WO2011135657A1 - 系統連系形インバータ - Google Patents

系統連系形インバータ Download PDF

Info

Publication number
WO2011135657A1
WO2011135657A1 PCT/JP2010/057386 JP2010057386W WO2011135657A1 WO 2011135657 A1 WO2011135657 A1 WO 2011135657A1 JP 2010057386 W JP2010057386 W JP 2010057386W WO 2011135657 A1 WO2011135657 A1 WO 2011135657A1
Authority
WO
WIPO (PCT)
Prior art keywords
solar cell
power
output
voltage
operating point
Prior art date
Application number
PCT/JP2010/057386
Other languages
English (en)
French (fr)
Inventor
一平 竹内
西尾 直樹
中林 弘一
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to JP2012512563A priority Critical patent/JP5349687B2/ja
Priority to EP10850676A priority patent/EP2566031A1/en
Priority to PCT/JP2010/057386 priority patent/WO2011135657A1/ja
Publication of WO2011135657A1 publication Critical patent/WO2011135657A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M7/00Conversion of ac power input into dc power output; Conversion of dc power input into ac power output
    • H02M7/42Conversion of dc power input into ac power output without possibility of reversal
    • H02M7/44Conversion of dc power input into ac power output without possibility of reversal by static converters
    • H02M7/48Conversion of dc power input into ac power output without possibility of reversal by static converters using discharge tubes with control electrode or semiconductor devices with control electrode
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M1/00Details of apparatus for conversion
    • H02M1/36Means for starting or stopping converters
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M1/00Details of apparatus for conversion
    • H02M1/0067Converter structures employing plural converter units, other than for parallel operation of the units on a single load
    • H02M1/007Plural converter units in cascade
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers

