WO2011074661A1 - 充放電システム - Google Patents

充放電システム Download PDF

Info

Publication number
WO2011074661A1
WO2011074661A1 PCT/JP2010/072753 JP2010072753W WO2011074661A1 WO 2011074661 A1 WO2011074661 A1 WO 2011074661A1 JP 2010072753 W JP2010072753 W JP 2010072753W WO 2011074661 A1 WO2011074661 A1 WO 2011074661A1
Authority
WO
WIPO (PCT)
Prior art keywords
power generation
charge
power
amount
discharge
Prior art date
Application number
PCT/JP2010/072753
Other languages
English (en)
French (fr)
Inventor
中島 武
総一 酒井
龍蔵 萩原
善次郎 内田
Original Assignee
三洋電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三洋電機株式会社 filed Critical 三洋電機株式会社
Priority to JP2011546179A priority Critical patent/JPWO2011074661A1/ja
Publication of WO2011074661A1 publication Critical patent/WO2011074661A1/ja
Priority to US13/423,725 priority patent/US20120256483A1/en

Links

Images

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/44Methods for charging or discharging
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/46Accumulators structurally combined with charging apparatus
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0068Battery or charger load switching, e.g. concurrent charging and load supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Definitions

  • the present invention relates to a charge and discharge system, and more particularly to a charge and discharge system including a power storage unit.
  • the electric power generation system provided with the electric power generating apparatus which electrically generates using natural energy, and the electrical storage apparatus which can accumulate the electric power generated by the electric power generating apparatus is known.
  • JP-A-2002-171674 discloses a solar cell, an inverter connected to the solar cell and an inverter connected to the electric power system, and a bi-directional chopper (DC) connected to a bus connecting the inverter and the solar cell.
  • a power generation system including a DC converter) and a power storage device connected to a charging / discharging unit.
  • the present invention has been made to solve the problems as described above, and one object of the present invention is to provide a charge / discharge system capable of controlling the charge / discharge amount with high accuracy. .
  • the charge and discharge system is connected to a bus connecting the power generation apparatus and the electric power system, and provided separately from the storage unit, the charging unit for supplying power from the bus to the storage unit, and the charging unit. And a charge / discharge control unit individually controlling the charge unit and the discharge unit.
  • the charge and discharge can be switched in a short time, the charge amount and the discharge amount can be accurately controlled. As a result, the amount of charge and discharge can be controlled with high accuracy.
  • the solar power generation system 1 is connected to a power generation device 2 formed of a solar cell that generates power using sunlight, a power storage device 3 capable of storing electric power generated by the power generation device 2, and a power system 50.
  • a power output unit 4 including an inverter for outputting to the power system 50 the power generated by the power supply and the power stored by the power storage device 3, and a charge / discharge control unit 5 for controlling charge / discharge of the power storage device 3.
  • a DC-DC converter 7 is connected in series to a bus 6 connecting the power generation device 2 and the power output unit 4.
  • the DC-DC converter 7 has a function of converting a DC voltage of the electric power generated by the power generation device 2 into a constant DC voltage (about 260 V in the first embodiment) and outputting the same to the power output unit 4 side.
  • the DC-DC converter 7 also has a so-called maximum power point tracking (MPPT) control function.
  • MPPT function is a function of automatically adjusting the operating voltage of the power generation device 2 so that the power generated by the power generation device 2 becomes maximum.
  • the DC-DC converter 7 is an example of the “first DC-DC converter” in the present invention.
  • a diode (not shown) is provided between the power generation device 2 and the DC-DC converter 7. The diode prevents the backflow of current towards the generator 2.
  • Power storage device 3 includes a storage battery 31 and a charge / discharge unit 32 that charges and discharges the storage battery 31.
  • Storage battery 31 and power generation device 2 are connected in parallel to bus 6.
  • a secondary battery for example, a Li-ion storage battery, a Ni-MH storage battery or the like
  • the voltage of the storage battery 31 is about 48V.
  • Storage battery 31 is an example of the "power storage unit" in the present invention.
  • the charge / discharge unit 32 has DC-DC converters 33 and 34.
  • DC-DC converters 33 and 34 are connected in parallel with each other between bus 6 and storage battery 31.
  • the DC-DC converter 33 is used to charge the storage battery 31 with the power generated by the power generation device 2.
  • the DC-DC converter 33 reduces the voltage of the power supplied to the storage battery 31 from the voltage of the bus 6 to a voltage suitable for charging the storage battery 31 during charging, thereby powering the storage battery 31 from the bus 6 side. Supply.
  • a diode 35 is provided between the DC-DC converter 33 and the bus 6 for regulating (rectifying) the direction of the current in the charging direction.
  • the DC-DC converter 33 is an example of the “charging unit” and the "second DC-DC converter” in the present invention.
  • the diode 35 is an example of the “first rectifier” in the present invention.
  • the DC-DC converter 34 is used when discharging from the storage battery 31 to the power output unit 4 side.
  • the DC-DC converter 34 discharges the power from the storage battery 31 to the bus 6 side by boosting the voltage of the power discharged to the bus 6 side from the voltage of the storage battery 31 to near the voltage of the bus 6 at the time of discharge.
  • a diode 36 is provided between the DC-DC converter 34 and the bus 6 to regulate (rectify) the direction of the current in the discharge direction.
  • the DC-DC converter 34 is an example of the "discharge part" and the "third DC-DC converter” in the present invention.
  • the diode 36 is an example of the “second rectifier” in the present invention.
  • the charge / discharge control unit 5 includes a CPU 5a and a memory 5b.
  • Charge / discharge control unit 5 performs charge / discharge control of storage battery 31 by controlling DC-DC converters 33 and 34 independently and individually. Specifically, the charge / discharge control unit 5 generates the target output power and the power generation amount of the power generation device 2 based on the power generation amount of the power generation device 2 (the output power of the DC-DC converter 7) and the target output power described later. Charge and discharge of the storage battery 31 so as to compensate for the difference between That is, when the power generation amount of the power generation device 2 is larger than the target output power, the charge / discharge control unit 5 controls the DC-DC converter 33 dedicated for charge so as to charge the storage battery 31 with an excess amount of power. When the power generation amount of the power generation device 2 is smaller than the target output power, the charge / discharge control unit 5 controls the DC-DC converter 34 dedicated to discharge so as to discharge the shortage of power from the storage battery 31.
  • a power generation amount detection unit 8 for detecting the power generation amount of the power generation device 2 is provided on the output side of the DC-DC converter 7, a power generation amount detection unit 8 for detecting the power generation amount of the power generation device 2 is provided. Based on the detection result of the power generation amount detection unit 8, the charge and discharge control unit 5 can acquire the power generation amount of the power generation device 2 at predetermined detection time intervals (for example, 30 seconds or less). The charge and discharge control unit 5 acquires power generation amount data of the power generation device 2 every 30 seconds. Since the detection time interval of the power generation amount can not accurately detect a change in the power generation amount even if it is too long or too short, it is set to an appropriate value in consideration of the fluctuation period of the power generation amount of the power generation device 2 and the like. There is a need. In the present embodiment, the detection time interval is set so as to be shorter than a fluctuation cycle that can be handled by load frequency control (LFC) and shorter than a standby time described later.
  • LFC load frequency control
  • the charge / discharge control unit 5 recognizes the difference between the power actually output from the power output unit 4 to the power system 50 and the target output power by acquiring the output power of the power output unit 4. Thereby, the charge / discharge control unit 5 can perform feedback control of charge / discharge of the charge / discharge unit 32 such that the output power from the power output unit 4 becomes the target output power.
  • the charge and discharge control unit 5 is configured to calculate the target output power to be output to the power system 50 using a moving average method.
  • the moving average method is a method of calculating the target output power at a certain point in time as an average value of the amount of power generation of the power generation device 2 in a period past that point.
  • a period for acquiring power generation amount data used to calculate the target output power is referred to as a sampling period.
  • the sampling period is a range that does not extend for a long time in a range exceeding T1 during a corresponding fluctuation period T1 to T2 in load frequency control (LFC), in particular, near the second half (near a long period).
  • LFC load frequency control
  • a specific value of the sampling period is, for example, a period of about 10 minutes or more and about 30 minutes or less in the power system having the "size of load variation-variation period" characteristic as shown in FIG.
  • the sampling period is about 10 minutes in periods other than the initial and final stages of charge and discharge control.
  • the charge / discharge control unit 5 acquires the power generation amount data of the power generation device 2 every approximately 30 seconds, it calculates the average value of the 20 power generation amount data included in the past 10 minutes as the target output power. doing.
  • the upper limit cycle T1 and the lower limit cycle T2 will be described in detail later.
  • the sampling period is an example of the “generation amount data acquisition period” in the present invention.
  • the charge / discharge control unit 5 calculates the target output power from the power generation amount of the power generation device 2 in the past, and the sum of the power generation amount of the power generation device 2 and the charge / discharge amount of the storage battery 31 becomes the target output power.
  • charge and discharge control of the storage battery 31 is controlled to output target output power to the electric power system 50.
  • the charge / discharge control unit 5 does not perform charge / discharge control when the adverse effect on the power system 50 is small even if the power generation amount of the power generation apparatus 2 is output to the power system 50 as it is. Is configured to do. Specifically, charge / discharge control unit 5 is configured such that the amount of power generation of power generation device 2 is equal to or greater than a predetermined amount of power generation (hereinafter, referred to as “control start power generation amount”). When the change amount is equal to or more than a predetermined change amount (hereinafter, referred to as “control start change amount”), charge / discharge control is performed.
  • the control start power generation amount is, for example, a power generation amount larger than the power generation amount at the time of rainy weather, and is, for example, 10% of the rated output of the power generation device 2.
  • the control start change amount is a change amount larger than the maximum change amount at each detection time interval in the daytime zone during clear weather (fine sky with few clouds). For example, 5 of the power generation amount before the change of power generation device 2 %.
  • the variation of the power generation amount is acquired by calculating the difference between two successive power generation amount data of the power generation amount of the power generation device 2 detected at each predetermined detection time interval.
  • the charge / discharge control unit 5 starts detection of the change amount of the power generation amount of the power generation device 2.
  • the charge / discharge control unit 5 starts charge / discharge control for the first time. If the power generation amount of the power generation device 2 becomes less than the control start power generation amount while the change amount of the power generation amount of the power generation device 2 does not exceed the control start change amount, the charge / discharge control unit 5 generates power of the power generation device 2 Stop detecting the amount of change.
  • the predetermined waiting time is a period equal to or less than a fluctuation period that can be handled by load frequency control (LFC).
  • LFC load frequency control
  • the predetermined standby time is preferably a period equal to or less than upper limit period T1, and more preferably a period equal to or less than lower limit period T2.
  • the predetermined waiting time is about 2 minutes or less.
  • the predetermined waiting time is larger than the detection time interval, and is twice or more the detection time interval (for example, an integral multiple of twice or more of the detection time interval).
  • the value in the vicinity of the amount of power generation before the change is the value between the upper threshold value that is larger by a small amount than the power generation amount before the change and the lower threshold that is smaller by a small amount than the power generation amount before the change.
  • the upper threshold is, for example, a value of 101% of the amount of power generation before change.
  • the lower threshold is, for example, 99% of the power generation amount before the change.
  • the charge / discharge control unit 5 lowers the lower threshold (change When the power generation amount rises to 99% or more of the previous power generation amount, it is determined that the value has returned to a value near the power generation amount before the change.
  • the change more than the control start change amount of the power generation amount is an increase more than the control start change amount of the power generation amount
  • the charge / discharge control unit 5 increases the power generation amount and then increases the upper threshold within the standby time ( When the power generation amount before the change decreases to 101% or less, it is determined that the power generation amount before the change has returned to a value near the power generation amount.
  • different threshold values are used to determine whether or not the power generation amount has returned to a value near the power generation amount before and after the change when the change is greater than the control start change amount of the power generation amount.
  • the charge / discharge control unit 5 starts charge / discharge control.
  • the waiting time is one minute.
  • the amounts of power generation P0 and P1 detected within the standby time from the time of detection of the amount of power generation P (-1) are not values near the amount of power generation P (-2). Therefore, the charge / discharge control unit 5 starts charge / discharge control at the time of detection of the power generation amount P1.
  • the value R near the power generation amount P (-2) (a value R of 99% or more of the power generation amount P (-2) which is the lower threshold) was detected within the standby time after the power generation amount P (-1) In this case, charge / discharge control unit 5 determines that it has returned to a value near the power generation amount P (-2) before the change, and does not start charge / discharge control.
  • the charge / discharge control unit 5 is configured to stop the charge / discharge control after a certain control period has elapsed after starting the charge / discharge control.
  • the control period is at least the sampling period determined based on the fluctuation period range corresponding to the load frequency control.
  • the control period is at least the sampling period plus the period for shortening the data acquisition period, which is the minimum control period.
  • the control period is set to 30 minutes.
  • the control period is an example of the “second period” in the present invention.
  • the charge / discharge control unit 5 is configured to extend the control period when the change of the power generation amount equal to or more than the control start change amount is detected a predetermined number of times (three times in the first embodiment) during the control period. There is. This extension is performed by setting a new control period of 30 minutes when the third change in the amount of power generation is detected.
