EP2511169A1 - Universal floating and launching system and operating method - Google Patents

Universal floating and launching system and operating method Download PDF

Info

Publication number
EP2511169A1
EP2511169A1 EP10835515A EP10835515A EP2511169A1 EP 2511169 A1 EP2511169 A1 EP 2511169A1 EP 10835515 A EP10835515 A EP 10835515A EP 10835515 A EP10835515 A EP 10835515A EP 2511169 A1 EP2511169 A1 EP 2511169A1
Authority
EP
European Patent Office
Prior art keywords
platform
load
dock
refloating
pillars
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP10835515A
Other languages
German (de)
French (fr)
Other versions
EP2511169A4 (en
Inventor
Cesar Del Campo Y Rulz De Almodovar
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Grupo de Ingenieria Oceanica SL
Original Assignee
Grupo de Ingenieria Oceanica SL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Grupo de Ingenieria Oceanica SL filed Critical Grupo de Ingenieria Oceanica SL
Publication of EP2511169A1 publication Critical patent/EP2511169A1/en
Publication of EP2511169A4 publication Critical patent/EP2511169A4/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C3/00Launching or hauling-out by landborne slipways; Slipways
    • B63C3/06Launching or hauling-out by landborne slipways; Slipways by vertical movement of vessel, i.e. by crane
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02CSHIP-LIFTING DEVICES OR MECHANISMS
    • E02C5/00Mechanisms for lifting ships vertically
    • E02C5/02Mechanisms for lifting ships vertically with floating chambers

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)
  • Platform Screen Doors And Railroad Systems (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Universal refloating and launching system and method comprising one or several platforms on which the load desired to be immersed or extracted from the sea will be placed. For introducing a load in water, the platform has to be fixed to the dock, through a system that allows it to move up and down in height, then fixing it to the bottom, through pillars and piles, and finally placing the load thereon. With the load placed, the platform is lowered so that the load is slightly immersed and may float. If the aim is to extract a load from the water, the operations will be reversed: starting with the immersed platform, the load is placed above and then the platform is lifted, so that the load can be moved to the dock.