Definitions

  • the present invention relates to a grid-connected inverter used in a solar power generation system.
  • a grid-connected inverter used in a photovoltaic power generation system includes a converter that converts DC power generated by a solar battery including a plurality of solar battery modules into DC power that is a desired DC voltage, and output power of the converter. And an output relay that opens and closes a connection path between the output terminal of the inverter circuit and the commercial power system.
  • the output relay is closed and the grid-connected inverter is started. Conversely, the generated power is not required for grid connection. In this case, the generated power is insufficient, and the start-up control is performed to open the output relay and place the grid-connected inverter in a standby state.
  • Patent Document 1 proposes a method capable of accurately determining the start of a grid-connected inverter. Below, the conventional starting determination procedure shown by patent document 1 is shown.
  • the converter circuit When the output voltage of the solar cell exceeds a predetermined value, the converter circuit is started to operate with the inverter circuit stopped, and the input voltage of the inverter circuit is reduced within a predetermined time after the converter starts operating. Monitor whether the capacitor to be formed is fully charged. When charging of the capacitor is completed within a predetermined time, the power charged in the capacitor is calculated from the change in the charging voltage of the capacitor within the required time to complete and the required time, and the solar power is calculated from the calculated charging power. Estimate the maximum power point of the battery.
  • the estimation of the maximum power point is performed by utilizing the fact that the maximum power point of the solar cell is present at about 80% of the no-load voltage of the solar cell. That is, since the characteristics of the solar cell are constant, the maximum power point of the solar cell is calculated from the calculated charging power by obtaining the ratio of the output voltage of the solar cell when the power is calculated to the maximum power point voltage. Estimated.
  • the procedure (1) is executed again after waiting for a predetermined time.
  • the conventional technique has the following problems. First, since the generated current is small when the amount of solar radiation in the morning and evening is small, the charging current to the capacitor is small, and charging takes time. Therefore, in the method of calculating the power charged in the capacitor from the change in the charging voltage of the capacitor and the required time, it takes time to calculate the power when the amount of solar radiation is small, and it takes time to determine whether or not to start.
  • the grid-connected inverter inevitably repeats startup and standby as described above.
  • the electric power charged in the capacitor is calculated from the charge voltage change and the required time from a certain charge voltage. It will be calculated. Since the charging is completed early, the power calculation accuracy is low. Therefore, in the method of calculating the power by the change in the charging voltage of the capacitor, when starting the start determination, if the charge voltage is higher than the predetermined value, the start determination is made until the charge voltage becomes equal to or lower than the predetermined value. It is necessary to wait, and the waiting time until the start determination is started becomes longer.
  • the predetermined value (starting power) used to determine whether or not to start can be estimated by taking an estimation error into a margin.
  • the minimum value of the predetermined value (startup power) used to determine whether or not to start can not be set to a value that correctly reflects the power required for grid connection, so the grid-connected inverter frequently starts and waits.
  • the determination accuracy is insufficient.
  • the present invention has been made in view of the above, and in a photovoltaic power generation system, the standby time until start of start determination is short, and it is possible to determine whether or not start is possible in a short time without being affected by the amount of solar radiation.
  • the purpose is to obtain a grid-connected inverter that can be used.
  • the present invention includes a step-down converter that steps down a DC voltage output from a solar cell to a desired DC voltage, a capacitor that smoothes the output voltage of the step-down converter, and an input
  • a grid-connected inverter comprising an inverter circuit that converts a charging voltage of the capacitor that is a DC voltage into an AC voltage, and an output relay that opens and closes a connection path between the output terminal of the inverter circuit and a commercial power system,
  • a power detector for detecting output voltage and output current of the solar cell to obtain output power; a charge voltage detector for detecting a charge voltage of the capacitor; and shutting down the inverter circuit to open the output relay.
  • the pre-interconnection converter control means for controlling the time width for turning on the switch element of the step-down converter so that the solar cell outputs predetermined power, and the pre-interconnection converter control means turns on the switch element.
  • a stable operating point search unit that performs stability determination of the operating point of the solar cell in a period and repeatedly controls the on-time width of the switch element by the pre-interconnection converter control unit until the operating point is stabilized;
  • the judgment power is compared with the solar cell output power obtained by the power detection means when the stable operating point search means detects a stable operating point, and when the solar battery output power is at least equal to the judgment power, the commercial power It is characterized by comprising a connection availability determination means for outputting an instruction to start connection with the power system.
  • the grid-connected inverter directly detects the output power of the solar cell from the charging voltage of the capacitor, and changes the gate pulse width that defines the on-time width of the switch element of the converter. Then, the stable operating point of the solar cell is found, and the startability determination is performed using the solar cell output power when the operating point is stabilized. Therefore, the standby time until the start determination is started is shortened, and there is an effect that the start determination can be performed with high accuracy in a short time even with low solar radiation without being affected by the amount of solar radiation.
  • FIG. 1 is a system configuration diagram of a photovoltaic power generation system including a grid-connected inverter according to Embodiment 1 of the present invention.
  • FIG. 2 is a flowchart for explaining a control procedure for starting the grid-connected inverter shown in FIG.
  • FIG. 3 is a diagram for explaining the relationship between the operating point of the solar cell and the generated power.
  • FIG. 4 is a system configuration diagram of a photovoltaic power generation system including a grid-connected inverter according to Embodiment 2 of the present invention.
  • FIG. 5 is a flowchart illustrating a control procedure for starting the grid-connected inverter shown in FIG.
  • FIG. 6 is a system diagram showing a photovoltaic power generation system including a grid-connected inverter according to Embodiment 3 of the present invention.
  • FIG. 1 is a system configuration diagram of a photovoltaic power generation system including a grid-connected inverter according to Embodiment 1 of the present invention.
  • a photovoltaic power generation system 1 a is configured by a solar cell 2 and a grid-connected inverter 3 a according to the first embodiment.
  • the solar cell 2 is composed of a plurality of solar cell modules, and generates DC power according to the amount of solar radiation.
  • the grid-connected inverter 3a is connected to the positive input terminal 4 and the negative input terminal 5 to which the positive electrode output terminal and the negative electrode output terminal of the solar battery 2 are connected, respectively, and two lines of the commercial power system (distribution system) 6 respectively.
  • System output terminals 7 and 8 are provided.
  • the grid-connected inverter 3a is a grid-connected inverter that uses a step-down converter, and has a configuration for performing start-up control as to whether or not the commercial power system 6 is linked.
  • a grid-connected inverter using a step-down converter includes a smoothing capacitor 9, a step-down converter 10, a smoothing capacitor 11, an inverter circuit 12, and the like from the positive input terminal 4 and the negative input terminal 5 toward the system output terminals 7 and 8.
  • the output relay 13 is arranged in this order.
  • the step-down converter 10 includes a switch element 21 having a diode connected in antiparallel, a diode 22, and a reactor 23.
  • IGBT is used for the switch element 21 in FIG.
  • the collector terminal of the switch element 21 is an input terminal of the step-down converter 10 and is connected to the positive input terminal 4.
  • the emitter terminal of the switch element 21 is connected to the cathode terminal of the diode 22 and one end of the reactor 23.
  • the anode terminal of the diode 22 is connected to a connection line between the negative input terminal 5 and the negative input terminal of the inverter circuit 12.
  • the other end of the reactor 23 is an output terminal of the step-down converter 10 and is connected to a positive input terminal of the inverter circuit 12.
  • a gate pulse signal generated by the gate pulse generator 20a based on the gate pulse width input from the gate pulse calculator 19a is applied to the gate terminal of the switch element 21 until the system is connected to the system.
  • the smoothing capacitor 9 includes a connection line between the positive input terminal 4 and the collector terminal of the switch element 21 between the positive input terminal 4 and the step-down converter 10, a negative input terminal 5, and a negative input end of the inverter circuit 12. It is connected between the connection lines and smoothes the DC voltage input from the solar cell 2 to the step-down converter 10.
  • the smoothing capacitor 11 includes a connection line between the other end of the reactor 23 and the positive input terminal of the inverter circuit 12, a negative input terminal 5, and a negative input terminal of the inverter circuit 12 between the step-down converter 10 and the inverter circuit 12. And the output voltage of the step-down converter 10 is smoothed to form a DC input voltage of the inverter circuit 12.
  • the inverter circuit 12 is in a stopped (standby) state without performing a conversion operation until the startup power determination unit 18 outputs a connection start instruction.
  • the starting power determination unit 18 outputs an interconnection start instruction, an operation for converting the charging voltage of the smoothing capacitor 11 into an AC voltage is started.
  • the AC output terminal of the inverter circuit 12 is connected to the system output terminals 7 and 8 via the output relay 13.
  • the output relay 13 is controlled to be in an open circuit state until the starting power determination unit 18 outputs an interconnection start instruction, and when the activation power determination unit 18 outputs an interconnection start instruction, the output relay 13 is controlled to be in a closed state and is connected to the inverter circuit 12. Are connected to the commercial power system 6.
  • a current detector 14, voltage detectors 15 and 16, and a power calculator 17 are provided.
  • a starting power determination unit 18, a gate pulse calculator 19a, and a gate pulse generator 20a are provided.