  • the charge / discharge control unit 5 does not detect the change of the power generation amount three times more than the control start change amount from the third detection time point (extension start time point). After 30 minutes from the detection time point (extension start time point), charge / discharge control is stopped. If a change in the amount of power generation that is equal to or more than the control start change amount is newly detected three times from the third detection time point (extension start time point), the time is extended again for 30 minutes.
  • the charge / discharge control unit 5 is configured to stop the charge / discharge control even before the control period has elapsed. It is done.
  • the power generation amount gradually rises, and power generation is performed from a certain power generation amount detection timing (power generation amount P (-2)) to the next power generation amount detection timing (power generation amount P (-1))
  • power generation amount P (-2) the next power generation amount detection timing
  • An abrupt change (decrease) in the amount occurs, and then the amount of change in the amount of power generation does not return to the value near the amount of power generation before the change (the amount of power generation P (-2)) within the standby time.
  • a certain power generation amount detection timing power generation amount P (-2)
  • P (-1) An abrupt change (decrease) in the amount occurs, and then the amount of change in the amount of power generation does not return to the value near the amount of power generation before the change (the amount of power generation P (-2)) within the standby time.
  • charge / discharge control unit 5 performs sampling for the past 10 minutes in periods other than the initial and final stages of charge / discharge control.
  • the average value of the 20 power generation amount data included in the period is calculated as the target output power.
  • charge / discharge control unit 5 For the initial stage of charge / discharge control (10 minutes from the start of charge / discharge control) and the final stage (10 minutes until the end of charge / discharge control), charge / discharge control unit 5
  • the target output power is calculated from the power generation amount data of a period shorter than the sampling period (10 minutes, 20 power generation amount data) of the power generation amount data of a period other than the final period.
  • charge / discharge control unit 5 sequentially stores power generation amount data (P1, P2%) After the start of charge / discharge control in memory 5b, and The sampling period is gradually increased in accordance with the accumulated amount of power generation amount data from the start of charge / discharge control.
  • the first target output power Q1 after the start of charge / discharge control is taken as the power generation amount data P1 itself acquired immediately before.
  • the second target output power Q2 is an average of the two power generation amount data (previous two power generation amount data P1 and P2) stored in the memory 5b.
  • the third target output power Q3 is an average of the three power generation amount data (preceding three power generation amount data P1, P2 and P3) stored in the memory 5b.
  • the 20th target output power Q20 is taken as the average of the 20 power generation amount data (P1 to P20) immediately before that.
  • the sampling period of the power generation amount data is gradually decreased according to the planned acquisition amount of power generation amount data until the end point of charge / discharge control (end point). Since the scheduled end time is 30 minutes from the start of charge / discharge control (start of extension), the time to start decreasing the sampling period of the power generation data can be calculated. At 10 minutes before the scheduled termination of charge / discharge control, the period shifts from the period other than the initial and final periods to the final period, and begins to reduce the sampling period of the generated energy data from the start of the final period.
  • the 20th target output power Q (n-19) before the control termination is Of the 20 power generation amount data P (n-38) to P (n-19).
  • the 19th target output power Q (n-18) before the end of control is taken as an average of 19 pieces of power generation amount data P (n-36) to P (n-18) immediately before that.
  • the three power generation amount data P (n-4), P (n-3) and P (n-2) immediately before that are output.
  • the average of The second target output power Q (n-1) before the end of control is taken as the average of the two pieces of power generation data P (n-2) and P (n-1) immediately before that. Then, the target output power Q (n) immediately before the end of the control is kept as it is the power generation amount data P (n) immediately before that.
  • Region D indicates a load fluctuation period that can be handled by load frequency control (LFC).
  • Region A indicates the load fluctuation cycle that can be handled by EDC.
  • Region B is a region that naturally absorbs the influence of load fluctuation by the self-controllability of power system 50 itself.
  • Region C is a region that can be handled by governor-free operation of the generators of each power plant.
  • the boundary between the region D and the region A is the upper limit period T1 of the load fluctuation period that can be handled by the load frequency control (LFC).
  • the boundary between the area C and the area D is the lower limit cycle T2 of the load fluctuation cycle that can be handled by the load frequency control. It is understood from FIG. 4 that the upper limit period T1 and the lower limit period T2 are not unique periods, but are numerical values that change according to the magnitude of the load fluctuation.
  • the load fluctuation has a fluctuation period (fluctuation frequency) included in the range of the area D (area which can be coped with by LFC) which can not be coped with by EDC, self controllability of power system 50 itself and governor free operation. It aims at paying attention and suppressing.
  • the charge / discharge control unit 5 detects the amount of power generation of the power generation device 2 at every predetermined detection time interval (every 30 seconds). Then, in step S1, the charge / discharge control unit 5 determines whether or not the power generation amount has become equal to or more than the control start power generation amount. This determination is repeated if the power generation amount does not reach the control start power generation amount. When the power generation amount becomes equal to or more than the control start power generation amount, in step S2, the charge / discharge control unit 5 starts monitoring of the change amount of the power generation amount. That is, the difference between the detected power generation amount and the detection value of the power generation amount immediately before that is acquired as the change amount of the power generation amount.
  • step S3 the charge / discharge control unit 5 determines whether or not there is a change in the amount of power generation that is greater than or equal to the control start change amount. If there is no change in the power generation amount greater than the control start change amount, the process returns to step S2, and the charge / discharge control unit 5 continues monitoring the change amount of the power generation amount.
  • step S4 the charge / discharge control unit 5 determines whether the power generation amount has returned to the vicinity of the value before the change within the standby time. If the power generation amount returns to the vicinity of the value before the change, the charge / discharge control unit 5 returns to step S2 without performing the charge / discharge control, and continues monitoring the amount of change in the power generation amount. If the power generation amount does not return to the vicinity of the value before the change, the charge / discharge control unit 5 starts charge / discharge control.
  • the charge / discharge control unit 5 checks the absolute value of the power generation amount when monitoring the change amount of the power generation amount in step S2, for example, and the power generation amount controls the control start power generation amount. If it falls below the threshold, the process returns to step S1.
  • step S5 the charge and discharge control unit 5 starts counting the elapsed time from the time when the charge and discharge control is started.
  • step S6 the charge / discharge control unit 5 determines that the number of stored power generation data (number of samplings k1) since the start of charge / discharge control or the estimated number of samplings k2 until the charge / discharge control is scheduled to end is a predetermined number of times. In the first embodiment, it is determined whether or not it is 20 times or more.
  • the charge / discharge control unit 5 performs the moving average method using the last 20 sampling values in step S7. Calculate and set target output power.
  • the charge / discharge control unit 5 selects k1 or k2 sampling values in step S8.
  • the target output power is calculated and set using the moving average method. That is, at the start of charge and discharge control, the charge and discharge control unit 5 increases the number of samplings used to calculate the target output power by 1 to 20 from 1 to 20 each time the target output power is calculated. At the end of the charge / discharge control (planned), the charge / discharge control unit 5 decreases the number of samplings used for calculation of the target output power one by one from 20 to 1 for each calculation of the target output power.
  • step S9 the charge / discharge control unit 5 calculates the difference between the target output power set in step S7 or S8 and the power generation amount detected after the calculation of the target output power. Then, in step S10, the charge / discharge control unit 5 instructs the charge / discharge unit 32 to charge / discharge an excess or deficiency. That is, when the target output power is larger than the power generation amount, the charge / discharge control unit 5 compensates for the lack of the power generation amount of the power generation device 2 with respect to the target output power by the storage battery 31. Instruct discharge to 34. Further, when the target output power is smaller than the power generation amount, the charge / discharge control unit 5 is configured to charge the storage battery 31 with a remainder obtained by subtracting the target output power from the power generation amount of the power generation device 2. Instructs 33 to charge.
  • step S11 the target output power (the power generation amount of the power generation device 2 + the charge / discharge amount of the storage battery 31) is output from the power output unit 4 to the power system 50.
  • step S12 the charge / discharge control unit 5 determines whether or not the amount of change in the amount of power generation that is equal to or more than a predetermined change amount (control start change amount) has occurred a predetermined number of times (three times in the first embodiment). If there is a change in the amount of power generation that is greater than or equal to the control start change amount, there is a high possibility that the change in the amount of power generation will continue thereafter. Therefore, in step S13, the charge / discharge control unit 5 resets the count of the elapsed time and extends the period of charge / discharge control. In this case, the process returns to step S5, and the charge / discharge control unit 5 newly starts counting elapsed time.
  • control start change amount control start change amount
  • step S14 the charge / discharge control unit 5 determines that the amount of power generation of the power generation device 2 exceeds a predetermined amount of power generation Determine if there is.
  • step S15 the charge / discharge control unit 5 starts the charge / discharge control or extends the charge / discharge control period, and then the control period (30 It is judged whether or not minutes have passed.
  • the charge and discharge control unit 5 stops the charge and discharge control. If the control period has not elapsed, the process returns to step S6, and the charge / discharge control unit 5 continues the charge / discharge control.
  • step S14 If it is determined in step S14 that the power generation amount is less than the control start power generation amount, the charge / discharge control unit 5 stops the charge / discharge control even if the control period has not elapsed.
  • the DC-DC converter 33 for charging the storage battery 31 and the charge / discharge control unit 5 for individually controlling the DC-DC converter 34 for discharging the storage battery 31 are provided.
  • the DC-DC converter 33 and DC-DC converter 34 in power storage device 3, for example, the heat dissipation is improved compared to the case where the charging unit and the discharging unit are incorporated in one device. The reliability can be further improved.
  • the charge / discharge control unit 5 determines that the amount of power generation detected by the power generation amount detection unit 8 is greater than or equal to the control start power generation, and the amount of change in power generation is the control start change When it is more than the amount, charge and discharge control is performed. According to this structure, charge and discharge control is not performed when the condition is not satisfied, and therefore, the number of charge and discharge of power storage device 3 can be reduced.
  • control start power generation amount is, for example, a power generation amount larger than the power generation amount at the time of rainy weather. According to this structure, even if charge and discharge control is not performed, charge and discharge control is not performed at the time of rainy weather when the adverse effect on power system 50 is small.
  • the control start power generation amount is 10% of the rated output of the power generation device 2.
  • the control start power generation amount which is a threshold value when starting charge and discharge control, can be made larger than the power generation amount at the time of rainy weather, so control is performed so that charge and discharge control is not performed easily at rainy weather. can do.
  • the charge / discharge control unit 5 changes the power generation amount by the control start change amount or more and generates the power generation amount near the power generation amount before the change in the standby time. If it does not return, charge / discharge control is performed. According to this structure, the charge / discharge control is not performed when the change amount of the power generation amount of the power generation device 2 is smaller than the control start change amount, so the number of charge / discharge times of the power storage device 3 can be reduced. Further, even if the amount of change in the amount of power generation of the power generation device 2 is equal to or greater than the amount of control start change, charge and discharge control is not performed when the amount of power generation in the vicinity of the power generation amount before the change is restored within the standby time. The number of times of charging and discharging of the storage device 3 can be further reduced. Thus, the life of the power storage device 3 can be extended.
  • control start change amount is set to be larger than the maximum change amount at each detection time interval in the daytime zone at the time of fine weather. According to this configuration, charge / discharge control is not performed during fine weather when the amount of change in the amount of power generation at each detection time interval is small, thereby suppressing the influence on the power system 50 due to the change in the amount of power generation by the power generation device 2 While the number of charging and discharging can be reduced. As a result, the life of the power storage device 3 can be extended.
  • the control start change amount is a change amount of 5% of the power generation amount before the change.
  • the control start change amount which is a threshold value for starting charge / discharge control, can be easily made larger than the maximum change amount for each predetermined detection time interval in the daytime zone at the time of clear weather. it can. Further, the control start change amount may be obtained based on the rated capacity of the power generation device 2. Even in this case, the same effect as described above can be obtained.
  • the charge / discharge control unit 5 uses the power generation amount used to calculate the moving average in the initial and final phases of charge / discharge control rather than in periods other than the initial and final phases of charge / discharge control.
  • the target output power is calculated by shortening the data acquisition period.
  • the charge / discharge control unit 5 stops the charge / discharge control after the control period elapses from the start of the charge / discharge control, and during the charge / discharge control, the control start change amount or more.
