절연애자
330 : 체결볼트 410 : 편출완금
420 : 암타이 430 : 암타이밴드
본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석되어서는 아니 되며, 발명자는 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.
따라서, 본 명세서에 기재된 실시예와 도면에 도시된 구성은 본 발명의 가장 바람직한 일 실시예에 불과할 뿐이고, 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 본 출원시점에 있어서 이들을 대체할 수 있는 다양한 균등물과 변형예들이 있을 수 있음을 이해하여야 한다.
이하, 본 발명의 바람직한 실시예를 첨부된 도면을 참고하여 상세히 설명한다.
도 1은 본 발명 가공지선 겸용 중성선 설치 멀티캡의 사시도 이고, 도 2는 본 발명 가공지선 겸용 중성선 설치 멀티캡이 전주에 설치된 상태의 단면도이다.
도 1 및 도 2의 도시와 같이 본 발명 가공지선 겸용 중성선 설치 멀티캡(1)은, 전력선(30)이 연결되는 다수의 애자(50)가 구비된 완금(40)이 설치되며, 상단에 가공지선 겸용 중성선(20)이 설치되는 전주(10)에 있어서, 설치 멀티캡(1)의 하부구조를 이루는 결합부(100)와, 멀티캡(1)의 상부구조를 이루는 원형플레이트(200)로 구성된 것이다.
이때, 상기 결합부(100)는, 전주(10) 상단에 끼움 결합 되게 하부가 개방된 공간부(110)가 형성된 원형관상으로 구성되며, 그 하부 양측에 하단으로부터 일정 높이로 절개된 절개부(120)가 형성되며, 상기 각각의 절개부(120) 단부에는 마주보는 한쌍으로 된 체결브라켓(130)이 형성되어 공간부(110)에 의해 전주(10)의 상단에 끼움 결합 후 체결브라켓(130)에 볼트와 너트 체결함으로 조임 결합되는 것이다.
또한, 상기 원형플레이트(200)는, 상기 결합부(100)의 상단에 형성되는 소정 두께를 갖는 원형판으로 구성되며, 그 중간부에 나사공(210)이 형성되고, 그 주연부 둘레에 나사공(210)을 중심으로 방사상으로 다수의 체결공(220)(220')이 형성된 것이다.
이때, 상기 체결공(220)(220')은, 설치되는 선로의 각도에 따라 적용가능하게 다양한 갯수로 사용 가능하며, 본 발명의 실시예 에서는 8개의 체결공(220)(220')을 지정하여 설명한다.
또한, 상기 원형플레이트(200)는, 그 외경이 결합부(100)의 외경보다 큰 외경을 가지게 구성하되,
원형플레이트(200)에 형성된 체결공(220)(220')이 결합부(100)와 간섭이 생기지 않게 그 결합부(100)의 외경 밖으로 형성함과 동시에 그 원형플레이트(200)에 조류둥지의 설치공간의 확보가 가능하게 구성함이 바람직한 것이다.
또한, 도 4의 도시와 같이 "ㄷ"형으로 절곡된 랙크(310) 내부에 절연애자(320)이 축설 되고, 상기 랙크(310)의 저면에 하향 돌출형 체결볼트(330)연결 되도록 구성하되,
상기 체결볼트(330)에 의해 원형플레이트(200)의 나사공(210)에 나사 결합 되게 구성할 수 있는 것으로, 이는 핀장주(직선주)에 적용시 중성선(20)의 설치가 가능하게 구성된 것이다.
또한, 도 5의 도시와 같이 일정한 길이를 갖는 편출완금(410)과, 상단이 상기 편출완금(410)에 결합 되고 하단이 암타이밴드(430)에 결합 되는 암타이(420)를 포함하여 구성하되,
상기 편출완금(410)이 원형플레이트(200)의 상부면에서 체결공(220)(220')에 전주(10)의 일측으로 편출되게 체결공(220)(220')에 볼트 고정되고, 상기 편출완금(410)을 지지하는 암타이(420)를 암타이밴드(430)에 의해 전주(10)상에 고정하여 편출완금(410)을 지지할 수 있게 구성할 수 있는 것으로, 이는 편출장주에 적용시 중성선(20)의 설치가 가능하게 구성된 것이다.
또한, 도 6의 도시와 같이 일정한 길이를 갖는 편출완금(410)과, 상기 편출완금(410)을 지지하는 암타이(420a)를 포함하여 구성하되,
상기 편출완금(410)이 원형플레이트(200)의 상부면에서 전주(10)의 일측으로 편출되게 체결공(220)(220')에 볼트 고정되고, 상기 편출완금(410)을 지지하는 암타이(420a)를 그 상단이 편출완금(410)의 편출부 후방에서 편출완금(410)에 결합 되고, 하단이 체결브라켓(130)에 결합하여 편출완금(410)을 지지할 수 있게 구성할 수 있는 것으로, 이 또한 편출장주에 적용시 중성선(20)의 설치가 가능하게 구성된 것이다.
도면중 미설명부호 80은 조류둥지 이다.
이하, 상기와 같은 구성을 갖는 본 발명 가공지선 겸용 중성선 설치 멀티캡의 설치관계 및 작용을 첨부된 도면을 참고하여 상세히 설명한다.
본 발명 가공지선 겸용 중성선 설치 멀티캡은, 중성선의 설치가 용이하면서도 견고하게 함은 물론 이를 통해 공사원가의 절감을 가져올 수 있게 한 것으로,
먼저, 그 설치관계를 살펴보면, 본 발명 설치 멀티캡(1)은, 전주(10)의 상단에 중성선(20)의 설치와 필요에 따라 조류둥지를 설치하기 위한 것으로, 하부 결합부(100)의 공간부(110)에 의해 중성선(20)을 설치하고자 하는 전주(10)의 상단에 끼움 결합하면 되는 것이다.