  • the current detector 14, the voltage detector 15, and the power calculator 17 constitute a power detection unit as a whole.
  • the gate pulse calculator 19a and the gate pulse generator 20a constitute the pre-interconnection converter control means as a whole.
  • the starting power determination unit 18 constitutes a stable operating point search unit and a linkage availability determination unit.
  • the voltage detector 16 constitutes a charging voltage detector.
  • the voltage detector 15 is connected between the positive input terminal 4 and the step-down converter 10 with one detection terminal connected to a connection line between the positive input terminal 4 and the collector terminal of the switch element 21, and the other detection terminal is a negative input. Connected to the connection line between the terminal 5 and the negative input terminal of the inverter circuit 12, the output voltage of the solar cell 2 is detected. The output voltage of the solar cell 2 detected by the voltage detector 15 is input to the power calculator 17.
  • the detection end of the current detector 14 is connected to, for example, a connection line between the negative input terminal 5 and the negative input end of the inverter circuit 12 between the negative input terminal 5 and the step-down converter 10.
  • the output current of the solar cell 2 detected by the current detector 14 is input to the power calculator 17.
  • the power calculator 17 multiplies the output voltage of the solar cell 2 detected by the voltage detector 15 and the output current of the solar cell 2 detected by the current detector 14 to obtain the output power of the solar cell 2, and the starting power The result is output to the determination unit 18.
  • the voltage detector 16 has one detection end connected to a connection line between the positive end of the smoothing capacitor 11 and the positive input end of the inverter circuit 12, and the other detection end connected to the negative end of the smoothing capacitor 11 and the inverter circuit 12.
  • the charging voltage of the smoothing capacitor 11 that is a DC input voltage of the inverter circuit 12 is detected.
  • the charging voltage of the smoothing capacitor 11 detected by the voltage detector 16 (hereinafter simply referred to as “capacitor charging voltage”) is input to the gate pulse calculator 19a.
  • the gate pulse calculator 19a has a gate pulse width which is a time width for turning on the switch element 21 necessary for outputting predetermined power from the solar cell 2 in the activation determination period for determining whether or not to connect to the grid. Calculation is performed based on the solar cell output voltage detected by the voltage detector 15 and the capacitor charging voltage detected by the voltage detector 16, and the result is output to the gate pulse generator 20a.
  • the gate pulse calculator 19a repeatedly calculates the gate pulse width until a notification that the operating point is stabilized is input from the activation power determination unit 18.
  • the gate pulse generator 20a generates a gate pulse signal that turns on the switch element 21 based on the designated gate pulse width.
  • the gate pulse calculator 19a calculates the gate pulse width as follows. In the start-up determination period for determining whether to connect to the grid, the amount of power generated by the solar cell 2 is determined while the inverter circuit 12 is stopped. Therefore, the step-down operation of the step-down converter 9 is a problem. Absent. Therefore, the switching frequency f of the step-down converter 9 may be constant or variable, but is assumed to be a constant value here for convenience of explanation.
  • the load current (charging current) flowing through the reactor 23 during the period when the switch element 21 is on reflects the amount of power generated by the solar cell 2. Since the inductance L of the reactor 23 is a fixed value, if the charging power P [W] of the smoothing capacitor 11 is designated as a predetermined value, the power P [W] is charged from the solar cell 2 to the smoothing capacitor 11.
  • the required gate pulse width D of the switch element 21 is determined by the output voltage Vs of the solar cell 2 detected by the voltage detector 15 and the capacitor charging voltage Vs2 detected by the voltage detector 16.
  • the load current I L flowing through the reactor 23 when brought into the ON operation of the switching element 21 at the gate pulse width D is represented by formula (1).
  • I L (Vs ⁇ Vc2) * D / L / f (1)
  • P L * I L 2 * f / 2 (2)
  • the charging power P [W] from the solar cell 2 to the smoothing capacitor 11 is the same value as the output power of the solar cell 2.
  • the charging power (that is, the input power of the inverter circuit 12) P [W] in the equation (3) is determined as follows. Since the grid-connected inverter 3a is operated with the power generated by the solar cell 2, the charging power P [W] in the equation (3) can be stably operated by the grid-connected inverter 3a.
  • the minimum required solar cell output power is set. Let the minimum value be Pok [W].
  • the minimum value Pok [W] is, for example, 40 W for convenience of explanation.
  • the activation power determination unit 18 is provided with a stability determination unit at the input stage and an activation determination unit at the output stage.
  • the stability determination unit performs the stability determination of the operating point of the solar cell 2 during the period when the switch element 21 is on with the gate pulse width calculated by the gate pulse calculator 19a. Or (2) based on the time for repeatedly controlling the gate pulse width.
  • the stability determination unit notifies the gate pulse calculator 19a of the result of the stability determination.
  • the gate pulse calculator 19a determines whether to repeat or stop the gate pulse width calculation according to the content of the stability determination result.
  • (1) Stability determination method based on the output power of the solar cell 2 When the output power of the solar battery 2 is 40 W or more, the output power is stabilized at an operating point where the power becomes 40 W. Therefore, whether or not the change width of the solar battery output power input from the power calculator 17 is within a specified range. Depending on what you do. In addition, when the output power of the solar cell 2 is less than 40 W, there is no operating point at which the output power becomes 40 W. Therefore, the gate pulse width continues to increase, the solar cell 2 enters a short circuit state, and the output power of the solar cell 2 becomes zero. . In spite of driving the switch element 21 with the calculated gate pulse width, when the generated power of the solar cell 2 becomes zero, it is determined that the operating point is stable.
  • the stability determination can be performed by the time for repeatedly controlling the gate pulse width.
  • the set time can be set to a sufficiently long time, but when the output power of the solar cell 2 is 40 W or more, it may be set longer than the time until it stabilizes to 40 W.
  • the output power of the solar cell 2 Is less than 40 W, the output power of the solar cell 2 does not exceed 40 W within the set time, so it is not necessary to set the time until the output power of the solar cell 2 becomes 0 W.
  • the activation determination unit determines that the solar cell output power input from the power calculator 17 is the determination power (predetermined power). It is determined whether or not the power that can be started is exceeded, and if at least the solar cell output power is equal to the determination power, an instruction to start grid interconnection is output to a control unit (not shown) of the grid interconnection inverter 3a.
  • the output error is based on the expectation that the solar battery 2 may not be able to output the minimum power of 40W.
  • FIG. 2 is a flowchart for explaining a control procedure for starting the grid-connected inverter shown in FIG.
  • FIG. 3 is a diagram for explaining the relationship between the operating point of the solar cell and the generated power.
  • 3 (1) shows a case where the power generation amount of the solar cell is sufficient
  • FIG. 3 (2) shows a case where the power generation amount of the solar cell is not sufficient.
  • the horizontal axis represents the solar cell output voltage V
  • the vertical axis represents the solar cell output power P.
  • “step” indicating the processing procedure is simply abbreviated as “ST”.
  • the gate pulse calculator 19 a reads the output voltage of the solar cell 2 detected by the voltage detector 15 and the charging voltage of the smoothing capacitor 11 detected by the voltage detector 16 (ST 1), Applying 3), the gate pulse width D is calculated (ST2).
  • the gate pulse generator 20a When the gate pulse width D is input from the gate pulse calculator 19a, the gate pulse generator 20a generates a gate pulse signal that turns on the switch element 21 within the period of the gate pulse width D, and drives the step-down converter 10. (ST3).
  • the starting power determination unit 18 operates according to whether the change width of the solar cell output power input from the power calculator 17 is within a predetermined range or whether the generated power of the solar cell is 0 W. Is determined (ST4).
  • the starting power determination unit 18 determines that the operating point is not stable when the change width of the solar cell output power is not within the predetermined range (ST4: No), and calculates the gate pulse to that effect. Notify the container 19a.
  • the processing operations of ST1 to ST4 are executed again. That is, the gate pulse calculator 19a calculates a next gate pulse width D in response to the notification that the operating point is not stable from the starting power determination unit 18.
  • the charging power P in the equation (3) is a constant value of 40 W, but since the solar cell output voltage Vs and the capacitor charging voltage Vc2 change, the next gate pulse width D changes. . Therefore, the operating point of the solar cell 2 changes as shown in FIG.
  • the starting power determination unit 18 determines that the operating point of the solar cell 2 is stable in ST4 in the repetition process of ST1 to ST4 (ST4: Yes)
  • the operating point is stable in the gate pulse calculator 19a.
  • the gate pulse calculator 19a receives the notification that the operating point is stabilized from the starting power determination unit 18 and stops the calculation operation.
  • the startup power determination unit 18 determines that the startup is OK (ST7), and starts grid interconnection.
  • the instruction is output to a control unit (not shown) (ST7), and this procedure is terminated.
  • a control unit instructs the gate pulse generator 20a to switch to the operation at the time of system interconnection, causes the inverter circuit 12 to start the conversion operation, and causes the output relay 13 to Close the circuit.
  • the output terminal of the inverter circuit 12 is connected to the system output terminals 7 and 8, and power supply to the commercial power system 6 is started.
  • the gate pulse generator 20a applies a gate pulse signal with a switching frequency and a duty for the step-down operation to the switch element 21. Further, the gate pulse generator 20a applies a gate pulse signal that always turns on the switch element 21 when the step-down converter 10 performs a bypass operation.
  • the starting power determination unit 18 determines that the generated power is insufficient (ST8), and waits for a predetermined time before the gate pulse.
  • An arithmetic operation start instruction is output to the arithmetic unit 19a (ST9). That is, the processes after ST1 are executed again.
  • operating points a and d are operating points in a stopped state in which the switching element 21 of the step-down converter 10 is off.
  • the output voltage of the solar cell 2 detected by the voltage detector 15 at this time is the no-load voltage of the solar cell 2.
  • the output power of the solar cell 2 is zero.