  • the control period of charge and discharge control is extended when there are three or more changes of. According to this structure, the number of times of charge and discharge can be reduced as compared with the case where charge and discharge control is not stopped, and therefore, the life of the power storage device 3 can be prolonged.
  • charge / discharge control may not be continued while fluctuations in the amount of power generation continue, and charge / discharge control is considered unnecessary. It is possible to suppress the control. As a result, charge / discharge control can be effectively performed while reducing the number of times of charge / discharge of power storage device 3.
  • FIG. 7 shows the transition of fluctuation of the actual amount of power generation (output power) on a day when the weather is clear and when the sky is clear.
  • FIG. 7 shows the output power to the electric power system 50 when the charge / discharge control is not performed (the amount of power generation of the power generation device 2 as it is). Since the sunlight is not blocked by the clouds when the weather is fine, the amount of power generation of the power generation device 2 changes smoothly without a large fluctuation. On the other hand, when the sky is clear with clouds, it can be seen that the amount of power generation of the power generation device 2 changes while repeating large fluctuations due to fluctuations in the amount of solar radiation due to the influence of the clouds.
  • FIG. 8 shows the transition of the charge amount of the storage battery 31 when the charge and discharge control is not performed.
  • the maximum depth difference H1 of charge and discharge at the time of clear weather is about 14% of the maximum charge of the storage battery
  • the maximum depth difference H2 of the charge and discharge at the sunny weather with clouds is about 15% of the maximum charge of the storage battery. That is, it can be seen that the difference in maximum depth of charge and discharge does not change significantly between the time of fine weather and the time of fine weather with clouds.
  • FIG. 9 shows the analysis result. It can be seen that a large difference can be seen in the power spectrum between clear weather and sunny weather. In particular, when looking at a frequency range of about several minutes which is a load frequency control (LFC) range, the power spectrum at the time of fine weather has a size of about 1/4 at the time of fine weather. Therefore, it is understood that, at the time of clear weather, the adverse effect on the power system 50 due to the output fluctuation is small even without performing the charge / discharge control.
  • LFC load frequency control
  • FIG. 10 shows the output power to the electric power system 50 when the charge / discharge control is not performed (the amount of power generation of the power generation device 2 as it is).
  • output fluctuation (fluctuation in the amount of power generation) is large even in rainy weather.
  • FIG. 11 it can be seen that the power spectrum by the FFT analysis is very small. That is, it can be seen that, when it is raining, the adverse effect on the power system 50 is small without performing charge / discharge control.
  • the power spectrum is small at the time of clear weather and rainy weather, and the adverse effect on the power system 50 is small even when the charge / discharge control is not performed. Was found to be low.
  • the charge and discharge depth which greatly affects the life of the storage battery 31 if charge and discharge control is performed regardless of the frequency of the large change, if the transition of the entire power generation amount is substantially the same It turned out that almost no difference was seen. Therefore, by not performing charge / discharge control at the time of fine weather or rainy weather, the frequency of charge / discharge control can be reduced, and the life of the storage battery can be extended.
  • FIG. 12 shows the FFT analysis results for Comparative Example 1, Comparative Example 2, and Examples 1, 2 and 3.
  • the comparative example 1 is an example in the case where charge / discharge control is not performed (when the amount of power generation of the power generation device 2 is output to the electric power system as it is).
  • Comparative Example 2 is an example in which charge / discharge control by a general moving average method different from the moving average method of the first embodiment is constantly performed throughout the day.
  • the general moving average method is at the start and end of charge / discharge control. Even in this case, control is always performed to calculate the target output power based on a fixed sampling number.
  • monitoring of the power generation amount is started when the power generation amount of the power generation device 2 exceeds 10% of the rated output, as in the first embodiment, and the power generation amount before change is changed
  • the charge / discharge control is started when the power generation amount does not return to the vicinity of the value before the change within the standby time.
  • the charge and discharge control is performed to reduce the sampling number at the start and the end of the charge and discharge control.
  • Examples 1, 2 and 3 are examples in which the standby time at the time of determining whether or not the power generation amount returns to the vicinity of the value before the change is 0 minutes, 1 minute and 2 minutes, respectively.
  • Example 1 the battery life can be expected to be extended by 10% or more as compared with Comparative Example 2.
  • the battery life estimated values of Examples 2 and 3 are improved compared to Example 1. This is considered to be because the period for performing the charge / discharge control is shortened by providing the one-minute or two-minute standby time, and accordingly, the number of times of charge / discharge of the storage battery 31 is reduced accordingly. .
  • FIG. 13 shows an FFT analysis result when the sampling period which is an acquisition period of power generation amount data is 10 minutes, and an FFT analysis result when the sampling period is 20 minutes.
  • the sampling period is 10 minutes
  • the fluctuation in the fluctuation period within the range of less than 10 minutes is suppressed, while the fluctuation in the fluctuation period of 10 minutes or more is not suppressed much.
  • the sampling period is 20 minutes
  • the fluctuation in the fluctuation period within the range of less than 20 minutes is suppressed, while the fluctuation in the fluctuation period of 20 minutes or more is not suppressed so much. Therefore, it is understood that there is a good correlation between the size of the sampling period and the fluctuation period which can be suppressed by the charge and discharge control. For this reason, it can be said that the range in which the fluctuation period can be effectively suppressed changes by the setting of the sampling period.
  • the sampling period is the fluctuation period or more corresponding to the load frequency control, in particular, the range from near T1 to T2 near the second half of T1 to T2 (around long period) It is understood that it is preferable to set the period of For example, it can be seen that, by setting the sampling period to 20 minutes or more in the example of FIG. 4, most of the corresponding fluctuation period can be suppressed by the load frequency control. However, if the sampling period is extended, the required storage battery capacity tends to increase, and it is preferable to select a sampling period that is not much longer than T1.
  • a photovoltaic power generation system according to a second embodiment of the present invention will be described with reference to FIG.
  • charge / discharge control is started when the power generation amount does not return to the pre-change power generation amount within a predetermined standby time.
  • An example has been described.
  • charge / discharge control is started immediately after detection of a control start change amount in a state where the control start power generation amount is greater.
  • the configuration of the solar power generation system 1 according to the second embodiment is the same as that of the first embodiment except for the control content of the charge / discharge control unit 5.
  • step S101 the charge / discharge control unit 5 determines whether the power generation amount has become equal to or more than the control start power generation amount. If the power generation amount does not become equal to or more than the control start power generation amount, the charge / discharge control unit 5 repeats this determination.
  • step S102 the charge / discharge control unit 5 starts to monitor a change in the power generation amount. That is, the difference between the detected power generation amount and the detection value of the power generation amount immediately before that is acquired as the change amount of the power generation amount.
  • step S103 the charge / discharge control unit 5 determines whether or not there has been a change in the amount of power generation that is greater than or equal to the control start change. If there is no change in the amount of power generation that is equal to or greater than the control start change, the charge / discharge control unit 5 repeats this determination. Further, when there is a change amount of the power generation amount more than the control start change amount, the charge and discharge control unit 5 immediately starts the charge and discharge control.
  • the charge and discharge control of the second embodiment is the same as the charge and discharge control of the first embodiment shown in FIG.
  • the solar power generation system 100 includes three power generation devices 2a, 2b and 2c formed by solar cells that generate electric power using sunlight, a power storage device 3, a power output unit 4, and a charge / discharge control unit 15. . It is preferable that the total power generation amount of the power generation devices 2 a, 2 b and 2 c be equal to or less than the power generation amount that can be processed by the power output unit 4.
  • the power generation devices 2 a, 2 b and 2 c are connected in parallel to the power output unit 4.
  • the DC-DC converters 7a, 7b and 7c have an MPPT control function.
  • the DC-DC converters 7a, 7b and 7c are provided for each of the power generation devices 2a, 2b and 2c.
  • Each of the DC-DC converters 7a, 7b and 7c has a function of converting the voltage of the power generated by each of the power generation devices 2a, 2b and 2c into a constant voltage and outputting it to the power output unit 4 side.
  • the DC-DC converters 7a, 7b and 7c are examples of the "first DC-DC converter" in the present invention.
  • the charge / discharge control unit 15 includes a CPU 15a and a memory 15b.
  • the charge / discharge control unit 15 acquires the amount of power generation of the power generation devices 2a, 2b and 2c from the power generation amount detectors 8a, 8b and 8c provided on the output side of the DC-DC converters 7a, 7b and 7c.
  • the charge / discharge control unit 15 calculates the target output power based on the total data of the power generation amounts of the respective power generation devices 2a, 2b and 2c, and the total power generation amount of the respective power generation devices 2a, 2b and 2c and the calculated target output
  • the charge and discharge control of the storage battery 31 is performed so as to compensate for the difference with the power.
  • the configuration other than the above configuration is the same as that of the first embodiment.
  • the plurality of power generation devices 2a, 2b and 2c are provided, and the DC-DC converters 7a, 7b and 7c are provided corresponding to the power generation devices 2a, 2b and 2c respectively.
  • the entire output of the power generation device 2 is obtained even when only a part of the power generation device 2 is a shade.
  • the other power generating devices 2b and 2c are not in the shadow if the other power generating devices 2b and 2c are not in the shadow. It is possible to prevent the decrease of the output of 2c. Thereby, the fall of the electric power generation amount of the whole electric power generating apparatus can be suppressed. Thereby, since the fluctuation of the amount of power generation can be suppressed, the adverse effect on the power system 50 can be suppressed.
  • the present invention is not limited to this and another secondary battery may be used.
  • the sampling period is shortened at both the start (initial) and the end (termination) of charge / discharge control.
  • the present invention is not limited to this.
  • the sampling period of only one of the start (initial) and the end (termination) of discharge control may be shortened.
  • the DC-DC converters 7a to 7c are provided for the three power generation devices 2a to 2c, respectively.
  • the present invention is not limited thereto, and one DC-DC converter may be used. It may be connected to a plurality of power generation devices.
  • separate DC-DC converters may be connected to the power generation devices 2a, 2b and 2c, respectively, or one DC-DC converter may be connected to the power generation devices 2a and 2b, and another DC-DC converter may be connected to the power generation device 2c.
  • a converter may be connected.
  • DC-DC converters 33 and 34 are used as examples of the “charging portion” and the “discharging portion” in the present invention, but the present invention is not limited thereto. I can not. That is, devices other than the DC-DC converter may be used as an example of the "charging unit” and the “discharging unit” in the present invention.
  • the present invention is not limited to this, and a voltage other than 48 V may be used.
  • a voltage of a storage battery 60 V or less is desirable.
  • control start power generation amount is 10% of the rated output of the power generation device 2 and the control start change amount is 5% of the power generation amount before the power generation device 2 change
  • the present invention is not limited to this, and other numerical values may be used.
  • the control start change amount may be determined based on the rated output of the power generation device. However, it is desirable that the magnitude of the control start power generation amount be larger than the magnitude of the control start change amount.
  • the waiting time is 2 minutes or less, but the present invention is not limited to this, and may be 2 minutes or more.
  • the waiting time is preferably equal to or less than the upper limit period T1 of the fluctuation period of the load that can be handled by load frequency control (LFC), and more preferably a period equal to or less than the lower limit period T2.
  • LFC load frequency control
  • the value of the lower limit cycle also changes due to the influence of so-called run-in effect on the power system side.
  • the size of the smoothing effect also changes according to the degree of spread and regional dispersion of the photovoltaic system.
  • the upper threshold and the lower threshold for determining that the power generation amount has returned to a value close to the power generation amount before change are 101% and 99% of the power generation amount before change, respectively.
  • the present invention is not limited to this, and values other than these values may be used as the upper threshold and the lower threshold. Also, the same value may be used without making the values of the upper threshold and the lower threshold different. For example, the same amount of power generation as the amount of power generation before change may be used as a common upper and lower threshold value.
  • the upper threshold and the lower threshold are set to 1% of the power generation amount before the change, but the present invention is not limited to this. It does not have to be%.
  • the threshold value in the range of 1% of the power generation amount before the change is used corresponding to the control start change amount being 5% of the power generation amount before the change. It may be changed according to the magnitude of the amount of change. For example, when the control start change amount is 10% of the rated output, the threshold value within the range of 2% of the power generation amount before the change (102% and 98% of the power generation amount before the upper threshold and lower threshold change respectively) It may be set to). Further, it is desirable that the threshold (upper threshold and lower threshold) be within 20% of the control start variation.
  • the present invention is not limited to this.
  • the amount may be configured to be constantly monitored.
  • the present invention is not limited to this and is used in the customer in calculating the target output power.
  • the amount of power consumed by at least a part of the loads may be detected, and the target power may be calculated taking into consideration the amount of load power consumption or the amount of load power consumption fluctuation.
  • the present invention is not limited to the specific numerical values such as the sampling period and the bus voltage described in the first to third embodiments, and can be appropriately changed.
  • the power generation amount detection unit is provided for every three power generation devices, but the present invention is not limited to this, one power generation amount detection unit for three power generation devices You may provide.

