WO2011070192A4 - Sistema universal de puesta a flote y botadura y método de funcionamiento - Google Patents

Sistema universal de puesta a flote y botadura y método de funcionamiento Download PDF

Info

Publication number
WO2011070192A4
WO2011070192A4 PCT/ES2010/000503 ES2010000503W WO2011070192A4 WO 2011070192 A4 WO2011070192 A4 WO 2011070192A4 ES 2010000503 W ES2010000503 W ES 2010000503W WO 2011070192 A4 WO2011070192 A4 WO 2011070192A4
Authority
WO
WIPO (PCT)
Prior art keywords
platform
launching
load
water
pillars
Prior art date
Application number
PCT/ES2010/000503
Other languages
English (en)
French (fr)
Other versions
WO2011070192A1 (es
Inventor
Cesar Del Campo Y Rulz De Almodovar
Original Assignee
Grupo De Ingeniería Oceánica, S.L
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Grupo De Ingeniería Oceánica, S.L filed Critical Grupo De Ingeniería Oceánica, S.L
Priority to KR1020127018035A priority Critical patent/KR20120120216A/ko
Priority to SG2012042107A priority patent/SG181576A1/en
Priority to CN201080063758XA priority patent/CN102762447A/zh
Priority to US13/514,603 priority patent/US20120321387A1/en
Priority to EP10835515.7A priority patent/EP2511169A4/en
Priority to BR112012013960A priority patent/BR112012013960A2/pt
Publication of WO2011070192A1 publication Critical patent/WO2011070192A1/es
Publication of WO2011070192A4 publication Critical patent/WO2011070192A4/es

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C3/00Launching or hauling-out by landborne slipways; Slipways
    • B63C3/06Launching or hauling-out by landborne slipways; Slipways by vertical movement of vessel, i.e. by crane
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02CSHIP-LIFTING DEVICES OR MECHANISMS
    • E02C5/00Mechanisms for lifting ships vertically
    • E02C5/02Mechanisms for lifting ships vertically with floating chambers

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Platform Screen Doors And Railroad Systems (AREA)

Abstract

Sistema universal de puesta a flote y botadura y método de funcionamiento que comprende una o varias plataformas sobre las que se apoyará la carga que se desee sumergir o extraer del mar. Para introducir en el agua una carga, hay que fijar Ia plataforma al muelle, mediante un sistema que le permita subir y bajar en altura; a continuación fijarla al fondo, por medio de unos pilares y unos pilotes y finalmente colocar la carga sobre ella. Con Ia carga situada, se hace descender a la plataforma para que la carga se quede ligeramente sumergida y pueda flotar. Si lo que se pretende es extraer una carga del agua, las operaciones serán las inversas: comenzando con la plataforma sumergida, se coloca la carga encima y a continuación se eleva Ia plataforma, de manera que la carga pueda salir al muelle.

