WO2012017314A3 - Closed trench tunnels - Google Patents
Closed trench tunnels Download PDFInfo
- Publication number
- WO2012017314A3 WO2012017314A3 PCT/IB2011/001960 IB2011001960W WO2012017314A3 WO 2012017314 A3 WO2012017314 A3 WO 2012017314A3 IB 2011001960 W IB2011001960 W IB 2011001960W WO 2012017314 A3 WO2012017314 A3 WO 2012017314A3
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- segments
- suspended
- machine
- tunnel
- bridge
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
This invention relates to a machine and system for constructing closed trench tunnels without holding up traffic, which comprises a pre-fabricated steel arched bridge structure over which the vehicles travel. A roadheader machine or mining cutter head, or any other system, is suspended from the structure, and excavates the area to be constructed, while a collecting shovel, also suspended from the structure, removes the earth excavated by the roadheader and deposits it in armoured vehicles towed by trucks that are inside the tunnel already constructed. Once a certain area has been excavated, pre-fabricated concrete segments, that will give the closed trench tunnel its shape, are installed or assembled, with a combination of three different types of segments (side, floor and roof), which are transported on low beds or slabs towed by trucks that pass through the tunnel. Said segments are hooked and lifted by a crane installed suspended from the structure of the bridge. Once the segments have been assembled and secured using bolts or any other method, forming a new stretch or section, the machine (bridge) advances to a new stretch using wheels that raise it and rotate it in any direction hydraulically and place it in the required location to construct the new stretch or section.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011800379258A CN103154434A (en) | 2010-08-02 | 2011-08-02 | Closed trench tunnels |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CO10-093917 | 2010-08-02 | ||
CO10093917A CO6380010A1 (en) | 2010-08-02 | 2010-08-02 | MACHINE AND SYSTEM FOR THE CONSTRUCTION OF CLOSED TUNNEL TUNNELS WITHOUT STOPPING VEHICLE TRAFFIC |
OA10093917 | 2011-08-02 |
Publications (3)
Publication Number | Publication Date |
---|---|
WO2012017314A2 WO2012017314A2 (en) | 2012-02-09 |
WO2012017314A3 true WO2012017314A3 (en) | 2012-07-19 |
WO2012017314A4 WO2012017314A4 (en) | 2012-09-07 |
Family
ID=45559873
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/IB2011/001960 WO2012017314A2 (en) | 2010-08-02 | 2011-08-02 | Closed trench tunnels |
Country Status (3)
Country | Link |
---|---|
CN (1) | CN103154434A (en) |
CO (2) | CO6380010A1 (en) |
WO (1) | WO2012017314A2 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB201301318D0 (en) * | 2013-01-25 | 2013-03-06 | Thomson James C | Method and apparatus for forming tunnels and tunnels formed thereby |
JP7266774B2 (en) * | 2020-04-28 | 2023-05-01 | 国立研究開発法人土木研究所 | Reconstruction method of existing road tunnel lining and equipment used therefor |
DE102021128896A1 (en) | 2021-11-05 | 2023-05-11 | ecoro GmbH | Supporting element and traffic structure |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3442088A (en) * | 1966-02-28 | 1969-05-06 | Bernard Borisof | Method and machine for building tunnels |
WO1999019603A1 (en) * | 1997-10-09 | 1999-04-22 | James Crawford Thomson | Arched support structure |
JP2004092092A (en) * | 2002-08-30 | 2004-03-25 | Public Works Research Institute | Transport facility integral with protector for tunnel widening construction work |
WO2006134408A2 (en) * | 2005-06-13 | 2006-12-21 | Robert Planinc | Assembly system for prefabricated secondary tunnel lining |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2533265Y (en) * | 2002-02-10 | 2003-01-29 | 中铁五局(集团)有限公司技术开发部 | Tunnel inverted arch operation bridge |
CN101251014A (en) * | 2008-04-14 | 2008-08-27 | 中铁隧道集团有限公司 | Method for wholly mining tunnel invert foundation separating segment and placing concrete as well as inverted arch trestle device |
CN101338677A (en) * | 2008-08-08 | 2009-01-07 | 上海市隧道工程轨道交通设计研究院 | Synchronous construction method for shield method tunnel |
CN201354518Y (en) * | 2008-12-26 | 2009-12-02 | 中铁隧道股份有限公司 | Walking trestle bridge |
CN201363154Y (en) * | 2009-03-03 | 2009-12-16 | 中国水利水电第七工程局有限公司 | Mobile trestle bridge |