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Power Engineering (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Secondary Cells (AREA)

Abstract

 この充放電システムは、発電装置(2)と電力系統(50)とを接続する母線(6)に接続され、蓄電部(31)と、母線から蓄電部に電力を供給する充電部(33)と、充電部とは別個に設けられるとともに、蓄電部から母線に電力を出力する放電部(34)と、充電部および放電部をそれぞれ個別に制御する充放電制御部(5)とを備える。

Description

充放電システム
 本発明は、充放電システムに関し、特に、蓄電部を備えた充放電システムに関する。
 従来、自然エネルギーを用いて発電する発電装置と、発電装置により発電された電力を蓄電可能な蓄電装置とを備えた発電システムが知られている。
 特開2002-171674号公報には、太陽電池と、太陽電池に接続されるとともに電力系統に接続されるインバータと、インバータと太陽電池とを接続する母線に接続された1つの双方向チョッパ(DC-DCコンバータ)と、充放電部に接続された蓄電装置とを備えた発電システムが開示されている。
特開2002-171674号公報
 しかしながら、上記特開2002-171674号公報では、1つのDC-DCコンバータ(双方向チョッパ)を制御することにより充電および放電を行っている。このため、充電から放電に切り替える場合には、充電を停止した後に放電を開始する必要がある。
 このような構成では充電を停止する動作を経る分、充電と放電とを切り替える際に時間がかかってしまう。このため、特に、充電と放電とを頻繁に切り替える必要があるシステム(たとえば、蓄電池を利用して太陽電池の出力変動を平滑化するシステム)において、充電量および放電量の制御性が低下し、その結果、充放電量を高精度に制御することが困難になる。
 この発明は、上記のような課題を解決するためになされたものであり、この発明の1つの目的は、充放電量を高精度に制御することが可能な充放電システムを提供することである。
 この発明の一の局面による充放電システムは、発電装置と電力系統とを接続する母線に接続され、蓄電部と、母線から蓄電部に電力を供給する充電部と、充電部とは別個に設けられるとともに、蓄電部から母線に電力を出力する放電部と、充電部および放電部をそれぞれ個別に制御する充放電制御部とを備える。
 本発明によれば、充電と放電とを短時間で切り替えることができるので、充電量および放電量を正確に制御することができる。その結果、充放電量を高精度に制御することができる。
本発明の第1実施形態による発電システムの構成を示すブロック図である。 図1に示した第1実施形態による発電システムの充放電制御の開始時における発電量の推移および目標出力電力について説明するための図である。 図1に示した第1実施形態による発電システムの充放電制御時における目標出力電力の算出のための発電量データの取得期間について説明するための図である。 電力系統に出力される負荷変動の大きさと変動周期との関係を説明するための図である。 図1に示した第1実施形態による発電システムの充放電制御開始前の制御フローを説明するためのフローチャートである。 図1に示した第1実施形態による発電システムの充放電制御開始後の制御フローを説明するためのフローチャートである。 快晴時および雲のある晴天時における電力系統への出力電力量の一日の推移(充放電制御なし)を示すグラフである。 快晴時および雲のある晴天時における蓄電池の蓄電量の一日の推移(充放電制御なし)を示すグラフである。 図7に示す快晴時および雲のある晴天時における電力系統への出力電力量(充放電制御なし)の変化をFFT(高速フーリエ変換)法により解析した解析結果を示す図である。 雨天時における電力系統への出力電力量の一日の推移(充放電制御なし)を示すグラフである。 図10に示す雨天時の電力系統への出力電力量(充放電制御なし)の変化をFFT(高速フーリエ変換)法により解析した解析結果を示す図である。 充放電制御を行うことによる電力系統への悪影響の軽減効果を検証するためのFFT解析結果を示す図である。 充放電制御におけるサンプリング期間について説明するための図である。 本発明の第2実施形態による発電システムの充放電制御開始前の制御フローを説明するためのフローチャートである。 本発明の第3実施形態による発電システムの構成を示すブロック図である。
 以下、本発明の実施形態を図面に基づいて説明する。
(第1実施形態)
 まず、図1~図4を参照して、本発明の第1実施形態による発電システム(太陽光発電システム1)の構造を説明する。
 太陽光発電システム1は、太陽光を用いて発電する太陽電池からなる発電装置2と、発電装置2により発電された電力を蓄電可能な蓄電装置3と、電力系統50に接続され、発電装置2により発電された電力および蓄電装置3により蓄電された電力を電力系統50に出力するインバータを含む電力出力部4と、蓄電装置3の充放電を制御する充放電制御部5とを備えている。
 発電装置2と電力出力部4とを接続する母線6には、DC-DCコンバータ7が直列的に接続されている。DC-DCコンバータ7は、発電装置2により発電された電力の直流電圧を一定の直流電圧(第1実施形態では、約260V)に変換して電力出力部4側に出力する機能を有する。また、DC-DCコンバータ7は、いわゆるMPPT(Maximum Power Point Tracking)制御機能を有している。MPPT機能とは、発電装置2により発電された電力が最大となるように発電装置2の動作電圧を自動的に調整する機能である。DC-DCコンバータ7は、本発明の「第1DC-DCコンバータ」の一例である。発電装置2とDC-DCコンバータ7との間には、ダイオード(図示せず)が設けられている。ダイオードは、発電装置2に向かって電流が逆流するのを防止する。
 蓄電装置3は、蓄電池31と、蓄電池31の充放電を行う充放電部32とを含んでいる。蓄電池31と発電装置2とは、母線6に対して並列的に接続されている。蓄電池31としては、自然放電が少なく、充放電効率の高い2次電池(たとえば、Li-ion蓄電池、Ni-MH蓄電池など)が用いられている。蓄電池31の電圧は約48Vである。蓄電池31は、本発明の「蓄電部」の一例である。
 充放電部32は、DC-DCコンバータ33および34を有している。母線6と蓄電池31との間において、DC-DCコンバータ33および34は、互いに並列的に接続されている。DC-DCコンバータ33は、発電装置2により発電された電力を蓄電池31に充電する際に用いられる。
 DC-DCコンバータ33は、充電時に、蓄電池31に供給する電力の電圧を、母線6の電圧から蓄電池31を充電するのに適した電圧まで降圧させることにより、母線6側から蓄電池31側に電力を供給する。DC-DCコンバータ33と母線6の間には、充電方向に電流の方向を規制(整流)するダイオード35が設けられている。DC-DCコンバータ33は、本発明の「充電部」および「第2DC-DCコンバータ」の一例である。ダイオード35は、本発明の「第1整流部」の一例である。
 DC-DCコンバータ34は、蓄電池31から電力出力部4側に放電する際に用いられる。DC-DCコンバータ34は、放電時に、母線6側に放電させる電力の電圧を、蓄電池31の電圧から母線6の電圧付近まで昇圧させることにより、蓄電池31側から母線6側に電力を放電させる。DC-DCコンバータ34と母線6の間には、放電方向に電流の方向を規制(整流)するダイオード36が設けられている。DC-DCコンバータ34は、本発明の「放電部」および「第3DC-DCコンバータ」の一例である。ダイオード36は、本発明の「第2整流部」の一例である。
 充放電制御部5は、CPU5aおよびメモリ5bを含んでいる。充放電制御部5は、DC-DCコンバータ33および34のそれぞれを独立して個別に制御することにより、蓄電池31の充放電制御を行う。具体的には、充放電制御部5は、発電装置2の発電量(DC-DCコンバータ7の出力電力)と、後述する目標出力電力とに基づいて、発電装置2の発電量と目標出力電力との差を補償するように蓄電池31の充放電を行う。すなわち、発電装置2の発電量が目標出力電力よりも大きい場合には、充放電制御部5は、過剰分の電力を蓄電池31に充電するように充電専用のDC-DCコンバータ33を制御する。発電装置2の発電量が目標出力電力よりも小さい場合には、充放電制御部5は、不足分の電力を蓄電池31から放電するように放電専用のDC-DCコンバータ34を制御する。
 DC-DCコンバータ7の出力側には、発電装置2の発電量を検出する発電量検出部8が設けられている。発電量検出部8の検出結果に基づいて、充放電制御部5は、発電装置2の発電量を所定の検出時間間隔(たとえば、30秒以下)毎に取得することが可能である。充放電制御部5は、30秒毎に発電装置2の発電量データを取得している。この発電量の検出時間間隔は、長すぎても短すぎても発電量の変化を正確に検出することができないので、発電装置2の発電量の変動周期などを勘案して適性な値に定める必要がある。本実施形態では、負荷周波数制御(LFC)により対応可能な変動周期よりも短く、かつ、後述する待機時間よりも短くなるように検出時間間隔を設定している。
 充放電制御部5は、電力出力部4の出力電力を取得することにより、実際に電力出力部4から電力系統50に出力された電力と目標出力電力との差を認識する。これにより、充放電制御部5は、電力出力部4からの出力電力が目標出力電力となるように充放電部32の充放電をフィードバック制御することが可能である。
 充放電制御部5は、電力系統50に出力する目標出力電力を、移動平均法を用いて算出するように構成されている。移動平均法とは、ある時点の目標出力電力を、その時点より過去の期間の発電装置2の発電量の平均値とする算出方法である。
 以下、目標出力電力の算出に用いる発電量データを取得するための期間をサンプリング期間と呼ぶ。サンプリング期間は、負荷周波数制御(LFC)で対応する変動周期T1~T2の間、特に後半付近(長周期付近)からT1を超える範囲であまり長時間に渡らない範囲とすることが好ましい。サンプリング期間の具体的な値としては、たとえば、図4に示すような「負荷変動の大きさ-変動周期」特性を有する電力系統においては約10分以上約30分以下の期間である。本実施形態では、充放電制御の初期および終期以外の期間においては、サンプリング期間を約10分としている。この場合、充放電制御部5は、約30秒置きに発電装置2の発電量データを取得するので、過去10分の期間に含まれる20個の発電量データの平均値を目標出力電力として算出している。この上限周期T1および下限周期T2については、後に詳細に説明する。サンプリング期間は、本発明の「発電量データの取得期間」の一例である。
 上記のように、充放電制御部5は、過去の発電装置2の発電量から目標出力電力を算出し、発電装置2の発電量と蓄電池31の充放電量との合計が目標出力電力となるように蓄電池31の充放電を制御して目標出力電力を電力系統50に出力する充放電制御を行う。これにより、発電装置2の発電量をそのまま電力系統50に出力する場合と比べて電力系統50に出力する電力の変動が抑制され、平滑化を図ることができる。
 充放電制御部5は、発電装置2の発電量をそのまま電力系統50に出力しても電力系統50への悪影響が小さい場合には充放電制御を行わず、悪影響が大きい場合にのみ充放電制御を行うように構成されている。具体的には、充放電制御部5は、発電装置2の発電量が所定の発電量(以下、「制御開始発電量」と呼ぶ)以上で、かつ、発電装置2の発電量の変化量が所定の変化量(以下、「制御開始変化量」と呼ぶ)以上である場合に、充放電制御を行うように構成されている。
 制御開始発電量は、たとえば雨天時の発電量よりも多い発電量であり、たとえば、発電装置2の定格出力の10%である。制御開始変化量は、快晴時(雲が殆どない晴天)の昼間の時間帯における検出時間間隔毎の最大変化量よりも多い変化量であり、たとえば、発電装置2の変化前の発電量の5%である。発電量の変化量は、所定の検出時間間隔毎に検出される発電装置2の発電量の連続する2つの発電量データの差分を算出することにより取得される。