Claims

REIVINDICACIONES MODIFICADAS recibidas por la oficina Internacional el 15 de Junio del 2011 (15.06.2011 )
1. Sistema universal de puesta a flote y botadura caracterizado porque comprende una o varias plataformas de sustentación de la carga que tienen la capacidad de elevarse o hundirse en el agua gracias a un sistema de guías verticales (7) que unen la plataforma al muelle y donde cada plataforma de sustentación comprende una viga de carga tipo cajón (3) que cuenta con una serie de apoyos sobre el fondo, siendo estos apoyos unos pilares telescópicos (2) cuyas bases están formadas por una placa que se denomina placa apoyo (1 ) que tiene una serie de taladros, que coinciden con otros tantos taladros pasantes que tiene cada viga (3) alrededor del pilar para la inserción de tubos auxiliares de pilotaje.
2. Sistema universal de puesta a flote y botadura según reivindicación 1 , caracterizado porque las gulas verticales (7) se atornillan al muelle en sentido perpendicular a la superficie del agua y se componen de dos carriles de sección en U entre los qu se encaja un cilindro que tiene los extremos de mayor diámetro que la barra del centro de forma que dichos extremos sean los que se enganchen en las gulas con forma de U y se deslicen por ellas, pudiendo subir y bajar.
3. Sistema universal de puesta a flote y botadura según reivindicación 2, caracterizado porque en el centro del cilindro se articula, mediante una rótula o unión equivalente, un eje que une la plataforma de apoyo al muelle,
4. Sistema universal de puesta a flote y botadura según reivindicación 1 , caracterizado porque cada viga de carga de tipo cajón (3) se encuentra rigidizada con una estructura interna (5), situándose en la parte superior de la viga (3) unos carriles de deslizamiento (6) para que la carga que se vaya a poner a flotar se deslice por ellos hasta situarse en el lugar requerido.
5. Método de funcionamiento del sistema universal de puesta a flote y botadura como el descrito en las reivindicaciones anteriores que comprende las eiguietes etapas:
- Diseño previo y construido de las plataformas adecuadas, en función del uso al que se destinen,
- A continuación se fijan al cantil del muelle, las gulas de desplazamiento vertical de cada plataforma. Para ello se atornillan, con tacos de acero y epoxi, perpendiculares a la superficie del agua, dos gulas en forma de U en el muelle y se introducen en ellas un cilindro (con los extremos de mayor diámetro) que desliza por las gulas, subiendo y bajando.
8 - En el centro del cilindro se sujeta, mediante una articulación, un eje que une la plataforma de apoyo con las gulas (7) y, en consecuencia, con el muelle.
- Una vez unida la plataforma de apoyo al muelle, se va introduciendo a través de unas válvulas agua en los pilares (2) que, al ser telescópicos, irán desplegándose y descendiendo hasta que la placa de apoyo (1 ) que se encuentra en su base, repose sobre el fondo. Si este fuera poco consistente, se hincarían e inyectarían los pilotes hasta la profundidad necesaria en el fondo marino y cuya coronación quedará al nivel de la placa de apoyo, pera ello se usarían los tubos pasantes (4) sobre la plataforma y especialmente diseñados para este fin.
- En este momento la estructura ya se encuentra fijada y guiada al muelle y apoyada en los pilotes o en el fondo; entonces, se inyecta agua del mar hasta enrasar la plataforma con el muelle,
- Se desplaza la carga que se quiere poner a flote sobre las plataformas, utilizando las vías especialmente dispuestas de apoyo.
- Con la carga situada, se hace descender la plataforma, simplemente abriendo las válvulas que retienen el agua en el interior de los pilares (2). A continuación se abren las válvulas de los tanques de lastre de la plataforma de botadura, que tienen por objeto mantenerla sumergida bajo el nivel de flotación de la carga, para que dicha carga pierda el contacto con la plataforma, comience a flotar y se pueda remolcar,
- Una vez que la carga ya se ha puesto a flote, se termina de sacar el agua de los pilares (2) con una bomba.
- Las plataformas de apoyo se pueden quedar a flote, unidas al muelle y con los pilares telescópicos (2) recogidos arriba.
6. Método de funcionamiento del sistema universal de puesta a flote y botadura según reivindicación 5 caracterizado porque si los pilares (2) van a estar extendidos durante un largo periodo de tiempo se protegen con algún tipo de funda para evitar su deterioro.
9

DECLARACION SEGUN EL ARTICULO 19 (1 )

Modificaciones Realizadas

Se han realizado las siguientes modificaciones en las reivindicaciones:

• Las características de la reivindicación inicial 5 se han incluido reivindicación 1.

• Consecuentemente, la reivindicación inicial 5 se ha eliminado.

• Se ha modificado ligeramente la redacción de la reivindicación 4,

10

PCT/ES2010/000503 2009-12-11 2010-12-10 Sistema universal de puesta a flote y botadura y método de funcionamiento WO2011070192A1 (es)

Priority Applications (6)