이후, 설치 멀티캡(1)은 전주(10)의 상단에서 유동이 발생할 수 있는 것인바, 이를 방지하기 위해 결합부(100)의 하부에 형성된 각쌍의 체결브라켓(130)을 볼트와 너트 체결방식으로 조입 결합하면 되는 것으로, 이때 절개부(120)에 의해 결합부(100)의 하부가 축소 및 전주(10)를 조여 고정하게 되는 것이다.
이상과 같이 설치된 설치 멀티캡(1)에는 중성선(20)이 설치되는 것인바, 설치되는 중성선(20)은 전주(10)의 선로에 따라 크게 인류주, 내장주(각도주), 핀장주(직선주), 편출장주로 구성된다.
이때, 도 3은 본 발명 설치 멀티캡(1)을 내장주(각도주)에 설치되는 중성선(20)에 적용시를 나타낸 사시도로서, 현수애자(60)가 결합된 양측의 중성선(20) 중 어느 한측의 중성선(20)을 현수애자(60)에 의해 원형플레이트(200)의 어느 하나의 체결공(220)에 체결하면 되는 것이다.
이후, 또 다른 측의 중성선(20)을 현수애자(60)에 의해 원형플레이트(200)의 또 다른 하나의 체결공(220')에 체결하면 되는 것이며, 설치된 중성선(20)은 점프선(70)에 의해 연결되는 것이다.
이때, 상기 현수애자(60)에 의해 설치되는 중성선(20)은, 그 선로의 각도에 따라 다수의 체결공(220)(220')에 선택적으로 설치하면 되는 것이며, 체결공(220)(220')에 설치되는 현수애자는 통상적으로 완금에 설치시 사용되는 링을 포함하여 여러 가지 장주용 자재를 선택적으로 사용하여 설치할 수 있는 것이다.
또한, 도 4는 본 발명 설치 멀티캡(1)을 핀장주(직선주)에 설치되는 중성선(20)에 적용시를 나타낸 실시예도로서, 원형플레이트(200)의 중앙에 형성된 나사공(210)에는 랙크(310)가 그 하부의 체결볼트(330)에 의해 나사 결합 되는 것이다.
이후, 원형플레이트(200)에 설치된 랙크(310)와 절연애자(320)의 사이에서 중성선(20)이 내입 설치되는 것이다.
또한, 도 5는 본 발명 설치 멀티캡(1)을 편출장주에 설치되는 중성선(20)에 적용시를 나타낸 실시예도로서, 원형플레이트(200)의 상부면에는 편출완금(410)이 설치되는 것으로, 편출완금(410)은 전주(10)의 일측으로 편출되게 설치되며, 체결공(220)(220')에 의해 볼트 등으로 체결하면 되는 것이다.
이후, 상기 편출완금(410)은 그 편심하중에 의한 처짐을 방지하기 위해 암타이(420)에 의해 지지 고정되는 것으로, 암타이(420)는 그 상단이 편출완금(410)상에 고정되고, 그 하단이 암타이밴드(430)에 의해 전주(10)상에 경사상으로 설치되며, 설치된 암타이(420)는 편출완금(410)을 하부로부터 지지하여 편출완금(410)의 편심하중에 의한 처짐을 막아줄 수 있는 것이다.
또한, 도 6은 본 발명 설치 멀티캡(1)을 편출장주에 설치되는 중성선(20)에 적용시를 나타낸 다른 실시예도로서, 원형플레이트(200)의 상부면에는 편출완금(410)이 설치되는 것으로, 편출완금(410)은 전주(10)의 일측으로 편출되게 설치되며, 체결공(220(220')에 의해 볼트 등으로 체결하면 되는 것이다.
이후, 상기 편출완금(41)은 그 편심하중에 의한 처짐을 방지하기 위해 암타이(420a)에 의해 지지 고정되는 것으로, 암타이(420a)는 그 상단이 편출완금(410)의 편출부 후방에서 고정되고, 그 하단이 결합부(100)의 체결브라켓(130)에 고정되며, 설치된 암타이(420a)는 편출완금(410)의 후방을 잡아주어 편출완금(410)의 편심하중에 의한 처지믈 막아줄 수 있는 것이다.
한편, 상기 편출장주는 선로방향에 따라 직선주 및 각도주의 적용이 가능한 것인데, 먼저 직선주에 적용시 그 편출완금(410)의 상부면에 도 5의 도시와 같이 LP애자의 설치 및 그 상부에 중성선(20)의 설치가 가능하고, 각도주에 적용시 전술한 내장주에 연결과 동일하게 현수애자에 의해 편출완금(410)의 양측으로 중성선의 설치 및 점퍼선에 의해 연결하면 되는 것이다.
또한, 도 7은 전주에 설치된 멀티캡에 조류둥지가 조성된 것을 나타낸 도로서, 멀티캡의 원형플레이트(200) 상부면은 조류의 습성을 파악하여 조류둥지(80)를 조성하기 용이한 형태로 구성됨으로서 전주에 조류둥지를 조성하되 전력선이나 기타 선로 사고의 위험이 없는 곳에 조류둥지를 조성하여도 전력공급에는 전혀 지장이 없는 위치에 조성하도록 유도하는 역할을 하여, 조류를 퇴치하거난 조류둥지를 빈번히 순시하여 철거하는 것이 아닌 전력시설물에 공생토록 하는 친환경 시설물이 되도록 하는 녹색기술이라 할 수 있는 것이다.
이상과 같이 본 발명 가공지선 겸용 중성선 설치 멀티캡은 선로의 종류에 따라 중성선을 연결하기 위한 별도의 설치수단을 전주에 각각 설치할 필요 없이 하나의 멀티캡에 의해 다양하게 적용할 수 있어 간단한 구조로도 간편하면서도 견고한 시공이 가능하게 함은 물론 이로 인한 재료비의 절감과 공사 원가의 절감을 가져올 수 있는 것이다.
또한, 중성선을 설치시 중성선을 설치하기 위한 지지구 등의 설치수단을 전주 측부에 설치하지 않고, 전주의 상단에 설치되게 함으로, 하중에 의해 설치수단의 처짐 및 중성선의 처짐을 방지할 수 있고, 조류둥지설치 공간을 제공하는 등 그 설치와 안전 면에서 매우 용이한 효과와, 조류사고예방 효과까지에 따른 친환경적인 녹색기술을 제공할 수 있는 것이다.

