WO2010081274A1 - 垂直刚性梁连接装置 - Google Patents
垂直刚性梁连接装置 Download PDFInfo
- Publication number
- WO2010081274A1 WO2010081274A1 PCT/CN2009/001058 CN2009001058W WO2010081274A1 WO 2010081274 A1 WO2010081274 A1 WO 2010081274A1 CN 2009001058 W CN2009001058 W CN 2009001058W WO 2010081274 A1 WO2010081274 A1 WO 2010081274A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- vertical rigid
- shaped steel
- rigid beam
- plate
- shaped
- Prior art date
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 47
- 239000010959 steel Substances 0.000 claims abstract description 47
- 238000001816 cooling Methods 0.000 abstract description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 14
- 238000003466 welding Methods 0.000 description 2
- 238000005304 joining Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22B—METHODS OF STEAM GENERATION; STEAM BOILERS
- F22B37/00—Component parts or details of steam boilers
- F22B37/02—Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
- F22B37/10—Water tubes; Accessories therefor
- F22B37/20—Supporting arrangements, e.g. for securing water-tube sets
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22B—METHODS OF STEAM GENERATION; STEAM BOILERS
- F22B37/00—Component parts or details of steam boilers
- F22B37/02—Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
- F22B37/24—Supporting, suspending, or setting arrangements, e.g. heat shielding
Definitions
- the utility model relates to a vertical rigid beam support, belonging to the technical field of boiler steel structure. Background technique
- a steam generating apparatus comprising a furnace body having a tube wall and at least one vertically rigid beam adjacent the outer surface of the spiral tube wall of the furnace body.
- the rigid beam of the spiral section of the boiler water wall often adopts a mesh format structure.
- the vertical rigid beam is located between the two horizontal rigid beams and corresponds to the water wall slings one by one to strengthen the water wall and protect the sling.
- the vertical rigid beam support is the connection between the vertical rigid beam and the swirling water wall.
- the existing support type consists mainly of U-shaped plates and tubes. The two sides of the U-shaped plate opening are respectively located on both sides of the water wall sling, and are fixed by welding with a zigzag small steel plate and a spiral water wall.
- the third side of the U-shaped plate is in close proximity to the flange of the vertical rigid beam, and the side of the U-shaped plate is clamped to the vertical rigid beam by a pipe.
- the upper and lower ends of the pipe are welded to the vertical rigid beams through small steel plates. This connects the u-shaped plate and the vertical rigid beam to achieve the connection between the spiral water wall and the vertical rigid beam.
- the tube and the small steel plate at the upper and lower ends of the pipe.
- the technical solution of the present invention provides a vertical rigid beam support, which is characterized in that it comprises an H-shaped steel, and two flange edges on one side of the H-shaped steel are fixedly connected to the end plate, and the end plate is fixed to the end plate.
- the L-shaped steel plates on the vertical rigid beam are meshed, and the two flanges on the other side of the H-shaped steel are fixedly connected to the small plugs arranged between the spiral water-cooled pipes, and the ribs are arranged in the middle of the H-shaped steel.
- the H-shaped steel of the utility model can be formed by splicing a rolled steel or a steel plate.
- ribs are also installed to reinforce the H-shaped steel and the end plates.
- the outer surface of the end plate is in close proximity to the vertical rigid beam.
- Two L-shaped steel plates are arranged on the upper and lower sides of the H-shaped steel. One side of the L-shaped steel plate is fixed on the vertical rigid beam, and the other side is stuck to the end plate. This connects the H-beam and end plate assembly to the vertical rigid beam.
- a series of small plugs are embedded between and welded to the water wall tube, and the outer surface of the small plug is tangent to the tube to form two planes. The two flanges of the H-shaped steel rest on the two planes and are welded to the small plugs. This secures the support to the water wall to connect the water wall to the vertical rigid beam.
- connection strength between the L-shaped steel plate and the vertical rigid beam is higher;
- the support can be subjected to greater pressure by increasing the number of L-shaped plates.