  • the detection voltage of the voltage detector 16 is zero if the previous charging voltage does not remain in the smoothing capacitor 11.
  • the gate pulse calculator 19a calculates the gate pulse width D, and the switch element 21 of the step-down converter 10 starts to be turned on during the period of the gate pulse width D.
  • the charging current to the smoothing capacitor 11 that is a load current flows and the output voltage of the solar cell 2 decreases from the no-load voltage, the operating point of the solar cell 2 transitions to the operating points b and e.
  • the gate pulse calculator 19a calculates the gate pulse width D again, and the switch element 21 of the step-down converter 10 has the new gate pulse width D. Start to turn on during the period. If it does so, the operating point of the solar cell 2 will change to the next operating point, and stability determination will be performed. The above operation is repeated until the operating point of the solar cell 2 transitions to a stable operating point (the operating points c and f at the time of determination).
  • the operating points b and e are examples of the operating point being determined.
  • the solar cell output power at the stable operating point c is equal to the determination power 40- ⁇ , and therefore it is determined that the start is OK.
  • the solar cell output power at the operating point f determined to be stable in FIG. 3B in which the power generation amount is equal to or less than the minimum value Pok (40 W) is 0 W, and does not reach the determination power 40- ⁇ . Therefore, it is determined that the generated power is insufficient.
  • the output power of the solar cell is not calculated from the charging voltage of the capacitor, but directly detected, and the gate pulse width that defines the on-time width of the switch element of the step-down converter is determined. Since the operating point of a stable solar cell is found by changing the output power when the operating point is stable, it is determined whether or not it can be started. In addition, the activation determination can be performed with high accuracy in a short time even with low solar radiation.
  • FIG. FIG. 4 is a system configuration diagram of a photovoltaic power generation system including a grid-connected inverter according to Embodiment 2 of the present invention.
  • the same or similar components as those shown in FIG. 1 are denoted by the same reference numerals.
  • the description will be focused on the portion related to the second embodiment.
  • the grid-connected inverter 3b according to the second embodiment has a boost converter 25 in place of the step-down converter 10 in the configuration shown in FIG. 1 (first embodiment), and a gate pulse calculator 19a. Instead of this, a gate pulse calculator 19b is provided, and the voltage detector 16 is omitted.
  • Other configurations are the same as those in FIG.
  • the step-up converter 25 includes a reactor 23, a switch element 27 having a diode connected in reverse parallel, and a diode 28 for preventing a backflow.
  • a switch element 27 As the switch element 27, an NMOS transistor is used in FIG. 4, but an IGBT may be used.
  • One end of the reactor 23 is an input terminal of the boost converter 25 and is connected to the positive input terminal 4.
  • the other end of the reactor 23 is connected to the drain terminal of the switch element 27 and the anode terminal of the diode 28.
  • the cathode terminal of the diode 28 is an output terminal of the boost converter 25 and is connected to the positive input terminal of the inverter circuit 12.
  • a source terminal of the switch element 27 is connected to a connection line between the negative input terminal 5 and the negative input terminal of the inverter circuit 12.
  • the switching frequency f of the boost converter 25 may be constant or variable during the activation determination period that determines whether or not to connect to the grid. However, it is assumed here that it is a constant value for convenience of explanation.
  • step-up converter 25 a charging current that charges smoothing capacitor 11 with desired power flows to reactor 23 during a period when switch element 27 is on.
  • the gate pulse calculator 19b has a gate pulse width that is a time width for turning on the switch element 27 necessary for outputting predetermined power from the solar cell 2 in the activation determination period for determining whether or not to connect to the grid. Is calculated based on the solar cell output voltage detected by the voltage detector 15, and is output to the gate pulse generator 20a.
  • the gate pulse calculator 19b repeatedly calculates the gate pulse width until a notification that the operating point is stabilized is input from the activation power determination unit 18.
  • the gate pulse generator 20a generates a gate pulse signal for turning on the switch element 27 based on the designated gate pulse width.
  • the gate pulse calculator 19a calculates the gate pulse width as follows. Since the inductance L of the reactor 23 is a fixed value, if the charging power P [W] of the smoothing capacitor 11 is designated as a predetermined value, the power P [W] is charged from the solar cell 2 to the smoothing capacitor 11.
  • the necessary gate pulse width D of the switch element 27 is determined by the output voltage Vs of the solar cell 2 detected by the voltage detector 15.
  • the load current I L flowing through the reactor 23 when brought into the ON operation of the switching element 27 at the gate pulse width D is represented by formula (4).
  • I L Vs * D / L / f (4)
  • P L * I L 2 * f / 2 (5)
  • the charging power P [W] from the solar cell 2 to the smoothing capacitor 11 is the same value as the output power of the solar cell 2.
  • the charging power (that is, the input power of the inverter circuit 12) P [W] in the equation (6) is necessary so that the grid-connected inverter 3b can be stably operated as in the first embodiment.
  • the minimum value Pok [W] of the solar cell output power is set.
  • the determination power possessed by the activation power determination unit 18 is Pok- ⁇ .
  • FIG. 5 is a flowchart for explaining a control procedure for starting the grid-connected inverter shown in FIG.
  • ST1 to ST3 in FIG. 2 are ST11 to ST13. Others are the same as in FIG.
  • the gate pulse calculator 19b reads the output voltage of the solar cell 2 detected by the voltage detector 15 (ST11) and applies it to the equation (6) to calculate the gate pulse width D (ST12). .
  • the gate pulse generator 20a When the gate pulse width D is input from the gate pulse calculator 19b, the gate pulse generator 20a generates a gate pulse signal that turns on the switch element 27 within the period of the gate pulse width D, and drives the boost converter 25. (ST13).
  • the charging current I L flows represented by the formula (4) in the reactor 23, the charging electric power P of the determination target indicated by the formula (5) is detected by the power calculator 17, the input to the starting power determination unit 18 Is done.
  • the starting power determination unit 18 operates according to whether the change width of the solar cell output power input from the power calculator 17 is within a predetermined range or whether the generated power of the solar cell is 0 W. Is determined (ST4). Thereafter, the same processing as in the first embodiment is performed.
  • the gate pulse generator 20a switches to an operation for generating a gate pulse signal for causing the boost converter 25 to perform a boost operation and a bypass operation.
  • a gate pulse signal having a switching frequency and a duty for the boosting operation is applied to the switch element 27.
  • a gate pulse signal that always turns off is applied to the switch element 27.
  • the converter is a boost converter
  • the same operation and effect as in the first embodiment can be obtained.
  • FIG. 6 is a system diagram showing a photovoltaic power generation system including a grid-connected inverter according to Embodiment 3 of the present invention.
  • the same or similar components as those shown in FIG. 4 (Embodiment 2) are denoted by the same reference numerals.
  • the description will be focused on the portion related to the third embodiment.
  • the grid-connected inverter 3c according to the third embodiment is provided with a step-up / down converter 30 in place of the boost converter 25 in the configuration shown in FIG. 4 (second embodiment), and a gate pulse generator A gate pulse generator 20b is provided in place of 20a.
  • Other configurations are the same as those in FIG.
  • the step-up / step-down converter 30 includes switch elements 21 and 27, a reactor 23, and diodes 22 and 28 in which diodes are connected in antiparallel.
  • Switch element 21, reactor 23 and diode 22 constitute a step-down circuit
  • reactor 23, switch element 27 and diode 28 constitute a step-up circuit.
  • the collector terminal of the switch element 21 is an input terminal of the buck-boost converter 30 and is connected to the positive input terminal 4.
  • the emitter terminal of the switch element 21 is connected to the cathode terminal of the diode 23 and one end of the reactor 23.
  • the anode terminal of the diode 23 is connected to a connection line between the negative input terminal 5 and the negative input terminal of the inverter circuit 12.
  • the other end of the reactor 23 is connected to the drain terminal of the switch element 27 and the anode terminal of the diode 28, and the source terminal of the switch element 27 is connected to a connection line between the negative input terminal 5 and the negative input end of the inverter circuit 12. ing.
  • the cathode terminal of the diode 28 is an output terminal of the buck-boost converter 30 and is connected to the positive input terminal of the inverter circuit 12.
  • the two switch elements 21 and 27 of the buck-boost converter 30 are identical to each other from the gate pulse generator 20b.
  • a gate pulse signal is applied, and the gate pulse calculator 19b is controlled to be turned on simultaneously within the period of the gate pulse width D calculated using the equation (6).
  • the charging current I L of the formula (4) in the reactor 23 which is shared by the booster circuit and the step-down circuit flows, detects charge power P of the determination target indicated by the formula (5) is at the power calculator 17
  • the activation power determination unit 18 can determine whether or not activation is possible.
  • the process in ST13 indicates that “the step-up / down converter 30 includes two switch elements 21, The only difference is that “the same gate pulse signal is applied to the driving circuit 27”.
  • the gate pulse generator 20b is operated in accordance with the operations (step-down operation, step-up operation, bypass operation) required for the buck-boost converter 30.
  • the operation is switched to the operation of separately applying the gate pulse signal to the switch element 21 and the switch element 27.
  • the gate pulse generator 20b applies a gate pulse signal with a switching frequency and a duty for the step-down operation to the switch element 21 and always turns off the switch element 27. Apply gate pulse signal.
  • the step-up / step-down converter 30 performs a boost operation, a gate pulse signal that is always turned on is applied to the switch element 21, and a gate pulse signal with a switching frequency and duty for the boost operation is applied to the switch element 27.
  • a gate pulse signal that is always turned on is applied to the switch element 21, and a gate pulse signal that is always turned off is applied to the switch element 27.
  • the same operation and effect as in the first embodiment can be obtained.
  • the grid-connected inverter according to the present invention has a short standby time until start of start determination in the photovoltaic power generation system, and can determine whether or not start can be performed in a short time without being affected by the amount of solar radiation. It is useful as a grid-connected inverter that can