Claims (4)

  1. 전력선(30)이 연결되는 다수의 애자(50)가 구비된 완금(40)이 설치되며, 상단에 가공지선 겸용 중성선(20)이 설치되는 전주(10)에 있어서,
    하부가 개방된 공간부(110)가 형성되어 전주(10)의 상단에 끼움 결합 되며, 하부 양측에 절개부(120)가 형성되고, 상기 각각의 절개부(120) 단부에는 마주보는 체결브라켓(130)이 형성된 원형관상의 결합부(100)와; 상기 결합부(100)의 상단에 형성되며, 중앙에 나사공(210)이 형성되고, 그 주연부 둘레에 나사공(210)을 중심으로 방사상으로 다수의 체결공(220)(220')이 형성된 조류둥지설치 공간확보를 위해 결합부(100)보다 큰 직경을 갖는 원형플레이트(200)를 포함하여 구성함을 특징으로 하는 가공지선 겸용 중성선 설치 멀티캡.
  2. 제 1항에 있어서,
    "ㄷ"형으로 절곡된 랙크(310) 내부에 절연애자(320)가 축설 되고, 상기 랙크(310)의 저면에 하향 돌출형 체결볼트(330)가 형성되도록 구성하되,
    상기 체결볼트(330)에 의해 원형플레이트(200)의 나사공(210)에 나사 결합 되게 구성함을 특징으로 하는 가공지선 겸용 중성선 설치 멀티캡.
  3. 제 1항에 있어서,
    일정한 길이를 갖는 편출완금(410)과, 상단이 상기 편출완금(410)에 결합 되고 하단이 암타이밴드(430)에 결합 되는 암타이(420)를 포함하여 구성하되,
    상기 편출완금(410)이 원형플레이트(200)의 상부면에서 전주(10)의 일측으로 편출되게 체결공(220)(220')에 볼트 고정되고, 상기 편출완금(410)을 지지하는 암타이(420)를 암타이밴드(430)에 의해 전주(10)상에 고정되게 구성함을 특징으로 하는 가공지선 겸용 중성선 설치 멀티캡.
  4. 제 1항에 있어서,
    일정한 길이를 갖는 편출완금(410)과, 상기 편출완금(410)을 지지하는 암타이(420a)를 포함하여 구성하되,
    상기 편출완금(410)이 원형플레이트(200)의 상부면에서 전주(10)의 일측으로 편출되게 체결공(220)(220')에 볼트 고정되고, 상기 편출완금(410)을 지지하는 암타이(420a)를 그 상단이 편출완금(410)의 편출부 후방에서 편출완금(410)에 결합 되고, 하단이 체결브라켓(130)에 결합되게 구성함을 특징으로 하는 가공지선 겸용 중성선 설치 멀티캡.
PCT/KR2011/004027 2010-10-29 2011-06-02 가공지선 겸용 중성선 설치 멀티캡 WO2012057423A1 (ko)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020100106582A KR101077083B1 (ko) 2010-10-29 2010-10-29 가공지선 겸용 중성선 설치 멀티캡
KR10-2010-0106582 2010-10-29