Description

    Technical field of the invention
  • The technical field wherein the invention belongs is that corresponding to different systems for refloating and launching ships or platforms, either in sea or inland waters.
  • Background of the invention
  • Currently, there are four main systems for launching and hoisting different types of ships or floating platforms.
    • ● Slipway: it is the more primitive system, currently used for smaller ships of small burden. It consists of an inclined plane on which the object to be immersed or lifted is moved.
    • ● Dry dock: it is a lock wherein the ship is introduced, and once closed the water is pumped from inside until placing the boat on a bed or keel block.
    • ● Floating dock: This is a naval appliance that by flooding tanks, it sinks the structure allowing the boat to be repaired or built to pass through. Once in place, these tanks get smaller causing the elevation of the assembly, thus achieving the put into dry dock.
    • Sincrolift: it is a system of articulated beams or winches having mechanical hooks at their ends. The assembly can be synchronously operated generating a lifting platform for large burden.
    • ● There is another system that only serves for launching ships or floating appliances, which is the slip that is nothing more than an inclined plane on which the ship or appliance to be refloated is built on lubricated skids.
  • All these systems are expensive and not very flexible or versatile and above all there are few facilities, whereby refloating ships and appliances of new construction or repairing or performing maintenance woks on those existing, must necessarily be therein wherein there are long distances towards the final installation site or from the usual workplaces. An economical and simple installation that can be installed on any existing dock extraordinarily eases the performing the reparation or maintenance works on resident or operating fleet around, and manufacturing production platforms and floating appliances of any kind around the installation site.
  • Therefore, the present invention is intended for describing a refloating regardless of size or weight thereof, nor the type of soil of the location, and which would be done in an economically viable manner.
  • Description of the invention
  • The launching system object of the present invention provides a fully flexible and multi-purpose system.
  • This system comprises one or several platforms on which the load (boat, platform or floating structure ...) desired to be immersed or removed from the sea will be supported. If it is a large size or weight cargo, two or more platforms may be installed in parallel and with sufficient length for said load. On the other hand, for example if a small boat is desired to be launched, a single platform not too long would be enough.
  • In order to introduce a load into the water, the platform has to be fixed to the dock at the first place, through a system that allows it to be lifted and lowered in height, and comprises vertical slide guides fixed to the edge thereof.
  • Then the platform is supported on the bed, through telescopic pillars. If the bottom of the dock is sludge or a material with little load capacity, the system has tubes for driving and automatically inserting the piles, on which the base of each column of telescopic tubes will be supported in the future ensuring the load capacity and eliminating uneven settlements. Platform is supported on the ground on piles previously executed, by simply injecting water into the cylinders making up the set for telescopic supporting on the ground. Under pressure water is continuously injected until the pillars move down and the platform moves up until leveling the dock.
  • Once the platform(s) are leveled with the dock, the load is put on them with a load transfer system.
  • With the load placed, the platform is lowered, by simply opening the valves retaining the water inside the cylinders. Then the valves of the ballast tanks of the launching platform are opened, which aim to keep it immersed under the load floating level, so that said load loses contact with the platform, starts floating and is capable of being towed.
  • If the aim is to extract a load from water, the operations will be reversed: starting with the immersed platform, the load is placed above and then the platform is lifted, first by emptying the ballast tanks and then by injecting water under pressure inside the telescopic hydraulic cylinders, until leveling it with dock and the load can be transferred to land through the previously installed load transfer system.
  • In the detailed description the structural details of the claimed invention are described in detail.
  • Addressing the problems mentioned in the previous section, the solution that has been developed and which protection is requested has the following advantages over that existing in the state of art:
    • Multi-purpose: since it serves for all types of loads, regardless of weight or size.
    • Easy to be mounted and demounted.
    • Reusable and transferable to another port
    Description of the figures
  • In order to complete the description being made and for helping to a better understanding of the features of the invention, a set of drawings is accompanied, wherein with an illustrative and nit limitative manner, the following has been representative:
    • Figure 1: Perspective of the refloating system with two support platforms.
    • Figure 2: Elevation of the refloating system.
    • Figure 3: Plant of the refloating system.
    • Figure 4: Details of the connection to the dock of the refloating system.
    • Figure 5: Platform with two rows of support pillars.
  • A list of references used in the figures is provided bellow:
    1. (1) Support plate
    2. (2) Telescopic pillars
    3. (3) Load beam
    4. (4) Auxiliary pilot tubes
    5. (5) Internal structure
    6. (6) Sliding rails
    7. (7) Guides in the dock
    Detailed description of the invention
  • In order to achieve a better understanding of the invention the claimed refloating and launching system is now described based on the presented figures.
  • As shown in Figure 1, the system consists of one or several support platforms (two shown in the figure) of the length that is required depending on the size of the load. On these support platforms the load desired to be set afloat will be placed. For larger loads, platforms can have two or more rows of telescopic pillars, such as shown in Figure 5.
  • These support platforms are fixed to the dock through vertical guides (7) screwed in a direction perpendicular to the water surface. Guides (7) are composed of two U-section rails between which a cylinder having the ends of larger in diameter than the center bar (i.e., dumbbell-shaped) is fitted. The objective pursued when the cylinder is thus designed is that those wider ends be those engaging the U-shaped guides and sliding along them, being able of moving up and down. In the center of the cylinder an axis that will connect the support platform to the dock is articulated by a ball-joint or equivalent joint. The fact that said axis is connected by a joint, gives the support platform one degree of freedom, so that the movement thereof has a game letting it slightly oscillates from up to down.
  • Moreover the support platform may go up and down, as will be explained later, to any height desired by sliding along the guides (7) fixed to the dock.
  • Each support platform comprises a load beam of the box type (3) stiffened with an internal structure (5). At the top of the beam (3) sliding rails (6) are located, which will allow the load to be refloated slides along them until placing at the required location.
  • Each beam (3) has a series of supports of the telescopic pillar type (2) base of which is formed by a plate so-called support plate (1).
  • This support plate (1) has a series of drill-holes (in Figure 3 four are shown) so-called auxiliary pilot tubes (4) that are matched with as many through drill-holes or auxiliary tubes (4) that the beam (3) has around the pillar.
  • The objective of said auxiliary tubes (4) is to introduce through them, from the beam (3), some piles for being driven and inject into the bottom to the depth needed to create a firm base for the plate support of the structure when working, preventing differential settlements regardless of the type of ground.
  • Now what would be the method of operation of the device in case introducing a boat, platform or any kind of structure in the sea is explained. The method comprises the following steps:
    • For any installation, the appropriate platforms have been previously designed and built, depending on their intended use: if they are to repair and maintenance the operative fleet around its characteristics and whether these are for manufacturing platforms or appliance, depending on their weights and dimensions.
    • Then the vertical displacement guides of each platform are fixed to the dock edge. For this purposes, two U-shaped guides are screwed, with steel and epoxy raw plugs, perpendicular to the water surface, at the dock and through which a cylinder (with the ends of larger diameter) sliding along the guides, moving up and down is introduced.
    • In the center of the cylinder an axis connecting the support platform with the guides (7) and, consequently, with the dock is held by a joint.
    • Once the support platform is fixed to dock, water is introduced through valves into the pillars (2), which by being telescopic, will be unfolding and moving down until the support plate (1), which is in their base, rests on the bottom. If this were not enough consistent, piles would be driven and injected to the required depth in the seabed and coronation of which will be at the level of support plate, for this purpose through tubes (4) specially designed for this end would be used on the platform.
    • At this time the structure is already fixed and guided to the dock and supported on piles or on the bottom, then, seawater is injected until leveling the platform with the dock. The roads previously installed on the dock and platform will be perfectly aligned and at the same level.
    • The load desired to be refloated is moved on the platforms, using specially arranged support roads. The placement is done very quickly and easily by using a sliding system based on rolling (6), which is installed along the load beam (3).
    • With the load placed, the platform is lowered, by simply opening the valves retaining the water inside the pillars (2). Then the valves of the ballast tanks of the launching platform, which aim to keep it immersed under the load floating level are opened, so that said load loses contact with the platform, starts floating and can be towed .
    • Once the load has been refloated, the water is completely taken out the pillars (2) using a pump.
  • Support platforms can remain afloat, joined to the dock and with the telescopic pillars (2) lifted. The fact that the axis connecting to the dock allows an up and down game because of the joint, is designed for this position, wherein the support platform floats on the water surface and can oscillate with the waves.
    • The pillars folded with some sort of sheath to prevent their damage can be protected, if they are to be extended over a long period of time.
  • With this the method for refloating any type of facility or boat at sea is detailed.
  • If the aim is to extract a load from the sea, operations would be the same but starting with the pillars (2) and the platform immersed in water, so that the load can put thereon, once the load is supported, the pillars (2) are filled with water using valves, so that the support platform rises to the desired level and it is removed from the water thought the load sliding system (6).
  • As you can see, this system is completely valid for refloating or extracting any type of boat or structure, regardless of its sizes, since only the number of support platforms, the number of telescopic pillars, which as mentioned can have two, three or even more rows of telescopic pillars parallel or spaced, or the diameter of the pillars have to be varied in order to adapt to the type of load desired to be immersed or extracted from the water.