 発電装置2の発電量が制御開始発電量未満の状態から制御開始発電量以上の状態になると、充放電制御部5は、発電装置2の発電量の変化量の検出を開始する。この状態で、さらに発電装置2の発電量の変化量が制御開始変化量以上になると、充放電制御部5は、はじめて充放電制御を開始する。発電装置2の発電量の変化量が制御開始変化量を超えないまま、発電装置2の発電量が制御開始発電量未満になった場合には、充放電制御部5は、発電装置2の発電量の変化量の検出を停止する。
 発電装置2の発電量の変化量が制御開始変化量以上になった場合であっても、制御開始変化量以上の変化を検出した時点から所定の待機時間内に発電量が変化前の発電量の近傍の値に戻った場合には、電力系統に与える悪影響が小さい。したがって、このような場合には、充放電制御部5は、充放電制御を開始しない。
 上記所定の待機時間は、負荷周波数制御(LFC)により対応可能な変動周期以下の期間である。図4に示す変動周期-負荷変動線の関係図を参照して、所定の待機時間は、好ましくは上限周期T1以下の期間であり、より好ましくは下限周期T2以下の期間である。本実施形態では、所定の待機時間を約2分以下とした。所定の待機時間は、検出時間間隔よりも大きく、検出時間間隔の2倍以上(たとえば、検出時間間隔の2倍以上の整数倍)である。
 変化前の発電量の近傍の値とは、変化前の発電量に対して微小量だけ大きい上側閾値と、変化前の発電量に対して微小量だけ小さい下側閾値との間の値である。上側閾値は、たとえば、変化前の発電量の101%の値である。下側閾値は、たとえば、変化前の発電量の99%の値である。
 発電量の制御開始変化量以上の変化が発電量の制御開始変化量以上の低下である場合には、充放電制御部5は、発電量が低下した後、待機時間内に下側閾値(変化前の発電量の99%)以上にまで上昇した場合に、変化前の発電量の近傍の値に戻ったと判断する。また、発電量の制御開始変化量以上の変化が発電量の制御開始変化量以上の上昇である場合には、充放電制御部5は、発電量が上昇した後、待機時間内に上側閾値(変化前の発電量の101%)以下にまで低下した場合に、変化前の発電量の近傍の値に戻ったと判断する。つまり、発電量の制御開始変化量以上の変化が上昇である場合と低下である場合とで、変化前の発電量の近傍の値に戻ったか否かの判断の基準となる閾値を異ならせている。
 図2を参照して具体的に説明する。発電量P(-2)から発電量P(-1)まで急激に発電量が低下した場合に、発電量P(-1)を検出した時点から待機時間内に発電量P(-2)の近傍の値まで戻らない場合には、充放電制御部5は、充放電制御を開始する。この例では待機時間を1分としている。発電量P(-1)を検出した時点から待機時間内に検出した発電量P0およびP1が発電量P(-2)の近傍の値ではない。このため、充放電制御部5は、発電量P1の検出時点で充放電制御を開始する。発電量P(-1)の後の待機時間内に発電量P(-2)の近傍の値R(下側閾値である発電量P(-2)の99%以上の値R)を検出した場合には、充放電制御部5は、変化前の発電量P(-2)の近傍の値に戻ったと判断して充放電制御を開始しない。
 充放電制御部5は、充放電制御を開始した後、一定の制御期間の経過後に充放電制御を停止するように構成されている。
 制御期間は、少なくとも負荷周波数制御で対応する変動周期範囲を基に決定したサンプリング期間以上である。充放電制御の初期あるいは終期に発電量データ取得期間を短くする手法を取る場合には、制御期間は、少なくともサンプリング期間にデータ取得期間を短くする期間を加えたものが最低の制御期間である。制御期間が短すぎると負荷周波数制御で対応する変動周期範囲の抑制効果が薄くなる。一方、制御期間が長すぎると充放電回数の頻度が増えることから蓄電池寿命が短くなる。したがって、制御期間には適切な時間を設定する必要がある。本実施形態では、制御期間は30分間に設定されている。制御期間は、本発明の「第2期間」の一例である。
 制御期間中に制御開始変化量以上の発電量の変化を所定回数(第1実施形態では、3回)検出した場合には、充放電制御部5は、制御期間を延長するように構成されている。この延長は、3回目の発電量変化を検出した時点で、新たに30分の制御期間を設定することにより行われる。制御期間が延長された場合、3回目の検出時点(延長開始時点)から制御開始変化量以上の発電量の変化を新たに3回検出しない場合には、充放電制御部5は、3回目の検出時点(延長開始時点)から30分後に充放電制御を停止する。3回目の検出時点(延長開始時点)から制御開始変化量以上の発電量の変化を新たに3回検出した場合には、再度30分延長される。
 制御期間中に、発電装置2の発電量が制御開始発電量未満になった場合には、制御期間の経過前であっても、充放電制御部5は、充放電制御を停止するように構成されている。
 次に、図2および図3を参照して、太陽光発電システム1の充放電制御部5による目標出力電力の算出方法について説明する。
 図2に示すように、徐々に発電量が上昇していき、ある発電量検出タイミング(発電量P(-2))からその次の発電量検出タイミング(発電量P(-1))にかけて発電量の急激な変化(低下)が生じ、その後、待機時間内に発電量の変化量が変化前の発電量(発電量P(-2))の近傍の値に戻らずに発電量が徐々に低下していく例を想定する。
 図2に示したような発電量の急激な変化があった場合、図3に示すように、充放電制御の初期および終期以外の期間においては、充放電制御部5は、過去10分のサンプリング期間に含まれる20個の発電量データの平均値を目標出力電力として算出する。その一方、充放電制御の初期(充放電制御の開始時から10分間)および終期(充放電制御の終了予定時までの10分間)については、充放電制御部5は、充放電制御の初期および終期以外の期間の発電量データのサンプリング期間(10分、20個の発電量データ)よりも短い期間の発電量データから目標出力電力を算出するように構成されている。
 具体的には、充放電制御の初期において、充放電制御部5は、充放電制御の開始以降の発電量データ(P1、P2…)をメモリ5bに順次蓄積していくとともに、発電量データのサンプリング期間を充放電制御の開始時点からの発電量データの蓄積量に応じて徐々に増加させる。
 すなわち、ある発電量検出タイミングにおける発電量P(-2)と、その次の発電量検出タイミングにおける発電量P(-1)との間に大きな変化が生じ、かつ、待機時間内に発電量P(-2)の近傍まで発電量が戻らないことが認識されて充放電制御が開始された場合について説明する。
 この場合、充放電制御開始後の1回目の目標出力電力Q1を、直前に取得した発電量データP1そのものとする。2回目の目標出力電力Q2を、メモリ5bに蓄積された2つの発電量データ(直前の2つの発電量データP1およびP2)の平均とする。3回目の目標出力電力Q3は、メモリ5bに蓄積された3つの発電量データ(直前の3つの発電量データP1、P2およびP3)の平均とする。同様にして、20回目の目標出力電力Q20を、その直前の20個の発電量データ(P1~P20)の平均とする。発電量データの蓄積量が20個に達した時点で、初期から初期および終期以外の期間に移行する。そして、発電量データの蓄積量が20個に達した後(初期および終期以外の期間)では、20個の発電量データに基づいて目標出力電力を算出する。
 充放電制御の終了時点(終了予定時点)が近づくと、発電量データのサンプリング期間を充放電制御の終了時点(終了予定時点)までの発電量データの取得予定量に応じて徐々に減少させる。終了予定時点は充放電制御の開始(延長の開始)から30分であるので、発電量データのサンプリング期間を減少させ始める時点は算出可能である。充放電制御の終了予定時点の10分前になった時点で、初期および終期以外の期間から終期に移行するとともに、終期の開始時点から発電量データのサンプリング期間を減少させ始める。
 具体的には、充放電制御の終了時点(終了予定時点)の目標出力電力の算出が制御開始からn回目とすると、制御終了前20回目の目標出力電力Q(n-19)を、その直前の20個の発電量データP(n-38)~P(n-19)の平均とする。制御終了前19回目の目標出力電力Q(n-18)を、その直前の19個の発電量データP(n-36)~P(n-18)の平均とする。同様にして、制御終了前3回目の目標出力電力Q(n-2)を、その直前の3個の発電量データP(n-4)、P(n-3)およびP(n-2)の平均とする。制御終了前2回目の目標出力電力Q(n-1)を、その直前の2個の発電量データP(n-2)およびP(n-1)の平均とする。そして、制御終了直前の目標出力電力Q(n)は、その直前の発電量データP(n)そのままとする。
 ここで、充放電制御により変動抑制を主に行う変動周期範囲について説明する。図4に示すように、変動周期によって対応可能な制御方法が異なっている。領域D(ハッチングで示す領域)は、負荷周波数制御(LFC)により対応可能な負荷の変動周期を示す。領域Aは、EDCにより対応可能な負荷の変動周期を示す。領域Bは、負荷変動による影響を電力系統50自体の自己制御性により自然に吸収する領域である。領域Cは、各発電所の発電機のガバナフリー運転により対応が可能な領域である。
 領域Dと領域Aとの境界線が負荷周波数制御(LFC)により対応可能な負荷の変動周期の上限周期T1となる。領域Cと領域Dとの境界線が負荷周波数制御により対応可能な負荷の変動周期の下限周期T2となる。この上限周期T1および下限周期T2は、図4より固有の周期ではなく、負荷変動の大きさによって変化する数値であることが分かる。
 構築された電力網によって図示されている変動周期の時間も変化する。本実施形態では、EDC、電力系統50自体の自己制御性およびガバナフリー運転などによって対応できない領域D(LFCにより対応可能な領域)の範囲内に含まれる変動周期(変動周波数)を有する負荷変動に着目し、抑制することを目的としている。
 次に、図5を参照して、太陽光発電システム1の充放電制御開始前の制御フローについて説明する。
 充放電制御部5は、発電装置2の発電量を所定の検出時間間隔毎(30秒毎)に検出している。そして、ステップS1において、充放電制御部5は、発電量が制御開始発電量以上になったか否かを判断する。発電量が制御開始発電量以上にならなかった場合には、この判断が繰り返される。発電量が制御開始発電量以上になった場合には、ステップS2において、充放電制御部5は、発電量の変化量の監視を開始する。すなわち、検出した発電量と、その直前の発電量の検出値との差分を発電量の変化量として取得する。
 ステップS3において、充放電制御部5は、制御開始変化量以上の発電量の変化があったか否かを判断する。制御開始変化量以上の発電量の変化がない場合には、ステップS2に戻り、充放電制御部5は、発電量の変化量の監視を継続する。
 制御開始変化量以上の発電量の変化があった場合には、ステップS4において、充放電制御部5は、待機時間以内に発電量が変化前の値の近傍に戻ったか否かを判断する。発電量が変化前の値の近傍に戻った場合には、充放電制御部5は、充放電制御を行わずにステップS2に戻り、発電量の変化量の監視を継続する。発電量が変化前の値の近傍に戻らない場合には、充放電制御部5は、充放電制御を開始する。
 なお、図5には記載していないが、充放電制御部5は、たとえばステップS2において発電量の変化量を監視する際に発電量の絶対値を確認し、発電量が制御開始発電量を下回った場合にはステップS1に戻るようにもしている。
 次に、図6を参照して、充放電制御の開始後の制御フローについて詳細に説明する。
 充放電制御を開始した後、ステップS5において、充放電制御部5は、充放電制御を開始した時点からの経過時間のカウントを開始する。
 次に、ステップS6において、充放電制御部5は、充放電制御を開始してからの発電量データの蓄積数(サンプリング回数k1)または充放電制御の終了予定までのサンプリング予定回数k2が所定回数(第1実施形態では、20回)以上であるか否かを判断する。
 発電量データのサンプリング数k1または終了までのサンプリング予定回数k2が20個以上である場合には、ステップS7において、充放電制御部5は、直前の20個のサンプリング値を用いて移動平均法により目標出力電力を算出して設定する。
 発電量データのサンプリング数k1または制御終了までのサンプリング予定回数k2が所定回数(20個)未満である場合には、ステップS8において、充放電制御部5は、k1個またはk2個のサンプリング値を用いて移動平均法により目標出力電力を算出して設定する。すなわち、充放電制御の開始時には、充放電制御部5は、目標出力電力の算出に用いるサンプリング数を目標出力電力の算出毎に1から20まで1つずつ増加させる。充放電制御の終了(予定)時には、充放電制御部5は、目標出力電力の算出に用いるサンプリング数を目標出力電力の算出毎に20から1まで1つずつ減少させる。
