US20120321387A1 - Universal refloating and launching system and method of operation - Google Patents

Universal refloating and launching system and method of operation Download PDF

Info

Publication number
US20120321387A1
US20120321387A1 US13/514,603 US201013514603A US2012321387A1 US 20120321387 A1 US20120321387 A1 US 20120321387A1 US 201013514603 A US201013514603 A US 201013514603A US 2012321387 A1 US2012321387 A1 US 2012321387A1
Authority
US
United States
Prior art keywords
platform
load
dock
refloating
universal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/514,603
Other languages
English (en)
Inventor
Cesar Del Campo y Ruiz de Almodovar
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Grupo de Ingenieria Oceanica SL
URBANIZACION LA QUINTA Bicararera 15 vivienda 39
Original Assignee
URBANIZACION LA QUINTA Bicararera 15 vivienda 39
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by URBANIZACION LA QUINTA Bicararera 15 vivienda 39 filed Critical URBANIZACION LA QUINTA Bicararera 15 vivienda 39
Publication of US20120321387A1 publication Critical patent/US20120321387A1/en
Assigned to GRUPO DE INGENIERIA OCEANICA, S.L. reassignment GRUPO DE INGENIERIA OCEANICA, S.L. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: DEL CAMPO Y RUIZ DE ALMODOVAR, CESAR
Abandoned legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C3/00Launching or hauling-out by landborne slipways; Slipways
    • B63C3/06Launching or hauling-out by landborne slipways; Slipways by vertical movement of vessel, i.e. by crane
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02CSHIP-LIFTING DEVICES OR MECHANISMS
    • E02C5/00Mechanisms for lifting ships vertically
    • E02C5/02Mechanisms for lifting ships vertically with floating chambers

Definitions

  • the technical field wherein the invention belongs is that corresponding to different systems for refloating and launching ships or platforms, either in sea or inland waters.
  • the present invention is intended for describing a refloating device that allows refloating or launching to the water any structure or boat, regardless of size or weight thereof, nor the type of soil of the location, and which would be done in an economically viable manner.
  • the launching system object of the present invention provides a fully flexible and multi-purpose system.
  • This system comprises one or several platforms on which the load (boat, platform or floating structure . . . ) desired to be immersed or removed from the sea will be supported. If it is a large size or weight cargo, two or more platforms may be installed in parallel and with sufficient length for said load. On the other hand, for example if a small boat is desired to be launched, a single platform not too long would be enough.
  • the platform In order to introduce a load into the water, the platform has to be fixed to the dock at the first place, through a system that allows it to be lifted and lowered in height, and comprises vertical slide guides fixed to the edge thereof.
  • the platform is supported on the bed, through telescopic pillars. If the bottom of the dock is sludge or a material with little load capacity, the system has tubes for driving and automatically inserting the piles, on which the base of each column of telescopic tubes will be supported in the future ensuring the load capacity and eliminating uneven settlements.
  • Platform is supported on the ground on piles previously executed, by simply injecting water into the cylinders making up the set for telescopic supporting on the ground. Under pressure water is continuously injected until the pillars move down and the platform moves up until leveling the dock.
  • the load is put on them with a load transfer system.
  • the platform With the load placed, the platform is lowered, by simply opening the valves retaining the water inside the cylinders. Then the valves of the ballast tanks of the launching platform are opened, which aim to keep it immersed under the load floating level, so that said load loses contact with the platform, starts floating and is capable of being towed.
  • the operations will be reversed: starting with the immersed platform, the load is placed above and then the platform is lifted, first by emptying the ballast tanks and then by injecting water under pressure inside the telescopic hydraulic cylinders, until leveling it with dock and the load can be transferred to land through the previously installed load transfer system.
  • FIG. 1 Perspective of the refloating system with two support platforms.
  • FIG. 2 Elevation of the refloating system.
  • FIG. 3 Plant of the refloating system.
  • FIG. 4 Details of the connection to the dock of the refloating system.
  • FIG. 5 Platform with two rows of support pillars.
  • the system consists of one or several support platforms (two shown in the figure) of the length that is required depending on the size of the load. On these support platforms the load desired to be set afloat will be placed. For larger loads, platforms can have two or more rows of telescopic pillars, such as shown in FIG. 5 .
  • These support platforms are fixed to the dock through vertical guides ( 7 ) screwed in a direction perpendicular to the water surface.
  • Guides ( 7 ) are composed of two U-section rails between which a cylinder having the ends of larger in diameter than the center bar (i.e., dumbbell-shaped) is fitted.
  • the objective pursued when the cylinder is thus designed is that those wider ends be those engaging the U-shaped guides and sliding along them, being able of moving up and down.
  • an axis that will connect the support platform to the dock is articulated by a ball-joint or equivalent joint. The fact that said axis is connected by a joint, gives the support platform one degree of freedom, so that the movement thereof has a game letting it slightly oscillates from up to down.
  • the support platform may go up and down, as will be explained later, to any height desired by sliding along the guides ( 7 ) fixed to the dock.
  • Each support platform comprises a load beam of the box type ( 3 ) stiffened with an internal structure ( 5 ). At the top of the beam ( 3 ) sliding rails ( 6 ) are located, which will allow the load to be refloated slides along them until placing at the required location.
  • Each beam ( 3 ) has a series of supports of the telescopic pillar type ( 2 ) base of which is formed by a plate so-called support plate ( 1 ).
  • This support plate ( 1 ) has a series of drill-holes (in FIG. 3 four are shown) so-called auxiliary pilot tubes ( 4 ) that are matched with as many through drill-holes or auxiliary tubes ( 4 ) that the beam ( 3 ) has around the pillar.
  • auxiliary tubes ( 4 ) The objective of said auxiliary tubes ( 4 ) is to introduce through them, from the beam ( 3 ), some piles for being driven and inject into the bottom to the depth needed to create a firm base for the plate support of the structure when working, preventing differential settlements regardless of the type of ground.
  • the method comprises the following steps:
  • Support platforms can remain afloat, joined to the dock and with the telescopic pillars ( 2 ) lifted.
  • this system is completely valid for refloating or extracting any type of boat or structure, regardless of its sizes, since only the number of support platforms, the number of telescopic pillars, which as mentioned can have two, three or even more rows of telescopic pillars parallel or spaced, or the diameter of the pillars have to be varied in order to adapt to the type of load desired to be immersed or extracted from the water.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Platform Screen Doors And Railroad Systems (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
US13/514,603 2009-12-11 2010-12-10 Universal refloating and launching system and method of operation Abandoned US20120321387A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
ES200902310A ES2361863B1 (es) 2009-12-11 2009-12-11 Sistema universal de puesta a flote y botadura y método de funcionamiento.
ESP200902310 2009-12-11
PCT/ES2010/000503 WO2011070192A1 (es) 2009-12-11 2010-12-10 Sistema universal de puesta a flote y botadura y método de funcionamiento