Application Number Priority Date Filing Date Title
KR1020127018035A KR20120120216A (ko) 2009-12-11 2010-12-10 유니버설 인양 및 진수 시스템과 작동 방법
SG2012042107A SG181576A1 (en) 2009-12-11 2010-12-10 Universal floating and launching system and operating method
CN201080063758XA CN102762447A (zh) 2009-12-11 2010-12-10 通用的再浮起和下水系统及其运行方法
US13/514,603 US20120321387A1 (en) 2009-12-11 2010-12-10 Universal refloating and launching system and method of operation
EP10835515.7A EP2511169A4 (en) 2009-12-11 2010-12-10 UNIVERSAL FLOAT AND LAUNCH SYSTEM AND METHOD OF OPERATION
BR112012013960A BR112012013960A2 (pt) 2009-12-11 2010-12-10 sistema universal de reflutuação e de lançamento, e, método de operação do mesmo

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
ES200902310A ES2361863B1 (es) 2009-12-11 2009-12-11 Sistema universal de puesta a flote y botadura y método de funcionamiento.
ESP200902310 2009-12-11

Publications (2)

Publication Number Publication Date
WO2011070192A1 WO2011070192A1 (es) 2011-06-16
WO2011070192A4 true WO2011070192A4 (es) 2011-08-11

Family

ID=44123100

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/ES2010/000503 WO2011070192A1 (es) 2009-12-11 2010-12-10 Sistema universal de puesta a flote y botadura y método de funcionamiento

Country Status (10)

Country Link
US (1) US20120321387A1 (es)
EP (1) EP2511169A4 (es)
KR (1) KR20120120216A (es)
CN (1) CN102762447A (es)
AR (1) AR079357A1 (es)
BR (1) BR112012013960A2 (es)
CL (1) CL2012001521A1 (es)
ES (1) ES2361863B1 (es)
SG (1) SG181576A1 (es)
WO (1) WO2011070192A1 (es)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102417016A (zh) * 2010-09-27 2012-04-18 上海市枫泾中学 碳纤船坞水压平台

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6550128B2 (ja) * 2014-11-27 2019-07-24 グラヴィフロート アクティーゼルスカブGravifloat As 海上活動のための海底ターミナル
CN104746525A (zh) * 2015-01-22 2015-07-01 中交二航局第三工程有限公司 大型沉箱下水升降平台系统
CN105836061A (zh) * 2016-03-21 2016-08-10 中国船舶工业集团公司第七○八研究所 一种自升半潜式下水的工作平台
US10364003B2 (en) * 2016-05-17 2019-07-30 Cmi Limited Co. Hybrid fixed/floating marine structures
US10597127B2 (en) * 2016-05-20 2020-03-24 Sea Power Boat Lifts, Llc Boat lift
US9944360B2 (en) 2016-08-23 2018-04-17 Michael Franklin Swim lift
AU2017347309B2 (en) * 2016-10-19 2019-10-03 Ame2 Pte Ltd System and method for off-shore and in-shore aquaculture using floating closed containment farming and amalgamated facility
AR109872A1 (es) * 2016-10-27 2019-01-30 Gravifloat As Planta portuaria y método para fondear un cuerpo flotante en una planta portuaria
FR3067047B1 (fr) 2017-06-06 2019-07-26 Ideol Procede de mise a l'eau
CN107226182A (zh) * 2017-06-13 2017-10-03 广东中远船务工程有限公司 一种大型船舶的水下转移船台的方法及系统

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1385516A (fr) * 1963-11-27 1965-01-15 Alsthom Cgee élévateur de péniches par moyen hydraulique
US3276211A (en) * 1964-01-27 1966-10-04 Theodore R Drake Dry dock
ES462374A1 (es) * 1977-09-14 1978-06-01 Garcia Blanco Manuel Flotador-elevador auto-estabilizado para la puesta en seco oa flote de cualquier tipo de buque.
US4251993A (en) * 1979-04-30 1981-02-24 Vancil Karl L Hydraulic boat lift with regulating system therefor
US4432664A (en) * 1981-03-03 1984-02-21 Duraline Products Corporation Boat hoist
DK161628C (da) * 1985-04-16 1992-01-13 Dme Handel & Licens Indretning til loeftning af skibe
US4708081A (en) * 1986-05-30 1987-11-24 Arsham Amirikian Stabilizer for floating and submersible structures
US5755529A (en) * 1996-05-23 1998-05-26 Follett; R.R. Brad Boat lift
US6591770B1 (en) * 2000-10-23 2003-07-15 St. Croix Marine Products, Inc. Boating lift
US6547485B2 (en) * 2001-03-14 2003-04-15 Hydrohoist International, Inc. Stern-on mooring boat lift
US6938572B1 (en) * 2002-08-13 2005-09-06 Lucky W. Besecker Swim lift platform
US7059803B2 (en) * 2002-08-22 2006-06-13 Wayne G. Floe Powered boatlift with electronic controls
US7419329B1 (en) * 2007-10-26 2008-09-02 Craig Allen Tafoya Semi-submersible dry-docking lift apparatus