 ステップS9において、充放電制御部5は、ステップS7またはS8において設定した目標出力電力と、目標出力電力の算出後に検出した発電量との差を算出する。そして、ステップS10において、充放電制御部5は、充放電部32に対して過不足分の充放電を指示する。すなわち、目標出力電力が発電量よりも大きい場合には、目標出力電力に対して発電装置2の発電量では足りない分を蓄電池31により補うように、充放電制御部5は、DC-DCコンバータ34に対して放電を指示する。また、目標出力電力が発電量よりも小さい場合には、発電装置2の発電量から目標出力電力を差し引いて余る分を蓄電池31に充電するように、充放電制御部5は、DC-DCコンバータ33に対して充電を指示する。
 ステップS11において、目標出力電力(発電装置2の発電量+蓄電池31の充放電量)が電力出力部4から電力系統50に出力される。
 この後、ステップS12において、充放電制御部5は、所定の変化量(制御開始変化量)以上の発電量の変化が所定回数(第1実施形態では、3回)あったか否かを判断する。制御開始変化量以上の発電量の変化が3回あった場合には、この後も発電量の変化が継続する可能性が高い。このため、ステップS13において、充放電制御部5は、経過時間のカウントをリセットするとともに、充放電制御の期間を延長する。この場合、ステップS5に戻り、充放電制御部5は、新たに経過時間のカウントを開始する。
 制御開始変化量以上の発電量の変化が3回未満の場合には、ステップS14において、充放電制御部5は、発電装置2の発電量が所定の発電量(制御開始発電量)を超えているか否かを判断する。そして、制御開始発電量を超えている場合には、ステップS15において、充放電制御部5は、充放電制御を開始してから、または、充放電制御期間を延長してから、制御期間(30分)を経過したか否かを判断する。制御期間が経過した場合には、充放電制御部5は充放電制御を停止する。制御期間が経過していない場合には、ステップS6に戻り、充放電制御部5は、充放電制御を継続する。
 ステップS14において発電量が制御開始発電量未満であると判断された場合には、制御期間が経過していない場合であっても、充放電制御部5は、充放電制御を停止する。
 第1実施形態では、上記のように、蓄電池31の充電を行うDC-DCコンバータ33および蓄電池31の放電を行うDC-DCコンバータ34をそれぞれ個別に制御する充放電制御部5とを備える。これにより、たとえば充電から放電に切り替える場合には、DC-DCコンバータ33による充電を停止するのと同時にDC-DCコンバータ34による放電を開始することができる。これにより、充電と放電とを短時間で切り替えることができるので、充電量および放電量を正確に制御することができる。その結果、充放電量を高精度に制御することができる。また、蓄電装置3にDC-DCコンバータ33とDC-DCコンバータ34とを設けることによって、充電部と放電部とが1つの装置に組み込まれている場合と比較して、たとえば、放熱性を向上させることができ、信頼性をより向上させることができる。
 また、第1実施形態では、上記のように、充放電制御部5は、発電量検出部8により検出された発電量が制御開始発電量以上で、かつ、発電量の変化量が制御開始変化量以上である場合に、充放電制御を行う。このように構成すれば、条件を満たさない場合には充放電制御を行わないので、蓄電装置3の充放電回数を減らすことができる。また、本願発明者は、鋭意検討した結果、発電装置2の発電量が制御開始発電量より小さい場合、および、発電装置2の発電量の変化量が制御開始変化量よりも小さい場合には、充放電制御を行わない場合であっても、発電装置2による発電量の変動に起因する電力系統50への影響が小さいことを見出した。したがって、本発明では、発電装置2による発電量の変動に起因する電力系統50への影響を抑制しながら、蓄電装置3の長寿命化を図ることができる。
 また、第1実施形態では、上記のように、制御開始発電量は、たとえば雨天時の発電量よりも多い発電量である。このように構成すれば、充放電制御を行わなくても電力系統50への悪影響が小さい雨天時に充放電制御を行わないことにより、蓄電装置3の長寿命化を図ることができる。
 また、第1実施形態では、上記のように、制御開始発電量は、発電装置2の定格出力の10%の発電量である。このように構成すれば、充放電制御を開始する際の閾値である制御開始発電量を雨天時の発電量よりも大きくすることができるので、容易に雨天時に充放電制御を行わないように制御することができる。
 また、第1実施形態では、上記のように、充放電制御部5は、発電量が制御開始変化量以上変化し、かつ、発電量が待機時間内に変化前の発電量近傍の発電量に戻らない場合に、充放電制御を行う。このように構成すれば、発電装置2の発電量の変化量が制御開始変化量よりも小さい場合には充放電制御を行わないので、蓄電装置3の充放電回数を減らすことができる。また、発電装置2の発電量の変化量が制御開始変化量以上の場合であっても、待機時間内に変化前の発電量近傍の発電量に戻った場合には充放電制御を行わないので、蓄電装置3の充放電回数をさらに減らすことができる。これにより、蓄電装置3の長寿命化を図ることができる。
 また、第1実施形態では、上記のように、制御開始変化量を快晴時の昼間の時間帯における検出時間間隔毎の最大変化量よりも多い変化量としている。このように構成すれば、検出時間間隔毎の発電量の変化量の少ない快晴時に充放電制御を行わないことにより、発電装置2による発電量の変動に起因する電力系統50への影響を抑制しながら充放電回数を減少することができる。その結果、蓄電装置3の長寿命化を図ることができる。
 また、第1実施形態では、上記のように、制御開始変化量は、変化前の発電量の5%の変化量である。このように構成すれば、容易に、充放電制御を開始する際の閾値である制御開始変化量を快晴時の昼間の時間帯における所定の検出時間間隔毎の最大変化量よりも大きくすることができる。また、制御開始変化量は、発電装置2の定格容量を基準にして求めてもよい。このようにしても、上記と同様の効果を得ることができる。
 また、第1実施形態では、上記のように、充放電制御部5は、充放電制御の初期および終期において、充放電制御の初期および終期以外の期間よりも、移動平均の算出に用いる発電量データの取得期間を短くして目標出力電力を算出する。このように構成すれば、充放電制御開始時の発電量と大きく異なる急激な変化前(充放電制御開始前)の発電量の値が充放電制御の初期における目標出力電力の算出に用いられてしまうことを抑制することができる。これにより、充放電制御開始時において算出する目標出力電力と実際の発電量との差を小さくすることができる。
 また、充放電制御の終期における移動平均の算出に用いる発電量データの取得期間を、充放電制御の初期および終期以外の期間よりも短くした場合には、充放電制御の終了時点で、充放電制御の終了時点近傍の発電量データのみ取得されて目標出力電力が算出されるので、充放電制御の終了時点の前後で電力系統50への出力電力量の変化を小さくすることができる。その結果、電力系統50に出力される電力量の変動を抑制することができる。
 また、第1実施形態では、上記のように、充放電制御部5は、充放電制御の開始から制御期間の経過後に充放電制御を停止するとともに、充放電制御中に、制御開始変化量以上の変化が3回以上あった場合に、充放電制御の制御期間を延長する。このように構成すれば、充放電制御を停止しない場合に比べて充放電回数を減少することができるので、蓄電装置3の長寿命化を図ることができる。また、発電量の変動が続くと予想される場合には継続して充放電制御を行うことができる一方、発電量の変動が続かず、充放電制御が不必要と考えられる期間には充放電制御を行うことを抑制することができる。その結果、蓄電装置3の充放電回数を減少させながら、効果的に充放電制御を行うことができる。
 次に、図7~図13を参照して、太陽光発電システム1を用いることによる効果に関して鋭意検討した結果について、詳細に説明する。
 図7には、快晴時および雲のある晴天時の一日の実際の発電量(出力電力)の変動推移を示している。図7は、充放電制御を行わない場合の電力系統50への出力電力(発電装置2の発電量そのまま)を示している。快晴時には、日光が雲により遮られることがないので、発電装置2の発電量が大きな変動なく滑らかに推移している。その一方、雲のある晴天時には、雲の影響により日射量が変動することに起因して、発電装置2の発電量が大きな変動を繰り返しながら推移していることがわかる。
 図8は、充放電制御を行わない場合における蓄電池31の充電量の推移を示している。快晴時の充放電の最大深度差H1は蓄電池の最大充電量の約14%であり、雲のある晴天時の充放電の最大深度差H2は蓄電池の最大充電量の約15%である。すなわち、快晴時と雲のある晴天時とで充放電の最大深度差は大きく変わらないことがわかる。
 充放電の最大深度差が蓄電池31の寿命に大きく影響することが知られている。しかし、快晴時と晴天時とで充放電の最大深度差が大きく変わらないことから、快晴時と雲のある晴天時とで蓄電池31の寿命は大きく変わらないことがわかる。すなわち、全体的な推移が略同じであれば、大きな変動の頻度に拘わらず、蓄電池寿命は殆ど変わらないことがわかる。
 ここで、図7の出力電力パターンが電力系統50に与える影響について考察する。電力系統50への影響を検討するために、図7のそれぞれの出力電力パターンについて、FFT(高速フーリエ変換)により解析した。図9は、その解析結果を示す。快晴時と雲のある晴天時とでパワースペクトルについて大きな差異が見られることがわかる。特に負荷周波数制御(LFC)領域である数分程度の周波数領域を見てみると、快晴時のパワースペクトルは晴天時の1/4程度の大きさとなっている。したがって、快晴時においては、充放電制御を行わなくても出力変動による電力系統50への悪影響は小さいことがわかる。
 次に、雨天時の出力変動が電力系統50に与える影響について考察する。図10および図11には、雨天時の一日の実際の発電量の変動推移およびそのFFT解析結果を示している。図10は、充放電制御を行わない場合の電力系統50への出力電力(発電装置2の発電量そのまま)を示している。
 図10に示すように、雨天時においても出力変動(発電量の変動)が多い。一方、図11に示すように、FFT解析によるパワースペクトルは非常に小さくなっていることがわかる。すなわち、雨天時には、充放電制御を行わなくても電力系統50への悪影響は小さいことがわかる。
 以上のことから、FFT解析の結果、快晴時や雨天時においてはパワースペクトルが小さく、充放電制御を行わない場合であっても電力系統50への悪影響は小さいので、充放電制御を行う必要性が低いことを見出した。また、蓄電池31の寿命には大きく影響を与える充放電深度については、全体的な発電量の推移が略同じであれば、大きな変動の頻度に拘わらず充放電制御を行う場合と行わない場合とで殆ど差が見られないことが判明した。したがって、快晴時や雨天時に充放電制御を行わないようにすることによって、充放電制御を行う頻度を低減することができ、蓄電池寿命を延ばすことができる。
 次に、充放電制御を行うことによる電力系統50への悪影響の軽減効果を検証した結果について説明する。
 図12には、比較例1、比較例2、実施例1、2および3についてのFFT解析結果を示している。比較例1は、充放電制御を行わない場合(発電装置2の発電量をそのまま電力系統に出力する場合)の例である。比較例2は、第1実施形態の移動平均法とは異なる一般的な移動平均法による充放電制御を一日中常時行った場合の例である。
 一般的な移動平均法とは、充放電制御の開始時および終了時においてサンプリング数(サンプリング期間)を減少させる第1実施形態の移動平均法と異なり、充放電制御の開始時および終了時であっても、常に一定のサンプリング数に基づいて目標出力電力を算出する制御である。
 実施例1~3は、第1実施形態と同様に、発電装置2の発電量が定格出力の10%を超えた場合に発電量の監視を開始し、発電量の変化が変化前の発電量の5%を超え、かつ、待機時間内に発電量が変化前の値の近傍に戻らなかった場合に充放電制御を開始する例である。
 また、実施例1~3では、第1実施形態と同様に、充放電制御の開始時および終了時にサンプリング数を減らす充放電制御を行っている。さらに、実施例1、2および3は、それぞれ、発電量が変化前の値の近傍に戻るか否かを判断する際の待機時間を0分、1分および2分とした例である。