- Figure 1 is a structural view of a vertical rigid beam support
- Figure 2 is a side view of a vertical rigid beam support
- FIG. 3 is an enlarged view of I in Figure 2;
- Figure 4 is a cross-sectional view taken along line A-A of Figure 3. detailed description
- FIG. 1 and FIG. 2 it is a vertical rigid beam support which is disposed between the water-cooled wall formed by the spiral water-cooling pipe 7 and the vertical rigid beam 6 located outside the water-cooling wall sling 8 by H-shaped steel 1.
- End plate 2 rib plate 3, L-shaped steel plate 4 and small plug block 5
- H-shaped steel 1 is provided with ribs 3 in the middle, and two flanges on the H-shaped steel 1 side are fixedly connected to the end plate 2, L-shaped steel plate 4 one side is fixed on the vertical rigid beam 6, and the other side is stuck on the end plate 2, while the L-shaped steel plate 4 and the H-shaped steel 1 and the end plate 2 leave a certain gap to meet the expansion of the boiler. begging.
- FIG. 3 which is an enlarged view of I in Fig. 2, a series of small plugs 5 are embedded between and welded with the spiral water-cooling pipe 7, and the number of small plugs 5 should be appropriately increased so that the site can be adjusted. position.
- FIG. 4 in the A-A cross-sectional view of Fig. 3, the outer surface of the small plug 5 is tangent to the spiral water-cooled tube 7 to form two planes, and the two flanges on the other side of the H-shaped steel 1 are fixedly connected to the small plug.
- the vertical rigid beam 6 When the site is installed, the vertical rigid beam 6 is first hoisted into position, and then the H-shaped steel 1 is welded to the corresponding small plug 5 on the water wall.
- the H-shaped steel 1 When installing, pay attention to adjusting the expansion gap between the H-shaped steel 1 and the L-shaped steel plate 4 so that the boiler can expand smoothly after being heated.
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Rod-Shaped Construction Members (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Joining Of Building Structures In Genera (AREA)
Description
Claims
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ZA2011/00737A ZA201100737B (en) | 2008-12-30 | 2011-01-28 | A pedestal of vertical buckstay |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200820208587.5 | 2008-12-30 | ||
CNU2008202085875U CN201331050Y (zh) | 2008-12-30 | 2008-12-30 | 一种垂直刚性梁支座 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2010081274A1 true WO2010081274A1 (zh) | 2010-07-22 |
Family
ID=41224432
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/CN2009/001058 WO2010081274A1 (zh) | 2008-12-30 | 2009-09-21 | 垂直刚性梁连接装置 |
Country Status (4)
Country | Link |
---|---|
CN (1) | CN201331050Y (zh) |
TR (1) | TR201100807T1 (zh) |
WO (1) | WO2010081274A1 (zh) |
ZA (1) | ZA201100737B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201331050Y (zh) * | 2008-12-30 | 2009-10-21 | 上海锅炉厂有限公司 | 一种垂直刚性梁支座 |
CN102345854B (zh) * | 2011-02-21 | 2015-03-11 | 哈尔滨锅炉厂有限责任公司 | 超临界w火焰锅炉的前后拱吊挂装置及制造方法 |