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102417016A (zh) * 2010-09-27 2012-04-18 上海市枫泾中学 碳纤船坞水压平台

Also Published As

Publication number Publication date
WO2011070192A1 (es) 2011-06-16
CN102762447A (zh) 2012-10-31
EP2511169A4 (en) 2014-02-26
US20120321387A1 (en) 2012-12-20
SG181576A1 (en) 2012-07-30
ES2361863B1 (es) 2012-05-09
EP2511169A1 (en) 2012-10-17
BR112012013960A2 (pt) 2019-09-24
ES2361863A1 (es) 2011-06-24
CL2012001521A1 (es) 2013-01-11
AR079357A1 (es) 2012-01-18
KR20120120216A (ko) 2012-11-01

Similar Documents

Publication Publication Date Title
WO2011070192A4 (es) Sistema universal de puesta a flote y botadura y método de funcionamiento
ES2835551T3 (es) Cimentación de gravedad para aerogeneradores offshore
ES2785674T3 (es) Estructura base de lecho marino y método para la instalación de la misma
ES2415058B2 (es) Mejoras en el procedimiento de instalación de torre para uso aguas adentro.
ES2471071T3 (es) Dispositivo de soporte de un aerogenerador de producción de energía eléctrica en el mar, instalación de producción de energía eléctrica en el mar correspondiente
ES2551294T3 (es) Cimentación de aerogenerador off-shore
ES2642177B1 (es) Sistema flotante auxiliar para la instalación y/o el transporte de estructuras marinas y procedimiento que comprende dicho sistema.
ES2545553B1 (es) Plataforma flotante de aprovechamiento de energía eólica
HRP20200873T1 (hr) Terminal na morskom dnu za podmorske aktivnosti
MX2011002385A (es) Central marina, fundamento de central marina y metodo de construccion de una central marina.
ES2954493T3 (es) Plataforma naval de soporte de un aerogenerador e instalación naval asociada
ES2457539T3 (es) Acoplamiento de una estructura de casco de flotación con una estructura de celosía
ES2210141T3 (es) Sistema de transferencia de carga.
ES2383663T3 (es) Estación flotante para ejercicios acuáticos
ES2608504B1 (es) Estructura flotante autoinstalable de tipo spar para soporte de aerogeneradores de gran potencia
CA1078631A (en) Oil-production platform and method of assembling and installing the same on a sea bed
KR101716339B1 (ko) 수평 복원력이 빠른 부력구조물
KR101957487B1 (ko) 스티로폼 내장형 부잔교
WO2020188127A1 (es) Método de instalación de estructura marítima offshore y estructura marítima offshore
ES2840055T3 (es) Planta portuaria y método para amarrar un cuerpo flotante en una planta portuaria
ES2396783A1 (es) Plataforma meteorológica flotante.
ES2618558T3 (es) Aparato y procedimiento de transporte, instalación y recuperación de estructuras marinas
WO2010013990A1 (es) Procedimiento de construcción de plataformas marinas flotantes a partir de dovelas de concreto y dovelas utilizadas
ES2363072B1 (es) Anclaje marítimo y dispositivo para la implantación del mismo.
KR101132135B1 (ko) 부유식 구조물 연속 진수 장치

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201080063758.X

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10835515

Country of ref document: EP

Kind code of ref document: A1

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10835515

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2010835515

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 20127018035

Country of ref document: KR

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 13514603

Country of ref document: US

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112012013960

Country of ref document: BR

ENP Entry into the national phase

Ref document number: 112012013960

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20120611