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Inverter Devices (AREA)
  • Dc-Dc Converters (AREA)

Abstract

 太陽電池の出力電力を直接検出し、コンバータのスイッチ素子のオン時間幅を規定するゲートパルス幅を変化させて安定した動作点を見つけ出し、動作点が安定したときの出力電力を用いて起動可否の判定を行う。起動判定開始までの待機時間が短くなり、日射量の影響を受けずに低日射でも短時間にしかも高い精度で起動判定を行うことができる。

Description

系統連系形インバータ
 本発明は、太陽光発電システムで使用される系統連系形インバータに関する。
 太陽光発電システムで使用される系統連系形インバータは、複数の太陽電池モジュールで構成される太陽電池が発電した直流電力を所望の直流電圧となる直流電力へ変換するコンバータと、コンバータの出力電力を交流電力へ変換するインバータ回路と、インバータ回路の出力端と商用電力系統との接続路を開閉する出力リレーとを備えている。
 太陽光発電システムでは、発電電力が系統連系に必要な電力を超えている場合に、出力リレーを閉路させて系統連系形インバータを起動し、逆に発電電力が連系に必要な電力でない場合は発電電力不足とし、出力リレーを開路させて系統連系形インバータを待機状態にする起動制御が行われる。
 この場合、系統連系形インバータの起動判定を精度よく行えないと、太陽電池が発電を開始しても発電電力不足として系統連系形インバータを待機状態にする頻度が高くなる。系統連系形インバータが起動と待機とを頻繁に繰り返すことになると、出力リレーの開閉回数が多くなり、出力リレーの接点寿命が短くなるという問題が起こる。
 このような問題に対し、例えば特許文献1では、系統連系形インバータの起動判定を精度よく行える方法が提案されている。以下に、特許文献1に示される従来の起動判定手順を示す。
 (1)太陽電池の出力電圧が所定値を超えると、インバータ回路を停止させた状態でコンバータに動作を開始させ、コンバータが動作を開始してからの所定時間内に、インバータ回路の入力電圧を形成するコンデンサの充電が完了するか否かを監視する。所定時間内にコンデンサの充電が完了した場合は、完了するまでの所要時間内におけるコンデンサの充電電圧変化と、その所要時間とからコンデンサに充電された電力を演算し、演算された充電電力から太陽電池の最大電力点を推定する。
 この最大電力点の推定は、太陽電池の最大電力点が太陽電池の無負荷時電圧の約8割りの電圧に存在することを利用して行われている。すなわち、太陽電池の特性は一定であるので、電力が演算されたときの太陽電池の出力電圧から最大電力点の電圧に対する割合を求めることで、演算された充電電力から太陽電池の最大電力点を推定している。
 なお、コンバータが動作を開始してからの所定時間内にコンデンサの充電が完了しない場合は発電電力不足と判定する。この場合は、所定時間待機後に再度、この(1)の手順を実行する。
 (2)推定された最大電力点から起動可否を判定する。すなわち、太陽電池の推定した最大電力点が所定値よりも大きい場合は起動OKと判定し、インバータ回路を動作させ、リレーを閉路させて商用電力系統に電力を供給する。一方、太陽電池の推定した最大電力点が所定値よりも小さい場合は発電電力不足と判定し、所定時間待機した後、再び(1)の手順から実行する。
特開2009-247184号公報(図2)
 しかし、上記従来の技術では、次のような問題がある。
 まず、朝夕の日射量が少ない場合には発電電流が少ないので、コンデンサへの充電電流が少なくなり、充電に時間がかかる。したがって、コンデンサの充電電圧変化と所要時間とからコンデンサに充電された電力を演算する方法では、日射量が少ない場合には電力演算に時間がかかり、起動可否の判定に時間がかかる。
 また、太陽電池の発電量は日射量に依存するので、系統連系形インバータは、前記したように起動と待機を必然的に繰り返す。前記した(1)の手順において、コンデンサに前回の起動状態時に蓄電された電荷が残っている場合、今回は、或る充電電圧からその充電電圧変化と所要時間とからコンデンサに充電された電力を演算することになる。充電は早めに完了するので、電力演算精度は低いものとなる。そのため、コンデンサの充電電圧変化により電力を演算する方法では、起動判定を開始しようとするときに、充電電圧が所定値よりも高い場合は、その充電電圧が所定値以下となるまで、起動判定を待機する必要があり、起動判定開始までの待機時間が長くなる。
 さらに、最大電力点は推定値であるので、起動可否の判定に用いる所定値(起動電力)は推定誤差を見込んでその最低値に余裕を持たせる必要がある。つまり、起動可否の判定に用いる所定値(起動電力)の最低値を、系統連系に必要な電力を正しく反映した値に定めることができないので、系統連系形インバータが起動と待機とを頻繁に繰り返す事態の発生は回避できるが、判定精度として不十分となっている。
 本発明は、上記に鑑みてなされたものであり、太陽光発電システムにおいて、起動判定開始までの待機時間が短く、日射量の影響を受けずに短時間にしかも高い精度で起動可否の判定が行える系統連系形インバータを得ることを目的とする。
 上述した課題を解決し、目的を達成するために、本発明は、太陽電池が出力する直流電圧を所望の直流電圧へ降圧する降圧コンバータと、前記降圧コンバータの出力電圧を平滑するコンデンサと、入力直流電圧である前記コンデンサの充電電圧を交流電圧へ変換するインバータ回路と、前記インバータ回路の出力端と商用電力系統との接続路を開閉する出力リレーとを備えている系統連系形インバータにおいて、前記太陽電池の出力電圧と出力電流とを検出して出力電力を求める電力検出手段と、前記コンデンサの充電電圧を検出する充電電圧検出器と、前記インバータ回路を動作停止させて前記出力リレーを開路させている系統連系前に、前記電力検出手段にて検出された太陽電池出力電圧と前記充電電圧検出器の検出電圧とに基づき、前記降圧コンバータのスイッチ素子をオンさせる時間幅を、前記太陽電池に所定電力を出力させるように制御する連系前コンバータ制御手段と、前記連系前コンバータ制御手段が前記スイッチ素子をオンさせている期間において前記太陽電池の動作点の安定判別を行い、動作点が安定するまで、前記連系前コンバータ制御手段に前記スイッチ素子のオン時間幅を繰り返し制御させる安定動作点検索手段と、予め定めた判定電力と前記安定動作点検索手段が安定した動作点を検出したときにおける前記電力検出手段が求めた太陽電池出力電力とを比較し、太陽電池出力電力が少なくとも前記判定電力と等しいとき、前記商用電力系統との連系を開始させる指示を出力する連系可否判定手段とを備えたことを特徴とする。
 本発明にかかる系統連系形インバータは、太陽電池の出力電力を、コンデンサの充電電圧から演算するのではなく、直接検出し、コンバータのスイッチ素子のオン時間幅を規定するゲートパルス幅を変化させて太陽電池の安定した動作点を見つけ出し、動作点が安定したときの太陽電池出力電力を用いて起動可否の判定を行う。したがって、起動判定開始までの待機時間が短くなり、日射量の影響を受けずに低日射でも短時間にしかも高い精度で起動判定を行うことができるという効果を奏する。
図1は、本発明の実施の形態1による系統連系形インバータを備えた太陽光発電システムのシステム構成図である。 図2は、図1に示す系統連系形インバータを起動する制御手順を説明するフローチャートである。 図3は、太陽電池の動作点と発電電力との関係を説明する図である。 図4は、本発明の実施の形態2による系統連系形インバータを備えた太陽光発電システムのシステム構成図である。 図5は、図4に示す系統連系形インバータを起動する制御手順を説明するフローチャートである。 図6は、本発明の実施の形態3による系統連系形インバータを備えた太陽光発電システムを示すシステム図である。
 以下に、本発明にかかる系統連系形インバータの実施の形態を図面に基づいて詳細に説明する。なお、この実施の形態によりこの発明が限定されるものではない。
実施の形態1.
 図1は、本発明の実施の形態1による系統連系形インバータを備えた太陽光発電システムのシステム構成図である。図1において、太陽光発電システム1aは、太陽電池2と、この実施の形態1による系統連系形インバータ3aとで構成される。
 太陽電池2は、複数の太陽電池モジュールで構成され、日射量に応じて直流電力を発生する。系統連系形インバータ3aには、太陽電池2の正極出力端および負極出力端がそれぞれ接続される正極入力端子4および負極入力端子5と、商用電力系統(配電系統)6の2線にそれぞれ接続される系統出力端子7,8とが設けられている。
 この実施の形態1による系統連系形インバータ3aは、降圧コンバータを用いる系統連系形インバータにおいて、商用電力系統6に連系させるか否かの起動制御を行う構成を備えたものである。降圧コンバータを用いる系統連系形インバータは、正極入力端子4および負極入力端子5から系統出力端子7,8側に向かって、平滑用コンデンサ9,降圧コンバータ10,平滑用コンデンサ11,インバータ回路12および出力リレー13がこの順に配置されている。
 接続関係等を示す。降圧コンバータ10は、ダイオードが逆並列に接続されたスイッチ素子21と、ダイオード22と、リアクトル23とで構成される。なお、スイッチ素子21には、図1ではIGBTを用いている。スイッチ素子21のコレクタ端子は降圧コンバータ10の入力端子であり、正極入力端子4に接続されている。スイッチ素子21のエミッタ端子はダイオード22のカソード端子とリアクトル23の一端とに接続されている。ダイオード22のアノード端子は、負極入力端子5とインバータ回路12の負極入力端との接続ラインに接続されている。リアクトル23の他端は、降圧コンバータ10の出力端子であり、インバータ回路12の正極入力端に接続されている。スイッチ素子21のゲート端子には、系統に連系するまでの期間においてゲートパルス発生器20aが、ゲートパルス演算器19aから入力されるゲートパルス幅に基づいて発生するゲートパルス信号が印加される。
 平滑用コンデンサ9は、正極入力端子4と降圧コンバータ10との間における、正極入力端子4とスイッチ素子21のコレクタ端子との接続ラインと、負極入力端子5とインバータ回路12の負極入力端との接続ラインとの間に接続され、太陽電池2から降圧コンバータ10に入力される直流電圧を平滑する。
 平滑用コンデンサ11は、降圧コンバータ10とインバータ回路12との間における、リアクトル23の他端とインバータ回路12の正極入力端との接続ラインと、負極入力端子5とインバータ回路12の負極入力端との接続ラインとの間に接続され、降圧コンバータ10の出力電圧を平滑してインバータ回路12の直流入力電圧を形成する。
 インバータ回路12は、起動電力判定部18が連系開始指示を出力するまでは、変換動作を行わず停止(待機)状態にある。起動電力判定部18が連系開始指示を出力すると、平滑用コンデンサ11の充電電圧を交流電圧に変換する動作を開始する。インバータ回路12の交流出力端は、出力リレー13を介して系統出力端子7,8に接続されている。
 出力リレー13は、起動電力判定部18が連系開始指示を出力するまでは、開路状態に制御され、起動電力判定部18が連系開始指示を出力すると、閉路状態に制御されてインバータ回路12の交流出力端を商用電力系統6に接続する。
 さて、このような降圧型系統連系形インバータを商用電力系統6に連系させるか否かの起動制御を行う構成として、電流検出器14と、電圧検出器15,16と、電力演算器17と、起動電力判定部18と、ゲートパルス演算器19aと、ゲートパルス発生器20aとを備えている。ここで、電流検出器14、電圧検出器15および電力演算器17は、全体として、電力検出手段を構成している。ゲートパルス演算器19aおよびゲートパルス発生器20aは、全体として連系前コンバータ制御手段を構成している。また、起動電力判定部18は、安定動作点検索手段と連系可否判定手段とを構成している。電圧検出器16は、充電電圧検出器を構成している。