Publications (1)

Publication Number Publication Date
WO2012057423A1 true WO2012057423A1 (ko) 2012-05-03

Family

ID=45033423

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2011/004027 WO2012057423A1 (ko) 2010-10-29 2011-06-02 가공지선 겸용 중성선 설치 멀티캡

Country Status (2)

Country Link
KR (1) KR101077083B1 (ko)
WO (1) WO2012057423A1 (ko)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016519560A (ja) * 2014-03-19 2016-06-30 デウォン エレクトリック カンパニー リミテッドDaewon Electric Co.,Ltd 特別高圧中性線と低圧中性線との分離設置構造を有する架空地線兼用特別高圧中性線を用いた配電線路工法

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102186000B1 (ko) * 2014-06-03 2020-12-07 한국전력공사 직류송전 방식 철탑
CN104242208B (zh) * 2014-09-22 2016-09-28 国家电网公司 一种架空输电线路双回电缆终端钢管杆
KR101618802B1 (ko) * 2015-09-14 2016-05-09 (주)비앤와이이엔지 특고압 전용 가공전선 배전을 위한 절연 배전반
KR102436932B1 (ko) * 2020-06-11 2022-08-29 한국전력공사 2회선용 가공지선 패널 및 이를 구비하는 가공지선 지지대
KR102563360B1 (ko) * 2023-04-28 2023-08-02 김현정 피뢰기능을 갖는 배전선 고정장치

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09322370A (ja) * 1996-05-31 1997-12-12 Kansai Electric Power Co Inc:The ジャンパ吊懸垂装置
KR100495559B1 (ko) * 2004-12-22 2005-06-16 동산엔지니어링 주식회사 전선 케이블용 경완금 연결 장치
KR100585617B1 (ko) * 2006-01-05 2006-06-07 김호광 조류의 인공둥지 구조
KR100725382B1 (ko) * 2003-02-18 2007-06-07 대원전기 주식회사 가공지선 겸용 중성선을 갖는 전주 및 이를 이용한 배전공법
KR100843162B1 (ko) * 2008-02-14 2008-07-02 김정숙 전선케이블 경완금 연결장치
KR100892155B1 (ko) * 2008-10-24 2009-04-10 유한회사 광진이엔지 방향전환이 가능한 배전용 전주 상부지지대