Publications (1)

Publication Number Publication Date
US20120321387A1 true US20120321387A1 (en) 2012-12-20

Family

ID=44123100

Family Applications (1)

Application Number Title Priority Date Filing Date
US13/514,603 Abandoned US20120321387A1 (en) 2009-12-11 2010-12-10 Universal refloating and launching system and method of operation

Country Status (10)

Country Link
US (1) US20120321387A1 (es)
EP (1) EP2511169A4 (es)
KR (1) KR20120120216A (es)
CN (1) CN102762447A (es)
AR (1) AR079357A1 (es)
BR (1) BR112012013960A2 (es)
CL (1) CL2012001521A1 (es)
ES (1) ES2361863B1 (es)
SG (1) SG181576A1 (es)
WO (1) WO2011070192A1 (es)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107226182A (zh) * 2017-06-13 2017-10-03 广东中远船务工程有限公司 一种大型船舶的水下转移船台的方法及系统
US9944360B2 (en) 2016-08-23 2018-04-17 Michael Franklin Swim lift
US20180163359A1 (en) * 2014-11-27 2018-06-14 Gravifloat As Sea bed terminal for offshore activities
US20190135390A1 (en) * 2016-05-20 2019-05-09 Sea Power Boat Lifts, Llc Boat lift
US10364003B2 (en) * 2016-05-17 2019-07-30 Cmi Limited Co. Hybrid fixed/floating marine structures
US10988905B2 (en) * 2016-10-27 2021-04-27 Gravifloat As Harbour plant and method for mooring a floating body in a harbour plant

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102417016A (zh) * 2010-09-27 2012-04-18 上海市枫泾中学 碳纤船坞水压平台
CN104746525A (zh) * 2015-01-22 2015-07-01 中交二航局第三工程有限公司 大型沉箱下水升降平台系统
CN105836061A (zh) * 2016-03-21 2016-08-10 中国船舶工业集团公司第七○八研究所 一种自升半潜式下水的工作平台
CN110167343B (zh) * 2016-10-19 2021-10-12 艾米海事环境能源私人有限公司 使用浮动封闭受控式养殖和合并设施进行离岸和靠岸水产养殖的系统和方法
FR3067047B1 (fr) 2017-06-06 2019-07-26 Ideol Procede de mise a l'eau

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3276211A (en) * 1964-01-27 1966-10-04 Theodore R Drake Dry dock
US4432664A (en) * 1981-03-03 1984-02-21 Duraline Products Corporation Boat hoist
US6591770B1 (en) * 2000-10-23 2003-07-15 St. Croix Marine Products, Inc. Boating lift
US6938572B1 (en) * 2002-08-13 2005-09-06 Lucky W. Besecker Swim lift platform
US7059803B2 (en) * 2002-08-22 2006-06-13 Wayne G. Floe Powered boatlift with electronic controls