 電圧検出器15は、正極入力端子4と降圧コンバータ10との間において、一方の検出端が正極入力端子4とスイッチ素子21のコレクタ端子との接続ラインに接続され、他方の検出端が負極入力端子5とインバータ回路12の負極入力端との接続ラインに接続され、太陽電池2の出力電圧を検出する。電圧検出器15にて検出された太陽電池2の出力電圧は、電力演算器17に入力される。
 電流検出器14の検出端は、例えば負極入力端子5と降圧コンバータ10との間において負極入力端子5とインバータ回路12の負極入力端との接続ラインに接続されている。電流検出器14にて検出された太陽電池2の出力電流は、電力演算器17に入力される。
 電力演算器17は、電圧検出器15が検出した太陽電池2の出力電圧と、電流検出器14が検出した太陽電池2の出力電流とを乗算して太陽電池2の出力電力を求め、起動電力判定部18に出力する。
 電圧検出器16は、一方の検出端が平滑用コンデンサ11の正極端とインバータ回路12の正極入力端との接続ラインに接続され、他方の検出端が平滑用コンデンサ11の負極端とインバータ回路12の負極入力端との接続ラインに接続され、インバータ回路12の直流入力電圧である平滑コンデンサ11の充電電圧を検出する。電圧検出器16にて検出された平滑コンデンサ11の充電電圧(以降、単に「コンデンサ充電電圧」と記す)は、ゲートパルス演算器19aに入力される。
 ゲートパルス演算器19aは、系統への連系可否を決める起動判定の期間において、太陽電池2から所定の電力を出力させるために必要なスイッチ素子21をオンさせる時間幅であるゲートパルス幅を、電圧検出器15にて検出された太陽電池出力電圧と、電圧検出器16にて検出されたコンデンサ充電電圧とに基づき演算し、それをゲートパルス発生器20aに出力する。ゲートパルス演算器19aは、起動電力判定部18から動作点が安定した旨の通知が入力するまで、ゲートパルス幅の演算を繰り返し行う。ゲートパルス発生器20aは、指定されたゲートパルス幅に基づきスイッチ素子21をオンさせるゲートパルス信号を発生する。
 ゲートパルス演算器19aは、具体的には次のようにしてゲートパルス幅を演算する。系統への連系可否を決める起動判定の期間では、インバータ回路12を停止させた状態で太陽電池2の発電量の多寡を判定するのであるから、降圧コンバータ9の降圧動作が問題となるのではない。したがって、降圧コンバータ9のスイッチング周波数fは、一定でも可変でもよいが、説明の便宜からここでは一定値であるとする。
 スイッチ素子21がオンしている期間にリアクトル23に流れる負荷電流(充電電流)は、太陽電池2の発電量を反映している。リアクトル23のインダクタンスLは固定値であるから、平滑用コンデンサ11の充電電力P[W]を所定値として指定すれば、太陽電池2から平滑用コンデンサ11へ電力P[W]だけ充電させるために必要なスイッチ素子21のゲートパルス幅Dは、電圧検出器15が検出した太陽電池2の出力電圧Vsと、電圧検出器16が検出したコンデンサ充電電圧Vs2とによって決まる。
 すなわち、スイッチ素子21をゲートパルス幅Dにてオン動作させたときにリアクトル23に流れる負荷電流Iは、式(1)で表される。
   I=(Vs-Vc2)*D/L/f  ・・・(1)
 また、式(1)に示す負荷電流Iがリアクトル23に流れる場合、太陽電池2から平滑用コンデンサ11への充電電力P[W]は、
   P=L*I *f/2  ・・・(2)
となる。したがって、式(1)(2)から、太陽電池2から平滑用コンデンサ11へ電力P[W]だけ充電させるために必要なスイッチ素子21のゲートパルス幅Dは、
   D=(√(2*P*L*f))/(Vs-Vc2)  ・・・(3)
と求められる。なお、太陽電池2から平滑用コンデンサ11への充電電力P[W]は、太陽電池2の出力電力と同値である。
 ここで、式(3)における充電電力(つまりインバータ回路12の入力電力)P[W]は、次にように定めている。系統連系形インバータ3aは、太陽電池2の発電電力で動作しているので、式(3)における充電電力P[W]は、系統連系形インバータ3aが安定して運転可能になるために必要な太陽電池出力電力の最低値に定めている。その最低値をPok[W]とする。最低値Pok[W]としては、説明の便宜から、例えば40Wとする。
 次に、起動電力判定部18は、入力段に安定判別部が設けられ、出力段に起動判定部が設けられている。
 安定判別部は、ゲートパルス演算器19aが演算したゲートパルス幅でスイッチ素子21がオンしている期間における太陽電池2の動作点の安定判別を、例えば、(1)太陽電池2の出力電力に基づき、または、(2)ゲートパルス幅を繰り返し制御する時間に基づき行う。安定判別部は、安定判別の結果をゲートパルス演算器19aに通知する。ゲートパルス演算器19aは、この安定判別の結果の内容に従ってゲートパルス幅演算を繰り返すか中止するかを決定する。
(1)太陽電池2の出力電力に基づく安定判別方法:
 太陽電池2の出力電力が40W以上の場合は出力電力が40Wとなる動作点にて安定するため、電力演算器17から入力される太陽電池出力電力の変化幅が規定範囲内に収まっている否かによって行う。また、太陽電池2の出力電力が40W未満の場合は出力電力が40Wとなる動作点がないため、ゲートパルス幅は増加し続け太陽電池2は短絡状態となり太陽電池2の出力電力がゼロとなる。スイッチ素子21を演算したゲートパルス幅にて駆動させているにもかかわらず、太陽電池2の発電電力がゼロとなった場合は動作点が安定したと判断する。
(2)ゲートパルス幅を繰り返し制御する時間に基づく安定判別方法:
 一定時間スイッチ素子21を演算されたゲートパルス幅にて駆動すると、太陽電池2の出力電力が40W以上の場合は40Wに安定し、太陽電池2の出力電力が40W未満の場合は太陽電池2の出力電力が0Wとなるので、安定判別をゲートパルス幅を繰り返し制御する時間によって行うことも可能である。設定時間は十分長い時間に設定することも可能であるが、太陽電池2の出力電力が40W以上の場合に40Wに安定するまでの時間以上に設定しておけばよく、太陽電池2の出力電力が40W未満の場合においては設定された時間内に太陽電池2の出力電力が40Wを越えることはないので、太陽電池2の出力電力が0Wとなるまでの時間に設定する必要はない。
 起動判定部は、安定判別部からの安定判別の結果が、太陽電池2の動作点が安定していることを示すとき、電力演算器17から入力される太陽電池出力電力が判定電力(所定の起動可能電力)を超えるか否かを判定し、少なくとも太陽電池出力電力が判定電力と等しい場合に、系統連系形インバータ3aの図示しない制御部に系統連系を開始させる指示を出力する。
 起動判定部は、判定電力として「Pok-α(=40-α)」が予め設定されている。なお、αは、式(3)を適用して求めたゲートパルス幅Dで降圧コンバータ10のスイッチ素子21を駆動しても、リアクトル23のインダクタンス値や電圧検出器15,16の検出精度によっては、太陽電池2が最低電力40Wを出力できない場合があることを見込んだ出力誤差分である。
 次に、図2と図3を参照して系統連系を行う制御動作について説明する。図2は、図1に示す系統連系形インバータを起動する制御手順を説明するフローチャートである。図3は、太陽電池の動作点と発電電力との関係を説明する図である。なお、図3(1)は、太陽電池の発電量が十分である場合を示し、図3(2)は、太陽電池の発電量が十分でない場合を示す。図3において、横軸は太陽電池出力電圧V、縦軸は太陽電池出力電力Pである。また、図2での説明では、処理手順を示す「ステップ」は単に「ST」と略記する。
 図2において、ゲートパルス演算器19aは、電圧検出器15が検出した太陽電池2の出力電圧と電圧検出器16が検出した平滑用コンデンサ11の充電電圧とを読み取り(ST1)、それを式(3)に適用してゲートパルス幅Dを演算する(ST2)。
 ゲートパルス発生器20aは、ゲートパルス演算器19aからゲートパルス幅Dが入力されると、スイッチ素子21を該ゲートパルス幅Dの期間内オンさせるゲートパルス信号を発生し、降圧コンバータ10を駆動する(ST3)。
 これによって、リアクトル23に所定の充電電流が流れ、平滑用コンデンサ11が所定電力で充電される。太陽電池出力電力の変化が電力演算器17にて検出され、起動電力判定部18に入力される。起動電力判定部18は、電力演算器17から入力される太陽電池出力電力の変化幅が所定範囲内に収まっているか否か、または太陽電池の発電電力が0Wであるか否かにより、動作点の安定判別を行う(ST4)。
 ST4において、起動電力判定部18は、太陽電池出力電力の変化幅が所定範囲内に収まっていない場合は、動作点は安定していないと判定し(ST4:No)、その旨をゲートパルス演算器19aに通知する。ST1~ST4の処理動作が再度実行される。つまりゲートパルス演算器19aは、起動電力判定部18から動作点が安定していない旨の通知を受けて、次のゲートパルス幅Dを演算する。ST1~ST4の繰り返し過程では、式(3)における充電電力Pは、40Wの一定値であるが、太陽電池出力電圧Vsおよびコンデンサ充電電圧Vc2が変化するので、次のゲートパルス幅Dは変化する。したがって、太陽電池2の動作点は、図3に示すように変化する。
 起動電力判定部18は、ST1~ST4の繰り返し過程でのST4において、太陽電池2の動作点が安定していると判定した場合は(ST4:Yes)、ゲートパルス演算器19aに動作点が安定している旨を通知し、電力演算器17から入力される太陽電池出力電力と判定電力Pok-α(=40-α)とを比較し、大小関係を調べる(ST5)。ゲートパルス演算器19aは、起動電力判定部18から動作点が安定した旨の通知を受けて演算動作を中止する。
 ST5において、太陽電池出力電力が判定電力Pok-αと等しい場合、或いは、超える場合は(ST5;Yes)、起動電力判定部18は、起動OKと判定し(ST7)、系統連系を開始させる指示を図示しない制御部に出力し(ST7)、本手順を終了する。
 図示しない制御部は、系統連系開始指示が入力されると、ゲートパルス発生器20aに系統連系時の動作への切り替えを指示し、インバータ回路12に変換動作を開始させ、出力リレー13に閉路させる。これによって、インバータ回路12の出力端が系統出力端子7,8に接続され、商用電力系統6への電力供給が開始される。ゲートパルス発生器20aは、降圧コンバータ10に降圧動作を行わせる場合は、スイッチ素子21に降圧動作用のスイッチング周波数およびデューティーによるゲートパルス信号を印加する。また、ゲートパルス発生器20aは、降圧コンバータ10にバイパス動作を行わせる場合は、スイッチ素子21に常時オンさせるゲートパルス信号を印加する。
 一方、ST5において、太陽電池出力電力が判定電力Pok-αよりも小さい場合は(ST5:No)、起動電力判定部18は、発電電力不足と判定し(ST8)、所定時間待機した後にゲートパルス演算器19aに演算動作開始指示を出力する(ST9)。すなわち、ST1以降の処理が再度実行される。
 次に、図3を参照して、太陽電池2の動作点の遷移について説明する。
 図3において、動作点a,dは、降圧コンバータ10のスイッチ素子21がオフしている停止状態での動作点である。このときに電圧検出器15が検出した太陽電池2の出力電圧は太陽電池2の無負荷時電圧である。太陽電池2の出力電力はゼロである。電圧検出器16の検出電圧は、平滑用コンデンサ11に前回の充電電圧が残っていなければゼロである。