Claims (7)

  1. Universal refloating and launching system characterized in that it comprises one or several platforms for supporting the load having the capacity of being lifted or immersed in water through a vertical guides system (7) connecting the platform to the dock and to telescopic pillars (2) serving as support on the bottom.
  2. Universal refloating and launching system according to claim 1, characterized in that the vertical guides (7) are screwed to the dock in a direction perpendicular to the water surface, and are composed of two U-section rails between which a cylinder having the ends of larger diameter than the center rod is fitted, so that said ends are those engaging the U-shaped guides and sliding along them, being able of moving up and down.
  3. Universal refloating and launching system according to claim 2, characterized in that an axis connecting the support platform to the dock is articulated at the center of the cylinder by a ball joint or equivalent joint.
  4. Universal refloating and launching system according to claim 1, characterized in that each support platform comprises a load beam of box type (3) stiffened with an internal structure (5), sliding rails (6) being located at the top of the beam (3) so that the load to be refloated slides along them until placing in the required place.
  5. Universal refloating and launching system according to claim 4, characterized in that each beam (3) has a series of supports of the pillar telescopic type (2) base of which is formed by a plate so-called support plate (1) having a series of drill-holes, so-called auxiliary pilot tubes (4) matching with many other through drill-holes or auxiliary tubes (4) that the beam (3) has around the pillar.
  6. Method of operation of the universal refloating and launching system according to that described in preceding claims comprising the following steps:
    - Previous and built designing the appropriate platforms, in terms of the intended use.
    - Then the vertical displacement guides of each platform are fixed to the dock edge. For this purposes, two U-shaped guides are screwed, with steel and epoxy raw plugs, perpendicular to the water surface, at the dock, and through which a cylinder (with the ends of larger diameter) sliding along the guides, moving up and down, is introduced.
    - In the center of the cylinder an axis connecting the support platform with the guides (7) and, consequently, with the dock is held by a joint.
    - Once the support platform is fixed to dock, water is introduced through valves into the pillars (2), which by being telescopic, will be unfolding and moving down until the support plate (1), which is in their base, rests on the bottom. If this were not enough consistent, piles would be driven and injected to the required depth in the seabed and coronation of which will be at the level of support plate, for this purpose through tubes (4) specially designed for this end would be used on the platform.
    - - At this time the structure is already fixed and guided to the dock and supported on piles or on the bottom, then, seawater is injected until leveling the platform with the dock.
    - The load desired to be refloated is moved on the platforms, using specially arranged support roads.
    - With the load placed, the platform is lowered, by simply opening the valves retaining the water inside the pillars (2). Then the valves of the ballast tanks of the launching platform, which aim to keep it immersed under the load floating level are opened, so that said load loses contact with the platform, starts floating and can be towed .
    - -Once the load has been refloated, the water is completely taken out from the pillars (2) using a pump.
    - Support platforms can remain afloat, joined to the dock and with the telescopic pillars (2) lifted.
  7. Method of operation of the universal refloating and launching system according to claim 6 characterized in that if the pillars (2) will be extended over a long period of time these are protected with some type of sheath in order to avoid their deterioration.
EP10835515.7A 2009-12-11 2010-12-10 Universal floating and launching system and operating method Withdrawn EP2511169A4 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
ES200902310A ES2361863B1 (en) 2009-12-11 2009-12-11 UNIVERSAL SYSTEM FOR FLEET AND BUTTING AND OPERATING METHOD.
PCT/ES2010/000503 WO2011070192A1 (en) 2009-12-11 2010-12-10 Universal floating and launching system and operating method