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09322370A (ja) * 1996-05-31 1997-12-12 Kansai Electric Power Co Inc:The ジャンパ吊懸垂装置
KR100725382B1 (ko) * 2003-02-18 2007-06-07 대원전기 주식회사 가공지선 겸용 중성선을 갖는 전주 및 이를 이용한 배전공법
KR100495559B1 (ko) * 2004-12-22 2005-06-16 동산엔지니어링 주식회사 전선 케이블용 경완금 연결 장치
KR100585617B1 (ko) * 2006-01-05 2006-06-07 김호광 조류의 인공둥지 구조
KR100843162B1 (ko) * 2008-02-14 2008-07-02 김정숙 전선케이블 경완금 연결장치
KR100892155B1 (ko) * 2008-10-24 2009-04-10 유한회사 광진이엔지 방향전환이 가능한 배전용 전주 상부지지대

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016519560A (ja) * 2014-03-19 2016-06-30 デウォン エレクトリック カンパニー リミテッドDaewon Electric Co.,Ltd 特別高圧中性線と低圧中性線との分離設置構造を有する架空地線兼用特別高圧中性線を用いた配電線路工法
EP3121920A4 (en) * 2014-03-19 2018-01-17 Daewon Electric Co., Ltd. Method for constructing power distribution line by using combined overhead ground wire and extra high voltage neutral line having separated installation structure for extra high voltage neutral line and low voltage neutral line

Also Published As

Publication number Publication date
KR101077083B1 (ko) 2011-10-26

Similar Documents

Publication Publication Date Title
WO2012057423A1 (ko) 가공지선 겸용 중성선 설치 멀티캡
CN205141183U (zh) 具有验电功能的个人保安线
WO2015141894A1 (ko) 특고압 중성선과 저압 중성선의 분리 설치 구조를 갖는 가공지선 겸용 특고압 중성선을 이용한 배전선로 공법
WO2012015160A1 (ko) 전선이선기구 및 바이패스케이블을 이용한 무정전 배전공법
CN106786290A (zh) 一种预防地线坠落和断线的悬垂装置
CN103474909B (zh) 引流线支撑扩距带电作业更换多回路耐张绝缘子串的方法
CN208078525U (zh) 用于配网带电作业立杆的三相导线撑开绝缘架
CN207988628U (zh) 一种大跨越地形便于电缆上下塔用的10kV宽基塔设备
CN109449867A (zh) ±1100kv直流线路耐张塔避雷器装置及拆装方法
CN108390311A (zh) 一种输电线路杆塔的v型绝缘子串带电更换方法
CN107237352A (zh) 一种带防护线缆罩的装配式预制管廊
RU184101U1 (ru) Пункт комплектный переходный опорный кабельно-воздушный (ПКПО-КВ)
CN108360907B (zh) 一种10kV线路双电源手拉手联络结构及其安装和使用方法
KR200446267Y1 (ko) 전선케이블 연결을 위한 경완금 연결장치
KR101238683B1 (ko) 밴드형 클램프와 탄력바 구조를 갖는 슬림형 가공중성지선 멀티캡
KR20100036065A (ko) 활선상태에서 배전선로의 교체시공방법
WO2014021482A1 (ko) 가공지선과 특고압 중성선을 겸용하는 가공중성지선 배전선로 내 통신망 구축을 위한 광섬유복합중성선을 갖는 배전선로
CN109473936B (zh) 一种终端杆上保护地线的安装结构及安装方法
KR20130014732A (ko) 가공지선과 특고압 중성선을 겸용하는 가공중성지선 배전선로 내 통신망 구축을 위한 광섬유복합중성선을 갖는 배전선로
CN206205553U (zh) 一种柱上新型断路器开关支架
KR101100796B1 (ko) 현수 철탑용 멀티 클램프
WO2022145765A1 (ko) 개선된 구조의 송전탑
KR101206495B1 (ko) 철탑 교체용 연결 지지 장치
KR101205711B1 (ko) 고정 클램프와 플랜지 형태의 연결구조를 갖는 배전선로의 가공중선지선 설치용 멀티캡
KR20020013090A (ko) 단완철 밴드

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11836515

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 11836515

Country of ref document: EP

Kind code of ref document: A1