 まず、この状態において、ゲートパルス演算器19aがゲートパルス幅Dを演算し、降圧コンバータ10のスイッチ素子21がゲートパルス幅Dの期間内オンすることを開始する。負荷電流である平滑用コンデンサ11への充電電流が流れ、太陽電池2の出力電圧が無負荷時電圧から低下することにより、太陽電池2の動作点が動作点b,eへ遷移する。
 動作点b,eにおける安定判別の結果、安定していないと判定されると、ゲートパルス演算器19aが再度ゲートパルス幅Dを演算し、降圧コンバータ10のスイッチ素子21が新ゲートパルス幅Dの期間内オンすることを開始する。そうすると、太陽電池2の動作点が次の動作点へ遷移し、安定判別が行われる。太陽電池2の動作点が安定した動作点(判定時の動作点c、f)に遷移するまで、以上の動作が繰り返される。動作点b,eは、判定中の動作点の一例である。
 発電量が最低値Pok(40W)以上である図3(1)において安定した動作点cでの太陽電池出力電力は、判定電力40-αと等しいので、起動OKと判定される。これに対し、発電量が最低値Pok(40W)以下である図3(2)において安定と判断された動作点fでの太陽電池出力電力は0Wであり、判定電力40-αに達していないので、発電電力不足と判定される。
 このように、実施の形態1によれば、太陽電池の出力電力を、コンデンサの充電電圧から演算するのではなく、直接検出し、降圧コンバータのスイッチ素子のオン時間幅を規定するゲートパルス幅を変化させて安定した太陽電池の動作点を見つけ出し、動作点が安定したときの出力電力を用いて起動可否の判定を行うので、起動判定開始までの待機時間が短くなり、日射量の影響を受けずに低日射でも短時間にしかも高い精度で起動判定を行うことができる。
実施の形態2.
 図4は、本発明の実施の形態2による系統連系形インバータを備えた太陽光発電システムのシステム構成図である。なお、図4では、図1(実施の形態1)に示した構成要素と同一ないしは同等である構成要素には同一の符号が付されている。ここでは、この実施の形態2に関わる部分を中心に説明する。
 図4において、この実施の形態2による系統連系形インバータ3bは、図1(実施の形態1)に示した構成において、降圧コンバータ10に代えて昇圧コンバータ25が設けられ、ゲートパルス演算器19aに代えてゲートパルス演算器19bが設けられ、電圧検出器16は削除されている。その他は、図1と同じ構成である。
 昇圧コンバータ25は、リアクトル23と、ダイオードが逆並列接続されたスイッチ素子27と、逆流阻止用のダイオード28とで構成される。なお、スイッチ素子27には、図4ではNMOSトランジスタを用いているが、IGBTでもよい。
 リアクトル23の一端は、昇圧コンバータ25の入力端子であり、正極入力端子4に接続されている。リアクトル23の他端は、スイッチ素子27のドレイン端子とダイオード28のアノード端子とに接続されている。ダイオード28のカソード端子は、昇圧コンバータ25の出力端子であり、インバータ回路12の正極入力端に接続されている。スイッチ素子27のソース端子は、負極入力端子5とインバータ回路12の負極入力端との接続ラインに接続されている。
 この昇圧コンバータ25を用いる系統連系形インバータ3bでも、系統への連系可否を決める起動判定の期間では、実施の形態1と同様に、昇圧コンバータ25のスイッチング周波数fは、一定でも可変でもよいが、説明の便宜からここでは一定値であるとする。昇圧コンバータ25では、スイッチ素子27がオンしている期間に、平滑用コンデンサ11に所望の電力を充電させる充電電流がリアクトル23に流れる。
 そこで、ゲートパルス演算器19bは、系統への連系可否を決める起動判定の期間において、太陽電池2から所定の電力を出力させるために必要なスイッチ素子27をオンさせる時間幅であるゲートパルス幅を、電圧検出器15にて検出された太陽電池出力電圧に基づいて演算し、それをゲートパルス発生器20aに出力する。ゲートパルス演算器19bは、起動電力判定部18から動作点が安定した旨の通知が入力するまで、ゲートパルス幅の演算を繰り返し行う。ゲートパルス発生器20aは、指定されたゲートパルス幅に基づきスイッチ素子27をオンさせるゲートパルス信号を発生する。
 ゲートパルス演算器19aは、具体的には次のようにしてゲートパルス幅を演算する。リアクトル23のインダクタンスLは固定値であるから、平滑用コンデンサ11の充電電力P[W]を所定値として指定すれば、太陽電池2から平滑用コンデンサ11へ電力P[W]だけ充電させるために必要なスイッチ素子27のゲートパルス幅Dは、電圧検出器15が検出した太陽電池2の出力電圧Vsによって決まる。
 すなわち、スイッチ素子27をゲートパルス幅Dにてオン動作させたときにリアクトル23に流れる負荷電流Iは、式(4)で表される。
   I=Vs*D/L/f  ・・・(4)
 また、式(4)に示す負荷電流Iがリアクトル23に流れる場合、太陽電池2から平滑用コンデンサ11への充電電力P[W]は、
   P=L*I *f/2  ・・・(5)
となる。したがって、式(4)(5)から、太陽電池2から平滑用コンデンサ11へ電力P[W]だけ充電させるために必要なスイッチ素子27のゲートパルス幅Dは、
   D=(√(2*P*L*f))/Vs  ・・・(6)
と求められる。なお、太陽電池2から平滑用コンデンサ11への充電電力P[W]は、太陽電池2の出力電力と同値である。
 ここで、式(6)における充電電力(つまりインバータ回路12の入力電力)P[W]は、実施の形態1と同様に、系統連系形インバータ3bが安定して運転可能になるために必要な太陽電池出力電力の最低値Pok[W]に定めている。起動電力判定部18に有する判定電力は、Pok-αである。
 次に、図5は、図4に示す系統連系形インバータを起動する制御手順を説明するフローチャートである。図5では、図2におけるST1~ST3がST11~ST13となっている。その他は、図2と同様である。
 図5において、ゲートパルス演算器19bは、電圧検出器15が検出した太陽電池2の出力電圧を読み取り(ST11)、それを式(6)に適用してゲートパルス幅Dを演算する(ST12)。
 ゲートパルス発生器20aは、ゲートパルス演算器19bからゲートパルス幅Dが入力されると、スイッチ素子27を該ゲートパルス幅Dの期間内オンさせるゲートパルス信号を発生し、昇圧コンバータ25を駆動する(ST13)。
 これによって、リアクトル23に式(4)で示される充電電流Iが流れ、式(5)で示される判定対象の充電電力Pが電力演算器17にて検出され、起動電力判定部18に入力される。起動電力判定部18は、電力演算器17から入力される太陽電池出力電力の変化幅が所定範囲内に収まっているか否か、または太陽電池の発電電力が0Wであるか否かにより、動作点の安定判別を行う(ST4)。以降、実施の形態1と同様の処理が行われる。
 系統連系開始の指示が出力されると(ST7)、ゲートパルス発生器20aは、昇圧コンバータ25に昇圧動作とバイパス動作とを行わせるゲートパルス信号を発生する動作に切り替わる。昇圧動作時はスイッチ素子27に昇圧動作用のスイッチング周波数およびデューティーによるゲートパルス信号が印加される。バイパス動作時は、スイッチ素子27に常時オフさせるゲートパルス信号が印加される。
 この実施の形態2によれば、コンバータが昇圧コンバータである場合も、実施の形態1と同様の作用・効果が得られる。
実施の形態3.
 図6は、本発明の実施の形態3による系統連系形インバータを備えた太陽光発電システムを示すシステム図である。なお、図6では、図4(実施の形態2)に示した構成要素と同一ないしは同等である構成要素には同一の符号が付されている。ここでは、この実施の形態3に関わる部分を中心に説明する。
 図6において、この実施の形態3による系統連系形インバータ3cは、図4(実施の形態2)に示した構成において、昇圧コンバータ25に代えて昇降圧コンバータ30が設けられ、ゲートパルス発生器20aに代えてゲートパルス発生器20bが設けられている。その他の構成は図4と同様である。
 昇降圧コンバータ30は、ダイオードが逆並列に接続されたスイッチ素子21,27とリアクトル23とダイオード22,28とで構成されている。スイッチ素子21、リアクトル23およびダイオード22は降圧回路を構成し、リアクトル23、スイッチ素子27およびダイオード28は昇圧回路を構成している。
 スイッチ素子21のコレクタ端子は昇降圧コンバータ30の入力端子であり、正極入力端子4に接続されている。スイッチ素子21のエミッタ端子はダイオード23のカソード端子とリアクトル23の一端とに接続されている。ダイオード23のアノード端子は、負極入力端子5とインバータ回路12の負極入力端との接続ラインに接続されている。
 リアクトル23の他端は、スイッチ素子27のドレイン端子とダイオード28のアノード端子とに接続され、スイッチ素子27のソース端子は負極入力端子5とインバータ回路12の負極入力端との接続ラインに接続されている。ダイオード28のカソード端子は昇降圧コンバータ30の出力端子であり、インバータ回路12の正極入力端に接続されている。
 この実施の形態3では、系統連系前において系統への連系可否を決める起動判定を行うのであるから、昇降圧コンバータ30の2つのスイッチ素子21,27は、ゲートパルス発生器20bから同一のゲートパルス信号が印加され、ゲートパルス演算器19bが式(6)を用いて演算したゲートパルス幅Dの期間内同時にオン動作するように制御される。
 これによって、降圧回路と昇圧回路で共用されるリアクトル23に式(4)で示される充電電流Iが流れ、式(5)で示される判定対象の充電電力Pが電力演算器17にて検出され、起動電力判定部18にて起動可否の判定が行えることになる。
 この実施の形態3による系統連系形インバータ3cを起動する制御手順を説明するフローチャートは、図示を省略したが、図5において、ST13での処理が「昇降圧コンバータ30を2つのスイッチ素子21,27に同一のゲートパルス信号を印加して駆動」となる点が異なるだけである。
 図5において、系統連系開始の指示が出力されると(ST7)、ゲートパルス発生器20bは、昇降圧コンバータ30に必要とされる動作(降圧動作、昇圧動作、バイパス動作)に応じて、スイッチ素子21とスイッチ素子27とに別々にゲートパルス信号を印加する動作に切り替わる。
 すなわち、ゲートパルス発生器20bは、昇降圧コンバータ30に降圧動作を行わせる場合、スイッチ素子21には降圧動作用のスイッチング周波数およびデューティーによるゲートパルス信号を印加し、スイッチ素子27には常時オフさせるゲートパルス信号を印加する。また、昇降圧コンバータ30に昇圧動作を行わせる場合、スイッチ素子21には常時オンさせるゲートパルス信号を印加し、スイッチ素子27には昇圧動作用のスイッチング周波数およびデューティーによるゲートパルス信号を印加する。また、昇降圧コンバータ30にバイパス動作を行わせる場合、スイッチ素子21には常時オンさせるゲートパルス信号を印加し、スイッチ素子27には常時オフさせるゲートパルス信号を印加する。
 この実施の形態3によれば、コンバータが昇降圧コンバータである場合も、実施の形態1と同様の作用・効果が得られる。
 以上のように、本発明にかかる系統連系形インバータは、太陽光発電システムにおいて起動判定開始までの待機時間が短く、日射量の影響を受けずに短時間にしかも高い精度で起動可否の判定が行える系統連系形インバータとして有用である。
 1a,1b,1c 太陽光発電システム
 2 太陽電池
 3a,3b,3c 系統連系形インバータ
 6 商用電力系統
 9,11 平滑用コンデンサ
 10 降圧コンバータ
 12 インバータ回路
 13 出力リレー
 14 電流検出器
 15,16 電圧検出器
 17 電力演算器
 18 起動電力判定部
 19a,19b ゲートパルス演算演算器
 20a,20b ゲートパルス発生器
 21,27 スイッチ素子
 25 昇圧コンバータ
 30 昇降圧コンバータ