Publications (2)

Publication Number Publication Date
EP2511169A1 true EP2511169A1 (en) 2012-10-17
EP2511169A4 EP2511169A4 (en) 2014-02-26

Family

ID=44123100

Family Applications (1)

Application Number Title Priority Date Filing Date
EP10835515.7A Withdrawn EP2511169A4 (en) 2009-12-11 2010-12-10 Universal floating and launching system and operating method

Country Status (10)

Country Link
US (1) US20120321387A1 (en)
EP (1) EP2511169A4 (en)
KR (1) KR20120120216A (en)
CN (1) CN102762447A (en)
AR (1) AR079357A1 (en)
BR (1) BR112012013960A2 (en)
CL (1) CL2012001521A1 (en)
ES (1) ES2361863B1 (en)
SG (1) SG181576A1 (en)
WO (1) WO2011070192A1 (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102417016A (en) * 2010-09-27 2012-04-18 上海市枫泾中学 Carbon fiber dock hydraulic platform
JP6550128B2 (en) * 2014-11-27 2019-07-24 グラヴィフロート アクティーゼルスカブGravifloat As Submarine terminal for maritime activities
CN104746525A (en) * 2015-01-22 2015-07-01 中交二航局第三工程有限公司 Lifting platform system for placing large caisson in water
CN105836061A (en) * 2016-03-21 2016-08-10 中国船舶工业集团公司第七○八研究所 Self-lifting semi-submersible type underwater working platform
US10364003B2 (en) * 2016-05-17 2019-07-30 Cmi Limited Co. Hybrid fixed/floating marine structures
US10597127B2 (en) * 2016-05-20 2020-03-24 Sea Power Boat Lifts, Llc Boat lift
US9944360B2 (en) 2016-08-23 2018-04-17 Michael Franklin Swim lift
AU2017347309B2 (en) * 2016-10-19 2019-10-03 Ame2 Pte Ltd System and method for off-shore and in-shore aquaculture using floating closed containment farming and amalgamated facility
AR109872A1 (en) * 2016-10-27 2019-01-30 Gravifloat As PORT PLANT AND METHOD TO FUND A FLOATING BODY ON A PORT PLANT
FR3067047B1 (en) 2017-06-06 2019-07-26 Ideol METHOD FOR LAUNCHING
CN107226182A (en) * 2017-06-13 2017-10-03 广东中远船务工程有限公司 A kind of method and system that shift building berth under water of large ship

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1385516A (en) * 1963-11-27 1965-01-15 Alsthom Cgee hydraulic barge elevator
US4251993A (en) * 1979-04-30 1981-02-24 Vancil Karl L Hydraulic boat lift with regulating system therefor
US4708081A (en) * 1986-05-30 1987-11-24 Arsham Amirikian Stabilizer for floating and submersible structures
US5755529A (en) * 1996-05-23 1998-05-26 Follett; R.R. Brad Boat lift