 図12に示すように、比較例2および実施例1~3は、比較例1に比べてFFT解析結果のパワースペクトルが減少している。すなわち、比較例2および実施例1~3では、充放電制御を行わない場合(比較例1)と比べて大きくパワースペクトルが減少している。また、実施例1~3では、一般的な移動平均法を一日中行った場合(比較例2)と同レベルで出力電力の平滑化ができていることから、一般的な移動平均法を一日中常時行った場合と同レベルで電力系統50への悪影響を抑制できていることがわかる。以上のことから、第1実施形態による充放電制御を行うことによって、一般的な移動平均法によって充放電制御を一日中常時行った場合と同様に、電力系統への悪影響を軽減することが可能であることが判明した。
 ここで、比較例2および実施例1~3における蓄電池31の寿命を簡易的に見積もった結果を以下の表1に示す。ここでは、約2ヶ月間の発電量データに基づいて、比較例2および実施例1~3のそれぞれの充電量および放電量の総和を求め、その逆数をもって電池寿命の見積もり値とした。また、実施例1~3の値は、比較例2の値を基準に規格化された値である。
Figure JPOXMLDOC01-appb-T000001
 表1に示すように、実施例1~3では、比較例2に比べて10%以上の電池寿命の長寿命化が期待できる。また、実施例1に比べて実施例2および3の電池寿命見積もり値が向上している。これは、1分または2分の待機時間を設けたことにより、充放電制御を行う期間が短くなったので、その分、蓄電池31の充放電回数が少なくなったことが理由であると考えられる。
 次に、移動平均法のサンプリング期間について検討した。
 図13は、発電量データの取得期間であるサンプリング期間を10分とした場合のFFT解析結果と、サンプリング期間を20分とした場合のFFT解析結果を示す。サンプリング期間が10分の場合には、変動周期が10分未満の範囲における変動が抑制されている一方、変動周期が10分以上の範囲における変動があまり抑制されていないことがわかる。サンプリング期間が20分の場合には、変動周期が20分未満の範囲における変動が抑制されている一方、変動周期が20分以上の範囲における変動はあまり抑制されていない。したがって、サンプリング期間の大きさと、充放電制御により抑制できる変動周期との間には良好な相関関係があることがわかる。このため、サンプリング期間の設定により効果的に変動周期を抑制できる範囲が変わることがいえる。
 そこで、負荷周波数制御により対応可能な変動周期の部分を抑制するためには、サンプリング期間を負荷周波数制御で対応する変動周期以上、特にT1~T2の後半付近(長周期付近)からT1以上の範囲の期間とすることが好ましいことがわかる。たとえば、図4の例では20分以上のサンプリング期間とすることにより、負荷周波数制御で対応する変動周期の殆どを抑制することができることがわかる。ただし、サンプリング期間を長くすると、必要な蓄電池容量が大きくなる傾向があり、T1よりもあまり長くないサンプリング期間を選択することが好ましい。
(第2実施形態)
 次に、図14を参照して、本発明の第2実施形態による太陽光発電システムについて説明する。第1実施形態では、制御開始発電量以上の状態で、制御開始変化量を検出した後、所定の待機時間内に発電量が変化前の発電量に戻らなかった場合に充放電制御を開始した例を説明した。これと異なり、第2実施形態では、制御開始発電量以上の状態で、制御開始変化量を検出した後、すぐに充放電制御を開始する例について説明する。なお、第2実施形態による太陽光発電システム1の構成は、充放電制御部5の制御内容以外については上記第1実施形態と同様である。
 充放電制御開始前の制御フローにおいて、図14に示すように、まず、ステップS101において、充放電制御部5は、発電量が制御開始発電量以上になったか否かを判断する。発電量が制御開始発電量以上にならない場合には、充放電制御部5は、この判断が繰り返す。発電量が制御開始発電量以上になった場合には、ステップS102において、充放電制御部5は、発電量の変化の監視を開始する。すなわち、検出した発電量と、その直前の発電量の検出値との差分を発電量の変化量として取得する。
 ステップS103において、充放電制御部5は、制御開始変化量以上の発電量の変化量があったか否かを判断する。制御開始変化量以上の発電量の変化量がない場合には、充放電制御部5は、この判断を繰り返す。また、制御開始変化量以上の発電量の変化量があった場合には、充放電制御部5は、直ちに充放電制御を開始する。
 第2実施形態の充放電制御は、図6に示した上記第1実施形態の充放電制御と同様である。
 第2実施形態の効果は、上記第1実施形態と同様である。
(第3実施形態)
 次に、図15を参照して、本発明の第3実施形態による発電システム(太陽光発電システム100)について説明する。
 太陽光発電システム100では、太陽光を用いて発電する太陽電池からなる3つの発電装置2a、2bおよび2cと、蓄電装置3と、電力出力部4と、充放電制御部15とを備えている。発電装置2a、2bおよび2cの総発電量が電力出力部4で処理可能な発電量以下になるようにすることが好ましい。
 発電装置2a、2bおよび2cは、電力出力部4に対して並列的に接続されている。
 DC-DCコンバータ7a、7bおよび7cは、MPPT制御機能を有している。DC-DCコンバータ7a、7bおよび7cは、各発電装置2a、2bおよび2c毎に設けられている。各DC-DCコンバータ7a、7bおよび7cは、発電装置2a、2bおよび2cのそれぞれにより発電された電力の電圧を一定電圧に変換して電力出力部4側に出力する機能を有する。DC-DCコンバータ7a、7bおよび7cは、本発明の「第1DC-DCコンバータ」の一例である。
 充放電制御部15は、CPU15aおよびメモリ15bを含む。充放電制御部15は、各DC-DCコンバータ7a、7bおよび7cの出力側に設けられた発電量検出部8a、8bおよび8cのそれぞれから発電装置2a、2bおよび2cの発電量を取得する。充放電制御部15は、各発電装置2a、2bおよび2cの発電量の総和データに基づいて目標出力電力を算出するとともに、各発電装置2a、2bおよび2cの発電量総和と上記算出した目標出力電力との差を補償するように蓄電池31の充放電制御を行う。
 上記した構成以外の構成は、上記第1実施形態と同様である。
 第3実施形態では、上記のように、複数の発電装置2a、2bおよび2cを設け、発電装置2a、2bおよび2cのそれぞれに対応してDC-DCコンバータ7a、7bおよび7cを設けている。このように構成することによって、上記第1実施形態のように1つの発電装置2を用いた場合には発電装置2の一部のみが陰になっただけの場合でも発電装置2全体の出力が低下する一方、第3実施形態では、1つの発電装置2aが雲の陰になって出力が低下した場合にも、他の発電装置2bおよび2cが陰になっていなければ他の発電装置2bおよび2cの出力が低下することを防止することができる。これにより、発電装置全体の発電量の低下を抑制することができる。これにより、発電量の変動を抑制することができるので、電力系統50への悪影響を抑制することができる。
 第3実施形態のその他の効果は、上記第1実施形態と同様である。
 なお、今回開示された実施形態および実施例は、すべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は、上記した実施形態の説明ではなく特許請求の範囲によって示され、さらに特許請求の範囲と均等の意味および範囲内でのすべての変更が含まれる。
 たとえば、上記第1~第3実施形態では、発電装置2(発電装置2a、2bおよび2c)として太陽電池を用いる例について説明したが、本発明はこれに限らず、風力発電装置などの他の自然エネルギー発電装置を用いてもよい。
 また、上記第1~第3実施形態では、蓄電池としてLi-ion電池やNi-MH電池を用いる例を示したが、本発明はこれに限らず、他の2次電池を用いてもよい。また、本発明の「蓄電部」の一例として、蓄電池の代わりにキャパシタを用いてもよい。
 また、上記第1~第3実施形態では、充放電制御の開始時(初期)および終了時(終期)の両方でサンプリング期間を短くした例を示したが、本発明はこれに限らず、充放電制御の開始時(初期)および終了時(終期)のいずれか一方のみのサンプリング期間を短くしてもよい。
 また、上記第3実施形態では、3つの発電装置2a~2cのそれぞれにDC-DCコンバータ7a~7cを設けた例を示したが、本発明はこれに限らず、1つのDC-DCコンバータを複数の発電装置に接続してもよい。たとえば、発電装置2a、2bおよび2cにそれぞれ個別のDC-DCコンバータを接続してもよいし、発電装置2aおよび2bに1つのDC-DCコンバータを接続し、発電装置2cに別のDC-DCコンバータを接続してもよい。
 また、上記第1~第3実施形態では、本発明の「充電部」および「放電部」の一例として、DC-DCコンバータ33および34を用いた例を示したが、本発明はこれに限られない。すなわち、DC-DCコンバータ以外の機器を本発明の「充電部」および「放電部」の一例として用いてもよい。
 また、上記第1~第3実施形態では、蓄電池31の電圧が48Vである例について説明したが、本発明はこれに限らず、48V以外の電圧にしてもよい。なお、蓄電池の電圧としては60V以下が望ましい。
 また、上記第1~第3実施形態では、制御開始発電量を発電装置2の定格出力の10%とし、制御開始変化量を発電装置2の変化前の発電量の5%とした例について説明したが、本発明はこれに限らず、上記以外の数値を用いてもよい。たとえば、制御開始変化量は、発電装置の定格出力を基準にして決めてもよい。ただし、制御開始発電量の大きさは、制御開始変化量の大きさよりも大きいことが望ましい。
 また、上記第1~第3実施形態では、待機時間が2分以下である例について説明したが、本発明はこれに限らず、2分以上でもよい。なお、待機時間は、負荷周波数制御(LFC)により対応可能な負荷の変動周期の上限周期T1以下が好ましく、下限周期T2以下の期間であることがより好ましい。ただし、電力系統側におけるいわゆるならし効果などの影響により下限周期の値も変化する。また、ならし効果の大きさも、太陽光発電システムの普及度および地域分散性などに応じて変化する。
 また、上記第1および第3実施形態では、変化前の発電量の近傍の値に戻ったと判断するための上側閾値および下側閾値を、それぞれ、変化前の発電量の101%および99%とした例を示したが、本発明はこれに限らず、これらの値以外の値を上側閾値および下側閾値としてもよい。また、上側閾値および下側閾値の値を異ならせずに、同じ値を用いてもよい。たとえば、変化前の発電量と同一の発電量を上側および下側の共通の閾値として用いてもよい。
 また、上記第1および第3実施形態では、上側閾値および下側閾値を変化前の発電量の1%とした例について説明したが、本発明はこれに限らず、変化前の発電量の1%でなくてもよい。上記第1および第3実施形態では、制御開始変化量を変化前の発電量の5%としたことに対応して変化前の発電量の1%の範囲となる閾値を用いたが、制御開始変化量の大きさに対応して変えてもよい。たとえば、制御開始変化量を定格出力の10%とした場合には、変化前の発電量の2%の範囲となる閾値(上側閾値および下側閾値それぞれ変化前の発電量の102%および98%)に設定してもよい。また、閾値(上側閾値および下側閾値)は、制御開始変化量の20%以内とすることが望ましい。
 また、上記第1~第3実施形態では、発電量が制御開始発電量以上になってはじめて発電量の変化量を監視する例について説明したが、本発明はこれに限らず、発電量の変化量を常時監視するように構成してもよい。
 また、上記第1~第3実施形態では、需要家内で用いる負荷における消費電力量を想定しない場合について説明したが、本発明はこれに限らず、目標出力電力の算出において、需要家内で用いられる少なくとも一部の負荷で消費する電力量を検出し、その負荷消費電力量あるいは負荷消費電力変動量を加味して目標出力の算出を行ってもよい。
 また、上記第1~第3実施形態に記載されたサンプリング期間、母線電圧などの具体的な数値についても、本発明はこれに限られず、適宜変更が可能である。
 また、上記第3実施形態では、発電量検出部を3つの発電装置毎に設けた例を示したが、本発明はこれに限らず、1つの発電量検出部を3つの発電装置に対して設けてもよい。
 