CN101560881B (en) * | 2009-05-15 | 2011-06-22 | 中铁第四勘察设计院集团有限公司 | Double-layer shield tunnel |
CN201428460Y (en) * | 2009-06-22 | 2010-03-24 | 中国水利水电第七工程局有限公司 | Multifunctional assembled hydraulically-driven moving trestle |
CN101598025B (en) * | 2009-06-22 | 2011-04-20 | 中国水利水电第七工程局有限公司 | Multifunctional fabricated hydraulic drive moveable trestle |
-
2010
- 2010-08-02 CO CO10093917A patent/CO6380010A1/en not_active Application Discontinuation
-
2011
- 2011-08-02 WO PCT/IB2011/001960 patent/WO2012017314A2/en active Application Filing
- 2011-08-02 CN CN2011800379258A patent/CN103154434A/en active Pending
-
2013
- 2013-02-22 CO CO13036769A patent/CO6680657A2/en unknown
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3442088A (en) * | 1966-02-28 | 1969-05-06 | Bernard Borisof | Method and machine for building tunnels |
WO1999019603A1 (en) * | 1997-10-09 | 1999-04-22 | James Crawford Thomson | Arched support structure |
JP2004092092A (en) * | 2002-08-30 | 2004-03-25 | Public Works Research Institute | Transport facility integral with protector for tunnel widening construction work |
WO2006134408A2 (en) * | 2005-06-13 | 2006-12-21 | Robert Planinc | Assembly system for prefabricated secondary tunnel lining |
Non-Patent Citations (2)
Title |
---|
DATABASE WPI Derwent World Patents Index; AN 1999-277701 * |
DATABASE WPI Derwent World Patents Index; AN 2004-253976 * |
Also Published As
Publication number | Publication date |
---|---|
WO2012017314A2 (en) | 2012-02-09 |
CO6680657A2 (en) | 2013-05-31 |
WO2012017314A4 (en) | 2012-09-07 |
CO6380010A1 (en) | 2012-02-15 |
CN103154434A (en) | 2013-06-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108194102B (en) | The dismounting of limit section and safe stress check calculation construction method are invaded in Tunnel deformation | |
CN204253054U (en) | Mountain tunnel stake arch cap excavation method comprehensive support structure | |
CN109989767A (en) | The ruggedized construction and construction method of existing railway are worn under Large span tunnel | |
CN104563158B (en) | Existing subway station realizes the construction method of transfer with new subway station platform layer | |
CN102748040A (en) | Main structure for metro long-span station and pillar arching construction method thereof | |
CN104453944A (en) | Coal-pillar-impacting-preventing roadway protecting method | |
JP2020084474A (en) | Widening construction method of existing tunnel | |
CN105134212B (en) | A kind of method that three soft high seam tunnel ensures the rate of extraction along top driving longwall top coal caving | |
WO2012017314A3 (en) | Closed trench tunnels | |
CN203700978U (en) | Box culvert pilot tubal curtain device | |
CN204716248U (en) | Tunnel Heng Dong enters main hole and to caunch structure | |
JP6944882B2 (en) | How to build an invert in an existing tunnel | |
CN108798705A (en) | First branch precast framework module, system and the construction method of TBM constructions | |
CN108755697A (en) | Long and narrow deep foundation pit earthwork digging method under a kind of rainy weather | |
CN208518675U (en) | The first branch precast framework module and system of TBM construction | |
JP6529378B2 (en) | Invert construction method, tunnel construction method and Teruha crane for tunnel | |
CA2912264A1 (en) | Mining site having a shallow angle extraction shaft, shallow angle mining method and method for constructing a penstock | |
CN102108679A (en) | Combined framework steel structure of jacked subway bridge and method for jacking subway bridge | |
JP3864377B2 (en) | Existing tunnel widening method | |
KR20020024912A (en) | Method of construct a tunnel | |
CN202012045U (en) | Combined steel frame structure for jacking in underpass bridge | |
CN204163734U (en) | Highway tunnel structure | |
CN104405412B (en) | Metro built by mining method adit construction component | |
JP7019360B2 (en) | Freezing method | |
CN108979641B (en) | Construction method for underground structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WWE | Wipo information: entry into national phase |
Ref document number: 201180037925.8 Country of ref document: CN |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 13036769 Country of ref document: CO |
|
122 | Ep: pct application non-entry in european phase |