CN105240866A (zh) * | 2015-11-02 | 2016-01-13 | 无锡华光锅炉股份有限公司 | 一种膜式刚性梁固定结构 |
CN107218588B (zh) * | 2017-05-31 | 2019-09-10 | 东方电气集团东方锅炉股份有限公司 | 一种汽冷管屏烟道及其支吊结构 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1069545A (en) * | 1964-03-14 | 1967-05-17 | Siemens Ag | Once-through boiler |
US5299535A (en) * | 1992-12-29 | 1994-04-05 | Combustion Engineering, Inc. | Furnace buckstay stirrup |
CN1242066A (zh) * | 1996-12-23 | 2000-01-19 | 燃烧工程有限公司 | 场调节无螺栓镫形装置 |
CN201331050Y (zh) * | 2008-12-30 | 2009-10-21 | 上海锅炉厂有限公司 | 一种垂直刚性梁支座 |
-
2008
- 2008-12-30 CN CNU2008202085875U patent/CN201331050Y/zh not_active Expired - Lifetime
-
2009
- 2009-09-21 WO PCT/CN2009/001058 patent/WO2010081274A1/zh active Application Filing
- 2009-09-21 TR TR2011/00807T patent/TR201100807T1/xx unknown
-
2011
- 2011-01-28 ZA ZA2011/00737A patent/ZA201100737B/en unknown
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1069545A (en) * | 1964-03-14 | 1967-05-17 | Siemens Ag | Once-through boiler |
US5299535A (en) * | 1992-12-29 | 1994-04-05 | Combustion Engineering, Inc. | Furnace buckstay stirrup |
CN1242066A (zh) * | 1996-12-23 | 2000-01-19 | 燃烧工程有限公司 | 场调节无螺栓镫形装置 |
CN201331050Y (zh) * | 2008-12-30 | 2009-10-21 | 上海锅炉厂有限公司 | 一种垂直刚性梁支座 |
Non-Patent Citations (1)
Title |
---|
HE,PEI'AO ET AL.: "Design and Construct of Rigid Girder on Boiler", POWER SYSTEM ENGINEERING, vol. 9, no. 5, October 1993 (1993-10-01), pages 1 - 11 * |
Also Published As
Publication number | Publication date |
---|---|
ZA201100737B (en) | 2011-10-26 |
TR201100807T1 (tr) | 2011-08-22 |
CN201331050Y (zh) | 2009-10-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2010081274A1 (zh) | 垂直刚性梁连接装置 | |
CN106642063B (zh) | 一种新型的过热器吊装装置 | |
CN201407945Y (zh) | 换热管与管板的焊接结构 | |
CN201149143Y (zh) | 一种两侧为圆弧状的扁平形膨胀节管 | |
KR20140040470A (ko) | 파형 강관의 연결구조 및 그 연결방법 | |
CN201387000Y (zh) | 锅炉中垂直刚性梁与水平刚性梁的连接结构 | |
CN204148797U (zh) | 一种锅炉省煤器蛇形管组对用的对管器 | |
CN204629509U (zh) | 省煤器管屏间烟气挡板装置 | |
CN202074560U (zh) | 一种膜式壁锅炉 | |
CN202726407U (zh) | 大直径管道的空中组对装置 | |
CN106524515A (zh) | 热泵热水器及其水箱组件 | |
CN218954857U (zh) | 一种用于塔式锅炉集箱悬吊装置 | |
CN2901219Y (zh) | 火力发电锅炉的新型预热器 | |
CN213268936U (zh) | 一种悬挑钢丝绳穿墙节点 | |
CN201126327Y (zh) | 高温气-气换热用挠性薄管板换热器 | |
CN219199133U (zh) | 一种锅炉膜式水冷壁吊挂装置 | |
CN216591665U (zh) | 一种耳朵弯的管束装置 | |
CN218721404U (zh) | 一种余热锅炉受热面结构 | |
CN209054187U (zh) | 核电站钢覆面贯穿件结构 | |
CN205716182U (zh) | 一体式弯管接头 | |
CN215982502U (zh) | 一种余热回收锅炉过热器结构 | |
CN212961532U (zh) | 一种钢管式省煤器 | |
CN206845109U (zh) | 一种精密冷轧无缝油井专用管 | |
CN215259771U (zh) | 一种应用于屏式过热器的定位装置 | |
CN215967121U (zh) | 一种用于余热锅炉受热管片与外置集箱的连接固定装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 09838061 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 8804/DELNP/2010 Country of ref document: IN |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2011/00807 Country of ref document: TR |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2011000199 Country of ref document: CL |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 09838061 Country of ref document: EP Kind code of ref document: A1 |