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3276211A (en) * 1964-01-27 1966-10-04 Theodore R Drake Dry dock
ES462374A1 (en) * 1977-09-14 1978-06-01 Garcia Blanco Manuel Self-stabilized elevator-float for drydocking or floating any type of vessel
US4432664A (en) * 1981-03-03 1984-02-21 Duraline Products Corporation Boat hoist
DK161628C (en) * 1985-04-16 1992-01-13 Dme Handel & Licens DEVICE FOR LIFTING OF SHIPS
US6591770B1 (en) * 2000-10-23 2003-07-15 St. Croix Marine Products, Inc. Boating lift
US6547485B2 (en) * 2001-03-14 2003-04-15 Hydrohoist International, Inc. Stern-on mooring boat lift
US6938572B1 (en) * 2002-08-13 2005-09-06 Lucky W. Besecker Swim lift platform
US7059803B2 (en) * 2002-08-22 2006-06-13 Wayne G. Floe Powered boatlift with electronic controls
US7419329B1 (en) * 2007-10-26 2008-09-02 Craig Allen Tafoya Semi-submersible dry-docking lift apparatus

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1385516A (en) * 1963-11-27 1965-01-15 Alsthom Cgee hydraulic barge elevator
US4251993A (en) * 1979-04-30 1981-02-24 Vancil Karl L Hydraulic boat lift with regulating system therefor
US4708081A (en) * 1986-05-30 1987-11-24 Arsham Amirikian Stabilizer for floating and submersible structures
US5755529A (en) * 1996-05-23 1998-05-26 Follett; R.R. Brad Boat lift

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of WO2011070192A1 *

Also Published As

Publication number Publication date
WO2011070192A1 (en) 2011-06-16
CN102762447A (en) 2012-10-31
EP2511169A4 (en) 2014-02-26
US20120321387A1 (en) 2012-12-20
SG181576A1 (en) 2012-07-30
ES2361863B1 (en) 2012-05-09
WO2011070192A4 (en) 2011-08-11
BR112012013960A2 (en) 2019-09-24
ES2361863A1 (en) 2011-06-24
CL2012001521A1 (en) 2013-01-11
AR079357A1 (en) 2012-01-18
KR20120120216A (en) 2012-11-01

Similar Documents

Publication Publication Date Title
EP2511169A1 (en) Universal floating and launching system and operating method
US2771747A (en) Offshore drilling barge
JP6837491B2 (en) Submarine foundation structure and its installation method
WO2008111829A1 (en) Offshore oil production platform
NO341401B1 (en) Sea bed terminal for drilling
MX2013004327A (en) Offshore tower for drilling and/or production.
NO139040B (en) VESSEL INCLUDING A MOVABLE PLATFORM.
US2657540A (en) Method of erecting and positioning marine structures
KR101434580B1 (en) Hybrid jack-up drilling and production system
JP2020522429A (en) Launch method
KR20150140792A (en) Arctic telescoping mobile offshore drilling unit
WO2009147448A2 (en) Transportation device and method
RU159247U1 (en) DESIGN OF THE SUPPORT OF THE MARINE STATIONARY PLATFORM ON THE SEA SHELF
US2946198A (en) Method of compacting soil for conducting offshore operations
JP6890178B2 (en) Port plants and methods for mooring floats in port plants
DK2860314T3 (en) Gravity fundering
KR101964835B1 (en) Facility for launching offshore structure, and method of launching offshore structure
TWI596256B (en) A gravity lift platform and lifting method thereof
WO2016030650A1 (en) Self installing floating tower improvements
RU2381135C1 (en) Installation and removal method of bottom complex for performing works on shelf, and complex of equipment for implementing thereof
NO743224L (en)
NO831929L (en) DOWN CELL.
NO346928B1 (en) Floating and submersible platform
NO172138B (en) LOAD TRANSFER EQUIPMENT FOR A BUILDING AT SEA
NO752527L (en)

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20120709

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

DAX Request for extension of the european patent (deleted)
A4 Supplementary search report drawn up and despatched

Effective date: 20140128

RIC1 Information provided on ipc code assigned before grant

Ipc: B63C 3/06 20060101AFI20140122BHEP

Ipc: E02C 5/02 20060101ALI20140122BHEP

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20150701