Claims (16)

  1.  発電装置と電力系統とを接続する母線に接続され、
     蓄電部と、
     前記母線から前記蓄電部に電力を供給する充電部と、
     前記充電部とは別個に設けられるとともに、前記蓄電部から前記母線に電力を出力する放電部と、
     前記充電部および前記放電部をそれぞれ個別に制御する充放電制御部とを備える、充放電システム。
  2.  前記発電装置と前記電力系統との間に直列的に接続された第1DC-DCコンバータをさらに備える、請求項1に記載の充放電システム。
  3.  前記充電部は、前記蓄電部の充電用の第2DC-DCコンバータを含み、
     前記放電部は、前記蓄電部の放電用の第3DC-DCコンバータを含む、請求項1に記載の充放電システム。
  4.  前記充電部は、前記蓄電部への充電方向に電流の方向を規制する第1整流部を含み、
     前記放電部は、前記蓄電部からの放電方向に電流の方向を規制する第2整流部を含む、請求項1に記載の充放電システム。
  5.  前記母線に対して複数の前記発電装置が並列的に接続されており、
     前記第1DC-DCコンバータは、前記複数の発電装置の各々または複数個に1つの割合で接続されている、請求項2に記載の充放電システム。
  6.  前記充放電制御部は、前記発電装置の発電量と前記電力系統に出力する目標出力電力とに基づいて、前記発電装置の発電量と前記目標出力電力との差を補償するように前記充電部および前記放電部をそれぞれ制御する充放電制御を行うことが可能なように構成されている、請求項1に記載の充放電システム。
  7.  前記充放電制御部は、前記充電部および前記放電部の充放電制御を行う際、
     前記発電装置の発電量が前記目標出力電力よりも大きい場合に、前記発電装置の発電量と前記目標出力電力との差分に相当する電力が前記発電装置から前記蓄電部に充電されるように前記充電部を制御するとともに、
     前記発電装置の発電量が前記目標出力電力よりも小さい場合に、前記発電装置の発電量と前記目標出力電力との差分に相当する電力が前記蓄電部から放電されるように前記放電部を制御するように構成されている、請求項6に記載の充放電システム。
  8.  前記発電装置と前記電力系統との間に直列的に接続され、前記発電装置により発電された直流電圧を所定の直流電圧に変換する第1DC-DCコンバータと、
     前記第1DC-DCコンバータにより変換された前記所定の直流電圧での電力を前記発電装置の発電量として検出する発電量検出部とをさらに備え、
     前記充放電制御部は、前記電力系統に出力する目標出力電力を算出するとともに、前記目標出力電力と、前記発電量検出部により検出された発電量に対応する電力との差を補償するように前記充電部および前記放電部をそれぞれ制御する充放電制御を行うように構成されている、請求項6に記載の充放電システム。
  9.  前記充放電制御部は、前記発電量検出部により検出された前記所定の直流電圧での発電量が所定の発電量以上で、かつ、前記所定の直流電圧での発電量の変化量が所定の変化量以上である場合に、前記充電部および前記放電部をそれぞれ制御する充放電制御を行うように構成されている、請求項8に記載の充放電システム。
  10.  前記第1DC-DCコンバータは、太陽光を用いて発電する前記発電装置に接続され、
     前記所定の発電量以上で前記充放電制御を行う際の前記所定の発電量は、前記太陽光を用いて発電する発電装置の雨天時の発電量よりも多い発電量である、請求項9に記載の充放電システム。
  11.  前記所定の発電量は、前記発電装置の定格出力の10%の発電量である、請求項9に記載の充放電システム。
  12.  前記充放電制御部は、前記発電量検出部により検出された前記所定の直流電圧での発電量の変化量が所定の変化量以上で、かつ、発電量が第1期間内に変化前の発電量近傍の発電量に戻らない場合に、前記充電部および前記放電部をそれぞれ制御する充放電制御を行うように構成されている、請求項8に記載の充放電システム。
  13.  前記第1DC-DCコンバータは、太陽光を用いて発電する前記発電装置に接続され、
     前記充放電制御部は、前記発電装置の発電量を所定の検出時間間隔で取得するとともに、前記所定の検出時間間隔で取得された発電量に基づいて、前記発電装置の発電量の変化量が所定の変化量以上であるか否かを判断し、
     前記発電量の変化量が前記所定の変化量以上で前記充放電制御を行う際の前記所定の変化量は、快晴時の昼間の時間帯における前記所定の検出時間間隔毎の最大変化量よりも多い変化量である、請求項9に記載の充放電システム。
  14.  前記発電量の所定の変化量は、変化前の発電量の5%の変化量である、請求項13に記載の充放電システム。
  15.  前記充放電制御部は、前記充電部および前記放電部の充放電制御を行う際に、前記電力系統に出力する目標出力電力を移動平均法により算出するとともに、前記充放電制御の初期および終期の少なくとも一方の期間において、前記充放電制御の初期および終期の少なくとも一方の期間以外の期間よりも、移動平均の算出に用いる発電量データの取得期間を短くして前記目標出力電力を算出するように構成されている、請求項8に記載の充放電システム。
  16.  前記充放電制御部は、前記充電部および前記放電部の前記充放電制御の開始から第2期間の経過後に前記充放電制御を停止するように構成されているとともに、前記充放電制御中に、前記発電装置による発電量の前記所定の変化量以上の変化が所定回数以上あった場合に、前記充放電制御の前記第2期間を延長するように構成されている、請求項9に記載の充放電システム。
     
PCT/JP2010/072753 2009-12-17 2010-12-17 充放電システム WO2011074661A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2011546179A JPWO2011074661A1 (ja) 2009-12-17 2010-12-17 充放電システム
US13/423,725 US20120256483A1 (en) 2009-12-17 2012-03-19 Electrical charge and discharge system, method of managing a battery and a power generator, and computer-readable recording medium

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2009-286172 2009-12-17
JP2009286172 2009-12-17

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US13/423,725 Continuation US20120256483A1 (en) 2009-12-17 2012-03-19 Electrical charge and discharge system, method of managing a battery and a power generator, and computer-readable recording medium

Publications (1)

Publication Number Publication Date
WO2011074661A1 true WO2011074661A1 (ja) 2011-06-23

Family

ID=44167411

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2010/072753 WO2011074661A1 (ja) 2009-12-17 2010-12-17 充放電システム

Country Status (3)

Country Link
US (1) US20120256483A1 (ja)
JP (1) JPWO2011074661A1 (ja)
WO (1) WO2011074661A1 (ja)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103825294A (zh) * 2012-11-19 2014-05-28 周锡卫 一种适用于分布式新能源电力的蓄能逆变器
CN104052142A (zh) * 2013-03-14 2014-09-17 周锡卫 一种光、储联动功率倍增调控装置
JP2015233380A (ja) * 2014-06-10 2015-12-24 株式会社 ハセテック 充放電装置
JP2016201893A (ja) * 2015-04-09 2016-12-01 アイシン精機株式会社 系統連系システム
CN108539777A (zh) * 2018-05-10 2018-09-14 国网江苏省电力有限公司徐州供电分公司 一种用于低压柔性配网供电系统的功率控制方法
JPWO2021215131A1 (ja) * 2020-04-23 2021-10-28
JP7449456B2 (ja) 2021-09-30 2024-03-13 寧徳時代新能源科技股▲分▼有限公司 回路制御方法、電池およびそのコントローラと管理システム、受電装置
CN118100290A (zh) * 2024-04-17 2024-05-28 深圳市正浩智造科技有限公司 双路直流变换器的控制方法及电力设备

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130158726A1 (en) 2011-12-20 2013-06-20 Kohler Co. System and method for using a network to control multiple power management systems
US9281716B2 (en) 2011-12-20 2016-03-08 Kohler Co. Generator controller configured for preventing automatic transfer switch from supplying power to the selected load
US9425727B2 (en) 2012-04-17 2016-08-23 Kohler Co. Charging an energy storage device with a variable speed generator
US9219294B2 (en) 2012-08-22 2015-12-22 Eric D. Albsmeier Power management system that changes the operating conditions of a battery charger
US9331498B2 (en) * 2012-09-07 2016-05-03 Kohler Co. Power generation system that provides efficient battery charger selection
US9276425B2 (en) 2012-12-28 2016-03-01 Younicos Inc. Power management systems with dynamic target state of charge
JP5867870B2 (ja) * 2013-02-22 2016-02-24 富士通テレコムネットワークス株式会社 充放電試験システム
CN104104105B (zh) * 2013-04-12 2016-06-01 周锡卫 一种基于直流共享调控的离网光蓄发电供电系统
US9450453B2 (en) * 2013-09-02 2016-09-20 Cyber Power Systems Inc. Uninterruptible power supply system with energy feedback to chargers and sinusoidal output
JP5915619B2 (ja) * 2013-10-22 2016-05-11 トヨタ自動車株式会社 太陽光発電装置及び太陽光発電装置の制御方法
CN104485679B (zh) * 2014-11-26 2016-12-07 上海载物能源科技有限公司 适用于配网的风储一体化的自平衡控制方法及系统
JP5882443B1 (ja) * 2014-12-17 2016-03-09 東芝エレベータ株式会社 太陽光蓄電システム
KR102400502B1 (ko) * 2015-09-24 2022-05-20 삼성에스디아이 주식회사 에너지 저장 시스템
US10069319B2 (en) * 2016-03-08 2018-09-04 Apple Inc. Systems and methods for simultaneously charging a battery with multiple power sources
CA3133021A1 (en) * 2019-02-12 2020-08-20 Elexsys Ip Pty Ltd System and method for managing power
CN115066664A (zh) 2019-09-09 2022-09-16 埃莱克赛斯Ip有限公司 双向配电网络

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006311707A (ja) * 2005-04-28 2006-11-09 Sanyo Electric Co Ltd 自然エネルギー発電システム
JP2009159734A (ja) * 2007-12-26 2009-07-16 Panasonic Electric Works Co Ltd 直流配電システム
JP2009159730A (ja) * 2007-12-26 2009-07-16 Panasonic Electric Works Co Ltd 直流配電システム

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006311707A (ja) * 2005-04-28 2006-11-09 Sanyo Electric Co Ltd 自然エネルギー発電システム
JP2009159734A (ja) * 2007-12-26 2009-07-16 Panasonic Electric Works Co Ltd 直流配電システム
JP2009159730A (ja) * 2007-12-26 2009-07-16 Panasonic Electric Works Co Ltd 直流配電システム

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103825294A (zh) * 2012-11-19 2014-05-28 周锡卫 一种适用于分布式新能源电力的蓄能逆变器
CN104052142A (zh) * 2013-03-14 2014-09-17 周锡卫 一种光、储联动功率倍增调控装置
CN104052142B (zh) * 2013-03-14 2016-03-09 周锡卫 一种光、储联动功率倍增调控装置
JP2015233380A (ja) * 2014-06-10 2015-12-24 株式会社 ハセテック 充放電装置
JP2016201893A (ja) * 2015-04-09 2016-12-01 アイシン精機株式会社 系統連系システム
CN108539777A (zh) * 2018-05-10 2018-09-14 国网江苏省电力有限公司徐州供电分公司 一种用于低压柔性配网供电系统的功率控制方法
JPWO2021215131A1 (ja) * 2020-04-23 2021-10-28
WO2021215131A1 (ja) * 2020-04-23 2021-10-28 株式会社村田製作所 充放電ユニット、バッテリモジュールおよび電源システム
JP7375920B2 (ja) 2020-04-23 2023-11-08 株式会社村田製作所 充放電ユニット、バッテリモジュールおよび電源システム
JP7449456B2 (ja) 2021-09-30 2024-03-13 寧徳時代新能源科技股▲分▼有限公司 回路制御方法、電池およびそのコントローラと管理システム、受電装置
CN118100290A (zh) * 2024-04-17 2024-05-28 深圳市正浩智造科技有限公司 双路直流变换器的控制方法及电力设备

Also Published As

Publication number Publication date
JPWO2011074661A1 (ja) 2013-05-02
US20120256483A1 (en) 2012-10-11

Similar Documents

Publication Publication Date Title
WO2011074661A1 (ja) 充放電システム
JP5479182B2 (ja) 発電システムおよび充放電制御装置
US9148020B2 (en) Method of controlling a battery, computer readable recording medium, electric power generation system and device controlling a battery
WO2011040470A1 (ja) 充放電制御装置および発電システム
JP5520365B2 (ja) 系統安定化システム、電力供給システム、集中管理装置の制御方法および集中管理装置のプログラム
JP5507669B2 (ja) 電力供給システム、電力供給方法および電力供給システムの制御プログラム
WO2011078151A1 (ja) 電力供給方法、コンピュータ読み取り可能な記録媒体および発電システム
JP5383902B2 (ja) 電力供給システム、電力供給方法および電力供給システムの制御プログラム
US20120228941A1 (en) Electric power supply system, master control device, system stabilization system, control method for the master control device and control program for the master control device
KR20150139492A (ko) 전력 변환 동안 개선된 버스트 모드를 위한 방법 및 장치
US20120253537A1 (en) Power supply method, recording medium which is computer readable and power generation system
JP5475019B2 (ja) 電力供給方法、コンピュータ読み取り可能な記録媒体および発電システム
JP2015164015A (ja) 直流給電システム、直流電源装置、及び給電制御方法
JP5479499B2 (ja) 充放電システムおよび充放電制御装置
JP7203325B2 (ja) 電力システム
JP5355721B2 (ja) 充放電システムおよび充放電制御装置
WO2023243072A1 (ja) 直流配電システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10837685

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2011546179

Country of ref document: JP

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 10837685

Country of ref document: EP

Kind code of ref document: A1