Claims (9)

  1.  太陽電池が出力する直流電圧を所望の直流電圧へ降圧する降圧コンバータと、前記降圧コンバータの出力電圧を平滑するコンデンサと、入力直流電圧である前記コンデンサの充電電圧を交流電圧へ変換するインバータ回路と、前記インバータ回路の出力端と商用電力系統との接続路を開閉する出力リレーとを備えている系統連系形インバータにおいて、
     前記太陽電池の出力電圧と出力電流とを検出して出力電力を求める電力検出手段と、
     前記コンデンサの充電電圧を検出する充電電圧検出器と、
     前記インバータ回路を動作停止させて前記出力リレーを開路させている系統連系前に、前記電力検出手段にて検出された太陽電池出力電圧と前記充電電圧検出器の検出電圧とに基づき、前記降圧コンバータのスイッチ素子をオンさせる時間幅を、前記太陽電池に所定電力を出力させるように制御する連系前コンバータ制御手段と、
     前記連系前コンバータ制御手段が前記スイッチ素子をオンさせている期間において前記太陽電池の動作点の安定判別を行い、動作点が安定するまで、前記連系前コンバータ制御手段に前記スイッチ素子のオン時間幅を繰り返し制御させる安定動作点検索手段と、
     予め定めた判定電力と前記安定動作点検索手段が安定した動作点を検出したときにおける前記電力検出手段が求めた太陽電池出力電力とを比較し、太陽電池出力電力が少なくとも前記判定電力と等しいとき、前記商用電力系統との連系を開始させる指示を出力する連系可否判定手段と
     を備えたことを特徴とする系統連系形インバータ。
  2.  前記安定動作点検索手段は、
     前記太陽電池の動作点の安定判別を前記電力検出手段が求めた太陽電池出力電力に基づいて行う
     ことを特徴とする請求項1に記載の系統連系形インバータ。
  3.  前記安定動作点検索手段は、
     前記太陽電池の動作点の安定判別を前記連系前コンバータ制御手段に前記スイッチ素子のオン時間幅を繰り返し制御させる時間によって判断する
     ことを特徴とする請求項1に記載の系統連系形インバータ。
  4.  太陽電池が出力する直流電圧を所望の直流電圧へ昇圧する昇圧コンバータと、前記昇圧コンバータの出力電圧を平滑するコンデンサと、入力直流電圧である前記コンデンサの充電電圧を交流電圧に変換するインバータ回路と、前記インバータ回路の出力端と商用電力系統との接続路を開閉する出力リレーとを備えている系統連系形インバータにおいて、
     前記太陽電池の出力電圧と出力電流とを検出して出力電力を求める電力検出手段と、
     前記インバータ回路を動作停止させて前記出力リレーを開路させている系統連系前に、前記電力検出手段にて検出された太陽電池出力電圧に基づき、前記昇圧コンバータのスイッチ素子をオンさせる時間幅を、前記太陽電池に所定電力を出力させるように制御する連系前コンバータ制御手段と、
     前記連系前コンバータ制御手段が前記スイッチ素子をオンさせている期間において前記太陽電池の動作点の安定判別を行い、動作点が安定するまで、前記連系前コンバータ制御手段に前記スイッチ素子のオン時間幅を繰り返し制御させる安定動作点検索手段と、
     予め定めた判定電力と前記安定動作点検索手段が安定した動作点を検出したときにおける前記電力検出手段が求めた太陽電池出力電力とを比較し、太陽電池出力電力が少なくとも前記判定電力と等しいとき、前記商用電力系統との連系を開始させる指示を出力する連系可否判定手段と
     を備えたことを特徴とする系統連系形インバータ。
  5.  前記安定動作点検索手段は、
     前記太陽電池の動作点の安定判別を前記電力検出手段が求めた太陽電池出力電力に基づいて行う
     ことを特徴とする請求項4に記載の系統連系形インバータ。
  6.  前記安定動作点検索手段は、
     前記太陽電池の動作点の安定判別を前記連系前コンバータ制御手段に前記スイッチ素子のオン時間幅を繰り返し制御させる時間によって判断する
     ことを特徴とする請求項4に記載の系統連系形インバータ。
  7.  太陽電池が出力する直流電圧を所望の直流電圧へ昇降圧する昇降圧コンバータと、前記昇降圧コンバータの出力電圧を平滑するコンデンサと、入力直流電圧である前記コンデンサの充電電圧を交流電圧に変換するインバータ回路と、前記インバータ回路の出力端と商用電力系統との接続路を開閉する出力リレーとを備えている系統連系形インバータにおいて、
     前記太陽電池の出力電圧と出力電流とを検出して出力電力を求める電力検出手段と、
     前記インバータ回路を動作停止させて前記出力リレーを開路させている系統連系前に、前記電力検出手段にて検出された太陽電池出力電圧に基づき、前記昇降圧コンバータの2つのスイッチ素子を同時にオンさせる時間幅を、前記太陽電池に所定電力を出力させるように制御する連系前コンバータ制御手段と、
     前記連系前コンバータ制御手段が前記2つのスイッチ素子を同時にオンさせている期間において前記太陽電池の動作点の安定判別を行い、動作点が安定するまで、前記連系前コンバータ制御手段に前記2つのスイッチ素子を同時にオンさせる時間幅を繰り返し制御させる安定動作点検索手段と、
     予め定めた判定電力と前記安定動作点検索手段が安定した動作点を検出したときにおける前記電力検出手段が求めた太陽電池出力電力とを比較し、太陽電池出力電力が少なくとも前記判定電力と等しいとき、前記商用電力系統との連系を開始させる指示を出力する連系可否判定手段と
     を備えたことを特徴とする系統連系形インバータ。
  8.  前記安定動作点検索手段は、
     前記太陽電池の動作点の安定判別を前記電力検出手段が求めた太陽電池出力電力に基づいてを行う
     ことを特徴とする請求項7に記載の系統連系形インバータ。
  9.  前記安定動作点検索手段は、
     前記太陽電池の動作点の安定判別を前記連系前コンバータ制御手段に前記スイッチ素子のオン時間幅を繰り返し制御させる時間によって判断する
     ことを特徴とする請求項7に記載の系統連系形インバータ。
PCT/JP2010/057386 2010-04-26 2010-04-26 系統連系形インバータ WO2011135657A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2012512563A JP5349687B2 (ja) 2010-04-26 2010-04-26 系統連系形インバータ
EP10850676A EP2566031A1 (en) 2010-04-26 2010-04-26 System interconnection inverter
PCT/JP2010/057386 WO2011135657A1 (ja) 2010-04-26 2010-04-26 系統連系形インバータ

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2010/057386 WO2011135657A1 (ja) 2010-04-26 2010-04-26 系統連系形インバータ

Publications (1)

Publication Number Publication Date
WO2011135657A1 true WO2011135657A1 (ja) 2011-11-03

Family

ID=44861004

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2010/057386 WO2011135657A1 (ja) 2010-04-26 2010-04-26 系統連系形インバータ

Country Status (3)

Country Link
EP (1) EP2566031A1 (ja)
JP (1) JP5349687B2 (ja)
WO (1) WO2011135657A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014171719A1 (ko) * 2013-04-15 2014-10-23 숭실대학교 산학협력단 교류 연계형 전력변환 장치
WO2019035320A1 (ja) * 2017-08-17 2019-02-21 株式会社村田製作所 太陽光発電システム、パワーコンディショナ

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT515725B1 (de) 2014-04-15 2020-12-15 Fronius Int Gmbh Verfahren zum Einspeisen von Energie von Photovoltaikmodulen einer Photovoltaikanlage sowie Wechselrichter zur Durchführung eines solchen Verfahrens
CN104090501B (zh) * 2014-07-29 2017-01-18 阳光电源股份有限公司 光伏逆变器的待机控制方法、装置和控制器
CN104158218B (zh) * 2014-08-27 2017-03-01 阳光电源股份有限公司 一种光伏逆变器启动控制方法、系统及光伏发电系统
JP6681162B2 (ja) * 2015-09-09 2020-04-15 株式会社日立産機システム パワーコンディショナおよびパワーコンディショナの制御方法
JP6400238B2 (ja) * 2016-02-16 2018-10-03 三菱電機株式会社 系統連系インバータ装置

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002142463A (ja) * 2000-11-07 2002-05-17 Sharp Corp 系統連系インバータ装置
WO2008029711A1 (fr) * 2006-09-05 2008-03-13 Toshiba Carrier Corporation Dispositif onduleur séquentiel
JP2009247184A (ja) 2008-03-31 2009-10-22 Mitsubishi Electric Corp 太陽光発電システムおよびその起動方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002142463A (ja) * 2000-11-07 2002-05-17 Sharp Corp 系統連系インバータ装置
WO2008029711A1 (fr) * 2006-09-05 2008-03-13 Toshiba Carrier Corporation Dispositif onduleur séquentiel
JP2009247184A (ja) 2008-03-31 2009-10-22 Mitsubishi Electric Corp 太陽光発電システムおよびその起動方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014171719A1 (ko) * 2013-04-15 2014-10-23 숭실대학교 산학협력단 교류 연계형 전력변환 장치
US9876368B2 (en) 2013-04-15 2018-01-23 Soongsil University Research Consortium Techno-Park Alternating current linked power converting apparatus
WO2019035320A1 (ja) * 2017-08-17 2019-02-21 株式会社村田製作所 太陽光発電システム、パワーコンディショナ

Also Published As

Publication number Publication date
JP5349687B2 (ja) 2013-11-20
EP2566031A1 (en) 2013-03-06
JPWO2011135657A1 (ja) 2013-07-18

Similar Documents

Publication Publication Date Title
JP5349687B2 (ja) 系統連系形インバータ
JP5503745B2 (ja) 太陽光発電システム、太陽光発電システムに用いる制御装置、並びに、制御方法およびそのプログラム
JP5589096B2 (ja) 電力変換器及び太陽光発電システム
WO2006112201A1 (ja) 電源装置およびその制御方法
JP5349688B2 (ja) 系統連系形インバータ
JP6849076B2 (ja) 太陽光発電システム、パワーコンディショナ
JP2008199808A (ja) 系統連系インバータ装置
JP2015162951A (ja) 双方向コンバータ
JP5716631B2 (ja) 電力変換装置
JP2009183080A (ja) Dc−dcコンバータの制御装置
JP2013236435A (ja) 昇降圧dc/dcコンバータ
JP2016110524A (ja) 太陽光発電システム
JP2014010587A (ja) 太陽光発電システム
JP2011160610A (ja) 太陽光発電装置
JP5586096B2 (ja) 電力変換装置
JP6119332B2 (ja) パワーコンディショナおよびプログラム
JP2012039736A (ja) 電源装置
WO2019065420A1 (ja) パワーコンディショナ及び太陽光発電システム
JP2003203663A (ja) 燃料電池発電システム
JP2015208131A (ja) 系統連系インバータおよび発電電力推定方法
CN117375381B (zh) Dc/dc变换器及其控制方法、功率变换装置和储能系统
JP6197700B2 (ja) 電力変換装置
JP4912285B2 (ja) 負荷装置
JP5972526B2 (ja) 燃料電池の発電制御装置、燃料電池発電システム、燃料電池の発電制御方法、およびプログラム
JP7034230B1 (ja) 電力変換装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10850676

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2012512563

Country of ref document: JP

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2010850676

Country of ref document: EP