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1385516A (fr) * 1963-11-27 1965-01-15 Alsthom Cgee élévateur de péniches par moyen hydraulique
ES462374A1 (es) * 1977-09-14 1978-06-01 Garcia Blanco Manuel Flotador-elevador auto-estabilizado para la puesta en seco oa flote de cualquier tipo de buque.
US4251993A (en) * 1979-04-30 1981-02-24 Vancil Karl L Hydraulic boat lift with regulating system therefor
DK161628C (da) * 1985-04-16 1992-01-13 Dme Handel & Licens Indretning til loeftning af skibe
US4708081A (en) * 1986-05-30 1987-11-24 Arsham Amirikian Stabilizer for floating and submersible structures
US5755529A (en) * 1996-05-23 1998-05-26 Follett; R.R. Brad Boat lift
US6547485B2 (en) * 2001-03-14 2003-04-15 Hydrohoist International, Inc. Stern-on mooring boat lift
US7419329B1 (en) * 2007-10-26 2008-09-02 Craig Allen Tafoya Semi-submersible dry-docking lift apparatus

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3276211A (en) * 1964-01-27 1966-10-04 Theodore R Drake Dry dock
US4432664A (en) * 1981-03-03 1984-02-21 Duraline Products Corporation Boat hoist
US6591770B1 (en) * 2000-10-23 2003-07-15 St. Croix Marine Products, Inc. Boating lift
US6938572B1 (en) * 2002-08-13 2005-09-06 Lucky W. Besecker Swim lift platform
US7059803B2 (en) * 2002-08-22 2006-06-13 Wayne G. Floe Powered boatlift with electronic controls

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180163359A1 (en) * 2014-11-27 2018-06-14 Gravifloat As Sea bed terminal for offshore activities
US10633815B2 (en) * 2014-11-27 2020-04-28 Gravifloat As Sea bed terminal for offshore activities
US10364003B2 (en) * 2016-05-17 2019-07-30 Cmi Limited Co. Hybrid fixed/floating marine structures
US20190135390A1 (en) * 2016-05-20 2019-05-09 Sea Power Boat Lifts, Llc Boat lift
US10597127B2 (en) * 2016-05-20 2020-03-24 Sea Power Boat Lifts, Llc Boat lift
US9944360B2 (en) 2016-08-23 2018-04-17 Michael Franklin Swim lift
US10988905B2 (en) * 2016-10-27 2021-04-27 Gravifloat As Harbour plant and method for mooring a floating body in a harbour plant
CN107226182A (zh) * 2017-06-13 2017-10-03 广东中远船务工程有限公司 一种大型船舶的水下转移船台的方法及系统

Also Published As

Publication number Publication date
EP2511169A1 (en) 2012-10-17
ES2361863A1 (es) 2011-06-24
CL2012001521A1 (es) 2013-01-11
KR20120120216A (ko) 2012-11-01
AR079357A1 (es) 2012-01-18
SG181576A1 (en) 2012-07-30
ES2361863B1 (es) 2012-05-09
BR112012013960A2 (pt) 2019-09-24
EP2511169A4 (en) 2014-02-26
WO2011070192A4 (es) 2011-08-11
CN102762447A (zh) 2012-10-31
WO2011070192A1 (es) 2011-06-16

Similar Documents

Publication Publication Date Title
US20120321387A1 (en) Universal refloating and launching system and method of operation
US2771747A (en) Offshore drilling barge
US20100150660A1 (en) Offshore oil production platform
JP6837491B2 (ja) 海底基礎構造体およびその設置方法
NO341401B1 (en) Sea bed terminal for drilling
MX2013004327A (es) Torre maritima para perforacion y/o produccion.
NO139040B (no) Fartoey omfattende en flytbar plattform.
KR101434580B1 (ko) 하이브리드 잭업 드릴링 및 생산 장치
JP2020522429A (ja) 進水方法
US4181452A (en) Oil-production platform and method of assembling and installing the same on a sea bed
KR20150140792A (ko) 극지의 신축형 이동식 해양 시추 유닛
JP6890178B2 (ja) 港湾プラント、及び港湾プラントに浮体を係留するための方法
RU159247U1 (ru) Конструкция опорной части морской стационарной платформы на шельфе морей
US2946198A (en) Method of compacting soil for conducting offshore operations
DK2860314T3 (en) Gravity fundering
NO743225L (es)
TWI596256B (zh) 重力式升降平台及升降一重力式升降平台的方法
KR101497448B1 (ko) 플로팅 도크의 데크와 이를 이용한 해양구조물의 제작방법
RU2381135C1 (ru) Способ установки и демонтажа донного комплекса для выполнения работ на шельфе и комплекс технических средств для его осуществления
NO743224L (es)
KR101132135B1 (ko) 부유식 구조물 연속 진수 장치
KR20180105434A (ko) 해양구조물 진수 설비 및 해양구조물 진수 방법
NO172138B (no) Lastoverfoeringsutstyr for en oppbygning til havs
NO831929L (no) Neddykket celle.
NO346928B1 (no) Flytende og nedsenkbar plattform

Legal Events

Date Code Title Description
AS Assignment

Owner name: GRUPO DE INGENIERIA OCEANICA, S.L., SPAIN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:DEL CAMPO Y RUIZ DE ALMODOVAR, CESAR;REEL/FRAME:030397/0842

Effective date: 20120606

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION